e:J~ FAIRFIELD
!I::;::-· --· .

MEMORANDUM

PUBLIC WORKS DEPARTMENT
DATE: June 17, 2026
TO:

FROM:

SUBJECT:

David Gassaway, City Manager
Sanjay Mishra, Public Works Director-$-
Clerical Error with May 26, 2026, City Council Resolution 2026-76

RECOMMENDED ACTION
Replace originally published May 26, 2026, City Council Resolution 2026-76 with the attached corrected Resolution No. 2026- 76.

STATEMENT OF ISSUE
A clerical error was identified in Section 2 of Resolution No. 2026-76.

DISCUSSION
Section 2 of Resolution No. 2026-76 incorrectly stated the contractor that the city manager was authorized to enter a contract with. The correct contractor, as reflected in the attached revised documents, is Subterra Construction, Inc.

DOCUMENTS ATTACHED:

Attachment 1: Resolution 2026-76
Attachment 2: Revised Resolution 2026-76 with tracked changes

STAFF CONTACT
Bryan Heinzelman, Associate Civil Engineer
(707) 434-6157
bh einzel ma [email protected] .gov
BH:ej

Docusign Envelope ID: CCFBBBF5-6E34-BF83-8181-858C2C9C21 E9

CITY OF FAIRFIELD
RESOLUTION NO. 2026-76

APPROVING THE PLANS AND SPECIFICATIONS AND AWARDING A CONTRACT TO SUBTERRA CONSTRUCTION, INC. FOR THE MANKAS BOULEVARD WATER DISTRIBUTION MAIN REPLACEMENT PROJECT AND AUTHORIZING AN UPDATE TO THE FISCAL VEAR 2025-2026 BUDGET
WHEREAS, the Fairfield Municipal Utility (FMU) provides a continuous water supply to residents, maintains the existing water system, and ensures it is designed to support future growth; and WHEREAS, an aging 16-inch diameter cast iron distribution main pipe in Mankas Boulevard between Barbour Drive and Interstate 80 has experienced several leaks over the last year and needs to be replaced; and
WHEREAS, the Mankas Boulevard Water Distribution Main Replacement (Project) includes the replacement of the existing 16-inch cast iron water distribution main pipe with a new 8-inch diameter water main pipe, abandonment of the existing 16-inch main from Barbour Drive across the freeway to Buckingham Drive, and reconnection of existing residential water services and fire hydrants to the new main; and
WHEREAS, the bid opening for the Project took place on November 20, 2025, and the apparent low bidder was R.J. Gordon Construction, Inc. of Pleasant Hill, California; and WHEREAS, a bid protest was received and delayed the Project award and as a result, R.J. Gordon Construction, Inc. withdrew their bid; and
WHEREAS, Subterra Construction, Inc, of San Francisco was the next apparent low bidder; and WHEREAS, staff have reviewed the bid documents and found them to be responsive and in order; and
WHEREAS, staff is recommending the City Council to award the Project to Subterra Construction, Inc for the total amount of $1,295,272 which includes the total base bid and contingency; and WHEREAS, funding of $33,000 has been updated from Capital W~ter Fund (Fund 462) to Senate Bill 1 (Fund 163) to accommodate for the remaining Project cost and contingency; and WHEREAS, the budget adjustment will result in a net-zero increase to the total Project budget; and

Docusign Envelope ID: CCFBBBF5-6E34-8F83-8181-858C2C9C21E9 RES. NO. 2026-76

Page 2 ends

WHEREAS, the revised appropriation constitutes an update to the fiscal year (FY) 2025-2026 Budget approved pursuant to Resolution No. 2025-103.

NOW, THEREFORE, THE COUNCIL OF THE CITY OF FAIRFIELD HEREBY RESOLVES:

Section 1. The plans and specifications for the Project are hereby approved. · Section 2. The city manager is hereby authorized to enter into a contract with R.J. Gordon Construction, Inc. in the amount of $1,177,520.

Section 3. The director of public works is hereby authorized to execute and administer change orders for an amount not to exceed the 10% contingency of the agreement value in the amount of$117,752.

Section 4. The council hereby approves a one-time budget adjustment to update the project's funding from Capital Water Fund (Fund 462) by $33,000 to Senate Bill 1 (Fund 163) in the FY 2025-2026 Mankas Blvd Distribution Main Replacement project (CPW090070).

Section 5. The city manager or designee is hereby authorized to implement the above­ mentioned contract.

PASSED AND ADOPTED this 26th day of May 2026, by the following vote:

AYES: MEMBERS: MOY/BERTANI/CARR/PANDURO/SANDHU/TONNESEN/WILLIAMS NOES: MEMBERS: NONE
ABSENT: MEMBERS: NONE
ABSTAIN: MEMBERS: NONE
lc~lgned by:
~c;~:~.6-3 .. -. ----------------
ATTEST:

Attachment A
City of Fairfield
Fiscal Year 2026/2027 RMRA Project List June 2026
Pavement Pavement Anticipated Anticipated Estimated
Project Title and Description Street Name From To Area Start Completion Useful life (SF) Treatment (MM/VY) (MM/VY) (Years)
Newly Proposed Projects (Funded In-Part or Solely With FY 26/ 27 RMRA) Lopes Rd. Red Top Rd. 1-80 36i ,660 Cape Seal
2027 Pavement Maintenance Project: Green Valley Rd. lopes Rd. City Limit 383,364 Cape Seal Pavement resurfacing of appmximatelv 1,335,000 square feet and ADA curb ramp 4/ 27 7/27 7-10 replacements. Mangels Blvd. Sunisun Valley Rd. Business Center Dr. 489,4S6 Cape Seal West America Dr. Sunisun Varley Rd. Business Center Dr. 99,819 Cape Seal Mankas Boulevard Distribution Main Replacement: 2.S" Asphalt Replacement of existing curb ramps with ADA-compliant ramps, accompanied by a 2.5-inch asphalt overlay, as part of the site restoration for the water distribution main replacement Mankas Blvd. Barbour Dr. Cul-De-Sac 52,000 Grind and 7/26 12/26 25-30 oroiect. Overlay
HSIP Cycle 11 Unsignalized lnterscctioin Visibility and Safety Improvements Project:

Pedestrican and bicycle crossing improvements, signage, striping and concrete medians at 37 Citywide (Various) N/A N/A N/A N/A 7/26 10/26 7-10 unsignalized and high collision Intersectlcns.

HSIP Cycle 1~ Citywide Systemic Signal Visibility Upgrades Project:

Improve traffic signal hardware throughout the City (103 signals). Improvements include adding Citywide (Various) N/A N/A N/A N/A 8/ 26 12/26 15-20 reflective backplates, larger signal heads, and advanced warning beacons.

Re-listed Projects (Previously Proposed and Approved Projects Potentially Utilizing FY26/27 RMRA Funds) East Tabor Avenue/To!enas Road Safe Routes to School Gap Closure Project:

Improve pedestrian access by installing sidewalk over an at-grade railroad crossing at East Tabor E. Tabor Ave. Clay Bank Rd. Olive Rd. 75,000 Slurry Seal Avenue and Railroad Avenue. The project will also widen the sidewalk along Tolenas Avenue 4/26 12/26 between East Tabor Avenue and the Tolenas Elementary School. Constructing the sidewalk and 25-30 bicycle lane on the north side of East Tabor Avenue will close the gap that currently exists across Tolcnas Kd. E. Tabor Ave. Tolenas Elementary

N/A N/A
the railroad tracks. School
NOTE: Included with each proposed project is the preparatory work to be completed in advance of the actual overlays and/ or surface seals.

This work includes crack sealing and asphalt digouts. Work not related to pavement malntena'nce are not funded by RMRA.

St reet Nam e From Ta Roadway Area (SF) Description
Classlflcatlon
Business Center Or. Green Valley Rd, End Collector 141,700 Mlcrosurfacing Business Center Dr. Green Valley Rd. Suisun Valley Rd. Arterial 293,820 Asphalt Rubber Cape Seal
Business Center Dr, Dan WIison Creek Suisun Valley Rd. Arterial 190,060 Mlcrosurfaclng Bridge
Business Center Or. Suisun Parkway Dan Wilson Creek Arterial 293,820 Mfcrosurfacing Bridge
Central Way Pittman Rd. City limits Collector 168,960 Asphalt Rubber Cape Seal
Central Place Pittman Rd. End Collector 56,647 Asphalt Rubber Cape Seal
Pittman Rd. Cordelia Rd. 1000' N/0 Arterial 71,440 Slurry Seal Redwood
Pittman Rd. 1000' north of link Rd. Arter!al 36,000 2.5" grind and Redwood asohalt overlay
Pitt man Rd. Link Rd. Central Way Arterial 73,200 2.5" grind and asohalt overlay
Pitt man Rd. Central Way 1-80 Arterial 15,000 Slurry Seal Suisun Valley Rd. Neitzel Rd. Mangels Blvd. Arterial 106,743 Slurry Seal Suisun Valley Rd. Mangels City Limits Arterial 198,927 Slurry Seal Cordelia Rd. Monument link Rd, Arterial 72,852 Asphalt Rubber Cape Seal
Cordelia Rd. Link Ad. City limits Arterial 88,275 Asphalt Rubber Cape Seal
Beck Avenue Highway 12 Cordelia Rd. Arterial 125,000 Asphalt Rubber Cape Seal
Chadbourne Road Highway 12 Cordelia Rd. Collector 227,000 Asphalt Rubber Cape Seal
Courage Drive Chadbourne Rd. Beck Ave. Collector 251,000 Asphalt Rubber Cape Seal
Maxwell Way Chadbourne Rd. End local 41,500 Asphalt Rubber Cape Seal
N. Watney Way Courage Or. Courage Dr. local 133,000 Asphalt Rubber Cape Sea!
S. Watney Way Courage Or. Courage Dr. local 152,000 Asphalt Rubber Cape Seal
Guittard Court Ch.Jdbourne Rd. End Local 36,00U Micro Surface Jelly Belly lane NWatneyWay End local 19,500 Micro Surface low Court End Chadbourne Rd. local 19,000 Micro Surface Meyer Way Beck Ave. End local 47,000 Micro Surace
Cordelia Road Ledgewood Creek 970' W/ 0 Arterial 340,000 Type Ill Micro with Bridge Chadbourne Rd. AR Cape Seal
Link Road Central Way Cordelia Rd. Collector 125,000 Asphalt Rubber Cape Seal
Commerce Court Central Way End local 37,000 Asphalt Rubber Cape Seal
Grobric Court Central Way End Local 31,000 Asphalt Rubber Cape Sea!
Lookout Road Central Way End Local 10,600 Asphalt Rubber Cape Seal
Air Base Parkway Peabody Rd. East City Limit Arterial 348,000 Parker Road Air Base Pkwy. End tocat 67,000
Fulton Drive Lopes Rd. Watt Dr. Collector 118,000

Fermi Drrive Watt Dr. Lopes Rd. Collector 142,000
Watt Drive Fulton Dr. Redtop Rd. Collector 159,000 Asphalt Rubber Eastman Court Watt Dr. End Local 17,000 Cape Seal
Edison Court Fulton Or. End Local 19,000
Pascal Court Fermi Or. End Local 26,000
Watt Court Watt Dr. End local 19,000
Travis Boulevard Eisenhower St. Sunset Ave. Arterial 150,000 North Texas Street Travis Blvd. Air Base Pkwy. Arterial 360,000 2.5" Grind and Asphalt
Overlay
E. Tabor Avenue Dover Ave. Clay Bank Rd. Collector 370,000 Asphalt Rubber
-

Com pleted
Estim ated
Useful LIie (years )
PMP 2018 Phase 2 5-7
PMP 2018 Phase 3 7-10
PMP 2018 Phase 4 5-7
PMP 2018 Phase 5 5-7
PMP 2018 Phase 6 7-10
PMP 2018 Phase 7 5-7
PMP 2018 Phase 8 5-7
PMP 2018 Phose 9 12-16
PMP 2018 Phase 10 12-16
PMP 2018 Phase 11 5-7
PMP 2018 Phase 12 5-7
PMP 2018 Phase 13 5-7
2018 -2022 7-10
2018 -2022 7-10
PMP 2019 7-10
PMP 2019 7-10
PMP 2019 7-10
PMP 2019 7-10
PMP 2019 7-10
PMP 2019 7-10
PMP 2019 5-7
PMP 2019 5-7
PMP 2019 5-7
PMP 2019 5-7
PMP 2019 7-10
PMP 2019 7-10
PMP 2019 7-10
PMP 2019 7-10
PMP 2019 7-10

2021 Pavement M aintenance Project.

Resurfacing of ap proxim at ely 1,065,000 square feet of pavement. 7-10 (Re-fisted Project)
N Texas Water Main Replacement and Overlay. Project Involves replacing the existing water main along N Texas Street, and repaving the street with a grind and overlay. 12-16 Approximately 360,000 square feet. (Re•li5ted Project)
Grange Middle School Safe Routes to School Project. Project will involve resurfacing E. 7-10 Tabor Ave, concrete bulb-outs, and traffic signal modifications. Sunset Avenue is an

$550,000 in SB-I (Project on hold, but more than

---A · .
ll[V OA.11:'.

CITY OF FAIRFIELD ATTACHMENT 4:

PUBLIC WORKS FISCAL YEAR 26-27 RMRA PROPOSED '""' , .

ENGINEERING DIVISION PAVEMENT MAINTENANCE STREETS IOOOW E8S fER ST. 3•d FLOOR, FAIRl'l~LO, CA 94533

Docusign Envelope ID: CCFBBBF5-6E34-BF83-8181-858C2C9C21 E9

CITY OF FAIRFIELD
RESOLUTION NO. 2026-76

APPROVING THE PLANS AND SPECIFICATIONS AND AWARDING A CONTRACT TO SUBTERRA CONSTRUCTION, INC. FOR THE MANKAS BOULEVARD WATER DISTRIBUTION MAIN REPLACEMENT PROJECT AND AUTHORIZING AN UPDATE TO THE FISCAL YEAR 2025-2026 BUDGET
WHEREAS, the Fairfield Municipal Utility (FMU) provides a continuous water supply to residents, maintains the existing water system, and ensures it is designed to support future growth; and WHEREAS, an aging 16-inch diameter cast iron distribution main pipe in Mankas Boulevard between Barbour Drive and Interstate 80 has experienced several leaks over the last year and needs to be replaced; and
WHEREAS, the Mankas Boulevard Water Distribution Main Replacement (Project) includes the replacement of the existing 16-inch cast iron water distribution main pipe with a new 8-inch diameter water main pipe, abandonment of the existing 16-inch main from Barbour Drive across the freeway to Buckingham Drive, and reconnection of existing residential water services and fire hydrants to the new main; and
WHEREAS, the bid opening for the Project took place on November 20, 2025, and the apparent low bidder was R.J. Gordon Construction, Inc. of Pleasant Hill, California; and WHEREAS, a bid protest was received and delayed the Project award and as a result, R.J. Gordon Construction, Inc. withdrew their bid; and
WHEREAS, Subterra Construction, Inc, of San Francisco was the next apparent low bidder; and WHEREAS, staff have reviewed the bid documents and found them to be responsive and in order; and
WHEREAS, staff is recommending the City Council to award the Project to Subterra Construction, Inc for the total amount of $1,295,272 which includes the total base bid and contingency; and WHEREAS, funding of $33,000 has been updated from Capital W~ter Fund (Fund 462) to Senate Bill 1 (Fund 163) to accommodate for the remaining Project cost and contingency; and WHEREAS, the budget adjustment will result in a net-zero increase to the total Project budget; and

Docusign Envelope ID: CCFBBBF5-6E34-8F83-8181-858C2C9C21E9 RES. NO. 2026-76

Page 2 ends

WHEREAS, the revised appropriation constitutes an update to the fiscal year (FY) 2025-2026 Budget approved pursuant to Resolution No. 2025-103.

NOW, THEREFORE, THE COUNCIL OF THE CITY OF FAIRFIELD HEREBY RESOLVES:

Section 1. The plans and specifications for the Project are hereby approved. · Section 2. The city manager Is hereby authorized to enter into a contract with R.J. GordoA CoAstructioA, Inc. Subterra Construction, Inc. in the amount of $1,177,520.

Section 3. The director of public works is hereby authorized to execute and administer change orders for an amount not to exceed the 10% contingency of the agreement value in the amount of $117,752.

Section 4. The council hereby approves a one-time budget adjustment to update the project's funding from Capital Water Fund (Fund 462) by $33,000 to Senate Bill 1 (Fund 163) in the FY 2025-2026 Mankas Blvd Distribution Main Replacement project (CPW090070).

Section 5. The city manager or designee is hereby authorized to implement the above­ mentioned contract.

PASSED AND ADOPTED this 26th day of May 2026, by the following vote:

AYES: MEMBERS: MOY/BERTANI/CARR/PANDURO/SANDHU/TONNESEN/WJLLIAMS NOES: MEMBERS: NONE
ABSENT: MEMBERS: NONE
ABSTAIN: MEMBERS: NONE
lc ~igned by:
~c;~:~46-3 .. -. ----------------
ATTEST:

Attachment A
City of Fairfield
Fiscal Year 2026/2027 RMRA Project List June 2026
Pavement Pavement Anticipated Anticipated Estimated
Project Title and Description Street Name From To Area Start Completion Useful Life (SF} Treatment (MM/ VY} (MM/ VY} (Years)
Newly Proposed Projects (Funded In-Part or Solely With FY 26/27 RMRA) Lopes Rd. Red Top Rd. 1-80 36i ,660 Cape Seal
2027 Pavement Maintenance Project: Green Valley Rd. Lopes Rd. City limit 383,364 Cape Seal Pavement resurfacinr, of approximately 1,335,000 square feet and ADA curb ramp 4/27 7/ 27 7-10 replacements. Mangels Blvd. Sunisun Valley Rd. Business Center Dr. 489,456 Cape Seal West America Dr. Sunisun Valley Rd. Business Center Dr. 99,819 Cape Seal Mankas Boulevard Distribution Main Replacement: 2.5" Asphalt Replacement of existing curb ramps with ADA-compliant ramps, accompanied by a 2..5-inch asphalt overlay, as part of the site restoration for the water distribution main replacement Mankas Blvd. Barbour Dr. Cul-De-Sac 52,000 Grind and 7/26 12/26 25-30 lcrciect.

Overlay
HSIP Cycle 11 Unsignalized lntersectioin Visibility and Safety Improvements Project:

Pedestrican and bicycle crossing improvements, signage, striping and concrete medians at 3/ Citywide {Various) N/A N/A N/A N/A 7/26 10/26 7-10 unsignalized and high collision intersections.

HSIP Cycle 1~ Citywide Systemic Signal Visibility Upgrades Project:

Improve traffic signal hardware throughout the City (103 signals). Improvements include addlng Citywide {Various) N/A NIA N/A N/A 8/26 12/26 15-20 reflective backplates, larger signal heads, and advanced warning beacons.

Re-llsted Projects {Previously Proposed and Approved Projed S Potentially Utiliilng FV26/27 RMRA Funds) East Tabor Avenue/Tolenas Road Safe Routes to School Gap Closure rfoject:

Improve pedestrian access by installing sidewalk over an at-grade railroad crossing at East Tabor E. Tabor Ave. Clay Bank Rd. Olive Rd. 75,000 Slurry Seal Avenue and Railroad Avenue. The project will also widen the sidewalk along Tolenas Avenue between East Tabor Avenue and the Totenas Elementary School. Constructing the sidewalk and 4/26 12/ 26 25-30 bicycle lane on the north side of East Tabor Avenue will close the gap that currently exists across Tolenas Hd. E. Tabor Ave. Tolenas Elementary

N/A N/A
the railroad tracks. School
NOTE: Included with each proposed project is the preparatory work to be completed in advance of the actual overlays and/or surface seals.

This work includes crack sealing and asphalt digouts. Work not related to pavement maintenaiice are not funded by RMRA.

Street Name From Ta
Roadway Area (SF) Description Classification
Business Center Dr. Green V.alley Rd. End Collector 141,700 Mlcrosurfoclng Business Center Dr. Green Valley Rd. Suisun Valley Rd. Arterial 293,820 Asphalt Rubber Cape Seal
Business Center Dr. Dan Wilson Creek Suisun Valley Rd. Arterial 190,060 Mlcrosurfaclng Bridge
Business Center Dr. Suisun Parkway Dan Wilson Creek Arterial 293,820 Mlcrosurfacing Bridge
Central Way Pittman Rd. City limits Collector 168,960 Asphalt Rubber Cape Seal
Central Place Pittman Rd. End Collector 56,647 Asphalt Rubber Cape Seal
Pittman Rd. Cordelia Rd. 1000' N/0 Arterial 71.440 Slurry Seal Redwood
Pittman Rd. 1000' north of Link Rd. Arterial 36,000 2.5" grind and Redwood asphalt overlay
Pittman Rd. Linlc Rd. Central Way Arterial 73,200 2.5" grind and asphalt overlay
Pittman Rd. Central Way l·BO Arterial 15,000 Slurry Seal Suisun Valley Rd. Neitzel Rd. Mangels Blvd. Arterial 106,743 Slurry Seal Suisun Valley Rd. Maneels City limits Arterial 198,927 Slurry Seal Cordelia Rd. Monument Link Rd, Arterial 71.B52 Asphalt Rubber Cape Seal
Cordelia Rd. link Rd. City limits Arterial BB,275 Asphalt Rubber Cape Seal
Beck Avenue Highwayn Cordelia Rd. Arterial 125,000 Asphalt Rubber Cape Seal
Chadbourne Road Highway 12 Cordelia Rd. Collector 227,000 Asphalt Rubber Cape Seal
Courage Drive Chadbourne Rd. Beck Ave. Collector 251,000 Asphalt Rubber Cape Sea!
Maxwell Way Chadbourne Rd. End Local 41,500 Asphalt Rubber Cape Seal
N. Watney Way Courage Dr. Courage Dr. local 133,000 Asphalt Rubber Cape Seal
s. Watney Way Courage Dr. Courage Dr. Local 152,000 Asphalt Rubber Cape Seal
Guittard Court Chadbourne Rd. End Local 36,000 Micro Surface Jelly Belfy Lane N WatneyWay End Local 19,500 Micro Surface Low Court End Chadbourne Rd. Local 19,000 Micro Surface Meyer Way Beck Ave. End Local 47,000 Micro Surace
Cordelia Road Ledgewood Creek 970' W/0 Arterial 340,000 Type Ill Micro with Bridge Chadbourne Rd. AR Cape Seal
link Road Central Wav Cordelia Rd. Collector 125,000 Asphalt Rubber Cape Sea!
Commerce Court Central Way End Local 37,000 Asphalt Rubber Cape Seal
Grobric Court Central Way End Local 31,000 Asphalt Rubber Cape Seat
Lookout Road Central Way End local 10,600 Asphalt Rubber Cape Seal
Air Base Parkway Peabody Rd. East City limit Arteria! 348,000 Parker Road Air Base Pkwy, End local 67,000
Fulton Drive lopes Rd. Watt Dr. Collector 118,000

Fermi Drrive Watt Or. lopes Rd. Collector 142,000
Watt Drive Fulton Dr. Redtop Rd. Collector 159,000 Asphalt Rubber Eastman Court Watt Dr. End Local 17,000 Cape Seal
Edison Court Fulton Dr. End local 19,000
Pascal Court Fermi Dr. End Local 26,000
Watt Court Watt Dr. End local 19,000
Travis Boulevard Eisenhower St. Sunset Ave. Arterial 150,000 North Texas Street Travis Blvd. Air Base Pkwy. Arterial 360,000 2.5" Grind and Asphalt
Overlay
E. Tabor Avenue Dover Ave. Clay Bank Rd. Collector 370,000 Asphalt Rubber

Completed Estimated
Useful life (years)
PMP 2018 Phase 2 5-7
PMP 2018 Phase 3 7-10
PMP 2018 Phase 4 5-7
PMP 2018 Phase 5 5-7
PMP 2018 Phase 6 7-10
PMP 2018 Phase 7 5-7
PMP 2018 Phase 8 5-7
PMP 2018 Phase 9 12-16
PMP 2018 Phase 10 12-16
PMP 2018 Phase 11 5-7
PMP 2018 Phase 12 5-7
PMP 2018 Phase 13 5-7
2018 -2022 7-10
2018 -2022 7-10
PMP 2019 7-10
PMP 2019 7-10
PMP 2019 7-10
PMP 2019 7-10
PMP 2019 7-10
PMP 2019 7-10
PMP 2019 5-7
PMP 2019 5-7
PMP 2019 5-7
PMP 2019 5-7
PMP 2019 7-10
PMP 2019 7-10
PMP 2019 7-10
PMP 2019 7-10
PMP 2019 7-10

2021 Pavement Maintenance Project.

Resurfacing of approximately 1,065,000 square feet of pavem ent. 7-10 (Re-listed Project)
N Texas Water Main Replacement and Overlay. Project involves replacing the existlng water main along N Texas Street, and repaving the street with a grind and overlay. 12-16 Approximately 360,000 square feet. (Re-listed Project)
Grange Middle School Safe Routes ta Schoo! Project. Project will involve resurfacing E. 7-10 Tabor Ave, concrete bulb-outs, and traffic signal modifications. Sunset Avenue is an

$550,000 in SB-1 (Project on hold, but more than

F,·"=f==t= =·=="(Et==±±=- =====~=~~~ =; ~7----1·- , OESO<oeooo CHECKED:

OAiTf:

CITY OF FAIRFIELD

PUBLIC WORKS
\OOOWEB: r~~ !~~ERING DIVISION ' "l FLOOR, FAIRFIELO. CA!14Sl l FISCAL YE: ;i;,~~HMENT 4
PAVEMENT MAIN; E~~RA PROPOSED NCE STREETS