PINON AND CO.

EXECUTIVE SUMMARY
Objective
Provide budgetary cost for New Road Construction.

Goals
Continue "Safe Neighborhood Now!" 2024 Completion -Construction of Maverick Lane.

Solutions
Safe neighborhoods infrastructure, Schools Zone Accessibility, Walking pathways, Biking pathways, Traffic congestion relief for peak school hours, Dedicated School Bus route, Quick access to main Pea Body Road, Emergency evacuation pathways. Captions for parking.

Project Outline items:

Maverick Lane
• 926' FT x 76' FT Road / 70,376 SQF Area
• One vehicle lane each direction
• Bike lane each direction
• Side walk each direction
• Pole lighting
• Fire Hydrants
• Storm Drains
• Speed burtips
• Use of existing turning lane
• Use of existing traffic signal
• Utilities
• Accessible corners crossing
• Lanscaping
• Grand opening ribbon cutting.

Page 2 of 6 ends

y
QT
.fi
MEOW
�WT* hntmtiraLii t-dil1UllIld
D.0 _= fiea%1Nap _ 4Lfn �
T f s
a
Aw.pop( w
9 {
Aj
r
'ru
Dr ;,treylC�
I 1Flh trr. y Gr..
or
1 .<

PINON AND CO.

MAVERICK LANE CONCEPT DESIGN

STEPS TO BUILD

1. ACQUIRE LAND, PURCHASE OPTIONS AND SIZE OF LOTS.
2, SAFE SIDEWALK AND ADJACENT WALKWAY

3. CONSTRUCTION PLANNING FOR A FAST ONE YEAR COMPLETION, 4, OPTION NO.1 STRAIGHT ROAD, SIDEWALK, BIKE LANE. MINIMUM DESIGN

5. OPTION NO,2 STRAIGHT ROAD, SIDEWALK, BIKE LANE, PARKING, AND RECREATION PARK.

6. BUDGETS, FUNDS, PERMITS, DOCUMENTS

7. MAYOR, FAIRFIELD BUILDING DEPARTMENT, FIRE DEPARTMENT. APPROVED TO BUILD

8. SCHEDULE AND SET FOR SITE START.

9. SCHEDULE COMPLETE AND SET.

10. CONSTRUCTION STARTS AND COMPLETE.
11, GRAND OPENING RED RIBBON CEREMONY

12. SASE EAIRPIELD ROADS
13, WIN

Page 4 of 6 ends

Maverick Lane ~City Of Fairfield CA.

Budget total sum will bndetermined by approved to build blueprints.

Property Purchase
--........... ----_............................................... !3O7K'32Ok
-....... ....... ................. -----
-._.................

Documents, Blueprirtts, Engineering.
....... .......... ' ......... ................ .............................. !120k -144k
----------------- —_,--................ ............
_---.......

State Founding and Grants.|QOOK-1K8
- -' -' -----' -............... ----_....... ............ ... ..................... .......... . . ---'
Construction Cost.
�..................

4.5M 5.21VI
'------'---'-
-----'--'---------------^----'-----~--------'—'--'----
1O% Contingency.
--......... ............. ........... .................... -.-..................................--- TB.[.
.........................................
-...................

Options Parking
350k

THANK YOU

Page 5 of 5 ends