Cities Index.
Agenda packet

Fontana City Council
September 12, 2023

Document
Agenda packet
Meeting
September 12, 2023
Body
Fontana City Council
Pages
38
Original file
138.6 MB
Text extracted from the city's file for reading and search. Open the original on fontana.legistar.com. That file is the official record.

course of work.
• Communicate clearly and concisely, both orally and in writing. • Maintain prompt and regular attendance.
• Other duties as assigned.
• This position is always evolving. Therefore, employer reserves the right to modify this job description as necessary.

THE ABOVE LIST OF ESSENTIAL FUNCTIONS IS NOT EXHAUSTIVE AND MAY BE SUPPLEMENTED AS NECESSARY BY THE EMPLOYER.

WORKING CONDITIONS: Position requires prolonged sitting, standing, walking, reaching, twisting, turning, kneeling, bending, squatting, and stooping in the performance of daily activities. The position also requires grasping, repetitive hand movement and fine coordination in preparing reports using a computer keyboard. Additionally, this position requires near and far vision in reading written reports and work- related documents. Acute hearing is required when working with the phone.

EXPERIENCE AND TRAINING GUIDELINES
A combination of experience and training that would prove the required knowledge is qualifying. The incumbent must have knowledge of:
• Principles and practices of employee supervision, including work planning, assignment review and evaluation, discipline, and the training of staff in work procedures.
• FEMA, Cal OES, SEMS, NIMS, CERT and related emergency management standards, regulations, and local ordinances pertaining to emergency response management and public safety communications systems
• Principles and practices of emergency services program development and administration.
• Methods and techniques of developing disaster preparedness programs. • Principles and practices of budget development and administration, and allocation of resources within budget constraints.
• Organizational and management practices with respect to the development and evaluation of programs, policies, and operational needs. • Methods and techniques of writing complete, accurate, and concise reports. • Incident command systems.
• Applicable federal, state, and local laws, regulatory codes, ordinances, and procedures related to area of responsibility.
• City and mandated safety rules, regulations, and protocols. • Techniques for providing a high level of customer service by effectively dealing with the public, vendors, contractors, and City staff.
• The structure and content of the English language, including the meaning and spelling of words, rules of composition, and grammar.
• Modern equipment and communication tools used for business functions and program, project, and task coordination, including computers and software programs relevant to work performed.
214

EMERGENCY SERVICES COORDINATOR

Page 3 ends

EXPERIENCE: At least four (4) years of progressively responsible experience in developing and implementing emergency services programs, and emergency preparedness and response; or an equivalent combination of education, training, and experience.

EDUCATION: Equivalent to a bachelor’s degree from an accredited college or university with major coursework in emergency management or a related field.

LICENSES/CERTIFICATIONS: Possession of, and continuously throughout employment, a valid California Class “C” Driver’s License or equivalent. Possession of, or ability to obtain, certification as an Emergency Management Program Specialist from the State of California, Certified Emergency Manager designation from the International Association of Emergency Managers, or equivalent certification.

SUPPLEMENTAL INFORMATION: Incumbents are required to complete a Statement of Economic Interest Form (700 Form) annually and ethics training bi-annually, pursuant to AB 1234.

Notes:

Classification established September 12, 2023
215

CITY OF FONTANA

MANAGEMENT CONFIDENTIAL

HOURLY/MONTHLY/ANNUAL PAY SCHEDULE
Effective 09/13/2023
TITLE RANGE STEP 1 STEP 2 STEP 3 STEP 4 STEP 5
$59.33 $62.30 $65.42 $68.70 $72.14 Hourly
$10,283.87 $10,798.67 $11,339.47 $11,908.00 $12,504.27 Monthly $123,406.40 $129,584.00 $136,073.60 $142,896.00 $150,051.20 Annual $27.73 $29.12 $30.58 $32.11 $33.72
$4,806.54 $5,047.47 $5,300.54 $5,565.74 $5,844.80
$57,678.40 $60,569.60 $63,606.40 $66,788.80 $70,137.60
$47.54 $49.92 $52.42 $55.05 $57.81
$8,240.27 $8,652.80 $9,086.14 $9,542.00 $10,020.40
$98,883.20 $103,833.60 $109,033.60 $114,504.00 $120,244.80 $33.19 $34.85 $36.60 $38.43 $40.36
$5,752.94 $6,040.67 $6,344.00 $6,661.20 $6,995.74
$69,035.20 $72,488.00 $76,128.00 $79,934.40 $83,948.80
$38.76 $40.70 $42.74 $44.88 $47.13
$6,718.40 $7,054.67 $7,408.27 $7,779.20 $8,169.20
$80,620.80 $84,656.00 $88,899.20 $93,350.40 $98,030.40
$40.52 $42.55 $44.68 $46.92 $49.27
$7,023.47 $7,375.34 $7,744.54 $8,132.80 $8,540.14
$84,281.60 $88,504.00 $92,934.40 $97,593.60 $102,481.60 $59.33 $62.30 $65.42 $68.70 $72.14
$10,283.87 $10,798.67 $11,339.47 $11,908.00 $12,504.27
$123,406.40 $129,584.00 $136,073.60 $142,896.00 $150,051.20 $51.47 $54.05 $56.76 $59.60 $62.58
$8,921.47 $9,368.67 $9,838.40 $10,330.67 $10,847.20
$107,057.60 $112,424.00 $118,060.80 $123,968.00 $130,166.40 $55.49 $58.27 $61.19 $64.25 $67.47
$9,618.27 $10,100.14 $10,606.27 $11,136.67 $11,694.80
$115,419.20 $121,201.60 $127,275.20 $133,640.00 $140,337.60 $52.78 $55.42 $58.20 $61.11 $64.17
$9,148.54 $9,606.14 $10,088.00 $10,592.40 $11,122.80
$109,782.40 $115,273.60 $121,056.00 $127,108.80 $133,473.60 $37.42 $39.30 $41.27 $43.34 $45.51
$6,486.14 $6,812.00 $7,153.47 $7,512.27 $7,888.40
$77,833.60 $81,744.00 $85,841.60 $90,147.20 $94,660.80
$55.12 $57.88 $60.78 $63.82 $67.02
$9,554.14 $10,032.54 $10,535.20 $11,062.14 $11,616.80
$114,649.60 $120,390.40 $126,422.40 $132,745.60 $139,401.60 $38.76 $40.70 $42.74 $44.88 $47.13
$6,718.40 $7,054.67 $7,408.27 $7,779.20 $8,169.20
$80,620.80 $84,656.00 $88,899.20 $93,350.40 $98,030.40
(IT) Business Analyst II MC06
Community Improvement
Program Manager MC10
Budget Manager MC07
Communications & Marketing
Manager MC09
Community Services Manager MC11
(IT) Customer Service
Manager MC91
Accounting Manager MC01
Administrative Secretary MC02
Assistant Internal Auditor MC04
Assistant Building Official MC03
(IT) Application Programmer/
Developer MC05
Community Services
Supervisor MC12
Customer Service Supervisor MC13

Page 1 of 7 ends

CITY OF FONTANA

MANAGEMENT CONFIDENTIAL

HOURLY/MONTHLY/ANNUAL PAY SCHEDULE
Effective 09/13/2023
TITLE RANGE STEP 1 STEP 2 STEP 3 STEP 4 STEP 5
$52.49 $55.12 $57.88 $60.78 $63.82 Hourly
$9,098.27 $9,554.14 $10,032.54 $10,535.20 $11,062.14 Monthly $109,179.20 $114,649.60 $120,390.40 $126,422.40 $132,745.60 Annual $65.93 $69.23 $72.70 $76.34 $80.16
$11,427.87 $11,999.87 $12,601.34 $13,232.27 $13,894.40
$137,134.40 $143,998.40 $151,216.00 $158,787.20 $166,732.80 $38.76 $40.70 $42.74 $44.88 $47.13
$6,718.40 $7,054.67 $7,408.27 $7,779.20 $8,169.20
$80,620.80 $84,656.00 $88,899.20 $93,350.40 $98,030.40
$43.03 $45.19 $47.45 $49.83 $52.33
$7,458.54 $7,832.94 $8,224.67 $8,637.20 $9,070.54
$89,502.40 $93,995.20 $98,696.00 $103,646.40 $108,846.40 $43.22 $45.39 $47.66 $50.05 $52.56
$7,491.47 $7,867.60 $8,261.07 $8,675.34 $9,110.40
$89,897.60 $94,411.20 $99,132.80 $104,104.00 $109,324.80 $60.11 $63.12 $66.28 $69.60 $73.08
$10,419.07 $10,940.80 $11,488.54 $12,064.00 $12,667.20
$125,028.80 $131,289.60 $137,862.40 $144,768.00 $152,006.40 $40.32 $42.34 $44.46 $46.69 $49.03
$6,988.80 $7,338.94 $7,706.40 $8,092.94 $8,498.54
$83,865.60 $88,067.20 $92,476.80 $97,115.20 $101,982.40 $37.35 $39.22 $41.19 $43.25 $45.42
$6,474.00 $6,798.14 $7,139.60 $7,496.67 $7,872.80
$77,688.00 $81,577.60 $85,675.20 $89,960.00 $94,473.60
$40.32 $42.34 $44.46 $46.69 $49.03
$6,988.80 $7,338.94 $7,706.40 $8,092.94 $8,498.54
$83,865.60 $88,067.20 $92,476.80 $97,115.20 $101,982.40 $60.11 $63.12 $66.28 $69.60 $73.08
$10,419.07 $10,940.80 $11,488.54 $12,064.00 $12,667.20
$125,028.80 $131,289.60 $137,862.40 $144,768.00 $152,006.40 $40.32 $42.34 $44.46 $46.69 $49.03
$6,988.80 $7,338.94 $7,706.40 $8,092.94 $8,498.54
$83,865.60 $88,067.20 $92,476.80 $97,115.20 $101,982.40 $52.49 $55.12 $57.88 $60.78 $63.82
$9,098.27 $9,554.14 $10,032.54 $10,535.20 $11,062.14
$109,179.20 $114,649.60 $120,390.40 $126,422.40 $132,745.60 $51.47 $54.05 $56.76 $59.60 $62.58
$8,921.47 $9,368.67 $9,838.40 $10,330.67 $10,847.20
$107,057.60 $112,424.00 $118,060.80 $123,968.00 $130,166.40 Fleet Supervisor MC21
(IT) GIS Administrator MC22
Development Services
Supervisor MC15
Finance Manager MC20
Facilities Maintenance
Supervisor MC19
(IT) Database Administrator MC14
Economic Development
Analyst
MC93
Engineering Manager MC16
Environmental Control
Supervisor MC17
Executive Secretary to City
Manager MC18
Emergency Services
Coordinator
Deputy Finance Officer MC86
Homeless Solutions Manager MC87

Page 2 of 7 ends

MC76
217

CITY OF FONTANA

MANAGEMENT CONFIDENTIAL

HOURLY/MONTHLY/ANNUAL PAY SCHEDULE
Effective 09/13/2023
TITLE RANGE STEP 1 STEP 2 STEP 3 STEP 4 STEP 5
$51.47 $54.05 $56.76 $59.60 $62.58 Hourly
$8,921.47 $9,368.67 $9,838.40 $10,330.67 $10,847.20 Monthly $107,057.60 $112,424.00 $118,060.80 $123,968.00 $130,166.40 Annual $39.72 $41.71 $43.80 $45.99 $48.29
$6,884.80 $7,229.74 $7,592.00 $7,971.60 $8,370.27
$82,617.60 $86,756.80 $91,104.00 $95,659.20 $100,443.20 $22.94 $24.09 $25.30 $26.57 $27.90
$3,976.27 $4,175.60 $4,385.34 $4,605.47 $4,836.00
$47,715.20 $50,107.20 $52,624.00 $55,265.60 $58,032.00
$33.88 $35.58 $37.36 $39.23 $41.20
$5,872.54 $6,167.20 $6,475.74 $6,799.87 $7,141.34
$70,470.40 $74,006.40 $77,708.80 $81,598.40 $85,696.00
$28.74 $30.18 $31.69 $33.28 $34.95
$4,981.60 $5,231.20 $5,492.94 $5,768.54 $6,058.00
$59,779.20 $62,774.40 $65,915.20 $69,222.40 $72,696.00
$55.49 $58.27 $61.19 $64.25 $67.47
$9,618.27 $10,100.14 $10,606.27 $11,136.67 $11,694.80
$115,419.20 $121,201.60 $127,275.20 $133,640.00 $140,337.60 $59.18 $62.14 $65.25 $68.52 $71.95
$10,257.87 $10,770.94 $11,310.00 $11,876.80 $12,471.34
$123,094.40 $129,251.20 $135,720.00 $142,521.60 $149,656.00 $31.85
$5,520.67 "Step 1 Only"
$66,248.00
$36.40 $38.22 $40.14 $42.15 $44.26
$6,309.34 $6,624.80 $6,957.60 $7,306.00 $7,671.74
$75,712.00 $79,497.60 $83,491.20 $87,672.00 $92,060.80
$41.88 $43.98 $46.18 $48.49 $50.92
$7,259.20 $7,623.20 $8,004.54 $8,404.94 $8,826.14
$87,110.40 $91,478.40 $96,054.40 $100,859.20 $105,913.60 $55.49 $58.27 $61.19 $64.25 $67.47
$9,618.27 $10,100.14 $10,606.27 $11,136.67 $11,694.80
$115,419.20 $121,201.60 $127,275.20 $133,640.00 $140,337.60 $43.03 $45.19 $47.45 $49.83 $52.33
$7,458.54 $7,832.94 $8,224.67 $8,637.20 $9,070.54
$89,502.40 $93,995.20 $98,696.00 $103,646.40 $108,846.40 $40.32 $42.34 $44.46 $46.69 $49.03
$6,988.80 $7,338.94 $7,706.40 $8,092.94 $8,498.54
$83,865.60 $88,067.20 $92,476.80 $97,115.20 $101,982.40 Parks Development
Coordinator MC30
Human Resources Specialist MC26
Human Resources Technician MC27
Housing Development
Manager MC23
Human Resources Analyst MC24
Management Trainee MC78
Management Analyst II MC81
Information Technology (IT)
Project Administrator MC85
Management Analyst I MC80
(IT) Infrastructure Manager MC28
(IT) Network/Security
Administrator MC29
Human Resources Clerk MC25
Parks & Landscape
Supervisor MC31

Page 3 of 7 ends

CITY OF FONTANA

MANAGEMENT CONFIDENTIAL

HOURLY/MONTHLY/ANNUAL PAY SCHEDULE
Effective 09/13/2023
TITLE RANGE STEP 1 STEP 2 STEP 3 STEP 4 STEP 5
$22.52 $23.65 $24.84 $26.09 $27.40 Hourly
$3,903.47 $4,099.34 $4,305.60 $4,522.27 $4,749.34 Monthly $46,841.60 $49,192.00 $51,667.20 $54,267.20 $56,992.00 Annual $33.88 $35.58 $37.36 $39.23 $41.20
$5,872.54 $6,167.20 $6,475.74 $6,799.87 $7,141.34
$70,470.40 $74,006.40 $77,708.80 $81,598.40 $85,696.00
$28.88 $30.33 $31.85 $33.45 $35.13
$5,005.87 $5,257.20 $5,520.67 $5,798.00 $6,089.20
$60,070.40 $63,086.40 $66,248.00 $69,576.00 $73,070.40
$51.47 $54.05 $56.76 $59.60 $62.58
$8,921.47 $9,368.67 $9,838.40 $10,330.67 $10,847.20
$107,057.60 $112,424.00 $118,060.80 $123,968.00 $130,166.40 $43.03 $45.19 $47.45 $49.83 $52.33
$7,458.54 $7,832.94 $8,224.67 $8,637.20 $9,070.54
$89,502.40 $93,995.20 $98,696.00 $103,646.40 $108,846.40 $34.11 $35.82 $37.62 $39.51 $41.49
$5,912.40 $6,208.80 $6,520.80 $6,848.40 $7,191.60
$70,948.80 $74,505.60 $78,249.60 $82,180.80 $86,299.20
$27.16 $28.52 $29.95 $31.45 $33.03
$4,707.74 $4,943.47 $5,191.34 $5,451.34 $5,725.20
$56,492.80 $59,321.60 $62,296.00 $65,416.00 $68,702.40
$32.78 $34.42 $36.15 $37.96 $39.86
$5,681.87 $5,966.14 $6,266.00 $6,579.74 $6,909.07
$68,182.40 $71,593.60 $75,192.00 $78,956.80 $82,908.80
$35.77 $37.56 $39.44 $41.42 $43.50
$6,200.14 $6,510.40 $6,836.27 $7,179.47 $7,540.00
$74,401.60 $78,124.80 $82,035.20 $86,153.60 $90,480.00
$59.91 $62.91 $66.06 $69.37 $72.84
$10,384.40 $10,904.40 $11,450.40 $12,024.14 $12,625.60
$124,612.80 $130,852.80 $137,404.80 $144,289.60 $151,507.20 $56.06 $58.87 $61.82 $64.92 $68.17
$9,717.07 $10,204.14 $10,715.47 $11,252.80 $11,816.14
$116,604.80 $122,449.60 $128,585.60 $135,033.60 $141,793.60 $43.03 $45.19 $47.45 $49.83 $52.33
$7,458.54 $7,832.94 $8,224.67 $8,637.20 $9,070.54
$89,502.40 $93,995.20 $98,696.00 $103,646.40 $108,846.40 $52.49 $55.12 $57.88 $60.78 $63.82
$9,098.27 $9,554.14 $10,032.54 $10,535.20 $11,062.14
$109,179.20 $114,649.60 $120,390.40 $126,422.40 $132,745.60 Police Dispatch Shift
Supervisor MC38
Police Records Supervisor MC39
Police Supervising Property
Control Clerk MC40
Police Support Services
Supervisor MC41
Principal Civil Engineer MC42
Public Information
Coordinator MC43
Principal Planner MC83
Public Safety Systems
Administrator MC84
Police Communications
Supervisor MC37
Police Administrative Support
Services Manager MC36
Payroll Technician MC34
Payroll Coordinator MC33
Payroll Clerk MC32

Page 4 of 7 ends

CITY OF FONTANA

MANAGEMENT CONFIDENTIAL

HOURLY/MONTHLY/ANNUAL PAY SCHEDULE
Effective 09/13/2023
TITLE RANGE STEP 1 STEP 2 STEP 3 STEP 4 STEP 5
$46.21 $48.53 $50.96 $53.51 $56.19 Hourly
$8,009.74 $8,411.87 $8,833.07 $9,275.07 $9,739.60 Monthly $96,116.80 $100,942.40 $105,996.80 $111,300.80 $116,875.20 Annual $55.49 $58.27 $61.19 $64.25 $67.47
$9,618.27 $10,100.14 $10,606.27 $11,136.67 $11,694.80
$115,419.20 $121,201.60 $127,275.20 $133,640.00 $140,337.60 $46.42 $48.75 $51.19 $53.75 $56.44
$8,046.14 $8,450.00 $8,872.94 $9,316.67 $9,782.94
$96,553.60 $101,400.00 $106,475.20 $111,800.00 $117,395.20 $31.75 $33.34 $35.01 $36.77 $38.61
$5,503.34 $5,778.94 $6,068.40 $6,373.47 $6,692.40
$66,040.00 $69,347.20 $72,820.80 $76,481.60 $80,308.80
$38.76 $40.70 $42.74 $44.88 $47.13
$6,718.40 $7,054.67 $7,408.27 $7,779.20 $8,169.20
$80,620.80 $84,656.00 $88,899.20 $93,350.40 $98,030.40
$36.68 $38.52 $40.45 $42.48 $44.61
$6,357.87 $6,676.80 $7,011.34 $7,363.20 $7,732.40
$76,294.40 $80,121.60 $84,136.00 $88,358.40 $92,788.80
$30.68 $32.22 $33.84 $35.54 $37.32
$5,317.87 $5,584.80 $5,865.60 $6,160.27 $6,468.80
$63,814.40 $67,017.60 $70,387.20 $73,923.20 $77,625.60
$47.54 $49.92 $52.42 $55.05 $57.81
$8,240.27 $8,652.80 $9,086.14 $9,542.00 $10,020.40
$98,883.20 $103,833.60 $109,033.60 $114,504.00 $120,244.80 $46.42 $48.75 $51.19 $53.75 $56.44
$8,046.14 $8,450.00 $8,872.94 $9,316.67 $9,782.94
$96,553.60 $101,400.00 $106,475.20 $111,800.00 $117,395.20 $57.59 $60.47 $63.50 $66.68 $70.02
$9,982.27 $10,481.47 $11,006.67 $11,557.87 $12,136.80
$119,787.20 $125,777.60 $132,080.00 $138,694.40 $145,641.60 $38.95 $40.90 $42.95 $45.10 $47.36
$6,751.34 $7,089.34 $7,444.67 $7,817.34 $8,209.07
$81,016.00 $85,072.00 $89,336.00 $93,808.00 $98,508.80
$30.93 $32.48 $34.11 $35.82 $37.62
$5,361.20 $5,629.87 $5,912.40 $6,208.80 $6,520.80
$64,334.40 $67,558.40 $70,948.80 $74,505.60 $78,249.60
$43.03 $45.19 $47.45 $49.83 $52.33
$7,458.54 $7,832.94 $8,224.67 $8,637.20 $9,070.54
$89,502.40 $93,995.20 $98,696.00 $103,646.40 $108,846.40 Public Works Inspection
Supervisor MC44
Senior Administrative Aide MC51
Senior Administrative Analyst MC52
Purchasing Supervisor MC47
Real Property Analyst MC48
Public Works Manager MC45
Resources Budget Officer MC49
Revenue Operations
Manager MC89
Risk Manager MC90
Senior Accountant MC50
Purchasing Specialist MC46
Records Coordinator MC77
Purchasing Manager MC88

Page 5 of 7 ends

CITY OF FONTANA

MANAGEMENT CONFIDENTIAL

HOURLY/MONTHLY/ANNUAL PAY SCHEDULE
Effective 09/13/2023
TITLE RANGE STEP 1 STEP 2 STEP 3 STEP 4 STEP 5
$30.51 $32.04 $33.65 $35.34 $37.11 Hourly
$5,288.40 $5,553.60 $5,832.67 $6,125.60 $6,432.40 Monthly $63,460.80 $66,643.20 $69,992.00 $73,507.20 $77,188.80 Annual $46.35 $48.67 $51.11 $53.67 $56.36
$8,034.00 $8,436.14 $8,859.07 $9,302.80 $9,769.07
$96,408.00 $101,233.60 $106,308.80 $111,633.60 $117,228.80 $55.28 $58.05 $60.96 $64.01 $67.22
$9,581.87 $10,062.00 $10,566.40 $11,095.07 $11,651.47
$114,982.40 $120,744.00 $126,796.80 $133,140.80 $139,817.60 $52.64 $55.28 $58.05 $60.96 $64.01
$9,124.27 $9,581.87 $10,062.00 $10,566.40 $11,095.07
$109,491.20 $114,982.40 $120,744.00 $126,796.80 $133,140.80 $52.64 $55.28 $58.05 $60.96 $64.01
$9,124.27 $9,581.87 $10,062.00 $10,566.40 $11,095.07
$109,491.20 $114,982.40 $120,744.00 $126,796.80 $133,140.80 $45.66 $47.95 $50.35 $52.87 $55.52
$7,914.40 $8,311.34 $8,727.34 $9,164.14 $9,623.47
$94,972.80 $99,736.00 $104,728.00 $109,969.60 $115,481.60 $47.54 $49.92 $52.42 $55.05 $57.81
$8,240.27 $8,652.80 $9,086.14 $9,542.00 $10,020.40
$98,883.20 $103,833.60 $109,033.60 $114,504.00 $120,244.80 $45.89 $48.19 $50.60 $53.13 $55.79
$7,954.27 $8,352.94 $8,770.67 $9,209.20 $9,670.27
$95,451.20 $100,235.20 $105,248.00 $110,510.40 $116,043.20 $50.25 $52.77 $55.41 $58.19 $61.10
$8,710.00 $9,146.80 $9,604.40 $10,086.27 $10,590.67
$104,520.00 $109,761.60 $115,252.80 $121,035.20 $127,088.00 $45.89 $48.19 $50.60 $53.13 $55.79
$7,954.27 $8,352.94 $8,770.67 $9,209.20 $9,670.27
$95,451.20 $100,235.20 $105,248.00 $110,510.40 $116,043.20 $55.28 $58.05 $60.96 $64.01 $67.22
$9,581.87 $10,062.00 $10,566.40 $11,095.07 $11,651.47
$114,982.40 $120,744.00 $126,796.80 $133,140.80 $139,817.60 $52.49 $55.12 $57.88 $60.78 $63.82
$9,098.27 $9,554.14 $10,032.54 $10,535.20 $11,062.14
$109,179.20 $114,649.60 $120,390.40 $126,422.40 $132,745.60 $60.11 $63.12 $66.28 $69.60 $73.08
$10,419.07 $10,940.80 $11,488.54 $12,064.00 $12,667.20
$125,028.80 $131,289.60 $137,862.40 $144,768.00 $152,006.40 Senior Traffic Engineer MC74
Senior Engineer MC56
Senior Management Analyst MC82
Senior Internal Auditor MC58
Senior Civil Land Surveyor MC79
Senior Civil Engineer MC55
Senior Human Resources
Analyst MC57
Strategic Transportation
Engineering Manager MC61
Senior Planner MC59
(IT) Software Development
Supervisor MC60
Senior Administrative
Secretary MC53
(IT) Senior Business Analyst MC54
Senior Landscape Planner MC92

Page 6 of 7 ends

CITY OF FONTANA

MANAGEMENT CONFIDENTIAL

HOURLY/MONTHLY/ANNUAL PAY SCHEDULE
Effective 09/13/2023
TITLE RANGE STEP 1 STEP 2 STEP 3 STEP 4 STEP 5
$44.97 $47.22 $49.59 $52.07 $54.68 Hourly
$7,794.80 $8,184.80 $8,595.60 $9,025.47 $9,477.87 Monthly $93,537.60 $98,217.60 $103,147.20 $108,305.60 $113,734.40 Annual $31.87 $33.47 $35.15 $36.91 $38.76
$5,524.14 $5,801.47 $6,092.67 $6,397.74 $6,718.40
$66,289.60 $69,617.60 $73,112.00 $76,772.80 $80,620.80
$47.54 $49.92 $52.42 $55.05 $57.81
$8,240.27 $8,652.80 $9,086.14 $9,542.00 $10,020.40
$98,883.20 $103,833.60 $109,033.60 $114,504.00 $120,244.80 $47.54 $49.92 $52.42 $55.05 $57.81
$8,240.27 $8,652.80 $9,086.14 $9,542.00 $10,020.40
$98,883.20 $103,833.60 $109,033.60 $114,504.00 $120,244.80 $47.54 $49.92 $52.42 $55.05 $57.81
$8,240.27 $8,652.80 $9,086.14 $9,542.00 $10,020.40
$98,883.20 $103,833.60 $109,033.60 $114,504.00 $120,244.80 $43.03 $45.19 $47.45 $49.83 $52.33
$7,458.54 $7,832.94 $8,224.67 $8,637.20 $9,070.54
$89,502.40 $93,995.20 $98,696.00 $103,646.40 $108,846.40 $46.67 $49.01 $51.47 $54.05 $56.76
$8,089.47 $8,495.07 $8,921.47 $9,368.67 $9,838.40
$97,073.60 $101,940.80 $107,057.60 $112,424.00 $118,060.80 $44.86 $47.11 $49.47 $51.95 $54.55
$7,775.74 $8,165.74 $8,574.80 $9,004.67 $9,455.34
$93,308.80 $97,988.80 $102,897.60 $108,056.00 $113,464.00 $52.49 $55.12 $57.88 $60.78 $63.82
$9,098.27 $9,554.14 $10,032.54 $10,535.20 $11,062.14
$109,179.20 $114,649.60 $120,390.40 $126,422.40 $132,745.60 $46.35 $48.67 $51.11 $53.67 $56.36
$8,034.00 $8,436.14 $8,859.07 $9,302.80 $9,769.07
$96,408.00 $101,233.60 $106,308.80 $111,633.60 $117,228.80 $37.41 $39.29 $41.26 $43.33 $45.50
$6,484.40 $6,810.27 $7,151.74 $7,510.54 $7,886.67
$77,812.80 $81,723.20 $85,820.80 $90,126.40 $94,640.00
$66.21 $69.53 $73.01 $76.67 $80.51
$11,476.40 $12,051.87 $12,655.07 $13,289.47 $13,955.07
$137,716.80 $144,622.40 $151,860.80 $159,473.60 $167,460.80 $40.32 $42.34 $44.46 $46.69 $49.03
$6,988.80 $7,338.94 $7,706.40 $8,092.94 $8,498.54
$83,865.60 $88,067.20 $92,476.80 $97,115.20 $101,982.40 Supervising Plans Examiner MC75
MC65 Supervising Code
Enforcement Inspector
Supervising Animal Services
Officer MC63
Supervising Building
Inspector MC64
Utilities & Streets Supervisor MC73
(IT) Systems Administrator MC70
(IT) Systems/Network
Specialist MC71
Transportation Engineering
Manager MC72
Supervising Traffic Systems
Specialist MC68
(IT) Support Supervisor MC69
Supervising Technical
Engineer MC67
Supervising Real Property
Agent MC66
Supervising Accountant MC62

Page 7 of 7 ends

City of Fontana
Action Report
City Council Meeting
8353 Sierra Avenue
Fontana, CA 92335
File #: 21-2392 Agenda Date: 9/12/2023
Agenda #: D. Category: Consent Calendar
FROM:

Engineering
SUBJECT:

Final Acceptance of Street and Sewer Improvements on Banana Avenue for Tract No. 18135 RECOMMENDATION:

1. Accept as complete the street and sewer improvements on Banana Avenue for Tract No. 18135 located south of Foothill Boulevard and east of Banana Avenue.

2. Adopt Resolution No. 2023-089, accepting sewer in Banana Avenue for Tract No. 18135 as part of the City sewer system.

COUNCIL GOALS:
· To invest in the city’s infrastructure (streets, sewers, parks, etc.) by maintaining and improving the city's existing infrastructure.
· To invest in the city’s infrastructure (streets, sewers, parks, etc.) by providing for the development of new infrastructure.

DISCUSSION:

Olive Communities, LLC constructed street and sewer improvements on Banana Avenue, a street that provides access to Tract No. 18135. This subdivision is located south of Foothill Boulevard and east of Banana Avenue.

The street and sewer improvements on Banana Avenue are now complete and acceptance by the City Council is required pursuant to Fontana Municipal Code, Section 26-184(b). Tract No. 18135 is a private community and the internal improvements are not a part of this action.

The street and sewer improvements have been completed to the satisfaction of the Department of Engineering. By accepting the improvements as complete, the City will be taking over the maintenance of these improvements.

This action will also authorize the release of the Faithful Performance Bond, which was posted to guarantee performance of the Subdivision Agreement. It will also authorize the release of the Labor and Material Bond after six months and the Warranty Bond after 12 months, less the total of any claims received by this date. The street and sewer improvements have met all Conditions of Approval and the improvements were inspected by the Department of Engineering.

Tract Map No. Bond No._ Bond Amount_
City of Fontana Page 1 of 2 Printed on 9/6/2023
powered by Legistar™223
File #: 21-2392 Agenda Date: 9/12/2023
Agenda #: D. Category: Consent Calendar
18135 4438982 $155,867
FISCAL IMPACT:

As part of the action to accept as complete the street and sewer improvements on Banana Avenue for Tract No. 18135, these improvements will be deemed complete and the City will take over operation and maintenance of this public infrastructure. Appropriate funding for the maintenance work is allocated to the Public Works Department, Utility and Street Division.

MOTION:

Approve staff recommendation.

City of Fontana Page 2 of 2 Printed on 9/6/2023
powered by Legistar™224
Sources: Esri, HERE, Garmin, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), (c) OpenStreetMap contributors, and the GIS User Community
Engineering Browser
0 0.0125 0.02
m
5 i .
7/20/2020
225
p
LLJ
U) _
X
Q
I! CAo QM emu)
U)
zr
a z HX
H W;!:

LU
O Wcn Z "
LL(
n
S cn
cn Z

SO) LU)
TE L ` Q
C U)
a ca rn en z ® `
x _ j
4i
W 11., 1 H
zanu9 a WW ar
z< 00
r
n Z<
CL
r < <
x t<- LL LLJ
4 ac
cld lQ- EE
Yt) R'
16 rnQHa w < d M M<
W1
r+ cn, Scar
53 u cz
Ho gz '
WWWc3
r O `
Q
H~
0 U) LLy j >
3: - ''`
rya
r yo H
Z Zcn pW FQv 01 ¢ aCn
W fl
H
nz f~ tf1 W Q W HH t
n/ [ Ij! Qwi j iS^ U CI w n
Sr
C3 * H-' a= ta J
H H
I
QWr"
F69<" ` wz
W
U)
i Ill
atJ< caLLJ z aaH " uo" c®
zr cSr •
ZNg ~ d Ill
U3
Mo
W !--
Wur W cn W
0 z0
cn
ww> +- i< Z
a
Ca
d W I-- U
W <
c w
1JtS- i®
r
cn
Sh
W 0 << Of ez-a lraM
z Wrrwa
W
U) rruQ
Jc m
w H U1 F- w H Q r S cn r H d
Iz S
My
w rr o Q < t Z
Z
w W ~ W< rp}: 50 W q X C] ® C] Ol 1 W >- `<
O
I- 1 < t w R y z 1 C. 0 W
H
m
w ui r-- n
w 4 - s U- >- > r l- S < c r a 4t -- 1 R
Wa>- niLHc~ r` n rr-+ Ci z> acn 2 O cc
ErS
0I
1-'
v W r
Qxruj
mz
z
IzE LIJIll
cp
U)
S' 1 H_ J W N >
Z U) icnc Srd<tcn 05 cc } f1)>'
H
Cz h"^ ® orc rcna+ WaJ ` Qr`
zil a cn
r wF5 CJ FQcnr., -- 0 t
z< U- O t Z = r
wz
o
ca W W
z Wz + C13 ©
m
wJwU] ate" _ 3 m a Z
r d > UD 0
lLl
1~- i Ur' 1WJ r
C., 1 ice- < S a -
i <
u IWZ( -
s
S
C1
Cc
d W Z cc
x U7
4:

O
r % -
C)
H Q < C $ ! Cr [ G
r7 LZao
c
ii UzLdJ
Ld o
z
d o
U LL
uu
poz
d
In x
L % cncoc© <
c
cL AshJullik <
Z
cc Qv ® L.
0 L rl „ ¢
Wow {
0 4 Qcr
crZd o '
Nx a oRi M W Cc LL
CC W
f.- a > o cS as Q COui W
til = SS ic
W.
w<
LN c°
u W r
Q W
c.7
h c
L ([ j
j ((
J (
C
o m O u a O d
V e'° M Q
U,
J IM 0. 0
N ' O. Q j cc
W d
Z Q m
co/
O ® Mg
9 ei
ffiu 0 i CC ,
t < J
r'" F- I / o R m / a rt S h- m CJ GS R x
CC Q H V o H I 1 Vl 9 V v x O-1p ®
Z W+WF- or
Z
U7c O
rwFn4 LL
0 LLd I- Lt
O
r Q y- H
U) Z ~
y
r
U) ZU U) 4
ar ac5 W vTe r, , d LliW x
wz
Z
Z W
Z ~ W t
d Zou_ ui uiF5 LL < pF- 1 ®
HrczfliC)
CI
HS( r1z LIJ 7 r= 1Z
rr
r W rN0 it--
H m r+
W
Ct= Q<
Z>
J
1 f~
JU
bS fWJ W} U prp F4- IWOp 3
W <
CE0cn
f
W
tn2
CJ
QWp` ti~
s
Y
y
H
h
to
W
CC =
c r "uS N
M
IWL
v W A v
d CC)
cn
cn v
III
Fes- N n H HIS- 1S- f0-
J1En
0 <NOO< rW LU QU
S
J
H
O iq cn ' tl Ci ©
cn
Q
CC
n z E„ XL' GL
U
1 M ''
0 <
M ( n
tt
cd >
0 z
cs3> r W °
N ~
co
Q r Hr S
r
q V cx y
Hp W z X r
0x
r
oa@' N 4 Wv
Dm d >- L/ 4 cn
E- CC
z
1 S
pp
z 0Q Gri ? S <W
rr
ZH
S ' W H - < r
r
W p C
to <
L m a ~
hA W W
a ,, H ,. cc
W° c`
c7 W `
W° w Q L1 W' H L rS O (
C) 1_ f
i E( r~ co w z <
U5
WW
Q ® Z1
JmW( 1J r ^' 1 W WJI
t-- i
p CJ 0 H
aC
r J U') tlj - < W WW U) cc
W QWO o
Ho«
Z C9
a
w
44 O
2Z
u Wr k- ,
eC ; C.
a ;
n
H ovocn W O
0 -
r rCD Lii Ca d >- w r w
cq r irl ; D W H crLL W" a _ - r
rycn
z tX
z LLJ Z iS< c 1-
QI {
rdr
11 r Zt3 2U 1 . a r p «"
4"°
1ri Z .

L
1 L r +. ( J.... L S Cam? V H cc `!- }- S 1
CUCU O H {. a m o4 M r < CrC1 5 cn 8 tJz MrcnQ Hr X w M x x u LL U. 226
w
W
C1
3AV Ma HO
LL
3Ad ONONIV
Im
cu
0 3AV HNdNH8 W
z
w
3AV
HseewlVO oc
ua 3AV
A883ennw ® w m cc)
Uez 16
wLO m ww® 3AV
OOOMNOLJ0 - F
1 N h J LO w cc if7
LL Ui r z \
h <
CLD (
CIO LO 0
rm m wl ` I wrCU CU " '*
s LO Z z (r) 0
Co 0 14 m Q w CA U1
m w m CU U + w
w _.
l Q CJ 1
T Ci Z m m C7 ao Q
rw
LO cc< u
a..

Q Cn i x w co
CD
r < g O Z >- U (
D
Oz. ` r w w O C<<C 31N3Av
3No M:

C
n.
n <c
eu z
a a ° Cm IW- ~
cu
a
a o W
awl`
Zo
zzHzmm awwaw
woa < z
ww 0 z 0I- U) tZ wH
w
LL m m 5 a Z z D
w
n Mg mm m
w m to m w - jmm aw ® d Uw w w w u zr® ar a Mt2 Sao
Q a a a H m W z` rw m mr+ u
v u v r z m Cf) aIziof w OC I-+
f-+ -, s+ + U) U) w Q r w
N
ZD mr o
0 n o < D r zr- 0 ch < 0 Z
Z
Z Z J_ j z W 0a0( D wa m J -+
H Iz LL t-+ U- a EL at CL E
O © a
w I X z v
H v
F4
rr
U. z O< g`
r
w
JZ ZC0
Cu
z Z•
O99 3„
ZS,£O. 00N> U - IZ
a N t.£ Z'o99 3„ 00,*O. 00N) __ 3nN3AH O 13 a D w ,
LZ' 099
94,
MOON _ Lij g o
bZ
o££ OWE t- O Z
N N <,Z£'
O££> <, 46' 6Z£> •• r a g
EISLS/ 99Z
SN 83d LOW 308 j0 n3n NI a"o80 C j ® 00 (
Vz o a
rn "
13 J: 3mns 008S MOVI dl „4 Od u°' i 69
02 co
cc ( 0
9a co ww
CM
w W gd
N3 Q Z
U) H
Q
U) n0..
b4
re Cr Q
Ul oa an
z z z w 0 UJ
m ..

V
WCL
M
Z`
099 3„
00, O. 00N) Z O 0
Z ,ZZ099
3,
9Z,£O. 00N ZZ' 0££ 00'
99l AO' 9l cr' o cn
04 a z
A,
t.£Z' o££>
a Z in 0
cc OR
v I- m o;_
o n v z
U)
0 —? :
1 2
om V
U)
0- cc
u m v= ww
a
o, r ° ° o : a
zU- 02 ¢ j
o CV
Z
Z
Z
OOOJCu •- a ___ Z M
w
co
OHOH W CO r
z
mZL >
w U: DU=
O
tzi)
Ca Cn Z¢ I- 8
W "' Izw=
Z 0. ri
j—
h
m O
Cl co to
0 A
3NIl _ —
O
OAS
Chi
O g
y Os W u E;
tt
I _
w g t0U COO tts
N
N N
Q' dpr° Q I .

M. 4
ka
pig
NN
N `` NpMpM zzz
I zzz M
I 133HS N 6 '
Ct
O J
O00 C1
e1
v
M
cv
s
M NN
Cw
w h
C4 a
w c*
a
s w w
a O w
w -- h--
Ours
3W U. QO 00
A ca s6°
ti9
i
z
t,£
Z•o££) g
3nN3AV
VNMNVG e661, 91
eL
L •099
3„ £4,£
O,OON -- t,£Z' 099 3p00, bO.
00N) IZ' 099 3.90,b0AON>
rQ? M
227
U1
Z
W
W
cn
T
Z
W
W
1—
m
O
LL.
3NIi
W
I
W I P91 0
I
00°
t•£ M„ Z$,, S£ s
AONcu
s W
0 MwZb,
W.00N I
I
r0
Cr!
CNI
7e
P
w i •' a®
0` 9CJ n4s r' tr, 'J£.VVN w o
or
Cu
LL®
J I
00"
99S M Z4, 9£.00N 0 t 1 N H
N
n
e
Z I
N
CC
O
CD 8
O
N
I
t0
w
I
r
ea

00. 99 M„ Z*,9£. 00N C4
N
z
z
M
0 133NS
J
T
H
CC
00'
95 M„ Zf, S£AON 0l"
i cr
a uj 0
00' 89 M. Z4, 5£AON O
MNQaO U"
u
0-
Z
OD ado
0 U OD C7 <
LL
N W
ItOD N
I-®
0Z Z
Z
HQ-.
p V 00" 99 M„ Zt+,S £AON U)
y ( T) u w z Z
p 0 Z H m
z
cJ F"
0 d `t
R' ho,° 1
O W CC
cc Z
Q Q CC U) 00'
89 M„ Zb, 9£.00N O
M N

00. 99 M Zt,, 9£.00N t1
1,-
I Z tL
C1 O W =
mtlwm
a O
z
0 cc I-- x q
vai o
00 w
a z 0)
LL.

CC LL m
z
bf
Qfi
Q9
M
J
c Z 85
Z5£ OON 0` 99 M. Z$,,£OON cn
pcc Ll
0° 55 Zi, 9£ ON 00` 95Z4,5.00N 0®
0Owccu CJ
dcc
0 E
W
LL
C>
o<
o
tv)
8 8U)
M
cg
8 W
M
O zfJ' cq
En cq
J Z
w rc LL
Uj
61 u S w
IIw
47 W
M . 1-
1 O
ZLf! W D
00" 55 N% Z*.5£. 00N D N
ara
00° 99 M Z*,W. 00N N
N
N
b)
mw
pf
0 U)
do
z$ Cd
z
z. z Q
M
CC

M N M W
1-
cn F=-
ZW = us
u>
o
N
a
Z -
q ta W Q Ll
00° 55 M„ Zt+,5£.00N Li m
CC 00" 95 M Zt,,S£.00N 00' 99 M Z$,, 9£ AON 8
8 8 C3
w
r
N
w
N
r N N ao
N
N
M
N
ppppoopp U
al h N Q C? O t[1 0
0 zN
z

0. 0z OQ zowi <2 In pZt, 5OON 0' 85 M Zi', S£.

A
00NrtN
la

PIP C, '
S
Aka
eL
h
N00OD O0NNNNN Z—NN~ iR
fJ
h NN^ bsfc,. y yM,
Mr ZZ9
e"
9ay9 2'
P' tt 19 IS I
t0
h
OD N 66' CJ NX.
b9l
z0

0. C9
r4i
CL
h8
3nN3AV
O
VWNVQ
30N383J38
ON
U
W99 t
308 83HSVM/
livN 0j n. 0 66°b9 t
3 £4 £
O.00N t tV r :3 y
z
3nmAb
vwNbm YJ
228
Lli
Cf)
r
t I
Cf)
LLJ
ui
F—
O co
11 0919 L
100' 994 3LS SOLON
09, 9
0 1 ' 00. Ls Mzs" gsooN 00' OL M. Z*, 9T. 00N
oo*w -
71 M Z*, 55:.00N
Lli T

00.9c
z0
I
Z
In
u
01-:
0 u
0 F- 4
N
to

0. b
co (1) d co
n
o g CD
V),
r—
OD
OD Nc41dy 00
0)
ul
N
0)) r
N1*
w
W
b
1:

OD b,
z
00 z 0
tp
z
z z cq
0 pp
Cl
h
M 00.
c 00. gc 66-
OC 00'
4£ M. Ztr, G2. 00N r 75

00. OL M. Z*.9C. 00N 75
co%
o
zFU)
UJ0)
0 z LL
m o 00- as M. Z' f,Gv. 00N M. Z*,GC. 00N t Z
J0 U- cu #,
Zif,
qc. 00N Ld _
3 z LLJ
8 CL <
c
n LO LL co
I , <
U -
D
0 M: d C4
w
cn
LL
00 1100 00 w
0 Ljw
r— co
Z
CD
04 N
C14 N< LO
0 00 "
bOD
08'
b ) ' t
00 z z '
00- 99
M.Z' O, GC. 00N 00- 99 M.Z*, GS:. 00N 0 0
00 ZOOZ 00* 99
M.Z*.QC. 00N U,5 CV), LY WWZ
00* 99
M.Zi,. 9C. 00N 1-4 _
j 0 En < 0
0 Mo
ui CC CCIr
U) Cd
z CC
U)
z <
cn
0 0 z 0-
2 a w
a m 0 d
8 Ll- 14)
co ( 1) w C3 W 9 C co
w
CL - C, r') 0
z 0
C[ z x C 04
40 ucn
Z v cn
0 v
ku
w <
z 00 I
z . 00- sq motxook- OD C14 U- C[
U- N N M 0
Cc
14 00- gg
N,.Z*. geoo m N
04 N 0 N
En
z
cl
cc
0 z -
8 - 8
Z Z
Et)
z
0 u
d
ow cr
u 0% U)
UMn ( 1
WW U)
z
0 UW L., 00-
99 M.Zi,, GC. 00N ' 00*99 M.Z*, GC. 00N I-- F4
I,.— oo- gg &,
Z*,GT. 00N 00-99 K,Z*. GT. 00N z z (
vu) z 0 0
C) Z) w C < U- " -
J
U)
CU
U 0> 0
Z
0 -
J
W 0, 0
Z
w OD !"
D M w
00 N NN
c
U
U OD W<
Cc
o
Z)
cn
Z Wcn
za:

N,.

Z*, 9C. 00N * G-n tkzf, gc. 00N .00-99 MZ*,9E. 00N m 91 Z cl -
A
mi I D 0
00-
CO
89 M,,Z*, 9C. 00N w Go
cn
N N
z 100-
99 M.0 L. 92. 00N 3N
1-1 OLI 00'
99 M.Z*. 9C. 00N 8 J— -
L— g 8 -
8 C4
CV
r
V OD .
99 00-
M.Z' r,gC. DON Cq 04
oi Cff
lv
cl
ci 8 8 bt to C4 in,
0 "
0 to N Z C, Z W ci
0 X to wl
W D %0
rn 8
n
Q (
A
N
IW
P:
p Pi C t C;t Ja: 31- N C, Lli z
N
4p
1 MI
00*
99 . Z*,MOON Lli o 00-
99 M.Z' 11, 5f. 00N z2z zzzzzzz
8Go
Go
LO
N
t
oq
Z
9 z
AX*
X.
00NI: q,6
6*
ET M. Z* X. 0 01N NSs9
8 00/
V
133HS
229
1 of 2
RESOLUTION NO. 2023-____

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF FONTANA ACCEPTING THE SEWER IN BANANA AVENUE FOR TRACT NO.
18135 AS PART OF THE CITY’S SEWER SYSTEM.

WHEREAS, Section 23-388 of the Code of the City of Fontana provides that each addition to or extension of the sewer systems shall be accepted by Resolution of the City Council; and
WHEREAS, the Resolution of Acceptance shall contain the terms of any special consideration which shall apply to the sewer so accepted; and NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Fontana, California hereby accepts as a part of the City’s sewer system the sewer main and laterals constructed within and part of Banana Avenue for Tract No. 18135 located south of Foothill Boulevard and east of Banana Avenue. No special consideration shall apply to any lots in Tract No. 18135.

APPROVED AND ADOPTED this 12th day of September, 2023.

READ AND APPROVED AS TO LEGAL FORM:
____________________________________
City Attorney
I, Germaine Key, City Clerk of the City of Fontana, and Ex-Officio Clerk of the City Council, do hereby certify that the foregoing resolution is the actual resolution duly and regularly adopted by the City Council at a regular meeting on the 12 th day of
September, 2023, by the following vote to wit:

AYES:

NOES:

ABSENT:

ABSTAIN:

City Clerk of the City of Fontana
Mayor of the City of Fontana
230
Resolution No. 2023-____
2 of 2
ATTEST:

City Clerk
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
City of Fontana
Action Report
City Council Meeting
8353 Sierra Avenue
Fontana, CA 92335
File #: 21-2406 Agenda Date: 9/12/2023
Agenda #: E. Category: Consent Calendar
FROM:

Finance
SUBJECT:

Business License Compliance Program
RECOMMENDATION:

Authorize the one-time waiver of penalties for businesses or individuals who are brought into compliance with City Code Chapter 15-36 through the Business License Compliance Program.

COUNCIL GOALS:
· Operate in a businesslike manner by creating a memorable customer experience with every interaction.
· Operate in a businesslike manner by improving services through the effective use of technology.
· Operate in a businesslike manner by correcting problems immediately. · Promote economic development by being business friendly at all levels and striving to constantly improve the city's competitiveness.

DISCUSSION:

Per Section 15-36 of the Fontana City Code, all businesses, trades, professions, callings and occupations who transact and carry on any business, trade, profession, calling or occupation in the city is required to first obtain a license from the City to do so. In April of 2023, the City of Fontana contracted with HDL Business Services to assist the City with its Business License Compliance program. The City has issued on average over 8,400 business licenses annually since 2017-18 that generate over $7 million in revenue for the City’s general fund. Through the Business License Compliance Program, HDL has forecasted that the City would realize an increase of over $660,000 in on-going business license tax revenue as a result of increased compliance through this program. To date, the first round of approximately 500 non-compliance notices have been sent to the property owners of non-residential real property rentals and over $1.0 million in current and prior year business license fee and penalty revenue has been received.

Per section 15-45 of the Code, failure to pay a license tax under this article when due shall result in a penalty of 20 percent of such license tax on 31st day after the business commenced to operate for the first time and an additional 20 percent on the first day of each month thereafter, provided that the amount of such penalty to be added shall in no event exceed 100 percent of the amount of the license tax due. Section 15-39(h) allows for a waiver of fees only for applications that are not more than 30 days past due.

City of Fontana Page 1 of 3 Printed on 9/6/2023
powered by Legistar™259
File #: 21-2406 Agenda Date: 9/12/2023
Agenda #: E. Category: Consent Calendar
The Business License Compliance Program is outlined below:
· The City has partnered with HdL for business license software since 2004. The software is used to process all business license applications.
· The Business License Compliance Program is administered by HdL. HdL takes the data in the business license software and compares it to sales tax data to ensure that every business that is reporting sales tax is also licensed. Additionally, HdL conducts field surveys. · Once non-compliant businesses are identified, HdL communicates required compliance information and outreach services to the business which includes a business license application.
· The non-compliant business applicant completes the application and returns it to HdL. · HdL reviews the application and applies the required annual business license fee and associated penalties per the City code based upon the information provided by the noncompliant business and invoices the business accordingly. · In the event the non-compliant business has been conducting business within the City for more than three years without a license, they will only be invoiced for a maximum of three years plus the current year.
· HdL also provides a business support center via phone or online where business owners can get answers to questions that arise; provides document submission/processing, invoicing, and data entry into the business license software.

Since the implementation of the program, numerous businesses have been successfully brought into compliance, and for others, compliance has presented a significant hardship. Due to some businesses owing multiple years’ worth of fees, with the associated penalties equally 100% of the fee, these businesses have requested the waiver of the penalties. As the goal of this program is compliance and due to the fact that the Finance Department does not have any legal authority to waive any penalties with the exception of that as cited above, staff is requesting the formal approval of the Business License Compliance Program that would be retroactive covering all associated notices/invoices that have already been sent, and to continue to the process as outlined above and including the following parameters:
· Invoicing of no more than three years plus the current year which reflects the total amount due including all associated penalties
· Adding the authority allowing the Finance Department to waive all penalties for invoices associated with and identified through the Business License Compliance Program if payment is made within 30 days from the date of the invoice
· Authorize the reimbursement of the penalty payments already collected if payment had been made within 30 days
· Authorizing the Finance Department to negotiate payment plans to assist businesses if requested
FISCAL IMPACT:

Based upon the program estimate, if all taxes and fees including penalties are received revenue would exceed $1.3 million. The impact of the waiver of penalties would be approximately 50% of the $1.3 million or a $650,000 decrease in one-time revenue to the general fund. As the program is now estimated to exceed initial estimates, the total required budget for the associated HdL contract City of Fontana Page 2 of 3 Printed on 9/6/2023
powered by Legistar™260
File #: 21-2406 Agenda Date: 9/12/2023
Agenda #: E. Category: Consent Calendar
expense is not included in the 2023-24 Adopted Budget. A requested increase in appropriations will be included in the First Quarter Budget Report.

MOTION:

To approve staff recommendation
City of Fontana Page 3 of 3 Printed on 9/6/2023
powered by Legistar™261
City of Fontana
Action Report
City Council Meeting
8353 Sierra Avenue
Fontana, CA 92335
File #: 21-2409 Agenda Date: 9/12/2023
Agenda #: F. Category: Consent Calendar
FROM:

Engineering
SUBJECT:

Acceptance of Final Map for Parcel Map No. 20585 and Abandonment of a Certain Portion of Right of Way of Banana Avenue
RECOMMENDATION:

Accept Parcel Map No. 20585 located at the northeast corner of Banana Avenue and Durian Avenue; accept as public dedicated streets and easements; and authorize the Mayor and City Clerk to certify the abandonment of a certain portion of right of way of Banana Avenue.

COUNCIL GOALS:
· To invest in the City’s infrastructure (streets, sewers, parks, etc.) by maintaining and improving the city's existing infrastructure.
· To invest in the City’s infrastructure (streets, sewers, parks, etc.) by providing for the development of new infrastructure.

DISCUSSION:

On December 20th, 2022, the City of Fontana Planning Commission approved Tentative Parcel Map No. 20585 (TPM No. 22-011) and Design Review No. 20-030 to consolidate five parcels into one parcel of approximately 4.4 acres for the development of a new industrial commerce center of approximately 97,474 square feet. The subdivider, MBK Industrial Properties LLC, has complied with the Conditions of Approval and dedicated the required streets and easements as a part of the project.

The Parcel Map No. 20585 has been reviewed by the City Engineer and found to be substantially correct.

As a part of this Parcel Map, portions of excess road right-of-way within the easterly four feet of Banana Avenue are no longer needed and will be abandoned. Pursuant to Section 66434(g) of the California Government Code and Section 66499.20.2 of the Subdivision Map Act, the City Clerk must certify the abandonment of those certain portions of street right-of-way. The filing of this Parcel Map shall constitute an abandonment of those portions of the easements granted to the City of Fontana for street and public utility purposes. In accordance with the Subdivision Map Act, the Parcel Map is now being brought to the City Council for final approval.

FISCAL IMPACT:

This action will only approve the Parcel Map for recordation and authorize permits for the construction of the development, therefore there is no fiscal impact to City resources at this time.

MOTION:

City of Fontana Page 1 of 2 Printed on 9/6/2023
powered by Legistar™262
File #: 21-2409 Agenda Date: 9/12/2023
Agenda #: F. Category: Consent Calendar
Approve staff recommendation.

City of Fontana Page 2 of 2 Printed on 9/6/2023
powered by Legistar™263

1 Revised - RP – 09/01/2022

LAND IMPROVEMENT AGREEMENT
PM # ASP #
DR # ADDRESS #
THIS AGREEMENT made and entered into this day of , 20___, by and between the City of Fontana, hereinafter call City and hereinafter called Applicant.

WITNESSETH:

WHEREAS, it is the intention of the Applicant to improve a certain parcel or parcels of land in the City of Fontana described as
and,
WHEREAS, the City Council of the City of Fontana has approved and adopted certain rules and regulations governing the developing of land in the City and the posting of improvements securities guaranteeing the installation of necessary permanent improvements as set forth in Article III of Chapter 25, Article IV of Chapter 26 and Article III of Chapter 27 of the Fontana City Code and,
WHEREAS, the City Code specifically sets forth the requirements for the installations of necessary improvements affecting land development.

NOW, THEREFORE, the City and the Applicant mutually agrees as follows:

The Applicant will construct or cause to be constructed at applicants expense all required permanent improvements on streets abutting his property, all required tests, design work, equipment materials, and labor in order to complete all of the improvements as associated with the requirements per the approved project or to the satisfaction of the City Engineer or as specifically described and shown on approved plans on file with City Engineer and total cost estimate as stated on Exhibit “A”, and in accordance with applicable provisions of the Standard Specifications and Standard Details of the City of Fontana in effect on the date of this Agreement.

The work shall be done under the supervision of and to the satisfaction of the City Engineer. The estimated cost of said work and improvement is the sum of ($ ).

Surety bond for Faithful Performance in the penal sum of the estimated cost of said work and improvement shall be properly executed in favor of and delivered to the City as part of this Agreement. In lieu of a surety bond the Applicant may deposit money or negotiable securities with the City as provided in Article III of Chapter 25, Article IV of Chapter 26 and Article III of Chapter 27 of the Fontana City Code.

The estimated cost of construction set forth in Exhibit “A” is for estimation purposes only, and for calculation of the amount of securities required pursuant to the provisions of this section. 268
2 Revised - RP – 09/01/2022
Applicant’s obligation to complete the improvements, or any portion of them, is not limited in any way by the estimated cost of construction, and the obligation of Applicant’s surety in connection with the securities required pursuant to the provisions of this section.

All of the required improvements shall be completed within 12 months from the effective date of this agreement. If the work is not completed within the specified time period because of acts of God, the public enemy, the City, or because of fire, flood, epidemic, quarantine restrictions, strikes or freight embargoes, the Applicant shall be entitled to an extension beyond the specified time period for a period equal to the length of such delay within ten days from the beginning of such delay
In addition to the extension for the reasons referenced in the foregoing paragraph, Applicant may submit a written request, Exhibit “B”, for a discretionary extension of the time for completion of the improvements to the City Engineer. The City Engineer may grant or reject such extension, in whole or in part or with conditions, in his sole discretion. If an extension time is granted it shall in no way affect the validity of this contract or release the surety on the securities referenced herein.

Upon timely completion of the required improvements pursuant to the terms of this Agreement, and prior to final acceptance of the improvements by the City, Applicant shall submit to the City Engineer for review and approval, a digital copy of “record” drawings of all improvement plans in accordance with the latest edition of the City of Fontana Electric File Submittal Requirements.

Upon the approval of “record” drawing, the City Engineer shall process the release of the Applicant’s performance bond posted pursuant to the Bond Guarantee for Faithful Performance.

In the event that Applicant fails to complete the improvements within the required period or any approved extension, the City may complete the work and shall be entitled to recover the full cost and expenses thereof from Applicant, or his surety as herein provided. If City pursues completion of the improvement work, it may require Applicant, or his surety, to pay the City in advance, sufficient monies to cover the City’s cost in completing construction of the improvements.

Any limitations period provided by law related to breach of this Agreement or the terms thereof shall not commence running until Applicant, or Applicant’s surety pursuant to this Agreement, has provided the City Engineer with written notice of Applicant’s intent to abandon or otherwise not complete the improvements.

Applicant shall defend, indemnify and hold City, its elected officials, officers, employees, and agents free and harmless from any and all liability arising out of or incident to Applicant’s performance of this Agreement, including without limitation all reasonable attorney’s fees, whether or not resulting from the negligence of Applicant or Applicant’s agents. This indemnity shall extend to any claims arising because Applicant has failed to properly secure any necessary easement, land right, contract, and approval, but shall not extend to any claim arising out of the sole negligence of City.
269
3 Revised - RP – 09/01/2022
It is further expressly agreed that the Applicant will procure all permits and licenses, pay all charges and fees, and give all notices necessary and incident to the due and lawful prosecution of the work.
270
4 Revised - RP – 09/01/2022
IN WITNESS WHEREOF, three (3) identical counterparts of this agreement, each of which shall for all purposes be deemed an original thereof, have been duly executed by the Applicant herein named on the day of , 20 the
name and corporate seal of each corporate party being hereto affixed and these presents duly signed by its undersigned representative(s) pursuant to authority of its governing body.

APPLICANT CITY OF FONTANA
____________________________ By:

Signature City Engineer

Print Name
____________________________ Date:

Print Name
____________________________
Company Name
____________________________
Address
____________________________
City State Zip Code
Attachments: (1) Exhibit “A” – Cost Estimate
(2) Exhibit “B” – Time Extension
(3) Securities
271

STAFF USE ONLY
ENGINEERING PC NO.

CITY OF FONTANA

ENGINEERING DEPARTMENT
COST ESTIMATE **EXHIBIT "A" **
SHEET 1
DATE:

DEVELOPER MBK PROJECT NAME
ENGINEER Huitt-Zollars TRACT MAP NO. N/A
PHONE NO. 909-941-7799 X 11450 PARCEL MAP NO. 20585

STREET IMPROVEMENTS

ITEM QUANTITY UNIT UNIT COST AMOUNT
6" CURB & GUTTER L.F. $17.00 $0.00
8" CURB & GUTTER 802 L.F. $19.00 $15,238.00
8" THICK CROSS GUTTER 1,100 S.F. $11.00 $12,100.00
4" SIDEWALK 5998 S.F. $7.00 $41,986.00
ACCESS RAMP 1 EA $5,000.00 $5,000.00
DRIVE WAY APPROACHES 1,604 S.F. $11.00 $17,644.00
ASPHALT CONCRETE DIKES L.F. $11.00 $0.00
FOG SEAL S.F. $0.10 $0.00
IMPORTED BANKMENT C.Y. $10.00 $0.00
PREPARATION OF SUBGRADE 13,880 S.F. $0.50 $6,940.00
*A.C. 474 TON $150.00 $71,100.00
*A.C. OVERLAY (1" MIN. THICKNESS) 94 TON $150.00 $14,100.00 **PCC CURB ONLY (MEDIAN) L.F. $16.00 $0.00
ADJUST SEWER MANHOLE TO GRADE 1 EA $500.00 $500.00

ADJUST SEWER CLEAN OUT TO
GRADE EA $300.00 $0.00
ADJUST WATER VALVES TO GRADE 5 EA $250.00 $1,250.00
BARRICADES (STD 118) L.F. $40.00 $0.00
2 X 4 REDWOOD HEADER L.F. $5.00 $0.00
*REMOVAL OF A.C. PAVEMENT 13,696 S.F. $0.66 $9,039.36
**REMOVAL OF P.C.C. CURB 925 L.F. $6.00 $5,550.00
*REMOVAL OF A.C. BERM L.F. $5.00 $0.00
RETAINING WALL H=2 1/2 FT.

OR LESS L.F. $40.00 $0.00
BLOCK WALL H=6 FEET L.F. $50.00 $0.00
AGGREGATE BASE 0 TON $30.00 $0.00
GUARD POSTS EA $70.00 $0.00
GUARD PANEL (WOOD) L.F. $40.00 $0.00
SAWCUT 1,090 L.F. $3.50 $3,815.00
REFLECTORS AND POSTS EA $100.00 $0.00
STREET SIGNS EA $250.00 $0.00
POWER POLE REMOVALS 4 EA $5,000.00 $20,000.00
STREET IMPROVEMENT SUBTOTAL $224,262.36
* A.C. ASPHALTIC CONCRETE
** P.C.C. PORTLAND CONCRETE CEMENT
Based on Revised 11/18/2021 - RG (placed in Excel by MG-HZ)

DURIAN FONTANA
4/19/2023
ELPC22-000073

CITY OF FONTANA

ENGINEERING PRELIMINARILY APPROVED BY DATE CONSTRUCTION APPROVED CORRECTIONS FINAL APPROVED FOR INFORMATION ONLY ✔
Henry Pham 5/22/2023
272
SHEET 2

STORM DRAIN IMPROVEMENTS

ITEM QUANTITY UNIT UNIT COST AMOUNT
* 18" RCP (or LESS) 50 L.F. $90.00 $4,500.00
* 24" RCP L.F. $110.00 $0.00
* 30" RCP L.F. $250.00 $0.00
* 36" RCP L.F. $250.00 $0.00
* 42" RCP L.F. $250.00 $0.00
* 48" RCP L.F. $260.00 $0.00
* 54" RCP L.F. $280.00 $0.00
* 60" RCP L.F. $300.00 $0.00
* 66" RCP L.F. $320.00 $0.00
* 78" RCP L.F. $340.00 $0.00
* 24" CMP L.F. $90.00 $0.00
* 60" CMP L.F. $320.00 $0.00
CATCH BASIN/CURB INLET:

W=7 EA $4,000.00 $0.00
W=10 EA $4,500.00 $0.00
W=14 2 EA $6,000.00 $12,000.00
W=21 EA $11,000.00 $0.00
W=28 EA $14,000.00 $0.00
JUNCTION STRUCTURE 1 EA $3,200.00 $3,200.00

TRAFFIC TYPE JUNCTION
STRUCTURE EA $2,800.00 $0.00
DISCHARGE STRUCTURE EA $2,800.00 $0.00
MANHOLES EA $2,500.00 $0.00
LOCAL DEPRESSION 2 EA $1,250.00 $2,500.00
INLET STRUCTURE EA $2,100.00 $0.00
OPENING MODIFICATION, PIPE CONNECTION 1 EA $7,000.00 $7,000.00

AND COLLAR
STORM DRAIN IMPROVEMENT SUBTOTAL $29,200.00

SANITARY SEWER IMPROVEMENTS
MANHOLES 60" DIAMETER EA $4,500.00 $0.00
MANHOLES 48" DIAMETER 1 EA $4,000.00 $4,000.00
DROP MAN HOLES EA $4,500.00 $0.00
WYES EA $100.00 $0.00
CLEANOUTS 1 EA $600.00 $600.00

REMODELING OF EXISTING
MANHOLE: EA $950.00 $0.00
** 4" VCP L.F. $50.00 $0.00
** 6" VCP 50 L.F. $60.00 $3,000.00
** 8" VCP 125 L.F. $70.00 $8,750.00
** 10" VCP L.F. $80.00 $0.00
** 12" VCP L.F. $90.00 $0.00
** 15" VCP L.F. $100.00 $0.00
SANITARY SEWER IMPROVEMENT SUBTOTAL $16,350.00
273
SHEET 3
Based on Revised 11/18/2021 - RG (placed in Excel by MG-HZ)

TRAFFIC SIGNALS / SIGN / STRIPING

ITEM QUANTITY UNIT UNIT COST AMOUNT

TRAFFIC SIGNAL (MODIFICATION)
One Corner EA/LS $50,000 $0.00
Two Corners EA/LS $100,000 $0.00
TRAFFIC SIGNAL (COMPLETE) EA/LS $250,000 $0.00
PAINT TRAFFIC STRIPE ( 1 COAT) 50 L.F. $2.40 $120.00
PAINT TRAFFIC STRIPE (2 COATS) L.F. $0.65 $0.00
PEDESTRIAN CROSSWALK STRIPING 19 L.F. $0.65 $12.35

PAVEMENT MARKER
(NON REFLECTIVE) EA $2.50 $0.00
PAVEMENT MARKER (REFLECTIVE) 4 EA $4.00 $16.00
REFLECTORS AND POSTS EA $100.00 $0.00
STREET SIGNS 1 EA $250.00 $250.00
PAVEMENT LETTER MARKERS 1 EA $500.00 $500.00
TRAFFIC SIGNAL / SIGNS / STRIPING SUBTOTAL $898.35
* REINFORCE CONCRETE PILE
** VITRIFIED CLAY PILE

CFD LANDSCAPE IMPROVEMENTS (BONDING PURPOSES ONLY)
AREA LANDSCAPED S.F. $12.00 $0.00
REFLECTORS AND POSTS S.F. $12.00 $0.00
LANDSCAPING IMPROVEMNTS SUBTOTAL $0.00
Based on Revised 11/18/2021 - RG (placed in Excel by MG-HZ) 274
SHEET 4
STREET IMPROVEMENT SUBTOTAL …………………………………………. $224,262
STORM DRAIN IMPROVEMENTS SUBTOTAL ……………………………….. $29,200 SANITARY SEWER IMPROVEMENTS SUBTOTAL…………………………… $16,350 TRAFFIC SIGNAL / SIGNS / STRIPING SUBTOTAL …………………………. $898 IMPROVEMENT SUBTOTAL $270,711
(USE THIS TOTAL FOR PLAN CHECK & PERMITTING PURPOSES)
CFD LANDSCAPE IMPROVEMENTS $0.00
SUBDIVISION MONUMENT GURANTEE $1200 +$50/LOT $1,250.00
STREET LIGHTS 4 $5,000 $20,000.00
CUCAMONGA COUNTY WATER DISTRICT FACILITIES $0.00
IMPROVEMENT SUBTOTAL $291,961
ADD 35% $102,186.25
BONDING TOTAL $395,000
APPROVED PUBLIC IMPROVEMENT PLANS:

STREET IMP. DWG. NO._________________________
STREET LIGHT DWG. NO._______________________
SEWER IMP. DWG. NO. _________________________
STORM DRAIN IMP. NO. ________________________
TRAFFIC SIGNAL DWG. NO. _____________________
SIGNING & STRIPING DWG. NO. _________________
Based on Revised 11/18/2021 - RG (placed in Excel by MG-HZ) 04/19/23
EXP. 09/30/23 DATE
EXP. 09/30/23
6330 6330LT 6331

CITY OF FONTANA

ENGINEERING PRELIMINARILY APPROVED BY DATE CONSTRUCTION APPROVED CORRECTIONS FINAL APPROVED FOR INFORMATION ONLY ✔
Henry Pham 5/22/2023
275
276
277
278
279
280
281
8 Revised - RP – 09/01/2022

LAND IMPROVEMENT AGREEMENT
EXHIBIT “B”
I,
(Applicant’s name here)
am the owner of the property to which this Request is being made for a One Year Time Extension for Project No. .

Print Name:

Applicant’s Signature:

Applicant’s Address:

Date:
(Attached Notary Acknowledgment)

CITY OF FONTANA
BY: DATE:

City Engineer
[ ] DENY
[ ] APPROVED
NEW DATE:
282
283
City of Fontana
Action Report
City Council Meeting
8353 Sierra Avenue
Fontana, CA 92335
File #: 21-2417 Agenda Date: 9/12/2023
Agenda #: G. Category: Consent Calendar
FROM:

Engineering
SUBJECT:

Award a Construction Contract for the Blanchard Avenue Sidewalk Gap Project RECOMMENDATION:

1. Award bid and authorize the City Manager to execute a construction contract with SNZ Contractors, Inc. for the construction of the Blanchard Ave Sidewalk Gap Project in the amount of $115,095.00 and authorize a 10% contingency in the amount of $11,509.50 (Bid No. SB-126-DE23).

2. Appropriate $102,000 of Air Quality Management District (AQMD) Fund 241 to the Blanchard Avenue Sidewalk Gap Project No. 3115.

3. Approve and authorize the City Manager to execute any and all utility agreements, utility easements, and subsequent agreements on behalf of the City of Fontana for the Blanchard Ave Sidewalk Gap Project.

COUNCIL GOALS:
· To invest in the City’s infrastructure (streets, sewers, parks, etc.) by maintaining and improving the city's existing infrastructure.
· To invest in the City’s infrastructure (streets, sewers, parks, etc.) by providing for the development of new infrastructure.

DISCUSSION:

The City of Fontana received requests from residents to close sidewalk gaps that exist along Blanchard Avenue, just south of Miller Avenue. This project will construct the missing sidewalk gaps in front of the four residential properties, thereby creating a continuous path of travel. Additionally, an existing curb ramp will be reconstructed to be compliant with the latest Americans with Disabilities Act (ADA) requirements. These improvements will enhance the pedestrian path of travel for residents in the vicinity.

On July 6th, 2023, at 2:00 p.m. the bids for this contract were opened. A total of nine (9) bids were received ranging from $115,095.00 to $796,175.00. SNZ Contractors, Inc. is the lowest bidder in the City of Fontana Page 1 of 2 Printed on 9/7/2023
powered by Legistar™284
File #: 21-2417 Agenda Date: 9/12/2023
Agenda #: G. Category: Consent Calendar
amount of $115,095.00. The Engineer's estimate was $100,000.00. After reviewing the proposed bid documents and performing reference checks, Engineering staff has determined SNZ Contractors, Inc. to be the lowest responsive and responsible bidder.

FISCAL IMPACT:

The fiscal impact associated with the approval of this item is $126,604.50, for the full term of the construction contract. The available budget is about $61,175. Considering all projected expenses for the project, an additional $102,000 is being requested in 37603115-241-I-8330 and is not included in the FY 2023-2024 budget. The request will be submitted in the next quarterly budget report and will be funded by Air Quality Management District (AQMD) Fund 241.

MOTION:

Approve staff recommendation.

City of Fontana Page 2 of 2 Printed on 9/7/2023
powered by Legistar™285
N
0 1 inch = 600 feet
600 1200

PROJECT LOCATION

BLANCHARD AVENUE SIDEWALK GAP
PROJECT (PN3115)
286
Bid Results
Blanchard Ave Sidewalk Gap Project
SB-126-DE-23

1. SNZ Contractors, Inc $115,095.00
Irvine, CA

2. FS Contractors, Inc $116,620.00
Sylmar, CA

3. Voltaire Engineering $123,610.00
Los Alamitos, CA

4. Dash Construction, Inc $130,690.00
Woodland Hills, CA

5. Gentry General Engineering, Inc $146,579.50
Rancho Cucamonga, CA

6. DM Contracting, Inc $167,405.00
Colton, CA

7. ISSA Electric, Inc $187,515.02
Riverside, CA

8. HZS Engineering, Inc $189,490.00
Santa Ana, CA

9. We R Builders, Inc $796,175.00
Glendale, CA
287
City of Fontana
BLANCHARD AVE. SIDEWALK GAP PROJECT (SB-126-DE-23), bidding on 07/06/2023 2:00 PM (PDT)

Page 1 of 4 ends

Printed 07/19/2023
PlanetBids, Inc.
288
City of Fontana
BLANCHARD AVE. SIDEWALK GAP PROJECT (SB-126-DE-23), bidding on 07/06/2023 2:00 PM (PDT)

Page 2 of 4 ends

Printed 07/19/2023
PlanetBids, Inc.
289
City of Fontana
BLANCHARD AVE. SIDEWALK GAP PROJECT (SB-126-DE-23), bidding on 07/06/2023 2:00 PM (PDT)

Page 3 of 4 ends

Printed 07/19/2023
PlanetBids, Inc.
290
City of Fontana
BLANCHARD AVE. SIDEWALK GAP PROJECT (SB-126-DE-23), bidding on 07/06/2023 2:00 PM (PDT)

Page 4 of 4 ends

Printed 07/19/2023
PlanetBids, Inc.
291
City of Fontana
Action Report
City Council Meeting
8353 Sierra Avenue
Fontana, CA 92335
File #: 21-2419 Agenda Date: 9/12/2023
Agenda #: H. Category: Consent Calendar
FROM:

Community Services
SUBJECT:

Approve a Contract with TA Mentoring Services LLC for the Noble Youth Program to be delivered at Fontana Expanded Learning Program school sites.

RECOMMENDATION:

1. Approve a contract with TA Mentoring Services LLC to provide and deliver the Noble Youth Leadership Program at the Fontana Expanded Learning Program’s twenty-eight (28) Elementary School sites and the five (5) Middle School sites.

2. Approve the Non-Competitive Proposal purchase under the Purchasing Policies 3.1.5 for Single Source/Sole Source method.

3. Authorize the City Manager or designee to sign the agreement, all related documents, and any amendments for the term of the agreement.

COUNCIL GOALS:
· Operate in a businesslike manner by creating a memorable customer experience with every interaction.
· Increase citizen involvement by Developing future leaders. · Increase citizen involvement by promoting healthy lifestyle opportunities to residents of all ages.

DISCUSSION:

The City of Fontana is currently in an Agreement with the Fontana Unified School District (FUSD) as the Fontana Expanded Program (FELP) Provider. FELP is an After School Education and Safety (ASES) Grant and Expanded Learning Opportunities Program (ELO-P) funded program.

As part of the grant required curriculum components, FELP provides leadership opportunities and 21st Century Skill lessons to meet the program requirements as well as align with the district’s efforts to prepare student education and leadership exploration.

To support the operating Agreement between the City and FUSD, FELP is recommending to contract with TA Mentoring Services LLC to provide and deliver the Noble Youth Leadership Program at the Fontana Expanded Learning Program’s twenty-eight (28) Elementary School sites and the five (5) Middle School sites. The program will support student leadership development and expose them to Social Emotional Skills needed for successful social and academic achievement. The Noble Youth City of Fontana Page 1 of 2 Printed on 9/6/2023
powered by Legistar™292
File #: 21-2419 Agenda Date: 9/12/2023
Agenda #: H. Category: Consent Calendar
Leadership curriculum will focus on teaching students important values in life such as respect, dignity, love and trust. In addition, they will train FELP staff on the Noble Youth Leadership curriculum.

This is a sole source contract as the curriculum is only available through TA Mentoring Services LLC.and meets grant requirements. Purchasing Policy 3.1.5 allows the purchase when no competitive advantage would be gained from services that are unique and are only available from one source.

FISCAL IMPACT:

The program cost is $517,000.00 and is budgeted in the adopted FY 2023/2024 Community Services Department operating budget in account 38624101.8130. The cost is 100% fully reimbursable.

MOTION:

Approve a contract with TA Mentoring Services LLC for the Fontana Expanded Learning Program at all thirty-three (33) FELP sites.

City of Fontana Page 2 of 2 Printed on 9/6/2023
powered by Legistar™293
TA Mentoring Services, LLC: 760-771-7701 - [email protected] TA Mentoring Services, LLC
Noble Youth (Restorative Circles)
Scope of work
Expanded Learning Youth Leadership Vision
To enhance the quality of life for youth in the City of Fontana.

Enrollment - Approximately 900 participants from the Fontana Expanded Learning Program will participate in the Noble Youth Program.

Cost to Participants - There is no cost to participants; Fontana Expanded Learning Program (FELP) will cover costs through the Expanded Learning Opportunities – Program grant funding
Curriculum - The Noble Youth curriculum will focus on teaching students about important values in life: respect, dignity, love, and trust.

Staff Follow-Up – TA Mentoring Services, LLC will provide ongoing check-ins with site staff.

Informational Sessions with Parents - Students will attend an informational session with their parents to outline the objectives of the program and review guidelines and expectations.

Sessions with Students - The participants will go through 12 sessions as part of the curriculum.

Training FELP staff - Fontana Expanded Learning Program (FELP) staff will receive training on implementation of Noble Youth Curriculum.

Contract Start/End - September 2023 to June 30, 2024
Services provided to - Fontana Expanded Learning Program (FELP) TA Mentoring Services, LLC fee includes:
• 12 sessions
• Up to 900 students served (3 groups of 15-20 students at each site) • FELP staff members will attend Noble Youth sessions
• Train staff in Restorative Practices.
• Parent informational meetings at each site or through Zoom. • Follow-up calls/meetings with students and parents.
294
TA Mentoring Services, LLC: 760-771-7701 - [email protected] • Develop outreach materials in partnership with Fontana Expanded Learning Program staff.
• Three celebrations for program participants in Noble Youth - Food will be provided.
• T-shirts, bracelets and backpacks are provided to student participants. • Program planning and implementation.
• Presentation to Fontana Expanded Learning Program staff on program implementation.
• Will support City of Fontana efforts to collect data based on evaluation outcomes agreed to collectively.
• Noble Youth staff will attend all meeting requests by the Fontana Expanded Learning Program.

Total Cost: $517,000
Program Budget
Program Budget (based on up to 900 youth served):

Item Total
T-shirts - 300 x 3 Cohorts $15,000
Backpacks 300 x 3 Cohorts $5,000
Bracelets (900) 300 x 3 Cohorts $2,000
Ceremony for 300 Participants x 3
Cohorts $20,000
Student Rewards 300 x 3 Cohorts $5,000
Trainings, Special Meetings, Program
Evaluation $70,000
1 - Facilitator Lead (Program
Manager) $100,000
5 Assistant Facilitators $300,000
Total $517,000
Student Rewards - Students who attend weekly and actively participate are rewarded with snacks and prizes.

Ceremonies - At the end of each cohort, students are invited to attend the ceremony. Food, cake, and drinks are provided for students and their families.

Trainings – FELP staff will receive trainings from the National Compadres Network on Noble Youth curriculum.

Facilitator - Provide oversight and program implementation.

Assistant Facilitators - Provide program support to school sites and help staff with implementation.
295
296
297
298
299
300
301
302
303
304
305
City of Fontana
Action Report
City Council Meeting
8353 Sierra Avenue
Fontana, CA 92335
File #: 21-2420 Agenda Date: 9/12/2023
Agenda #: I. Category: Consent Calendar
FROM:

Community Services
SUBJECT:

Approve a Contract EBK & Company LLC to provide and deliver the US Engineering League for the Fontana Expanded Learning Program.

RECOMMENDATION:

1. Approve a contract with EBK & Company LLC to provide and deliver the US Engineering League, Mechanical Engineering/Robotics Club for the Fontana Expanded Learning Program at ten (10) Elementary School sites and the five (5) Middle School sites.

2. Approve the Non-Competitive Proposal purchase under the Purchasing Policies 3.1.5 for Single Source/Sole Source method.

3. Authorize the City Manager or designee to sign the agreement, all related documents, and any amendments for the term of the agreement.

COUNCIL GOALS:
· Operate in a businesslike manner by creating a memorable customer experience with every interaction.
· Increase citizen involvement by Developing future leaders.

DISCUSSION:

The City of Fontana is currently in an Agreement with the Fontana Unified School District (FUSD) as the Fontana Expanded Program (FELP) Provider. FELP is an After School Education and Safety (ASES) Grant and Expanded Learning Opportunities Program (ELO-P) funded program.

As part of the grant required curriculum components, FELP provides science, technology, engineering, and mathematics opportunities and 21st Century Skill lessons to meet the program requirements as well as align with the district’s efforts to prepare student education and career exploration.

To support the operating Agreement between the City and FUSD, FELP is recommending to contract with EBK & Company LLC to provide and deliver the US Engineering League, Mechanical Engineering/Robotics Club for FELP at ten (10) Elementary School sites and the five (5) Middle School sites. The United States Engineering League curriculum will focus on teaching students important skills in STEM such as coding, mechanical engineering, physics, and art. In addition, they City of Fontana Page 1 of 2 Printed on 9/7/2023
powered by Legistar™306
File #: 21-2420 Agenda Date: 9/12/2023
Agenda #: I. Category: Consent Calendar
will train FELP staff on the US Engineering League curriculum.

This is a sole source contract as the curriculum is only available through EBK & Company LLC and meets grant requirements. Purchasing Policy 3.1.5 allows the purchase when no competitive advantage would be gained from services that are unique and are only available from one source.

FISCAL IMPACT:

The program cost is $1,747,500.00 and is budgeted in the adopted FY 2023/2024 Community Services Department operating budget in account 38624101.8130. The cost is 100% fully reimbursable.

MOTION:

Approve a contract with EBK & Company LLC to provide and deliver the US Engineering League, Mechanical Engineering/Robotics Club for the Fontana Expanded Learning Program at ten (10) Elementary School and the five (5) Middle School FELP sites.

City of Fontana Page 2 of 2 Printed on 9/7/2023
powered by Legistar™307
Please Make Checks Payable To: US Engineering League
US Engineering League
2933 S Walker ave
Ontario, CA 91761
(909) 545-6711
[email protected]
usengineeringleague.org

BILL TO SHIP TO
Accounts Payable
City of Fontana Expanded
Learning Program
8353 Sierra Avenue
Fontana, CA 92335
Community Services
16860 Valencia Ave
Fontana, CA 92335
QUOTE1287
DATE 07/28/2023 TERMS Net 60

ACTIVITY QTY RATE AMOUNT
After-School Program:USEL Race Engineering - Full Implementation Provide the City with USEL Race Engineering Sessions at 15 School Sites.

USEL will provide 2 instructors per site, race track,, and all instruction to implement the program.

Scheduled to start 09/01/2023 and conclude 12/08/2023
15 11,666.6666667 175,000.00
Product Sales:USEL Race Car Engineering Kit
USEL Race Engineering set used for race engineering programs 300 350.00 105,000.00
Product Sales:USEL Race Engineering Spare Parts Kits
Spare parts used to replace motor, wheels, and metallic pieces from USEL Race Car Kit
15 1,000.00 15,000.00
Consultant:Professional Devlopment
Specialized training for FELP staff on USEL Specific curriculum.

Training Conducted on 3 separate occasions over the 2023/2024 school year
3 15,000.00 45,000.00
After-School Program:USEL Robotics Competition Training - World Robot Olympiad
Provide the City with USEL Race Engineering Sessions at 15 School Sites.

USEL will provide 2 instructors per site and required training materials Scheduled to start 01/22/2024 and conclude 05/03/2024
15 11,666.6666667 175,000.00
Product Sales:World Robot Olympiad Table Tops
World Robot Olympiad Expandable Table Top used for practice and competition (9 tables per school site)
135 350.00 47,250.00
WRO Challenge Pieces & Mats
World Robot Olympiad Expandable Table Top used for practice and competition (9 tables per school site)
135 200.00 27,000.00
WRO Official School Banner Plaques
Official School Partner Plaques For Display
15 433.333333 6,500.00
308
Please Make Checks Payable To: US Engineering League

ACTIVITY QTY RATE AMOUNT
USEL Robotic Sensor Upgrades
Robot Sensor Upgrades For use on Competition Robot Kits 15 school sites
15 1,000.00 15,000.00
After-School Program:USEL SumoBots League - Full Implementation by USEL
Provide the City with USEL SumoBots League Sessions at 15 School Sites.

USEL will provide 2 instructors per site.

Scheduled to start 06/03/2024 and conclude 06/28/2024
33 23,333.3333333 770,000.00
Product Sales:SumoBot Kit
USEL SumoBot Kit for 33 elementary sites
990 325.00 321,750.00
Product Sales:SumoBot Kit Replacement Parts
SUmoBot Kit replacement parts, motors, metallic pieces for 33 school sites
33 303.030303 10,000.00
USEL SumoMat
USEL SumoMat Table for 33 school sites (Each site needs 4 Tables) 120 200.00 24,000.00
Consultant:Professional Video / Photography
Professional Video and photography for all programs run during the school year for use by the City of Fontana
1 11,000.00 11,000.00
Any Questions Regarding this Invoice please call Ericka Kreimann (909) 644-7545
SUBTOTAL 1,747,500.00
TAX 0.00
TOTAL 1,747,500.00
TOTAL DUE $1,747,500.00
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
City of Fontana
Action Report
City Council Meeting
8353 Sierra Avenue
Fontana, CA 92335
File #: 21-2421 Agenda Date: 9/12/2023
Agenda #: J. Category: Consent Calendar
FROM:

Community Services
SUBJECT:

Approve the purchase of Sandy Spin Inc. Skillastics Speed Stacks curriculum to be delivered at Fontana Expanded Learning Program’s school sites.

RECOMMENDATION:

1. Approve purchase of Sandy Spin Inc. Skillastics Speed Stacks Curriculum, an additional component to the current physical education curriculum at all sites of the Fontana Expanded Learning Program.

2. Approve the Non-Competitive Proposal purchase under the Purchasing Policies 3.1.5 for Single Source/Sole Source method.

3. Authorize the Purchasing Division to issue a purchase order for the Speed Stack Skillastics Custom Package curriculum from Sandy Spin Slade.

COUNCIL GOALS:
· Operate in a businesslike manner by creating a memorable customer experience with every interaction.
· Increase citizen involvement by promoting healthy lifestyle opportunities to residents of all ages.

DISCUSSION:

The City of Fontana is currently in an Agreement with the Fontana Unified School District (FUSD) as the Fontana Expanded Program (FELP) Provider. FELP is an After School Education and Safety (ASES) Grant and Expanded Learning Opportunities Program (ELO-P) funded program.

As part of the grant required curriculum components, FELP provides physical education opportunities and 21st Century Skill lessons to meet the program requirements as well as align with the districts’ efforts to prepare students to have physically active lives and make healthy choices.

To support the operating Agreement between the City and FUSD, FELP is recommending the purchase of Sandy Spin Inc. Skillastics Speed Stacks Curriculum, an additional component to the current physical education curriculum at all sites of the Fontana Expanded Learning Program. The Skillastics Speed Stack curriculum offers a wide range of physical activities and specialty programs, in a fun and engaging manner, for a variety of ages and skill levels. The curriculum focuses on teaching students important values in living a healthy life such as mindfulness and physical exercise.

City of Fontana Page 1 of 2 Printed on 9/6/2023
powered by Legistar™326
File #: 21-2421 Agenda Date: 9/12/2023
Agenda #: J. Category: Consent Calendar
FELP will have access to this curriculum for the life of the program.

This is a sole source contract as the curriculum is only available through Sandy Spin Inc. Skillastics and meets grant requirements. Purchasing Policy 3.1.5 allows the purchase when no competitive advantage would be gained from services that are unique and are only available from one source.

FISCAL IMPACT:

The program cost is $178,540.10 and is budgeted in the adopted FY 2023/2024 Community Services Department operating budget account 38624101.8010. This cost is 100% fully reimbursable.

MOTION:

Approve the purchase of Sandy Spin Inc Skillastics Speed Stacks curriculum for the Fontana Expanded Learning Program to be used at all FELP sites.

City of Fontana Page 2 of 2 Printed on 9/6/2023
powered by Legistar™327
Quote#:

Date:

Prepared by:

E-mail:

Preparer's Phone:

Name: Email:

School/Org.:

Address:

City/State: Zip: 92335 Phone:

ATTN To:

City: State: Zip:

Phone: Email:

Item # QTY Unit Price
VFFCSS 33 $ 4,518.00
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
$ -
Pricing valid for 90 Days
E-mail: [email protected]
PO Box 1513, Corona, CA 92878 Applicable Taxes (7.75%) $ 11,554.80 (951) 279-3476 • Fax: (951) 279-3957 • Toll Free (888) 842-7746 Total Delivered Cost $ 178,540.10 Mail, Fax or E-mail this quote to: Product Cost $ 149,094.00 Sandy Spin Slade, Inc./DBA Skillastics Shipping & Handling $ 17,891.30 *Included is a Free 1 Hour Training $ -
$ -
$ -
(6) Timers for Competitions $ -
(6) Stack Mats $ -
Carrying Case for Cups, Timers and Stack Mats $ -
(2) Speed Stacks Skillastics kits $ -
(2) Sets of Jumbo Cups $ -
30 Day Cup Stacking Specialty Digital Program $ -
Speed Stack Skillastics Custom Package $ 149,094.00
Package Includes: $ -
(4) 30 Set Class Packs (120 cups per site) $ -
Product Description Total Price
P.O. Number : Shipping Facility Name:

Shipping Street Address:

Customer's Billing and Shipping Information
Sandy Spin Slade, Inc./DBA Skillastics
Customer's Contact Information
Tammy Wilkerson [email protected]
City of Fontana
16860 Valencia Ave.

Fontana/CA 909-349-6945
Notes:
**Sorting and Labeling per site is included
(310) 431-8205
Price Quote
JW092322a
August 2, 2023
Jess Wadleigh
[email protected]
328
City of Fontana
Action Report
City Council Meeting
8353 Sierra Avenue
Fontana, CA 92335
File #: 21-2422 Agenda Date: 9/12/2023
Agenda #: K. Category: Consent Calendar
FROM:

Community Services
SUBJECT:

Approve the purchase ZTag curriculum to be delivered at Fontana Expanded Learning Program’s school sites.

RECOMMENDATION:

1. Approve purchase of ZTag, an additional component to support academic and physical education development of participants at all sites of the Fontana Expanded Learning Program.

2. Approve the Non-Competitive Proposal purchase under the Purchasing Policies 3.1.5 for Single Source/Sole Source method.

3. Authorize the Purchasing Division is issue a purchase order for the ZUES v2 curriculum from ZTag.

COUNCIL GOALS:
· Improve public safety by emphasizing community-oriented policing, community involvement, and youth programs.
· Increase citizen involvement by promoting healthy lifestyle opportunities to residents of all ages.

DISCUSSION:

The City of Fontana is currently in an Agreement with the Fontana Unified School District (FUSD) as the Fontana Expanded Program (FELP) Provider. FELP is an After School Education and Safety (ASES) Grant and Expanded Learning Opportunities Program (ELO-P) funded program.

As part of the grant required curriculum components, FELP provides academic support, physical education opportunities and 21st Century Skill lessons to meet the program requirements as well as align with the districts’ efforts to support students’ academic and physical development.

To support the operating agreement between the City and FUSD, FELP is recommending purchasing ZTag an additional component to support academic and physical education development of participants at all sites of the Fontana Expanded Learning Program. The ZTag curriculum offers a wide-ranging academic support curriculum based on physical activities and specialty programs, in a fun and engaging manner, for a variety of ages and skill levels.

This is a sole source contract as the curriculum is only available through ZTag and meets grant City of Fontana Page 1 of 2 Printed on 9/6/2023
powered by Legistar™329
File #: 21-2422 Agenda Date: 9/12/2023
Agenda #: K. Category: Consent Calendar
requirements. Purchasing Policy 3.1.5 allows the purchase when no competitive advantage would be gained from services that are unique and are only available from one source.

FISCAL IMPACT:

The program cost is $1,488,081.38 and is budgeted in the adopted FY 2023/2024 Community Services Department operating budget in account 38624101.8130. The cost is 100% reimbursable.

MOTION:

Approve the purchase of ZTag curriculum for the Fontana Expanded Learning Program to be used at all FELP program sites.

City of Fontana Page 2 of 2 Printed on 9/6/2023
powered by Legistar™330
1 Sub Total 1,534,500.00
Discount(10.00%) (-) 153,450.00
SB (7.75%) 107,031.38
Total $1,488,081.38
Quote Date : 08 May 2023
ZTAG
30440 Byfield Rd
Castaic California 91384
U.S.A
Quote
# ZTAG Quote - 001083
Bill To
Fontana City
# Item & Description Qty Rate Amount
1 ZUES v2
ZUES v2 - Command Center with 24 zTagger Pro - with 6 programs (Red Light Green Light, Zombie Survival, Rock Paper Scissor, Pattern Match, Keep Away, Math Match). Includes 1 year complimentary service and software upgrade plan
165.00
pcs
9,300.00 1,534,500.00
Notes
With Gratitude,
Stan Liu
Email: [email protected]
Tel Direct: 323-253-2800
Zoom Meeting: https://calendly.com/sonicsurfer/30min
Tel: (888) 3GO-ZTAG
Terms & Conditions
ZTAG warrants its products against manufacturing defects for 1 year from purchase date.
331
City of Fontana
Action Report
City Council Meeting
8353 Sierra Avenue
Fontana, CA 92335
File #: 21-2423 Agenda Date: 9/12/2023
Agenda #: L. Category: Consent Calendar
FROM:

Engineering
SUBJECT:

Approve an Encroachment Agreement to Construct and Maintain Improvements Beneath the Etiwanda Avenue Overpass
RECOMMENDATION:

Approve and authorize the City Manager to execute an Encroachment Agreement between the City of Fontana and Union Pacific Railroad Company to construct and maintain improvements located beneath the Etiwanda Avenue overpass at the intersection of Etiwanda Avenue and North Loop Road COUNCIL GOALS:
· To invest in the City’s infrastructure (streets, sewers, parks, etc.) by maintaining and improving the city's existing infrastructure.
· To invest in the City’s infrastructure (streets, sewers, parks, etc.) by providing for the development of new infrastructure.

DISCUSSION:

The Union Pacific Railroad Company is proposing to construct crash walls to provide protection for the piers supporting the Etiwanda Avenue overpass, together with minor grading improvements to support a portion of the railroad track bed. These improvements are located beneath the Etiwanda Avenue overpass at the intersection of Etiwanda Avenue and North Loop Road. The proposed improvements encroach onto City right-of-way and this agreement will allow Union Pacific Railroad Company to encroach onto City right-of-way for the installation and maintenance of the improvements. Under the terms of this agreement, Union Pacific Railroad Company agrees to maintain, repair, and replace all improvements as necessary.

FISCAL IMPACT:

Union Pacific Railroad Company will assume responsibility for all proposed improvements, therefore there is no impact to City resources at this time.

MOTION:

Approve staff recommendation.

City of Fontana Page 1 of 1 Printed on 9/6/2023
powered by Legistar™332
RECORDING REQUESTED BY:

City Clerk
City of Fontana
WHEN RECORDED MAIL TO:

City of Fontana
8353 Sierra Avenue
Fontana, CA 92335
Attn: City Clerk
(Space above for Recorder's Use)
Exempt from Recording Fees per Gov. Code §§ 6103, 27383

ENCROACHMENT AGREEMENT
THIS ENCROACHMENT AGREEMENT (“AGREEMENT”) is issued by the CITY OF FONTANA, a California municipal corporation and general law city (“CITY”), to UNION PACIFIC RAILROAD COMPANY, a Delaware corporation (“PERMITTEE”). CITY and PERMITTEE are sometimes hereinafter referred to individually as a “Party” and collectively as the “Parties.”

RECITALS
A. CITY holds a public right-of-way (“PUBLIC RIGHT-OF-WAY”) on, over, under and across certain real property in the City of Fontana, County of San Bernardino, State of California, more particularly described in Exhibit A and depicted on Exhibit B, which are attached hereto and incorporated herein by reference, with respect to the highway overpass known as Etiwanda Avenue (the “OVERPASS”).

B. PERMITTEE has applied for an encroachment permit from CITY in connection with PERMITTEE’S construction of a project on PERMITTEE’S right-of-way adjacent to the PUBLIC RIGHT-OF-WAY.

C. PERMITTEE desires to construct and maintain a crash wall on a portion of the PUBLIC RIGHT-OF-WAY to provide protection for the piers supporting the OVERPASS, together with minor grading improvements to support a portion of PERMITTEE’S track bed.

D. PERMITTEE has requested that CITY enter into this AGREEMENT, whereby PERMITTEE would be authorized to install, maintain, repair and replace certain improvements on, over, under and across the PUBLIC RIGHT-OF-WAY.
333
E. CITY agrees to provide to PERMITTEE the right to encroach upon the PUBLIC RIGHT-OF-WAY for the installation and maintenance of certain improvements on, over, under and across the PUBLIC RIGHT-OF-WAY, subject to the terms and conditions contained herein.

AGREEMENT

1. Grant of Encroachment. CITY hereby grants to PERMITTEE a right of encroachment upon the PUBLIC RIGHT-OF-WAY for the purpose of constructing, installing, maintaining, repairing, replacing and operating the IMPROVEMENTS (defined below), subject to the limitations set forth in this AGREEMENT and PERMITTEE’S fulfillment and ongoing compliance with the terms and conditions set forth herein. The installation and maintenance of, and any use of, the IMPROVEMENTS shall be subordinate to any use and operations which CITY may conduct during the effective period of this AGREEMENT, and PERMITTEE shall not cause any unreasonable delay or interference with CITY’S access to the PUBLIC RIGHT-OF-WAY.

PERMITTEE shall not interfere with the operations of CITY on the PUBLIC RIGHT-OF-WAY, whether or not such interference is considered material.

2. Authorized Improvements. The improvements authorized to be installed pursuant to this AGREEMENT are limited to elements of a crash wall to provide protection for the piers supporting the OVERPASS, together with minor grading improvements to support a portion of PERMITTEE’S track bed ( the “IMPROVEMENTS”), in the PUBLIC RIGHT-OF-WAY, as more particularly described and depicted in Exhibits A and B. The right of PERMITTEE to install, maintain, repair, replace and use the IMPROVEMENTS is subject to the following limitations, and conditioned upon PERMITTEE implementing the following protective measures and physical construction standards in connection with the IMPROVEMENTS:
a. Final design drawings and plans for the IMPROVEMENTS, as approved by CITY and PERMITTEE, are attached hereto as Exhibit C and incorporated herein by reference and considered a material part of this AGREEMENT. PERMITTEE shall construct, install, operate and maintain the IMPROVEMENTS in strict compliance with the approved final design drawings and plans, and no changes or deviations therefrom shall be permitted without PERMITTEE first obtaining the prior written consent of CITY, which may be granted or denied in CITY’S sole discretion. The issuance of building and encroachment permits by CITY for any changes and modifications shall be presumed to constitute consent of such changes and modifications under this AGREEMENT. b. A schedule of construction activities within the PUBLIC RIGHT-OF-WAY shall be provided to and approved by CITY prior to the commencement of any construction work within the PUBLIC RIGHT-OF-WAY. No heavy equipment shall be operated within or traverse the PUBLIC RIGHT-OF-WAY, when there is less than 24 inches of soil over any existing public improvements. No vibratory compaction will be allowed within the PUBLIC RIGHT-OF-WAY unless approved in writing by CITY. All IMPROVEMENTS shall be open and subject to inspection by CITY, and PERMITTEE shall give notice and allow CITY to inspect any underground improvements prior to backfilling. PERMITTEE shall provide CITY with “as-built” drawings of the IMPROVEMENTS within thirty (30) days of completion of the construction activities.
c. PERMITTEE shall reimburse CITY for any and all expenses incurred by CITY for work, if any, to support or protect the PUBLIC RIGHT-OF-WAY within thirty (30) days 334
after receiving written demand and a statement from CITY detailing such costs. If PERMITTEE fails to perform the necessary work to support or protect the PUBLIC RIGHT-OF-WAY within thirty (30) days after receiving written notice from CITY , or if CITY must immediately perform such work in the event of an emergency or if otherwise legally mandated to do so, CITY may proceed with performing such work at the sole expense of PERMITTEE. PERMITTEE shall thereafter reimburse CITY within thirty (30) days after receiving written demand and an itemized statement from CITY detailing the costs incurred for such work. d. PERMITTEE shall be required to obtain all other necessary and required licenses, permits and authorizations from any governmental agency with jurisdiction over the IMPROVEMENTS and to pay all fees and charges associated therewith, prior to commencing any work on the IMPROVEMENTS. This AGREEMENT does not constitute, nor grant, permission to use or occupy any property or portion thereof, not belonging to, or under the control of CITY.

Permission to use or occupy such property must be obtained from the owner or controller of the property, separate from and in addition to this AGREEMENT. e. PERMITTEE shall not alter, replace, or otherwise change the IMPROVEMENTS without complying with the terms of this Section 2.

3. No Grant of Property Interest. This AGREEMENT is not a grant by CITY of any property or ownership interest, but is made subject and subordinate to the prior and continuing right of CITY to use all of the PUBLIC RIGHT-OF-WAY including, but not limited to, public use as a street and for the purpose of laying, installing, maintaining, repairing, protecting, replacing, and removing sanitary sewers, water mains, storm drains, gas mains, poles, overhead and underground electrical and telephone wires, cable television, telecommunications facilities and other utility and municipal uses, as applicable, together with appurtenances thereof and with right of ingress and egress, along, over, across and on said PUBLIC RIGHT-OF-WAY.

4. Construction and Operation. PERMITTEE shall construct, operate, maintain and repair the IMPROVEMENTS so as not to endanger or interfere with any improvements that CITY makes or to otherwise interfere in any manner with the PUBLIC RIGHT-OF-WAY or legal rights of any property owner or to unnecessarily hinder or obstruct pedestrian or vehicular traffic within any portion of the PUBLIC RIGHT-OF-WAY. PERMITTEE shall not place facilities, equipment or fixtures where they will interfere with any gas, electric, telephone, telecommunications, water, sewer or other utility facilities, as applicable, or obstruct or hinder in any manner such entity’s use of any PUBLIC RIGHT-OF-WAY, and shall provide the minimum distance or separation for any sewer, storm, water, electrical and gas lines as required by all applicable codes and regulations.

5. Repair of Damage. Any damage caused directly or indirectly by PERMITTEE to the PUBLIC RIGHT-OF-WAY or to CITY’S improvements therein or other property shall be repaired by CITY, at PERMITTEE’S sole cost and expense, or if authorized by CITY may be repaired by PERMITTEE at its sole cost and expense. If CITY elects to perform the repair work itself, PERMITTEE shall reimburse CITY for the full costs of the repair work within thirty (30) days after receiving a written demand and itemized statement from CITY detailing such costs. In the event payment is not made within said thirty (30) day period, said payment shall accrue interest at a rate of ten percent (10%) per annum from the end of said thirty (30) day period until paid in full.

6. Relocation or Abandonment of Improvements.
335
a. Emergency Relocation. In the event of an emergency, or where the IMPROVEMENTS create or are contributing to an imminent danger to health, safety or property, CITY may remove, relay or relocate any or all parts of the IMPROVEMENTS with prior notice to PERMITTEE’S Response Management Communications Center at (888) 877-7267. Except for instances where a coordinated response by CITY and PERMITTEE is necessary, the aforementioned notice requirement shall not impede or prevent the CITY from removing, relaying, or relocating any or all parts of the IMPROVEMENTS in emergency circumstances where immediate action is required and, in any such event, notice of CITY’s actions shall be communicated by CITY to PERMITTEE’S Response Management Communications Center as soon thereafter as conditions may reasonably and safely allow. PERMITTEE shall be responsible for all costs reasonably incurred in connection with such emergency relocation. The term “emergency” shall be defined in accordance with California law and in general, shall be considered as an unforeseen circumstance which calls for immediate action. b. Permanent Relocation. PERMITTEE shall permanently remove or relocate, without cost or expense to CITY, the IMPROVEMENTS or any portion thereof installed, used and maintained under this AGREEMENT if and when made necessary by any lawful change of grade, alignment or width of the PUBLIC RIGHT-OF-WAY, including the construction, maintenance or operation of any other CITY underground or aboveground facilities. In the event all or any portion of the PUBLIC RIGHT-OF-WAY occupied by the IMPROVEMENTS shall be needed by CITY for governmental purposes or in the event the existence of the IMPROVEMENTS shall be considered detrimental to governmental activities, including but not limited to, interference with CITY construction projects, or is in conflict vertically and/or horizontally with any proposed CITY installation, PERMITTEE shall, following direction from the City Engineer, remove and relocate the IMPROVEMENTS or applicable portion thereof, to such other location or locations on said PUBLIC RIGHT-OF-WAY as may be designated by CITY. Said removal or relocation shall be completed within ninety (90) days of written notification by CITY; provided PERMITTEE can timely obtain any necessary permits from CITY. In the event the IMPROVEMENTS or applicable portion thereof are not removed or relocated within ninety (90) days after said notification, CITY may cause the same to be done at the sole expense of PERMITTEE. c. Repair of Public Right-of-Way. When removal or relocation is required under this AGREEMENT, PERMITTEE shall, after the removal or relocation of the IMPROVEMENTS, at its own cost, repair and return the PUBLIC RIGHT-OF-WAY, or public utility or service easements on which the facilities were located, to a safe and satisfactory condition in accordance with the construction-related conditions and specifications as established by CITY, according to its standard practice. Should PERMITTEE remove the IMPROVEMENTS from the PUBLIC RIGHTOF-WAY, PERMITTEE shall, within ten (10) days after such removal, give notice thereof to CITY specifying the portion of the PUBLIC RIGHT-OF-WAY affected and the location thereof, as well as the date of removal. Before proceeding with removal or relocation work, PERMITTEE shall obtain and CITY shall issue an excavation permit from the CITY. d. Abandonment of Improvements. If any portions of the IMPROVEMENTS covered under this AGREEMENT are no longer used by PERMITTEE, or are abandoned for a period in excess of one (1) year, PERMITTEE shall notify CITY and shall either promptly vacate and remove the facilities at PERMITTEE’S own expense or, at CITY’S sole discretion, may abandon some or all of the IMPROVEMENTS in place.
336

7. Waiver and Release. PERMITTEE, in perpetuity, expressly waives, releases and relinquishes any and all claims, causes of action, rights and remedies PERMITTEE may now or hereafter have against CITY, and its officials, officers, employees, and agents, whether known or unknown, with respect to liability for any damage to or loss, upon, above, beneath, or across the PUBLIC RIGHT-OF-WAY pursuant to this AGREEMENT unless such damage or loss is caused by the sole active negligence or willful misconduct of CITY. As a material part of CITY’S decision to issue this AGREEMENT, PERMITTEE hereby assumes all risk of damage to the IMPROVEMENTS in or upon the PUBLIC RIGHT-OF-WAY arising from any cause attributable to CITY’S exercising its rights hereunder, and PERMITTEE hereby waives all claims in respect thereto against CITY, except if caused by the sole active negligence or willful misconduct of CITY.

PERMITTEE HEREBY ACKNOWLEDGES THAT IT HAS READ AND IS FAMILIAR WITH THE PROVISIONS OF CALIFORNIA CIVIL CODE SECTION 1542 (“SECTION 1542”), WHICH IS SET FORTH BELOW:
“A GENERAL RELEASE DOES NOT EXTEND TO CLAIMS WHICH THE

CREDITOR DOES NOT KNOW OR SUSPECT TO EXIST IN HIS OR HER

FAVOR AT THE TIME OF EXECUTING THE RELEASE, WHICH IF KNOWN

BY HIM MUST HAVE MATERIALLY AFFECTED HIS OR HER
SETTLEMENT WITH THE DEBTOR.”

BY INITIALING BELOW, PERMITTEE HEREBY WAIVES THE PROVISIONS OF SECTION 1542 SOLELY IN CONNECTION WITH THE MATTERS WHICH ARE THE SUBJECT OF THE FOREGOING WAIVERS AND RELEASES:

PERMITTEE’S Initials: ___________
The waivers and releases by PERMITTEE contained herein shall survive the term of this AGREEMENT and shall be binding upon the assignees, transferees, and successors in interest of PERMITTEE.

8. Recovery of Costs for Enforcement of Agreement. The terms of this AGREEMENT may be enforced by CITY or its successors or assigns. In the event of any controversy, claim or dispute relating to this AGREEMENT, or the breach thereof, the prevailing party shall be entitled to recover from the other Party reasonable expenses, attorneys’ fees and costs.

9. Hazardous Materials Use.
a. PERMITTEE covenants that it will not handle or transport Hazardous Materials on, over or across the IMPROVEMENTS or the PUBLIC RIGHT-OF-WAY. As used in this AGREEMENT, the term “Hazardous Materials” means: (a) any substance, products, waste, or other material of any nature whatsoever which is or becomes listed, regulated, or addressed pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), 42 United States Code Section 9601 et seq.; the Resources Conservation and Recovery Act, 42 United States Code Section 6901 et seq.; the Hazardous Materials Transportation 337
Conservation and Recovery Act, 42 United States Code Section 1801 et seq.; the Clean Water Act, 33 United States Code Section 1251 et seq.; the Toxic Substances Control Act, 15 United States Code Section 2601 et seq.; the California Hazardous Waste Control Act, Health and Safety Code Section 25100 et seq.; the Hazardous Substance Account Act, Health and Safety Code Section 25330 et seq.; the California Safe Drinking Water and Toxic Enforcement Act, Health and Safety Code Section 25249.5 et seq.; California Health and Safety Code Section 25280 et seq. (Underground Storage of Hazardous Substances); the California Hazardous Waste Management Act, Health and Safety Code Section 25170.1 et seq.; California Health and Safety Code Section 25501 et seq. (Hazardous Materials Release Response Plans and Inventory); or the California Porter-Cologne Water Quality Control Act, Water Code Section 13000 et seq., all as amended (the above cited California state statutes are hereinafter collectively referred to as “the State Toxic Substances Law”); or any other federal, state, or local statute, law, ordinance, resolution, code, rule, regulation, order or decree regulating, relating to, or imposing liability or standards of conduct concerning any Hazardous Substance, now or at any time hereinafter in effect; (b) any substance, product, waste or other material of any nature whatsoever which may give rise to liability under any of the above statutes or under any statutory or common law theory based on negligence, trespass, intentional tort, nuisance or strict liability or under any reported decisions of a state or federal court; (c) petroleum or crude oil, other than petroleum and petroleum products which are contained within regularly operated motor vehicles; and (d) asbestos.

In the event the IMPROVEMENTS are now or in the future used in the handling or transporting of Hazardous Materials, PERMITTEE agrees to fully comply with all applicable federal, state, and local laws, rules, regulations, orders, decisions and ordinances (hereinafter referred to as “Hazardous Materials Standards”) concerning Hazardous Materials. PERMITTEE further agrees that at CITY’S request it will furnish CITY with proof, satisfactory to CITY, that PERMITTEE is in compliance with all such laws, rules, regulations, orders, decisions and ordinances. b. Notwithstanding anything else contained in this AGREEMENT and to the fullest extent permitted by law, in case of a breach of the obligations contained in this Section 9, PERMITTEE agrees to assume liability for and to save, indemnify, defend and hold harmless CITY from and against any and all injuries to any person, including wrongful death, and damage to property, including without limitation, property of CITY and PERMITTEE, and all related expenses, including without limitation reasonable attorneys’ fees, investigators’ fees, litigation expenses, and mitigation costs resulting in whole or in part from PERMITTEE’S failure to comply with any Hazardous Materials Standards issued by any governmental authority concerning Hazardous Materials. PERMITTEE, at its cost, shall assume the defense of all claims, in accordance with Section 13 hereof. PERMITTEE agrees to reimburse CITY for all reasonable costs of any kind incurred as a result of the PERMITTEE’S failure to comply with this Section, including, but not limited to, judicial or administrative fines, penalties, clean-up and disposal costs, and reasonable legal costs incurred as a result of PERMITTEE’S handling, transporting, or disposing of Hazardous Materials on, over, or across the IMPROVEMENTS and PUBLIC RIGHTOF-WAY.

10. Standards. PERMITTEE shall comply with all statutes, ordinances, rules, regulations, orders and decisions (hereinafter referred to as “Standards”) issued by any federal, state or local governmental body or agency established thereby relating to PERMITTEE’S use of the IMPROVEMENTS and PUBLIC RIGHT-OF-WAY hereunder. In its use of the IMPROVEMENTS 338
and PUBLIC RIGHT-OF-WAY, PERMITTEE shall at all times be in full compliance with all Standards, present or future, including, but not limited to, Standards concerning air quality, water quality, noise, and Hazardous Materials. In the event PERMITTEE fails to be in full compliance with Standards, CITY may, but shall not be obligated to, after giving notice of the failure to PERMITTEE, and if PERMITTEE, within thirty (30) days of such notice, fails to correct such non-compliance, or if such non-compliance is not capable of cure within thirty (30) days then promptly commences and diligently performs such appropriate corrective measures, take whatever action it determines in its sole discretion to be necessary to protect the public improvements, PUBLIC RIGHT-OF-WAY, and other adjacent property. PERMITTEE shall reimburse CITY for all reasonable costs (including but not limited to, consulting, engineering, clean-up and disposal, and reasonable legal costs) incurred by CITY as a result of PERMITTEE’S failure to comply with such Standards, and also such reasonable costs incurred by CITY in abating a violation of such Standards, protecting against a threatened violation of such Standards, defending any claim of violation of such Standards in any proceeding before any agency or court, and paying any fines or penalties imposed for such violations.

PERMITTEE shall, to the extent permitted by law, assume liability for and shall save and hold harmless CITY from any claim of a violation of the Standards regardless of the nature thereof or the agency or person asserting such claim, which results from PERMITTEE’S use of the IMPROVEMENTS and PUBLIC RIGHT-OF-WAY; provided, however, that the foregoing shall not apply to the extent of CITY’S negligence or willful misconduct. PERMITTEE, at its cost, shall assume the defense of all such claims.

11. Tests and Inspections. CITY shall have the right at any time to inspect the IMPROVEMENTS, PUBLIC RIGHT-OF-WAY, and public improvements so as to monitor compliance with this AGREEMENT. If, in CITY’S sole judgment, any installation, use, or condition of the IMPROVEMENTS may have an adverse effect on the public improvements, PUBLIC RIGHTOF-WAY, or CITY’S operations, CITY shall be permitted to, at its sole cost and expense, conduct any tests or assessments, including but not limited to environmental assessments, of or on the PUBLIC RIGHT-OF-WAY and public improvements, as it determines to be necessary or useful to evaluate the condition of the PUBLIC RIGHT-OF-WAY and public improvements. PERMITTEE shall cooperate with CITY in any tests or inspections deemed necessary by CITY. PERMITTEE shall pay or reimburse CITY, as appropriate, for all reasonable costs and expenses incurred due to any necessary corrective work and inspections thereafter within thirty (30) days of a request for payment and a statement detailing such costs and expenses.

12. Insurance.
a. Types; Amounts. PERMITTEE shall obtain, and shall require any subcontractor to obtain, insurance in the amounts described below unless specifically altered or waived by CITY (“Required Insurance”) prior to performing any work authorized by this AGREEMENT. If any of the Required Insurance contains a general aggregate limit, such insurance shall apply separately to this License or be no less than two times the specified occurrence limit; however, the aggregate limit may be satisfied through the use of a primary general liability policy and umbrella / excess liability policy(ies).
(i) General Liability Insurance. PERMITTEE shall maintain occurrence version general liability insurance, or equivalent form, with a combined single limit of not less than Two Million Dollars ($2,000,000) per 339
occurrence, with such limits being able to be satisfied through the use of a primary general liability policy and umbrella / excess liability policy(ies).

The general liability insurance policy must include coverage for the following:
(1) Bodily Injury and Property Damage
(2) Personal Injury/Advertising Injury
(3) Premises/Operations Liability
(4) Products/Completed Operations Liability
(5) Explosion, Collapse and Underground (UCX) exclusion deleted (6) Contractual Liability with respect to this AGREEMENT (7) Broad Form Property Damage
(8) Independent Contractor Coverage
(ii) Business Automobile Liability Insurance. PERMITTEE shall maintain business automobile liability insurance with an each accident limit of not less than One Million Dollars ($1,000,000) for bodily injury and property damage, which shall be shall be at least as broad as Insurance Services Office Form Number CA 00 01 covering automobile liability (Coverage Symbol 1, any auto).
(iii) “All Risk” Property Insurance. PERMITTEE shall maintain a policy of property insurance for perils usual to a standard “all risk” insurance policy on all its IMPROVEMENTS or alterations in or on the PUBLIC RIGHTOF-WAY, with limits equal to the value of all such IMPROVEMENTS or alterations.
b. General Provisions. The general liability insurance policy and the business automobile liability insurance policy shall (1) name CITY, its officials, officers, employees and agents as additional insureds; (2) be endorsed to waive subrogation against CITY, its officials, officers, employees and agents as additional insureds; and (3) be primary and non-contributory.

All Required Insurance herein shall contain standard separation of insureds provisions, and shall contain no special limitations on the scope of protection provided to CITY, its officials, officers, employees and agents.
c. Certificates; Insurer Rating; Cancellation Notice. Prior to conducting any work in the PUBLIC RIGHT-OF-WAY, PERMITTEE shall furnish to CITY properly executed certificates of insurance which evidence all Required Insurance. PERMITTEE shall maintain the Required Insurance at all times while this AGREEMENT is in effect, and shall replace any certificate, policy, or endorsement which will expire prior to that date. All policies shall be 340
endorsed to provide the Required Insurance shall not be suspended, voided, reduced, canceled, or allowed to expire except on thirty (30) days prior written notice to CITY. Unless approved in writing by CITY, PERMITTEE shall place the Required Insurance with insurers licensed to do business in the State of California and with a current A.M. Best rating of at least A-:VII. d. Waiver of Subrogation. PERMITTEE releases CITY, its officials, officers, employees and agents from any claims for damage or harm to any person, the PUBLIC RIGHT-OFWAY, or the IMPROVEMENTS, caused by, or which result from, risks insured under any insurance policy carried by PERMITTEE at the time of such damage or harm. PERMITTEE shall cause each insurance policy required herein to provide a waiver of subrogation in favor of CITY, its officials, officers, employees and agents.
e. Umbrella or Excess Insurance. If umbrella or an excess liability insurance policy is used to satisfy the minimum requirements for insurance coverage listed above, the umbrella or excess liability policies shall provide coverage at least as broad as specified for the underlying coverages and covering those insured in the underlying policies. Coverage shall be “pay on behalf,” with defense costs payable in addition to policy limits. PERMITTEE shall provide a “follow form” endorsement or schedule of underlying coverage satisfactory to the CITY indicating that such coverage is subject to the same terms and conditions as the underlying liability policy. f. Right to Self-Insure. PERMITTEE shall have the right and, by execution of this AGREEMENT and until PERMITTEE notifies CITY otherwise in writing, hereby elects to self-insure its risks under this AGREEMENT. PERMITTEE’s election to self-insure shall satisfy the requirements of this Section 12; provided, however, that PERMITEE shall be liable for all claims and damages which would otherwise have been insured against pursuant to this Section 12 with respect to the insurance types and limits specified herein as if third party policies were in effect.

13. Indemnity. PERMITTEE hereby agrees to defend, indemnify and hold CITY and its officials, officers, agents and employees free and harmless from and against any and all claims, demands, causes of action, costs, liabilities, expenses, losses, damages or injuries of any kind in law or equity, to persons or property, including wrongful death, in any manner arising out of or incident to any acts, omissions or willful misconduct of PERMITTEE, its partners, affiliates, agents, officials, officers or employees in performance of this AGREEMENT, use of the PUBLIC RIGHT-OF-WAY, or the construction, use, or operation of the IMPROVEMENTS. PERMITTEE shall further defend, indemnify and hold harmless the CITY and its officials, officers, agents and employees from all claims, demands, lawsuits, writs of mandamus, and other actions or proceedings (brought against the CITY or its departments, commissions, agents, officers, officials, or employees to challenge, attack seek to modify, set aside, void or annul any CITY decision made in connection with this AGREEMENT or PERMITTEE’S use of the PUBLIC RIGHT-OF-WAY. PERMITTEE shall defend, with counsel of CITY’S choosing and at PERMITTEE’S sole expense, any and all aforesaid suits, actions or proceedings, legal or affirmative, that may be brought or instituted against CITY, its officials, officers, agents or employees. PERMITTEE shall pay and satisfy any judgment, award or decree that may be rendered against CITY, its officials, officers, agents or employees with respect to the IMPROVEMENTS or PERMITTEES use of the PUBLIC RIGHT-OF-WAY pursuant to the terms of this AGREEMENT. PERMITTEE shall reimburse such parties for any and all legal expenses and costs incurred by one or all of them in connection with this AGREEMENT or the 341
indemnity herein provided. PERMITTEE’S obligation shall survive termination or expiration of this AGREEMENT, and shall not be restricted to insurance proceeds, if any, received by CITY or its officials, officers, agents or employees.

14. Covenant Running With Land. This AGREEMENT shall be deemed a covenant running with the real property comprising the PUBLIC RIGHT-OF-WAY. All of the covenants, obligations, and provisions of this AGREEMENT shall be binding upon and inure to the benefit of successors, legal representatives and assigns of the Parties. Every person who now or hereafter owns or acquires any right, title, or interest in and to any portion of the PUBLIC RIGHT-OF-WAY shall be conclusively deemed to have notice of this AGREEMENT, whether or not reference to this AGREEMENT is contained in the instrument by which such person acquires an interest in the PUBLIC RIGHT-OF-WAY. Therefore, each and every contract, deed or other instrument hereinafter executed, covering or conveying the PUBLIC RIGHT-OF-WAY shall conclusively be deemed to have been executed, delivered and accepted subject to this AGREEMENT.

15. Revocation. If any material breach of this AGREEMENT remains uncured by PERMITTEE for thirty (30) days following written notice by CITY (or such shorter period as emergency circumstances may require), CITY may revoke this AGREEMENT and associated encroachment permit by giving PERMITTEE thirty (30) days prior written notice of the CITY’S intention to revoke the AGREEMENT and associated encroachment permit.

16. Miscellaneous.
a. Amendments. The provisions of this AGREEMENT may be amended by mutual written consent of both Parties.
b. Notices. All notices permitted or required under this AGREEMENT shall be given to the respective Parties at the following address, or at such other address as the respective Parties may provide in writing for this purpose:

PERMITTEE: Union Pacific Railroad Company
1400 Douglas Street, Mail Stop 1690
Omaha, Nebraska 68179
Attn: Kris Anderson, Manager – Acquisitions
With a copy to:

Union Pacific Railroad Company
1400 Douglas Street, Mail Stop 1580
Omaha, Nebraska 68179
Attn: Colby Rinker – Counsel
CITY: City of Fontana
8353 Sierra Avenue
Fontana, CA 92335
Attn: City Manager
342
Such notice shall be deemed made when personally delivered or forty-eight (48) hours after deposit in the U.S. Mail, first class postage prepaid and addressed to the Party at its applicable address.

Actual notice shall be deemed adequate notice on the date actual notice occurred, regardless of the method of service.
c. Entire Understanding. This AGREEMENT constitutes the entire understanding between the Parties, and supersedes all offers, negotiations and other agreements concerning the subject matter contained herein.
d. Invalidity. If any provision of this AGREEMENT is invalid or unenforceable with respect to any Party, the remainder of this AGREEMENT or the application of such provision to persons other than those as to whom it is held invalid or unenforceable, shall not be affected and each provision of this AGREEMENT shall be valid and enforceable to the fullest extent permitted by law.
e. Successors and Assigns. This AGREEMENT shall be binding on and inure to the benefit of the successors and permitted assignees of the respective Parties. f. No Third Party Beneficiaries. This AGREEMENT shall not be construed to create any third party beneficiaries. This AGREEMENT is for the sole benefit of the Parties, and their permitted successors, transferees, and assignees, and no other person or entity shall be entitled to rely upon or receive any benefit from this AGREEMENT or any of its terms. g. Consent to Jurisdiction and Venue. This AGREEMENT shall be construed in accordance with and governed by the laws of the State of California. Any legal action or proceeding brought to interpret or enforce this AGREEMENT, or which in any way arises out of the Parties’ activities undertaken pursuant to this AGREEMENT, shall be filed and prosecuted in the appropriate California State Court in the County of San Bernardino, California. Each Party waives the benefit of any provision of state or federal law providing for a change of venue to any other court or jurisdiction including, without limitation, a change of venue based on the fact that a governmental entity is a party to the action or proceeding, or that a federal right or question is involved or alleged to be involved in the action or proceeding. Without limiting the generality of the foregoing waiver, PERMITTEE expressly waives any right to have venue transferred pursuant to California Code of Civil Procedure Section 394.
h. Exhibits. All exhibits attached hereto form material parts of this AGREEMENT.

17. Possessory Interest. In accordance with Revenue and Taxation Code Section 107.6, this AGREEMENT may create a possessory interest subject to personal property taxation for which PERMITTEE shall be responsible.

18. Effective Date. The Parties hereby agree that the effective date of this AGREEMENT, and the effective date for all obligations of the Parties hereunder, shall be the date on which this AGREEMENT has been fully executed by both Parties. 343

SIGNATURE PAGE TO

ENCROACHMENT AGREEMENT

BETWEEN

CITY OF FONTANA

AND PERMITTEE
IN WITNESS WHEREOF, this AGREEMENT and the Encroachment Permit granted hereby have been duly issued by CITY on the date of execution last set forth below.

CITY OF FONTANA,
a California municipal corporation
By: ______________________________________
Name: ____________________________________
Its: _______________________________________
Date: ______________________________
PERMITTEE:

UNION PACIFIC RAILROAD COMPANY, a
Delaware corporation
By: ______________________________________
Name: ____________________________________
Its: _______________________________________
Date: ______________________________
344

EXHIBIT A & B

LEGAL DESCRIPTION AND MAP OF PUBLIC RIGHT-OF-WAY
[SEE ATTACHED]
345
346
347

EXHIBIT C

APPROVED FINAL DESIGN DRAWINGS AND PLANS FOR THE IMPROVEMENTS [SEE ATTACHED]
348
3487+00
3488+00
3489+00
3490+00
3491+00
3492+00
3493+00
3494+00
50'
50'
28'
ProposedAlhambraMainTrack1
ProposedAlhambraMainTrack2
ProposedTrack125
NorthLoopRoad
50'
North Loop Road

15.50' 18.00' 17.00' 15.00'

8.50'

3.00' C 2.87' C
NorthLoopRoad

FONTANA, CALIFORNIA
O
verpass
N
orth
Loop
R
oad
O
verpass
Etwi
anda
Ave
Track Structure
Green is Proposed Track and
NOTE: Everything Depicted in

5.6'

3.5'

33.5 9
'
.1'
90 UPRR A
'
ccessRoad
40'
N
001 001

TYPICAL SECTION FOR SECOND MAIN TRACK
Sta. 3491+50.00
R
oad
50 0 50

S C A L E I N F E E T
100
R
/W
R
/W

ETIWANDA AVE CONSTRUCTION EASEMENT EXHIBIT
G
DRAWN BY:
8/4/2022
of
CHECKED BY:

DATE:

SHEET NUMBER
LOCATION & DESCRIPTION:

SHEET TITLE:

Color table:K:\Bentley\WorkspaceV8i\projects\Clients\UPRR_Track\UPRR_Track_V8i\color\UPRR.tblF:\2019\0501-1000\019-0853\40-Design\Microstation\019-0853_RLTK\pentable\019-0853_RLTK.tblDefault 8/4/2022
F:\2019\0501-1000\019-0853\40-Design\Microstation\019-0853_RLTK\DGN\Sheets\00_Exhibits\Etiwanda Loop Exhibit.dgn Omaha, NE 68106-2810
2111 South 67th Street, Suite 200
FAX 402.341.5895 www.olsson.com
TEL 402.341.1116
AJZ
JRM
CONSTRUCT 2MT BON VIEW TO SOUTH FONTANA
ALHAMBRA SUBDIVISION MP 520.94 TO MP 530.54

ONTARIO, CALIFORNIA

UPRR ROW
Sta. 3490+88 to 3492+42
ROW Required (0.02 AC)
Bridge Pier

UPRR ROW
Subgrade Subgrade
6" Subballast
12" Ballast
6" Subballast
12" Ballast
20:1 Max. Slope
Walkway Ballast
Required R/W
Existing Pavement
CE 118495
See Structural Dwg
Construct Pier Protection
Track 125
Proposed
Main Track #1
Proposed
L
C LC
-2.0%
Cut Section
L
Proposed Main Track #2
Existing Main Track #1 /
CL
3:1

2.0%
L
349
FILE N
A
ME: pw://
HDR_US_National_01/4195/10337880/alh52744_oca.dgn
PLOTTED: 11/29/2022 12:26:21 PM
ALO
TMR
DJK
ALO

AS NOTED
ALHAMBRA SUB.

3.1 MILES WEST OF FONTANA, CA

GENERAL ARRANGEMENT

SECTION DESIGNATION

LETTER SERIES
SHEET NO. CUT ON SHEET NO. SHOWN ON
variances.
in compliance with the plans and indicating any construction as-built drawings confirming that the project was constructed to provide to the office of the Director Structures Design Contractor or UPRR Manager in charge of construction

POSTCONSTRUCTION COMPLIANCE

IN CHARGE OF CONSTRUCTION DATE

1 of 7
OVHD 527.44 & 527.45
SP ROUTE SYMBOL B, FORMER OVHD 527.33 AND 527.34
118496
DRAWN BY:

C E NUMBER
CHECKED BY:

SCALE:

WORK ORDER:

LOCATION:

FACILITY:

DWG TITLE:

CHECKED BY:

DESIGN BY:

PROJECT ID:

NO. DATE REVISIONS
1 1
2 3 4 5 6 7 8 9 10 11 12
2 3
4 5
6 7
8 9
10 11
12 INCHES
SHEET NO.

ENGINEER: LATITUDE:

LONGITUDE:
34°03'53" N
117°31'27" W

HDR-JWT
(EXISTING BENT #2)

CONCRETE PIER PROTECTION
BY:
(ORIGINAL SIGNED BY)
DATE:

JEFFREY W. TEIG
(OMAHA, NE)

HDR ENGINEERING, INC
BY
UNION PACIFIC RAILROAD CO.

APPROVED FOR
(HOLD)
6'-9"
(HOLD)
7'-0"

GENERAL NOTES

CONSTRUCTION NOTES
3'-10" 2
8'-
0" 5
0'-
0"
15'-
6" M
I
N.

V
A
R
I
E
S
15'-
6" M
I
N.

V
A
R
I
E
S 18'-
0"
125100
65374 UP-DGW
05-26-22
11/29/22
/ /
/ /
/ /
5'-
6"
8'-10"
1 COMMENTS SHTS. 1-7

UPDATED FOR CITY OF ONTARIO

PROPOSED CONSTRUCTION SEQUENCE

NAME:GEORGE SARAH P.E. DATE
McLean & Schultz

RECOMMENDED FOR ACCEPTANCE
RECOMMENDED BY:

ACCEPTED BY: KHOI DO, P.E., CITY ENGINEER
DATE
DATE

CITY OF ONTARIO
ASST. CITY ENGINEER
BRYAN LIERLEY, P.E.,
(
9'-
0" M
I
N.)
V
A
R
I
E
S
(
2'-
0" T
O
V
A
R
I
E
S

PROFESSIONAL
REG

ISTERED
ENGIN
E
ER

TATE OF
STA
A IFC
RNIA
O L
CIVIL
MARK C.HATC
EXP.06-30-23
H
C77971

PLAN - CONCRETE PIER PROTECTION
SCALE: 1"=15'
A
1 2
B
1 2
1 1
1 1
1 1
` LOOP ROAD ` ETIWANDA AVE.

A
B
U
T
M
E
N
T
#
5 ` E
X
I
S
T
I
N
G
B
E
N
T
#
4 ` E
X
I
S
T
I
N
G ` L
O
O
P
R
O
A
D
B
E
N
T
#
3 ` E
X
I
S
T
I
N
G
B
E
N
T
#
2 ` E
X
I
S
T
I
N
G
A
B
U
T
M
E
N
T
#1
` E
X
I
S
T
I
N
G
3490+00 3491+00
construction.
construction. Notify DigAlert, 1-800-227-2600, at least 48 hours prior to

13. Location of known utilities is approximate. Location shall be verified prior to 1-800-336-9193.
that all necessary relocations have been completed. The CBYD number is:
60 days) prior to proposed construction start date. Prior to construction, confirm

12. Contact the Union Pacific "Call Before You Dig" number 90 days (not less than

DIVISION OF RESPONSIBILITY
A. RAILROAD
Proposed Track 125.

1. Provide and install ballast, ties, rail and OTM for Proposed Track No. 1 and B. CONTRACTOR
of AVP Engineering Design prior to construction.

3. Modifications to the design drawings shall be approved by the Office Manager.
shown on the plans shall be reported immediately to UPRR Project and elevations. Any variations in dimensions or elevations from those field inspection of the site verifying all pertinent dimensions

2. Before ordering any material, the Contractor shall make a detailed

1. Coordinate all construction activities with the Railroad. relocation of, fiber optic cable, call 1-800-336-9193.
companies, agencies and/or authorities. For information on, and embankment and coordinate these activities with the appropriate utility of all utilities affected by the construction of the structure and

4. Verify the location, relocation, abandonment, and/or temporary support by the Railroad, required to complete the work.

Contractor shall be responsible for providing all material, not provided

7. Bill of material and schedule are provided for information only. approved by the Railroad.

Construction shall not begin until the construction plan has been activity, schedule and procedure for each aspect of the work.

6. Provide the Railroad with a detailed construction plan defining the

work.

5. Apply for and obtain all construction permits necessary to perform the construction plan.

15. Accomplish activities within the schedule specified in the approved shown on this sheet.

14. Accomplish all of the tasks described in the proposed construction sequence embankment.

Specifications. Perform grading as required to drain and match existing

13. Provide and place all fill and subballast material per UPRR Grading prior to beginning construction.
if proposed, shall be approved by the Office of AVP Engineering Design construction sequence on this sheet. An alternate construction sequence,

12. Perform the required construction in the order described in the proposed

11. Construct cast-in-place reinforced concrete pier protection. met, including the provisions on Plan No. 710000, Sheet No. 1. requirements in BNSF/UPRR Temporary Shoring Guidelines shall be AVP Engineering Design prior to beginning construction. The shoring and bracing must be approved by the Office of UPRR engineer registered in the state of California. All temporary and bracing shall be designed, signed and sealed by a professional for all temporary shoring and/or bracing. All temporary shoring the work. Provide the Railroad with details, design and procedure protect the existing track and bridge structure affected by

10. Provide all temporary shoring and/or bracing required to support and

9. Perform all work not performed by the Railroad.
slipping between the midrail and walking/working surface. protection shall be provided such as screens or mesh to prevent If conditions warrant, i.e. pedestrian traffic/weather, additional rails and midrails shall not extend past the posts or uprights. and lacerations and prevent snagging of clothing. The ends of top Guardrail system shall be surfaced to prevent injuries from punctures outward or downward direction at any point.
withstanding without failure, a force of 200 lbs. applied in any Entire guardrail system, including anchorages, shall be capable of intervals.

Metal or timber posts or uprights shall be spaced at maximum 10 foot walking/working surface and top rail.

At least one midrail shall be provided, evenly spaced between 3 inches above the walking/working surface.

The top edge height of the top rail shall be 42 inches plus or minus on Temporary Shoring shall include but not be limited to the following:

8. Provide temporary handrail system as directed by UPRR Manager. Guardrails

IN PLACE)

MORGAN GAS LINE (ABANDONED
EXISTING 20" DIA. KINDER
SEE DWG. CE #118495

PIER PROTECTION WALLS,
T/R ELEV. 990.87 (PROPOSED)
T/R ELEV. 990.58 (EXISTING)
STA. 3490+06.75 (FIELD VERIFY)
T/R ELEV. 991.17 (PROPOSED)
T/R ELEV. 990.93 (EXISTING)
STA. 3490+86.78 (FIELD VERIFY)

EXISTING COLUMN

EAST FACE OF
PIER PROTECTION #1 PIER PROTECTION #2

EXISTING COLUMN

EAST FACE OF
(TIMETABLE WEST)
& YUMA JCT.

TO K-MART
(TIMETABLE EAST)

RANCHO (COLTON)

TO KAISER &
87°56'14"
87°56'14"
R
I
G
H
T
PROFILE:

RIGHT-OF-WAY:

Approx. 28' left of ` Existing Mainline Track
Approx. 50' right of ` Existing Mainline Track
UPRR track plans (Ref. 1).

Top of rail profile of Existing Mainline and Proposed Switching Lead per

ELECTRIC

UPRR UNDERGROUND

UPRR ROW

EXISTING
ROW

PROPOSED UPRR

IN PLACE)

MORGAN GAS LINE (ABANDONED
EXISTING 16" DIA. KINDER
A
L
I
GN
M
E
N
T: T
AN
G
E
N
T
` P
R
O
P
O
S
E
D
T
RA
C
K
N
O. 2
` E
X
I
S
T
I
N
G
M
A
I
N
L
I
N
E
T
RA
C
K
=
A
L
I
GN
M
E
N
T: T
AN
G
E
N
T
` P
R
O
P
O
S
E
D
T
RA
C
K 12
5 A
L
I
GN
M
E
N
T: T
AN
G
E
N
T
` P
R
O
P
O
S
E
D
T
RA
C
K
N
O. 1

UPRR ROW

EXISTING
+-
+-
+-
+-
+-

5. Restore area to original condition or better.

Ref. 1, and as shown on Sheet No. 2.

4. Re-establish embankments to elevations shown on the UPRR track plans,

3. Construct pier protection.
to construct pier protection. Locate and protect 16" KM gas line.

2. Perform temporary excavation and/or construct temporary shoring as required

1. Existing track to remain in service.

BILL OF MATERIAL

REQ'D UNIT DESCRIPTION ORDERED BY
247 CU.YD. CONTRACTOR
SHEET NOS. 3 THRU 7)
PIER PROTECTION #2 (PER SPECIFICATIONS, SHEET NO. 4 AND DETAILS, 4000 PSI CONCRETE - 80.1 CU.YD. PIER PROTECTION NO. 1 AND 166.6 CU.YD. 1 LOT
SHEET NO. 4 AND SCHEDULE, SHEET NO. 3)
REINFORCING STEEL FOR PIER PROTECTION #1 (PER SPECIFICATIONS, 1 LOT
SHEET NO. 4 AND SCHEDULE, SHEET NO. 6)
REINFORCING STEEL FOR PIER PROTECTION #2 (PER SPECIFICATIONS, 1 LOT VOID FORM, MINIMUM COMPRESSION AFTER SATURATION = 95% 1 LOT MATERIAL FOR UTILITY LINE PROTECTION

DRAWING SCHEDULE

DESCRIPTION
1 T
H
I
S
S
E
T

GENERAL ARRANGEMENT
SHEET NO.
2 TYPICAL SECTIONS
3 4
5 6
7 CONCRETE PIER PROTECTION #1 DETAILS (SHEET 1 OF 2)
CONCRETE PIER PROTECTION #1 DETAILS (SHEET 2 OF 2)
CONCRETE PIER PROTECTION #2 DETAILS (SHEET 1 OF 3)
CONCRETE PIER PROTECTION #2 DETAILS (SHEET 2 OF 3)
CONCRETE PIER PROTECTION #2 DETAILS (SHEET 3 OF 3)
SHEET NO.

R
E
F.

NO. DWG. NO. DESCRIPTION
1 REV.NO.
- -
2 -
P035
OF
P014
C-503-11 1 -10
OVERHEAD, BRIDGE NO. 54C-93, 1963

SAN BERNARDINO COUNTY, WEST KAISER & SERVICE ROAD
DATED AUGUST 13, 2019
MP. 523.45 TO 532.38, CONSTRUCT SECOND MAINLINE,

SIERRA, CALIFORNIA, ALHAMBRA SUBDIVISION

TRACK PLAN AND TOP OF RAIL PROFILE, GUASTI TO
3 6518B - -
AS-BUILTS, DATED 2019
SLPP L.P., PIPELINE RELOCATION AND PROTECTION
+-

GAS LINE (PROTECT IN PLACE)

CALIFORNIA UNDERGROUND

EXISTING SOUTHERN
+-
3'-
6" )
+-

THIS SHEET)

IN PLACE)(SEE UTILITY NOTE,
GAS LINE w/36" CASING (PROTECT
EXISTING 16" DIA. KINDER MORGAN
VERIFY LOCATION PRIOR TO CONSTRUCTION.

AS-BUILTS (REF. 3). CONTRACTOR TO

AN APPROXIMATION ONLY BASED ON PIPELINE

LOCATION OF UTILITY LINES SHOWN IS
UTILITY NOTE:
(Ref. 2), subtract 1.61' from design elevations.

For elevations to relate to West Kaiser and Service Road Overhead As-Built plans at centerline of existing Etiwanda Ave. Overhead, Bridge No. 54C-93, Sta. 3490+86.78.

11. Elevation Datum : NAVD88 Top of Rail Elevation 990.93 on existing mainline track no. 54C-93, Sta.3490+86.78 at centerline of existing mainline track.

10. Rail Stationing is based on centerline of existing Etiwanda Ave. Overhead, Bridge

9. These drawings to be worked with UPRR Track Profile and Grading Plan (Ref. 1). construction of the proposed pier protection.

8. The existing mainline track and siding track are to remain in service during (909) 395-2025
Engineering Department
City of Ontario
Contact:

Contractor to contact City of Ontario to arrange for temporary closures if necessary. to remain in service during and after the construction of the pier protection.

7. The existing overheads at Etiwanda Ave. and Loop Road, Bridge No. 54C-93, are to a condition equal to or better than existing.
structure and replace the areas removed and disturbed in the course of construction

6. Contractor shall perform excavation as required for construction of the new

bridge plans and a survey performed by HDR Engineering, Inc. dated 06/28/06. information provided by UPRR including track plans, existing overhead proposed track, existing bridge and existing ground elevations is based on

5. All information shown on these plans regarding location of the existing and Seismic Design Criteria for a peak rock acceleration of 1.5g.

4. Seismic design forces for pier protection are in accordance with AREMA (API) package.

3. Construction means and methods shall comply with the All Permits Issued Foundations and Chapter 9 - Seismic Design for Railway Structures. accordance with the AREMA Manual, Chapter 8 - Concrete Structures and

2. The cast-in-place concrete pier protection has been designed in conflict between specifications, the more restrictive will apply.

Way Association (AREMA) Manual for Railway Engineering. In the event of and the most current American Railway Engineering and Maintenance-of- shall be accomplished as specified in Union Pacific Railroad Specifications

1. All work requirements shown on these drawings and not otherwise detailed (PROTECT IN PLACE)
ELEV. 949 +/-

KINDER MORGAN GAS LINE
EXISTING 20" DIA.
350

TYPICAL SECTIONS
9"
2'-6"
FILE N
A
ME: pw://
HDR_US_National_01/4195/10337880/alh52744_oca.dgn
PLOTTED: 11/29/2022 12:26:22 PM

ALO
TMR
DJK
ALO

AS NOTED
ALHAMBRA SUB.

3.1 MILES WEST OF FONTANA, CA
2 of 7

118496
DRAWN BY:

C E NUMBER
CHECKED BY:

SCALE:

WORK ORDER:

LOCATION:

FACILITY:

DWG TITLE:

CHECKED BY:

DESIGN BY:

PROJECT ID:

NO. DATE REVISIONS
1 1
2 3 4 5 6 7 8 9 10 11 12
2 3
4 5
6 7
8 9
10 11
12 INCHES
SHEET NO.

ENGINEER: LATITUDE:

LONGITUDE:
34°03'53" N
117°31'27" W

HDR-JWT
(EXISTING BENT #2)

CONCRETE PIER PROTECTION
BY:
(ORIGINAL SIGNED BY)
DATE:

JEFFREY W. TEIG
(OMAHA, NE)

HDR ENGINEERING, INC
BY
UNION PACIFIC RAILROAD CO.

APPROVED FOR
(HOLD)
1'-0"
(HOLD)
1'-0"
23'-4" 45'-0"
(
T
Y
P.)
V
A
R
I
E
S
(12'-
3" M
I
N.)
(
T
Y
P.)
V
A
R
I
E
S
(12'-
3" M
I
N.)
OVHD 527.44 & 527.45
2 3'-
5"
M
I
N. V
E
R
T
I
C
A
L
C
L
E
A
RAN
C
E
M
I
N. V
E
R
T
I
C
A
L
C
L
E
A
RAN
C
E
2 3'-
5"
125100
65374 UP-DGW
05-26-22
11/29/22

/ /
/ /
/ /
1 COMMENTS SHTS. 1-7

UPDATED FOR CITY OF ONTARIO

NAME:GEORGE SARAH P.E. DATE
McLean & Schultz

RECOMMENDED FOR ACCEPTANCE
RECOMMENDED BY:

ACCEPTED BY: KHOI DO, P.E., CITY ENGINEER
DATE
DATE

CITY OF ONTARIO
ASST. CITY ENGINEER
BRYAN LIERLEY, P.E.,
23'-4" 46'-0"
VARIES (9'-0" MIN.) 18'-0" VARIES (15'-6" MIN.) VARIES (15'-6" MIN.) (2'-0" TO 3'-6" )
VARIES
VARIES (9'-0" MIN.) 18'-0" VARIES (15'-6" MIN.) VARIES (15'-6" MIN.) (2'-0" TO 3'-6" )
VARIES

PROFESSIONAL
REG

ISTERED
ENGIN
E
ER

TATE OF
STA
A IFC
RNIA
O L
CIVIL
MARK C.HATC
EXP.06-30-23
H
C77971

SECTION A
SCALE: ‚"=1'-0" 1 2

SECTION B
SCALE: ‚"=1'-0" 1 2
1 1
1 1
1 ` EXISTING BENT #3
` EXISTING BENT #2

BASE OF EXISTING FOOTING
ELEV. 980.86
ELEV. 981.37

BASE OF FOOTING
ELEV. 980.86

BASE OF EXISTING FOOTING

TOP OF WALL
ELEV. 1003.12
` EXISTING BENT #3
` EXISTING BENT #2

BASE OF EXISTING FOOTING
ELEV. 982.36
ELEV. 982.84

BASE OF FOOTING
ELEV. 981.61

BASE OF EXISTING FOOTING

TOP OF WALL
ELEV. 1003.42
` PROPOSED TRACK NO. 1
` PROPOSED TRACK NO. 2
` EXISTING MAINLINE TRACK =
` PROPOSED TRACK NO. 1
` PROPOSED TRACK NO. 2
` EXISTING MAINLINE TRACK =
` PROPOSED TRACK 125
` PROPOSED TRACK 125
SEE DWG. CE #118495

PIER PROTECTION WALL,
+
- +
-

SUBBALLAST

BALLAST

VOID FORM

EXISTING COLUMN

FACE OF

NEAR FACE
PROTECTION #1
PIER
+
-
+
-
+
-

EXISTING COLUMN

FACE OF

NEAR FACE
PROTECTION #2
SEE DWG. CE #118495 PIER

PIER PROTECTION WALL,

SUBBALLAST

BALLAST
+
-
+
-
+
-
+
-
+
-
+
-
+
-
+
-
ELEV. 983.87

BASE OF WALL
ELEV. 985.34

BASE OF WALL

LOW CHORD

LOW CHORD
CASING

EDGE OF
+
CASING

EDGE OF
(ABANDONED IN PLACE)
T/PIPELINE ELEV. 982
STA. 3489+84

KINDER MORGAN GAS LINE
EXISTING 20" DIA.
(ABANDONED IN PLACE)
T/PIPELINE ELEV. 982
STA. 3489+84

KINDER MORGAN GAS LINE
EXISTING 20" DIA.
+
-
+

UTILITY NOTE, THIS SHEET)
(PROTECT IN PLACE)(SEE
ELEV. 978

T/PIPELINE
w/ 36" DIA. CASING

KINDER MORGAN GAS LINE
EXISTING 16" DIA.
+ +

UTILITY NOTE, THIS SHEET)
(PROTECT IN PLACE)(SEE
ELEV. 977

T/PIPELINE
w/ 36" DIA. CASING

KINDER MORGAN GAS LINE
EXISTING 16" DIA.

VERIFY LOCATION PRIOR TO CONSTRUCTION.

AS-BUILTS (REF. 3). CONTRACTOR TO

AN APPROXIMATION ONLY BASED ON PIPELINE

LOCATION OF UTILITY LINES SHOWN IS
UTILITY NOTE:
351
FILE N
A
ME: pw://
HDR_US_National_01/4195/10337880/alh52744_oca.dgn
PLOTTED: 11/29/2022 12:26:22 PM

ALO
PTL
DJK
ALO

AS NOTED
ALHAMBRA SUB.

3.1 MILES WEST OF FONTANA, CA
3 of 7
21'-
9"
40'-6"
4'-6" 4'-6"
4'-6"
5'-9" 5'-0" 7'-0" 5'-0" 7'-0" 5'-0" 5'-9"
40'-6"
4'-6" 7'-6" 4'-6" 7'-6" 4'-6" 7'-6" 4'-6"
8'-3" 12'-0" 12'-0" 8'-3"
1'-
0"
2'-2'
2'-
0"
5"
1'-
3" 1'-
3"
6-C402b 8-C402b
5"
1'-
3"
1'-
9"
6'-8"
1'-
9"
4'-7"
1'-9"
3'-
0"
9'-
9"
1'-10"
2'-
2"
2'-
0"
6"
1'-11"

118496
DRAWN BY:

C E NUMBER
CHECKED BY:

SCALE:

WORK ORDER:

LOCATION:

FACILITY:

DWG TITLE:

CHECKED BY:

DESIGN BY:

PROJECT ID:

NO. DATE REVISIONS
1 1
2 3 4 5 6 7 8 9 10 11 12
2 3
4 5
6 7
8 9
10 11
12 INCHES
SHEET NO.

ENGINEER:

HDR-JWT
LATITUDE:

LONGITUDE:
34°03'53" N
117°31'27" W
(EXISTING BENT #2)

CONCRETE PIER PROTECTION
(SHEET 1 OF 2)
CONCRETE PIER PROTECTION #1 DETAILS
BY:
(ORIGINAL SIGNED BY)
DATE:

JEFFREY W. TEIG
(OMAHA, NE)

HDR ENGINEERING, INC
BY
UNION PACIFIC RAILROAD CO.

APPROVED FOR
(TYP.)
4'-3"
(
T
Y
P.)
9"
(
T
Y
P.)
2" C
L
R.
(
T
Y
P.)
16'-
6"
(
T
Y
P.)
7'-
0" 2'-
6"
(
T
Y
P.)
7'-
0"
(HOLD)
6'-9"
(
T
Y
P.)
1'-
0" (
H
O
L
D
)
(TYP.)
3" GAP
(TYP.)
1'-0" GAP
(
T
Y
P.)
3" G
A
P
(
T
Y
P.)
8'-
3"
(
T
Y
P.)
8'-
3"
(TYP.)
2'-3"
(TYP.)
2'-3"
(
T
Y
P.)
2'-
6" 19'-
3"
CLR.
3"
C
L
R.
3"
C
L
R.
3"
(TYP.)
3" GAP
(TYP.)
2'-3"
(TYP.)
2'-3"
5-G1900 (EF) 8-D1810 (EF)
(TOP & BOT.)
6-D211b 8-C402b
6-G1900 (EF) 8-D1810 (EF) 6-G1900 (EF) 8-D1810 (EF)
(TOP & BOT.)
6-D211b
(TOP & BOT.)
6-D211b
5-G1900 (EF)
6-C402b
4•"
= 3'-9"
7•" 7 SPA. @ 1'-0" = 7'-0" 7•" 5 SPA. @ 9"
= 3'-9"
7•" 7 SPA. @ 1'-0" = 7'-0" 7•" 5 SPA. @ 9"
= 3'-9"
7•" 7 SPA. @ 1'-0" = 7'-0" 7•" 5 SPA. @ 9"
= 3'-9"
4•" 5 SPA. @ 9"
OVHD 527.44 & 527.45
125100
65374 UP-DGW
05-26-22
2'-
6"
11/29/22

/ /
/ /
/ /
1 COMMENTS SHTS. 1-7

UPDATED FOR CITY OF ONTARIO

NAME:GEORGE SARAH P.E. DATE
McLean & Schultz

RECOMMENDED FOR ACCEPTANCE
RECOMMENDED BY:

ACCEPTED BY: KHOI DO, P.E., CITY ENGINEER
DATE
DATE

CITY OF ONTARIO
ASST. CITY ENGINEER
BRYAN LIERLEY, P.E.,

PROFESSIONAL
REG

ISTERED
ENGIN
E
ER

TATE OF
STA
A IFC
RNIA
O L
CIVIL
MARK C.HATC
EXP.06-30-23
H
C77971
PLAN
CONCRETE PIER PROTECTION #1
SCALE: …"=1'-0"
(LOOKING AT NEAR FACE OF WALL)

ELEVATION
C
3 4
F
3 4
D
3 4
E
3 4
1 1
1 1
(TYP.)
I1600
R
E
I
N
F
O
R
C
I
N
G
F
O
O
T
I
N
G
C402b D606b
I1107b
C102b C209b
COLUMN
` EXISTING
COLUMN
` EXISTING
COLUMN
` EXISTING
` FOOTING
` FOOTING

BASE OF FOOTING
ELEV. 981.37

TOP OF WALL
ELEV. 1003.12
D211b
E604b E1002b
C211b
C300b
G1900
P
R
O
T
E
C
T
I
O
N
#1
` C
O
N
C
R
E
T
E
P
I
E
R
LAST TWO DIGITS ARE INCHES.

BAR LENGTHS ARE GIVEN IN FEET AND INCHES; THE
CORRESPONDING TO BAR SIZE #2 THROUGH #18.

ARE REPRESENTED BY THE LETTERS A THROUGH L
FOLLOWED BY THE LETTER "b" IF BENT. BAR SIZES

BAR DESIGNATIONS CONSIST OF BAR SIZE & LENGTH
NOTE:
(DIMENSIONS ARE OUT TO OUT)

BENDING DIAGRAM
E604b
(TYP.)
D211b
(TYP.)
C402b
(TYP.)
E1002b

EXISTING COLUMN

FACE OF
(TYP.)
FORM
VOID
E3706
E3806
E604b

FAR FACE (FF)
D606b (TYP.)

NEAR FACE (NF)
G1900
D606b (TYP.)
(TYP.)
(PLACE AS SHOWN)
C102b OR C211b
(TYP.)
D211b
C402b
(TYP.)

VOID FORM
C402b
C402b
(TYP.)
C209b
D400 (TYP.)
(TYP.)
C300b
BARS)
MATCH G1900
I1107b (TYP.

G1900
(TYP.)
D606b
E3806 (NF)

REINFORCING SCHEDULE
C
O
N
C
R
E
T
E
P
I
E
R
P
R
O
T
E
C
T
I
O
N
W
A
L
L
#1

MARK SIZE LENGTH SHAPE
34 C402b #4 4'-2"
32 C209b #4 2'-9"
80 C300b #4 3'-0"
24 #6 16'-0"
#5 4'-0"
16'-0"
C102b #4 1'-2"
C211b #4 2'-11"
81 81
36 D211b #5 2'-11"
40 D606b #5 6'-6"
60 D1810 #5 18'-10"
40 E604b #6 6'-4"
40 E1002b #6 10'-2"
20 E3706 #6 37'-6"
20 E3806 #6 38'-6"
46 G1900 #8 19'-0"
46 I1107b #10 11'-7"
24 136
E1600
I1600 #10
D400
TOTAL
EST. WT. OF REINFORCING STEEL = 12,795 LB.

HOOK
90° STD.

HOOK
90° STD.

HOOK
90° STD.

HOOK
135° STD.

HOOK
135° STD.

HOOK
135° STD.
11•"R
(TYP.)
G1900
(TYP.)
D1810
(TYP.)

AS SHOWN)
D1810 (PLACE
G1900
NF = NEAR FACE
FF = FAR FACE
EF = EACH FACE

3. BOT. = BOTTOM
2'-0" EACH WAY.

AS SHOWN. THEY ARE SPACED AT APPROX.

2. C102b AND C211b TIES SHOULD BE PLACED
SHEET NO. 4.

STEEL NOTES AND VOID FORM NOTES, SEE

1. FOR CAST-IN-PLACE CONCRETE, REINFORCING
NOTES:

FAR FACE REINFORCING MATCHES NEAR FACE SPACING.

NEAR FACE REINFORCING SHOWN ONLY FOR CLARITY.

NOTE:
1'
-3"R
1'-3"
R
4'-6"
JOINT

CONSTRUCTION
(TYP.)
E1600
352
FILE N
A
ME: pw://
HDR_US_National_01/4195/10337880/alh52744_oca.dgn
PLOTTED: 11/29/2022 12:26:22 PM

ALO
PTL
DJK
ALO

AS NOTED
ALHAMBRA SUB.

3.1 MILES WEST OF FONTANA, CA
4 of 7
16'-
6"
8'-
3" 8'-
3"
19'-
3" 2'-
6"
7'-0" 2'-6" 7'-0" 7'-0" 2'-6" 7'-0"
19'-
3" 2'-
6"
3" 9"
19'-
3"

118496
DRAWN BY:

C E NUMBER
CHECKED BY:

SCALE:

WORK ORDER:

LOCATION:

FACILITY:

DWG TITLE:

CHECKED BY:

DESIGN BY:

PROJECT ID:

NO. DATE REVISIONS
1 1
2 3 4 5 6 7 8 9 10 11 12
2 3
4 5
6 7
8 9
10 11
12 INCHES
SHEET NO.

ENGINEER:

HDR-JWT
LATITUDE:

LONGITUDE:
34°03'53" N
117°31'27" W
(EXISTING BENT #2)

CONCRETE PIER PROTECTION
(SHEET 2 OF 2)
CONCRETE PIER PROTECTION #1 DETAILS
BY:
(ORIGINAL SIGNED BY)
DATE:

JEFFREY W. TEIG
(OMAHA, NE)

HDR ENGINEERING, INC
BY
UNION PACIFIC RAILROAD CO.

APPROVED FOR
(TYP.)
2" CLR.
(
T
Y
P.)
3" C
L
R.
(
T
Y
P.)
3" C
L
R.
(TYP.)
2" CLR.
3"
19 -
E
3 8
0 6
(
N
F
)
& 19
-
E
6 0
4 b
(
F
F
)
18 S
P
A. @ 1'-
0" = 18'-
0" 8" 4"
3"
19 -
E
3 8
0 6
(
N
F
), 19
-
E
3 7
0 6
(
M
I
D
)
& 19
-
E10
0 2
b
(
F
F
)
18 S
P
A. @ 1'-
0" = 18'-
0" 8" 4"
(TYP.)
2" CLR.
3"
19 -
E
3 8
0 6
(
N
F
)
& 19
-
E
3 7
0 6
(
F
F
)
18 S
P
A. @ 1'-
0" = 18'-
0" 8" 4"
C
L
R.
3"
4• "
17 -
D
4 0
0 (
T
O
P
&
B
O
T.)
16 E
Q
U
A
L
S
P
A
C
E
S
= 15'-
9" 4• "

VOID FORM NOTES

CAST-IN-PLACE CONCRETE NOTES
OVHD 527.44 & 527.45
125100
65374 UP-DGW
05-26-22
2'-
6"
2'-
6"
2'-
6"
11/29/22

/ /
/ /
/ /
1 COMMENTS SHTS. 1-7

UPDATED FOR CITY OF ONTARIO

NAME:GEORGE SARAH P.E. DATE
McLean & Schultz

RECOMMENDED FOR ACCEPTANCE
RECOMMENDED BY:

ACCEPTED BY: KHOI DO, P.E., CITY ENGINEER
DATE
DATE

CITY OF ONTARIO
ASST. CITY ENGINEER
BRYAN LIERLEY, P.E.,

PROFESSIONAL
REG

ISTERED
ENGIN
E
ER

TATE OF
STA
A IFC
RNIA
O L
CIVIL
MARK C.HATC
EXP.06-30-23
H
C77971

SECTION C
SCALE: …"=1'-0" 3 4

SECTION D
SCALE: …"=1'-0" 3 4

SECTION E
SCALE: …"=1'-0" 3 4

SECTION F
SCALE: …"=1'-0" 3 4
1 1 1
1 1
1 ` FOOTING
(TYP.)
D400
(TYP.)
D400
(TYP.)
E1002b
(TYP.)
E3806
(TYP.)
E3706
PROTECTION #1
` CONCRETE PIER
` EXISTING BENT
PROTECTION #1
` CONCRETE PIER
P
R
O
T
E
C
T
I
O
N
#1
` C
O
N
C
R
E
T
E
P
I
E
R
(TYP.)
C209b
I1600
(TYP.)
C300b
E1600
(NF)

NEAR FACE
E604b & E3806 BARS)
D606b (TYP., MATCH
G1900
(FF)

FAR FACE
I1107b
(TYP.)
90° HOOK ENDS AS SHOWN)
SHEET NO. 3, ALTERNATE
C211b (PLACE AS SHOWN ON
C402b
G1900
(NF)

NEAR FACE
(TYP.)
E1600
I1107b
(TYP.)
C209b
(TYP.)
I1600
(TYP.)
C300b
(FF)

FAR FACE
D211b

VOID FORM
HOOK ENDS AS SHOWN) (TYP.)
SHEET NO. 3, ALTERNATE 90°
C102b (PLACE AS SHOWN ON
(NF)

NEAR FACE
D211b
D400 (TYP.)

AROUND PERIMETER)
20-C300b (PLACE AS SHOWN

PROTECTION WALL

OUTLINE OF PIER

SHOWN IN INTERIOR)
8-C209b (PLACE AS
I1600 (BOT.)
E1600 (TOP) &

2. Minimum compression of saturated void form is 95%.
water.
pier protection wall, saturate void form with

1. Seven days after placement of concrete for
CONCRETE:

REINFORCING STEEL:

Engineering requirements.
otherwise noted shall meet current AREMA Manual for Railway is prohibited. Minimum concrete cover on reinforcing not securely wired against displacement. Tack welding of reinforcing

3. Reinforcing steel is to be blocked to proper location and are out to out of bar.

CRSI Manual of Standard Practice. Dimensions of bending details

2. Fabrication of reinforcing steel shall be per Chapter 7 of the ASTM A615 Specifications and meet Grade 60 requirements.

1. Reinforcing steel shall be deformed, new billet bars per current (FF)

FAR FACE
E604b
E3806
(TYP.)
E604b
(TYP.)
E3806
E1002
E3706
E3806
(TYP.)
E3706
(TYP.)
E3806
E3706
E3806
G1900 BARS (TYP.)
I1107b (LLV) MATCH
NF = NEAR FACE
MID = MIDDLE
LLV = LONG LEG VERTICAL
FF = FAR FACE

2. BOT. = BOTTOM
SEE SHEET NO. 3.

1. FOR REINFORCING STEEL SCHEDULE,
NOTES:
4'-6"
2'-3" 2'-3"
4•"
= 3'-9"
4•" 5 SPA. @ 9"
(TYP.)
3"CLR.
construction joints.

C309 Type 2 membrane. Curing membrane shall not be used on concrete in

9. Curing shall be accomplished by wet curing or application of an ASTM

8. Admixtures shall not be used without approval by the Railroad. be between 5% and 7% (by volume).
air-entraining admixture at the time of mixing. Air-entrainment shall

7. All concrete shall be air-entrained by addition of an approved sand.

Coarse aggregate shall be size no. 67. Fine aggregate shall be natural

6. Aggregates shall be graded in accordance with ASTM C33 specifications. accordance with ASTM C150 specifications.

5. Cement shall be Type I, Type II or Type III Portland Cement in weight) does not exceed 0.45.

4. Concrete shall be proportioned such that the water - cement ratio (by a smooth finish, free of all float or trowel marks.
edges of 90° or less are to be chamfered ƒ" x ƒ". Top surfaces to have smooth and uniform appearance without rubbing or plastering. Exposed

3. Exposed surfaces shall be formed in a manner which shall produce a

2. Minimum compressive strength at 28 days shall be 4000 psi. for Railway Engineering.
with Chapter 8: Concrete Structures and Foundations of the AREMA Manual

1. All concrete materials, placement and workmanship shall be in accordance JOINT

CONSTRUCTION
JOINT

CONSTRUCTION
JOINT

CONSTRUCTION
D1810
353
FILE N
A
ME: pw://
HDR_US_National_01/4195/10337880/alh52744_oca.dgn
PLOTTED: 11/29/2022 12:26:23 PM

ALO
PTL
DJK
ALO

AS NOTED
ALHAMBRA SUB.

3.1 MILES WEST OF FONTANA, CA
5 of 7
81'-0"
4'-6" 7'-10" 7'-8"
7'-8"
81'-0"
2'-
6" 18'-1"
2 0'-
7"
6'-0" 5'-0" 11'-0" 5'-0" 11'-0" 5'-0" 11'-0" 5'-0"
8'-6" 16'-0" 16'-0" 16'-0"
1'-0" = 7'-0"
1'-
3" 1'-
3"
2'-3" 2'-3" 3'-11" 3'-11"
4'-6" 8'-0" 7'-10" 8'-4" 7'-8" 8'-4" 7'-8" 8'-4"
6-C402b
= 3'-9"
4•" 5 SPA. @ 9" 10•" 7 SPA. @ 1'-0" = 7'-0" 10" 9 EQ. SPA. = 7'-2" 1'-0" 7 SPA. @ 1'-0" = 7'-0" 1'-0" 9 EQ. SPA. = 7'-0" 1'-0" 7 SPA. @ 1'-0" = 7'-0" 1'-0" 9 EQ. SPA. = 7'-0" 1'-0" 7 SPA. @ 8-D1708 (EF)
3" CLR. D704

118496
DRAWN BY:

C E NUMBER
CHECKED BY:

SCALE:

WORK ORDER:

LOCATION:

FACILITY:

DWG TITLE:

CHECKED BY:

DESIGN BY:

PROJECT ID:

NO. DATE REVISIONS
1 1
2 3 4 5 6 7 8 9 10 11 12
2 3
4 5
6 7
8 9
10 11
12 INCHES
SHEET NO.

ENGINEER:
(EXISTING BENT #2)

CONCRETE PIER PROTECTION
(SHEET 1 OF 3)
CONCRETE PIER PROTECTION #2 DETAILS

HDR-JWT
LATITUDE:

LONGITUDE:
34°03'53" N
BY: (ORIGINAL SIGNED BY)
117°31'27" W
DATE:

JEFFREY W. TEIG
(OMAHA, NE)

HDR ENGINEERING, INC
BY
UNION PACIFIC RAILROAD CO.

APPROVED FOR
(
T
Y
P.)
2" C
L
R.
(TYP.)
2'-9" LAP
(TYP.)
2'-9" LAP
(TYP.)
2'-9" LAP
(
T
Y
P.)
7'-
0" 2'-
6"
(
T
Y
P.)
7'-
0"
(TYP.)
7'-0"
(TYP.)
3'-10"
(TYP.)
3'-10"
(
T
Y
P.)
1'-
0" H
O
L
D
(
T
Y
P.)
9"
(TYP.)
6" GAP
(TYP.)
1'-0" GAP
(
T
Y
P.)
3" G
A
P
(TYP.)
4'-3"
5-G1710 (EF) 8-D1708 (EF)
(TOP & BOT.)
6-D211b
10-G1710 (EF)
12-C402b
8-D1708 (EF)
(TOP & BOT.)
6-D211b
10-G1710 (EF)
12-C402b
8-D1708 (EF)
(TOP & BOT.)
6-D211b
10-G1710 (EF)
12-C402b
(TOP & BOT.)
6-D211b
C
L
R.
3"
C
L
R.
3"
(TYP.)
3'-10"
(TYP.)
3'-10"
(TYP.)
6" GAP
2'-3" 2'-3" 3'-11" 3'-11"
(TYP.)
2'-9" LAP
(TYP.)
2'-9" LAP
(
T
Y
P.)
16'-
6"
OVHD 527.44 & 527.45
125100
65374 UP-DGW
05-26-22
2'-
6"
11/29/22

/ /
/ /
/ /
1 COMMENTS SHTS. 1-7

UPDATED FOR CITY OF ONTARIO

NAME:GEORGE SARAH P.E. DATE
McLean & Schultz

RECOMMENDED FOR ACCEPTANCE
RECOMMENDED BY:

ACCEPTED BY: KHOI DO, P.E., CITY ENGINEER
DATE
DATE

CITY OF ONTARIO
ASST. CITY ENGINEER
BRYAN LIERLEY, P.E.,

PROFESSIONAL
REG

ISTERED
ENGIN
E
ER

TATE OF
STA
A IFC
RNIA
O L
CIVIL
MARK C.HATC
EXP.06-30-23
H
C77971
CONCRETE PIER PROTECTION #2
SCALE: …"=1'-0"
(LOOKING AT NEAR FACE OF WALL)

ELEVATION
PLAN
K
5 7
M
5 7
L
5 7
G
5 7
H
5 7
J
5 7
1 1
1 ` FOOTING ` FOOTING ` FOOTING
COLUMN
` EXISTING
COLUMN
` EXISTING
COLUMN
` EXISTING

TOP OF WALL
ELEV. 1003.42

BASE OF FOOTING
ELEV. 982.84
` FOOTING ` FOOTING ` FOOTING
COLUMN
` EXISTING
P
R
O
T
E
C
T
I
O
N
#
2 ` C
O
N
C
R
E
T
E
P
I
E
R
M
A
T
C
H
L
I
N
E
-
S
E
E
S
H
E
E
T
N
O. 6
M
A
T
C
H
L
I
N
E
-
S
E
E
S
H
E
E
T
N
O. 6

EXISTING COLUMN

FACE OF
C402b (TYP.)
D606b E1306 (TYP.)
E607b
1'-3"R
E4000
(TYP.)

VOID FORM
(TYP.)
D211b
(TYP.)
E1402b
(FF)

FAR FACE
(NF)
E1703 NEAR FACE E2703
G1710
(TYP.)
D606b
(TYP.)
C300b
G1710 BARS)
(TYP. MATCH
H1000b
(TYP.)
C209b
D400
C402b
(TYP.)
D702
C402b
C402b
C402b
AS SHOWN) (TYP.)
C102b OR C211b (PLACE
E4000 (NF) E1703 (NF)
E4000 (NF)
E2703 (NF)
VOID FORM (TYP.)
G1710 (TYP.)
(TYP.)

AS SHOWN)
D1708 (PLACE
(TYP.)
D1708
FAR FACE REINFORCING MATCHES NEAR FACE SPACING.

NEAR FACE REINFORCING SHOWN ONLY FOR CLARITY.

NOTE:

NF = NEAR FACE
FF = FAR FACE
EF = EACH FACE

4. BOT. = BOTTOM
2'-0" EACH WAY.

AS SHOWN. THEY ARE SPACED APPROX. AT

3. C102b AND C211b TIES SHOULD BE PLACED
SHEET NO. 6.

2. FOR REINFORCING STEEL SCHEDULE, SEE
SHEET NO. 4.

STEEL NOTES AND VOID FORM NOTES, SEE

1. FOR CAST-IN-PLACE CONRETE, REINFORCING
NOTES:

JOINT

CONSTRUCTION
(TYP.)
E1600
(TYP.)
I1600
G1710
354
FILE N
A
ME: pw://
HDR_US_National_01/4195/10337880/alh52744_oca.dgn
PLOTTED: 11/29/2022 12:26:23 PM

ALO
PTL
DJK
ALO

AS NOTED
7'-10" 4'-6"
16'-0" 8'-6"
1'-0" = 7'-0"
ALHAMBRA SUB.

3.1 MILES WEST OF FONTANA, CA
6 of 7
8'-4" 7'-10" 8'-0" 4'-6"
81'-0"
5'-0" 11'-0" 5'-0" 6'-0"
1'-
3" 1'-
3"
81'-0"
2 0'-
7"
2'-
6" 18'-1"
7 SPA. @ 1'-0" 9 EQ. SPA. = 7'-2" 10" 7 SPA. @ 1'-0 = 7'-0" 10•" 5 SPA. @ 9" 4•" = 3'-9"
6-C402b
2'-3" 2'-3"
3'-11" 3'-11" 2'-3" 2'-3"
118496
DRAWN BY:

C E NUMBER
CHECKED BY:

SCALE:

WORK ORDER:

LOCATION:

FACILITY:

DWG TITLE:

CHECKED BY:

DESIGN BY:

PROJECT ID:

NO. DATE REVISIONS
1 1
2 3 4 5 6 7 8 9 10 11 12
2 3
4 5
6 7
8 9
10 11
12 INCHES
SHEET NO.

ENGINEER:
(EXISTING BENT #2)

CONCRETE PIER PROTECTION
(SHEET 2 OF 3)
CONCRETE PIER PROTECTION #2 DETAILS

HDR-JWT
LATITUDE:

LONGITUDE:
34°03'53" N
BY:
(ORIGINAL SIGNED BY)
117°31'27" W
DATE:

JEFFREY W. TEIG
(OMAHA, NE)

HDR ENGINEERING, INC
BY
UNION PACIFIC RAILROAD CO.

APPROVED FOR
(TYP.)
2'-9" LAP
3'-11" 3'-11"
(TYP.)
6" GAP
8-D1708 (EF) 5-G1710 (EF)
(TOP & BOT.)
6-D211b
10-G1710 (EF)
12-C402b
8-D1708 (EF)
(TOP & BOT.)
6-D211b
(
T
Y
P.)
7'-
0" 2'-
6"
(
T
Y
P.)
7'-
0"
(
T
Y
P.)
16'-
6"
(TYP.)
4'-3"
LAP
2'-9"
1'-
0"
2'-2'
2'-
0"
5"
5"
1'-
3"
1'-
9"
1'-
9"
1'-9"
3'-
0"
8'-
2 1'-10"
2'-
2"
2'-
0"
6"
1'-11"
4'-10" 10'-8"
OVHD 527.44 & 527.45
125100
65374 UP-DGW
05-26-22
11/29/22

/ /
/ /
/ /
1 COMMENTS SHTS. 1-7

UPDATED FOR CITY OF ONTARIO
2'-
6"

NAME:GEORGE SARAH P.E. DATE
McLean & Schultz

RECOMMENDED FOR ACCEPTANCE
RECOMMENDED BY:

ACCEPTED BY: KHOI DO, P.E., CITY ENGINEER
DATE
DATE

CITY OF ONTARIO
ASST. CITY ENGINEER
BRYAN LIERLEY, P.E.,

PROFESSIONAL
REG

ISTERED
ENGIN
E
ER

TATE OF
STA
A IFC
RNIA
O L
CIVIL
MARK C.HATC
EXP.06-30-23
H
C77971
CONCRETE PIER PROTECTION #2
SCALE: …"=1'-0"
(LOOKING AT NEAR FACE OF WALL)

ELEVATION
PLAN
1 1
1 1
G1710
COLUMN
` EXISTING
COLUMN
` EXISTING

TOP OF WALL
ELEV. 1003.42

BASE OF FOOTING
ELEV. 982.84
` FOOTING ` FOOTING
` FOOTING ` FOOTING
R
E
I
N
F
O
R
C
I
N
G
F
O
O
T
I
N
G
P
R
O
T
E
C
T
I
O
N
#
2 ` C
O
N
C
R
E
T
E
P
I
E
R
M
A
T
C
H
L
I
N
E
-
S
E
E
S
H
E
E
T
N
O. 5
M
A
T
C
H
L
I
N
E
-
S
E
E
S
H
E
E
T
N
O. 5
LAST TWO DIGITS ARE INCHES.

BAR LENGTHS ARE GIVEN IN FEET AND INCHES; THE
CORRESPONDING TO BAR SIZE #2 THROUGH #18.

ARE REPRESENTED BY THE LETTERS A THROUGH L
FOLLOWED BY THE LETTER "b" IF BENT. BAR SIZES

BAR DESIGNATIONS CONSIST OF BAR SIZE & LENGTH
NOTE:

C402b D606b
H1000b
C102b C209b
D211b
E607b E1402b
C211b
C300b
(DIMENSIONS ARE OUT TO OUT)

BENDING DIAGRAM
HOOK
90° STD.

HOOK
90° STD.

HOOK
90° STD.

HOOK
135° STD.

HOOK
135° STD.

HOOK
135° STD.
11•"R
EST. WT. OF REINFORCING STEEL = 24,090 LB.

MARK SIZE LENGTH SHAPE
70 C402b #4 4'-2"
64 C209b #4 2'-9"
C300b #4 3'-0"
52 #6 16'-0"
#5 4'-0"
10'-0"
C102b #4 1'-2"
C211b #4 2'-11"
60 D211b #5 2'-11"
38 D606b #5 6'-6"
D1708 #5
38 E607b #6 6'-7"
76 E1402b #6 14'-2"
E1306 #6 13'-6"
19 E1703 #6 17'-3"
G1710 #8
52 I1600 16'-0"
C
O
N
C
R
E
T
E
P
I
E
R
P
R
O
T
E
C
T
I
O
N
W
A
L
L
#
2 E1600
H1000b
D400
120
176
100 17'-8"
19 E2703 #6 27'-3"
102 17'-10"
19 E4000 #6 40'-0"
128
68 68 D702 #5 7'-2"
68 D704 #5 7'-4"
102 #9
95 TOTAL

REINFORCING SCHEDULE
(TYP.)

VOID FORM
E4000
C402b (TYP.)
E1402b
E1306 (TYP.)
E607b D606b
E1703
(TYP.)
D211b
G1710
(TYP.)
D606b
(TYP.)
(PLACE AS SHOWN)
C102b OR C211b
BARS)
MATCH G1710
H1000b (TYP.
(TYP.)
C300b
(TYP.)
C209b
D400
C402b
D704
C402b
(TYP.)

VOID FORM
E4000 (NF) E2703 (NF) E1703 (NF)
(TYP.)

AS SHOWN)
D1708 (PLACE
NF = NEAR FACE
FF = FAR FACE
EF = EACH FACE

3. BOT. = BOTTOM
2'-0" EACH WAY.

AS SHOWN. THEY ARE SPACED APPROX. AT

2. C102b AND C211b TIES SHOULD BE PLACED
SHEET NO. 4.

STEEL NOTES AND VOID FORM NOTES, SEE

1. FOR CAST-IN-PLACE CONRETE, REINFORCING
NOTES:

FAR FACE REINFORCING MATCHES NEAR FACE SPACING.

NEAR FACE REINFORCING SHOWN ONLY FOR CLARITY.

NOTE:
1'-3"R
G1710 (TYP.)
(TYP.)
E1600
(TYP.)
I1600
#10
JOINT

CONSTRUCTION
355
FILE N
A
ME: pw://
HDR_US_National_01/4195/10337880/alh52744_oca.dgn
PLOTTED: 11/29/2022 12:26:23 PM

ALO
PTL
DJK
ALO

AS NOTED
4'-6"
2'-3" 2'-3"
16'-
6"
8'-
3" 8'-
3"
18'-1" 2'-
6"
7'-0" 2'-6" 7'-0" 7'-0" 2'-6" 7'-0"
18'-1" 2'-
6"
3" 9"
18'-1"
7'-10"
3'-11" 3'-11"
16'-
6"
8'-
3" 8'-
3"
7 of 7
ALHAMBRA SUB.

3.1 MILES WEST OF FONTANA, CA
7'-8"
3'-10" 3'-10"
16'-
6"
8'-
3" 8'-
3"

118496
DRAWN BY:

C E NUMBER
CHECKED BY:

SCALE:

WORK ORDER:

LOCATION:

FACILITY:

DWG TITLE:

CHECKED BY:

DESIGN BY:

PROJECT ID:

NO. DATE REVISIONS
1 1
2 3 4 5 6 7 8 9 10 11 12
2 3
4 5
6 7
8 9
10 11
12 INCHES
SHEET NO.

ENGINEER:
(EXISTING BENT #2)

CONCRETE PIER PROTECTION
(SHEET 3 OF 3)
CONCRETE PIER PROTECTION #2 DETAILS

HDR-JWT
LATITUDE:

LONGITUDE:
34°03'53" N
117°31'27" W BY:
(ORIGINAL SIGNED BY)
DATE:

JEFFREY W. TEIG
(OMAHA, NE)

HDR ENGINEERING, INC
BY
UNION PACIFIC RAILROAD CO.

APPROVED FOR
4•"
= 3'-9"
4•" 5 SPA. @ 9"
(TYP.)
2" CLR.
(
T
Y
P.)
3" C
L
R.
(
T
Y
P.)
3" C
L
R.
(TYP.)
2" CLR.
(TYP.)
2" CLR.

C
L
R.
3"
4• "
17 -
D
4 0
0 (
T
O
P
&
B
O
T.)
16 E
Q
U
A
L
S
P
A
C
E
S
= 15'-
9" 4• "
(TYP.)
3" CLR.
4• "
17 -
D
7 0
4 (
T
O
P
&
B
O
T.)
16 E
Q
U
A
L
S
P
A
C
E
S
= 15'-
9" 4• "
(TYP.)
3" CLR.
4• "
17 -
D
7 0
2 (
T
O
P
&
B
O
T.)
16 E
Q
U
A
L
S
P
A
C
E
S
= 15'-
9" 4• "
(TYP.)
3" CLR.
4•" 9 EQUAL SPACES = 7'-1" 4•"
3"
18 -
E
4 0
0 0
0 R
E
2 7
0 3
(
N
F
)
& 18
-
E
6 0
7 b
(
F
F
)
17 S
P
A. @ 1'-
0" = 17'-
0" 6" 4"
4" 6"
18 -
E
4 0
0 0
O
R
E
2 7
0 3
(
N
F
)
& 18
-
E14
0 2
b
(
F
F
)
17 S
P
A. @ 1'-
0" = 17'-
0" 3"
4•" 9 EQUAL SPACES = 6'-11" 4•"
3"
18 -
E
4 0
0 0
O
R
E
2 7
0 3
(
N
F
)
& 18
-
E13
0 6
b
(
F
F
)
17 S
P
A. @ 1'-
0" = 17'-
0" 6" 4"
OVHD 527.44 & 527.45
125100
65374 UP-DGW
05-26-22

2'-
6"
2'-
6"
2'-
6"
11/29/22

/ /
/ /
/ /
1 COMMENTS SHTS. 1-7

UPDATED FOR CITY OF ONTARIO

NAME:GEORGE SARAH P.E. DATE
McLean & Schultz

RECOMMENDED FOR ACCEPTANCE
RECOMMENDED BY:

ACCEPTED BY: KHOI DO, P.E., CITY ENGINEER
DATE
DATE

CITY OF ONTARIO
ASST. CITY ENGINEER
BRYAN LIERLEY, P.E.,

PROFESSIONAL
REG

ISTERED
ENGIN
E
ER

TATE OF
STA
A IFC
RNIA
O L
CIVIL
MARK C.HATC
EXP.06-30-23
H
C77971

SECTION G
SCALE: …"=1'-0" 5 7

SECTION H
SCALE: …"=1'-0" 5 7

SECTION J
SCALE: …"=1'-0" 5 7

SECTION K
SCALE: …"=1'-0" 5 7

SECTION L
SCALE: …"=1'-0" 5 7

SECTION M
SCALE: …"=1'-0" 5 7
1 1 1
1 1
1 1
1 ` FOOTING
(TYP.)
E4000
PROTECTION #2
` CONCRETE PIER
` EXISTING BENT
` FOOTING ` FOOTING
(TYP.)
E2703
(TYP.)
E2703
(TYP.)
E4000
PROTECTION #2
` CONCRETE PIER
P
R
O
T
E
C
T
I
O
N
#
2 ` C
O
N
C
R
E
T
E
P
I
E
R
P
R
O
T
E
C
T
I
O
N
#
2 ` C
O
N
C
R
E
T
E
P
I
E
R
P
R
O
T
E
C
T
I
O
N
#
2 ` C
O
N
C
R
E
T
E
P
I
E
R
(NF)

NEAR FACE
G1710
MATCH E601b BARS)
D606b (TYP.,
(FF)

FAR FACE
H1000b
E1600
(TYP.)
C209b
I1600
(TYP.)
C300b
G1710
C402b
90° HOOK ENDS AS SHOWN) (TYP.)
SHEET NO. 5 AND 6, ALTERNATE
C211b (PLACE AS SHOWN ON
(NF)

NEAR FACE
H1000b
(TYP.)
I1600 C209b
E1600
(TYP.)
C300b
(FF)

FAR FACE
(NF)

NEAR FACE
D211b
D211b
90° HOOK ENDS AS SHOWN) (TYP.)
SHEET NO. 5 AND 6, ALTERNATE
C102b (PLACE AS SHOWN ON

VOID FORM
(FF)

FAR FACE

PROTECTION WALL

OUTLINE OF PIER

SHOWN IN INTERIOR)
8-C209b (PLACE AS
I1600 (BOT.)
E1600 (TOP) &

AROUND PERIMETER)
20-C300b (PLACE AS SHOWN
D400 (TYP.)

PROTECTION WALL

OUTLINE OF PIER

SHOWN IN INTERIOR)
12-C209b (PLACE AS
I1600 (BOT.)
E1600 (TOP) &

AROUND PERIMETER)
22-C300b (PLACE AS SHOWN
D704 (TYP.)

PROTECTION WALL

OUTLINE OF PIER

SHOWN IN INTERIOR)
12-C209b (PLACE AS
I1600 (BOT.)
E1600 (TOP) &

AROUND PERIMETER)
22-C300b (PLACE AS SHOWN
D702 (TYP.)
E607b
E4000
(TYP.)
D400
(TYP.)
E607b
(TYP.)
E1402b
(TYP.)
E4000
(TYP.)
E2703
E1306 E4000
(TYP.)
E1306
E4000
E1402b (TYP.)
D704
G1710 BARS (TYP.)
H1000b (LLV) MATCH
G1710 BARS (TYP.)
H1000b (LLV) MATCH
G1710 BARS (TYP.)
H1000b (LLV) MATCH
NF = NEAR FACE
LLV = LONG LEG VERTICAL
FF = FAR FACE

3. BOT. = BOTTOM
SHEET NO. 6.

2. FOR REINFORCING STEEL SCHEDULE, SEE
SHEET NO. 4.

STEEL NOTES AND VOID FORM NOTES, SEE

1. FOR CAST-IN-PLACE CONCRETE, REINFORCING
NOTES:

JOINT

CONSTRUCTION JOINT

CONSTRUCTION JOINT

CONSTRUCTION
D1708
356

FILE N
A
ME: pw://
HDR_US_National_01/4195/10337880/alh52744_oca.dgn
PLOTTED: 11/29/2022 12:26:23 PM
ALO
TMR
DJK
ALO

AS NOTED
ALHAMBRA SUB.

3.1 MILES WEST OF FONTANA, CA

GENERAL ARRANGEMENT

SECTION DESIGNATION

LETTER SERIES
SHEET NO. CUT ON SHEET NO. SHOWN ON
1 of 8
SP ROUTE SYMBOL B, FORMER OVHD 527.33 AND 527.34
118495
DRAWN BY:

C E NUMBER
CHECKED BY:

SCALE:

WORK ORDER:

LOCATION:

FACILITY:

DWG TITLE:

CHECKED BY:

DESIGN BY:

PROJECT ID:

NO. DATE REVISIONS
1 1
2 3 4 5 6 7 8 9 10 11 12
2 3
4 5
6 7
8 9
10 11
12 INCHES
SHEET NO.

ENGINEER:
(EXISTING BENT #3)

CONCRETE PIER PROTECTION

HDR-JWT
LATITUDE:

LONGITUDE:
34°03'53" N
BY:
(ORIGINAL SIGNED BY)
117°31'27" W
DATE:

JEFFREY W. TEIG
(OMAHA, NE)

HDR ENGINEERING, INC
BY
UNION PACIFIC RAILROAD CO.

APPROVED FOR
(HOLD)
6'-9"
(HOLD)
7'-0"

CONSTRUCTION NOTES

GENERAL NOTES

PROPOSED CONSTRUCTION SEQUENCE
OVHD 527.44 & 527.45
3'-10" 2
8'-
0" 5
0'-
0"
15'-
6" M
I
N.

V
A
R
I
E
S
15'-
6" M
I
N.

V
A
R
I
E
S 18'-
0"
9'-
0" M
I
N.

V
A
R
I
E
S
125100
65374 UP-DGW
05-26-22
8'-10"
5'-
6"
11/29/22

/ /
/ /
/ /
1 COMMENTS SHTS. 1-8

UPDATED FOR CITY OF ONTARIO

NAME:GEORGE SARAH P.E. DATE
McLean & Schultz

RECOMMENDED FOR ACCEPTANCE
RECOMMENDED BY:

ACCEPTED BY: KHOI DO, P.E., CITY ENGINEER
DATE
DATE

CITY OF ONTARIO
ASST. CITY ENGINEER
BRYAN LIERLEY, P.E.,
(
2'-
0" T
O
V
A
R
I
E
S

PROFESSIONAL
REG

ISTERED
ENGIN
E
ER

TATE OF
STA
A IFC
RNIA
O L
CIVIL
MARK C.HATC
EXP.06-30-23
H
C77971

PLAN - CONCRETE PIER PROTECTION
SCALE: 1"=15'
A
1 2
B
1 2
1 1
1 1
1 ` LOOP ROAD ` ETIWANDA AVE.

A
B
U
T
M
E
N
T
#
5 ` E
X
I
S
T
I
N
G
B
E
N
T
#
4 ` E
X
I
S
T
I
N
G ` L
O
O
P
R
O
A
D
B
E
N
T
#
3 ` E
X
I
S
T
I
N
G
B
E
N
T
#
2 ` E
X
I
S
T
I
N
G
A
B
U
T
M
E
N
T
#1
` E
X
I
S
T
I
N
G
3490+00 3491+00
PROFILE:

RIGHT-OF-WAY:

Approx. 28' left of ` Existing Mainline Track
Approx. 50' right of ` Existing Mainline Track
UPRR track plans (Ref. 1).

Top of rail profile of Existing Mainline and Proposed Switching Lead per construction plan.

15. Accomplish activities within the schedule specified in the approved shown on this sheet.

14. Accomplish all of the tasks described in the proposed construction sequence embankment.

Specifications. Perform grading as required to drain and match existing

13. Provide and place all fill and subballast material per UPRR Grading prior to beginning construction.
if proposed, shall be approved by the Office of AVP Engineering Design construction sequence on this sheet. An alternate construction sequence,

12. Perform the required construction in the order described in the proposed

11. Construct cast-in-place reinforced concrete pier protection. met, including the provisions on Plan No. 710000, Sheet No. 1. requirements in BNSF/UPRR Temporary Shoring Guidelines shall be AVP Engineering Design prior to beginning construction. The shoring and bracing must be approved by the Office of UPRR engineer registered in the state of California. All temporary and bracing shall be designed, signed and sealed by a professional for all temporary shoring and/or bracing. All temporary shoring the work. Provide the Railroad with details, design and procedure protect the existing track and bridge structure affected by

10. Provide all temporary shoring and/or bracing required to support and

9. Perform all work not performed by the Railroad.
slipping between the midrail and walking/working surface. protection shall be provided such as screens or mesh to prevent If conditions warrant, i.e. pedestrian traffic/weather, additional rails and midrails shall not extend past the posts or uprights. and lacerations and prevent snagging of clothing. The ends of top Guardrail system shall be surfaced to prevent injuries from punctures outward or downward direction at any point.
withstanding without failure, a force of 200 lbs. applied in any Entire guardrail system, including anchorages, shall be capable of intervals.

Metal or timber posts or uprights shall be spaced at maximum 10 foot walking/working surface and top rail.

At least one midrail shall be provided, evenly spaced between 3 inches above the walking/working surface.

The top edge height of the top rail shall be 42 inches plus or minus on Temporary Shoring shall include but not be limited to the following:

8. Provide temporary handrail system as directed by UPRR Manager. Guardrails construction.
construction. Notify DigAlert, 1-800-227-2600, at least 48 hours prior to

13. Location of known utilities is approximate. Location shall be verified prior to 1-800-336-9193.
that all necessary relocations have been completed. The CBYD number is:
60 days) prior to proposed construction start date. Prior to construction, confirm

12. Contact the Union Pacific "Call Before You Dig" number 90 days (not less than

DIVISION OF RESPONSIBILITY
A. RAILROAD
Proposed Track 125.

1. Provide and install ballast, ties, rail and OTM for Proposed Track No. 1 and B. CONTRACTOR
of AVP Engineering Design prior to construction.

3. Modifications to the design drawings shall be approved by the Office Manager.
shown on the plans shall be reported immediately to UPRR Project and elevations. Any variations in dimensions or elevations from those field inspection of the site verifying all pertinent dimensions

2. Before ordering any material, the Contractor shall make a detailed

1. Coordinate all construction activities with the Railroad. relocation of, fiber optic cable, call 1-800-336-9193.
companies, agencies and/or authorities. For information on, and embankment and coordinate these activities with the appropriate utility of all utilities affected by the construction of the structure and

4. Verify the location, relocation, abandonment, and/or temporary support by the Railroad, required to complete the work.

Contractor shall be responsible for providing all material, not provided

7. Bill of material and schedule are provided for information only. approved by the Railroad.

Construction shall not begin until the construction plan has been activity, schedule and procedure for each aspect of the work.

6. Provide the Railroad with a detailed construction plan defining the

work.

5. Apply for and obtain all construction permits necessary to perform the

5. Restore area to original condition or better.

Ref. 1, and as shown on Sheet No. 2.

4. Re-establish embankments to elevations shown on the UPRR track plans,

3. Construct pier protection.
to construct pier protection. Locate and protect 20" KM gas line.

2. Perform temporary excavation and/or construct temporary shoring as required

1. Existing track to remain in service.
(TIMETABLE EAST)

RANCHO (COLTON)

TO KAISER &
(TIMETABLE WEST)
& YUMA JCT.

TO K-MART
R
I
G
H
T

EXISTING COLUMN

WEST FACE OF

EXISTING COLUMN

WEST FACE OF
PIER PROTECTION #1 PIER PROTECTION #2

IN PLACE)

MORGAN GAS LINE (ABANDONED
EXISTING 20" DIA. KINDER
T/R ELEV. 990.87 (PROPOSED)
T/R ELEV. 990.58 (EXISTING)
STA. 3490+06.75 (FIELD VERIFY)
T/R ELEV. 991.17 (PROPOSED)
T/R ELEV. 990.93 (EXISTING)
STA. 3490+86.78 (FIELD VERIFY)
SEE DWG. CE #118496

PIER PROTECTION WALLS,
+-
+-
+-

ELECTRIC

UPRR UNDERGROUND
87°56'14"
87°56'14"

UPRR ROW

EXISTING
ROW

PROPOSED UPRR

UPRR ROW

EXISTING
A
L
I
GN
M
E
N
T: T
AN
G
E
N
T
` P
R
O
P
O
S
E
D
T
RA
C
K
N
O. 1
A
L
I
GN
M
E
N
T: T
AN
G
E
N
T
` P
R
O
P
O
S
E
D
T
RA
C
K
N
O. 2
` E
X
I
S
T
I
N
G
M
A
I
N
L
I
N
E
T
RA
C
K
=
A
L
I
GN
M
E
N
T: T
AN
G
E
N
T
` P
R
O
P
O
S
E
D
T
RA
C
K 12
5 +-
+-
+-
PERMANENT STEEL CASING (TYP.)
3'-0" DIA. DRILLED SHAFT w/

DRAWING SCHEDULE

DESCRIPTION
1 T
H
I
S
S
E
T

GENERAL ARRANGEMENT
SHEET NO.
2 TYPICAL SECTIONS
3 4
5 6
7 CONCRETE PIER PROTECTION #1 DETAILS (SHEET 1 OF 2)
CONCRETE PIER PROTECTION #1 DETAILS (SHEET 2 OF 2)
CONCRETE PIER PROTECTION #2 DETAILS (SHEET 1 OF 3)
CONCRETE PIER PROTECTION #2 DETAILS (SHEET 2 OF 3)
CONCRETE PIER PROTECTION #2 DETAILS (SHEET 3 OF 3)
8 DRILLED SHAFT DETAILS AND NOTES
SHEET NO.

R
E
F.

NO. DWG. NO. DESCRIPTION
1 REV.NO.
- -
2 -
P035
OF
P014
C-503-11 1 -10
OVERHEAD, BRIDGE NO. 54C-93, 1963

SAN BERNARDINO COUNTY, WEST KAISER & SERVICE ROAD
DATED AUGUST 13, 2019
MP. 523.45 TO 532.38, CONSTRUCT SECOND MAINLINE,

SIERRA, CALIFORNIA, ALHAMBRA SUBDIVISION

TRACK PLAN AND TOP OF RAIL PROFILE, GUASTI TO
3 6518B - -
AS-BUILTS, DATED 2019
SLPP L.P., PIPELINE RELOCATION AND PROTECTION

BILL OF MATERIAL

REQ'D UNIT DESCRIPTION ORDERED BY
CU.YD. CONTRACTOR
1 LOT
1 LOT
1 LOT VOID FORM, MINIMUM COMPRESSION AFTER SATURATION = 95% 1 LOT MATERIAL FOR UTILITY LINE PROTECTION
158.1
NO. 4 AND DETAILS, SHEET NOS. 3 THRU 7)
#1 AND 105.5 CU.YD. PIER PROTECTION #2 (PER SPECIFICATIONS, SHEET 4000 PSI CONCRETE FOR PIER PROTECTION - 52.6 CU.YD. PIER PROTECTION

62.0 CU.YD.

SHEET NO. 8)
#1 AND 37.2 CU.YD. PIER PROTECTION #2 (PER SPECIFICATIONS AND DETAILS, 4000 PSI CONCRETE FOR DRILLED SHAFTS - 24.8 CU.YD. PIER PROTECTION 250 LIN.FT.
(PER SPECIFICATIONS AND DETAILS, SHEET NO. 8)
•" THICK x 36" DIA. PERMANENT STEEL CASING (ASTM A252, GRADE 2) SHEET NO. 4 AND SCHEDULE, SHEET NOS. 3 AND 8)
REINFORCING STEEL FOR PIER PROTECTION #1 (PER SPECIFICATIONS, SHEET NO. 4 AND SCHEDULE, SHEET NOS. 6 AND 8)
REINFORCING STEEL FOR PIER PROTECTION #2 (PER SPECIFICATIONS,

IN PLACE)

MORGAN GAS LINE (ABANDONED
EXISTING 16" DIA. KINDER

GAS LINE (PROTECT IN PLACE)

CALIFORNIA UNDERGROUND

EXISTING SOUTHERN
+-
3'-
6" )
+-

THIS SHEET)
(PROTECT IN PLACE)(SEE UTILITY NOTE,
MORGAN GAS LINE w/ 36" DIA. CASING
EXISTING 16" DIA. KINDER
(Ref. 2), subtract 1.61' from design elevations.

For elevations to relate to West Kaiser and Service Road Overhead As-Built plans at centerline of existing Etiwanda Ave. Overhead, Bridge No. 54C-93, Sta. 3490+86.78.

11. Elevation Datum : NAVD88 Top of Rail Elevation 990.93 on existing mainline track no. 54C-93, Sta.3490+86.78 at centerline of existing mainline track.

10. Rail Stationing is based on centerline of existing Etiwanda Ave. Overhead, Bridge

9. These drawings to be worked with UPRR Track Profile and Grading Plan (Ref. 1). construction of the proposed pier protection.

8. The existing mainline track and siding track are to remain in service during (909) 395-2025
Engineering Department
City of Ontario
Contact:

Contractor to contact City of Ontario to arrange for temporary closures if necessary. to remain in service during and after the construction of the pier protection.

7. The existing overheads at Etiwanda Ave. and Loop Road, Bridge No. 54C-93, are to a condition equal to or better than existing.
structure and replace the areas removed and disturbed in the course of construction

6. Contractor shall perform excavation as required for construction of the new

bridge plans and a survey performed by HDR Engineering, Inc. dated 06/28/06. information provided by UPRR including track plans, existing overhead proposed track, existing bridge and existing ground elevations is based on

5. All information shown on these plans regarding location of the existing and Seismic Design Criteria for a peak rock acceleration of 1.5g.

4. Seismic design forces for pier protection are in accordance with AREMA (API) package.

3. Construction means and methods shall comply with the All Permits Issued Foundations and Chapter 9 - Seismic Design for Railway Structures. accordance with the AREMA Manual, Chapter 8 - Concrete Structures and

2. The cast-in-place concrete pier protection has been designed in conflict between specifications, the more restrictive will apply.

Way Association (AREMA) Manual for Railway Engineering. In the event of and the most current American Railway Engineering and Maintenance-of- shall be accomplished as specified in Union Pacific Railroad Specifications

1. All work requirements shown on these drawings and not otherwise detailed

UTILITY NOTE, THIS SHEET)
(PROTECT IN PLACE)(SEE
ELEV. 949 +/-

MORGAN GAS LINE
EXISTING 20" DIA. KINDER
VERIFY LOCATION PRIOR TO CONSTRUCTION.

AS-BUILTS (REF. 3). CONTRACTOR TO

AN APPROXIMATION ONLY BASED ON PIPELINE

LOCATION OF UTILITY LINES SHOWN IS
UTILITY NOTE:
357

TYPICAL SECTIONS
9"
2'-6"
FILE N
A
ME: pw://
HDR_US_National_01/4195/10337880/alh52744_oca.dgn
PLOTTED: 11/29/2022 12:26:24 PM

ALO
TMR
DJK
ALO

AS NOTED
ALHAMBRA SUB.

3.1 MILES WEST OF FONTANA, CA
2 of 8 118495
DRAWN BY:

C E NUMBER
CHECKED BY:

SCALE:

WORK ORDER:

LOCATION:

FACILITY:

DWG TITLE:

CHECKED BY:

DESIGN BY:

PROJECT ID:

NO. DATE REVISIONS
1 1
2 3 4 5 6 7 8 9 10 11 12
2 3
4 5
6 7
8 9
10 11
12 INCHES
SHEET NO.

ENGINEER:
(ORIGINAL SIGNED BY)
(EXISTING BENT #3)

CONCRETE PIER PROTECTION

HDR-JWT
LATITUDE:

LONGITUDE:
34°03'53" N
BY: 117°31'27" W
DATE:

JEFFREY W. TEIG
(OMAHA, NE)

HDR ENGINEERING, INC
BY
UNION PACIFIC RAILROAD CO.

APPROVED FOR
(HOLD)
1'-0"
(HOLD)
1'-0"
23'-4" 46'-0"
23'-4" 45'-0"
(
T
Y
P.)
V
A
R
I
E
S
(12'-
3" M
I
N.)
(
T
Y
P.)
V
A
R
I
E
S
(12'-
3" M
I
N.)
OVHD 527.44 & 527.45
M
I
N. V
E
R
T
I
C
A
L
C
L
E
A
RAN
C
E
2 3'-
5"
M
I
N. V
E
R
T
I
C
A
L
C
L
E
A
RAN
C
E
2 3'-
5"
125100
65374 UP-DGW
05-26-22
11/29/22

/ /
/ /
/ /
1 COMMENTS SHTS. 1-8

UPDATED FOR CITY OF ONTARIO

NAME:GEORGE SARAH P.E. DATE
McLean & Schultz

RECOMMENDED FOR ACCEPTANCE
RECOMMENDED BY:

ACCEPTED BY: KHOI DO, P.E., CITY ENGINEER
DATE
DATE

CITY OF ONTARIO
ASST. CITY ENGINEER
BRYAN LIERLEY, P.E.,
VARIES (9'-0" MIN.) 18'-0" VARIES (15'-6" MIN.) VARIES (15'-6" MIN.) (2'-0" TO 3'-6" )
VARIES
(2'-0" TO 3'-6" )
VARIES
VARIES (9'-0" MIN.) 18'-0" VARIES (15'-6" MIN.) VARIES (15'-6" MIN.)

PROFESSIONAL
REG

ISTERED
ENGIN
E
ER

TATE OF
STA
A IFC
RNIA
O L
CIVIL
MARK C.HATC
EXP.06-30-23
H
C77971

SECTION A
SCALE: ‚"=1'-0" 1 2

SECTION B
SCALE: ‚"=1'-0" 1 2
1 1
1 1
1 ` EXISTING BENT #3 ` EXISTING BENT #2

BASE OF EXISTING FOOTING
ELEV. 980.86
ELEV. 981.37
ELEV. 983.87
ELEV. 980.86

BASE OF EXISTING FOOTING
ELEV. 1003.12

TOP OF WALL
` EXISTING BENT #3 ` EXISTING BENT #2

BASE OF EXISTING FOOTING
ELEV. 982.36
ELEV. 982.84
ELEV. 985.34
ELEV. 981.61

BASE OF EXISTING FOOTING
` PROPOSED TRACK NO. 1 ` PROPOSED TRACK NO. 2
` EXISTING MAINLINE TRACK =
ELEV. 1003.42

TOP OF WALL
` PROPOSED TRACK NO. 1 ` PROPOSED TRACK NO. 2
` EXISTING MAINLINE TRACK =

BASE OF FOOTING

BASE OF FOOTING
` PROPOSED TRACK 125
` PROPOSED TRACK 125
+
-
+
-
+
-
+
-
+
-
SEE DWG. CE #118496

PIER PROTECTION WALL,

BALLAST
PROTECTION #1
PIER

NEAR FACE

EXISTING COLUMN

FACE OF

VOID FORM

SUBBALLAST
+
-
+
-
PROTECTION #2
PIER

NEAR FACE

EXISTING COLUMN

FACE OF
+
-
+
-
+
-

SUBBALLAST

BALLAST
SEE DWG. CE #118496

PIER PROTECTION WALL,

BASE OF WALL

BASE OF WALL
RIGHT
RIGHT

UPRR ROW

PROPOSED

UPRR ROW

PROPOSED
w/ PERMANENT STEEL CASING
3'-0" DIA. DRILLED SHAFT
w/ PERMANENT STEEL CASING
3'-0" DIA. DRILLED SHAFT

LOW CHORD

LOW CHORD
+
CASING

EDGE OF
+
CASING

EDGE OF
+
-
(ABANDONED IN PLACE)
T/PIPELINE ELEV. 982
STA. 3489+84

KINDER MORGAN GAS LINE
EXISTING 20" DIA.
+
+ -
-
(ABANDONED IN PLACE)
T/PIPELINE ELEV. 982
STA. 3489+84

KINDER MORGAN GAS LINE
EXISTING 20" DIA.
+
-
VERIFY LOCATION PRIOR TO CONSTRUCTION.

AS-BUILTS (REF. 3). CONTRACTOR TO

AN APPROXIMATION ONLY BASED ON PIPELINE

LOCATION OF UTILITY LINES SHOWN IS
UTILITY NOTE:
+
+

UTILITY NOTE, THIS SHEET)
(PROTECT IN PLACE)(SEE
ELEV. 978

T/PIPELINE
w/ 36" DIA. CASING

KINDER MORGAN GAS LINE
EXISTING 16" DIA.

UTILITY NOTE, THIS SHEET)
(PROTECT IN PLACE)(SEE
ELEV. 977

T/PIPELINE
w/ 36" DIA. CASING

KINDER MORGAN GAS LINE
EXISTING 16" DIA.
358
FILE N
A
ME: pw://
HDR_US_National_01/4195/10337880/alh52744_oca.dgn
PLOTTED: 11/29/2022 12:26:24 PM

ALO
PTL
DJK
ALO

AS NOTED
ALHAMBRA SUB.

3.1 MILES WEST OF FONTANA, CA
3 of 8

118495
DRAWN BY:

C E NUMBER
CHECKED BY:

SCALE:

WORK ORDER:

LOCATION:

FACILITY:

DWG TITLE:

CHECKED BY:

DESIGN BY:

PROJECT ID:

NO. DATE REVISIONS
1 1
2 3 4 5 6 7 8 9 10 11 12
2 3
4 5
6 7
8 9
10 11
12 INCHES
SHEET NO.

ENGINEER:
(ORIGINAL SIGNED BY)

HDR-JWT
LATITUDE:

LONGITUDE:
34°03'53" N
117°31'27" W
(EXISTING BENT #3)

CONCRETE PIER PROTECTION
(SHEET 1 OF 2)
CONCRETE PIER PROTECTION #1 DETAILS
BY:

DATE:

JEFFREY W. TEIG
(OMAHA, NE)

HDR ENGINEERING, INC
BY
UNION PACIFIC RAILROAD CO.

APPROVED FOR
40'-6"
5'-9" 5'-0" 7'-0" 5'-0" 7'-0" 5'-0" 5'-9"
40'-6"
8'-3" 12'-0" 12'-0" 8'-3"
1'-
3" 1'-
3"
(TYP.)
4'-3"
(
T
Y
P.)
9"
(
T
Y
P.)
2" C
L
R.
(HOLD)
6'-9"
(
T
Y
P.)
1'-
0" (
H
O
L
D
)
(TYP.)
1'-0" GAP
(
T
Y
P.)
3" G
A
P
C
L
R.
3"
5-G1810 (EF) 8-D1810 (EF)
(TOP & BOT.)
6-D211b
6-G1810 (EF) 8-D1810 (EF) 6-G1810 (EF) 8-D1810 (EF)
(TOP & BOT.)
6-D211b
(TOP & BOT.)
6-D211b
5-G1810 (EF)
4•"
= 3'-9"
7•" 7 SPA. @ 1'-0" = 7'-0" 7•" 5 SPA. @ 9"
= 3'-9"
7•" 7 SPA. @ 1'-0" = 7'-0" 7•" 5 SPA. @ 9"
= 3'-9"
7•" 7 SPA. @ 1'-0" = 7'-0" 7•" 5 SPA. @ 9"
= 3'-9"
4•" 5 SPA. @ 9"
1'-
0"
2'-2'
5"
5"
1'-
3"
1'-
9"
6'-8"
1'-
9"
4'-7"
1'-9"
3'-
0"
2'-
2"
1'-11"
OVHD 527.44 & 527.45
19'-
3"
2'-
6"
2'-3" 12'-0" 12'-0" 12'-0" 2'-3"
(TOP & BOT.)
6-C402b
(TOP & BOT.)
8-C402b
(TOP & BOT.)
6-C402b
(TOP & BOT.)
8-C402b
2'-3" 6'-0" 6'-0" 6'-0" 6'-0" 6'-0" 6'-0" 2'-3"
(
T
Y
P.)
3" M
I
N. G
A
P
125100
65374 UP-DGW
05-26-22
2'-
6"
11/29/22

/ /
/ /
/ /
1 COMMENTS SHTS. 1-8

UPDATED FOR CITY OF ONTARIO

NAME:GEORGE SARAH P.E. DATE
McLean & Schultz

RECOMMENDED FOR ACCEPTANCE
RECOMMENDED BY:

ACCEPTED BY: KHOI DO, P.E., CITY ENGINEER
DATE
DATE

CITY OF ONTARIO
ASST. CITY ENGINEER
BRYAN LIERLEY, P.E.,

PROFESSIONAL
REG

ISTERED
ENGIN
E
ER

TATE OF
STA
A IFC
RNIA
O L
CIVIL
MARK C.HATC
EXP.06-30-23
H
C77971
PLAN

ELEVATION
CONCRETE PIER PROTECTION #1
SCALE: …"=1'-0"
(LOOKING AT NEAR FACE OF WALL)
D
3 4
E
3 4
C
3 4
1 1
1 COLUMN
` EXISTING
COLUMN
` EXISTING
COLUMN
` EXISTING
ELEV. 983.87

TOP OF WALL
ELEV. 1003.12
E604b
(TYP.)
D211b
(TYP.)
C402b
(TYP.)
E1002b

EXISTING COLUMN

FACE OF
E3706
E3806
E604b

FAR FACE (FF)
D606b (TYP.)

NEAR FACE (NF)
G1810
D606b (TYP.)
(TYP.)
(PLACE AS SHOWN)
C102b OR C211b
(TYP.)
D211b
(TYP.)

VOID FORM
G1810
(TYP.)
D606b
E3806 (NF)
C402b
D606b
C102b
D211b
E1002b
E604b
C211b
LAST TWO DIGITS ARE INCHES.

BAR LENGTHS ARE GIVEN IN FEET AND INCHES; THE
CORRESPONDING TO BAR SIZE #2 THROUGH #18.

ARE REPRESENTED BY THE LETTERS A THROUGH L
FOLLOWED BY THE LETTER "b" IF BENT. BAR SIZES

BAR DESIGNATIONS CONSIST OF BAR SIZE & LENGTH
NOTE:
(DIMENSIONS ARE OUT TO OUT)

BENDING DIAGRAM REINFORCING SCHEDULE
C
O
N
C
R
E
T
E
P
I
E
R
P
R
O
T
E
C
T
I
O
N
W
A
L
L
#1

MARK SIZE LENGTH SHAPE
56 C402b #4 4'-2"
C102b #4 1'-2"
C211b #4 2'-11"
81 81
36 D211b #5 2'-11"
40 D606b #5 6'-6"
60 D1810 #5 18'-10"
40 E604b #6 6'-4"
40 E1002b #6 10'-2"
20 E3706 #6 37'-6"
20 E3806 #6 38'-6"
46 G1810 #8
TOTAL
EST. WT. OF REINFORCING STEEL = 7,525 LB.

HOOK
90° STD.

HOOK
90° STD.

HOOK
135° STD.

HOOK
135° STD.
11•"R
(TYP.)
G1810
(TYP.)

AS SHOWN)
D1810 (PLACE
(TYP.)
D1810
G1810 G1810
1'
-3"R
1'-3"
R
NF = NEAR FACE
FF = FAR FACE
EF = EACH FACE

3. BOT. = BOTTOM
2'-0" EACH WAY.

AS SHOWN. THEY ARE SPACED AT APPROX.

2. C102b AND C211b TIES SHOULD BE PLACED
SHEET NO. 4.

STEEL NOTES AND VOID FORM NOTES, SEE

1. FOR CAST-IN-PLACE CONCRETE, REINFORCING
NOTES:

FAR FACE REINFORCING MATCHES NEAR FACE SPACING.

NEAR FACE REINFORCING SHOWN ONLY FOR CLARITY.

NOTE:

BASE OF WALL
` DRILLED SHAFT
` DRILLED SHAFT
` DRILLED SHAFT ` DRILLED SHAFT ` DRILLED SHAFT
` DRILLED SHAFT ` DRILLED SHAFT ` DRILLED SHAFT
STEEL CASING (TYP.)
SHAFT w/ PERMANENT
3'-0" DIA. DRILLED
STEEL CASING (TYP.)
SHAFT w/ PERMANENT
3'-0" DIA. DRILLED
18'-10"
D
R
I
L
L
E
D
S
H
A
F
T
P
R
O
T
E
C
T
I
O
N
#1 =
` C
O
N
C
R
E
T
E
P
I
E
R
(TYP.)
FORM
VOID
JOINT

CONSTRUCTION
359
FILE N
A
ME: pw://
HDR_US_National_01/4195/10337880/alh52744_oca.dgn
PLOTTED: 11/29/2022 12:26:24 PM
ALO
PTL
DJK
ALO

AS NOTED
ALHAMBRA SUB.

3.1 MILES WEST OF FONTANA, CA
4 of 8 118495
DRAWN BY:

C E NUMBER
CHECKED BY:

SCALE:

WORK ORDER:

LOCATION:

FACILITY:

DWG TITLE:

CHECKED BY:

DESIGN BY:

PROJECT ID:

NO. DATE REVISIONS
1 1
2 3 4 5 6 7 8 9 10 11 12
2 3
4 5
6 7
8 9
10 11
12 INCHES
SHEET NO.

ENGINEER:
(ORIGINAL SIGNED BY)

HDR-JWT
LATITUDE:

LONGITUDE:
34°03'53" N
117°31'27" W
(EXISTING BENT #3)

CONCRETE PIER PROTECTION
(SHEET 2 OF 2)
CONCRETE PIER PROTECTION #1 DETAILS
BY:

DATE:

JEFFREY W. TEIG
(OMAHA, NE)

HDR ENGINEERING, INC
BY
UNION PACIFIC RAILROAD CO.

APPROVED FOR
3" 9"
19'-
3"
(TYP.)
2" CLR.
3"
19 -
E
3 8
0 6
(
N
F
)
& 19
-
E
3 7
0 6
(
F
F
)
18 S
P
A. @ 1'-
0" = 18'-
0" 8" 4"
C
L
R.
3"

VOID FORM NOTES

CAST-IN-PLACE CONCRETE NOTES
(TYP.)
2" CLR.
3"
19 -
E
3 8
0 6
(
N
F
)
& 19
-
E
6 0
4 b
(
F
F
)
18 S
P
A. @ 1'-
0" = 18'-
0" 8" 4"
(TYP.)
2" CLR.
3"
19 -
E
3 8
0 6
(
N
F
), 19
-
E
3 7
0 6
(
M
I
D
)
& 19
-
E10
0 2
b
(
F
F
)
18 S
P
A. @ 1'-
0" = 18'-
0" 8" 4"
OVHD 527.44 & 527.45
19'-
3"
19'-
3"
2'-6" 2'-6"
125100
65374 UP-DGW
05-26-22
2'-
6"
2'-
6"
2'-
6"
11/29/22

/ /
/ /
/ /
1 COMMENTS SHTS. 1-8

UPDATED FOR CITY OF ONTARIO

NAME:GEORGE SARAH P.E. DATE
McLean & Schultz

RECOMMENDED FOR ACCEPTANCE
RECOMMENDED BY:

ACCEPTED BY: KHOI DO, P.E., CITY ENGINEER
DATE
DATE

CITY OF ONTARIO
ASST. CITY ENGINEER
BRYAN LIERLEY, P.E.,

PROFESSIONAL
REG

ISTERED
ENGIN
E
ER

TATE OF
STA
A IFC
RNIA
O L
CIVIL
MARK C.HATC
EXP.06-30-23
H
C77971

SECTION E
SCALE: …"=1'-0" 3 4

SECTION C
SCALE: …"=1'-0" 3 4

SECTION D
SCALE: …"=1'-0" 3 4
1 1
1 1
1 1
` EXISTING BENT
D211b

VOID FORM
HOOK ENDS AS SHOWN) (TYP.)
SHEET NO. 3, ALTERNATE 90°
C102b (PLACE AS SHOWN ON
(NF)

NEAR FACE
D211b
(FF)

FAR FACE

2. Minimum compression of saturated void form is 95%.
water.
pier protection wall, saturate void form with

1. Seven days after placement of concrete for
CONCRETE:

REINFORCING STEEL:

Engineering requirements.
otherwise noted shall meet current AREMA Manual for Railway is prohibited. Minimum concrete cover on reinforcing not securely wired against displacement. Tack welding of reinforcing

3. Reinforcing steel is to be blocked to proper location and are out to out of bar.

CRSI Manual of Standard Practice. Dimensions of bending details

2. Fabrication of reinforcing steel shall be per Chapter 7 of the ASTM A615 Specifications and meet Grade 60 requirements.

1. Reinforcing steel shall be deformed, new billet bars per current (NF)

NEAR FACE
E604b & E3806 BARS)
D606b (TYP., MATCH
G1810
(FF)

FAR FACE
E604b
E3806
(TYP.)
E604b
(TYP.)
E3806
(TYP.)
E3706
(TYP.)
E3806
E3706
E3806
(TYP.)
E1002b
(TYP.)
E3806
(TYP.)
E3706
(TYP.)
90° HOOK ENDS AS SHOWN)
SHEET NO. 3, ALTERNATE
C211b (PLACE AS SHOWN ON
C402b
G1810
(NF)
(FF)

NEAR FACE

FAR FACE
E1002b
E3706
E3806

DRILLED SHAFT
PROTECTION #1 =
` CONCRETE PIER

DRILLED SHAFT
PROTECTION #1 =
` CONCRETE PIER
C402b
(TYP.)

SHAFT REINFORCING

STEEL CASING
SHAFT w/ PERMANENT
3'-0" DIA. DRILLED

STEEL CASING
SHAFT w/ PERMANENT
3'-0" DIA. DRILLED
D1810
construction joints.

C309 Type 2 membrane. Curing membrane shall not be used on concrete in

9. Curing shall be accomplished by wet curing or application of an ASTM

8. Admixtures shall not be used without approval by the Railroad. be between 5% and 7% (by volume).
air-entraining admixture at the time of mixing. Air-entrainment shall

7. All concrete shall be air-entrained by addition of an approved sand.

Coarse aggregate shall be size no. 67. Fine aggregate shall be natural

6. Aggregates shall be graded in accordance with ASTM C33 specifications. accordance with ASTM C150 specifications.

5. Cement shall be Type I, Type II or Type III Portland Cement in weight) does not exceed 0.45.

4. Concrete shall be proportioned such that the water - cement ratio (by a smooth finish, free of all float or trowel marks.
edges of 90° or less are to be chamfered ƒ" x ƒ". Top surfaces to have smooth and uniform appearance without rubbing or plastering. Exposed

3. Exposed surfaces shall be formed in a manner which shall produce a

2. Minimum compressive strength at 28 days shall be 4000 psi. for Railway Engineering.
with Chapter 8: Concrete Structures and Foundations of the AREMA Manual

1. All concrete materials, placement and workmanship shall be in accordance JOINT

CONSTRUCTION
JOINT

CONSTRUCTION
JOINT

CONSTRUCTION
NF = NEAR FACE
MID = MIDDLE
FF = FAR FACE

2. BOT. = BOTTOM
SEE SHEET NO. 3.

1. FOR REINFORCING STEEL SCHEDULE,
NOTES:
360
FILE N
A
ME: pw://
HDR_US_National_01/4195/10337880/alh52744_oca.dgn
PLOTTED: 11/29/2022 12:26:25 PM

ALO
PTL
DJK
ALO

AS NOTED
ALHAMBRA SUB.

3.1 MILES WEST OF FONTANA, CA
5 of 8

118495
DRAWN BY:

C E NUMBER
CHECKED BY:

SCALE:

WORK ORDER:

LOCATION:

FACILITY:

DWG TITLE:

CHECKED BY:

DESIGN BY:

PROJECT ID:

NO. DATE REVISIONS
1 1
2 3 4 5 6 7 8 9 10 11 12
2 3
4 5
6 7
8 9
10 11
12 INCHES
SHEET NO.

ENGINEER:
(ORIGINAL SIGNED BY)

HDR-JWT
LATITUDE:

LONGITUDE:
34°03'53" N
117°31'27" W
(EXISTING BENT #3)

CONCRETE PIER PROTECTION
(SHEET 1 OF 3)
CONCRETE PIER PROTECTION #2 DETAILS
BY:

DATE:

JEFFREY W. TEIG
(OMAHA, NE)

HDR ENGINEERING, INC
BY
UNION PACIFIC RAILROAD CO.

APPROVED FOR
81'-0"
81'-0"
6'-0" 5'-0" 11'-0" 5'-0" 11'-0" 5'-0" 11'-0" 5'-0"
8'-6" 16'-0" 16'-0" 16'-0"
1'-0" = 7'-0"
1'-
3" 1'-
3"
= 3'-9"
4•" 5 SPA. @ 9" 10•" 7 SPA. @ 1'-0" = 7'-0" 10" 9 EQ. SPA. = 7'-2" 1'-0" 7 SPA. @ 1'-0" = 7'-0" 1'-0" 9 EQ. SPA. = 7'-0" 1'-0" 7 SPA. @ 1'-0" = 7'-0" 1'-0" 9 EQ. SPA. = 7'-0" 1'-0" 7 SPA. @ 8-D1708 (EF)
(
T
Y
P.)
2" C
L
R.
(TYP.)
2'-9" LAP
(TYP.)
2'-9" LAP
(TYP.)
2'-9" LAP
(TYP.)
7'-0"
(
T
Y
P.)
1'-
0" H
O
L
D
(
T
Y
P.)
9"
(TYP.)
1'-0" GAP
(
T
Y
P.)
3" G
A
P
(TYP.)
4'-3"
5-G1708 (EF) 8-D1708 (EF)
(TOP & BOT.)
6-D211b
10-G1708 (EF) 8-D1708 (EF)
(TOP & BOT.)
6-D211b
10-G1708 (EF) 8-D1708 (EF)
(TOP & BOT.)
6-D211b
10-G1708 (EF)
(TOP & BOT.)
6-D211b
C
L
R.
3"
(TYP.)
2'-9" LAP
(TYP.)
2'-9" LAP
OVHD 527.44 & 527.45
2'-
6"
2'-3" 6'-3" 8'-0" 8'-0" 8'-0" 8'-0" 8'-0" 8'-0"
18'-1"
2'-3" 14'-3" 16'-0" 16'-0" 8'-0"
(TOP & BOT.)
12-C402b
(TOP & BOT.)
12-C402b
(TOP & BOT.)
12-C402b
(TOP & BOT.)
6-C402b
125100
65374 UP-DGW
05-26-22
2'-
6"
11/29/22

/ /
/ /
/ /
1 COMMENTS SHTS. 1-8

UPDATED FOR CITY OF ONTARIO

NAME:GEORGE SARAH P.E. DATE
McLean & Schultz

RECOMMENDED FOR ACCEPTANCE
RECOMMENDED BY:

ACCEPTED BY: KHOI DO, P.E., CITY ENGINEER
DATE
DATE

CITY OF ONTARIO
ASST. CITY ENGINEER
BRYAN LIERLEY, P.E.,

PROFESSIONAL
REG

ISTERED
ENGIN
E
ER

TATE OF
STA
A IFC
RNIA
O L
CIVIL
MARK C.HATC
EXP.06-30-23
H
C77971
CONCRETE PIER PROTECTION #2
SCALE: …"=1'-0"
(LOOKING AT NEAR FACE OF WALL)

ELEVATION
PLAN
G
5 7 H
5 7
J
5 7
1 1
1 COLUMN
` EXISTING
COLUMN
` EXISTING
COLUMN
` EXISTING

TOP OF WALL
ELEV. 1003.42
ELEV. 985.34
COLUMN
` EXISTING
M
A
T
C
H
L
I
N
E
-
S
E
E
S
H
E
E
T
N
O. 6
M
A
T
C
H
L
I
N
E
-
S
E
E
S
H
E
E
T
N
O. 6

EXISTING COLUMN

FACE OF
C402b (TYP.)
D606b E1306 (TYP.)
E607b
1'-3"R
E4000
(TYP.)

VOID FORM
(TYP.)
D211b
(TYP.)
E1402b
(FF)

FAR FACE
(NF)
E1703 NEAR FACE E2703
G1708
(TYP.)
D606b
AS SHOWN) (TYP.)
C102b OR C211b (PLACE
E4000 (NF) E1703 (NF)
E4000 (NF)
E2703 (NF)
VOID FORM (TYP.)
G1708
G1708 (TYP.)
(TYP.)

AS SHOWN)
D1708 (PLACE
(TYP.)
D1708
FAR FACE REINFORCING MATCHES NEAR FACE SPACING.

NEAR FACE REINFORCING SHOWN ONLY FOR CLARITY.

NOTE:

NF = NEAR FACE
FF = FAR FACE
EF = EACH FACE

4. BOT. = BOTTOM
2'-0" EACH WAY.

AS SHOWN. THEY ARE SPACED APPROX. AT

3. C102b AND C211b TIES SHOULD BE PLACED
SHEET NO. 6.

2. FOR REINFORCING STEEL SCHEDULE, SEE
SHEET NO. 4.

STEEL NOTES AND VOID FORM NOTES, SEE

1. FOR CAST-IN-PLACE CONRETE, REINFORCING
NOTES:

D
R
I
L
L
E
D
S
H
A
F
T
S
P
R
O
T
E
C
T
I
O
N
#
2 =
` C
O
N
C
R
E
T
E
P
I
E
R

BASE OF WALL
` DRILLED SHAFT ` DRILLED SHAFT ` DRILLED SHAFT ` DRILLED SHAFT STEEL CASING (TYP.)
SHAFT w/ PERMANENT
3'-0" DIA. DRILLED
STEEL CASING (TYP.)
SHAFT w/ PERMANENT
3'-0" DIA. DRILLED
` DRILLED SHAFT ` DRILLED SHAFT ` DRILLED SHAFT ` DRILLED SHAFT JOINT

CONSTRUCTION
361
FILE N
A
ME: pw://
HDR_US_National_01/4195/10337880/alh52744_oca.dgn
PLOTTED: 11/29/2022 12:26:25 PM

ALO
PTL
DJK
ALO

AS NOTED
ALHAMBRA SUB.

3.1 MILES WEST OF FONTANA, CA
6 of 8

118495
DRAWN BY:

C E NUMBER
CHECKED BY:

SCALE:

WORK ORDER:

LOCATION:

FACILITY:

DWG TITLE:

CHECKED BY:

DESIGN BY:

PROJECT ID:

NO. DATE REVISIONS
1 1
2 3 4 5 6 7 8 9 10 11 12
2 3
4 5
6 7
8 9
10 11
12 INCHES
SHEET NO.

ENGINEER:
(ORIGINAL SIGNED BY)
(EXISTING BENT #3)

CONCRETE PIER PROTECTION
(SHEET 2 OF 3)
CONCRETE PIER PROTECTION #2 DETAILS

HDR-JWT
LATITUDE:

LONGITUDE:
34°03'53" N
BY: 117°31'27" W
DATE:

JEFFREY W. TEIG
(OMAHA, NE)

HDR ENGINEERING, INC
BY
UNION PACIFIC RAILROAD CO.

APPROVED FOR
1'-
0"
2'-2'
5"
5"
1'-
3"
1'-
9"
1'-
9"
1'-9"
3'-
0"
2'-
2"
1'-11"
4'-10" 10'-8"
1'-0" = 7'-0"
81'-0"
5'-0" 11'-0" 5'-0" 6'-0"
1'-
3" 1'-
3"
81'-0"
7 SPA. @ 1'-0" 9 EQ. SPA. = 7'-2" 10" 7 SPA. @ 1'-0 = 7'-0" 10•" 5 SPA. @ 9" 4•" = 3'-9"
(TYP.)
2'-9" LAP
8-D1708 (EF) 5-G1708 (EF)
(TOP & BOT.)
6-D211b
8-D1708 (EF) 10-G1708 (EF)
(TOP & BOT.)
6-D211b
(TYP.)
4'-3"
LAP
2'-9"
OVHD 527.44 & 527.45
18'-1"
8'-0" 14'-3" 2'-3"
2'-
6"
16'-0" 8'-6"
8'-0" 8'-0" 6'-3" 2'-3"
(TOP & BOT.)
6-C402b
(TOP & BOT.)
12-C402b
125100
65374 UP-DGW
05-26-22

2'-
6"
11/29/22

/ /
/ /
/ /
1 COMMENTS SHTS. 1-8

UPDATED FOR CITY OF ONTARIO

NAME:GEORGE SARAH P.E. DATE
McLean & Schultz

RECOMMENDED FOR ACCEPTANCE
RECOMMENDED BY:

ACCEPTED BY: KHOI DO, P.E., CITY ENGINEER
DATE
DATE

CITY OF ONTARIO
ASST. CITY ENGINEER
BRYAN LIERLEY, P.E.,

PROFESSIONAL
REG

ISTERED
ENGIN
E
ER

TATE OF
STA
A IFC
RNIA
O L
CIVIL
MARK C.HATC
EXP.06-30-23
H
C77971
CONCRETE PIER PROTECTION #2
SCALE: …"=1'-0"
(LOOKING AT NEAR FACE OF WALL)

ELEVATION
PLAN
1 1
1 LAST TWO DIGITS ARE INCHES.

BAR LENGTHS ARE GIVEN IN FEET AND INCHES; THE
CORRESPONDING TO BAR SIZE #2 THROUGH #18.

ARE REPRESENTED BY THE LETTERS A THROUGH L
FOLLOWED BY THE LETTER "b" IF BENT. BAR SIZES

BAR DESIGNATIONS CONSIST OF BAR SIZE & LENGTH
NOTE:

C402b
D606b
C102b
D211b
E607b E1402b
C211b
(DIMENSIONS ARE OUT TO OUT)

BENDING DIAGRAM
HOOK
90° STD.

HOOK
90° STD.

HOOK
135° STD.

HOOK
135° STD.
11•"R
EST. WT. OF REINFORCING STEEL = 14,200 LB.

MARK SIZE LENGTH SHAPE
C402b #4 4'-2"
C102b #4 1'-2"
C211b #4 2'-11"
60 D211b #5 2'-11"
38 D606b #5 6'-6"
D1708 #5
38 E607b #6 6'-7"
76 E1402b #6 14'-2"
E1306 #6 13'-6"
19 E1703 #6 17'-3"
G1708 #8
C
O
N
C
R
E
T
E
P
I
E
R
P
R
O
T
E
C
T
I
O
N
W
A
L
L
#
2 120
176
100 17'-8"
19 E2703 #6 27'-3"
102
19 E4000 #6 40'-0"
95 TOTAL

REINFORCING SCHEDULE
COLUMN
` EXISTING
COLUMN
` EXISTING

TOP OF WALL
ELEV. 1003.42
ELEV. 985.34
M
A
T
C
H
L
I
N
E
-
S
E
E
S
H
E
E
T
N
O. 5
M
A
T
C
H
L
I
N
E
-
S
E
E
S
H
E
E
T
N
O. 5
(TYP.)

VOID FORM
E4000
C402b (TYP.)
E1402b
E1306 (TYP.)
E607b D606b
E1703
(TYP.)
D211b
G1708
(TYP.)
D606b
(TYP.)
(PLACE AS SHOWN)
C102b OR C211b
(TYP.)

VOID FORM
E4000 (NF) E2703 (NF) E1703 (NF)
(TYP.)

AS SHOWN)
D1708 (PLACE
G1708
NF = NEAR FACE
FF = FAR FACE
EF = EACH FACE

3. BOT. = BOTTOM
2'-0" EACH WAY.

AS SHOWN. THEY ARE SPACED APPROX. AT

2. C102b AND C211b TIES SHOULD BE PLACED
SHEET NO. 4.

STEEL NOTES AND VOID FORM NOTES, SEE

1. FOR CAST-IN-PLACE CONRETE, REINFORCING
NOTES:

FAR FACE REINFORCING MATCHES NEAR FACE SPACING.

NEAR FACE REINFORCING SHOWN ONLY FOR CLARITY.

NOTE:
1'-3"R
` DRILLED SHAFT ` DRILLED SHAFT

BASE OF WALL
` DRILLED SHAFT ` DRILLED SHAFT
D
R
I
L
L
E
D
S
H
A
F
T
S
P
R
O
T
E
C
T
I
O
N
#
2 =
` C
O
N
C
R
E
T
E
P
I
E
R
17'-8"
120
(TYP.)
D1708
JOINT

CONSTRUCTION
G1708 (TYP.)
362
FILE N
A
ME: pw://
HDR_US_National_01/4195/10337880/alh52744_oca.dgn
PLOTTED: 11/29/2022 12:26:25 PM

ALO
PTL
DJK
ALO

AS NOTED 7 of 8
ALHAMBRA SUB.

3.1 MILES WEST OF FONTANA, CA

118495
DRAWN BY:

C E NUMBER
CHECKED BY:

SCALE:

WORK ORDER:

LOCATION:

FACILITY:

DWG TITLE:

CHECKED BY:

DESIGN BY:

PROJECT ID:

NO. DATE REVISIONS
1 1
2 3 4 5 6 7 8 9 10 11 12
2 3
4 5
6 7
8 9
10 11
12 INCHES
SHEET NO.

ENGINEER:
(ORIGINAL SIGNED BY)

HDR-JWT
LATITUDE:

LONGITUDE:
34°03'53" N
117°31'27" W
(EXISTING BENT #3)

CONCRETE PIER PROTECTION
(SHEET 3 OF 3)
CONCRETE PIER PROTECTION #2 DETAILS
BY:

DATE:

JEFFREY W. TEIG
(OMAHA, NE)

HDR ENGINEERING, INC
BY
UNION PACIFIC RAILROAD CO.

APPROVED FOR
3" 9"
18'-1"
(TYP.)
2" CLR.
(TYP.)
2" CLR.
(TYP.)
2" CLR.

C
L
R.
3"
3"
18 -
E
4 0
0 0
0 R
E
2 7
0 3
(
N
F
)
& 18
-
E
6 0
7 b
(
F
F
)
17 S
P
A. @ 1'-
0" = 17'-
0" 6" 4"
4" 6"
18 -
E
4 0
0 0
O
R
E
2 7
0 3
(
N
F
)
& 18
-
E14
0 2
b
(
F
F
)
17 S
P
A. @ 1'-
0" = 17'-
0" 3"
3"
18 -
E
4 0
0 0
O
R
E
2 7
0 3
(
N
F
)
& 18
-
E13
0 6
b
(
F
F
)
17 S
P
A. @ 1'-
0" = 17'-
0" 6" 4"
OVHD 527.44 & 527.45
2'-6" 2'-6"
18'-1"18'-1"
125100
65374 UP-DGW
05-26-22
11/29/22

/ /
/ /
/ /
1 COMMENTS SHTS. 1-8

UPDATED FOR CITY OF ONTARIO

NAME:GEORGE SARAH P.E. DATE
McLean & Schultz

RECOMMENDED FOR ACCEPTANCE
RECOMMENDED BY:

ACCEPTED BY: KHOI DO, P.E., CITY ENGINEER
DATE
DATE

CITY OF ONTARIO
ASST. CITY ENGINEER
BRYAN LIERLEY, P.E.,
2'-
6"
2'-
6"
2'-
6"

PROFESSIONAL
REG

ISTERED
ENGIN
E
ER

TATE OF
STA
A IFC
RNIA
O L
CIVIL
MARK C.HATC
EXP.06-30-23
H
C77971

SECTION G
SCALE: …"=1'-0" 5 7

SECTION H
SCALE: …"=1'-0" 5 7

SECTION J
SCALE: …"=1'-0" 5 7
1 1
1 1
1 1
(TYP.)
E4000
` EXISTING BENT
(TYP.)
E2703
(TYP.)
E2703
(TYP.)
E4000
(NF)

NEAR FACE
G1708
MATCH E607b BARS)
D606b (TYP.,
(FF)

FAR FACE
G1708
C402b
90° HOOK ENDS AS SHOWN) (TYP.)
SHEET NO. 5 AND 6, ALTERNATE
C211b (PLACE AS SHOWN ON
(NF)

NEAR FACE
(FF)

FAR FACE
(NF)

NEAR FACE
D211b
D211b
90° HOOK ENDS AS SHOWN) (TYP.)
SHEET NO. 5 AND 6, ALTERNATE
C102b (PLACE AS SHOWN ON

VOID FORM
(FF)

FAR FACE
(TYP.)
E607b
E607b
E4000
E1402b
E4000
(TYP.)
E1402b
(TYP.)
E4000
(TYP.)
E2703
(TYP.)
E1306
E1306 E4000
C402b

STEEL CASING
SHAFT w/ PERMANENT
3'-0" DIA. DRILLED
(TYP.)

SHAFT REINFORCING

STEEL CASING
SHAFT w/ PERMANENT
3'-0" DIA. DRILLED

DRILLED SHAFT
PROTECTION #2 =
` CONCRETE PIER

DRILLED SHAFT
PROTECTION #2 =
` CONCRETE PIER
D1708
NF = NEAR FACE
FF = FAR FACE

3. BOT. = BOTTOM
SHEET NO. 6.

2. FOR REINFORCING STEEL SCHEDULE, SEE
SHEET NO. 4.

STEEL NOTES AND VOID FORM NOTES, SEE

1. FOR CAST-IN-PLACE CONCRETE, REINFORCING
NOTES:

JOINT

CONSTRUCTION
JOINT

CONSTRUCTION
JOINT

CONSTRUCTION
363
FILE N
A
ME: pw://
HDR_US_National_01/4195/10337880/alh52744_oca.dgn
PLOTTED: 11/29/2022 12:26:25 PM

MCH
GPM
MAM
MCH

AS NOTED 8 of 8
ALHAMBRA SUB.

3.1 MILES WEST OF FONTANA, CA

118495
DRAWN BY:

C E NUMBER
CHECKED BY:

SCALE:

WORK ORDER:

LOCATION:

FACILITY:

DWG TITLE:

CHECKED BY:

DESIGN BY:

PROJECT ID:

NO. DATE REVISIONS
1 1
2 3 4 5 6 7 8 9 10 11 12
2 3
4 5
6 7
8 9
10 11
12 INCHES
SHEET NO.

ENGINEER:
(ORIGINAL SIGNED BY)

HDR-JWT
LATITUDE:

LONGITUDE:
34°03'53" N
117°31'27" W
(EXISTING BENT #3)

CONCRETE PIER PROTECTION
BY:

DATE:

JEFFREY W. TEIG
(OMAHA, NE)

HDR ENGINEERING, INC
BY
UNION PACIFIC RAILROAD CO.

APPROVED FOR
OVHD 527.44 & 527.45

DRILLED SHAFT NOTES

DETAILS AND NOTES

DRILLED SHAFT
125100
65374 UP-DGW
05-26-22
11/29/22

/ /
/ /
/ /
1 COMMENTS SHTS. 1-8

UPDATED FOR CITY OF ONTARIO

NAME:GEORGE SARAH P.E. DATE
McLean & Schultz

RECOMMENDED FOR ACCEPTANCE
RECOMMENDED BY:

ACCEPTED BY: KHOI DO, P.E., CITY ENGINEER
DATE
DATE

CITY OF ONTARIO
ASST. CITY ENGINEER
BRYAN LIERLEY, P.E.,

PROFESSIONAL
REG

ISTERED
ENGIN
E
ER

TATE OF
STA
A IFC
RNIA
O L
CIVIL
MARK C.HATC
EXP.06-30-23
H
C77971

SECTION K
SCALE: 1"=1'-0" 8 8

DRILLED SHAFT DETAIL
SCALE: 1"=1'-0"
K
8 8 1
1 added chloride ions. Testing for chloride ions is not required.

9. Do not use calcium chloride or any admixture containing intentionally Membrane curing compound shall conform to ASTM C309, Type 2.

8. Curing shall be accomplished by wet curing or membrane curing compound. using the slurry displacement method.
method, 6 inches using the temporary steel casing method, or 7 inches not less than 4 inches using the dry uncased or permanent steel casing greater than 4 inches. During placement, concrete shall have a slump of

7. Prior to the addition of admixtures, concrete shall have a slump not

6. Admixtures shall be submitted to the Railroad for acceptance.

5. Air content shall be between 5% and 7% (by volume).
shall be size no. 67. Fine aggregate shall be natural sand.

4. Aggregates shall be graded in accordance with ASTM C33. Coarse aggregate of cement per cubic yard of concrete.
weight) does not exceed 0.45. Concrete must contain a minimum of 6 sacks

3. Concrete shall be proportioned such that the water-cement ratio (by

2. Minimum compressive strength at 28 days shall be 4000 psi. for Railway Engineering.
with Chapter 8: Concrete Structures and Foundations of the AREMA Manual

1. All concrete material, placement, and workmanship shall be in accordance out of bar.

Manual of Standard Practice. Dimensions of bending details are out to

3. Fabrication of reinforcing steel shall be per Chapter 7 of the CRSI shall conform to the requirements of ASTM A706.

A615 specifications and meet Grade 60 requirements. Bars to be welded

2. Reinforcing steel shall be deformed, new billet bars per current ASTM for Railway Engineering.
with Chapter 8: Concrete Structures and Foundations of the AREMA Manual

1. All reinforcing steel materials and placement shall be in accordance withdrawal, if any, shall be 6 inches.

8. Permissible reinforcing steel vertical movement during steel casing the proper location. Secure the cage against displacement. placement. Provide spacer rollers to maintain the reinforcing cage at

7. Place reinforcing steel cage immediately prior to the start of concrete maximum aggregate size, whichever is larger.
lapped bars, shall be 1.5 times the bar diameter or four times the

6. The minimum clear distance between vertical reinforcing steel, including splice details to the Railroad for acceptance.

5. Splice bars in conformance with the drawings. Submit any alternative prohibited.
during handling and concrete placement. Tack welding of reinforcing is be securely tied to prevent deformation or relative displacement of bars

4. Reinforcing steel cage shall be prefabricated. Reinforcing steel is to

GENERAL

CONSTRUCTION

CAST-IN-PLACE CONCRETE

REINFORCING STEEL
REINFORCING STEEL, CONT. CONSTRUCTION, CONT.
steel casing to maintain diameter within 2 percent.

7. Deliver steel casings to site in undamaged condition. Handle and protect for acceptance.
shall be AWS certified. Submit any alternative splice details to the Railroad requirements for joints in non-corrugated permanent steel casings. Welders Welding Code - Steel" (ANSI/AWS D1.1) of the American Welding Society

6. Furnish full-penetration welds meeting the requirements of "Structural if any, prior to the mobilization of equipment to the site.

5. Submit the proposed method of steel casing installation and withdrawal, selected methods of transporting, handling and installing the casing. • inch, and any additional thickness needed depending on the Contractor's

4. The minimum wall thickness for the permanent steel casing shall be the Railroad for acceptance.
size, wall thickness, type of steel and length of permanent casing to casing shall conform to the requirements of ASTM A252 Grade 2. Submit surrounding earth and water pressures, if required. Steel for permanent handling stresses, drilling stresses, concrete pressures, and

3. Permanent steel casing shall have sufficient strength to withstand used.

The use of a two casing system (temporary and permanent) shall not be

2. The use of a permanent steel casing is required for all drilled shafts. prohibited.

1. Installation of steel casing by driving or by vibratory hammer is

STEEL CASING
9'-
0"
3" 2"
4'-
0"
3"

STEEL CASING
•" PERMANENT
8-J1300
D800b (TYP.)
D800b (TYP.)
8-J1300
ELEV. "A"

TOP OF DRILLED SHAFT
ELEV. "B"

BOTTOM OF DRILLED SHAFT
D800b

STEEL CASING
•" PERMANENT
` P
I
E
R
P
R
O
T
E
C
T
I
O
N
W
A
L
L
` D
R
I
L
L
E
D
S
H
A
F
T
=
` DRILLED SHAFT
LAST TWO DIGITS ARE INCHES.

BAR LENGTHS ARE GIVEN IN FEET AND INCHES; THE
CORRESPONDING TO BAR SIZE #2 THROUGH #18.

ARE REPRESENTED BY THE LETTERS A THROUGH L
FOLLOWED BY THE LETTER "b" IF BENT. BAR SIZES

BAR DESIGNATIONS CONSIST OF BAR SIZE & LENGTH
NOTE:
(DIMENSIONS ARE OUT TO OUT)

BENDING DIAGRAM

REINFORCING SCHEDULE

MARK SIZE LENGTH SHAPE
D800b #5 8'-0"
32 J1300 13'-0"
TOTAL
EST. WT. OF REINFORCING STEEL = 3,080 LB.
#11
104
8 SHAFT
PER
DRILLED SHAFT-PIER #1 PROTECTION

REINFORCING SCHEDULE

MARK SIZE LENGTH SHAPE
D800b #5 8'-0"
48 J1300 13'-0"
TOTAL
EST. WT. OF REINFORCING STEEL = 4,620 LB.
#11
156
8 SHAFT
PER
DRILLED SHAFT-PIER #2 PROTECTION
26 26
D800b
PIER PROTECTION "A" "B"

ELEVATIONS TABLE
#1
#2
983.87
985.34 960.34
958.87
void space outside any permanent steel casing is minimized. with or without slurry. Make diameter of excavation such that the annular not perform shaft excavation using uncased or open hole drilling methods

4. Provide permanent steel casing for shaft excavation. The Contractor shall Elevations, Sheet No. 8.

3. Top of drilled shafts shall be at the elevations shown in the Table of noted.

2. Use tolerances for construction in accordance with ACI 117, except as at all times.

1. Qualified construction personnel shall be present at the excavated hole shear key when required by the Railroad.
recommencement of concrete placement. Provide reinforcing dowels or construction joints to the satisfaction of the Railroad prior to permitted by the Railroad. Level, roughen and clean surface of

15. Place concrete in shaft in one continuous operation unless otherwise Engineering, Chapter 8, Sections 1.14 and 1.15.
acceptable procedures in accordance with AREMA Manual of Railway

14. For placing concrete underwater, use tremie or concrete pumping with the concrete does not hit sides of the hole or reinforcing steel cage. directed so that the fall is vertical down the center of the shaft and be allowed unless otherwise approved by the Railroad. Concrete should be of concrete to 8 feet. Free-fall distances greater than 8 feet shall not

13. Concrete shall be placed in such a manner as to limit free-fall distance the excavation remains clean and stable and the concrete remains fluid. the shaft is assured. Place concrete within the time period during which

12. Do not start concrete placement until a concrete supply adequate to fill least 24 hours in advance unless waived by the Railroad. after acceptance. Notification of concrete placement shall be made at

11. Place concrete as soon as possible after completion of excavation and other acceptable means.
as extending steel casing, installing outside deep wells, grouting, or acceptable to the Railroad, use alternative means to reduce inflow, such

10. If water inflow or sidewall instability encountered exceeds that adversely affect the drilled shaft or existing adjacent structures. manner that will not create subsidence or ground loss that might

9. Dewater drilled shaft excavation prior to placing concrete. Dewater in a out.
excavation to avoid contamination of the excavation after final clean

9. Keep all soil and excavated materials away from each open shaft of workers during operation necessitating entry into the shaft.

Local laws for inspection and testing of drilled shafts and protection Railroad. Provide all safety equipment called for by Federal, State, and direct down-hole inspection shall be subject to the acceptance of the drilled shaft and personnel to facilitate inspection. Alternatives to

8. Provide a safe method of access for inspection of the bottom of the Railroad.
diameters below the bottom of each drilled shaft, unless waived by the explore bearing stratum with a probe hole to a minimum depth of two shafts will be determined by the Railroad. For end-bearing shafts, bearing stratum during excavation. Inspection and testing of the drilled

7. The Railroad will verify actual final bearing levels and suitability of after any possible vibration of the ground or sloughing has occurred. drawings or as acceptable to the Railroad. Hole shall be re-cleaned to the Railroad. Provide bottom area not less than that shown on the plane within tolerance of 1 vertical to 12 horizontal, or as acceptable required by the Railroad. Excavate the bottom of the shaft to a level

6. Remove loose material and free water from bottom of drilled shafts, as present, re-clean hole to the satisfaction of the Railroad. with firm, undisturbed soil. If loose or unacceptable material is of loose material that would prevent intimate contact of the concrete

5. Use excavation methods that leave the sides and bottom of the hole free excavation using a procedure acceptable to the Railroad.

19. Completely fill annular space between permanent steel casing and shaft Requirements
Engineering, Chapter 8, Part 1: Materials, Tests and Construction loss and temperature extremes in accordance with AREMA Manual of Railway

18. Protect tops of shafts against damage and for curing to prevent moisture will perform compression tests at 28 days.

Railroad's testing, or accept the Railroad's test results. The Railroad

17. Perform concrete testing for quality control to supplement the proper shaft geometry.
diameter and plotted on a graph vs. theoretical volume to check for be recorded during placement at intervals not exceeding one shaft shaft dimensions as measured in the field. Actual concrete volume shall

16. Theoretical concrete volume shall be computed based on actual drilled these notes.
and actual measured volume for each drilled shaft in accordance with g. Graphical plot of depth or elevation vs. theoretical concrete volume in accordance with the notes and drawings.
of drilled shafts, specifically identifying any shafts that are not f. Reports of as-built location, alignment, elevations, and dimensions ASTM C94.
e. Concrete batch-plant tickets containing the information required by these notes.
d. Down-hole slurry test results in accordance with the requirements in markings.
c. Certified mill test reports for reinforcing steel, including bar steel casing, and slurry.
b. Reports of material quantities including concrete, reinforcing steel, reinforcing steel and concrete.
inspection of the finished excavation prior to placement of a. Notification of drilling 24 hours in advance to permit in-place construction:

9. The Contractor shall submit the following to the Railroad during slurry.
admixtures and the physical and chemical properties of the mixed j. A test report from the slurry supplier giving the slurry type and i. AWS welder certification.
h. Welding procedures for permanent steel casing and reinforcement. splice details and locations.
g. Shop drawings showing placement of reinforcing steel, including notes.
f. Concrete materials and mix proportions in accordance with these these notes.
e. Steel casing material properties and quantities in accordance with d. List of equipment and operating procedures.
c. Detailed description of shaft construction method.
b. Quality control program.
a. Experience record of supervisory and drilling personnel. at least 14 days before the start of the work, if applicable:

8. The Contractor shall submit the following to the Railroad for approval concrete placement.
samples and make tests during the steel casing withdrawal and f. Provide the means and opportunity to inspect the operation, take shaft before concrete placement.
e. Schedule and provide time and means for inspection of each drilled the Railroad unless otherwise permitted.
d. Perform all excavation and concrete placement work in the presence of c. Develop and adhere to a program for quality control. used.
years of acceptable experience with the installation method to be b. Provide an on-site supervisor and drillers having a minimum of five in accordance with these notes.
a. Construct drilled shafts as detailed and noted on these drawings and

7. The Contractor shall:
of these notes and the drawings.
acceptability of the shaft installation within the terms and conditions perform required testing on construction materials, and determine the

6. The Railroad will provide observation of the drilled shaft construction, 48 hours of such a determination.
the Railroad immediately by phone, e-mail, or fax and in writing within subsurface conditions differ substantially from those provided, notify "Foundation Design Recommendations Memorandum", dated 9-27-2019. If actual

5. Subsurface conditions were approximated by HDR, Inc. as specified in the and concrete placement, as applicable.
temporary steel casing installation and withdrawal, reinforcing steel excavation in soil and rock, permanent steel casing installation, construction. Proposed method shall include equipment and procedures for conditions at the site and shall be accepted by the Railroad prior to the bid. Installation methods shall be compatible with subsurface

4. Contractor shall submit proposed drilled shaft installation method with Part 24: Drilled Shaft Foundations.
of Railway Engineering, Chapter 8: Concrete Structures and Foundations,

3. Drilled shaft construction shall be in accordance with the AREMA Manual friction and end bearing.

2. Drilled shafts shall derive their support from a combination of side Shaft Foundations.
for Railway Engineering, Chapter 8, Part 2: Design and Part 24: Drilled

1. Drilled shafts have been designed in accordance with the AREMA Manual 2 5'-
0"
8 -
D
8 0
0 b
7 S
P
A. @
6" =
3'-
6"
18 -
D
8 0
0 b
17 S
P
A. @
6" =
8'-
6"
6" C
L
R
1'-6" 1'-6"
3'-0"
2'-0"
LAP
1 '
-8"
364

PROJECT

LOCATION
365
City of Fontana
Action Report
City Council Meeting
8353 Sierra Avenue
Fontana, CA 92335
File #: 21-2424 Agenda Date: 9/12/2023
Agenda #: M. Category: Consent Calendar
FROM:

Engineering
SUBJECT:

Award bid for the Active Transportation Program (ATP) Safe Routes to School (SRTS) Pedestrian Improvements Project on Ramona, Alder, Locust Avenue Project [Federal ID No. ATPSB1L-5307 (027)] (Bid No. SB-67-DE-23).

RECOMMENDATION:

1. Award bid and authorize the City Manager to execute a construction contract with Riverside Construction Company, Inc. for the construction of the Active Transportation Program (ATP) Safe Routes to School (SRTS) Pedestrian Improvements Project along Ramona, Alder, Locust Avenue, Federal ID No. ATPSB1L-5307(027), in the amount of $4,218,475.00 and authorize a 10% contingency in the amount of $421,847.50 (Bid No. SB-67-DE-23).

2. Approve and authorize the City Manager to execute any and all utility agreements, utility easements, and subsequent agreements on behalf of the City of Fontana for the Active Transportation Program (ATP) Safe Routes to School (SRTS) Pedestrian Improvements Project on Ramona, Alder, Locust Avenue Project Federal ID No. ATPSB1L-5307(027) (Bid No. SB-67-DE -23).

3. Appropriate $645,000.00 from Local Measure I Fund No. 246 to the Safe Routes to School Pedestrian Improvements Project along Ramona, Alder, Locust Avenues Project No. 3339.

COUNCIL GOALS:
· To invest in the City’s infrastructure (streets, sewers, parks, etc.) by maintaining and improving the city's existing infrastructure.
· To invest in the City’s infrastructure (streets, sewers, parks, etc.) by providing for the development of new infrastructure.
· To invest in the City’s infrastructure (streets, sewers, parks, etc.) by focusing on relief of traffic congestion.

DISCUSSION:

On October 14, 2017, the City Council accepted an Active Transportation Program Grant in the amount of $1,918,000.00 to fund the design and construction of the Safe Routes to School Project along four (4) segments within the City. The segments are: Ramona Avenue between Juniper Avenue and Sierra Avenue, Alder Avenue between Baseline Avenue and Shamrock Avenue, and two segments along Locust Avenue between Miller Avenue and Arrow Boulevard. The proposed City of Fontana Page 1 of 2 Printed on 9/7/2023
powered by Legistar™366
File #: 21-2424 Agenda Date: 9/12/2023
Agenda #: M. Category: Consent Calendar
improvements include installation of Americans with Disabilities Act (ADA) compliant sidewalks, curb and gutter, ADA curb ramps, street striping and traffic signs, and bike lanes where none currently exist.

On July 28, 2023, at 2:00 p.m. the bids for this contract were opened. A total of three (3) bids were received ranging from $4,218,475.00 to $5,567,282.80. Riverside Construction Company, Inc. is the lowest bidder in the amount of $4,218,475.00. The Engineer's estimate was $3,575,000.00. After reviewing the proposed bid documents, Engineering staff has determined Riverside Construction Company, Inc. to be the lowest responsive and responsible bidder.

FISCAL IMPACT:

The fiscal impact associated with the approval of this item is $4,640,322.50, for the full term of the construction contract. The available budget is about $4,570,742. Considering all projected expenses, an additional $645,000.00 is being requested in 37603339-246-D-8330 and is not included in the FY 2023-2024 budget. The request will be submitted in the next quarterly budget report and will be funded by Local Measure I Fund No. 246. All future costs will be included in subsequent fiscal year budgets.

MOTION:

Approve staff recommendation.

City of Fontana Page 2 of 2 Printed on 9/7/2023
powered by Legistar™367
N
0 1 inch = 600 feet
600 1200

PROJECT LOCATION

FONTANA'S SAFE ROUTES TO SCHOOLS PEDESTRIAN

IMPROVEMENTS PROJECT
FEDERAL PROJECT NO. ATPSB1L-5307(027)
SEGMENT: RAMONA AVE. FROM JUNIPER AVE. TO SIERRA AVE
368
N
0 1 inch = 600 feet
600 1200

FONTANA'S SAFE ROUTES TO SCHOOLS PEDESTRIAN

IMPROVEMENTS PROJECT
FEDERAL PROJECT NO. ATPSB1L-5307(027)
SEGMENT: ALDER AVE. FROM BASELINE AVE. TO SHAMROCK AVE.

PROJECT LOCATION
369
N
0 1 inch = 800 feet
800 1600

FONTANA'S SAFE ROUTES TO SCHOOLS PEDESTRIAN

IMPROVEMENTS PROJECT
FEDERAL PROJECT NO. ATPSB1L-5307(027)
SEGMENTS: LOCUST AVE. FROM MILLER AVE. TO FOOTHILL BLVD.

AND LOCUST AVE. FROM FOOTHILL BLVD. TO ARROW RTE.

PROJECT LOCATION

PROJECT LOCATION
370
Bid Results

RAMONA, ALDER, LOCUST AVENUE SAFE ROUTES TO

SCHOOL PEDESTRIAN IMPROVEMENTS PROJECT
[Federal ID No. ATPSB1L-5307(027)]
(SB-67-DE-23)

1. Riverside Construction Company, Inc. $4,218,475.00
Riverside, CA

2. All American Asphalt $5,237,669.00
Corona, CA

3. Nationwide Contracting Services, Inc. $5,567,282.80
Huntington Beach, CA
371
City of Fontana
RAMONA, ALDER, LOCUST AVENUE SAFE ROUTES TO SCHOOL PEDESTRIAN IMPROVEMENTS PROJECT (SB-67-DE-23), bidding on 07/28/2023 2:00 PM (PDT)

Page 1 of 6 ends

Printed 08/14/2023
PlanetBids, Inc.
372
City of Fontana
RAMONA, ALDER, LOCUST AVENUE SAFE ROUTES TO SCHOOL PEDESTRIAN IMPROVEMENTS PROJECT (SB-67-DE-23), bidding on 07/28/2023 2:00 PM (PDT)

Page 2 of 6 ends

Printed 08/14/2023
PlanetBids, Inc.
373
City of Fontana
RAMONA, ALDER, LOCUST AVENUE SAFE ROUTES TO SCHOOL PEDESTRIAN IMPROVEMENTS PROJECT (SB-67-DE-23), bidding on 07/28/2023 2:00 PM (PDT)

Page 3 of 6 ends

Printed 08/14/2023
PlanetBids, Inc.
374
City of Fontana
RAMONA, ALDER, LOCUST AVENUE SAFE ROUTES TO SCHOOL PEDESTRIAN IMPROVEMENTS PROJECT (SB-67-DE-23), bidding on 07/28/2023 2:00 PM (PDT)

Page 4 of 6 ends

Printed 08/14/2023
PlanetBids, Inc.
375
City of Fontana
RAMONA, ALDER, LOCUST AVENUE SAFE ROUTES TO SCHOOL PEDESTRIAN IMPROVEMENTS PROJECT (SB-67-DE-23), bidding on 07/28/2023 2:00 PM (PDT)

Page 5 of 6 ends

Printed 08/14/2023
PlanetBids, Inc.
376
City of Fontana
RAMONA, ALDER, LOCUST AVENUE SAFE ROUTES TO SCHOOL PEDESTRIAN IMPROVEMENTS PROJECT (SB-67-DE-23), bidding on 07/28/2023 2:00 PM (PDT)

Page 6 of 6 ends

Printed 08/14/2023
PlanetBids, Inc.
377
City of Fontana
Action Report
City Council Meeting
8353 Sierra Avenue
Fontana, CA 92335
File #: 21-2425 Agenda Date: 9/12/2023
Agenda #: N. Category: Consent Calendar
FROM:

Public Works
SUBJECT:

Award a Contract for the Demolition of Slovene Hall.

RECOMMENDATION:

Award bid and Authorize the City Manager to execute a contract with Interior Demolition in the amount of $128,168.00 for the Demolition of Slovene Hall and authorize a 10% contingency in the amount of $12,816.00.

COUNCIL GOALS:
· Invest in the City’s infrastructure (streets, sewers, parks, etc.) by maintaining and improving the city's existing infrastructure.

DISCUSSION:

The Slovene Hall located at 8425 Cypress Ave was acquired by the City of Fontana in June of 2021.

The City intended on utilizing the facility for meetings, events and as a rental facility for the Community Services Department. After further evaluation of the facility, the City has determined the best option is to demolish the existing structure. The bidding process for the Slovene Hall Demolition bid (PW-24-SB-04) was conducted by City staff in July 2023. One hundred sixty (160) bidders were notified of the bid. Bid packets were downloaded by thirty-eight (38) vendors. Four (4) Fontana vendors were notified. No Fontana vendor responses were received. The bid closed on July 25, 2023 and the City received a total of four (4) bids.

After reviewing each individual company that provided a bid for the project, the Purchasing Office has recommended that the contract be awarded to Interior Demolition of Montrose, CA. Interior Demolition submitted all the necessary documents and therefore is the most responsible and responsive bidder.

FISCAL IMPACT:

The total fiscal impact of this item is $140,984. Funds for this project are budgeted in the current FY 2023/2024 Budget in Org 10337317-8130.

MOTION:

Approve staff recommendation.

City of Fontana Page 1 of 1 Printed on 9/6/2023
powered by Legistar™378
City of Fontana
Slovene Hall Demolition (PW-24-SB-04), bidding on 07/25/2023 2:00 PM (PDT)

Page 1 of 20 ends

Printed 08/17/2023
PlanetBids, Inc.
379
City of Fontana
Slovene Hall Demolition (PW-24-SB-04), bidding on 07/25/2023 2:00 PM (PDT)

Page 2 of 20 ends

Printed 08/17/2023
PlanetBids, Inc.
380
City of Fontana
Slovene Hall Demolition (PW-24-SB-04), bidding on 07/25/2023 2:00 PM (PDT)

Page 3 of 20 ends

Printed 08/17/2023
PlanetBids, Inc.
381
City of Fontana
Slovene Hall Demolition (PW-24-SB-04), bidding on 07/25/2023 2:00 PM (PDT)

Page 4 of 20 ends

Printed 08/17/2023
PlanetBids, Inc.
382
City of Fontana
Slovene Hall Demolition (PW-24-SB-04), bidding on 07/25/2023 2:00 PM (PDT)

Page 5 of 20 ends

Printed 08/17/2023
PlanetBids, Inc.
383
City of Fontana
Slovene Hall Demolition (PW-24-SB-04), bidding on 07/25/2023 2:00 PM (PDT)

Page 6 of 20 ends

Printed 08/17/2023
PlanetBids, Inc.
384
City of Fontana
Slovene Hall Demolition (PW-24-SB-04), bidding on 07/25/2023 2:00 PM (PDT)

Page 7 of 20 ends

Printed 08/17/2023
PlanetBids, Inc.
385
City of Fontana
Slovene Hall Demolition (PW-24-SB-04), bidding on 07/25/2023 2:00 PM (PDT)

Page 8 of 20 ends

Printed 08/17/2023
PlanetBids, Inc.
386
City of Fontana
Slovene Hall Demolition (PW-24-SB-04), bidding on 07/25/2023 2:00 PM (PDT)

Page 9 of 20 ends

Printed 08/17/2023
PlanetBids, Inc.
387
City of Fontana
Slovene Hall Demolition (PW-24-SB-04), bidding on 07/25/2023 2:00 PM (PDT)

Page 10 of 20 ends

Printed 08/17/2023
PlanetBids, Inc.
388
City of Fontana
Slovene Hall Demolition (PW-24-SB-04), bidding on 07/25/2023 2:00 PM (PDT)

Page 11 of 20 ends

Printed 08/17/2023
PlanetBids, Inc.
389
City of Fontana
Slovene Hall Demolition (PW-24-SB-04), bidding on 07/25/2023 2:00 PM (PDT)

Page 12 of 20 ends

Printed 08/17/2023
PlanetBids, Inc.
390
City of Fontana
Slovene Hall Demolition (PW-24-SB-04), bidding on 07/25/2023 2:00 PM (PDT)

Page 13 of 20 ends

Printed 08/17/2023
PlanetBids, Inc.
391
City of Fontana
Slovene Hall Demolition (PW-24-SB-04), bidding on 07/25/2023 2:00 PM (PDT)

Page 14 of 20 ends

Printed 08/17/2023
PlanetBids, Inc.
392
City of Fontana
Slovene Hall Demolition (PW-24-SB-04), bidding on 07/25/2023 2:00 PM (PDT)

Page 15 of 20 ends

Printed 08/17/2023
PlanetBids, Inc.
393
City of Fontana
Slovene Hall Demolition (PW-24-SB-04), bidding on 07/25/2023 2:00 PM (PDT)

Page 16 of 20 ends

Printed 08/17/2023
PlanetBids, Inc.
394
City of Fontana
Slovene Hall Demolition (PW-24-SB-04), bidding on 07/25/2023 2:00 PM (PDT)

Page 17 of 20 ends

Printed 08/17/2023
PlanetBids, Inc.
395
City of Fontana
Slovene Hall Demolition (PW-24-SB-04), bidding on 07/25/2023 2:00 PM (PDT)

Page 18 of 20 ends

Printed 08/17/2023
PlanetBids, Inc.
396
City of Fontana
Slovene Hall Demolition (PW-24-SB-04), bidding on 07/25/2023 2:00 PM (PDT)

Page 19 of 20 ends

Printed 08/17/2023
PlanetBids, Inc.
397
City of Fontana
Slovene Hall Demolition (PW-24-SB-04), bidding on 07/25/2023 2:00 PM (PDT)

Page 20 of 20 ends

Printed 08/17/2023
PlanetBids, Inc.
398
City of Fontana
Slovene Hall Demolition (PW-24-SB-04), bidding on 07/25/2023 2:00 PM (PDT)

Page 1 of 4 ends

Printed 08/17/2023
PlanetBids, Inc.
399
City of Fontana
Slovene Hall Demolition (PW-24-SB-04), bidding on 07/25/2023 2:00 PM (PDT)

Page 2 of 4 ends

Printed 08/17/2023
PlanetBids, Inc.
400
City of Fontana
Slovene Hall Demolition (PW-24-SB-04), bidding on 07/25/2023 2:00 PM (PDT)

Page 3 of 4 ends

Printed 08/17/2023
PlanetBids, Inc.
401
City of Fontana
Slovene Hall Demolition (PW-24-SB-04), bidding on 07/25/2023 2:00 PM (PDT)

Page 4 of 4 ends

Printed 08/17/2023
PlanetBids, Inc.
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
Bid Results
Slovene Hall Demolition
PW-24-SB-04
Interior Demolition, Inc. $128,168.00
Montrose, CA
Resource Environmental, Inc. $140,000.00
Cerritos, CA
Unlimited Environmental Inc. $150,619.00
Long Beach, CA
423
City of Fontana
Action Report
City Council Meeting
8353 Sierra Avenue
Fontana, CA 92335
File #: 21-2426 Agenda Date: 9/12/2023
Agenda #: O. Category: Consent Calendar
FROM:

Engineering
SUBJECT:

Award a Construction Contract for the Arrow Boulevard at Cypress Avenue Traffic Signal Project (Bid No. SB-162-DE-23).

RECOMMENDATION:

1. Award bid and authorize the City Manager to execute a construction contract with DBX, Inc. for the construction of the Arrow Boulevard at Cypress Avenue Traffic Signal Project (Bid No. SB162-DE-23) in the amount of $1,628,816.00 and authorize a 10% contingency in the amount of $162,881.60 (Bid No. SB-67-DE-23).

2. Approve and authorize the City Manager to execute any and all utility agreements, utility easements, and subsequent agreements on behalf of the City of Fontana for the Arrow Boulevard at Cypress Avenue Traffic Signal Project (Bid No. SB-162-DE-23).

3. Appropriate $945,000.00 from Local Measure I Fund No. 246 to the Arrow Boulevard at Cypress Avenue Traffic Signal Project No. 3386.

COUNCIL GOALS:
· To invest in the City’s infrastructure (streets, sewers, parks, etc.) by maintaining and improving the city's existing infrastructure.
· To invest in the City’s infrastructure (streets, sewers, parks, etc.) by providing for the development of new infrastructure.
· To invest in the City’s infrastructure (streets, sewers, parks, etc.) by focusing on relief of traffic congestion.

DISCUSSION:

The City determined the need for a new traffic signal at the intersection of Arrow Boulevard at Cypress Avenue to aid in circulation and ease congestion. This location is on the City-Wide Traffic Signal Priority List and is a component of a comprehensive transportation improvement and traffic management program. The improvements will include reconstructing new Americans with Disabilities Act (ADA) compliant curb ramps and storm drain facilities. This new traffic signal will enhance traffic flow and access to the adjacent parks and schools.

On August 3, 2023, at 2:00 p.m. the bids for this contract were opened. A total of seven (7) bids were received ranging from $1,628,816.00 to $1,984,174.00. DBX, Inc. is the lowest bidder in the amount City of Fontana Page 1 of 2 Printed on 9/7/2023
powered by Legistar™424
File #: 21-2426 Agenda Date: 9/12/2023
Agenda #: O. Category: Consent Calendar
of $1,628,816.00. The Engineer's estimate was $1,057,000.00. After reviewing the proposed bid documents, Engineering staff has determined DBX, Inc. to be the lowest responsive and responsible bidder.

FISCAL IMPACT:

The fiscal impact associated with the approval of this item is $1,791,697.60, for the full term of the construction contract. The available budget is about $1,087,825. Considering all projected expenses, an additional $945,000.00 is being requested in 37603386-246-A-8330 and is not included in the FY 2023-2024 budget. The request will be submitted in the next quarterly budget report and will be funded by Local Measure I Fund No. 246. All future costs will be included in subsequent fiscal year budgets.

MOTION:

Approve staff recommendation.

City of Fontana Page 2 of 2 Printed on 9/7/2023
powered by Legistar™425
N
0 1 inch = 600 feet
600 1200

PROJECT LOCATION

ARROW BOULEVARD AT CYPRESS AVENUE

TRAFFIC SIGNAL PROJECT
426
Bid Results
Arrow Boulevard at Cypress Avenue Traffic Signal Project SB-162-DE-23

1. DBX, Inc. $1,628,816.00
Temecula, CA

2. Alfaro Communications Construction, Inc. $1,730,997.23 Compton, CA

3. Roadway Engineering & Construction Corp. $1,734,123.00 Perris, CA

4. Select Electric Inc $1,795,275.00
Vista, CA

5. Baker Electric Inc. $ 1,847,294.20
Escondido, CA

6. International Line Builders, Inc. $ 1,890,659.00
Corona, CA

7. Elecnor Belco Electric, Inc. $ 1,984,174.00
Chino, CA
427
City of Fontana
Arrow Blvd @ Cypress Ave Traffic Signal Project (SB-162-DE-23), bidding on 08/03/2023 2:00 PM (PDT)

Page 1 of 4 ends

Printed 08/17/2023
PlanetBids, Inc.
428
City of Fontana
Arrow Blvd @ Cypress Ave Traffic Signal Project (SB-162-DE-23), bidding on 08/03/2023 2:00 PM (PDT)

Page 2 of 4 ends

Printed 08/17/2023
PlanetBids, Inc.
429
City of Fontana
Arrow Blvd @ Cypress Ave Traffic Signal Project (SB-162-DE-23), bidding on 08/03/2023 2:00 PM (PDT)

Page 3 of 4 ends

Printed 08/17/2023
PlanetBids, Inc.
430
City of Fontana
Arrow Blvd @ Cypress Ave Traffic Signal Project (SB-162-DE-23), bidding on 08/03/2023 2:00 PM (PDT)

Page 4 of 4 ends

Printed 08/17/2023
PlanetBids, Inc.
431
City of Fontana
Action Report
City Council Meeting
8353 Sierra Avenue
Fontana, CA 92335
File #: 21-2427 Agenda Date: 9/12/2023
Agenda #: P. Category: Consent Calendar
FROM:

Community Services
SUBJECT:

Award bid (SB-112-CS23) to Carreras Tours LLC., to provide bussing transportation for the Fontana Expanded Learning Program.

RECOMMENDATION:

1. Award bid (SB-112-CS-23) to Carreras Tours LLC. for Transportation Services for the Fontana Expanded Learning Program (FELP) for the Fiscal Year 2023-24.

2. Authorize the Purchasing Division to issue a purchase order to Carreras Tours for the FELP transportation service for Fiscal Year 2023-24.

COUNCIL GOALS:
· Increase citizen involvement by Developing future leaders. · Increase citizen involvement by promoting healthy lifestyle opportunities to residents of all ages.

DISCUSSION:

The City of Fontana is currently in an Agreement with the Fontana Unified School District (FUSD) as the Fontana Expanded Program (FELP) Provider. FELP is an After School Education and Safety (ASES) grant and Expanded Learning Opportunities Program (ELO-P) funded program.

As part of the grant-required components, FELP provides field trips while providing safe and supervised transportation from school sites to offsite destinations for hands-on experiences that are aligned with 21st-century life skills.

Purchasing solicited bids from 42 vendors and received 2 bids for the transportation bus service. To support the operating agreement between the City and FUSD, FELP is recommending to award bid (SB-112-CS-23) to Carreras Tours LLC. for Transportation Services for the Fontana Expanded Learning Program (FELP) for the Fiscal Year 2023-24.

This transportation service will allow for field trips that will broaden participants' horizons to future careers, life skills, and engagement with the community.

FISCAL IMPACT:

The program cost is $500,000.00 and is budgeted in the adopted FY 2023/2024 Community Services Department operating budget in account 38624101.8135. This cost is 100% fully reimbursable.

City of Fontana Page 1 of 2 Printed on 9/6/2023
powered by Legistar™432
File #: 21-2427 Agenda Date: 9/12/2023
Agenda #: P. Category: Consent Calendar
MOTION:

Approve bid (SB-112-CS-23) to be awarded to Carreras Tours of Ontario, CA for Transportation Services for the Fontana Expanded Learning Program (FELP) for the Fiscal Year 2023-24.

City of Fontana Page 2 of 2 Printed on 9/6/2023
powered by Legistar™433
408 E Transit St Ontaro, Ca 91761
(909) 467-4949 Office
(909) 614-7159 Fax
[email protected]
www.carrerstours.com
SPAB RATES EFF 01/30/2023
Depending where a trip is going prices are based on an hourly rate or by the mile.

Pricing is as follows for SPAB buses
5 hour minimum $1100 then $220 Per hour there after
$6.25 per mile if trip is priced by the mile.

Day rate local is anything over 8 but under 12 hours of service $1,675
Mountain Runs
$1500 Flat rate one Way plus Fuel Surcharge and SPAB fees $300 Winter Mountain Fee Mid November Until mid-March. This can be expanded if snow is present before during or after trip.

Grad Night Rates (Hourly)
$245 per hour 10 hour minimum
$6.75 per mile if priced by mile
10% Fuel Surcharge (This rate may increase due to the unsteady and constant rise in fuel prices. This is also in accordance with our terms and conditions which accompany each charter confirmation or quote request) Admin Fee added to all charters
Driver gratuity is NOT included however can be added at school’s discretion.

CANCELATION POLICY
-No Charge 7 days prior to departure-Up to 72 Hours Prior to departure 50% of the trip cost due and or is Nonrefundable. 1 to 72 Hours prior to departure 100% of the trip cost due and or is Nonrefundable
434
City of Fontana
Action Report
City Council Meeting
8353 Sierra Avenue
Fontana, CA 92335
File #: 21-2430 Agenda Date: 9/12/2023
Agenda #: Q. Category: Consent Calendar
FROM:

Engineering
SUBJECT:

Approve a Task Order for Engineering Design Services for the Courtplace Housing Development Project (Infrastructure Improvements)
RECOMMENDATION:

1. Approve and authorize the City Manager to execute Task Order No. 18 in a not-to-exceed amount of $266,446.00 with TKE Engineering, Inc. for Engineering Design Services for the Courtplace Housing Development Project (Infrastructure Improvements) Request for Proposals SQ-87-DE-19-58.

2. Approve and authorize the City Manager to execute any future amendments to the Task Order.

3. Authorize the City Manager to execute any and all utility agreements, utility easements, and any related items on behalf of the City of Fontana for the Courtplace Housing Development Project (Infrastructure Improvements).

COUNCIL GOALS:
· To invest in the City’s infrastructure (streets, sewers, parks, etc.) by maintaining and improving the city's existing infrastructure.
· To invest in the City’s infrastructure (streets, sewers, parks, etc.) by providing for the development of new infrastructure.

DISCUSSION:

Staff solicited a Request for Proposals (RFP) for Engineering Design Services by notifying the City’s forty-six (46) pre-qualified firms through the Purchasing Office. Six (6) prospective bidders downloaded the RFP documents. On July 13, 2023, proposals were received from two (2) firms interested in providing design services for the project. Proposals were evaluated and ranked in accordance with the City policies and procedures.
· TKE Engineering, Inc. $266,446
· Dan Guerra and Associates $339,000
Staff recommends the City Council approve a Task Order Agreement in the amount of $266,466.00 with TKE Engineering, Inc. for design services for the project.

FISCAL IMPACT:

The fiscal impact associated with the approval of this item is $266,466.00 and is included in the FY City of Fontana Page 1 of 2 Printed on 9/6/2023
powered by Legistar™435
File #: 21-2430 Agenda Date: 9/12/2023
Agenda #: Q. Category: Consent Calendar
2023-2024 Budget in Project No. 37600063-622-A-8113.

MOTION:

Approve staff recommendation.

City of Fontana Page 2 of 2 Printed on 9/6/2023
powered by Legistar™436
N
0 1 inch = 600 feet
600 1200

PROJECT LOCATION

COURTPLACE HOUSING DEVELOPMENT PROJECT
437
8353SierraAve,
PurchasingOffice
Fontana,CA92335
438

TABLE OF CONTENTS
Prepared for:

City of Fontana
8353 Sierra Avenue
Fontana, CA 92335
Contact: Sid Lambert
Phone: (909) 350-7600
Email: [email protected]
Prepared by:

TKE Engineering, Inc.
2305 Chicago Avenue
Riverside, CA 92507
Contact: Terry Renner, P.E., Q.S.D., Senior Vice President Phone: (951) 680-0440
Fax:(951) 680-0490
Email: [email protected]

TABLE OF CONTENTS
Technical Proposal

1. Firm Profile

2. Point of Contact

3. Work Plan

4. Proposed Project Team

5. Schedule

6. References
Cost Proposal (submitted separately)
439
Page | 1
Request for Proposal | Design Services for Courtplace Housing Development Project (Infrastructure Improvements) | SQ-87-DE-19-58
City of Fontana

TECHNICAL PROPOSAL

1. FIRM PROFILE
TKE Engineering, Inc. (TKE), has extensive experience with an excellent reputation in both the design and construction support of drainage improvement facilities, including
associated drainage analysis, grading, conveyance, as well as improvement restoration. TKE is currently working on several drainage analysis, storm drain and basin design, street design and sewer design projects with various cities throughout the Inland Empire that are nearly identical in scope.

TKE was established in 2000, and in the last twenty-three years has developed into one of Southern California’s premier fullservice consulting engineering firms. TKE is a California Corporation and our headquarter office is located in a business owned 7,000 square foot office building at 2305 Chicago Avenue, Riverside, CA 92507. TKE currently maintains a staff of 46 engineers, surveyors, inspectors, drafters and clerical personnel.

2. POINT OF CONTACT
Terry Renner P.E., L.S., Q.S.D., Senior Vice President
Address: 2305 Chicago Avenue, Riverside, CA 92507
Phone: 951.680.0440
Fax Number: 951.680.0490
Email: [email protected]

AUTHORIZATION
TKE’s Senior Vice President, Terry Renner P.E., L.S., Q.S.D. is authorized to bind the firm and the proposal is valid for ninety (90) days.

Terry’s signature (below) binds this proposal on behalf of TKE Engineering, Inc.

INSURANCE
TKE will comply with the City of Fontana’s standard contract and insurance requirements. TKE holds no exceptions to the standard contract and/or the city’s insurance requirement.

TKE will provide insurance certificates prior to contract execution.

Location of Office
TKE Engineering, Inc.’s main office is located
at 2305 Chicago Avenue Riverside, CA 92507
Years in Business
TKE was founded in 2000 and has 23 years
of experience in providing survey support
services for Municipalities.

Company Structure
TKE is a California Corporation founded in
June 2000. TKE is not a subsidiary. California
Business License Number: 00109901
DIR NUMBER PWCR #1000019851
Firm Owners
Michael Thornton, P.E., P.L.S., M.S. –
President
Terry Renner, P.E., L.S., Q.S.D. –
Senior Vice President
Steve Ledbetter, P.E. – Vice President
Size of Organization
46 Professional Surveyors, Engineers,
Project and Construction Managers,
Inspectors, Designers, Plan Checkers, &
Support Staff
City/District Surveyor
TKE serves as the City/District Surveyor in 7
Cities/Districts in Southern California,
including 4 in San Bernardino County
Drainage and Street Experience
TKE has provided more than 50 designs on
drainage, basins, streets and sewer projects
for the City of Fontana over the past 23
years.

City of Fontana’s
Point of Contact
Terry Renner, P.E., L.S., Q.S.D. –
Senior Vice President
Phone: (951) 680-0440
Email: [email protected]
TKE Engineering TKE Engineering, Inc. Inc. AT A GLANCE
440
Page | 2
Request for Proposal | Design Services for Courtplace Housing Development Project (Infrastructure Improvements) | SQ-87-DE-19-58
City of Fontana

TECHNICAL PROPOSAL

ADDENDUM
TKE is in receipt of Addendum No.1 on July 12, 2023.

3. WORK PLAN

PROJECT UNDERSTANDING
The City of Fontana (City) is seeking qualified Civil Engineering firms to provide Engineering Services for the Development of Plans, Specifications, and Estimates, and other Engineering Services for the Courtplace Housing Development Project (Infrastructure Improvements).

TKE has reviewed the preliminary plans and has experience on past projects with the existing basin site and the storm drain pipes which convey drainage to the basin. Our history in the City and with the project area provides us with the experience and knowledge to provide street, sewer, storm drain, signing and striping, detention basin, retaining wall(s), and backfill of the remaining portion of the existing basin.

PROJECT APPROACH
Our approach to your project, recognizing that both schedule and budget are of primary concern, dictates that design decisions must be made quickly and carefully. When this is coupled with the various constraints present, it is critical that the City choose a consultant with a proven track record of delivering. With a familiar team of senior level design professionals, TKE is the right choice for this project.

With a project of this type, our experience tells us that there has to be a proactive approach to completing the work. This includes early identification of critical design elements and accurate cost estimating throughout the entire process. In preparing this proposal, our team established key issues so we can “hit the ground running” to make this a successful project for the City.

CRITICAL ISSUES

FLOOD PROTECTION
For a project of this type where a flood control basin in being reduced in size, maintenance of flood protection is one of the project’s primary objectives. It can be accomplished in various ways and basin routing will be a critical aspect. TKE will consider review the proposed basin properties and ensure flood routing analysis shows that storm runoff from a multiday storm system will be safely conveyed through the basin. We will review basin configuration alternatives as well to determine the most cost effective project alternative that achieves project requirements and project funding objectives.

UTILITIES
For pipeline projects, construction contract change orders are primarily attributable to inaccurate plotting of utility interferences or due to unknown utilities. Comprehensive utility research together with design potholing of critical utility interferences and potholing of all critical interferences prior to construction by the project contractor, will ensure that contract change orders will be significantly reduced or even eliminated. It is anticipated that numerous underground utilities will be encountered in street intersections that are located throughout the project. TKE will identify existing larger and gravity facilities, as well as, project connections, as critical and request excavation of them to verify both horizontal and vertical alignments. In addition, we will request that at connections, existing pipeline materials and condition be noted to properly design each connection and pipeline
abandonments. Again, to avoid potential change orders,
detailed connection and abandonment designs will be
included.

TRAFFIC CONTROL
Traffic impacts created by construction of the pipelines and street improvements must be mitigated to the maximum
extent practicable. Access to resident’s and commercial properties must be maintained at all times. When considering pipeline alignments and street improvements, construction traffic control, property assessment, utility and mail services and emergency vehicle access needs to be considered. Once the alignments are selected, traffic control design needs to be prepared to ensure safe and convenient vehicular and
pedestrian mobility during construction operations. We have extensive experience in construction traffic control plan preparation and we are intimately familiar with the, CATTCH, WATCH, Caltrans, and MUTCD requirements. We will also
review existing pavement conditions to determine if poor conditions may result in the potential for additional pavement removal and replacement during trench repair.

SCOPE OF WORK
TKE will provide project management and design services in three progressive phases, 60% Level Completion, 90% Level Completion and 100% Level Completion. TKE’s scope of
services is presented in the following paragraphs:

T ASK N O . 1 . P ROJECT M ANAGE MENT
TKE’s Project Manager will be responsible for the entire project team. He will attend all meetings, prepare agendas and
corresponding meeting minutes together with collection of signatures for meeting attendees (sign-in sheets). He will meet with the City at appropriate times and will meet as needed with agencies, residents, property owners, and utilities in addition 441
Page | 3
Request for Proposal | Design Services for Courtplace Housing Development Project (Infrastructure Improvements) | SQ-87-DE-19-58
City of Fontana

TECHNICAL PROPOSAL
to the meetings presented below. He will also update the project budget and schedule prior to each City meeting for discussion with staff.

Deliverables: Agendas, Meeting Minutes, Exhibits, and Project Progress, Schedule and Budget Updates
T ASK N O . 2 . I N I TIAL ‘ K ICK O F F ’ M EETING
Prior to commencement of services, we propose to meet City staff to review project obligations and to discuss all project requirements in detail. TKE’s Project Manager and \Engineer will attend the meeting to determine project protocol and obtain City record drawings.

Deliverables: Agenda, Minutes, and Distribution to all Entities T ASK N O . 3 . R ECORD S R ESEARCH
We will thoroughly research existing utility records and acquire copies of all available records. The purpose of the records research is to assemble survey records to establish locations of street centerlines, street rights-of-way, and easements and determine locations of all existing utilities and improvements.

The research will consist of assembling copies of assessors’ maps, tract maps, parcel maps, easement documents,
monument ties, benchmark data, corner records, street and storm drain improvement plans, and utility drawings. We will request the City provide copies of available pertinent City records, such as survey ties, benchmarks, and street, sewer and storm drain improvement plans.

We will notify Underground Service Alert to acquire a complete list of underground utility purveyors. The utility drawings will include existing drawings from the City, and drawings and/or atlas maps from all private utility companies, and/or agencies.

We will confer and coordinate with the following agencies as well as any additional agencies listed in the Underground Service Alert:

Δ Fontana Water Company
Δ Marygold Mutual Water Company
Δ Verizon Telephone
Δ AT&T and PacBell
Δ Sprint
Δ Southern California Gas Co.

Δ Southern California Edison
Δ Time Warner Cable Television
We will send first utility notice letters to all listed utility companies and agencies requesting their data. We will
maintain copies of the letters and correspondence for future reference. We shall also provide the City with a complete copy of all correspondence with all utility companies.

Deliverables: Record Data and Utility Information
T ASK N O . 4 . D ESIGN S URVEY
TKE will conduct a conventional design survey of the sidewalk and ramp construction project areas due to the level of detail needed for precise grading design. Our field survey crews will collect appropriate detail as required to prepare a topographic map for all areas where grading improvements are required.

The topographic map shall be a minimum of 120-feet wide and shall extend 100-feet beyond end of centerline. In addition, we will collect 50-foot cross sections with shots extending to rightof-way and 10-feet beyond right-of-way on each side where possible. Survey data will include trees over 2-inches in diameter, buildings, walkways, sidewalks, driveways, curbs, gutters, cross gutters, fire hydrants, water valves, manholes, water meters, signs, street lights, power poles, fences, structure, traffic signal poles and all other visible features.

Our crews will set 100-foot stationing along street centerlines and collect existing topography as needed to provide sufficient level of detail for precise design. The crew will also measure invert, top of cone and rim elevations for all existing manholes in the project area and invert and rim elevations for all drainage facilities. The crew will set temporary benchmarks within the project limits and each will be shown on the drawings.

Deliverables: Ground Topography, Utilities and Data in ASCII Format with Description Codes.

T ASK N O . 5 T OPOGRAPHIC M AP / S URVEY

C ONTROL P LAN
We will prepare a topographic map for the entire reach of sidewalk replacement and ramp construction areas. The
topographic map shall be prepared in AutoCAD format at
1”=40’ scale and shall include 1 foot contours. For areas of striping improvements only a topographic survey will not be performed
A survey control plan shall be prepared and shall show all existing found monumentation, benchmarks, ties and
temporary control points. All found monumentation will
include descriptions and tie-out information.

The survey control plan will be provided to the City in hard copy (mylar) and digital (AutoCAD and PDF) formats.

Deliverables: Topographic Mapping.
442
Page | 4
Request for Proposal | Design Services for Courtplace Housing Development Project (Infrastructure Improvements) | SQ-87-DE-19-58
City of Fontana

TECHNICAL PROPOSAL
T ASK N O . 6 BASE CONSTRUCTION

DRAWINGS
We will prepare the base construction drawings on 24” by 36” sheets with the City’s standard title block using AutoCAD 2020 software, at a drawing scale of 1”=40’. The base construction drawings will include a plan view based on the accumulated conventional survey data. We will add the sheet north arrow, graphic scale, existing improvements and utilities (based on both assembled records and field data), property lines, public and private right-of-way, easement areas, assessor parcel numbers, street centerline, street names, building locations, water service location; sewer manhole lids and water valve lids; cross gutters; driveways, pedestrian ramps; traffic stripes and legends; curb returns; details of private improvements, fences, gates, irrigation systems, mailboxes, trees and landscaping, and survey data to the drawings. Once the base drawings are complete, we will perform a careful field review to ensure all underground facilities are shown correctly.

Deliverables: Base Construction Drawings in Plan View
T ASK N O . 7 . C OMPOSITE U TILITY P LAN
TKE will prepare a composite utility plan which identifies all existing utilities within the proposed right-of-way and all utilities affected by the proposed street and storm drain improvements and requiring relocation. The plan shall show all above and below ground utilities including all laterals. The utility plan will be for City use in coordinating with utility companies.

For all facilities to be potholed, we propose to verify the horizontal and vertical alignments by locating the facilities. will request that Underground Service Alert (USA) notify USA members to attend a field meeting to review locations to be excavated. We will mark critical utility locations as defined by TKE and approved by City staff in the field.

We will conduct a field meeting to request that utility representatives mark their facilities within specified locations.

We will document meeting attendees for future reference.

TKE’s subconsultant, C Below will excavate each utility. We will measure all utilities that are excavated to record their horizontal and vertical alignments.

Deliverables: Utility Plan
T ASK N O . 8 ENVIRONMENTAL COMPLIANCE
TKE will provide assistance to the City’s environmental compliance staff for the proposed project. TKE will assist with exhibit preparation and other as needed services for obtaining the required environmental compliance documents and
establishing appropriate mitigation factors.

Deliverables: Environmental Compliance Assistance
T ASK N O . 9. G EOTECHNICAL R EPORT
TKE’s subconsultant, Aragón Geotechnical, Inc. (AGI) will prepare one preliminary written report with subsections documenting the limited investigation findings, conclusions, opinions, and construction alternatives for infrastructure and site mass grading. Sample grading specifications will be assembled. Existing Juniper Avenue and Sierra Avenue
pavement sections will be compared to City of Fontana
standard designs and City-issued traffic indices to arrive at repair or replacement options. Foundation-zone preparation criteria for the Sierra Avenue VCP sewer main will be
presented. Recommendations for excavation slopes and trench shoring methods, backfills, concrete mixes, and any special dewatering requirements are expected. Four bound client copies and an electronic PDF file will include appendices with graphical boring logs, summaries of laboratory test standards and our obtained results, and map exhibits depicting our soil boring locations.

Δ Drilling, sampling and logging of necessary borings for evaluation of street structural section. AGI will notify Underground Service Alert and will provide necessary
traffic control for the field operations. The borings will be drilled to a depth of at least five feet. The asphalt pavement thickness and base thickness will be noted
during the boring operations.

Δ Design of pavement structural section using City
provided traffic indices. The pavement will be
designed for the larger of the two indices plus one
point.

Δ Laboratory testing of representative soil samples to
evaluate in-situ moisture content, density tests, max
density and optimum tests, sieve analysis, R-value,
direct shear tests, consolidation and collapse tests and percolation test of the on-site soils.

Δ Data compilation and geotechnical analysis of existing geotechnical maps, reports, and field and laboratory
data to provide recommendations for pavement
design. Analysis will include recommendations for
new pavement section alternatives, based on the
traffic indices and R value testing.

Δ Preparation of a report presenting their findings,
conclusions and recommendations pertaining to
design, compaction requirements, and subgrade
preparation for each street. In addition, the report
will provide recommendations for asphalt pavement
recycling and other recommendations for
rehabilitative repair strategies. The report will include 443
Page | 5
Request for Proposal | Design Services for Courtplace Housing Development Project (Infrastructure Improvements) | SQ-87-DE-19-58
City of Fontana

TECHNICAL PROPOSAL
a scale plan showing locations and identifications of all borings and other geotechnical information.

Deliverables: Preliminary report documenting limited
investigation findings, conclusions, opinions, and construction alternatives for infrastructure and site mass grading. Sample grading specifications will be assembled.

T ASK N O . 10. 60% D ESIGN
60% Design will include preparation geometric roadway
improvement exhibits, preliminary construction drawings, preliminary technical specifications, preliminary construction estimates, and completed geotechnical report.

Construction drawings will show proposed street geometrics including locations of proposed asphalt concrete pavement, curb and gutters, sidewalk, ramps, drive approaches, and bike lanes. In addition, preliminary street and sidewalk grades will be prepared to establish project grading requirements.

Proposed improvements will be designed in accordance with the City’s current street design standards and specifications.

The proposed improvements will be designed to minimize
removals, grading and earthwork.

For the drawings, we will prepare a title sheet, construction notes sheet, demolition sheets, plan/profile sheets, grading sheets, signing and striping sheets, and necessary detail sheets.

The title sheet shall include the title of the job, a vicinity map showing the City in relationship to surrounding communities, a location map showing the project limits, a list of abbreviations used, benchmark data, general notes, construction notes and quantities, an index for the drawings, list of utilities with phone numbers, and references on the City’s standard title block.

The construction note sheet will show general construction notes and project specific requirements.

The demolition sheet will show existing improvement
demolition including limits of pavement removal, saw cutting locations and limits and concrete cross gutters and curbs, if required. In addition, the plan will specify relocation of private improvements such as mailboxes fences, drive approaches, etc. as required.

Plan/profile sheets will show proposed improvements at
1”=40’ scale including curb and gutter, sidewalk, ramps, driveways, pavement limits, existing utility relocations, water service relocations, and manhole, valve, and vault cover grade adjustments. For the profile portion of the drawings, we will show existing and proposed pavement elevations at centerline top of curb and centerline with appropriate design data. The construction details will include connections and abandonment details, all at appropriate drawing scales.

The storm drain and sewer sheets will show plan view
topographic data, existing improvements and utilities,
centerline control, proposed storm drain, manholes, catch basins, laterals and pavement to be replaced as a result of the construction. The profile (at a drawing scale of 1”=40’ horizontal and 1”=4’ vertical) will show existing ground surface over the proposed pipeline, pipeline flow line, top of pipe, utility crossings, slopes, length of pipe, manholes, catch basins, and special bedding requirements.

The basin sheets will show all required grading, slope
protection, Rip-rap, headwalls, wingwalls, spillways, and any other information required for basin and inlet/outlet
construction. We will also include all structural calculations required for any applicable reinforced concrete structures that cannot be constructed using standard plans.

The signing and striping sheets will include all required pavement markings, lane stripes and signage in accordance with the MUTCD, California supplement and all other
applicable City requirements, for the project limits. The sheets will be prepared at 1”=40’ scale and include full geometrical layouts at each intersection.

For the specifications, we will amend the City Standards Technical Provisions as required for the projects. The
construction specifications will be prepared in Microsoft Word (2020 Version) format in accordance with City standards.

In addition, we will prepare quantity estimates for all proposed improvements prepared using an excel spreadsheet showing an itemized construction cost breakdown. Descriptions of work, unit prices, and quantities will be included in the spreadsheet.

Deliverables: 60% Design Sheets
T ASK N O . 1 1. C OORDINATION WITH

A GENCIES U TILITIES / P ERMITTING
After 60% design is complete, plans will be sent to agencies having facilities in the project areas requesting that they verify their facilities are shown correctly and that they furnish any construction requirements they desire. We will highlight each agency’s facilities and advise each of potential conflicts and relocation requirements. We will request that they respond within two weeks and we will follow up with telephone calls to confirm all agency requirements have been incorporated. We 444
Page | 6
Request for Proposal | Design Services for Courtplace Housing Development Project (Infrastructure Improvements) | SQ-87-DE-19-58
City of Fontana

TECHNICAL PROPOSAL
will document all conferences with utilities and agencies and copy the City via e-mail.

TKE will prepare permit applications with Caltrans necessary for approval of the project construction. TKE will coordinate with Caltrans to address any comments or concerns and track the permit process throughout approval.

Deliverables: Utility Coordination Matrix/ Permit Application T ASK N O . 1 2. 60% D ESIGN R EVIEW

M EETINGS
After the City has completed its review, we will meet with City staff to acquire Staff’s comments.

Deliverables: Meeting Agenda, Minutes and Final Design
Approval
T ASK N O . 1 3. 90% D ESIGN
90% design will include incorporation of City comments, final street, storm drain, and sewer design, and signing and striping plans. We will verify that the project will comply with ADA design requirements and that adequate drainage will be
achieved. 90% Design will be submitted with a project
summary memorandum together with updated project
specifications and estimates.

Deliverables: 90% Design Sheets
T ASK N O . 1 4. 90% D ESIGN R EVIEW

M EETINGS
After the City has completed its review, we will meet with City staff to acquire Staff’s comments.

Deliverables: Meeting Agenda, Minutes and Final Design
Approval
T ASK N O . 1 5. 100% D ESIGN
100% design will include incorporation of City comments, final plans, specifications, and estimates, ready for public bidding.

Final documents will include mylars and hard copy
specifications with signatures and electronic copies of final documents.
100% Design will be submitted with a project summary
memorandum together with an updated project schedule,
additional stakeholder meeting summary, and internal plan review documentation.

Deliverables: One (1) Full-Size Mylar of 100% Drawings; Hard Copy of Specifications and Estimate, Electronic Files of Final Plans, Specifications and Estimate
T ASK N O . 1 6 F INAL C OORDINATION WITH

A GENCIES / U TILITIES
After the final drawings are approved by the City, we will again submit them to all agencies/utilities having underground facilities in the project area requesting that they verify their facilities are shown correctly and we will advise them of the project construction schedule and relocation requirements. In addition, we will coordinate final relocation construction prior to project bidding. We will document all meetings and
conferences with utilities and agencies.

Deliverables: Utility Coordination Matrix
T ASK N O . 1 7 . A SSISTANCE D URING

B IDDING
Upon request, TKE shall post final documents to plan rooms and assist the City with responses to requests for information, addendum preparation, and design changes during
construction. TKE will review RFI’s and RFC’s and assist the City with preparing a response as requested. In addition, TKE will perform periodic field reviews, as requested by the City, to review the construction progress and quality of work.

Deliverables: Tabulated Response to RFI’s, Addendums, as Necessary
T ASK N O . 1 8 . P REPARATION OF A S - B UILT

D RAWINGS
Upon receipt of redlined drawings, TKE will prepare a complete set of signed and stamped record drawings, which will reflect the improvements as constructed; any changes made during project construction. Said record drawings will be based on data furnished by the public agencies, the contractor, and the City.

Deliverables: Furnish a Complete Set of Revised Original Record Drawings
445
Page | 7
Request for Proposal | Design Services for Courtplace Housing Development Project (Infrastructure Improvements) | SQ-87-DE-19-58
City of Fontana

TECHNICAL PROPOSAL
Principal-In-Charge
Terry Renner, P.E., L.S., Q.S.D.

TKE Engineering Inc.

Senior Surveyor
Ron Musser, P.L.S.

TKE Engineering Inc.

Project Manager
Octavio Parada
TKE Engineering Inc.

Project Engineer
Brian Wolfe, P.E.

TKE Engineering Inc.

4. PROPOSED PROJECT
TEAM

SUPPORT TEAM
(40+ Members)
Michael P. Thornton P.E., P.L.S. | President Steve Nix, P.E., P.L.S. | Senior Engineer Steve Ledbeter, P.E. | Vice President Jus�n Schlaefli, P.E., T.E., PTOE | Traffic Engineer Michelle Arellano, P.E. | Senior Plan Check Engineer Marvin Lara, E.I.T. | Associate Engineer Steve Duket | Managing Director Development Services Shelby Kelley, E.I.T. | Associate Engineer Bret Enscoe | Survey Party Chief Daniel Melero, E.I.T. | Associate Engineer Mycal Batla | Survey Chance Renner, EIT | Associate Engineer Nelson Blackwell, CPII | Senior Construction Inspector Metehan Gumustekin, EIT | Associate Engineer Jeff Lantosh, CPII | Senior Construction Inspector Travis Bradshaw, EIT | Associate Engineer Brad Enscoe | Senior Public Works Inspector Jose Mar�nez | Associate Engineer Jeffrey Lynn | Senior Public Works Inspector Alex Estepa | Associate Engineer Michael Counce | Senior Public Works Inspector Jose Hernandez | Associate Engineer Naeem Dulloo | Senior Public Works Inspector Jayden Renner | Engineering Technician Tyler Ault | Senior Construction Inspector Emmanuel Perez, E.I.T. | Engineering Technician Patrick Palafox | Senior Construction Inspector Brian Chu | Assistant Engineer Brian McDuffie | Senior Public Works Inspector Michelle Sells | Accounting/Office Manager Stephen Bisco� | Senior Public Works Inspector Deana Vilches | Clerical Tony Tran| Senior Public Works Inspector Tracey McLoughlin | Clerical Ralph Mar�nez | Senior Public Works Inspector Jeannete Barlow | Clerical Jennifer Cioffi, P.E. | Project Manager Britany Simmons | Proposal Coordinator Monae Pugh | Traffic Engineer Specialist Genesi Lozano | Proposal Coordinator 446
Page | 8
Request for Proposal | Design Services for Courtplace Housing Development Project (Infrastructure Improvements) | SQ-87-DE-19-58
City of Fontana

TECHNICAL PROPOSAL

5. SCHEDULE
TKE is prepared to commit to the project schedule as outlined below. 447
Page | 9
Request for Proposal | Design Services for Courtplace Housing Development Project (Infrastructure Improvements) | SQ-87-DE-19-58
City of Fontana

TECHNICAL PROPOSAL

6. REFERENCES

CALIMESA CREEK STORM DRAIN
City of Calimesa, CA
Client Contact: Will Kolbow
Phone Number: 909-795-9801
Email: [email protected]
Project Cost: $9.8M
Completion Date: On-Going

DESCRIPTION
TKE provides pre-project planning, development, preliminary engineering, hydrology, and hydraulics, project grant writing, environmental compliance, state and federal funding coordination. The Calimesa Creek Storm Drain Improvements Project scope of work includes the design of 1,700 linear feet of 78” storm drain pipe, natural low flow drainage creek improvements, and associated inlet/outlet facilities for 100-Year flood conveyance storm drain protection.

SERVICES
Services include pre-project planning, development, preliminary engineering, hydrology and hydraulics, design, project grant writing, environmental compliance, state and federal funding coordination, grant administration, utility relocation coordination, right-of-way acquisition and permitting.

KEY STAFF
Michael P. Thornton, P.E., L.S., Terry Renner, P.E., L.S., Q.S.D., Ron Musser, P.L.S., Steven Ledbetter, P.E., Octavio Parada

SIERRA AVENUE WIDENING PROJECT
City of Fontana, CA
Client Contact: Phil Burum
Phone Number: 909-350-6727
Email: [email protected]
Project Cost: $11.3
Completion Date: Current

DESCRIPTION
The Sierra Avenue widening improvements project is approximately 1 mile of widening for the City’s primary north-south arterial street widening the roadway from 4 lanes to 6 lanes. The project includes street widening, raised landscape median, new sewer main installation, traffic signal installation and modifications, traffic signal interconnect and fiber optic cable installation, and extensive utility coordination for water main replacement, Rule 20A and Rule 20B undergrounding work. The project also includes right-of-way acquisition for 76 parcels, traffic analysis, review of construction plans, coordination with project design consultants, construction management and construction staking services. TKE represents the City with other agencies, represented engineering with the City’s management personnel and other meetings, managed engineering budgets and project schedules.

SERVICES
Services include design, topographic survey, right-of-way engineering and acquisition, roadway safety analysis, preparation of exhibits, cost estimates, utility coordination, construction management, and construction staking.

KEY STAFF
Michael P. Thornton, P.E., L.S., Terry Renner, P.E., L.S., Q.S.D., Ron Musser, P.L.S., Steven Ledbetter, P.E., Octavio Parada, Monae Pugh

RELEVANCE TO FONTANA
• Major Drainage Infrastructure
Regional Flood Control
• Basin Design
• Connection to County Flood Control
• Extensive Utility Coordination and
Permitting
• Hydraulics/Hydrology Modeling

RELEVANCE TO FONTANA
• City Experience
• Street Design
• Sewer Design
• Storm Drain Design
448
Page | 10
Request for Proposal | Design Services for Courtplace Housing Development Project (Infrastructure Improvements) | SQ-87-DE-19-58
City of Fontana

TECHNICAL PROPOSAL

WALNUT AVENUE BASIN
City of Hesperia, CA
Client Contact: Nils Bentsen
Phone Number: 760-947-1025
Email: [email protected]
Project Cost: $1.1M
Completion Date: December 2022

DESCRIPTION
The H-01 Drainage Corridor project is located in the southeasterly portions of the City of Hesperia. The H-01 drainage corridor is the City’s largest area in the drainage tributary containing more than 12,000 acres and conveys flows in excess of 5,000 cfs.

The project includes construction of a sediment control basin totaling 13 acre-feet of storage, with inlet and outlet facilities, and berms to allow the sediment to settle. During moderate and larger storm events, flooding and sediment accumulation occurs along the entire drainage corridor; in particular, downstream of the project site, two existing 10’ RCP storm drains that cross-Main Street were full of sediment, requiring the city to clean out the dual pipes. The proposed Walnut Basin will reduce sediment accumulation, and enhance water quality

SERVICES
Services include investigate and acquire grant funding, planning, design, topographic survey, hydrology and hydraulic analysis, bidding services, construction administration, State and Federal funding coordination.

KEY STAFF
Michael P. Thornton, P.E., L.S., Terry Renner, P.E., L.S., Q.S.D., Ron Musser, P.L.S., Steven Ledbetter, P.E.

ESCONDIDO RD BASIN
City of Hesperia, CA
Client Contact: Nils Bentsen
Phone Number: 760-947-1025
Email: [email protected]
Project Cost: $6.2M
Completion Date: 2021

DESCRIPTION
TKE provided investigation services and acquired grant funding, planning, design, hydrology and hydraulic analysis, permitting from San Bernardino County Flood Control District, Regional Quality Control Board 401 permit, DSOD for a jurisdictional berm, US Army Corps of Engineers’ 404 permit, bidding services, construction administration, State and Federal funding coordination. The project includes a 470-acre foot basin, together with inlet and outlet facilities. The project will enhance flood protection, reduce sediment transport, improve local water supplies and quality, reduce the region’s dependence on imported water supplies and simulate economic development.

SERVICES
Services included investigate and acquire grant funding, planning, design, hydrology and hydraulic analysis, permitting from San Bernardino County Flood Control District, Regional Quality Control Board 401 permit, DSOD for a jurisdictional berm, US Army Corps of Engineers’ 404 permit, bidding services, construction administration, State and Federal funding coordination.

KEY STAFF
Michael P. Thornton, P.E., L.S., Terry Renner, P.E., L.S., Q.S.D., Ron Musser, P.L.S., Steven Ledbetter, P.E.

RELEVANCE TO FONTANA
• Basin Design
• Drainage Analysis
• Hydrology/Hydraulics
• Street Design
• Basin Routing

RELEVANCE TO FONTANA
• Storm Drain Hydrology/Hydraulics
• Master Drainage Planning
• Storm Drain Pipe Sizing
• Basin Routing
449
450
Subconsultants Total
Task No. Task Hours $ Hours $ Hours $ Hours $ Hours $ Hours $ Hours $ $ $

1. Project Management 4 $ 720 16 $ 2,720 $ - 24 $ 3,840 $ - 8 $ 720 $ - $ 8,000

2. Initial "Kick Off" Meeting $ - 4 $ 680 $ - 8 $ 1,280 8 $ 1,120 4 $ 360 $ - $ 3,440

3. Records Research $ - $ - 4 $ 680 4 $ 640 16 $ 2,240 12 $ 1,080 $ - $ 4,640

4. Design Surveying $ - 2 $ 340 2 $ 340 $ - $ - $ - 96 $ 24,000 $ 24,680

5. Topographic Map/Survey Control Plan $ - 2 $ 340 4 $ 680 8 $ 1,280 16 $ 2,240 $ - $ - $ 4,540

6. Base Construction Drawings $ - 4 $ 680 $ - 8 $ 1,280 100 $ 14,000 $ - $ - $ 15,960

7. Composite Utility Plan/Utility Pothling 2.) 2 $ 360 8 $ 1,360 $ - 24 $ 3,840 40 $ 5,600 $ - 24 $ 6,000 $ 22,033 $ 39,193

8. Environmental Compliance $ - 4 $ 680 $ - 4 $ 640 4 $ 560 2 $ 180 $ - $ 2,060

9. Geotechnical Report 3.) 2 $ 360 4 $ 680 $ - 8 $ 1,280 $ - 4 $ 360 $ - $ 16,638 $ 19,318

10. 60% Design 4.) 8 $ 1,440 40 $ 6,800 $ - 64 $ 10,240 180 $ 25,200 40 $ 3,600 $ - $ 14,685 $ 61,965

11. Coordination with Agencies/Utilities $ - 2 $ 340 $ - 4 $ 640 8 $ 1,120 4 $ 360 $ - $ 2,460

12. 60% Design Review Meeting $ - 4 $ 680 $ - 4 $ 640 $ - 2 $ 180 $ - $ 1,500

13. 90% Design 4.) 4 $ 720 24 $ 4,080 $ - 40 $ 6,400 120 $ 16,800 24 $ 2,160 $ - $ 7,343 $ 37,503

14. 90% Design Review Meeting $ - 4 $ 680 $ - 4 $ 640 $ - 2 $ 180 $ - $ 1,500

15. 100 % Design 4.) 2 $ 360 16 $ 2,720 $ - 24 $ 3,840 64 $ 8,960 16 $ 1,440 $ - $ 2,448 $ 19,768

16. Final Coordination with Agencies/Utilities $ - 2 $ 340 $ - 4 $ 640 8 $ 1,120 4 $ 360 $ - $ 2,460

17. Assistance During Construction $ - 8 $ 1,360 $ - 16 $ 2,560 8 $ 1,120 8 $ 720 $ - $ 5,760

18. Perparation of As-Built Drawings $ - 2 $ 340 $ - 4 $ 640 16 $ 2,240 8 $ 720 $ - $ 3,940 Subtotal: 18 $ 3,240 130 $ 22,100 10 $ 1,700 228 $ 36,480 588 $ 82,320 130 $ 11,700 120 $ 30,000 $ 63,146 $ 258,686 Reimbursables (@3%)1.): $ 7,761
Project Total: $ 266,446
Rates: Notes:

Principal-In-Charge $ 180 /HR 1.) Reimbursables Include Cost for Prints, Copies, Mileage, Etc.

Project Manager $ 170 /HR 2.) Subconsultant Fees for C Below Potholing (10 Potholes) Senior Surveyor $ 170 /HR 3.) Subconsultant Fees for Aragon Geotechnical, Inc.

Project Engineer $ 160 /HR 4.) Subconsultant Fees for Knapp and Associates Structural Assistant Engineer/Designer $ 140 /HR
Clerical $ 90 /HR
2-Man Survey Crew $ 250 /HR TKE Engineering, Inc.

City of Fontana
Design Services for Courtplace Housing Development Project (Infrastructure Imrpovements) SQ-87-DE-19-58
Fee Schedule Breakdown
Principal-In-Charge Project Engineer
Assistant
Project Manager Senior Surveyor Engineer/Designer Clerical Survey Crew 451
Proposal Evaluation Ranking
Project: Engineering Design Services for the Courtplace Housing Development (SQ-87-DE-19-58) Evaluator
Consultant Firm Rating Ranking Rating Ranking Rating Ranking Avg. Rating (Ranking) Dan Guerra & Asscoiates 43.75 2 61.25 2 57.5 2 54.17 2
TKE Engineering, Inc. 95 1 78.75 1 91.25 1 88.33 1
Rater No. 1 Rater No. 2 Rater No. 3
452
City of Fontana
Action Report
City Council Meeting
8353 Sierra Avenue
Fontana, CA 92335
File #: 21-2432 Agenda Date: 9/12/2023
Agenda #: R. Category: Consent Calendar
FROM:

Police Department
SUBJECT:

Police Department Monthly Information Update
RECOMMENDATION:

Accept the Police Department monthly information update for July 2023.

COUNCIL GOALS:
· Operate in a businesslike manner by creating a memorable customer experience with every interaction.
· Increase citizen involvement by informing the public about issues, program, and accomplishments.
· Concentrate on Inter-governmental relations by establishing partnerships and positive working relationships with other public agencies providing services to residents and local businesses.

DISCUSSION:

The July 2023 monthly information report has been completed. Once the report is accepted by the City Council it will be featured on the Department website.

FISCAL IMPACT:

There is no fiscal impact.

MOTION:

Approve staff recommendation.

City of Fontana Page 1 of 1 Printed on 9/6/2023
powered by Legistar™453

POLICE DEPARTMENT

MONTHLY REPORT
July 2023
454

NOTEWORTHY EVENTS
• Fontana Police Department deployed 71 Police Officers for the July 4th Holiday. 21 citations were issued on the 4th and over 5,000 pounds of illegal fireworks were confiscated and destroyed.
• Fontana Air-Support Unit discovered a small fire in a pallet yard and was able to direct resources to it before it spread.
• Areas 1 and 2 conducted Area Commander Meetings
• Fontana Police Officers and Explorers participated in the Spring Street Market Night. • Chief Dorsey is seeking volunteers for the Chief’s Roundtable Committee. • Fontana Police seized over 1100 pounds of methamphetamine and 45 kilos of cocaine in two separate narcotic investigations.
• The Fontana Police Foundation and Chief Dorsey presented a $2000 check to a victim in the community who fell on hard times as a result of being assaulted. • ICAC arrested numerous individuals for child pornography. • COPE hosted Playdate with the Police at Don Day Park.

KA1
455
Slide 2
KA1 Kevin Anderson, 2/9/2021
456
457

CITYWIDE
• Priority 1 response time- 4:36(Emergency calls like subject not breathing, shots fired, and other immediate risk to life/safety)
• Calls for service- 11,465
• Total Traffic Accidents- 224
• Non-Injury- 173, Injury - 51
• Total arrests- 515
• Hispanic- 359, White- 71 , Black- 71, All others races- 14 • Total Group A Offenses- 757
• Crimes Against Persons- 171
• Crimes Against Property- 404
• Crimes Against Society- 182
458
• Crimes Against Person- 171 CITYWIDE • Homicide- 0
• Sex Offenses- 14
• Assault- 155
• Kidnapping- 2
• Other- 0
• Crimes Against Property- 404
• Robbery- 11
• Burglary- 24
• Larceny- 166
• Destruction of Property- 36
• Fraud- 35
• Possession of Stolen Property- 64
• Motor Vehicle Theft- 54
• Other Miscellaneous Property Crimes- 14
• Crimes Against Society- 182
• Drug and Paraphernalia Possession- 140
• Possession of Child Pornography- 7
• Possession of Weapons- 34
• Other Miscellaneous Crimes- 1
459

CRIMES BY BEAT
• Police Department Beat system is NOT
geographically the same as City Council
representation Districts
• Beat 1- All area north of 210 Freeway
• Beat 2- All area south of 210 Freeway and
north of Foothill
• Beat 3- All area south of Foothill and north
of 10 Freeway
• Beat 4- All area south of the 10 Freeway
Area 1
Area 2
Area 3
Area 4
460
BEAT 1

AREA COMMANDER IS LIEUTENANT KELLEN GUTHRIE
EMAIL- [email protected]
DESK- (909) 350-7716
• Total Group A Offenses- 91
• Crimes Against Persons- 17
• Crimes Against Property- 66
• Crimes Against Society- 8
461
BEAT 2

AREA COMMANDER IS LIEUTENANT MATT KRAUT
EMAIL- [email protected]
DESK- (909) 356-7142
• Total Group A Offenses- 148
• Crimes Against Persons- 43
• Crimes Against Property- 88
• Crimes Against Society- 17
462
BEAT 3

AREA COMMANDER IS LIEUTENANT CHRIS TUSANT
EMAIL – [email protected]
DESK – (909) 350-7706
• Total Group A Offenses- 336
• Crimes Against Persons- 79
• Crimes Against Property- 146
• Crimes Against Society- 111
463
Beat 4

AREA COMMANDER IS LIEUTENANT TRACY DILLS
EMAIL – [email protected]
DESK – (909) 350-7707
• Total Group A Offenses- 141
• Crimes Against Persons- 31
• Crimes Against Property- 96
• Crimes Against Society- 14
464

ADDITIONAL USEFUL INFORMATION
• For more information regarding specific geographical crime data, visit www.crimemapping.com and enter your zip code
• Police Department information line- (909) 350-7740
• Police Department Dispatch non-emergency line- (909) 350-7700 • Anonymous crime reporting (909) 356-TIPS to leave a recorded message
• Report Graffiti on City Property- (909) 350-GONE
• Office of the Chief- (909) 350-7702 or [email protected] 465
City of Fontana
Action Report
City Council Meeting
8353 Sierra Avenue
Fontana, CA 92335
File #: 21-2433 Agenda Date: 9/12/2023
Agenda #: S. Category: Consent Calendar
FROM:

Public Works
SUBJECT:

Authorize the Purchase of a 570N EP Skip Loader from Sonsray Machinery.

RECOMMENDATION:

Authorize the Purchasing Office to use Sourcewell (Contract # 32119-CNH) for the purchase of one (1) Case 570N EP skip loader from Sonsray Machinery in the amount of $124,243.57.

COUNCIL GOALS:
· Operate in a businesslike manner by creating a memorable customer experience with every interaction.
· Practice sound fiscal management by living within our means while investing in the future. · Invest in the City’s infrastructure (streets, sewers, parks, etc.) by focusing on relief of traffic congestion.
· Invest in the City’s infrastructure (streets, sewers, parks, etc.) by creating and promoting community through people, parks, and programs.

DISCUSSION:

The Public Works Department (Utilities and Streets Division) is responsible for maintaining a variety of infrastructure needs such as cleaning road edges on City streets, concrete removal, and repair to City sidewalks. The street crew is responsible for the removal of debris from multiple empty lots throughout the City and also assists the sewer crew with the excavation of dirt to access underground sewer pipes. A skip loader is an essential piece of equipment used to perform multiple jobs throughout the City. This unit is replacing the current grader, which no longer meets the standards set by the California Regulatory Entity (CARB). The new skip loader is equipped with a tier 4 carb compliant engine.

The selected 570N EP skip loader is being recommended for purchase after a comprehensive review process by Department staff, Field staff and Fleet. Staff has reviewed specifications from multiple manufacturers and based on the research, the skip loader is capable of keeping up with the demands required by the department. Sonsray equipment can also provide quick parts, service, repairs, and technical support.

Fontana City Code Article V- Purchasing Section 10-152(4) authorizes bidding to be exempt since competitive bidding was already conducted by another agency. Staff is recommending that City Council authorize this purchase between Sonsray Machinery and the City, and to “piggy-back” off City of Fontana Page 1 of 2 Printed on 9/6/2023
powered by Legistar™466
File #: 21-2433 Agenda Date: 9/12/2023
Agenda #: S. Category: Consent Calendar
the Sourcewell contract for the skip loader.

FISCAL IMPACT:

The purchase cost is $124,243.57 and funds have been approved in the current FY 2023/2024 Budget in Account No. 75137306-8319, as part of the FY23/24 vehicle replacement budget.

MOTION:

Approve staff recommendation.

City of Fontana Page 2 of 2 Printed on 9/6/2023
powered by Legistar™467
468
Contract Number: 032119 - CNH
Contract Period: 7-8-19 -thru 5-13-24
Pricing Revised: 5/12/2023
Eligible Customers: All Sourcewell members in United States Members Include: Government
Education (K-12 and higher)
Non-profit agencies
States that have adopted the contract (see
below)
States that have Adopted Sourcewell as their
term contract: Member #
New York PC6265 4652
Delaware GSS15750-Equip_HD 38542
Arkansas 4600046991 1089
Washington Master Contract 01020 888
Ohio RSC008252 956
Member list: https://www.sourcewell-mn.gov/member-lookup Need to Join? https://sourcewell-mn.gov/
Contract Pricing
Multiple Unit Discount
Third Party Items
Trade-In
Payment Contact your local Case CE dealer for payment options.

Sourcewell (NJPA) - Construction Equipment Contract

CONTRACT DETAILS
Specified discount off List Price/MSRP plus freight and setup and local delivery. Also surcharge but this must be placed on a separate line item. These discounts not allowed with wholesale discount.

Not applicable.

Allowed. Third party equipment and/or accessories must be listed on individual line(s) below the contract items.

Allowed. The value is determined by the agency and the local dealer. 469
See www.casece.com for product information
SOURCEWELL PRICE LIST DISCOUNTS--Contract 032119 Valid until 05/13/2024 Pricing Revised: 5/12/2023

FOR USA MARKET ONLY

PRODUCT / MODEL PRICE LIST

USA SOURCEWELL

MEMBER DISCOUNT

OFF LIST PRICE
570N EP Current Pricing 28%
575N EP Current Pricing 37%
580N Current Pricing 37%
580N EP Current Pricing 37%
580SN Current Pricing 37%
580SN WT Current Pricing 37%
580SV Current Pricing 37%
590SN Current Pricing 37%
586H Current Pricing 30%
588H Current Pricing 30%
DL550 Current Pricing 25%
650M Current Pricing 26%
750M Current Pricing 37%
850M Current Pricing 37%
1150M Current Pricing 31%
1650M Current Pricing 37%
2050M Current Pricing 31%
21F Current Pricing 26%
121F Current Pricing 31%
221F Current Pricing 31%
321F Current Pricing 31%
521G Current Pricing 37%
621G Current Pricing 37%
721G Current Pricing 37%
821G Current Pricing 38%
921G Current Pricing 38%
1021G Current Pricing 30%
1121G Current Pricing 30%
Freight FOB North America plant or import distribution location CASE CE dealer can add delivery freight and PDI costs.

Dealer quotes should only be valid 30 days to remain price protected

WHEEL LOADER

COMPACT WHEEL LOADER

CRAWLER DOZER

FORKLIFT

TRACTOR LOADER

TRACTOR LOADER BACKHOE
Compact Dozer Loader
470
See www.casece.com for product information
SOURCEWELL PRICE LIST DISCOUNTS--Contract 032119 Valid until 05/13/2024 Pricing Revised: 5/12/2023

FOR USA MARKET ONLY

PRODUCT / MODEL PRICE LIST

USA SOURCEWELL

MEMBER DISCOUNT

OFF LIST PRICE
TR270 Current Pricing 33%
TR310 Current Pricing 26%
TR340 Current Pricing 26%
TV370 Current Pricing 26%
TV450 Current Pricing 26%
TV620 Current Pricing 26%
CX17C Current Pricing 25%
CX26C Current Pricing 25%
CX30C Current Pricing 25%
CX37C Current Pricing 25%
CX42D Current Pricing 25%
CX57C Current Pricing 25%
CX60C Current Pricing 25%
CX75C Current Pricing 26%
CX80C Current Pricing 26%
CX130D Current Pricing 26%
CX140E Current Pricing 26%
CX145D Current Pricing 26%
CX160D Current Pricing 26%
CX170E Current Pricing 26%
CX190E Current Pricing 26%
CX220E Current Pricing 26%
CX245D Current Pricing 26%
CX260E Current Pricing 26%
CX290D Current Pricing 26%
CX300E Current Pricing 26%
CX350D Current Pricing 26%
CX365E Current Pricing 26%
CX490D Current Pricing 26%
CX500D Current Pricing 26%
CX750D Current Pricing 26%
SR160 Current Pricing 24%
SR175 Current Pricing 26%
SV185 Current Pricing 26%
SR210 Current Pricing 26%
SR240 Current Pricing 26%
SR270 Current Pricing 26%
SV280 Current Pricing 27%
SV340 Current Pricing 33%
Freight FOB North America plant or import distribution location CASE CE dealer can add delivery freight and PDI costs.

Dealer quotes should only be valid 30 days to remain price protected

SKID STEER LOADER

EXCAVATOR

COMPACT EXCAVATOR

COMPACT TRACK LOADER
471
See www.casece.com for product information
SOURCEWELL PRICE LIST DISCOUNTS--Contract 032119 Valid until 05/13/2024 Pricing Revised: 5/12/2023

FOR USA MARKET ONLY

PRODUCT / MODEL PRICE LIST

USA SOURCEWELL

MEMBER DISCOUNT

OFF LIST PRICE
836C 4WD / AWD Current Pricing 31%
856C 4WD / AWD Current Pricing 31%
DV23 Current Pricing 25%
DV26 Current Pricing 25%
DV36 Current Pricing 25%
DV45 Current Pricing 25%
DV209 Current Pricing 25%
DV210 Current Pricing 25%
SV207 Current Pricing 25%
SV211 Current Pricing 25%
SV213 Current Pricing 25%
SV215 Current Pricing 25%
SV217 Current Pricing 25%
PT240D Current Pricing 25%
CNH Parts Current Pricing LIST PRICE
Freight FOB North America plant or import distribution location Cannot be combined with any other retail/whole goods program discounts Discounts valid for this contract only.

CASE CE dealer can add delivery freight and PDI costs.

Dealer quotes should only be valid 30 days to remain price protected

COMPACTION

MOTOR GRADER
472
City of Fontana
Action Report
City Council Meeting
8353 Sierra Avenue
Fontana, CA 92335
File #: 21-2434 Agenda Date: 9/12/2023
Agenda #: T. Category: Consent Calendar
FROM:

Public Works
SUBJECT:

Authorize the Purchase of a Altec AT37G Aerial Truck.

RECOMMENDATION
Authorize the Purchasing Division to use the Sourcewell Cooperative Purchasing Agreement (Contract #110421-ALT) for the purchase of one (1) 2024 Ford F-550 AT37G aerial truck for $152,203.00, plus sales tax (7.75%) $11,796.00, CA tire fee $136.00, and a delivery fee of $7,102.00 for a total of $171,237.00.

COUNCIL GOALS:
· Operate in a businesslike manner by creating a memorable customer experience with every interaction.
· Practice sound fiscal management by living within our means while investing in the future. · Invest in the City’s infrastructure (streets, sewers, parks, etc.) by providing for the development of new infrastructure.

DISCUSSION:

The Public Works Department, Parks and Landscape Division is responsible for the maintenance and repair of the city park infrastructures which includes special projects. The aerial truck is an essential piece of equipment needed to maintain ballfield lights, hanging banners throughout the City and repairing scoreboards. The department is requesting to purchase a new vehicle to replace one of the existing trucks.

The selected aerial truck is being recommended for purchase after a comprehensive review process by Department staff, Field staff, and Fleet Services staff. Based upon the research, the truck meets the department needs. The aerial equipment will be mounted on a Ford F-550 chassis.

Fontana City Code Article V- Purchasing Section 10-152(4) authorizes bidding to be exempt since the competitive bidding was already conducted by another agency. Staff is recommending that City Council authorize this purchase between Altec and the City, and to “piggyback” off the Sourcewell Contract for the aerial truck.

FISCAL IMPACT:

Funding in the amount of $171,237.00 for the purchase of this vehicle has been approved in the FY 2023/2024 budget as part of the Fleet Services capital replacement, in Account No. 75137306.8319.

City of Fontana Page 1 of 2 Printed on 9/6/2023
powered by Legistar™473
File #: 21-2434 Agenda Date: 9/12/2023
Agenda #: T. Category: Consent Calendar
MOTION:

Approved staff recommendation.

City of Fontana Page 2 of 2 Printed on 9/6/2023
powered by Legistar™474
475
110421-ALT
Rev. 3/2021 1
Solicitation Number: RFP #110421

CONTRACT
This Contract is between Sourcewell, 202 12th Street Northeast, P.O. Box 219, Staples, MN 56479 (Sourcewell) and Altec Industries, Inc., 210 Inverness Center Drive, Birmingham, AL 35242 (Supplier).

Sourcewell is a State of Minnesota local government unit and service cooperative created under the laws of the State of Minnesota (Minnesota Statutes Section 123A.21) that offers cooperative procurement solutions to government entities. Participation is open to eligible federal, state/province, and municipal governmental entities, higher education, K-12 education, nonprofit, tribal government, and other public entities located in the United States and Canada.

Sourcewell issued a public solicitation for Public Utility Equipment with Related Accessories and Supplies from which Supplier was awarded a contract.

Supplier desires to contract with Sourcewell to provide equipment, products, or services to Sourcewell and the entities that access Sourcewell’s cooperative purchasing contracts (Participating Entities).

1. TERM OF CONTRACT
A. EFFECTIVE DATE. This Contract is effective upon the date of the final signature below.

B. EXPIRATION DATE AND EXTENSION. This Contract expires December 27, 2025, unless it is cancelled sooner pursuant to Article 22. This Contract may be extended one additional year upon the request of Sourcewell and written agreement by Supplier.

C. SURVIVAL OF TERMS. Notwithstanding any expiration or termination of this Contract, all payment obligations incurred prior to expiration or termination will survive, as will the following: Articles 11 through 14 survive the expiration or cancellation of this Contract. All other rights will cease upon expiration or termination of this Contract.

2. EQUIPMENT, PRODUCTS, OR SERVICES
A. EQUIPMENT, PRODUCTS, OR SERVICES. Supplier will provide the Equipment, Products, or Services as stated in its Proposal submitted under the Solicitation Number listed above. 







  


476
110421-ALT
Rev. 3/2021 2
Supplier’s Equipment, Products, or Services Proposal (Proposal) is attached and incorporated into this Contract.

Except as expressly agreed in the participating addendum or transaction document with the participating entity, all Equipment and Products provided under this Contract must be new and the current model. Supplier may offer close-out or refurbished Equipment or Products if they are clearly indicated in Supplier’s product and pricing list. Unless agreed to by the Participating Entities in advance, Equipment or Products must be delivered as operational to the Participating Entity’s site.

This Contract offers an indefinite quantity of sales, and while substantial volume is anticipated, sales and sales volume are not guaranteed.

B. WARRANTY. Supplier warrants that all new Equipment, Products, and Services furnished (which does not include equipment or products that are solely financed) are free from liens and encumbrances, and are free from defects in design, materials, and workmanship. In addition, Supplier warrants the Equipment, Products, and Services are suitable for and will perform in accordance with the ordinary use for which they are intended. Supplier’s dealers and distributors must agree to assist the Participating Entity in reaching a resolution in any dispute over warranty terms with the manufacturer. Any manufacturer’s warranty that extends beyond the expiration of the Supplier’s warranty will be passed on to the Participating Entity.

C. DEALERS, DISTRIBUTORS, AND/OR RESELLERS. Upon Contract execution and throughout the Contract term, Supplier must provide to Sourcewell a current means to validate or authenticate Supplier’s authorized dealers, distributors, or resellers relative to the Equipment, Products, and Services offered under this Contract, which will be incorporated into this Contract by reference. It is the Supplier’s responsibility to ensure Sourcewell receives the most current information.

3. PRICING
All Equipment, Products, or Services under this Contract will be priced at or below the price stated in Supplier’s Proposal.

When providing pricing quotes to Participating Entities, all pricing quoted must reflect a Participating Entity’s total cost of acquisition. This means that the quoted cost is for delivered Equipment, Products, and Services that are operational for their intended purpose, and includes all costs to the Participating Entity’s requested delivery location.

Regardless of the payment method chosen by the Participating Entity, the total cost associated with any purchase option of the Equipment, Products, or Services must always be disclosed in the pricing quote to the applicable Participating Entity at the time of purchase. 







  


477
110421-ALT
Rev. 3/2021 3
A. SHIPPING AND SHIPPING COSTS. All delivered Equipment and Products must be properly packaged. Damaged Equipment and Products may be rejected. If the damage is not readily apparent at the time of delivery, Supplier must permit the Equipment and Products to be returned within a reasonable time at no cost to Sourcewell or its Participating Entities.

Participating Entities reserve the right to inspect the Equipment and Products at a reasonable time after delivery where circumstances or conditions prevent effective inspection of the Equipment and Products at the time of delivery. In the event of the delivery of nonconforming Equipment and Products, the Participating Entity will notify the Supplier as soon as possible and the Supplier will replace nonconforming Equipment and Products with conforming Equipment and Products that are acceptable to the Participating Entity.

Supplier must arrange for and pay for the return shipment on Equipment and Products that arrive in a defective or inoperable condition.

Sourcewell may declare the Supplier in breach of this Contract if the Supplier intentionally delivers substandard or inferior Equipment or Products.

B. SALES TAX. Each Participating Entity is responsible for supplying the Supplier with valid taxexemption certification(s). When ordering, a Participating Entity must indicate if it is a taxexempt entity.

C. HOT LIST PRICING. At any time during this Contract, Supplier may offer a specific selection of Equipment, Products, or Services at discounts greater than those listed in the Contract.

When Supplier determines it will offer Hot List Pricing, it must be submitted electronically to Sourcewell in a line-item format. Equipment, Products, or Services may be added or removed from the Hot List at any time through a Sourcewell Price and Product Change Form as defined in Article 4 below.

Hot List program and pricing may also be used to discount and liquidate close-out and discontinued Equipment and Products as long as those close-out and discontinued items are clearly identified as such. Current ordering process and administrative fees apply. Hot List Pricing must be published and made available to all Participating Entities.

4. PRODUCT AND PRICING CHANGE REQUESTS
Supplier may request Equipment, Product, or Service changes, additions, or deletions at any time. All requests must be made in writing by submitting a signed Sourcewell Price and Product Change Request Form to the assigned Sourcewell Supplier Development Administrator. This approved form is available from the assigned Sourcewell Supplier Development Administrator.

At a minimum, the request must:
x Identify the applicable Sourcewell contract number;








  


478
110421-ALT
Rev. 3/2021 4
x Clearly specify the requested change;
x Provide sufficient detail to justify the requested change; x Individually list all Equipment, Products, or Services affected by the requested change, along with the requested change (e.g., addition, deletion, price change); and x Include a complete restatement of pricing documentation in Microsoft Excel with the effective date of the modified pricing, or product addition or deletion. The new pricing restatement must include all Equipment, Products, and Services offered, even for those items where pricing remains unchanged.

A fully executed Sourcewell Price and Product Change Request Form will become an amendment to this Contract and will be incorporated by reference.

5. PARTICIPATION, CONTRACT ACCESS, AND PARTICIPATING ENTITY REQUIREMENTS

A. PARTICIPATION. Sourcewell’s cooperative contracts are available and open to public and nonprofit entities across the United States and Canada; such as federal, state/province, municipal, K-12 and higher education, tribal government, and other public entities.

The benefits of this Contract should be available to all Participating Entities that can legally access the Equipment, Products, or Services under this Contract. A Participating Entity’s authority to access this Contract is determined through its cooperative purchasing, interlocal, or joint powers laws. Any entity accessing benefits of this Contract will be considered a Service Member of Sourcewell during such time of access. Supplier understands that a Participating Entity’s use of this Contract is at the Participating Entity’s sole convenience and Participating Entities reserve the right to obtain like Equipment, Products, or Services from any other source.

Supplier is responsible for familiarizing its sales and service forces with Sourcewell contract use eligibility requirements and documentation and will encourage potential participating entities to join Sourcewell. Sourcewell reserves the right to add and remove Participating Entities to its roster during the term of this Contract.

B. PUBLIC FACILITIES. Supplier’s employees may be required to perform work at governmentowned facilities, including schools. Supplier’s employees and agents must conduct themselves in a professional manner while on the premises, and in accordance with Participating Entity policies and procedures, and all applicable laws.

6. PARTICIPATING ENTITY USE AND PURCHASING
A. ORDERS AND PAYMENT. To access the contracted Equipment, Products, or Services under this Contract, a Participating Entity must clearly indicate to Supplier that it intends to access this Contract; however, order flow and procedure will be developed jointly between Sourcewell and Supplier. Typically, a Participating Entity will issue an order directly to Supplier or its authorized 







  


479
110421-ALT
Rev. 3/2021 5
subsidiary, distributor, dealer, or reseller. If a Participating Entity issues a purchase order, it may use its own forms, but the purchase order should clearly note the applicable Sourcewell contract number. All Participating Entity orders under this Contract must be issued prior to expiration or cancellation of this Contract; however, Supplier performance, Participating Entity payment obligations, and any applicable warranty periods or other Supplier or Participating Entity obligations may extend beyond the term of this Contract.

Supplier’s acceptable forms of payment are included in its attached Proposal. Participating Entities will be solely responsible for payment and Sourcewell will have no liability for any unpaid invoice of any Participating Entity.

B. ADDITIONAL TERMS AND CONDITIONS/PARTICIPATING ADDENDUM. Additional terms and conditions to a purchase order, or other required transaction documentation, may be negotiated between a Participating Entity and Supplier, such as job or industry-specific requirements, legal requirements (e.g., affirmative action or immigration status requirements), or specific local policy requirements. Some Participating Entities may require the use of a Participating Addendum; the terms of which will be negotiated directly between the Participating Entity and the Supplier. Any negotiated additional terms and conditions for the direct purchase of new equipment or products must never be less favorable to the Participating Entity than what is contained in this Contract.

C. SPECIALIZED SERVICE REQUIREMENTS. In the event that the Participating Entity requires service or specialized performance requirements not addressed in this Contract (such as ecommerce specifications, specialized delivery requirements, or other specifications and requirements), the Participating Entity and the Supplier may enter into a separate, standalone agreement, apart from this Contract. Sourcewell, including its agents and employees, will not be made a party to a claim for breach of such agreement.

D. TERMINATION OF ORDERS. Participating Entities may terminate an order, in whole or in part, immediately upon notice to Supplier in the event of any of the following events:

1. The Participating Entity fails to receive funding or appropriation from its governing body at levels sufficient to pay for the equipment, products, or services to be purchased; or

2. Federal, state, or provincial laws or regulations prohibit the purchase or change the Participating Entity’s requirements.

E. GOVERNING LAW AND VENUE. The governing law and venue for any action related to a Participating Entity’s order will be determined by the Participating Entity making the purchase. 







  


480
City of Fontana
Action Report
City Council Meeting
8353 Sierra Avenue
Fontana, CA 92335
File #: 21-2439 Agenda Date: 9/12/2023
Agenda #: U. Category: Consent Calendar
FROM:

Police Department
SUBJECT:

Approve Crossing Guard Service Agreement between Fontana Unified School District, Etiwanda School District, and the City of Fontana
RECOMMENDATION:

1. Approve Amendment No. 2 of the Crossing Guard Services Agreement with Fontana Unified School District (FUSD), Etiwanda School District (ESD), and the City of Fontana (COF) for a oneyear (1) term renewing year three (3) of the contract at the new hourly rate of $29.50.

2. Approve a recurring appropriation from General Fund #101 to 10140114.8130 to provide for the annual contract increase over the prior year in the amount of $10,440.00.

COUNCIL GOALS:
· Improve public safety by increasing operational efficiency, visibility and availability. · Concentrate on Inter-governmental relations by establishing partnerships and positive working relationships with other public agencies providing services to residents and local businesses.

DISCUSSION:

Fontana Unified School District administers the crossing guard services for both the City of Fontana and the Etiwanda School District. The contract provider for these services via Fontana Unified School District is All City Management Services who employs and provides the school crossing guards.

Fontana Unified School District submits invoices to the City and ESD on a quarterly basis for the services rendered in the preceding quarter.

Current pricing is based upon 43,722 billable hours per school year which includes covering 75 locations between the 2 school districts. The new contract price for year three is $1,289,799.00. Per the contract the City agrees to pay fifty percent (50% not to exceed $644,899.50) of the cost.

Staff recommends accepting the contract so the school districts can continue to provide crossing guard services to the children in our community that attend FUSD and ESD schools.

FISCAL IMPACT:

Staff is requesting annual recurring funds in the amount of $10,440.00 be appropriated from General Fund #101 to 10140114.8130 to cover additional crossing guard services.

City of Fontana Page 1 of 2 Printed on 9/6/2023
powered by Legistar™481
File #: 21-2439 Agenda Date: 9/12/2023
Agenda #: U. Category: Consent Calendar
Appropriate paperwork will be submitted during the First Quarter Budget Review.

MOTION:

Approve staff recommendation.

City of Fontana Page 2 of 2 Printed on 9/6/2023
powered by Legistar™482
483
484
City of Fontana
Action Report
City Council Meeting
8353 Sierra Avenue
Fontana, CA 92335
File #: 21-2441 Agenda Date: 9/12/2023
Agenda #: V. Category: Consent Calendar
FROM:

Engineering
SUBJECT:

Award a Construction Contract for the S. Highland Avenue at Mango Avenue Traffic Signal Project (Bid No. SB-97-DE-23).

RECOMMENDATION:

1. Award bid and authorize the City Manager to execute a construction contract with Alfaro Communications Construction, Inc. for the construction of S. Highland Avenue at Mango Avenue Traffic Signal Project in the amount of $823,929.64 and authorize a 10% contingency in the amount of $82,392.96 (Bid No. SB-97-DE-23).

2. Approve and authorize the City Manager to execute any and all utility agreements, utility easements, and subsequent agreements on behalf of the City of Fontana for the S. Highland Avenue at Mango Avenue Traffic Signal Project.

COUNCIL GOALS:
· To invest in the City’s infrastructure (streets, sewers, parks, etc.) by maintaining and improving the city's existing infrastructure.
· To invest in the City’s infrastructure (streets, sewers, parks, etc.) by providing for the development of new infrastructure.
· To invest in the City’s infrastructure (streets, sewers, parks, etc.) by focusing on relief of traffic congestion.

DISCUSSION:

The City determined the need for a new traffic signal at the intersection of S. Highland Avenue at Mango Avenue to aid in circulation and ease congestion. This Project is a component of a comprehensive transportation improvement and traffic management program. The improvements will include reconstructing and installing new Americans with Disabilities Act (ADA) compliant curb ramps, pavement surface, roadway signage, and traffic striping.

On July 20, 2023, at 2:00 p.m. the bids for this contract were opened. A total of eight (8) bids were received ranging from $823,929.64 to $1,074,377.00. Alfaro Communications Construction, Inc. is the lowest bidder in the amount of $823,929.64. The Engineer's estimate was $1,030,000.00. After reviewing the proposed bid documents, Engineering staff has determined Alfaro Communications Construction, Inc. to be the lowest responsive and responsible bidder.

City of Fontana Page 1 of 2 Printed on 9/7/2023
powered by Legistar™485
File #: 21-2441 Agenda Date: 9/12/2023
Agenda #: V. Category: Consent Calendar
FISCAL IMPACT:

The fiscal impact associated with the approval of this item is $906,322.60 for the full term of the contract and is included in the 2023-2024 budget in 37603382-246-A-8330.

MOTION:

Approve staff recommendation.

City of Fontana Page 2 of 2 Printed on 9/7/2023
powered by Legistar™486
N
0 1 inch = 600 feet
600 1200

PROJECT LOCATION

SOUTH HIGHLAND AVENUE AND MANGO AVENUE

TRAFFIC SIGNAL PROJECT
SB-97-DE-23 487
Bid Results
S. Highland Ave at Mango Ave Traffic Signal Project
SB-97-DE-23

1. Alfaro Communications Construction, Inc. $823,929.64 Compton, CA

2. Crosstown Electrical & Data, Inc. $974,868.00
Irwindale, CA

3. International Line Builders, Inc. $981,994.00
Corona, CA

4. DBX, Inc. $993,909.00
Temecula, CA

5. Select Electric, Inc. $999,255.00
Vista, CA

6. Elecnor Belco Electric, Inc. $1,033,950.00
Chino, CA

7. Asplundh Construction, LLC $1,062,362.00
Buena Park, CA

8. California Professional Engineering, Inc. $1,074,377.00 La Puente, CA
488
City of Fontana
S. Highland at Mango Traffic Signal (SB-97-DE-23), bidding on 07/20/2023 2:00 PM (PDT)

Page 1 of 4 ends
← All documents from this meeting