Bio Clean CPS ™
A Stormwater Trash Capture Solution
A Forterra Company

ADVANTAGES
• CAPTURES 100% OF TRASH AND DEBRIS
5MM AND GREATER
• 100% STAINLESS STEEL CONSTRUCTION

UTILIZING ONL Y PERFORATED METAL

CONSTRUCTION
• MODULAR DESIGN ALLOWS IT TO

ADAPT TO PIPE SIZES RANGING
FROM 4 INCHES TO 48 INCHES
• MODULAR DESIGN ALLOWS FOR

DESIGN FLEXIBILITY

OVERVIEW
The Bio Clean CPS™ (Connector Pipe Screen) is designed to utilize existing catch basins, allowing them to efficiently capture 100% of trash and debris.

The Bio Clean CPS technology can be retrofitted into any curb or drop inlet to help municipalities meet current stormwater regulations and comply with their NPDES or MS4 permit. Bio Clean CPS devices can be used for new site developments as the first line of defense to prevent trash and debris from reaching downstream stormwater BMPs where they can cause clogging and unnecessary maintenance burdens.

Constructed from 100% 304 perforated stainless steel, the system is feasible, effective, and built to last. An innovative curved design with multiple cross supports ensures the device can withstand several hundred pounds of pressure, far exceeding the 60-plus pound requirement by the County of Los Angeles.

Its modular design makes it easy to insert through a 24-inch diameter manhole and assemble inside the basin within minutes. The center piece comes in different lengths allowing it to be used with outlet pipe sizes up to 48 inches or greater. For catch basins with pipes exiting in the corner, the system can easily be adapted to an ‘L’ shape using a single corner piece and a single center piece.

Perforated Stainless Steel Panels
Reinforcement Bracket
Panels retain all trash
larger than 5mm

CONFIGURATIONS
Treated flows enter the basin and are passed through the Bio Clean CPS which retains all trash and debris down to 5 mms in size.

High flows are allowed to bypass over the top of
the Bio Clean CPS during intense storm events.

OPERATION
L-Shape U-Shape

INSTALLATION MAINTENANCE
The modular design of the system makes installation
fast and easy. Rounded end pieces and center
sections fit through any standard manhole. The
system is assembled using self-tapping screws and
concrete drive pins.

The Bio Clean CPS makes any catch basin a Full
Trash Capture device. Maintenance of the catch
basin can be performed using a standard vacuum
truck or removed by hand.
06102020
A Forterra Company
5796 Armada Drive Suite 250
Carlsbad, CA 92008
855.566.3938
[email protected]
biocleanenvironmental.com
Bio Clean CPS
A Stormwater Trash Capture Solution

INSTALLATION MANUAL
5796 Armada Drive Suite 250 | Carlsbad, CA 92008 | 855.566.3938 [email protected] | biocleanenvironmental.com

1 | P a g e

INSTALLATION

Bio Clean CPS is designed to be installed inside each catch basin covering the outlet pipe within the acceptable perimeters. Bio Clean CPS requires entry into each catch basin for installing this product.

Please follow all guidelines for working and entering a catch basin per your State and Federal Guidelines. Bio Clean is not responsible for any injuries or damages that might occur during this installation process.

Installer to determine which Bio Clean CPS model to install based on the following criteria:

1. Location of connector pipe inside the catch basin to determine the screen shape

2. Sizing of the Outlet Pipe for Connector Pipe Screen to Filter

3. Location of the curb opening to determine if a bypass lid is required

4. Treatment flow rate through the screen

5. Bypass requirements – typically over the screen

It is recommended that the catch basin be cleaned during time of install as the install can be used as opportunity to do so. Bio Clean CPS installation requires a debris free surface when installing to make sure that the CPS rests with no more than a 5MM gap on any of its edges.

Requirements:

The contractor shall furnish all labor, equipment, materials, and incidentals required to install the CPS and appurtenances in accordance with the contract documents. Any damage to the existing drainage structure (retrofit applications) or surrounding infrastructure that may need to be repaired to allow for proper installation of the CPS shall be considered incidental and to be paid for at no

2 | P a g e
cost to the client. Bio Clean does offer installation services in certain areas. Please contact Bio Clean for more information on pre-authorized 3rd party contractors that can provide install service in your area.

The manufacturer of the Bio Clean CPS does provide a warranty against defects in materials and workmanship for a period of 3 years from the date of acceptance by the Engineer. The Bio Clean CPS also carries a 2-year warranty on installation.

Components:

Tools:

 Marker – Sharpie
 Tape Measure
 Square – Straight Edge
 Hammer (recommend 2lbs sledge hammer)
 Level 24”
 RotoHammer w/ 3/8” x 6” concrete bit
 9/16 wrench
 Impact Drill with 9/16 socket (not required)

Hardware:

 3/8” x 2 ¾” Wedge Anchors
 3/8” x 1 ½” Nuts & Bolt, Washers

3 | P a g e

Installation:

1. Carefully lower the Bio Clean CPS unit through the manhole opening.

2. Position the Bio Clean CPS so it is evenly spaced around the connector pipe, ensuring a minimum of 4” spacing away from any corners.

3. Mark the hole locations on the wall for the stainless anchor bolts.

4. Drill holes and hammer the bolts in place

5. Secure the Bio Clean CPS using stainless nuts.

6. If the bottom of the base exposes more than a 5 mm gap, then an additional face strip may be fastened to the base channel using stainless tek screws or rivets. This base face strip matches the length and contour of the base screen.

For Installation Support
Please Contact Us At:
760-433-7640
[email protected]
Bio Clean CPS
A Stormwater Trash Capture Solution
A Forterra Company

OPERATION & MAINTENANCE
MANUAL
5796 Armada Drive Suite 250 | Carlsbad, CA 92008 | 855.566.3938 [email protected] | biocleanenvironmental.com 1 | Page

OPERATION & MAINTENANCE
CPS devices should be maintained by individuals who are trained in proper disposal procedures, confined space entry and traffic safety regulations. When servicing a Bio Clean CPS device be sure to follow all safety and traffic control protocols as well as wearing all proper personal protection equipment such as gloves, safety glasses, hard-hat, safety vest and work boots.

Visual Inspection

1. Begin by inspecting the inflow of the catch basin where the Bio Clean CPS device is located.

Check for any obstructions to inflow of the CB unit. If any large obstructions are found, have them removed. Once the inflow inspection is completed, remove the man-hole cover for further inspection. (Note: Confined Space Entry Procedures may apply if trained personnel intend to enter the interior space of any Catch Basin. Please follow all applicable confined space entry procedures)

2. Remove the manhole cover and visually estimate the amount and types of debris found in the CB unit. Look for any visual signs of damage that may compromise the CB unit to function properly.

Inspect for any standing water in the CB unit as well as for large amounts of sediment and debris surrounding the CPS device. If standing water and high sediment volume is found, remove water, sediment and debris by vacuum truck or by other debris removal methods.

2 | Page
Cleaning Procedures and Frequencies

1. Like all other storm water BMP’s, Bio Clean CPS devices require periodic maintenance.

Routine inspection and maintenance intervals for all CPS devices are typically twice per year for inspections and once per year for maintenance service. Bio Clean CPS devices may require more frequent maintenance service if the device is located in a high debris loading drainage area, such as certain downtown areas, retail/restaurant, or residential areas where a significant amount of vegetation/foliage is located. In such cases, Bio Clean CPS devices may require more frequent inspection and maintenance service, which could range from twice per year to monthly inspection and maintenance service, depending on pollutant load conditions.

2. To begin Bio Clean CPS cleaning procedures, conduct a visual inspection of the CPS device and the surrounding area to ensure a safe working environment. Setup appropriate barriers and signage as necessary to establish a work zone surrounding the catch basin. Once the work zone has been established, remove the manhole cover from the catch basin.

3. Once the manhole cover is removed from the basin the Bio Clean CPS is ready for servicing. All debris can be removed by either a vacuum truck or manually removing sediment and debris by hand.

4. Bio Clean CPS devices shall be cleaned using a pressure washer as may be necessary if any materials are found to cause occlusion or clogging of the screen.

Disposal

1. All trash and debris removed from the Bio Clean CPS unit shall be disposed of in accordance with local, state and federal regulation.

2. Solid waste disposal can be coordinated with local landfills. Liquids may need to be disposed of by wastewater treatment plant, municipal vacuum truck decant facility or approved facility.

For Maintenance Services or
Information Please Contact Us At:
760-433-7640
Or Email:
[email protected]

Stormwater Connector Pipe Screen Page 1 of 4

Section [________]
Stormwater Connector Pipe Screen

PART 1 – GENERAL

01.01.00 Purpose
The purpose of this specification is to establish generally acceptable criteria for Connector Pipe Screens used for collecting trash and debris inside catch basins. It is intended to serve as a guide to producers, distributors, architects, engineers, contractors, plumbers, installers, inspectors, agencies and users; to promote understanding regarding materials, manufacture and installation; and to provide for identification of devices complying with this specification.

01.02.00 Description
Stormwater Connector Pipe Screens (CPS) are used to prevent trash and debris from entering the stormwater system during dry weather and moderate storm flows by keeping the trash inside the catch basin. The CPS is a screen placed permanently or temporarily in a catch basin at the location of the outlet pipe. The screen separates trash and debris from stormwater treatment flows. Flows that exceed the treatment flow rate bypass over the top of the screen. When the outlet pipe is located below a curb opening the CPS features a lid to prevent debris from passing behind the screen and flowing directly to the outlet pipe. The CPS shall be designed to retain all trash larger than 5 mm (0.197 inches) in the catch basin.

01.03.00 Manufacturer
The manufacturer of the CPS shall be one that is regularly engaged in the engineering, design and production of systems developed for the treatment of stormwater runoff for at least (10) years, and which has a history of successful production, acceptable to the engineer of work. In accordance with the drawings, the CPS(s) shall be a screen device manufactured/distributed by Bio Clean Environmental Services, Inc., or assigned distributors or licensees. Bio Clean Environmental Services, Inc. can be reached at:

5796 Armada Drive, Suite 250
Carlsbad, CA 92008
Phone: (760) 433-7640
Fax: (760) 433-3176
www.biocleanenvironmental.net

01.04.00 Submittals

01.04.01 Submittal drawings will be provided with each order to the contractor and engineer of work.

01.04.02 Submittal drawings are to detail the CPS, its components and the sequence for installation, including:
• CPS configuration with primary dimensions
• Various CPS components
• Any accessory equipment

01.04.03 Inspection and maintenance documentation submitted upon request.

01.05.00 Work Included

01.05.01 Specification requirements for installation of CPS.

01.05.02 Manufacturer to supply CPS(s):

Stormwater Connector Pipe Screen Page 2 of 4

• Screen
• Mounting hardware
• Bypass lid with supports (when required)

PART 2 – COMPONENTS

02.01.01 The CPS shall have a sufficient structural integrity to withstand a lateral force of standing water within the catch basin area when the screen becomes 100% clogged. The CPS unit shall be bolted to the catch basin walls.

02.01.02 The CPS shall be configured with deflector plates or screens preventing trash from falling between the screen and connector pipe. The deflector plate shall be designed to withstand a vertical load.

02.01.03 The gap at the bottom, sides, and joints of the CPS unit shall not exceed 5 mm (0.197 inches).

02.01.04 The CPS shall include vertical structural stiffeners extending the full length of the screen in the form as bends in the screen itself, a bolting surface to fasten the CPS to the wall of the catch basin, and support for the upper portion of the CPS unit referred to as the “bypass.”

02.01.05 All parts/components of the CPS unit must be sized to fit through the catch basin’s manhole opening.

02.01.06 The CPS frame shall be fabricated from 304 stainless steel.

02.01.07 The CPS screen shall be fabricated from perforated 304 stainless steel. The screen shall have a minimum thickness of 16 gauge. The geometrical opening shape shall have a diameter of 5 mm (0.197 inches).

02.01.08 The screen material used shall have at least 45% open area.

02.01.09 Any edge of the CPS that is not flush with the wall or floor of the catch basin shall be smooth with no prongs or jagged edges.

02.01.10 The assembly bolts, screws, nuts, and washers shall be fabricated entirely from 316 stainless steel. The concrete anchor bolts shall use a wedge anchor, with Type 316 stainless steel threaded rods, nuts, and washers.

PART 3 – PERFORMANCE

03.01.00 General

03.01.01 Function - The CPS has no moving internal components and functions based on gravity flow, unless otherwise specified. Stormwater runoff enters the catch basin through a curb opening and flows toward the connector pipe. The CPS is placed to intercept flows prior to exiting the catch basin through the connector pipe. The CPS must be able to be removed through the catch basin opening. Stormwater flow up to the peak treatment rate is processed through the screen. Flows in excess of the peak treatment rate will overtop the screen in a bypass. The lid (when required) shall be place high enough above the screen to allow for full bypass flow.

03.01.02 Pollutants - The CPS will remove and retain trash and debris larger than 5 mm in diameter entering the catch basin during frequent storm events and specified flow rates.

03.01.03 Treatment Flow Rate - The CPS operates through gravity flow. The CPS is to be sized so the screen is capable of passing the calculated project specific water quality flow rate per local standards. All treatment flow rates must include a 50% screen clogging factor.

Stormwater Connector Pipe Screen Page 3 of 4

03.01.04 Bypass Flow Rate – The CPS is designed to fit within the catch basin in a way not to affect the existing hydraulics and treat or bypass all flows. The bypass must be sized with a surface area greater than the outlet pipe size, thus the CPS shall not be a critical point of flow restriction.

PART 4 - EXECUTION

04.01.00 General
The installation and use of the CPS shall conform to all applicable national, state, municipal and local specifications.

04.02.00 Installation
The contractor shall furnish all labor, equipment, materials and incidentals required to install the CPS device(s) and appurtenances in accordance with the drawings, installation manual, and these specifications, and be inspected and approved by the local governing agency. Any damage to catch basin and surrounding infrastructure caused by the installation of the CPS is the responsibility of the installation contractor.

04.02.01 CPS and all components or accessories shall be inserted through the catch basin and properly secured per manufactures installation manual and these specifications.

04.03.00 Shipping, Storage and Handling

04.03.01 Shipping – CPS shall be shipped to the contractor’s address and is the responsibility of the contractor to transport the unit(s) to the exact site of installation.

04.03.02 Storage and Handling– The contractor shall exercise care in the storage and handling of the CPS(s) and its components prior to and during installation.

Any repair or replacement costs associated with events occurring after delivery is accepted, and unloading has commenced shall be born by the contractor. The CPS(s) and its components shall always be stored indoors and transported inside the original shipping container(s) until the CPS(s) are ready to be installed. The CPS shall always be handled with care and lifted according to OSHA and NIOSA lifting recommendations and/or contractor’s workplace safety professional recommendations.

04.04.00 Maintenance and Inspection

04.04.01 Inspection – After installation, the contractor shall demonstrate that the CPS has been properly installed at the correct location(s), elevations, and with appropriate supports and fasteners. All components associated with the CPS and its installation shall be subject to inspection by the engineer of work, governing agency, and the manufacture at the place of installation. In addition, the contractor shall demonstrate that the CPS has been installed per the manufacturer’s specifications and recommendations. CPS(s) shall be physically inspected regularly in accordance to owner’s Stormwater Pollution Prevention Plans (SWPPP) and manufacture’s recommendations. An inspection record shall be kept by the inspection operator. The record shall include the condition of the CPS and its appurtenances. The most current copy of the inspection record shall always be copied and placed in the owner’s SWPPP.

04.04.02 Maintenance – The maintenance shall be performed by someone qualified. A Maintenance Manual is available upon request from the manufacturer. The

Stormwater Connector Pipe Screen Page 4 of 4

manual has detailed information regarding the maintenance of the CPS(s). A detailed Maintenance Record shall be kept by the maintenance operator. The Maintenance Record shall include any maintenance activities preformed, amount and description of debris collected, and the condition of the CPS. The most current copy of the Maintenance Record shall always be copied and placed in the owner’s Stormwater Pollution Prevention Plan (SWPPP) per governing agency. Upon cleaning: no trash or debris shall be located in the catch basin, on top of the bypass lid, or between the screen; no vegetation shall block the catch basin opening or connector pipe; and no trash or debris shall be located within the catch basin opening.

04.04.03 Material Disposal - All debris, trash, organics, and sediments captured and removed from the CPS shall be transported and disposed of at an approved facility for disposal in accordance with local and state regulations. Please refer to state and local regulations for the proper disposal of toxic and non- toxic material.

PART 5 – QUALITY ASSURANCE

05.01.00 Warranty
The manufacturer shall guarantee the CPS against all manufacturing defects in materials and workmanship for a period of (1) year from the date of delivery to the contractor. The manufacturer shall be notified of repair or replacement issues in writing within the warranty period. The CPS is limited to recommended application for which it was designed.

[End of This Section]