09/09/2025 Item No.5.
Broadstone Crossing Phase II
Transportation Impact Study and Local Transportation Study
59 Figure 13. EPAP 2029 with Project turning movements and lane geometry
09/09/2025 Item No.5.
Broadstone Crossing Phase II
Transportation Impact Study and Local Transportation Study
60 Figure 13. EPAP 2029 with Project turning movements and lane geometry (continued)
09/09/2025 Item No.5.
Broadstone Crossing Phase II
Transportation Impact Study and Local Transportation Study
61 Table 18. EPAP 2029 intersection delay and level-of-service, with and without Project ID Intersection
Control & Left
Turn Pocket or
Through Segment
Length (feet)
2029 AM
No Project
2029 PM
No Project
2029 AM
With
Project
2029 PM
With
Project
2 E. Bidwell/
Scholar
Signal 12.2 / B 17.8 / B 11.9 / B 23.6 / C
EBL 200 162 210 148 227
WBL 200 91 210 88 231
NBL 250 78 114 67 98
SBL 230 155 269 166 317
3 E. Bidwell/
Power Center
Signal 7.8 / A 25.5 / C 7.1 / A 56.21 / E
NBL 185 103 139 105 171
SBL 240 111 326 98 376
4 E. Bidwell/
Broadstone
Signal 18.9 / B 29 / C 18.1 / B 46.4 / D
EBL 230 46 87 47 166
WBL 240 239 240 239 306
NBL 230 64 189 85 222
SBL 230 182 256 199 313
5 E. Bidwell/
Via Sole
Signal 11 / B 29.3 / C 12 / B 51.4 / D
EBL 75 105 145 90 206
WBL n/a 62 59 57 68
NBL 250 49 139 54 163
SBL 250 44 198 41 244
NBT 775 233 419 437 516
SBT 539 397 743 379 751
6 E. Bidwell/
Via Felice
Signal 8.2 / A 40 / D 30.2 / C 62.8 / E
EBL N/A,
AWSC @ 75’ 70 218 90 253
WBL n/a 17 17 117 296
NBL 250 70 176 156 258
SBL 250 12 72 305 331
NBT 785 180 238 384 394
SBT 775 433 963 615 995
7 E. Bidwell/
Iron Point
Signal 58.6 / E 80.6 / F 65.9 / E 81.6 / F
EBL 280 50 121 84 146
WBL 240 580 406 635 622
NBL 260 355 401 354 399
SBL 440 318 607 468 613
NBT 546 563 705 559 682
SBT 785 567 699 708 705
09/09/2025 Item No.5.
Broadstone Crossing Phase II
Transportation Impact Study and Local Transportation Study
62 Table 18. EPAP 2029 intersection delay and level-of-service, with and without Project continued ID Intersection
Control & Left
Turn Pocket or
Through Segment
Length (feet)
2029 AM
No Project
2029 PM
No Project
2029 AM
With
Project
2029 PM
With
Project
8 E. Bidwell/
Placerville
Signal 31.9 / C 15.1 / B 30.8 / C 15.6 / B
SBL 250 118 176 116 176
9 E. Bidwell/
WB Ramps
Signal 108.1 / F 38 / D 112 / F 42.4 / D
WB (1560' ramp) 1376 727 1558 886
10 E. Bidwell
/EB Ramps
Signal 400.7 / F 222.5 / F 403.9 / F 230.1 / F
EB (1815' ramp) 1457 1300 1456 1293
NB 3087 3265 3173 3212
11 Broadstone/
Iron Pt
Signal 6.6 / A 10.7 / B 6.2 / A 10.3 / B
EBL 225 83 208 88 196
WBL 240 49 22 46 19
SBL 230 30 51 32 44
12 Kilrush/
Driveway 1
AWSC 2.5 / A 2.6 / A 3.9 / A 16.3 / C
EBL 190 10 26 8 21
WB 261 25 25 40 39
14 Cavitt/
Kilrush
TWSC 3.8 (WB) /
A
5.3 (WB) /
A 4 (WB) / A 5.7 (WB) /
A
NBL 90 7 6 16 18
SBL 90 17 21 19 21
15 Iron Pt/
Cavitt
Signal 13.7 / B 42.7 / D 23.5 / C 75.7 / E
EBL 200 63 150 59 155
WBL 200 34 196 88 208
NBL 250 95 283 94 333
SBL 160 26 55 29 102
WB 267 1046 556 1039
16 Iron Pt/Driveway
2 TWSC Does Not Exist 48.9 (SB) /
E
1149.5
(SB) / F
* Worst approach or movement on multi-lane approaches
09/09/2025 Item No.5.
Broadstone Crossing Phase II
Transportation Impact Study and Local Transportation Study
63 Table 19. EPAP 2029 freeway segment density / level-of-service, with and without Project ID Description Segment
Type
2029 AM
No Project
2029 PM
No Project
2029 AM
With
Project
2029 PM
With
Project
Westbound
A E. Bidwell diagonal offramp Diverge 18.5 / B 18.4 / B 19.3 / B 18.9 / B B E. Bidwell diagonal onramp Merge 20.5 / C 17.6 / B 20.7 / C 18.1 / C Eastbound
C E. Bidwell diagonal offramp Diverge 17.7 / B 24.7 / C 18.5 / B 25.6 / C D E. Bidwell diagonal onramp Merge 12.1 / B 15.6 / B 12.5 / B 16.6 / B Note: density has units of passenger cars per hour per lane mile
09/09/2025 Item No.5.
Broadstone Crossing Phase II
Transportation Impact Study and Local Transportation Study
64 (This page intentionally left blank)
09/09/2025 Item No.5.
Broadstone Crossing Phase II
Transportation Impact Study and Local Transportation Study
65 7.0 ABATEMENT STRATEGY
7.1 Existing 2024 Plus Project Conditions Deficiencies (Deficiency #1) This analysis identified Project related deficiencies at four study intersections. Three of the intersections are on East Bidwell St (East Bidwell St/Via Felice , East Bidwell St/Iron Point Road , and East Bidwell St/Eastbound US 50 offramp ), and one is adjacent to East Bidwell St (Iron Point Road/Cavitt Dr).
Additionally, the Project’s Iron Point Road driveway is anticipated to have level-of-service F operation on its southbound approach. The driveway operations are a potential issue for the Applicant, however since the delay is on private property it does not create a deficiency relative to General Plan policies.
After describing anticipated Project related deficiencies, abatement is presented. Rather than an intersection-by-intersection abatement approach, a study area wide approach based on improved signal coordination and pedestrian safety along East Bidwell St is proposed. This approach is proposed because existing/anticipated operational issues arise from demand exceeding capacity at the East Bidwell St/Iron Point Rd intersection and difficulty maintaining signal coordination when pedestrians utilize crosswalks to cross East Bidwell St between the Project and the Palladio. Deficiencies at intersections adjacent to East Bidwell St also result from progression and queueing issues on East Bidwell St (i.e., queues extend from the East Bidwell/Iron Point intersection back through adjacent intersections causing them to fail as well).
Improvements to signal coordination on East Bidwell Street abate deficiencies at nearby intersections as well, as once the bottlenecks along East Bidwell St are addressed those adjacent in tersections are no longer blocked. In general, these Existing 2024 plus Project deficiencies and abatements are a subset of those detailed later for the 2029 EPAP plus Project condition abatements.
Note that where queuing is discussed below, it refers to either existing or anticipated 95 th percentile
queue length. 95th percentile queue length is the length that is anticipated be exceeded five percent of the time. In simple terms if a signal has a 90 second cycle length, the 95 th percentile queue would be expected to be exceeded two times during the peak hour. Because signals along East Bidwell generally have a 120 second to 156 second cycle length, the 95 th percentile queue may not occur at all during the peak hour.
#6 East Bidwell St/Via Felice deficiencies (2024 Existing plus Project conditions) This intersection (and the Cavitt Dr extension) serves as the primary access to the Project. The Project along with Broadstone Villas, adds an eastbound approach to this intersection and is anticipated to generate high demand for pedestrian crossings of East Bidwell.
09/09/2025 Item No.5.
Broadstone Crossing Phase II
Transportation Impact Study and Local Transportation Study
66 Project related queue spillback is anticipated on every approach:
• The eastbound approach is anticipated to have a PM peak hour 95 th percentile left turn queue length of 229 feet, which exceeds available storage of 75 feet and is more than one car length longer than the 95th percentile queue without the Project. This anticipated issue is a result of the Project, however because it occurs on private property it is not considered a deficiency relative to General Plan policies. Additionally, there is “three -way-stop-control” at the upstream intersection within the Palladio so that outgoing Palladio traffic cannot block incoming Palladio traffic. There is a similar issue on this eastbound approach during the AM peak hour, however the 95th percentile queue length is not extended by more than one car length, and the issue occurs on private property and thus is not considered to be a Project related deficiency. • The westbound approach is anticipated to have a PM peak hour 95 th percentile left turn queue length of 273 feet, which exceeds storage capacity of 238 feet. Without the Project this approach does not exist under Existing 2024 plus Project conditions. This anticipated deficiency is a result of the Project.
• The northbound approach is anticipated to have a PM peak hour 95 th percentile left turn queue
length of 273 feet, which exceeds available storage of 250 feet and is more than one car length longer than the 95 th percentile queue without the Project. This anticipated deficiency is a result of the Project.
• The southbound approach is anticipated to have a PM peak hour 95 th percentile left turn queue length of 280 feet, which exceeds available storage of 250 feet and is more than one car length longer than the 95th percentile queue without the Project. This anticipated deficiency is a result of the Project.
Pedestrian Safety:
The Project is anticipated to generate 75 AM peak hour pedestrian trips and 109 PM peak hour pedestrian trips. Half (or more) of those pedestrian trips are anticipated to cross East Bidwell Street and the additional pedestrian traffic makes it impractical to maintain coordinated signal timing plans. Also, given the road widths, traffic volumes, and congestion, East Bidwell Street is anticipated to experience an unsafe pedestrian environment. The anticipated signal timing and pedestrian safety issues are a r esult of both the Project, and existing traffic flows.
As stated above, a study area wide approach based on improved signal coordination and pedestrian safety along East Bidwell Street is proposed as an abatement. That Existing 2024 plus Project abatement strategy is discussed after a description of all the deficiencies.
#7 East Bidwell St/Iron Point Rd deficiencies (2024 Existing plus Project conditions) Without the Project there are queue spillback issues on two of the four left turn approaches to the intersection and the level-of-service fails to meet the City’s level- of-service D policy (General Plan Policy M 4.1.3) during the AM and PM peak hour s. Level-of-service and queueing are anticipated to worsen in the future with or without the Project until additional interchanges and bridges accessing US 50 and Folsom Ranch are constructed. Project traffic is anticipated to contribute to the worsening qu eue
09/09/2025 Item No.5.
Broadstone Crossing Phase II
Transportation Impact Study and Local Transportation Study
67 spillback, however intersection delay is anticipated to increase by less than five seconds, which is not considered to worsen the level -of-service per the standards previously detailed in this report ( Section
4.3).
Note that there is an existing CEQA statement of overriding considerations for this location. The General Plan CEQA analysis anticipated that this intersection would operate deficiently until additional freeway interchanges and overcrossings are constructe d. Those additional facilities include the planned Empire Ranch and Oak Avenue Parkway interchanges and the planned Rowberry Dr overcrossing, which will be constructed as quickly as funding from adopted fee programs can accommodate. In recognition of this, the General Plan CEQA determination included the adoption of a statement of overriding considerations for the East Bidwell St/Iron Point Rd intersection. Deficient operation at this location is permissible as long as all reasonably feasible abatement measures are implemented. This intersection already includes three northbound/southbound through lanes, and intersection specific abatement at this intersection to fully address the deficiencies is infeasible without additional through lanes. As part of the st atement of overriding considerations, the City of Folsom has stated that additional widening at this location for more through lanes is infeasible because it would be inconsistent with other General Plan policies and there are physical constraints from existing structures and the railroad tracks that parallel East Bidwell St.
Project related queue spillback is anticipated on three of the four approaches:
• The southbound approach is anticipated to have a PM peak hour 95 th percentile left turn queue length of 447 feet, which exceeds available storage of 440 feet, and is more than one car length longer than the 95th percentile queue without the Project. This anticipated deficiency is a result of the Project.
• The eastbound approach is anticipated to have a PM peak hour 95 th percentile left turn queue length of 298 feet, which exceeds available storage of 280 feet, and is more than one car length longer than the 95th percentile queue without the Project. This anticipated deficiency is a result of the Project.
• The northbound approach is anticipated to have a PM peak hour 95 th percentile through movement queue length of 6 82 feet, which exceeds available storage length on East Bidwell St between Iron Point Rd and Placerville Rd and, is more than one car length longer than the 95th percentile queue without the Project. This anticipated deficiency is a result of the Project.
As stated above, a study area wide approach based on improved signal coordination and pedestrian safety along East Bidwell St is proposed as abatement. That Existing 2024 plus Project abatement strategy is discussed after a description of all the deficiencies.
#15 Iron Point Rd/Cavitt Dr deficiencies (2024 Existing plus Project conditions) Without the Project there are queue spillback issues on two of the four approaches to the intersection and the level -of-service fails to meet the City’s level- of-service D policy (General Plan Policy M 4.1.3).
These operational issues are related to the do wnstream westbound left turn queue at the East Bidwell St/Iron Point Rd intersection which causes queueing at Iron Point Rd/Cavitt Dr as vehicles pre-position for downstream left turns. Level -of-service and queueing are anticipated to worsen in the future with or without the Project until additional interchanges and bridges accessing US 50 and Folsom Ranch are
09/09/2025 Item No.5.
Broadstone Crossing Phase II
Transportation Impact Study and Local Transportation Study
68 constructed to relieve traffic at East Bidwell St/Iron Point Rd. Project traffic is anticipated to contribute to the worsening queue spillback.
Project related level-of-service deficiencies are anticipated:
• The level-of service during the AM peak hour is anticipated to worsen from E with 57.2 seconds of delay to F with 69.8 seconds of delay. This anticipated deficiency is a result of the Project. • The level-of service during the PM peak hour is anticipated to worsen from F with 126 seconds of delay to F with 141 seconds of delay. This anticipated deficiency is a result of the Project.
As stated above, a study area wide approach based on improved signal coordination and pedestrian safety along East Bidwell St is proposed as abatement. That Existing 2024 plus Project abatement strategy is discussed below.
7.2 Existing 2024 Plus Project Conditions Abatement (Abatement 1) The abatement strategy includes:
• Changes to lane striping at East Bidwell St/Iron Point Rd and East Bidwell St/Placerville Rd that are already being implemented and will improve traffic flow from westbound Iron Point Rd to the westbound freeway onramp.
• Changes in lane striping at East Bidwell St/Broadstone Pkwy. ( Similar to those at East Bidwell St/Iron Point Rd).
• A pedestrian bridge over East Bidwell St between Kilrush Dr and Iron Point Rd, with elimination of existing at-grade east/west pedestrian crossings of East Bidwell St at Kilrush Drive. • Updated signal coordination along East Bidwell Street from Scholar Way to Placerville Rd. • Minor extension of left turn pockets to prevent “secondary deficiencies” at East Bidwell St/Scholar Way, East Bidwell St/Power Center Dr, East Bidwell St/Via Felice, and East Bidwell St/Iron Point Rd.
Each of these abatements are detailed below, with technical details related to signal timing and phasing located in Appendix D.
East Bidwell/Scholar Way Turn Pocket Extension:
• The East Bidwell/Scholar Way eastbound left turn pocket shall be extended from 200 feet to 210 feet (not including the entry taper). The Project is responsible for this improvement.
East Bidwell/Power Center Dr Turn Pocket Extension:
• The East Bidwell/Power Center Dr northbound left turn pocket shall be extended from 185 feet to 250 feet (not including the entry taper). The Project is responsible for this improvement.
East Bidwell St/Broadstone Pkwy Lane St riping Changes:
• Restripe the westbound Broadstone Pkwy approach to East Bidwell St from one right turn lane, three through lanes and two left turn lanes to one right turn lane, two through lanes and three left turn lanes over the fall of 2024. Split phasing is required for Broadstone Pkwy to prevent eastbound and westbound left turn phases from operating concurrently. The Project is responsible for this improvement.
East Bidwell St/Via Felice Turn Pocket Extension:
09/09/2025 Item No.5.
Broadstone Crossing Phase II
Transportation Impact Study and Local Transportation Study
69 • In addition to the phasing changes to accommodate the eastern leg of the intersection, extend the northbound left turn pocket from 250 to 260 feet. The Project is responsible for this improvement.
East Bidwell St/Iron Point Rd Lane Striping Changes and Turn Pocket Extension:
• The westbound Iron Point Rd approach to East Bidwell St was restriped from one right turn lane, three through lanes and two left turn lanes to one right turn lane, two through lanes and three left turn lanes over the fall of 2024. That change is incorporated as part of the Project’s Existing 2024 plus Project abatement. This change has already been implemented and the Project’s responsibility is limited to payment of applicable fees. Note that split phasing is required for Iron Point Rd to prevent eastbound and westbound left turn phases from operating concurrently. • Extend the westbound left turn pockets to the Project’s Iron Point Road Driveway. The Project is responsible for this improvement.
East Bidwell St/Placerville Rd Lane Striping and Geometric Changes:
• The southbound East Bidwell St approach to Placerville Rd is in the process ( fall 2024) of being restriped from a shared through-right, two through lanes and a left turn lane (total of 4 lanes) to a dedicated right turn lane, a shared through-right turn lane, a single through lane and a left turn lane (total of 4 lanes) . In addition to that striping change, which is already being implemented, widening the southbound approach to include one additional lane and stripe the southbound approach to include a single dedicated right turn lane, a single shared through-right turn lane, two dedicated through lanes, and a single dedicated left turn lane. These changes are illustrated in Figure 14 below. The Project is responsible for this improvement. • Note that this change will require coordination with Caltrans.
Pedestrian Bridge:
Construct an eastbound/westbound pedestrian overcrossing of East Bidwell St between Iron Point Rd and Kilrush Dr, to eliminate at-grade eastbound/westbound pedestrian crossing of East Bidwell St Kilrush Dr.
The pedestrian bridge is required to preserve safe pedestrian access across East Bidwell St (with or without the Project), consistent with:
• LU 2.1.2- Broadstone District. Encouraging a mix of uses, including an emphasis on high -density residential, and pedestrian and bicycle friendly street patterns in the Broadstone District to increase its functionality as a vibrant gathering place for the community. • M 2.1.14- Intersections. Ensure new intersections are designed to safely accommodate pedestrians and bicyclists, along with all other transportation modes. • M 2.1.17- Pedestrian and Bicycle Overpasses. Pursue the development of pedestrian and bicycle overpasses in areas with limited connectivity, particularly to connect development north and south of Highway 50.
• M 7.1.1- New Development. Require new development to contribute towards the construction of offsite facilities and provision of services to achieve the City’s mobility goals. • M 7.1.2- Fair Share for Transportation Infrastructure Improvements. Require all new development to dedicate rights -of-way, construct facilities, or pay its fair share for needed transportation infrastructure improvements that support all travel modes, including pedestrian, bicycle, and
09/09/2025 Item No.5.
Broadstone Crossing Phase II
Transportation Impact Study and Local Transportation Study
70 transit facilities, roadway improvements, and ITS and transportation demand management (TDM) programs and services.
The Pedestrian Bridge is also shown in Figure 14 below. The Project is responsible for its fair share of the cost of the pedestrian bridge and shall dedicate appropriate right-of-way as necessary. The value of land dedications shall count toward the Project’s fair share of the improvement cost. Additional Project support for the pedestrian bridge such as design and environmental work may also count toward the Project’s fair share of the cost. Note that this is being treated as a cumulative abatement growth in vehicle and pedestrian traffic would require this specific improvement with or without the Project, and therefore the City is requesting a fair share contribution. Note that the location o f the pedestrian bridge is conceptual at this time and shall be located such that it can accommodate pedestrians from both the Project and surrounding land uses.
Fair share cost of the pedestrian bridge is estimated as 15% of the bridge’s complete delivery cost which includes CEQA and NEPA clearance, design, and right of way. Based on the Project’s contribution to traffic on East Bidwell Street during the PM peak hour between Placerville Rd and Scholar Way (anticipated 589 Project trips) divided by the anticipated 2024 to 2029 growth in PM peak hour traffic on the same segment of East Bidwell St (14,881 vehicle trips in 2024 and anticipated 18,828 vehicle trips in 2029).
Signal Coordination:
Re-time AM and PM peak period traffic signals along East Bidwell St at:
• East Bidwell St/Scholar Way (re-time and modify coordination), • East Bidwell St/Power Center Dr (re-time and modify coordination), • East Bidwell St/Broadstone Pkwy (re-time and modify coordination), • East Bidwell St/Via Sole (re-time and modify coordination), • East Bidwell St/Via Felice (Kilrush Dr) (re-time and modify coordination), • East Bidwell St/Iron Point Road (re-time and modify coordination), • East Bidwell St/Placerville Rd (re-time only and remove from coordination).
Timing plans developed for this analysis include:
• Phasing changes at East Bidwell St/Via Felice (Kilrush Dr) to accommodate the extension of Kilrush Drive,
• Nonstandard phasing at East Bidwell St/Power Center Dr to accommodate double left turn phases to minimize northbound and southbound left turns queue lengths (note 2029 abatement was able to remove that nonstandard phasing),
• Cycle lengths of 156 seconds,
• A 90th percentile coordinated green band northbound and southbound along East Bidwell St of at least 60-70 seconds,
09/09/2025 Item No.5.
Broadstone Crossing Phase II
Transportation Impact Study and Local Transportation Study
71 Figure 14. East Bidwell St/Iron Point Rd and East Bidwell St/Placerville Rd geometric changes for Existing 2024 (and EPAP 2029) abatement strategy.
09/09/2025 Item No.5.
Broadstone Crossing Phase II
Transportation Impact Study and Local Transportation Study
72 • Eastbound/westbound pedestrian crossings times are lengthened so that the pedestrian clearance interval accommodate s the MUTCD 3.5 ft/sec walking speed during the pedestrian clearance (“flashing don’t walk”) interval, and reducing the initial walk interval from 7 seconds to 4 seconds as needed to allow for faster recovery of coordination after a pedestrian call breaks coordination.
• Eastbound/westbound split phasing at East Bidwell St/Broadstone Pkwy and East Bidwell St/Iron Point Rd.
The Project is responsible for developing and implementing signal timing to the satisfaction of the City Engineer. Recommended timing plans for the AM and PM peak hours are provided in Appendix D.
2024 Abatement Demonstration
Table 20 below shows level of service and queueing data without the Project, with the Project, and with the abated Project. Violations of City General Plan policies that are not considered to be Project deficiencies are shown with a grey highlight. Project related deficiencies are show n with an orange highlight. Several movements are shown in a red font, these were used for and are presented as part of a quality assurance quality control check that documents that abated approach queues to the study area are generally reduced relative to without Project conditions and/or to check the length of through queues near the proposed pedestrian bridge.
With the recommended abatements, Project traffic is not anticipated to cause new or worsen existing deficiencies relative to the City’s General Plan policies. The Project is however anticipated to lengthen the eastbound and westbound left turn queue at East Bidwell St/Iron Point Rd where there is already an existing statement of overriding considerations in the General Plan CEQA determination. It therefore is not considered to be a new CEQA impact and is generally allowed as an exception to the General Plan policies.
Iron Point Road/Cavitt Dr and Iron Point Rd/Project (Iron Point Rd) Driveway:
As previously discussed, there are anticipated Project related deficiencies at these two locations which result from anticipated westbound left turn queueing at the East Bidwell St/Iron Point Road intersection.
That queueing is anticipated to be abated by improvements along the East Bidwell corridor. Table 20 includes abated level-of-service and queuing results for these locations to document that those deficiencies are addressed by Abatement 1.
09/09/2025 Item No.5.
Broadstone Crossing Phase II
Transportation Impact Study and Local Transportation Study
73 Table 20. Existing 2024 Project abatement demonstration ID Intersection
Control & Left Turn
Pocket or Through
Segment Length (feet)
2024 AM No
Project
2024 PM No
Project
2024 AM
With Project
2024 PM
With Project
Abated Turn
Pocket
Length (feet)
2024 AM
with Abated
Project
2024 PM
with Abated
Project
2 E. Bidwell/
Scholar
Signal 13.4 / B 19.6 / B 13.9 / B 18.3 / B 14.9 / B 21.4 / C EBL 200 151 181 150 180 210 152 209
WBL 200 93 170 91 169 104 183
NBL 250 74 94 103 105 112 165
SBL 230 129 234 132 229 72 241
3 E. Bidwell/
Power Center
Signal 7.4 / A 18.2 / B 7.7 / A 19 / B 14.7 / B 31.2 / C NBL 185 119 167 143 165 250 143 249
SBL 240 93 246 88 271 133 259
4 E. Bidwell/
Broadstone
Signal 20.5 / C 21.9 / C 19.9 / B 21.8 / C 23.9 / C 28.6 / C EBL 230 42 86 37 85 43 96
WBL 240 251 216 226 217 233 180
NBL 230 68 120 102 155 140 191
SBL 230 143 175 161 176 176 230
5 E. Bidwell/
Via Sole
Signal 1.7 / A 4.2 / A 1.8 / A 4.5 / A 2.7 / A 5.6 / A EBL 75 57 102 63 106 66 108
WBL n/a N/A N/A N/A N/A N/A N/A
NBL 250 61 121 60 123 73 117
SBL 250 0 27 0 30 0 29
NBT 775 58 188 113 275 99 197
SBT 539 121 101 112 152 192 242
6 E. Bidwell/
Via Felice
Signal 2.5 / A 7.4 / A 26 / C 35.8 / D 10.4 / B 20.6 / C
EBL N/A,
AWSC @ 75’ 66 170 83 229 90 189
WBL n/a N/A N/A 89 273 83 191
NBL 250 91 203 165 273 260 140 252
SBL 250 12 19 225 280 196 156
NBT 785 94 243 382 412 262 400
SBT 775 146 286 418 648 257 365
09/09/2025 Item No.5.
Broadstone Crossing Phase II
Transportation Impact Study and Local Transportation Study
74 Table 20. Existing 2024 Project abatement demonstration (continued) ID Intersection
Control & Left Turn
Pocket or Through
Segment Length (feet)
2024 AM No
Project
2024 PM No
Project
2024 AM
With Project
2024 PM
With Project
Abated Turn
Pocket
Length (feet)
2024 AM
with Abated
Project
2024 PM
with Abated
Project
7 E. Bidwell/
Iron Point
Signal 57.7 / E 65.4 / E 60.9 / E 70.3 / E 50.2 / D 64.9 / E EBL 280 57 133 80 298 93 310
WBL 240 372 344 357 341 To Proj Drwy
(~500') 462 609
NBL 260 360 386 354 404 308 405
SBL 440 156 335 177 447 240 432
NBT 546 561 673 563 682 665 669
SBT 785 375 488 545 656 528 582
8 E. Bidwell/
Placerville
Signal 33.1 / C 19.6 / B 32.2 / C 18.8 / B 12.4 / B 12.5 / B SBL 250 119 200 117 197 142 217
9 E. Bidwell/
WB Ramps
Signal 127.1 / F 55.8 / E 110.4 / F 57.4 / E 33.9 / C 35 / C WB (1560' ramp) 1623 938 1275 1113 358 513
10 E. Bidwell/
EB Ramps
Signal 351.6 / F 82.1 / F 377.1 / F 85.9 / F 22.3 / C 35.6 / D EB (1815' ramp) 1618 1588 1545 1609 542 1281
NB 3771 850 3869 1016 496 404
11 Broadstone/
Iron Pt
Signal 6.5 / A 9.8 / A 6.3 / A 9.3 / A 6.8 / A 8.9 / A EBL 225 54 154 46 156 56 157
WBL 240 49 25 51 19 58 25
SBL 230 35 52 30 48 32 54
12 Kilrush/
Driveway 1
AWSC
Does Not Exist
4 / A 4 / A 7.1 / A 3.7 / A
EBL 190 126 122 100 111
WB 261 40 42 33 41
14 Cavitt/
Kilrush
TWSC 3.8 (EB) / A 3.6 (WB) / A 3.3 (EB) / A 3.5 (WB) / A 3 (EB) / A 3.9 (WB) / A NBL 90 6 0 16 17 22 17
SBL 90 4 8 3 4 4 5
15 Iron Pt/
Cavitt
Signal 57.2 / E 126 / F 69.8 / E 141 / F 12.3 / B 27.6 / C EBL 200 68 124 65 110 65 138
WBL 200 186 229 223 234 40 52
NBL 250 118 387 114 390 49 250
SBL 160 20 42 33 90 31 81
WB 1302 1798 1445 1793 261 583
16 Iron Pt/Driveway 2 TWSC Does Not Exist 303.6 (SB) / F 391.7 (SB) / F 5.8 (SB) / A 34.3 (SB) / D * Worst approach or movement on multi-lane approaches) 8/16/2024
09/09/2025 Item No.5.
Broadstone Crossing Phase II
Transportation Impact Study and Local Transportation Study
75 7.3 EPAP 2029 Plus Project Conditions Deficiencies (Deficiency #2) This analysis identified Project related deficiencies at seven study intersections, six of which are on East Bidwell St (Scholar Way, Power Center Drive, Broadstone Pkwy, Via Sole, Via Felice, and Iron Point Road) and one which is adjacent to East Bidwell St (Iron Point Road/Cavitt Dr). Additionally, the Project’s Iron Point Road driveway is anticipated to have level-of-service F operation on its southbound approach. The driveway operations are a potential issue for the Applicant, however since the delay is on private property it does not create a deficiency relative to General Plan policies.
As with the Existing 2024 plus Project discussion above, after describing anticipated Project related deficiencies, abatement is presented. Rather than an intersection-by-intersection abatement approach, a study area wide approach based on improved signal coordination and pedestrian safety along East Bidwell St is proposed. This approach is proposed because existing/anticipated operational issues arise from demand exceeding capacity at the East Bidwell St/Iron Point Rd intersection and difficulty maintainin g signal coordination that is operationally interrupted when pedestrians utilize crosswalks to cross East Bidwell St. As with the 2024 deficiencies, d eficiencies at intersections adjacent to East Bidwell St also result from progression and queueing issues on East Bidwell St and improvements to signal coordination on East Bidwell Street abate deficiencies at nearby intersections as well. The list of deficiencies and abatements presented here expands on the list presented previously for Existing 2024 plus Pro ject conditions.
Note that where queuing is discussed below, it refers to either existing or anticipated 95 th percentile
queue length. 95th percentile queue length is the length that is anticipated be exceeded five percent of the time. In simple terms if a signal has a 90 second cycle length, the 95 th percentile queue would be expected to be exceeded two times during the peak hour. Because signals along East Bidwell generally have a 120 second to 156 second cycle length, the 95
th percentile queue may not occur at all during the
peak hour.
#2 East Bidwell St/Scholar Way (2029 EPAP plus Project conditions) This intersection has 95 th percentile left turn queues that are longer than available storage and are worsened by Project traffic.
Project related queue spillback is anticipated on one of the four approaches:
The southbound approach is anticipated to have a PM peak hour 95th percentile left turn queue length of 317 feet, which exceeds available storage of 230 feet and is more than one car length longer than the 95th percentile queue without the Project. This anticipated deficiency is a result of the Project.
As stated above, a study area wide approach based on improved signal coordination and pedestrian safety along East Bidwell St is proposed as abatement. That EPAP 2029 plus Project abatement strategy is discussed after a description of all the deficiencies.
09/09/2025 Item No.5.
Broadstone Crossing Phase II
Transportation Impact Study and Local Transportation Study
76 #3 East Bidwell St/Power Center Dr (2029 EPAP plus Project conditions) This intersection has 95 th percentile left turn queues that are longer than available storage and are worsened by Project traffic, and a level-of-service deficiency that is caused by the Project.
Project related queue spillback is anticipated on one of the four approaches:
The southbound approach is anticipated to have a PM peak hour 95th percentile left turn queue length of 376 feet, which exceeds available storage of 240 feet and is more than one car length longer than the 95th percentile queue without the Project. This anticipated deficiency is a result of the Project.
Level-of-service:
Prior to the addition of Project traffic, the intersection is anticipated to operate at level-of-service C during the PM peak hour and level-of-service E with the addition of Project traffic. This anticipated deficiency is a result of the Project.
As stated above, a study area wide approach based on improved signal coordination and pedestrian safety along East Bidwell St is proposed as abatement. That EPAP 2029 plus Project abatement strategy is discussed after a description of all the deficiencies.
#4 East Bidwell St/Broadstone Pkwy (EPAP 2029 plus Project conditions) This intersection has 95 th percentile left turn queues that are longer than available storage and are worsened by Project traffic.
Project related queue spillback is anticipated on two of the four approaches:
• The westbound approach is anticipated to have a PM peak hour 95 th percentile left turn queue length of 306 feet, which exceeds available storage of 2 40 feet and is more than one car length longer than the 95 th percentile queue without the Project. This anticipated deficiency is a result of the Project.
• The southbound approach is anticipated to have a PM peak hour 95 th percentile left turn queue length of 313 feet, which exceeds available storage of 2 30 feet and is more than one car length longer than the 95 th percentile queue without the Project. This anticipated deficiency is a result of the Project.
As stated above, a study area wide approach based on improved signal coordination and pedestrian safety along East Bidwell St is proposed as abatement. That EPAP 2029 plus Project abatement strategy is discussed after a description of all the deficiencies.
#5 East Bidwell St/Via Sole deficiencies (EPAP 2029 plus Project conditions) This intersection serves as the primary access to the Broadstone Villas apartments which were still under construction in 2024 and assumed to be occupied by 2029. The eastern leg of this intersection serves as the primary access point to the approved Broadstone Villas project.
Project related queue spillback is anticipated on one of the four approaches:
• The eastbound approach is anticipated to have a PM peak hour 95 th percentile left turn queue length of 206 feet, which exceeds available storage of 75 feet and is more than one car length longer than the 95th percentile queue without the Project. This anticipated issue is a result of the Project, however because it occurs on private property it is not considered a deficiency relative
09/09/2025 Item No.5.
Broadstone Crossing Phase II
Transportation Impact Study and Local Transportation Study
77 to General Plan policies. There is a similar issue on the eastbound approach during the AM peak hour, however the 95th percentile queue length is extended by less than one car length and the issue occurs on private property and thus is not considered to be a Project related deficiency.
As stated above, a study area wide approach based on improved signal coordination and pedestrian safety along East Bidwell Street is proposed as abatement. That EPAP 2029 plus Project abatement strategy is discussed after a description of all the deficiencies.
#6 East Bidwell St/Via Felice deficiencies (EPAP 2029 plus Project conditions) This intersection (and the Cavitt Dr extension) serves as the primary access to the Project. The Project along with Broadstone Villas, adds an eastbound approach to this intersection and is anticipated to generate high demand for pedestrian crossings of East Bidwell.
Project related queue spillback is anticipated on three of the four approaches:
• The eastbound approach is anticipated to have a PM peak hour 95 th percentile left turn queue length of 25 3 feet, which exceeds available storage of 75 feet and is more than one car length longer than the 95th percentile queue without the Project. This anticipated issue is a result of the Project, however because it occurs on private property it is not considered a deficiency relative to General Plan policies. Additionally, there is “three -way-stop-control” at the upstream intersection within the Palladio so that outgoing Palladio traffic cannot block incoming Palladio traffic. There is a similar issue on this eastbound approach during the AM peak hour, however the 95th percentile queue length is not extended by more than one car length, and the issue occurs on private property and thus is not considered to be a Project related deficiency. • The northbound approach is anticipated to have a PM peak hour 95 th percentile left turn queue length of 258 feet which exceeds the storage capacity of 250 feet and is more than one car length longer than the 95 th percentile queue without the Project. This anticipated deficiency is a result of the Project.
• The southbound approach is anticipated to have an AM peak hour 95th percentile left turn queue length of 305 feet and a PM peak hour 95th percentile left turn queue length of 331 feet, both of which exceed available storage of 250 feet and are more than one car length longer than the 95th percentile queue without the Project. These anticipated deficiencies are a result of the Project.
Pedestrians Safety:
The Project is anticipated to generate 75 AM peak hour pedestrian trips and 109 PM peak hour pedestrian trips. Half (or more) of those pedestrian trips are anticipated to cross East Bidwell Street and the additional pedestrian traffic makes it impractical to maintain coordinated signal timing plans. Without abatement on East Bidwell Street, the road widths, traffic volumes, and congestion is anticipated to experience an unsafe pedestrian environment. Portions of the anticipated signal timing and pedestrian safety issues are a result of the Project.
Level-of-service:
Prior to the addition of Project traffic, the intersection is anticipated to operate at level-of-service D during the PM peak hour and level-of-service E with the addition of Project traffic. This anticipated deficiency is a result of the Project.
09/09/2025 Item No.5.
Broadstone Crossing Phase II
Transportation Impact Study and Local Transportation Study
78 As stated above, a study area wide approach based on improved signal coordination and pedestrian safety along East Bidwell Street is proposed as abatement. That EPAP 2029 plus Project abatement strategy is discussed after a description of all the deficiencies.
#7 East Bidwell St/Iron Point Rd deficiencies (EPAP 2029 plus Project conditions) Without the Project there are queue spillback issues on three of the four approaches to the intersection and the level-of-service is anticipated to fail to meet the City’s level-of-service D policy during the AM and PM peak hour (General Plan Policy M 4.1.3). Level- of-service and queueing are anticipated to worsen in the future with or without the P roject until additional interchanges and bridges accessing US 50 and Folsom Ranch are constructed. Project traffic is anticipated to contribute to the worsening queue spillback. Project traffic also causes the AM peak hour level- of-service to become deficient and worsens the PM peak hour level-of-service deficiency.
Note that there is an existing CEQA statement of overriding considerations for this location. The General Plan CEQA analysis anticipated that this intersection would operate deficiently until additional freeway interchanges and overcrossings are constructe d. Those additional facilities include the planned Empire Ranch and Oak Avenue Parkway interchanges and the planned Rowberry Dr overcrossing, which will be constructed as quickly as funding from adopted fee programs can accommodate. In recognition of this, the General Plan CEQA determination included the adoption of a statement of overriding considerations for the East Bidwell St/Iron Point Rd intersection. Deficient operation at this location is permissible as long as all reasonably feasible abatement measures are implemented. This intersection already includes three northbound/southbound through lanes, and intersection specific abatement at this intersection to fully address the deficiencies is infeasible without additional through lanes. As part of the st atement of overriding considerations, the City of Folsom has stated that additional widening at this location for more through lanes is infeasible because it would be inconsistent with other General Plan policies and there are physical constraints from existing structures and the railroad tracks that parallel East Bidwell St.
Project related queue spillback is anticipated on two of the four approaches:
• The westbound approach is anticipated to have an AM peak hour 95 th percentile left turn queue length of 635 feet and a PM peak hour 95th percentile left turn queue length of 622 feet, both of which exceed available storage of 240 feet and are more than one car length longer than the 95th percentile queue without the Project. These anticipated deficiencies are a result of the Project. • The southbound approach is anticipated to have an AM peak hour 95th percentile left turn queue length of 468 feet, which exceeds available storage of 440 feet and is more than one car length longer than the 95 th percentile queue without the Project. This anticipated deficiency is a result of the Project.
Level-of-service:
Prior to the addition of Project traffic, the intersection is anticipated to operate at level-of-service E during the AM peak hour and level -of-service F during the PM. With the addition of Project traffic, the intersection level-of-service is not anticipated to change, but the AM peak hour delay is anticipated to increase by more than 5 seconds which is considered a Project related deficiency.
09/09/2025 Item No.5.
Broadstone Crossing Phase II
Transportation Impact Study and Local Transportation Study
79 As stated above, a study area wide approach based on improved signal coordination and pedestrian safety along East Bidwell St is proposed as abatement. That EPAP 2029 plus Project abatement strategy is discussed after a description of all the deficiencies.
#15 Iron Point Rd/Cavitt Dr deficiencies (EPAP 2029 plus Project Conditions) Without the Project there are queue spillback issues on one of the four approaches to the intersection and the level -of-service fails to meet the City’s level -of-service D policy (General Plan Policy M 4.1.3) during the PM peak -hour. These operational issues are related to the downstream westbound left turn queue at the East Bidwell St/Iron Point Rd intersection which causes queueing at Iron Point Rd/Cavitt Dr as vehicles pre -position for downstream left turns. Level -of-service and q ueueing are anticipated to worsen in the future with or without the Project until additional interchanges and bridges accessing US 50 and Folsom Ranch are constructed to relieve traffic at East Bidwell St/Iron Point Rd. Project traffic is anticipated to contribute to the worsening queue spillback and level-of-service.
Project related queue spillback is anticipated on one of the four approaches:
• The northbound approach is anticipated to have a P M peak hour 95th percentile left turn queue length of 333 feet, which exceeds available storage of 250 feet and is more than one car length longer than the 95th percentile queue without the Project. This anticipated deficiency is the result of the Project.
Project related level-of-service deficiencies are anticipated:
• The level-of service during the PM peak hour is anticipated to worsen from D to F. This anticipated deficiency is a result of the Project.
As stated above, a study area wide approach based on improved signal coordination and pedestrian safety along East Bidwell St is proposed as abatement. That EPAP 2029 plus Project abatement strategy is discussed after a description of all the deficiencies.
#16 Iron Point Rd/Project driveway (EPAP 2029 plus Project conditions) This intersection is a right-in/right-out Project driveway with uncontrolled traffic on Iron Point Rd and side-street-stop-controlled traffic on the driveway. Without the Project there is no driveway at this location. Driveway level-of-service is anticipated to be level-of service E with 48.9 seconds of delay during the morning and level-of-service F with 1150 seconds of delay during the evening. Because these delays occur on private property, they are not a deficiency related to General Plan policies.
The delay is the result of outgoing vehicles that want to cross to the westbound left turn lanes for East Bidwell St/Iron Point Rd (and ultimately head toward or across the freeway), and the backups are the result of congestion at East Bidwell St/Iron Point Rd. Abatement for East Bidwell St is anticipated to reduce delays on this driveway to about a minute. As stated above, a study area wide approach based on improved signal coordination and pedestrian safety along East Bidwell St is proposed as abatement. That EPAP 2029 plus Project abatement strategy is discussed after a description of all the deficiencies.
09/09/2025 Item No.5.
Broadstone Crossing Phase II
Transportation Impact Study and Local Transportation Study
80 7.4 EPAP 2029 Plus Project Conditions Abatement (Abatement 2) Abatement 2 builds on Abatement 1 with additional and Turn Pocket Extensions and further refinement of the coordinated signal timing plan for the East Bidwell corridor.
Extension of left-turn pockets along the East Bidwell St:
Three left turn pockets require extensions to avoid secondary deficiencies from 95 th percentile left turn queues spilling back out of their pockets with the updated timing plans. These include:
East Bidwell/Scholar Way
• The eastbound left turn pocket shall be extended to 265 feet, not including the entry taper. (This pocket is extended to 210 feet by Abatement 1.)
• The southbound left turn pocket shall be extended to 300 feet, not including the entry taper. • The Project is responsible for these improvements.
East Bidwell/ Power Center Dr
• The northbound left turn pocket shall be extended from 250 feet, not including the entry taper. (This pocket is extended to 250 feet by Abatement 1.)
• The Project is responsible for this improvement.
East Bidwell/ Broadstone Pkwy
• The northbound left turn pocket shall be extended to 270 feet, not including the entry taper. (This pocket is extended to 260 feet by Abatement 1.)
• The southbound left turn pocket shall be extended to 280 feet, not including the entry taper. • The Project is responsible for these improvements.
East Bidwell/ Via Felice
• The East Bidwell/Via Felice southbound left turn pocket shall be extended from 2 50 feet to 380 feet, not including the entry taper.
• The Project is responsible for this improvement.
East Bidwell/ Iron Point Road
• The westbound left turn pocket shall be extended to the Project’s Iron Point Rd driveway (identical to Abatement 1).
Signal Coordination:
Re-time AM and PM peak period traffic signals along East Bidwell St at:
• East Bidwell St/Scholar Way (re-time and modify coordination), • East Bidwell St/Power Center Dr (re-time and modify coordination), • East Bidwell St/Broadstone Pkwy (re-time and modify coordination), • East Bidwell St/Via Sole (re-time and modify coordination), • East Bidwell St/Via Felice (Kilrush Dr) (re-time and modify coordination), • East Bidwell St/Iron Point Road (re-time and modify coordination), • East Bidwell St/Placerville Rd (re-time only and remove from coordination).
Timing plans developed for this analysis include:
• Phasing changes at East Bidwell St/Via Felice (Kilrush Dr) to accommodate the extension of Kilrush Drive,
09/09/2025 Item No.5.
Broadstone Crossing Phase II
Transportation Impact Study and Local Transportation Study
81 • Nonstandard phasing at East Bidwell St/Power Center Dr to accommodate double left turn phases to minimize northbound and southbound left turns queue lengths (note 2029 abatement was able to remove that nonstandard phasing),
• Cycle lengths of 156 seconds,
• A 90th percentile coordinated green band northbound and southbound along East Bidwell St at least 60-70 seconds,
• Eastbound/westbound pedestrian crossings times are lengthened so that the pedestrian clearance interval accommodate s the MUTCD 3.5 ft/sec walking speed during the pedestrian clearance (“flashing don’t walk”) interval, and reducing the initial walk interval from 7 seconds to 4 seconds as needed to allow for faster recovery of coordination after a pedestrian call breaks coordination.
• Eastbound/westbound split phasing at East Bidwell St/Broadstone Pkwy and East Bidwell St/Iron Point Rd.
The Project is responsible for developing and implementing signal timing to the satisfaction of the City Engineer. Recommended timing plans for the AM and PM peak hours are provided in Appendix D.
Iron Point Road/Cavitt Dr and Iron Point Rd/Project (Iron Point Rd) Driveway:
As previously discussed, there are anticipated Project related deficiencies at these two locations which result from anticipated westbound left turn queueing at the East Bidwell St/Iron Point Road intersection.
That queueing is anticipated to be abated by improvements along the East Bidwell corridor. Table 20 includes abated level-of-service and queuing results for these locations to document that those deficiencies are addressed by Abatement 2.
2029 Abatement Demonstration
Table 21 below shows level of service and queueing data without the Project, with the Project, and with the abated Project. Violations of City General Plan policies that are not considered to be Project impacts are shown with a grey highlight. Project related deficiencies are shown with an orange highlight. Several movements are shown in a red font, these were used for and are presented as part of a quality assurance quality control check that documents that abated approach queues to the study area are generally reduced and/or to check the length of through queues near the proposed pedestrian bridge.
With the recommended abatements, Project traffic is not anticipated to cause new or worsen existing deficiencies relative to the City’s General Plan policies. As discussed above, an internal queueing issue (within the Palladio) on eastbound Via Felice will remain without the addition of a stop sign to break up and meter the queue, however that is not anticipated to effect General Plan policy compliance. The Project would also lengthen the eastbound left turn queue at East Bidwell St/Iron Point Rd where there is already an existing statement of overriding considerations in the General Plan CEQA determination. It therefore is not considered to be a new CEQA impact and is generally allowed as an exception to the General Plan policies.
09/09/2025 Item No.5.
Broadstone Crossing Phase II
Transportation Impact Study and Local Transportation Study
82 Table 21. EPAP 2029 Project abatement demonstration
ID Intersection
Control & Left Turn Pocket
or Through Segment
Length (feet)
2029 AM No
Project
2029 PM No
Project
2029 AM With
Project
2029 PM With
Project
Abated Turn
Pocket Length
(feet)
2029 AM with
Abated
Project
2029 PM with
Abated
Project
2 E. Bidwell/
Scholar
Signal 12.2 / B 17.8 / B 11.9 / B 23.6 / C 17.2 / B 21.1 / C EBL 200 162 210 148 227 265 168 249
WBL 200 91 210 88 231 79 161
NBL 250 78 114 67 98 122 154
SBL 230 155 269 166 317 300 206 283
3 E. Bidwell/
Power Center
Signal 7.8 / A 25.5 / C 7.1 / A 56.21 / E 11.5 / B 28.9 / C NBL 185 103 139 105 171 250 145 244
SBL 240 111 326 98 376 121 279
4 E. Bidwell/
Broadstone
Signal 18.9 / B 29 / C 18.1 / B 46.4 / D 20.3 / C 32.1 / C EBL 230 46 87 47 166 50 129
WBL 240 239 240 239 306 250 228
NBL 230 64 189 85 222 250 124 248
SBL 230 182 256 199 313 171 260
5 E. Bidwell/
Via Sole
Signal 11 / B 29.3 / C 12 / B 51.4 / D 9.6 / A 14.5 / B EBL 75 105 145 90 206 103 146
WBL n/a 62 59 57 68 74 53
NBL 250 49 139 54 163 72 165
SBL 250 44 198 41 244 54 91
NBT 775 233 419 437 516 329 376
SBT 539 397 743 379 751 329 573
6 E. Bidwell/
Via Felice
Signal 8.2 / A 40 / D 30.2 / C 62.8 / E 10.8 / B 30.1 / C
EBL N/A,
AWSC @ 75’ 70 218 90 253 92 217
WBL n/a 17 17 117 296 97 248
NBL 250 70 176 156 258 270 143 264
SBL 250 12 72 305 331 280 195 277
NBT 785 180 238 384 394 332 416
SBT 775 433 963 615 995 261 757
7 E. Bidwell/
Iron Point
Signal 58.6 / E 80.6 / F 65.9 / E 81.6 / F 47.2 / D 72.2 / E EBL 280 50 121 84 146 94 377
WBL 240 580 406 635 622 To Proj Drwy
(~500') 489 651
NBL 260 355 401 354 399 391 405
SBL 440 318 607 468 613 256 577
NBT 546 563 705 559 682 697 665
SBT 785 567 699 708 705 560 731
09/09/2025 Item No.5.
Broadstone Crossing Phase II
Transportation Impact Study and Local Transportation Study
83 Table 21. EPAP 2029 Project abatement demonstration(continued) ID Intersection
Control & Left Turn
Pocket or Through
Segment Length (feet)
2029 AM No
Project
2029 PM No
Project
2029 AM With
Project
2029 PM With
Project
Abated Turn
Pocket Length
(feet)
2029 AM with
Abated
Project
2029 PM with
Abated
Project
8 E. Bidwell/
Placerville
Signal 31.9 / C 15.1 / B 30.8 / C 15.6 / B 11.8 / B 11.3 / B SBL 250 118 176 116 176 132 213
9 E. Bidwell/
WB Ramps
Signal 108.1 / F 38 / D 112 / F 42.4 / D 33 / C 32.5 / C WB (1560' ramp) 1376 727 1558 886 357 477
10 E. Bidwell
/EB Ramps
Signal 400.7 / F 222.5 / F 403.9 / F 230.1 / F 214.1 / F 197.7 / F EB (1815' ramp) 1457 1300 1456 1293 971 1246
NB 3087 3265 3173 3212 3165 3086
11 Broadstone/
Iron Pt
Signal 6.6 / A 10.7 / B 6.2 / A 10.3 / B 6.8 / A 11.2 / B EBL 225 83 208 88 196 89 207
WBL 240 49 22 46 19 59 22
SBL 230 30 51 32 44 34 51
12 Kilrush/
Driveway 1
AWSC 2.5 / A 2.6 / A 3.9 / A 16.3 / C 3.7 / A 5.6 / A EBL 190 10 26 8 21 10 22
WB 261 25 25 40 39 42 38
14 Cavitt/
Kilrush
TWSC 3.8 (WB) / A 5.3 (WB) / A 4 (WB) / A 5.7 (WB) / A 4.4 (WB) / A 5.8 (WB) / A NBL 90 7 6 16 18 16 19
SBL 90 17 21 19 21 19 22
15 Iron Pt/
Cavitt
Signal 13.7 / B 42.7 / D 23.5 / C 75.7 / E 13.6 / B 23.7 / C EBL 200 63 150 59 155 62 166
WBL 200 34 196 88 208 36 66
NBL 250 95 283 94 333 58 191
SBL 160 26 55 29 102 71 103
WB 267 1046 556 1039 326 319
16 Iron Pt/Driveway 2 TWSC Does Not Exist 48.9 (SB) / E 1149.5 (SB) / F 7.9 (SB) / A 33.2 (SB) / D * Worst approach or movement on multi-lane approaches
09/09/2025 Item No.5.
Broadstone Crossing Phase II
Transportation Impact Study and Local Transportation Study
84 (This page intentionally left blank)
09/09/2025 Item No.5.
Broadstone Crossing Phase II
Transportation Impact Study and Local Transportation Study
85 8. INTERNAL CIRCULATION/ACCESS SITE PLAN REVIEW
A preliminary site plan was provided as Figure 2. This section reviews parking, driveway throat- depth, on-site emergency vehicle access, and pedestrian access.
8.1 Parking Requirements
The Project is within the Broadstone Unit No. 3 Specific Plan area. The Specific Plan includes a parking standard for office and retail commercial uses in the C -2 zoning district of one space per 250 square feet of gross floor area . With 200,840 sqft of space the Project requires 804 parking spaces. 858 spaces are provided. The Project is therefor e adequately parked relative to Folsom code. A check against ITE parking guidance was also done as medical office uses are not explicitly addressed in Folsom municipal code or the Broadstone Unit No. 3 Specific Plan. That review, shown in Table 22, was done on a parcel -by-parcel basis and shows that the proposed parking meets or exceeds both the ITE recommendations and City requirements both for the Project as a whole and on a parcel-by-parcel basis.
Table 22. Parking demand cross reference.
Building Sqft Metric ITE Parking Demand Proposed Project Broadstone Unit No. 3 Specific Plan
Medical Office 106,500 demand 3.23 spaces per 1000 sqft 4.5 spaces/1000 sqft 1 space per 250 sqft spaces 344.0 480 426
Office 48,840 demand 2.39 spaces per 1000 sqft 1 space per 250 sqft 1 space per 250 sqft spaces 116.7 196 196
Office 45,500 demand 2.39 spaces per 1000 sqft 1 space per 250 sqft 1 space per 250 sqft spaces 108.7 182 182
Total 200,840 Spaces 569.5 858 804
Finding: The Project is anticipated to need a total of 570 parking spaces, with the Broadstone Unit No. 3 Specific Plan requiring 804 parking spaces. The proposed 858 spaces are both adequate and meet City of Folsom requirements.
8.2 Minimum Required Throat-Depth
Minimum Required Throat-Depth (MRTD): The minimum required throat depth is a function of the characteristics of the roadway being accessed and the proposed land use. • Project driveways access the extension of Kilrush Drive and the westbound side of the divided Iron Point Road. The wider roadway width would be the 60’ half section of Iron Point Road. In combination with the 200,840 sqft of medical office and office space, a 175-foot throat depth is required.
• The preliminary site plan allows for 300-feet of throat depth between the two driveways, which is more than sufficient to meet City of Folsom requirements.
Finding: The Project has adequate throat depth.
09/09/2025 Item No.5.
Broadstone Crossing Phase II
Transportation Impact Study and Local Transportation Study
86 8.3 Emergency Vehicle Access
The Project’s internal drive isles have 25 -foot inner/50 -foot outer minimum turning radii to accommodate fire department access. In addition to the primary access, separate emergency vehicle access is also provided.
Finding: Emergency vehicle access is anticipated to be adequate.
8.4 Right-Turn Deceleration/Acceleration Lanes and Tapers for Driveways For driveways on minor or major arterials, City standards require a 60-foot right turn taper in conditions with ten or more peak-hour right turns into a driveway, and a 150-foot pocket plus 60- foot taper, with fifty or more peak-hour right turns18.
The Project’s Kilrush Dr driveway is anticipated to have up to 302 inbound right turns and a 150- foot pocket plus 60-foot taper. Kilrush Dr is not a minor or major arterial and therefore does not require any changes.
The Project’s Iron Point Rd driveway is anticipated to have up to 30 inbound right turns from Iron Point R oad. A right turn taper is required . The site plan’s depiction of a planned right turn deceleration lane and taper at this location does not require any changes.
Finding: Driveway access geometry is anticipated to be adequate.
8.5 Pedestrian Access
While traffic counts show relatively low demand for pedestrian crossings of East Bidwell St (6 or fewer crossings combined between the East Bidwell St/Iron Point Rd and East Bidwell St/Broadstone Pkwy intersections) , i t is anticipated the Project ’s 200,840 sqft of space will accommodate approximately 670 employees (1 employee per 300 sqft). Institute of Transportation Engineers trip generation data (Section 5.2) estimates that the Project will generate 75 AM peak hour pedestrian trips and 109 PM peak hour pedestrian trips. This translates into enough demand to expect pedestrian phase calls to cro ss East Bidwell during nearly every cycle of the traffic signal at East Bidwell /Via Felice.
Microsimulation of the effect of those pedestrian crossings to the signal coordination on East Bidwell St was shown in Section 5 and Section 6. That analysis showed that level-of-service at East Bidwell St /Via Felice would fail to meet General Plan policy level- of-service D standard and that there would be extensive queue. The City and TKTPM believe that this creates a dangerous and frustrating environment for Pedestrians. Having adequate time and space to separate Pedestrian and vehicle traffic is particularly important near medical facilities which are frequented by the elderly and infirm.
18 Folsom Improvement Standards, section 12.5 and 12.6, https://www.folsom.ca.us/home/showpublisheddocument/384/637466585843430000 .
09/09/2025 Item No.5.
Broadstone Crossing Phase II
Transportation Impact Study and Local Transportation Study
87 A pedestrian over crossing (bridge) of East Bidwell St is recommended to maintain a safe pedestrian environment. A pedestrian bridge is also a key part of the abatement strategy for Project vehicle traffic. The pedestrian bridge addresses both the increases in vehicle and pedestrian traffic associated with the Project, and vehicle traffic from other foreseeable Projects.
Therefore, it is appropriate that the Project pays for its fair share of the cost of the pedestrian bridge.
Fair share is typically based on the project’s percentage of growth in vehicle traffic, which in this case is 15% for the PM peak hour. This is calculated as the Project’s contribution to traffic on East Bidwell Street during the PM peak hour between Placerville Rd and Scholar Way (anticipated 589 project trips) divided by the anticipated 2024 to 2029 growth in PM peak hour traffic on the same segment of East Bidwell St (1 4,881 vehicle trips in 2024 and anticipated 18,828 vehicle trips in 2029).
The Applicant shall make land available to the City on each side of East Bidwell Street for the ends of the pedestrian bridge and provide environmental analysis and preliminary design to develop a bid-ready package for construction of the pedestrian bridge . The cost of the required land, environmental work, and design work shall be considered part of the Project ’s fair share contribution toward offsite improvements and may be subject to a fee credit/reimbursement agreement between the Applicant and City.
09/09/2025 Item No.5.
Broadstone Crossing Phase II
Transportation Impact Study and Local Transportation Study
88 (This page intentionally left blank)
09/09/2025 Item No.5.
Broadstone Crossing Phase II
Transportation Impact Study and Local Transportation Study
89 9. FINDINGS AND RECOMENDATIONS
9.1 Trip Generation
The Project is anticipated to generate 5571 daily vehicle trips, 541 AM peak-hour vehicle trips, and 718 PM peak-hour vehicle trips.
9.2 General Plan Consistency
The Project is consistent with the General Plan land use and zoning. The Project is anticipated to cause new or worsen existing deficiencies with respect to General Plan policy M 4.13 at eight locations:
• East Bidwell St/Scholar Way,
• East Bidwell St/Power Center Dr,
• East Bidwell St / Broadstone Pkwy,
• East Bidwell St/Via Sole,
• East Bidwell St/Kilrush Dr (Via Felice),
• East Bidwell St/Iron Point Rd,
• East Bidwell St/ Eastbound ramps,
• Iron Point Rd/Cavitt Dr,
Recommended abatement measures are located in Section 7 of this report.
9.3 CEQA Impacts and Mitigation
There are three categories of Project related CEQA impacts considered by this analysis: VMT; pedestrian, bicycle, and transit infrastructure; and safety.
Category 1 – VMT
With an anticipated 14.3 VMT per capita, The Project is anticipated to generate less than 70% of the regional baseline office VMT per capita of 20.9, and less than 74 % of the Folsom baseline office VMT per capita of 19.5.
CEQA Finding: The Project is therefore anticipated to have a less-than-significant VMT impact.
Category 2 – pedestrian, bicycle, and/or transit infrastructure The Project does not i nhibit the use of bicycle , pedestrian, and/or transit facilities; eliminate existing bicycle, pedestrian, and/or transit facilities; or prevent the implementation of planned bicycle, pedestrian, and/or transit facilities. Note that pedestrian safety is discussed below under the under Category 3 – Safety.
CEQA Finding: The Project’s impact on bicycle, pedestrian, and/or transit facilities under CEQA is anticipated to be less-than-significant.
09/09/2025 Item No.5.
Broadstone Crossing Phase II
Transportation Impact Study and Local Transportation Study
90 Category 3 – Safety
The Project is not anticipated to worsen existing accident rates or create unsafe conditions. The Project’s impact on accident rates under CEQA is anticipated to be less-than-significant.
CEQA Finding: The Project is not anticipated to worsen existing accident rates or create unsafe conditions. The Project’s impact on accident rates under CEQA is anticipated to be less -than- significant.
9.4 Parking
The Project is anticipated to need a total of 570 parking spaces, with the Broadstone Unit No. 3 Specific Plan requiring 804 parking spaces. The proposed 858 spaces are both adequate and meet City of Folsom requirements.
9.5 Minimum Required Throat-Depth
The Project driveway throat-depth is anticipated to be adequate.
9.6 Emergency Vehicle Access
Emergency vehicle access is anticipated to be adequate.
9.7 Right-Turn Deceleration/Acceleration Lanes and Tapers for Driveways Driveway geometry is anticipated to be adequate.
9.8 Recommended Conditions of Approval
Apart from standard conditions there are several recommended conditions of approval provided:
• The applicant/owner shall execute a development agreement with City for a pedestrian overcrossing across East Bidwell Street located between Kilrush Drive and Iron Point Road prior to the issuance of the first building permit for the project based on the project’s fair share contribution that includes the following commitments from the applicant/owner:
Payment for the design,
Payment for environmental review covering both CEQA and NEPA Dedication of land necessary for a pedestrian overcrossing across East Bidwell from the project site to the Palladio.
.
• Applicant/owner shall be responsible for the geometric and signal timing improvements described in Abatement #1 and #2, as described in Section 7 of this report, to address level-of-service and queueing deficiencies relative to General Plan policies.
Because the abatement strategy functions on a corridor level rather than an intersection -by- intersection level, the City may need to modify the recommended abatement to accommodate additional project approvals. The City Engineer may modify the proposed abatement as other project applications are processed. However, any such modifications shall not increase the Project’s abatement cost.
09/09/2025 Item No.5.
Ordinance No. 1354
EXHIBIT "F"
ASSUMPTION AGREEMENT
OFFICIAL BUSINESS
Document entitled to free recording
Government Code Section 6103
RECORDING REQUESTED BY
AND WHEN RECORDED MAIL TO:
City of Folsom
50 Natoma Street
Folsom, CA 95630
(SPACE ABOVE THIS LINE RESERVED FOR RECORDER'S USE)
ASSIGNMENT AND ASSUMPTION AGREEMENT
RELATIVE TO _____________________
THIS ASSIGNMENT AND ASSUMPTION AGREEMENT (hereinafter, the "Agreement") is entered into this ________ day of __________, 20 ___, by and between Broadstone Crossing Phase II LLC, a California limited liability company and Elliott Homes, Inc., an Arizona corporation (collectively, "Developer"), and _______________________, a __________________________ (hereinafter "Assignee").
RECITALS
On ____________________, 20__, the City of Folsom and Developer entered into that certain agreement entitled "Development Agreement By and Between the City of Folsom and Broadstone Crossing Phase II LLC, a California limited liability company and Elliott Homes, Inc., an Arizona corporation (hereinafter the "Development Agreement"). Pursuant to the Development Agreement, Developer agreed to develop certain property more particularly described in the Development Agreement (hereinafter, the " Subject Property"), subject to certain conditions and obligations as set forth in the Development Agreement. The Development Agreement was recorded against the Subject Property in the Official Records of Sacramento County on _________________, 2025, as Instrument No. 2025-_____________________.
Developer intends to convey a portion of the Subject Property to Assignee, commonly referred to as Parcel _________, and more particularly identified and described in Exhibit A, attached hereto and incorporated herein by this reference (hereinafter the " Assigned Parcel").
Developer desires to assign and Assignee desires to assume all of Developer's right, title, interest, burdens and obligations under the Development Agreement with respect to and as related to the Assigned Parcel.
09/09/2025 Item No.5.
Ordinance No. 1354
ASSIGNMENT AND ASSUMPTION
NOW, THEREFORE, Developer and Assignee hereby agree as follows:
Developer hereby assigns, effective as of Developer's conveyance of the Assigned Parcel to Assignee, all of the rights, title, interest, burdens and obligations of Developer under the Development Agreement with respect to the Assigned Parcel. Developer retains all the rights, title, interest, burdens and obligations under the Development Agreement with respect to all other property within the Subject Property owned by Developer.
Assignee hereby assumes all of the rights, title, interest, burdens and obligations of Developer under the Development Agreement with respect to the Assigned Parcel, and agrees to observe and fully perform all of the duties and obligations of Developer und er the Development Agreement with respect to the Assigned Parcel. The parties intend hereby that, upon the execution of this Agreement and conveyance of the Assigned Parcel to Assignee, Assignee shall become substituted for Developer as the "Developer" under the Development Agreement with respect to the Assigned Parcel and Developer shall be released of and from any obligations or liabilities under the Development Agreement with respect to the Assigned Parcel.
All of the covenants, terms and conditions set forth herein shall be binding upon and shall inure to the benefit of the parties hereto and their respective heirs, successors and assigns.
The address described in Section 1.6 of the Development Agreement for Developer with respect to the Assigned Parcel shall be:
______________________________
______________________________
______________________________
Attn: __________________________
[Signatures follow on next page]
09/09/2025 Item No.5.
Ordinance No. 1354
IN WITNESS HEREOF, the parties hereto have executed this Agreement as of the day and year first above written. This Agreement may be signed in identical counterparts.
DEVELOPER:
____________________________________,
a ___________________________________
By: _________________________________
Print Name: __________________________
Title: ________________________________
ASSIGNEE:
____________________________________,
a ___________________________________
By: _________________________________
Print Name: __________________________
Title: ________________________________
DEVELOPER:
____________________________________,
a ___________________________________
By: _________________________________
Print Name: __________________________
Title: ________________________________
09/09/2025 Item No.5.
Ordinance No. 1354
EXHIBIT "G"
ESTIMATED COSTS OF PUBLIC IMPROVEMENTS EXCLUDING PEDESTRIAN
OVERCROSSING
09/09/2025 Item No.5.
Estimated Cost of Construction Estimated Time to Complete Phase of Work with High Level Tasks
Environmental Phase (3%-5%) $51,000 $85,000
Preliminary Design (35% plans)
Technical Studies and Documentation
Final Design (8% - 12%) $136,000 $204,00018 months to 2 years after Environmental Document Complete 65% Design (Plans and Estimate)
90% Design (Plans, Specs, and Estimate)
100% (Final Bid Documents)
Right of Way (5%-10%) $85,000 $170,0006 to 18 months for regular acquisition, 2 years to 5 years with condemnation Right of Way Acquisition
Acquisition Services
Utility Relocations (5%-10%) $85,000 $170,00018 months to 3 years for processing, design and field work Construction
Hard Costs $1,700,000 $1,700,000
Construction Management (15%-20%) $255,000 $340,000
Construction Engineering (5%-7%) $85,000 $119,000
City Administration (10% - 18%) $170,000 $306,000For the duration of the project.
Contingency (10%-30%) $170,000.0 $510,00010% if at 100% plans/bid, 30% if just starting Environmental TOTAL ESTIMATED PROJECT COST $2,737,000 $3,604,000
HARD COSTS OF PROJECT DELIVERY $1,700,000 $1,700,000
SOFT COSTS OF PROJECT DELIVERY $1,037,000 $1,904,000
$1,445,000
$2,159,000
Total Estimate $3,604,000
Depends on the volume of project, could be 6 months up to 3 years Initial Deposit at Sutter MOB Building Permit
Remaining Deposit Due at Certificate of Occupancy for Sutter *Initial Construction Estimate Provided by Elliott Homes and Prepared by Teichert for intersection improvements only as described in Condition of Approval No. 42. This estimate is conceptual in nature and does not reflect final design of the project. The Developer is responsible for compensating the City of Folsom for actual costs of the project delivery.
Exhibit G
Broadstone Crossing II - Developer Commitment Traffic Abatement Measures Concept to Construction Preliminary Engineer's Estimate Range of Cost
$1,700,000
Enter the Engineer's Construction Cost Estimate*
18 months to 5 years, depends on project and impacts as well as needing NEPA in addition to CEQA
09/09/2025 Item No.5.
Ordinance No. 1354
EXHIBIT "H"
PARCELS POTENTIALLY SUBJECT TO FAIR SHARE CONTRIBUTION
09/09/2025 Item No.5.
09/09/2025 Item No.5.
This page is intentionally blank.
09/09/2025 Item No.5.
Folsom City Council
Staff Report
1 MEETING DATE:
9/9/2025
AGENDA SECTION:
Consent Calendar
SUBJECT: Ordinance No. 1356 - An Uncodified Ordinance Adopting Prima Facie Speed Limits on East Bidwell Street, Westwood Drive, Alder Creek Parkway, Grand Prairie Road, and Mangini Parkway (Second Reading and Adoption)
FROM: Public Works Department
RECOMMENDATION / CITY COUNCIL ACTION
The Public Works Department recommends that the City Council conduct the second reading and adopt Ordinance No. 1356 – An Uncodified Ordinance Adopting Prima Facie Speed Limits on East Bidwell Street, Westwood Drive, Alder Creek Parkway, Grand Prairie Road, and Mangini Parkway.
BACKGROUND / ISSUE
California state law requires local agencies to establish speed limits on public streets based on an Engineering and Traffic Survey for Speed Zoning (ETS). Procedures are defined in both the California Vehicle Code (CVC) and the Manual on Uniform Traffic C ontrol Devices (MUTCD).
A new ETS must be conducted when a roadway is newly opened or when traffic conditions have significantly changed. If the ETS recommends a speed limit above the statutory minimum (25 MPH) and below the maximum (65 MPH), the limit mus t be adopted by ordinance after a public hearing. Ordinance No. 1356 was introduced at the 8/26/2025 City Council meeting and no changes have been made since the first reading.
POLICY / RULE
Section 10.08.030 of the Folsom Municipal Code states that speed limits shall be established by an Engineering and Traffic Study and adopted by ordinance of the City Council.
09/09/2025 Item No.6.
2 ANALYSIS
Speed limits are set to establish a uniform speed that allows traffic to safely traverse a given road segment. The underlying theory is that a proper speed limit will improve traffic flow by reducing conflicts between vehicles traveling at greatly differing speeds. Artificially low limits can create safety problems (i.e., rear -end collisions, tailgating ), while artificially high limits can be unsafe under normal roadway and environmental conditions. If a proper speed limit is posted, those motorists who significantly exceed the posted limit are considered unsafe compared to the general traffic flow and can be cited. Further, an ETS allows speed limits to be enforced with radar.
Speed surveys are necessary to determine speed limits in excess of the minimum speed limit of 25 MPH but less than the state maximum limit of either 55 or 65 MPH , depending on the roadway’s functional classification. Certain roadways or sections of roadways have “prima facie” limits associated with them. A “prima facie” speed does not require a radar survey, as long as the road segment in question meets specific requirements. Some examples of “pr ima facie” limits are as follows:
1. 25 MPH on residential streets that are less than 40 feet wide, not more than one -half mile between traffic control devices, and only one lane of traffic per direction.
2. 25 MPH in business districts, as defined by the California Vehicle Code.
3. 25 MPH when passing a senior center or senior housing facility with proper signage posted.
4. 25 MPH when passing a children’s play area during times when children are typically present (usually dawn to dusk).
5. 25 MPH when passing a school while children are present, when the school is not separated from the roadway by a fence. When th e school is fenced, then the 25 MPH limit only applies when children are going to or coming from school, if the roadway is used by school age pedestrians to access the campus.
6. 15 MPH in alleys
On roadways that do not meet these criteria, an ETS must be performed to determine the proper prima facie speed. An ETS evaluates existing roadway geometric conditions, collision history, and the land uses adjacent to a given road segment. A radar survey is conducted to determine the 85th- percentile speed (the speed that is not exceeded by 85 percent of vehicles surveyed), the average speed, and the 10 MPH pace (a 10 MPH range of speeds in which the majority of vehicle s were traveling). The nearest 5 MPH increment to the 85 th-percentile speed is typically deemed the appropriate speed limit, unless other conditions are present that, in the opinion of the traffic engineer, justify further reduction; in which case , the engineer may cite a one -time, downward zoning of an additional five miles per hour.
In accordance with the C VC and the MUTCD, traffic engineers also retain the professional discretion to reduce the posted speed limit by an additional 5 MPH when specific roadway or
09/09/2025 Item No.6.
3 environmental conditions exist that are not readily apparent to the average motorist. Such conditions may include limited sight distance due to curves or hills, hi gh pedestrian activity in areas without marked crosswalks, unexpected driveway or intersection density, or unique roadside development patterns. This provision intends to enhance safety where hazards may not be immediately visible, ensuring that the establ ished speed limit reflects not just prevailing traffic speeds but also latent safety considerations. Justification for the applicable roadway segments is below.
1. Westwood Drive (Alder Creek Parkway to Mangini Parkway)
Justification: Surrounding land uses include residential neighborhoods on both sides of the roadway. Sidewalks and bike lanes run along the majority of the road in both directions, supporting year-round pedestrian and bicycle activity. The roadway consists of a single lane in each direction s eparated by a planted median. Multiple residential driveways and intersecting local streets increase the number of potential conflict points. Recommended speed limit is within the 10 MPH pace range.
2. Alder Creek Parkway (Westwood Drive to Rustic Ridge Circle)
Justification: Land uses are primarily residential on both sides of the roadway. Sidewalks and bike lanes run along the majority of the road in both directions, and the segment includes a planted median. High pedestrian activity occurs due to nearby p ark access, with crossing activity at uncontrolled locations. Recommended speed limit is within the 10 MPH pace range.
3. Mangini Parkway (Savannah Parkway to Empire Ranch Road)
Justification: The roadway is flanked by residential neighborhoods on both sides. Sidewalks and bike lanes are present in both directions. Multiple driveways and unsignalized intersections contribute to potential turning conflicts. The corridor’s geometry, combined with residential access points, supports a lower posted limit while remaining within the 10 MPH pace range.
The Public Works Department conducts speed surveys on a road -by-road basis, establishing logical segments along each roadway based on geometry and adja cent land use. The item before the Council focuses on six specific segments where speed limits are proposed or updated based on the results of recent traffic engineering surveys. The first recommendation is to establish a 30 mph speed limit on Westwood Drive between Alder Creek Parkway and Mangini Parkway. The second is to establish a 35 mph limit on Alder Creek Parkway between Westwood Drive and Rustic Ridge Circle. The third proposes a 35 mph limit on Mangini Parkway between Savannah Parkway and Empire Ranch Road. A fourth recommends a 35 mph limit on Grand Prairie Road between Summit Street/Rustic Ridge Circle and Alder Creek Parkway. The fifth recommendation is for Mangini Parkway between East Bidwell Street and Oak Avenue Parkway. Finally, a 45 mph speed limit is proposed for East Bidwell Street between the US -50 eastbound off-ramp and White Rock Road.
These recommended speed limits were developed through data analysis and thorough evaluation of traffic conditions, roadway characteristics, and adjacent land uses on each surveyed segment.
09/09/2025 Item No.6.
4 FINANCIAL IMPACT
There are no financial impacts.
ENVIRONMENTAL REVIEW
This action is exempt from environmental review under the California Environmental Quality Act (CEQA) pursuant to CEQA Guidelines Section 15301.
ATTACHMENTS
1. Ordinance No. 1356 – An Uncodified Ordinance Adopting Prima Facie Speed Limits on East Bidwell Street, Westwood Drive, Alder Creek Parkway, Grand Prairie Road, and Mangini Parkway
2. Draft Action Summary of the June 26, 2025, Traffic Safety Committee meeting
Submitted,
___________________________________________________
Rebecca Neves, PUBLIC WORKS DIRECTOR/CITY ENGINEER
09/09/2025 Item No.6.
Attachment 1
09/09/2025 Item No.6.
Ordinance No. 1356
ORDINANCE NO. 1356
AN UNCODIFIED ORDINANCE ADOPTING PRIMA FACIE SPEED LIMITS ON
EAST BIDWELL STREET, WESTWOOD DRIVE, ALDER CREEK PARKWAY,
GRAND PRAIRIE ROAD, AND MANGINI PARKWAY
The City Council of the City of Folsom hereby does ordain as follows:
SECTION 1. PURPOSE
A. State law requires that local agencies establish speed limits on public streets within their jurisdictions using criteria defined in the California Vehicle Code; and B. The roadways listed in this ordinance are newly created and have not h ad adopted speed limits; and
C. The Public Works Department has conducted valid Engineering and Traffic Studies for speed zoning to determine prima facie speeds on East Bidwell Street, Westwood Drive, Alder Creek Parkway, Grand Prairie Road, and Mangini Parkway; and D. The proposed speed limits were reviewed and approved by th e Traffic Safety Committee on June 26, 2025; and
E. Notice of hearing has been given in the form and the manner required by State law and the Folsom Municipal Code.
SECTION 2. DESIGNATION OF PRIMA FACIE SPEED LIMITS
The Prima Facie speed limits on East Bidwell Street, Westwood Drive, Alder Creek Parkway, Grand Prairie Road, and Mangini Parkway, as shown under the “Recommended” column in Exhibit A attached to this Ordinance, are hereby adopted by the City Council.
SECTION 3. SEVERABILITY
If any section, subsection, sentence, clause, or phrase in this Ordinance or any part thereof is for any reason held to be unconstitutional, invalid, or ineffective by any court of competent jurisdiction, such decision shall not affect the validity or effectiveness of the remaining portions of this Ordinance or any part thereof. The City Council declares that it would have passed each section irrespective of the fact that any one or more section, subsection, sentence, clause, or phrase be declared unconstitutional, invalid, or ineffective.
SECTION 4. EFFECTIVE DATE
This Ordinance shall become effective thirty (30) days from and after its passage and adoption, provided it is published in full or in summary within twenty (20) days after its adoption in a newspaper of general circulation in the City.
09/09/2025 Item No.6.
Ordinance No. 1356
This Ordinance was introduced and the title thereof read at the regular meeting of the City Council on August 26, 2025 and the second reading occurred at the regular meeting of the City Council on September 9, 2025.
On a motion by Councilmember seconded by Councilmember , the foregoing ordinance was passed and adopted by the City Council of the City of Folsom, State of California, this 9th day of September 2025, by the following roll-call vote:
AYES: Councilmember(s):
NOES: Councilmember(s):
ABSENT: Councilmember(s):
ABSTAIN: Councilmember(s):
_________________________________
Sarah Aquino, MAYOR
ATTEST:
__________________________________
Christa Freemantle, CITY CLERK
09/09/2025 Item No.6.
Ordinance No. 1356
Exhibit A
CHART OF RECOMMENDED SPEED LIMITS
09/09/2025 Item No.6.
Ordinance No. 1356
Speed Survey Recommendations Table
# Street Survey Limits
Speed (mph)
Existing
85th
Percentile
Recommended
1 East Bidwell Street US-50 Eastbound Off-Ramp to White Rock Road 45 47.8 45
2 Westwood Drive Alder Creek Parkway to Mangini Parkway Not Posted 35.9 30
3 Alder Creek Parkway Westwood Drive to Rustic Ridge Circle 30 42.5 35 4 Grand Prairie Road Summit Street/Rustic Ridge Drive to Alder Creek Parkway 35 38 35
5 Mangini Parkway Savannah Parkway to Empire Ranch Road 30 38 35 6 Mangini Parkway East Bidwell Street to Oak Avenue Parkway 40 41.6 35
09/09/2025 Item No.6.
Attachment 2
09/09/2025 Item No.6.
1 DRAFT Traffic Safety Committee Meeting
Minutes
City Council Chambers | 50 Natoma Street, Folsom, CA 95630 June 26, 2025
4:00 PM
Meeting minutes contain an action summary. A video recording of the meeting in its entirety can be found on the City of Folsom website on the Traffic Safety Committee webpage.
1. CALL TO ORDER
Chair Brausch called the meeting to order at 4:00 p.m.
2. ROLL CALL:
PRESENT: M. Austin (arrived at 4:03 p.m.), Z. Bosch, J. Brausch, R. Cogil, K. Goddard
ABSENT: M. McGee, M. Washburn
3. MINUTES
Approval of the Minutes of the April 24, 2025, Meeting.
Goddard motioned to accept the minutes.
Cogil seconded the motion.
Motion was carried with the following vote:
AYES: Austin, Bosch, Brausch, Cogil, Goddard
ABSTAIN: None
ABSENT: McGee, Washburn
4. BUSINESS FROM THE FLOOR/GOOD OF THE ORDER
No public comments were made.
5. ACTION/DISCUSSION ITEMS
a. Pine Grove Way and Oakplace East/Oakplace West – Resident Request for All-Way Stop Sign Control
Public Comment made by David Hassin, Craig Burnett, Sharlotte Bennett, Alison Majer, Amanda Ross, Dale Alto, and Jann Jones.
09/09/2025 Item No.6.
1 The Traffic Safety Committee did not recommend placing an all-way stop sign at the intersection of Pine Grove Way and Oakplace East/Oakplace West.
The Traffic Safety Committee recommends speed limit signs on Pine Grove Way in both directions, pavement paint with speed limit in both directions, pedestrian warning signage, intersection pedestrian warning signage, and installation of radar feedback signs on Pine Grove Way on approach. There will be a three-month evaluation of the effectiveness of the preventative measures, based on residential feedback and results from the radar feedback signs.
Cogil proposed the motion.
Goddard seconded the motion.
Motion carried with the following vote:
AYES: Austin, Bosch, Brausch, Cogil, Goddard
ABSTAIN: None
ABSENT: McGee, Washburn
b. Westwood Drive and Needlegrass Drive – Resident Request for Traffic Calming/Intersection Control
The Traffic Safety Committee recommends radar feedback signs on north and south bound Needlegrass Drive, committee standard measures for speed reduction, dotted line paint markers for bike lanes across street entrances , encourage the residential speed watch program , and encourage the Folsom Police Department to increase enforcement of speed limits where possible. Six months after the future trail and crosswalk are completed, Rectangular Rapid Flashing Beacons (RRFB) installed, and school resumes, the committee will evaluate the effectiveness, unless the speed watch program brings additional information sooner that needs to be addressed.
Brausch proposed the motion.
Cogil seconded the motion.
Motion carried with the following vote:
AYES: Austin, Bosch, Brausch, Cogil, Goddard
ABSTAIN: None
ABSENT: McGee, Washburn
c. Speed Limit Adoption: Various Arterial and Collector Streets in the Folsom Plan Area
The Traffic Safety Committee recommends the approval of the speed limit recommendations for various arterial and collector streets in the Folsom Plan Area. Specifically, US-50 eastbound off- ramp to White Rock Road, Alder Creek Parkway to Mangini Parkway, Westwood Drive to Rustic Ridge Circle, Rustic Ridge Circle to Alder Creek Parkway , Savannah Parkway to Empire Ranch Road, and East Bidwell Street to Oak Avenue Parkway. The committee approves City staff to bring the speed limit adjustments to the City Council for adoption by ordinance.
Goddard proposed the motion.
Cogil seconded the motion.
Motion carried with the following vote:
AYES: Austin, Bosch, Brausch, Cogil, Goddard
09/09/2025 Item No.6.
1 ABSTAIN: None
ABSENT: McGee, Washburn
5. INFORMATIONAL ITEMS
a. Traffic Safety Committee Action Item Updates
Chair Brausch commented that Mangini Parkway RRFBs have been installed.
Chair Brausch requested to reconsider the yellow sanctions on North Lexington Drive on a future agenda due to residential complaints that they are not aiding in the traffic control. Bosch agreed to monitor the intersection after school resumes to get video on the situation before adding it to a future agenda.
Bosch will remove Natoma Station Drive and Ashcat Way from the tracker as RRFBs have been installed, the school district has confirmed RRFBs are working, and it has been two years since any outreach.
Bosch informed the committee that there has been no outreach from the public on the South Lexington Drive speeding issue, and there is no urgency to act.
Cogil brought to the committee’s attention that the bollards at Willow Creek Drive and Randall Drive have been run over and are bent. Bosch agreed to send City staff to replace the broken bollards.
b. Upcoming Traffic Safety Committee items
• Riley Street and Teceira Way – All Way Stop Control Request • East Natoma Street and Wesley Drive – All Way Stop Control Request • Oak Avenue and Vista Oak Drive – All Way Stop Request • Willow Creek Drive – Traffic Calming Request by Committee Member Cogil
Bosch received a request for a stop sign at American River Canyon Drive and Morning Dove Lane/Bobwhite Lane, which will be added to upcoming Traffic Safety Committee items.
Cogil requested that the Willow Creek Drive – Traffic Calming item be removed from upcoming agendas until the water project is completed. Bosch agreed and will be in contact with Cogil about when the item can be added back to the list.
6. ADJOURNMENT
Meeting adjourned at 5:22 p.m.
09/09/2025 Item No.6.
This page is intentionally left blank
to facilitate double-sided printing
and minimize paper use.
09/09/2025 Item No.6.
Folsom City Council
Staff Report
1 MEETING DATE:
9/9/2025
AGENDA SECTION:
Consent Calendar
SUBJECT: Resolution No. 11455 – A Resolution Authorizing the City Manager to Execute Amendment No. 1 to the Agreement
(Contract No. 173-21 23-049) with Water Systems Consulting, Inc. for $31,464 with $15,732 from the Water Impact Fee Fund (Fund 456) and $15,732 from the Water Operating Fund (Fund 520) for the City of Folsom Water Vision and Appropriation of Funds
FROM: Environmental and Water Resources Department
RECOMMENDATION / CITY COUNCIL ACTION
The Environmental and Water Resources Department recommends the City Council pass and adopt Resolution No. 11455 – A Resolution Authorizing the City Manager to Execute Amendment No. 1 to the Agreement (Contract No. 173 -21 23-049) with Water Systems Consult ing, Inc. for $31,464 with $15,732 from the Water Impact Fee Fund (Fund 456) and $15,732 from the Water Operating Fund (Fund 520) for the City of Folsom Water Vision and Appropriation of Funds.
BACKGROUND / ISSUE
On August 22, 2023, City Council approved Resolution No. 11089 with Water Systems Consulting, Inc. (WSC) to complete the City’s Water Vision planning process. EWR staff recommended a Water Vision planning process to evaluate water supply alternatives to meet customer demands during drought or infrastructure outages, to consider water supply impacts due to climate variability, and to include key stakeholders and customers in the development process.
The process evaluated the adequacy and reliability of the City’s water supplies, developed a water supply portfolio that addresses water supply reliability, resiliency, and sustainability, and developed recommendations to provide long -term guidance for managing these supplies through the Stakeholder process.
09/09/2025 Item No.7.
2 Based on feedback from City Council d uring the February 20, 2023 City Council meeting, a focused stakeholder group consisting of 20 -25 members of the community was created, which included all seven Utility Commissioners. The program contents below were presented to the stakeholder group and the public in six workshops for public comment, feedback, and discussion. City water supplies and contracts.
City’s current and future water use.
Statewide landscape regarding water usage.
Potential threats to the City’s water supplies.
Opportunities for water supply reliability, resiliency, and redundancy.
POLICY / RULE
In accordance with Chapter 2.36 of the Folsom Municipal Code , supplies, equipment, services, and construction with a value of $75,049 or greater shall be awarded by City Council.
The 2035 General Plan outlines the necessary public facilities and services (PFS) to serve the needs of existing and future residents and businesses. The policies within Section 7 of the General Plan seek to ensure that PFS are provided and maintained, so that Fol som can continue to grow and thrive to 2023 and beyond.
Folsom General Plan 2035 , Goal PFS 3.1/Objective 3.1.5 – Coordinate with regional and sub - regional agencies to ensure the reliability of an adequate water supply.
Folsom General Plan 2035, Goal PFS 3.1/Objective 3.1.7 – Provide an adequate supply of water for all users in Folsom now and in the future.
Folsom General Plan 2035, Goal PFS 3.1/Objective 3.1.8 – Require water resources be developed in coordination with local flood management, water conservation, and groundwater agencies.
Folsom General Plan 2035, Goal PFS 3.1/Objective 3.1.11 – Ensure a resilient water storage and distribution system that can rapidly recover in the event of a disaster.
ANALYSIS
The intent of the Water Vision was to initiate a City-wide discussion and an opportunity for public participation in the long -range (at least 50 years) planning of Folsom’s future water supply. The planning process was structured into eight key stages across six workshops, including:
Defining planning objectives to reflect city values, desired outcomes, and process goals Assessing risks and vulnerabilities in the current supply Screening potential projects for supply improvements
Developing themed water supply portfolios
Evaluating and refining these portfolios
Identifying a recommended future supply portfolio
Creating an adaptable roadmap for implementation
Documenting the process in a comprehensive report
09/09/2025 Item No.7.
3 City staff along with WSC conducted six stakeholder and public meetings throughout the process of the Water Vision. The workshops covered the following:
Workshop 1: Your Water Values & Goals
Workshop 2: Our Drinking Water Supply
Workshop 3: Confirm New Water Supply Alternatives
Workshop 4: Future Water Supply Portfolios
Workshop 5: Defining the Recommended Portfolio
Workshop 6: Adaptable Implementation Roadmap
This amendment provides for additional work requested by EWR staff during the workshops and for two new items moving forward to complete the project. The additional items below are outside the original scope of work and staff request an amendment to the agreement to complete the work for the Water Vision process.
Stakeholder meeting packets – WSC developed stakeholder meetings packets to provide to the stakeholder prior to each of the six meetings. This effort was not included in the original scope of work and benefited the process by having more focused and robust public meeting discussions because the stakeholders had time prior to the meetings to review the meeting content.
Additional project team meetings – At the request of EWR staff, WSC conducted additional coordination meetings with certain stakeholders that provided specific feedback throughout the Water Vision process. This allowed for a better understanding of their comments, concerns, and ideas about the various topics covered during the six workshops and will allow WSC to better incorporate this information into the draft and final reports.
This also included comments and feedback received during the process on the adaptive implementation roadmap that provided for the phasing and timing of recommended portfolio approaches.
Supply and demand evaluations – EWR staff asked WSC to incorporate a risk -based calculation when evaluating existing water system vulnerabilities, which was not included in the original scope of work. This allowed the project team to identify the risk leve l of the various system vulnerabilities being evaluated while factoring in the probability of the event occurring and the impact of the event. The total risk for each challenge is composed of its impact on water supply and the likelihood of its occurrence. Enhanced Executive Summary – this request will provide for the development of a more graphically enhanced summary of the Water Vision process. This will provide for a document that is more accessible to the public without having to read the entire report and distills all the information into a user-friendly document. Public draft report comment log – this request will allow for the development of an appendix to document public comments and the associated responses to comments when the public draft report is circulated.
FINANCIAL IMPACT
The Water Vision process was not included in the Fiscal Year 2025 -26 operating budget. The Environmental and Water Resources Department is requesting a total appropriation of $31,464 with $15,732 to be appropriated in the Fiscal Year 2025 -26 Water Operating Fund (Fund 520) budget and $15,732 to be appropriated in the Water Impact Fee Fund (Fund 456) for an updated
09/09/2025 Item No.7.
4 total contract amount of $423,989. One of the allowed expenses for the Water Impact Fund is expenses due to dry years. Sufficient funds are available in the Water Operating Fund (Fund 520) and the Water Impact Fund (Fund 456) for this appropriation.
ENVIRONMENTAL REVIEW
This project is exempt from environmental review under the California Environmental Quality Act, Section 15262 “Feasibility and Planning Studies”.
ATTACHMENT
Resolution No. 11455 – A Resolution Authorizing the City Manager to Execute Amendment No. 1 to the Agreement (Contract No. 173-21 23-049) with Water Systems Consulting, Inc. for $31,464 with $15,732 from the Water Impact Fee Fund (Fund 456) and $15,732 from the Water Operating Fund (Fund 520) for the City of Folsom Water Vision and Appropriation of Funds
Submitted,
Marcus Yasutake, Director
ENVIRONMENTAL AND WATER RESOURCES DEPARTMENT
09/09/2025 Item No.7.
Attachment 1
09/09/2025 Item No.7.
Resolution No. 11455
RESOLUTION NO. 11455
A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE
AMENDMENT NO. 1 TO THE AGREEMENT (CONTRACT NO. 173-21 23-049) WITH WATER SYSTEMS CONSULTING, INC. FOR $31,464 WITH $15,732 FROM THE WATER IMPACT FEE FUND (FUND 456) AND $15,732 FROM THE WATER OPERATING FUND (FUND 520) FOR THE CITY OF FOLSOM WATER VISION AND
APPROPRIATION OF FUNDS
WHEREAS, the City of Folsom’s 2020 Urban Water Management Plan is the City’ s primary water supply planning document; and
WHEREAS, the City selected Water Systems Consulting, Inc. to develop the Water Vision process through Resolution No. 11089; and
WHEREAS, the Water Vision process included six stakeholders and public workshops to define a recommended long-term water supply portfolio; and
WHEREAS, the Environmental and Water Resources Department requested additional work to be completed for the Water Vision process to include in the draft and final documents the comments, ideas, and feedback received from the stakeholders and the public; and
WHEREAS, the Water Vision process yielded a water supply portfolio through the stakeholder process along with an adaptable implementation roadmap; and
WHEREAS, the draft and final reports of the Water Vision process will incorporate comments and feedback from the stakeholder group and the public; and
WHEREAS, the agreement will be in a form acceptable to the City Attorney:
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Folsom authorizes the City Manager to execute Amendment No. 1 to the Agreement (Contract No. 173 - 21 23-049) with Water Systems Consulting, Inc. for $31,464 with $15,732 from the Water Impact Fee Fund (Fund 456) and $1 5,732 from the Water Operating Fund (Fund 520) for the City of Folsom Water Vision and Appropriation of Funds.
BE IT FURTHER RESOLVED that the Finance Director is authorized to appropriate $15,732 in the Water Operating Fund (Fund 520) and $15,732 in the Water Impact Fund (Fund 456).
PASSED AND ADOPTED this 9th day of September 2025, by the following roll-call vote:
AYES: Councilmember(s):
NOES: Councilmember(s):
ABSENT: Councilmember(s):
ABSTAIN: Councilmember(s):
09/09/2025 Item No.7.
Resolution No. 11455
___________________________________
Sarah Aquino, MAYOR
ATTEST:
____________________________________
Christa Freemantle, CITY CLERK
09/09/2025 Item No.7.
This page is intentionally left blank
to facilitate double-sided printing
and minimize paper use.
09/09/2025 Item No.7.
Folsom City Council
Staff Report
MEETING DATE:
9/9/2025
AGENDA SECTION:
Consent Calendar
SUBJECT: Resolution No. 11457 – A Resolution Authorizing the City Manager to Execute an Agreement with Western Systems, Inc. for $160,906.25 from the Transportation Improvement Fund (Fund 446) to Purchase Cabinets at Four Locations for the Flashing Yellow Arrow Trial Project
FROM: Public Works Department
RECOMMENDATION / CITY COUNCIL ACTION
The Public Works Department recommends that the City Council pass and adopt Resolution No. 11457 – A Resolution Authorizing the City Manager to Execute an Agreement with Western Systems, Inc. for $160,906.25 from the Transportation Improvement Fund (Fund 446) to Purchase Cabinets at Four Locations for the Flashing Yellow Arrow Trial Project.
BACKGROUND / ISSUE
On May 13, 2025, the City Council approved Resolution No. 11379 authorizing the Public Works Department to implement a Flashing Yellow Arrow (FYA) Trial Project. The project advances the use of protected/permissive left turn operations with a four -section signal head containing a flashing yellow arrow, a Federal Highway Administration –approved traffic control device. This operational enhancement is intended to impr ove traffic flow, reduce vehicle emissions, and improve driver experience.
As part of the trial project, the City identified four intersections as candidates for FYA installation. The four locations identified for the trial are along Natoma Street at Prison Road, Wales Drive, Stafford Street, and Coloma Street. To implement the project, upgrades to the existing traffic signal controller cabinets and foundations are required to ensure compatibility with modern equipment and to allow efficient maintenance and troubleshooting.
09/09/2025 Item No.8.
The City has standardized its traffic signal cabinet specification to the Western Systems , Inc.
P-Plus cabinet, developed in coordination with City staff and tested for compatibility with existing infrastructure. Standardization of equipment across all locations has proven beneficial, allowing City staff to quickly address issues, reduce downtime, and enhance roadway safety.
Western Systems, Inc. provided a quote dated June 3, 2025, for the necessary cabinets and components to serve the four project locations. The total cost, including equipment, shipping, and tax, is $160,906.25. The requested purchase represents a sole -source procurement, consistent with Folsom Municipal Code Section 2.36.140, due to the City’s standardization on Western Systems cabinets.
POLICY / RULE
Section 2.36.080 of the Folsom Municipal Code states, in part, that contracts for supplies, equipment, services, and construction with an estimated value of $ 75,049 or greater shall be awarded by the City Council.
FINANCIAL IMPACT
The purchase of four Western Systems , Inc. P-Plus traffic signal cabinets and related components, will be funded from the Transportation Improvement Fund (Fund 446) in the amount of $160,906.25. Sufficient funds are budgeted and available for this expenditure.
ENVIRONMENTAL REVIEW
The action under consideration involves the purchase of equipment and does not constitute a project under the California Environmental Quality Act (CEQA).
ATTACHMENTS
1. Resolution No. 11457 – A Resolution Authorizing the City Manager to Execute an Agreement with Western Systems , Inc. for $160,906 .25 from the Transportation Improvement Fund (Fund 446) to Purchase Cabinets at Four Locations for the Flashing Yellow Arrow Trial Project
2. Flashing Yellow Arrow Trial Project Locations Map
Submitted,
Rebecca Neves, PUBLIC WORKS DIRECTOR/CITY ENGINEER
09/09/2025 Item No.8.
Attachment 1
09/09/2025 Item No.8.
Resolution No. 11457
RESOLUTION NO. 11457
A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE AN AGREEMENT WITH WESTERN SYSTEMS, INC. FOR $160,906.25 FROM THE TRANSPORTATION IMPROVEMENT FUND (FUND 446) TO PURCHASE CABINETS
AT FOUR LOCATIONS FOR THE FLASHING YELLOW ARROW PROJECT
WHEREAS, on May 13, 2025, the City Council approved Resolution No. 11379 authorizing the Public Works Department to implemen t a Flashing Yellow Arrow (FYA) Trial Project to improve traffic flow, reduce emissions, and enhance driver experience; and
WHEREAS, to implement the trial project, upgrades to the existing traffic signal controller cabinets are required to ensure compatibility with modern equipment and allow efficient maintenance and troubleshooting; and
WHEREAS, the City has standardized its traffic signal cabinet specification to the Western Systems, Inc. P-Plus cabinet, which was developed in coordination with City staff and tested for compatibility with existing infrastructure, thereby improving safety and operational efficiency; and
WHEREAS, Western Systems, Inc. provided a quote dated June 3, 2025, for the necessary cabinets and components to serve the four project locations, with a total cost, including equipment, shipping, and tax, of $160,906.25; and
WHEREAS, sufficient funds in the amount of $160,906.25 are budgeted and available in the Transportation Improvement Fund (Fund 446) for the purchase; and
WHEREAS, the agreement will be in a form acceptable to the City Attorney:
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Folsom hereby authorizes the City Manager to execute an agreement with Western Systems , Inc. in the amount of $160,906.25 to purchase four P-Plus cabinets and related components for the Flashing Yellow Arrow Trial Project.
PASSED AND ADOPTED on this 9th day of September 2025, by the following roll- call vote:
AYES: Councilmember(s):
NOES: Councilmember(s):
ABSENT: Councilmember(s):
ABSTAIN: Councilmember(s):
___________________________________
Sarah Aquino, MAYOR
ATTEST:
____________________________________
Christa Freemantle, CITY CLERK
09/09/2025 Item No.8.
Attachment 2
09/09/2025 Item No.8.
09/09/2025 Item No.8.
Folsom City Council
Staff Report
1 MEETING DATE:
9/9/2025
AGENDA SECTION:
New Business
SUBJECT: Resolution No. 11454 - A Resolution Authorizing the City Manager to Execute an Agreement with ARB, Inc. for $3,101,298 from the Sewer Operating Fund (Fund 530) for the Construction of the Basin 4 Sewer Phase 1 Project (WW2201) and Appropriation of Funds
FROM: Environmental and Water Resources Department
RECOMMENDATION / CITY COUNCIL ACTION
The Environmental and Water Resources Department recommends the City Council pass and adopt Resolution No. 11454 - A Resolution Authorizing the City Manager to Execute an Agreement with ARB, Inc. for $3,101,298 from the Sewer Operating Fund (Fund 530) for the Construction of the Basin 4 Sewer Phase 1 Project (WW2201) and Appropriation of Funds.
BACKGROUND / ISSUE
The Environmental and Water Resources (EWR) Department identifies infrastructure rehabilitation and replacement projects through water and sewer master plans, ongoing condition assessment programs, and regulatory changes. As a condition of the City’s Stat e permit for its wastewater collection system, the EWR Department is required to perform ongoing condition assessments on the wastewater system and correct any defects/deficiencies identified through this process. Through these efforts, EWR staff identified the Basin 4 Sewer Phase 1 Project as a priority project.
The Basin 4 Sewer Phase 1 Project consists of rehabilitating and replacing approximately 3,200 lineal feet of sanitary sewer pipeline and the rehabilitation and repair of various sewer manholes within the City. Specifically, the project includes rehabilitating and replacing approximately 400 feet of sewer pipeline near Granite Park along Reading Street from Mormon/Natoma Alley to Figueroa/Mormon Alley, approximately 1,800 feet of sewer pipeline within the Natoma -Persifer Alley between Sibley Street and Riley Street, approximately 1,000 feet of sewer pipeline along Sutter Street between Scott Street and Coloma Street, and the rehabilitation and repair of a sewer
09/09/2025 Item No.9.
2 manhole near Oak Avenue and East Bidwell. Additionally, the project consists of relining approximately 16 sanitary sewer manholes near East Bidwell and Clarksville Road as well replacing the flow meter at Pump Station No. 2. This project will reduce inflow and infiltr ation, minimize annual maintenance costs, and minimize the risk of sewer overflows.
This resolution will authorize the City Manager to execute an agreement with ARB, Inc. for the Construction of the Basin 4 Sewer Phase 1 Project for a not -to-exceed amount of $3,101,298 and appropriation of funds.
POLICY / RULE
In accordance with Chapter 2.36 of the Folsom Municipal Code, supplies, equipment, services, and construction with a value of $75,049 or greater shall be awarded by City Council.
ANALYSIS
The City completed plans and specifications for the Basin 4 Sewer Phase 1 Project and publicly advertised in the Sacramento Bee for bids on July 16, 2025. In addition, the City provided these documents to www.publicpurchase.com and www.virtual-bid.com, which are picked up by several area builders’ exchanges , and posted information on the City of Folsom’s website. The Environmental and Water Resources Department received the following bids on August 15, 2025 for construction of the Basin 4 Sewer Phase 1 Project:
Contractor Bid Amount
ARB, Inc. $2,819,362.00
Mozingo Construction, Inc. $2,957,575.00
Marques General Engineering, Inc. $3,193,362.00
Ghilotti Construction Company, Inc. $3,388,021.00
Cox & Cox Construction, Inc. $3,869,914.50 *
WestRock Engineering $3,979,565.00
A. Teichert & Son, Inc. dba Teichert Construction $4,509,534.00
* Cox & Cox Construction, Inc. submitted a Sealed Proposal bid of $3,858,230.00. However, after conducting a review of all bids submitted, EWR staff calculated that their actual total bid as $3,869,914.50, which is reflected in the table above.
Staff has reviewed the submitted bids and has determined that ARB, Inc. is the lowest responsible and responsive bidder who meets the requirements and specifications set forth in the invitation for bids.
FINANCIAL IMPACT
The Environmental and Water Resources Department recommends that the contract be awarded to the lowest responsible, responsive bidder, ARB, Inc. for $2,819,362 with the project budgeted
09/09/2025 Item No.9.
3 for this agreement in the amount of $3,101,298 which will include a 10% contingency in the amount of $281,936.
The Basin 4 Sewer Phase 1 Project (Project No. WW2201) is included in the Fiscal Year 2025-26 Capital Improvement Plan with a project budget of $2,840,705 in the Sewer Operating Fund (Fund 530). The project budget will require an appropriation in the amount of $515,655 in the Sewer Operating Fund (Fund 530) for t his a greement. This will bring the total project budget to $3,356,360. Sufficient funds are available in the Sewer Operating Fund (Fund 5 30) for the appropriation.
ATTACHMENTS
1. Resolution No. 11454 - A Resolution Authorizing the City Manager to Execute an Agreement with ARB, Inc. for $3,101,298 from the Sewer Operating Fund (Fund 530) for the Construction of the Basin 4 Sewer Phase 1 Project (WW2201 ) and Appropriation of Funds
2. Basin 4 Phase 1 Sewer Project Map
Submitted,
Marcus Yasutake, Director
ENVIRONMENTAL AND WATER RESOURCES DEPARTMENT
09/09/2025 Item No.9.
Attachment 1
09/09/2025 Item No.9.
Resolution No. 11454
RESOLUTION NO. 11454
A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE AN AGREEMENT WITH ARB, INC. FOR $3,101,298 FROM THE SEWER OPERATING FUND (FUND 530) FOR THE CONSTRUCTION OF THE BASIN 4 SEWER PHASE 1 PROJECT (WW2201) AND APPROPRIATION OF FUNDS
WHEREAS, the City has identified this project as a priority to maintain the integrity and operation of the City’s sanitary sewer system; and
WHEREAS, the Basin 4 Sewer Phase 1 Project consists of rehabilitating and replacing approximately 3,200 lineal feet of sanitary sewer pipeline and appurtenances, the rehabilitation and repair of 17 manholes at various locations within the City as well as the replacement of a sewer flow meter at Pump Station No. 2; and
WHEREAS, plans and specifications were prepared for this work and publicly advertised for bids on July 16, 2025; and
WHEREAS, ARB, Inc. was the lowest responsible and responsive bidder, with an amount of $2,819,362; and
WHEREAS, this project was included in the FY 2025-26 Capital Improvement Plan with a project budget of $2,840,705; and
WHEREAS, an additional appropriation of funds in the amount of $515,655 is needed for a revised project budget of $3,356,360 and sufficient funds are available in the Sewer Operating Fund (Fund 530) for this additional appropriation; and
WHEREAS, the agreement will be in a form acceptable to the City Attorney:
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Folsom authorizes the City Manager to execute an agreement with ARB, Inc. for the Construction of the Basin 4 Sewer Phase 1 Project (WW2201 ) for a not -to-exceed amount of $ 2,819,362 with the budgeted amount to include a 10% contingency, of $281,936 for a total of $3,101,298.
BE IT FURTHER RESOLVED that the Finance Director is authorized to appropriate $515,655 in the Fiscal Year 202 5-26 Sewer Operating Fund (Fund 530) for Construction of the Basin 4 Sewer Phase 1 Project (WW2201) for a total project budget of $3,356,360.
PASSED AND ADOPTED this 9th day of September 2025, by the following roll-call vote:
AYES: Councilmember(s):
NOES: Councilmember(s):
ABSENT: Councilmember(s):
ABSTAIN: Councilmember(s):
09/09/2025 Item No.9.
Resolution No. 11454
___________________________________
Sarah Aquino, MAYOR
ATTEST:
____________________________________
Christa Freemantle, CITY CLERK
09/09/2025 Item No.9.
Attachment 2
09/09/2025 Item No.9.
Drawn by: MBudd
Page Size: 11" x 17"
Date Saved: 8/22/20251 IN : 210 FT
Document Path: M:\2_GIS_STAFF\MBUDD\CIPS\B4PH1RoadsToRehab.pdf City of Folsom - Basin 4 Phase 1 Project
Roads for Sewer Rehabilitation
PERSIFER ST
NATOMA ST
MORMON ST NATOMA ST ALY
MORMON ST
FIGUEROA ST
SUTTER ST
FIGUEROA ST ALY
SUTTER ST
LEIDESDORFF ST
SUTTER ST ALY
LEIDESDORFF ST
S
I
B
L
E
Y
S
T
READING ST DECATUR ST
WOOL ST
R I L E Y S T
GOLD
LAKE DRREADING
ST GOLD
LAKE DR
F
O
L
S
O
M
B
L
V
D
BRIDGE ST
S
C
O
T
T
S
T
COLOMA ST
SUTTER ST
U N N A M E D R D
A
M
E
R
I C
A
N
R
I
V
E
R
B
I K
E
T
R
L
READING ST
LEIDESDORFF ST
SUTTER ST
FIGUEROA ST ALY
WELCHS WAY
NATOMA ST
PERSIFER ST ALY
FIGUEROA ST
MORMON ST ALY
NATOMA ST
PERSIFER ST ALY
PEDDLERS LN
CANAL STTRADERS LN
F
0 200 400 600 800100
US Feet
City of Folsom Parcel
City of Folsom Road
Road Selected for
Sewer Rehabilitation
09/09/2025 Item No.9.
Folsom City Council
Staff Report
1 MEETING DATE:
9/9/2025
AGENDA SECTION:
New Business
SUBJECT: Resolution No. 11456 - A Resolution Authorizing the City Manager to Execute an Agreement with Dewberry Engineers Inc. for $541,442 from the Sewer Operating Fund (Fund 530) for
Construction Management and Inspection Services for the Basin 4 Sewer Phase 1 Project (WW2201) and Appropriation of Funds
FROM: Environmental and Water Resources Department
RECOMMENDATION / CITY COUNCIL ACTION
The Environmental and Water Resources Department recommends the City Council pass and adopt Resolution No. 11456 - A Resolution Authorizing the City Manager to Execute an Agreement with Dewberry Engineers Inc. for $541,442 from the Sewer Operating Fund (Fund 530) for Construction Management and Inspection Services for the Basin 4 Sewer Phase 1 Project (WW2201) and Appropriation of Funds.
BACKGROUND / ISSUE
The Environmental and Water Resources (EWR) Department identifies infrastructure rehabilitation and replacement projects through water and sewer master plans, ongoing condition assessment programs, and regulatory changes. As a condition of the City’s State permit for its wastewater collection system, the EWR Department is required to perform ongoing condition assessments on the wastewater system and correct any defects/deficiencies identified through this process. Through these efforts, EWR staff identified the Basin 4 Sewer Phase 1 Project as a priority project.
The Basin 4 Sewer Phase 1 Project consists of rehabilitating and replacing approximately 3,200 lineal feet of sanitary sewer pipeline and the rehabilitation and repair of various sewer manholes within the City. Specifically, the project includes rehabilitating and replacing approximately 400 feet of sewer pipeline near Granite Park along Reading Street from Mormon/Natoma Alley to Figueroa/Mormon Alley, approximately 1,800 feet of sewer pipeline within the Natoma -Persifer
09/09/2025 Item No.10.
2 Alley between Sibley Street and Riley Street, approximately 1,000 feet of sewer pipeline along Sutter Street between Scott Street and Coloma Street, and the rehabilitation and repair of a sewer manhole near Oak Avenue Parkway and East Bidwell. Additionally, the project consists of relining approximately 16 sanitary sewer manholes near East Bidwell and Clarksville Road and 1 sanitary sewer manhole on Sutter Street as well replacing the flow meter at Pump Station No. 2. This project will reduce inflow and infiltration, minimize annual maintenance costs, and minimize the risk of sewer overflows.
This resolution will authorize the City Manager to execute an agreement with Dewberry Engineers Inc. for Construction Management and Inspection Services for the Basin 4 Sewer Phase 1 Project for a not-to-exceed amount of $541,442 and appropriation of funds.
POLICY / RULE
In accordance with Chapter 2.36 of the Folsom Municipal Code, supplies, equipment, services, and construction with a value of $75,049 or greater shall be awarded by City Council.
ANALYSIS
In January 2025, the EWR Department completed a pre -qualification process for consultants for construction management services for water and wastewater projects. The firms Dewberry Engineers Inc., Psomas, and West Yost & Associates, Inc. were among a group of firms selected to provide these services for this type o f project through this previously completed pre - qualification process.
On June 26, 2025, the City re quested proposals from these consultants to provide construction management services consisting of resident engineer services, full-time on-site inspection, project schedule tracking, review and/or coordination of project submittals, coordination with the other on-going City construction projects, labor compliance review, customer coordination, materials testing, and overall owner representation throughout construction of the Basin 4 Sewer Phase 1 Project. On July 18, 2025, EWR received proposals from Dewberry Engineers Inc., Psomas, and West Yost & Associates, Inc. The scope of work included the following assumptions that were required to be included in the proposals.
1. Construction Period: 150 calendar days
a. Full time inspector for duration of project
b. Resident Engineer for duration of the project
2. Pre-construction and post -construction period (submittals, punch list, final project walkthrough, as-builts, change order support): 90 calendar days a. Inspector for 50% of period duration
b. Resident Engineer for 50% of period duration
3. Night work: 10 shifts
4. Materials testing
a. Compaction testing at eight (8) locations
b. Concrete testing (sidewalk, curb, and gutter)
5. Special inspections
a. Sewer manhole coating
09/09/2025 Item No.10.
3 b. Cured in place pipeline (CIPP)
c. Sewer manhole injection grouting
Based on the scope of work assumptions described above, EWR staff calculated approximately 2,400 hours of work required for the duration of the project. This includes inspection time during regular working hours , night work inspection hours, resident engineer time, and administration support time for the project. These assumptions are based on previous City projects of similar size and scope.
The proposals were evaluated by three EWR staff members for technical evaluation prior to reviewing project costs. The proposals were reviewed and scored for project understanding, project team qualifications and experience, recent relevant project experience, and understanding of the scope of work. The technical evaluations were scored as shown in Table 1.
Consultant EWR 1 EWR 2 EWR 3 Average
Dewberry Engineers Inc. 66 68 69 67.7
Psomas 67 69 67 67.7
West Yost & Associates, Inc. 70 66 62 66.0
Table 1: Consultant Technical Scores without Costs
After reviewing each proposal for project understanding, project team qualifications and experience, recent relevant project experience , and understanding of the scope of work , the proposals were reviewed for project costs. The fee schedules for the scope of work outlined in the request for proposal from each consultant are shown in Table 2.
Consultant Total Fee Amount
Dewberry Engineers Inc. $541,441.36
Psomas $710,556.00
West Yost & Associates, Inc. $424,260.00
Table 2: Consultant Project Costs
EWR staff noted various differences and assumptions used amongst the 3 proposers related to pre- construction work, work during construction, and work during project closeout . To better understand the impacts of the consultant costs and related working hour s, EWR staff compare d the direct hours and corresponding direct cost s from each proposal for work expected to be performed by the Project Manager, Resident Engineer, Inspector (regular time), Inspector (night work), and Administration for pre-construction services, services during construction and post - construction services. These were then compared to the assumptions included in the RFP described above. The direct hours from each consultant are shown in Table 3. The direct costs per hour from each consultant are shown in Table 4.
Consultant
Direct Hours for
Pre-Construction
Phase
Direct Hours
for
Construction
Phase
Direct Hours
for Project
Closeout
Phase
Total
Direct
Hours
Dewberry Engineers Inc. 303 1,851 315 2,469
09/09/2025 Item No.10.
4 Psomas 208 1,736 588 2,532
West Yost & Associates, Inc. 18 1,245 100 1,363
Table 3: Consultant Direct Hours
Based on the review of the associated hours within each proposal there was a significant difference between the hours submitted by West Yost & Associates, Inc. compared to Dewberry Engineers Inc. and Psomas. The hours provided by West Yost & Associates, Inc. are significantly lower than the calculated hours assumed in the RFP by EWR staff and by the hours proposed by the other two consultant firms.
To better understand the cost impacts , EWR staff calculated the direct cost per hour of all three firms as sh own in the table below. Increasing West Yost’s hours to 2,400 hours (1,037 hour increase), would yield an additional funding need of approximately $260,000 above West Yost’s direct costs of $341,573 listed below for a revised not-to-exceed amount of approx imately $600,000, which is higher than the other two consultant firms for slightly less total hours. EWR staff considers the proposal by West Yost & Associates, Inc. insufficient to meet the project needs and does not adequately represent the necessary working hours needed for this project.
Consultant Direct Cost Total Direct Hours
Direct Cost/Direct
Hour
Dewberry Engineers Inc. $513,846.47 2,469 $208.12
Psomas $526,076.00 2,532 $207.77
West Yost & Associates, Inc. $341,573.00 1,363 $250.60
Table 4: Consultant Cost Per Hour
Dewberry Engineers Inc. was determined to provide the best value to the City based on the scope of work provided in their proposal, the project team, their expertise for this type of project, and the fee amount that aligned with the assumptions provided in the RFP . Dewberry Engineers Inc. included a detailed and thorough project understanding as well as past relevant experience with similar projects. Dewberry Engineers Inc. also went above and beyond and provided a complimentary constructability re view in their proposal, which highlighted some potential challenges with the project and ideas of how to mitigate them. EWR staff was able to incorporate some of the items of the constructability review into an addendum for this project ’s construction bid, potentially preventing some complications during the construction phase. Table 5 shows the overall total scores including direct project costs based on a maximum score of 100.
Consultant
Technical
Score (Avg.) Cost Score Total Score
Dewberry Engineers Inc. 67.7 17.1 84.8
Psomas 67.7 17.0 84.7
West Yost & Associates, Inc. 66 18.3 84.3
Table 5: Consultant Overall Scoring Including Project Costs
This resolution will authorize the City Manager to execute an agreement with Dewberry Engineers Inc. for Construction Management and Inspection services for the Basin 4 Sewer Phase 1 Project for a not-to-exceed amount of $541,442.
09/09/2025 Item No.10.
5 FINANCIAL IMPACT
The Basin 4 Sewer Phase 1 Project (WW2201) is included in the F iscal Year 2025-26 Capital Improvement Plan with a project budget of $2,840,705 in the Sewer Operating Fund (Fund 530).
The project budget will require an appropriation in the amount $ 541,442 in the Sewer Operating Fund (Fund 530) for this agreement which has sufficient fun ds available. Assuming the City Council passes and adopts Resolution No. 11454 authorizing an appropriation increase of $515,655, the updated total project budget will be $3,897,802.
ATTACHMENTS
1. Resolution No. 11456 - A Resolution Authorizing the City Manager to Execute an Agreement with Dewberry Engineers Inc. for $541,442 from the Sewer Operating Fund (Fund 530) for Construction Management and Inspection Services for the Basin 4 Sewer Phase 1 Project (WW2201)
2. Basin 4 Phase 1 Sewer Project Map
Submitted,
Marcus Yasutake, Director
ENVIRONMENTAL AND WATER RESOURCES DEPARTMENT
09/09/2025 Item No.10.
Attachment 1
09/09/2025 Item No.10.
Resolution No. 11456
RESOLUTION NO. 11456
A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE AN AGREEMENT WITH DEWBERRY ENGINEERS INC. FOR $541,442 FROM THE SEWER OPERATING FUND (FUND 530) FOR CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES FOR THE BASIN 4 PHASE 1 PROJECT (WW2201)
AND APPROPRIATION OF FUNDS
WHEREAS, the City has identified this project as a priority to maintain the integrity and operation of the City’s sanitary sewer system; and
WHEREAS, the Basin 4 Sewer Phase 1 Project consists of rehabilitating and replacing approximately 3,200 lineal feet of sanitary sewer pipeline and appurtenances, the rehabilitation and repair of 17 manholes at various locations within the City as well as the replacement of a sewer flow meter at Pump Station No. 2; and
WHEREAS, Dewberry Engineers Inc. by reason of their past experience, knowledge, and abilities for performing these types of services, are qualified to perform the required cons truction management and inspection services for the project; and
WHEREAS, the Basin 4 Sewer Phase 1 Project (WW2201) is included in the Fiscal Year 2025-26 Capital Improvement Plan; and
WHEREAS, an appropriation of funds in the amount of $541,442 is needed in the Sewer Operating Fund (Fund 530) for the Basin 4 Sewer Phase 1 Project budget to accommodate the cost of the agreement; and
WHEREAS, the agreement will be in a form acceptable to the City Attorney:
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Folsom authorizes the City Manager to execute an agreement with Dewberry Engineers Inc. for Construction Management and Inspection Services for $541,442 from the Sewer Operating Fund (Fund 530) for the Basin 4 Sewer Phase 1 Project (WW2201).
BE IT FURTHER RESOLVED that the Finance Director is authorized to appropriate $541,442 in the Fiscal Year 202 5-26 Sewer Operating Fund (F und 530) for Construction Management and Inspection Service for the Basin 4 Sewer Phase 1 Project (WW2201) for a total project budget of $3,897,802.
PASSED AND ADOPTED this 9th day of September 2025, by the following roll-call vote:
AYES: Councilmember(s):
NOES: Councilmember(s):
ABSENT: Councilmember(s):
ABSTAIN: Councilmember(s):
09/09/2025 Item No.10.
Resolution No. 11456
___________________________________
Sarah Aquino, MAYOR
ATTEST:
____________________________________
Christa Freemantle, CITY CLERK
09/09/2025 Item No.10.
Attachment 2
09/09/2025 Item No.10.
Drawn by: MBudd
Page Size: 11" x 17"
Date Saved: 8/22/20251 IN : 210 FT
Document Path: M:\2_GIS_STAFF\MBUDD\CIPS\B4PH1RoadsToRehab.pdf City of Folsom - Basin 4 Phase 1 Project
Roads for Sewer Rehabilitation
PERSIFER ST
NATOMA ST
MORMON ST NATOMA ST ALY
MORMON ST
FIGUEROA ST
SUTTER ST
FIGUEROA ST ALY
SUTTER ST
LEIDESDORFF ST
SUTTER ST ALY
LEIDESDORFF ST
S
I
B
L
E
Y
S
T
READING ST DECATUR ST
WOOL ST
R I L E Y S T
GOLD
LAKE DRREADING
ST GOLD
LAKE DR
F
O
L
S
O
M
B
L
V
D
BRIDGE ST
S
C
O
T
T
S
T
COLOMA ST
SUTTER ST
U N N A M E D R D
A
M
E
R
I C
A
N
R
I
V
E
R
B
I K
E
T
R
L
READING ST
LEIDESDORFF ST
SUTTER ST
FIGUEROA ST ALY
WELCHS WAY
NATOMA ST
PERSIFER ST ALY
FIGUEROA ST
MORMON ST ALY
NATOMA ST
PERSIFER ST ALY
PEDDLERS LN
CANAL STTRADERS LN
F
0 200 400 600 800100
US Feet
City of Folsom Parcel
City of Folsom Road
Road Selected for
Sewer Rehabilitation
09/09/2025 Item No.10.
Folsom City Council
Staff Report
1 MEETING DATE:
9/9/2025
AGENDA SECTION:
New Business
SUBJECT: Resolution No. 11458- A Resolution Authorizing the City Manager to Execute a Memorandum of Understanding Between the City of Folsom and the Sacramento Area Firefighters Local 522, IAFF, Folsom Unit
FROM: Human Resources Department
RECOMMENDATION / CITY COUNCIL ACTION
The Human Resources Director recommends that the City Council pass and adopt Resolution No.11458– A R esolution Authorizing the City Manager to Execute a Memorandum of Understanding Between the City of Folsom and the Sacramento Area Firefighters Local 522, IAFF, Folsom Unit.
BACKGROUND / ISSUE
The existing Memorandum of Understanding (MOU) between the City of Folsom and the Sacramento Area Firefighters Local 522, IAFF, Folsom Unit expired on June 30, 2025. The parties began negotiations on a new MOU on February 24, 2025 , and reached a tentative agreement on August 22 , 2025 . The Sacramento Area Firefighters Local 522 ratified the tentative agreement on August 28, 2025. The new proposed successor MOU is being presented to the City Council on September 9, 2025, for consideration and approval.
POLICY / RULE
Government Code Title 1, Division 4, Chapter 10 commonly known as the Meyers -Milias- Brown Act requires that representatives of the Governing Body of a public agency shall meet and confer in good faith regarding wages, hours, and other terms and conditions of employment with representatives of recognized employee organizations. Both parties shall endeavor to reach a tentative agreement within the scope of representation, and, if a tentative agreement is reached and ratified by the respective pa rties, they shall prepare a written memorandum of understanding.
09/09/2025 Item No.11.
2 ANALYSIS and FINANCIAL IMPACT
A tentative agreement was reached by the parties and the proposed successor Memorandum of Understanding, which will be effective July 1, 2025, contains the following changes that have some economic impact, as outlined below. The changed provisions are as follows:
1. The MOU term will be for three (3) years: July 1, 2025, through June 30, 2028.
2. A Cost-of-living adjustment (COLA) will be provided for each year of the agreement:
o Year 1: Effective July 1, 2025
2.5% for all classifications
The cost for the first year of the COLA will increase salary and benefits approximately $337,456.
o Year 2: Effective July 1, 2026
2.5% for all classifications
The cost for the second year of the COLA will increase salary and benefits approximately $465,589.
o Year 3: Effective July 1, 2027
2.5% for all classifications
The cost for the third year of the COLA will increase salary and benefits approximately $658,698.
3. Tuition Reimbursement
o Tuition/books reimbursement increase from $1,500 per fiscal year to $2,500 per fiscal year.
o The cost of the increase in educational incentive pay will be approximately $20,500.
4. Longevity Pay
o Employees with ten (10) or more years of full-time continuous City service will be eligible to receive 2 ½% of their base salary.
o The cost will be approximately $35,500.
5. Paramedic Incentive Pay
o Effective the first pay period following ratification, Firefighters, Fire Engineers and Fire Captains that maintain paramedic licensure will receive the following incentive pay:
1) Firefighter – 9% of base wage (currently $765/mo)
2) Fire Engineer – 6% of base wage (currently $600/mo)
3) Fire Captain – 5% of base wage (currently $550/mo)
o Effective first full pay period in July 2027:
1) Firefighter – 10% of base wage.
2) Fire Engineer – 7% of base wage.
3) Fire Captain – 6% of base wage.
o For FY 2027-28, the cost will be approximately $143,721.
09/09/2025 Item No.11.
3 6. A variety of non-economical and clarification language changes were also agreed upon.
ATTACHMENTS
1. Resolution No. 11458- A Resolution Authorizing the City Manager to Execute a Memorandum of Understanding between the City of Folsom and the Sacramento Area Firefighters Local 522, IAFF, Folsom Unit.
2. Proposed Memorandum of Understanding between the City of Folsom and the Sacramento Area Firefighters Local 522, IAFF, Folsom Unit for the term of July 1, 2025, through June 30, 2028.
Submitted,
Allison Garcia, Human Resources Director
09/09/2025 Item No.11.
Attachment 1
09/09/2025 Item No.11.
Resolution No. 11458
RESOLUTION NO. 11458
A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE A
MEMORANDUM OF UNDERSTANDING BETWEEN THE CITY OF FOLSOM AND THE SACRAMENTO AREA FIREFIGHTERS LOCAL 522, IAFF, FOLSOM UNIT
WHEREAS, the City of Folsom and the Sacramento Area Firefighters Local 522, IAFF, Folsom Unit have met and conferred in good faith since February 24, 2025; and
WHEREAS, the parties reached a tentative agreement on August 22, 2025; and
WHEREAS, the members of the Sacramento Area Firefighters Local 522, IAFF, Folsom Unit ratified the tentative agreement on August 28, 2025; and
WHEREAS, the City Manager and the City’s negotiation team recommend the City Council adopt the agreement
NOW, THEREFORE, BE IT RESOLVED that the City Council adopts the agreement between the City of Folsom and the Sacramento Area Firefighters Local 522, IAFF, Folsom Unit for the period of July 1, 2025, to June 30, 2028; and
BE IT FURTHER RESOLVED, that the City Council of the City of Folsom authorizes the City Manager to execute a Memorandum of Understanding between the City of Folsom and the Sacramento Area Firefighters Local 522, IAFF, Folsom Unit.
PASSED AND ADOPTED this 9th day of September, 2025, by the following roll-call vote:
AYES: Councilmember(s):
NOES: Councilmember(s):
ABSENT: Councilmember(s):
ABSTAIN: Councilmember(s):
__________________________________
Sarah Aquino, MAYOR
ATTEST:
______________________________
Christa Freemantle, CITY CLERK
09/09/2025 Item No.11.
Attachment 2
09/09/2025 Item No.11.
MEMORANDUM OF UNDERSTANDING
BETWEEN
CITY OF FOLSOM
AND
SACRAMENTO AREA FIREFIGHTERS
LOCAL 522, IAFF, FOLSOM UNIT
July 1, 20252, through June 30, 20285
09/09/2025 Item No.11.
TABLE OF CONTENTS
PREAMBLE ................................................................................................................................................................ 85 ARTICLE I .................................................................................................................................................................. 85 RECOGNITION AND COVERAGE .......................................................................................................................... 85
1. RECOGNITION ................................................................................................................................................ 85
2. CONTINUATION OF BENEFITS ......................................................................................................................... 85
3. TERMS OF UNDERSTANDING .......................................................................................................................... 96
4. MEETING AND CONFERRING DURING THE TERM OF THE MEMORANDUM OF UNDERSTANDING ..................... 96
5. SEVERANCE.................................................................................................................................................... 96
6. NO STRIKE ..................................................................................................................................................... 96 ARTICLE II ............................................................................................................................................................... 107 MANAGEMENT RIGHTS ....................................................................................................................................... 107 ARTICLE III ............................................................................................................................................................. 118 UNION RIGHTS ....................................................................................................................................................... 118
1. UNION LEAVE .............................................................................................................................................. 118
2. UNION BANK TIME....................................................................................................................................... 129
3. UNION SECURITY ......................................................................................................................................... 129 ARTICLE IV ........................................................................................................................................................... 1310 SALARY AND OTHER COMPENSATION ......................................................................................................... 1310
1. MARKET SURVEY ....................................................................................................................................... 1310
2. PARAMEDIC INCENTIVE PAY ...................................................................................................................... 1310
3. TEMPORARY WORK ASSIGNMENTS ............................................................................................................ 1512
4. EDUCATIONAL INCENTIVE ......................................................................................................................... 1512
5. LONGEVITY PAY PLAN ............................................................................................................................... 1613
6. OUT OF CLASS COMPENSATION ................................................................................................................. 1714
7. RETIREMENT .............................................................................................................................................. 1714
8. PRE-RETIREMENT OPTIONAL SETTLEMENT 2W DEATH BENEFIT (SURVIVORS) ......................................... 1915
9. PERS RETIREMENT – ALTERNATE DEATH BENEFIT .................................................................................. 1915
10. SOCIAL SECURITY WITHDRAWAL .............................................................................................................. 1915
11. FIELD TRAINING OFFICER (FTO) ............................................................................................................... 1915
12. SALARY...................................................................................................................................................... 2016 ARTICLE V ............................................................................................................................................................ 2116 OVERTIME ............................................................................................................................................................ 2117
1. OVERTIME COMPUTATION/ACCRUED STAFFING FURLOUGH TIME ............................................................ 2117
2. COMPENSATING TIME OFF ......................................................................................................................... 2117
3. OVERTIME SCHEDULING ............................................................................................................................ 2218
4. EMERGENCY CALLBACK ............................................................................................................................ 2218
5. MANDATORY HIRES ................................................................................................................................... 2218
6. COURT APPEARANCES ............................................................................................................................... 2319
7. STATION ASSIGNMENT CHANGES .............................................................................................................. 2319
8. STAFFING ERRORS ..................................................................................................................................... 2319
9. SCHEDULED OFF-DUTY TRAINING ............................................................................................................. 2420
10. CITY BUSINESS TRAVEL ............................................................................................................................. 2420 ARTICLE VI ........................................................................................................................................................... 2420
09/09/2025 Item No.11.
HOURS OF WORK ................................................................................................................................................ 2420
1. 48/96 WORK SHIFT .................................................................................................................................... 2420
2. MODIFIED DUTY ASSIGNMENTS ................................................................................................................. 2521
3. FAIR LABOR STANDARDS ACT (FLSA) ...................................................................................................... 2521
4. STATION AND SHIFT TRANSFER PROCESS .................................................................................................. 2521
5. STATION BIDS ............................................................................................................................................ 2622 ARTICLE VII .......................................................................................................................................................... 2723 HOLIDAYS ............................................................................................................................................................. 2723
1. NON-SHIFT PERSONNEL ............................................................................................................................. 2723
2. HOLIDAY PAY DIFFERENTIAL .................................................................................................................... 2824
3. HOLIDAY ROUTINE .................................................................................................................................... 2824 LEAVES .................................................................................................................................................................. 2824
1. ANNUAL LEAVE. ........................................................................................................................................ 2824
2. LEAVE REQUEST PROCEDURE .................................................................................................................... 2925
3. VACATION BIDDING ................................................................................................................................... 3026
4. SHIFT TRADES ............................................................................................................................................ 3228
5. SICK LEAVE ............................................................................................................................................... 3430
6. FLMA OR CFRA ....................................................................................................................................... 3531
7. BEREAVEMENT LEAVE ............................................................................................................................... 3531
8. PERSONAL LEAVE TIME ............................................................................................................................. 3632
9. EMERGENCY LEAVE ................................................................................................................................... 3632
10. LEAVE TIME ACCRUAL - NON-PAY STATUS............................................................................................... 3632
11. LOCAL 522 CATASTROPHIC TIME BANK .................................................................................................... 3732
12. LEAVE CONVERSION RATES ....................................................................................................................... 3733
13. JURY DUTY LEAVE ..................................................................................................................................... 3834 ARTICLE IX ........................................................................................................................................................... 3935 INSURANCE .......................................................................................................................................................... 3935
1. MEDICAL INSURANCE ................................................................................................................................ 3935
2. HEALTH INSURANCE .................................................................................................................................. 3935
3. HIGH DEDUCTIBLE HEALTH PLANS............................................................................................................ 4136
4. OUT OF AREA HEALTH PLAN ..................................................................................................................... 4236
5. DENTAL INSURANCE .................................................................................................................................. 4337
6. VISION CARE.............................................................................................................................................. 4338
7. HEALTH BENEFITS LABOR-MANAGEMENT COMMITTEE ............................................................................ 4438
8. LIFE INSURANCE ........................................................................................................................................ 4438
9. SHORT TERM DISABILITY INSURANCE ....................................................................................................... 4438
10. LONG TERM DISABILITY INSURANCE ......................................................................................................... 4438
11. FMLA/CFRA LEAVE STATUS ................................................................................................................... 4439
12. RETIREE HEALTH INSURANCE .................................................................................................................... 4539
13. RETIREE HEALTH BENEFITS REOPENER ..................................................................................................... 4741
14. IAFF MEDICAL EXPENSE REIMBURSEMENT PLAN ..................................................................................... 4741 ARTICLE X ............................................................................................................................................................ 4943 ALLOWANCES AND REIMBURSEMENTS ....................................................................................................... 4943
1. UNIFORM ALLOWANCE .............................................................................................................................. 4943
2. UNIFORMS - CLASS A ................................................................................................................................. 5044
3. MILEAGE REIMBURSEMENT ....................................................................................................................... 5044
4. TUITION/BOOKS REIMBURSEMENT ............................................................................................................ 5044
5. COMPENSATION FOR TRAINING .................................................................................................................. 5145
09/09/2025 Item No.11.
6. REPLACEMENT OF DAMAGED PERSONAL PROPERTY ................................................................................. 5145
7. SCBA OPTICS REIMBURSEMENT................................................................................................................ 5245 ARTICLE XI ........................................................................................................................................................... 5246 EMPLOYEE DISCIPLINE ..................................................................................................................................... 5246
1. EMPLOYEE DISCIPLINE ............................................................................................................................... 5246
2. PERFORMANCE EVALUATIONS ................................................................................................................... 5751
3. PERSONNEL FILES ...................................................................................................................................... 5751
4. PURGING PERSONNEL FILES ....................................................................................................................... 5851 ARTICLE XII .......................................................................................................................................................... 5852 GRIEVANCE PROCEDURE ................................................................................................................................. 5852
1. GRIEVANCE PROCEDURE ............................................................................................................................ 5852 ARTICLE XIII ........................................................................................................................................................ 6054 MISCELLANEOUS ................................................................................................................................................ 6054
1. FITNESS FOR DUTY..................................................................................................................................... 6054
2. FITNESS EVALUATION (WELLNESS) ........................................................................................................... 6155
3. MODIFIED DUTY ASSIGNMENTS ................................................................................................................. 6255
4. FIRE JOB CLASSIFICATION.......................................................................................................................... 6255
5. PROMOTIONAL TEST SCHEDULING ............................................................................................................. 6256
6. PAYCHECK DISTRIBUTION.......................................................................................................................... 6356
7. LABOR/MANAGEMENT TEAM .................................................................................................................... 6357
8. DEPARTMENT BULLETINS .......................................................................................................................... 6357
9. PROGRAM COORDINATOR/TECHNICIAN ..................................................................................................... 6357
10. PROGRAM INCENTIVE PAY ......................................................................................................................... 6457
11. MEDIC UNIT INCENTIVE PAY ..................................................................................................................... 6559
12. STRIKE TEAM - ASSIGNMENTS ................................................................................................................... 6559
13. PROBATIONARY PERIOD, SENIORITY, DEMOTION AND LAYOFFS ............................................................... 6660
13. LATERAL HIRES ......................................................................................................................................... 6862
14. PERSONNEL RULES..................................................................................................................................... 6862
15. STAFFING ................................................................................................................................................... 6862
16. BILINGUAL PAY ......................................................................................................................................... 6962 ARTICLE XIV ........................................................................................................................................................ 7064 SIGNATURE CLAUSE .......................................................................................................................................... 7064
1. SIGNATURE CLAUSE ................................................................................................................................... 7064 APPENDIX A ......................................................................................................................................................... 7265 SALARY SCHEDULE ........................................................................................................................................... 7265 PREAMBLE .................................................................................................................................................................. 5 ARTICLE I .................................................................................................................................................................... 5 RECOGNITION AND COVERAGE ............................................................................................................................ 5
1. RECOGNITION .................................................................................................................................................. 5
2. CONTINUATION OF BENEFITS ........................................................................................................................... 5
3. TERMS OF UNDERSTANDING ............................................................................................................................ 6
4. MEETING AND CONFERRING DURING THE TERM OF THE MEMORANDUM OF UNDERSTANDING ....................... 6
5. SEVERANCE...................................................................................................................................................... 6
6. NO STRIKE ....................................................................................................................................................... 7 Formatted: Default Paragraph Font, All caps
Formatted: Default Paragraph Font, All caps
Formatted: Default Paragraph Font, All caps
Formatted: Default Paragraph Font, Small caps
Formatted: Default Paragraph Font, Small caps
Formatted: Default Paragraph Font, Small caps
Formatted: Default Paragraph Font, Small caps
Formatted: Default Paragraph Font, Small caps
Formatted: Default Paragraph Font, Small caps
09/09/2025 Item No.11.
ARTICLE II ................................................................................................................................................................... 7 MANAGEMENT RIGHTS ........................................................................................................................................... 7 ARTICLE III ................................................................................................................................................................. 8 UNION RIGHTS ........................................................................................................................................................... 8
1. UNION LEAVE .................................................................................................................................................. 8
2. UNION BANK TIME........................................................................................................................................... 9
3. UNION SECURITY ............................................................................................................................................. 9 ARTICLE IV ............................................................................................................................................................... 10 SALARY AND OTHER COMPENSATION ............................................................................................................. 10
1. MARKET SURVEY ........................................................................................................................................... 10
2. PARAMEDIC INCENTIVE PAY .......................................................................................................................... 10
3. TEMPORARY WORK ASSIGNMENTS ................................................................................................................ 11
4. EDUCATIONAL INCENTIVE ............................................................................................................................. 12
5. LONGEVITY PAY PLAN ................................................................................................................................... 13
6. OUT OF CLASS COMPENSATION ..................................................................................................................... 14
7. RETIREMENT .................................................................................................................................................. 14
8. PRE-RETIREMENT OPTIONAL SETTLEMENT 2W DEATH BENEFIT (SURVIVORS) ............................................. 15
9. PERS RETIREMENT – ALTERNATE DEATH BENEFIT ...................................................................................... 15
10. SOCIAL SECURITY WITHDRAWAL .................................................................................................................. 15
11. FIELD TRAINING OFFICER (FTO) ................................................................................................................... 15
12. SALARY.......................................................................................................................................................... 16
13. SPECIAL SALARY INCREASE ........................................................................................................................... 16
14. SALARY RANGES............................................................................................................................................ 16 ARTICLE V ................................................................................................................................................................ 17 OVERTIME ................................................................................................................................................................ 17
1. OVERTIME COMPUTATION/ACCRUED STAFFING FURLOUGH TIME ................................................................ 17
2. COMPENSATING TIME OFF ............................................................................................................................. 18
3. OVERTIME SCHEDULING ................................................................................................................................ 18
4. EMERGENCY CALLBACK ................................................................................................................................ 18
5. MANDATORY HIRES ....................................................................................................................................... 19
6. COURT APPEARANCES ................................................................................................................................... 19
7. STATION ASSIGNMENT CHANGES .................................................................................................................. 19
8. STAFFING ERRORS ......................................................................................................................................... 20
9. SCHEDULED OFF-DUTY TRAINING ................................................................................................................. 20
10. CITY BUSINESS TRAVEL ................................................................................................................................. 20 ARTICLE VI ............................................................................................................................................................... 20 HOURS OF WORK .................................................................................................................................................... 20
1. 48/96 WORK SHIFT ........................................................................................................................................ 20
2. MODIFIED DUTY ASSIGNMENTS ..................................................................................................................... 21
3. FAIR LABOR STANDARDS ACT (FLSA) .......................................................................................................... 21
4. STATION AND SHIFT TRANSFER PROCESS ...................................................................................................... 21
5. STATION BIDS ................................................................................................................................................ 22 ARTICLE VII .............................................................................................................................................................. 23 HOLIDAYS ................................................................................................................................................................. 23
1. NON-SHIFT PERSONNEL ................................................................................................................................. 23
2. HOLIDAY PAY DIFFERENTIAL ........................................................................................................................ 24 Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
09/09/2025 Item No.11.
3. HOLIDAY ROUTINE ........................................................................................................................................ 24 LEAVES ...................................................................................................................................................................... 24
1. ANNUAL LEAVE. ............................................................................................................................................ 24
2. LEAVE REQUEST PROCEDURE ........................................................................................................................ 25
3. VACATION BIDDING ....................................................................................................................................... 26
4. SHIFT TRADES ................................................................................................................................................ 28
5. SICK LEAVE ................................................................................................................................................... 30
6. FLMA OR CFRA ........................................................................................................................................... 31
7. BEREAVEMENT LEAVE ................................................................................................................................... 31
8. PERSONAL LEAVE TIME ................................................................................................................................. 32
9. EMERGENCY LEAVE ....................................................................................................................................... 32
10. LEAVE TIME ACCRUAL - NON-PAY STATUS................................................................................................... 32
11. LOCAL 522 CATASTROPHIC TIME BANK ........................................................................................................ 32
12. LEAVE CONVERSION RATES ........................................................................................................................... 33
13. JURY DUTY LEAVE ......................................................................................................................................... 34 ARTICLE IX ............................................................................................................................................................... 35 INSURANCE .............................................................................................................................................................. 35
1. MEDICAL INSURANCE .................................................................................................................................... 35
2. HEALTH INSURANCE ...................................................................................................................................... 35
3. HIGH DEDUCTIBLE HEALTH PLANS................................................................................................................ 37
4. OUT OF AREA HEALTH PREMIUM PLAN ......................................................................................................... 37
5. DENTAL INSURANCE ...................................................................................................................................... 38
6. VISION CARE.................................................................................................................................................. 38
7. HEALTH BENEFITS LABOR-MANAGEMENT COMMITTEE ................................................................................ 39
8. LIFE INSURANCE ............................................................................................................................................ 39
9. SHORT TERM DISABILITY INSURANCE ........................................................................................................... 39
10. LONG TERM DISABILITY INSURANCE ............................................................................................................. 39
11. FMLA/CFRA LEAVE STATUS ....................................................................................................................... 40
12. RETIREE HEALTH INSURANCE ........................................................................................................................ 40
13. RETIREE HEALTH BENEFITS REOPENER ......................................................................................................... 42 ARTICLE X ................................................................................................................................................................ 42 ALLOWANCES AND REIMBURSEMENTS ........................................................................................................... 42
1. UNIFORM ALLOWANCE .................................................................................................................................. 42
2. UNIFORMS - CLASS A ..................................................................................................................................... 43
3. MILEAGE REIMBURSEMENT ........................................................................................................................... 43
4. TUITION/BOOKS REIMBURSEMENT ................................................................................................................ 43
5. COMPENSATION FOR TRAINING ...................................................................................................................... 44
6. REPLACEMENT OF DAMAGED PERSONAL PROPERTY ..................................................................................... 44
7. SCBA OPTICS REIMBURSEMENT.................................................................................................................... 44 ARTICLE XI ............................................................................................................................................................... 45 EMPLOYEE DISCIPLINE ......................................................................................................................................... 45
1. EMPLOYEE DISCIPLINE ................................................................................................................................... 45
2. PERFORMANCE EVALUATIONS ....................................................................................................................... 50
3. PERSONNEL FILES .......................................................................................................................................... 50
4. PURGING PERSONNEL FILES ........................................................................................................................... 50 ARTICLE XII .............................................................................................................................................................. 51 GRIEVANCE PROCEDURE ..................................................................................................................................... 51 Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
09/09/2025 Item No.11.
1. GRIEVANCE PROCEDURE ................................................................................................................................ 51 ARTICLE XIII ............................................................................................................................................................ 53 MISCELLANEOUS .................................................................................................................................................... 53
1. FITNESS FOR DUTY......................................................................................................................................... 53
2. FITNESS EVALUATION (WELLNESS) ............................................................................................................... 54
3. MODIFIED DUTY ASSIGNMENTS ..................................................................................................................... 54
4. FIRE JOB CLASSIFICATION.............................................................................................................................. 55
5. PROMOTIONAL TEST SCHEDULING ................................................................................................................. 55
6. PAYCHECK DISTRIBUTION.............................................................................................................................. 56
7. LABOR/MANAGEMENT TEAM ........................................................................................................................ 56
8. DEPARTMENT BULLETINS .............................................................................................................................. 56
9. PROGRAM COORDINATOR/TECHNICIAN ......................................................................................................... 56
10. PROGRAM INCENTIVE PAY ............................................................................................................................. 56
11. MEDIC UNIT INCENTIVE PAY ......................................................................................................................... 58
12. STRIKE TEAM - ASSIGNMENTS ....................................................................................................................... 58
13. PROBATIONARY PERIOD, SENIORITY, DEMOTION AND LAYOFFS ................................................................... 59
13. LATERAL HIRES ............................................................................................................................................. 61
14. PERSONNEL RULES......................................................................................................................................... 61
15. STAFFING ....................................................................................................................................................... 61
16. BILINGUAL PAY ............................................................................................................................................. 62 ARTICLE XIV ............................................................................................................................................................ 63 SIGNATURE CLAUSE .............................................................................................................................................. 63
1. SIGNATURE CLAUSE ....................................................................................................................................... 63 APPENDIX A ............................................................................................................................................................. 64 SALARY SCHEDULE ............................................................................................................................................... 64
Formatted: Default Paragraph Font, Small caps
Formatted: Default Paragraph Font, All caps
Formatted: Default Paragraph Font, All caps
Formatted: Default Paragraph Font, Small caps
Formatted: Default Paragraph Font, Small caps
Formatted: Default Paragraph Font, Small caps
Formatted: Default Paragraph Font, Small caps
Formatted: Default Paragraph Font, Small caps
Formatted: Default Paragraph Font, Small caps
Formatted: Default Paragraph Font, Small caps
Formatted: Default Paragraph Font, Small caps
Formatted: Default Paragraph Font, Small caps
Formatted: Default Paragraph Font, Small caps
Formatted: Default Paragraph Font, Small caps
Formatted: Default Paragraph Font, Small caps
Formatted: Default Paragraph Font, Small caps
Formatted: Default Paragraph Font, Small caps
Formatted: Default Paragraph Font, Small caps
Formatted: Default Paragraph Font, Small caps
Formatted: Default Paragraph Font, Small caps
Formatted: Default Paragraph Font, All caps
Formatted: Default Paragraph Font, All caps
Formatted: Default Paragraph Font, Small caps
Formatted: Default Paragraph Font, Font: Not Bold, All caps Formatted: Default Paragraph Font, All caps
09/09/2025 Item No.11.
PREAMBLE
On the date hereinafter subscribed, authorized representatives of the City of Folsom, herein called "City", and authorized representatives of the Sacramento Area Firefighters Local 522, IAFF, herein called " SAFF, Local 522", made and entered into this Memorandum of Understanding, hereinafter referred to as "Agreement" or "MOU." Pursuant to Section 3500 et seq. of the Government Code of the State of California, an agreement between the aforementioned parties has as its purpose the promotion of harmonious la bor relations; establishment of an equitable and peaceful procedure for the resolution of differences; and the establishment of rates of pay, hours of work, and other terms and conditions of employment.
The term "Agreement" as used herein means the written agreement provided under Section 3505.1 of the Government Code.
It is understood and agreed that this Memorandum of Understanding supersedes and replaces all previous agreements on these points by and between the City of Folsom and the Sacramento Area Firefighters Local 522.
ARTICLE I
RECOGNITION AND COVERAGE
1. Recognition
The Sacramento Area Firefighters Local 522 is recognized as the exclusive representative, as provided in the City's Employer-Employee Relations Policy, for all employees assigned to the Sacramento Area Firefighters Local 522 Bargaining Unit in the following classifications:
Fire Captain
Fire Engineer
Firefighter
In the event new classifications are established which are appropriate for this unit, the parties agree to meet and confer for the purpose of including such in the Sacramento Area Firefighter Local 522 Bargaining Unit.
2. Continuation of Benefits
A. This Memorandum of Understanding is a final expression of the agreement between the parties with respect to the terms and conditions of employment. No amendment, alteration, understanding, variation, waiver or modification of any terms or provisions of this Memorandum of Understanding shall in any manner be binding Formatted: None
Formatted: None
09/09/2025 Item No.11.
upon the parties unless made and executed in writing between the parties hereto and approved by the City Council.
B. Terms and conditions of employment as specified in this Memorandum of Understanding shall remain in full force and effect during the term of this Memorandum of Understanding unless modified pursuant to the above paragraph or as otherwise specified in this agreement.
3. Terms of Understanding
This Memorandum of Understanding incorporates all modifications regarding wages, hours, and other terms and conditions of employment. This Memorandum of Understanding shall be effective as of July 1, 20222025, and shall expire June 30, 20258.
The parties agree to begin negotiations on a successor Memorandum of Understanding no later than 120 calendar days prior to expiration of this Memorandum of Understanding.
4. Meeting and Conferring During the Term of the Memorandum of Understanding
Unless specifically agreed otherwise, this Memorandum of Understanding sets forth the full and entire understanding of the parties regarding the matters contained in this Memorandum of Understanding and supersedes and cancels all prior or existing understandings or agreements between the parties, whether formal or informal.
During the term of this Memorandum of Understanding, representatives of the City and the SAFF, Local 522 may meet and confer on matters of mutual concern. Any agreement reached between the parties shall be memorialized in writing and be deemed a “Side Letter” to this Memorandum of Understanding.
The City Manager is authorized to enter into a Side Letter on behalf of the City for purposes of the interpretation or administration of this Memorandum of Understanding. A Side Letter to this Memorandum of Understanding shall not be deemed valid until signed by the City Manager or designee, approved as to form by the City Attorney, and signed by an authorized representative of the SAFF, Local 522. Side Letters agreed to during the term of this Memorandum of Understanding may be incorporated into any succ essor Memorandum of Understanding.
5. Severance
Should any provision of this Agreement be found unlawful or unenforceable by a court of competent jurisdiction, or invalidated by subsequent enacted legislation, the remainder of the Agreement shall continue enforce. Upon occurrence of such an event, the parties shall meet and confer as soon as practical to renegotiate the invalidated provision(s).
6. No Strike
09/09/2025 Item No.11.
The SAFF, Local 522 agrees that during the term of this Agreement, neither it nor its officers, employees, representatives, or members will engage in, encourage, sanction, support or suggest any strikes, work stoppages, boycotts, slowdowns, mass resignations, mass absenteeism, picketing or any other similar actions which would involve suspension of, or interference with, the normal work of the City of Folsom. In the event that SAFF, Local 522 members participate in such activities in violation of this provision, SAFF, Local 522 shall notify those members so engaged to cease and desist from such activities and shall instruct the members to return to their normal duties.
ARTICLE II
MANAGEMENT RIGHTS
To ensure that the City is able to carry out its statutory functions and responsibilities, nothing contained in this article shall be construed to require the City to negotiate on matters which are solely a function of management, or not otherwise assigned as an employee right, including the following:
1. To manage the City generally and to determine issues of policy.
2. To determine the existence of facts which are the basis of management decisions.
3. To determine the necessity for and organization of any service or activity conducted by the City, and to expand or diminish services.
4. To determine the nature, manner, means, technology, and extent of services to be provided to the public.
5. To determine methods of financing.
6. To determine types of equipment or technology to be used.
7. To determine and/or change the facilities, methods, technology, means, organizational structure, and size and composition of the work force, and to allocate and assign the work by which the City operations are to be conducted.
8. To determine and change the number of locations, relocations, and types of operations, processes, and materials to be used in carrying out all City functions, including, but not limited to, the right to contract for or sub-contract any work or operation of the City. Such changes shall be subject to reasonable notice and good faith meet and confer.
9. To assign work to and schedule employees in accordance with requirements as determined by the City, and to establish and change work schedules and assignments upon reasonable notice and good faith meet and confer.
Formatted: None
09/09/2025 Item No.11.
10. To lay off employees from duties because of lack of work or funds, or under conditions where continued work would be ineffective or non-productive.
11. To establish and modify productivity and performance programs and standards.
12. To dismiss, suspend without pay, demote, reprimand, withhold salary step increases, or otherwise discipline employees for cause.
13. To determine minimum qualifications, skills, abilities, knowledge, selection procedures and standards, and job classifications, and to reclassify employees.
14. To hire, transfer, promote, and demote employees for non-disciplinary reasons.
15. To determine policies, procedures, and standards for selection, training, and promotion of employees.
16. To establish reasonable employee performance standards including, but not limited to, quality and quantity standards; and to require compliance therewith.
17. To maintain order and efficiency in City facilities and operations
18. To establish, publish, and/or modify rules and regulations to maintain order and safety and health in the City. The City agrees to meet and confer on any items that fall within the scope of Government Code Section 3500 et, seq.
19. To restrict the activity of an employee organization on the municipal property and on municipal time except as set forth in the City's Personnel Rules and Regulations.
20. To take any and all necessary action to carry out the mission of the City in emergencies.
ARTICLE III
UNION RIGHTS
1. Union Leave
A. The designated unit representative shall be granted reasonable release time, without loss of compensation or benefits, to meet with representative(s) of the City in regard to employee-employer relations matters.
B. Upon request of the SAFF, Local 522 unit representative, a reasonable number of employees may be released from duty, without loss of compensation or benefits, for the purpose of meeting with the City. Such release time shall include thirty (30) Formatted: None
09/09/2025 Item No.11.
minutes before and fifteen (15) minutes after the scheduled meeting. The times before and after the meetings are in addition to reasonable travel time to and from the employee's work location.
C. The City reserves the right to postpone or cancel a meeting if adequate staffing of the City's emergency services would be curtailed by the release of participating personnel.
D. Time used, pursuant to this section, shall be in addition to the time provided in Article III, Section 2, Union Bank Time.
2. Union Bank Time
A. Employees in the bargaining unit may , but are not required to, donate accrued annual leave, holiday leave, compensating time off or staffing furlough time, in no less than one (1) hour increments, into a bank of hours from which designated representatives may draw time for the purposes of conducting Sacramento Area Firefighters Local 522 activities. Donated time will be transferred from the donating employee's accrued annual leave to the Union Bank in August of each year. Should supplemental donations be needed, the unit representative will notify the City and an additional "donating" period will be permitted.
B. The unit representative or designee must approve, fill out and submit a leave slip for all employees using the Union Bank. The release of employees on Union Bank Time shall be subject to both the approval of the Unit Representative and the needs of the City, as determined by the Fire Chief. Approval by the Fire Chief shall not be unreasonably withheld. In no event shall more than three (3) bargaining unit members be released from duty, pursuant to this section, at the same time.
C. The unit representative or designee must request through the on -duty Battalion Chief for the release of employees on Union Bank Time at least ten (10) work days prior to the desired time off. Under unusual or emergency circumstances, the request may be considered for approval with less than ten (10) working days’ notice.
3. Union Security
The following provision has been agreed to pursuant to Section 3502.5 of the Government Code.
A. Membership dues shall be payroll deducted and transmitted to the SAFF, Local No. 522.
B. Any employee who is a member of a bonafide religion, body or sect that has held conscientious objections to joining or financially supporting public employee organizations shall not be required to financially support SAFF, Local No. 522. Such an
09/09/2025 Item No.11.
employee shall, in lieu of the service fee, pay a sum equal to the service fee to a non - religious, non-labor charitable organization that is exempt from taxation under the Internal Revenue Service Code and identified by the SAFF, Local 522.
C. The SAFF, Local 522 expressly agrees to indemnify , defend and hold the City harmless for any and all claims, demands, costs (including any costs and attorney’s fees incurred by the City in defense of a lawsuit), expenses, damages or other monetary losses arising out of or in any way connected with any action or inaction of the City in adoption or administration of this section. This hold harmless defense and indemnity agreement shall include but not be limited to employee legal actions of any sort or natur e against the City based upon or related to this section.
ARTICLE IV
SALARY AND OTHER COMPENSATION
1. Market Survey
The City agrees that if a Market Survey is to be completed, the classes of Firef ighter I, Firefighter II, Fire Engineer, and Fire Captain shall be used. Additionally, it is agreed that the following agencies shall be used: City of Davis, City of Rocklin, City of West Sacramento, City of Sacramento, Sacramento Metropolitan Fire Protection District, City of Roseville, El Dorado Hills Fire District, and Cosumnes Community Services District.
2. Paramedic Incentive Pay
A. Effective first full pay period following ratification:
A. Positions in the job classification of Firefighter , Fire Engineer and Fire Captain that maintain paramedic licensure and accreditation will receive the following monthly paramedic pay incentive:
1) Firefighter -– 9% of the employee’s base wage$765.00 per month. 2) Fire Engineer -– 6% of the employee’s base wage$600.00 per month. 3) Fire Captain -– 5% of the employee’s base wage$550 per month.
B. Effective first full pay period in July 2027:
Positions in the job classification of Firefighter, Fire Engineer and Fire Captain that maintain paramedic licensure and accreditation will receive the following monthly paramedic pay incentive:
1) Firefighter – 10% of the employee’s base wage.
2) Fire Engineer – 7% of the employee’s base wage.
3) Fire Captain – 6% of the employee’s base wage.
Formatted: None
Formatted: Centered
Formatted: Left, None, Tab stops: Not at 3.25"
Formatted: Centered
Formatted: None
Formatted: None
Formatted: None
Formatted: Font: Times New Roman
Formatted: Normal, Indent: Left: 1", No bullets or
numbering
Formatted: Indent: Left: 1", No bullets or numbering
09/09/2025 Item No.11.
B.C. Employees assigned to a temporary assignment shall maintain the paramedic incentive pay of their permanent classification.
C.D. Employees that maintain paramedic licensure and accreditation shall be reimbursed for the cost of the license and accreditation. Employees will not receive compensation for any late fees associated with paramedic licensure renewal or accreditation continuation.
D.E. Current employees achieving paramedic status must receive pre-authorization from the department to qualify for participation in the paramedic program.
E.F. The department shall have the right to remove paramedic incentive pay from any required or authorized employee as a result of a loss or lapse of paramedic licensure and accreditation by Sacramento County or State of California requirements and regulations.
F.G. The department shall provide a fiscal year list of the names of those employees that are required, and those that are authorized, by terms of this MOU to perform in the capacity of paramedic and receive paramedic incentive pay. All current and/or new employees authorized or required to possess paramedic licensure and accreditation, will be automatically added to this list.
G.H. An employee authorized to operate as a paramedic can request, in writing to terminate paramedic status. This request must be received ninety (90) days prior to the requested termination date. The department will evaluate the number of current paramedics, and the service level within the City of Folsom, to determine whether to grant this request. Such request will be granted if the service level will not be disrupted or does not cause negative financial impact.
H.I. All employees receiving paramedic incentive pay shall have their performance as a paramedic included in their City employee performance evaluations. Performance that falls below "meets expectations" shall be reviewed by the department EMS Officer and Fire Service Medical Director. Such employees, identified as authorized in the fiscal year list, may be subject to removal from participation in the paramedic program and loss of paramedic incentive pay. The parties agree that disagreements under this provision may be appealed through the grievance procedure contained in Article XII, Grievance Procedure of this MOU.
I.J. Those employees, regardless of rank, receiving paramedic incentive pay may request re-assignment to a medical transporting unit for periods not to exceed 30 days.
J.K. Merit step increases will not be withheld as a result of paramedic performance for employees who are not participating in the paramedic program as a condition of employment.
Formatted: Numbered + Level: 1 + Numbering Style: A, B, C, … + Start at: 1 + Alignment: Left + Aligned at: 0.5" + Indent at: 1", Tab stops: Not at 0.75"
09/09/2025 Item No.11.
3. Temporary Work Assignments
A. Employees assigned to a temporary, 40-hour work week will receive a 10% pay increase for the duration of the assignment. Such assignment shall be for not more than ninety (90) days in duration unless otherwise agreed to by the Employee and the Department.
B. Career Development Positions: The City and the SAFF, Local 522 agree to jointly develop and implement a career development program for purposes of gaining the knowledge, skills and abilities in the Training, EMS, and Fire Prevention Divisions, or other id entified assignments, of the Fire Department. This includes the development of job descriptions and responsibilities for each identified assignment.
The assignment shall be considered non -mandatory and shall be filled only with qualified volunteers. Should more than one volunteer for the assignment, the Fire Chief will evaluate the qualifications of all candidates before selecting a volunteer.
Seniority in grade , performance evaluations, disciplinary actions and commendations, and educational experience shall be the determining factor in this selection. The duration of the assignment shall be for no longer than twelve (12) months. The assignment may be extended by mutual agreement between the individual and the Department. Permanent employees will not be assigned until successfully completing their probationary period.
4. Educational Incentive
A. Employees subject to this Agreement shall be eligible, upon proof of eligibility, to receive a monthly educational incentive pay as described in this section of up to 10%, in addition to the regular base pay:
1) Any Associate of Arts or Science Degree from a City approved recognized college or university (as defined in Section D), or CSFM “Fire Officer” or “Company Officer” completion of certification track shall receive 5%.
2) Employees who successfully complete all CSFM “Chief Officer” or “Chief Fire Officer” certification track educational requirements (Pre - Certification) in addition to completion of the requirements in Item 1 above shall receive 7.5%; or
3) Bachelor of Arts or Science Degree in Fire Technology/Science, Public Administration, Business Administration, Public Safety , Emergency Management, or other approved program from a City approved accredited college or university (as defined in Section D); or any Associates of Arts or Science Degree from a City -approved recognized college or university (as defined in Section D) and CSFM “Fire Officer” or “Company Officer” certificate and successful completion of CSFM “Chief Officer” certification Formatted: None
09/09/2025 Item No.11.
track or CSFM “Chief Fire Officer” requirements as follows: course completion, task book completion, and experience as specified in the CSFM Chief Fire Officer Certification Checklist shall receive 10%. Employees may seek pre-approval from the City prior to taking courses in this program.
4) CSFM Fire Officer certificate shall be equivalent to a CSFM Company Officer certificate.
5) CSFM Chief Officer certificate shall be equivalent to the CSFM Chief Fire Officer certificate.
B. Employees hired prior to July 1, 2010 , who receive a Master of Arts or Science Degree in Fire Technology/Science, Public Administration, Business Administration or Public Safety from an accredited college or university shall receive an additional 5% Educational Incentive Pay. Employees hired on or after July 1, 2010, shall not qualify for an additional 5% for a Masters of Arts/Masters of Science degree.
C. Educational Incentive Pay shall be received by the employee upon submitting substantial proof of eligibility acceptable to the department, and shall not be applied retroactively. Substantial proof shall be a diploma, certificate, or official acknowledgement that all educational criteria for the document have been submitted.
D. Recognized colleges and universities are those institutions of higher learn ing accredited by one or more of the United States regional accrediting bodies.
E. For purposes of clarification the City agrees to amend titles contained in this Section in a manner consistent with changes enacted by the California State Fire Marshal.
5. Longevity Pay Plan
A. Subject to subsections B and C below, the City will pay employees represented by the SAFF, Local 522 for their continued longevity based on the following formula.
The Longevity Pay increments will be paid on a monthly basis.
2 ½% After 10 years of full-time City service
Additional 2 ½% After 15 years of full-time City service Additional 2 ½% After 20 years of full-time City service
B. Longevity Pay shall not exceed a total of 7 ½% per month for an employee with twenty or more years of full-time City service.
Formatted: None
09/09/2025 Item No.11.
C. Notwithstanding subsection A above, for the period
beginning July 1, 2011, and ending June 30, 2012, employee advancement from one Longevity Pay increment to the next increment shall be frozen. Employees who would normally have advanced to a higher increment during this period
shall advance to the next higher increment twelve (12)
months from their anniversary date and shall not receive any retroactive payment. Total service credit for longevity purposes is not impacted.
D. Employees hired after July 1, 2011, shall not be
eligible to receive Longevity Pay.
B.
6. Out of Class Compensation
The City shall pay out of class compensation pursuant to City Personnel Rules and Regulations, except that, such compensation shall be paid on an hour -for-hour basis to employees who are assigned to work in a higher classification. Employees shall receive an additional $3.00 per hour for Acting Battalion/Division Chief or Acting Captain, or $2.50 per hour for Acting Engineer for the duration of the out of class assignment.
Employees will not be forced to work out of class in a lower class except in those instances outlined in Article VIII, Section 8, Emergency Leave . In the event that all eligible employees for a vacancy have been contacted and have refused the overtime opportunity, then a qualified employee in any class may volunteer for that overtime opportunity.
• A Captain or Engineer will not be eligible for immediate need or planned need strike team assignments while assigned to a lower rank without the Fire Chief’s approval.
The Fire Chief or their designee may waive this work restriction based upon the needs of the City.
7. Retirement
A. Public Employees Retirement System (PERS) – Formula
1) SAll safety fire employees hired by the City of Folsom on or before prior to June 30, 2010 October 16, 2011 , shall recei ve the retirement benefit of 3%@50.
2) SAll safety fire employees hired by the City of Folsom on or after July 1, 2010 October 17, 2011 , who qualify as CalPERS Classic Members shall receive the retirement benefit of 2%@50.
1) Pursuant to the California Public Employee's Pension Reform Act of 2013 Formatted: Font: Times New Roman
Formatted: List Paragraph, Indent: Left: 0.5", Numbered + Level: 3 + Numbering Style: A, B, C, … + Start at: 1 +
Alignment: Left + Aligned at: 1.38" + Indent at: 1.88" Formatted: Left, Indent: Left: 0.5", No bullets or
numbering
Formatted: Left
Formatted: Left, Indent: Left: 0.5", No bullets or
numbering
Formatted: List Paragraph, Indent: Left: 0.5", Numbered + Level: 3 + Numbering Style: A, B, C, … + Start at: 1 +
Alignment: Left + Aligned at: 1.38" + Indent at: 1.88" Formatted: None
Formatted: None
09/09/2025 Item No.11.
(AB 340), all Safety fire employees hired on or after January 1, 2013, shall receive the retirement benefit of 2.7%@57 or as specified in the California Public Employee’ Pension Reform Act of 2013 (PEPRA). otherwise required by PERS law.
3)
2)4) All Safety fire employees hired on or prior tobefore June 30, 2010 October 16, 2011, shall receive the retirement benefit based on the single highest twelve (12) months of compensation. AllSafety fire employees hired on or after July 1, 2010 October 17, 2011 , shall receive the retirement benefit based on the employee's highest average monthly compensation during thirty-six (36) consecutive months of employment as provided in state law pertaining to PERS.
B. Public Employees Retirement System (PERS) -- Retirement Contribution:
1) The City agrees to pay the full cost of employer contributions to the Public Employees’ Retirement System (PERS) for all employees in the Sacramento Area Firefighters Local 522 bargaining unit, as currently contracted with PERS. Effective July 1, 2011, employees shall pay the employee share of retirement according to the following implementation schedule:
1)
2) Employees who are CalPERS Classic members s hall pay 9% of the employee share of retirement. Safety fire employees who are PERS PEPRA members will pay the employee contribution as specified and adjusted by PERS.
2)
a. Effective July 1, 2011, employees shall pay 5% of the employee share of retirement.
b. Effective January 1, 2012, employees shall pay 9% of the employee share of retirement.
a. The City agrees to continue Government Code Section 20691, Conversion of
3) Employer Paid Member Contributions (EPMC).
C. PEPRA Members Supplemental Retirement Plan:
1) Effective as soon as administratively possible, but no later than 90 days from ratification, the City shall establish a 457 Plan for members hired on or after January 1, 2013. Government (Gov.) Code section 7522.10 of the PEPRA law provides the authority for the ear nings limit for all PEPRA members. In the event PEPRA members reach the annual compensation limits in a calendar year, the City and employee shall deposit an amount Formatted: Font: Times New Roman
Formatted: List Paragraph, Indent: Left: 1", Hanging: 0.5", Numbered + Level: 1 + Numbering Style: 1, 2, 3, … + Start at: 1 + Alignment: Left + Aligned at: 0.25" + Indent at:
Formatted: Indent: Left: 0.5", First line: 0"
Formatted: Left, None, Indent: Left: 0"
Formatted: List Paragraph, Indent: Left: 1", Hanging: 0.5", Numbered + Level: 1 + Numbering Style: 1, 2, 3, … + Start at: 1 + Alignment: Left + Aligned at: 0.25" + Indent at:
0.5"
Formatted: Font: Times New Roman
Formatted: Indent: Left: 1.5", No bullets or numbering Formatted: Indent: Left: 0.5", No bullets or numbering Formatted: List Paragraph, Indent: Left: 1", Hanging: 0.5", Numbered + Level: 1 + Numbering Style: 1, 2, 3, … + Start at: 1 + Alignment: Left + Aligned at: 0.81" + Indent at:
1.06"
09/09/2025 Item No.11.
equal to the employee/employer retirement contributions into the employee’s 457 Plan for the remainder of the calendar year. Contributions to the 457 Plan shall be paid on each payroll cycle. At the start of the new calendar year, contributions to the 457 Plan shall be paused, and all contributions shall resume to CalPERS until the member reaches the annual limit in the new calendar year.
8. Pre-Retirement Optional Settlement 2W Death Benefit (Survivors)
Effective October 16, 2006 , the City modif ied the contract with the Public Employees Retirement System (PERS) to add Government Code Section 21548, Pre -Retirement Optional Settlement 2W Death Benefit.
9. PERS Retirement – Alternate Death Benefit
The City has amended its contract with the California Public Employees Retirement System to add the Alternate Death Benefit for Local Fire Members credited with 20 or more years of service (Government Code Section 21547.7). SAFF Local 522 agrees that all costs associated with this PERS contract amendment shall be borne by employees in the SAFF Local 522 Bargaining Unit. To this end, the City will deduct a flat amount per paycheck from each employee in the SAFF Local 522 Bargaining Unit sufficient to fund the cost of this PERS contract amendment.
10. Social Security Withdrawal
The City agrees to reopen and negotiate the direction of funds, should the City withdraw from Social Security.
11. Field Training Officer (FTO)
A. Field Training Officer Program
The City and the SAFF, Local 522 agree to jointly develop and implement a Field Training Officer (FTO) program to assist in the career development and mentoring of department employees or paramedic interns. Additional career development training may be added to the program as agreed to by both parties. Only one person may serve as an FTO at any one time for an individual receiving career development and mentoring. Parties agree to meet as agreed on for the purpose of developing a FTO operating plan for the Department.
1) The Fire Chief shall certify the qualifications of an employee as a designated FTO prior to using the employee in that capacity. The FTO plan used by the department shall be voluntary in nature and shall not require participation by employees. Employees who volunteer to be an FTO shall not be negatively affected in their annual evaluation for performance as an Formatted: Font: Times New Roman
09/09/2025 Item No.11.
FTO. An employee may be removed from the FTO position by the Fire Chief due to lack of need for the FTO or other reasons as set forth by the City.
B. Field Training Officer Compensation
1) The City shall pay FTO compensation on an hour -for-hour basis to employees who are assigned in writing by the department to work in this capacity. Employees in the classes of F ire Captain, Fire Engineer, and Firefighter shall receive an additional $4.00 per hour while serving as an FTO.
2) FTO compensation shall be paid to employees providing for the training of department employees (probation or full time) or paramedic interns as authorized by the Fire Chief.
12. Salary
A. Effective July 1, 20252, all employees shall receive a salary increase of 23.5%.
B. Effective the first full pay period in July 1, 20263, all employees shall receive a salary increase of 2.53%.
C. Effective the first full pay period in July 1, 20274, all employees shall receive a salary increase of 2.53%.
13. Special Salary Increase
Effective July 1, 2022, the classes of Firefighter, Fire Engineer, and Fire Captain shall receive a special salary increase of 5%.
14. Salary Ranges
A. Effective July 1, 2022, the Salary Range for Firefighter, Fire Engineer, and Fire Captain shall be as set forth in Attachment A. The amounts specified in Attachment A include the salary described in Section 12 and Section 13.
B. The new salary range shall be a total of seven salary steps, with approximately 5% between each step. The current top step shall be the new top step of the seven-step salary range.
C. Employees will be moved to the new salary range effective July 1, 2022.
D. Employees in each class shall be placed on the salary range step that is closest to their salary as of June 30, 2022, without being lower.
Formatted: Normal
Formatted: Left
Formatted: Normal, Left, No bullets or numbering, Tab
stops: Not at 0.75" + 0.81"
Formatted: Normal, Left
Formatted: Normal, Left, No bullets or numbering, Tab
stops: Not at 0.75" + 0.81"
Formatted: Normal, Left
Formatted: Normal, Left, No bullets or numbering, Tab
stops: Not at 0.75" + 0.81"
09/09/2025 Item No.11.
ARTICLE V
OVERTIME
1. Overtime Computation/Accrued Staffing Furlough Time
A. Overtime hours worked will be compensated at one and one -half (1 ½) times the employee’s straight time hourly rate of pay (including all compensation regularly and routinely received by the employee) , based on a 56-hour work week (2912 hours worked per year) or 40-hour work week (2080 hours worked per year).
1) SFT earned shall not be cashed out except upon separation of employment.
Upon separation, banked SFT will be cashed out at the employee’s straight time rate of pay (including all compensation regularly and routinely received by the employee).
2) Employees may use accrued SFT for leave purposes.
3) Employees may request SFT time off consistent with Annual Leave procedures (Article VIII, Section 1, Annual Leave).
B. Employees shall be compensated at their overtime rate for all hours worked that are not part of the employee's normally assigned work schedule. It is understood that leave time taken by an employee shall continue to not be counted as time worked for FLSA purposes.
C. Pursuant to City Personnel Rules and Regulations all overtime shall be compensable in increments of thirty (30) minutes.
D. Incidental overtime of less than fifteen (15) minutes in a non-recurrent extension of the work day/shift is non-compensable in any form.
E. Employees shall be compensated at their overtime rate of pay for one (1) full hour when working beyond the incidental overtime period (Article V, Section 1(D) , Overtime) as a result of a dispatched incident.
F. The department has the right to require employees to remain at work and perform work-related duties for the duration of the established overtime period.
2. Compensating Time Off
Compensatory time off (CTO) may be accrued in lieu of overtime pay to a maximum of one hundred forty-four (144) hours. Employees shall take CTO off in a manner consistent with Annual Leave. Accrued CTO shall be used before any other accrued leave time is Formatted: None
09/09/2025 Item No.11.
used.
3. Overtime Scheduling
The City agrees to a list for “Special Events” and a list for “Scheduled Overtime Duty”.
A. “Scheduled Overtime Duty” (“SOD”) procedures will follow the most current “SOD” Procedures found in the Fire Department Standard Operating Procedures Manual. “SOD” list shall be zero ed out on January 1 st of each year and revert to overall seniority then to overtime hours.
B. “Special Events” shall be a rotating list. Employees hired and/or mandatory hired under the “Special Events” criteria shall rotate to the bottom of the “Special Events” list, without regard to the number of regular overtime hours worked.
1) "Special Events" is defined as any event that increases the daily staffing over the normal staffing level (i.e., Rodeo stand by, Red Flag warning day, Wind event).
C. The parties agree to meet and confer over the impact of future special events on SAFF 522 members.
4. Emergency Callback
A. Employees are subject to routine or periodic emergency callback that is inherent and integral part of their assigned job responsibilities in order to provide continuous public services deemed to be necessary and appropriate by the City Manager or Fire Chief. The Fire Chief or his/her designee shall initiate emergency callback to all employees to return to work when an emergency condition at the National, State, or local level compels the Fire Chief to provide staffing for continuous public service deemed necessary and appropriate to maintain department operations.
B. Employees shall keep the Department apprised of a current telephone number where they can normally be reached during off -duty hours. Employees shall respond to an emergency callback within a reasonable amount of time, unless the employee is incapable of doing so.
C. Emergency callback shall be paid at (1 1/2) times the hourly rate of pay, for a period of two (2) hours or for hours actually worked, whichever is greater.
Section 5 of Article V, Overtime, does not apply to emergency callbacks.
5. Mandatory Hires
A. Employees who are notified that they are being mandatory hired to work overtime as a result of unplanned vacancies (e.g., sick leave, emergency leave, strike team Formatted: None
09/09/2025 Item No.11.
backfill) that originate within twenty-four (24) hours or less of the start of the next scheduled work shift shall be compensated at a rate at two (2) times the employee’s regular hourly rate of pay for up to a maximum of eight (8) hours per occurrence and one and one-half (1 ½) times the employee's hourly rate of pay for the balance of the mandatory hire shift.
B. Employees that volunteer to work a mandatory h ire in place of another employee who has been notified that they are being mandatory hired will work that overtime at the employee’s normal overtime pay rate of one- and one-half times (1 ½). The employee volunteering for that shift will have their n ame moved to the bottom of the mandatory hire list.
6. Court Appearances
Fire personnel will be compensated for required, job related off-duty court appearances at one- and one-half times (1 ½) the hourly rate of pay, for a period of four (4) hours or for hours actually worked, whichever is greater. Personnel filling shift vacancies for employees appearing on-duty for court appearances shall receive overtime compensation in accordance with Article V, Section 1, Overtime.
7. Station Assignment Changes
A. Employees who are notified of station assignment changes after the completion of their shift and leaving the work site, shall be compensated by the payment of one half (½) hour of pay at the employee's overtime rate. The purpose of this provision is to recognize, and compensate for, the additional time and effort required to make the transition to the new station assignment.
B. Employees who voluntarily accept overtime assignments that require attendance at more than one station for purposes of shift change, that create a “holdover” or “cover” situation, except late calls, shall make arrangement(s) to trade the “holdover” time with the respective employee awaiting relief, or will be docked the amount of time consistent with the current MOU to compensate the holdover employee.
C. In the instance of a late call causing a delay and forfeiture of scheduled overtime hours, the affected employee is still eligible for compensation as provided in Article V, Section 1(E), Overtime “as a result of a dispatched incident.”
8. Staffing Errors
An employee, who reports to work on an overtime shift and is released from duty because of a staffing error, will be compensated for four (4) hours at one and a half times (1 ½) the hourly rate of pay when the employee remains at work and performs work related duties for the duration of the four (4) hour work period. Employees who elect to leave the work
09/09/2025 Item No.11.
site prior to the four (4) hour work period shall be compensated for the actual hours worked.
The provision governing force hire compensation shall govern when applicable.
9. Scheduled Off-Duty Training
Fire personnel will be compensated for scheduled, off-duty training that is required by the Department and approved by the Fire Chief. Compensation shall be at one and a half times (1 ½) the hourly rate of pay, for a period of two (2) hours or for hours actually in attendance, whichever is greater. In the event the training is canceled, and the employee has arrived at the training location he/she will be compensated for two hours of overtime.
10. City Business Travel
A. Employees who travel to do business for the City shall be compensated for actual hours worked, including travel time. Employees that are not on a regular scheduled day to work shall be compensated one and one half (1 ½) times the employee's total hourly compensation rate.
B. Employees who travel to do business for the City that are on a regular scheduled work day shall be placed on Offsite (OS) Status for the entire work period with no loss in wages or benefits.
C. The employee may request a Per Diem, which shall be the maximum Per Diem based on the most current Maximum Domestic Per Diem Rate table in accordance with the City Travel Policy. If Per Diem was not requested prior to departing on City business, the employee upon returning from the City business may submit a Per Diem request for reimbursement with receipts. Out-of-county strike team assignments or overhead assignments do not qualify for Per Diem.
ARTICLE VI
HOURS OF WORK
1. 48/96 Work Shift
Subject to Subsection 1(C) below, the City and the SAFF, Local 522 agree to continue the 48/96 work schedule, as follows:
A. Personnel working a 56-hour workweek (2,912 hours per year) will work a total of four shifts within a twelve (12) day cycle. Each shift shall be for 24 hours in duration and shall be scheduled back -to-back, contiguously. A shift rotation is defined as two (2) back-to-back, contiguous 24-hour shifts.
B. The twelve (12) day cycle shall start at 0800 hours.
Formatted: None
Formatted: None
09/09/2025 Item No.11.
C. Pursuant to Article II, Item 9 , Management Rights, of the MOU work schedules shall continue to be at the discretion of the Fire Chief in consultation with the City Manager, upon reasonable notice and good faith meet and confer with the SAFF, Local 522. The City also reserves the right to review this shift schedule on a periodic basis in order to address any potential inequities or problems.
D. All Fair Labor Standards Act (FLSA) 7K exemptions for Firefighters will apply, e.g., hours worked and overtime provisions, etc., unless modified by other provisions in this Memorandum of Understanding.
2. Modified Duty Assignments
The department reserves the right to determine and approve all modified duty assignments.
However, the City will endeavor to provide modified duty assignments upon request to any employee who submits verification from a medical physician identified from a City health insurance plan, or from a Worker's Compensation approved treating medical physician, substantiating the necessity for such modified duty as a result of pregnancy, injury or illness. The department shall determine the hours and duties of any approved modified duty assignment. Although Modified Duties Assignments are temporary, they are not to be classified as “Temporary Work Assignments” as defined in Article IV, Section 3A, Temporary Work Assignments. In the event the employee is placed on a forty (40) hour work schedule Article VII, Section 1, Holidays, will not apply and the employee will continue to receive HIL pay.
3. Fair Labor Standards Act (FLSA)
The City shall comply with the Fair Labor Standards Act (FLSA) and agrees to meet with the SAFF, Local 522 in order to discuss sections of the Act which affect the agreed upon wages, hours and other terms and conditions of employment.
4. Station and Shift Transfer Process
A. Department Requests
In the event a departmental need arises to move personnel from one shift to another shift, or from one station assignment to another, the basic reason for the need shall be made known to the affected employees. Whenever a vacancy occurs, it shall be bid for by seniority in the rank in which the vacancy occurs. If the vacant position is not filled through the bid process (no one applies), assignments shall be made through inverse order of senio rity within the rank. If the transfer is due to departmental need, the City will be responsible for honoring the employee’s scheduled vacation dates.
B. Employee Requests
Formatted: None
Formatted: None
09/09/2025 Item No.11.
Employees voluntarily seeking transfer from shift to shift, or station to station, may fill out a shift/transfer request form and submit it to the Fire Chief or his/her designee for approval.
1) Requests to move stations/shifts will be approved by the Fire Chief or his/her designee if there are no negative operational impacts to the Department.
2) Station/Shift transfer requests may be submitted twice annually for consideration.
a. Deadlines to request a transfer are September 15 th, with an implementation date near the beginning of the next calendar year based upon established work schedules and pay cycles. Employees granted a shift transfer at this time will be notified by the Fire Chief or his/her designee no later than October 1 st, and will bid station assignment and vacation dates on the newly assigned shift.
b. Station / Shift transfer requests will be considered mid-year as well.
The deadline for such requests is June 1 st with an implementation date near the beginning of July based upon established work schedules and pay cycles. Employees granted a shift transfer at this time will be notified by the Fire Chief or his/her designee no later than June 15 th. Employees who are granted a Station/Shift transfer mid-year assume all responsibility for re -scheduling their vacation dates pursuant to the MOU and/or loss of the bid vacation dates.
Employees granted a Station/Shift transfer mid -year will be assigned to the vacancy identified based upon their seniority in rank.
c. Voluntary Station/Shift requests are final once the Department has notified the employee in writing of the transfer request approval.
Members are specifically precluded from initiating any appeal process (including Article XII , Grievance Procedure) to either the City of Folsom or the Folsom Fire Department for any alleged violations of this section.
5. Station Bids
Station bids for each shift will be conducted at least annually . The Department will establish a list of departmental needs for each individual station. The most senior person by rank will bid for assignment based on filling the department's needs until all of the department's needs have been met and all of the vacant seats have been filled. All firefighters that bid at a medic station will participate in a medic seat rotation, to be determined by the station supervisor.
09/09/2025 Item No.11.
ARTICLE VII
HOLIDAYS
1. Non-Shift Personnel
Employees who are not assigned by the Fire Chief to work shifts shall receive the following:
A. The following holidays shall be observed by the City:
1) New Year’s Day (January 1)
2) Martin Luther King Day
3) President’s Day (Washington’s Birthday)
4) Memorial Day
5) Independence Day
6) Labor Day
7) Veterans Day
8) Thanksgiving Day
9) Friday following Thanksgiving Day
10) December 24
11) Christmas Day
12) December 31
13) One (1) personal holiday as set forth in Item E) below.
B. If any holiday falls on a Saturday, the proceeding Friday shall be observed as the holiday; and if any such holiday falls on a Sunday, the following Monday shall be observed as the holiday.
C. If a holiday occurs on the employee’s first normal day off, the employee shall take the preceding day as the holiday; however, if the holiday occurs on the employee's second consecutive normal day off, the employee shall take the following day as the holiday.
D. Notwithstanding the above, eligible employees who are not able to take a designated holiday day off shall be credited with one (1) additional day of annual leave (8 hours) for each holiday not taken.
E. As listed under Item A above, employees shall be entitled to one (1) personal holiday (8 hours) per calendar year. Employees who have not completed their initial probationary period may not take their personal holiday until they have completed the probationary period.
Formatted: Left, None
09/09/2025 Item No.11.
F. No holiday pay shall be accrued when an employee has been off work on unpaid status for more than ninety (90) days.
F.
2. Holiday Pay Differential
Effective July 1, 2011, employees shall receive a 6% Holiday Pay differential. Holiday Pay shall be multiplied by the employee’s salary step. Employees with accrued Holiday Leave credits on the books may take such time off in the same manner as Annual Leave.
In lieu of all holidays authorized or observed by the City, employees shall receive holiday- in-lieu pay as follows: Holiday -in-lieu pay of six percent (6.0%) shall be paid in equal amounts each pay period. The amount of such pay shall be of the employee’s base hourly pay, in effect during the pay period. Holiday -in-lieu is additional compensation for employees who are normally required to work on an employer approved holiday because they work in positions that require staffing without regard to holidays.
Holiday Pay shall be compensable for retirement (PERS) purposes.
2.3. Holiday Routine
On those days which are official City holidays, or on any other days declared a holiday by the Administration, a holiday routine will be utilized. Under this procedure, the personnel will be allowed to spend the day pursuing leisure activities within the following guidelines:
A. Morning apparatus checks are to be performed promptly as on any other day.
B. Any maintenance or other activity required to maintain the company at an appropriate level of readiness will be performed.
C. Any other activity will be performed, if in the judgment of the officer in charge, to delay or fail to perform such an activity would in any way be detrimental to the Department's equipment or operation.
ARTICLE VIII
LEAVES
1. Annual Leave.
1. Employees shall receive the following Annual Leave credits:
Non-shift personnel (40-hour work week):
Length of Service Annual Leave Allowance
0 - 5 years 15.34 hours per month
5 – 10 years 18.66 hours per month
Formatted: Indent: Left: 0.5", Hanging: 0.5", Right:
-0.13", Numbered + Level: 1 + Numbering Style: A, B, C, … + Start at: 1 + Alignment: Left + Aligned at: 0.56" + Tab after: 0.81" + Indent at: 0.81", Widow/Orphan control, Tab stops: 1", List tab + Not at 0.81"
Formatted: Heading 2, Indent: Left: 0", Hanging: 0.5", Numbered + Level: 1 + Numbering Style: 1, 2, 3, … + Start at: 2 + Alignment: Left + Aligned at: 0.56" + Indent at:
0.81"
Formatted: Level 1
Formatted: None
Formatted: None
09/09/2025 Item No.11.
10 – 15 years 21.34 hours per month
15+ years 23.34 hours per month
Shift personnel (56-hour work week):
Length of Service Annual Leave Allowance
0 - 5 years 24.34 hours per month
5 - 10years 27.66 hours per month
10 - 15 years 30.34 hours per month
15+ years 32.34 hours per month
B. Except as specified in Article VIII, Section D (1) below, employees shall not accrue sick leave. However, employees who have accumulated sick leave hours shall retain such hours and may use such leave credits pursuant to Article VIII, Section 5, Sick Leave, of this MOU.
C. Subject to Article V, Section 2, annual leave credits may be used for any approved absence, including vacation and illness or injury. When annual leave is used for vacation, it will be scheduled pursuant to Article VIII, Section 2, Leave Request Procedure and Section 3, Vacation Bidding. When annual leave is used for illness or injury leave (e.g., sick leave) purposes, it will be taken pursuant to Article VIII, Section 5, Sick Leave, of the MOU.
D. Employees with annual leave balances that exceed the annual leave caps of 320 for non-shift/480 for shift employees as of the date of ratification by City Council of this MOU, may retain such balances until the annual leave balances are reduced to the new caps.
1) To avoid exceeding the maximum of 320/480 hours of accumulated annual leave, the City may direct an employee to take time off on annual leave.
However, in the event the City does not approve annual leave for an employee in an amount sufficient to reduce accumulated annual leave to 320/480 hours, the number of hours that exceed 320/480 hours shall be rolled over into sick leave until the annual leave balance is reduced to the cap.
E. Employees may cash out up to 40 hours of annual leave for non-shift personnel, and 56 hours of annual leave for shift personnel per fiscal year. Annual leave shall be cashed out pursuant to procedures established by the City Human Resources Department.
F. Accrued annual leave shall be cashed out upon separation of employment with City on an hour for hour basis.
2. Leave Request Procedure
Formatted: None
09/09/2025 Item No.11.
A. Leave requests less than twelve (12) hours shall be granted if a qualified individual voluntarily accepts the overtime opportunity.
B. Unless an exception is granted by the Fire Chief no less than twelve (12) hours can be granted for leave purposes and 12-hour leave increments must begin or end at 0800 (i.e. 0800-2000 or 2000-0800 hours).
C. No more than fifteen percent (15%), (rounded to the nearest whole number), per shift within the Fire Captain, Fire Engineer, or Firefighter classifications shall be granted leave for bid vacation (BV) purposes at any one time. Leave usage requests scheduled during an approved Bid Vacation (BV) process will be granted in accordance with this subsection.
D. No more than fifteen percent (15%), (rounded to the nearest whole number), per shift within the Fire Captain, Fire Engineer, or Firefighter classification may be granted leave. Consideration of all shift vacancies will be examined prior to any additional leave approval by the Fire Chief or desi gnated supervisor andin consultation with the Unionunit Rrepresentative. All prior approved leave requests will be honored regardless of total personnel off.
E. Exceptions to Subsection (D) may be granted by the Fire Chief so long as it does not result in a mandatory hire.
F. Leave requests for dates submitted twenty -one (21) days or more from the requested leave date will be accepted and may be approved as per subsection D above. Leave requests submitted within the twenty -one (21) day period, which create a vacancy requiring an overtime fill, will be approved if a qualified replacement accepts the overtime opportunity as per Section D above.
3. Vacation Bidding
A. Vacation bid scheduling consists of one calendar year, starting January 1.
B. Vacation bidding will be based on seniority by shift. Seniority will be based on the original, full-time hire date of the employee.
C. The bidding process shall be completed ninety (90) days prior to the beginning of the calendar year. Bidding shall take place by the shift proceeding the ninety (90) day period and shall consist of a one-day process for each shift.
D. Shift employees shall be notified of the scheduled bid day for their respective shift thirty (30) days prior to that day by the Shift Representative.
09/09/2025 Item No.11.
E. Shift e mployees on extended leave, i.e., Worker’s Compensation and vacation, shall be notified thirty (30) days prior to the scheduled bid date for their shift by the Shift Representative.
F. Vacation bidding will be held in rounds. Each employee will have the opportunity to select a continuous block of time, one (1) continuous block per round. Bidding by rounds will continue until all employees have completed selections. At the conclusion of t he bidding process, employees shall submit their bid selections to the shift representative or unit representative on a Department Vacation Request slip by the end of that shift.
G. Vacation bidding cannot result in more than fifteen percent (15%), (rounded to the nearest whole number), or authorized shift personnel per shift shall be granted annual leave for bid vacation purposes at the same time. For example: 20 shift personnel per shift x 15% =3 personnel granted leave for bid vacation purposes.
H. Shift representatives or authorized designees will handle the bidding process for their respective shifts.
I. Employees on leave, i.e., Worker’s Compensation, disability leave, or leave shall be responsible for submitting their selections for the bidding process. The desired bids by such employee shall be submitted to the respective shift representative or unit representative prior to the scheduled bid day. Failure to do so will result in vacation bid passes by the employee.
J. A continuous block of time consists of no less than twelve (12) hours and no more than ten (10) shifts. All blocks shall be consecutive, including multiple days of request of less than twenty-four (24) hours. A continuous block of time is defined as any vacation request within a ten (10) shift period when that block contains no more than fifteen percent (15%), (rounded to the nearest whole number), or authorized shift personnel per shift off.
K. Employees shall have the option to cancel Scheduled Bid Vacation and/or vacation thirty-one (31) days prior to the scheduled date.
L. At the completion of the bidding process, all calendar days with less than fifteen percent (15%), (rounded to the nearest whole number), of authorized shift personnel per shift off can submit a leave request pursuant to the MOU. These leave requests will be considered by the Fire Chief or designated supervisor,, within consultation with the Unit Representative, and approval will be dependent upon the number of total vacancies on the requested day.
M. Vacation scheduling disputes will be submitted to the unit representative for review by a designated committee. Decisions by the committee will be final.
09/09/2025 Item No.11.
N. A calendar will be completed by the unit representative and/or shift representative and submitted to Fire Administration. The calendar and signed Department Leave Slips will be forwarded to Fire Administration. Individual employees are responsible for entering their own bid requests into TeleStaff within two rotations, after the bid process is complete, for review and approval by their immediate supervisor. Bid Vacation not entered into TeleStaff after two rotations from the bid process may be subject to forfeiture by the employee.
O. New hire employees will have seniority determined by the City at time of hire.
Vacation scheduling shall be in accordance with City rules and regulations, Section
2.01.100 (B,1).
P. In the event an employee is transferred to another shift due to departmental needs, the City will be responsible for honoring the employee’s scheduled vacation dates.
If the employee requests a transfer to another shift after vacation bids are completed, the employee assumes all responsibility for re -scheduling of the bid dates pursuant to the MOU and/or loss of the bid vacation dates.
Q. The days of December 24th and 25th and Thanksgiving Day are considered "Sacred Holidays" and are not eligible for Bid Vacation or Vacation.
R. In the event an employee bids for vacation on the front end of a sacred holida y, it shall not be considered as a non -continuous block of time if the employee wishes to bid on the back end of the sacred holiday event, i.e. bidding or requesting vacation after the 25th of December.
S. The City of Folsom and the Folsom Fire Department shall be held harmless for the enforcement or implementation of this Section. Members are specifically precluded from initiating any appeal process (including Article XII, Grievance Procedure) to either the City of Folsom or the Folsom Fire Department for any alleged violations of this Section.
T. Employees shall not be allowed to bid more time than they have the ability to accrue in a calendar year in addition to 96 hours of comp time per month.
4. Shift Trades
A. Each employee may be allowed to trade time for shift(s) for which they are able to secure another qualified employee to work in their place; provided that the substitution does not impose any fiscal impact to the City. Substitutions are to be made with the approval of the department. The Fire Chief or his/her designee retains the right to refuse the shift trade. The substitutions will be applied for in advance. The employee requesting the trade is responsible to fill the vacancy and for any financial consequences. The City shall not be held responsible for arrangements between employees.
09/09/2025 Item No.11.
B. Shift Trades not working must be 24 hours or greater at the end of the assigned rotation (0800-0800), or at the beginning of the assigned rotation (0800-0800).
Shift trades of 24-hours will protect against a mandatory hire for the 4-days after or before the trade not working dependent on which end of the rotation it falls.
C. An employee on a shift trade will remain eligible for a mandatory overtime pursuant to Article V, Section 4, Emergency Callback.
D. In the event an employee creates an approved shift trade agreement with another qualified employee and that employee is unable to report to work for the shift, he/she shall either:
1) Notify the original employee so they can secure another qualified employee to work the shift, or
2) The trade individual must find another qualified individual to work the shift, or
3) The original employee must report to work, or
4) In the event the original employee is unable to report to work, the Department will deduct the appropriate number of annual leave hours. If the Department must hire a replacement on overtime for the vacancy created, annual leave will be deducted from the accepting trade working employee using the provisions governing force hire compensation, Article V, Section 5 Mandatory Hires when applicable.
4)5) In the event that the accepting trade-working employee has an approved Workers' Compensation injury that prevents him/her from covering the shift in question, the fiscal responsibility shifts to the original employee requesting the shift trade unless the original employee finds another qualified individual to work the shift as trade working. If the Department must hire a replacement on overtime for the vacancy created, annual leave will be deducted from the original employee requesting the shift trade using provisions governing force hire compensation, as outlined in Article V, Section 5 Mandatory Hires.
E. An employee who submits and receives vacation bid dates pursuant to the MOU vacation bid process shall not cancel vacation date(s) and then use a shift trade with another employee to take the same date(s) off from work.
Exceptions:
1) An employee may cancel their vacation bid date and give it to a co-worker in need of the day off and then take a trade if the co-worker’s vacation
09/09/2025 Item No.11.
position will not create a mandatory hiring to fill the vacancy.
2) If, due to unforeseen use of annual or sick leave for injury or illness leave purposes, employee's hours drop below the hours needed for vacation, the employee may cancel the bid vacation and take a trade.
F. Vacation date(s) that have been approved and filled with overtime cannot be cancelled and replaced by a shift trade, unless, the overtime was filled with a mandatory hire.
5. Sick Leave
A. For the purposes of this Section, immediate family is defined as the employee's parents, grandparents, spouse, son, daughter, brother, or sister and any step or foster relationship mentioned above, or any of these relationships to the employee's spouse. Im mediate family shall also include any other person living in the employee's household as a family member.
B. Subject to Article V, Section 2, l eave used for illness or injury (e.g., sick leave) is a paid leave of absence to be used in the following circumstances:
1) Actual illness or injury of the employee that occurred outside the scope of their employment;
2) Actual illness or injury of a member of the employee's immediate family, where the employee's attention/attendance is required.
3) Exposure of the employee to a contagious disease;
4) Medical, dental, or vision care appointments of the employee which cannot be scheduled outside of duty hours;
5) Medical, dental, or vision appointments of the employee's immediate family which require the presence of the employee.
C. Pursuant to Government Code section 20965, employees may convert accrued sick leave to service credit for purposes of retirement.
D. Utilization of leave for illness or injury and requirements the City may impose is as follows:
1) Eligible employees may be granted leave in minimum units of one (1) hour for the purpose of Section 5 of this Article.
2) The City may require probationary employees to support each use Formatted: None
09/09/2025 Item No.11.
of leave for an illness or injury by requiring an attending physician’s statement.
3) The City may requir e employees who have used three or more consecutive work days of leave for an illness or injury to submit an attending physician’s statement.
4) Employees shall not use leave for disabilities determined to be job- related and compensable under Worker’s Compensation.
5) An eligible employee who becomes ill or injured while on vacation may have such period of illness or injury charged to Sick Leave. The request to change leave status must be requested to the on duty Chief Officer on the day of the occurrence or upon the employee’s return to duty.
6) The following modifies City Rules and Regulations Section
2.01.110, Sick Leave, Subsection I, Item 2. Where an employee uses leave for the purpose of illness or injury for more than three (3) instances, during any twelve (12) month period may be considered as one indicator of abuse of leave for injury or illness.
E. Employees unable to report to duty and requesting leave due to illness or injury, after 2100 hours the day prior shall notify the Department pursuant to procedures established by the Department before 0700 hours on the morning of the leave request. Leave shall be approved if the reason meets the criteria specified in Article VIII Section 5B, Illness or Injury Leave.
6. FLMA or CFRA
A. Leave shall be granted for baby bonding time in accordance with CRFA with a 30-day notice given to the Battalion Chief. Baby-bonding leave shall be a minimum of 96-hour blocks with the exception that an employee may apply for less than 96 hours twice.
B. FMLA or CFRA leave for medical appointments will require approval by the Human Resources Department with valid documentation from the attending physician.
C. FMLA or CFRA leave for long-term care of a family member with medical needs will require approval by the Human Resources Department.
7. Bereavement Leave
Classified permanent or promotional probationary employees may be granted a maximum Formatted: None
09/09/2025 Item No.11.
of ninety-six (96) hours or four (4) shifts from accrued leave time for each instance to deal with matters related to the funeral, death, or critical illness (where death appears imminent) of any member of the employee's immediate family, including parents, children, siblings, aunt, uncle, brother/sister-in-law, or daughter/son-in-law.
Annual leave usage for bereavement leave shall be taken by the employee in twelve (12) hour or greater increments for 56-hour employees and four (4) hour increments for 40 hour employees.
8. Personal Leave Time
A. Any Personal Leave Time (PLT) earned by employees and still remaining on the books may be used by employees for time off on an hour for hour basis until the employee has exhausted the bank. Use of PLT time shall be subject to the following:
1) Use of PLT shall be subject to the operating needs of the Fire Department.
2) PLT shall have no cash value and may not be cashed out. If an employee terminates employment with the City, any PLT remaining in the bank shall be surrendered with no value to the employee.
9. Emergency Leave
A. An employee may be approved for the use of annual leave for circumstances that requires the employee’s immediate attention and are extraordinary, unforeseen, last minute, and unavoidable situations requiring not more than 24-hours.
B. When emergency leave is necessary after the start of the shift, the department will, if necessary, operate a 2-person engine company or a 3-person truck company until the vacancy is filled, or for a maximum of the remainder of the 24 -hour shift , whichever occurs first.
C. When emergency leave is granted that removes an Engineer from an engine or truck company, and the Firefighter on the company is not on the acting Fire Engineer’s list, the Captain on the engine or truck, if previously a Fire Engineer and feels comfortable, may operate the engine or truck.
10. Leave Time Accrual - Non-Pay Status
Notwithstanding Article VII, Section 1 and 2 , Non-Shift Personnel and Holiday Pay Differential, and Article VII I, Section 1, Annual Leave , employees shall not accrue additional Annual Leave or Holiday Leave while on non -pay status; provided however, that employees on Workers Compensation (job related injuries) shall continue to accrue leave time until such employees are considered "permanent and stationary" pursuant to Formatted: None
09/09/2025 Item No.11.
Workers Compensation law or expiration of 4850 time, whichever is sooner.
11. Local 522 Catastrophic Time Bank
The purpose of the catastrophic time bank is to enable employees to receive and donate any accrued annual, sick, personal or holiday leave to assist employees who have no leave, and who will suffer a financial hardship due to a prolonged illness or injury to themselves or a member of their immediate family as defined in Article VIII, Leaves, Section 5A. The following conditions shall apply:
A. Catastrophic leave will be available only to employees who have exhausted all of their own paid leave through a bona fide serious illness or injury.
B. The SAFF Local 522 (Folsom Unit) Catastrophic Time Bank shall be administered by the City.
C. An employee may be on disability insurance and use the time bank credits in the same manner that sick leave is used to supplement disability insurance benefits.
D. All donations are to be confidential between the donating employee and the City.
E. Employees donating to the time bank must have ninety-six hours of available leave credits after making a donation.
F. Donating employees must sign an authorization form (prepared by the City), and specify which catastrophic time bank the donation will be applied to, and the employee who is to be a recipient of the donation. Employees relinquish all rights and claims to hours donated.
G. Unused leave hours will remain in the SAFF Local 522 (Folsom Unit) Catastrophic Time Bank
H. Donations shall be subject to applicable tax laws.
I. Availability, and the use of, catastrophic leave time shall not delay or prevent the City from taking action to medically separate or disability retire an employee.
J. The City may require a physician’s statement, stating that the presence of the employee who is requesting catastrophic leave time to care for an ill or injured immediate family member is necessary.
12. Leave Conversion Rates
The City and the SAFF, Local 522 agree to the following terms related to the conversion of leave hours by employees when they are placed in temporary , permanent or modified
09/09/2025 Item No.11.
duty assignments (in excess of the 1st full pay period) within the department.
G. Conversion from 56-hour to 40-hour work week assignments. Employees temporarily or permanently assigned to staff positions on a 40-hour work week schedule shall have all leave usage banks (sick leave, annual leave, holiday-in-lieu, etc.) converted using a division factor of 1.4 for each hour available in the leave bank. As an example, a 56-hour employee with 100 hours of annual leave would see their annual leave bank adjusted to 71.43 hours with the employee assigned to a 40-hour work assignment.
H. Conversion from 40 -hour to 56-hour work week assignments. Employees temporarily or permanently assigned to line positions on a 56-hour work week schedule shall have all leave usage banks (sick leave, annual lave, holiday-in-lieu, etc.) converted using a multiplier factor of 1.4 for each hour of available in the leave bank. As an example, a 40-hour employee with 71.43 hours of annual leave would see their annual leave bank adjusted to 100 hours.
I. Leave accrual and usage rates shall be applied at the hourly rate used by the employee during the temporary or permanent assignment.
J. Leave conversion rates shall be applied to all leave accrual banks provided to the employee by the City (annual leave, holiday-in-lieu, etc.).
K. Any accrual in excess of the limits shall be paid to the employee in cash at the employee's total hourly compensation rate.
13. Jury Duty Leave
A. Employees who have been summoned or subsequently selected to serve on a jury shall receive their regular rate of compensation by the City for normal worked hours and days or shifts during such absence from work, provided the employee endorses to the city that compensation received by the employee for jury duty service.
B. Employees will be allowed to retain any mileage compensation granted to them by the respective court jurisdiction to which they were summoned or selected for jury duty. Employees summoned to jury duty must provide evidence of such summons and subsequent jury duty days away from work through the Fire Chief or the Human Resources Director. Employees shall be granted leave without loss of compensation and benefits for all time required to meet the jury duty obligation, as follows:
1) Jury Selection. When the employee is required to physically report to the court for jury selection, he/she shall be released from Fire Department duty at 2000 hours when scheduled for work on the evening prior. When available, employees shall use telephonic or electronic methods for
09/09/2025 Item No.11.
determining jury selection.
2) Serving Jury Duty. W hen the employee has been selected for jury duty he/she shall be released from Fire Department duty at 2000 hours when scheduled for work on the evening prior to each day of service.
3) Serving Concurrent Days. When the employee is serving on a jury panel for concurrent days he/she shall be released from his/her duty on a 24 hour basis for the specific days in service to the court.
4) Completion of Jury Duty. When service to the court is completed, the employee shall return to work as normally scheduled.
5) Scheduled Overtime. An employee who has scheduled overtime Fire Department duty shall notify the on -duty Battalion Chief of the summons and will be released from the scheduled overtime duty assignment for the entire work period.
ARTICLE IX
INSURANCE
1. Medical Insurance
The City’s obligation for health, dental, vision, life and disability insurance coverage is limited to plan contribution. Plan content, including eligibility criteria, is determined by the respective carriers.
2. Health Insurance
A. The City’s maximum monthly contribution for active employee health coverage for the year 2025 is as follows:
Employee only: $854
Employee plus one: $1,506
Employee plus family: $1,955
B. The City’s maximum monthly contribution for active employees health insurance will be adjusted annually. If there is an increase in the Kaiser HMO monthly premium, the City will cover 50% of the increase, adding it to the previous year’s contribution for employee-only, employee plus one, and employee plus two or more coverage levels. The final amount will be rounded to the next whole number. The employee is responsible for the difference between the applicable premium and the City’s contribution. If there is no premium increase, the City’s contribution remains unchanged.
Formatted: None
Formatted: Indent: First line: 0.5"
Formatted: Indent: Left: 1"
Formatted: Indent: Left: 0.5", First line: 0.5", No bullets or numbering
09/09/2025 Item No.11.
Example:
If the previous year’s City contribution for employee-only coverage was $500 and the Kaiser HMO premium increased by $20, the new City contribution would be:
$500 + (50% of $20) = $500 + $10 = $510
C. Employees who enroll in a health plan with a higher monthly premium than the City's maximum monthly contribution as established under part A and B above shall pay the difference between the maximum contribution amount and cost of the premium through payroll deduction.
A. Effective January 1, 2012, as demonstrated in the example below, employees shall be included in the same health plan design as the majority of City employees, including copayments. The City’s maximum monthly contribution for active employee health insurance coverage shall be adjusted annually to an amount equal to 50% of the increase, if any, above the prior year’s Kaiser monthly premium rate combined with the City’s prior year contribution amount for employee only, employee plus 1, and employee plus 2 or more (rounded to the next whole number).
The employee is responsible for the difference between the applicable premium and the City’s contribution.
Example:
Employee only category: The 2010 monthly premium for Kaiser employee only is $507.89 and the City’s maximum monthly contribution is $486.00. If this premium increases by 10% for 2011, or to $558.68, the City’s contribution for 2011 for the employee only ca tegory would be computed as follows: $558.68 - $507.89 = $50.79, $50.79 x 50% = $23.40, $486.00 + $23.40 = $509.40. After rounding to the next whole number, the City’s maximum contribution for health insurance for the employee only category would be $509 per month. If the premium increases by 10% for 2012, or to $614.55, the City’s contribution for 2012 for the employee only category would be computed as follows: $614.55 - $558.68 = $55.87, $55.87 x 50% = $27.93, $509.00 + $27.93 = $536.93. After roundin g to the next whole number, the City’s maximum contribution for health insurance for the employee only category would be $537 per month.
Employee plus 1 category: The 2010 monthly premium for Kaiser employee plus 1 is $1,015.78 and the City’s maximum monthly contribution is $972.00. If this premium increases by 10% for 2011, or to $1,117.36, the City’s contribution for 2011 for the employee plus 1 category would be computed as follows: $1,117.36 - $1,015.78 = $101.58, $101.58 x 50% = $50.79, $972.00 + $50.79. = $1,022.79.
After rounding to the next whole number, the City’s maximum contribution for health insurance for the employee plus 1 category would be $1,023 per month. If Formatted: Indent: Left: 1", No bullets or numbering
Formatted: No bullets or numbering
09/09/2025 Item No.11.
the premium increases by 10% for 2012, or to $1,229.10, the City’s contribution for 2012 for the employee plus 1 category would be computed as follows: $1,229.10 - $1,117.36 = $111.74, $111.74 x 50% = $55.87, $1,023.00 + $55.87. = $1,078.87.
After rounding to the next whole number, the City’s maximum contribution for health insurance for the employee plus 1 category would be $1,079 per month.
Employee plus 2 or more category: The 2010 monthly premium for Kaiser employee plus 2 or more is $1,320.52 and the City’s maximum monthly contribution is $1,263.00. If this premium increases by 10% for 2011, or to $1,452.57, the City’s contribution for 20 11 for the employee plus 2 or more category would be computed as follows: $1,452.57 - $1,320.00 = $132.57, $132.57 x 50% = $66.29, $1,263 + $66.29 = $1,329.29. After rounding to the next whole number, the City’s maximum contribution for health insurance f or the employee plus 2 or more category would be $1,329 per month. If the premium increases by 10% for 2012, or to $1,597.83 , the City’s contribution for 2012 for the employee plus 2 or more category would be computed as follows: $1,597.83 - $1,452.57 = $145.26, $145.26 x 50% = $72.63, $1,329 + $72.63 = $1,401.63. After rounding to the next whole number, the City’s maximum contribution for health insurance for the employee plus 2 or more category would be $1,402 per month.
B. Employees who select a health plan with higher monthly premiums than the maximum monthly premium paid by the City in Section (A) above shall pay the difference through payroll deduction. Should employees select a health plan with lower monthly premiums th an the maximum monthly premium paid the City, the City’s contribution shall be limited to the cost of the monthly premium.
C. Notwithstanding Section 2, Item A, the City's maximum monthly contribution for active employee health insurance coverage shall not be reduced below eighty percent (80%) of the Kaiser premium cost for the employee only category, employee plus 1 category, or employee plus 2 or more category.
D. The City will maintain an IRS 125 Medical Rei mbursement Account. Employees may participate in the account pursuant to administrative procedures established by the City.
E. Effective December 31, 2019, employees who retire from City service must have at least 120 months of continuous service as a City employee to qualify for dental and vision insurance benefits provided to active employees. The City shall contribute 5% of the premium per year of City service, up to an 80% City contribution.
3. High Deductible Health Plans
A. The City agrees to offer two High Deducti ble Health Benefit Plans offered by the health benefit plan carriers.
09/09/2025 Item No.11.
B. The City agrees to make available a Health Savings Account (HSA) to employees who select either of the High Deductible Health Benefit Plans.
C. Fifty percent (50%) of the difference between the City's monthly contribution towards the cost of the Kaiser HMO Health plan premiums as set forth in Article IX, Section 2 of the MOU and the monthly cost of the premium for a High Deductible Health Plan shall be con tributed into the employee's HSA . The City shall make this contribution through the termination date of this MOU, after which this Section C shall sunset.
D. Employees who decline to participate in City health insurance coverage shall receive a cash back payment from the City of $300.00 per month for each month the employee does not participate in City health insurance coverage.
E. Tax status of contributions, contribution amounts, and use of HSA funds shall be in accordance with federal and state law.
4. Out of Area Health Premium Plan
A. OAHPP shall work in conjunction with the Health Reimbursement Arrangement Retirement Account (HRA) provided by the City to active employees. Each OAHPP retiree will obtain a participant account.
B. Only retirees who (a) are not eligible for Medicare who live reside outside of the service plan area, as defined by the City health insurance carriers; (b) qualify for rRetiree health cCoverage pursuant to Article IX, Section 9 and (c) agree to disenroll from the current group medical benefit plan for retiree health coverage may participate in OAHPP.
C. Once a retiree opts to participate in OAHPP, the retiree shall thereafter be prohibited from returning to retiree health coverage.
D. The City will contribute to the retiree’s participant account on a monthly basis in an amount equal to the amount of the City’s contribution for employee only or employee plus 1 coverage, based on the retiree’s marital status at the time of OAHPP election. Eligible dependents not covered at the time of election will not be added at a later date, Annual confirmation of dependent eligibility will be required. Spouses may not be added later. The City’s contribution would be used for premiums to obtain health coverage and other qualified out-of-pocket medical expenses. Under no circumstances shall the contribution be higher than the City paid premiums for similarly situated in -area employees. The retiree shall be responsible for administrative costs established by the HRA plan administrator.
09/09/2025 Item No.11.
E. Upon the death of, or martial dissolution from, the retiree’s spouse on record at the time of election to participate on in the OAHPP, the funding level will be adjusted to employee only. Subsequent spouse(s) from any subsequent marriage(s) (i.e. post initial OAHPP election) shall not be eligible to participate and funding will remain at employee only. In the event of the retiree’s death, surviving spousal benefits will conform to City practices applicable to employe es participating in City plans.
Should the retiree obtain coverage from another source (e.g. coverage by spouse), the funding will cease and will not be reinstated.
F. Rules and procedures governing OAHPP shall be determined and administered by the City’s Human Resources Department. Disputes regarding the OAHPP shall be appealed to the City Manager or designee and shall not be subject to arbitration.
G. As an option to the OAHPP, retirees who qualify for retiree health coverage pursuant to Article IX, Section 12, may elect the Aetna PPO plan during annual enrollment and prior to moving out of state. The retiree must then keep Aetna as their provider until such time as they move back into the regions covered by whoever are the City health providers at the time, and may elect another provider during the next open enrollment. It is understood by both parties that this option is available only in accordance with the rules and proced ures of Aetna and only as long as Aetna chooses to be a provider for the City.
5. Dental Insurance
Dental insurance will be provided by Delta Dental Services, Inc. The City will contribute 100% of the monthly premium for an employee, employee and dependent or an employee plus family as set forth in the plan document. The Delta Dental Preferred Provider Program shall provide coverage maximum of $1,750 per year for employees/dependents who patronize Preferred Provider Program participating dentists. Employees/dependents that choose non -participating dentists shall have a coverage maximum of $1,500 per year.
Otherwise, the City’s obligation for dental insurance coverage is limited to dental plan contributions. Delta Dental Services, Inc. shall determine dental plan coveragecontent.
6. Vision Care
The City will contract with Vision Services Plan (VSP) to provide vision care. The City will contribute 100% of the monthly premium for an employee, employee and dependent, or employee and family as set forth in the plan document. The following elements shall provide the basis of VSP coverage:
1) One eye exam every 12 months;
2) One set of lenses every 12 months;
3) $100 allowance/whole sale basis for frames; and
4) A co-pay of $5.00 per visit.
Formatted: None
Formatted: Body Text, Left, Indent: Left: 0.5", No bullets or numbering
09/09/2025 Item No.11.
Except for the items listed ab ove, tThe City’s obligation for Vision insurance coverage is limited to plan contributions. VSP shall determine Vision insurance plan coveragecontent.
7. Health Benefits Labor-Management Committee
The parties agree to participate in a joint Health Benefits Labor -Management Committee to review existing health benefit programs, including, but not limited to, cost containment, direct contracting for health benefit plans, and creation of a health benefi ts cafeteria plan.
The Health Benefits -Labor Management Committee shall be open to all employee organizations representing City of Folsom employees. The SAFF, Local 522 may select up to two City employees to participate in Committee meetings. Employees who participate in Committee meetings shall do so without loss of compensation.
8. Life Insurance
The City agrees to continue to pay the premium for $40,000 life insurance coverage and $40,000 accidental death and dismemberment coverage for employees in the bargaining unit for the term of this Agreement.
Eligible dependents shall receive $2,0001,000 life insurance coverage.
9. Short Term Disability Insurance
The City agrees to provide a Short-Term Disability Insurance Program, with the City paying 100% of the premium rate for the weekly indemnity insurance program (short-term disability) of up to 60% of the salary of the plan maximum for up to sixty (60) calendar days. The waiting period for initiation of benefits shall be twelve (12) calendar days.
Otherwise, the City’s obligation to provide Short Term Disability insurance coverage is limited to plan contributions. The Short-Term Disability insurance carrier shall determine plan content. The City will meet with Local 522 upon request.
10. Long Term Disability Insurance
The City and the SAFF, Local 522 agree that the SAFF, Local 522 will provide a Union sponsored plan covering long-term disability for non-work related injury and illness.
The cost of the premium will be a post -tax deduction from the employee’s semi -monthly paycheck.
The Long-Term Disability insurance carrier shall determine plan content.
11. FMLA/CFRA Leave Status
Health insurance coverage is limited to the City’s obligation as set forth in Federal and
09/09/2025 Item No.11.
State law in relation to FMLA or CFRA. An employee on either FMLA or CFRA leave status will have continued health insurance as found in this Article during the leave period.
The employee is responsible for applicable premium co-payments as required.
Upon exhaustion of FMLA or CFRA, the City will provide the employee with a notice advising of COBRA rights to which the employee may be entitled. Notwithstanding whether the employee is or is not supplementing disability insurance to maximize income, the e mployee shall cease leave accruals and be solely responsible for health insurance coverage.
12. Retiree Health Insurance
A. Existing employees hired on or prior to May 8, 2007, who retire1 from City service on July 1, 2007 or later may participate in the health insurance plans made available by the City for active employees. The amount of the City’s monthly contribution shall be determined as set forth below. Any costs that exceed the maximum paid by the City towards retiree health insurance costs shall be borne by the retiree.
1) Employees who retire with less than 5 years of service2 shall not be eligible to receive any City contribution toward the cost of retiree health insurance.
2) Employees who retire with more than 5 years of service shall qualify for a monthly City retiree health insurance contribution.
a. Subject to the maximum set forth in 10b below, the City retiree health insurance contribution shall be as follows:
i. Retiree only – an amount equal the City’s contribution towards active employee health insurance 3 for the category of “employee only.”
ii. Retiree and one dependent – an amount equal to the City’s contribution towards active employee health insurance for the category of “employee plus one.”
iii. Retiree and two or more dependents - an amount equal to the City’s contribution towards active employee health
1 “Existing Eemployees” are exclusively permanent and/or probationary employees of the City of Folsom on the date theis Addendum wasis approved by the Folsom City Council (May 8, 2007). “Retire” or “retiree” is defined as any classified City employee who (1) applies for retirement with the Public Employees’ Retirement System (PERS) within ninety (90) days after terminating employment with the City; and (2) receives a PERS retirement be nefit. 2 “Service” is defined as full time (or equivalent) continuous permanent and/or probationary employment status with the City of Folsom.
3 "Active employee health insurance" shall be defined as the health benefits contribution formula in effect for active employees as of July 1, 2011.
09/09/2025 Item No.11.
insurance for the category of “employee plus two or more” until the retiree reaches age 55. Thereafter, the City's contribution towards a retiree with two or more dependents shall be an amount equal to the City's contribution toward active employee health insurance for the category of
"employee plus one plus $100".
b. Effective January 1, 2012, the City’s monthly contribution toward the cost of retiree health insurance shall not exceed the maximum monthly contribution paid by the City to active employee health insurance for the categories of employee only (for retiree only), employee plus one (for retiree plus one dependent), and employee plus two or more until age 55 and employee plus one plus $100 after age 55(for retiree plus two or more dependents).
i. The January 1, 2012 cap for each category shall be adjusted each January thereafter by an amount not the exceed 3%, depending on the percent increase in the Consumer Price Index (CPI), U.S. Department of Labor, for November - November of the previous year, Index CPI-W, Urban Wage Earners and Clerical Workers, Series #CWUR0400SA0, United States.
(Example, if the cost of living for the specified period increases by 2%, the cap shall be increased by 2%. If the cost of living for the specified period increases by 4%, the cap shall be increased by 3% (cost of living increases in the cap shall be rounded to the nearest tenth.)
i.
c. Pursuant to applicable law, and prior to January 1, 2017, if administratively possible the City shall establish a tax exempt retiree health plan for all employees in the Fire Bargaining Unit. The purpose of the plan is to provide a mechanism whereby employees may voluntarily contribute toward future costs of retiree health insurance premiums and related expenses. The governing plan shall be agreed to by SAFF 522 and the City.
a.c. The City shall contribute $25 per pay period into a retiree health reimbursement account Health Reimbursement Arrangement
(RHRA) for each probationary/permanent employee hired after May 8, 2007.
b.d. The parties acknowledge that unit members who retire from City service prior to July 1, 2007, shall, subject to future negotiations and agreements, receive health benefits as set forth in the 2006 -2008 Memorandum of Understanding (Article IX, Insurance, paragraph Formatted: Right: -0.13", Numbered + Level: 3 +
Numbering Style: i, ii, iii, … + Start at: 1 + Alignment: Right + Aligned at: 2.38" + Indent at: 2.5"
Formatted: Left, Indent: Hanging: 0.5", Numbered + Level:
2 + Numbering Style: a, b, c, … + Start at: 1 + Alignment:
Left + Aligned at: 1.75" + Indent at: 2"
Formatted: Indent: Hanging: 0.5", Numbered + Level: 2 + Numbering Style: a, b, c, … + Start at: 1 + Alignment: Left + Aligned at: 1.75" + Indent at: 2"
09/09/2025 Item No.11.
2(A) between the City and Sacramento Area Firefighters, Local 522, IAFF Folsom Unit.
13. Retiree Health Benefits Reopener
A. The City agrees to conduct a bi-annual actuarial study of the cost of health benefit programs for employees who retire from City employment. The first actuarial study shall be conducted not later than July 1, 2007.
B. A copy of the completed actuarial study shall be sent to each employee organization that represents City employees. Upon request of either the City or SAFF, Local 522, the parties agree to reopen the MOU and meet and confer in good faith on MOU provisions covering health, dental, and/or vision insurance programs for active employees and/or active employees who retire from City employment.
C. If the City and an employee organization other than SAFF, Local 522 reopen that employee organization’s MOU on the MOU provisions referenced in 11B above, the City will immediately notify SAFF, Local 522 and offer to meet and confer.
14. IAFF Medical Expense Reimbursement Plan
A. Acknowledgement. The City acknowledges that the SAFF, Local 522 has entered into an agreement with the IAFF Medical Expense Reimbursement Plan (hereafter, the “IAFF MERP”) of the Washington State Council of Fire Fighters Employee Benefit Trust (hereafter, the “Trust”). The purpose of the Trust shall be to provide for retiree health expense reimbursement benefits. The Trust shall be, and remain separate and apart from any City health insurance funding program.
B. Defined Class of Employees Receiving Contributions. The “Defined Class” of employees receiving contributions to the Trust as set forth below, consists of all employees represented by the SAFF, Local 522
C. Employee Contribution Amount. The City and the SAFF, Local 522 agree that the City shall withhold a mandatory pre-tax contribution of $37.50 per pay period from the pay of every employee of the Defined Class and shall transmit such contributions to the Trust pursuant to the requirement s in Part (E) below. No employee shall be permitted to opt-out of the mandatory employee contributions or receive any portion of the contribution in cash.
D. City Contribution Amount. The City and SAFF, Local 522 agree that upon adoption of this agreement the City shall cease making contributions to the RHRA set forth in Article IX - Section 12(A)(2)(d) above and shall instead commence contributions of $25 per pay period to the Trust for all employees of the Defined Class hired after May 8, 2007.
Formatted: Normal, Level 2, Indent: Left: 0", Hanging:
0.5", Right: 0", Numbered + Level: 1 + Numbering Style: 1, 2, 3, … + Start at: 13 + Alignment: Left + Aligned at: 0.75" + Tab after: 1" + Indent at: 1", Tab stops: 0.5", List tab + Not at 1"
Formatted: Font: (Default) Times New Roman
Formatted: Font: (Default) Times New Roman
09/09/2025 Item No.11.
1) In-lieu Contribution. The City and SAFF, Local 522 agree that upon the adoption of this agreement the City shall cease the $300 monthly cash incentive for employees declining City health insurance coverage set forth in Article IX Section 3(D) above and shall instead make an equivalent monthly contribution of $300 to the Trust.
The employee, by written election may direct any portion of the in-lieu incentive contribution to the employee’s 457 account up to allowable IRS limits.
No employee in the Defined Class shall have the option to receive cash in lieu of making contributions to the Trust and/or 457 plan.
2) Transfer of Employee Annual Leave – At Termination. The City and SAFF, Local 522 agree that the cash option for accrued Annual Leave at termination set forth in Article XIII – Section (1)(F) shall be eliminated.
For every employee in the Defined Class, the City shall, upon the employee’s separation from the City, irrevocably contribute to the employee’s Trust account on a pre-tax basis, an amount equal in value to 100% of the payments that would otherwise be paid to the employee for unused Annual Leave. The employee, by written election received by the City no later than 30 days prior to separation, may elect to direct any portion of the value of the accrued Annual Leave to a City sponsored 457 plan up to allowable IRS plan limits.
No employee in the Defined Class shall have the option to receive cash for the value of the accrued Annual Leave in lieu of making contributions to the Trust and/or 457 plans.
E. Remittance of Contributions. The City shall remit all contributions set forth herein directly to the custodian of the Trust within 30 days of the date the payment would have been payable to the employee. The City hereby acknowledges receipt of the Trust Agreement governing the Trust and will comply with rules set by the Trust in regard to reporting and depositing the required contributions set forth herein.
F. Reporting to the Trust Office. The City shall electronically submit to the Trust Office a report of contributing employees for each contribution sent to the Trust, in the format requested by the Trust, and received by the Trust Office within five (5) days of receipt of the contribution funds. The report will include at a minimum: employee first and last name, with suffix as applicable; employee number; Social Security Number; employee status (e.g., active, on leave); date of birth; gender; date of hire; b argaining unit; date of change in bargaining unit, as applicable; home mailing address; City contribution amount; Employee contribution amount; leave transfer amount, as applicable; separation date, as applicable; and separation reason.