Project Title and Description Street Name From To
Pavement
Area
(SF)
Pavement
Treatment
Anticipated
Start
(MM/YY)
Anticipated
Completion
(MM/YY)
Estimated
Useful Life
(Years)
Lopes Rd. Red Top Rd. I-80 361,660 Cape Seal
Green Valley Rd. Lopes Rd. City Limit 383,364 Cape Seal Mangels Blvd. Sunisun Valley Rd. Business Center Dr. 489,456 Cape Seal West America Dr. Sunisun Valley Rd. Business Center Dr. 99,819 Cape Seal Mankas Boulevard Distribution Main Replacement:
Replacement of existing curb ramps with ADA-compliant ramps, accompanied by a 2.5-inch asphalt overlay, as part of the site restoration for the water distribution main replacement project.
Mankas Blvd. Barbour Dr. Cul-De-Sac 52,000
2.5" Asphalt
Grind and
Overlay
7/26 12/26 25-30
HSIP Cycle 11 Unsignalized Intersectioin Visibility and Safety Improvements Project:
Pedestrican and bicycle crossing improvements, signage, striping and concrete medians at 37 unsignalized and high collision intersections.
Citywide (Various) N/A N/A N/A N/A 7/26 10/26 7-10
HSIP Cycle 11 Citywide Systemic Signal Visibility Upgrades Project:
Improve traffic signal hardware throughout the City (103 signals). Improvements include adding reflective backplates, larger signal heads, and advanced warning beacons.
Citywide (Various) N/A N/A N/A N/A 8/26 12/26 15-20
E. Tabor Ave. Clay Bank Rd. Olive Rd. 75,000 Slurry Seal Tolenas Rd. E. Tabor Ave. Tolenas Elementary
School N/A N/A
2027 Pavement Maintenance Project:
Pavement resurfacing of approximately 1,335,000 square feet and ADA curb ramp replacements.
4/27 7/27 7-10
NOTE: Included with each proposed project is the preparatory work to be completed in advance of the actual overlays and/or surface seals.
This work includes crack sealing and asphalt digouts. Work not related to pavement maintenance are not funded by RMRA.
Attachment A
City of Fairfield
Fiscal Year 2026/2027 RMRA Project List June 2026 4/26 12/26 25-30
East Tabor Avenue/Tolenas Road Safe Routes to School Gap Closure Project:
Improve pedestrian access by installing sidewalk over an at-grade railroad crossing at East Tabor Avenue and Railroad Avenue. The project will also widen the sidewalk along Tolenas Avenue between East Tabor Avenue and the Tolenas Elementary School. Constructing the sidewalk and bicycle lane on the north side of East Tabor Avenue will close the gap that currently exists across the railroad tracks.
Re-listed Projects (Previously Proposed and Approved Projects Potentially Utilizing FY26/27 RMRA Funds) Newly Proposed Projects (Funded In-Part or Solely With FY 26/27 RMRA) Street Name From To Roadway
Classification Area (SF) Description
Business Center Dr. Green Valley Rd. End Collector 141,700 Microsurfacing Business Center Dr. Green Valley Rd. Suisun Valley Rd. Arterial 293,820 Asphalt Rubber Cape Seal
Business Center Dr. Dan Wilson Creek
Bridge
Suisun Valley Rd. Arterial 190,060 Microsurfacing
Business Center Dr. Suisun Parkway Dan Wilson Creek
Bridge
Arterial 293,820 Microsurfacing
Central Way Pittman Rd. City Limits Collector 168,960 Asphalt Rubber Cape Seal
Central Place Pittman Rd. End Collector 56,647 Asphalt Rubber Cape Seal
Pittman Rd. Cordelia Rd. 1000' N/O
Redwood
Arterial 71,440 Slurry Seal
Pittman Rd. 1000' north of
Redwood
Link Rd. Arterial 36,000 2.5" grind and
asphalt overlay
Pittman Rd. Link Rd. Central Way Arterial 73,200 2.5" grind and asphalt overlay
Pittman Rd. Central Way I‐80 Arterial 15,000 Slurry Seal Suisun Valley Rd. Neitzel Rd. Mangels Blvd. Arterial 106,743 Slurry Seal Suisun Valley Rd. Mangels City Limits Arterial 198,927 Slurry Seal Cordelia Rd. Monument Link Rd. Arterial 72,852 Asphalt Rubber Cape Seal
Cordelia Rd. Link Rd. City Limits Arterial 88,275 Asphalt Rubber Cape Seal
Beck Avenue Highway 12 Cordelia Rd. Arterial 125,000 Asphalt Rubber Cape Seal
Chadbourne Road Highway 12 Cordelia Rd. Collector 227,000 Asphalt Rubber Cape Seal
Courage Drive Chadbourne Rd. Beck Ave. Collector 251,000 Asphalt Rubber Cape Seal
Maxwell Way Chadbourne Rd. End Local 41,500 Asphalt Rubber Cape Seal
N. Watney Way Courage Dr. Courage Dr. Local 133,000 Asphalt Rubber Cape Seal
S. Watney Way Courage Dr. Courage Dr. Local 152,000 Asphalt Rubber Cape Seal
Guittard Court Chadbourne Rd. End Local 36,000 Micro Surface Jelly Belly Lane N Watney Way End Local 19,500 Micro Surface Low Court End Chadbourne Rd. Local 19,000 Micro Surface Meyer Way Beck Ave. End Local 47,000 Micro Surace
Cordelia Road Ledgewood Creek
Bridge
970' W/O
Chadbourne Rd.
Arterial 340,000 Type III Micro with
AR Cape Seal
Link Road Central Way Cordelia Rd. Collector 125,000 Asphalt Rubber Cape Seal
Commerce Court Central Way End Local 37,000 Asphalt Rubber Cape Seal
Grobric Court Central Way End Local 31,000 Asphalt Rubber Cape Seal
Lookout Road Central Way End Local 10,600 Asphalt Rubber Cape Seal
Air Base Parkway Peabody Rd. East City Limit Arterial 348,000 Parker Road Air Base Pkwy. End Local 67,000
Fulton Drive Lopes Rd. Watt Dr. Collector 118,000
Asphalt Rubber
Cape Seal
Fermi Drrive Watt Dr. Lopes Rd. Collector 142,000
Watt Drive Fulton Dr. Redtop Rd. Collector 159,000
Eastman Court Watt Dr. End Local 17,000
Edison Court Fulton Dr. End Local 19,000
Pascal Court Fermi Dr. End Local 26,000
Watt Court Watt Dr. End Local 19,000
Travis Boulevard Eisenhower St. Sunset Ave. Arterial 150,000 North Texas Street Travis Blvd. Air Base Pkwy. Arterial 360,000 2.5" Grind and Asphalt
Overlay
E. Tabor Avenue Dover Ave. Clay Bank Rd. Collector 370,000 Asphalt Rubber
Cape Seal
Asphalt Rubber
Cape Seal
Completed Estimated
Useful Life (years)
PMP 2018 Phase 2 5‐7
PMP 2018 Phase 3 7‐10
PMP 2018 Phase 4 5‐7
PMP 2018 Phase 5 5‐7
PMP 2018 Phase 6 7‐10
PMP 2018 Phase 7 5‐7
PMP 2018 Phase 8 5‐7
PMP 2018 Phase 9 12‐16
PMP 2018 Phase 10 12‐16
PMP 2018 Phase 11 5‐7
PMP 2018 Phase 12 5‐7
PMP 2018 Phase 13 5‐7
2018 ‐2022 7‐10
2018 ‐2022 7‐10
PMP 2019 7‐10
PMP 2019 7‐10
PMP 2019 7‐10
PMP 2019 7‐10
PMP 2019 7‐10
PMP 2019 7‐10
PMP 2019 5-7
PMP 2019 5-7
PMP 2019 5-7
PMP 2019 5-7
PMP 2019 7‐10
PMP 2019 7‐10
PMP 2019 7‐10
PMP 2019 7‐10
PMP 2019 7‐10
7-10
2021 Pavement Maintenance Project.
Resurfacing of approximately 1,065,000 square feet of pavement. (Re-listed Project)
N Texas Water Main Replacement and Overlay. Project involves replacing the existing water main along N Texas Street, and repaving the street with a grind and overlay.
Approximately 360,000 square feet.
(Re-listed Project)
12-16
7-10Grange Middle School Safe Routes to School Project. Project will involve resurfacing E.
Tabor Ave, concrete bulb-outs, and traffic signal modifications. Sunset Avenue is an additive alternate option.
7-10
2021 Pavement Maintenance Project.
Resurfacing of approximately 1,065,000 square feet of pavement. (Re-listed Project)
$550,000 in SB-1 (Project on hold, but more than
enough was expended by June 2023)