CONTRACT FOR SERVICES

THIS AGREEMENT FOR PROFESSIONAL SERVICES (“Agreement”) is entered into as of _____________________, (“Effective Date”) between the FAIRFIELD- SUISUN SEWER DISTRICT (“District”) and CITY OF FAIRFIELD (“Contractor”).

W I T N E S S E T H:

WHEREAS, the District desires to contract for Solano Bayshore Resiliency Project services funded under the Ocean Protection Council Grant Agreement No.

C0227116, which for the purposes of this Agreement shall be called “PROJECT,” and,

WHEREAS, Contractor is willing and qualified to provide the services desired;

NOW, THEREFORE, in consideration of the mutual promises, covenants and agreements set forth in this Agreement, the sufficiency of which is acknowledged, the parties agree as follows:

I. DUTIES OF CONTRACTOR

A. Contractor shall provide services required for the PROJECT as described in the Scope of Work, attached to and incorporated into this Agreement as Exhibit “A”.

B. Contractor agrees that Contractor and all of Contractor’s employees and subcontractors hold, have obtained, and shall continue to maintain during the course of this Agreement, all licenses or other statutorily mandated certifications requisite to the performance of the PROJECT as may be required in the State of California, if any. Failure of Contractor, its employees and subcontractors to obtain and/or maintain in good standing such licenses or certification shall constitute a breach of this Agreement and shall provide grounds for immediate termination thereof.

C. Contractor shall perform the PROJECT work in such a manner as to fully comply with customary standards of care, including but not limited to professional quality, technical accuracy, timely completion, and the coordination of designs, drawings, specifications, reports, and other services furnished, work undertaken, and/or labor, materials, tolls, equipment, transportation services and other items provided by Contractor to complete the PROJECT pursuant to this Agreement.

D. The District’s approval of drawings, designs, specifications, reports, and incidental engineering work or other services or materials furnished by Contractor under this Agreement shall not relieve Contractor of responsibility for the technical adequacy of its work. Neither the District’s review, approval or acceptance of, nor payment for, any of the services shall be construed to operate as a waiver of any rights under this Agreement or of any cause of action arising out of the performance of this Agreement.

(rev. 7/1/25) Page 2 of 15

E. Contractor shall not be relieved of any of the obligations or covenants contained in this Agreement until the tasks as set forth in Exhibit “A” have been completed.

It is agreed between Contractor and the District that those provisions of this Agreement which by their nature continue beyond expiration or earlier termination of the Agreement, including but not limited to Sections VIII, X(F), and X(G), shall continue beyond such expiration or termination.

F. As required under California Government Code Section 1096.7(c)(1), the Contractor’s duties and services under this agreement shall not include preparing or assisting the District with any portion of the District’s preparation of a request for proposals, request for qualifications, or any other solicitation regarding a
subsequent or additional contract with the District. The District shall at all times retain responsibility for public contracting, including with respect to any subsequent phase of this Project. Contractor’s participation in the planning, discussions, or drawing of project plans or specifications shall be limited to conceptual, preliminary, or initial plans or specifications. Contractor shall cooperate with the District to ensure that all bidders for a subsequent contract on any subsequent phase of this Project have access to the same information, including all conceptual, preliminary, or initial plans or specifications prepared by contractor pursuant to this Agreement.

II. DUTIES OF DISTRICT

The District, without cost to Contractor, will provide pertinent information reasonably available to it, which is necessary for performance by Contractor under this Agreement, including previous reports and data relative to the PROJECT. The District does not guarantee or ensure the accuracy of any reports, information, and/or data so provided. Contractor will use its professional judgment in the review and use of data so provided. However, Contractor will not be liable for any error or omission in any data furnished by the District and used by Contractor which could not reasonably be discovered by Contractor. To this extent Contractor is entitled to rely on data provided by the District.

III. COMPENSATION OF CONTRACTOR

A. Basis of Compensation: The District will pay Contractor for services provided under this Agreement on a time and material basis with a maximum fee not to exceed SIXTY-THREE THOUSAND TWO HUNDRED EIGHTY-FOUR
DOLLARS AND THIRTY-EIGHT CENTS ($63,284.38) in accordance with the Fee Schedule or Bid Schedule attached to and incorporated into this Agreement as Exhibit “A”. When compensation is determined using hourly rates of Contractor’s personnel and equipment assigned to the work, Contractor rates may be adjusted annually if proposed by Contractor and approved by the District.

Such rate adjustments shall not exceed five percent (5%) annually.

B. Change in Scope of Work: Adjustment in compensation for changes in scope of work authorized in writing by the General Manager of the District shall be based (rev. 7/1/25) Page 3 of 15

on the Fee Schedule, Bid Schedule, firm prices quotations, and/or rates set forth and attached as Exhibit “A.” Changes in scope of work so authorized shall not exceed twenty percent of the total maximum fee. No payment shall be made for changes unless authorized in writing by the District.

C. Monthly Payment to Contractor: Upon submission of an invoice by Contractor, and upon approval of the District’s authorized representative, the District will pay Contractor monthly in arrears for fees and expenses incurred up to the maximum amount reflected in Exhibit “A”. The District will issue payment within thirty (30) calendar days after receipt of an invoice from Contractor, provided that all invoices are accompanied by cost documentation determined to be sufficient by the District to allow the determination of the reasonableness and accuracy of the invoice. If a payment dispute arises between the parties, Contractor shall provide to the District full and complete access to Contractor’s project labor cost records and other direct project related cost data, and copies thereof if requested by the District.

D. Notification at 75% of Maximum Fee: Contractor shall notify the District when the costs incurred for the PROJECT work total approximately seventy-five percent (75%) of the maximum fee. With the notification, Contractor shall indicate whether the sum of the current costs incurred plus the estimated total cost to complete the task or tasks set forth in the Scope of Work, Exhibit “A,” shall be greater or less than the maximum fee. Receipt by the District of said notification that the cost for completion of all tasks shall exceed the established maximum fee, will not constitute an approval or authorization to increase the established maximum fee or a waiver of any rights which the District may have under this Agreement.

E. Cost of Rework: Contractor shall, at no cost to the District, prepare any necessary rework occasioned by Contractor’s failure to provide services required for the PROJECT as described in Exhibit “A” in a satisfactory manner, due to any act or omission attributable to Contractor, or its agents, including subcontractors.

Nothing in this subsection is intended to limit the liability of Contractor for damages which might arise from Contractor’s negligence, willful misconduct, or breach of the covenants set forth in this Agreement.

F. Markup Allowances: Markup allowances apply only to services provided on a time and materials basis. Contractor may markup Subcontractor and Sub- consultant costs by no more than 5%. Other Direct Costs (reproduction, delivery, mileage, travel expenses, other services) will be billed at cost. Any applicable markups for professional services overhead, including equipment and communication expenses, shall be included in labor hourly rates

(rev. 7/1/25) Page 4 of 15

IV. TERM OF AGREEMENT

A. The term of this Agreement shall begin on the Effective Date and end on the date when the tasks set forth in Exhibit A have been completed or the Agreement is otherwise terminated in accordance with Article VI.

B. Contractor agrees to immediately and diligently proceed with the Scope of Work and satisfactorily complete the PROJECT within the prescribed time as set forth in Exhibit A.

V. CONTRACTOR’S ASSIGNED PERSONNEL

Contractor designates Kayla Gacosta to act as Project Manager for the performance of the work and for all matters relating to performance under this Agreement.

Substitution of these assigned personnel will require the prior written approval of the District.

If the District determines that a proposed substitution is not acceptable, then, at the request of the District, Contractor shall substitute with a person acceptable to the District.

No subcontract shall be awarded, or an outside consultant engaged, by Contractor, unless Contractor has made written request to use such subcontractor or outside consultant and its request has been approved in writing by the District. No additional approval shall be required for subcontracting with or engagement of a subcontractor or outside consultant identified in Exhibit “A.” The written approval of the District resulting in the use of or engagement of a subcontractor or outside consultant does not relieve Contractor of the obligations or covenants set forth in this Agreement.

VI. TERMINATION

A. The District may terminate this Agreement at any time, with or without cause, upon 30 day’s written notice to Contractor.

B. The District may terminate this Agreement immediately upon notice of Contractor’s malfeasance. If the District terminates this Agreement pursuant to this subsection, nothing set forth in this Agreement is intended to require the District to compensate Contractor for any services which may be claimed to have been provided or be in progress if the District reasonably concludes that further compensation is unwarranted.

C. Upon receipt of a termination notice, or in the event that Contractor ceases performing services under this Agreement or otherwise abandons the PROJECT prior to completing all of the services described in the Scope of Work, Contractor (rev. 7/1/25) Page 5 of 15

shall: (1) promptly discontinue all services affected (unless the notice directs otherwise), and (2) deliver or otherwise make available to the District all data, information, and materials as Contractor may have prepared or developed in performing this Agreement, whether completed or in process, including, but not limited to, drawings, specifications, reports, estimates, summaries, software, and electronic files of all deliverables.

D. Following termination, the District will reimburse Contractor for all expenditures made in good faith that are unpaid at the time of termination not to exceed the maximum amount payable under this Agreement unless Contractor is in default of this Agreement.

E. Upon termination, Contractor’s sole right and remedy shall be to receive payment for all amounts due and not previously paid to Contractor for services completed or in progress in accordance with the Agreement prior to the date of receipt of notice of termination and for services thereafter completed at the request of the District and any other reasonable cost incidental to such termination of services.

Such payments available to Contractor under this subsection shall not include costs related to lost profit associated with the expected completion of the work or other such payments relating to the benefit of the bargain.

VII. INDEMNITY

Contractor shall indemnify, hold harmless and defend, in any actions at law or in equity, the District, its officers, employees, agents, and elective and appointive boards, from all claims, losses, damage, including property damage, personal injury, including death, and liability of every kind, nature and description, including attorneys’ fees, to the extent arising from Contractor’s operations, or from any persons directly or indirectly employed by, or acting as agent for, Contractor, excepting the sole negligence or willful misconduct of the District.

Notwithstanding anything in this Agreement to the contrary, this indemnification shall extend to such claims, losses, damage, injury, death, or other liabilities occurring after the completion of Contractor’s operations, as well as during the progress of rendering such services.

Submission of insurance certificates or submission of other proof of compliance with the insurance requirements of this Agreement does not relieve Contractor from liability under this indemnification section. The obligations of this indemnification section shall apply whether or not such insurance policies have been determined to be applicable to any of such damages or claims for damages.

VIII. INSURANCE

Without limiting Contractor's obligation to indemnify the District, The policy shall remain in full force and effect for no less than 5 years following the completion of work under this Contract
(rev. 7/1/25) Page 6 of 15

Contractor shall procure and maintain for the duration of the Agreement insurance against claims for injuries to persons or damages to property which may arise out of or in connection with the performance of the work under this Agreement by Contractor, its agents, representatives, or employees.

A. MINIMUM SCOPE AND LIMIT OF INSURANCE

Coverage shall be at least as broad as:

1. Commercial General Liability (CGL): Insurance Services Office Form CG 00 01 covering CGL on an “occurrence” basis, including products and completed operations, property damage, bodily injury and personal & advertising injury with limits no less than $2,000,000 per occurrence. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this project/location (ISO CG 25 03 or 25 04) or the general aggregate limit shall be twice the required occurrence limit.

2. Automobile Liability: Insurance Services Office Form Number CA 0001 covering, Code 1 (any auto), or if Contractor has no owned autos, Code 8 (hired) and 9 (non-owned), with limit no less than $1,000,000 per accident for bodily injury and property damage.

3. Workers’ Compensation insurance as required by the State of California, with Statutory Limits, Workers’ Compensation and Employer’s Liability Insurance with limit of no less than $1,000,000 per accident for bodily injury or disease.

If Contractor maintains broader coverage and/or higher limits than the minimums shown above, the District requires and shall be entitled to the broader coverage and/or the higher limits maintained by Contractor. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the District. No representation is made that the minimums shown above are sufficient to cover the indemnity or other obligations of the Contractor under this Agreement.

B.OTHER INSURANCE PROVISIONS

The insurance policies are to contain, or be endorsed to contain, the following provisions:

1. Additional Insured Status. The District, its officers, officials, employees, and volunteers are to be covered as additional insureds on the CGL policy with respect to liability arising out of work or operations performed by or on behalf of the Contractor including materials, parts, or equipment furnished in connection with such work or operations. General liability coverage can be provided in the form of an endorsement to Contractor’s insurance (at least as (rev. 7/1/25) Page 7 of 15

broad as ISO Form CG 20 10 11 85 or if not available, through the addition of both CG 20 10, CG 20 26, CG 20 33, or CG 20 38; and CG 20 37 if a later edition is used).

2. Primary Coverage. For any claims related to this Agreement, Contractor’s insurance coverage shall be primary and non-contributory and at least as broad as ISO CG 20 01 12 19 as respects the District, its officers, officials, employees, and volunteers. Any insurance or self-insurance maintained by the District, its officers, officials, employees, or volunteers shall be excess of Contractor’s insurance and shall not contribute with it. This requirement shall also apply to any Excess or Umbrella liability policies.

3. Umbrella or Excess Policy. Contractor may use Umbrella or Excess Policies to provide the liability limits as required in this Agreement. This form of insurance will be acceptable provided that all of the Primary and Umbrella or Excess Policies shall provide all of the insurance coverages herein required, including, but not limited to, primary and non-contributory, additional insured, Self-Insured Retentions (SIRs), indemnity, and defense requirements. The Umbrella or Excess policies shall be provided on a true “following form” or broader coverage basis, with coverage at least as broad as provided on the underlying Commercial General Liability insurance. No insurance policies maintained by the Additional Insureds, whether primary or excess, and which also apply to a loss covered hereunder, shall be called upon to contribute to a loss until Contractor’s primary and excess liability policies are exhausted.

4. Notice of Cancellation. Each insurance policy required above shall provide that coverage shall not be canceled, except with notice to the Entity

5. Waiver of Subrogation. Contractor hereby grants to the District a waiver of any right to subrogation which any insurer of Contractor may acquire against the District by virtue of the payment of any loss under such insurance.

Contractor agrees to obtain any endorsement that may be necessary to affect this waiver of subrogation, but this provision applies regardless of whether or not the District has received a waiver of subrogation endorsement from the insurer. The Workers’ Compensation Policy shall be endorsed with a waiver of subrogation in favor of the District for all work performed by the Contractor, its employees, agents, and subcontractors.

6. Self-Insured Retentions. Self-insured retentions must be declared to and approved by the District. The District may require Contractor to purchase coverage with a lower retention or provide proof of ability to pay losses and related investigations, claim administration, and defense expenses within the retention. The policy language shall provide, or be endorsed to provide, that the self-insured retention may be satisfied by either the named insured or the District. The CGL and any policies, including Excess liability policies, may not be subject to a self-insured retention (SIR) that exceeds $50,000 unless approved in writing by the District. Any and all SIRs shall be the sole (rev. 7/1/25) Page 8 of 15

responsibility of Contractor or subcontractor who procured such insurance and shall not apply to the Indemnified Additional Insured Parties. The District may deduct from any amounts otherwise due Contractor to fund the SIR.

Policies shall NOT contain any self-insured retention (SIR) provision that limits the satisfaction of the SIR to the Named. The policy must also provide that defense costs, including the Allocated Loss Adjustment Expenses, will satisfy the SIR. The District reserves the right to obtain a copy of any policies and endorsements for verification.

7. Acceptability of Insurers. Insurance is to be placed with insurers authorized to conduct business in the state with a current A.M. Best’s rating of no less than A:VII, unless otherwise acceptable to the District.

8. Verification of Coverage. Contractor shall furnish the District with original certificates and amendatory endorsements or copies of the applicable policy language effecting coverage required by this clause and a copy of the Declarations and Endorsements Pages of the CGL and any Excess policies listing all policy endorsements. All certificates and endorsements and copies of the Declarations & Endorsements pages are to be received and approved by the District before work commences. However, failure to obtain the required documents prior to the work beginning shall not waive Contractor’s obligation to provide them. The District reserves the right to require complete, certified copies of all required insurance policies, including endorsements required by these specifications, at any time. District reserves the right to modify these requirements, including limits, based on the nature of the risk, prior experience, insurer, coverage, or other special circumstances.

The District may withhold payment to Contractor until Contractor provides complete insurance certificates and endorsements satisfactory to the District.

9. Subcontractors. Consultant shall require and verify that all subcontractors maintain insurance meeting all the requirements stated herein, and Contractor shall ensure that District is an additional insured on insurance required from subcontractors.

10. Duration of Coverage. CGL & Excess liability policies for any construction related work, including, but not limited to, maintenance, service, or repair work, shall continue coverage for a minimum of 5 years for Completed Operations liability coverage. Insurance must be maintained and evidence of insurance must be provided for at least five (5) years after completion of the contract of work.

IX. DEFAULT

A. If Contractor defaults in Contractor’s performance, the District shall promptly notify Contractor in writing. If Contractor fails to cure a default within 30 days after notification, or if the default requires more than 30 days to cure and Contractor fails to commence to cure the default within 30 days after notification, (rev. 7/1/25) Page 9 of 15

then the District may immediately terminate this Agreement at the District’s sole discretion.

B. If Contractor fails to cure default within the specified period of time, the District may elect to cure the default and any expense incurred shall be payable by Contractor to the District. The Agreement may be immediately terminated at the District’s sole discretion.

C. If this Agreement is terminated because of Contractor's default, the District shall be entitled to recover from Contractor all damages allowed by law.

X TERMS OF OPC GRANTS

A. INCORPORATION OF PRIME GRANT TERMS.

The Subrecipient acknowledges that this Agreement is funded under the State of California Grant Agreement No. C0227116 between the Fairfield-Suisun Sewer District (“District”) and the California Natural Resources Agency/Ocean Protection Council (the “State Agreement”). The Subrecipient agrees to comply with all applicable terms, conditions, and requirements of the State Agreement, which are incorporated herein by reference as though fully set forth.

B. INDEMNIFICATION

The Subrecipient shall indemnify, defend, and hold harmless the Fairfield-Suisun Sewer District (“District”), the State of California, and their respective officers, agents, and employees (collectively, “Indemnified Parties”) from and against any and all claims, damages, losses, liabilities, and expenses (including reasonable attorneys’ fees) to the extent arising out of or resulting from the acts, errors, or omissions, or willful misconduct of the Subrecipient, its officers, employees, agents, contractors, or assigns, in connection with the performance of this Agreement or any activity funded under it.

The Subrecipient’s indemnification obligations shall apply to the same extent as those required of the District under the State Agreement, and shall include, without limitation, any claim, demand, or cause of action for personal injury, property damage, or violation of law arising out of or related to the Subrecipient’s performance of this Agreement.

This obligation shall not extend to claims or liabilities caused by the sole negligence or willful misconduct of the District, the State, or their officers, agents, or employees.

C. REPAYMENT AND DISALLOWANCE

The Subrecipient shall be responsible for any disallowances, questioned costs, or other items, including interest, not allowed under the State Agreement or by (rev. 7/1/25) Page 10 of 15

subsequent action of the State. The Subrecipient shall return to the District any funds disallowed, including any interest or penalties assessed, within thirty days of notification from the District to return such funds. The District may offset such amounts against any unpaid balance due to the Subrecipient.

D. CEQA AND REGULATORY COMPLIANCE

The Subrecipient shall be solely responsible for ensuring compliance with the California Environmental Quality Act (CEQA) and all other applicable environmental and permitting requirements for its activities. Any delay or failure to obtain necessary approvals shall not relieve the Subrecipient of its obligations under this Agreement or entitle it to additional compensation.

E. AUDIT AND RECORDS

The Subrecipient shall maintain financial records, invoices, and supporting documentation in accordance with generally accepted accounting principles for a minimum of five (5) years after final payment or project completion, whichever is later. Such records shall be made available for inspection and audit by the District, the State of California, or their designees upon request. Failure to retain or produce documentation shall render the associated cost ineligible for reimbursement.

F. INSURANCE

The Subrecipient shall, at its own expense, obtain and maintain throughout the entire term of this Subaward, the insurance set forth in Attachment, Section O, attached hereto, and shall name the District and the State of California as additional insureds. Certificates of insurance shall be provided prior to commencement of work.

G. SUBAWARD TERMINATION

The District may terminate this Agreement immediately upon written notice if the Subrecipient materially breaches this Agreement, fails to meet performance standards, or engages in conduct that places the District in violation of the State Grant Agreement. In such event, the Subrecipient shall be liable for repayment to the District of all grant funds disbursed under this Agreement.

H. FLOW-DOWN REQUIREMENT

The Subrecipient shall include these provisions in all sub contracts or agreements entered into for the performance of work under this Agreement.

(rev. 7/1/25) Page 11 of 15

XI MISCELLANEOUS TERMS AND CONDITIONS

A. ASSIGNMENT

Contractor shall not assign any rights or duties under this Agreement to a third party without the prior written consent of the District.

B. INDEPENDENT CONTRACTOR

1. Contractor is an independent contractor and not an agent, officer or employee of the District. The parties mutually understand that this Agreement is between two independent contractors and is not intended to and shall not be construed to create the relationship of agent, servant, employee, partnership, joint venture or association.

2. Contractor shall have no claim against the District for employee rights or benefits including, but not limited to, seniority, vacation time, vacation pay, sick leave, personal time off, overtime, medical, dental or hospital benefits, retirement benefits, Social Security, disability, Workers' Compensation, unemployment insurance benefits, civil service protection, disability retirement benefits, paid holidays or other paid leaves of absence.

3. Contractor is solely obligated to pay all applicable taxes, deductions and other obligations including, but not limited to, federal and state income taxes, withholding, Social Security, unemployment, disability insurance, Workers' Compensation and Medicare payments.

4. Contractor shall indemnify and hold the District harmless from any liability which the District may incur because of Contractor's failure to pay such obligations nor shall the District be responsible for any employer-related costs not otherwise agreed to in advance between the District and Contractor.

5. As an independent contractor, Contractor is not subject to the direction and control of the District except as to the final result contracted for under this Agreement. the District may not require Contractor to change Contractor’s manner of doing business, but may require redirection of efforts to fulfill this Agreement.

6. Contractor may provide services to others during the same period Contractor provides service to the District under this Agreement.

7. Any third persons employed by Contractor shall be under Contractor's exclusive direction, supervision and control. Contractor shall determine all conditions of employment including hours, wages, working conditions, discipline, hiring and discharging or any other condition of employment.

8. As an independent contractor, Contractor shall indemnify and hold the District harmless from any claims that may be made against the District based on any contention by a third party that an employer-employee relationship exists under this Agreement.
(rev. 7/1/25) Page 12 of 15

9. Contractor, with full knowledge and understanding of the foregoing, freely, knowingly, willingly and voluntarily waives the right to assert any claim to any right or benefit or term or condition of employment insofar as they may be related to or arise from compensation paid under this Agreement.

C. PROPRIETARY MATERIAL

The District does not authorize the impermissible use of any patent or the impermissible reproduction of any copyrighted material by Contractor in the performance of this Agreement. Contractor is solely responsible for any such use.

D. WAIVER

Any failure of a party to assert any right under this Agreement shall not constitute a waiver or a termination of that right, under this Agreement or any of its provisions.

E. NONDISCRIMINATION

1. In rendering services under this Agreement, Contractor shall comply with all applicable federal, state and local laws, rules and regulations and shall not discriminate based on age, ancestry, color, gender, marital status, medical condition, national origin, physical or mental disability, race, religion, sexual orientation, or other protected status.

2. Further, Contractor shall not discriminate against its employees, which includes, but is not limited to, employment upgrading, demotion or transfer, recruitment or recruitment advertising, layoff or termination, rates of pay or other forms of compensation and selection for training, including apprenticeship.

F. OWNERSHIP AND CONFIDENTIALITY OF DOCUMENTS

The District shall be the owner of and shall be entitled to possession of all rights, title, royalties and interest to and in all work product of Contractor resulting from its performance under this Agreement, including, but not limited to, drawings, specifications, data, reports, estimates, software, summaries, electronic files of all deliverables, and any other such information and materials as may be prepared or developed by Contractor in performing work under this Agreement, whether complete or in progress and none shall be revealed, disseminated, or made available by Contractor to others without prior consent of the District. If this Agreement is terminated in accordance with Section VI, Contractor shall deliver such documents within two weeks of receipt of a termination notice.

It is understood that Contractor’s work product is prepared for this specific Project. Any use of such work product by the District for a different project without Contractor’s written approval shall be at the District’s risk. Any use by (rev. 7/1/25) Page 13 of 15

District of an incomplete work product without Contractor’s written approval shall be at District’s risk.

“Confidential Information” as used in this Agreement shall mean (a) information concerning the District’s business, property or technology, is confidential in nature and not generally known to the public, and is disclosed by the District to Contractor in connection with the PROJECT; and (b) any information received from the District that may be made known to Contractor to treat as confidential or proprietary, including information designated as “Confidential” (or with some other similar legend) or identified as confidential at the time of disclosure or is of a nature that should be considered confidential based on the circumstances surrounding the disclosure.

Contractor shall not disclose any Confidential Information of the District to any third party (other than to its employees and representatives as provided for in this Agreement), and shall only use Confidential Information of the District in connection with the PROJECT. Contractor will treat all Confidential Information with the same degree of care as it accords its own confidential information, but in no case less than reasonable care. Contractor will disclose Confidential Information only to those of its employees and representatives who need to know such information and who are bound by confidentiality obligations that are similar to those which protect the Confidential Information.

Contractor’s obligations under this section shall not apply to Confidential Information that is (a) in the public domain or known in the trade at or subsequent to the time communicated to Contractor by the District through no fault of Contractor; (b) rightfully in Contractor’s possession free of any obligation of confidentiality at or subsequent to the time communicated to Contractor by the District; (c) received from a third party who rightfully disclosed it to Contractor without restriction on its subsequent disclosure; (d) developed by employees or agents of Contractor independently of and without reference to any Confidential Information communicated to Contractor by District or approved for release in writing by the District. In addition, any disclosure of any portion of Confidential Information either (i) in response to a valid order by a court or other governmental body, or (ii) otherwise required by law, shall not be considered to be a breach of this Agreement or a waiver of confidentiality for other purposes; provided, however, that, to the extent legally permissible and reasonably possible, Contractor shall provide prompt prior written notice thereof to District to enable District (at its sole expense) to seek a protective order or otherwise prevent such disclosure.

This section will remain in full force and effect until such time the Confidential Information is no longer considered by the District to be confidential. Upon the District’s written request, Recipient shall, at its sole election, return or destroy all Confidential Information received under this Agreement. Notwithstanding the foregoing, nothing shall require the alteration, modification, deletion or destruction of back-up tapes or other back-up media made in the ordinary course (rev. 7/1/25) Page 14 of 15

of business, provided that said backup tapes or other back-up media shall be stored in a manner that prevents unauthorized access or use of Confidential Information.

G. EXAMINATION OF RECORDS

Contractor agrees that the District will have access to and the right to examine any directly pertinent books, documents, papers, and records of any and all transactions relating to this Agreement at any time after the inception of the Agreement upon reasonable notice.

H. SCOPE OF AGREEMENT

This writing constitutes the entire Agreement between the parties relative to Contractor’s services on the PROJECT, and no modification hereof shall be effective unless and until such modification is evidenced by a writing signed by both parties to this Agreement.

I. NOTICES

All notices from one party to the other shall be in writing and delivered or mailed to such party at its designated address as follows, or sent via facsimile transmission to such telephone number indicated as follows. Such notices shall be deemed to have been made: (1) when hand delivered; (2) as indicated by certified mail receipt; (3) five days after mailing by first class mail; or (4) as indicated on facsimile transmission receipt, if facsimile transmission is followed by prompt certified or first class mailing or hand delivery.

DISTRICT: Fairfield-Suisun Sewer District
1010 Chadbourne Road
Fairfield, CA 94534-9700
Phone (707) 429-8930
Fax (707) 429-1280

CONSULTANT: City of Fairfield
Kayla Gacosta
1000 Webster Street
Fairfield, CA 94533
Phone (707) 428-7746

J. APPLICABLE LAWS

Contractor shall perform this Agreement in accordance with all applicable federal, state, and local laws and regulations. This Agreement shall be construed in accordance with California law. Venue concerning any dispute shall be in Solano County.

(rev. 7/1/25) Page 15 of 15

Contractor and any subcontractors shall comply with the provisions of Labor Code Sections 1770 et seq., if applicable.

K. EXECUTION IN COUNTERPARTS

This Agreement may be executed in two or more counterparts, each of which together shall be deemed an original, but all of which together shall constitute one and the same instrument, it being understood that all parties need not sign the same counterpart. In the event that any signature is delivered by facsimile or electronic transmission (e.g., by e-mail delivery of a ".pdf" format data file), such signature shall create a valid and binding obligation of the party executing (or on whose behalf such signature is executed) with the same force and effect as if such facsimile or electronic signature page were an original signature.

IN WITNESS the parties have executed this Agreement on the day first above-written.

FAIRFIELD-SUISUN SEWER DISTRICT:

Signature

Printed Name

Title

CITY OF FAIRFIELD:

Signature

Printed Name

Title
State of California
The Natural Resources Agency – GRANT AGREEMENT
GRANTEE NAME: Fairfield-Suisun Sewer District
PROJECT TITLE: Solano Bayshore Resiliency Project
AUTHORITY: Budget Act of 2022
PROGRAM: Ocean Protection Council
AGREEMENT NUMBER: C0227116
PROJECT COMPLETION DATE: September 30, 2027
Under the terms and conditions of this agreement, the applicant agrees to complete the project as described in the project scope described in Exhibit A, and any subsequent amendments, and the State of California, acting through the Natural Resources Agency pursuant to the Budget Act of 20 22, agrees to fund the project up to the total state grant amount indicated.

PROJECT DESCRIPTION: See project description on Page 1 and Exhibit A of the Agreement Total State Grant not to exceed $1, 391,713.00 (or project costs, whichever is less) The Special and General Provisions attached are made a part of and incorporated into the Agreement.

FAIRFIELD-SUISUN SEWER DISTRICT S TATE OF CALIFORNIA

THE NATURAL RESOURCES AGENCY
By By
Jordan Damerel
Title General Manager
Jenn Eckerle
Title Deputy Secretary for Ocean and Coastal Policy
Date Date

CERTIFICATION OF FUNDING

AMOUNT OF ESTIMATE

FUNDING

AGREEMENT NUMBER FUND
$1,391,713.00 C0227116 3228 – SB1 Greenhouse Gas Reduction Fund ADJ. INCREASING

ENCUMBRANCE
$
ADJ. DECREASING

ENCUMBRANCE

FUNCTION
$ Local Assistance

UNENCUMBERED

BALANCE
Ref Number Fund Enactment
Year (ENY)
Account
Number
Alt Account
$1,391,713.00 601 3228 2022 5432000 5432000000
Program PCBU Project Activity RPTG
Structure
SVC Loc Agency Use Budget Period
0320 0540 0540C0227116 22701 05403001 22701 N/A 2025
I hereby certify upon my personal knowledge that budgeted funds are available for this encumbrance __________________________________________________

SIGNATURE OF ACCOUNTING OFFICER
__________________________
DATE

Docusign Envelope ID: 69930DD7-4EF4-47B3-83E6-7D9F85B36802 10/13/2025
10/30/2025
11/4/2025

C0227116
Fairfield-Suisun Sewer District
Solano Bayshore Resiliency Project

Page 1 ends

GRANT AGREEMENT
State of California - The Natural Resources Agency
GRANTEE NAME: Fairfield-Suisun Sewer District
PROJECT TITLE: Solano Bayshore Resiliency Project
AUTHORITY: Budget Act of 2022, Greenhouse Gas Reduction Fund PROGRAM: Ocean Protection Council
AGREEMENT NUMBER: C0227116
Under the terms and conditions of this agreement, the applicant agrees to complete the Project Scope described in Exhibit A, and any subsequent amendments, and the State of California, acting through the Natural Resources Agency pursuant to the Budget Act of 2022, agrees to fund the project up to the total state grant amount indicated.

PROJECT DESCRIPTION
A detailed Project Scope and activities, project schedule and Project Budget are described and attached hereto as Exhibit A.

Grant Funds are to be used to provide local assistance for implementation of Chapter 236 of the Statutes of 2021 (SB 1) for the purposes of supporting local and regional governments, and for directly related investments to implement those plans, in accordance with the provisions contained in the Ocean Protection Council (OPC) Senate Bill 1 (SB 1) Grant Program Solicitation and this Agreement.

TERMS AND CONDITIONS OF GRANT
S
pecial Provisions

1. All materials produced with grant funds shall include acknowledgement of grant funding. The Ocean Protection Council shall have the right to republish any material generated by this grant, unless otherwise specified.

2. Recipients of Grant Funds shall post signs acknowledging the source of the funds pursuant to the SB 1 Grant Program Solicitation and Application (Applicati on
G
uidelines). Size, location and number of signs shall be determined by the State .

Required signage must be in place before Grant Funds for construction will be r
eleased.

3. Upon completion of detailed Project design, plans and specifications, Grantee shall provide to the State for review and approval a revised detailed Project Budget, Project Scope and detailed site plan. If P roject includes habitat restoration or landscaping, Grantee shall provide a planting palette demonstrating how native, low-water, drought- resistant vegetation will be used in the Project . Approval by the State of such plans and specifications, or any other approvals provided for in this Agreement, shall be for Docusign Envelope ID: 69930DD7-4EF4-47B3-83E6-7D9F85B36802 C0227116
Fairfield-Suisun Sewer District
Solano Bayshore Resiliency Project

Page 2 ends

scope of work as described in Exhibit A and shall not relieve Grantee of the obligation to construct and maintain the facilities, or carry out any other obligations required by this Agreement, in accordance with applicable law or any other standards ordinarily applied to such work or activity.

4. The Grantee may be required to record Deed Restrictions, incorporating by reference this Grant Agreement and giving public notice that the Grantee received Funds under this Agreement in order to assist Grantee in developing the real property and that, in c
onsideration for the receipt of the Grant Funds, the Grantee has agreed to the terms of this Agreement.

5. As conditions precedent to the State’s obligation to make any construction funding available pursuant to this Agreement, Grantee shall first provide evidence of compliance with CEQA. Grant Funds for planning and document preparation may be available sooner if included in the grant Project Scope (Exhibit A) and approved by the State. In such instances, CEQA compliance shall be completed within one (1) year from the Grant Agreement start date, unless an extension is granted by the State.

6. If the Grantee is a nonprofit organization and ceases to exist, all of its rights, title and interest in the real property shall vest in the State of California. The State may, at its discretion, identify an appropriate public or private entity to accept the right, title and interest in the real property in lieu of the State.

7. As conditions precedent to the State’s obligation to make any funding availabl e
pur
suant to this Agreement, Grantee shall first provide evidence of adequate land tenure and evidence that the project will be operated and maintained for a minimum of twenty ( 20) years satisfactory to the State for all land to be improved under this Agreement, unless otherwise specified in writing by the Executive Director.

General Provisions
A. Definitions

1. The term "Act" means Assembly Bill (AB) 32, the California Global Warming Solutions Act of 2006.

2. The term “Agreement” means this Grant Agreement.

3. The term “Application” means the individual application form, its required attachments for grants pursuant to the enabling legislation and/or program and any applicabl e
m
aterials supplied by applicant to the Natural Resources Agency prior to award.

4. The term “Application Guidelines” means the SB 1 Grant Program Solicitation and A
pplication.

5. The term “Development” means improvement, rehabilitation, restoration, enhancement, preservation, protection and interpretation or other similar activities Docusign Envelope ID: 69930DD7-4EF4-47B3-83E6-7D9F85B36802 C0227116
Fairfield-Suisun Sewer District
Solano Bayshore Resiliency Project

Page 3 ends

6. The term “Fair Market Value” means the value placed upon the property as supported by
an appraisal that has been reviewed and approved by the California Department of General Services (DGS).

7. The term “Grant” or “Grant Funds” means the money provided by the State to the Grantee in this Agreement.

8. The term "Grantee" means an applicant who has a signed agreement for Grant Funds.

9. The term “Interpretation” means visitor-serving amenities that communicate the significance and value of natural, historical and cultural resources in a manner that increases the understanding and enjoyment of these resources, or other similar activities.

10. The term “Other Sources of Funds” means cash or in -kind contributions that are required or used to complete the Project beyond the Grant Funds provided by this Agreement.

11. The term "Project" means the Development activity described in the application as modified by Exhibit A to be accomplished with Grant Funds.

12. The term “Project Budget” means the State approved cost estimate included as Exhibit A to this Agreement.

13. The term “Project Scope” means the description or activity for work to b e ac
complished by the Project.

14. The term “Public Agency” means any State of California department or agency, a county, city, public district or public agency formed under California law.

15. The term "State" means the Secretary for Natural Resources or his/her representatives, or other political subdivision of the State.

B. Project Execution

1. Subject to the availability of funds in the Act, the State hereby grants to the Grant ee
a
sum of money (Grant Funds) not to exceed the amount stated on the signature page in consideration of and on condition that the sum be expended in carrying out the purposes as set forth in the description of Project in this Agreement and its attachments and under the Terms and Conditions set forth in this Agreement.

2. Grantee shall furnish any and all additional funds that may be necessary to complete the Project.

3. Grantee shall complete the Project in accordance with the Project P erformance P
eriod set forth on the signature page, unless an extension has been formally granted by the State and under the Terms and Conditions of this Agreement. Extensions may be requested in advance and will be considered by State, at its sole discretion, in the Docusign Envelope ID: 69930DD7-4EF4-47B3-83E6-7D9F85B36802 C0227116
Fairfield-Suisun Sewer District
Solano Bayshore Resiliency Project

Page 4 ends

event of circumstances beyond the control of the Grantee, but in no event beyond March 31, 2029.

4. Grantee shall at all times ensure that Project complies with the California Environmental Quality Act (CEQA) (Public Resources Code, Division 13, commencing with section 21000, et. seq., Cal Code Regs tit. 14, section 15000 et. seq.) and all other environmental laws , including but not limited to obtaining all necessary permits. Grant Funds will not be disbursed before the close of the period for legal challenge under CEQA.

Grant Funds for planning and document preparation may be available sooner if included in the grant Project Scope (Exhibit A) and approved by the State. CEQA compliance shall be completed within one (1) year from the Grant Agreement start date, unless an extension is granted by the State.

Changes to the scope resulting from CEQA compliance are permitted provided the State determines that the project continues to meet all objectives of the SB 1 Grant Program and is consistent with the intent cited in the original Application.

If a grantee's project is disapproved on grounds related to the Resource Agency's CEQA determination, the grantee shall have the option of either: (1) reimbursing the Resource Agency for all State -reimbursed preliminary costs (e.g., planning, design, etc.), or (2) relinquishing any planning/design documents, including all copies, reproductions, and variations resulting from said funding, without a license to use or otherwise retain in any form.

5. Projects must comply with any applicable laws pertaining to prevailing wage and labor compliance.

6. Grantee certifies that the Project does and will continue to comply with all current laws and regulations which apply to the Project, including, but not limited to, legal requirements for construction contracts, building codes, environmental laws, health and safety codes, and disabled access laws. Grantee cer tifies that, prior to commencement of construction, all applicable permits and licenses (e.g., state contractor’s license) will have been obtained.

7. Grantee shall provide access by the State upon 24 hours’ notice to determine if Project work is in accordance with the approved Project Scope, including a final inspection upon Project completion.

8. Prior to the commencement of any work, Grantee agrees to submit in writing to the State for prior approval any deviation from the original Project Scope per Exhibit A and the Application. Changes in Project Scope must continue to meet the need cited in the original application or they will not be approved. Any modification or alteration in the Project as set forth in the Application on file with the State must be submitted to the State for approval . Any modification or alteration in the Project must also comply with all current laws and regulations, including but not limited to CEQA.

9. For projects involving construction or implementation, Grantee shall provide for public access to the Project in accordance with the intent of the Act.

Docusign Envelope ID: 69930DD7-4EF4-47B3-83E6-7D9F85B36802 C0227116
Fairfield-Suisun Sewer District
Solano Bayshore Resiliency Project

Page 5 ends

10. For projects involving construction or implementation, Grantee must have (1) fee title, (2) leasehold, or (3) other interest to Project lands and demonstrate to the satisfaction of the State that the proposed Project will provide public benefits that are commensurate with the type and duration of the interest in land. Any acquisition of Project lands by Grantee following award shall not involve eminent domain proceedings or threat of eminent domain proceedings.

11. For projects involving construction or implementation, Grantee shall promptly provide photographs of the site during and after implementation of Project at the request of the State.

12. Grantee shall provide status reports of the work performed pursuant this agreement at the request of the State.

C. Project Costs

1. Any Grant Funds provided to Grantee under this Agreement will be disbursed for eligible costs, on a reimbursement basis, as follows, but shall not exceed in any event the amount set forth on the signature page of this Agreement:
a. U p to t en percent (10%) of the reimbursement amount will be held back and issued as a final payment upon completion of the Project. b. Remaining Grant Funds shall be paid up to the total amount of the Grant Funds or the actual Project cost, whichever is less, up on completion of the Project, receipt of a detailed summary of Project costs from the Grantee found to be satisfactory by the State, and as applicable, the satisfactory completion of a site inspection by the State.
c. Invoices must be submitted on a quarterly basis. If quarters are lumped into larger invoices, OPC reserves the right to reject the invoices until the Grantee resubmits quarterly invoices.

If all or any part of the project to be funded under this agreement will be performed by third parties under contract with the grantee, then the Grantee should, prior to executing an agreement for services, seek the approval of the Executive Director or his/her designee on the selection of the third party. The Grantee shall then comply with the above paragraph regarding submission and approval of a work program prior to project commencement.

2. Payment Documentation:
a. All payment requests must be submitted using a completed Request for Disbursement Form. This form must be accompanied by an itemized list of all expenditures that clearly documents the check numbers, dates, recipients, line- item description as described in the Project Budget approved by the State and amounts. Each payment request must also include proof of payment such as receipts, paid invoices, canceled checks or other forms of documentation demonstrating payment has been made. An authorized representative of the Grantee shall sign the form.

Docusign Envelope ID: 69930DD7-4EF4-47B3-83E6-7D9F85B36802 C0227116
Fairfield-Suisun Sewer District
Solano Bayshore Resiliency Project

Page 6 ends

b. In connection with submission of each form, the Grantee shall also submit, unless the Executive Director makes a specific exemption, the following:

1. An itemized ledger, in a form approved by an authorized representative, detailing all direct expenditures incurred by the grantee and any subgrantee.

2. Receipts, travel expense vouchers and claim forms for travel expenses incurred by the Grantee and any subgrantee. The State will reimburse the Grantee for expenses necessary to the project when documented by appropriate receipts. The State will reimburse travel and related expenses at actual costs not to exceed the rates provided in Title 2, Division 1, Chapter 3, Subchapter 1, Article 2 of the California Code of Regulations (“CCR”), except that reimbursement may be in excess of these rates upon documentation that these rates are not reasonably available to the Grantee. Reimbursement for the cost of operating a private vehicle shall not, under any circumstance, exceed the current rate specified by the State of California for unrepresented state employees as of the date the cost is incurred. The State will reimburse the Grantee for other necessary expenses if those expenses are reasonable in nature and amount taking into account the nature of the project, its location, and other relevant factors.

3. Receipts or any other source documents for direct expenditures for any purchase of equipment or materials by the Grantee and any subgrantee.

4. A supporting progress report from the grantee summarizing the work that was completed during the invoice period and the current status of the work for which disbursement is sought, including work by any subgrantee, and comparing it to the status required by the Work Program (budget, timeline, tasks, etc.).
c. The Grantee’s failure to fully execute and submit a Request for Disbursement form, including attachment of supporting documents, may relieve the State of its obligation to disburse funds to the Grantee unless and until the Grantee corrects all deficiencies.
d. Notwithstanding the foregoing, the Executive Director may request, and the Grantee shall provide, receipts or other source documents for any other direct expenditure or cost as described in the ledger, as and when necessary to resolve any substantial issue concerning reimbursement.

e. Any payment request that is submitted without the required itemization and documentation will not be authorized. If the payment request package is incomplete, inadequate or inaccurate, the State will inform the Grantee and hold the payment request until all required information is received or corrected.

Any penalties imposed on the Grantee by a contractor, or other consequence, because of delays in payment will be paid by the Grantee and is not reimbursable under this Agreement.

Docusign Envelope ID: 69930DD7-4EF4-47B3-83E6-7D9F85B36802 C0227116
Fairfield-Suisun Sewer District
Solano Bayshore Resiliency Project

Page 7 ends

3. Grant Funds in this award have a limited period in which they must be expended.

Grantee expenditures funded by the State must occur within the time frame of the Project Performance Period as indicated in this Agreement.

4. Except as otherwise provided herein, the Grantee shall expend Grant Funds in the manner described in the Exhibit A approved by the State. The total dollars of a category in the Project Budget may be increased by up to ten percent (10%) through a reallocation of funds from another category , without approval by the State .

However, the Grantee shall notify the State in writing when any such reallocation is made, and shall identify both the item(s) being increased and those being decreased.

Any cumulative increase or decrease of more than ten percent (10%) from the original budget in the amount of a category must be approved by the State. In any event, the total amount of the Grant Funds may not be increased, nor may any adjustments exceed the limits for management costs as described in the Application Guidelines.

D. Project Administration

1. Grantee shall promptly submit written Project reports and/or photographs upon request by the State. In any event Grantee shall provide the State a report showing total final Project expenditures with the final Request for Disbursement and required closing documents.

2. Grantee shall make property and facilities acquired or developed pursuant to this Agreement available for inspection upon request by the State.

3. Grantee shall use any income earned by the Grantee from use of the Project to further Project purposes, or, if approved by the State, for related purposes within the jurisdiction.

4. Grantee shall submit all documentation for Project completion, including a notice of completion as applicable and final reimbursement within ninety (90) days of Project completion, but in no event any later than April 20, 2029.

5. Final payment is contingent upon State verification that Project is consistent with Project Scope as described in Exhibit A, together with any State approved amendments.

6. This Agreement may be amended by mutual agreement in writing between Grantee and State. Any request by the Grantee for amendments must be in writing stating the amendment request and reason for the request. The Grantee shall make requests in a timely manner and in no event less than sixty (60) days before the effective date of the proposed amendment.

7. Grantee must report to the State all sources of other funds for the Project.

E. Project Termination

1. Prior to the completion of P roject construction, either party may terminate this Agreement by providing the other party with thirty (30) days’ written notice of such termination. The State may also terminate this Grant Agreement for any reason at Docusign Envelope ID: 69930DD7-4EF4-47B3-83E6-7D9F85B36802 C0227116
Fairfield-Suisun Sewer District
Solano Bayshore Resiliency Project

Page 8 ends

any time if it learns of or otherwise discovers that there is a violation of any state or federal law or policy by Grantee which affects performance of this or any other grant agreement or contract entered into with the State.

2. If the State terminates without cause the Agreement prior to the end of the Project Performance Period, the Grantee shall take all reasonable measures to prevent further costs to the State under this Agreement. The State shall be responsible for any reasonable and non- cancelable obligations incurred by the Grantee in the performance of the Agreement prior to the date of the notice to terminate, but only up to the undisbursed balance of funding authorized in this Agreement.

3. If the Grantee fails to complete the Project in accordance with this Agreement, or fails to fulfill any other obligations of this Agreement prior to the termination date, the Grantee shall be liable for immediate repayment to the State of all amounts disbursed by the State under this Agreement, plus accrued interest and any further costs related to the Project . The State may, at its sole discretion, consider extenuating circumstances and not require repayment for work partially completed provided that the State determines it is in the State’s best interest to do so. This paragraph shall not be deemed to limit any other remedies available to the State for breach of this Agreement.

4. Failure by the Grantee to comply with the terms of this Agreement or any other Agreement under the Act may be cause for suspension of all obligations of the State hereunder.

5. Failure of the Grantee to comply with the terms of this Agreement shall not be cause for suspending all obligations of the State hereunder if , in the judgment of the State, such failure was due to no fault of the Grantee. At the discretion of the State, any amount required to settle at minimum cost any irrevocable obligations properly incurred shall be eligible for reimbursement under this Agreement.

6. Because the benefit to be derived by the State, from the full compliance by the Grantee with the terms of this Agreement, i ncludes developing sea level rise adaptation plans, and for directly related investments to implement those plans, because such benefit exceeds to an immeasurable and unascertainable extent the amount of money furnished by the State by way of Grant Funds under the provisions of this Agreement, the Grantee agrees that payment by the Grantee to the State of an amount equal to the amount of the Grant Funds disbursed under this Agreement by the State would be inadequate compensation to the State for any breach by the Grantee of this Agreement. The Grantee further agrees therefore, that the appropriate remedy in the event of a breach by the Grantee of this Agreement shall be the specific performance of this Agreement, unless otherwise agreed to by the State.

F. Hold Harmless

1. Grantee shall waive all claims and recourses against the State, including the right to contribution for loss or damage to persons or property arising from, growing out of or in any way connected with or incident to this Agreement, except claims arising from the gross negligence of State, its officers, agents and employees.

Docusign Envelope ID: 69930DD7-4EF4-47B3-83E6-7D9F85B36802 C0227116
Fairfield-Suisun Sewer District
Solano Bayshore Resiliency Project

Page 9 ends

2. Grantee shall indemnify, hold harmless and defend State, its officers, agents and employees in perpetuity against any and all claims , demands, damages, costs, expenses or liability costs arising out of the Project, including Development, construction, operation or maintenance of the property described in the Project description which claims, demands or causes of action arise under Government Code Section 895.2 or otherwise, including but not limited to items to which the Grantee has certified, except for liability arising out of the gross negligence of State, its officers, agents or employees. Grantee acknowledges that it is solely responsible for compliance with items to which it has certified.

3. Grantee and State agree that in the event of judgment entered against the State and Grantee because of the gross negligence of the State and Grantee, their officers, agents or employees, an apportionment of liability to pay such judgment shall be made by a court of competent jurisdiction. Neither party shall request a jury apportionment.

G. Audit Requirements and Financial Records

1. OPC projects are subject to audit by the State annually and for three (3) years following the payment of Grant Funds. Grantee shall maintain satisfactory financial accounts, documents, records, and supporting documentation consistent with the policies outlined in this Agreement and to make them available to the State for auditing at reasonable times. Grantee shall also retain such financial accounts, documents, records, and supporting documentation for three (3) years after final payment and one (1) year following an audit on site. OPC shall maintain all grant records for 35 years at the State Records Center and in perpetuity if funds are granted for acquisition of real property, in accordance with all applicable protocols as updated and required by the State Treasurer’s Office.

2. Grantee agrees that during regular office hours, the State and its duly authorized representatives shall have the right to inspect and make copies of any books, records or reports of the Grantee pertaining to this Agreement or matters related thereto.

Grantee shall maintain and make available for inspection by the State accurate records of all of its costs, disbursements and receipts with respect to its activities under this Agreement.

3. Grantee shall use applicable g enerally accepted accounting principles, unless otherwise agreed to by the State.

4. If Grantee stated in the Application for funding and/or Work Plan that other sources of funding will be used to complete the Project, the Grantee shall establish internal systems to track expenditures of matching or in-kind funds on a regular basis and will make the documentation available to the State upon request.

H. Use of Facilities

1. If the project involves real property, the property (including any portion of it or any interest in it) may not be sold or transferred without the written approval of the State of California, acting through the Natural Resources Agency, or its successor, Docusign Envelope ID: 69930DD7-4EF4-47B3-83E6-7D9F85B36802 C0227116
Fairfield-Suisun Sewer District
Solano Bayshore Resiliency Project

Page 10 ends

provided that such approval shall not be unreasonably withheld as long as the purposes for which the Grant was awarded are maintained.

2. Grantee shall maintain, operate and use the Project in fulfillment of the purpose funded pursuant to this Grant for a minimum of 20 YEARS, consistent with the Land Tenure/Site Control requirements included in the Application Guidelines. An alternate period may be considered and subject to approval by the Executive Director. The Grantee, or the Grantee’s successor in interest in the property, may assign without novation the responsibility to maintain and operate the property in accordance with this requirement only with the written approval of the State. Grantee may be excused from its obligations for operation and maintenance of the Project site only upon the written approval of the State for good cause. “Good cause” includes, but is not limited to, natural disasters that destroy the Project improvements and render the Project obsolete or impracticable to rebuild.

3. Grantee shall use the property for the purposes for which the Grant was made and shall make no other use or sale or other disposition of the property. This Agreement shall not prevent the transfer of the property from the Grantee to a Public Agency, if the successor Public A gency assumes the obligations imposed by this Agreement.

4. If the use of the property is changed to a use that is not permitted by the Agreement, or if the property is sold or otherwise disposed of, at the State’s sole discretion, an amount equal to (1) the amount of the Grant (2) the Fair Market Value of the real property, or (3) the proceeds from the sale or other disposition, whichever is greater, may be reimbursed to the State. If the property sold or otherwise disposed of is less than the entire interest in the property funded in the Grant, an amount equal to either the proceeds from the sale or other disposition of the interest or the Fair Market Value of the interest sold or otherwise disposed of, whichever is greater, shall be reimbursed to the State.

5. The Grantee shall not use or allow the use of any portion of the real property for mitigation without the written permission of the State.

6. The Grantee shall not use or allow the use of any portion of the real property as security for any debt.

I. Nondiscrimination

1. During the performance of this grant, grantee and its subcontractors shall not unlawfully discriminate, harass or allow harassment, against any person because of sex, sexual orientation, race, color, religious creed, marital status, denial of family and medical care leave, ancestry, national origin, medical condition (cancer/genetic characteristics), age (40 and above), disability (mental and physical) including HIV and AIDS, denial of pregnancy disability leave or reasonable accommodation.

Grantee and subcontractors shall ensure that the evaluation and treatment of all persons, and particularly their employees and applicants for employment are free from such discrimination and harassment. Grantee and its subcontractors shall comply with the provisions of th e Fair Employment and Housing Act (Gov. Code, §12900 et seq.) and the applicable regulations promulgated thereunder (Cal. Code Docusign Envelope ID: 69930DD7-4EF4-47B3-83E6-7D9F85B36802 C0227116
Fairfield-Suisun Sewer District
Solano Bayshore Resiliency Project

Page 11 ends

Regs, tit. 2, §7285.0 et seq.). The applicable regulations of the Fair Employment and Housing Commission implementing Government Code, §12990 (a) –(f), are incorporated into this grant by reference and made a part hereof as if set forth in full (Cal. Code Regs, tit. 2, §7285.0 et seq.). Grantee shall include this non-discrimination and compliance provisions of this clause in all subcontracts to perform work under the grant.

2. The Grantee shall not discriminate against any person on the basis of residence except to the extent that reasonable difference in admission or other fees may be maintained on the basis of residence and pursuant to law.

3. The completed Project and all related facilities shall be open to members of the public generally, except as noted under the special provisions of this Agreement or under provisions of the Act.

J. Application Incorporation
The Grant Guidelines and the Application and any subsequent changes or additions to the Application approved in writing by the State are hereby incorporated by reference into this Agreement as though set forth in full in this Agreement.

K. Severability
If any provision of this Agreement or the application thereof is held invalid, that invalidity shall not affect other provisions or applications of this Agreement which can be given effect without the invalid provision or application, and to this end the provisions of this Agreement are severable.

L. Waiver
No term or provision hereof will be considered waived by either party, and no breach excused by either party, unless such waiver or consent is in writing and signed on behalf of the party against whom the waiver is asserted. No consent by either party to, or waiver of, a breach by either party, whether expressed or implied, will constitute consent to, waiver of or excuse of any other, different or subsequent breach by either party.

M. Assignment
Except as expressly provided otherwise, this Agreement is not assignable by the Grantee either in whole or in part.

N. Disputes
If the Grantee believes that there is a dispute or grievance between Grantee and the State arising out of or relating to this Agreement, the Grantee shall first discuss and attempt to resolve the issue informally with the Project Manager. If the issue cannot be resolved at this level, the Grantee shall follow the following procedures:

1. If the issue cannot be resolved informally with the Project Manager , the Grantee shall submit, in writing, a grievance report together with any evidence to the Deputy Docusign Envelope ID: 69930DD7-4EF4-47B3-83E6-7D9F85B36802 C0227116
Fairfield-Suisun Sewer District
Solano Bayshore Resiliency Project

Page 12 ends

Director of OPC . The grievance report must state the issues in the dispute, the legal authority, or other basis for the Grantee’s position and the remedy sought.

Within ten (10) working days of receipt of the written grievance report from the Grantee, the Deputy Director shall make a determination on the issue(s) and shall respond in writing to the Grantee indicating the decision and reasons therefore.

Should the Grantee disagree with the Deputy Director’s decision, the Grantee may appeal to the Executive Director of the OPC.

2. The Grantee must submit a letter of appeal to the Executive Director explaining why the Deputy Director’s decision is unacceptable. The letter must include, as an attachment, copies of the Grantee’s original grievance report, evidence originally submitted, and response from the Deputy Director. The Grantee’s letter of appeal must be submitted within ten (10) working days of the receipt of the Deputy Director’s written decision. The Executive Director or designee shall, within twenty (20) working days of receipt of Grantee’s letter of appeal, review the issues raised and shall render a written decision to the Grantee. The decision of the Executive Director or designee shall be final.

O. Insurance
Throughout the term of this agreement, for the life of any asset funded by the grant monies awarded pursuant to this agreement, or for any period of project implementation after the termination date of this agreement, the Grantee shall maintain self -insurance, as specified in this section, against claims for injuries to persons or damage to property that may arise from or in connection with any activities by the Grantee or its agents, representatives, employees, volunteers, or contractors associated with the project undertaken pursuant to this Agreement.

If the Grantee provides funds to any contractor to accomplish any of the work of this Agreement or provides funds to any subgrantee to carry out a project under this Agreement, the Grantee shall first enter into an agreement with each subgrantee or contractor requiring it to provide and maintain liability and property-damage insurance, as specified in this section, against claims for injuries to persons or damage to property that may arise from or in connection with any activities by the subgrantee or contractor, or its agents, representatives, employees, or volunteers, associated with the project undertaken pursuant to this Agreement. As an alternative, with the written approval of the Executive Director, the subgrantee or contractor may satisfy the coverage required by this section in whole or in part through: (a) its participation in a “risk management” plan, self-insurance program or insurance pooling arrangement, or any combination of these, if consistent with the coverage required by this section. Requi red insurance shall be maintained from the commencement date through the completion date of the work undertaken by the subgrantee or contractor under the approved Work Program.

1. Minimum Scope of Insurance. Coverage shall be at least as broad as:
a. Insurance Services Office (“ISO”) Commercial General Liability coverage (occurrence Form CG 0001) or ISO Comprehensive General Liability form (1973) or comparable with Broad Form Comprehensive General Liability endorsement.

Docusign Envelope ID: 69930DD7-4EF4-47B3-83E6-7D9F85B36802 C0227116
Fairfield-Suisun Sewer District
Solano Bayshore Resiliency Project

Page 13 ends

b. Automobile Liability coverage - ISO Form Number CA 0001, Code 1 (any auto).
c. Workers’ Compensation insurance as required by the Labor Code of the State of California.

2. Minimum Limits of Insurance. Grantee shall maintain coverage limits no less than:
a. General
Liability:
(Including operations,
products and
completed operations,
as applicable)
$1,000,000 per occurrence for bodily injury, personal
injury and property damage. If Commercial General
Liability Insurance or other form with a general
aggregate limit is used, either the general aggregate
limit shall apply separately to the activities un der this agreement or the general aggregate limit shall be twice the required occurrence limit.
b. Automobile
Liability:
$1,000,000 per accident for bodily injury and property
damage.

3. Use of Watercraft . If the subgrantee or contractor is to engage in project work involving the use of watercraft, it shall provide and maintain insurance covering injury to person or property in connection with the use of watercraft, which may include, as appropriate, an endorsement to a Commercial General Liability policy covering non-owned watercraft liability or Protection and Indemnity Insurance or Jones Act coverage. Coverage shall be in a reasonable amount in light of the nature of the activity and shall be documented and approved by the Executive Director.

4. Deductibles and Self -Insured Retentions . Any deductibles or self -insured retentions must be declared to and approved by the Executive Director.

5. Required Provisions . Each insurance policy required by this section shall be endorsed to state that coverage shall not be canceled by either party, except after thirty days’ prior written notice by certified mail, return receipt requested, has been given to the OPC. The general liability and automobile liability policies are to contain, or to be endorsed to contain, the following provisions:
a. The State of California, its officers, agents, and employees are to be covered as insured with respect to liability arising out of automobiles owned, leased, hired or borrowed by or on behalf of the Grantee; and with respect to liability arising out of wor k or operations performed by or on behalf of the Grantee including materials, parts or equipment furnished in connection with such work or operations.
b. For any claims related to this agreement, the Grantee’s insurance coverage shall be primary insurance with respect to the State of California, its officers, agents and employees.

Docusign Envelope ID: 69930DD7-4EF4-47B3-83E6-7D9F85B36802 C0227116
Fairfield-Suisun Sewer District
Solano Bayshore Resiliency Project

Page 14 ends

c. Coverage shall not extend to any indemnity coverage for the active negligence of the additional insured in any case where an agreement to indemnify the additional insured would be invalid under Subdivision (b) of Section 2782 of the Civil Code.

6. Acceptability of Insurers . Insurance shall be placed with insurers admitted to transact business in the State of California and having a current Best’s rating of “B+:VII” or better or, in the alternative, acceptable to the OPC and approved in writing by the Executive Director.

7. Verification of Coverage. The Grantee shall furnish the Executive Director with original certificates and amendatory endorsements effecting coverage required by this clause. All certificates and endorsements are to be received and approved by the Executive Director before work commences. The OPC reserves the right t o
r
equire complete, certified copies of all required insurance policies, including endorsements affecting the coverage, at any time.

8. Premiums and Assessments. The OPC is not responsible for premiums and assessments on any insurance policy.

9. Indemnity. The grantee shall agree to indemnify and hold harmless the State of California, acting by and through the OPC , and any employee or agent thereof harmless from any liability, loss or damage that may be suffered as a result of claims, demands, costs or judgments against them arising out of the activities to be carried out pursuant to the obligations of this Agreement, including, but not limited to, the use by Grantee of results obtained from the activities performed under this agreement; provided, however, that any such liability, loss or damage resulting from this agreement was not caused by the gross negligence or malfeasance of the OPC, its employees or agents.

Docusign Envelope ID: 69930DD7-4EF4-47B3-83E6-7D9F85B36802 C0227116
Fairfield-Suisun Sewer District
Solano Bayshore Resiliency Project

CNRA OPC WP 001 Page 1 of 12

State of California Natural Resources Agency
Ocean Protection Council

Grantee Name: Fairfield-Suisun Sewer District
Project Title: Solano Bayshore Resiliency Project
Agreement Number C0227116
Term of Agreement: Upon Approval Through September 30, 2027

Project Summary:

The Solano Bayshore Resiliency Project (Project) is a collaborative, multi-jurisdictional adaptation planning effort facilitated through the Solano Resiliency Roundtable. Aligned with the Bay Conservation and Development Commission's (BCDC) Regional Shoreline Adaptation Plan (RSAP), this project includes:
• Task 1 – Project Planning, Management, and Coordination; • Task 2 – Community Outreach and Engagement;
• Task 3 – Sea Level Rise Vulnerability Assessment; and • Task 4 – Development of a Multi-jurisdictional Regional Shoreline Action Plan for unincorporated Solano County and the cities of Vallejo, Fairfield, Suisun City, and Benicia.

Building on previous studies, the Project will ultimately include evaluation of the feasibility of nature-based, green, and hybrid adaptation solutions, and aligning with BCDC RSAP Guidelines. Focus areas include vulnerable regions within the project area and the Suisun Marsh, the largest remaining wetland in the San Francisco Bay Area, accounting for over 10% of California's remaining wetlands.

The project will guide place-based community planning and critical infrastructure investment decisions while prioritizing equitable engagement with historically underrepresented communities across the project area for fair and inclusive outcomes.

This effort directly advances the Ocean Protection Council’s (OPC) Strategic Plan objectives, specifically:

Docusign Envelope ID: 69930DD7-4EF4-47B3-83E6-7D9F85B36802 C0227116
Fairfield-Suisun Sewer District
Solano Bayshore Resiliency Project

CNRA OPC WP 001 Page 2 of 12

• Objective 1.1: Build resiliency to sea-level rise, coastal storms, erosion, and flooding by informing adaptation planning with localized vulnerability assessments and prioritized solutions.
• Objective 1.3: Improve understanding of climate impacts on California’s coast and ocean through data gathering, hazard mapping, and regional knowledge- sharing.
• Objective 2.2: Enhance engagement with underserved communities via inclusive outreach, community workgroups, and youth engagement strategies. • Objective 3.1: Protect and restore coastal and marine ecosystems by evaluating the feasibility of nature-based and hybrid infrastructure to increase ecosystem resilience.

Objective:

Through development of a science-based vulnerability assessment and a multi- jurisdictional shoreline action plan (MSAP), the project aims to identify and prioritize adaptation strategies that protect people, critical services, and natural resources from the accelerating threats of sea level rise and coastal flooding. By coordination across jurisdictions (Solano County and the cities of Vallejo, Fairfield, Suisun City, and Benicia), this project enhances regional capacity to plan proactively, share resources, and respond collectively to climate-driven shoreline hazards.

This effort aims to serve as a model for inclusive governance and integrated planning that centers historically underserved communities. The project will meet RSAP's Equity Assessment Standard through comprehensive community engagement, ensuring meaningful consultation and incorporation of the needs and perspectives of vulnerable, historically underrepresented communities in all aspects of sea level rise adaptation planning. The project will support climate resilience through meaningful community engagement, regional knowledge-sharing, and the co-creation of locally relevant solutions. By aligning with the BCDC’s RSAP and SB 272, this work directly advances statewide goals for climate adaptation while addressing localized flood risks, infrastructure vulnerabilities, and environmental justice priorities along the Solano Bayshore.

Project Tasks and Deliverables:

Task 1: Project Planning, Management, and Coordination
Description: Task 1 involves coordinating activities of the project team, managing resources, and ensuring that the project progresses smoothly and on schedule. This task includes regular reporting, ongoing project management meetings, Technical Advisory Committee (TAC) meetings, and BCDC consultation throughout the program period.

Docusign Envelope ID: 69930DD7-4EF4-47B3-83E6-7D9F85B36802 C0227116
Fairfield-Suisun Sewer District
Solano Bayshore Resiliency Project

CNRA OPC WP 001 Page 3 of 12

Subtasks:

1.1 Design / Launch Solano County Sea Level Rise / Climate Resilience Initiative Progress toward RSAP Element A: Planning Process
Approach Outcomes/ Deliverables
Coordination meetings with the Project Team, TAC,
BCDC, and Technical Consultants to establish project
goals, timelines, and expectations. The Project Team,
including FSSD, the County, engagement partner, and
technical consultants, meet every two weeks to discuss
project progress.

The TAC meets every six to eight weeks to discuss
project milestones.

Meeting notes and project
roadmap
Launch Regional Resiliency Website & portal to access
data set and knowledge products
Website and data-sharing
portal

1.2 Roundtable and TAC Participation & Coordination
Progress toward RSAP Element A: Planning Process
Approach Outcomes/ Deliverables
Attendance and active participation in bi-monthly
Roundtable meetings to provide technical oversight and
ensure consistent progress
Meeting notes, technical
recommendations
Launch Regional Resiliency Website & portal to access
data set and knowledge products
Website and data-sharing
portal

1.3 Grant Management and Reporting
Progress toward RSAP Element A: Planning Process
Approach Outcomes/ Deliverables
Prepare quarterly reports detailing milestones and
deliverables completed
Quarterly reports, milestone
achievement documentation
Continuous coordination and contracting with
subcontractors, scheduling and facilitating regular TAC meetings to track progress
Periodic reports, invoices,
project status updates
Docusign Envelope ID: 69930DD7-4EF4-47B3-83E6-7D9F85B36802 C0227116
Fairfield-Suisun Sewer District
Solano Bayshore Resiliency Project

CNRA OPC WP 001 Page 4 of 12

The Project Team, including FSSD, the County,
engagement partner, and technical consultants, meet
every two weeks to discuss project progress
The TAC meets every six to eight weeks to discuss
project milestones
Communication with BCDC and OPC regarding project
updates.

As part of the TAC, BCDC will be updated every six to
eight weeks on key milestones such as the Vulnerability Assessment
Ad hoc meetings with BCDC and OPC will be
scheduled as needed/requested.

BCDC and OPC
communication at key
project milestones

Task 2: Community Outreach and Engagement
Description: This task involves designing and implementing a comprehensive community engagement strategy to ensure broad and equitable community involvement, particularly among Disadvantaged Communities and marginalized groups.

This includes website development, social media campaigns, and organizing community meetings.

Subtasks:

2.1 Conduct Social Media Campaign
Progress toward RSAP Element A: Planning Process
Meets the Equity Assessment Standard
Approach Outcomes/ Deliverables
Lead a two-year social media campaign to engage the
public through Instagram, Facebook, and Nextdoor,
using Greenbelt Alliance as the community partner,
with targeted outreach to historically underrepresented communities and content in multiple languages as
appropriate
Ongoing social media
campaign

2.2 Host Quarterly Community Meetings
Progress toward RSAP Element A: Planning Process
Docusign Envelope ID: 69930DD7-4EF4-47B3-83E6-7D9F85B36802 C0227116
Fairfield-Suisun Sewer District
Solano Bayshore Resiliency Project

CNRA OPC WP 001 Page 5 of 12

Approach Outcomes/ Deliverables
Host meetings in rotating locations across the project
area (Vallejo, Suisun City, Benicia, Fairfield) offering multiple opportunities for public input
Proposed topics include:
• Review asset exposure and identify potential
cascading impacts

• Brainstorm and refine adaptation strategies
• Finalize adaptation strategies and discuss
potential Nature-Based Solutions (NBS) sites

Meeting summaries, feedback
forms, and attendance records

2.3 Develop Community Engagement Plan
Progress toward RSAP Elements A: Planning Process, B: Existing Conditions Meets the Equity Assessment Standard
Approach Outcomes/ Deliverables
Identify and engage communities at risk through
targeted outreach, focusing on those
disproportionately affected by sea level rise,
particularly near-shore low-income communities.

Develop an engagement plan grounded in
vulnerability maps and demographic data
Community Engagement Plan,
risk maps, engagement
strategies
Consider impact of policy changes, particularly on
vulnerable communities
Create accessible materials—
reports, executive summaries,
infographics—that convey the
plan’s key findings and
recommendations to diverse
audiences.

2.4 Convening Community Workgroups
Progress toward RSAP Elements A: Planning Process, D: Adaptation Strategies and Pathways
Meets the Equity Assessment Standard
Approach Outcomes/ Deliverables
Docusign Envelope ID: 69930DD7-4EF4-47B3-83E6-7D9F85B36802 C0227116
Fairfield-Suisun Sewer District
Solano Bayshore Resiliency Project

CNRA OPC WP 001 Page 6 of 12

Establish Community Workgroups in Disadvantaged
Communities for direct input and decision-making
Workgroup formation, reports,
meeting notes

2.5 Engage Youth through a Science Program*
Progress toward RSAP Element A: Engaging community members and local effected parties
Approach Outcomes/ Deliverables
Involve middle and high school students in science
programs related to sea level rise and climate
adaptation, led by Solano Resource Conservation
District and Sustainable Solano
Completion of youth
programming, Youth
engagement reports, program
curriculum
*NOTE: This work (Subtask 2.5) is being funded through an existing agreement with the Governor’s Office of Planning and Research. No OPC funding is used for this subtask.

Task 3: Sea Level Rise Vulnerability Assessment and Data/Information Gathering Description: Task 3 will assess the vulnerabilities of the Solano Bayshore area to sea level rise, including gathering data and conducting hazard mapping. The goal is to create a comprehensive vulnerability assessment and data set to inform adaptation strategies.

Subtasks:

3.1 Define Vulnerability Assessment Goals
Progress toward RSAP Element A: Planning Process
Approach Outcomes/ Deliverables
Collaboratively define the assessment objectives
through TAC meetings, community consultations, and
youth programming
Vulnerability assessment
goals and documentation

3.2 Identify and Collect Data
Progress toward RSAP Elements B: Existing Conditions, C: Vulnerability Assessment Approach Outcomes/ Deliverables
Conduct a gap analysis to identify missing data and
complete the data set, integrating Solano County into
Vulnerability assessment
goals and documentation
Docusign Envelope ID: 69930DD7-4EF4-47B3-83E6-7D9F85B36802 C0227116
Fairfield-Suisun Sewer District
Solano Bayshore Resiliency Project

CNRA OPC WP 001 Page 7 of 12

broader sea level rise and groundwater condition
mapping
Review existing assessments, studies, and plans
related to SLR and climate resilience in the project
area
Incorporate review into
vulnerability assessment
report
Perform hazard mapping to assess asset exposure
and create vulnerability maps for people, assets, and
services in the project area
Data collection reports,
updated vulnerability maps.

3.3 Conduct Hazard Mapping and Asset Exposure Assessment Progress toward RSAP Element C: Vulnerability Assessment Approach Outcomes/ Deliverables
Perform hazard mapping to assess asset exposure
and create vulnerability maps for people, assets, and
services in the project area
Hazard maps, exposure
assessment reports
Prepare a draft and final vulnerability assessment,
addressing key sectors and vulnerability criteria
outlined in the RSAP Guidelines
Vulnerability assessment
reports, maps, and data sets

Task 4: Multi-jurisdictional Regional Shoreline Adaptation Plan Subtasks:

4.1 Define Adaptation Plan Goals and Prioritization Criteria Progress toward RSAP Element D: Adaptation Strategies and Pathways Approach Outcomes/ Deliverables
Define the regional vision and action plan goals
working with the TAC, Roundtable, and community
groups
Adaptation plan goals,
prioritization criteria
Prepare a draft and final vulnerability assessment,
addressing key sectors and vulnerability criteria
outlined in the RSAP Guidelines
Vulnerability assessment
reports, maps, and data sets

4.2 Identify Adaptation Pathways and Strategies
Docusign Envelope ID: 69930DD7-4EF4-47B3-83E6-7D9F85B36802 C0227116
Fairfield-Suisun Sewer District
Solano Bayshore Resiliency Project

CNRA OPC WP 001 Page 8 of 12

Progress toward RSAP Element D: Adaptation Strategies and Pathways Approach Outcomes/ Deliverables
Identify a range of adaptation strategies, including
green, green-gray, and gray infrastructure
alternatives, tailored to different shoreline reaches
List of adaptation pathways,
strategy options
Integrate vulnerability findings into strategy
development to ensure adaptation approaches directly
address identified risks
Updated vulnerability
assessment with integrated
adaptation strategies and risk-
strategy alignment maps

4.3 Prioritize Adaptation Solutions
Progress toward RSAP Elements D: Adaptation Strategies and Pathways, G: Project List
Approach Outcomes/ Deliverables
Using a community-driven framework, prioritize at
least six place-based adaptation solutions for
implementation
Finalized list of prioritized
solutions
Apply vulnerability assessment findings to inform
solution prioritization and update assessment with
selected priorities
Updated vulnerability
assessment with prioritization
analysis and implementation
maps

4.4 Develop Project Concept Designs
Progress toward RSAP Elements F: Project Implementation Plan and Funding Strategy, G: Project List
Approach Outcomes/ Deliverables
Develop 5% design concepts for six prioritized
adaptation projects, including implementation plans
5% design concepts, project
cost estimates
Refine vulnerability assessment with project-specific
risk analysis to support detailed design development
Updated vulnerability
assessment incorporating
project-level analysis and
design-informed risk maps

4.5 Implementation Plan and Funding Strategy
Docusign Envelope ID: 69930DD7-4EF4-47B3-83E6-7D9F85B36802 C0227116
Fairfield-Suisun Sewer District
Solano Bayshore Resiliency Project

CNRA OPC WP 001 Page 9 of 12

Progress toward RSAP Element F: Project Implementation Plan and Funding Strategy Approach Outcomes/ Deliverables
Develop an implementation plan with funding
strategies and a monitoring program for long-term
adaptation
Implementation plan, funding
strategy, monitoring program,
website updates

4.6 Completion of Draft Multijurisdictional Shoreline Adaptation Plan, Preparation for Council Adoption
Develop Summary of Policy Changes Necessary
Progress toward RSAP Element E: Land Use and Policy Plan Approach Outcomes/ Deliverables
Completion of full MSAP for all jurisdictions, pulling
together Elements A-G, comments, and revisions as
necessary
Draft and final MSAP for all
jurisdictions
Council adoption for each jurisdiction is expected in
the fourth quarter of 2027
Adoption timelines, council
resolution drafts, jurisdictional
coordination documentation

Accessibility:

All public-facing products will be produced in accordance with California Department of Rehabilitation guidelines as per https://dor.ca.gov/Home/WebAccessibilityToolkit.

Project Timeline:

Outcomes/Deliverables as outlined above will be submitted to OPC at the end of the task timeline. See the project timeline in the GANNT chart below.

Docusign Envelope ID: 69930DD7-4EF4-47B3-83E6-7D9F85B36802 C0227116
Fairfield-Suisun Sewer District
Solano Bayshore Resiliency Project

CNRA OPC WP 001 Page 10 of 12

Year 1 - 2025
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Task 1

Task 2

EP
Task 3

Task 4

Year 2 - 2026
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Task 1
Task 2
Task 3 DFT

VA FNL VA
Task 4

Year 3 - 2027
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Task 1
Task 2
Task 3
Task 4 DFT

SLR FNL
SLR

EP = Engagement Plan (Subtask 2.3)
DFT VA = Draft Vulnerability Assessment (Subtask 3.1 – 3.3) FNL VA = Final Vulnerability Assessment (Subtask 3.1 – 3.3) DFT SLR = Draft Sea Level Rise Multijurisdictional Shoreline Adaption Plan (Subtask 4.6) FNL SLR = Final Sea Level Rise Multijurisdictional Shoreline Adaptation Plan (Subtask 4.6)

Docusign Envelope ID: 69930DD7-4EF4-47B3-83E6-7D9F85B36802 C0227116
Fairfield-Suisun Sewer District
Solano Bayshore Resiliency Project

CNRA OPC WP 001 Page 11 of 12

Budget:

Task 1 Task 2 Task 3 Task 4 Total
Personnel  $83,540  $86,140  $203,930  $278,930  $652,540 Subaward(s)  $0  $217,900  $119,043  $402,230  $739,173 Task Total  $83,540  $304,040  $322,973  $681,160  $1,391,713 Agreement Total: $1,391,713

Personnel Breakdown:

Title Maximum Hourly
Rate (Fully Burdened)
Director of Environmental Services, FSSD $275.00
Senior Planner, County $240.00
County GIS 1 $215.00
County GIS 2 $255.00
County GIS 3 $300.00

City Allocations:

City staff allocations for their partnership in this multi-jurisdictional plan are made in consideration of three metrics (with an equal division to each metric): Miles of shoreline, city population, and population below 3 feet. These allocations are reflected as direct subawards, not personnel (which applies only to FSSD and Solano County staff as direct grantees).

Metric
City Miles of
Shoreline Population
Population
below 3 feet
(According to
Climate Central)
Allocation
# of hours
(at $250
fully loaded
rate)
Suisun City 2.32 28,840 2257 $131,592.70

526
Fairfield 1.92 120,339 27 $63,284.38 253
Vallejo 18.29 121,558 262 $142,659.20 571
Benicia 9.82 26,033 213 $62,463.72 250
Docusign Envelope ID: 69930DD7-4EF4-47B3-83E6-7D9F85B36802 C0227116
Fairfield-Suisun Sewer District
Solano Bayshore Resiliency Project

CNRA OPC WP 001 Page 12 of 12

Agreement Contacts:

Grantee: Fairfield-Suisun Sewer District
Contact Name: Meg Herston
Contact Number: 925-978-6358 (Cell/Text)
Contact Address: 1010 Chadbourne Road
Fairfield CA 94534
Contact Email: [email protected]

California Natural Resources Ocean Protection Council
Contact Name: Ella McDougall
Contact Number: (916) 653-5656
Contact Address: 715 P Street, 20th Floor
Sacramento, CA 95814
Contact Email: [email protected]