Cities Index.
TRACT 20018 Subdivision Improvement Agreement Bond Replacement.pdf

Fontana City Council
March 8, 2022

Document
TRACT 20018 Subdivision Improvement Agreement Bond Replacement.pdf
Meeting
March 8, 2022
Body
Fontana City Council
Original file
3.5 MB
Text extracted from the city's file for reading and search. Open the original on fontana.legistar1.com. That file is the official record.

Revised – KE -9/17/20

SUBDIVISION IMPROVEMENT AGREEMENT

Tract Map No.: 20018

THIS AGREEMENT is between the City of Fontana, a municipal corporation, County of San Bernardino, State of California ("City") and D.R. Horton Los Angeles Holding Company Inc ("Subdivider"):

WHEREAS, the application for tentative Tract Map No. 20018, was conditionally approved on July 14, 2020 ; and

WHEREAS, Subdivider is the owner of that certain parcel of land defined by the Final Map and Subdivider proposes to do and perform certain work of imp rovement thereon as set forth in this agreement; and

WHEREAS, City desires to assure that the proposed improvements will be done in a good workmanlike manner and in accordance with the laws and standards now in force and effect in the City, the terms and conditions of which are incorporated herein by reference; and

WHEREAS, Subdivider declares acknowledgement the pertinent regulations contained in the City Code and in the Subdivision Map Act (Government Code Sections 66410 to 66500) and agrees to comply therewith; and

WHEREAS, a Fi nal Map of the subdivision, prepared in accordance with the City's Subdivision Ordinance, has been filed by Subdivider with City for approval by the City Council;

NOW THEREFORE, in consideration of the approval and acceptance of the Final Map by the City Council and the acceptance of easements therein offered for dedication for street, utility, and other public purposes and the covenants herein contained, the parties hereto mutually covenant and agree as follows:

1. General requirements:

Subdivider shall , at its own cost and expense, provide all required tests, design work, equipment, materials and labor in order to complete all of the improvements as associated with the requirements per the approved project or to the satisfaction of the City Engineer of the City of Fontana.

All required improvements have an estimated cost of construction totaling Four Million Six ty-One Thousand Nine Hundred Thirty -One Dollars ($4,061,931.00) as shown on Exhibit " A". Improvements are shown on approved plans on file with City Engineer.

The estimated cost of construction set forth in Exhibit “A” is for estimation purposes only, and for calculation of the amount of securities

Revised – KE -9/17/20

required pursuant to the provisions of section (2), below . Subdivider’s obligation to complete the improveme nts, or any portion of them, is not limited in any way by the estimated cost of construction, and the obligation of Subdivider’s surety in connection with the securities required pursuant to the provisions of section (2), below.

2. Security:

Subdivider shall, at all times, guarantee its performance of this agreement by furnishing to City and maintaining good and sufficient security as required by the State Subdivision Map Act on forms approved by City for the purposes and in the amounts as follows:

a. To ensure a faithful performance of this agreement in regard to the improvements in the amount of 100% of the estimated cost of construction of the improvements; and

b. To secure payment to any contracto r, sub -contractor, pers ons renting equipment or furn ishing labor or materials for the improvements required to be constructed or installed pursuant to this agreement in the additional amount of 100% of the estimated cost of construction of the improvements; and

c. To guarantee or warranty the work done pur suant to this agreement for a period of one (1) year following acceptance thereof by City Council of the City of Fontana against any defective work or labor done or defective materials furnished in the am ount of 20% of the esti mated cost of construction of the improvements; and

d. To warranty the setting of required subdivision monuments within one - year following recordation of the Final Map in the amount of 100% of the estimated cost of setting subdivision monuments as shown in Exhibit "A".

e. To guarant ee the landscape maintenance of all landscape improvements for a period of one year (1) year following acceptance of thereof by the City.

The securities required by this agreement shall be kept on file with the City Clerk.

The terms of the security docu ments required by this agreement are hereby incorporated in this agreement by reference and copies attached hereto.

The security, which guarantees performance, can be released upon acceptance of the improvements by the City Council. The security which guarantees payment to contractor, sub -contractors and to persons furnishing labor, materials or equipment will be released 6 months after acceptance of the improvements by the

Revised – KE -9/17/20

City Council, less the total o f all claims to which t he City has been given proper notice.

Securities may be released upon the final completion and acceptance of the work subject to the provisions herein. The City Council, in its absolute discretion, may release a portion of the secu rity given for faithful performance of the improvement work as the improvement progresses upon application thereof by the Subdivider.

3. Time of Completion:

All of the required improvements shall be completed within 24 months from the effective date of this agreement. If the work is not completed within the specified time period because of acts of God, the public enemy, the City, or because of fire, flood, epidemic, quarantine restrictions, strikes or freight embargoes, the Subdivider shall be entitled to an extension beyond the specified time period for a period equal to the length of such delay within ten days from the beginning of such delay.

In addition to the extension for the reasons referenced in the foregoing paragraph, Subdivider may submit a written request , Exhibit “B” , for a discretionary extension of the time for completion of the improvements to the City Engineer.

The City Engineer may grant or reject such extension, in whole or in part or with conditions, in his sole discretion. If a n extension of time is granted it shall in no way af fect the validity of this contract or release the surety on the securities referenced herein.

In the event that Subdivider fails to complete the improvements within the required period or any approved e xtension, the City may complete the work and shall be entitled to recover the full cost and expenses thereof from Subdivider, or his surety as herein provided. If City pursues completion of the improvement work, it may require Subdivider, or his surety, t o pay the City in advan ce, sufficient monies to cove r the City's cost in completing construction of the improvements.

Any limitations period provided by law related to breach of this Agreement or the terms thereof shall not commence running until Subdivid er, or Subdivider’s surety pursuant to Section 2 of this Agreement, has provided the City Engineer with written notice of Subdivider’s intent to abandon or otherwise not complete the improvements.

4. Effective Date of Agreement:

This Agreement shall not become effective unless and until the Subdivision Map has been approved by the City Council of the City of Fontana and also accepted

Revised – KE -9/17/20

the Final Map for reco rdation by the County Recorder of the County of San Bernardino.

5. Utility Deposits - Statements:

Prior to the commencemen t of any work to be performed within the area delineated on the Final Map, the Subdivider must file a written statement with the City Clerk and the City Engineer, signed by the Subdivider, and each public utility involved, to the eff ect that Subdivider has made all deposits legally required by such public utility for the connection/extension of any and all public serving utilities to be provided to or within the subdivision.

6. Permits - Compliance with Law:

Subdivider shall, at Su bdivider's expense, obt ain all necessary permits and licenses, pay all charges, fees and taxes, and give all necessary and incidental notices to the due and lawful prosecution of the work.

7. Definition and Ownership of Improvements:

The term "improveme nts" means: grading, pa ving, curbs and gutters, path ways, storm drains, sanitary sewers, utilities, drainage facilities, traffic controls, landscaping, street lights, and all other required facilities as shown in detail upon plans, profiles and specificati ons which have been pre pared or are now in final preparation by engineers acting for Subdivider subject to approval by the City Engineer of the City of Fontana . No work on the improvements shall be commenced until plans and/or profiles therefore have been submitted, approved and permitted by the City Engin eer. All required public improvements constructed or installed pursuant to this Agreement shall become the sole exclusive property of the City, without payment therefore, upon acceptance of the improvements by the City Council.

8. Obligations of Subdivider:

Notwithstanding the fact that Subdivider's plans and specifications, completion of the work, and other acts are subject to approval of the City, it is understood and agreed that any approval by the C ity thereof shall in no way relieve Subdivider of satisfactorily performing all work on the related obligations hereunder. The construction shall be done strictly in accordance with the plans and specifications prepared by Subdivider or its engineer, and as approved by the C ity as being consistent with the City Code and Standards. Subdivider warrants that its plans and specifications conform as a minimum to all City codes and standards and that they are adequate to accomplish the work in a good workmanlik e manner and in accordance with responsible construction practices.

Revised – KE -9/17/20

9. Superintendence by Subdivider:

Subdivider shall personally supervise all work involved in the improvements, or shall designate a competent foreman or superintendent, satisfactory to the City Engineer, to supervise the work at all tim es during progress, with authority to act for Subdivider. In the event satisfactory superintendence is not being exercised by the Subdivider, the City Engineer may order suspension of all work within the subdivision until the deficiency is adequately corrected.

10. Repair and Replacements:

Subdivider shall replace, or have replaced, or repair, or have repaired, as the case may be, or pay to the owner the entire cost of replacement or repairs, for all survey monuments or for any and all property damaged or destroyed by reason of any work done hereunder, whether such property be owned by the United States or any agency thereof, or by the City or by any public or private corporation, or by any person whoms oever or by combinat ion of such owners. Any such re pair or replacement shall be completed in a reasonable manner and subject to the approval of the City Engineer and affected property owner.

11. Inspection by City:

Subdivider shall at all times maintain proper facilities and provide safe access for inspection by City to all parts of the work and to the shops where the work is in preparation. The cost of inspections shall be paid by the Subdivider.

12. Approval by City Engineer.

All required improvemen ts shall be construc ted under the inspection of and subject to approval of the City Engineer. Therefore, it is mutually agreed by the parties hereto that the City Engineer shall have the right to reject any or all of the work to be performed under this co ntract if such work does not conform to the plans and specifications set forth herein or the City's Codes and standards. Any damage to the improvements (existing or new) that occurs during the course of work performed under this Agreement shall be repaire d or replaced, by th e Subdivider, to the satisfactio n of the City Engineer before the final acceptance of completed work and release of security.

13. Liability for Performance Injury or Damage:

Neither the City nor any of its officers or agents shall be liable to Subdivider or its contractors for any erro r or omission arising out of or in connection with any work to be performed under this contract. Additionally, the City shall not be liable to the Subdivider or to any other person, firm, or corporation whatsoever, for any injury or damage that may result to any person or property by or from any

Revised – KE -9/17/20

cause whatsoever in, on, or about the subdivision of said land covered by this Agreement, or any part thereof.

14. Indemnification and Release:

Prior to the co mmencement of any wo rk pursuant to this contract, Su bdivider's contractors shall furnish to City satisfactory evidence of an insurance policy written upon a form and by a company (which meets with the approval of City) insuring City, its officers, agents, and employees agains t loss or liability which may ar ise during the work or which may result from any of the work herein required to be done, including all costs of defending and claim arising as a result thereof. Minimum liability and property damage insu rance shall not be l ess than $250,000 for all damages arising out of bodily injury to a death of one person and not less than $1,000,000 for all damages arising out of bodily injuries to or death of more than one person in any occurrence; and not less than $250,000 for all damages and/or destruction of prop erty in any one occurrence and not less than $500,000 for all damages and/or destruction of property during the policy period.

Such policy shall be in favor of Subdivider or its contractors and of the Ci ty, its officers, agents, and employees and shall be maintained in full force and effect during the life of this contract. The policy shall state by its terms and by an endorsement that it shall not be cancelled until City shall have had at least ninety (90) days' notice in writing of such cancellation.

The Subdivider hereby releases and agrees to indemnify and save the City harmless from and against any and all injuries to and deaths of persons and injuries to property, and all claims, demands, costs, lo ss, damage and liabi lity, howsoever the same may be caused and whensoever the same may appear, resulting directly or indirectly from the performance or non -performance of any of or all work to be done in and upon premises adjacent thereto pursuant to this Agreement, and also from any and all injuries to and deaths of persons and injuries to property or other interests and all claims, demands, costs, loss, damage, and liability, howsoever same may be caused and whensoever the same may appear, either directly or indirectly made or suffered by the Subdivider, t he Subdivider's agents, employees, and sub -contractors, while engaged in the performance if the work.

15. Liability of Subdivider:

The Subdivider agrees that the use for any purpose and by any person of any and all of the streets, easements and improvements herein specified shall be at the sole and exclusive risk of the Subdivider at all times prior to final acceptance by the City of the completed street and other improvements thereon and therein; provided that acceptance b y the City shall in no way elimi nate or lessen any of Subdivider's obligations or undertakings contained in this Agreement. The issuance of any occupancy permits (if granted) by the City for buildings located within the subdivision shall not be construed in any manner to constitute an

Revised – KE -9/17/20

acceptance and approval of any or all of the required improvements in said subdivision.

16. Relationship of Contractors:

It is hereby mutually covenanted and agreed by the parties hereto that Subdivider's contractors are n ot agents of the City, if any, a re those of independent contractors.

17. Repair or Reconstruction of Defective Work:

If, within a period of up to one year after City Council acceptance of the improvement work performed under this Agreement, any of the improvements for work done under t his Agreement fails to fulfill any of the requirements of this Agreement, or the specifications referred to herein, Subdivider shall without delay and without any cost to the City (upon receipt of written notice from the Cit y), repair or replace or reconst ruct any defective of otherwise unsatisfactory part or parts of the work or structure. Should Subdivider fail to act promptly or in accordance with this requirement, or should the exigencies of the case require repairs or r eplacements to be made before Su bdivider can be notified, City may, at its own option, make the necessary repairs or replacements or perform the necessary work and offset that amount against any security pledged by Subdivider for faithful performance, labo r and materials, or warranty obl igations under this agreement.

18. Warranty:

Without limiting the foregoing, Subdivider warrants and guarantees: materials used and workmanship performed on said work for a period of one (1) year after completion and accep tance thereof by the City , and the setting of all required Final Map monuments.

19. Assignment:

This agreement shall not be assignable by Subdivider without written consent of City.

Revised – KE -9/17/20

IN WITNESS WHEREOF, this agreement shall for all purposes be deemed an original thereof, having been duly executed by the Subdivider herein named on the day of , 20 being duly signed by its undersigned representative(s) pursuant to authority of its governing body.

SUBDIVIDER CITY OF FONTANA

By: By:

Shannon Yauchzee, Interim City Manager

By: Attest:

Tonia Lewis, City Clerk

APPROVED AS TO FORM:

By:

Ruben Duran, City Attorney

APPROVED AS TO CONTENT:

By:

Ricardo Sandoval, City Engineer

Attachments: (1) Exhibit "A" – Cost Estimate
(2) Exhibit "B" – Time Extension
(3) Securities

D.R. Horton Los Angeles Holding
Company, Inc.

Name: VICKI GULLION_________
Title: ASSISTANT SECRETARY_

Revised – KE -9/17/20

Exhibit “A”

INSERT ENGINEER’S

COST ESTIMATE

IN THIS SPOT

Revised 12/1/2016 – GM/RG

STAFF USE ONLY
ENGINEERING PC NO.
__________________

CITY OF FONTANA

ENGINEERING DEPARTMENT
COST ESTIMATE **EXHIBIT "A"**
SHEET 1
DATE: _____________________
DEVELOPER PROJECT NAME__________________
ENGINEER TRACT MAP NO._________________
PHONE NO. PARCEL MAP NO. _______________

STREET IMPROVEMENTS
UNIT

ITEM QUANTITY UNIT COST AMOUNT
6" CURB & GUTTER _ L.F. 17.00 __
8" CURB & GUTTER L.F. 19.00 _
8" THICK CROSS GUTTER S.F. 11.00 _
4" SIDEWALK S.F. 5.00 _
ACCESS RAMP EA 2500.00 _
DRIVE WAY APPROACHES S.F. 11.00 _
ASPHALT CONCRETE DIKES L.F. 11.00 _
FOG SEAL S.F. .10 ____
IMPORTED EMBANKMENT C.Y. 10.00 _
PREPARATION OF SUBGRADE S.F. .50 _
*A.C. TON 90.00 _
*A.C.OVERLAY(1"MI.THICKNESS) S.F. .80 _
**PCC CURB ONLY (MEDIAN) L.F. 16.00 _
ADJUST SEWER MANHOLE TO GRADE EA 500.00 _

ADJUST SEWER CLEAN OUT TO
GRADE EA 300.00 _
ADJUST WATER VALVES TO GRADE EA 250.00 _
BARRICADES L.F. 40.00 _
2 X 4 REDWOOD HEADER L.F. 5.00 _
*REMOVAL OF A.C. PAVEMENT S.F. .66 _
**REMOVAL OF P.C.C. CURB L.F. 6.00 _
*REMOVAL OF A.C. BERM L.F. 5.00 _
RETAINING WALL H=2 1/2 FT.

OR LESS L.F. 40.00 ________
BLOCK WALL H=6 FEET L.F. 50.00 ________
AGGREGATE BASE TON 30.00 _ __
GUARD POSTS EA 70.00 _
GUARD PANEL (WOOD) L.F. 40.00 _
SAWCUT L.F. 3.50 _
REFLECTORS AND POSTS EA 100.00 _
STREET SIGNS EA 25 0.00 _
______________________ ________ EA _______ ________
______________________ ________ EA _______ ________
______________________ ________ EA _______ ________ ______________________ ________ EA _______ ________ STREET IMPROVEMENT SUBTOTAL __
* A.C. ASPHALTIC CONCRETE
** P.C.C. PORTLAND CONCRETE CEMENT
==== NAME SIGNS
ELPC20-000035

APPROVED
Permit No.:ELPC20-000035
By: Gabriel Guerrero
Date: 09/03/2020

DEPARTMENT OF ENGINEERING
Revised 12/1/2016 – GM/RG
SHEET 2

STORM DRAIN IMPROVEMENTS
UNIT

ITEM QUANTITY UNIT COST AMOUNT
* 18" RCP L.F. 90.00 ________
* 24" RCP L.F. 110.00 ________
* 30" RCP L.F. 200.00 ________
* 36" RCP L.F. 220.00 ________
* 42” RCP ________ L.F. 240.00 ________
* 48" RCP L.F. 260.00 ________
* 54" RCP L.F. 280.00 ________
* 60" RCP L.F. 300.00 ________
* 66” RCP ________ L.F. 320.00 ________
* 78” RCP ________ L.F. 340.00 ________
* 24” CMP ________ L.F. 90.00 ________
* 60” CMP ________ L.F. 320.00 ________
CATCH BASIN/CURB INLET:

W=7 EA 4,000.00 ________
W=10 EA 4, 500.00 ________
W=14 EA 6,000.00 ________
W=21 EA 11,000.00 ________
W=28 EA 14,000.00 ________
JUNCTION STRUCTURE EA 3,200.00 ________

TRAFFIC TYPE JUNCTION
STRUCTURE EA 2,800.00 ________
DISCHARGE STRUCTURE EA 2,800.00 ________
MANHOLES EA 2,500.00 ________
LOCAL DEPRESSION EA 1,250.00 ________
GRATE INLET STRUCTURE EA 2,100.00 ________
_____________________ ________ EA ________ ________
_____________________ ________ EA ________ ________
_____________________ ________ EA ________ ________
STORM DRAIN IMPROVEMENT SUBTOTAL ________
* REINFORCE CONCR ETE PIPE

SANITARY SEWER IMPROVEMENTS
MANHOLES 60" DIAMETER EA 4,500.00 ________
MANHOLES 48" DIAMETER EA 4,000.00 ________
DROP MAN HOLES EA 4,500.00 ________
WYES EA 100.00 ________
CLEANOUTS EA 600.00 ________

REMODELING OF EXISTING
MANHOLE EA 950.00 ________
** 4" VCP L.F. 50.00 ________
** 6" VCP L.F. 6 0.00 ________
** 8" VCP L.F. 70.00 ________
** 10" VCP L.F. 80.00 ________
** 12" VCP L.F. 90.00 ________
** 15" VCP L.F. 100.00 ________
__________________ ________ L.F. _______ ________
__________________ ________ L.F. _______ ________
SANITARY SEWER IMPROVEMENT SUBTOTAL ________
** VITRIFIED CLAY PIPE
X 4'
XXXXXXX 96" CMP
XXX SDR-35 XXXXX 40.00
XXX SDR-35 XXXXX 37.00
Revised 12/1/2016 – GM/RG
SHEET 3

TRAFFIC SIGNALS/SIGN/STRIPING
UNIT

ITEM QUANTITY UNIT COST AMOUNT
TRAFFIC SIGNAL MODIFICATION:

ONE CORNER L.S. 50K _
TWO CORNERS L.S. 100K _
TRAFFIC SIGNAL NEW L.S. 250K _
PAINT TRAFFIC STRIPE (1 COAT) L.F. 2.40 _
PAINT TRAFFIC STRIPE(2 COATS) L.F. .65 _
PEDESTRIAN CROSSWALK STRIPING L.F. .65 _

PAVEMENT MARKER
(NON REFLECTIVE) EA 2.50 ________
PAVEMENT MARKER (REFLECTIVE) EA 4.00 _
REFLECTORS AND POSTS EA 100.00 _
STREET SIGNS EA 250.00 _
___________________ ________ EA ________ ________
___________________ ________ EA ________ ________
TRAFFIC SIGNAL/SIGNS/STRIPING SUBTOTAL __

CFD LANDSCAPE IMPROVEMENTS (BONDING PURPOSES ONLY)
AREA LANDSCAPED S.F. $12.00 _
CENTER MEDIAN S.F. $12.00 _
LANDSCAPING IMPROVEMENTS SUBTOTAL __________
"STOP"
Revised 12/1/2016 – GM/RG

SHEET 4
SUBTOTALS:

STREET IMPROVEMENT SUBTOTAL....................___________________ STORM DRAIN IMPROVEMENTS SUBTOTAL..............___________________ SANITARY SEWER IMPROVEMENTS SUBTOTAL...........___________________ TRAFFIC SIGNAL/SIGNS/STRIPING SUBTOTAL.........___________________

IMPROVEMENT SUBTOTAL ===================
(*USE THIS TOTAL FOR PLAN CHECK & PERMITTING PURPOSES*)

CFD LANDSCAPE IMPROVEMENTS ....................___________________ SUBDIVISION MONUMENT GUARANTEE $1,200 + $50/LOT ...___________________ STREET LIGHTS _______ @ $5,000 ................___________________ CUCAMONGA COUNTY WATER DISTRICT FACILITIES.....___________________

IMPROVEMENT SUBTOTAL.... ===================
ADD 35%..................... ____________________

BONDING TOTAL........___________________

APPROVED PUBLIC IMPROVEMENT PLANS:

STREET IMP. DWG. NO._____________________
STREET LIGHT DWG. NO.____________________
SEWER IMP. DWG. NO.______________________
STORM DRAIN IMP. DWG. NO. _______________
TRAFFIC SIGNAL DWG. NO.__________________
SIGNING & STRIPING DWG. NO.______________

Revised – KE -9/17/20

SUBDIVISON IMPROVEMENT AGREEMENT
Tract Map No.:

Exhibit “B”

I, D.R. Horton Los Angeles Holding Company Inc. (Subdivider’s name here) am the owner of the property to which this Request is being made for of a Time Extension for Project No. Tract 20018 - Onsite Improvements .

Name: Todd Funk
Subdivider’s Signature:

Subdivider’s Address: 2280 Wardlow Circle, Ste 100
Corona, CA 92280
Date:
(Attached Notary Acknowledgment)

CITY OF FONTANA
BY: DATE:

Ricardo Sandoval, City Engineer

[ ] DENY

[ ] APPROVED

NEW DATE:

← All documents from this meeting