Attachment B
TDA Article 3 Project Application Form

1. Agency City of Fairfield

2. Primary Contact Phil Layoso

3. Mailing Address 1000 Webster Street, Fairfield, CA, 94533

4. Email Address [email protected] 5. Phone Number 707.428.7505

6. Secondary Contact (in
the event primary is not
available)
David Vong

7. Mailing address (if
different) N/A☐

8. Email Address [email protected] 9. Phone Number 707.428.7784

10. Send allocation
instructions to (if
different from above):

11. Project Title East Tabor Avenue/Tolenas Avenue Safe Routes to School & Sidewalk Gap Closure Project

12. Amount requested $234,710 in TDA-3 funds will
be requested for this project.

The funding request will be
divided into the following two
fiscal years:
$132,820 in FY 2025-26
$101,890 in FY 2026-27

13. Fiscal Year of Claim 2025-2026 and
2026-27

14. Description of Overall Project:

The Project would close an existing sidewalk gap on East Tabor Avenue that crosses Union Pacific Railroad (UPRR), widen sidewalk on Tolenas Avenue, and provide safety improvements to bicycle and pedestrian users, and to students attending Grange Middle School and Tolenas Elementary School.

15. Project Scope Proposed for Funding: (Project level environmental, preliminary planning, and ROW are ineligible uses of TDA funds.)

16. Project Location: A map of the project location is attached or a link to a online map of the project location is provided below:

Project Relation to Regional Policies (for information only)

17. Is the project in an Equity Priority Community?
Yes☒ No☐

18. Is this project in a Priority Development Area or a Transit-Oriented Community? Yes☒ No☐

19. Project Budget and Schedule

Project
Phase
TDA 3 Other Funds Total Cost Estimated
Completion
Bike/Ped
Plan
ENV
PA&ED
PS&E $0 $282,011 $282,011 Sep-26
ROW $0 $100,000 $100,000 Dec-25
CON $234,710 $4,416,290 $4,651,000 Sep-26
Total Cost $5,033,011

Project Eligibility
A. Has the project been reviewed by the Bicycle and Pedestrian Advisory Committee? Yes☒ No☐
If “YES,” identify the date and provide a copy or link to the agenda.

If "NO," provide an explanation).

B. Has the project been approved by the claimant's governing body? Yes☐ No☒
Construction of Project improvements.

East Tabor Avenue and Tolenas Avenue

If "NO," provide expected date: November 4, 2025

C. Has this project previously received TDA Article 3 funding? Yes☐ No☒
(If "YES," provide an explanation on a separate page)

D. For "bikeways," does the project meet Caltrans minimum safety design criteria pursuant to Chapter 1000 of the California Highway Design Manual? Yes☒ No☐

E. 1. Is the project categorically exempt from CEQA, pursuant to CCR Section 15301(c), Existing Facility? Yes☒ No☐

2. If “NO” above, is the project is exempt from CEQA for another reason? Yes☐ No☐
Cite the basis for the exemption. __________________________ N/A☐
If the project is not exempt, please check “NO,” and provide environmental documentation, as appropriate.

F. Estimated Completion Date of project (month and year): September 2026

G. Have provisions been made by the claimant to maintain the project or facility, or has the claimant arranged for such maintenance by another agency? (If agency other than the Claimant is to maintain the facility, please identify below and provide the agreement) Yes☒ No☐

H. Is a Complete Streets Checklist required for this project ? Yes☒ No☐

If the amount requested is over $250,000 or if the total project phase or construction phase is over $250,000; a Complete Streets checklist is likely required. Please attach the Complete Streets checklist or record of review, as applicable. More information and the form may be found here: