1 RVPUB\AQUINTERO\717659.1 (BB&K: 2006)
AMENDMENT NO. 2
TO THE PROFESSIONAL SERVICES AGREEMENT
BETWEEN
THE CITY OF FONTANA
AND
T.Y. LIN INTERNATIONAL
TRACKING NUMBER SQ-04-DE-19
1. Parties and Date.
This AMENDMENT No. 2 to the Professional Services Agreement for Professional Engineering Design Services is made and entered int o as of this 15 th day of April , 2023, by and between the City of Fontana, a municipal corporatio n organized under the laws of the State of California with its principal place of business at 8353 Sierra Avenue, Fontana, California 92335 (hereinafter referred to as the “City”) and T.Y. Lin International, a California CORPORATION with its principal place of business at 3633 East Inland Empire Boulevard, Suite 900 Ontario, CA 91764 (hereinafter referred to as the “Consultant”). Ci ty and Consultant are sometimes individually referred to as “Party” and collectively as “Parties .”
2. Recitals.
2.1 Consultant. The City, under the Professional Services Agreement dated the 3 rd of April, 2018 (“Agreement”), has retained the service s of CONSULTANT to provide Professional Engineering Design Services.
2.2 Amendment Purpose. The City and Consultant de sire to amend the Agreement to include additional scope of services, extend the Te rm of the Agreement, and increase the not-to- exceed compensation amount. The Parties have hereto fore entered into that Amendment No. 1, dated September 14, 2021.
2.3 Amendment Authority. This AMENDMENT No. 2 is authorized pursuant to Section
3.3.4 of the Agreement.
3. Terms.
3.1 Section 3.1.1 General Scope of Services of the Agreement is hereby amended in its entirety to read as follows:
3.1.1 General Scope of Services. Consultant promises and agrees to furnish to the City all labor, materials, tools, equipment, services, and incidental and customary work necessary to fully and adequately supply the professional design consu lting services necessary for the Project (“Services”). The additional Services are more particularly described in Exhibit “A” attached hereto and incorporated herein by reference. All Services shall be subject to, and performed in accordance with, this Agreement, the exhibits attac hed hereto and incorporated herein by reference, and all applicable local, state and fede ral laws, rules and regulations. 2 RVPUB\AQUINTERO\717659.1 (BB&K: 2006)
3.3 Section 3.3.1.8 of the Agreement is hereby a mended in its entirety to read as follows:
3.3.1.8 Consultant shall receive compensation, including authorized reimbursements, for all Services rendered under this Agreement, includi ng the Amendments, at the rates set forth in Exhibit ”A” attached hereto and incorporated herein by reference. Amendment No. 2 is authorized in the amount of one hundred seventy-two thousand, three hundred fifty-seven dollars and zero cents ($72,357.00). The total compensation shall no t exceed one-million, nine hundred nineteen thousand, five hundred fifty-five dollars ($1,919,5 55.00) without written approval of City’s Engineering Manager . Extra Work may be authorized, as described below; and if authorized, said Extra Work will be compensated at the rates and man ner set forth in this Agreement.
3.4 Continuing Effect of Agreement. Except as ame nded by this AMENDMENT No. 2, all other provisions of the aforementioned Profe ssional Services Agreement remain in full force and effect. From and after the date of this AMENDMENT No. 2, whenever the term “Agreement” appears in the Agreement, it shall mean the Agreement as amended by this AMENDMENT No. 2.
3.5 Adequate Consideration. The Parties hereto ir revocably stipulate and agree that they have each received adequate and independent co nsideration for the performance of the obligations they have undertaken pursuant to this A MENDMENT No. 2.
[SIGNATURES ON FOLLOWING PAGE]
3 RVPUB\AQUINTERO\717659.1 (BB&K: 2006)
SIGNATURE PAGE TO
AMENDMENT NO. 2
TO THE CITY OF FONTANA
PROFESSIONAL SERVICES AGREEMENT
CITY OF FONTANA
By:
Matthew C. Ballantyne
City Manager
T.Y. LIN INTERNATIONAL
By:
James Rucker
Vice President
Attest:
By:
Germaine McClellan Key
City Clerk
By:
James Barr
Vice President
By:
Phillip Burum
Deputy City Manager
Approved as to form:
Best Best & Krieger LLP
City Attorney
By: _____________________________
Gia Kim
Director of Engineering / City Engineer
IN COMPLIANCE WITH CONTRACT INSURANCE REQUIREMENTS
By: ______________________________
Rakesha Thomas
Human Resources & Risk Management Dire ctor
IN COMPLIANCE WITH PURCHASING AND CONTRACT ADMINIST RATION POLICIES/PROCEDURES
___________________________________
Jessica Brown
Chief Financial Officer
Purchasing Office
EXHIBIT A
4 RVPUB\AQUINTERO\717659.1 (BB&K: 2006)
EXHIBIT “A”
- ATTACHED BEHIND THIS PAGE -
4/3/2023
Environmental & Design Services for Foothill Blvd - Hemlock Ave to Almeria Ave Street Improvements (Malaga Bridge) – Additional Scope of Services for Phase II Subsurface Investigation (PSI)
1 Introduction
An Initial Site Assessment Report (ISA) was conducted for Foothill Blvd, from Hemlock Ave to Almeria Ave on May 24, 2022 and revised on August 26, 2022. The report identified the historical occupancy of the Site as a railway, the long-term occupancy of the Site as a major roadway, and the current and historical occupancies of auto repair shops and the unknown status of an underground storage tank at adjoining properties as recognized environmental conditions.
Based on those ISA findings, it was recommended to conduct a Phase II Subsurface Investigation (PSI) consisting of soil sampling throughout the Site to determine if the soil has been impacted by the historical occupancy as a railway and by aerially deposited lead (ADL) from vehicle exhaust; soil vapor sampling near three adjoining properties located at 15129, 15559 and 15735 Foothill Boulevard that represents a vapor encroachment condition (VEC); and lead-based paint (LBP) sampling of the bridge components.
The City requests TYLin to provide an additional scope of work and fee proposal for the proposed Phase II Subsurface Investigation (PSI). The additional scope shall include the following:
• Additional project management, coordination, and m eetings • Street Improvement Plan updates based on PSI
• Cost estimate and specification updates based on P SI • The PSI Health and Safety Plan, PSI Soil and Solid Vapor Sampling, PSI Data Evaluation and Reporting, PSI Additional Soil, Soil Vapor and Paint Chip Sampling Contingency, and PSI QA/QC.
TYLin’s Scope of Services:
The below scope of services is added to the TYLin’s original scope of services and City’s base scope of services for the Environmental & Design Services for Foothill Blvd - Hemlock Ave to Almeria Ave Street Improvements Project.
Task 1. PROJECT MANAGEMENT:
TYLin will provide overall project management services for the additional scope of work as follows:
1.1 Project Management/Progress Reports: This inclu des extra management associated with overseeing the PSI.
1.2 Coordination/Meetings: This includes extra coo rdination with the City, Caltrans and the consultant team associated with the PSI. It is assumed that there will be an additional two focus meetings for to the PSI.
Task 3. CONSTRUCTION PLAN PREPARATION & COORDINATION:
The TYLin Team will provide updates to the Street I mprovement Plans and Demolition Plans based on the PSI.
3.1 Street Improvement Plans: TYLin will prepare St reet Improvement Plans updates
4/3/2023
Environmental & Design Services for Foothill Blvd - Hemlock Ave to Almeria Ave Street Improvements (Malaga Bridge) – Additional Scope of Services for Phase II Subsurface Investigation (PSI)
2 based on PSI.
3.7 QA/QC: TYLin will perform a QA/QC for the deliv erables associated with the PSI.
Task 4. CONSTRUCTION COST ESTIMATE & SPECIFICATIONS:
The TYLin Team will provide additional technical sp ecifications and estimates based on PSI results.
4.1 Cost Estimate: TYLin will update cost estimates associated with the additional PSI related improvements.
4.2 Specifications: TYLin will prepare specificatio ns associated with the additional PSI related improvements.
4.3 Structures Specifications: TYLin will prepare s tructural specifications associated with the additional PSI related improvements.
4.4 QC/QC: TYLin will perform a QA/QC for the deli verables associated with the additional PSI related improvements.
Task 6. ENVIRONMENTAL:
6.2 Environmental Technical Studies
6.2.12a. Phase II Subsurface Investigation (PSI): Health and Safety Plan:
A site-specific Health and Safety Plan (HASP) will be prepared. This HASP will identify existing and potential hazards for workers at the Site during drilling activities.
Deliverable:
• Health and Safety Plan
6.2.12b. PSI: Soil Vapor Sampling:
To evaluate the subsurface, the TYLin team, will conduct a total of 24 borings across the Site and collect soil and soil vapor samples.
The team will conduct seven borings along the railway at approximately 250 foot spacing to a depth of approximately two feet below ground surface (bgs), and eight borings along Foothill Boulevard at approximately 500 foot spacing to a depth of approximately one foot bgs using a hand auger. Following the collection of soil samples, the boring locations will be backfilled with hydrated bentonite.
The team will conduct nine small diameter borings across the Site using a rotary hammer drill, with seven borings along the railway and offset to the soil borings, and two borings at each adjoining property identified in the ISA as a potential VEC. The borings will be advanced to a depth of approximately five feet bgs in seven borings, and approximately 10 feet bgs in the two borings at 15559 Foothill Boulevard where an underground storage tank of unknown status is potentially present. A soil vapor probe will be set in each boring at
4/3/2023
Environmental & Design Services for Foothill Blvd - Hemlock Ave to Almeria Ave Street Improvements (Malaga Bridge) – Additional Scope of Services for Phase II Subsurface Investigation (PSI)
3 approximately five feet bgs. Probes will also be set at ten feet bgs in the two deeper borings.
Field measurements of volatile organic compounds (VOCs) will be collected from each vapor probe.
Following the collection of soil vapor samples, the tubing will be removed from each boring, and backfilled with hydrated bentonite and the surface will be finished to match the surrounding surface.
Fifteen soil samples collected from the six inch depth of each boring will be analyzed for lead by EPA Method 6010B. The six inch depth samples collected from the railway will also be analyzed for organochlorine pesticides (OCP) by EPA Method 8081. Seven soil samples collected from the two foot depth in each of the railway borings will be analyzed for VOCs by EPA Method 8260B, total petroleum hydrocarbons (TPH) full range by EPA Method 8015B and polynuclear aromatic hydrocarbons (PAHs) by EPA Method 8270C SIM.
Fifteen soil vapor samples and two replicate samples will be analyzed for VOCs by EPA Method TO-15. Four vapor samples from the 15559 Foothill Boulevard location will also be analyzed for TPH as gasoline (TPHg) by EPA Method TO-3.
The team will collect up to four paint chip samples from the bridge components. The samples will be analyzed for lead using Inductively Coupled Plasma (ICP) by NIOSH Method 7300.
6.2.12c. PSI: Data Evaluation and Reporting:
At the completion of on-Site activities and receipt of laboratory analysis, a draft report will be submitted to the City and Caltrans documenting the team’s methodologies and procedures, and laboratory analytical results. The draft report will provide a discussion of findings, conclusions, and recommendations, if necessary. Comments from City and Caltrans on the draft report will be addressed and incorporated in the final report and submitted for approval.
Deliverable:
• Draft and Final Phase II Investigation Report
6.2.12d. PSI: Additional Soil, Soil Vaper and Paint Chip Sampling (Contingency):
The TYLin team will collect additional soil, soil vapor, or paint chip samples as requested. The samples may be analyzed for VOCs, TPH, PAH, OCP, lead, or Title 22 Metals. For budgeting purposes the TYLin team assumes one additional day of soil sampling and the analysis of three soil samples, six soil vapor samples, and two paint chip samples.
Laboratory results will be received approximately five to seven business days
4/3/2023
Environmental & Design Services for Foothill Blvd - Hemlock Ave to Almeria Ave Street Improvements (Malaga Bridge) – Additional Scope of Services for Phase II Subsurface Investigation (PSI)
4 following submission of the samples to the laboratory. A report will be submitted upon completion of all on-Site activities and within five business days of receiving the final laboratory report.
6.5. PSI QA/QC: The TYLin team will perform a QA/QC on the PSI.
Additional Assumptions:
1. Access will be provided by the City and be acces sible at the time of the Site visit.
2. Laboratory rates are based on standard turnaroun d time of five to seven business day. An additional surcharge will be applied if lab oratory results are needed on a faster turnaround time.
3. It is assumed that the project’s environmental, right of way and design tasks will be completed by July 5, 2024, if the schedule extends beyond this date, compensation will be requested to cover for the additional project management efforts.
T.Y. LIN INTERNATIONAL
FOOTHILL BLVD STREET IMPROVEMENTS (MALAGA BRIDGE)
BUDGET WORKSHEET
Date: 4/3/23
Prime Consultant: TYLin
Project Title: Environmental & Design Services for Foothill Blvd - Hemlock Ave to Almeria Ave Street Improvements (Malaga Bridge) - Additonal Scope (PSI work) Project Number: 3010.0012554.001
Client Reference: SQ-04-DE-19
Estimated Labor Hours
Task/Subtask Description Activity
WBS or
Activity
Code
Chapman, Karen
PIC
Gonzalez,
Rodrigo
Project Manager
Faber, James
QA/QC Manager
Pan, Albert
Sr Transp Eng II
Lemke, Alicia
Enviro. Svcs.
Manager
Dawa, Bethany
Sr Transp Eng II
Lau, Ryan
Sr Transp Eng I
Kirilov, Tohomir
Sr Br Eng I
Gerami, Homayon
Transp Eng II
Kaya, Stephanie
Transp. Eng
Staff
Br Design Tech I
Staff
Design Tech I
Staff
Proj Accountant
Staff
Proj. Admin Hours
Raw Labor
Amount
1.0 PROJECT MANAGEMENT
1.1 Project Management / Progress Reports 8 8 2 2
20 $1,626
1.2 Coordination / Meetings 4 2 4 2 12 $1,014
1.3 Project Specific QA/QC Plan 0 $0
1.4 Request to obtian Federal Project Number (FPN) from Caltrans 0 $0 Coordination with Caltrans and City 0 $0
Cover letter to request federal project number from Caltrans 0 $0 Exhibit 7-B (Field Review Form) 0 $0
Project's Vicinity Map 0 $0
TASK SUBTOTAL: 0 12 0 2 12 0 0 0 0 4 0 0 2 0 0 32 $2,640
2.0 SURVEY
2.1 Utilities Identification 0 $0
2.2 Potholes 0 $0
2.3 Topographic Map 0 $0
2.4 Cross Sections 0 $0
2.5 Survey Control Plan 0 $0
2.6 QA/QC 0 $0
TASK SUBTOTAL: 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0
3.0 CONSTRUCTION PLAN PREP & COORD
3.1 Street Improvement Plans (Including GAD updates) 0 $0 Demolition Plans (2 sheets) 0 $0
Construction Details Plans (2 sheets) 0 $0
Staging/TH [Foothill/Beech Intersection] (1 sheet) 0 $0 Cross sections at 25' intervals 0 $0
Revisions based on Phase II Subsurface Investigation 8 4 40 40 92 $4,847
3.2 Storm Drain Improvement Plans 0 $0
3.3 Signing & Striping Plans 0 $0
3.4 Street Lighting Plans 0 $0
3.5 Landscape and Irrigation Plans 0 $0
3.6 Bridge Structural Plans/Foundation Report 0 $0
30% Submittal Package Assembly 0 $0
60% Submittal Package Assembly 0 $0
90% Submittal Package Assembly 0 $0
100% Submittal Package Assembly 0 $0
3.7 QA/QC 2 8 4 2 4 2 22 $1,943
TASK SUBTOTAL: 0 10 8 8 2 0 0 0 0 44 0 42 0 0 0 114 $6,790
4.0 CONSTRUCTION COST ESTIMATE & SPECS
4.1 Cost Estimate 1 2 2 2 7 $476
4.2 Specifications 1 2 2 2 7 $476
4.3 Structures Specifications 2 2 2 6 $341
4.4 QA/QC 1 4 2 2 2 2 13 $1,086
TASK SUBTOTAL: 0 3 4 6 0 0 0 4 0 8 2 6 0 0 0 33 $2,379
5.0 RIGHT OF WAY
5.1 Legal Description / Deed Plat 0 $0
5.2 Right-of-Way Requirement Map 0 $0
5.3 QA/QC 0 $0
TASK SUBTOTAL: 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0
6.0 ENVIRONMENTAL
6.1 Environmental Document 0 $0
6.1.1 0 $0
6.1.2 0 $0
6.1.3 0 $0
6.1.4 0 $0
6.1.5 0 $0
6.1.6 0 $0
6.2 Technical Studies 0 $0
Responses to Comments, Finalize IS/MND and CE/NOE
Preparation of Project Description
Prepare Preliminary Environmental Studies (PES) form
Prepare Draft Initial Study/Categorial Exclusion (IS/CE) Prepare Mitigated Negative Declaration/Notice of Exemption (MND/NOE) Disseminate Draft IS/MND and CE/NOE
Fontana Foothill-Malaga-add PSI_ Fee TYLI_DRAFT 4-3-23.xlsx Printed: 4/5/2023 T.Y. LIN INTERNATIONAL
FOOTHILL BLVD STREET IMPROVEMENTS (MALAGA BRIDGE)
BUDGET WORKSHEET
6.2.1 Air Quality/Greenhouse Gases Emissions Assessment 0 $0
6.2.2 Biological Resources Assessment 0 $0
6.2.3a Cultural Resources Study: Identification of Historic Properities 0 $0
6.2.3b Cultural Resources Study: Project Effect Assessment and Mitigation 0 $0
6.2.4 Section 4(f) de minimis determination 0 $0
6.2.5 Noise Impact Assessment 0 $0
6.2.6 Traffic/Circulation Impact Assessment 0 $0
6.2.7 Phase I Environmental Site Assessment (ISA) 0 $0
6.2.8 Visual Impact Memorandum 0 $0
6.2.9 Relocation Impact Memorandum 0 $0
6.2.10 Community Impact Assessment Technical Memorandum 0 $0
6.2.11 Water Quality Assessment Memorandum 0 $0
6.2.12a Phase II Subsurface Investigation (PSI): Health and Safety Plan 1 1 4 2 8 $603
6.2.12b PSI: Soil and Soil Vapor Sampling 1 2 3 $256
6.2.12c PSI: Data Evaluation and Reporting 1 2 3 $256
6.2.12d PSI: Additional Soil, Soil Vapor and Paint Chip Sampling (Contingency) 1 2 3 $256
6.3 WQMP/NPDS 0 $0
6.4 QA/QC (WQMP) 0 $0
6.5 QA/QC (PSI) 1 4 8 1 14 $1,218
0 $0
TASK SUBTOTAL: 0 5 4 1 18 0 0 0 0 3 0 0 0 0 0 31 $2,590
7.0 COMPOSITE UTILITY PLAN & UTILITY COORD
7.1 Composite Utility Plan Oversight/Support 0 $0
7.2 Utility Coordination and Meetings (assume 5) 0 $0
7.3 QA/QC 0 $0
TASK SUBTOTAL: 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0
8.0 PUBLIC OUTREACH
8.1 Community Outreach Action Plan/Summary Report 0 $0
8.2 Community Outreach Coordination 0 $0
8.3 Open House Community Meetings (2) (includes 3-D rendering of bridge) 0 $0
8.4 Council Meetings (2) 0 $0
TASK SUBTOTAL: 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0
9.0 ADVERTISEMENT/CONSTRUCTION SUPPORT
9.1 Review Drawings & Submittals 0 $0
9.2 Review RFIs 0 $0
9.3 Review Construction Design Changes 0 $0
TASK SUBTOTAL: 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0
10.0 RECORD DRAWINGS
10.1 Record Drawings 0 $0
TASK SUBTOTAL: 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0
Total Hours: 0 30 16 17 32 0 0 4 0 59 2 48 2 0 0 210 $14,399 Raw Labor Rate: $101.23 $105.62 $115.00 $94.65 $75.28 $74.53 $60.03 $75.00 $50.50 $50.58 $45.00 $40.00 $39.00 $20.00 $0.00 210 $14,399 Raw Labor Subtotal: $0.00 $3,168.66 $1,840.00 $1,609.05 $2,408.96 $0.00 $0.00 $300.00 $0.00 $2,984.22 $90.00 $1,920.00 $78.00 $0.00 $0.00 Annual Escalation Rate: 4.0%
SUBCONSULTANT/VENDOR SERVICES Amount % DBE? Contract Duration (Years): 2.50 Arellano Associates (Public Outreach) $0 0.0% y RAW LABOR: $14,835 See note 1 Earth Mechanics, Inc. (Geotechnical) $0 0.0% y
Epic Land Solutions, Inc. (Right of Way) $0 0.0% n Audited Overhead Rate: 150.75% OVERHEAD: $22,364 Guida Surveying (Surveying) $0 0.0% n RAW LABOR + OVERHEAD: $37,199 LIN Consulting, Inc. (Electrical) $0 0.0% y Profit (Fee) Percentage: 10.0% FIXED FEE: $3,720 PacRim Engineering, Inc. (Drainage, PE Trail) $0 0.0% y SUBCONSULTANT/VENDOR SERVICES: $31,437 Iteris (Traffic Analysis) $0 0.0% n OTHER DIRECT COSTS Quantity Unit Price Amount OTHER DIRECT COSTS: $0 Ultrasystems (Environmental) $31,437 43.4% y Printing & Repro 11x17 Copies $0.10 $0 BASE BUDGET: $72,357 Yunsoo Kim Design, Inc. (Landscape Architecture) $0 0.0% y Printing & Repro 8.5x11 Copies $0.05 $0 ADDITIONAL SERVICES BUDGET:
Mileage Miles $0.60 $0 TOTAL BUDGET: $72,357
Shipping & Delivery Each $49.00 $0
Miscellaneous (Potholing - 8) each $3,000.00 $0
$0
TYLI $40,919
Subtotal - SUBCONSULTANT SERVICES: $31,437 43.4% $0
$0
DBE Participation: $31,437 43.4% $0
$0
Prime Consultant Markup $0 0.0% OTHER DIRECT COSTS: $0
TYLI $0
Boudreau Pipeline $0
Notes:
1. Escalated Fee assumed to midpoint of contract duration, with no escalation for the first year.
Fontana Foothill-Malaga-add PSI_ Fee TYLI_DRAFT 4-3-23.xlsx Printed: 4/5/2023 T.Y. LIN INTERNATIONAL
PROJECT TITLE
BUDGET WORKSHEET
Contract No. XXXXXXX
Date: 4/3/23
Consultant Firm: UltraSystems Environmental
Project Title: Environmental & Design Services for Foothill Blvd - Hemlock Ave to Almeria Ave Street Improvements (Malaga Bridge) - Additonal Scope (PSI work) Project Number: 3010.0012554.001
Client Reference: SQ-04-DE-19
Estimated Labor Hours
Task/Subtask Description Activity
WBS or
Activity
Code
Lindsay, Betsy
Project Director
Gupta, Hina
Sr. Project
Manager
Rogozen, Mike
Sr. Principal
Engineer
Lindsay, Mike
Scientist/Eng.
Partridge,
Margaret
Deputy Project
Manager
Reicher, Robert
Senior Planner
Fell, Paula
Senior Planner
Verlaan, Robert
Senior Planner
Makini, Emily
Associate
Planner
Tollett, Michelle
Sr. Biologist II
Carver, Allison
Sr. Biologist I
O'Neil, Steve
Cultural Specialist
Black, Megan
Archaeologist
Rouhi, Mina
Sr. GIS Mgr.
Jackson, Gwen
Wordprocessor Hours
Raw Labor
Amount
6.0 ENVIRONMENTAL
6.1 Environmental Document
6.1.1 1 4 1 6 $260
6.1.2 0 $0
6.1.3 0 $0
6.1.4 0 $0
6.1.5 0 $0
6.1.6 0 $0
6.2 Technical Studies 0 $0
6.2.1 Air Quality/Greenhouse Gases Emissions Assessment 0 $0
6.2.2 Biological Resources Assessment 0 $0
6.2.3a Cultural Resources Study: Identification of Historic Properities 0 $0
6.2.3b Cultural Resources Study: Project Effect Assessment and Mitigation 0 $0
6.2.4 Section 4(f) de minimis determination 0 $0
6.2.5 Noise Impact Assessment 0 $0
6.2.6 Traffic/Circulation Impact Assessment 0 $0
6.2.7 Phase I Environmental Site Assessment (ISA) 0 $0
6.2.8 Visual Impact Memorandum 0 $0
6.2.9 Relocation Impact Memorandum 0 $0
6.2.10 Community Impact Assessment Technical Memorandum 0 $0
6.2.11 Water Quality Assessment Memorandum 0 $0
6.2.12a Phase II Subsurface Investigation (PSI): Health and Safety Plan 1 2 3 $133
6.2.12b PSI: Soil and Soil Vapor Sampling 1 8 9 $349
6.2.12c PSI: Data Evaluation and Reporting (Draft and final) 1 4 8 13 $604
6.2.12d PSI: Additional Soil, Soil Vapor and Paint Chip Sampling (Contingency) 2 6 4 12 $549
6.5 QA/QC (PSI) 0 $0
TASK SUBTOTAL: 5 23 15 0 0 0 0 0 0 0 0 0 0 0 0 43 $1,894 Total Hours: 5 23 15 0 0 0 0 0 0 0 0 0 0 0 0 43 $1,894
Raw Labor Rate: $72.12 $34.62 $49.14 $48.08 $36.35 $45.00 $45.00 $40.00 $18.00 $40.87 $35.00 $28.11 $20.00 $38.46 $21.00 43 $1,894 Labor Subtotal: $361 $796 $737 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Annual Escalation Rate: 4.0%
2nd TIER SUBCONSULTANT/VENDOR SERVICES Amount % DBE? Contract Duration (Years): 2.50 Sub a Citadel - PSI (Phase II Subsurface Investigation) $26,183 N RAW LABOR: $1,951 Sub b N
Sub c N OVERHEAD: $2,825
Sub d N RAW LABOR + OVERHEAD: $4,777
Sub e N FIXED FEE: $478
Sub f N SUBCONSULTANT/VENDOR SERVICES: $26,183
Sub g N OTHER DIRECT COSTS Quant Unit Price Amount OTHER DIRECT COSTS: $0 Sub h N Printing & Repro 11x17 Copies $0 BASE BUDGET: $31,437 Sub i N Printing & Repro 8.5x11 Report $100.00 $0 ADDITIONAL SERVICES BUDGET:
Mileage Miles $0.58 $0 TOTAL BUDGET: $31,437
Shipping & Delivery Each $45.00 $0
Certified Mailing Each $4.00 $0
CDs Each $15.00 $0
Each $800.00 $0
Translation cost for notices (spanish) Each $500.00 $0
County clerks for the NOI, NOD Each $100.00 $0
Subtotal - SUBCONSULTANT SERVICES: $26,183 83.3% CDFW filing fees Each $2,355.00 $0 CHRIS Center - Arch Each $295.00 $0
DBE Participation: $0 0.0% CIA, population run Each $800.00 $0 Scoping - graphics Each $500.00 $0
Notes: OTHER DIRECT COSTS: $0
1. Escalated Fee assumed to midpoint of contract duration, with no escalation for the first year.
Newspapaer ads for notice (spanish)
Project Kick-off Meeting, Project Meeting, Project Management, Coordination, and Preparation of Project Description
Prepare Preliminary Environmental Studies
Prepare Draft Initial Study/Categorial Exclusion (IS/CE) Prepare Mitigated Negative Declaration/Notice of Exemption (MND/NOE) Disseminate Draft IS/MND and CE/NOE
Responses to Comments, Finalize IS/MND and CE/NOE