showing the school district boundaries (for all districts in the City) shall be displayed. The General Plan information and school district boundaries may be included on the same map. The maps shall be clearly and prominently displayed and be visible to all persons entering the sales office.

22. The applicant and/or property owner shall file a petition with the Fontana City Council requesting police enforcement of the California Vehicle Code and the Fontana Municipal Code on the private streets of the development while the development is under a single ownership, or prior to Certificate of Occupancy of any dwelling unit.

23. The development shall maintain an active Homeowner’s Association (HOA) at all times. The City shall be a third party to the HOA. in the event the development cannot maintain said HOA. The HOA. Board shall meet in the recreation/club room located within the development. A property management company is strongly recommended to manage the site appropriately.

24. Install and maintain the Fontana Police Department’s R.E.A.C.T. electronic gate system (in addition to the County’s Knox Box system).

25. If a digital video surveillance system is available at the premise, it is recommended to be an internet-based system and shall be maintained in proper working order at all times. The surveillance video/visual media shall be maintained for a minimum of sixty (60) days and upon request, shall be accessible to law enforcement personnel for viewing, copying and collection purposes during regular business hours.

26. A locator map or directory should be posted at the site entrances. The directory should be located on the site so as to be easily and quickly identified and free from visual obstruction. The directory should be illuminated from dusk until dawn.

The directory should have vandal resistant glazing to minimize criminal damage and the structure should be weather resistant.

27. Community address numbers and complex numbers should be visible. Building and unit numbers should be posted and visible. Address specifications are meant to ensure identification and location of buildings. Proper posting and maintenance minimizes confusion as to location and expedites public safety response.

28. Adhere to the city light standard of one foot candle minimum of light for all entrances, exits, pedestrian walkways, parking lots and activity areas. Reflect all light fixtures on the site plan. The type of illumination shall be either florescent, metal halide or white L.E.D.’s., and the luminaries shall be vandal resistant. All luminaries shall remain lit from dusk until dawn. Provide a photometric layout under separate exhibit to ensure the minimum light standard is met.

29. A Register of Professional Archaeologists (RPA)-qualified archeologist experienced with Native American artifact identification and approved by the City of Fontana shall be present to monitor the first two (2) days of site preparation/ grubbing; the first two (2) days of mass grading; and the first two (2) days of utility 164
Resolution PC No. 2023-____

Page 33 of 42 ends

trenching. Such monitoring activities may be reduced or terminated depending on the findings and recommendations of the archeologist. In the event that prehistoric or historic cultural resources be uncovered during these activities, representatives of the tribal entity(s) whom consider the project site to be within their traditional use area shall be contacted and invited to the site to review the find, and monitoring shall be continued at the discretion of archeologist.

30. Historic Archaeological Resources
A. Upon discovery of any tribal cultural or archaeological resources, cease construction activities in the immediate vicinity of the find until the find can be assessed. All tribal cultural and archaeological resources unearthed by project construction activities shall be evaluated by the qualified archaeologist and tribal monitor/consultant. If the resources are Native American in origin, interested Tribes (as a result of correspondence with area Tribes) shall coordinate with the landowner regarding treatment and curation of these resources. Typically, the Tribe will request preservation in place or recovery for educational purposes.

Work may continue on other parts of the project while evaluation takes place.

B. Preservation in place shall be the preferred manner of treatment. If preservation in place is not feasible, treatment may include implementation of archaeological data recovery excavation to remove the resource along the subsequent laboratory processing and analysis. All Tribal Cultural Resources shall be returned to the Tribe. Any historic archaeological material that is not Native American in origin shall be curated at a public, non-profit institution with a research interest in the materials, if such an institution agrees to accept the material. If no institution accepts the archaeological material, they shall be offered to the Tribe or a local school or historical society in the area for educational purposes.

C. Archaeological and Native American monitoring and excavation during construction projects shall be consistent with current professional standards. All feasible care to avoid any unnecessary disturbance, physical modification, or separation of human remains and associated funerary objects shall be taken. Principal personnel shall meet the Secretary of the Interior standards for archaeology and have a minimum of 10 years’ experience as a principal investigator working with Native American archaeological sites in southern California. The Qualified Archaeologist shall ensure that all other personnel are appropriately trained and qualified.

31. The construction contractor shall use the following source controls at all times:
165
Resolution PC No. 2023-____

Page 34 of 42 ends

a. Construction shall be limited to 7:00 am to 6:00 pm on weekday, 8:00 am to 5:00 pm on Saturdays, and no construction on Sundays and holidays unless it is approved by the Building Inspector for cases that are considered urgently necessary as defined in Section No. 18-63(7) of the Municipal Code. For all noise-producing equipment, use types and models that have the lowest horsepower and the lowest noise generating potential practical for their intended use.
b. The construction contractor will ensure that all construction equipment, fixed or mobile, is properly operating (tuned-up) and lubricated, and that mufflers are working adequately.
c. Have only necessary equipment onsite.
d. Use manually-adjustable or ambient-sensitive backup alarms. When working adjacent to residential use(s), the construction contractor will also use the following path controls, except where not physically feasible, when necessary:
e. Install portable noise barriers, including solid structures and noise blankets, between the active noise sources and the nearest noise receivers. f. Temporarily enclose localized and stationary noise sources. g. Store and maintain equipment, building materials, and waste materials as far as practical from as many sensitive receivers as practical.

32. There shall be five (5) feet of landscaping and two (2) feet of decorative concrete for passengers to step out of vehicles, total of seven (7) feet, at the end of automobile parking aisles.

33. Color combinations and color schemes for buildings approved under a design review application shall not be modified or changed without prior approval of the original approving body by a revision to the original application. Minor hue color changes may be approved by the Director of Planning. The Director of Planning may refer minor hue color changes to the original approving body for consideration under a revision to the original application.

34. Exterior lighting compatible with the design of the building shall be provided for the parking lot. The lighting shall be directed and shielded so as to illuminate only the parking area and to avoid glare impacts on adjacent properties.

35. Sidewalks shall be provided for all new developments in accordance with the city’s circulation element of the General Plan.

36. All roof-mounted equipment and ground mounted equipment shall be screened from view from adjacent properties and streets to the satisfaction of the Director of Planning.

37. All landscaping shall be healthy and maintained in a reasonable manner as determined by the Director of Planning or his/her designee. 166
Resolution PC No. 2023-____

Page 35 of 42 ends

38. Any transformer visible from the public right-of-way shall be screened by a solid screen wall and mature, dense landscaping.

39. After the fifteen (15) day appeal period, the applicant shall remove the notice of Filing sign(s) from the project site. The applicant may request a refund of the sign deposit; the request shall be in writing accompanied with a refund application.

The request shall be submitted to the Planning Department.

40. In the event that any off-site utility and/or infrastructure improvements are required as a direct result of future projects, construction of such off-site utility and infrastructure improvements shall not occur concurrently with the demolition, site preparation, and grading phases of project construction. This requirement shall be clearly noted on all applicable grading and/or building plans.

41. Adhere to the City standard of one foot candle minimum for all entrances, exits, pedestrian paths, parking lots, and activity areas. Reflect all light fixtures on the site plan. All areas shall be illuminated during all hours of darkness and all luminaries utilized shall be vandal-resistant fixtures. The type of lighting shall be fluorescent, white L.E.D.s or metal halide. Provide a photometric layout under separate exhibit to ensure the minimum light standard is met.

42. Incorporate an anti-graffiti coating onto the exterior of all proposed block walls to discourage graffiti.

43. If possible incorporate hostile landscape into the exterior, perimeter landscape setback areas to discourage subjects from accessing the site.

PRIOR TO ISSUANCE OF GRADING PERMIT

44. All Conditions of Approval and Mitigation, Monitoring, and Reporting Program (MMRP) contained herein shall be incorporated into all applicable final construction plans and a copy of these conditions shall be placed on a sheet in the final building and grading plans prior to issuance of any building or grading permits.

PRIOR TO ISSUANCE OF CERTIFICATE OF OCCUPANCY

45. Prior to issuance of a Certificate of Occupancy, the applicant shall underground all utilities, which for the purpose of this condition shall include all boxes, structures and/or other equipment located in the public rights-of-way, any public utility easement(s), and on any private property, to the satisfaction of the Director of Planning.

46. Development fees and Planning Department final inspection fee must be paid prior to Certificate of Occupancy.
167
Resolution PC No. 2023-____

Page 36 of 42 ends

ENGINEERING LAND DEVELOPMENT:

47. The Project shall be served by the City’s sanitary sewer system, all sewer facilities shall be constructed in accordance with the City Standards. Main trunk sewer line shall be in accordance with master sanitary sewer plan or as approved by the City Engineer.

48. The Applicant shall obtain design and plan approval from all utility providers having jurisdiction over the on-site and off-site utilities. Completion of all undergrounding of on-site and off-site utilities is required by Section 27-52 of the City Municipal Code and in accordance with plans and specifications approved by the City Engineer.

49. The applicant shall maintain all improvements and utilities within the public rightof-way, including street sweeping, prior to issuance of final certificate of occupancy by the City.

PRIOR TO ISSUANCE OF GRADING PERMIT

50. Applicant shall submit and gain approval of a complete Water Quality Management Plan report in accordance with the County of San Bernardino Technical Guidance Document and latest template.

51. The Applicant shall submit and gain approval of a final drainage study prepared in accordance with the County of San Bernardino Hydrology Manual and Fontana Master Storm Drainage Plan.

PRIOR TO MAP RECORDATION

52. Applicant shall provide a Subdivision Improvement Agreement, with accompanying security. The agreement shall be executed on City-provided forms.

53. Applicant shall record Community Facility District (CFD) map as required for the development.

PRIOR TO ISSUANCE OF CONSTRUCTION PERMITS

54. The Applicant shall record all maps as required for the development.

55. Applicant shall submit engineered improvement plans and obtain full approval. All required public improvements, including but not limited to streets, storm drainage systems, sewers, traffic signals, streetlights, striping, signs, landscape, and any required traffic control and/or detour plans. All plans shall conform to City Standards and Specifications, and as approved by the City Engineer. 168
Resolution PC No. 2023-____

Page 37 of 42 ends

PRIOR TO ISSUANCE OF FIRST BUILDING PERMIT

56. The Applicant/Engineer of Record shall submit a conforming copy of the recorded Memorandum of Agreement for the Water Quality Management Plan and Storm Water Best Management Practices transfer that reflects the constructed condition. The Access, Maintenance, and the WQMP Certification for BMP Completion must be submitted to the City Project Engineer.

PRIOR TO ISSUANCE OF FINAL CERTIFICATE OF OCCUPANCY

57. Applicant/Design Engineer to provide the City of Fontana with As-Built/Record Drawings for all public improvement plans.

58. The Applicant/Engineer shall provide centerline ties to the City of Fontana reflecting proper setting of all survey monuments within the project limits and replace any existing survey monuments damaged or removed during construction.

59. The Applicant/Engineer shall set survey monuments as required by the map and corner records must be recorded with the County.

60. Applicant/Landscape Architect shall provide a “Landscape Certificate of Compliance” certifying that the work has been designed, installed, and will be maintained in accordance with the City of Fontana’s Model Water Efficiency Landscape Ordinance (Ordinance 1743, FCC Section 28).

61. All sewers shall be video inspected by applicant/contractor. Sewer video shall include clean-out connection, clean-out to lateral segment, lateral, and main line.

Contractor performing the video inspection must have a NASSCO PACP, LACP, and MACP certification. Applicant shall provide a copy of the video on DVD or flash drive to inspection staff with an accompanying full report. Videos to be inspected and approved by City Inspector. If removal and replacement of any utility is required, a subsequent video of the repair will be required.

62. All storm drains shall be video inspected by applicant/contractor. Storm drain video shall include main lines and laterals. Applicant shall provide a copy of the video on DVD or flash drive to inspection staff. Videos to be inspected and approved by City Inspector. If removal and replacement of any utility is required, a subsequent video of the repair will be required.

BURRTEC WASTE & RECYCLING SERVICES

63. Prior to the issuance of building permits, the developer shall meet with Burrtec to coordinate and develop a Waste Collection Service Plan satisfactory to Burrtec. 169
Resolution PC No. 2023-____

Page 38 of 42 ends

The Service Plan shall be subject to review and approval by Burrtec and the City.

BUILDING & SAFETY DIVISION:

64. Shall comply with the latest adopted edition of the following codes as applicable:

I. California Building Code
J. California Residential Code
K. California Electrical Code
L. California Mechanical Code
M. California Plumbing Code
N. California Energy Code
O. California Fire Code
P. California Green Building Standards Code

65. The applicant shall install an automatic fire suppression systems shall be installed in all new construction per Article II, Chapter 11 of the Code of the City of Fontana.

Design and type of system shall be based upon the requirements of the Building Code, Fire Code and the requirements of the Fontana Fire Prevention District.

66. The requirements of the Department of Environmental Health Services and the South Coast Air Quality Management District shall be satisfied prior to the issuance of any permit if hazardous materials are stored and/or used.

67. The applicant shall verify that any temporary building, trailer, commercial coach, etc. installed and/or used in connection with a construction project complies with FMC Chapter 5 Article XIV

68. The applicant shall verify all perimeter/boundary walls shall be designed and constructed so that the outer/exterior face of the wall is as close as possible to the lot line. In any case, the outer/exterior face of the wall shall be within two (2) inches of the lot line. Distances greater than two (2) inches may be approved prior to construction by the Building Official on a case by case basis for extenuating circumstances.

69. All lot lines, easement lines, etc. shall be located and/or relocated in such a manner as to not cause any existing structure to become non-conforming with the requirements of the latest adopted edition of the Building Code, or any other applicable law, ordinance, or code.

70. The Tentative Tract or Parcel map shall record prior to the issuance of any permits.

71. The applicant shall comply with the grading requirements:

A. Grading plans shall be submitted to, and approved by Building & Safety. The grading plans shall indicate all site improvements, and shall indicate complete drainage paths of all drainage water run-offs.

B. All drainage water shall drain via approved methods, to an approved location – public street, public drainage system, etc.
170
Resolution PC No. 2023-____

Page 39 of 42 ends

C. Drainage water shall not cross over a public sidewalk. Drainage water may however cross under a sidewalk if an approved drainage structure is used.

D. A recorded drainage acceptance agreement is required from adjoining property(s) receiving flows from this property.

E. No water course or natural drainage shall be obstructed.

F. Minimum slope or grade for ALL drainage structures shall be one half (0.50) percent for concrete and one (1.0) percent for all other, or as otherwise approved by the Building Official.

G. Drainage water shall not pass from an ‘improved’ type of drainage structure to an ‘unimproved’ type of drainage structure (e.g., concrete swale to slag or dirt swale) unless otherwise approved by the Building Official.

H. A complete hydrology study using the latest edition of the San Bernardino County Flood Control Hydrology Manual, and complete hydraulic calculations justifying the size, slope, capacity, etc. of any and all drainage structures being utilized, shall be submitted to, and approved by Building & Safety.

The on-site drainage system shall, as a minimum, be designed to handle the run-off generated by a ten (10) year storm. Check for flooding of all on-site structures (buildings) and all adjacent properties during a hundred (100) year storm.

I. The grading plans shall, as a minimum, contain sections at all lot lines and/or permit boundary lines. These sections shall clearly indicate:

1. The relationship between the proposed finished on-site grade elevations and the existing adjacent property grade elevations (Indicate any additional drainage water that may come from an adjacent property.); and

2. The ground cover/finished surface material being proposed (e.g., type of pavement, plant material, etc.); and

3. All proposed drainage structures; and

4. Any proposed and/or required walls or fencing.

72. All signs shall be Underwriters Laboratories approved (or equal).

73. Permits are required prior to the removal and/or demolition of structures.

74. All exterior lighting shall be oriented, directed, and/or shielded as much as possible so that direct illumination does not infringe onto adjoining properties.

75. The project site is located in a VHFSZ and the project will need to comply with all fire zone requirements.
171
Resolution PC No. 2023-____

Page 40 of 42 ends

PRIOR TO ISSUANCE OF BUILDING/CONSTRUCTION PERMITS

76. The following items shall be completed and/or submitted to Building & Safety – as applicable – prior to the issuance of building permits for this project:

C. Precise grading plans shall be approved
D. Rough grading completed
E. Compaction certification
E. Pad elevation certification
F. Rough grade inspection signed off by a City Building Inspector FIRE PROTECTION DISTRICT:

77. Jurisdiction. The above referenced project is under the jurisdiction of the Fontana fire Protection District (herein “Fire Department”). Prior to any construction occurring on any parcel, the applicant shall contact the Fire Department for verification of current fire protection requirements. All new construction shall comply with the current California Fire Code requirements and all applicable statutes, codes, ordinances, and standards of the Fire Department.

78. Fire Access Road Width. Prior to map recordation, all fire access roadways shall be designed to meet the requirements for this development and shall be approved by the Fire Department. All buildings shall have access provided by approved roads, alleys, and private drives with a minimum twenty-six (26) foot unobstructed width and vertically to fourteen (14) feet six (6) inches in height. Buildings three (3) stories in height or more shall have a minimum access of thirty (30) feet unobstructed width and vertically to fourteen (14) feet six (6) inches in height.

California Fire Code Chapter 5 & SBCoFD Standard A-1.

79. Turnaround. An approved turnaround shall be provided at the end of each roadway one hundred and fifty (150) feet or more in length. Cul-de-sac length shall not exceed six hundred (600) feet; all roadways shall not exceed a 12 % grade and have a minimum of nineteen (19) foot inside radius and a forty-five (45) foot outside radius for all turns. California Fire Code Chapter 5 & SBCoFD Standard A-1.

80. Street Signs. Approved temporary or permanent street signs shall be installed throughout the project prior any combustible materials being placed on the construction site. California Fire Code Chapter 5 & SBCoFD Standard A-2.

81. Fire Lanes. The applicant shall submit a site plan to the Fire Department for review and approval of all proposed signage and striping for all fire access roadways. All curbs adjacent to fire lanes shall be painted red and “No Parking, Fire Lane” signs shall be installed on public and private roads in accordance with approved standards. SBCoFD Standard A-2.
172
Resolution PC No. 2023-____

Page 41 of 42 ends

82. Water System Residential. Prior to map recordation or lot line adjustment, all water supply systems shall be designed to meet the required fire flow for this development and shall be approved by the Fire Department. The required fire flow shall be determined by using Appendix B of the California Fire Code. A minimum of one new six (6) inch fire hydrant assembly with two (2) two and one half (2 1/2) inch and one (1) four (4) inch outlet (4”x2.5”x2.5”) shall be provided.

All fire hydrants shall be spaced no more than six hundred (600) feet apart as measured along vehicular travel-ways. California Fire Code Chapter 5 & SBCoFD Standard W-2.

The Fire Flow for this project shall be: 1,500 GPM for a one (1) hour duration at 20 psi residual operating pressure. Fire Flow is based on a 2,307 Square Foot structure.

83. Hydrant Marking. Blue reflective pavement markers indicating fire hydrant locations shall be installed as specified by the Fire Department. SBCoFD Standard W-2.

84. Water System Certification. The applicant shall provide the Fire Department with a letter from the serving water company, certifying that the required water improvements have been made or that the existing fire hydrants and water system will meet distance and fire flow requirements. Fire flow water supply shall be in place prior to placing combustible materials on the jobsite. California Fire Code Chapter 5.

85. Combustible Protection. Prior to combustibles being placed on the project site an approved paved roadway providing fire access and fire hydrants providing an acceptable fire flow shall be installed. California Fire Code Chapter 5.

86. Combustible Native Vegetation. Combustible native vegetation shall be removed as follows: Where the average slope of the site is less than 15%, combustible vegetation shall be removed a minimum distance of thirty (30) feet from all structures or to the property line, whichever is less. Where the average slope of the site is 15% or greater, combustible vegetation shall be removed a minimum one hundred (100) feet from all structures or to the property line, whichever is less. California Fire Code Chapter 49.

87. Fuel Modification Zones. A Fire Protection Plan has been designed specifically for the subject project and approved by the Fire Department. All requirements of the Plan shall be adhered to, and any landscaping or construction within these areas shall be submitted to the Fire Department for review and approval in compliance with appropriate standards. California Fire Code Chapter 49.

88. Fire Sprinkler-NFPA #13D. An automatic life safety fire sprinkler system complying with NFPA 13D and Fire Department standards is required. A fire sprinkler contractor shall submit three (3) sets of detailed plans with hydraulic calculations and manufacturer specification sheets to the Fire Department for approval. The required fees shall be paid at the time of plan submittal. California Fire Code Chapter 9 & SBCoFD Standard F-2.
173
Resolution PC No. 2023-____

Page 42 of 42 ends

89. Residential Addressing. The street address shall be installed on the building with numbers that are a minimum of four (4) inches in height and with a one half (½) inch stroke. The address shall be visible from the street. During the hours of darkness, the numbers shall be internally and electrically illuminated with a low voltage power source. Numbers shall contrast with their background and be legible from the street. Where the building is fifty (50) feet or more from the roadway, additional contrasting four (4) inch numbers shall be displayed at the property access entrances. California Fire Code Chapter 5 & SBCoFD Standard B-1

90. Key Box. An approved Fire Department key box is required. The key box shall be provided with a tamper switch and shall be monitored by a Fire Department approved central monitoring service. California Fire Code Chapter 5 & SBCoFD Standard A-4

91. Security Gates. In commercial, industrial, and multi-family complexes, all swing gates shall have an approved fire department Knox Lock. Where an automatic electric security gate is used, an approved Fire Department override switch is required. California Fire Code Chapter 5 & SBCoFD Standard A-3

92. Secondary Access. The development shall have a minimum of two (2) points of vehicular access during each phase of construction for fire and emergency access purposes and for evacuation routes. SBCoFD Standard A-11

93. Spark Arrestor. An approved spark arrestor is required. Every chimney that is used in conjunction with any fireplace or any heating appliance in which solid or liquid fuel are used, shall have an approved spark arrestor visible from the ground that is maintained in conformance with Fire Department requirements. California Fire Code Chapter 6.

MANAGEMENT SERVICES:

94. To eliminate the negative fiscal impact on municipal services associated with this proposal, the project will be required to annex into an existing community facilities district (CFD) or form a new community facilities district (CFD) for the purpose of financing the costs of maintenance and operation of the public street lighting, landscaping, the water quality basin, parkways and the removal of or cover of graffiti within the boundaries of, or along the perimeter of the district. The district’s annual levy will include an amount for the maintenance of city parks. The city will determine which is more appropriate for the project, establishing a new district or annexing into an existing district. The district formation or annexation must be completed prior to the issuance of building permits.

END OF CONDITIONS OF APPROVAL
174
ATTACHMENT NO. 9

NOTICE OF DETERMINATION
TO: X County Clerk, County of FROM: City of Fontana
San Bernardino Planning Department
8353 Sierra Avenue
___ Office of Planning and Research Fontana, CA 92335
SUBJECT: Filing of Notice of Determination in Compliance with Section 21152 of the Public Resources Code.

Project Title: Master Case No. 22-084: General Plan Amendment No. 22-008, Specific Plan Amendment No. 22-004, Tentative Parcel Map No. 20565 (TPM No. 22-018), Tentative Tract Map No. 20568 (TTM No. 22-007), Administrative Site Plan No. 23-014, and Design Review No. 22-043 – The Height at Southridge Project
State Clearinghouse Number: SCH No. 81052210
Name of Person or Agency carrying out project: Salvador Quintanilla – Senior Planner. City of Fontana (Lead Agency) 8353 Sierra Avenue, Fontana, CA 92335.

Project Location: The project site is located on the south side of Village Drive and east of Live Oak Avenue (APNs: 0237-411-13, -14, and -27, 0237-201-27, 0237-441-01 through -19) Project Description: A request for the site and architectural review for the development of 255 condominium units (147 detached Cluster Homes units and 108 detached Stub Drive units), with various amenities and park within a 37.3 acre site (54-acres overall project area). An Addendum to the Southridge Village Specific Plan Environmental Impact Report has been prepared for this proposed project.

Project Proponent & Address: NH Southridge LLC, 500 Newport Beach, CA 92660 Contact Name & Phone: Ian Harvey – (949) 344-2703
This is to certify that the City of Fontana approved the above described project on June 20, 2023 and made the following determinations:

1. The project ____ will X will not have a significant effect on the environment.

2. An Addendum to the previous certified Environmental Impact Report (EIR) was previously prepared and approved and fully analyzed the effects of the project. The previous certified EIR thoroughly analyzed and discussed all potential environmental impacts. None of the conditions described in Section 15162 of the State CEQA Guidelines calling for the preparation of a subsequent EIR addendum or MND have occurred.

Additionally, this action does not include any additional impacts beyond those impacts already disclosed in the previous certified EIR and no further environmental review is required.

3. Mitigation measures X were were not made a condition of the approval of the project.

4. A Statement of Overriding Considerations __ was X was not adopted for this project.

5. Findings X were were not made pursuant to the provisions of CEQA.

6. The location and custodian of the documents which comprise the record of proceedings for the Addendum are specified as follows:

Custodian: City of Fontana, Planning Department
Location: 8353 Sierra Avenue, Fontana, CA 92335
175
ATTACHMENT NO. 9
______________________________
DiTanyon Johnson
Principal Planner
Date Received for Filing
176
ATTACHMENT NO. 10

NOTICE OF PUBLIC HEARING
SI DESEA INFORMACION EN ESPAÑOL REFERENTE A ESTA NOTIFICACION O PROYECTO, FAVOR DE COMUNICARSE AL (909) 350-6728.

In compliance with Section 202 of the Americans with Disabilities Act of 1990 (42 U.S.C. Sec. 12132) and the federal rules and regulations adopted in implementation thereof, the Agenda will be made available in appropriate alternative formats to persons with a disability. Should you need special assistance to participate in this meeting, please contact the City Clerk’s Department by calling (909) 350-7602. Notification 48 hours prior to the meeting will enable the City to make reasonable arrangements to ensure accessibility to this meeting.

A PUBLIC HEARING HAS BEEN SCHEDULED BEFORE THE PLANNING COMMISSION OF THE CITY OF FONTANA FOR THE FOLLOWING:

Master Case (MCN) No. 22-084 – General Plan Amendment No. 22-008, Specific Plan Amendment No. 22- 004, Tentative Parcel Map No. 20565 (TPM No. 22-018), Tentative Tract Map No. 20569 (TTM No. 22-007), Design Review No. 22-043, and Administrative Site Plan No. 23-014: Amend the General Plan Land Use Designation for various parcels within the project area. The land use designation amendments are from Recreational Facilities (P-R) to Medium Residential (R-M), Open Space (OS) to Medium Density Residential (RM), OS to General Commercial (C-G), C-G to Public Facilities (P-PF), and OS to Residential Planned Community (R-PC). Specific Plan Amendment to the Southridge Village Specific Plan which will amend Planning Area 56 and 66 from Bird Farm and Quarry to Medium Density Residential and amend the Medium Density Residential Guidelines to reduce the minimum Building Site Area/Unit from 3,000 square feet to 2,000 square feet and reduce the distance between principal structures from 10 feet to 8 feet. Subdivision of the site into three (3) parcels, for the establishment of condominium map and the architectural review of the proposed 255 singlefamily (condominiums) residential development along with parking, landscape, and common use amenities, a public park, and public trail on a site totaling approximately 37.3 acres (54 acres overall project area). The future public park is approximately 1.74 acres and is comprised of parking, three (3) pickleball court, covered benches, two (2) shade structures, concrete walking trails, open lawn area, lighting, fencing, benches, and waste receptacles.

Environmental
Determination:

Pursuant to Sections 15162 and
15164 of the California
Environmental Quality Act
(CEQA) Guidelines and Section

8.06 of the City of Fontana’s 2019
Local CEQA Guidelines, an
Addendum to the Southridge
Village Specific Plan Final
Environmental Impact Report
(SVSP FEIR) (State
Clearinghouse [SCH] No.
81052210) has been prepared for
this proposed project. The
aforementioned EIR was adopted
by the City Council in 1981 and it
anticipated the development of
residential uses and also
adequately identified any
potential impacts associated with
177
this project. No new additional impacts beyond what was anticipated in the EIR mentioned above were identified and an addendum was prepared for the project.

Location of
Property:

Southeast of the intersection of Live Oak
Avenue and Village Drive (APNs: 0237-411-
13, -14, and -27, 0237-201-27, 0237-441-01
through -19)

Date of
Hearing:

June 20, 2023
Place of
Hearing:

City Hall Council Chambers
8353 Sierra Avenue
Fontana, CA 92335
Time of
Hearing: 6:00 P.M.

The City of Fontana (City) has prepared an Addendum to previously certified Environmental Impact Report (EIR) for the Southridge Village Specific Plan. The EIR Addendum is available for review at City Hall (8353 Sierra Avenue Fontana, CA 92335) and online at Environmental Documents | Fontana, CA - Official Website (fontanaca.gov). Should you have any questions concerning this project, please contact Salvador Quintanilla, Senior Planner, at (909) 350-6656. E-mail: [email protected]

ANY INTERESTED PARTY MAY PROVIDE INFORMATION BY LETTER OR EMAIL WHICH MAY BE OF ASSISTANCE TO THE PLANNING COMMISSION. A COPY OF THE APPLICATION AND ENVIRONMENTAL DOCUMENTATION IS AVAILABLE FOR INSPECTION. PLEASE CONTACT THE PLANNER LISTED ABOVE.

IF YOU CHALLENGE IN COURT ANY ACTION TAKEN CONCERNING A PUBLIC HEARING ITEM, YOU MAY

BE LIMITED TO RAISING ONLY THOSE ISSUES YOU OR SOMEONE ELSE RAISED AT THE PUBLIC

HEARING DESCRIBED IN THIS NOTICE, OR IN WRITTEN CORRESPONDENCE TO THE CITY AT, OR PRIOR TO, THE PUBLIC HEARING.

Publish: June 9, 2023
178
PUBLIC COMMENTS FOR MCN NO. 22-84

FROM PLANNING COMMISION MEETING
JUNE 20, 2023

L-7
263

PUBLIC NOTICE

SIGNAGE

PUBLIC NOTICE

SIGNAGE

NO PUBLIC NOTICE SIGNAGE

FACING THE PARK ACCESS TO THE

WILD SPACE LANDS DESIGNATED

ON THE CURRENT GENERAL PLAN

NO NOTICE OF PRIVATE PROPERTY

AS THE LONG-USED TRAILS REMAIN

OPEN, ACCESSIBLE WITH NO

SIGNAGE TO THE COMMUNITY