MANUEL CAMPOS PARKWAY
NEW McCRORY ROAD
27 22
23 284
12 5
10 14
3 31
35 24
NEW
21 PEABODY ROAD
2 15
42 8 26
16 9
30 3
11 32
1 25
29 34
37 39
33 38
40 41
44 CAMPOS
45 6
3A
2 6
5 4
1A
ROAD
VANDEN ROAD
WALTERS ROAD
48 7
CANON
PEABODY ROAD
NEW
CANON
ROAD
PARKWAYMANUEL
17B
17A
18 19
LEGEND:
NORTHEAST AREA FEE BOUNDARY
ON-SITE ROAD TO BE IMPROVED AS PART OF
BACKBONE INFRASTRUCTURE WORK
1 APPENDIX A REFERENCE
LINEAR PARKS ROAD TO BE IMPROVED AS PART OF
BACKBONE INFRASTRUCTURE WORK
DATE: MARCH 23, 2017
0' 3,000'1,000' 4,000'
1" = 1,000'SCALE:
NORTHEAST AREA FEE
PROJECT SUMMARY
CITY OF FAIRFIELD SOLANO COUNTY CALIFORNIA G:\1668\1668-01\ACAD\EXHIBITS\XB-1_PROJECT SUMMARY.DWG
5/18/2017 4:21 PM
& Gibson, Inc.
Carlson, Barbee
SAN RAMON, CALIFORNIA 94583
2633 CAMINO RAMON, SUITE 350
CIVIL ENGINEERS SURVEYORS PLANNERS
(925) 866-0322
www.cbandg.com OF SHEETS
SHEET NO.
1 1
MANUEL CAMPOS PARKWAY
2 DOVER TO MYSTIC
3 MYSTIC TO DICKSON HILL - PHASE 1
4 MYSTIC TO DICKSON HILL - PHASE 2
5 DICKSON HILL TO CLAY BANK
6 CLAY BANK TO PORTLAND DRIVE - PHASE 1
7 CLAY BANK TO PORTLAND DRIVE - PHASE 2
8 PORTLAND DRIVE TO WALTERS - PHASE 1
9 PORTLAND DRIVE TO WALTERS - PHASES 2 AND 3
10 WALTERS TO NOONAN - PHASE 1
11 WALTERS TO NOONAN - PHASE 2
12 NOONAN TO PEABODY
VANDEN ROAD
14 PEABODY TO WEST COLLECTOR
15 WEST COLLECTOR TO LAKE ENTRANCE
16 LAKE SIGNAL TO PHASE 2A LIMIT
17A PHASE 2A LIMIT TO SOUTH SIDE OF EMBANKMENT
17B SOUTH SIDE OF EMBANKMENT TO NEW CANON
18 NEW CANON TO NORTH SIDE OF EMBANKMENT
19 NORTH SIDE OF EMBANKMENT TO CITY LIMIT
PEABODY ROAD
21 AIR BASE PARKWAY TO DOBE LANE
22 DOBE LANE TO HUNTINGTON
23 HUNTINGTON TO NEW MARKELEY
24 NEW MARKELEY TO VANDEN
25 UPRR OVERCROSSING
26 VANDEN TO 350' PAST VANDEN
27 350' PAST VANDEN TO INTERSECTION #44
28 INTERSECTION #44 TO INTERSECTION #45
29 INTERSECTION #45 TO LINEAR PARK
30 LINEAR PARK TO PUTAH SOUTH CANAL
31 PUTAH SOUTH CANAL BRIDGE
32 PUTAH SOUTH CANAL BRIDGE TO CHUCK HAMMOND DRIVE
33 CHUCK HAMMOND DRIVE TO McAVENIA DRIVEWAY
34 McAVENIA DRIVEWAY TO NEW CANON ROAD
35 NEW CANON ROAD TO CITY LIMITS
NEW CANON ROAD
37 PEABODY TO PUTAH SOUTH CANAL
38 PUTAH SOUTH CANAL TO RESIDENTIAL COLLECTOR
39 RESIDENTIAL COLLECTOR TO VANDEN
40 VANDEN TO McCRORY
41 McCRORY TO END OF INDUSTRIAL
42 END OF INDUSTRIAL TO NORTHGATE
McCRORY ROAD EXTENSION
44 NEW CANON TO INDUSTRIAL
45 INDUSTRIAL TO OLD McCRORY ROAD
WALTERS ROAD
48 AIR BASE PARKWAY TO MANUEL CAMPOS PARKWAY
LINEAR PARKS
1 CLAY BANK TO PORTLAND
1A PORTLAND TO MANUEL CAMPOS/WALTERS
2 WALTERS TO PEABODY
3 PEABODY TO LAKE TRAIL
3A LINEAR TRAIL TO VANDEN
4 VANDEN TO CENTER SCHOOL
5 LAKE TRAIL TO NEW CANON
6 VANDEN PEDESTRIAN BRIDGE
PROJECT LIST: