RESOLUTION NO. 2024-____
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF FONTANA ADOPTING A LIST OF PROJECTS FOR FISCAL YEAR 2024-25 FUNDED BY SB 1: THE ROAD REPAIR AND ACCOUNTABILITY ACT OF 2017.
WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017 (Chapter 5, Statutes of 2017) was passed by the Legislature and Signed into law by the Governor in April 2017 to address the significant multi-modal transportation funding shortfalls statewide; and WHEREAS, SB 1 includes accountability and transparency provisions that will ensure the residents of the City of Fontana are aware of the projects proposed for funding in our community and which projects have been completed each fiscal year; and WHEREAS, the City of Fontana must adopt by resolution a list of projects proposed to receive fiscal year funding from the Road Maintenance and Rehabilitation Account (RMRA), created by SB 1, which must include a description and the location of each proposed project, a proposed schedule for the project’s completion, and the estimated useful life of the improvement; and WHEREAS, the City of Fontana, will receive an estimated $5,472,951.00 in RMRA funding in Fiscal Year 2024-25 from SB 1; and WHEREAS, this is the eigth year in which the City of Fontana is receiving SB 1 funding and will enable the City of Fontana to continue essential road maintenance and rehabilitation projects, safety improvements, repairing and replacing aging bridges, and increasing access and mobility options for the traveling public that would not have otherwise been possible without SB 1; and WHEREAS, the City of Fontana has undergone a robust public process to ensure public input into our community’s transportation priorities/the project list; and WHEREAS, the City of Fontana used a Pavement Management System to develop the SB 1 project list to ensure revenues are being used on the most high priority and cost-effective projects that also meet the communities’ priorities for transportation investment; and WHEREAS, the funding from SB 1 will help the City of Fontana maintain and rehabilitate up to 58 lane miles of streets/roads, and all of the required ADA curb ramp, curb and gutter, and striping upgrades throughout the City of Fontana this year and many more of similar projects into the future; and WHEREAS, the Final Report August 2021 California Statewide Local Streets and Roads Needs Assessment found that the City of Fontana streets and roads are “estimated” to be in “good” condition, and this revenue will help us maintain or increase the overall quality of our road system and over the next decade will keep our streets and roads in an “estimated good” condition, or bring our streets and roads into a “excellent” condition; and WHEREAS, the SB 1 project list and overall investment in our local streets and roads infrastructure with a focus on basic maintenance and safety, investing in complete streets infrastructure, and using cutting-edge technology, materials and practices, will have significant positive co-benefits statewide.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Fontana, California, as follows:
Section 1. The foregoing recitals are true and correct.
Section 2. The following list of newly proposed projects will be funded in-part or solely with Fiscal Year 2024-25 Road Maintenance and Rehabilitation Account revenues:
Project Title: Beech Avenue Pavement Rehabilitation
Project Description: Grind & Overlay and Pavement Patching Project to include all pre-construction and construction costs, which include design, survey, Geotech, grind and overlay, pavement repairs, ADA ramp upgrades, curb and gutter, cross gutters, loops, striping, and testing, but may include additional work.
Project Location: Beech Avenue (I15 freeway to Curtis Avenue) Estimated Pre-Construction Schedule: Start – July 2024, Completion – January 2025 Estimated Construction Schedule: Start – February 2025, Completion – May 2025 based on the component being funded with RMRA funds Estimated Project Useful Life: 7 to 15 years
Project Title: Jurupa Avenue Pavement Rehabilitation
Project Description: Grind & Overlay and Pavement Patching Project to include all pre-construction and construction costs, which include design, survey, Geotech, grind and overlay, pavement repairs, ADA ramp upgrades, curb and gutter, cross gutters, loops, striping, and testing, but may include additional work.
Project Location: Jurupa Avenue (Sierra Avenue and Tamarind Avenue, including Via Larga and Volante Drive, south of Jurupa) Estimated Pre-Construction Schedule: Start – July 2024, Completion – January 2025 Estimated Construction Schedule: Start – February 2025, Completion – May 2025 based on the component being funded with RMRA funds Estimated Project Useful Life: 7 to 15 years
Project Title: Marygold Avenue Pavement Rehabilitation
Project Description: Pavement Removal & Replacement, and Grind & Overlay Project to include all pre-construction and construction costs, which include design, survey, Geotech, grind and overlay, pavement repairs, crack sealing, slurry seal, ADA ramp upgrades, curb and gutter, cross gutters, loops, striping, and testing, but may include additional work.
Project Location: Marygold Avenue between Sierra Avenue and Alder Avenue Estimated Pre-Construction Schedule: Start – July 2024, Completion – January 2025 Estimated Construction Schedule: Start – January 2025, Completion – May 2025 based on the component being funded with RMRA funds Estimated Project Useful Life: 7 to 15 years
Project Title: Village of Heritage East Lincoln Loop Pavement Maintenance and Rehabilitation Project Description: Grind & Overlay, slurry seal, and Pavement Patching Project to include all pre-construction and construction costs, which include design, survey, Geotech, grind and overlay, pavement repairs, ADA ramp upgrades, curb and gutter, cross gutters, loops, striping, and testing, but may include additional work.
Project Location: Various residential and collector streets in the Village of Heritage neighborhood between Grand Avenue and East Liberty Parkway and between Baseline Avenue and Foothill Boulevard Estimated Pre-Construction Schedule: Start – July 2024, Completion – January 2025 Estimated Construction Schedule: Start – January 2025, Completion – May 2025 based on the component being funded with RMRA funds Estimated Project Useful Life: 7 to 15 years
Project Title: Southridge Grid 52 Pavement Maintenance and Rehabilitation Project Description: Grind & Overlay, Slurry Seal and Pavement Patching Project to include all pre-construction and construction costs, which include design, survey, Geotech, grind and overlay, pavement repairs, ADA ramp upgrades, curb and gutter, cross gutters, loops, striping, and testing, but may include additional work.
Project Location: Various residential streets between Beech Avenue and Citrus Avenue and between Jurupa Avenue and Jurupa Hills Estimated Pre-Construction Schedule: Start – July 2024, Completion – January 2025 Estimated Construction Schedule: Start – January 2025, Completion – May 2025 based on the component being funded with RMRA funds Estimated Project Useful Life: 7 to 15 years
Project Title: Hunters Ridge/Coyote Canyon North Pavement Maintenance and Rehabilitation Project Description: Grind and Overlay, Remove and Replace, Slurry Seal and Pavement Patching Project to include all pre-construction and construction costs, which include design, survey, Geotech, grind and overlay, pavement repairs, crack sealing, slurry seal, ADA ramp upgrades, curb and gutter, cross gutters, loops, striping, and testing, but may include additional work.
Project Location: Various residential streets north of Duncan Canyon Road to City limits and west of Cherry Avenue to City limits in the Hunters Ridge/Coyote Canyon neighborhood Estimated Pre-Construction Schedule: Start – July 2024, Completion – January 2025 Estimated Construction Schedule: Start – January 2025, Completion – May 2025 based on the component being funded with RMRA funds Estimated Project Useful Life: 5 to 10 years
Project Title: Hunters Ridge/Coyote Canyon Central Pavement Maintenance and Rehabilitation Project Description: Grind and Overlay, Remove and Replace, Slurry Seal and Pavement Patching Project to include all pre-construction and construction costs, which include design, survey, Geotech, grind and overlay, pavement repairs, crack sealing, slurry seal, ADA ramp upgrades, curb and gutter, cross gutters, loops, striping, and testing, but may include additional work.
Project Location: Various residential streets south of Duncan Canyon Road to the SCE right of way and east of Cherry Avenue to Coyote Canyon Road in the Hunters Ridge/Coyote Canyon neighborhood Estimated Pre-Construction Schedule: Start – July 2024, Completion – January 2025 Estimated Construction Schedule: Start – January 2025, Completion – May 2025 based on the component being funded with RMRA funds Estimated Project Useful Life: 5 to 10 years
Project Title: Grid 47 Residential Pavement Maintenance and Rehabilitation Project Description: Grind and Overlay, Remove and Replace, Slurry Seal and Pavement Patching Project to include all pre-construction and construction costs, which include design, survey, Geotech, grind and overlay, pavement repairs, crack sealing, slurry seal, ADA ramp upgrades, curb and gutter, cross gutters, loops, striping, and testing, but may include additional work.
Project Location: Various residential streets between Oleander Avenue and Sierra Avenue and between Slover Avenue and Santa Ana Avenue Estimated Pre-Construction Schedule: Start – July 2024, Completion – January 2025 Estimated Construction Schedule: Start – January 2025, Completion – May 2025 based on the component being funded with RMRA funds Estimated Project Useful Life: 5 to 10 years
Project Title: Grid 48 Pavement Maintenance and Rehabilitation Project Description: Grind and Overlay, Remove and Replace, Slurry Seal and Pavement Patching
Project to include all pre-construction and construction costs, which include design, survey, Geotech, grind and overlay, pavement repairs, crack sealing, slurry seal, ADA ramp upgrades, curb and gutter, cross gutters, loops, striping, and testing, but may include additional work.
Project Location: Various residential and collector streets between Sierra Avenue and Tamarind Avenue and between Santa Ana Avenue and Jurupa Avenue Estimated Pre-Construction Schedule: Start – July 2024, Completion – January 2025 Estimated Construction Schedule: Start – January 2025, Completion – May 2025 based on the component being funded with RMRA funds Estimated Project Useful Life: 5 to 10 years
Project Title: Sierra Avenue Pavement Rehabilitation
Project Description: Grind and Overlay and Pavement Patching Project to include all pre-construction and construction costs, which include design, survey, Geotech, grind and overlay, pavement repairs, crack sealing, slurry seal, ADA ramp upgrades, curb and gutter, cross gutters, loops, striping, and testing, but may include additional work.
Project Location: Sierra Avenue between Summit Avenue and Sierra Lakes Parkway Estimated Pre-Construction Schedule: Start – July 2024, Completion – January 2025 Estimated Construction Schedule: Start – January 2025, Completion – May 2025 based on the component being funded with RMRA funds Estimated Project Useful Life: 5 to 10 years
Project Title: Merrill Avenue Pavement Rehabilitation
Project Description: Grind and Overlay, Remove and Replace, and Pavement Patching
Project to include all pre-construction and construction costs, which include design, survey, Geotech, grind and overlay, pavement repairs, crack sealing, slurry seal, ADA ramp upgrades, curb and gutter, cross gutters, loops, striping, and testing, but may include additional work.
Project Location: Merrill Avenue between Sierra Avenue and Alder Avenue Estimated Pre-Construction Schedule: Start – July 2024, Completion – January 2025 Estimated Construction Schedule: Start – January 2025, Completion – May 2025 based on the component being funded with RMRA funds Estimated Project Useful Life: 5 to 10 years
APPROVED AND ADOPTED this 14th day of May, 2024.
READ AND APPROVED AS TO LEGAL FORM:
____________________________________
City Attorney
I, Germaine Key, City Clerk of the City of Fontana, and Ex-Officio Clerk of the City Council, do hereby certify that the foregoing resolution is the actual resolution duly and regularly adopted by the City Council at a regular meeting on the 14th day of May, 2024, by the following vote to wit:
AYES:
NOES:
ABSENT:
ABSTAIN:
City Clerk of the City of Fontana
Mayor of the City of Fontana
ATTEST:
City Clerk
2 of 2
2 of 2
Resolution No. 2024-____