PERI PARK PLAYGROUND

TOT LOT PROJECT
Presentation by
Maria Baird, PARC Special Events and
Volunteer Coordinator
Loren Umbertis, Public Works Director

TOT LOT CONCEPT
• The “Tot Lot” is intended to be a protected enclosure for children between the ages of 0 and 3
• The Concept was presented by members of the public
and reviewed by PARC with input from the Public
Works Department on November 12, 2024.
• The project is intended to be fully funded by public
donations along with Staff time and Coordination.

PROJECT LOCATION AND DRAFT

CONCEPTUAL RENDERING

TOT LOT REVIEW
1) Location appears to be feasible with accessible access for pathways
2) Location allows parents to observe children and other areas of the Park
3) Not intended to have play structures installed within the enclosed area
4) Surfacing is proposed as artificial grass or similar to provide crawling surface and easier to maintain than sand
5) Based upon initial review, cost is estimated between $9-12K to be raised by community
QUESTIONS?