AMENDMENT NO. 7 TO THE AGREEMENT FOR PROFESSIONAL SERVICES (DESIGN) FOR THE ARCHITECTURAL AND ENGINEERING SERVICES FOR THE FIRE STATION 36 PROJECT
This Amendment No. 7 “AMENDMENT” is entered into and by between the City of Fairfield, a municipal corporation, hereinafter referred to as “CITY”, and Shah Kawasaki Architects, hereinafter referred to as “CONSULTANT”.
On August 17, 2021, the CITY and CONSULTANT entered into an Agreement for Professional Services (Design) for architectural and engineering services for the Fire Station 36 Project.
Based upon the need for additional consulting work outside the scope of the agreement, the CITY and CONSULTANT do hereby agree to amend the existing AGREEMENT FOR PROFESSIONAL SERVICES as follows:
WITNESSETH
WHEREAS, CITY desires to contract for additional architectural and engineering services to provide adjusted fee schedule, construction administration services, and building commissioning scope for the Fire Station 36 Project, and for the purposes of this Agreement shall be called “PROJECT”; and
WHEREAS, CONSULTANT is providing design services for the PROJECT; and WHEREAS, CONSULTANT is willing and qualified to provide design and architectural services for the PROJECT.
NOW, THEREFORE, in consideration of the mutual promises, covenants and agreements herein set forth, the parties do hereby agree as follows:
1. Section 1, SERVICES, of the AGREEMENT, shall be amended to include EXHIBIT “A2” attached to this Amendment.
2. Section 2, PAYMENT of the AGREEMENT, shall be amended as follows:
a. For those services described in Section 1, compensation shall be provided on a time and material basis. The maximum fee shall be increased by SIXTY-EIGHT THOUSAND FIVE HUNDRED AND SIX DOLLARS ($68,506), resulting in a revised maximum fee not to exceed, ONE MILLION TWO HUNDRED
SEVENTY TWO THOUSAND TWO HUNDRED FORTY-SEVEN DOLLARS
AND FIFTY CENTS ($1,272,247.50), pursuant to Exhibit “A2” attached to this Amendment.
IN WITNESS WHEREOF, the parties hereto have executed this Agreement on the ____ day of __________ 2026.
CITY OF FAIRFIELD
a municipal corporation (CITY)
David Gassaway
City Manager
CONSULTANT
By
Alan Kawasaki, Principal
Shah Kawasaki Architects
REQUEST FOR AUTHORIZATION
OF ADDITIONAL SERVICES
Basic Services Project: Fairfield Fire Station #36
Date: 02/06/2026
Project Number: 21712
Additional Request Number: 7
To: Ryan Panganiban, PE
Assistant Public Works Director
City of Fairfield
Department of Public Works
1000 Webster Street, 3rd Floor
Fairfield, CA 94533
1. BACKGROUND FOR ADDITIONAL SERVICE REQUEST
Major delays in the pre-construction schedule have outdated contract agreement fees impacting the following phases: Bid/Neg, Construction Administration, Record Documents. Start date of these services shifted from Oct, 2022 to Apr, 2025. A fee adjustment is requested to reflect appropriate escalation over the respective time period based on Consumer Price Index data from the Bureau of Labor Statistics.
2. SCOPE OF ADDITIONAL SERVICE
Original Bid/Neg, Construction Administration, and Record Document scopes remain the same.
This adjustment realigns fees with the project schedule.
Per 06/28/2021 contract: “Removal of Project Hold: Should the project be placed on hold through no fault of SKA, SKA shall receive additional service compensation to reform a team and restart the executed contract.” This remobilization fee will be 10% of impacted phase’s fees.
3. SCHEDULE
Bid/Neg phase is completed. Anticipated CA durations remains the same, 14 months. Record Documents are anticipated to be produced after construction is completed
4. COMPENSATION
For the scope of services described above, SKA requests an additional service compensation of $54,333.35. Consultant Fees are requested to be lump sum, and SKA fees are requested to be T&M to a maximum, consistent with the original contract.
EXHIBIT A
REQUEST FOR AUTHORIZATION
OF ADDITIONAL SERVICES
5. TERMS
Upon return of a fully executed authorization, this service shall become part of the agreement identified above. Any further services are excluded and will be requested under a separate authorization of additional services.
6. ACCEPTANCE
(Please sign both copies, return one copy to SKA and keep the other copy for your records) SHAH KAWASAKI ARCHITECTS OWNER:
A CALIFORNIA CORPORATION
BY: BY:
TITLE: Principal TITLE:
DATE: 02/06/2026 DATE:
REQUEST FOR AUTHORIZATION
OF ADDITIONAL SERVICES
Basic Services Project: Fairfield Fire Station 36
Date: 09/04/2026
Project Number: 21712
Additional Request Number: 10
To: Matt Kett
Construction Manager - City of Fairfield
Department of Public Works
1000 Webster Street, 3rd Floor
Fairfield, CA 94533
1. BACKGROUND FOR ADDITIONAL SERVICE REQUEST
Per the 6/28/2021 contract, the duration of the Construction Administration Phase was scheduled to be 14 months. Per the most recent construction schedule issued by the General Contractor on 8/18/26, the Construction Phase duration has been extended to 16 months. Therefore, we propose to amend our contract to cover the 2 additional months of Construction Administration for Fire Station 36.
2. SCOPE OF ADDITIONAL SERVICE
The additional fee request listed below reflects only the costs directly associated with the extended schedule, 2 extra months of site visits and 2 extra months of OAC meetings. We are not proposing an increase in fees associated with answering RFI’s, processing submittals, and issuing bulletins.
The assumption is that the work associated with those tasks will not increase due to the 2-month extended schedule.
3. SCHEDULE
After authorization, Construction Administration shall continue throughout the construction phase until the scheduled Final Completion date of 11/4/26.
4. COMPENSATION
For the scope of services described above, SKA requests an additional service compensation of $7,944.00
Architect 2 ($212) x 28 hrs. = $5,936.00
Senior Architect ($251) x 8 hrs. = $2,008.00
____________
Total Fee: $7,944.00
5. TERMS
Upon return of a fully executed authorization, this service shall become part of the agreement identified above. Any further services are excluded and will be requested under a separate authorization of additional services.
6. ACCEPTANCE
(Please sign both copies, return one copy to SKA and keep the other copy for your records) SHAH KAWASAKI ARCHITECTS OWNER:
A CALIFORNIA CORPORATION
BY: BY: _____
TITLE: Principal TITLE:
DATE: 09/04/2026 ______ DATE: ____
EXHIBIT B