Cities Index.
2022 - Bid Proposal - Heritage Pool Deck - 2-20-22

Fontana City Council
April 12, 2022

Document
2022 - Bid Proposal - Heritage Pool Deck - 2-20-22
Meeting
April 12, 2022
Body
Fontana City Council
Original file
62 KB
Text extracted from the city's file for reading and search. Open the original on fontana.legistar1.com. That file is the official record.

_____________________________________________________________________________________ BID PROPOSAL 2-20-2022 _____________________________________________________________ To: Michael Springer From: David DiBaggio, Owner City of Fontana
909-428-8811
Project: Heritage Pool Deck - 7350 West Liberty Parkway, Fontana ______________________________________________________________________________________ Scope of Work:

We propose to furnish all labor, material and equipment necessary to repair and resurface the concrete pool deck, approx. 12,700 square feet, with Crossfield Products Dex-O-Tex Auto Dex V system as follows:

Acid etch and neutralize deck to remove surface contaminants.

Grind deck to remove loose material.

Remove existing joint sealants, approx. 2,900 lineal feet.

Rout cracks and fill with epoxy.

Level up spalled concrete with acrylic cement.

Prime deck with 500 W epoxy primer.

Apply co-polymer cement bondcoat by trowel.

Apply SBR rubber waterproof membrane reinforced with polypropylene fabric.

Apply first topping coat co-polymer cement by trowel. Sand deck.

Apply second topping coat co-polymer cement by trowel. Sand deck.

Apply co-polymer cement texture by spray and knockdown method.

Seal expansion joints with polyether sealant over backer rod.

Apply two coats AJ 44 SR pigmented acrylic sealer.

See HYPERLINK "http://www.dex-o-tex.com" www.dex-o-tex.com for more information. ______________________________________________________________________________________ The Dex-O-Tex Auto Dex V system will restore this deck to like new condition. The fabric reinforced waterproof membrane in the system will keep water out of the concrete and provide maximum crack resistance. The polyether joint sealant is superior to polyurethane in terms of UV and chemical resistance. ______________________________________________________________________________________ TOTAL PRICE: $219,500 Prevailing wage included.

Warranty: (5) years labor and material. Life expectancy is 10-15 years with periodic maintenance (clean and seal every five years).

Working Time: (60) days/trips.

Workmanship: All work is supervised by owner and guaranteed neat and professional. Owner has over (45) years’ experience as a contractor and manufacturers rep in the waterproofing and special coatings industry. ______________________________________________________________________________________ SHAPE \* MERGEFORMAT
SHAPE \* MERGEFORMAT
Masterseal Corp. Tel.: 949-355-5031 30 Via Soria CA Contractors License 810097 San Clemente CA 92673 Email: HYPERLINK "mailto:[email protected]" [email protected] Masterseal Corp. 949-355-5031 San Clemente, CA Contractors License 810097

← All documents from this meeting