CITY OF FONTANA
ENGINEERING DEPARTMENT
COST ESTIMATE **EXHIBIT "A"**
SHEET 1
DATE: _____________________
DEVELOPER PROJECT NAME__________________
ENGINEER TRACT MAP NO._________________
PHONE NO. PARCEL MAP NO. _______________
STREET IMPROVEMENTS
UNIT
ITEM QUANTITY UNIT COST AMOUNT
6" CURB & GUTTER _ L.F. 17.00 __
8" CURB & GUTTER L.F. 19.00 _
8" THICK CROSS GUTTER S.F. 11.00 _
4" SIDEWALK S.F. 5.00 _
ACCESS RAMP EA 2500.00 _
DRIVE WAY APPROACHES S.F. 11.00 _
ASPHALT CONCRETE DIKES L.F. 11.00 _
FOG SEAL S.F. .10 ____
IMPORTED EMBANKMENT C.Y. 10.00 _
PREPARATION OF SUBGRADE S.F. .50 _
*A.C. TON 90.00 _
*A.C.OVERLAY(1"MI.THICKNESS) S.F. .80 _
**PCC CURB ONLY (MEDIAN) L.F. 16.00 _
ADJUST SEWER MANHOLE TO GRADE EA 500.00 _
ADJUST SEWER CLEAN OUT TO
GRADE EA 300.00 _
ADJUST WATER VALVES TO GRADE EA 250.00 _
BARRICADES L.F. 40.00 _
2 X 4 REDWOOD HEADER L.F. 5.00 _
*REMOVAL OF A.C. PAVEMENT S.F. .66 _
**REMOVAL OF P.C.C. CURB L.F. 6.00 _
*REMOVAL OF A.C. BERM L.F. 5.00 _
RETAINING WALL H=2 1/2 FT.
OR LESS L.F. 40.00 ________
BLOCK WALL H=6 FEET L.F. 50.00 ________
AGGREGATE BASE TON 30.00 _ __
GUARD POSTS EA 70.00 _
GUARD PANEL (WOOD) L.F. 40.00 _
SAWCUT L.F. 3.50 _
REFLECTORS AND POSTS EA 100.00 _
STREET SIGNS EA 25 0.00 _
______________________ ________ EA _______ ________
______________________ ________ EA _______ ________
______________________ ________ EA _______ ________ ______________________ ________ EA _______ ________ STREET IMPROVEMENT SUBTOTAL __
* A.C. ASPHALTIC CONCRETE
** P.C.C. PORTLAND CONCRETE CEMENT
==== NAME SIGNS
ELPC20-00034
APPROVED
Permit No.:ELPC20-000034
By: Gabriel Guerrero
Date: 09/29/2020
DEPARTMENT OF ENGINEERING
Revised 12/1/2016 – GM/RG
SHEET 2
STORM DRAIN IMPROVEMENTS
UNIT
ITEM QUANTITY UNIT COST AMOUNT
* 18" RCP L.F. 90.00 ________
* 24" RCP L.F. 110.00 ________
* 30" RCP L.F. 200.00 ________
* 36" RCP L.F. 220.00 ________
* 42” RCP ________ L.F. 240.00 ________
* 48" RCP L.F. 260.00 ________
* 54" RCP L.F. 280.00 ________
* 60" RCP L.F. 300.00 ________
* 66” RCP ________ L.F. 320.00 ________
* 78” RCP ________ L.F. 340.00 ________
* 24” CMP ________ L.F. 90.00 ________
* 60” CMP ________ L.F. 320.00 ________
CATCH BASIN/CURB INLET:
W=7 EA 4,000.00 ________
W=10 EA 4, 500.00 ________
W=14 EA 6,000.00 ________
W=21 EA 11,000.00 ________
W=28 EA 14,000.00 ________
JUNCTION STRUCTURE EA 3,200.00 ________
TRAFFIC TYPE JUNCTION
STRUCTURE EA 2,800.00 ________
DISCHARGE STRUCTURE EA 2,800.00 ________
MANHOLES EA 2,500.00 ________
LOCAL DEPRESSION EA 1,250.00 ________
GRATE INLET STRUCTURE EA 2,100.00 ________
_____________________ ________ EA ________ ________
_____________________ ________ EA ________ ________
_____________________ ________ EA ________ ________
STORM DRAIN IMPROVEMENT SUBTOTAL ________
* REINFORCE CONCR ETE PIPE
SANITARY SEWER IMPROVEMENTS
MANHOLES 60" DIAMETER EA 4,500.00 ________
MANHOLES 48" DIAMETER EA 4,000.00 ________
DROP MAN HOLES EA 4,500.00 ________
WYES EA 100.00 ________
CLEANOUTS EA 600.00 ________
REMODELING OF EXISTING
MANHOLE EA 950.00 ________
** 4" VCP L.F. 50.00 ________
** 6" VCP L.F. 6 0.00 ________
** 8" VCP L.F. 70.00 ________
** 10" VCP L.F. 80.00 ________
** 12" VCP L.F. 90.00 ________
** 15" VCP L.F. 100.00 ________
__________________ ________ L.F. _______ ________
__________________ ________ L.F. _______ ________
SANITARY SEWER IMPROVEMENT SUBTOTAL ________
** VITRIFIED CLAY PIPE
XXX SDR-35
XXX SDR-35
XXXXX 40.00
XXXXXX 75.00
XXXXXXX 18" CMP
XXXXXX 7' W X 3'H RCB
XXXXX
$2,800
XXX RCB TRANS. STRUCT.
XXXXXXXXX11,500
XXXXXXXREINF. LINER
XXXXXX150.00
XXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXTYPE A CLOSURE XXXXXXXX 550.00
Revised 12/1/2016 – GM/RG
SHEET 3
TRAFFIC SIGNALS/SIGN/STRIPING
UNIT
ITEM QUANTITY UNIT COST AMOUNT
TRAFFIC SIGNAL MODIFICATION:
ONE CORNER L.S. 50K _
TWO CORNERS L.S. 100K _
TRAFFIC SIGNAL NEW L.S. 250K _
PAINT TRAFFIC STRIPE (1 COAT) L.F. 2.40 _
PAINT TRAFFIC STRIPE(2 COATS) L.F. .65 _
PEDESTRIAN CROSSWALK STRIPING L.F. .65 _
PAVEMENT MARKER
(NON REFLECTIVE) EA 2.50 ________
PAVEMENT MARKER (REFLECTIVE) EA 4.00 _
REFLECTORS AND POSTS EA 100.00 _
STREET SIGNS EA 250.00 _
___________________ ________ EA ________ ________
___________________ ________ EA ________ ________
TRAFFIC SIGNAL/SIGNS/STRIPING SUBTOTAL __
CFD LANDSCAPE IMPROVEMENTS (BONDING PURPOSES ONLY)
AREA LANDSCAPED S.F. $12.00 _
CENTER MEDIAN S.F. $12.00 _
LANDSCAPING IMPROVEMENTS SUBTOTAL __________
"STOP"
Revised 12/1/2016 – GM/RG
SHEET 4
SUBTOTALS:
STREET IMPROVEMENT SUBTOTAL....................___________________ STORM DRAIN IMPROVEMENTS SUBTOTAL..............___________________ SANITARY SEWER IMPROVEMENTS SUBTOTAL...........___________________ TRAFFIC SIGNAL/SIGNS/STRIPING SUBTOTAL.........___________________
IMPROVEMENT SUBTOTAL ===================
(*USE THIS TOTAL FOR PLAN CHECK & PERMITTING PURPOSES*)
CFD LANDSCAPE IMPROVEMENTS ....................___________________ SUBDIVISION MONUMENT GUARANTEE $1,200 + $50/LOT ...___________________ STREET LIGHTS _______ @ $5,000 ................___________________ CUCAMONGA COUNTY WATER DISTRICT FACILITIES.....___________________
IMPROVEMENT SUBTOTAL.... ===================
ADD 35%..................... ____________________
BONDING TOTAL........___________________
APPROVED PUBLIC IMPROVEMENT PLANS:
STREET IMP. DWG. NO._____________________
STREET LIGHT DWG. NO.____________________
SEWER IMP. DWG. NO.______________________
STORM DRAIN IMP. DWG. NO. _______________
TRAFFIC SIGNAL DWG. NO.__________________
SIGNING & STRIPING DWG. NO.______________