January 2025

City of Fontana
Master Storm
Drain Plan
This page intentionally left blank.

CITY OF FONTANA MASTER STORM DRAIN PLAN
January 21, 2025
Prepared for:

This page intentionally left blank.

City of Fontana Master Storm Drain Plan
January 25 v
Table of Contents
Executive Summary ................................................................................................... xi 1 Introduction ........................................................................................................... 1

1.1 Purpose of the Master Plan ...................................................................................................... 1

1.2 Master Plan Objectives and Approach ....................................................................................... 3

1.3 Design Criteria ........................................................................................................................ 4

1.4 Previous Studies and Available Data ......................................................................................... 5 2 Area of Study Characteristics ................................................................................. 6

2.1 Area of Study Overview ........................................................................................................... 6

2.1.1 AOS 1 ........................................................................................................................... 6

2.1.2 AOS 2 ........................................................................................................................... 7

2.1.3 AOS 3 ........................................................................................................................... 8

2.1.4 Sphere of Influence ........................................................................................................ 9

2.2 Existing Storm Drain Infrastructure .......................................................................................... 9

2.2.1 AOS 1 ......................................................................................................................... 10

2.2.2 AOS 2 ......................................................................................................................... 10

2.2.3 AOS 3 ......................................................................................................................... 11

2.3 Regional Flood Control Channels ............................................................................................ 12

2.4 Climate and Rainfall .............................................................................................................. 13

2.5 Existing Land Use .................................................................................................................. 14

2.6 Proposed Land Use ............................................................................................................... 14

2.7 Soils ..................................................................................................................................... 14

2.8 Known Flooding .................................................................................................................... 16 3 Capacity Evaluation .............................................................................................17

3.1 Hydrologic Analysis ............................................................................................................... 17

3.1.1 Technical Approach ...................................................................................................... 17

3.1.2 Design Storms ............................................................................................................. 17

3.1.3 Subbasin Delineation .................................................................................................... 18

3.1.4 Runoff Coefficients ....................................................................................................... 22

3.1.5 Unit Hydrograph Development ...................................................................................... 24

3.2 Hydraulic Analysis ................................................................................................................. 25

3.2.1 Technical Approach ...................................................................................................... 25

3.2.2 1D Model for Storm Pipe Network ................................................................................. 26

3.2.3 2D Model for Surface Flows .......................................................................................... 26

3.2.4 Boundary Conditions .................................................................................................... 28

3.2.5 Model Validation .......................................................................................................... 28

3.3 Model Results ....................................................................................................................... 31 City of Fontana Master Storm Drain Plan
January 25 vi

3.3.1 Hydraulic Model Results................................................................................................ 31

3.3.2 Critical Facilities ........................................................................................................... 36

3.3.3 Maximum Depth .......................................................................................................... 38

3.3.4 Duration of Inundation and Time to Inundation ............................................................. 39 4 Capital Projects ....................................................................................................43

4.1 Master Storm Drain Capital Projects ....................................................................................... 43

4.2 Capital Improvement Projects ................................................................................................ 43

4.2.1 AOS 1 ......................................................................................................................... 43

4.2.2 AOS 2 ......................................................................................................................... 43

4.2.3 AOS 3 ......................................................................................................................... 44

4.2.4 Proposed Projects on Regional Facilities ........................................................................ 44

4.3 Capital Project Cost Estimating .............................................................................................. 48

4.4 Capital Project Prioritization ................................................................................................... 50

4.4.1 Prioritization Criteria ..................................................................................................... 51

4.4.2 Weighting Factors ........................................................................................................ 52

4.4.3 Prioritization Results ..................................................................................................... 52 5 Conclusion and Recommendations ......................................................................56 6 References ...........................................................................................................57 Appendix 1 Hydrologic Inputs and Results
Appendix 2 Hydraulic Results Summary
Appendix 3 Capital Project Exhibits
Appendix 4 Capital Project Cost Estimates
Appendix 5 Capital Project Prioritization Table
Appendix 6 Detention Basin Policy and Design Criteria

City of Fontana Master Storm Drain Plan
January 25 vii
List of Figures
Figure 1-1. Current City of Fontana Master Plan, Developed in 1992, Revised in 2006 ............................. 1 Figure 1-2. Project Location Overview .................................................................................................. 2 Figure 1-3. Design Criteria ................................................................................................................... 4 Figure 2-1. AOS 1 Overview ................................................................................................................. 7 Figure 2-2. AOS 2 Overview ................................................................................................................. 8 Figure 2-3. AOS 3 Overview ................................................................................................................. 9 Figure 2-4. Comparison of Proposed Lines From the 1992 Master Plan to Existing Pipes in AOS 1 (red lines) ........................................................................................................................................................ 10 Figure 2-5. Comparison of DZ Lines from the 1992 Master Plan to Existing Pipes in AOS 2 (red lines) .... 11 Figure 2-6. Comparison of B and C Lines from the 1992 Master Plan to Existing Pipes in AOS 3 (red lines) ........................................................................................................................................................ 12 Figure 2-7. Hydrologic Soil Groups ..................................................................................................... 15 Figure 2-8. Known Flooding Locations ................................................................................................ 16 Figure 3-1. Subbasins Used in the Trunkline Hydrologic Analysis .......................................................... 19 Figure 3-2. Subbasins Used in the Collector Hydrologic Analysis. Areas in Pink Shown in Detail in Figure 3-3. .................................................................................................................................................. 20 Figure 3-3. Detailed of Collector Basin Delineation for ‘M’ Line Portion of AOS 1 for Pipe Sizes 36” through 42”................................................................................................................................................... 21 Figure 3-4. Detailed of Collector Basin Delineation for ‘M’ Line Portion of AOS 1 for Pipe Sizes 42” through 72” ................................................................................................................................................... 21 Figure 3-4. Intensity-Duration Curve for AOS 1 to Determine Runoff Coefficients for the Collector Hydrologic Analysis ............................................................................................................................................ 24 Figure 3-6. Flow and Accumulated Volume for Subbasin D7 in AOS 1 for the 25- and 100-year storms ... 25 Figure 3-7. Graphic Representation of 1D/2D Surface/Subsurface Model (from Barnard et al., 2007) ..... 25 Figure 3-8. City of Fontana Topography ............................................................................................. 27 Figure 3-9. Example of 2D Mesh Element Resolution in AOS 3 ............................................................. 28 Figure 3-10. 100-year Storm Existing Conditions Hydraulic Modeling Results for Model Validation .......... 29 Figure 3-11. ICM Model Results Near Slover Avenue During the 100-year Event ................................... 30 Figure 3-12. ICM Model Results Near Etiwanda and Jurupa Avenue During the 100-year Event .............. 31 Figure 3-13. Existing Conditions 25-year Flooding in AOS 1 ................................................................. 33 Figure 3-14. Existing Conditions 25-year Flooding in AOS 2 ................................................................. 34 Figure 3-15. Existing Conditions 25-year Flooding in AOS 3 ................................................................. 35 Figure 3-16. Select Critical Facilities within the Sphere of Influence ...................................................... 38 Figure 3-17. 25-year Time to Inundation for AOS 1 ............................................................................. 40 Figure 3-18. 25-year Time to Inundation for AOS 2 ............................................................................. 41 Figure 3-19. 25-year Time to Inundation for AOS 3 ............................................................................. 42 Figure 4-1. Capital Projects for AOS 1 ................................................................................................ 45 Figure 4-2. Capital Projects for AOS 2 ................................................................................................ 46 Figure 4-3. Capital Projects for AOS 3 ................................................................................................ 47 Figure 4-4. Prioritization Results ......................................................................................................... 55

City of Fontana Master Storm Drain Plan
January 25 viii
List of Tables
Table 1-1. Previous Studies, Specific Plans, and Reports ........................................................................ 5 Table 2-1. 1-Hour Rainfall Intensity (in/hr) Comparison for NOAA Atlas 14 and Atlas 2 .......................... 14 Table 2-2. Existing and Proposed Land Use Summary Table ................................................................ 14 Table 2-3. Hydrologic Soil Groups Summary Table .............................................................................. 15 Table 3-1. AOS 1 NOAA 14 Rainfall Depth for Design Storm Events ...................................................... 17 Table 3-2. AOS 2 NOAA 14 Rainfall Depth for Design Storm Events ...................................................... 17 Table 3-3. AOS 3 NOAA 14 Rainfall Depth for Design Storm Events ...................................................... 17 Table 3-4. Land Use Types, Curve Numbers, and Associated A (San Bernardino Hydrology Manual) ....... 23 Table 3-5. Assumed Infiltration Rates (Fp) by Hydrologic Soil Group for the Rational Method Analysis .... 23 Table 3-6. Critical Facilities Impacted by Flooding Greater than 0.5 Feet During the 25-year Event ........ 36 Table 3-7. Critical Facilities Impacted by Flooding Greater than 0.5 Feet During the 100-year Event ...... 37 Table 4-1. Cost Summary .................................................................................................................. 49 Table 4-2. Unit Costs Applied to the Capital Project Cost Estimates ...................................................... 49 Table 4-3. Downstream to Upstream Prioritization Criteria ................................................................... 51 Table 4-4. Known Flooded Areas Prioritization Criteria ......................................................................... 51 Table 4-5. Depth of Flooding Prioritization Scoring .............................................................................. 51 Table 4-6. Road Hierarchy Drainage Consideration Scoring .................................................................. 52 Table 4-7. Evaluation Criteria Weighting ............................................................................................. 52 Table 4-8. Prioritization Results for Projects in the Top 30% ................................................................ 53

City of Fontana Master Storm Drain Plan
January 25 ix
List of Abbreviations and Acronyms
1D One-Dimensional
2D Two-Dimensional
AES Applied Engineering Solutions (Hydrology Software Program) AMC Antecedent Moisture Condition
AOS 1 Area of Study 1
AOS 2 Area of Study 2
AOS 3 Area of Study 3
As-builts Construction Plans
ATSF Atchison, Topeka and Santa Fe Railroad
BMP Best Management Practice (Water Quality Treatment Facility) CB Catch Basin
cfs Cubic Feet per Second
CIP Capital Improvement Program
City City of Fontana
County San Bernadino County
CSDP Comprehensive Storm Drain Plan
DBL Double
DEA David Evans and Associates, Inc.

DEM Digital Elevation Model
EOC Emergency operation center
EPA Environmental Protection Agency
FEMA Federal Management Agency
GIS Geographic Information System
HGL Hydraulic Grade Line
IB Infiltration Basin
ID Identification
LID Low Impact Development
MH Manhole
MSDP Master Storm Drain Plan
N/A Not Applicable
NC Natural Channel
NOAA National Oceanic and Atmospheric Administration
NPDES National Pollutant Discharge Elimination System
RCB Reinforced Concrete Box
RCC Rectangular Concrete Channel
City of Fontana Master Storm Drain Plan
January 25 x
RCP Reinforced Concrete Pipe
RWQCB Regional Water Quality Control Board
SBCFCD San Bernardino County Flood Control District
TC Time of Concentration
USACE United States Army Corps of Engineers
USDA United States Department of Agriculture
USGS United States Geological Survey
WSPGW Water Surface Profile Gradient for Windows (Hydraulic Software) WxH “Width” by “Height”
City of Fontana Master Storm Drain Plan
January 25 xi

EXECUTIVE SUMMARY
This Master Storm Drain Plan (MSDP) is an update to the City of Fontana (City) 1992 City of Fontana and “Sphere of Influence” Master Storm Drain Plan Study (MSDP) prepared by Hall and Foreman (now David Evans and Associates , Inc . (DEA)). This MSDP includes comprehensive analysis of the City’s drainage systems to help identify critical short-term and long-term drainage issues and provides a corresponding list of prioritized capital projects intended to help alleviate them. Prioritized project descriptions, estimated costs, and supporting figures are provided. This report provides the basis for adopting fees to provide funding for design and construction of the capital projects.

Evaluation of the drainage patterns and storm drain recommendations were divided into three separate areas of study to provide a clear level of detail and for planning purposes , which are identified as Area of Study 1 (AOS 1), Area of Study 2 (AOS 2), and Area of Study 3 (AOS 3). Tasks included performing a hydrologic and hydraulic analysis of the City’s storm drain infrastructure. Hydrologic analysis followed the San Bernardino County Hydrology Manual and evaluation of the drainage system hyd raulics used the modeling software InfoWorks ICM. Where applicable, existing hydrology studies were used where current and relevant information was provided. An integrated 1- and 2-dimensional (1D/2D) model was developed to represent the storm drain systems in each of the three major study areas listed above. The 1D elements of the model are limited to the master plan of drainage facilities of 36-inch diameter and larger but does not include city or regional detention or recharge facilities. The 2D elements of the model include the surface mesh representing a Digital Elevation Model (DEM) derived ground surface to model overland flow and surface retention storage.

The storm drain system models were used to assess and identify areas of insufficient conveyance capacity and corresponding flooding. To alleviate areas of flooding and insufficient conveyance, proposed ultimate improvements were analyzed with the existing model. The model results with the proposed improvements were then used to determine the conveyance and storm drain capital projects. Development of the capital projects identified a total of 198 projects to address infrastructure needs. The average project cost was $5,925,000, with the minimum being $235,000 and maximum being $87,343,000. In total the cost of AOS 1 is $898,928,000, AOS 2 is $131,702,000, and AOS 3 is $137,433,000.

A set of evaluation criteria was developed to assist in selecting the most critical projects for the City to pursue. The importance of each project was considered using four evaluation criteria: 1. Downstream to Upstream Prioritization 2. Known Flooded Are as 3. Depth of Flooding and 4. Road Hierarchy Drainage.

Capital projects received prioritization scores between 1.0 and 4.4, with 59 projects receiving a score of

2.6 or above, which corresponds to the 30th percentile score.

City of Fontana Master Storm Drain Plan

January 25 1
1 INTRODUCTION

1.1 PURPOSE OF THE MASTER PLAN
This Master Storm Drain Plan (MSDP) is an update to the City of Fontana (City) 1992 City of Fontana and “Sphere of Influence” Master Storm Drain Plan Study (MSDP) prepared by Hall and Foreman (now David Evans and Associates, Inc. (DEA)). It is intended to be a user-friendly guidance tool for assessing, planning, and achieving goals for future storm drain management system improvements within Fontana over a 30- to 50-year planning horizon. The target audience is City staff, elected officials, developers, and anyone interested in storm management improvements in Fontana. This MSDP includes comprehensive analysis of the City’s existing and proposed drainage systems to help identify critical short-term and long-term drainage issues and provides a corresponding list of prioritized capital projects intended to help alleviate them.

Prioritized project descriptions, estimated costs, and supporting figures are provided. This report provides the basis for adopting fees to provide funding for design and construction of the capital projects.

Figure 1-1. Current City of Fontana Master Plan, Developed in 1992, Revised in 2006 The City of Fontana and its sphere of influence encompasses approximately 52.4 square miles and is located adjacent to the cities of Rancho Cucamonga, Rialto, Bloomington, and Jurupa Valley in San Bernadino County, California. The Etiwanda and San Sevaine channels run through the westside of Fontana, carrying flows from the Los Angeles mountains to the north and to the Santa Ana River to the south.

Evaluation of the drainage patterns and storm drain recommendations are divided into three separate areas, which are identified as Area of Study 1 (AOS 1), Area of Study 2 (AOS 2), and Area of Study 3 (AOS 3). These areas are primarily tributary to the Etiwanda/San Sevaine Watershed and a small portion

City of Fontana Master Storm Drain Plan

January 25 2
of the City is tributary to the Rialto Storm Channel east of the City. Figure 1-2 is a project location map showing the general extents of the three regional areas of study.

Figure 1-2. Project Location Overview

City of Fontana Master Storm Drain Plan

January 25 3

1.2 MASTER PLAN OBJECTIVES AND APPROACH
Development of this MSDP and the recommended capital projects started with City and DEA collaborating to determine key goals and objectives for the updated MSDP. This collaborative approach established that the primary focus of this MSDP should be to address storm drain conveyance limitations and localized flooding problems. This MSDP is intended to address and support the goals and objectives listed below, be easy to use, and be easy to update for future revisions.

This updated MSDP has the following objectives:

1. Analyze the City’s existing and future storm drain system capacities to identify potential deficiencies and needed improvements. The improvements considered include:
o Updating hydrology to current NOAA Atlas 14 rainfall data following the County of San Bernardino Hydrology Manual Addendum for Arid Regions dated April 2010 o Incorporate development which has occurred since the 1992 MSDP o Incorporate proposed land use data from the City of Fontana General Plan Land Use Map dated February 2022
o Assess conveyance capacity of primary storm drainage features throughout the City

2. Develop a prioritized list of capital projects that address storm drain system deficiencies (existing and future). The capital projects includes:
o A description of the City’s existing storm drain system o A project prioritization matrix based on key project benefits o A system overview of considered and recommended projects, a City-wide capital projects figure, and a planning-level cost estimate
o A hydraulic model that can be used to assess system responses to improvements and basin changes/developments
o Provide overall cost estimates to assist in creation of development impact fees for drainage infrastructure
Once the objectives were established, the project assessment and analysis began. This step included researching past studies and recommended projects, interviewing City staff about known problems, and performing a hydrologic and hydraulic analysis of the City’s storm drain infrastructure. Evaluation of the drainage system used the modeling software InfoWorks ICM. An integrated 1- and 2-dimensional (1D/2D) model was developed to represent the storm drain systems in each of the three major areas listed above.

The model was limited to drainage facilities of 36-inch diameter and larger. City and regional detention and recharge facilities were not analyzed for capacity as part of this analysis.

The storm drain system models were used to assess and identify areas of insufficient conveyance capacity and corresponding flooding. To alleviate areas of flooding and insufficient conveyance, proposed ultimate improvements were analyzed with the existing model. The model results with the proposed improvements were then used to inform the conveyance and storm drain capital projects. The next step was to prioritize the potential projects based on a matrix of selection criteria established in collaboration between DEA and the City. A total of 198 potential capital projects were identified to address existing capacity limitations and flooding.

City of Fontana Master Storm Drain Plan

January 25 4

1.3 DESIGN CRITERIA
The City’s 1992 MSDP storm management design standards include public and private development requirements, which are intended to provide guidance to design professionals and ensure consistency in the safety and quality of infrastructure improvements that align with conveyance and flood alleviation goals.

The original MSDP design standards will continue to be used with this update.

A summary of the 1992 design standards follows:
• The 100-year design recurrence interval storm was directed by the National Flood Insurance Act of 1968 and the necessity to protect new habitable structures from flooding during the 100 -year storm. It was used to size all primary storm lines proposed for the capital projects. • The hydrologic analysis was based on the San Bernardino Hydrology Manual dated January 1986.

The rational method was used to develop unit hydrographs within the Advanced Engineering Software (AES) program. The 1992 MSDP used NOAA Atlas 2 rainfall data, but since that time the City and San Bernardino County have updated to NOAA Atlas 14 rainfall data, which represent an increase of approximately 25%. The updated MSDP uses flows generated from NOAA Atlas 14. See Section 3.1 for more information.
• For the sake of economy, some proposed pipes were limited to convey the 25 -year event, where the streets hold the difference in runoff between the 25-year and the 100-year events. Figure 1-3 below shows the design criteria from the 1992 SMPD for these locations. These pipes are generally smaller than 54 inches and located at the upstream ends of proposed projects or along smaller collector lines; larger pipes (typically greater than 54 inches) were sized to convey the 100 -year event. See Sections 3.1 and 3.2 for more information.

Figure 1-3. Design Criteria

City of Fontana Master Storm Drain Plan

January 25 5

1.4 PREVIOUS STUDIES AND AVAILABLE DATA
The 1992 MSDP was used as the basis of this study. However, additional studies, specific plans, and other data were also used to prepare this master plan. Table 1-1 lists reports used to provide data and supplementary information to complete this study.

In addition to the studies and reports listed below, as-built plans were used to accurately model existing storm drain infrastructure across the City. Geospatial information (shapefiles) containing existing storm drain pipes and manholes were also used to model existing infrastructure. Additional shapefiles were provided by the City containing information on City streets, pertinent utilities, known flooding locations, land use, and City boundaries.

Three-foot resolution LiDAR derived topography obtained from the City was used in the hydrologic and hydraulic analyses for runoff calculations and facility sizing. Additionally, high resolution aerial photos from 2016 were used t o explore, assess, and confirm locations of pertinent drainage features and City infrastructure. All studies, reports, as-built plans, and geospatial information pertaining to City storm drain infrastructure were provided by the City of Fontana.

Table 1-1. Previous Studies, Specific Plans, and Reports Previous Study/Report Year Author Purpose
City of Fontana MSPD 1992 Hall & Foreman, Inc. Basis of updated analysis herein
Downtown Core Project Environmental
Impact Report 2023 De Novo Planning Group AOS 1 proposed dev.

Speedway Commerce Center Specific
Plan 2022 Kimley Horn AOS 1 proposed dev.

Rialto Comprehensive Storm Drain Plan 1988 JMM Consulting, Inc. AOS 1 proposed project Village of Heritage Hydrology Report 1988 Hall & Foreman, Inc. AOS 1 proposed project Westgate Specific Plan 2017 JHA Consulting AOS1/AOS 3 proposed dev.

Southridge Specific Plan 1981 PBR, Inc. AOS 2 hydrology West Valley Logistics Center Specific
Plan 2018 Metis Environmental
Group AOS 2 proposed dev.

City of Fontana Infrastructure Drainage
Report 2006 AEI CASC Engineering AOS 3 hydrology
Summit Heights Drainage Report 2002 Hall & Foreman, Inc. AOS 3 proposed dev.

Hunter’s Ridge Specific Plan 1988 Crosby Mead Benton &
Assoc. AOS 3 proposed dev.

Coyote Canyon Specific Plan 1997 AEI CASC Engineering AOS 3 proposed dev.

Ventana at Duncan Canyon Specific Plan 2022 Frontier Enterprises AOS 3 proposed dev.

Final Drainage Study (Arboretum) 2020 Q3 AOS 3 hydrology I-15 Logistics Center Hydrology Report 2021 David Evans and Assoc., Inc. AOS 3 hydrology
Citrus Heights North Specific Plan 2004 T&B Planning
Consultants, Inc. AOS 3 proposed dev.

Citrus Heights South Specific Plan 2003 T&B Planning
Consultants, Inc. AOS 3 proposed dev.

The Arboretum Specific Plan 2009 Place Works AOS 3 proposed dev.

City of Fontana Master Storm Drain Plan

January 25 6
2 AREA OF STUDY CHARACTERISTICS
This section provides details of the MSDP study area, describing the local climate, topography, soils, existing storm drain infrastructure, and land use conditions used to develop the hydrologic and hydraulic models.

2.1 AREA OF STUDY OVERVIEW
The entire City is located within the Santa Ana River Watershed and ultimately drains to the Santa Ana River. The Fontana watershed lies in the plain adjacent to the Santa Ana River. Generally, the topography of the area is relatively flat, sloping from north to southwest at approximately a 0.5 percent grade. Although, there are portions of the City which drain towards the southeast, located primarily east of Sierra Avenue.

The watershed is predominately urbanized. Storm runoff is generally intercepted by local City facilities then conveyed to major San Bernadino County facilities to the Santa Ana River, then to the Pacific Ocean.

2.1.1 AOS 1
AOS 1 has a drainage area of approximately 20 square miles (sq. mi.; 12,914 ac). The area occupies the middle of the City and is entirely within the City of Fontana (Figure 2-1). AOS 1 is bounded by Interstate 210 (Foothill Freeway) to the north and Interstate 10 to the south. West of Sierra Avenue, AOS 1 drains towards the Etiwanda/San Sevaine Watershed while areas east of Sierra Avenue (between Baseline Road and I-10 Freeway) drain towards the East Fontana Channel following the north side of the Atchison, Topeka and Santa Fe Railroad (ATSF) from Palmetto Avenue to the Rialto Channel . Both areas ultimately drain to the Santa Ana River and into the Pacific Ocean. AOS 1 is fully developed with mixed land uses and contains some of the oldest developments in the City , including the entire Downtown Development area. It is the highest priority for improving storm drainage.

City of Fontana Master Storm Drain Plan

January 25 7

Figure 2-1. AOS 1 Overview

2.1.2 AOS 2
AOS 2 is directly south of AOS 1 and has a drainage area of approximately 14 square miles (9,120 acres).

The area is entirely within the City of Fontana (Figure 2-2). AOS 2 is bounded by Interstate 10 to the north and Philadelphia Avenue, the Jurupa Hills, and the Fontana City Boundary to the south. AOS 2 drains primarily to the Declez Channel, which runs northeast to southwest through the study area. North of the Jurupa Hills, AOS 2 drains southwest , while the Jurupa Hills drain primarily north. The Western-most portions of AOS 2 (generally west of Calabash Avenue) drain towards the San Sev aine Channel . Both channels ultimately drain south to the Santa Ana River and into the Pacific Ocean. The southeast portion of AOS 2, adjacent to the Jurupa Hills drains to the east and into Rialto. The West Valley Logistics Center Specific Plan is proposed in this area but was not considered in this analysis as the specific hydrology and hydraulic analysis for this project is under City review and not finalized for inclusion. AOS 2 has been mostly developed since the 1992 Master Plan was completed and contains mixed land uses. The exception to this occurs near Jurupa Aven ue, north of Jurupa Avenue there is significant industrial development and redevelopment opportunities and the area south of Jurupa Avenue and into the Jurupa Hills, remain undeveloped.

City of Fontana Master Storm Drain Plan

January 25 8

Figure 2-2. AOS 2 Overview

2.1.3 AOS 3
AOS 3 is located north of AOS 1 and has a drainage area of approximately 9 square miles (5,691 acres).

The area is entirely within the City of Fontana and drains primarily southwest (Figure 2-3). AOS 3 is bounded by Interstate 210 (Foothill Freeway) to the south and the San Gabriel Mountains to the north. Interstate 15 runs southwest to northeast through AOS 3. Most of AOS 3 north of Interstate 15 drains to the Hawker- Crawford Channel. Areas south of Interstate 15 and north of Summit Avenue drain to the Summit Avenue Storm Drain. Areas between Summit Avenue and Interstate 210 drain to the Highland Channel. All areas East of Sierra Avenue drain towards the Cactus Channel, which heads east and south through Rialto. All of AOS 3 ultimately drains to the Santa Ana River and into the Pacific Ocean. AOS 3 is the most recently developed, primarily with residential land uses. Many portions of AOS 3 remain undeveloped, specifically in the northern portion of the study area.

City of Fontana Master Storm Drain Plan

January 25 9

Figure 2-3. AOS 3 Overview

2.1.4 SPHERE OF INFLUENCE
In addition to the City of Fontana boundary, the City also retains a ‘sphere of influence’ boundary, which is an expanded version of the City boundary that includes areas surrounding the City that may be annexed in the future. These areas were also included in the analysis and are shown in Figure 1-2. The majority of the additional area not included in AOS 1, 2, or 3 mentioned previously is located to the West of AOS 1 and includes Kaiser and the Auto Club Speedway (5,092 acres). This area is primarily composed of residential and industrial land use and drains to the San Sevaine Channel. Additional, smaller areas within the sphere of influence that were included in the analysis are located to the southeast of AOS 1 ( 158 acres), and to the North of AOS 3 in the San Gabriel Mountains (508 acres).

2.2 EXISTING STORM DRAIN INFRASTRUCTURE
The density and adequacy of existing City-owned storm drain infrastructure varies across the City. Since the 1992 MSDP, many developments have been constructed with corresponding storm drain infrastructure that meets capacity requirements. However, other areas are still primarily without subsurface storm drain drainage infrastructure to control local flooding . A summary of existing infrastructure by AOS is provided below. All existing storm drain drainage pipes are shown in Appendix 2.

City of Fontana Master Storm Drain Plan

January 25 10

2.2.1 AOS 1
AOS 1 is the oldest and most infrastructure -deficient area of the City. Most of the AOS lacks drainage infrastructure more than park drains and minor (< 36 inches in diameter) storm drainage lines to control localized flooding. The major storm drainage lines (≥ 36 inches in diameter) that do exist are infrequent and primarily centralized in new er parts of the AOS, such as the Village of Heritage and areas north of Baseline Avenue, where portions of the 1992 MSDP were implemented (Figure 2-4).

Figure 2-4. Comparison of Proposed Lines From the 1992 Master Plan to Existing Pipes in AOS 1 (red lines)

2.2.2 AOS 2
AOS 2 has been mostly developed since the 1992 MSDP, and newer residential and industrial developments have sufficient drainage infrastructure. Major storm drain lines, such as the DZ lines, from the 1992 MSDP are present running north to south along most streets between Mulberry Avenue and Sierra Avenue, draining to the Declez Channel (Figure 2-5). Residential developments, including Southridge and Sycamore Hills, also drain via major storm drainage lines to the Declez Channel. Other areas remain undeveloped.

City of Fontana Master Storm Drain Plan

January 25 11

Figure 2-5. Comparison of DZ Lines from the 1992 Master Plan to Existing Pipes in AOS 2 (red lines)

2.2.3 AOS 3
AOS 3 is the most recently developed ; new residential developments are planned or in construction in several areas. Most of the developed portions of the AOS have sufficient storm drain infrastructure, including the B - and C-lines from the 1992 MSDP (Figure 2-6). Similarly, the Hunter’s Ridge and Coyote Canyon developments contain lines presented in the 1992 MSDP. Undeveloped areas in the northern portions of the AOS have specific plans in place, including the Arboretum development north of Duncan Canyon Road which has major storm lines proposed that are similar to those in the 1992 MSDP. Runoff from areas north of I-15 currently flow through a series of box culverts below I -15 and discharge into an undeveloped area to the south . Drainage patterns for these culverts will be altered based on planned development and are reflected in the present study.

City of Fontana Master Storm Drain Plan

January 25 12

Figure 2-6. Comparison of B and C Lines from the 1992 Master Plan to Existing Pipes in AOS 3 (red lines)

2.3 REGIONAL FLOOD CONTROL CHANNELS
San Bernadino County (County) Department of Public Works operates and maintains several regional flood control channels throughout the City of Fontana. These channels act as the downstream discharge point s for major City-owned and maintained storm drain infrastructure. The location and extent of the facilities is shown in Figure 1-2. These include:

Declez Channel – This major facility is a concrete trapezoidal channel that begins at Sierra Avenue, flows west, and drains the majority of AOS 2 . It discharges to the Declez Detention Basin before continuing southwest to the San Sevaine Channel. The Chino Basin Groundwater Recharge basins are located along the Declez Channel, near the intersection of Jurupa Avenue and Beech Avenue; however, these basins were not included in the present analysis as they are County facilities and were outside the scope of th is study. The Declez Channel was included in the capacity analysis for this study to determine if additional flow to the channel would require upsizing portions of the channel.

I-10 Channel – The I-10 Channel is owned and maintained by Caltrans and flows east to west along the northern side of I -10. It drains the southern portion of AOS 1 before discharging into the San Sevaine Channel. It was included in the capacity analysis to determine if additional flow to the channel would require upsizing portions of the channel.

West Fontana Channel – The West Fontana Channel is a rectangular channel that flows east-to- west along the Burlington Northern and Sante Fe Railroad and drains the middle and western portions of AOS 1. It discharges to the San Sevaine Channel after flowing through two regional detention facilities. The analysis calculated the channel capacity through the first detention basin (Banana Basin).

City of Fontana Master Storm Drain Plan

January 25 13
Highland Channel – The Highland Channel is a concrete trapezoidal channel that drains AOS 3 between Foothill Freeway and Summit Avenue from Citrus Avenue west. It flows under the Foothill Freeway and into the San Sevaine Channel. It was not included in th is analysis because it was determined to be sufficiently sized to convey flows from the contributing watershed based on results of this analysis compared to the design discharge (Q100) for the channel.

East Fontana Channel – The East Fontana Channel is a trapezoidal channel that begins at Mango Avenue and drains east, collecting runoff from eastern AOS 1 between the Burlington Northern and Sante Fe Railroad and Foothills Boulevard. It eventually drains to the Rialto Channel to the east. It was included in the capacity analysis of the current study to determine if additional flow to the channel would require upsizing portions of the channel.

Hawker-Crawford Channel – This channel begins in the north-central portion of AOS 3, north of I- 15, and flows southwest, collecting runoff from Hunter’s Ridge and Coyote Canyon developments. A reroute of the channel is currently under construction due to the adjacent Nara Hills Development north of I-15. The channel flows into the Rich Detention Basin, then continues and discharges to the San Sevaine Basins. The channel was not included in the present analysis because it is in AOS 3, which is the most recently developed, it is County maintained, and because the area north of the channel that drains into the facility contains new development that was assumed to have sufficiently sized infrastructure.

San Sevaine Channel – The San Sevaine Channel originates in northern AOS 3 at the foot of the San Gabriel Mountains and flows south into the San Sevaine Detention Basins. It then continues south along the western edge of Fontana until it eventually discharges to the Santa Ana River. This channel collects runoff from the majority of the City as it acts as the final discharge point for the other regional channels mentioned above (except the East Fontana Channel). It was not included in the analysis, as it is a County-operated facility, was further downstream from many of the discharge points used in the capacity analysis, and was assumed to be sufficiently sized.

2.4 CLIMATE AND RAINFALL
The City of Fontana climate is characterized as Mediterranean, with hot, dry summers and cool, cloudy winters. Annual rainfall is 14 inches, on average, and rain typically occurs during winter storms between December and March . Snow accumulates in the San Gabriel Mountains to the north of the city that contributes to runoff during the spring freshet. Rainfall typically falls in intense, short duration events, except during more unique events, such as atmospheric rivers that can bring substantial rain over days.

The 1992 MSDP used rainfall data from NOAA Atlas 2 (NOAA, 1973), where rainfall depths and intensities are based on data from fewer rain gauges than updated NOAA Atlas 14 data. The NOAA Atlas 14 Publication (NOAA, 2014) includes data from additional rain gauges that were not available at the time of NOAA Atlas 2, as well as approximately 25 years of additional data f rom the gauges included in NOAA Atlas 2. The rainfall values from NOAA Atlas 14 were used in this analysis (see Section 3.1 for more information). In general, rainfall intensities based on data from Atlas 14 are 6-10% higher than those from Atlas 2 , on average. This analysis used rainfall depths and intensities unique to each AOS, considering the spatial variation in rainfall from north to south Fontana, reflected in the NOAA Atlas 14 data below.

City of Fontana Master Storm Drain Plan

January 25 14
Table 2-1. 1-Hour Rainfall Intensity (in/hr) Comparison for NOAA Atlas 14 and Atlas 2 Source Recurrence Interval AOS 1 AOS 2 AOS 3 Average
Atlas 14 100-Year 1.58 1.33 1.80 1.57
25-Year 1.20 1.02 1.42 1.21
Atlas 2 100-Year 1.40 1.35 1.52 1.42
25-Year 1.11 1.06 1.22 1.13

2.5 EXISTING LAND USE
Existing land use was based on the 2022 General Plan Land Use Map provided by the City but revised to represent existing conditions. For example, areas that were not currently developed, but are reflected as such in the 2022 general plan, were assigned a land use of ‘Open Space’ for the hydrologic analysis. Areas outside of the general plan boundary, such as those in the San Gabriel Mountains to the north and Jurupa Hills to the south that contribute runoff were also characterized as ‘Open Space’. Land use designations for existing conditions were confirmed via aerial imagery. An exhibit showing the existing land use applied to the hydrologic modeling is shown in Appendix 1.

2.6 PROPOSED LAND USE
Future land use designations were provided by the City as information from the General Plan adopted in 2022. An exhibit showing the future land use applied to the hydrologic modeling is shown in Appendix 1.

A summary of land use for existing and proposed conditions is shown in Table 2-2. A comparison of between impervious percentage used in the 1992 MSDP and this study is provided in Appendix 1. This figure shows an increase in land-use density and corresponding impervious area compared to the 1992 MSDP.

Table 2-2. Existing and Proposed Land Use Summary Table AOS Total
Acres1
Existing Land Use Proposed Land Use
Impervious Acres Impervious % Impervious Acres Impervious % 1 17,812 9,966 56 10,773 60
2 9,016 5,530 61 5,606 62
3 5,858 2,660 45 2,730 47
1Values discount area within right of way of I-15, I-10, and Foothill Freeway, and include area within the sphere of influence outside of AOS boundaries

2.7 SOILS
Soils across the City are primarily well-drained, hydrologic group A soils, such as loamy and gravelly sands.

Some areas in mountainous areas to the north and south of the City are less well-drained, hydrologic soil group B, C, and D soils. Soil data was extracted from the USDA Web Soil Survey (USDA, 2023) for the entire sphere of influence. An exhibit showing the soils data applied to the hydrologic modeling is shown in
Figure 2-7. Table 2-3 below summarizes hydrologic soil types in each AOS. Generally, soils in the very northern portion of the City and within the very southern portions of the City are of a finer material and less permeable than the majority of the City which are course and well-draining.

City of Fontana Master Storm Drain Plan

January 25 15
Table 2-3. Hydrologic Soil Groups Summary Table
AOS
Hydrologic Soil Group
Total Acres1 A B C D
Acres % Acres % Acres % Acres %
1 18,163 100 - - - - - - 18,163
2 7,501 82.3 - - 65 0.7 1,554 17 9,120
3 5,349 86.3 88 1.4 104 1.7 657 10.6 6,198
1Values include area within the sphere of influence outside of AOS boundaries.

Figure 2-7. Hydrologic Soil Groups

City of Fontana Master Storm Drain Plan

January 25 16

2.8 KNOWN FLOODING
Areas of known flooding were provided by the City and based on locations where the Public Works Department routinely places Flooded Zone signs during periods of heavy rainfall. These areas are concentrated in AOS 1 near the Downtown Development Area and along Sierra Avenue to the south, and in AOS 2 along Jurupa Avenue. The City provides notices within City limits and does not provide s ignage for unincorporated areas. Figure 2-8 shows locations of known flooding provided by the City.

Figure 2-8. Known Flooding Locations

City of Fontana Master Storm Drain Plan

January 25 17
3 CAPACITY EVALUATION

3.1 HYDROLOGIC ANALYSIS

3.1.1 TECHNICAL APPROACH
The rational method was used to compute peak runoff rates and develop unit hydrographs to analyze the capacity of existing and proposed storm pipes. Rational method analyses and unit hydrographs were prepared in accordance with the San Bernardino County Flood Control Hydrology Manual. The hydrologic analysis was completed for existing and proposed conditions using updated NOAA 14 rainfall data . The proposed conditions hydrology used land use data from the 2022 General Plan Land Use Map provided by the City. The existing conditions hydrology used the same land use plan but considered areas that have not yet been developed as Open Space.

The hydrologic analysis was divided into two parts. First, hydrology for subbasins draining to existing and proposed storm drain mains/trunklines throughout the City were calculated using the Advanced Engineering Software (AES), Version 2013, for both the 25 - and 100-year storms. The second part of the hydrologic analysis included the delineation of additional, smaller subbasins so the proposed storm drain system could be developed with the smallest collector line being at or near a 36-inch pipe diameter. The rational method was used to size the proposed collector lines primarily for the 25 -year storm , but also included some collector lines designed for the 100-year storm.

3.1.2 DESIGN STORMS
NOAA Atlas 14 data was used in the analysis. Depths associated with the 5-minute through 24-hour duration were input into AES to produce runoff unit hydrographs. Rainfall data was extracted from the centroid of each area of study. Table 3-1 through Table 3-3 below show the rainfall values used in the analysis.

Table 3-1. AOS 1 NOAA 14 Rainfall Depth for Design Storm Events Storm Event
Duration
5 min 30 min 1 hour 3 hours 6 hours 24 hours
Depth (inches)
25-Year 0.31 0.81 1.20 2.18 3.13 5.88
100-Year 0.41 1.06 1.58 2.78 3.94 7.32
Table 3-2. AOS 2 NOAA 14 Rainfall Depth for Design Storm Events Storm Event
Duration
5 min 30 min 1 hour 3 hours 6 hours 24 hours
Depth (inches)
25-Year 0.27 0.69 1.02 1.78 2.49 4.57
100-Year 0.35 0.91 1.33 2.26 3.11 5.69
Table 3-3. AOS 3 NOAA 14 Rainfall Depth for Design Storm Events Storm Event
Duration
5 min 30 min 1 hour 3 hours 6 hours 24 hours
Depth (inches)
25-Year 0.35 0.92 1.42 2.68 3.98 7.64
100-Year 0.44 1.17 1.80 3.37 4.97 9.53
City of Fontana Master Storm Drain Plan

January 25 18

3.1.3 SUBBASIN DELINEATION
Subbasin delineations for this study used delineations and parcel shapes from the 1992 MSPD study but were updated where necessary to represent current terrain and flow patterns based on updated topographic information. The 1992 MSPD did not include areas that drain towards the East Fontana Channel in Rialto (San Bernardino County Flood Control project area 3-3), so additional delineation was completed in this area based on the Rialto Channel Drainage Area Storm Drain Plan and general drainage patterns of the area. Figure 3-1 shows delineated subbasins for the trunkline hydrologic analysis. Figure 3-2 shows delineated subbasins for each basin used in the collector hydrologic analysis. Figure 3-4 and Figure 3-5 exhibits the M-line portion of AOS 1 used for the collector hydrologic analysis.

City of Fontana Master Storm Drain Plan

January 25 19

Figure 3-1. Subbasins Used in the Trunkline Hydrologic Analysis

City of Fontana Master Storm Drain Plan

January 25 20

Figure 3-2. Subbasins Used in the Collector Hydrologic Analysis. Areas in Pink Shown in Detail in Figure 3-4.

City of Fontana Master Storm Drain Plan

January 25 21

Figure 3-3. Detailed of Collector Basin Delineation for ‘M’ Line Portion of AOS 1 for Pipe Sizes 36” through 42”.

Figure 3-4. Detailed of Collector Basin Delineation for ‘M’ Line Portion of AOS 1 for Pipe Sizes 42” through 72”

City of Fontana Master Storm Drain Plan

January 25 22

3.1.4 RUNOFF COEFFICIENTS
Runoff coefficients for each subbasin were computed based on land use and underlying soil conditions , using procedures from sections C.6 and D.5 from the San Bernadino Hydrology Manual. The climate characteristics of the City of Fontana were classified as "valley“.

First, the 24-hour storm runoff yield , 𝑌, was computed for each land use and soil combination (subarea) within each subbasin, based on the curve number and 24-hour rainfall depth:

𝐼𝑎 = 0.2 ∗ 𝑆
𝑆 = 1000
𝐶𝑁 − 10
𝑌𝑗 = (𝑃24 − 𝐼𝑎)2
(𝑃24 − 𝐼𝑎 + 𝑆) ∗ 𝑃24

Where 𝐼𝑎 is the initial rainfall abstraction (in.); 𝑆 is the estimated total soil capacity (in.), 𝐶𝑁 is the subarea curve number listed in Table 3-4 based on land use and soil condition, 𝑌𝑗 is the 24-hour storm runoff yield fraction for subarea 𝑗, and 𝑃24 is the 24-hour storm rainfall (in.).

Then, the area-weighted 24-hour storm runoff yield, 𝑌, was computed for each subbasin:

𝑌 = 𝑌1𝐴1 + ⋯ + 𝑌𝑚𝐴𝑚
𝐴1 + ⋯ + 𝐴𝑚

The low loss fraction (portion of runoff lost) was then calculated as:

𝑌̅ = 1 − 𝑌
Where 𝑌̅ is the area weighted low loss fraction for each subbasin.

After, the maximum loss rate (in/hr) was computed for each land use and soil combination within each subbasin:

𝐹𝑖 = 𝐴𝑝𝐹𝑝
Where 𝐴𝑝is the pervious area fraction of the subarea (unitless) based on land use (Table 3-4), and 𝐹𝑝 is the infiltration rate (in/hr) based on soil type and antecedent moisture condition (AMC) (Table 3-5).

Then, the area-weighted maximum loss rate, 𝐹 was computed for each subbasin:

𝐹 = 𝐹1𝐴1 + ⋯ + 𝐹𝑚𝐴𝑚
𝐴1 + ⋯ + 𝐴𝑚

For the trunkline analysis, both the low loss fraction and maximum loss rate were then used as inputs to develop unit hydrographs in AES. AMC II was assumed for computations of 𝐹 and Ῡ during the 25 -year event and AMC III was assumed for computation of 𝐹 and Ῡ during the 100-year event. Curve numbers were adjusted for AMC III conditions per Table C.1 within the San Bernardina Hydrology Manual. For the City of Fontana Master Storm Drain Plan

January 25 23
trunkline analysis, time of concentrations (TC) were calculated in AES based on landuse, flowpath and/or pipe length, and assumed velocities.

Table 3-4. Land Use Types, Curve Numbers, and Associated A (San Bernardino Hydrology Manual) Land Use Description Hydrologic Soil Group Ap

A B C D
Apartments 32 56 69 75 0.20
Barren 78 86 91 93 1.00
Chaparral, Broadleaf, Fair 40 63 75 81 1.00
Chaparral, Narrowleaf, Fair 55 72 81 86 1.00
Commercial 32 56 69 75 0.10
Commercial, Industrial 32 56 69 75 0.10
Condominiums 32 56 69 75 0.35
Fallow 77 86 91 94 1.00
Grass, Annual or Perennial, Fair 50 69 79 84 1.00
Meadows or Cienegas, Fair 51 70 80 84 1.00
Open Brush, Fair 46 66 77 83 1.00
Open Brush, Good 41 63 75 81 1.00
Orchards, Evergreen, Fair 44 65 77 82 1.00
Public Park 32 56 69 75 0.85
Residential 1 acre lots 32 56 69 75 0.80
Residential 2 dwellings/acre 32 56 69 75 0.70
Residential 2.5 acre lots 32 56 69 75 0.90
Residential 3-4 dwellings/acre 32 56 69 75 0.60
Residential 5-7 dwellings/acre 32 56 69 75 0.50
Residential 8-10 dwellings/acre 32 56 69 75 0.40
Residential 10+ dwellings/acre 32 56 69 75 0.20
Row Crops, Good 67 78 85 89 1.00
Row Crops, Poor 72 81 88 91 1.00
School 32 56 69 75 0.60
Turf, Good 33 58 72 79 1.00
Water 98 98 98 98 0.00
Woodland, Fair 36 60 73 79 1.00
Woodland, Grass, Fair 44 65 77 82 1.00
Woodland, Poor 45 66 77 83 1.00
Table 3-5. Assumed Infiltration Rates (Fp) by Hydrologic Soil Group for the Rational Method Analysis Hydrologic Soil Group AMC II Fp Value (in/hr) AMC III Fp Value (in/hr) A 0.40 0.18
B 0.30 0.12
C 0.25 0.10
D 0.20 0.07
City of Fontana Master Storm Drain Plan

January 25 24
For the collector analysis, a weighted runoff coefficient, 𝐶, was calculated for each subbasin as:

𝐶 = 0.90 ∗ ((1 − 𝐴𝑝) + (𝐼 − 𝐹𝑝) ∗ 𝐴𝑝
𝐼 )
Where 𝐴𝑝 and 𝐹𝑝 are as previously defined, and 𝐼 is the rainfall intensity for a storm duration equal to the subbasin time of concentration. Time of concentration for each basin for the collector analysis was estimated by assuming a velocity along the diagonal flow path across each basin. Average velocities were

0.75, 1.0, and 2.0 ft/s for basins in AOS 1, 2, and 3, respectively, based on the average slope of each AOS.

𝐼 was determined for each subbasin by fitting a power curve to the rainfall intensity-duration curve for events between 5 minutes and 6 hours; an example for AOS 1 is shown in Figure 3-5.

Figure 3-5. Intensity-Duration Curve for AOS 1 to Determine Runoff Coefficients for the Collector Hydrologic Analysis Peak flow rates were then determined for the collector analysis by the rational method equation:

𝑄 = 𝐶 ∗ 𝐼 ∗ 𝐴

3.1.5 UNIT HYDROGRAPH DEVELOPMENT
AES was used to develop runoff unit hydrographs for the trunkline analysis using the resulting times of concentration, loss rates, and low loss fractions described previously. An example of the unit hydrographs generated in AES are shown below in Figure 3-6. Tabular data for all subbasins used in the trunkline analysis are shown in Appendix 1.
y = 7.5633x-0.453
R² = 0.9989

0.0 0.5

1.0 1.5

2.0 2.5

3.0 3.5

4.0 1 10 100 1000
Intensity (in/hr)
Duration (mins, log scale)
25 year
Power (25 year)
City of Fontana Master Storm Drain Plan

January 25 25

Figure 3-6. Flow and Accumulated Volume for Subbasin D7 in AOS 1 for the 25- and 100-year storms

3.2 HYDRAULIC ANALYSIS

3.2.1 TECHNICAL APPROACH
A coupled 1- and 2-dimensional (1D/2D) hydraulic model was used to evaluate flooding across the City .

Autodesk InfoWorks ICM was used to perform this analysis. Dynamic modeling allows the effects of storage and backwater in conduits and floodplains and the timing of the hydrographs to yield a more realistic representation of hydraulic conditions. InfoWorks ICM can model the surface using 2D flow, while linking to the storm drain system with a 1D analysis. The result is a comprehensive model that can dynamically communicate between the surface and storm drain. Using these modeling techniques, hydraulic analyses were completed for both baseline (existing storm infrastructure network) and proposed conditions. Figure 3-7 provides a schematic of how a 1D/2D model is configured . The InfoWorks ICM input and results can be found in Appendix 2.

Figure 3-7. Graphic Representation of 1D/2D Surface/Subsurface Model (from Barnard et al., 2007) 0 10
20 30
40 50
60 70
80 0
50 100
150
200
250
300
350
400
0 5 10 15 20 25
Accumulated Volume (acre-feet)
Flow (cfs)
Time (hrs)
Prop. 25-yr Flow
Prop. 100-yr Flow
Prop. 25-yr Vol.

Prop. 100-yr Vol.

City of Fontana Master Storm Drain Plan

January 25 26

3.2.2 1D MODEL FOR STORM PIPE NETWORK
As-built data and shapefiles showing existing storm drainage pipes and manholes were provided by the City. After a thorough review of the data quality , this information was imported into the InfoWorks ICM model to create 1D elements representing existing pipes and manholes . For AOS 1, existing pipes larger than 18-inches were included in this analysis. AOS 2 and 3 were more recently developed and have fewer capacity issues than older areas of the City , so only the existing pipes 36 inches and larger were included for AOS 2 and 3. All existing pipes incorporated into the ICM model are shown in a large-scale exhibit in Appendix 2.

3.2.3 2D MODEL FOR SURFACE FLOWS
The 2D model domain in InfoWorks ICM relies on topographic data, a computational mesh, and connections to the 1D storm drain model domain. Topography was represented in the model by a 3-foot resolution Digital Elevation Model (DEM) provided by the City. The DEM and associated 50-foot elevation contours are shown in Figure 3-8. All elevations reference the North American Vertical Datum of 1988 (NAVD88).

City of Fontana Master Storm Drain Plan

January 25 27

Figure 3-8. City of Fontana Topography
The computational mesh resolution is an important consideration in 2D modeling. Small mesh cell sizes increase accuracy but require additional computation time, while larger mesh sizes compromise accuracy but decrease computation time. Multiple cell sizes can be specified within one model, allowing a larger mesh size to be used in areas where a high level of detail is not required for an accurate model result, such as areas with flat topography . A smaller mesh size should be used in primary areas of interest or where topography changes rapidly. The mesh size specified in this study was intended t o replicate the hydraulic behavior of the drainage watershed. It is recommended to have major 2D surface flow paths (such as streets, open channels) to be represented by at least three to four cells. This study used a dynamic 1000-

City of Fontana Master Storm Drain Plan

January 25 28
square foot maximum mesh element area size that decreased in size where topography rapidly changes , to a minimum element size of 100 -square feet. This mesh size best reflected conveyance within the City and captured enough detail for accurate hydraulic routing to 1D elements. An example of the mesh size resolution is shown in Figure 3-9.

Figure 3-9. Example of 2D Mesh Element Resolution in AOS 3

3.2.4 BOUNDARY CONDITIONS
Hydrographs from the hydrologic analysis were input at discrete 2D points, node locations (manholes), or the upstream end of culverts to capture the accumulation of runoff and resulting flow throughout the City.

Hydrographs were primarily input along trunklines (as shown on Figure 3 -1) and as surface flow inputs under existing conditions; proposed condition analyses only included flow inputs along the trunklines.

Modeling ended at the downstream end of trunklines where they either flowed outside the City’s sphere of influence or into County-maintained detention basins or channels. Downstream boundary conditions for these locations were set to outfall with or without considering flow onto the 2D mesh, depending on location. 2D outfall locations were modeled using normal depth as a downstream boundary condition.

3.2.5 MODEL VALIDATION
Model validation was completed by referencing the model results to known flooding locations (Figure 2-8), as this was the only evidence available from the City. Figure 3-10 shows the 100-year storm hydraulic modeling results for existing conditions overlaid with known flooding locations.

City of Fontana Master Storm Drain Plan

January 25 29
Flooding history provided in the City Local Hazard Mitigation Plan from 2017 was also used to anecdotally confirm model results. This process provided a level of confidence that the rainfall -runoff relationships in the model sufficiently reflect real world conditions.

Figure 3-10. 100-year Storm Existing Conditions Hydraulic Modeling Results for Model Validation

City of Fontana Master Storm Drain Plan

January 25 30
Pertinent Information from City of Fontana Flooding History:
• October 19 -20, 2004 – “The San Sevaine wash was completely overrun at the Railroad undercrossing just north of Slover Avenue. The resulting flooding waters washed out the train tracks.” During this event, 3 inches fell in 24-hour in nearby San Bernardino (USGS Station 340436117173001); nearly 14 inches fell at the Lytle Creek gauge in the San Gabriel Mountains north of Fontana (USGS Station 3 41509117312601). These depths are associated with approximately the 25-year event. The San Sevaine channel was not explicitly modeled for this study as it is a County maintained facility, but the areas draining Solver Avenue were. This area experiences flooding greater than 1.25 feet during the 100-year event (Figure 3-11).

Figure 3-11. ICM Model Results Near Slover Avenue During the 100-year Event • December 31, 2004 – “Etiwanda Avenue had to be closed due to flash flooding.” Although the anecdote does not state the area along Etiwanda Avenue that closed, areas along Etiwanda Avenue do experience flooding based on the modeling results, specifically near Jurupa Avenue (Figure 3-12).

City of Fontana Master Storm Drain Plan

January 25 31

Figure 3-12. ICM Model Results Near Etiwanda and Jurupa Avenue During the 100-year Event

3.3 MODEL RESULTS

3.3.1 HYDRAULIC MODEL RESULTS
The existing condition hydraulic results provide a baseline to assess drainage infrastructure deficiency and comparison to proposed drainage improvements. Modeling results indicate that f looding under existing conditions for the 25- and 100-year events is widespread and overwhelms existing infrastructure and streets in many areas, with the worst flooding occurring in AOS 1 and 3. Large portions of both AOS are devoid of drainage infrastructure to handle major storm events. Figure 3-13 to Figure 3-15 show the extent and depth of flooding for the 25 -year event under existing conditions for each AOS. The 100 -year event is shown in Appendix 2.

General flooding behavior in AOS 1 during the 25-year event is from northeast to the southwest. Much of the flooding from the northern portion of AOS 1 is intercepted by the East and West Fontana Channels.

However, runoff along Sierra Avenue and around the downtown development area continues south as it travels between the East and West Fontana Channels. Runoff in southern AOS 1 collects in the I-10 channel.

The majority of the flooding is less than 0.1 feet; however, many areas experience flooding depths greater than 0.5 feet, such as along Beech Avenue, Valley Boulevard, Oleander Avenue, Catawba Avenue, and Alder Avenue.

In AOS 2, flooding is focused in the west portion of the AOS , where runoff travels primarily south to the Declez Channel. Flooding depths more than 0.5 feet occur along Jurupa Avenue, Cherry Avenue, and Calabash Avenue, as well as other discrete areas near the Declez Channel. Most of the flooding along Jurupa Avenue appears to be linked to flooding along Redwood Avenue and Live Oak Avenue, which are void of storm drain infrastructure.

City of Fontana Master Storm Drain Plan

January 25 32
Floods in AOS 3 are primarily conveyed under I-15 from the north through a series of box culverts. These culverts convey runoff from the San Gabriel Mountains. Runoff travels south and west through the AOS, with flooding depths primarily less than 0.1 feet. Few areas experience flooding deeper than 0.5 feet because the existing drainage infrastructure controls surface flooding in the lower portions of the AOS and because runoff from the north travels over undeveloped areas as unconcentrated flow. However, s ome areas have concentrated runoff reach depths greater than 0.5 feet, such as along Citrus Avenue and Sierra Avenue.

City of Fontana Master Storm Drain Plan

January 25 33

Figure 3-13. Existing Conditions 25-year Flooding in AOS 1

City of Fontana Master Storm Drain Plan

January 25 34

Figure 3-14. Existing Conditions 25-year Flooding in AOS 2

City of Fontana Master Storm Drain Plan

January 25 35

Figure 3-15. Existing Conditions 25-year Flooding in AOS 3

City of Fontana Master Storm Drain Plan

January 25 36
To evaluate flooding results within each AOS, the following indicators were considered to determine the significance of flooding within each area.

3.3.2 CRITICAL FACILITIES
According to the Federal Management Agency (FEMA), the term “critical facilities” is used to describe all manmade structures or other improvements that, because of their function, size, service area, or uniqueness, have the potential to cause serious bodily harm, extensive property damage, or disruption of vital socioeconomic activities if they are destroyed, damaged, or if their functionality is impaired. Critical facilities commonly include all public and private facilities that a community considers essential for the delivery of vital services and for the protection of the community. They usually include:
• emergency response facilities (fire stations, police stations, rescue squads, and emergency operation centers [EOCs])
• custodial facilities (jails and other detention centers, long-term care facilities, hospitals, and other health care facilities)
• schools
• emergency shelters
• utilities (water supply, wastewater treatment facilities, and power) • communications and transportation facilities
• any other assets determined by the community to be of critical importance for the protection of the health and safety of the population
Critical facilities were included in the assessment and protection during a storm event and are shown in Figure 3-16. Table 3-6 and Table 3-7 provides lists of critical facilities that were flooded during the 25- and 100-year event based on the results of the capacity analysis. Data on critical facilities were provided by the San Bernardino County Plan in Geographic Information System (GIS) shapefile format. Tables displaying data for all impacted critical facilities is shown in Appendix 2.

Table 3-6. Critical Facilities Impacted by Flooding Greater than 0.5 Feet During the 25-year Event AOS Facility Name Maximum Ponding Depth (feet)
1 ROBERTO M TRUCKING 1.2
2 FUSD/CANYON CREST ELEMENTARY 1.0
2 SIERRA ALUMINUM CO 0.9
2 SIERRA ALUMINUM FONTANA FINISHING
OPERATION 0.9
2 CLIFFSTAR CORPORATION/FONTANA 0.9
1 ALAMEDA PAINTING CO., INC. 0.8
2 CANYON CREST ELEMENTARY SCHOOL 0.6
1 RUBEN BAROCIO 0.6
2 AMERICAN SECURITY PRODUCTS CO 0.6
1 HERNANDEZ BOARD AND CARE 0.6
2 CURTIS 1000 0.5
3 SOUTHERN CALIFORNIA EDISON 0.5

City of Fontana Master Storm Drain Plan

January 25 37
Table 3-7. Critical Facilities Impacted by Flooding Greater than 0.5 Feet During the 100-year Event AOS Facility Name Maximum Ponding Depth (feet)
2 OAK PARK ELEMENTARY SCHOOL 1.6
2 FUSD/OAK PARK 1.2
2 FUSD/CANYON CREST ELEMENTARY 1.2
2 SIERRA ALUMINUM CO 1.2
2 SIERRA ALUMINUM FONTANA FINISHING
OPERATION 1.2
2 CLIFFSTAR CORPORATION/FONTANA 1.1
1 ROBERTO M TRUCKING 0.8
2 CANYON CREST ELEMENTARY SCHOOL 0.8
1 RUBEN BAROCIO 0.8
2 CURTIS 1000 0.7
2 AMERICAN SECURITY PRODUCTS CO 0.7
1 HERNANDEZ BOARD AND CARE 0.6
3 SOUTHERN CALIFORNIA EDISON 0.6
1 BIRCH CONTINUATION HIGH SCHOOL 0.6
1 ALL START ACADEMY 0.6
1 C & M STEEL 0.6
1 ALAMEDA PAINTING CO., INC. 0.5
2 CHAPARRAL ELEMENTARY SCHOOL 0.5
1 CIRCLE K STORE #349 0.5
1 PALMETTO FAMILY HOME 0.5
1 MARYGOLD MWC 0.5

City of Fontana Master Storm Drain Plan

January 25 38

Figure 3-16. Select Critical Facilities within the Sphere of Influence

3.3.3 MAXIMUM DEPTH
The hydraulic modeling allows results to be displayed in terms of maximum ponding depth. This is the highest depth at each cell (location) that occurs during a particular storm event. This parameter helps to clearly identify ponded areas where flood depth exceeds existing street curbs or right-of-way. According to the various Emergency Management Handbooks “Deep floodwaters can be dangerous because they can

City of Fontana Master Storm Drain Plan

January 25 39
destabilize people and cars, and carry them away, resulting in injuries and fatalities. For instance, 3 -feet deep water with no velocity is sufficient to prevent able-bodied adults from wading.” Where maximum ponding depths exceeded 0.5 feet, flood waters travel led over curbs and onto adjacent properties. Figure 3-13, Figure 3-14, and Figure 3-15 show flooding depths for each AOS during the 25 - year event. Figures for the 100-year event are in Appendix 2. 25-Year Event
Maximum ponding depths varied between 0 and 11 f eet during the 25 -year event in AOS 1 , with the deepest flooding occurring along Foothills Boulevard where the road dips below the Empire Trail . Average ponding depth in AOS 1 is 0.27 feet; 84% of ponding depths by area are less than 0.5 feet.

In AOS 2, maximum ponding up to 7 feet occurs along the San Sevaine Channel and near Cherry Ave nue along the Declez Channel. The average ponding depth in AOS 2 is 0.28 feet; 82% of ponding depths by area are less than 0.5 feet.

In AOS 3, maximum ponding of up to 12 feet occurs within the Sierra Lakes Golf Course. The average ponding depth in AOS 2 is 0.19 feet; 93% of ponding depths by area are less than 0.5 feet. 100-Year Event
The maximum ponding depth in AOS 1 varied between 0 and 13 feet during the 100-year event. Average ponding depth in AOS 1 is 0.29 feet; 84% of ponding depths by area are less than 0.5 feet.

In AOS 2, the maximum ponding depth varied between 0 and 8 feet. The average ponding depth in AOS 2 is 0.31 feet; 83% of ponding depths by area are less than 0.5 feet.

Maximum ponding depths varied between 0 and 15 feet in AOS 3. The average ponding depth in AOS 3 is

0.25 feet and 96% of ponding depths by area are less than 0.5 feet.

3.3.4 DURATION OF INUNDATION AND TIME TO INUNDATION
The time to inundation and duration of inundation are important parameters, especially for emergency planning purposes. The time to inundation represents the time it takes to achieve the flooded condition (i.e. depth threshold) at a particular location, while the duration of inundation is the time the flooding (ponding) remains at a particular location. These results allow users to visualize how long it takes to reach certain depths of flooding at critical locations within the City. Effective warning time is the time available for people to undertake appropriate actions, such as elevating or removing belongings and evacuating people and pets. Figure 3-17 to Figure 3-19 display the time to inundation across the City during the 25 - year flood. Results for the 100 -year event and additional figures showing the duration of inundation are shown in Appendix 2.

City of Fontana Master Storm Drain Plan

January 25 40

Figure 3-17. 25-year Time to Inundation for AOS 1

City of Fontana Master Storm Drain Plan

January 25 41

Figure 3-18. 25-year Time to Inundation for AOS 2

City of Fontana Master Storm Drain Plan

January 25 42

Figure 3-19. 25-year Time to Inundation for AOS 3

City of Fontana Master Storm Drain Plan

January 25 43
4 CAPITAL PROJECTS

4.1 MASTER STORM DRAIN CAPITAL PROJECTS
The development of the storm drain capital projects is intended to provide the City of Fontana with a comprehensive action plan to identify and address storm drain infrastructure issues and propose improvements to effectively manage storm runoff within Cit y limits. Chapter 4 summarizes the process used to identify projects, prioritize these projects, and provide a corresponding cost summary.

The methodology used for identifying proposed projects included researching past studies, known maintenance issues, and performing a hydrologic and hydraulic model analysis of the City’s infrastructure.

The model results were reviewed for areas not meeting the design criteria discussed in section 1.3 and to alleviate flooding. Conveyance solutions were then developed into individual capital projects. Capital projects were spatially divided between major roadways to minimize project impacts during constructi on, see section 4.2 and 4.3 for additional details. Each project was given a unique indication name based on its location in relat ion to a prominent trunk line. Generally, this MSDP update attempted to follow the naming convention of the 1992 MSDP where feasible.

Development of the capital projects identified a total of 198 projects to address infrastructure needs. Each project was assessed using a set of weighted criteria to prioritize, with the top 30 percent of projects listed in Section 4.4. Project cost estimating is discussed in Section 4.3.

4.2 CAPITAL IMPROVEMENT PROJECTS

4.2.1 AOS 1
Capital Projects in AOS 1 primarily follow the line names and locations that were laid out in the 1992 MSDP but not yet built, with additional Capital Projects added to minimize flooding and adapt to changing road alignments and development since 1992. In total 135 Capital Projects are proposed in AOS 1. An overview of Capital Projects in AOS 1 is shown as Figure 4-1.

Additional ‘SS’ lines were added throughout the Auto Club Speedway following information from the Auto Club Specific Plan. Similarly, Capital Projects were added in the Westgate area in the northwest corner of AOS 1 following the latest plans available.

The proposed line s T-6 and T -6B along Lime Avenue and across Foothill Boulevard assumes the dip in Foothill Boulevard will be filled, and the Inland Empire Trail will be elevated above Foothill Boulevard. This is currently being addressed by the Margalo Bridge Project which, as of this moment, is a top priority project for the City.

4.2.2 AOS 2
Capital Projects in AOS 2 were also named following the line names and locations that were laid out in the 1992 MSDP. Compared to AOS 1, many of the lines proposed in the 1992 M SDP have already been built, but many smaller lines are still required to minimize flood risk. Lines DZ-4 through DZ -16 are proposed Capital Projects in AOS 2 between I-10 and Jurupa Avenue . An overview of Capital Projects in AOS 2 is shown as Figure 4-2.

City of Fontana Master Storm Drain Plan

January 25 44
Some lines required upsizing to convey the 100 -year event, such as lines SR -3 and SR -1 in Southridge Village. Additional lines were also added in the southeast corner of AOS 2 to represent development associated with West Valley Logistics Center. In total 30 Capital Projects are proposed in AOS 2.

4.2.3 AOS 3
Capital Projects in AOS 3 were also named following the line names and locations that were laid out in the 1992 MP. Many proposed developments and specific plans provide d additional Capital Projects that were incorporated into this master plan . These include lines associated with Ventana and the Arboretum at Fontana (A and B lines). In these cases, pipe sizes determined from other analyses were used to define the Capital Projects. In total 33 Capital Projects are proposed in AOS 3. An overview of Capital Projects in AOS 3 is shown as Figure 4-3.

4.2.4 PROPOSED PROJECTS ON REGIONAL FACILITIES
Hydraulic modeling revealed a need to upsize approximately 330 feet of the East Fontana Storm Drain between Kaiser Avenue and Palmetto Avenue, listed as Capital Project F-0. The existing channel is 5’ x 4’ and the proposed channel is 13’ x 4’ to match the pipe immediately upstream. This project was not estimated for cost or included in the project prioritization analysis but included in the Master Plan Exhibit in Appendix 3 for San Bernadino County consideration.

City of Fontana Master Storm Drain Plan

January 25 45

Figure 4-1. Capital Projects for AOS 1

City of Fontana Master Storm Drain Plan

January 25 46

Figure 4-2. Capital Projects for AOS 2

City of Fontana Master Storm Drain Plan

January 25 47

Figure 4-3. Capital Projects for AOS 3

City of Fontana Master Storm Drain Plan

January 25 48

4.3 CAPITAL PROJECT COST ESTIMATING
Cost estimates were prepared for each of the 198 proposed Capital Projects. The City of Fontana provided a current bid results list (project: DE-24-71-SB, 2024) that was used in conjunction with engineering judgement to determine unit prices for each line item included in the cost estimates. All unit prices are compiled in the Master List of Items (Table 4-2). The unit prices associated with the Master List of Items should only be recognized as average values without strict adherence to specifications and design standards required by the City of Fontana.

Reinforced concrete pipe (RCP) and reinforced concrete box (RCB) unit prices (feet) were determined by taking the average unit prices from the bid results list, excluding the minimum and maximum value, and interpolating for the pipe sizes not included in the provided bid results list using an exponential best fit line (R2=0.99) relating pipe diameter to unit cost. No RCBs were included in the bid results list provided by the City, therefore, the diagonal cross-sectional length of each RCB size was used to determine unit costs, using the same exponential best fit line as for RCPs. Unit prices (feet) for RCP and RCB removal, where upsizing existing pipes was required, were estimated as 10% of the installation unit price of each corresponding pipe and interpolated for the pipe sizes not included in the provided bid results list.

Manhole unit prices were determined by taking the average unit price, excluding the minimum and maximum value. The manhole unit price includes the average bid price for two types of manholes (City of Fontana Standard Detail 3011 and 3012). The number of manholes for each Capital Project were calculated by taking the sum of pipe length (feet) in each project divided by an assumed maximum spacing of 400 feet (City of San Bernardino Storm Drain Design Policy Section 18.44).

Unit prices for saw cutting and removing existing asphalt pavement, replacing asphalt concrete pavement, and crushed miscellaneous base were listed in tons in the bid results list, which were converted to square feet by assuming an asphalt density of 0.0725 ton/feet3 and a depth of 2 inches. The crushed miscellaneous base was assumed to be 12 inches, per City of Fontana Standard Detail 1008. The unit prices (feet2) for these items were calculated by taking the average unit price, excluding the minimum and maximum value. Quantities were calculated assuming two feet of additional width was added to the outside diameter of each installed RCP and RCB per City of Fontana Standard Detail 1008.

Additional costs for each Capital Project were included for Traffic Control (5%), Erosion Control (1%), Mobilization and Demobilization (10%), Engineering and Design (10%), Surveying and Staking/Geotechnical (5%), and Construction Management/Staff (10%), based on engineering judgement.

A 20% contingency was assumed for each project for any unforeseen costs. This percentage was increased to 25% for projects that conflicted with major highways, the SCG transmission line, and the 12- foot diameter water main, this increase is noted as contingency + in cost estimates. The cost estimate analysis does not include costs for utility relocation and other miscellaneous items that would be required on a case-by-case basis.

Per the City of Fontana’s direction, the extent of each project was partially dependent on the anticipated cost. A cost estimate for each Capital Project is provided in Appendix 4 and a summary is provided below in Table 4-1.

City of Fontana Master Storm Drain Plan

January 25 49
Table 4-1. Cost Summary
Study Area Total Cost (2024 Dollars) Average Cost (2024 Dollars) AOS 1 $898,928,000 $4,439,000
AOS 2 $131,702,000 $3,477,000
AOS 3 $137,433,000 $2,671,000
Total $1,168,063,000 NA

Table 4-2. Unit Costs Applied to the Capital Project Cost Estimates Item Unit of
Measure Unit Price
Install 36" RCP FT $527
Install 42" RCP FT $588
Install 48" RCP FT $656
Install 54" RCP FT $732
Install 60" RCP FT $816
Install 66" RCP FT $911
Install 72" RCP FT $1,016
Install 78" RCP FT $1,133
Install 84" RCP FT $1,264
Install 90" RCP FT $1,409
Install 96" RCP FT $1,572
Install 102" RCP FT $ 1,753
Install 120" RCP FT $2,433
Install Double 66" RCP FT $1,822
Install 6' x 4' RCB FT $1,323
Install 6' x 7' RCB FT $2,052
Install 8' x 5' RCB FT $2,150
Install 10' x 8' RCB FT $4,491
Install 10' x 10' RCB FT $6,012
Install 12' x 8' RCB FT $6,391
Install 12' x 9' RCB FT $7,251
Install 14' x 6' RCB FT $7,627
Install 14' x 7' RCB FT $8,361
Install Double 14' x 7' RCB FT $16,722
Remove 24" RCP FT $35
Remove 30" RCP FT $44
Remove 36" RCP FT $53
Remove 39" RCP FT $58
Remove 42" RCP FT $62
Remove 48" RCP FT $71
City of Fontana Master Storm Drain Plan

January 25 50
Item Unit of
Measure Unit Price
Remove 54" RCP FT $80
Remove 60" RCP FT $89
Remove 64" RCP FT $96
Remove 66" RCP FT $99
Remove 69" RCP FT $103
Remove 72" RCP FT $108
Remove 78" RCP FT $117
Remove 84" RCP FT $126
Remove 12' x 8' RCB FT $639
Remove 12' x 9' RCB FT $725
Remove 12' x 10' RCB FT $811
Remove 14' x 8' RCB FT $910
Manhole EA $20,322
Catch Basin EA $21,003
Sawcut and Remove Existing AC
Pavement SF $2.66
Replace Asphalt Concrete
Pavement SF $2
Crushed Miscellaneous Base SF $4
Traffic Control % 5%
Erosion Control % 1%
Mobilization/Demobilization % 10%
Engineering and Design % 10%

Surveying & Staking/Geotechnical % 5%
Construction Management/Staff % 10%
Contingency % 20%
Contingency + % 25%
+ Notes projects that conflicted with major highways, the SCG transmission line, and the 12-foot diameter water main.

4.4 CAPITAL PROJECT PRIORITIZATION
A set of evaluation criteria was developed to assist in selecting the most critical projects for the City to pursue. The importance of each project was considered using four evaluation criteria: 1. Downstream to Upstream Prioritization 2. Known Flooded Areas 3. Depth of Flooding and 4. Road Hierarchy Drainage.

All criteria were determined for each project using output from the Infoworks ICM model and information on known flooding locations and road hierarchy provided by the City . Prioritization calculations were completed in ArcGIS Pro, Version 3.10. Each criterion is defined below.

City of Fontana Master Storm Drain Plan

January 25 51

4.4.1 PRIORITIZATION CRITERIA
Downstream to Upstream Prioritization
The downstream to upstream prioritization criterion provides a preference to projects that are located on the downstream end of a drainage system. Projects located downstream have the potential of benefiting a greater watershed area as these systems would possibly reduce the tailwater control in the tributary systems. To accurately score systems that act as tributaries to the main stem of a system, the assigned score of the most downstream section of the tributary will be compared to the assigned score of t he main stem where the junction occurs. Independent storm drains not tied to a main stem (less than two laterals) will receive a score of no more than 3. Overall, the scores were assigned using engineering judgement.

Table 4-3 shows the criterion scoring. A score of 5 indicates greater priority.

Table 4-3. Downstream to Upstream Prioritization Criteria D/S to Upstream Percent Score
Approximately 65 - 100% 1
Approximately 35 - 65% 3
Approximately < 35% 5
Known Flooded Areas
The known flooded areas criterion accounts for the projects potential to improve flooding in areas that have been documented by the city and residents. Projects adjacent to or that improve drainage in known flooded areas were ranked “5,” and projects away from known flooded areas were ranked “1.” Adjacency of a Capital Project to known flooded areas was limited to a radius of 1,000 feet.

Table 4-4. Known Flooded Areas Prioritization Criteria
Description Score
Project does not contain known flooded areas 1
Project contains known flooded areas 5
Depth of Flooding
The depth of flooding criterion accounts for the projects with the most severe flooding depth based on the 100-year existing condition s model results. Projects with less than 0.5 feet of flooding were ranked “1,” and projects with greater than 1.25 foot of flooding were ranked “5.” For projects located on multiple streets, the most severe flooding depth was used for the ranking.

Table 4-5. Depth of Flooding Prioritization Scoring
Description Score
Flooding Depths less than 0.5 feet 1
Flooding Depths between 0.5 and 0.75 feet 2
Flooding Depths between 0.75 and 1.0 feet 3
Flooding Depths between 1.0 and 1.25 feet 4
Flooding Depths more than 1.25 feet 5

City of Fontana Master Storm Drain Plan

January 25 52
Road Hierarchy Drainage Consideration
The road hierarchy drainage criterion accounts for the type of road that a project drains. Priority is given to projects that provide drainage to primary highways and major highways versus collector streets. If a project drains more than one type of road, it will be assigned the score associated with the highest scoring road type in the table below. Corridors within the downtown development area were classified as primary highways for this criterion to increase the rank of projects that drain the downtown development area. An exhibit showing the road hierarchy for the City is provided in Appendix 5.

Table 4-6. Road Hierarchy Drainage Consideration Scoring Road Type Score
Collector Street 1
Major Highway 3
Primary Highway 5

4.4.2 WEIGHTING FACTORS
The four prioritization criteria were given weights corresponding to the relative importance of each criterion and were developed in collaboration with the City. The weights for the four criteria, which add up to 100, are summarized in Table 4-7 below. The weighting system was developed to allow for specific criteria to hold more significance in the final project prioritization score. Once each project was scored on all four criteria, the final project ranking w as determined by calculating a weighted score . The assigned weight s were multiplied by the corresponding score and each criterion was added to achieve the final score, which ranged between 1 and 5. Projects with higher scores were given greater priority.

Table 4-7. Evaluation Criteria Weighting
Criteria Weight
Downstream to Upstream Prioritization 30
Known Flooded Areas 30
Depth of Flooding 20
Road Hierarchy Drainage 20
Total 100

4.4.3 PRIORITIZATION RESULTS
Projects received prioritization s cores between 1 .0 and 4.4, with 59 projects receiving a score of 2.6 or above, which corresponds to the 30th percentile score. Table 4-8 and Figure 4-4 below show the results of the prioritization analysis and lists the top 30% highest scoring Capital Project s to improve drainage throughout the City. All prioritization data and results are shown in Appendix 5. Refer to the overall Master Plan exhibit in Appendix 3 for project locations.

Forty-three projects in AOS 1 received a score of 2.6 or greater. These projects are distributed throughout the AOS, but specifically in areas with a history of flooding and along major roadways, such as along Sierra, Fontana, and Beech Avenue. Eight projects in AOS 2 received a score of 2.6 or greater, with most of these projects near the intersection of Beech and Jurupa Avenue, where flooding is known to occur and due to the low position in the drainage network. AOS 3 had eight projects that received a score of 2.6, the maximum of any project in AOS 3. All of these projects are located adjacent to the Highland Channel.

City of Fontana Master Storm Drain Plan

January 25 53
Table 4-8. Prioritization Results for Projects in the Top 30% Project
Name AOS # DS/US
Priority
Known
Flooded
Areas Priority
Depth of
Flooding
Priority
Road
Hierarchy
Priority
Weighted
Score
F-4 1 3 5 5 5 4.4
M-5E 1 5 5 1 5 4.2
M-5B 1 3 5 2 5 3.8
DZ-11 2 3 5 1 5 3.6
G-2 1 3 5 1 5 3.6
G-2A 1 3 5 1 5 3.6
J-1A 1 3 5 1 5 3.6
M-5B-E 1 3 5 1 5 3.6
T-1A 1 3 5 1 5 3.6
M-3A 1 5 5 1 1 3.4
SS-10 2 5 1 3 5 3.4
T-6B 1 1 5 5 3 3.4
DZ-12 2 3 5 3 1 3.2
DZ-13 2 3 5 1 3 3.2
F-1 1 3 1 5 5 3.2
M-5H 1 5 1 2 5 3.2
T-2A 1 1 5 2 5 3.2
T-6 1 3 5 1 3 3.2
C-5 3 5 1 1 5 3
C-6 3 5 1 1 5 3
C-7 3 5 1 1 5 3
C-9 3 5 1 1 5 3
F-5A 1 1 5 1 5 3
G-4 1 3 1 4 5 3
HR-1 3 5 1 1 5 3
J-3 1 5 1 1 5 3
J-4B 1 3 1 4 5 3
M-2 1 5 1 1 5 3
M-5-A 1 5 1 5 1 3
M-5E-C 1 5 1 1 5 3
M-5F 1 5 1 1 5 3
M-6C 1 5 1 1 5 3
SR-2 2 5 1 1 5 3
SR-3 2 5 1 5 1 3
SR-4 2 5 1 1 5 3
SS-0 1 5 1 1 5 3
SS-11 2 5 1 1 5 3
City of Fontana Master Storm Drain Plan

January 25 54
Project
Name AOS # DS/US
Priority
Known
Flooded
Areas Priority
Depth of
Flooding
Priority
Road
Hierarchy
Priority
Weighted
Score
T-0 1 1 5 1 5 3
T-11 1 5 1 1 5 3
T-1B 1 1 5 1 5 3
M-5-D 1 3 5 1 1 2.8
M-5E-D 1 3 5 1 1 2.8
M-7B 1 5 1 2 3 2.8
T-2 1 3 5 1 1 2.8
G-6 1 3 1 3 5 2.8
M-6D 1 5 1 3 1 2.6
M-7E 1 5 1 3 1 2.6
C-8 3 5 1 1 3 2.6
C-8A 3 5 1 1 3 2.6
C-8B 3 5 1 1 3 2.6
M-0 1 5 1 1 3 2.6
M-1 1 5 1 1 3 2.6
M-5G-A 1 5 1 1 3 2.6
M-5G-B 1 5 1 1 3 2.6
M-7A 1 5 1 1 3 2.6
M-7C 1 5 1 1 3 2.6
SS-2B 1 5 1 1 3 2.6
SS-2D 1 5 1 1 3 2.6
T-2C 1 1 5 1 3 2.6

City of Fontana Master Storm Drain Plan

January 25 55

Figure 4-4. Prioritization Results

City of Fontana Master Storm Drain Plan

January 25 56
5 CONCLUSION AND RECOMMENDATIONS
A key outcome of this study is recommended stormwater infrastructure improvements as part of the 198 capital projects. These projects, once complete, will develop the backbone of the drainage system for the City and will address identified drainage issues. The capital projects should be done in conjunction with the San Bernardino County flood control facilities and other jurisdictional partner s where improvements contribute to these systems. Additional improvement may be necessary for localized drainage issue beyond the scope of this study.

It is recommended the City of Fontana implement the following actions:
• Use this information to appropriately set drainage fees to finance the construction of the identified capital projects.
• Reserve and dedicate right-of-way where needed for future project construction. • When development projects file tentative maps or preliminary plans, the City should require as much of the Master Plan facilities to be constructed as possible.

City of Fontana Master Storm Drain Plan

January 25 57
6 REFERENCES
AEI CASC Engineering, 1997. Coyote Canyon Specific Plan AEI CASC Engineering, 2006. City of Fontana Infrastructure Drainage Report Crosby Mead Benton & Assoc., 1988. Hunter’s Ridge Specific Plan David Evans and Assoc., Inc., 2021. I-15 Logistics Center Hydrology Report De Novo Planning Group, 2023. Downtown Core Project Environmental Impact Report Frontier Enterprises, 2022. Ventana at Duncan Canyon Specific Plan Hall & Foreman, Inc., 1988. Village of Heritage Hydrology Report Hall & Foreman, Inc., 1992. City of Fontana Master Storm Plan of Drainage Hall & Foreman, Inc., 2002. Summit Heights Drainage Report JHA Consulting, 2017. Westgate Specific Plan
JMM Consulting, Inc., 1988. Rialto Channel Drainage Area Storm Drain Plan Kimley Horn, 2022. Speedway Commerce Center Specific Plan Metis Environmental Group, 2018. West Valley Logistics Center Specific Plan PBR, Inc., 1981. Southridge Specific Plan
Place Works, 2009. The Arboretum Specific Plan
Q3, 2020. Final Drainage Study (Arboretum)
T&B Planning Consultants, Inc., 2003. Citrus Heights South Specific Plan T&B Planning Consultants, Inc., 2004. Citrus Heights North Specific Plan Williamson and Schmid, Civil Engineers, 1986. San Bernardino County Hydrology Manual County of San Bernardino, Department of Public Works, 2010. County of San Bernardino Hydrology Manual Addendum for Arid Regions

January 25
APPENDIX 1 HYDROLOGIC INPUTS AND RESULTS
Soils and Land Use Data

7 Custom Soil Resource Report
Soil Map
3765000 3767000 3769000 3771000 3773000 3775000 3777000 3779000 3781000 3783000 3765000 3767000 3769000 3771000 3773000 3775000 3777000 3779000 3781000 3783000 450000 452000 454000 456000 458000 460000 462000 464000 450000 452000 454000 456000 458000 460000 462000 464000 34° 12' 3'' N
117° 32' 45'' W
34° 12' 3'' N
117° 22' 46'' W
34° 1' 5'' N
117° 32' 45'' W
34° 1' 5'' N
117° 22' 46'' W
N
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 11N WGS84 0 4500 9000 18000 27000
Feet
0 1000 2000 4000 6000
Meters
Map Scale: 1:99,000 if printed on A portrait (8.5" x 11") sheet.

MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Map Unit Polygons
Soil Map Unit Lines
Soil Map Unit Points
Special Point Features
Blowout
Borrow Pit
Clay Spot
Closed Depression
Gravel Pit
Gravelly Spot
Landfill
Lava Flow
Marsh or swamp
Mine or Quarry
Miscellaneous Water
Perennial Water
Rock Outcrop
Saline Spot
Sandy Spot
Severely Eroded Spot
Sinkhole
Slide or Slip
Sodic Spot
Spoil Area
Stony Spot
Very Stony Spot
Wet Spot
Other
Special Line Features
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
The soil surveys that comprise your AOI were mapped at scales ranging from 1:15,800 to 1:24,000.

Please rely on the bar scale on each map sheet for map
measurements.

Source of Map: Natural Resources Conservation Service
Web Soil Survey URL:

Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required.

This product is generated from the USDA-NRCS certified data as of the version date(s) listed below.

Soil Survey Area: San Bernardino County Southwestern Part, California
Survey Area Data: Version 15, Aug 30, 2023
Soil Survey Area: San Bernardino National Forest Area,
California
Survey Area Data: Version 15, Aug 30, 2023
Soil Survey Area: Western Riverside Area, California
Survey Area Data: Version 16, Aug 30, 2023
Your area of interest (AOI) includes more than one soil survey area. These survey areas may have been mapped at different scales, with a different land use in mind, at different times, or at different levels of detail. This may result in map unit symbols, soil properties, and interpretations that do not completely agree across soil survey area boundaries.

Soil map units are labeled (as space allows) for map scales 1:50,000 or larger.

Custom Soil Resource Report
8 MAP LEGEND MAP INFORMATION
Date(s) aerial images were photographed: Mar 17, 2022—Jun 12, 2022
The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident.

Custom Soil Resource Report
9 Map Unit Legend
Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI Cb Chino silt loam 18.7 0.1%
CnD Cieneba sandy loam, 9 to 15
percent slopes
176.5 0.5%
Cr Cieneba-Rock outcrop complex,
30 to 50 percent slopes,
MLRA 20
2,022.4 6.0%
Db Delhi fine sand 2,088.2 6.2%
GP Quarries and Pits soils 44.8 0.1%
Gr Grangeville fine sandy loam,
warm MAAT, MLRA 19

71.0 0.2%
GtC Greenfield sandy loam, 2 to 9
percent slopes

44.0 0.1%
GtD Greenfield fine sandy loam, 9 to
15 percent slopes

2.5 0.0%
HaC Hanford coarse sandy loam, 2
to 9 percent slopes
836.3 2.5%
HaD Hanford coarse sandy loam, 9
to 15 percent slopes
111.6 0.3%
HbA Hanford sandy loam, 0 to 2
percent slopes

26.8 0.1%
Hr Hilmar loamy fine sand 34.1 0.1%
M-W Miscellaneous water 20.2 0.1%
MoC Monserate sandy loam, 2 to 9
percent slopes

11.0 0.0%
Ps Psamments, Fluvents and
Frequently flooded soils

71.5 0.2%
RmC Ramona sandy loam, 2 to 9
percent slopes, MLRA 19

11.0 0.0%
RmD Ramona sandy loam, 9 to 15
percent slopes

3.4 0.0%
RmE2 Ramona sandy loam, 15 to 30
percent slopes, eroded

92.0 0.3%
ShF Saugus sandy loam, 30 to 50
percent slopes

87.0 0.3%
SoC Soboba gravelly loamy sand, 0
to 9 percent slopes
1,661.4 5.0%
SpC Soboba stony loamy sand, 2 to
9 percent slopes
1,372.2 4.1%
TuB Tujunga loamy sand, 0 to 5
percent slopes
7,961.9 23.8%
TvC Tujunga gravelly loamy sand, 0
to 9 percent slopes
16,690.5 49.8%
W Water 1.4 0.0%
Custom Soil Resource Report
10 Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI Subtotals for Soil Survey Area 33,460.5 99.9%
Totals for Area of Interest 33,485.4 100.0%
Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI AbD Soboba-Hanford families
association, 2 to 15 percent
slopes

5.5 0.0%
DnG Trigo family-Lithic Xerorthents,
warm complex, 50 to 75
percent slopes

5.0 0.0%
Subtotals for Soil Survey Area 10.5 0.0%
Totals for Area of Interest 33,485.4 100.0%
Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI Cr Cieneba-Rock outcrop complex,
30 to 50 percent slopes,
MLRA 20

8.4 0.0%
Db Delhi fine sand 4.2 0.0%
HcD2 Hanford coarse sandy loam, 8
to 15 percent slopes, eroded

0.5 0.0%
Hr Hilmar loamy fine sand 0.4 0.0%
MmC2 Monserate sandy loam, 5 to 8
percent slopes, eroded

0.7 0.0%
TwC Tujunga gravelly loamy sand, 0
to 8 percent slopes

0.3 0.0%
Subtotals for Soil Survey Area 14.4 0.0%
Totals for Area of Interest 33,485.4 100.0%
Map Unit Descriptions
The map units delineated on the detailed soil maps in a soil survey represent the soils or miscellaneous areas in the survey area. The map unit descriptions, along with the maps, can be used to determine the composition and properties of a unit.

A map unit delineation on a soil map represents an area dominated by one or more major kinds of soil or miscellaneous areas. A map unit is identified and named according to the taxonomic classification of the dominant soils. Within a taxonomic class there are precisely defined limits for the properties of the soils. On the landscape, however, the soils are natural phenomena, and they have the characteristic variability of all natural phenomena. Thus, the range of some observed properties may extend beyond the limits defined for a taxonomic class.

Areas of soils of a single taxonomic class rarely, if ever, can be mapped without including areas of other taxonomic classes. Consequently, every map unit is made up of the soils or miscellaneous areas for which it is named and some minor components that belong to taxonomic classes other than those of the major soils.

Custom Soil Resource Report
11 Most minor soils have properties similar to those of the dominant soil or soils in the map unit, and thus they do not affect use and management. These are called noncontrasting, or similar, components. They may or may not be mentioned in a particular map unit description. Other minor components, however, have properties and behavioral characteristics divergent enough to affect use or to require different management. These are called contrasting, or dissimilar, components. They generally are in small areas and could not be mapped separately because of the scale used. Some small areas of strongly contrasting soils or miscellaneous areas are identified by a special symbol on the maps. If included in the database for a given area, the contrasting minor components are identified in the map unit descriptions along with some characteristics of each. A few areas of minor components may not have been observed, and consequently they are not mentioned in the descriptions, especially where the pattern was so complex that it was impractical to make enough observations to identify all the soils and miscellaneous areas on the landscape.

The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The objective of mapping is not to delineate pure taxonomic classes but rather to separate the landscape into landforms or landform segments that have similar use and management requirements. The delineation of such segments on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, however, onsite investigation is needed to define and locate the soils and miscellaneous areas.

An identifying symbol precedes the map unit name in the map unit descriptions.

Each description includes general facts about the unit and gives important soil properties and qualities.

Soils that have profiles that are almost alike make up a soil series. Except for differences in texture of the surface layer, all the soils of a series have major horizons that are similar in composition, thickness, and arrangement.

Soils of one series can differ in texture of the surface layer, slope, stoniness, salinity, degree of erosion, and other characteristics that affect their use. On the basis of such differences, a soil series is divided into soil phases. Most of the areas
shown on the detailed soil maps are phases of soil series. The name of a soil phase commonly indicates a feature that affects use or management. For example, Alpha silt loam, 0 to 2 percent slopes, is a phase of the Alpha series.

Some map units are made up of two or more major soils or miscellaneous areas.

These map units are complexes, associations, or undifferentiated groups.

A complex consists of two or more soils or miscellaneous areas in such an intricate pattern or in such small areas that they cannot be shown separately on the maps.

The pattern and proportion of the soils or miscellaneous areas are somewhat similar in all areas. Alpha-Beta complex, 0 to 6 percent slopes, is an example.

An association is made up of two or more geographically associated soils or miscellaneous areas that are shown as one unit on the maps. Because of present or anticipated uses of the map units in the survey area, it was not considered practical or necessary to map the soils or miscellaneous areas separately. The pattern and relative proportion of the soils or miscellaneous areas are somewhat similar. Alpha-Beta association, 0 to 2 percent slopes, is an example.

An undifferentiated group is made up of two or more soils or miscellaneous areas that could be mapped individually but are mapped as one unit because similar interpretations can be made for use and management. The pattern and proportion Custom Soil Resource Report
12 of the soils or miscellaneous areas in a mapped area are not uniform. An area can be made up of only one of the major soils or miscellaneous areas, or it can be made up of all of them. Alpha and Beta soils, 0 to 2 percent slopes, is an example.

Some surveys include miscellaneous areas. Such areas have little or no soil material and support little or no vegetation. Rock outcrop is an example.

Custom Soil Resource Report
13 Soil Information for All Uses
Soil Properties and Qualities
The Soil Properties and Qualities section includes various soil properties and qualities displayed as thematic maps with a summary table for the soil map units in the selected area of interest. A single value or rating for each map unit is generated by aggregating the interpretive ratings of individual map unit components. This aggregation process is defined for each property or quality.

Soil Qualities and Features
Soil qualities are behavior and performance attributes that are not directly measured, but are inferred from observations of dynamic conditions and from soil properties. Example soil qualities include natural drainage, and frost action. Soil features are attributes that are not directly part of the soil. Example soil features include slope and depth to restrictive layer. These features can greatly impact the use and management of the soil.

Hydrologic Soil Group
Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms.

The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows:

Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission.

Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission.
55 Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission.

Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material.

These soils have a very slow rate of water transmission.

If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes.

Custom Soil Resource Report
56 57
Custom Soil Resource Report
Map—Hydrologic Soil Group
3765000 3767000 3769000 3771000 3773000 3775000 3777000 3779000 3781000 3783000 3765000 3767000 3769000 3771000 3773000 3775000 3777000 3779000 3781000 3783000 450000 452000 454000 456000 458000 460000 462000 464000 450000 452000 454000 456000 458000 460000 462000 464000 34° 12' 3'' N
117° 32' 45'' W
34° 12' 3'' N
117° 22' 46'' W
34° 1' 5'' N
117° 32' 45'' W
34° 1' 5'' N
117° 22' 46'' W
N
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 11N WGS84 0 4500 9000 18000 27000
Feet
0 1000 2000 4000 6000
Meters
Map Scale: 1:99,000 if printed on A portrait (8.5" x 11") sheet.

MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Rating Polygons
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating Lines
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating Points
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
The soil surveys that comprise your AOI were mapped at scales ranging from 1:15,800 to 1:24,000.

Please rely on the bar scale on each map sheet for map
measurements.

Source of Map: Natural Resources Conservation Service
Web Soil Survey URL:

Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required.

This product is generated from the USDA-NRCS certified data as of the version date(s) listed below.

Soil Survey Area: San Bernardino County Southwestern Part, California
Survey Area Data: Version 15, Aug 30, 2023
Soil Survey Area: San Bernardino National Forest Area,
California
Survey Area Data: Version 15, Aug 30, 2023
Soil Survey Area: Western Riverside Area, California
Survey Area Data: Version 16, Aug 30, 2023
Your area of interest (AOI) includes more than one soil survey area. These survey areas may have been mapped at different scales, with a different land use in mind, at different times, or at different levels of detail. This may result in map unit symbols, soil properties, and interpretations that do not completely agree across soil survey area boundaries.

Soil map units are labeled (as space allows) for map scales 1:50,000 or larger.

Custom Soil Resource Report
58 MAP LEGEND MAP INFORMATION
Date(s) aerial images were photographed: Mar 17, 2022—Jun 12, 2022
The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident.

Custom Soil Resource Report
59 Table—Hydrologic Soil Group
Map unit symbol Map unit name Rating Acres in AOI Percent of AOI Cb Chino silt loam C 18.7 0.1%
CnD Cieneba sandy loam, 9
to 15 percent slopes
D 176.5 0.5%
Cr Cieneba-Rock outcrop
complex, 30 to 50
percent slopes, MLRA
20 D 2,022.4 6.0%
Db Delhi fine sand A 2,088.2 6.2%
GP Quarries and Pits soils 44.8 0.1%
Gr Grangeville fine sandy
loam, warm MAAT,
MLRA 19
A 71.0 0.2%
GtC Greenfield sandy loam, 2
to 9 percent slopes
A 44.0 0.1%
GtD Greenfield fine sandy
loam, 9 to 15 percent
slopes
A 2.5 0.0%
HaC Hanford coarse sandy
loam, 2 to 9 percent
slopes
A 836.3 2.5%
HaD Hanford coarse sandy
loam, 9 to 15 percent
slopes
A 111.6 0.3%
HbA Hanford sandy loam, 0 to
2 percent slopes
A 26.8 0.1%
Hr Hilmar loamy fine sand B 34.1 0.1%
M-W Miscellaneous water 20.2 0.1%
MoC Monserate sandy loam, 2
to 9 percent slopes
C 11.0 0.0%
Ps Psamments, Fluvents
and Frequently flooded
soils
A 71.5 0.2%
RmC Ramona sandy loam, 2
to 9 percent slopes,
MLRA 19
C 11.0 0.0%
RmD Ramona sandy loam, 9
to 15 percent slopes
C 3.4 0.0%
RmE2 Ramona sandy loam, 15
to 30 percent slopes,
eroded
C 92.0 0.3%
ShF Saugus sandy loam, 30
to 50 percent slopes
B 87.0 0.3%
SoC Soboba gravelly loamy
sand, 0 to 9 percent
slopes
A 1,661.4 5.0%
Custom Soil Resource Report
60 Map unit symbol Map unit name Rating Acres in AOI Percent of AOI SpC Soboba stony loamy
sand, 2 to 9 percent
slopes
A 1,372.2 4.1%
TuB Tujunga loamy sand, 0 to
5 percent slopes
A 7,961.9 23.8%
TvC Tujunga gravelly loamy
sand, 0 to 9 percent
slopes
A 16,690.5 49.8%
W Water 1.4 0.0%
Subtotals for Soil Survey Area 33,460.5 99.9%
Totals for Area of Interest 33,485.4 100.0%
Map unit symbol Map unit name Rating Acres in AOI Percent of AOI AbD Soboba-Hanford families
association, 2 to 15
percent slopes
A 5.5 0.0%
DnG Trigo family-Lithic
Xerorthents, warm
complex, 50 to 75
percent slopes
D 5.0 0.0%
Subtotals for Soil Survey Area 10.5 0.0%
Totals for Area of Interest 33,485.4 100.0%
Map unit symbol Map unit name Rating Acres in AOI Percent of AOI Cr Cieneba-Rock outcrop
complex, 30 to 50
percent slopes, MLRA
20 D 8.4 0.0%
Db Delhi fine sand A 4.2 0.0%
HcD2 Hanford coarse sandy
loam, 8 to 15 percent
slopes, eroded
A 0.5 0.0%
Hr Hilmar loamy fine sand C 0.4 0.0%
MmC2 Monserate sandy loam, 5
to 8 percent slopes,
eroded
C 0.7 0.0%
TwC Tujunga gravelly loamy
sand, 0 to 8 percent
slopes
A 0.3 0.0%
Subtotals for Soil Survey Area 14.4 0.0%
Totals for Area of Interest 33,485.4 100.0%
Rating Options—Hydrologic Soil Group
Aggregation Method: Dominant Condition
Component Percent Cutoff: None Specified
Custom Soil Resource Report
61 Tie-break Rule: Higher
Custom Soil Resource Report
62 City of Fontana Storm Drain Master Plan
City of Fontana Storm Drain Master Plan
I
Land Use Comparison Map
City of Fontana
Storm Drain Master Plan Update
This product was made for informational and display purposes only and was created with the best available data at time of production. It does not represent any legal information or boundaries.
17542 E. 17th Street, Suite 150
Tustin, CA 92780
(714) 665-4500
Legend
City Boundary
Percent Impervious
Increase/Decrease
90 80
70 60
50 40
30 25
20 15
10 0
-5
-10
-20
-25
-30
-35
-40
-45
-50
-55
-60
-65
-75
-80
Trunkline Analysis, Loss Rates Tables

City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
16 A Residential 3-4 dwellings/acre 32 52 6.33 8.86 0.60 0.40 0.18 3.84 15 A School 32 52 5.93 8.31 0.60 0.40 0.18 3.60
13 A Commercial 32 52 11.25 11.68 0.10 0.40 0.18 0.52
30 A Residential 10+ dwellings/acre 32 52 23.15 24.89 0.20 0.40 0.18 2.40 87 A Public Park 32 52 13.98 33.21 0.85 0.40 0.18 29.58 38 A Public Park 32 52 6.11 14.50 0.85 0.40 0.18 12.92
84 A Residential 5-7 dwellings/acre 32 52 41.13 52.32 0.50 0.40 0.18 16.80 37 A Commercial 32 52 32.03 33.24 0.10 0.40 0.18 1.48
19 A Public Park 32 52 3.05 7.25 0.85 0.40 0.18 6.46
10 A Residential 10+ dwellings/acre 32 52 7.72 8.30 0.20 0.40 0.18 0.80 9 A Public Park 32 52 1.45 3.44 0.85 0.40 0.18 3.06
21 A Commercial 32 52 18.18 18.87 0.10 0.40 0.18 0.84
379 0.551 0.407 0.217
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - Line Cherry to Etiwanda Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
1 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
3 A Commercial 32 52 2.72 2.82 0.10 0.40 0.18 0.13
3 A Commercial 32 52 2.86 2.96 0.10 0.40 0.18 0.13
3 A Commercial 32 52 2.60 2.70 0.10 0.40 0.18 0.12
11 A Commercial 32 52 9.52 9.88 0.10 0.40 0.18 0.44
6 A Commercial 32 52 4.98 5.17 0.10 0.40 0.18 0.23
12 A Commercial 32 52 10.06 10.44 0.10 0.40 0.18 0.46
14 A Commercial 32 52 12.46 12.94 0.10 0.40 0.18 0.58
6 A Commercial 32 52 5.31 5.52 0.10 0.40 0.18 0.25
9 A Commercial 32 52 7.55 7.83 0.10 0.40 0.18 0.35
22 A Residential 8-10 dwellings/acre 32 52 12.86 15.25 0.40 0.40 0.18 3.53 25 A Residential 8-10 dwellings/acre 32 52 14.86 17.62 0.40 0.40 0.18 4.08 3 A Apartments 32 52 1.93 2.07 0.20 0.40 0.18 0.20
25 A Residential 8-10 dwellings/acre 32 52 14.77 17.50 0.40 0.40 1.18 4.05 142 0.280 0.208 0.102 Fm = Low Loss Fraction (1-Y) = Maximum
Loss Rate
(Fm) x Area
AMCLand Use Ap
Low Loss Fraction (1-Y) x Area Fp
AMC

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - Line D1 Area
(ac) Soil Type
Curve Number (CN)
2 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
10 A Residential 8-10 dwellings/acre 32 52 5.84 6.92 0.40 0.40 0.18 1.60 69 A Residential 3-4 dwellings/acre 32 52 27.26 38.17 0.60 0.40 0.18 16.54 3 A Residential 10+ dwellings/acre 32 52 2.16 2.32 0.20 0.40 0.18 0.22 78 A Residential 3-4 dwellings/acre 32 52 31.02 43.43 0.60 0.40 0.18 18.82 1 A Residential 10+ dwellings/acre 32 52 0.39 0.41 0.20 0.40 0.18 0.04 24 A Condominiums 32 52 15.13 17.43 0.35 0.40 0.18 3.36 20 A Apartments 32 52 15.43 16.59 0.20 0.40 0.18 1.60
39 A Residential 3-4 dwellings/acre 32 52 15.43 21.60 0.60 0.40 0.18 9.36 5 A Commercial 32 52 4.33 4.49 0.10 0.40 0.18 0.20
3 A Residential 3-4 dwellings/acre 32 52 0.99 1.38 0.60 0.40 0.18 0.60 3 A School 32 52 0.99 1.38 0.60 0.40 0.18 0.60
3 A Residential 3-4 dwellings/acre 32 52 1.11 1.55 0.60 0.40 0.18 0.67 3 A School 32 52 1.11 1.55 0.60 0.40 1.18 0.67
6 A Commercial 32 52 4.85 5.03 0.10 0.40 0.18 0.22
9 A Commercial 32 52 7.79 8.09 0.10 0.40 0.18 0.36
5 A School 32 52 1.98 2.77 0.60 0.40 0.18 1.20
5 A Residential 3-4 dwellings/acre 32 52 1.82 2.55 0.60 0.40 0.18 1.10 13 A Commercial 32 52 10.99 11.41 0.10 0.40 0.18 0.51
15 A School 32 52 5.90 8.25 0.60 0.40 0.18 3.58
9 A Residential 3-4 dwellings/acre 32 52 3.64 5.10 0.60 0.40 1.18 2.21 54 A School 32 52 21.37 29.91 0.60 0.40 0.18 12.96
26 A Commercial 32 52 22.50 23.36 0.10 0.40 0.18 1.04
45 A Residential 3-4 dwellings/acre 32 52 17.80 24.93 0.60 0.40 0.18 10.80 38 A Commercial 32 52 32.89 34.14 0.10 0.40 0.18 1.52
483 0.477 0.353 0.186
Area
(ac) Soil Type

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - Line D2 Maximum
Loss Rate
(Fm) x Area
AMCLand Use Ap
Low Loss Fraction (1-Y) =
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
AMC
Fm =
3 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
11 A Residential 10+ dwellings/acre 32 52 8.49 9.12 0.20 0.40 0.18 0.88 67 A Residential 5-7 dwellings/acre 32 52 32.81 41.73 0.50 0.40 0.18 13.40 8 A Public Park 32 52 1.29 3.05 0.85 0.40 0.18 2.72
13 A Residential 8-10 dwellings/acre 32 52 7.30 8.65 0.40 0.40 0.18 2.00 2 A Apartments 32 52 1.54 1.66 0.20 0.40 0.18 0.16
56 A Residential 3-4 dwellings/acre 32 52 22.16 31.02 0.60 0.40 0.18 13.44 1 A Commercial 32 52 1.21 1.26 0.10 0.40 0.18 0.06
3 A Residential 3-4 dwellings/acre 32 52 1.19 1.66 0.60 0.40 0.18 0.72 5 A Residential 3-4 dwellings/acre 32 52 1.98 2.77 0.60 0.40 0.18 1.20 2 A Commercial 32 52 1.30 1.35 0.10 0.40 0.18 0.06
9 A Residential 3-4 dwellings/acre 32 52 3.36 4.71 0.60 0.40 0.18 2.04 3 A Commercial 32 52 2.60 2.70 0.10 0.40 0.18 0.12
17 A Residential 3-4 dwellings/acre 32 52 6.73 9.42 0.60 0.40 1.18 4.08 5 A Commercial 32 52 4.33 4.49 0.10 0.40 0.18 0.20
33 A Residential 3-4 dwellings/acre 32 52 13.06 18.28 0.60 0.40 0.18 7.92 22 A Residential 10+ dwellings/acre 32 52 16.97 18.25 0.20 0.40 0.18 1.76 52 A Residential 3-4 dwellings/acre 32 52 20.57 28.81 0.60 0.40 0.18 12.48 308 0.523 0.386 0.205 Fm =
Area
(ac) Soil Type

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - Line D3 Maximum
Loss Rate
(Fm) x Area
AMCLand Use Ap
Low Loss Fraction (1-Y) =
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
AMC
4 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
10 A School 32 52 3.96 5.54 0.60 0.40 0.18 2.40
152 A Residential 5-7 dwellings/acre 32 52 74.42 94.67 0.50 0.40 0.18 30.40 3 A Residential 10+ dwellings/acre 32 52 2.31 2.49 0.20 0.40 0.18 0.24 2 A Residential 3-4 dwellings/acre 32 52 0.79 1.11 0.60 0.40 0.18 0.48 5 A Residential 10+ dwellings/acre 32 52 3.86 4.15 0.20 0.40 0.18 0.40 2 A Residential 3-4 dwellings/acre 32 52 0.79 1.11 0.60 0.40 0.18 0.48 5 A Residential 10+ dwellings/acre 32 52 3.86 4.15 0.20 0.40 0.18 0.40 4 A Residential 5-7 dwellings/acre 32 52 1.96 2.49 0.50 0.40 0.18 0.80 20 A Residential 5-7 dwellings/acre 32 52 9.79 12.46 0.50 0.40 0.18 4.00 38 A Residential 5-7 dwellings/acre 32 52 18.61 23.67 0.50 0.40 0.18 7.60 38 A Residential 5-7 dwellings/acre 32 52 18.61 23.67 0.50 0.40 0.18 7.60 11 A Public Park 32 52 1.77 4.20 0.85 0.40 0.18 3.74
32 A Residential 5-7 dwellings/acre 32 52 15.67 19.93 0.50 0.40 1.18 6.40 322 0.514 0.380 0.202 Fm =
Area
(ac) Soil Type

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - Line D4 Maximum
Loss Rate
(Fm) x Area
AMCLand Use Ap
Low Loss Fraction (1-Y) =
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
AMC
5 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
160 A Residential 3-4 dwellings/acre 32 52 63.38 88.74 0.60 0.40 0.18 38.45 2 A Residential 10+ dwellings/acre 32 52 1.54 1.66 0.20 0.40 0.18 0.16 3 A Residential 5-7 dwellings/acre 32 52 1.22 1.56 0.50 0.40 0.18 0.50 5 A Residential 5-7 dwellings/acre 32 52 2.45 3.11 0.50 0.40 0.18 1.00 2 A Residential 10+ dwellings/acre 32 52 1.70 1.82 0.20 0.40 0.18 0.18 8 A Residential 5-7 dwellings/acre 32 52 3.77 4.80 0.50 0.40 0.18 1.54 5 A Residential 10+ dwellings/acre 32 52 3.47 3.73 0.20 0.40 0.18 0.36 15 A Residential 5-7 dwellings/acre 32 52 7.10 9.03 0.50 0.40 0.18 2.90 2 A School 32 52 0.79 1.11 0.60 0.40 0.18 0.48
9 A Residential 10+ dwellings/acre 32 52 6.94 7.47 0.20 0.40 0.18 0.72 10 A School 32 52 3.96 5.54 0.60 0.40 0.18 2.40
20 A Residential 5-7 dwellings/acre 32 52 9.79 12.46 0.50 0.40 0.18 4.00 20 A Residential 8-10 dwellings/acre 32 52 11.67 13.83 0.40 0.40 1.18 3.20 10 A Residential 10+ dwellings/acre 32 52 7.72 8.30 0.20 0.40 0.18 0.80 50 A Residential 3-4 dwellings/acre 32 52 19.78 27.70 0.60 0.40 0.18 12.00 320 0.545 0.403 0.215 Fm =
Area
(ac) Soil Type

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - Line D5 Maximum
Loss Rate
(Fm) x Area
AMCLand Use Ap
Low Loss Fraction (1-Y) =
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
AMC
6 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
23 A School 32 52 9.10 12.74 0.60 0.40 0.18 5.52
12 A Commercial 32 52 10.39 10.78 0.10 0.40 0.18 0.48
124 A Residential 3-4 dwellings/acre 32 52 49.08 68.72 0.60 0.40 0.18 29.77 159 0.569 0.420 0.225 Fm =
Area
(ac) Soil Type

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - Line D6 Maximum
Loss Rate
(Fm) x Area
AMCLand Use Ap
Low Loss Fraction (1-Y) =
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
AMC
7 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
5 A Residential 10+ dwellings/acre 32 52 3.86 4.15 0.20 0.40 0.18 0.40 1 A Residential 10+ dwellings/acre 32 52 0.39 0.41 0.20 0.40 0.18 0.04 5 A School 32 52 1.78 2.49 0.60 0.40 0.18 1.08
5 A School 32 52 1.98 2.77 0.60 0.40 0.18 1.20
5 A Residential 10+ dwellings/acre 32 52 3.86 4.15 0.20 0.40 0.18 0.40 10 A School 32 52 3.96 5.54 0.60 0.40 0.18 2.40
10 A Residential 10+ dwellings/acre 32 52 7.72 8.30 0.20 0.40 0.18 0.80 16 A School 32 52 6.33 8.86 0.60 0.40 0.18 3.84
18 A Residential 10+ dwellings/acre 32 52 13.89 14.93 0.20 0.40 0.18 1.44 5 A School 32 52 1.98 2.77 0.60 0.40 0.18 1.20
14 A Residential 2.5 acre lots 32 52 1.59 4.86 0.90 0.40 0.18 5.04 30 A Residential 3-4 dwellings/acre 32 52 11.87 16.62 0.60 0.40 0.18 7.20 20 A Residential 10+ dwellings/acre 32 52 15.43 16.59 0.20 0.40 1.18 1.60 143 0.478 0.354 0.186 Fm =
Area
(ac) Soil Type

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - Line D6-2 Maximum
Loss Rate
(Fm) x Area
AMCLand Use Ap
Low Loss Fraction (1-Y) =
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
AMC
8 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
2 A Commercial 32 52 1.73 1.80 0.10 0.40 0.18 0.08
1 A Residential 2.5 acre lots 32 52 0.07 0.21 0.90 0.40 0.18 0.22 2 A Residential 2.5 acre lots 32 52 0.17 0.52 0.90 0.40 0.18 0.54 4 A Residential 10+ dwellings/acre 32 52 2.70 2.90 0.20 0.40 0.18 0.28 3 A Commercial 32 52 2.60 2.70 0.10 0.40 0.18 0.12
2 A Residential 2.5 acre lots 32 52 0.23 0.69 0.90 0.40 0.18 0.72 3 A Residential 10+ dwellings/acre 32 52 2.31 2.49 0.20 0.40 0.18 0.24 4 A Residential 10+ dwellings/acre 32 52 3.09 3.32 0.20 0.40 0.18 0.32 5 A Residential 2.5 acre lots 32 52 0.57 1.74 0.90 0.40 0.18 1.80 7 A Commercial 32 52 6.06 6.29 0.10 0.40 0.18 0.28
20 A Commercial 32 52 17.31 17.97 0.10 0.40 0.18 0.80
8 A Residential 2.5 acre lots 32 52 0.91 2.78 0.90 0.40 0.18 2.88 1 A Residential 10+ dwellings/acre 32 52 0.77 0.83 0.20 0.40 1.18 0.08 40 A Commercial 32 52 34.62 35.94 0.10 0.40 0.18 1.60
36 A Residential 10+ dwellings/acre 32 52 27.78 29.86 0.20 0.40 0.18 2.88 2 A Commercial 32 52 1.73 1.80 0.10 0.40 0.18 0.08
139 0.259 0.193 0.093 Fm =
Area
(ac) Soil Type

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - Line D7 Maximum
Loss Rate
(Fm) x Area
AMCLand Use Ap
Low Loss Fraction (1-Y) =
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
AMC
9 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
6 A Residential 5-7 dwellings/acre 32 52 2.79 3.55 0.50 0.40 0.18 1.14 4 A Commercial 32 52 3.12 3.23 0.10 0.40 0.18 0.14
9 A Commercial 32 52 7.96 8.27 0.10 0.40 0.18 0.37
10 A Residential 5-7 dwellings/acre 32 52 5.09 6.48 0.50 0.40 0.18 2.08 27 A Residential 5-7 dwellings/acre 32 52 13.42 17.07 0.50 0.40 0.18 5.48 2 A Public Park 32 52 0.37 0.88 0.85 0.40 0.18 0.78
12 A Commercial 32 52 10.30 10.69 0.10 0.40 0.18 0.48
81 A Residential 5-7 dwellings/acre 32 52 39.51 50.26 0.50 0.40 0.18 16.14 4 A Commercial 32 52 3.32 3.45 0.10 0.40 0.18 0.15
72 A Residential 5-7 dwellings/acre 32 52 35.20 44.78 0.50 0.40 0.18 14.38 5 A Residential 8-10 dwellings/acre 32 52 2.92 3.46 0.40 0.40 0.18 0.80 3 A Commercial 32 52 2.16 2.25 0.10 0.40 0.18 0.10
77 A Residential 5-7 dwellings/acre 32 52 37.51 47.71 0.50 0.40 1.18 15.32 3 A Residential 2.5 acre lots 32 52 0.31 0.94 0.90 0.40 0.18 0.97 314 0.477 0.353 0.186
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - Line DA Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
10 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
72 A Commercial 32 52 62.32 64.69 0.10 0.40 0.18 2.88
37 A Commercial 32 52 32.03 33.24 0.10 0.40 0.18 1.48
109 0.134 0.102 0.040
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - East Village Cherry Ave Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
11 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
44 A Commercial 32 52 38.08 39.53 0.10 0.40 0.18 1.76
12 A School 32 52 4.75 6.65 0.60 0.40 0.18 2.88
6 A Public Park 32 52 0.96 2.29 0.85 0.40 0.18 2.04
22 A Commercial 32 52 19.04 19.77 0.10 0.40 0.18 0.88
19 A Commercial 32 52 16.45 17.07 0.10 0.40 0.18 0.76
120 A Residential 5-7 dwellings/acre 32 52 58.76 74.74 0.50 0.40 0.18 24.00 223 0.381 0.282 0.145
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - East Village H1 Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
12 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
63 A Commercial 32 52 54.53 56.60 0.10 0.40 0.18 2.52
2 A Residential 10+ dwellings/acre 32 52 1.54 1.66 0.20 0.40 0.18 0.16 4 A Residential 10+ dwellings/acre 32 52 3.09 3.32 0.20 0.40 0.18 0.32 12 A Commercial 32 52 10.39 10.78 0.10 0.40 0.18 0.48
46 A Residential 3-4 dwellings/acre 32 52 18.20 25.48 0.60 0.40 0.18 11.04 5 A Public Park 32 52 0.80 1.91 0.85 0.40 0.18 1.70
132 0.329 0.244 0.123
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - East Village H13 Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
13 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
29 A Public Park 32 52 4.66 11.07 0.85 0.40 0.18 9.86
18 A School 32 52 7.12 9.97 0.60 0.40 0.18 4.32
9 A Commercial 32 52 7.79 8.09 0.10 0.40 0.18 0.36
9 A Commercial 32 52 7.79 8.09 0.10 0.40 0.18 0.36
62 A Residential 5-7 dwellings/acre 32 52 30.36 38.62 0.50 0.40 0.18 12.40 127 0.546 0.403 0.215
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - East Village H7 Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
14 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
12 A Public Park 32 52 1.93 4.58 0.85 0.40 0.18 4.08
10 A School 32 52 3.96 5.54 0.60 0.40 0.18 2.40
252 A Residential 5-7 dwellings/acre 32 52 123.39 156.95 0.50 0.40 0.18 50.40 274 0.528 0.390 0.208
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - East Village Mulberry Ave Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
15 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
45 A Residential 5-7 dwellings/acre 32 52 22.03 28.03 0.50 0.40 0.18 9.00 12 A Residential 2.5 acre lots 32 52 1.36 4.17 0.90 0.40 0.18 4.32 57 0.590 0.435 0.234
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - East Village H8 Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
16 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
14 A Commercial 32 52 12.12 12.58 0.10 0.40 0.18 0.56
13 A Residential 10+ dwellings/acre 32 52 10.03 10.78 0.20 0.40 0.18 1.04 37 A Commercial 32 52 32.03 33.24 0.10 0.40 0.18 1.48
86 A Residential 5-7 dwellings/acre 32 52 42.11 53.56 0.50 0.40 0.18 17.20 150 0.358 0.266 0.135
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - East Village H9 Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
17 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
126 A Residential 5-7 dwellings/acre 32 52 61.69 78.48 0.50 0.40 0.18 25.20 12 A Residential 2.5 acre lots 32 52 1.36 4.17 0.90 0.40 0.18 4.32 138 0.543 0.401 0.214
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - East Village Cottonwood Ave Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
18 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
151 A Residential 5-7 dwellings/acre 32 52 73.94 94.05 0.50 0.40 0.18 30.20 10 A School 32 52 3.96 5.54 0.60 0.40 0.18 2.40
3 A Residential 3-4 dwellings/acre 32 52 1.19 1.66 0.60 0.40 0.18 0.72 86 A Commercial 32 52 74.44 77.26 0.10 0.40 0.18 3.44
2 A Public Park 32 52 0.32 0.76 0.85 0.40 0.18 0.68
252 0.390 0.289 0.149
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - East Village Miller Ave Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
19 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
158 A Commercial 32 52 136.76 141.95 0.10 0.40 0.18 6.32 4 A Public Park 32 52 0.64 1.53 0.85 0.40 0.18 1.36
162 0.152 0.114 0.047
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - East Village Redwood Ave Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
20 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
10 A Residential 3-4 dwellings/acre 32 52 3.96 5.54 0.60 0.40 0.18 2.40 2 A Apartments 32 52 1.16 1.24 0.20 0.40 0.18 0.12
1 A Residential 3-4 dwellings/acre 32 52 0.40 0.55 0.60 0.40 0.18 0.24 10 A Apartments 32 52 7.72 8.30 0.20 0.40 0.18 0.80
20 A Apartments 32 52 15.43 16.59 0.20 0.40 0.18 1.60
20 A Commercial 32 52 17.31 17.97 0.10 0.40 0.18 0.80
6 A Apartments 32 52 4.63 4.98 0.20 0.40 0.18 0.48
15 A Commercial 32 52 12.98 13.48 0.10 0.40 0.18 0.60
6 A Commercial 32 52 5.19 5.39 0.10 0.40 0.18 0.24
27 A Apartments 32 52 20.83 22.40 0.20 0.40 0.18 2.16
117 0.231 0.172 0.081
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - Line M0 Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
21 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
10 A Apartments 32 52 7.72 8.30 0.20 0.40 0.18 0.80
10 A Apartments 32 52 7.72 8.30 0.20 0.40 0.18 0.80
20 A Apartments 32 52 15.43 16.59 0.20 0.40 0.18 1.60
40 A Apartments 32 52 30.86 33.18 0.20 0.40 0.18 3.20
6 A Commercial 32 52 5.19 5.39 0.10 0.40 0.18 0.24
28 A Apartments 32 52 21.60 23.23 0.20 0.40 0.18 2.24
114 0.223 0.167 0.078
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - Line M1 Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
22 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
5 A Apartments 32 52 3.86 4.15 0.20 0.40 0.18 0.40
5 A Residential 3-4 dwellings/acre 32 52 1.98 2.77 0.60 0.40 0.18 1.20 10 A Residential 3-4 dwellings/acre 32 52 3.96 5.54 0.60 0.40 0.18 2.40 10 A School 32 52 3.96 5.54 0.60 0.40 0.18 2.40
8 A Residential 3-4 dwellings/acre 32 52 3.17 4.43 0.60 0.40 0.18 1.92 23 A Residential 3-4 dwellings/acre 32 52 9.10 12.74 0.60 0.40 0.18 5.52 19 A Apartments 32 52 14.66 15.76 0.20 0.40 0.18 1.52
8 A Commercial 32 52 6.92 7.19 0.10 0.40 0.18 0.32
26 A Apartments 32 52 20.06 21.57 0.20 0.40 0.18 2.08
114 0.406 0.301 0.156
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - Line M2 Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
23 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
9 A Residential 3-4 dwellings/acre 32 52 3.64 5.10 0.60 0.40 0.18 2.21 9 A Residential 3-4 dwellings/acre 32 52 3.64 5.10 0.60 0.40 0.18 2.21 8 A Residential 3-4 dwellings/acre 32 52 3.17 4.43 0.60 0.40 0.18 1.92 8 A Residential 3-4 dwellings/acre 32 52 3.17 4.43 0.60 0.40 0.18 1.92 22 A Residential 3-4 dwellings/acre 32 52 8.70 12.19 0.60 0.40 0.18 5.28 5 A Residential 10+ dwellings/acre 32 52 3.86 4.15 0.20 0.40 0.18 0.40 13 A Commercial 32 52 11.25 11.68 0.10 0.40 0.18 0.52
6 A Residential 3-4 dwellings/acre 32 52 2.37 3.32 0.60 0.40 0.18 1.44 1 A Residential 8-10 dwellings/acre 32 52 0.58 0.69 0.40 0.40 0.18 0.16 4 A Commercial 32 52 3.03 3.14 0.10 0.40 0.18 0.14
30 A Residential 3-4 dwellings/acre 32 52 11.87 16.62 0.60 0.40 0.18 7.20 115 0.519 0.383 0.204
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - Line M3 Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
24 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
5 A School 32 52 1.98 2.77 0.60 0.40 0.18 1.20
5 A Residential 3-4 dwellings/acre 32 52 1.98 2.77 0.60 0.40 0.18 1.20 10 A School 32 52 3.96 5.54 0.60 0.40 0.18 2.40
8 A School 32 52 3.17 4.43 0.60 0.40 0.18 1.92
6 A Residential 3-4 dwellings/acre 32 52 2.37 3.32 0.60 0.40 0.18 1.44 30 A Residential 3-4 dwellings/acre 32 52 11.87 16.62 0.60 0.40 0.18 7.20 8 A Commercial 32 52 6.92 7.19 0.10 0.40 0.18 0.32
20 A Residential 3-4 dwellings/acre 32 52 7.91 11.08 0.60 0.40 0.18 4.80 42 A Commercial 32 52 36.35 37.73 0.10 0.40 0.18 1.68
134 0.429 0.318 0.165
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - Line M4 Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
25 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
7 A Apartments 32 52 5.02 5.39 0.20 0.40 0.18 0.52
4 A Apartments 32 52 2.70 2.90 0.20 0.40 0.18 0.28
2 A Apartments 32 52 1.54 1.66 0.20 0.40 0.18 0.16
8 A Residential 3-4 dwellings/acre 32 52 3.17 4.43 0.60 0.40 0.18 1.92 5 A Apartments 32 52 3.86 4.15 0.20 0.40 0.18 0.40
8 A Residential 3-4 dwellings/acre 32 52 3.17 4.43 0.60 0.40 0.18 1.92 13 A Apartments 32 52 10.03 10.78 0.20 0.40 0.18 1.04
19 A Residential 3-4 dwellings/acre 32 52 7.52 10.52 0.60 0.40 0.18 4.56 17 A Apartments 32 52 13.12 14.10 0.20 0.40 0.18 1.36
14 A Residential 8-10 dwellings/acre 32 52 8.17 9.68 0.40 0.40 0.18 2.24 4 A Commercial 32 52 3.46 3.59 0.10 0.40 0.18 0.16
4 A Residential 8-10 dwellings/acre 32 52 2.33 2.77 0.40 0.40 0.18 0.64 4 A Commercial 32 52 3.46 3.59 0.10 0.40 1.18 0.16
11 A Residential 8-10 dwellings/acre 32 52 6.42 7.61 0.40 0.40 0.18 1.76 11 A Residential 8-10 dwellings/acre 32 52 6.42 7.61 0.40 0.40 0.18 1.76 2 A Commercial 32 52 1.73 1.80 0.10 0.40 0.18 0.08
21 A Residential 8-10 dwellings/acre 32 52 12.26 14.53 0.40 0.40 0.18 3.36 2 A Residential 8-10 dwellings/acre 32 52 1.17 1.38 0.40 0.40 0.18 0.32 8 A Commercial 32 52 6.92 7.19 0.10 0.40 0.18 0.32
2 A Commercial 32 52 1.73 1.80 0.10 0.40 1.18 0.08
8 A Residential 3-4 dwellings/acre 32 52 3.17 4.43 0.60 0.40 0.18 1.92 10 A Residential 8-10 dwellings/acre 32 52 5.84 6.92 0.40 0.40 0.18 1.60 10 A Residential 3-4 dwellings/acre 32 52 3.96 5.54 0.60 0.40 0.18 2.40 18 A Residential 3-4 dwellings/acre 32 52 7.12 9.97 0.60 0.40 0.18 4.32 1 A Commercial 32 52 0.43 0.45 0.10 0.40 0.18 0.02
3 A Residential 8-10 dwellings/acre 32 52 1.75 2.08 0.40 0.40 0.18 0.48 10 A Apartments 32 52 7.72 8.30 0.20 0.40 0.18 0.80
10 A Apartments 32 52 7.72 8.30 0.20 0.40 0.18 0.80
20 A Apartments 32 52 15.43 16.59 0.20 0.40 0.18 1.60
40 A Apartments 32 52 30.86 33.18 0.20 0.40 0.18 3.20
24 A Residential 3-4 dwellings/acre 32 52 9.50 13.29 0.60 0.40 0.18 5.76 56 A Apartments 32 52 43.21 46.45 0.20 0.40 0.18 4.48
15 A Residential 8-10 dwellings/acre 32 52 8.75 10.38 0.40 0.40 0.18 2.40 8 A School 32 52 3.17 4.43 0.60 0.40 0.18 1.92
16 A Apartments 32 52 12.35 13.27 0.20 0.40 0.18 1.28
41 A Residential 3-4 dwellings/acre 32 52 16.22 22.71 0.60 0.40 0.18 9.84 3 A Commercial 32 52 2.60 2.70 0.10 0.40 0.18 0.12
62 A Residential 3-4 dwellings/acre 32 52 24.53 34.34 0.60 0.40 0.18 14.88 12 A Residential 8-10 dwellings/acre 32 52 7.00 8.30 0.40 0.40 0.18 1.92 2 A Commercial 32 52 1.73 1.80 0.10 0.40 0.18 0.08
5 A Residential 3-4 dwellings/acre 32 52 1.98 2.77 0.60 0.40 0.18 1.20 539 0.407 0.302 0.156
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - Line M5AB Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
26 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
7 A Commercial 32 52 6.06 6.29 0.10 0.40 0.18 0.28
2 A Commercial 32 52 1.73 1.80 0.10 0.40 0.18 0.08
9 A Residential 8-10 dwellings/acre 32 52 5.25 6.23 0.40 0.40 0.18 1.44 9 A Residential 8-10 dwellings/acre 32 52 5.25 6.23 0.40 0.40 0.18 1.44 17 A Commercial 32 52 14.71 15.27 0.10 0.40 0.18 0.68
11 A Residential 3-4 dwellings/acre 32 52 4.35 6.09 0.60 0.40 0.18 2.64 14 A Residential 8-10 dwellings/acre 32 52 8.17 9.68 0.40 0.40 0.18 2.24 26 A Residential 3-4 dwellings/acre 32 52 10.29 14.40 0.60 0.40 0.18 6.24 40 A Residential 3-4 dwellings/acre 32 52 15.83 22.16 0.60 0.40 0.18 9.60 20 A Residential 3-4 dwellings/acre 32 52 7.91 11.08 0.60 0.40 0.18 4.80 155 0.487 0.360 0.190
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - Line M5C Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
27 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
10 A Apartments 32 52 7.72 8.30 0.20 0.40 0.18 0.80
8 A Apartments 32 52 5.79 6.22 0.20 0.40 0.18 0.60
7 A Apartments 32 52 5.56 5.97 0.20 0.40 0.18 0.58
25 A Apartments 32 52 19.29 20.74 0.20 0.40 0.18 2.00
30 A Apartments 32 52 23.15 24.89 0.20 0.40 0.18 2.40
11 A Apartments 32 52 8.49 9.12 0.20 0.40 0.18 0.88
8 A School 32 52 3.17 4.43 0.60 0.40 0.18 1.92
36 A Residential 3-4 dwellings/acre 32 52 14.24 19.94 0.60 0.40 0.18 8.64 25 A Public Park 32 52 4.02 9.54 0.85 0.40 0.18 8.50
80 A Residential 3-4 dwellings/acre 32 52 31.65 44.32 0.60 0.40 0.18 19.20 50 A School 32 52 19.78 27.70 0.60 0.40 0.18 12.00
39 A Residential 3-4 dwellings/acre 32 52 15.43 21.60 0.60 0.40 0.18 9.36 30 A School 32 52 11.87 16.62 0.60 0.40 1.18 7.20
50 A Residential 3-4 dwellings/acre 32 52 19.78 27.70 0.60 0.40 0.18 12.00 60 A Residential 3-4 dwellings/acre 32 52 23.74 33.24 0.60 0.40 0.18 14.40 1 A Commercial 32 52 0.87 0.90 0.10 0.40 0.18 0.04
19 A Residential 3-4 dwellings/acre 32 52 7.52 10.52 0.60 0.40 0.18 4.56 10 A Residential 3-4 dwellings/acre 32 52 3.96 5.54 0.60 0.40 0.18 2.40 10 A Residential 3-4 dwellings/acre 32 52 3.96 5.54 0.60 0.40 0.18 2.40 20 A Residential 3-4 dwellings/acre 32 52 7.91 11.08 0.60 0.40 1.18 4.80 9 A School 32 52 3.56 4.99 0.60 0.40 0.18 2.16
33 A Residential 3-4 dwellings/acre 32 52 13.06 18.28 0.60 0.40 0.18 7.92 60 A Commercial 32 52 51.93 53.90 0.10 0.40 0.18 2.40
631 0.514 0.380 0.202
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - Line M5DE Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate (Fm)
x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
28 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
8 A Residential 5-7 dwellings/acre 32 52 3.67 4.67 0.50 0.40 0.18 1.50 8 A Commercial 32 52 6.49 6.74 0.10 0.40 0.18 0.30
11 A Residential 3-4 dwellings/acre 32 52 4.35 6.09 0.60 0.40 0.18 2.64 17 A Commercial 32 52 14.71 15.27 0.10 0.40 0.18 0.68
10 A Residential 3-4 dwellings/acre 32 52 3.96 5.54 0.60 0.40 0.18 2.40 40 A Residential 3-4 dwellings/acre 32 52 15.83 22.16 0.60 0.40 0.18 9.60 40 A Residential 3-4 dwellings/acre 32 52 15.83 22.16 0.60 0.40 0.18 9.60 2 A Commercial 32 52 1.30 1.35 0.10 0.40 0.18 0.06
79 A Residential 3-4 dwellings/acre 32 52 31.26 43.76 0.60 0.40 0.18 18.96 20 A Residential 3-4 dwellings/acre 32 52 7.91 11.08 0.60 0.40 0.18 4.80 234 0.549 0.405 0.216
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - Line M5F Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
29 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
7 A Residential 3-4 dwellings/acre 32 52 2.77 3.88 0.60 0.40 0.18 1.68 7 A School 32 52 2.77 3.88 0.60 0.40 0.18 1.68
7 A Residential 3-4 dwellings/acre 32 52 2.77 3.88 0.60 0.40 0.18 1.68 7 A School 32 52 2.77 3.88 0.60 0.40 0.18 1.68
6 A School 32 52 2.37 3.32 0.60 0.40 0.18 1.44
6 A Residential 3-4 dwellings/acre 32 52 2.37 3.32 0.60 0.40 0.18 1.44 20 A Residential 3-4 dwellings/acre 32 52 7.91 11.08 0.60 0.40 0.18 4.80 20 A Commercial 32 52 17.31 17.97 0.10 0.40 0.18 0.80
50 A Residential 3-4 dwellings/acre 32 52 19.78 27.70 0.60 0.40 0.18 12.00 10 A School 32 52 3.96 5.54 0.60 0.40 0.18 2.40
20 A Commercial 32 52 17.31 17.97 0.10 0.40 0.18 0.80
20 A Commercial 32 52 17.31 17.97 0.10 0.40 0.18 0.80
60 A Residential 3-4 dwellings/acre 32 52 23.74 33.24 0.60 0.40 1.18 14.40 20 A Commercial 32 52 17.31 17.97 0.10 0.40 0.18 0.80
41 A Residential 3-4 dwellings/acre 32 52 16.22 22.71 0.60 0.40 0.18 9.84 20 A Commercial 32 52 17.31 17.97 0.10 0.40 0.18 0.80
5 A Commercial 32 52 4.33 4.49 0.10 0.40 0.18 0.20
55 A Residential 3-4 dwellings/acre 32 52 21.76 30.47 0.60 0.40 0.18 13.20 381 0.475 0.351 0.185
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - Line M5G Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
30 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
6 A Commercial 32 52 5.19 5.39 0.10 0.40 0.18 0.24
6 A Commercial 32 52 5.19 5.39 0.10 0.40 0.18 0.24
11 A Residential 3-4 dwellings/acre 32 52 4.35 6.09 0.60 0.40 0.18 2.64 14 A Commercial 32 52 12.12 12.58 0.10 0.40 0.18 0.56
9 A Residential 3-4 dwellings/acre 32 52 3.56 4.99 0.60 0.40 0.18 2.16 40 A Residential 3-4 dwellings/acre 32 52 15.83 22.16 0.60 0.40 0.18 9.60 10 A Residential 3-4 dwellings/acre 32 52 3.96 5.54 0.60 0.40 0.18 2.40 10 A Residential 3-4 dwellings/acre 32 52 3.96 5.54 0.60 0.40 0.18 2.40 20 A Residential 3-4 dwellings/acre 32 52 7.91 11.08 0.60 0.40 0.18 4.80 10 A School 32 52 3.96 5.54 0.60 0.40 0.18 2.40
30 A Residential 3-4 dwellings/acre 32 52 11.87 16.62 0.60 0.40 0.18 7.20 40 A Residential 3-4 dwellings/acre 32 52 15.83 22.16 0.60 0.40 0.18 9.60 206 0.545 0.403 0.215
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - Line M6A Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
31 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
9 A Residential 3-4 dwellings/acre 32 52 3.56 4.99 0.60 0.40 0.18 2.16 8 A Residential 3-4 dwellings/acre 32 52 3.17 4.43 0.60 0.40 0.18 1.92 17 A Residential 3-4 dwellings/acre 32 52 6.73 9.42 0.60 0.40 0.18 4.08 46 A Residential 3-4 dwellings/acre 32 52 18.20 25.48 0.60 0.40 0.18 11.04 20 A School 32 52 7.91 11.08 0.60 0.40 0.18 4.80
60 A Residential 3-4 dwellings/acre 32 52 23.74 33.24 0.60 0.40 0.18 14.40 20 A Commercial 32 52 17.31 17.97 0.10 0.40 0.18 0.80
60 A Residential 3-4 dwellings/acre 32 52 23.74 33.24 0.60 0.40 0.18 14.40 240 0.565 0.417 0.223
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - Line M6B Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
32 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
6 A Commercial 32 52 5.19 5.39 0.10 0.40 0.18 0.24
5 A Commercial 32 52 4.33 4.49 0.10 0.40 0.18 0.20
10 A Residential 3-4 dwellings/acre 32 52 3.96 5.54 0.60 0.40 0.18 2.40 20 A Commercial 32 52 17.31 17.97 0.10 0.40 0.18 0.80
40 A Commercial 32 52 34.62 35.94 0.10 0.40 0.18 1.60
10 A Residential 3-4 dwellings/acre 32 52 3.96 5.54 0.60 0.40 0.18 2.40 10 A Residential 3-4 dwellings/acre 32 52 3.96 5.54 0.60 0.40 0.18 2.40 20 A Residential 3-4 dwellings/acre 32 52 7.91 11.08 0.60 0.40 0.18 4.80 40 A Residential 3-4 dwellings/acre 32 52 15.83 22.16 0.60 0.40 0.18 9.60 40 A Commercial 32 52 34.62 35.94 0.10 0.40 0.18 1.60
201 0.345 0.256 0.130
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - Line M7A Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
33 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
10 A Residential 3-4 dwellings/acre 32 52 3.96 5.54 0.60 0.40 0.18 2.40 10 A Residential 3-4 dwellings/acre 32 52 3.96 5.54 0.60 0.40 0.18 2.40 20 A Residential 3-4 dwellings/acre 32 52 7.91 11.08 0.60 0.40 0.18 4.80 10 A School 32 52 3.96 5.54 0.60 0.40 0.18 2.40
30 A Residential 3-4 dwellings/acre 32 52 11.87 16.62 0.60 0.40 0.18 7.20 2 A Residential 8-10 dwellings/acre 32 52 1.17 1.38 0.40 0.40 0.18 0.32 79 A Commercial 32 52 68.38 70.97 0.10 0.40 0.18 3.16
161 0.371 0.275 0.141
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - Line M7B Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
34 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
10 A Residential 3-4 dwellings/acre 32 52 3.96 5.54 0.60 0.40 0.18 2.40 10 A Residential 3-4 dwellings/acre 32 52 3.96 5.54 0.60 0.40 0.18 2.40 20 A Residential 3-4 dwellings/acre 32 52 7.91 11.08 0.60 0.40 0.18 4.80 20 A Commercial 32 52 17.31 17.97 0.10 0.40 0.18 0.80
20 A Residential 3-4 dwellings/acre 32 52 7.91 11.08 0.60 0.40 0.18 4.80 20 A Commercial 32 52 17.31 17.97 0.10 0.40 0.18 0.80
5 A Residential 3-4 dwellings/acre 32 52 1.98 2.77 0.60 0.40 0.18 1.20 56 A Commercial 32 52 48.47 50.31 0.10 0.40 0.18 2.24
161 0.324 0.241 0.121
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - Line M7C Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
35 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
2 A Commercial 32 52 1.73 1.80 0.10 0.40 0.18 0.08
38 A Apartments 32 52 29.32 31.52 0.20 0.40 0.18 3.04
33 A Apartments 32 52 25.46 27.37 0.20 0.40 0.18 2.64
2 A Public Park 32 52 0.32 0.76 0.85 0.40 0.18 0.68
4 A Residential 8-10 dwellings/acre 32 52 2.04 2.42 0.40 0.40 0.18 0.56 1 A Residential 10+ dwellings/acre 32 52 0.10 0.21 0.80 0.40 0.18 0.16 10 A Residential 3-4 dwellings/acre 32 52 3.96 5.54 0.60 0.40 0.18 2.40 3 A Residential 3-4 dwellings/acre 32 52 0.99 1.38 0.60 0.40 0.18 0.60 8 A Apartments 32 52 5.79 6.22 0.20 0.40 0.18 0.60
7 A Residential 3-4 dwellings/acre 32 52 2.77 3.88 0.60 0.40 0.18 1.68 8 A Apartments 32 52 6.17 6.64 0.20 0.40 0.18 0.64
1 A Commercial 32 52 0.43 0.45 0.10 0.40 0.18 0.02
20 A Apartments 32 52 15.05 16.18 0.20 0.40 1.18 1.56
20 A Apartments 32 52 15.43 16.59 0.20 0.40 0.18 1.60
154 0.289 0.215 0.106
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - Line NT1 - Fontana Channel Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
36 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
4 A Residential 3-4 dwellings/acre 32 52 1.58 2.22 0.60 0.40 0.18 0.96 4 A Apartments 32 52 3.09 3.32 0.20 0.40 0.18 0.32
2 A Residential 3-4 dwellings/acre 32 52 0.79 1.11 0.60 0.40 0.18 0.48 15 A Apartments 32 52 11.57 12.44 0.20 0.40 0.18 1.20
26 A Apartments 32 52 20.06 21.57 0.20 0.40 0.18 2.08
20 A Apartments 32 52 15.43 16.59 0.20 0.40 0.18 1.60
20 A Apartments 32 52 15.43 16.59 0.20 0.40 0.18 1.60
40 A Apartments 32 52 30.86 33.18 0.20 0.40 0.18 3.20
131 0.246 0.183 0.087
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - Line NT1 - Foothill Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
37 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
15 A Apartments 32 52 11.57 12.44 0.20 0.40 0.18 1.20
8 A Residential 3-4 dwellings/acre 32 52 3.17 4.43 0.60 0.40 0.18 1.92 17 A Residential 3-4 dwellings/acre 32 52 6.73 9.42 0.60 0.40 0.18 4.08 31 A Apartments 32 52 23.92 25.72 0.20 0.40 0.18 2.48
8 A Public Park 32 52 1.29 3.05 0.85 0.40 0.18 2.72
1 A Apartments 32 52 0.77 0.83 0.20 0.40 0.18 0.08
24 A Apartments 32 52 18.52 19.91 0.20 0.40 0.18 1.92
21 A Residential 10+ dwellings/acre 32 52 16.20 17.42 0.20 0.40 0.18 1.68 2 A Commercial 32 52 1.73 1.80 0.10 0.40 0.18 0.08
127 0.339 0.252 0.127
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - Line NT2 - Fontana Channel Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
38 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
8 A Residential 5-7 dwellings/acre 32 52 3.92 4.98 0.50 0.40 0.18 1.60 2 A Commercial 32 52 1.73 1.80 0.10 0.40 0.18 0.08
5 A Commercial 32 52 4.33 4.49 0.10 0.40 0.18 0.20
10 A Residential 10+ dwellings/acre 32 52 7.72 8.30 0.20 0.40 0.18 0.80 5 A Apartments 32 52 3.86 4.15 0.20 0.40 0.18 0.40
20 A Residential 8-10 dwellings/acre 32 52 11.67 13.83 0.40 0.40 0.18 3.20 11 A Apartments 32 52 8.49 9.12 0.20 0.40 0.18 0.88
8 A Residential 3-4 dwellings/acre 32 52 3.17 4.43 0.60 0.40 0.18 1.92 5 A Apartments 32 52 3.86 4.15 0.20 0.40 0.18 0.40
5 A Residential 3-4 dwellings/acre 32 52 1.98 2.77 0.60 0.40 0.18 1.20 1 A Commercial 32 52 0.43 0.45 0.10 0.40 0.18 0.02
10 A Residential 10+ dwellings/acre 32 52 7.72 8.30 0.20 0.40 0.18 0.80 10 A School 32 52 3.96 5.54 0.60 0.40 1.18 2.40
20 A Residential 3-4 dwellings/acre 32 52 7.91 11.08 0.60 0.40 0.18 4.80 8 A Commercial 32 52 6.92 7.19 0.10 0.40 0.18 0.32
3 A Residential 10+ dwellings/acre 32 52 1.93 2.07 0.20 0.40 0.18 0.20 40 A Residential 3-4 dwellings/acre 32 52 15.83 22.16 0.60 0.40 0.18 9.60 40 A Residential 3-4 dwellings/acre 32 52 15.83 22.16 0.60 0.40 0.18 9.60 3 A Residential 3-4 dwellings/acre 32 52 1.35 1.88 0.60 0.40 0.18 0.82 2 A Public Park 32 52 0.26 0.61 0.85 0.40 1.18 0.54
1 A Public Park 32 52 0.16 0.38 0.85 0.40 0.18 0.34
4 A Residential 3-4 dwellings/acre 32 52 1.50 2.10 0.60 0.40 0.18 0.91 1 A Residential 3-4 dwellings/acre 32 52 0.20 0.28 0.60 0.40 0.18 0.12 3 A Apartments 32 52 1.93 2.07 0.20 0.40 0.18 0.20
4 A Apartments 32 52 3.09 3.32 0.20 0.40 0.18 0.32
8 A Residential 3-4 dwellings/acre 32 52 3.17 4.43 0.60 0.40 0.18 1.92 4 A Public Park 32 52 0.64 1.53 0.85 0.40 0.18 1.36
5 A Apartments 32 52 3.86 4.15 0.20 0.40 0.18 0.40
10 A Residential 3-4 dwellings/acre 32 52 3.96 5.54 0.60 0.40 0.18 2.40 4 A Public Park 32 52 0.64 1.53 0.85 0.40 0.18 1.36
20 A Residential 3-4 dwellings/acre 32 52 7.91 11.08 0.60 0.40 0.18 4.80 4 A Public Park 32 52 0.64 1.53 0.85 0.40 0.18 1.36
8 A Apartments 32 52 6.17 6.64 0.20 0.40 0.18 0.64
290 0.494 0.365 0.193
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - Line NT2 - Foothill Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
39 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
23 A Residential 3-4 dwellings/acre 32 52 9.10 12.74 0.60 0.40 0.18 5.52 16 A Apartments 32 52 12.35 13.27 0.20 0.40 0.18 1.28
6 A Residential 3-4 dwellings/acre 32 52 2.37 3.32 0.60 0.40 0.18 1.44 18 A Public Park 32 52 2.81 6.68 0.85 0.40 0.18 5.95
18 A Apartments 32 52 13.50 14.52 0.20 0.40 0.18 1.40
40 A Apartments 32 52 30.48 32.77 0.20 0.40 0.18 3.16
10 A Commercial 32 52 8.66 8.98 0.10 0.40 0.18 0.40
130 0.388 0.287 0.148
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - Line NT3 - Fontana Channel Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
40 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
5 A School 32 52 1.82 2.55 0.60 0.40 0.18 1.10
4 A Residential 3-4 dwellings/acre 32 52 1.38 1.94 0.60 0.40 0.18 0.84 8 A Residential 3-4 dwellings/acre 32 52 3.17 4.43 0.60 0.40 0.18 1.92 5 A Residential 3-4 dwellings/acre 32 52 1.98 2.77 0.60 0.40 0.18 1.20 5 A School 32 52 1.98 2.77 0.60 0.40 0.18 1.20
16 A Residential 3-4 dwellings/acre 32 52 6.33 8.86 0.60 0.40 0.18 3.84 41 A Residential 3-4 dwellings/acre 32 52 16.22 22.71 0.60 0.40 0.18 9.84 8 A Residential 3-4 dwellings/acre 32 52 2.97 4.15 0.60 0.40 0.18 1.80 8 A Residential 3-4 dwellings/acre 32 52 2.97 4.15 0.60 0.40 0.18 1.80 1 A Residential 3-4 dwellings/acre 32 52 0.32 0.44 0.60 0.40 0.18 0.19 5 A Apartments 32 52 3.86 4.15 0.20 0.40 0.18 0.40
16 A Residential 3-4 dwellings/acre 32 52 6.33 8.86 0.60 0.40 0.18 3.84 5 A Apartments 32 52 3.86 4.15 0.20 0.40 1.18 0.40
30 A Residential 3-4 dwellings/acre 32 52 11.87 16.62 0.60 0.40 0.18 7.20 10 A Apartments 32 52 7.72 8.30 0.20 0.40 0.18 0.80
165 0.559 0.413 0.221
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - Line NT3 - Foothill Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
41 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
22 A Apartments 32 52 16.59 17.83 0.20 0.40 0.18 1.72
5 A Residential 3-4 dwellings/acre 32 52 1.98 2.77 0.60 0.40 0.18 1.20 37 A Residential 3-4 dwellings/acre 32 52 14.64 20.50 0.60 0.40 0.18 8.88 17 A Residential 3-4 dwellings/acre 32 52 6.65 9.31 0.60 0.40 0.18 4.03 11 A Apartments 32 52 8.49 9.12 0.20 0.40 0.18 0.88
1 A Public Park 32 52 0.16 0.38 0.85 0.40 0.18 0.34
20 A Apartments 32 52 15.43 16.59 0.20 0.40 0.18 1.60
3 A Public Park 32 52 0.42 0.99 0.85 0.40 0.18 0.88
1 A Residential 3-4 dwellings/acre 32 52 0.51 0.72 0.60 0.40 0.18 0.31 23 A Apartments 32 52 17.75 19.08 0.20 0.40 0.18 1.84
10 A School 32 52 3.96 5.54 0.60 0.40 0.18 2.40
22 A Residential 8-10 dwellings/acre 32 52 12.84 15.22 0.40 0.40 0.18 3.52 171 0.419 0.310 0.161
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - Line NT4 - Fontana Channel Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
42 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
8 A Residential 3-4 dwellings/acre 32 52 2.97 4.15 0.60 0.40 0.18 1.80 8 A Residential 3-4 dwellings/acre 32 52 2.97 4.15 0.60 0.40 0.18 1.80 5 A Residential 3-4 dwellings/acre 32 52 2.10 2.94 0.60 0.40 0.18 1.27 20 A Residential 3-4 dwellings/acre 32 52 7.91 11.08 0.60 0.40 0.18 4.80 2 A Commercial 32 52 1.73 1.80 0.10 0.40 0.18 0.08
6 A Commercial 32 52 5.54 5.75 0.10 0.40 0.18 0.26
39 A Residential 3-4 dwellings/acre 32 52 15.35 21.49 0.60 0.40 0.18 9.31 8 A Residential 5-7 dwellings/acre 32 52 3.67 4.67 0.50 0.40 0.18 1.50 8 A Residential 5-7 dwellings/acre 32 52 3.67 4.67 0.50 0.40 0.18 1.50 3 A Commercial 32 52 2.16 2.25 0.10 0.40 0.18 0.10
3 A Residential 8-10 dwellings/acre 32 52 1.63 1.94 0.40 0.40 0.18 0.45 2 A Public Park 32 52 0.24 0.57 0.85 0.40 0.18 0.51
15 A Residential 5-7 dwellings/acre 32 52 7.34 9.34 0.50 0.40 1.18 3.00 3 A Commercial 32 52 2.60 2.70 0.10 0.40 0.18 0.12
2 A Residential 8-10 dwellings/acre 32 52 1.17 1.38 0.40 0.40 0.18 0.32 32 A Residential 5-7 dwellings/acre 32 52 15.67 19.93 0.50 0.40 0.18 6.40 2 A Residential 8-10 dwellings/acre 32 52 1.40 1.66 0.40 0.40 0.18 0.38 8 A Commercial 32 52 6.92 7.19 0.10 0.40 0.18 0.32
172 0.505 0.373 0.198
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - Line NT4 - Foothill Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
43 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
14 A Apartments 32 52 10.80 11.61 0.20 0.40 0.18 1.12
1 A Public Park 32 52 0.16 0.38 0.85 0.40 0.18 0.34
14 A Apartments 32 52 10.80 11.61 0.20 0.40 0.18 1.12
22 A Residential 3-4 dwellings/acre 32 52 8.70 12.19 0.60 0.40 0.18 5.28 2 A Public Park 32 52 0.32 0.76 0.85 0.40 0.18 0.68
10 A Apartments 32 52 7.72 8.30 0.20 0.40 0.18 0.80
10 A Apartments 32 52 7.72 8.30 0.20 0.40 0.18 0.80
15 A Residential 8-10 dwellings/acre 32 52 8.75 10.38 0.40 0.40 0.18 2.40 26 A Residential 2.5 acre lots 32 52 2.96 9.03 0.90 0.40 0.18 9.36 114 0.492 0.364 0.192
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - Line NT5 - Fontana Channel Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
44 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
2 A Commercial 32 52 1.99 2.07 0.10 0.40 0.18 0.09
5 A Residential 3-4 dwellings/acre 32 52 1.98 2.77 0.60 0.40 0.18 1.20 8 A Residential 3-4 dwellings/acre 32 52 2.97 4.15 0.60 0.40 0.18 1.80 5 A Residential 3-4 dwellings/acre 32 52 1.98 2.77 0.60 0.40 0.18 1.20 3 A Commercial 32 52 2.60 2.70 0.10 0.40 0.18 0.12
18 A Residential 3-4 dwellings/acre 32 52 7.12 9.97 0.60 0.40 0.18 4.32 40 A Residential 3-4 dwellings/acre 32 52 15.83 22.16 0.60 0.40 0.18 9.60 40 A Residential 3-4 dwellings/acre 32 52 15.83 22.16 0.60 0.40 0.18 9.60 8 A Apartments 32 52 5.79 6.22 0.20 0.40 0.18 0.60
8 A Apartments 32 52 5.79 6.22 0.20 0.40 0.18 0.60
5 A Apartments 32 52 3.86 4.15 0.20 0.40 0.18 0.40
20 A Apartments 32 52 15.43 16.59 0.20 0.40 0.18 1.60
20 A School 32 52 7.91 11.08 0.60 0.40 1.18 4.80
10 A Apartments 32 52 7.72 8.30 0.20 0.40 0.18 0.80
10 A Residential 10+ dwellings/acre 32 52 7.72 8.30 0.20 0.40 0.18 0.80 10 A School 32 52 3.96 5.54 0.60 0.40 0.18 2.40
10 A Residential 10+ dwellings/acre 32 52 7.72 8.30 0.20 0.40 0.18 0.80 20 A Apartments 32 52 15.43 16.59 0.20 0.40 0.18 1.60
241 0.454 0.335 0.176
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - Line NT5 - Foothill Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
45 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
10 A Commercial 32 52 8.66 8.98 0.10 0.40 0.18 0.40
10 A Commercial 32 52 8.66 8.98 0.10 0.40 0.18 0.40
20 A Commercial 32 52 17.31 17.97 0.10 0.40 0.18 0.80
28 A Commercial 32 52 24.24 25.16 0.10 0.40 0.18 1.12
40 A Commercial 32 52 34.62 35.94 0.10 0.40 0.18 1.60
78 A Residential 2.5 acre lots 32 52 8.87 27.09 0.90 0.40 0.18 28.08 186 0.450 0.333 0.174
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - Line NT6 Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
46 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
35 A Residential 3-4 dwellings/acre 32 52 13.85 19.39 0.60 0.40 0.18 8.40 64 A Residential 8-10 dwellings/acre 32 52 37.35 44.27 0.40 0.40 0.18 10.24 4 A Public Park 32 52 0.64 1.53 0.85 0.40 0.18 1.36
3 A Commercial 32 52 2.60 2.70 0.10 0.40 0.18 0.12
2 A Residential 3-4 dwellings/acre 32 52 0.79 1.11 0.60 0.40 0.18 0.48 15 A Residential 10+ dwellings/acre 32 52 3.01 6.03 0.80 0.40 0.18 4.64 0 A Public Park 32 52 0.06 0.15 0.85 0.40 0.18 0.14
5 A Commercial 32 52 4.33 4.49 0.10 0.40 0.18 0.20
2 A Commercial 32 52 1.73 1.80 0.10 0.40 0.18 0.08
8 A Commercial 32 52 6.49 6.74 0.10 0.40 0.18 0.30
5 A Commercial 32 52 4.33 4.49 0.10 0.40 0.18 0.20
20 A Commercial 32 52 17.31 17.97 0.10 0.40 0.18 0.80
40 A Commercial 32 52 34.62 35.94 0.10 0.40 1.18 1.60
40 A Commercial 32 52 34.62 35.94 0.10 0.40 0.18 1.60
80 A Commercial 32 52 69.24 71.87 0.10 0.40 0.18 3.20
322 0.284 0.211 0.103
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - Line NT7 - Fontana Channel Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
47 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
8 A Residential 3-4 dwellings/acre 32 52 2.97 4.15 0.60 0.40 0.18 1.80 8 A Residential 3-4 dwellings/acre 32 52 2.97 4.15 0.60 0.40 0.18 1.80 5 A Residential 3-4 dwellings/acre 32 52 1.98 2.77 0.60 0.40 0.18 1.20 20 A Residential 3-4 dwellings/acre 32 52 7.91 11.08 0.60 0.40 0.18 4.80 40 A Residential 3-4 dwellings/acre 32 52 15.83 22.16 0.60 0.40 0.18 9.60 8 A Residential 3-4 dwellings/acre 32 52 2.97 4.15 0.60 0.40 0.18 1.80 2 A Residential 3-4 dwellings/acre 32 52 0.79 1.11 0.60 0.40 0.18 0.48 6 A Residential 8-10 dwellings/acre 32 52 3.21 3.80 0.40 0.40 0.18 0.88 2 A Residential 8-10 dwellings/acre 32 52 1.17 1.38 0.40 0.40 0.18 0.32 3 A Apartments 32 52 2.31 2.49 0.20 0.40 0.18 0.24
13 A Residential 3-4 dwellings/acre 32 52 4.95 6.92 0.60 0.40 0.18 3.00 9 A Residential 8-10 dwellings/acre 32 52 4.96 5.88 0.40 0.40 0.18 1.36 4 A Apartments 32 52 3.09 3.32 0.20 0.40 1.18 0.32
23 A Residential 3-4 dwellings/acre 32 52 9.10 12.74 0.60 0.40 0.18 5.52 9 A Residential 8-10 dwellings/acre 32 52 5.25 6.23 0.40 0.40 0.18 1.44 6 A Apartments 32 52 4.63 4.98 0.20 0.40 0.18 0.48
163 0.546 0.403 0.215
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - Line NT7 - Foothill Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
48 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
10 A Commercial 32 52 8.66 8.98 0.10 0.40 0.18 0.40
27 A Residential 3-4 dwellings/acre 32 52 10.68 14.96 0.60 0.40 0.18 6.48 48 A Residential 3-4 dwellings/acre 32 52 18.99 26.59 0.60 0.40 0.18 11.52 45 A Commercial 32 52 38.95 40.43 0.10 0.40 0.18 1.80
11 A Residential 3-4 dwellings/acre 32 52 4.35 6.09 0.60 0.40 0.18 2.64 141 0.421 0.312 0.162
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - Line NT8 - Fontana Channel Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
49 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
8 A Residential 5-7 dwellings/acre 32 52 3.67 4.67 0.50 0.40 0.18 1.50 8 A Residential 5-7 dwellings/acre 32 52 3.67 4.67 0.50 0.40 0.18 1.50 5 A Residential 5-7 dwellings/acre 32 52 2.45 3.11 0.50 0.40 0.18 1.00 20 A Residential 5-7 dwellings/acre 32 52 9.79 12.46 0.50 0.40 0.18 4.00 40 A Residential 5-7 dwellings/acre 32 52 19.59 24.91 0.50 0.40 0.18 8.00 5 A Commercial 32 52 4.33 4.49 0.10 0.40 0.18 0.20
35 A Residential 5-7 dwellings/acre 32 52 17.14 21.80 0.50 0.40 0.18 7.00 20 A Residential 3-4 dwellings/acre 32 52 7.91 11.08 0.60 0.40 0.18 4.80 1 A Public Park 32 52 0.16 0.38 0.85 0.40 0.18 0.34
21 A Commercial 32 52 18.18 18.87 0.10 0.40 0.18 0.84
2 A Residential 10+ dwellings/acre 32 52 0.42 0.83 0.80 0.40 0.18 0.64 164 0.468 0.346 0.182
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - Line NT8 - Foothill Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
50 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
21 A Residential 3-4 dwellings/acre 32 52 8.31 11.63 0.60 0.40 0.18 5.04 14 A Residential 8-10 dwellings/acre 32 52 8.17 9.68 0.40 0.40 0.18 2.24 17 A Residential 8-10 dwellings/acre 32 52 9.92 11.76 0.40 0.40 0.18 2.72 2 A Public Park 32 52 0.32 0.76 0.85 0.40 0.18 0.68
25 A Residential 3-4 dwellings/acre 32 52 9.89 13.85 0.60 0.40 0.18 6.00 23 A Residential 3-4 dwellings/acre 32 52 9.10 12.74 0.60 0.40 0.18 5.52 19 A Residential 8-10 dwellings/acre 32 52 11.09 13.14 0.40 0.40 0.18 3.04 1 A Commercial 32 52 0.87 0.90 0.10 0.40 0.18 0.04
10 A Commercial 32 52 8.66 8.98 0.10 0.40 0.18 0.40
25 A Residential 3-4 dwellings/acre 32 52 9.89 13.85 0.60 0.40 0.18 6.00 2 A Public Park 32 52 0.32 0.76 0.85 0.40 0.18 0.68
3 A Residential 10+ dwellings/acre 32 52 2.31 2.49 0.20 0.40 0.18 0.24 15 A Residential 8-10 dwellings/acre 32 52 8.75 10.38 0.40 0.40 1.18 2.40 1 A Commercial 32 52 0.87 0.90 0.10 0.40 0.18 0.04
24 A Residential 3-4 dwellings/acre 32 52 9.50 13.29 0.60 0.40 0.18 5.76 25 A Residential 3-4 dwellings/acre 32 52 9.89 13.85 0.60 0.40 0.18 6.00 9 A School 32 52 3.56 4.99 0.60 0.40 0.18 2.16
8 A Commercial 32 52 6.92 7.19 0.10 0.40 0.18 0.32
244 0.515 0.381 0.202
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - Line Channel Alder Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
51 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
21 A Residential 3-4 dwellings/acre 32 52 8.31 11.63 0.60 0.40 0.18 5.04 7 A Residential 10+ dwellings/acre 32 52 5.40 5.81 0.20 0.40 0.18 0.56 7 A Commercial 32 52 6.06 6.29 0.10 0.40 0.18 0.28
23 A Residential 3-4 dwellings/acre 32 52 9.10 12.74 0.60 0.40 0.18 5.52 2 A Public Park 32 52 0.32 0.76 0.85 0.40 0.18 0.68
20 A Residential 8-10 dwellings/acre 32 52 11.67 13.83 0.40 0.40 0.18 3.20 10 A Residential 8-10 dwellings/acre 32 52 5.84 6.92 0.40 0.40 0.18 1.60 31 A Residential 3-4 dwellings/acre 32 52 12.27 17.17 0.60 0.40 0.18 7.44 8 A Commercial 32 52 6.92 7.19 0.10 0.40 0.18 0.32
46 A Residential 3-4 dwellings/acre 32 52 18.20 25.48 0.60 0.40 0.18 11.04 2 A Public Park 32 52 0.32 0.76 0.85 0.40 0.18 0.68
8 A Residential 8-10 dwellings/acre 32 52 4.67 5.53 0.40 0.40 0.18 1.28 10 A School 32 52 3.96 5.54 0.60 0.40 1.18 2.40
5 A Residential 10+ dwellings/acre 32 52 3.86 4.15 0.20 0.40 0.18 0.40 36 A Residential 3-4 dwellings/acre 32 52 14.24 19.94 0.60 0.40 0.18 8.64 5 A Commercial 32 52 4.33 4.49 0.10 0.40 0.18 0.20
241 0.521 0.385 0.204
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - Line Channel Locust Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
52 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
15 A Residential 3-4 dwellings/acre 32 52 5.93 8.31 0.60 0.40 0.18 3.60 20 A Apartments 32 52 15.43 16.59 0.20 0.40 0.18 1.60
18 A School 32 52 7.12 9.97 0.60 0.40 0.18 4.32
2 A Public Park 32 52 0.32 0.76 0.85 0.40 0.18 0.68
25 A Residential 3-4 dwellings/acre 32 52 9.89 13.85 0.60 0.40 0.18 6.00 35 A Apartments 32 52 27.00 29.03 0.20 0.40 0.18 2.80
12 A Residential 3-4 dwellings/acre 32 52 4.75 6.65 0.60 0.40 0.18 2.88 13 A Apartments 32 52 10.03 10.78 0.20 0.40 0.18 1.04
8 A Public Park 32 52 1.29 3.05 0.85 0.40 0.18 2.72
6 A Commercial 32 52 5.19 5.39 0.10 0.40 0.18 0.24
5 A School 32 52 1.98 2.77 0.60 0.40 0.18 1.20
11 A Public Park 32 52 1.77 4.20 0.85 0.40 0.18 3.74
33 A Residential 3-4 dwellings/acre 32 52 13.06 18.28 0.60 0.40 1.18 7.92 203 0.489 0.361 0.191
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - Line Channel Palmetto Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
53 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
82 A Residential 3-4 dwellings/acre 32 52 32.44 45.42 0.60 0.40 0.18 19.68 69 A Residential 3-4 dwellings/acre 32 52 27.30 38.22 0.60 0.40 0.18 16.56 11 A Commercial 32 52 9.52 9.88 0.10 0.40 0.18 0.44
82 A Residential 3-4 dwellings/acre 32 52 32.44 45.42 0.60 0.40 0.18 19.68 5 A Commercial 32 52 4.33 4.49 0.10 0.40 0.18 0.20
13 A Residential 8-10 dwellings/acre 32 52 7.59 8.99 0.40 0.40 0.18 2.08 5 A Public Park 32 52 0.80 1.91 0.85 0.40 0.18 1.70
10 A School 32 52 3.96 5.54 0.60 0.40 0.18 2.40
47 A Residential 3-4 dwellings/acre 32 52 18.60 26.04 0.60 0.40 0.18 11.28 324 0.577 0.426 0.228
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - Line Foothill Alder Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
54 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
23 A School 32 52 9.10 12.74 0.60 0.40 0.18 5.52
58 A Residential 3-4 dwellings/acre 32 52 22.95 32.13 0.60 0.40 0.18 13.92 5 A Residential 8-10 dwellings/acre 32 52 2.92 3.46 0.40 0.40 0.18 0.80 5 A Commercial 32 52 4.33 4.49 0.10 0.40 0.18 0.20
11 A Residential 10+ dwellings/acre 32 52 8.49 9.12 0.20 0.40 0.18 0.88 30 A Residential 3-4 dwellings/acre 32 52 11.87 16.62 0.60 0.40 0.18 7.20 30 A Residential 3-4 dwellings/acre 32 52 11.87 16.62 0.60 0.40 0.18 7.20 2 A Public Park 32 52 0.32 0.76 0.85 0.40 0.18 0.68
68 A Residential 3-4 dwellings/acre 32 52 26.90 37.67 0.60 0.40 0.18 16.32 10 A School 32 52 3.96 5.54 0.60 0.40 0.18 2.40
7 A Commercial 32 52 6.06 6.29 0.10 0.40 0.18 0.28
63 A Residential 3-4 dwellings/acre 32 52 24.93 34.90 0.60 0.40 0.18 15.12 10 A School 32 52 3.96 5.54 0.60 0.40 1.18 2.40
322 0.573 0.423 0.226
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - Line Foothill Locust Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
55 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
81 A Residential 3-4 dwellings/acre 32 52 32.05 44.87 0.60 0.40 0.18 19.44 11 A Residential 3-4 dwellings/acre 32 52 4.35 6.09 0.60 0.40 0.18 2.64 10 A School 32 52 3.96 5.54 0.60 0.40 0.18 2.40
11 A Residential 8-10 dwellings/acre 32 52 6.42 7.61 0.40 0.40 0.18 1.76 34 A Apartments 32 52 26.23 28.20 0.20 0.40 0.18 2.72
3 A Residential 10+ dwellings/acre 32 52 2.31 2.49 0.20 0.40 0.18 0.24 42 A Residential 3-4 dwellings/acre 32 52 16.62 23.27 0.60 0.40 0.18 10.08 20 A Apartments 32 52 15.43 16.59 0.20 0.40 0.18 1.60
11 A Residential 3-4 dwellings/acre 32 52 4.35 6.09 0.60 0.40 0.18 2.64 223 0.499 0.369 0.195 Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - Line Foothill Palmetto Low Loss Fraction (1-Y) =
Soil Type Land Use Ap
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
AMCArea
(ac)
Maximum
Loss Rate
(Fm) x Area
AMC
56 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
72 A Residential 3-4 dwellings/acre 32 52 28.49 39.88 0.60 0.40 0.18 17.28 45 A Residential 3-4 dwellings/acre 32 52 17.80 24.93 0.60 0.40 0.18 10.80 72 A Residential 3-4 dwellings/acre 32 52 28.49 39.88 0.60 0.40 0.18 17.28 45 A Residential 3-4 dwellings/acre 32 52 17.80 24.93 0.60 0.40 0.18 10.80 234 0.604 0.446 0.240
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - Line Randall Alder Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
57 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
1 A School 32 52 0.40 0.55 0.60 0.40 0.18 0.24
72 A Residential 3-4 dwellings/acre 32 52 28.49 39.88 0.60 0.40 0.18 17.28 45 A Residential 3-4 dwellings/acre 32 52 17.80 24.93 0.60 0.40 0.18 10.80 75 A Residential 3-4 dwellings/acre 32 52 29.67 41.55 0.60 0.40 0.18 18.00 44 A Residential 3-4 dwellings/acre 32 52 17.41 24.37 0.60 0.40 0.18 10.56 237 0.604 0.446 0.240
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - Line Randall Locust Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
58 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
48 A Apartments 32 52 37.04 39.82 0.20 0.40 0.18 3.84
20 A Residential 3-4 dwellings/acre 32 52 7.91 11.08 0.60 0.40 0.18 4.80 46 A Apartments 32 52 35.49 38.16 0.20 0.40 0.18 3.68
42 A Residential 3-4 dwellings/acre 32 52 16.62 23.27 0.60 0.40 0.18 10.08 2 A Public Park 32 52 0.32 0.76 0.85 0.40 0.18 0.68
2 A Apartments 32 52 1.54 1.66 0.20 0.40 0.18 0.16
25 A Public Park 32 52 4.02 9.54 0.85 0.40 0.18 8.50
42 A Residential 3-4 dwellings/acre 32 52 16.62 23.27 0.60 0.40 0.18 10.08 227 0.473 0.350 0.184 Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - Line Randall Palmetto Low Loss Fraction (1-Y) =
Soil Type Land Use Ap
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
AMCArea
(ac)
Maximum
Loss Rate
(Fm) x Area
AMC
59 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
2 A Commercial 32 52 1.73 1.80 0.10 0.40 0.18 0.08
78 A Residential 3-4 dwellings/acre 32 52 30.86 43.21 0.60 0.40 0.18 18.72 2 A Commercial 32 52 1.73 1.80 0.10 0.40 0.18 0.08
27 A Residential 8-10 dwellings/acre 32 52 15.76 18.68 0.40 0.40 0.18 4.32 31 A Residential 3-4 dwellings/acre 32 52 12.27 17.17 0.60 0.40 0.18 7.44 19 A Apartments 32 52 14.66 15.76 0.20 0.40 0.18 1.52
29 A Commercial 32 52 25.10 26.05 0.10 0.40 0.18 1.16
188 0.457 0.338 0.177
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - Line SB Fwy and Alder Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
60 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
80 A Residential 3-4 dwellings/acre 32 52 31.65 44.32 0.60 0.40 0.18 19.20 40 A Apartments 32 52 30.86 33.18 0.20 0.40 0.18 3.20
40 A Residential 3-4 dwellings/acre 32 52 15.83 22.16 0.60 0.40 0.18 9.60 18 A Apartments 32 52 13.50 14.52 0.20 0.40 0.18 1.40
38 A Residential 3-4 dwellings/acre 32 52 15.04 21.05 0.60 0.40 0.18 9.12 25 A Commercial 32 52 21.64 22.46 0.10 0.40 0.18 1.00
30 A Apartments 32 52 23.15 24.89 0.20 0.40 0.18 2.40
271 0.439 0.325 0.170
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - Line SB Fwy and Palmetto Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
61 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
10 A School 32 52 3.96 5.54 0.60 0.40 0.18 2.40
71 A Residential 3-4 dwellings/acre 32 52 28.09 39.33 0.60 0.40 0.18 17.04 18 A Apartments 32 52 13.89 14.93 0.20 0.40 0.18 1.44
59 A Residential 3-4 dwellings/acre 32 52 23.34 32.68 0.60 0.40 0.18 14.16 16 A Apartments 32 52 12.35 13.27 0.20 0.40 0.18 1.28
13 A Commercial 32 52 11.25 11.68 0.10 0.40 0.18 0.52
187 0.503 0.372 0.197
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - Line SB Fwy and Tamarind Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
62 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
10 A Residential 2.5 acre lots 32 52 1.14 3.47 0.90 0.40 0.18 3.60 10 A Residential 2.5 acre lots 32 52 1.14 3.47 0.90 0.40 0.18 3.60 17 A Residential 2.5 acre lots 32 52 1.93 5.90 0.90 0.40 0.18 6.12 37 A Commercial 32 52 32.03 33.24 0.10 0.40 0.18 1.48
45 A Commercial 32 52 38.95 40.43 0.10 0.40 0.18 1.80
45 A Commercial 32 52 38.95 40.43 0.10 0.40 0.18 1.80
164 0.304 0.226 0.112
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - Line SS2 Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
63 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
10 A Commercial 32 52 8.66 8.98 0.10 0.40 0.18 0.40
10 A Commercial 32 52 8.66 8.98 0.10 0.40 0.18 0.40
20 A Commercial 32 52 17.31 17.97 0.10 0.40 0.18 0.80
20 A Commercial 32 52 17.31 17.97 0.10 0.40 0.18 0.80
40 A Commercial 32 52 34.62 35.94 0.10 0.40 0.18 1.60
96 A Commercial 32 52 83.09 86.25 0.10 0.40 0.18 3.84
100 A Commercial 32 52 86.55 89.84 0.10 0.40 0.18 4.00
96 A Commercial 32 52 83.09 86.25 0.10 0.40 0.18 3.84
174 A Commercial 32 52 150.60 156.32 0.10 0.40 0.18 6.96 566 0.134 0.102 0.040
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - Line SS2A Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
64 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
10 A Commercial 32 52 8.66 8.98 0.10 0.40 0.18 0.40
10 A Commercial 32 52 8.66 8.98 0.10 0.40 0.18 0.40
20 A Commercial 32 52 17.31 17.97 0.10 0.40 0.18 0.80
40 A Commercial 32 52 34.62 35.94 0.10 0.40 0.18 1.60
80 A Commercial 32 52 69.24 71.87 0.10 0.40 0.18 3.20
80 A Commercial 32 52 69.24 71.87 0.10 0.40 0.18 3.20
88 A Commercial 32 52 76.17 79.06 0.10 0.40 0.18 3.52
154 A Commercial 32 52 133.29 138.36 0.10 0.40 0.18 6.16 482 0.134 0.102 0.040
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - Line SS2B Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
65 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
10 A Commercial 32 52 8.66 8.98 0.10 0.40 0.18 0.40
10 A Commercial 32 52 8.66 8.98 0.10 0.40 0.18 0.40
20 A Commercial 32 52 17.31 17.97 0.10 0.40 0.18 0.80
40 A Commercial 32 52 34.62 35.94 0.10 0.40 0.18 1.60
80 A Commercial 32 52 69.24 71.87 0.10 0.40 0.18 3.20
80 A Commercial 32 52 69.24 71.87 0.10 0.40 0.18 3.20
83 A Commercial 32 52 71.84 74.57 0.10 0.40 0.18 3.32
151 A Commercial 32 52 130.70 135.66 0.10 0.40 0.18 6.04 474 0.134 0.102 0.040
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - Line SS2C Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
66 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
10 A Residential 3-4 dwellings/acre 32 52 3.96 5.54 0.60 0.40 0.18 2.40 10 A Residential 3-4 dwellings/acre 32 52 3.96 5.54 0.60 0.40 0.18 2.40 10 A Residential 3-4 dwellings/acre 32 52 3.96 5.54 0.60 0.40 0.18 2.40 20 A Commercial 32 52 17.31 17.97 0.10 0.40 0.18 0.80
20 A Residential 3-4 dwellings/acre 32 52 7.91 11.08 0.60 0.40 0.18 4.80 20 A Commercial 32 52 17.31 17.97 0.10 0.40 0.18 0.80
5 A Residential 3-4 dwellings/acre 32 52 1.98 2.77 0.60 0.40 0.18 1.20 56 A Commercial 32 52 48.47 50.31 0.10 0.40 0.18 2.24
151 0.306 0.227 0.113
AMC
Fm = Low Loss Fraction (1-Y) =

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - Line SS2D Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
67 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
7 A Residential 10+ dwellings/acre 32 52 5.40 5.81 0.20 0.40 0.18 0.56 3 A Residential 3-4 dwellings/acre 32 52 1.19 1.66 0.60 0.40 0.18 0.72 6 A Residential 10+ dwellings/acre 32 52 4.63 4.98 0.20 0.40 0.18 0.48 3 A Residential 3-4 dwellings/acre 32 52 1.27 1.77 0.60 0.40 0.18 0.77 6 A Residential 10+ dwellings/acre 32 52 4.63 4.98 0.20 0.40 0.18 0.48 3 A Residential 3-4 dwellings/acre 32 52 1.19 1.66 0.60 0.40 0.18 0.72 10 A Residential 10+ dwellings/acre 32 52 7.72 8.30 0.20 0.40 0.18 0.80 10 A Residential 3-4 dwellings/acre 32 52 3.96 5.54 0.60 0.40 0.18 2.40 10 A Apartments 32 52 7.72 8.30 0.20 0.40 0.18 0.80
7 A Residential 3-4 dwellings/acre 32 52 2.77 3.88 0.60 0.40 0.18 1.68 5 A Residential 3-4 dwellings/acre 32 52 1.98 2.77 0.60 0.40 0.18 1.20 5 A Residential 3-4 dwellings/acre 32 52 1.98 2.77 0.60 0.40 0.18 1.20 10 A Residential 3-4 dwellings/acre 32 52 3.96 5.54 0.60 0.40 1.18 2.40 10 A Residential 3-4 dwellings/acre 32 52 3.96 5.54 0.60 0.40 0.18 2.40 17 A Residential 3-4 dwellings/acre 32 52 6.53 9.14 0.60 0.40 0.18 3.96 43 A Residential 3-4 dwellings/acre 32 52 17.13 23.99 0.60 0.40 0.18 10.39 10 A Commercial 32 52 8.66 8.98 0.10 0.40 0.18 0.40
30 A Residential 3-4 dwellings/acre 32 52 11.87 16.62 0.60 0.40 0.18 7.20 20 A Commercial 32 52 17.31 17.97 0.10 0.40 0.18 0.80
215 0.471 0.348 0.183
Area
(ac) Soil Type Land Use

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - West Fontana T1 Low Loss Fraction (1-Y) =
AMC Ap
Maximum
Loss Rate
(Fm) x Area
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
AMC
Fm =
68 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
5 A Residential 3-4 dwellings/acre 32 52 1.98 2.77 0.60 0.40 0.18 1.20 5 A Commercial 32 52 4.33 4.49 0.10 0.40 0.18 0.20
5 A Residential 3-4 dwellings/acre 32 52 1.98 2.77 0.60 0.40 0.18 1.20 5 A Commercial 32 52 4.33 4.49 0.10 0.40 0.18 0.20
9 A Residential 3-4 dwellings/acre 32 52 3.56 4.99 0.60 0.40 0.18 2.16 9 A Commercial 32 52 7.79 8.09 0.10 0.40 0.18 0.36
15 A Commercial 32 52 12.98 13.48 0.10 0.40 0.18 0.60
53 0.303 0.225 0.112
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - West Fontana T1A Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
69 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
1 A Residential 3-4 dwellings/acre 32 52 0.40 0.55 0.60 0.40 0.18 0.24 9 A Apartments 32 52 6.94 7.47 0.20 0.40 0.18 0.72
2 A Apartments 32 52 1.54 1.66 0.20 0.40 0.18 0.16
4 A Residential 3-4 dwellings/acre 32 52 1.58 2.22 0.60 0.40 0.18 0.96 1 A Apartments 32 52 0.77 0.83 0.20 0.40 0.18 0.08
6 A Residential 3-4 dwellings/acre 32 52 2.37 3.32 0.60 0.40 0.18 1.44 18 A Residential 3-4 dwellings/acre 32 52 7.12 9.97 0.60 0.40 0.18 4.32 2 A Residential 3-4 dwellings/acre 32 52 0.79 1.11 0.60 0.40 0.18 0.48 5 A Apartments 32 52 3.47 3.73 0.20 0.40 0.18 0.36
10 A Residential 3-4 dwellings/acre 32 52 3.96 5.54 0.60 0.40 0.18 2.40 7 A Residential 3-4 dwellings/acre 32 52 2.85 3.99 0.60 0.40 0.18 1.73 10 A Commercial 32 52 8.66 8.98 0.10 0.40 0.18 0.40
7 A Residential 3-4 dwellings/acre 32 52 2.57 3.60 0.60 0.40 1.18 1.56 22 A Commercial 32 52 19.04 19.77 0.10 0.40 0.18 0.88
10 A School 32 52 3.96 5.54 0.60 0.40 0.18 2.40
8 A Residential 3-4 dwellings/acre 32 52 3.17 4.43 0.60 0.40 0.18 1.92 19 A Commercial 32 52 16.45 17.07 0.10 0.40 0.18 0.76
140 0.389 0.288 0.148
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - West Fontana T2 Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
70 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
8 A Apartments 32 52 5.79 6.22 0.20 0.40 0.18 0.60
8 A Apartments 32 52 5.79 6.22 0.20 0.40 0.18 0.60
5 A Commercial 32 52 4.33 4.49 0.10 0.40 0.18 0.20
15 A Apartments 32 52 11.57 12.44 0.20 0.40 0.18 1.20
5 A Commercial 32 52 4.33 4.49 0.10 0.40 0.18 0.20
29 A Apartments 32 52 22.38 24.06 0.20 0.40 0.18 2.32
9 A Residential 3-4 dwellings/acre 32 52 3.56 4.99 0.60 0.40 0.18 2.16 3 A Residential 8-10 dwellings/acre 32 52 1.46 1.73 0.40 0.40 0.18 0.40 7 A Apartments 32 52 5.40 5.81 0.20 0.40 0.18 0.56
10 A School 32 52 3.76 5.26 0.60 0.40 0.18 2.28
59 A Residential 3-4 dwellings/acre 32 52 23.34 32.68 0.60 0.40 0.18 14.16 32 A Residential 3-4 dwellings/acre 32 52 12.66 17.73 0.60 0.40 0.18 7.68 47 A Apartments 32 52 36.26 38.99 0.20 0.40 1.18 3.76
38 A Commercial 32 52 32.89 34.14 0.10 0.40 0.18 1.52
8 A Residential 2.5 acre lots 32 52 0.91 2.78 0.90 0.40 0.18 2.88 6 A Commercial 32 52 5.19 5.39 0.10 0.40 0.18 0.24
287 0.374 0.277 0.142
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - West Fontana T3 Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
71 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
3 A Commercial 32 52 2.60 2.70 0.10 0.40 0.18 0.12
2 A Commercial 32 52 1.73 1.80 0.10 0.40 0.18 0.08
5 A Commercial 32 52 4.33 4.49 0.10 0.40 0.18 0.20
10 A Commercial 32 52 8.66 8.98 0.10 0.40 0.18 0.40
20 A Commercial 32 52 17.31 17.97 0.10 0.40 0.18 0.80
5 A Commercial 32 52 4.33 4.49 0.10 0.40 0.18 0.20
16 A Commercial 32 52 13.85 14.37 0.10 0.40 0.18 0.64
61 0.134 0.102 0.040
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - West Fontana T3A Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
72 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
5 A Commercial 32 52 4.33 4.49 0.10 0.40 0.18 0.20
5 A Commercial 32 52 4.33 4.49 0.10 0.40 0.18 0.20
10 A Commercial 32 52 8.66 8.98 0.10 0.40 0.18 0.40
20 A Commercial 32 52 17.31 17.97 0.10 0.40 0.18 0.80
21 A Commercial 32 52 18.18 18.87 0.10 0.40 0.18 0.84
61 0.134 0.102 0.040
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - West Fontana T3B Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
73 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
8 A Apartments 32 52 5.79 6.22 0.20 0.40 0.18 0.60
8 A Apartments 32 52 5.79 6.22 0.20 0.40 0.18 0.60
5 A Apartments 32 52 3.86 4.15 0.20 0.40 0.18 0.40
20 A Apartments 32 52 15.43 16.59 0.20 0.40 0.18 1.60
40 A Apartments 32 52 30.86 33.18 0.20 0.40 0.18 3.20
80 A Apartments 32 52 61.73 66.36 0.20 0.40 0.18 6.40
51 A Commercial 32 52 44.14 45.82 0.10 0.40 0.18 2.04
15 A Commercial 32 52 12.98 13.48 0.10 0.40 0.18 0.60
226 0.201 0.150 0.068
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - West Fontana T4 Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
74 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 1
25 100
II III 5.88 7.32 II III
5 A Commercial 32 52 4.33 4.49 0.10 0.40 0.18 0.20
3 A Commercial 32 52 2.16 2.25 0.10 0.40 0.18 0.10
8 A Commercial 32 52 6.49 6.74 0.10 0.40 0.18 0.30
15 A Commercial 32 52 12.98 13.48 0.10 0.40 0.18 0.60
21 A Commercial 32 52 18.18 18.87 0.10 0.40 0.18 0.84
13 A Commercial 32 52 11.25 11.68 0.10 0.40 0.18 0.52
64 0.134 0.102 0.040
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 1
Unit Hydrograph Method Loss Rate Parameter Development - West Fontana T4A Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
75 of 75
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 2
25 100
II III 5.88 7.32 II III
9 A Commercial 32 52 7.36 7.64 0.10 0.40 0.18 0.34
9 A Commercial 32 52 7.36 7.64 0.10 0.40 0.18 0.34
20 A Commercial 32 52 17.31 17.97 0.10 0.40 0.18 0.80
33 A Commercial 32 52 28.56 29.65 0.10 0.40 0.18 1.32
46 A Commercial 32 52 39.82 41.33 0.10 0.40 0.18 1.84
63 A Commercial 32 52 54.53 56.60 0.10 0.40 0.18 2.52
20 A Residential 2 dwellings/acre 32 52 6.03 9.70 0.70 0.40 0.18 5.60 199 0.191 0.143 0.064
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 2
Unit Hydrograph Method Loss Rate Parameter Development - Line DZ10 - Poplar Ave Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
1 of 42
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 2
25 100
II III 5.88 7.32 II III
8 A Commercial 32 52 6.49 6.74 0.10 0.40 0.18 0.30
8 A Commercial 32 52 6.49 6.74 0.10 0.40 0.18 0.30
15 A Commercial 32 52 12.98 13.48 0.10 0.40 0.18 0.60
30 A Commercial 32 52 25.97 26.95 0.10 0.40 0.18 1.20
37 A Commercial 32 52 32.03 33.24 0.10 0.40 0.18 1.48
16 A Commercial 32 52 13.85 14.37 0.10 0.40 0.18 0.64
87 A Commercial 32 52 75.30 78.16 0.10 0.40 0.18 3.48
200 0.134 0.102 0.040
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 2
Unit Hydrograph Method Loss Rate Parameter Development - Line DZ11 - Live Oak Ave Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
2 of 42
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 2
25 100
II III 5.88 7.32 II III
9 A Commercial 32 52 7.79 8.09 0.10 0.40 0.18 0.36
6 A Commercial 32 52 4.76 4.94 0.10 0.40 0.18 0.22
15 A Commercial 32 52 12.55 13.03 0.10 0.40 0.18 0.58
29 A Commercial 32 52 25.10 26.05 0.10 0.40 0.18 1.16
50 A Commercial 32 52 43.28 44.92 0.10 0.40 0.18 2.00
80 A Commercial 32 52 69.24 71.87 0.10 0.40 0.18 3.20
188 0.134 0.102 0.040
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 2
Unit Hydrograph Method Loss Rate Parameter Development - Line DZ12 - Redwood Ave Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
3 of 42
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 2
25 100
II III 5.88 7.32 II III
7 A Commercial 32 52 6.06 6.29 0.10 0.40 0.18 0.28
7 A Commercial 32 52 6.06 6.29 0.10 0.40 0.18 0.28
14 A Commercial 32 52 12.12 12.58 0.10 0.40 0.18 0.56
28 A Commercial 32 52 24.24 25.16 0.10 0.40 0.18 1.12
52 A Commercial 32 52 45.01 46.72 0.10 0.40 0.18 2.08
83 A Commercial 32 52 71.84 74.57 0.10 0.40 0.18 3.32
191 0.134 0.102 0.040
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 2
Unit Hydrograph Method Loss Rate Parameter Development - Line DZ13 - Cherry Ave Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
4 of 42
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 2
25 100
II III 5.88 7.32 II III
10 A Commercial 32 52 8.66 8.98 0.10 0.40 0.18 0.40
9 A Commercial 32 52 7.79 8.09 0.10 0.40 0.18 0.36
9 A Commercial 32 52 7.79 8.09 0.10 0.40 0.18 0.36
27 A Commercial 32 52 23.37 24.26 0.10 0.40 0.18 1.08
53 A Commercial 32 52 45.87 47.62 0.10 0.40 0.18 2.12
40 A Commercial 32 52 34.62 35.94 0.10 0.40 0.18 1.60
43 A School 32 52 17.01 23.82 0.60 0.40 0.18 10.32
191 0.240 0.179 0.085
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 2
Unit Hydrograph Method Loss Rate Parameter Development - Line DZ14 - Almond Ave Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
5 of 42
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 2
25 100
II III 5.88 7.32 II III
10 A Commercial 32 52 8.66 8.98 0.10 0.40 0.18 0.40
9 A Commercial 32 52 7.79 8.09 0.10 0.40 0.18 0.36
9 A Commercial 32 52 7.79 8.09 0.10 0.40 0.18 0.36
27 A Commercial 32 52 23.37 24.26 0.10 0.40 0.18 1.08
51 A Commercial 32 52 44.14 45.82 0.10 0.40 0.18 2.04
83 A Commercial 32 52 71.84 74.57 0.10 0.40 0.18 3.32
189 0.134 0.102 0.040
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 2
Unit Hydrograph Method Loss Rate Parameter Development - Line DZ15 - Banana Ave Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
6 of 42
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 2
25 100
II III 5.88 7.32 II III
10 A Commercial 32 52 8.66 8.98 0.10 0.40 0.18 0.40
9 A Commercial 32 52 7.79 8.09 0.10 0.40 0.18 0.36
9 A Commercial 32 52 7.79 8.09 0.10 0.40 0.18 0.36
27 A Commercial 32 52 23.37 24.26 0.10 0.40 0.18 1.08
10 A Residential 2 dwellings/acre 32 52 3.02 4.85 0.70 0.40 0.18 2.80 42 A Commercial 32 52 36.35 37.73 0.10 0.40 0.18 1.68
83 A Commercial 32 52 71.84 74.57 0.10 0.40 0.18 3.32
190 0.164 0.123 0.053
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 2
Unit Hydrograph Method Loss Rate Parameter Development - Line DZ16 - Calabash Ave Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
7 of 42
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 2
25 100
II III 5.88 7.32 II III
31 A Public Park 32 52 4.98 11.83 0.85 0.40 0.18 10.54
21 A School 32 52 8.31 11.63 0.60 0.40 0.18 5.04
5 A Commercial 32 52 4.33 4.49 0.10 0.40 0.18 0.20
90 A Commercial 32 52 77.90 80.86 0.10 0.40 0.18 3.60
35 A Apartments 32 52 27.00 29.03 0.20 0.40 0.18 2.80
274 A Commercial 32 52 237.16 246.16 0.10 0.40 0.18 10.96 196 A Residential 3-4 dwellings/acre 32 52 77.55 108.57 0.60 0.40 0.18 47.04 652 0.329 0.245 0.123
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 2
Unit Hydrograph Method Loss Rate Parameter Development - Line DZ2A, DZ2, DZ1, SA - Sierra Ave Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
8 of 42
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 2
25 100
II III 5.88 7.32 II III
10 A Apartments 32 52 7.72 8.30 0.20 0.40 0.18 0.80
3 A Commercial 32 52 2.60 2.70 0.10 0.40 0.18 0.12
2 A Residential 5-7 dwellings/acre 32 52 0.98 1.25 0.50 0.40 0.18 0.40 5 A Apartments 32 52 3.86 4.15 0.20 0.40 0.18 0.40
10 A Apartments 32 52 7.72 8.30 0.20 0.40 0.18 0.80
10 A Commercial 32 52 8.66 8.98 0.10 0.40 0.18 0.40
10 A Apartments 32 52 7.72 8.30 0.20 0.40 0.18 0.80
10 A Commercial 32 52 8.66 8.98 0.10 0.40 0.18 0.40
6 A Apartments 32 52 4.63 4.98 0.20 0.40 0.18 0.48
10 A Commercial 32 52 8.66 8.98 0.10 0.40 0.18 0.40
76 0.195 0.146 0.066
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 2
Unit Hydrograph Method Loss Rate Parameter Development - Line DZ4 - South Juniper Ave Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
9 of 42
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 2
25 100
II III 5.88 7.32 II III
5 A Commercial 32 52 4.33 4.49 0.10 0.40 0.18 0.20
5 A Commercial 32 52 4.33 4.49 0.10 0.40 0.18 0.20
11 A Commercial 32 52 9.52 9.88 0.10 0.40 0.18 0.44
21 A Commercial 32 52 18.18 18.87 0.10 0.40 0.18 0.84
10 A Commercial 32 52 8.66 8.98 0.10 0.40 0.18 0.40
7 A Residential 5-7 dwellings/acre 32 52 3.43 4.36 0.50 0.40 0.18 1.40 8 A Residential 5-7 dwellings/acre 32 52 3.92 4.98 0.50 0.40 0.18 1.60 23 A Residential 5-7 dwellings/acre 32 52 11.26 14.33 0.50 0.40 0.18 4.60 6 A Residential 5-7 dwellings/acre 32 52 2.94 3.74 0.50 0.40 0.18 1.20 12 A Residential 5-7 dwellings/acre 32 52 5.88 7.47 0.50 0.40 0.18 2.40 5 A Commercial 32 52 4.33 4.49 0.10 0.40 0.18 0.20
5 A Commercial 32 52 4.33 4.49 0.10 0.40 0.18 0.20
10 A Commercial 32 52 8.66 8.98 0.10 0.40 0.18 0.40
10 A Commercial 32 52 8.66 8.98 0.10 0.40 0.18 0.40
4 A Commercial 32 52 3.46 3.59 0.10 0.40 0.18 0.16
5 A Commercial 32 52 4.33 4.49 0.10 0.40 0.18 0.20
10 A Commercial 32 52 8.66 8.98 0.10 0.40 0.18 0.40
5 A Commercial 32 52 4.33 4.49 0.10 0.40 0.18 0.20
5 A Commercial 32 52 4.33 4.49 0.10 0.40 0.18 0.20
167 0.261 0.194 0.094
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 2
Unit Hydrograph Method Loss Rate Parameter Development - Line SS5A - Pacific Railroad and San Sevaine Channel Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
10 of 42
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 2
25 100
II III 5.88 7.32 II III
10 A Commercial 32 52 8.66 8.98 0.10 0.40 0.18 0.40
10 A Commercial 32 52 8.66 8.98 0.10 0.40 0.18 0.40
20 A Commercial 32 52 17.31 17.97 0.10 0.40 0.18 0.80
14 A Residential 5-7 dwellings/acre 32 52 6.85 8.72 0.50 0.40 0.18 2.80 20 A Commercial 32 52 17.31 17.97 0.10 0.40 0.18 0.80
45 A Residential 5-7 dwellings/acre 32 52 22.03 28.03 0.50 0.40 0.18 9.00 119 0.321 0.238 0.119
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 2
Unit Hydrograph Method Loss Rate Parameter Development - Line DZ6 - Cypress Ave Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
11 of 42
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 2
25 100
II III 5.88 7.32 II III
31 A Residential 5-7 dwellings/acre 32 52 15.18 19.31 0.50 0.40 0.18 6.20 51 A Commercial 32 52 44.14 45.82 0.10 0.40 0.18 2.04
25 A Residential 5-7 dwellings/acre 32 52 12.24 15.57 0.50 0.40 0.18 5.00 21 A School 32 52 8.31 11.63 0.60 0.40 0.18 5.04
10 A Commercial 32 52 8.66 8.98 0.10 0.40 0.18 0.40
10 A Commercial 32 52 8.66 8.98 0.10 0.40 0.18 0.40
20 A Commercial 32 52 17.31 17.97 0.10 0.40 0.18 0.80
16 A Commercial 32 52 13.85 14.37 0.10 0.40 0.18 0.64
19 A Residential 5-7 dwellings/acre 32 52 9.30 11.83 0.50 0.40 0.18 3.80 2 A Residential 5-7 dwellings/acre 32 52 0.98 1.25 0.50 0.40 0.18 0.40 81 A Commercial 32 52 70.11 72.77 0.10 0.40 0.18 3.24
286 0.270 0.201 0.098
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 2
Unit Hydrograph Method Loss Rate Parameter Development - Line DZ7 - Oleander Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
12 of 42
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 2
25 100
II III 5.88 7.32 II III
23 A Residential 5-7 dwellings/acre 32 52 11.26 14.33 0.50 0.40 0.18 4.60 30 A School 32 52 11.87 16.62 0.60 0.40 0.18 7.20
98 A Commercial 32 52 84.82 88.04 0.10 0.40 0.18 3.92
151 0.285 0.212 0.104
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 2
Unit Hydrograph Method Loss Rate Parameter Development - Line DZ8 D/S - Citrus Ave Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
13 of 42
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 2
25 100
II III 5.88 7.32 II III
10 A Commercial 32 52 8.66 8.98 0.10 0.40 0.18 0.40
10 A Commercial 32 52 8.66 8.98 0.10 0.40 0.18 0.40
20 A Commercial 32 52 17.31 17.97 0.10 0.40 0.18 0.80
23 A Commercial 32 52 19.91 20.66 0.10 0.40 0.18 0.92
16 A School 32 52 6.33 8.86 0.60 0.40 0.18 3.84
79 0.230 0.171 0.081
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 2
Unit Hydrograph Method Loss Rate Parameter Development - Line DZ8 U/S - Citrus Ave Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
14 of 42
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 2
25 100
II III 5.88 7.32 II III
18 A Residential 2 dwellings/acre 32 52 5.43 8.73 0.70 0.40 0.18 5.04 29 A Commercial 32 52 25.10 26.05 0.10 0.40 0.18 1.16
85 A Commercial 32 52 73.57 76.36 0.10 0.40 0.18 3.40
132 0.211 0.158 0.073
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 2
Unit Hydrograph Method Loss Rate Parameter Development - Line DZ9 D/S - Catawea Ave Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
15 of 42
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 2
25 100
II III 5.88 7.32 II III
9 A Commercial 32 52 7.79 8.09 0.10 0.40 0.18 0.36
9 A Commercial 32 52 7.79 8.09 0.10 0.40 0.18 0.36
20 A Commercial 32 52 17.31 17.97 0.10 0.40 0.18 0.80
13 A Residential 2 dwellings/acre 32 52 3.92 6.31 0.70 0.40 0.18 3.64 20 A Commercial 32 52 17.31 17.97 0.10 0.40 0.18 0.80
71 0.238 0.177 0.084
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 2
Unit Hydrograph Method Loss Rate Parameter Development - Line DZ9 U/S - Catawea Ave Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
16 of 42
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 2
25 100
II III 5.88 7.32 II III
117 A Commercial 32 52 101.27 105.11 0.10 0.40 0.18 4.68 117 0.134 0.102 0.040
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 2
Unit Hydrograph Method Loss Rate Parameter Development - Line FGCS - Business Dr Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
17 of 42
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 2
25 100
II III 5.88 7.32 II III
102 A Commercial 32 52 88.29 91.64 0.10 0.40 0.18 4.08
17 A Open Brush, Fair 46 66 2.36 8.03 1.00 0.40 0.18 6.80 119 0.238 0.162 0.091
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 2
Unit Hydrograph Method Loss Rate Parameter Development - Line FGCS - Commerce Way Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
18 of 42
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 2
25 100
II III 5.88 7.32 II III

28.0 A Commercial 32 52 24.24 25.16 0.10 0.40 0.18 1.12

28.0 A Commercial 32 52 24.24 25.16 0.10 0.40 0.18 1.12

49.0 A Commercial 32 52 42.41 44.02 0.10 0.40 0.18 1.96 105.0 0.134 0.102 0.040
AMC
Fm = Low Loss Fraction (1-Y) =

FONTANA MASTER PLAN OF DRAINAGE
AOS 2
Unit Hydrograph Method Loss Rate Parameter Development - Line FGCS - Mulberry Avenue Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
19 of 42
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 2
25 100
II III 5.88 7.32 II III
70 A Commercial 32 52 60.59 62.89 0.10 0.40 0.18 2.80
13 A Open Brush, Fair 46 66 1.81 6.14 1.00 0.40 0.18 5.20 83 0.248 0.168 0.096
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 2
Unit Hydrograph Method Loss Rate Parameter Development - Line FGCS - Slover Ave Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
20 of 42
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 2
25 100
II III 5.88 7.32 II III
13 A Residential 5-7 dwellings/acre 32 52 6.37 8.10 0.50 0.40 0.18 2.60 2 A Open Brush, Fair 46 66 0.28 0.94 1.00 0.40 0.18 0.80 9 A Commercial 32 52 7.79 8.09 0.10 0.40 0.18 0.36
21 A Residential 5-7 dwellings/acre 32 52 10.28 13.08 0.50 0.40 0.18 4.20 8 A Open Brush, Fair 46 66 1.11 3.78 1.00 0.40 0.18 3.20 49 D Open Brush, Fair 83 96 33.17 45.65 1.00 0.20 0.07 9.80 14 D Public Park 75 91 8.45 12.20 0.85 0.20 0.07 2.38
116 0.419 0.208 0.201
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 2
Unit Hydrograph Method Loss Rate Parameter Development - Line JH - Jurupa Hills East Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
21 of 42
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 2
25 100
II III 5.88 7.32 II III
30 A Residential 5-7 dwellings/acre 32 52 14.69 18.69 0.50 0.40 0.18 6.00 28 A Residential 5-7 dwellings/acre 32 52 13.71 17.44 0.50 0.40 0.18 5.60 13 A Commercial 32 52 11.25 11.68 0.10 0.40 0.18 0.52
9 A Open Brush, Fair 46 66 1.25 4.25 1.00 0.40 0.18 3.60 13 A Public Park 32 52 2.09 4.96 0.85 0.40 0.18 4.42
4 A Public Park 32 52 0.64 1.53 0.85 0.40 0.18 1.36
12 A Public Park 32 52 1.93 4.58 0.85 0.40 0.18 4.08
6 A Commercial 32 52 5.19 5.39 0.10 0.40 0.18 0.24
142 A Residential 5-7 dwellings/acre 32 52 69.53 88.44 0.50 0.40 0.18 28.40 10 A School 32 52 3.96 5.54 0.60 0.40 0.18 2.40
10 A Public Park 32 52 1.61 3.82 0.85 0.40 0.18 3.40
89 A Residential 5-7 dwellings/acre 32 52 43.58 55.43 0.50 0.40 0.18 17.80 11 A School 32 52 4.35 6.09 0.60 0.40 0.18 2.64
22 D Open Brush, Fair 83 96 14.89 20.49 1.00 0.20 0.07 4.40 6 A Open Brush, Fair 46 66 0.83 2.83 1.00 0.40 0.18 2.40 77 D Open Brush, Fair 83 96 52.12 71.73 1.00 0.20 0.07 15.40 482 0.499 0.330 0.213
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 2
Unit Hydrograph Method Loss Rate Parameter Development - Line JH - Jurupa Hills Northwest Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
22 of 42
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 2
25 100
II III 5.88 7.32 II III
14 A Open Brush, Fair 46 66 1.95 6.61 1.00 0.40 0.18 5.60 77 D Open Brush, Fair 83 96 52.12 71.73 1.00 0.20 0.07 15.40 21 A Open Brush, Fair 46 66 2.92 9.92 1.00 0.40 0.18 8.40 9 B Open Brush, Fair 66 84 3.60 6.67 1.00 0.30 0.12 2.70 49 D Open Brush, Fair 83 96 33.17 45.65 1.00 0.20 0.07 9.80 9 A Open Brush, Fair 46 66 1.25 4.25 1.00 0.40 0.18 3.60 4 D Open Brush, Fair 83 96 2.71 3.73 1.00 0.20 0.07 0.80 15 A Residential 5-7 dwellings/acre 32 52 7.34 9.34 0.50 0.40 0.18 3.00 6 A Commercial 32 52 5.19 5.39 0.10 0.40 0.18 0.24
32 A Residential 5-7 dwellings/acre 32 52 15.67 19.93 0.50 0.40 0.18 6.40 2 D Residential 5-7 dwellings/acre 75 91 1.50 1.82 0.50 0.20 0.07 0.20 238 0.465 0.223 0.236
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 2
Unit Hydrograph Method Loss Rate Parameter Development - Line JH - Jurupa Hills Southwest Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
23 of 42
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 2
25 100
II III 5.88 7.32 II III
8 A Commercial 32 52 6.92 7.19 0.10 0.40 0.18 0.32
8 A Commercial 32 52 6.92 7.19 0.10 0.40 0.18 0.32
17 A Commercial 32 52 14.71 15.27 0.10 0.40 0.18 0.68
81 A Commercial 32 52 70.11 72.77 0.10 0.40 0.18 3.24
85 A Commercial 32 52 73.57 76.36 0.10 0.40 0.18 3.40
199 0.134 0.102 0.040
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 2
Unit Hydrograph Method Loss Rate Parameter Development - Line JSPH - Beech Ave Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
24 of 42
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 2
25 100
II III 5.88 7.32 II III
7 A Commercial 32 52 6.06 6.29 0.10 0.40 0.18 0.28
7 A Commercial 32 52 6.06 6.29 0.10 0.40 0.18 0.28
20 A Commercial 32 52 17.31 17.97 0.10 0.40 0.18 0.80
80 A Commercial 32 52 69.24 71.87 0.10 0.40 0.18 3.20
84 A Commercial 32 52 72.71 75.47 0.10 0.40 0.18 3.36
198 0.134 0.102 0.040
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 2
Unit Hydrograph Method Loss Rate Parameter Development - Line JSPH - Elm Ave Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
25 of 42
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 2
25 100
II III 5.88 7.32 II III
7 A Commercial 32 52 6.06 6.29 0.10 0.40 0.18 0.28
8 A Commercial 32 52 6.92 7.19 0.10 0.40 0.18 0.32
17 A Commercial 32 52 14.71 15.27 0.10 0.40 0.18 0.68
82 A Commercial 32 52 70.97 73.67 0.10 0.40 0.18 3.28
85 A Commercial 32 52 73.57 76.36 0.10 0.40 0.18 3.40
199 0.134 0.102 0.040
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 2
Unit Hydrograph Method Loss Rate Parameter Development - Line JSPH - Hemlock Ave Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
26 of 42
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 2
25 100
II III 5.88 7.32 II III
62 A Residential 5-7 dwellings/acre 32 52 30.36 38.62 0.50 0.40 0.18 12.40 36 A Commercial 32 52 31.16 32.34 0.10 0.40 0.18 1.44
2 D Commercial 75 91 1.84 1.91 0.10 0.20 0.07 0.04
5 A Residential 2 dwellings/acre 32 52 1.51 2.43 0.70 0.40 0.18 1.40 117 D Residential 2 dwellings/acre 75 91 77.97 103.92 0.70 0.20 0.07 16.38 2 A Public Park 32 52 0.32 0.76 0.85 0.40 0.18 0.68
53 A Residential 5-7 dwellings/acre 32 52 25.95 33.01 0.50 0.40 0.18 10.60 56 D Residential 5-7 dwellings/acre 75 91 42.01 51.01 0.50 0.20 0.07 5.60 10 A Public Park 32 52 1.61 3.82 0.85 0.40 0.18 3.40
87 D Public Park 75 91 52.52 75.80 0.85 0.20 0.07 14.79 430 0.383 0.201 0.155
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 2
Unit Hydrograph Method Loss Rate Parameter Development - Line P1, P2, & P3 - Sierra Ave Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
27 of 42
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 2
25 100
II III 5.88 7.32 II III
28 A Residential 5-7 dwellings/acre 32 52 13.71 17.44 0.50 0.40 0.18 5.60 17 A Residential 2.5 acre lots 32 52 1.93 5.90 0.90 0.40 0.18 6.12 44 A Residential 5-7 dwellings/acre 32 52 21.54 27.40 0.50 0.40 0.18 8.80 9 A Public Park 32 52 1.45 3.44 0.85 0.40 0.18 3.06
153 D Public Park 75 91 92.36 133.31 0.85 0.20 0.07 26.01 32 D Open Brush, Fair 83 96 21.66 29.81 1.00 0.20 0.07 6.40 8 D Residential 2 dwellings/acre 75 91 5.33 7.11 0.70 0.20 0.07 1.12 291 0.457 0.229 0.196
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 2
Unit Hydrograph Method Loss Rate Parameter Development - Line P4 Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
28 of 42
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 2
25 100
II III 5.88 7.32 II III
59 A Residential 5-7 dwellings/acre 32 52 28.89 36.75 0.50 0.40 0.18 11.80 21 A Residential 2.5 acre lots 32 52 2.39 7.29 0.90 0.40 0.18 7.56 23 A School 32 52 9.10 12.74 0.60 0.40 0.18 5.52
1 A Public Park 32 52 0.16 0.38 0.85 0.40 0.18 0.34
50 A Commercial 32 52 43.28 44.92 0.10 0.40 0.18 2.00
38 A Residential 5-7 dwellings/acre 32 52 18.61 23.67 0.50 0.40 0.18 7.60 50 A Open Brush, Fair 46 66 6.95 23.62 1.00 0.40 0.18 20.00 43 D Open Brush, Fair 83 96 29.11 40.06 1.00 0.20 0.07 8.60 12 A School 32 52 4.75 6.65 0.60 0.40 0.18 2.88
19 A Commercial 32 52 16.45 17.07 0.10 0.40 0.18 0.76
1 D Commercial 75 91 0.92 0.96 0.10 0.20 0.07 0.02
2 A Residential 5-7 dwellings/acre 32 52 0.98 1.25 0.50 0.40 0.18 0.40 2 D Residential 5-7 dwellings/acre 75 91 1.50 1.82 0.50 0.20 0.07 0.20 20 A School 32 52 7.91 11.08 0.60 0.40 0.18 4.80
43 A School 32 52 17.01 23.82 0.60 0.40 0.18 10.32
384 0.510 0.344 0.216
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 2
Unit Hydrograph Method Loss Rate Parameter Development - Line SR - Southridge 1 Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
29 of 42
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 2
25 100
II III 5.88 7.32 II III
132 A Residential 5-7 dwellings/acre 32 52 64.63 82.21 0.50 0.40 0.18 26.40 4 A Commercial 32 52 3.46 3.59 0.10 0.40 0.18 0.16
6 A School 32 52 2.37 3.32 0.60 0.40 0.18 1.44
10 A Public Park 32 52 1.61 3.82 0.85 0.40 0.18 3.40
14 A Commercial 32 52 12.12 12.58 0.10 0.40 0.18 0.56
31 A Residential 5-7 dwellings/acre 32 52 15.18 19.31 0.50 0.40 0.18 6.20 4 A Open Brush, Fair 46 66 0.56 1.89 1.00 0.40 0.18 1.60 201 0.503 0.370 0.198
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 2
Unit Hydrograph Method Loss Rate Parameter Development - Line SR - Southridge 2 Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
30 of 42
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 2
25 100
II III 5.88 7.32 II III
40 A Open Brush, Fair 46 66 5.56 18.89 1.00 0.40 0.18 16.00 208 D Open Brush, Fair 83 96 140.79 193.76 1.00 0.20 0.07 41.60 38 C Open Brush, Fair 77 92 21.81 33.19 1.00 0.25 0.10 9.50 3 A Open Brush, Fair 46 66 0.42 1.42 1.00 0.40 0.18 1.20 119 D Open Brush, Fair 83 96 80.55 110.85 1.00 0.20 0.07 23.80 8 C Open Brush, Fair 77 92 4.59 6.99 1.00 0.25 0.10 2.00 10 A Open Brush, Fair 46 66 1.39 4.72 1.00 0.40 0.18 4.00 216 A Residential 5-7 dwellings/acre 32 52 105.76 134.53 0.50 0.40 0.18 43.20 19 D Residential 5-7 dwellings/acre 75 91 14.25 17.31 0.50 0.20 0.07 1.90 3 C Residential 5-7 dwellings/acre 69 86 2.11 2.62 0.50 0.25 0.10 0.38 4 A Public Park 32 52 0.64 1.53 0.85 0.40 0.18 1.36
6 A School 32 52 2.37 3.32 0.60 0.40 0.18 1.44
8 A School 32 52 3.17 4.43 0.60 0.40 0.18 1.92
6 A School 32 52 2.37 3.32 0.60 0.40 0.18 1.44
26 A Public Park 32 52 4.18 9.92 0.85 0.40 0.18 8.84
2 D Public Park 75 91 1.21 1.74 0.85 0.20 0.07 0.34
716 0.454 0.234 Fm = 0.222
AMC

FONTANA MASTER PLAN OF DRAINAGE
AOS 2
Unit Hydrograph Method Loss Rate Parameter Development - Line SR - Southridge 3 Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
31 of 42
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 2
25 100
II III 5.88 7.32 II III
237 A Residential 5-7 dwellings/acre 32 52 116.04 147.61 0.50 0.40 0.18 47.40 11 A Commercial 32 52 9.52 9.88 0.10 0.40 0.18 0.44
5 A Public Park 32 52 0.80 1.91 0.85 0.40 0.18 1.70
3 A School 32 52 1.19 1.66 0.60 0.40 0.18 0.72
1 A Open Brush, Fair 46 66 0.14 0.47 1.00 0.40 0.18 0.40 257 0.503 0.371 0.197
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 2
Unit Hydrograph Method Loss Rate Parameter Development - Line SR - Southridge 4 Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
32 of 42
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 2
25 100
II III 5.88 7.32 II III
8 A Commercial 32 52 6.49 6.74 0.10 0.40 0.18 0.30
7 A Commercial 32 52 6.06 6.29 0.10 0.40 0.18 0.28
6 A Commercial 32 52 5.19 5.39 0.10 0.40 0.18 0.24
20 A Commercial 32 52 17.31 17.97 0.10 0.40 0.18 0.80
41 A Commercial 32 52 35.49 36.83 0.10 0.40 0.18 1.64
12 A Residential 2.5 acre lots 32 52 1.36 4.17 0.90 0.40 0.18 4.32 70 A Commercial 32 52 60.59 62.89 0.10 0.40 0.18 2.80
164 0.190 0.142 0.063
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 2
Unit Hydrograph Method Loss Rate Parameter Development - Line SS10 - West Marlay Ave to San Sevaine Channel Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
33 of 42
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 2
25 100
II III 5.88 7.32 II III
41 A Commercial 32 52 35.49 36.83 0.10 0.40 0.18 1.64
4 A Residential 2.5 acre lots 32 52 0.45 1.39 0.90 0.40 0.18 1.44 78 A Commercial 32 52 67.51 70.08 0.10 0.40 0.18 3.12
123 0.159 0.120 0.050
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 2
Unit Hydrograph Method Loss Rate Parameter Development - Line SS11 D/S - Riverside Road to San Sevaine Channel Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
34 of 42
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 2
25 100
II III 5.88 7.32 II III
8 A Commercial 32 52 6.49 6.74 0.10 0.40 0.18 0.30
7 A Commercial 32 52 6.06 6.29 0.10 0.40 0.18 0.28
6 A Commercial 32 52 5.19 5.39 0.10 0.40 0.18 0.24
20 A Commercial 32 52 17.31 17.97 0.10 0.40 0.18 0.80
41 0.134 0.102 0.040
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 2
Unit Hydrograph Method Loss Rate Parameter Development - Line SS11 U/S - Riverside Road to San Sevaine Channel Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
35 of 42
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 2
25 100
II III 5.88 7.32 II III
6 A Commercial 32 52 5.19 5.39 0.10 0.40 0.18 0.24
6 A Residential 2.5 acre lots 32 52 0.68 2.08 0.90 0.40 0.18 2.16 12 A Commercial 32 52 10.39 10.78 0.10 0.40 0.18 0.48
13 A Commercial 32 52 11.25 11.68 0.10 0.40 0.18 0.52
13 A Commercial 32 52 11.25 11.68 0.10 0.40 0.18 0.52
50 0.225 0.168 0.078
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 2
Unit Hydrograph Method Loss Rate Parameter Development - Line SS5A - Pacific Railroad and San Sevaine Channel Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
36 of 42
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 2
25 100
II III 5.88 7.32 II III
10 A Residential 2.5 acre lots 32 52 1.14 3.47 0.90 0.40 0.18 3.60 1 A Commercial 32 52 0.87 0.90 0.10 0.40 0.18 0.04
11 A Commercial 32 52 9.52 9.88 0.10 0.40 0.18 0.44
12 A Commercial 32 52 10.39 10.78 0.10 0.40 0.18 0.48
13 A Commercial 32 52 11.25 11.68 0.10 0.40 0.18 0.52
47 0.294 0.219 0.108
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 2
Unit Hydrograph Method Loss Rate Parameter Development -Line SS5B - Slover Ave and San Sevaine Channel Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
37 of 42
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 2
25 100
II III 5.88 7.32 II III
2 A Residential 2.5 acre lots 32 52 0.23 0.69 0.90 0.40 0.18 0.72 5 A Commercial 32 52 4.33 4.49 0.10 0.40 0.18 0.20
7 A Commercial 32 52 6.06 6.29 0.10 0.40 0.18 0.28
1 A Residential 2.5 acre lots 32 52 0.11 0.35 0.90 0.40 0.18 0.36 4 A Commercial 32 52 3.46 3.59 0.10 0.40 0.18 0.16
18 A Commercial 32 52 15.58 16.17 0.10 0.40 0.18 0.72
1 A Residential 2.5 acre lots 32 52 0.11 0.35 0.90 0.40 0.18 0.36 37 A Commercial 32 52 32.03 33.24 0.10 0.40 0.18 1.48
2 A Residential 2.5 acre lots 32 52 0.23 0.69 0.90 0.40 0.18 0.72 2 A Residential 2.5 acre lots 32 52 0.23 0.69 0.90 0.40 0.18 0.72 38 A Commercial 32 52 32.89 34.14 0.10 0.40 0.18 1.52
38 A Commercial 32 52 32.89 34.14 0.10 0.40 0.18 1.52
5 A Residential 2.5 acre lots 32 52 0.57 1.74 0.90 0.40 0.18 1.80 160 0.196 0.146 0.066
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 2
Unit Hydrograph Method Loss Rate Parameter Development - Line SS6 - Santa Ana Ave and San Sevaine Channel Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
38 of 42
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 2
25 100
II III 5.88 7.32 II III
194 A Commercial 32 52 167.92 174.29 0.10 0.40 0.18 7.76 26 A Commercial 32 52 22.50 23.36 0.10 0.40 0.18 1.04
220 0.134 0.102 0.040
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 2
Unit Hydrograph Method Loss Rate Parameter Development - Line SS7 - Jurupa Ave and San Sevaine Channel Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
39 of 42
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 2
25 100
II III 5.88 7.32 II III
2 A Residential 2.5 acre lots 32 52 0.23 0.69 0.90 0.40 0.18 0.72 20 A Commercial 32 52 17.31 17.97 0.10 0.40 0.18 0.80
13 A Residential 2.5 acre lots 32 52 1.48 4.51 0.90 0.40 0.18 4.68 62 A Commercial 32 52 53.23 55.25 0.10 0.40 0.18 2.46
97 0.251 0.187 0.090
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 2
Unit Hydrograph Method Loss Rate Parameter Development - Line SS8 D/S - East Marlay Ave to San Sevaine Channel Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
40 of 42
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 2
25 100
II III 5.88 7.32 II III
5 A Commercial 32 52 4.33 4.49 0.10 0.40 0.18 0.20
5 A Commercial 32 52 4.33 4.49 0.10 0.40 0.18 0.20
4 A Commercial 32 52 3.03 3.14 0.10 0.40 0.18 0.14
1 A Residential 2.5 acre lots 32 52 0.11 0.35 0.90 0.40 0.18 0.36 13 A Commercial 32 52 10.82 11.23 0.10 0.40 0.18 0.50
2 A Residential 2.5 acre lots 32 52 0.23 0.69 0.90 0.40 0.18 0.72 26 A Commercial 32 52 22.50 23.36 0.10 0.40 0.18 1.04
55 0.175 0.132 0.057
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 2
Unit Hydrograph Method Loss Rate Parameter Development - Line SS8 U/S - East Marlay Ave to San Sevaine Channel Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
41 of 42
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis Subbasins
Loss Rate Tables: AOS 2
25 100
II III 5.88 7.32 II III
121 A Commercial 32 52 104.73 108.71 0.10 0.40 0.18 4.84 34 C Commercial 69 86 30.88 32.25 0.10 0.25 0.10 0.85
6 A Open Brush, Fair 46 66 0.83 2.83 1.00 0.40 0.18 2.40 161 0.153 0.107 0.050
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 2
Unit Hydrograph Method Loss Rate Parameter Development - Line SS9 - West Marlay Ave to San Sevaine Channel Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
42 of 42
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis
Loss RateTables: AOS 3
25 100
II III 5.88 7.32 II III
3 A Residential 2 dwellings/acre 32 52 0.76 1.21 0.70 0.40 0.18 0.70 49 A Commercial 32 52 42.60 44.22 0.10 0.40 0.18 1.97
47 A Open Brush, Fair 46 66 6.58 22.38 1.00 0.40 0.18 18.95 11 A Residential 2.5 acre lots 32 52 1.23 3.75 0.90 0.40 0.18 3.89 1 D Residential 2 dwellings/acre 75 91 0.50 0.67 0.70 0.20 0.07 0.11 1 D Commercial 75 91 1.14 1.19 0.10 0.20 0.07 0.02
39 D Open Brush, Fair 83 96 26.64 36.66 1.00 0.20 0.07 7.87 151 0.475 0.272 0.222
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 3
Unit Hydrograph Method Loss Rate Parameter Development - Line 604.1 Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
1 of 37
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis
Loss RateTables: AOS 3
25 100
II III 5.88 7.32 II III
14 A Commercial 32 52 12.29 12.76 0.10 0.40 0.18 0.57
75 A Open Brush, Fair 46 66 10.39 35.32 1.00 0.40 0.18 29.91 6 A Residential 2.5 acre lots 32 52 0.73 2.23 0.90 0.40 0.18 2.31 109 D Open Brush, Fair 83 96 74.08 101.95 1.00 0.20 0.07 21.89 205 0.524 0.257 0.267
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 3
Unit Hydrograph Method Loss Rate Parameter Development - Line 606.1 Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
2 of 37
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis
Loss RateTables: AOS 3
25 100
II III 5.88 7.32 II III
18 A Residential 2 dwellings/acre 32 52 5.49 8.82 0.70 0.40 0.18 5.09 41 A Commercial 32 52 35.12 36.45 0.10 0.40 0.18 1.62
13 A Open Brush, Fair 46 66 1.77 6.00 1.00 0.40 0.18 5.08 6 B Residential 2 dwellings/acre 56 76 2.96 4.55 0.70 0.30 0.12 1.32 3 B Residential 2.5 acre lots 56 76 0.95 1.88 0.90 0.30 0.12 0.78 0 C Residential 2 dwellings/acre 69 86 0.09 0.12 0.70 0.25 0.10 0.03 0 C Open Brush, Fair 77 92 0.01 0.02 1.00 0.25 0.10 0.00 5 C Residential 2.5 acre lots 69 86 2.49 3.99 0.90 0.25 0.10 1.13 0 D Residential 2 dwellings/acre 75 91 0.02 0.03 0.70 0.20 0.07 0.00 0 D Open Brush, Fair 83 96 0.06 0.08 1.00 0.20 0.07 0.02 108 D Open Brush, Fair 83 96 73.26 100.83 1.00 0.20 0.07 21.65 2 D Residential 2.5 acre lots 75 91 1.05 1.56 0.90 0.20 0.07 0.32 196 0.371 0.161 0.189
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 3
Unit Hydrograph Method Loss Rate Parameter Development - Line 608.1 Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
3 of 37
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis
Loss RateTables: AOS 3
25 100
II III 5.88 7.32 II III
40 A Commercial 32 52 34.62 35.94 0.10 0.40 0.18 1.60
39 A Residential 10+ dwellings/acre 32 52 30.09 32.35 0.20 0.40 0.18 3.12 10 A Residential 2.5 acre lots 32 52 1.14 3.47 0.90 0.40 0.18 3.60 14 A School 32 52 5.54 7.76 0.60 0.40 0.18 3.36
32 A Residential 5-7 dwellings/acre 32 52 15.67 19.93 0.50 0.40 0.18 6.40 135 0.355 0.263 0.134
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 3
Unit Hydrograph Method Loss Rate Parameter Development - Line B Summit & Devore Fwy Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
4 of 37
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis
Loss RateTables: AOS 3
25 100
II III 5.88 7.32 II III
3 A Residential 2.5 acre lots 32 52 0.34 1.04 0.90 0.40 0.18 1.08 3 A Residential 10+ dwellings/acre 32 52 2.31 2.49 0.20 0.40 0.18 0.24 6 A Commercial 32 52 5.19 5.39 0.10 0.40 0.18 0.24
3 A Residential 2.5 acre lots 32 52 0.34 1.04 0.90 0.40 0.18 1.08 4 A Residential 10+ dwellings/acre 32 52 3.09 3.32 0.20 0.40 0.18 0.32 7 A Commercial 32 52 6.06 6.29 0.10 0.40 0.18 0.28
28 A Residential 5-7 dwellings/acre 32 52 13.71 17.44 0.50 0.40 0.18 5.60 5 A Residential 2.5 acre lots 32 52 0.57 1.74 0.90 0.40 0.18 1.80 13 A Residential 10+ dwellings/acre 32 52 10.03 10.78 0.20 0.40 0.18 1.04 1 A Commercial 32 52 0.87 0.90 0.10 0.40 0.18 0.04
30 A Residential 5-7 dwellings/acre 32 52 14.69 18.69 0.50 0.40 0.18 6.00 24 A Residential 5-7 dwellings/acre 32 52 11.75 14.95 0.50 0.40 0.18 4.80 9 A Residential 2.5 acre lots 32 52 1.02 3.13 0.90 0.40 0.18 3.24 20 A Commercial 32 52 17.31 17.97 0.10 0.40 0.18 0.80
7 A Residential 10+ dwellings/acre 32 52 5.40 5.81 0.20 0.40 0.18 0.56 29 A Commercial 32 52 25.10 26.05 0.10 0.40 0.18 1.16
13 A Residential 2.5 acre lots 32 52 1.48 4.51 0.90 0.40 0.18 4.68 40 A Residential 5-7 dwellings/acre 32 52 19.59 24.91 0.50 0.40 0.18 8.00 11 A Residential 2.5 acre lots 32 52 1.25 3.82 0.90 0.40 0.18 3.96 37 A Commercial 32 52 32.03 33.24 0.10 0.40 0.18 1.48
293 0.413 0.305 0.158
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 3
Unit Hydrograph Method Loss Rate Parameter Development - Line B1 Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
5 of 37
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis
Loss RateTables: AOS 3
25 100
II III 5.88 7.32 II III
24 A Residential 5-7 dwellings/acre 32 52 11.75 14.95 0.50 0.40 0.18 4.80 25 A Residential 5-7 dwellings/acre 32 52 12.24 15.57 0.50 0.40 0.18 5.00 26 A Residential 5-7 dwellings/acre 32 52 12.73 16.19 0.50 0.40 0.18 5.20 3 A Residential 5-7 dwellings/acre 32 52 1.47 1.87 0.50 0.40 0.18 0.60 2 A Residential 5-7 dwellings/acre 32 52 0.98 1.25 0.50 0.40 0.18 0.40 1 A Residential 2.5 acre lots 32 52 0.11 0.35 0.90 0.40 0.18 0.36 1 A Residential 2.5 acre lots 32 52 0.11 0.35 0.90 0.40 0.18 0.36 5 A Residential 5-7 dwellings/acre 32 52 2.45 3.11 0.50 0.40 0.18 1.00 16 A Residential 5-7 dwellings/acre 32 52 7.83 9.97 0.50 0.40 0.18 3.20 4 A Residential 2.5 acre lots 32 52 0.45 1.39 0.90 0.40 0.18 1.44 15 A Residential 5-7 dwellings/acre 32 52 7.34 9.34 0.50 0.40 0.18 3.00 3 A Residential 2.5 acre lots 32 52 0.34 1.04 0.90 0.40 0.18 1.08 125 0.537 0.397 0.212
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 3
Unit Hydrograph Method Loss Rate Parameter Development - Line B2 Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
6 of 37
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis
Loss RateTables: AOS 3
25 100
II III 5.88 7.32 II III
8 A Residential 5-7 dwellings/acre 32 52 3.92 4.98 0.50 0.40 0.18 1.60 8 A Residential 5-7 dwellings/acre 32 52 3.92 4.98 0.50 0.40 0.18 1.60 16 A Residential 5-7 dwellings/acre 32 52 7.83 9.97 0.50 0.40 0.18 3.20 29 A Residential 5-7 dwellings/acre 32 52 14.20 18.06 0.50 0.40 0.18 5.80 12 A Residential 5-7 dwellings/acre 32 52 5.88 7.47 0.50 0.40 0.18 2.40 12 A Residential 5-7 dwellings/acre 32 52 5.88 7.47 0.50 0.40 0.18 2.40 22 A Residential 5-7 dwellings/acre 32 52 10.77 13.70 0.50 0.40 0.18 4.40 19 A Residential 5-7 dwellings/acre 32 52 9.30 11.83 0.50 0.40 0.18 3.80 56 A Residential 5-7 dwellings/acre 32 52 27.42 34.88 0.50 0.40 0.18 11.20 7 A Residential 2.5 acre lots 32 52 0.80 2.43 0.90 0.40 0.18 2.52 2 A Residential 10+ dwellings/acre 32 52 1.54 1.66 0.20 0.40 0.18 0.16 6 A Residential 10+ dwellings/acre 32 52 4.63 4.98 0.20 0.40 0.18 0.48 9 A Residential 2.5 acre lots 32 52 1.02 3.13 0.90 0.40 0.18 3.24 12 A Residential 5-7 dwellings/acre 32 52 5.88 7.47 0.50 0.40 0.18 2.40 3 A Residential 5-7 dwellings/acre 32 52 1.47 1.87 0.50 0.40 0.18 0.60 2 A Residential 3-4 dwellings/acre 32 52 0.79 1.11 0.60 0.40 0.18 0.48 2 A Residential 2.5 acre lots 32 52 0.23 0.69 0.90 0.40 0.18 0.72 4 A Residential 3-4 dwellings/acre 32 52 1.58 2.22 0.60 0.40 0.18 0.96 2 A Residential 2.5 acre lots 32 52 0.23 0.69 0.90 0.40 0.18 0.72 6 A Residential 3-4 dwellings/acre 32 52 2.37 3.32 0.60 0.40 0.18 1.44 3 A Residential 5-7 dwellings/acre 32 52 1.47 1.87 0.50 0.40 0.18 0.60 5 A Residential 5-7 dwellings/acre 32 52 2.45 3.11 0.50 0.40 0.18 1.00 11 A Residential 3-4 dwellings/acre 32 52 4.35 6.09 0.60 0.40 0.18 2.64 3 A Residential 2.5 acre lots 32 52 0.34 1.04 0.90 0.40 0.18 1.08 5 A Residential 5-7 dwellings/acre 32 52 2.45 3.11 0.50 0.40 0.18 1.00 8 A Residential 3-4 dwellings/acre 32 52 3.17 4.43 0.60 0.40 0.18 1.92 3 A Residential 2.5 acre lots 32 52 0.34 1.04 0.90 0.40 0.18 1.08 46 A Residential 5-7 dwellings/acre 32 52 22.52 28.65 0.50 0.40 0.18 9.20 10 A Residential 2.5 acre lots 32 52 1.14 3.47 0.90 0.40 0.18 3.60 42 A Residential 5-7 dwellings/acre 32 52 20.56 26.16 0.50 0.40 0.18 8.40 9 A Residential 2.5 acre lots 32 52 1.02 3.13 0.90 0.40 0.18 3.24 382 0.556 0.411 0.220
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 3
Unit Hydrograph Method Loss Rate Parameter Development - Line B3 Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate (Fm)
x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
7 of 37
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis
Loss RateTables: AOS 3
25 100
II III 5.88 7.32 II III
24 A Residential 5-7 dwellings/acre 32 52 11.75 14.95 0.50 0.40 0.18 4.80 38 A Residential 8-10 dwellings/acre 32 52 22.18 26.29 0.40 0.40 0.18 6.08 13 A Residential 5-7 dwellings/acre 32 52 6.37 8.10 0.50 0.40 0.18 2.60 75 0.463 0.342 0.180
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 3
Unit Hydrograph Method Loss Rate Parameter Development - Line B3 South Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
8 of 37
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis
Loss RateTables: AOS 3
25 100
II III 5.88 7.32 II III
6 A Residential 10+ dwellings/acre 32 52 4.63 4.98 0.20 0.40 0.18 0.48 20 A Residential 10+ dwellings/acre 32 52 15.43 16.59 0.20 0.40 0.18 1.60 25 A Residential 10+ dwellings/acre 32 52 19.29 20.74 0.20 0.40 0.18 2.00 1 A Residential 2.5 acre lots 32 52 0.11 0.35 0.90 0.40 0.18 0.36 4 A Commercial 32 52 3.46 3.59 0.10 0.40 0.18 0.16
4 A Residential 10+ dwellings/acre 32 52 3.09 3.32 0.20 0.40 0.18 0.32 8 A Residential 10+ dwellings/acre 32 52 6.17 6.64 0.20 0.40 0.18 0.64 3 A Residential 5-7 dwellings/acre 32 52 1.47 1.87 0.50 0.40 0.18 0.60 5 A Residential 2.5 acre lots 32 52 0.57 1.74 0.90 0.40 0.18 1.80 3 A Residential 5-7 dwellings/acre 32 52 1.47 1.87 0.50 0.40 0.18 0.60 6 A Residential 2.5 acre lots 32 52 0.68 2.08 0.90 0.40 0.18 2.16 8 A Residential 2.5 acre lots 32 52 0.91 2.78 0.90 0.40 0.18 2.88 3 A Residential 8-10 dwellings/acre 32 52 1.75 2.08 0.40 0.40 0.18 0.48 1 A Residential 5-7 dwellings/acre 32 52 0.49 0.62 0.50 0.40 0.18 0.20 8 A Residential 10+ dwellings/acre 32 52 6.17 6.64 0.20 0.40 0.18 0.64 6 A Residential 2.5 acre lots 32 52 0.68 2.08 0.90 0.40 0.18 2.16 6 A Residential 10+ dwellings/acre 32 52 4.63 4.98 0.20 0.40 0.18 0.48 11 A Residential 8-10 dwellings/acre 32 52 6.42 7.61 0.40 0.40 0.18 1.76 2 A Residential 5-7 dwellings/acre 32 52 0.98 1.25 0.50 0.40 0.18 0.40 9 A Residential 2.5 acre lots 32 52 1.02 3.13 0.90 0.40 0.18 3.24 2 A Residential 10+ dwellings/acre 32 52 1.54 1.66 0.20 0.40 0.18 0.16 16 A Residential 8-10 dwellings/acre 32 52 9.34 11.07 0.40 0.40 0.18 2.56 5 A Residential 5-7 dwellings/acre 32 52 2.45 3.11 0.50 0.40 0.18 1.00 3 A Residential 5-7 dwellings/acre 32 52 1.47 1.87 0.50 0.40 0.18 0.60 3 A Residential 5-7 dwellings/acre 32 52 1.47 1.87 0.50 0.40 0.18 0.60 1 A Residential 2.5 acre lots 32 52 0.11 0.35 0.90 0.40 0.18 0.36 5 A Residential 5-7 dwellings/acre 32 52 2.45 3.11 0.50 0.40 0.18 1.00 2 A Residential 2.5 acre lots 32 52 0.23 0.69 0.90 0.40 0.18 0.72 12 A Residential 5-7 dwellings/acre 32 52 5.88 7.47 0.50 0.40 0.18 2.40 10 A Residential 2.5 acre lots 32 52 1.14 3.47 0.90 0.40 0.18 3.60 23 A Residential 2.5 acre lots 32 52 2.62 7.99 0.90 0.40 0.18 8.28 29 A Residential 5-7 dwellings/acre 32 52 14.20 18.06 0.50 0.40 0.18 5.80 250 0.511 0.377 Fm = 0.200
AMC

FONTANA MASTER PLAN OF DRAINAGE
AOS 3
Unit Hydrograph Method Loss Rate Parameter Development - Line B5 Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate (Fm)
x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
9 of 37
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis
Loss RateTables: AOS 3
25 100
II III 5.88 7.32 II III
38 A Residential 5-7 dwellings/acre 32 52 18.61 23.67 0.50 0.40 0.18 7.60 37 A Residential 5-7 dwellings/acre 32 52 18.12 23.04 0.50 0.40 0.18 7.40 4 A Residential 5-7 dwellings/acre 32 52 1.96 2.49 0.50 0.40 0.18 0.80 24 A Public Park 32 52 3.86 9.16 0.85 0.40 0.18 8.16
13 A Residential 2.5 acre lots 32 52 1.48 4.51 0.90 0.40 0.18 4.68 116 0.621 0.458 Fm = 0.247
AMC

FONTANA MASTER PLAN OF DRAINAGE
AOS 3
Unit Hydrograph Method Loss Rate Parameter Development - Line B5 South Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
10 of 37
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis
Loss RateTables: AOS 3
25 100
II III 5.88 7.32 II III
1 A Public Park 32 52 0.16 0.38 0.85 0.40 0.18 0.34
3 A Residential 5-7 dwellings/acre 32 52 1.47 1.87 0.50 0.40 0.18 0.60 2 A Public Park 32 52 0.32 0.76 0.85 0.40 0.18 0.68
3 A Residential 5-7 dwellings/acre 32 52 1.47 1.87 0.50 0.40 0.18 0.60 3 A Public Park 32 52 0.48 1.15 0.85 0.40 0.18 1.02
6 A Residential 5-7 dwellings/acre 32 52 2.94 3.74 0.50 0.40 0.18 1.20 14 A Residential 5-7 dwellings/acre 32 52 6.85 8.72 0.50 0.40 0.18 2.80 6 A Public Park 32 52 0.96 2.29 0.85 0.40 0.18 2.04
2 A Public Park 32 52 0.32 0.76 0.85 0.40 0.18 0.68
42 A Residential 5-7 dwellings/acre 32 52 20.56 26.16 0.50 0.40 0.18 8.40 8 A Commercial 32 52 6.92 7.19 0.10 0.40 0.18 0.32
10 A Commercial 32 52 8.66 8.98 0.10 0.40 0.18 0.40
18 A Commercial 32 52 15.58 16.17 0.10 0.40 0.18 0.72
44 A Commercial 32 52 38.08 39.53 0.10 0.40 0.18 1.76
7 A Commercial 32 52 6.06 6.29 0.10 0.40 0.18 0.28
7 A Commercial 32 52 6.06 6.29 0.10 0.40 0.18 0.28
16 A Commercial 32 52 13.85 14.37 0.10 0.40 0.18 0.64
27 A Residential 10+ dwellings/acre 32 52 20.83 22.40 0.20 0.40 0.18 2.16 4 A Commercial 32 52 3.46 3.59 0.10 0.40 0.18 0.16
223 0.305 0.226 0.112
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 3
Unit Hydrograph Method Loss Rate Parameter Development - Line C1 Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
11 of 37
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis
Loss RateTables: AOS 3
25 100
II III 5.88 7.32 II III
8 A Public Park 32 52 1.29 3.05 0.85 0.40 0.18 2.72
32 A Residential 5-7 dwellings/acre 32 52 15.67 19.93 0.50 0.40 0.18 6.40 24 A Commercial 32 52 20.77 21.56 0.10 0.40 0.18 0.96
22 A Residential 5-7 dwellings/acre 32 52 10.77 13.70 0.50 0.40 0.18 4.40 22 A Commercial 32 52 19.04 19.77 0.10 0.40 0.18 0.88
25 A Public Park 32 52 4.02 9.54 0.85 0.40 0.18 8.50
27 A Residential 5-7 dwellings/acre 32 52 13.22 16.82 0.50 0.40 0.18 5.40 28 A Public Park 32 52 4.50 10.69 0.85 0.40 0.18 9.52
15 A Commercial 32 52 12.98 13.48 0.10 0.40 0.18 0.60
53 A Residential 5-7 dwellings/acre 32 52 25.95 33.01 0.50 0.40 0.18 10.60 17 A Commercial 32 52 14.71 15.27 0.10 0.40 0.18 0.68
1 A Public Park 32 52 0.16 0.38 0.85 0.40 0.18 0.34
3 A Residential 5-7 dwellings/acre 32 52 1.47 1.87 0.50 0.40 0.18 0.60 4 A Public Park 32 52 0.64 1.53 0.85 0.40 0.18 1.36
2 A Residential 5-7 dwellings/acre 32 52 0.98 1.25 0.50 0.40 0.18 0.40 3 A Public Park 32 52 0.48 1.15 0.85 0.40 0.18 1.02
8 A Residential 5-7 dwellings/acre 32 52 3.92 4.98 0.50 0.40 0.18 1.60 6 A Public Park 32 52 0.96 2.29 0.85 0.40 0.18 2.04
11 A Residential 5-7 dwellings/acre 32 52 5.39 6.85 0.50 0.40 0.18 2.20 24 A Public Park 32 52 3.86 9.16 0.85 0.40 0.18 8.16
17 A Residential 5-7 dwellings/acre 32 52 8.32 10.59 0.50 0.40 0.18 3.40 45 A Residential 5-7 dwellings/acre 32 52 22.03 28.03 0.50 0.40 0.18 9.00 28 A Public Park 32 52 4.50 10.69 0.85 0.40 0.18 9.52
13 A School 32 52 5.14 7.20 0.60 0.40 0.18 3.12
17 A Public Park 32 52 2.73 6.49 0.85 0.40 0.18 5.78
56 A Residential 5-7 dwellings/acre 32 52 27.42 34.88 0.50 0.40 0.18 11.20 511 0.548 0.405 0.216
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 3
Unit Hydrograph Method Loss Rate Parameter Development - Line C2 Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum Loss
Rate (Fm) x
Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
12 of 37
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis
Loss RateTables: AOS 3
25 100
II III 5.88 7.32 II III
41 A Residential 5-7 dwellings/acre 32 52 20.08 25.54 0.50 0.40 0.18 8.20 27 A Public Park 32 52 4.34 10.31 0.85 0.40 0.18 9.18
2 A Condominiums 32 52 1.26 1.45 0.35 0.40 0.18 0.28
1 A Residential 1 acre lots 32 52 0.21 0.42 0.80 0.40 0.18 0.32 1 A Commercial 32 52 0.87 0.90 0.10 0.40 0.18 0.04
5 A Residential 3-4 dwellings/acre 32 52 1.98 2.77 0.60 0.40 0.18 1.20 1 A Commercial 32 52 0.87 0.90 0.10 0.40 0.18 0.04
1 A Residential 1 acre lots 32 52 0.21 0.42 0.80 0.40 0.18 0.32 2 A Condominiums 32 52 1.26 1.45 0.35 0.40 0.18 0.28
4 A Residential 3-4 dwellings/acre 32 52 1.58 2.22 0.60 0.40 0.18 0.96 4 A Residential 1 acre lots 32 52 0.83 1.66 0.80 0.40 0.18 1.28 6 A Condominiums 32 52 3.78 4.36 0.35 0.40 0.18 0.84
7 A Residential 3-4 dwellings/acre 32 52 2.77 3.88 0.60 0.40 0.18 1.68 30 A Condominiums 32 52 18.92 21.79 0.35 0.40 0.18 4.20 10 A Residential 3-4 dwellings/acre 32 52 3.96 5.54 0.60 0.40 0.18 2.40 78 A Residential 5-7 dwellings/acre 32 52 38.19 48.58 0.50 0.40 0.18 15.60 220 0.540 0.399 0.213
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 3
Unit Hydrograph Method Loss Rate Parameter Development - Line C3 Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
13 of 37
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis
Loss RateTables: AOS 3
25 100
II III 5.88 7.32 II III
20 A Commercial 32 52 17.31 17.97 0.10 0.40 0.18 0.80
22 A Public Park 32 52 3.54 8.40 0.85 0.40 0.18 7.48
21 A Residential 5-7 dwellings/acre 32 52 10.28 13.08 0.50 0.40 0.18 4.20 63 0.506 0.374 0.198
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 3
Unit Hydrograph Method Loss Rate Parameter Development - Line C3 East Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
14 of 37
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis
Loss RateTables: AOS 3
25 100
II III 5.88 7.32 II III
71 A Residential 5-7 dwellings/acre 32 52 34.76 44.22 0.50 0.40 0.18 14.20 63 D Residential 5-7 dwellings/acre 75 91 47.26 57.38 0.50 0.20 0.07 6.30 15 D Residential 2.5 acre lots 75 91 8.74 12.98 0.90 0.20 0.07 2.70 149 0.391 0.231 0.156
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 3
Unit Hydrograph Method Loss Rate Parameter Development - Line C4 Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
15 of 37
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis
Loss RateTables: AOS 3
25 100
II III 5.88 7.32 II III
28 A Residential 10+ dwellings/acre 32 52 21.60 23.23 0.20 0.40 0.18 2.24 43 A Residential 5-7 dwellings/acre 32 52 21.05 26.78 0.50 0.40 0.18 8.60 5 A School 32 52 1.98 2.77 0.60 0.40 0.18 1.20
5 A Residential 5-7 dwellings/acre 32 52 2.45 3.11 0.50 0.40 0.18 1.00 5 A Residential 5-7 dwellings/acre 32 52 2.45 3.11 0.50 0.40 0.18 1.00 6 A School 32 52 2.37 3.32 0.60 0.40 0.18 1.44
9 A Residential 5-7 dwellings/acre 32 52 4.41 5.61 0.50 0.40 0.18 1.80 9 A School 32 52 3.56 4.99 0.60 0.40 0.18 2.16
22 A Residential 5-7 dwellings/acre 32 52 10.77 13.70 0.50 0.40 0.18 4.40 20 A School 32 52 7.91 11.08 0.60 0.40 0.18 4.80
152 0.483 0.357 0.188
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 3
Unit Hydrograph Method Loss Rate Parameter Development - Line C4 East Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
16 of 37
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis
Loss RateTables: AOS 3
25 100
II III 5.88 7.32 II III
27 A Residential 5-7 dwellings/acre 32 52 13.22 16.82 0.50 0.40 0.18 5.40 16 A Residential 2.5 acre lots 32 52 1.82 5.56 0.90 0.40 0.18 5.76 24 A Residential 8-10 dwellings/acre 32 52 14.01 16.60 0.40 0.40 0.18 3.84 5 A Residential 8-10 dwellings/acre 32 52 2.92 3.46 0.40 0.40 0.18 0.80 1 A Residential 2.5 acre lots 32 52 0.11 0.35 0.90 0.40 0.18 0.36 3 A Residential 5-7 dwellings/acre 32 52 1.47 1.87 0.50 0.40 0.18 0.60 3 A Residential 5-7 dwellings/acre 32 52 1.47 1.87 0.50 0.40 0.18 0.60 1 A Public Park 32 52 0.16 0.38 0.85 0.40 0.18 0.34
1 A Residential 2.5 acre lots 32 52 0.11 0.35 0.90 0.40 0.18 0.36 1 A Public Park 32 52 0.16 0.38 0.85 0.40 0.18 0.34
6 A Residential 5-7 dwellings/acre 32 52 2.94 3.74 0.50 0.40 0.18 1.20 2 A Residential 2.5 acre lots 32 52 0.23 0.69 0.90 0.40 0.18 0.72 1 A Commercial 32 52 0.87 0.90 0.10 0.40 0.18 0.04
10 A Residential 5-7 dwellings/acre 32 52 4.90 6.23 0.50 0.40 0.18 2.00 4 A Residential 2.5 acre lots 32 52 0.45 1.39 0.90 0.40 0.18 1.44 5 A Public Park 32 52 0.80 1.91 0.85 0.40 0.18 1.70
8 A Commercial 32 52 6.92 7.19 0.10 0.40 0.18 0.32
17 A Residential 5-7 dwellings/acre 32 52 8.32 10.59 0.50 0.40 0.18 3.40 4 A Public Park 32 52 0.64 1.53 0.85 0.40 0.18 1.36
7 A Residential 2.5 acre lots 32 52 0.80 2.43 0.90 0.40 0.18 2.52 20 A Commercial 32 52 17.31 17.97 0.10 0.40 0.18 0.80
50 A Residential 5-7 dwellings/acre 32 52 24.48 31.14 0.50 0.40 0.18 10.00 2 A Public Park 32 52 0.32 0.76 0.85 0.40 0.18 0.68
218 0.521 0.385 0.204
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 3
Unit Hydrograph Method Loss Rate Parameter Development - Line C5 Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
17 of 37
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis
Loss RateTables: AOS 3
25 100
II III 5.88 7.32 II III
40 A Residential 5-7 dwellings/acre 32 52 19.59 24.91 0.50 0.40 0.18 8.00 20 A Residential 8-10 dwellings/acre 32 52 11.67 13.83 0.40 0.40 0.18 3.20 10 A Residential 8-10 dwellings/acre 32 52 5.84 6.92 0.40 0.40 0.18 1.60 70 0.470 0.348 0.183
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 3
Unit Hydrograph Method Loss Rate Parameter Development - Line C5 East Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
18 of 37
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis
Loss RateTables: AOS 3
25 100
II III 5.88 7.32 II III
58 A Residential 10+ dwellings/acre 32 52 44.75 48.11 0.20 0.40 0.18 4.64 13 A Residential 2.5 acre lots 32 52 1.48 4.51 0.90 0.40 0.18 4.68 64 A Residential 10+ dwellings/acre 32 52 49.38 53.09 0.20 0.40 0.18 5.12 60 A Commercial 32 52 51.93 53.90 0.10 0.40 0.18 2.40
4 A Residential 10+ dwellings/acre 32 52 3.09 3.32 0.20 0.40 0.18 0.32 5 A Residential 10+ dwellings/acre 32 52 3.86 4.15 0.20 0.40 0.18 0.40 12 A Residential 10+ dwellings/acre 32 52 9.26 9.95 0.20 0.40 0.18 0.96 16 A Residential 10+ dwellings/acre 32 52 12.35 13.27 0.20 0.40 0.18 1.28 13 A Residential 10+ dwellings/acre 32 52 10.03 10.78 0.20 0.40 0.18 1.04 245 0.240 0.179 0.085
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 3
Unit Hydrograph Method Loss Rate Parameter Development - Line C6 Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
19 of 37
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis
Loss RateTables: AOS 3
25 100
II III 5.88 7.32 II III
3 A Commercial 32 52 2.24 2.33 0.10 0.40 0.18 0.10
2 A Commercial 32 52 1.64 1.70 0.10 0.40 0.18 0.08
3 A Residential 5-7 dwellings/acre 32 52 1.63 2.07 0.50 0.40 0.18 0.67 8 0.295 0.219 0.108
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 3
Unit Hydrograph Method Loss Rate Parameter Development - Line D1 Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
20 of 37
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis
Loss RateTables: AOS 3
25 100
II III 5.88 7.32 II III
5 A Commercial 32 52 4.24 4.40 0.10 0.40 0.18 0.20
5 0.134 0.102 0.040
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 3
Unit Hydrograph Method Loss Rate Parameter Development - Line D1-0 Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
21 of 37
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis
Loss RateTables: AOS 3
25 100
II III 5.88 7.32 II III
3 A Commercial 32 52 2.67 2.78 0.10 0.40 0.18 0.12
3 A Residential 5-7 dwellings/acre 32 52 1.63 2.07 0.50 0.40 0.18 0.66 1 A Commercial 32 52 1.23 1.28 0.10 0.40 0.18 0.06
6 A Residential 5-7 dwellings/acre 32 52 3.08 3.92 0.50 0.40 0.18 1.26 27 A Residential 5-7 dwellings/acre 32 52 12.98 16.51 0.50 0.40 0.18 5.30 41 0.469 0.347 0.182
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 3
Unit Hydrograph Method Loss Rate Parameter Development - Line D1-5 Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
22 of 37
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis
Loss RateTables: AOS 3
25 100
II III 5.88 7.32 II III
11 A Residential 8-10 dwellings/acre 32 52 6.36 7.54 0.40 0.40 0.18 1.74 1 A Public Park 32 52 0.14 0.34 0.85 0.40 0.18 0.30
9 A Condominiums 32 52 5.36 6.17 0.35 0.40 0.18 1.19
13 A Residential 10+ dwellings/acre 32 52 9.88 10.62 0.20 0.40 0.18 1.02 5 A Commercial 32 52 4.25 4.41 0.10 0.40 0.18 0.20
38 0.316 0.235 0.117
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 3
Unit Hydrograph Method Loss Rate Parameter Development - Line D2-0 Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
23 of 37
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis
Loss RateTables: AOS 3
25 100
II III 5.88 7.32 II III
15 A School 32 52 5.74 8.03 0.60 0.40 0.18 3.48
13 A Residential 5-7 dwellings/acre 32 52 6.56 8.35 0.50 0.40 0.18 2.68 24 A Residential 5-7 dwellings/acre 32 52 11.70 14.89 0.50 0.40 0.18 4.78 5 A Commercial 32 52 4.48 4.65 0.10 0.40 0.18 0.21
5 A Commercial 32 52 4.31 4.47 0.10 0.40 0.18 0.20
10 A Commercial 32 52 8.92 9.25 0.10 0.40 0.18 0.41
72 0.423 0.313 0.163
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 3
Unit Hydrograph Method Loss Rate Parameter Development - Line D2-5 Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
24 of 37
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis
Loss RateTables: AOS 3
25 100
II III 5.88 7.32 II III
6 A Commercial 32 52 5.19 5.39 0.10 0.40 0.18 0.24
6 A Condominiums 32 52 3.78 4.36 0.35 0.40 0.18 0.84
1 A Public Park 32 52 0.14 0.32 0.85 0.40 0.18 0.29
2 A Public Park 32 52 0.32 0.76 0.85 0.40 0.18 0.68
4 A Condominiums 32 52 2.52 2.90 0.35 0.40 0.18 0.56
2 A Residential 5-7 dwellings/acre 32 52 0.98 1.25 0.50 0.40 0.18 0.40 21 0.380 0.281 0.144
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) =

FONTANA MASTER PLAN OF DRAINAGE
AOS 3
Unit Hydrograph Method Loss Rate Parameter Development - Line D3-1 Land Use
Low Loss Fraction (1-Y) x Area
Ap
Curve Number (CN) Fp
AMC
Fm =
Area
(ac) Soil Type
25 of 37
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis
Loss RateTables: AOS 3
25 100
II III 5.88 7.32 II III
10 A Commercial 32 52 8.22 8.53 0.10 0.40 0.18 0.38
7 A Condominiums 32 52 4.35 5.01 0.35 0.40 0.18 0.97
1 A Public Park 32 52 0.14 0.32 0.85 0.40 0.18 0.29
4 A Public Park 32 52 0.66 1.58 0.85 0.40 0.18 1.40
8 A Condominiums 32 52 5.17 5.95 0.35 0.40 0.18 1.15
8 A Residential 5-7 dwellings/acre 32 52 4.11 5.23 0.50 0.40 0.18 1.68 38 0.403 0.299 0.154
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 3
Unit Hydrograph Method Loss Rate Parameter Development - Line D3-1 Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
26 of 37
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis
Loss RateTables: AOS 3
25 100
II III 5.88 7.32 II III
5 A Residential 8-10 dwellings/acre 32 52 3.09 3.67 0.40 0.40 0.18 0.85 7 A Residential 8-10 dwellings/acre 32 52 4.03 4.77 0.40 0.40 0.18 1.10 2 A Public Park 32 52 0.37 0.88 0.85 0.40 0.18 0.78
20 A Condominiums 32 52 12.86 14.81 0.35 0.40 0.18 2.86 9 A Condominiums 32 52 5.49 6.32 0.35 0.40 0.18 1.22
8 A Condominiums 32 52 5.17 5.95 0.35 0.40 0.18 1.15
1 A Public Park 32 52 0.18 0.42 0.85 0.40 0.18 0.37
10 A Condominiums 32 52 6.37 7.33 0.35 0.40 0.18 1.41
6 A Condominiums 32 52 3.91 4.50 0.35 0.40 0.18 0.87
9 A Residential 5-7 dwellings/acre 32 52 4.16 5.29 0.50 0.40 0.18 1.70 7 A Public Park 32 52 1.17 2.79 0.85 0.40 0.18 2.48
8 A Residential 5-7 dwellings/acre 32 52 4.11 5.23 0.50 0.40 0.18 1.68 93 0.455 0.336 Fm = 0.176
AMC

FONTANA MASTER PLAN OF DRAINAGE
AOS 3
Unit Hydrograph Method Loss Rate Parameter Development - Line D4 Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
27 of 37
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis
Loss RateTables: AOS 3
25 100
II III 5.88 7.32 II III
7 A Public Park 32 52 1.13 2.67 0.85 0.40 0.18 2.38
10 A Condominiums 32 52 6.05 6.97 0.35 0.40 0.18 1.34
8 A Commercial 32 52 6.84 7.10 0.10 0.40 0.18 0.32
25 0.428 0.317 0.165
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 3
Unit Hydrograph Method Loss Rate Parameter Development - Line D5-3 Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
28 of 37
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis
Loss RateTables: AOS 3
25 100
II III 5.88 7.32 II III
6 A Open Brush, Fair 46 66 0.83 2.83 1.00 0.40 0.18 2.40 7 A Open Brush, Fair 46 66 0.93 3.16 1.00 0.40 0.18 2.68 14 A Open Brush, Fair 46 66 1.89 6.42 1.00 0.40 0.18 5.44 26 0.861 0.528 0.400
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 3
Unit Hydrograph Method Loss Rate Parameter Development - Line D6 Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
29 of 37
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis
Loss RateTables: AOS 3
25 100
II III 5.88 7.32 II III
14 A Commercial 32 52 12.38 12.85 0.10 0.40 0.18 0.57
12 A Commercial 32 52 10.30 10.69 0.10 0.40 0.18 0.48
16 A Commercial 32 52 14.19 14.73 0.10 0.40 0.18 0.66
43 0.134 0.102 0.040
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 3
Unit Hydrograph Method Loss Rate Parameter Development - Line G1 Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
30 of 37
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis
Loss RateTables: AOS 3
25 100
II III 5.88 7.32 II III
12 A Commercial 32 52 10.13 10.51 0.10 0.40 0.18 0.47
16 a Commercial 32 52 14.02 14.55 0.10 0.40 0.18 0.65
28 0.134 0.102 0.040
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 3
Unit Hydrograph Method Loss Rate Parameter Development - Line G2 Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
31 of 37
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis
Loss RateTables: AOS 3
25 100
II III 5.88 7.32 II III
8 A Commercial 32 52 6.66 6.92 0.10 0.40 0.18 0.31
15 A Commercial 32 52 12.90 13.39 0.10 0.40 0.18 0.60
6 A Open Brush, Fair 46 66 0.81 2.74 1.00 0.40 0.18 2.32 18 A Commercial 32 52 15.84 16.44 0.10 0.40 0.18 0.73
7 A Open Brush, Fair 46 66 0.99 3.35 1.00 0.40 0.18 2.84 54 0.309 0.204 0.126
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 3
Unit Hydrograph Method Loss Rate Parameter Development - Line G3 Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
32 of 37
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis
Loss RateTables: AOS 3
25 100
II III 5.88 7.32 II III
22 A Commercial 32 52 18.96 19.68 0.10 0.40 0.18 0.88
22 0.134 0.102 0.040
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 3
Unit Hydrograph Method Loss Rate Parameter Development - Line G4 Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
33 of 37
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis
Loss RateTables: AOS 3
25 100
II III 5.88 7.32 II III
6 A Commercial 32 52 5.11 5.30 0.10 0.40 0.18 0.24
10 A Commercial 32 52 8.92 9.25 0.10 0.40 0.18 0.41
26 A Commercial 32 52 22.85 23.72 0.10 0.40 0.18 1.06
16 A Commercial 32 52 13.42 13.93 0.10 0.40 0.18 0.62
58 0.134 0.102 0.040
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 3
Unit Hydrograph Method Loss Rate Parameter Development - Line G5 Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
34 of 37
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis
Loss RateTables: AOS 3
25 100
II III 5.88 7.32 II III
1 A Commercial 32 52 0.87 0.90 0.10 0.40 0.18 0.04
3 A Commercial 32 52 2.60 2.70 0.10 0.40 0.18 0.12
12 A Commercial 32 52 10.39 10.78 0.10 0.40 0.18 0.48
14 A Commercial 32 52 12.12 12.58 0.10 0.40 0.18 0.56
30 0.134 0.102 0.040
AMC
Fm = Low Loss Fraction (1-Y) =

FONTANA MASTER PLAN OF DRAINAGE
AOS 3
Unit Hydrograph Method Loss Rate Parameter Development - Line G5-4 Area
(ac) Soil Type Land Use Ap
Low Loss Fraction (1-Y) x Area Maximum
Loss Rate
(Fm) x Area
AMC
Curve Number (CN) Fp
35 of 37
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis
Loss RateTables: AOS 3
25 100
II III 5.88 7.32 II III
26 A Commercial 32 52 22.59 23.45 0.10 0.40 0.18 1.04
48 A Commercial 32 52 41.89 43.48 0.10 0.40 0.18 1.94
75 0.134 0.102 0.040
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 3
Unit Hydrograph Method Loss Rate Parameter Development - Line G6 Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
36 of 37
City of Fontana Storm Drain Master Plan
FONT-0121
Trunkline Analysis
Loss RateTables: AOS 3
25 100
II III 5.88 7.32 II III
458 A Residential 5-7 dwellings/acre 32 52 224.25 285.26 0.50 0.40 0.18 91.60 7 D Residential 5-7 dwellings/acre 75 91 5.25 6.38 0.50 0.20 0.07 0.70 8 C Residential 5-7 dwellings/acre 69 86 5.62 6.98 0.50 0.25 0.10 1.00 92 A Residential 2.5 acre lots 32 52 10.46 31.95 0.90 0.40 0.18 33.12 40 A Public Park 32 52 6.43 15.27 0.85 0.40 0.18 13.60
11 A School 32 52 4.35 6.09 0.60 0.40 0.18 2.64
45 D Open Brush, Fair 83 96 30.46 41.92 1.00 0.20 0.07 9.00 45 A Open Brush, Fair 46 66 6.25 21.26 1.00 0.40 0.18 18.00 706 0.585 0.412 0.240
AMC
Fm =

FONTANA MASTER PLAN OF DRAINAGE
AOS 3
Unit Hydrograph Method Loss Rate Parameter Development - Hunter Ridge Low Loss Fraction (1-Y) =
Area
(ac) Soil Type Land Use Ap
Maximum
Loss Rate
(Fm) x Area
AMC
Low Loss Fraction (1-Y) x AreaCurve Number (CN) Fp
37 of 37
Rational Method Calculations, Collector Analysis

City of Fontana Storm Drain Master Plan
FONT-0121
Rational Method Calculations
Collector Hydrologic Analysis
AOS 1 Rational Method Calculations
Basin ID Ap Fp Fm C25yr Fp Fm C100yr Tc (min) i25yr
(in/hr)
i100yr
(in/hr)
A
(ac)
Qrunoff_25yr
(cfs)
Qrunoff_100yr
(cfs)
Diameter
(ft)
Diameter
(in.) n Slope
(ft/ft)
A Pipe
(ft2)
R Pipe
(ft)
Q-capacity
(cfs)
Q-calculated
(cfs)
Q-difference
(cfs)
Q-capacity
(cfs)
Q-calculated
(cfs)
Q-difference
(cfs)
1 0.20 0.40 0.08 0.85 0.18 0.04 0.88 42 1.39 1.81 41 48 65 3.0 36 0.013 0.016 7.07 0.83 85 48 37 85 65 20 2 0.44 0.40 0.18 0.78 0.18 0.08 0.86 51 1.27 1.66 61 60 86 3.5 42 0.013 0.011 9.62 0.91 104 60 44 104 86 18 3 0.60 0.40 0.24 0.74 0.18 0.11 0.85 42 1.39 1.81 41 43 63 3.0 36 0.013 0.014 7.07 0.83 79 43 37 79 63 16 4 0.60 0.40 0.24 0.75 0.18 0.11 0.85 42 1.40 1.82 40 42 62 3.0 36 0.013 0.012 7.07 0.83 74 42 32 74 62 12 5 0.57 0.40 0.23 0.75 0.18 0.10 0.85 44 1.36 1.77 45 46 68 3.0 36 0.013 0.015 7.07 0.83 83 46 37 83 68 15 6 0.10 0.40 0.04 0.87 0.18 0.02 0.89 44 1.36 1.77 45 54 71 3.0 36 0.013 0.007 7.07 0.83 54 54 0 54 71 -18 7 0.59 0.40 0.23 0.72 0.18 0.11 0.84 59 1.19 1.55 82 70 106 3.5 42 0.013 0.02 9.62 0.91 144 70 74 144 106 38 8 0.60 0.40 0.24 0.74 0.18 0.11 0.84 45 1.35 1.75 47 47 70 3.0 36 0.013 0.017 7.07 0.83 86 47 39 86 70 16 9 0.25 0.40 0.10 0.83 0.18 0.05 0.88 42 1.39 1.81 41 47 65 3.0 36 0.013 0.017 7.07 0.83 87 47 40 87 65 22 10 0.41 0.40 0.16 0.81 0.18 0.07 0.87 30 1.63 2.13 20 27 38 3.0 36 0.013 0.015 7.07 0.83 81 27 54 81 38 43 11 0.60 0.40 0.24 0.75 0.18 0.11 0.85 40 1.43 1.86 36 39 57 3.0 36 0.013 0.013 7.07 0.83 75 39 36 75 57 18 12 0.60 0.40 0.24 0.75 0.18 0.11 0.85 40 1.42 1.85 37 40 58 3.0 36 0.013 0.016 7.07 0.83 84 40 44 84 58 25 13 0.60 0.40 0.24 0.75 0.18 0.11 0.85 40 1.42 1.85 38 40 59 3.0 36 0.013 0.014 7.07 0.83 80 40 40 80 59 21 14 0.60 0.40 0.24 0.75 0.18 0.11 0.85 41 1.41 1.83 39 41 61 3.0 36 0.013 0.015 7.07 0.83 82 41 41 82 61 22 15 0.60 0.40 0.24 0.74 0.18 0.11 0.85 42 1.39 1.81 42 43 64 3.0 36 0.013 0.013 7.07 0.83 77 43 34 77 64 14 16 0.40 0.40 0.16 0.79 0.18 0.07 0.86 46 1.33 1.74 49 52 74 3.0 36 0.013 0.014 7.07 0.83 78 52 25 78 74 4 17 0.60 0.40 0.24 0.74 0.18 0.11 0.84 44 1.36 1.77 46 46 69 3.0 36 0.013 0.015 7.07 0.83 81 46 35 81 69 12 18 0.10 0.40 0.04 0.88 0.18 0.02 0.89 32 1.58 2.06 23 32 43 3.0 36 0.013 0.058 7.07 0.83 160 32 128 160 43 117 19 0.10 0.40 0.04 0.87 0.18 0.02 0.89 53 1.25 1.62 66 72 95 3.5 42 0.013 0.023 9.62 0.91 152 72 80 152 95 56 20 0.30 0.40 0.12 0.83 0.18 0.05 0.88 33 1.55 2.03 25 32 45 3.0 36 0.013 0.014 7.07 0.83 78 32 46 78 45 34 21 0.49 0.40 0.20 0.76 0.18 0.09 0.85 53 1.25 1.62 66 63 91 3.5 42 0.013 0.014 9.62 0.91 121 63 58 121 91 29 22 0.29 0.40 0.12 0.83 0.18 0.05 0.88 35 1.52 1.98 28 35 48 3.0 36 0.013 0.015 7.07 0.83 81 35 46 81 48 33 23 0.48 0.40 0.19 0.76 0.18 0.09 0.85 54 1.24 1.61 69 65 94 3.5 42 0.013 0.017 9.62 0.91 130 65 65 130 94 36 24 0.52 0.40 0.21 0.73 0.18 0.09 0.84 69 1.11 1.44 111 90 134 4.0 48 0.013 0.015 12.57 1.00 175 90 85 175 134 41 25 0.33 0.40 0.13 0.82 0.18 0.06 0.87 38 1.46 1.90 34 40 56 3.0 36 0.013 0.017 7.07 0.83 86 40 46 86 56 30 26 0.44 0.40 0.18 0.77 0.18 0.08 0.86 54 1.24 1.61 68 65 94 3.5 42 0.013 0.011 9.62 0.91 106 65 41 106 94 13 27 0.50 0.40 0.20 0.74 0.18 0.09 0.84 68 1.12 1.45 108 89 132 4.0 48 0.013 0.014 12.57 1.00 170 89 81 170 132 38 28 0.39 0.40 0.16 0.80 0.18 0.07 0.87 38 1.46 1.91 33 39 54 3.0 36 0.013 0.005 7.07 0.83 47 39 9 47 54 -7 29 0.38 0.40 0.15 0.78 0.18 0.07 0.86 64 1.15 1.49 96 86 123 4.0 48 0.013 0.01 12.57 1.00 146 86 60 146 123 23 30 0.20 0.40 0.08 0.85 0.18 0.04 0.88 42 1.40 1.82 40 48 64 3.0 36 0.013 0.014 7.07 0.83 80 48 32 80 64 15 31 0.44 0.40 0.18 0.79 0.18 0.08 0.86 42 1.40 1.82 40 44 63 3.0 36 0.013 0.017 7.07 0.83 86 44 42 86 63 23 32 0.60 0.40 0.24 0.72 0.18 0.11 0.84 59 1.19 1.55 80 69 105 3.5 42 0.013 0.014 9.62 0.91 121 69 52 121 105 16 33 0.60 0.40 0.24 0.72 0.18 0.11 0.84 59 1.20 1.55 80 69 104 3.5 42 0.013 0.015 9.62 0.91 121 69 52 121 104 17 34 0.20 0.40 0.08 0.84 0.18 0.04 0.88 59 1.20 1.55 80 80 109 3.5 42 0.013 0.014 9.62 0.91 118 80 37 118 109 9 35 0.60 0.40 0.24 0.74 0.18 0.11 0.84 45 1.35 1.76 47 47 69 3.0 36 0.013 0.02 7.07 0.83 94 47 48 94 69 25 36 0.60 0.40 0.24 0.74 0.18 0.11 0.84 45 1.35 1.75 47 47 70 3.0 36 0.013 0.017 7.07 0.83 86 47 39 86 70 16 37 0.60 0.40 0.24 0.74 0.18 0.11 0.84 45 1.35 1.76 47 47 69 3.0 36 0.013 0.018 7.07 0.83 91 47 44 91 69 21 38 0.60 0.40 0.24 0.74 0.18 0.11 0.84 45 1.35 1.76 46 46 69 3.0 36 0.013 0.019 7.07 0.83 91 46 44 91 69 22 39 0.60 0.40 0.24 0.74 0.18 0.11 0.84 45 1.34 1.75 48 48 71 3.0 36 0.013 0.016 7.07 0.83 85 48 37 85 71 14 40 0.60 0.40 0.24 0.72 0.18 0.11 0.84 59 1.19 1.55 81 70 105 3.5 42 0.013 0.017 9.62 0.91 132 70 62 132 105 26 41 0.11 0.40 0.04 0.87 0.18 0.02 0.89 42 1.39 1.80 42 50 67 3.0 36 0.013 0.016 7.07 0.83 85 50 34 85 67 18 42 0.11 0.40 0.04 0.87 0.18 0.02 0.89 56 1.22 1.58 74 78 104 3.5 42 0.013 0.006 9.62 0.91 78 78 0 78 104 -26 43 0.11 0.40 0.04 0.87 0.18 0.02 0.89 41 1.40 1.82 40 49 65 3.0 36 0.013 0.015 7.07 0.83 81 49 32 81 65 16 44 0.10 0.40 0.04 0.87 0.18 0.02 0.89 59 1.20 1.55 80 83 110 3.5 42 0.013 0.016 9.62 0.91 126 83 43 126 110 15 45 0.47 0.40 0.19 0.76 0.18 0.09 0.85 59 1.19 1.55 80 73 106 3.5 42 0.013 0.013 9.62 0.91 117 73 44 117 106 11 46 0.10 0.40 0.04 0.87 0.18 0.02 0.89 68 1.12 1.45 108 105 139 4.0 48 0.013 0.017 12.57 1.00 187 105 82 187 139 47 47 0.53 0.40 0.21 0.73 0.18 0.10 0.84 67 1.13 1.46 105 86 129 4.0 48 0.013 0.012 12.57 1.00 155 86 69 155 129 27 48 0.35 0.40 0.14 0.78 0.18 0.06 0.86 84 1.02 1.31 165 130 185 4.5 54 0.013 0.005 15.90 1.08 138 130 8 138 185 -47 49 0.60 0.40 0.24 0.75 0.18 0.11 0.85 41 1.40 1.83 40 42 61 3.0 36 0.013 0.006 7.07 0.83 53 42 11 53 61 -8 50 0.60 0.40 0.24 0.69 0.18 0.11 0.83 83 1.02 1.32 160 112 175 4.0 48 0.013 0.007 12.57 1.00 120 112 8 120 175 -54 51 0.60 0.40 0.24 0.75 0.18 0.11 0.85 39 1.44 1.88 35 38 56 3.0 36 0.013 0.016 7.07 0.83 85 38 47 85 56 29 52 0.54 0.40 0.22 0.71 0.18 0.10 0.84 79 1.04 1.35 146 109 165 4.5 54 0.013 0.012 15.90 1.08 211 109 103 211 165 47 53 0.59 0.40 0.24 0.75 0.18 0.11 0.85 41 1.41 1.84 39 41 60 3.0 36 0.013 0.014 7.07 0.83 79 41 38 79 60 18 54 0.29 0.40 0.12 0.80 0.18 0.05 0.86 84 1.02 1.32 163 132 186 4.5 54 0.013 0.005 15.90 1.08 139 132 7 139 186 -47 55 0.42 0.40 0.17 0.78 0.18 0.07 0.86 53 1.26 1.63 65 63 90 3.5 42 0.013 0.008 9.62 0.91 89 63 26 89 90 -1 56 0.20 0.40 0.08 0.85 0.18 0.04 0.88 46 1.33 1.73 50 56 76 3.0 36 0.013 0.014 7.07 0.83 79 56 23 79 76 3 57 0.60 0.40 0.24 0.74 0.18 0.11 0.84 46 1.33 1.73 50 49 73 3.0 36 0.013 0.014 7.07 0.83 78 49 29 78 73 5 58 0.44 0.40 0.18 0.79 0.18 0.08 0.86 38 1.45 1.89 34 39 55 3.0 36 0.013 0.014 7.07 0.83 79 39 40 79 55 23 59 0.60 0.40 0.24 0.75 0.18 0.11 0.85 39 1.45 1.89 34 37 55 3.0 36 0.013 0.016 7.07 0.83 84 37 46 84 55 29 60 0.32 0.40 0.13 0.81 0.18 0.06 0.87 54 1.24 1.61 69 69 96 3.5 42 0.013 0.014 9.62 0.91 117 69 49 117 96 21 61 0.75 0.40 0.30 0.71 0.18 0.13 0.84 39 1.45 1.89 34 36 54 3.0 36 0.013 0.018 7.07 0.83 90 36 54 90 54 35 62 0.27 0.40 0.11 0.81 0.18 0.05 0.87 70 1.10 1.43 114 102 142 4.0 48 0.013 0.015 12.57 1.00 174 102 71 174 142 32 63 0.59 0.40 0.23 0.74 0.18 0.11 0.85 46 1.33 1.73 50 49 73 3.0 36 0.013 0.014 7.07 0.83 78 49 29 78 73 5 64 0.62 0.40 0.25 0.71 0.18 0.11 0.83 58 1.20 1.55 80 68 103 3.5 42 0.013 0.015 9.62 0.91 124 68 56 124 103 20 65 0.60 0.40 0.24 0.74 0.18 0.11 0.84 46 1.33 1.73 50 49 73 3.0 36 0.013 0.015 7.07 0.83 82 49 32 82 73 8 66 0.60 0.40 0.24 0.72 0.18 0.11 0.84 59 1.19 1.55 81 69 105 3.5 42 0.013 0.014 9.62 0.91 120 69 51 120 105 15 67 0.60 0.40 0.24 0.73 0.18 0.11 0.84 49 1.30 1.69 56 53 79 3.0 36 0.013 0.014 7.07 0.83 80 53 27 80 79 1 68 0.60 0.40 0.24 0.71 0.18 0.11 0.84 62 1.16 1.51 90 75 114 3.5 42 0.013 0.016 9.62 0.91 128 75 53 128 114 14 69 0.60 0.40 0.24 0.74 0.18 0.11 0.84 46 1.33 1.74 49 49 72 3.0 36 0.013 0.01 7.07 0.83 67 49 19 67 72 -5 70 0.60 0.40 0.24 0.72 0.18 0.11 0.84 59 1.20 1.55 80 69 104 3.5 42 0.013 0.015 9.62 0.91 124 69 55 124 104 20 RATIONAL METHOD MANNING'S EQUATION 25-Year 100-Year

AMC II AMC III
1 of 7
City of Fontana Storm Drain Master Plan
FONT-0121
Rational Method Calculations
Collector Hydrologic Analysis
AOS 1 Rational Method Calculations
Basin ID Ap Fp Fm C25yr Fp Fm C100yr Tc (min) i25yr
(in/hr)
i100yr
(in/hr)
A
(ac)
Qrunoff_25yr
(cfs)
Qrunoff_100yr
(cfs)
Diameter
(ft)
Diameter
(in.) n Slope
(ft/ft)
A Pipe
(ft2)
R Pipe
(ft)
Q-capacity
(cfs)
Q-calculated
(cfs)
Q-difference
(cfs)
Q-capacity
(cfs)
Q-calculated
(cfs)
Q-difference
(cfs)
RATIONAL METHOD MANNING'S EQUATION 25-Year 100-Year

AMC II AMC III
71 0.60 0.40 0.24 0.75 0.18 0.11 0.85 39 1.43 1.87 36 38 57 3.0 36 0.013 0.005 7.07 0.83 49 38 10 49 57 -8 72 0.42 0.40 0.17 0.79 0.18 0.08 0.86 42 1.40 1.82 40 44 63 3.0 36 0.013 0.018 7.07 0.83 90 44 46 90 63 27 73 0.48 0.40 0.19 0.75 0.18 0.09 0.85 59 1.19 1.55 81 73 107 3.5 42 0.013 0.016 9.62 0.91 128 73 55 128 107 21 74 0.32 0.40 0.13 0.80 0.18 0.06 0.87 59 1.20 1.55 80 77 108 3.5 42 0.013 0.012 9.62 0.91 109 77 32 109 108 1 75 0.60 0.40 0.24 0.75 0.18 0.11 0.85 41 1.40 1.83 39 41 61 3.0 36 0.013 0.016 7.07 0.83 86 41 44 86 61 25 76 0.59 0.40 0.23 0.72 0.18 0.11 0.84 59 1.20 1.55 80 69 104 3.5 42 0.013 0.014 9.62 0.91 118 69 49 118 104 14 77 0.60 0.40 0.24 0.72 0.18 0.11 0.84 59 1.19 1.55 81 69 105 3.5 42 0.013 0.015 9.62 0.91 124 69 55 124 105 19 78 0.40 0.40 0.16 0.78 0.18 0.07 0.86 58 1.20 1.56 79 74 106 3.5 42 0.013 0.013 9.62 0.91 113 74 39 113 106 7 79 0.60 0.40 0.24 0.72 0.18 0.11 0.84 59 1.19 1.55 80 69 104 3.5 42 0.013 0.012 9.62 0.91 109 69 40 109 104 5 80 0.50 0.40 0.20 0.72 0.18 0.09 0.84 83 1.02 1.32 160 118 177 5.0 60 0.013 0.005 19.63 1.16 184 118 66 184 177 7 81 0.41 0.40 0.16 0.76 0.18 0.07 0.85 83 1.02 1.32 159 123 179 5.0 60 0.013 0.005 19.63 1.16 184 123 61 184 179 5 82 0.48 0.40 0.19 0.72 0.18 0.09 0.84 102 0.93 1.20 240 160 242 5.5 66 0.013 0.006 23.76 1.24 249 160 89 249 242 7 83 0.51 0.40 0.20 0.69 0.18 0.09 0.83 119 0.87 1.12 330 197 305 6.0 72 0.013 0.006 28.27 1.31 328 197 131 328 305 23 84 0.53 0.40 0.21 0.67 0.18 0.09 0.82 133 0.83 1.06 410 227 358 6.0 72 0.013 0.007 28.27 1.31 362 227 135 362 358 4 85 0.54 0.40 0.21 0.66 0.18 0.10 0.82 142 0.80 1.03 470 248 395 6.5 78 0.013 0.006 33.18 1.38 406 248 158 406 395 11 86 0.54 0.40 0.22 0.66 0.18 0.10 0.81 145 0.79 1.02 490 255 408 6.5 78 0.013 0.006 33.18 1.38 419 255 164 419 408 12 87 0.20 0.40 0.08 0.85 0.18 0.04 0.88 42 1.40 1.82 40 48 65 3.0 36 0.013 0.014 7.07 0.83 79 48 32 79 65 15 88 0.55 0.40 0.22 0.76 0.18 0.10 0.85 40 1.42 1.85 38 41 59 3.0 36 0.013 0.012 7.07 0.83 73 41 33 73 59 14 89 0.60 0.40 0.24 0.75 0.18 0.11 0.85 39 1.43 1.87 36 39 57 3.0 36 0.013 0.013 7.07 0.83 76 39 38 76 57 20 90 0.60 0.40 0.24 0.75 0.18 0.11 0.85 42 1.39 1.82 41 42 62 3.0 36 0.013 0.016 7.07 0.83 84 42 42 84 62 22 91 0.48 0.40 0.19 0.76 0.18 0.09 0.85 58 1.20 1.56 79 72 105 3.5 42 0.013 0.012 9.62 0.91 111 72 39 111 105 6 92 0.48 0.40 0.19 0.76 0.18 0.09 0.85 59 1.19 1.55 80 73 106 3.5 42 0.013 0.014 9.62 0.91 119 73 46 119 106 13 93 0.48 0.40 0.19 0.73 0.18 0.09 0.84 83 1.02 1.32 160 120 178 4.5 54 0.013 0.008 15.90 1.08 176 120 56 176 178 -2 94 0.47 0.40 0.19 0.72 0.18 0.08 0.84 97 0.95 1.23 220 151 227 5.5 66 0.013 0.005 23.76 1.24 228 151 77 228 227 1 95 0.44 0.40 0.18 0.73 0.18 0.08 0.84 102 0.93 1.20 240 164 243 5.5 66 0.013 0.006 23.76 1.24 260 164 96 260 243 17 96 0.49 0.40 0.20 0.75 0.18 0.09 0.85 59 1.19 1.55 81 72 106 3.5 42 0.013 0.012 9.62 0.91 110 72 38 110 106 4 97 0.50 0.40 0.20 0.73 0.18 0.09 0.84 71 1.10 1.42 117 95 141 4.0 48 0.013 0.014 12.57 1.00 171 95 76 171 141 30 98 0.48 0.40 0.19 0.76 0.18 0.09 0.85 59 1.20 1.55 80 72 105 4.0 48 0.013 0.012 12.57 1.00 156 72 84 156 105 51 99 0.39 0.40 0.15 0.77 0.18 0.07 0.86 70 1.10 1.43 115 98 141 4.0 48 0.013 0.026 12.57 1.00 233 98 135 233 141 92 100 0.20 0.40 0.08 0.84 0.18 0.04 0.88 59 1.20 1.55 80 80 109 3.5 42 0.013 0.014 9.62 0.91 117 80 37 117 109 8 101 0.60 0.40 0.24 0.72 0.18 0.11 0.84 60 1.19 1.54 83 70 107 3.5 42 0.013 0.02 9.62 0.91 142 70 72 142 107 36 102 0.56 0.40 0.22 0.71 0.18 0.10 0.83 77 1.06 1.37 138 104 158 4.0 48 0.013 0.016 12.57 1.00 184 104 81 184 158 27 103 0.60 0.40 0.24 0.72 0.18 0.11 0.84 59 1.19 1.55 81 69 105 3.5 42 0.013 0.017 9.62 0.91 133 69 64 133 105 28 104 0.60 0.40 0.24 0.70 0.18 0.11 0.83 77 1.06 1.37 136 101 155 4.5 54 0.013 0.016 15.90 1.08 248 101 148 248 155 93 105 0.60 0.40 0.24 0.72 0.18 0.11 0.84 59 1.19 1.54 82 70 106 3.5 42 0.013 0.018 9.62 0.91 134 70 64 134 106 28 106 0.58 0.40 0.23 0.70 0.18 0.10 0.83 83 1.02 1.32 162 115 177 4.5 54 0.013 0.017 15.90 1.08 256 115 142 256 177 80 107 0.60 0.40 0.24 0.70 0.18 0.11 0.83 76 1.06 1.37 136 100 155 4.5 54 0.013 0.018 15.90 1.08 260 100 160 260 155 106 108 0.61 0.40 0.24 0.72 0.18 0.11 0.84 59 1.19 1.55 80 69 104 3.5 42 0.013 0.018 9.62 0.91 136 69 68 136 104 32 109 0.60 0.40 0.24 0.70 0.18 0.11 0.83 76 1.06 1.38 135 100 154 4.5 54 0.013 0.017 15.90 1.08 255 100 155 255 154 100 110 0.60 0.40 0.24 0.72 0.18 0.11 0.84 59 1.19 1.55 81 70 105 3.5 42 0.013 0.017 9.62 0.91 132 70 62 132 105 27 111 0.60 0.40 0.24 0.70 0.18 0.11 0.83 78 1.05 1.36 141 103 159 4.5 54 0.013 0.016 15.90 1.08 252 103 149 252 159 93 112 0.50 0.40 0.20 0.76 0.18 0.09 0.85 51 1.27 1.65 62 59 86 3.5 42 0.013 0.018 9.62 0.91 134 59 74 134 86 47 115 0.10 0.40 0.04 0.87 0.18 0.02 0.89 72 1.09 1.41 120 113 151 4.0 48 0.013 0.016 12.57 1.00 179 113 66 179 151 29 116 0.46 0.40 0.19 0.78 0.18 0.08 0.86 40 1.42 1.85 38 42 60 3.0 36 0.013 0.015 7.07 0.83 80 42 38 80 60 20 117 0.54 0.40 0.22 0.74 0.18 0.10 0.84 60 1.18 1.54 84 73 109 3.5 42 0.013 0.015 9.62 0.91 125 73 52 125 109 16 118 0.44 0.40 0.17 0.75 0.18 0.08 0.85 73 1.08 1.40 125 102 149 4.0 48 0.013 0.016 12.57 1.00 183 102 81 183 149 34 119 0.31 0.40 0.13 0.82 0.18 0.06 0.87 36 1.49 1.94 30 37 52 3.0 36 0.013 0.016 7.07 0.83 83 37 46 83 52 32 120 0.36 0.40 0.14 0.81 0.18 0.06 0.87 39 1.43 1.87 36 42 59 3.0 36 0.013 0.014 7.07 0.83 79 42 37 79 59 21 121 0.46 0.40 0.18 0.78 0.18 0.08 0.86 46 1.34 1.74 49 51 73 3.0 36 0.013 0.014 7.07 0.83 79 51 29 79 73 6 122 0.44 0.40 0.18 0.78 0.18 0.08 0.86 50 1.29 1.67 58 58 83 3.5 42 0.013 0.014 9.62 0.91 120 58 62 120 83 37 123 0.60 0.40 0.24 0.76 0.18 0.11 0.85 32 1.56 2.04 25 29 43 3.0 36 0.013 0.021 7.07 0.83 98 29 68 98 43 55 124 0.21 0.40 0.08 0.85 0.18 0.04 0.88 44 1.36 1.77 45 52 71 3.0 36 0.013 0.013 7.07 0.83 77 52 25 77 71 7 125 0.21 0.40 0.08 0.85 0.18 0.04 0.88 44 1.36 1.77 46 53 71 3.0 36 0.013 0.015 7.07 0.83 81 53 29 81 71 10 126 0.24 0.40 0.10 0.84 0.18 0.04 0.88 44 1.36 1.77 46 52 71 3.0 36 0.013 0.016 7.07 0.83 84 52 32 84 71 13 127 0.52 0.40 0.21 0.76 0.18 0.09 0.85 44 1.36 1.77 46 47 69 3.0 36 0.013 0.015 7.07 0.83 82 47 34 82 69 13 128 0.20 0.40 0.08 0.85 0.18 0.04 0.88 45 1.35 1.76 47 53 72 3.0 36 0.013 0.012 7.07 0.83 73 53 20 73 72 1 129 0.20 0.40 0.08 0.84 0.18 0.04 0.88 59 1.19 1.55 81 81 110 3.5 42 0.013 0.015 9.62 0.91 123 81 42 123 110 13 130 0.16 0.40 0.07 0.84 0.18 0.03 0.88 75 1.07 1.39 131 118 160 4.0 48 0.013 0.013 12.57 1.00 162 118 44 162 160 2 131 0.20 0.40 0.08 0.84 0.18 0.04 0.88 59 1.19 1.55 81 81 110 3.5 42 0.013 0.013 9.62 0.91 114 81 33 114 110 3 132 0.16 0.40 0.07 0.84 0.18 0.03 0.88 75 1.07 1.38 131 119 160 4.0 48 0.013 0.02 12.57 1.00 201 119 83 201 160 41 133 0.36 0.40 0.15 0.79 0.18 0.07 0.86 59 1.19 1.55 81 76 108 3.5 42 0.013 0.013 9.62 0.91 117 76 41 117 108 9 134 0.27 0.40 0.11 0.81 0.18 0.05 0.87 74 1.07 1.39 129 112 156 4.0 48 0.013 0.019 12.57 1.00 200 112 88 200 156 44 135 0.56 0.40 0.22 0.73 0.18 0.10 0.84 59 1.20 1.55 80 70 104 3.5 42 0.013 0.012 9.62 0.91 112 70 42 112 104 8 136 0.41 0.40 0.16 0.77 0.18 0.07 0.85 72 1.09 1.42 119 100 144 4.0 48 0.013 0.013 12.57 1.00 165 100 65 165 144 21 137 0.24 0.40 0.10 0.83 0.18 0.04 0.88 59 1.19 1.55 80 80 109 3.5 42 0.013 0.016 9.62 0.91 126 80 47 126 109 17 138 0.19 0.40 0.08 0.84 0.18 0.03 0.88 72 1.09 1.42 119 109 148 4.0 48 0.013 0.013 12.57 1.00 165 109 56 165 148 17 139 0.49 0.40 0.20 0.75 0.18 0.09 0.85 59 1.20 1.55 80 72 105 3.5 42 0.013 0.014 9.62 0.91 121 72 49 121 105 16 140 0.45 0.40 0.18 0.75 0.18 0.08 0.85 71 1.10 1.42 118 97 142 4.0 48 0.013 0.017 12.57 1.00 187 97 90 187 142 45 141 0.49 0.40 0.20 0.75 0.18 0.09 0.85 59 1.19 1.55 81 72 106 3.5 42 0.013 0.014 9.62 0.91 118 72 45 118 106 12 142 0.49 0.40 0.20 0.74 0.18 0.09 0.84 72 1.09 1.41 121 98 144 4.0 48 0.013 0.018 12.57 1.00 191 98 93 191 144 46 2 of 7
City of Fontana Storm Drain Master Plan
FONT-0121
Rational Method Calculations
Collector Hydrologic Analysis
AOS 1 Rational Method Calculations
Basin ID Ap Fp Fm C25yr Fp Fm C100yr Tc (min) i25yr
(in/hr)
i100yr
(in/hr)
A
(ac)
Qrunoff_25yr
(cfs)
Qrunoff_100yr
(cfs)
Diameter
(ft)
Diameter
(in.) n Slope
(ft/ft)
A Pipe
(ft2)
R Pipe
(ft)
Q-capacity
(cfs)
Q-calculated
(cfs)
Q-difference
(cfs)
Q-capacity
(cfs)
Q-calculated
(cfs)
Q-difference
(cfs)
RATIONAL METHOD MANNING'S EQUATION 25-Year 100-Year

AMC II AMC III
143 0.41 0.40 0.16 0.76 0.18 0.07 0.85 72 1.09 1.41 121 101 145 4.0 48 0.013 0.014 12.57 1.00 169 101 69 169 145 24 144 0.45 0.40 0.18 0.76 0.18 0.08 0.85 59 1.19 1.55 81 74 107 3.5 42 0.013 0.014 9.62 0.91 120 74 46 120 107 13 145 0.10 0.40 0.04 0.88 0.18 0.02 0.89 31 1.59 2.07 23 32 43 3.0 36 0.013 0.005 7.07 0.83 47 32 15 47 43 5 146 0.10 0.40 0.04 0.87 0.18 0.02 0.89 42 1.39 1.82 41 50 66 3.0 36 0.013 0.015 7.07 0.83 80 50 31 80 66 15 147 0.10 0.40 0.04 0.87 0.18 0.02 0.89 58 1.20 1.56 79 83 110 3.5 42 0.013 0.013 9.62 0.91 116 83 33 116 110 6 148 0.10 0.40 0.04 0.87 0.18 0.02 0.89 53 1.25 1.63 65 71 95 3.5 42 0.013 0.014 9.62 0.91 121 71 49 121 95 26 149 0.34 0.37 0.14 0.82 0.17 0.06 0.87 39 1.44 1.88 35 41 57 3.0 36 0.013 0.018 7.07 0.83 89 41 47 89 57 31 150 0.60 0.40 0.24 0.75 0.18 0.11 0.85 42 1.38 1.80 42 43 64 3.0 36 0.013 0.008 7.07 0.83 59 43 16 59 64 -5 151 0.48 0.40 0.19 0.74 0.18 0.09 0.85 70 1.11 1.43 113 93 137 4.0 48 0.013 0.01 12.57 1.00 145 93 52 145 137 8 152 0.11 0.40 0.04 0.87 0.18 0.02 0.89 55 1.23 1.60 70 75 99 3.5 42 0.013 0.016 9.62 0.91 125 75 51 125 99 26 153 0.11 0.40 0.04 0.87 0.18 0.02 0.89 39 1.44 1.88 35 44 59 3.0 36 0.013 0.005 7.07 0.83 47 44 3 47 59 -11 154 0.60 0.40 0.24 0.74 0.18 0.11 0.85 44 1.36 1.77 46 46 68 3.0 36 0.013 0.016 7.07 0.83 83 46 38 83 68 15 155 0.60 0.40 0.24 0.75 0.18 0.11 0.85 39 1.44 1.88 35 38 56 3.0 36 0.013 0.015 7.07 0.83 83 38 45 83 56 27 156 0.20 0.39 0.08 0.86 0.18 0.04 0.88 32 1.57 2.05 24 32 44 3.0 36 0.013 0.016 7.07 0.83 84 32 51 84 44 40 157 0.60 0.40 0.24 0.75 0.18 0.11 0.85 42 1.39 1.81 41 43 63 3.5 42 0.013 0.013 9.62 0.91 116 43 73 116 63 53 158 0.60 0.40 0.24 0.72 0.18 0.11 0.84 56 1.22 1.59 72 64 96 4.0 48 0.013 0.02 12.57 1.00 203 64 139 203 96 107 159 0.60 0.40 0.24 0.72 0.18 0.11 0.84 59 1.19 1.55 81 69 105 4.0 48 0.013 0.016 12.57 1.00 179 69 110 179 105 74 160 0.56 0.40 0.23 0.71 0.18 0.10 0.84 73 1.09 1.41 123 95 144 4.5 54 0.013 0.018 15.90 1.08 265 95 170 265 144 120 161 0.46 0.40 0.18 0.79 0.18 0.08 0.86 36 1.49 1.95 30 35 50 3.0 36 0.013 0.021 7.07 0.83 96 35 61 96 50 46 162 0.60 0.40 0.24 0.76 0.18 0.11 0.85 35 1.51 1.97 29 33 48 3.0 36 0.013 0.019 7.07 0.83 93 33 60 93 48 45 163 0.60 0.40 0.24 0.76 0.18 0.11 0.85 34 1.52 1.99 28 32 47 3.0 36 0.013 0.019 7.07 0.83 91 32 60 91 47 45 164 0.39 0.40 0.16 0.82 0.18 0.07 0.87 23 1.82 2.38 13 19 26 3.0 36 0.013 0.019 7.07 0.83 91 19 73 91 26 65 165 0.53 0.40 0.21 0.77 0.18 0.10 0.85 40 1.42 1.86 37 40 59 3.0 36 0.013 0.019 7.07 0.83 91 40 51 91 59 33 166 0.54 0.40 0.21 0.76 0.18 0.10 0.85 42 1.39 1.81 42 44 64 3.0 36 0.013 0.019 7.07 0.83 92 44 48 92 64 28 167 0.42 0.40 0.17 0.78 0.18 0.08 0.86 52 1.26 1.64 63 62 89 3.5 42 0.013 0.017 9.62 0.91 133 62 71 133 89 44 168 0.37 0.40 0.15 0.79 0.18 0.07 0.86 60 1.18 1.54 84 78 111 4.0 48 0.013 0.017 12.57 1.00 188 78 110 188 111 77 169 0.39 0.40 0.16 0.77 0.18 0.07 0.86 70 1.11 1.44 112 96 138 4.5 54 0.013 0.015 15.90 1.08 240 96 144 240 138 102 170 0.55 0.40 0.22 0.73 0.18 0.10 0.84 62 1.17 1.52 88 76 113 3.5 42 0.013 0.018 9.62 0.91 136 76 61 136 113 24 171 0.49 0.40 0.20 0.72 0.18 0.09 0.84 87 1.00 1.29 175 127 190 4.0 48 0.013 0.018 12.57 1.00 194 127 67 194 190 4 172 0.43 0.40 0.17 0.79 0.18 0.08 0.86 42 1.39 1.81 42 46 65 3.0 36 0.013 0.016 7.07 0.83 85 46 39 85 65 20 173 0.44 0.40 0.17 0.77 0.18 0.08 0.85 59 1.19 1.54 82 75 108 3.5 42 0.013 0.018 9.62 0.91 136 75 61 136 108 28 174 0.36 0.40 0.14 0.77 0.18 0.06 0.86 84 1.02 1.32 162 128 183 4.5 54 0.013 0.016 15.90 1.08 250 128 122 250 183 67 175 0.29 0.40 0.12 0.83 0.18 0.05 0.87 42 1.39 1.81 41 47 65 3.0 36 0.013 0.017 7.07 0.83 87 47 40 87 65 22 176 0.36 0.40 0.14 0.79 0.18 0.06 0.86 59 1.19 1.55 81 77 108 3.5 42 0.013 0.019 9.62 0.91 138 77 62 138 108 30 177 0.60 0.40 0.24 0.72 0.18 0.11 0.84 59 1.19 1.55 81 69 105 3.5 42 0.013 0.019 9.62 0.91 137 69 68 137 105 32 178 0.60 0.40 0.24 0.72 0.18 0.11 0.84 60 1.18 1.53 84 72 108 3.5 42 0.013 0.019 9.62 0.91 138 72 66 138 108 30 179 0.60 0.40 0.24 0.70 0.18 0.11 0.83 74 1.08 1.40 126 95 146 4.0 48 0.013 0.017 12.57 1.00 190 95 95 190 146 44 180 0.16 0.40 0.06 0.85 0.18 0.03 0.88 69 1.11 1.44 111 104 140 4.0 48 0.013 0.013 12.57 1.00 164 104 60 164 140 24 181 0.20 0.39 0.08 0.85 0.18 0.04 0.88 51 1.28 1.66 60 65 87 3.5 42 0.013 0.014 9.62 0.91 118 65 53 118 87 30 184 0.23 0.40 0.09 0.83 0.18 0.04 0.88 59 1.20 1.55 80 80 109 3.5 42 0.013 0.015 9.62 0.91 123 80 43 123 109 14 185 0.35 0.40 0.14 0.79 0.18 0.06 0.86 59 1.19 1.55 80 76 108 3.5 42 0.013 0.016 9.62 0.91 126 76 50 126 108 18 186 0.38 0.40 0.15 0.77 0.18 0.07 0.86 72 1.09 1.41 120 101 145 4.5 54 0.013 0.017 15.90 1.08 260 101 159 260 145 115 187 0.10 0.40 0.04 0.86 0.18 0.02 0.89 80 1.04 1.34 150 134 179 4.5 54 0.013 0.011 15.90 1.08 210 134 75 210 179 31 188 0.10 0.40 0.04 0.87 0.18 0.02 0.89 76 1.06 1.38 134 123 164 4.5 54 0.013 0.007 15.90 1.08 165 123 41 165 164 1 189 0.10 0.40 0.04 0.86 0.18 0.02 0.89 94 0.97 1.25 205 171 227 5.0 60 0.013 0.008 19.63 1.16 233 171 62 233 227 6 190 0.10 0.40 0.04 0.86 0.18 0.02 0.89 109 0.90 1.16 277 215 286 5.5 66 0.013 0.008 23.76 1.24 291 215 76 291 286 5 191 0.10 0.40 0.04 0.86 0.18 0.02 0.88 134 0.82 1.06 417 293 391 6.5 78 0.013 0.008 33.18 1.38 465 293 172 465 391 75 192 0.49 0.40 0.20 0.76 0.18 0.09 0.85 52 1.26 1.64 64 61 89 3.5 42 0.013 0.015 9.62 0.91 122 61 61 122 89 33 193 0.48 0.40 0.19 0.76 0.18 0.09 0.85 53 1.25 1.63 65 62 90 3.5 42 0.013 0.014 9.62 0.91 121 62 59 121 90 31 194 0.48 0.40 0.19 0.76 0.18 0.09 0.85 54 1.24 1.62 67 64 92 3.5 42 0.013 0.017 9.62 0.91 130 64 67 130 92 38 195 0.30 0.40 0.12 0.83 0.18 0.05 0.88 32 1.57 2.05 24 32 44 3.0 36 0.013 0.015 7.07 0.83 80 32 49 80 44 37 196 0.31 0.40 0.12 0.83 0.18 0.06 0.88 31 1.59 2.07 23 30 42 3.0 36 0.013 0.017 7.07 0.83 88 30 58 88 42 46 197 0.53 0.40 0.21 0.73 0.18 0.10 0.84 67 1.13 1.46 103 85 127 4.0 48 0.013 0.015 12.57 1.00 174 85 89 174 127 47 198 0.53 0.40 0.21 0.73 0.18 0.09 0.84 67 1.12 1.46 105 86 129 4.0 48 0.013 0.015 12.57 1.00 176 86 90 176 129 48 199 0.31 0.40 0.12 0.83 0.18 0.06 0.87 34 1.53 1.99 27 34 47 3.0 36 0.013 0.018 7.07 0.83 89 34 54 89 47 41 200 0.53 0.40 0.21 0.73 0.18 0.09 0.84 68 1.12 1.45 107 88 131 4.0 48 0.013 0.016 12.57 1.00 181 88 93 181 131 50 201 0.31 0.40 0.12 0.83 0.18 0.05 0.88 35 1.52 1.98 28 35 48 3.0 36 0.013 0.025 7.07 0.83 105 35 71 105 48 57 202 0.52 0.40 0.21 0.70 0.18 0.09 0.83 104 0.92 1.19 249 160 246 5.0 60 0.013 0.014 19.63 1.16 304 160 143 304 246 57 203 0.60 0.40 0.24 0.77 0.18 0.11 0.85 29 1.64 2.15 20 25 36 3.0 36 0.013 0.014 7.07 0.83 79 25 54 79 36 43 204 0.31 0.40 0.12 0.83 0.18 0.06 0.87 35 1.50 1.96 29 36 50 3.0 36 0.013 0.015 7.07 0.83 81 36 45 81 50 31 205 0.36 0.40 0.15 0.79 0.18 0.07 0.86 54 1.24 1.61 69 68 96 3.5 42 0.013 0.016 9.62 0.91 128 68 60 128 96 32 206 0.41 0.40 0.16 0.77 0.18 0.07 0.86 62 1.16 1.51 91 81 117 4.0 48 0.013 0.014 12.57 1.00 168 81 87 168 117 51 207 0.35 0.40 0.14 0.80 0.18 0.06 0.87 49 1.29 1.68 57 59 83 3.5 42 0.013 0.013 9.62 0.91 113 59 54 113 83 30 208 0.20 0.40 0.08 0.84 0.18 0.04 0.88 58 1.20 1.56 79 80 109 3.5 42 0.013 0.016 9.62 0.91 126 80 46 126 109 17 209 0.24 0.40 0.10 0.81 0.18 0.04 0.87 91 0.98 1.27 194 154 213 5.5 66 0.013 0.005 23.76 1.24 237 154 84 237 213 24 210 0.27 0.40 0.11 0.79 0.18 0.05 0.86 109 0.90 1.17 274 197 276 6.0 72 0.013 0.005 28.27 1.31 299 197 103 299 276 23 211 0.32 0.40 0.13 0.77 0.18 0.06 0.85 124 0.85 1.10 355 232 333 6.0 72 0.013 0.006 28.27 1.31 333 232 101 333 333 0 212 0.58 0.40 0.23 0.77 0.18 0.10 0.86 30 1.62 2.12 21 26 38 3.0 36 0.013 0.006 7.07 0.83 52 26 25 52 38 14 213 0.34 0.40 0.14 0.75 0.18 0.06 0.85 131 0.83 1.07 400 249 363 6.0 72 0.013 0.007 28.27 1.31 364 249 115 364 363 2 214 0.35 0.40 0.14 0.75 0.18 0.06 0.85 134 0.82 1.06 419 258 376 6.5 78 0.013 0.006 33.18 1.38 403 258 145 403 376 27 3 of 7
City of Fontana Storm Drain Master Plan
FONT-0121
Rational Method Calculations
Collector Hydrologic Analysis
AOS 1 Rational Method Calculations
Basin ID Ap Fp Fm C25yr Fp Fm C100yr Tc (min) i25yr
(in/hr)
i100yr
(in/hr)
A
(ac)
Qrunoff_25yr
(cfs)
Qrunoff_100yr
(cfs)
Diameter
(ft)
Diameter
(in.) n Slope
(ft/ft)
A Pipe
(ft2)
R Pipe
(ft)
Q-capacity
(cfs)
Q-calculated
(cfs)
Q-difference
(cfs)
Q-capacity
(cfs)
Q-calculated
(cfs)
Q-difference
(cfs)
RATIONAL METHOD MANNING'S EQUATION 25-Year 100-Year

AMC II AMC III
215 0.60 0.40 0.24 0.73 0.18 0.11 0.84 51 1.28 1.66 60 56 84 3.5 42 0.013 0.016 9.62 0.91 129 56 73 129 84 45 216 0.60 0.40 0.24 0.72 0.18 0.11 0.84 55 1.23 1.60 70 62 94 3.5 42 0.013 0.016 9.62 0.91 126 62 64 126 94 32 217 0.61 0.41 0.24 0.71 0.18 0.11 0.83 62 1.17 1.52 88 73 112 3.5 42 0.013 0.013 9.62 0.91 113 73 40 113 112 1 218 0.60 0.41 0.24 0.69 0.18 0.11 0.83 82 1.02 1.33 158 111 173 4.0 48 0.013 0.007 12.57 1.00 120 111 9 120 173 -53 221 0.60 0.40 0.24 0.71 0.18 0.11 0.83 68 1.12 1.45 107 85 129 4.5 54 0.013 0.015 15.90 1.08 243 85 158 243 129 113 222 0.60 0.40 0.24 0.72 0.18 0.11 0.84 55 1.23 1.60 71 63 95 3.5 42 0.013 0.005 9.62 0.91 71 63 8 71 95 -24 223 0.67 0.40 0.27 0.70 0.18 0.12 0.83 58 1.20 1.56 79 66 102 3.5 42 0.013 0.017 9.62 0.91 129 66 63 129 102 27 224 0.60 0.40 0.24 0.72 0.18 0.11 0.84 57 1.21 1.58 75 66 99 3.5 42 0.013 0.005 9.62 0.91 71 66 5 71 99 -28 225 0.60 0.40 0.24 0.71 0.18 0.11 0.83 69 1.11 1.44 110 86 132 4.5 54 0.013 0.015 15.90 1.08 245 86 158 245 132 112 227 0.60 0.40 0.24 0.75 0.18 0.11 0.85 39 1.44 1.88 35 38 56 3.0 36 0.013 0.015 7.07 0.83 81 38 43 81 56 25 228 0.60 0.40 0.24 0.72 0.18 0.11 0.84 59 1.20 1.55 80 69 104 3.5 42 0.013 0.017 9.62 0.91 130 69 61 130 104 26 229 0.60 0.40 0.24 0.75 0.18 0.11 0.85 39 1.43 1.87 36 39 57 3.0 36 0.013 0.015 7.07 0.83 81 39 43 81 57 24 230 0.60 0.40 0.24 0.72 0.18 0.11 0.84 59 1.20 1.55 80 69 104 3.5 42 0.013 0.015 9.62 0.91 123 69 55 123 104 20 231 0.60 0.40 0.24 0.70 0.18 0.11 0.83 71 1.10 1.42 117 90 139 4.5 54 0.013 0.015 15.90 1.08 241 90 151 241 139 103 232 0.60 0.40 0.24 0.72 0.18 0.11 0.84 59 1.19 1.55 81 69 105 3.5 42 0.013 0.005 9.62 0.91 71 69 2 71 105 -34 233 0.60 0.40 0.24 0.69 0.18 0.11 0.83 83 1.02 1.32 161 113 176 4.5 54 0.013 0.015 15.90 1.08 243 113 130 243 176 67 234 0.10 0.40 0.04 0.87 0.18 0.02 0.89 82 1.03 1.33 155 138 184 5.0 60 0.013 0.005 19.63 1.16 189 138 51 189 184 6 235 0.10 0.40 0.04 0.86 0.18 0.02 0.89 101 0.94 1.21 235 190 252 5.5 66 0.013 0.006 23.76 1.24 260 190 70 260 252 8 236 0.10 0.40 0.04 0.86 0.18 0.02 0.89 117 0.87 1.13 318 239 318 6.0 72 0.013 0.006 28.27 1.31 328 239 89 328 318 10 237 0.10 0.40 0.04 0.85 0.18 0.02 0.88 144 0.80 1.03 479 326 435 6.5 78 0.013 0.026 33.18 1.38 851 326 525 851 435 416 238 0.48 0.40 0.19 0.74 0.18 0.09 0.85 72 1.09 1.41 120 97 144 4.5 54 0.013 0.019 15.90 1.08 269 97 172 269 144 126 239 0.42 0.40 0.17 0.77 0.18 0.08 0.86 59 1.20 1.55 80 74 106 3.5 42 0.013 0.015 9.62 0.91 124 74 50 124 106 18 240 0.33 0.40 0.13 0.82 0.18 0.06 0.87 36 1.49 1.95 30 37 51 3.0 36 0.013 0.016 7.07 0.83 83 37 47 83 51 32 241 0.67 0.40 0.27 0.75 0.18 0.12 0.85 30 1.62 2.12 21 26 38 4.0 48 0.013 0.008 12.57 1.00 128 26 102 128 38 90 242 0.53 0.40 0.21 0.76 0.18 0.10 0.85 41 1.41 1.84 39 42 61 3.0 36 0.013 0.02 7.07 0.83 95 42 54 95 61 35 243 0.62 0.40 0.25 0.73 0.18 0.11 0.84 47 1.32 1.72 52 50 75 3.5 42 0.013 0.038 9.62 0.91 196 50 146 196 75 121 244 0.60 0.40 0.24 0.72 0.18 0.11 0.84 56 1.22 1.58 73 65 98 4.0 48 0.013 0.019 12.57 1.00 196 65 131 196 98 98 245 0.35 0.40 0.14 0.80 0.18 0.06 0.86 55 1.23 1.60 70 69 97 4.0 48 0.013 0.016 12.57 1.00 184 69 116 184 97 87 246 0.50 0.40 0.20 0.70 0.18 0.09 0.83 114 0.88 1.14 303 186 286 5.5 66 0.013 0.019 23.76 1.24 459 186 273 459 286 173 247 0.37 0.40 0.15 0.81 0.18 0.07 0.87 39 1.44 1.88 35 41 58 3.0 36 0.013 0.015 7.07 0.83 81 41 39 81 58 23 248 0.47 0.40 0.19 0.77 0.18 0.09 0.85 52 1.27 1.65 62 60 87 3.5 42 0.013 0.02 9.62 0.91 141 60 81 141 87 54 249 0.50 0.40 0.20 0.75 0.18 0.09 0.85 59 1.19 1.55 81 72 106 4.0 48 0.013 0.019 12.57 1.00 199 72 126 199 106 92 250 0.52 0.40 0.21 0.77 0.18 0.09 0.86 39 1.44 1.88 35 39 56 3.0 36 0.013 0.017 7.07 0.83 87 39 48 87 56 31 251 0.56 0.40 0.22 0.74 0.18 0.10 0.85 51 1.27 1.65 62 58 86 3.5 42 0.013 0.014 9.62 0.91 121 58 63 121 86 35 252 0.53 0.40 0.21 0.74 0.18 0.09 0.84 59 1.20 1.55 80 71 105 4.0 48 0.013 0.018 12.57 1.00 194 71 123 194 105 89 253 0.51 0.40 0.20 0.73 0.18 0.09 0.84 70 1.10 1.43 114 92 137 4.5 54 0.013 0.017 15.90 1.08 260 92 167 260 137 122 254 0.52 0.40 0.21 0.73 0.18 0.09 0.84 73 1.08 1.40 124 98 146 5.0 60 0.013 0.024 19.63 1.16 401 98 303 401 146 255 255 0.45 0.40 0.18 0.79 0.18 0.08 0.86 39 1.44 1.88 35 40 57 3.0 36 0.013 0.016 7.07 0.83 84 40 45 84 57 28 256 0.52 0.40 0.21 0.75 0.18 0.09 0.85 51 1.27 1.66 61 58 85 3.5 42 0.013 0.014 9.62 0.91 118 58 60 118 85 33 257 0.49 0.40 0.19 0.75 0.18 0.09 0.85 59 1.20 1.55 80 72 105 4.0 48 0.013 0.022 12.57 1.00 212 72 140 212 105 107 258 0.42 0.40 0.17 0.80 0.18 0.07 0.86 39 1.44 1.88 35 40 57 3.0 36 0.013 0.015 7.07 0.83 81 40 41 81 57 24 259 0.50 0.40 0.20 0.76 0.18 0.09 0.85 51 1.28 1.66 60 58 85 3.5 42 0.013 0.012 9.62 0.91 112 58 54 112 85 27 260 0.45 0.40 0.18 0.79 0.18 0.08 0.86 39 1.44 1.88 35 40 57 3.0 36 0.013 0.016 7.07 0.83 84 40 43 84 57 26 261 0.49 0.40 0.20 0.76 0.18 0.09 0.85 50 1.28 1.67 59 58 84 3.5 42 0.013 0.013 9.62 0.91 116 58 59 116 84 33 4 of 7
City of Fontana Storm Drain Master Plan
FONT-0121
Rational Method Calculations
Collector Hydrologic Analysis
AOS 2 Rational Method Calculations
Basin ID Ap Fp Fm C25yr Fp Fm C100yr Tc (min) i25yr
(in/hr)
i100yr
(in/hr) A (ac) Qrunoff_25yr
(cfs)
Qrunoff_100yr
(cfs)
Diameter
(ft)
Diameter
(in.) n Slope
(ft/ft)
A Pipe
(ft2)
R Pipe
(ft)
Q-capacity
(cfs)
Q-calculated
(cfs)
Q-difference
(cfs)
Q-capacity
(cfs)
Q-calculated
(cfs)
Q-difference
(cfs)
1 0.10 0.40 0.04 0.88 0.18 0.02 0.89 27 1.44 1.87 30 38 50 3 36 0.013 0.012 7.07 0.83 72 38 34 72 50 22 2 0.10 0.40 0.04 0.87 0.18 0.02 0.89 38 1.23 1.59 59 64 84 3.5 42 0.013 0.015 9.62 0.91 123 64 60 123 84 39 3 0.15 0.40 0.06 0.85 0.18 0.03 0.88 52 1.06 1.36 111 100 134 4 48 0.013 0.009 12.57 1.00 139 100 39 139 134 5 4 0.13 0.40 0.05 0.85 0.18 0.02 0.88 68 0.93 1.19 193 153 203 4.5 54 0.013 0.014 15.90 1.08 237 153 84 237 203 33 5 0.10 0.40 0.04 0.87 0.18 0.02 0.89 27 1.43 1.86 31 38 51 3 36 0.013 0.012 7.07 0.83 72 38 33 72 51 21 6 0.10 0.40 0.04 0.87 0.18 0.02 0.89 38 1.23 1.58 60 64 84 3.5 42 0.013 0.013 9.62 0.91 117 64 53 117 84 32 7 0.10 0.40 0.04 0.87 0.18 0.02 0.89 47 1.11 1.44 90 87 114 4 48 0.013 0.013 12.57 1.00 162 87 76 162 114 48 8 0.10 0.40 0.04 0.87 0.18 0.02 0.89 29 1.40 1.82 34 41 55 3 36 0.013 0.014 7.07 0.83 78 41 36 78 55 23 9 0.10 0.40 0.04 0.87 0.18 0.02 0.89 40 1.20 1.55 65 68 89 3.5 42 0.013 0.013 9.62 0.91 115 68 47 115 89 26 10 0.10 0.40 0.04 0.87 0.18 0.02 0.89 53 1.05 1.35 116 105 139 4 48 0.013 0.013 12.57 1.00 167 105 61 167 139 27 11 0.10 0.40 0.04 0.86 0.18 0.02 0.89 62 0.98 1.26 156 132 174 4.5 54 0.013 0.014 15.90 1.08 231 132 99 231 174 56 12 0.10 0.40 0.04 0.87 0.18 0.02 0.89 29 1.39 1.80 35 43 56 3 36 0.013 0.015 7.07 0.83 82 43 39 82 56 25 13 0.10 0.40 0.04 0.87 0.18 0.02 0.89 40 1.20 1.55 65 68 90 3.5 42 0.013 0.012 9.62 0.91 110 68 42 110 90 20 14 0.10 0.40 0.04 0.87 0.18 0.02 0.89 53 1.05 1.35 115 104 138 4 48 0.013 0.013 12.57 1.00 166 104 61 166 138 28 15 0.10 0.40 0.04 0.86 0.18 0.02 0.89 69 0.93 1.19 195 156 206 5 60 0.013 0.013 19.63 1.16 296 156 140 296 206 90 16 0.10 0.40 0.04 0.87 0.18 0.02 0.89 30 1.38 1.78 36 44 58 3 36 0.013 0.014 7.07 0.83 78 44 35 78 58 21 17 0.10 0.40 0.04 0.87 0.18 0.02 0.89 40 1.19 1.54 68 70 92 3.5 42 0.013 0.013 9.62 0.91 113 70 43 113 92 21 18 0.10 0.40 0.04 0.87 0.18 0.02 0.89 50 1.08 1.39 104 97 128 4 48 0.013 0.013 12.57 1.00 165 97 68 165 128 37 19 0.10 0.40 0.04 0.87 0.18 0.02 0.89 54 1.04 1.34 118 107 141 4.5 54 0.013 0.014 15.90 1.08 235 107 128 235 141 94 20 0.10 0.40 0.04 0.86 0.18 0.02 0.89 71 0.92 1.18 206 163 215 5 60 0.013 0.016 19.63 1.16 327 163 164 327 215 112 21 0.10 0.40 0.04 0.87 0.18 0.02 0.89 30 1.38 1.78 36 44 58 3 36 0.013 0.015 7.07 0.83 82 44 38 82 58 24 22 0.10 0.40 0.04 0.87 0.18 0.02 0.89 40 1.19 1.54 67 70 92 3.5 42 0.013 0.016 9.62 0.91 126 70 56 126 92 34 23 0.10 0.40 0.04 0.87 0.18 0.02 0.89 50 1.08 1.39 103 96 127 4 48 0.013 0.014 12.57 1.00 168 96 72 168 127 41 24 0.10 0.40 0.04 0.87 0.18 0.02 0.89 31 1.36 1.76 39 46 60 3 36 0.013 0.009 7.07 0.83 65 46 19 65 60 4 25 0.10 0.40 0.04 0.87 0.18 0.02 0.89 43 1.15 1.49 77 78 102 3.5 42 0.013 0.013 9.62 0.91 116 78 39 116 102 14 26 0.10 0.40 0.04 0.87 0.18 0.02 0.89 53 1.05 1.35 118 107 141 4 48 0.013 0.012 12.57 1.00 154 107 48 154 141 13 27 0.17 0.40 0.07 0.84 0.18 0.03 0.88 62 0.97 1.25 159 129 174 4.5 54 0.013 0.01 15.90 1.08 197 129 68 197 174 23 28 0.10 0.40 0.04 0.87 0.18 0.02 0.89 32 1.34 1.73 42 48 64 3 36 0.013 0.013 7.07 0.83 76 48 28 76 64 12 29 0.24 0.40 0.10 0.82 0.18 0.04 0.87 45 1.14 1.47 82 77 105 3.5 42 0.013 0.011 9.62 0.91 104 77 27 104 105 -1 30 0.25 0.40 0.10 0.81 0.18 0.05 0.87 54 1.04 1.33 123 103 142 4 48 0.013 0.01 12.57 1.00 146 103 43 146 142 4 31 0.10 0.40 0.04 0.87 0.18 0.02 0.89 33 1.31 1.70 44 51 67 3 36 0.013 0.013 7.07 0.83 76 51 25 76 67 8 32 0.22 0.40 0.09 0.83 0.18 0.04 0.88 45 1.13 1.46 84 79 108 3.5 42 0.013 0.011 9.62 0.91 105 79 26 105 108 -3 33 0.33 0.40 0.13 0.79 0.18 0.06 0.86 55 1.03 1.33 125 101 143 4 48 0.013 0.011 12.57 1.00 148 101 47 148 143 6 34 0.10 0.40 0.04 0.87 0.18 0.02 0.89 28 1.42 1.84 32 40 53 3 36 0.013 0.012 7.07 0.83 73 40 34 73 53 21 35 0.10 0.40 0.04 0.87 0.18 0.02 0.89 39 1.21 1.56 63 67 88 3.5 42 0.013 0.012 9.62 0.91 111 67 44 111 88 23 36 0.10 0.40 0.04 0.87 0.18 0.02 0.89 44 1.15 1.48 79 79 104 3.5 42 0.013 0.012 9.62 0.91 110 79 31 110 104 6 37 0.41 0.40 0.16 0.78 0.18 0.07 0.86 37 1.23 1.60 58 56 79 3.5 42 0.013 0.009 9.62 0.91 94 56 38 94 79 14 38 0.45 0.40 0.18 0.75 0.18 0.08 0.85 52 1.06 1.36 111 88 128 4 48 0.013 0.019 12.57 1.00 197 88 109 197 128 69 RATIONAL METHOD MANNING'S EQUATION 25-Year 100-Year

AMC II AMC III
5 of 7
City of Fontana Storm Drain Master Plan
FONT-0121
Rational Method Calculations
Collector Hydrologic Analysis
AOS 3 Rational Method Calculations
Basin
ID Ap Fp Fm C Fp Fm C Tc
(min)
i25yr
(in/hr)
i100yr
(in/hr) A (ac) Qrunoff_25yr
(cfs)
Qrunoff_100yr
(cfs)
Diameter
(ft)
Diameter
(in.) n Slope
(ft/ft)
A Pipe
(ft2)
R Pipe
(ft)
Q-capacity
(cfs)
Q-calculated
(cfs)
Q-difference
(cfs)
Q-capacity
(cfs)
Q-calculated
(cfs)
Q-difference
(cfs)
1 0.50 0.40 0.20 0.83 0.18 0.09 0.89 15 2.50 3.18 39 81 110 3 36 0.013 0.023 7.07 0.83 102 81 21 102 110 -8 2 0.53 0.40 0.21 0.82 0.18 0.10 0.89 16 2.44 3.10 44 88 121 3 36 0.013 0.033 7.07 0.83 121 88 33 121 121 0 3 0.20 0.40 0.08 0.87 0.18 0.04 0.90 19 2.29 2.92 59 117 153 3.5 42 0.013 0.02 9.62 0.91 141 117 24 141 153 -13 4 0.23 0.40 0.09 0.87 0.18 0.04 0.90 17 2.41 3.07 46 97 127 3.5 42 0.013 0.013 9.62 0.91 116 97 19 116 127 -12 5 0.34 0.40 0.14 0.85 0.18 0.06 0.89 15 2.53 3.22 37 80 106 3.5 42 0.013 0.012 9.62 0.91 111 80 31 111 106 5 6 0.50 0.40 0.20 0.83 0.18 0.09 0.89 16 2.44 3.11 44 88 120 3 36 0.013 0.019 7.07 0.83 91 88 3 91 120 -29 7 0.37 0.40 0.15 0.85 0.18 0.07 0.89 13 2.69 3.43 28 63 84 3 36 0.013 0.019 7.07 0.83 91 63 28 91 84 7 8 0.49 0.40 0.19 0.83 0.18 0.09 0.89 16 2.44 3.11 44 88 120 3 36 0.013 0.021 7.07 0.83 96 88 8 96 120 -24 9 0.20 0.40 0.08 0.87 0.18 0.04 0.90 11 2.84 3.62 21 53 69 3 36 0.013 0.028 7.07 0.83 113 53 60 113 69 43 10 0.16 0.40 0.07 0.87 0.18 0.03 0.90 18 2.35 2.99 52 107 140 3.5 42 0.013 0.025 9.62 0.91 159 107 52 159 140 19 11 0.61 0.40 0.24 0.81 0.18 0.11 0.88 17 2.38 3.02 50 95 132 3.5 42 0.013 0.027 9.62 0.91 166 95 71 166 132 34 12 0.34 0.40 0.13 0.85 0.18 0.06 0.89 17 2.40 3.06 47 96 128 3.5 42 0.013 0.031 9.62 0.91 177 96 81 177 128 48 13 0.20 0.40 0.08 0.87 0.18 0.04 0.90 17 2.41 3.07 46 97 128 3.5 42 0.013 0.026 9.62 0.91 163 97 66 163 128 35 14 0.34 0.40 0.14 0.85 0.18 0.06 0.89 19 2.30 2.93 57 112 150 3.5 42 0.013 0.015 9.62 0.91 124 112 12 124 150 -26 15 0.50 0.40 0.20 0.83 0.18 0.09 0.89 14 2.61 3.32 32 69 94 4 48 0.013 0.031 12.57 1.00 254 69 185 254 94 160 16 0.51 0.40 0.20 0.82 0.18 0.09 0.89 18 2.36 3.00 52 100 137 4 48 0.013 0.019 12.57 1.00 198 100 97 198 137 60 17 0.22 0.40 0.09 0.86 0.18 0.04 0.90 27 1.95 2.48 125 210 278 4.5 54 0.013 0.018 15.90 1.08 265 210 56 265 278 -13 18 0.32 0.40 0.13 0.85 0.18 0.06 0.89 17 2.40 3.05 47 97 129 4 48 0.013 0.032 12.57 1.00 257 97 160 257 129 128 19 0.45 0.40 0.18 0.83 0.18 0.08 0.89 17 2.38 3.03 49 97 132 4 48 0.013 0.029 12.57 1.00 245 97 148 245 132 113 20 0.29 0.40 0.12 0.85 0.18 0.05 0.89 21 2.18 2.77 74 138 185 4 48 0.013 0.025 12.57 1.00 228 138 90 228 185 43 21 0.50 0.40 0.20 0.83 0.18 0.09 0.89 16 2.47 3.14 41 84 115 4 48 0.013 0.027 12.57 1.00 236 84 152 236 115 121 22 0.42 0.40 0.17 0.82 0.18 0.08 0.89 31 1.86 2.36 159 242 333 4.5 54 0.013 0.029 15.90 1.08 335 242 93 335 333 2 23 0.50 0.40 0.20 0.84 0.18 0.09 0.89 10 3.03 3.86 16 40 54 4.5 54 0.013 0.021 15.90 1.08 287 40 247 287 54 233 24 0.51 0.40 0.20 0.82 0.18 0.09 0.89 21 2.21 2.81 70 126 174 4.5 54 0.013 0.03 15.90 1.08 341 126 215 341 174 168 25 0.24 0.40 0.10 0.85 0.18 0.04 0.90 39 1.68 2.13 254 362 485 6.5 78 0.013 0.016 33.18 1.38 654 362 293 654 485 170 RATIONAL METHOD MANNING'S EQUATION 25-Year 100-Year

AMC II AMC III
6 of 7
City of Fontana Storm Drain Master Plan
FONT-0121
Rational Method Calculations
Collector Hydrologic Analysis
Intensity-Duration Curves for Each Basin based on NOAA Atlas 14 Precipitation Intensity Data Duration Duration (mins) 25 year (in/hr) 100 year (in/hr) Duration (mins) 25 year (in/hr) 100 year (in/hr) Duration (mins) 25 year (in/hr) 100 year (in/hr) 5-min: 5 3.72 4.9 5 3.19 4.18 5 4.19 5.33
10-min: 10 2.67 3.51 10 2.29 2.99 10 3 3.82
15-min: 15 2.15 2.83 15 1.84 2.41 15 2.42 3.08
30-min: 30 1.61 2.12 30 1.38 1.81 30 1.84 2.34
60-min: 60 1.2 1.58 60 1.02 1.33 60 1.42 1.8
2-hr: 120 0.869 1.12 120 0.718 0.918 120 1.05 1.33
3-hr: 180 0.727 0.926 180 0.593 0.752 180 0.894 1.12
6-hr: 360 0.523 0.658 360 0.415 0.52 360 0.664 0.83
12-hr: 720 0.35 0.436 720 0.274 0.341 720 0.456 0.568
24-hr: 1440 0.245 0.305 1440 0.191 0.237 1440 0.318 0.397 2-day: 2880 0.16 0.202 2880 0.122 0.155 2880 0.209 0.267 3-day: 4320 0.121 0.156 4320 0.093 0.119 4320 0.16 0.21 4-day: 5760 0.101 0.131 5760 0.078 0.1 5760 0.133 0.177 7-day: 10080 0.069 0.09 10080 0.053 0.07 10080 0.09 0.12 10-day: 14400 0.053 0.071 14400 0.042 0.055 14400 0.069 0.093 20-day: 28800 0.033 0.045 28800 0.026 0.035 28800 0.043 0.058 30-day: 43200 0.026 0.036 43200 0.021 0.028 43200 0.033 0.046 45-day: 64800 0.021 0.028 64800 0.016 0.022 64800 0.027 0.037 60-day: 86400 0.018 0.024 5 0.014 0.019 86400 0.023 0.032 Equations: y = 7.5633x -0.453 y = 10.229x -0.463 Equations: y = 6.7792x -0.47 y = 9.1132x -0.481 Equations: y = 7.9411x -0.423 y = 10.214x -0.427
AOS 1 AOS 2 AOS 3
y = 7.5633x -0.453
R² = 0.9989
y = 10.229x -0.463
R² = 0.9992
0 1
2 3
4 5
6 1 10 100 1000
Intensity (in/hr)
Duration (mins, log scale)
AOS 1 Intensity-Duration
25 year (in/hr)
100 year (in/hr)
Power (25 year
(in/hr))
y = 6.7792x -0.47
R² = 0.9993
y = 9.1132x -0.481
R² = 0.9992
0 0.5
1 1.5
2 2.5
3 3.5
4 4.5
1 10 100 1000
Intensity (in/hr)
Duration (mins, log scale)
AOS 2 Intensity-Duration
25 year (in/hr)
100 year (in/hr)
Power (25 year
(in/hr))
y = 7.9411x -0.423
R² = 0.9966
y = 10.214x -0.427
R² = 0.9971
0 1
2 3
4 5
6 1 10 100 1000
Intensity (in/hr)
Duration (mins, log scale)
AOS 3 Intensity-Duration
25 year (in/hr)
100 year (in/hr)
Power (25 year
(in/hr))
7 of 7
Trunkline Analysis Subbasin Peak Flows

City of Fontana Master Plan
FONT-0121
Proposed Pipe Design Flows
AOS Project Name Pipe Size (in.
or ft)
Design Flow
(cfs)
Design Event
(years)
Design Flow
Method
Length
(ft)
Project Prioritization
Score Drainage Area (ac)
1 D-1A 42" 70 25 Rational 538 1 82
1 D-6 10' x 8' 1270 100 ICM 1986 1 2322
1 D-6A 36" 41 25 Rational 1314 1.4 35
1 D-6A 42" 41 25 Rational 1691 1.4 35
1 D-6A 54" 151 25 Rational 678 1.4 177
1 D-6B 36" 58 25 Rational 372 1.4 58
1 D-6B 42" 58 25 Rational 613 1.4 58
1 D-6B 48" 93 25 Rational 1296 1.4 113
1 D-6C 36" 43 25 Rational 1284 1 42
1 D-7 48" 127 100 Pro Development 444 1 92
1 D-7 54" 127 100 Pro Development 668 1 110
1 D-7 60" 211 100 Pro Development 947 1 136
1 E-0 102" 1408 100 ICM 7913 1 875
1 E-1 36" 59 25 Rational 783 1 42
1 E-1 42" 97 25 Rational 1169 1 82
1 E-1 48" 97 25 Rational 2643 1 82
1 E-1 54" 165 25 Rational 2643 1 162
1 E-2 66" 434 100 ICM 795 1.4 229
1 E-2 36" 62 25 Rational 687 1.4 47
1 E-2 42" 91 25 Rational 1149 1.4 83
1 E-2 48" 91 25 Rational 511 1.4 83
1 E-2 54" 134 25 Rational 1339 1.4 138
1 E-3 36" 61 25 Rational 881 1 47
1 E-3 42" 90 25 Rational 1141 1 81
1 E-3 48" 90 25 Rational 999 1 81
1 E-3 54" 130 25 Rational 1644 1 136
1 E-4 72" 602 100 ICM 952 2.2 324
1 E-4 36" 61 25 Rational 648 2.2 47
1 E-4 42" 91 25 Rational 1133 2.2 82
1 E-4 54" 149 25 Rational 1689 2.2 162
1 E-5 66" 185 100 Rational 1000 1.8 162
1 E-5 36" 61 25 Rational 471 1.8 47
1 E-5 42" 90 25 Rational 1137 1.8 81
1 E-5 54" 130 25 Rational 1647 1.8 136
1 E-6 72" 570 100 ICM 675 2.2 322
1 E-6 36" 61 25 Rational 320 2.2 46
1 E-6 42" 89 25 Rational 1179 2.2 80
1 E-6 54" 129 25 Rational 1969 2.2 135
1 E-7 36" 62 25 Rational 554 1 48
1 E-7 42" 90 25 Rational 1070 1 81
1 E-7 54" 134 25 Rational 1987 1 141
1 E-7 66" 134 25 Rational 668 1 141
1 F-1 72" 402 100 ICM 1333 3.2 205
1 F-1A 36" 47 25 Rational 721 2 41
1 F-1A 42" 76 25 Rational 681 2 60
1 F-1A 48" 101 25 Rational 650 2 80
1 F-1A 54" 125 25 Rational 996 2 99
1 F-1B 36" 41 25 Rational 709 1 35
1 F-1B 42" 60 25 Rational 686 1 62
1 F-1B 48" 72 25 Rational 963 1 81
1 F-2 36" 39 25 Rational 812 1 35
1 F-2 42" 58 25 Rational 641 1 62
1 F-2 48" 71 25 Rational 661 1 80
1 F-2 54" 137 100 Rational 1107 1 114
1 F-2 60" 146 100 Rational 274 1 124
1 F-3 36" 40 25 Rational 845 2.4 35
1 F-3 42" 58 25 Rational 631 2.4 61
1 F-3 48" 72 25 Rational 663 2.4 80
1 F-3 54" 348 100 ICM 528 2.4 193
1 F-3 66" 446 100 ICM 833 2.4 247
1 F-4 36" 27 25 Rational 477 4.4 45
1 F-4 42" 59 25 Rational 1311 4.4 87
1 F-5 36" 40 25 Rational 884 2.4 35
1 F-5 42" 58 25 Rational 703 2.4 59
1 F-5 72" 497 100 ICM 1969 2.4 242
1 F-5A 36" 40 25 Rational 830 3 35
1 F-5A 42" 58 25 Rational 602 3 58
1 F-6 36" 48 25 Rational 628 2 30
1 F-6 42" 96 25 Rational 1644 2 80
1 F-6 54" 126 25 Rational 1244 2 120
1 G-0 120" 1269 100 ICM 6602 1.6 700
1 of 8
City of Fontana Master Plan
FONT-0121
Proposed Pipe Design Flows
AOS Project Name Pipe Size (in.
or ft)
Design Flow
(cfs)
Design Event
(years)
Design Flow
Method
Length
(ft)
Project Prioritization
Score Drainage Area (ac)
1 G-0 54" 199 100 Rational 1319 1.6 153
1 G-1 36" 36 25 Rational 642 1.6 34
1 G-1 42" 66 25 Rational 1495 1.6 79
1 G-2 66" 420 100 ICM 1491 3.6 228
1 G-2 36" 51 25 Rational 541 3.6 36
1 G-2 54" 110 25 Rational 1162 3.6 107
1 G-2A 36" 37 25 Rational 521 3.6 34
1 G-2A 42" 63 25 Rational 1317 3.6 71
1 G-3 36" 38 25 Rational 665 1.6 35
1 G-3 42" 69 25 Rational 1481 1.6 80
1 G-4 66" 412 100 ICM 1441 3 235
1 G-4 36" 52 25 Rational 682 3 38
1 G-4 54" 112 25 Rational 1208 3 110
1 G-4A 36" 40 25 Rational 658 1.6 37
1 G-4A 42" 66 25 Rational 1320 1.6 75
1 G-5 36" 39 25 Rational 704 2.4 36
1 G-5 42" 69 25 Rational 1448 2.4 80
1 G-6 66" 446 100 ICM 1436 2.8 237
1 G-6 36" 56 25 Rational 808 2.8 42
1 G-6 54" 117 25 Rational 1218 2.8 117
1 G-6A 36" 41 25 Rational 674 2.4 39
1 G-6A 42" 69 25 Rational 1317 2.4 81
1 G-7 36" 43 25 Rational 775 1.6 42
1 G-7 54" 90 25 Rational 1194 1.6 117
1 G-7 60" 113 25 Rational 1458 1.6 161
1 H-0 72" 322 100 ICM 1325 1.6 240
1 H-0 78" 331 100 ICM 1325 1.6 372
1 H-0 84" 426 100 ICM 3894 1.6 481
1 H-0A 66" 286 100 Rational 681 1 303
1 J-1 78" 478 100 ICM 2512 2.2 274
1 J-1A 36" 52 25 Rational 661 3.6 49
1 J-1A 42" 74 25 Rational 1317 3.6 79
1 J-1A 42" 74 25 Rational 1013 3.6 79
1 J-1B 36" 49 25 Rational 796 1.6 50
1 J-1B 42" 69 25 Rational 1018 1.6 80
1 J-1B 54" 118 25 Rational 1323 1.6 160
1 J-1C 36" 46 25 Rational 658 2 46
1 J-1C 42" 69 25 Rational 1156 2 81
1 J-2 66" 328 100 ICM 3565 2.2 158
1 J-2 72" 319 100 ICM 556 2.2 191
1 J-2A 36" 46 25 Rational 649 1.8 46
1 J-2A 42" 69 25 Rational 1146 1.8 81
1 J-2A 60" 69 25 Rational 197 1.8 81
1 J-3 54" 382 100 ICM 1311 3 122
1 J-3 66" 380 100 ICM 1303 3 162
1 J-3 72" 379 100 ICM 926 3 195
1 J-3A 36" 41 25 Rational 485 2.4 39
1 J-3A 42" 69 25 Rational 1350 2.4 80
1 J-4 48" 112 25 Rational 1133 2.4 158
1 J-4A 36" 46 25 Rational 578 2.4 46
1 J-4A 42" 74 25 Rational 1326 2.4 88
1 J-4B 36" 38 25 Rational 592 3 35
1 J-4B 42" 62 25 Rational 1317 3 70
1 M-0 60" 232 100 ICM 1699 2.6 112
1 M-1 6' x 4' 271 100 ICM 250 2.6 115
1 M-1 60" 271 100 ICM 869 2.6 110
1 M-1A 36" 48 25 Rational 660 2.2 40
1 M-1A 42" 80 25 Rational 1231 2.2 80
1 M-2 48" 98 25 Rational 1083 3 115
1 M-2A 36" 41 25 Rational 544 2.2 38
1 M-2A 42" 72 25 Rational 1150 2.2 80
1 M-3 48" 95 25 Rational 1145 2.2 117
1 M-3A 36" 39 25 Rational 572 3.4 36
1 M-3A 42" 72 25 Rational 1459 3.4 81
1 M-4 36" 42 25 Rational 698 2.2 41
1 M-5A 36" 40 25 Rational 458 2.4 34
1 M-5A 42" 59 25 Rational 1393 2.4 57
1 M-5-A 2, 14' x 6' 3135 100 ICM 1281 3 1986
1 M-5B 66" 213 100 Rational 1329 3.8 194
1 M-5B 72" 276 100 Rational 1322 3.8 274
1 M-5B 78" 376 100 Rational 1322 3.8 419
2 of 8
City of Fontana Master Plan
FONT-0121
Proposed Pipe Design Flows
AOS Project Name Pipe Size (in.
or ft)
Design Flow
(cfs)
Design Event
(years)
Design Flow
Method
Length
(ft)
Project Prioritization
Score Drainage Area (ac)
1 M-5B 72" 363 100 Rational 2801 3.8 400
1 M-5-B 14' x 8' 2136 100 ICM 1877 2.4 1565
1 M-5-B 2, 14' x 6' 2501 100 ICM 1865 2.4 1946
1 M-5B-A 36" 46 25 Rational 335 2.4 45
1 M-5B-B 36" 44 25 Rational 690 2.4 40
1 M-5B-B 42" 73 25 Rational 1342 2.4 81
1 M-5B-C 36" 44 25 Rational 662 1.6 40
1 M-5B-C 42" 77 25 Rational 1348 1.6 80
1 M-5B-D 36" 48 25 Rational 728 1.6 40
1 M-5B-D 42" 80 25 Rational 1323 1.6 79
1 M-5B-E 36" 39 25 Rational 784 3.6 34
1 M-5B-E 42" 69 25 Rational 1313 3.6 69
1 M-5B-E 48" 102 25 Rational 1329 3.6 114
1 M-5C 36" 36 25 Rational 350 1.6 29
1 M-5C 42" 68 25 Rational 1319 1.6 69
1 M-5C 48" 81 25 Rational 1332 1.6 91
1 M-5-C 96" 1060 100 ICM 1869 2.4 697
1 M-5-C 96" 1366 100 ICM 1891 2.4 1326
1 M-5D 36" 25 25 Rational 801 1.8 20
1 M-5-D 36" 54 100 Rational 667 2.8 33
1 M-5-D 42" 90 100 Rational 1308 2.8 65
1 M-5-D 54" 123 100 Rational 3179 2.8 96
1 M-5-D 60" 244 100 Rational 2004 2.8 174
1 M-5E 60" 179 100 Rational 1312 4.2 159
1 M-5E 66" 242 100 Rational 1326 4.2 240
1 M-5E 72" 358 100 Rational 5471 4.2 410
1 M-5E 78" 408 100 Rational 5471 4.2 490
1 M-5-E 36" 34 25 Rational 692 2.4 21
1 M-5E-A 36" 38 25 Rational 511 2.2 36
1 M-5E-A 42" 56 25 Rational 812 2.2 60
1 M-5E-B 36" 49 25 Rational 493 2.2 49
1 M-5E-B 42" 69 25 Rational 1191 2.2 80
1 M-5E-C 36" 53 25 Rational 488 3 56
1 M-5E-C 42" 75 25 Rational 1175 3 90
1 M-5E-D 36" 49 25 Rational 589 2.8 50
1 M-5E-D 42" 69 25 Rational 1065 2.8 81
1 M-5E-E 36" 49 25 Rational 631 2.4 50
1 M-5E-E 42" 68 25 Rational 1030 2.4 80
1 M-5E-F 36" 56 25 Rational 650 2.4 50
1 M-5E-F 42" 80 25 Rational 1000 2.4 80
1 M-5F 36" 47 100 Rational 342 3 27
1 M-5F 42" 92 100 Rational 1312 3 67
1 M-5F 48" 131 100 Rational 1345 3 107
1 M-5F 60" 246 100 Rational 1135 3 249
1 M-5F 66" 264 100 Rational 1517 3 267
1 M-5F-A 36" 35 25 Rational 354 1.6 28
1 M-5F-A 42" 65 25 Rational 1328 1.6 68
1 M-5F-A 48" 89 25 Rational 1316 1.6 108
1 M-5F-A 54" 177 25 Rational 1328 1.6 143
1 M-5G 54" 178 100 Rational 1335 2.2 160
1 M-5G 66" 243 100 Rational 2646 2.2 240
1 M-5G-A 42" 60 25 Rational 1145 2.6 61
1 M-5G-B 36" 43 25 Rational 748 2.6 41
1 M-5G-B 42" 73 25 Rational 1309 2.6 80
1 M-5G-C 36" 42 25 Rational 727 2.2 40
1 M-5G-C 42" 72 25 Rational 1307 2.2 79
1 M-5H 72" 439 100 ICM 2829 3.2 239
1 M-5H 36" 46 25 Rational 347 3.2 28
1 M-5H 42" 84 25 Rational 1314 3.2 69
1 M-5H 48" 116 25 Rational 1335 3.2 111
1 M-5H 54" 141 25 Rational 1141 3.2 146
1 M-6A 72" 413 100 ICM 2630 2.2 450
1 M-6A 78" 408 100 ICM 1378 2.2 490
1 M-6B 66" 420 100 ICM 2646 2.2 210
1 M-6B 36" 44 100 Rational 334 2.2 24
1 M-6B 42" 91 100 Rational 1361 2.2 66
1 M-6B 48" 129 100 Rational 1289 2.2 105
1 M-6C 36" 38 25 Rational 320 3 35
1 M-6C 42" 69 25 Rational 1646 3 80
1 M-6C 48" 112 25 Rational 1309 3 160
1 M-6D 36" 32 25 Rational 340 2.6 25
3 of 8
City of Fontana Master Plan
FONT-0121
Proposed Pipe Design Flows
AOS Project Name Pipe Size (in.
or ft)
Design Flow
(cfs)
Design Event
(years)
Design Flow
Method
Length
(ft)
Project Prioritization
Score Drainage Area (ac)
1 M-6D 42" 62 25 Rational 1381 2.6 65
1 M-6D 48" 86 25 Rational 1273 2.6 105
1 M-6D 54" 86 25 Rational 1315 2.6 105
1 M-7A 84" 699 100 ICM 2678 2.6 540
1 M-7A 96" 698 100 ICM 1245 2.6 580
1 M-7B 72" 425 100 ICM 2661 2.8 377
1 M-7B 36" 43 100 Rational 396 2.8 23
1 M-7B 42" 95 100 Rational 1319 2.8 66
1 M-7B 48" 139 100 Rational 1338 2.8 108
1 M-7C 36" 41 25 Rational 632 2.6 39
1 M-7C 42" 73 25 Rational 1379 2.6 80
1 M-7C 54" 132 25 Rational 1370 2.6 163
1 M-7D 36" 42 25 Rational 652 2.2 40
1 M-7D 42" 69 25 Rational 1447 2.2 80
1 M-7D 54" 130 25 Rational 1393 2.2 165
1 M-7E 36" 30 25 Rational 335 2.6 23
1 M-7E 42" 61 25 Rational 1321 2.6 64
1 M-7E 48" 85 25 Rational 1350 2.6 103
1 M-7E 54" 85 25 Rational 1393 2.6 103
1 SS-0 54" 118 25 Rational 1087 3 131
1 SS-0 60" 222 25 Rational 197 3 208
1 SS-0A 36" 32 25 Rational 481 2.2 24
1 SS-0A 42" 65 25 Rational 1179 2.2 60
1 SS-0A 48" 104 25 Rational 1665 2.2 111
1 SS-0B 36" 52 25 Rational 500 2.4 45
1 SS-0B 42" 81 25 Rational 1191 2.4 81
1 SS-0B 48" 118 25 Rational 1651 2.4 131
1 SS-1 36" 44 25 Rational 1016 2.2 35
1 SS-2A 10' x 10' 886 100 Pro Development 1665 2.2 408
1 SS-2A 42" 65 100 Pro Development 683 2.2 13
1 SS-2A 72" 717 100 Pro Development 4809 2.2 274
1 SS-2A-1 36" 62 100 Pro Development 1815 2.2 39
1 SS-2A-1 42" 110 100 Pro Development 1218 2.2 69
1 SS-2A-1 48" 113 100 Pro Development 1037 2.2 73
1 SS-2A-1 54" 127 100 Pro Development 1377 2.2 108
1 SS-2A-2 48" 138 100 Pro Development 3246 2.2 77
1 SS-2A-3 36" 78 100 Pro Development 1643 2.2 19
1 SS-2A-3 36" 125 100 Pro Development 1081 2.2 42
1 SS-2A-3 72" 281 100 Pro Development 1702 2.2 144
1 SS-2B 36" 32 25 Rational 481 2.6 23
1 SS-2B 42" 71 25 Rational 1426 2.6 65
1 SS-2B 54" 164 100 Rational 1321 2.6 134
1 SS-2B 60" 227 100 Rational 1339 2.6 205
1 SS-2B 66" 286 100 Rational 1368 2.6 277
1 SS-2B 78" 391 100 Rational 2549 2.6 417
1 SS-2C 36" 50 25 Rational 619 2.2 41
1 SS-2C 42" 83 25 Rational 1286 2.2 79
1 SS-2C 60" 184 100 Rational 1318 2.2 155
1 SS-2C 66" 252 100 Rational 1338 2.2 235
1 SS-2C 72" 318 100 Rational 1569 2.2 318
1 SS-2C 78" 435 100 Rational 2518 2.2 479
1 SS-2D 36" 64 25 Rational 827 2.6 76
1 SS-2D 42" 75 25 Rational 2935 2.6 70
1 SS-2D 54" 134 25 Rational 1152 2.6 150
1 T-0 36" 62 25 Rational 725 3 41
1 T-0 42" 99 25 Rational 1278 3 80
1 T-0 54" 131 25 Rational 1272 3 120
1 T-0 54" 131 25 Rational 438 3 120
1 T-10 36" 52 25 Rational 496 2.2 46
1 T-10 42" 76 25 Rational 1186 2.2 81
1 T-10 48" 112 25 Rational 1745 2.2 129
1 T-11 36" 53 25 Rational 471 3 46
1 T-11 42" 81 25 Rational 1214 3 81
1 T-11 48" 119 25 Rational 1773 3 131
1 T-1A 60" 317 100 ICM 1215 3.6 171
1 T-1A 72" 318 100 ICM 952 3.6 171
1 T-1B 36" 48 25 Rational 719 3 41
1 T-1B 42" 80 25 Rational 1285 3 80
1 T-2 60" 244 100 Pro Development 285 2.8 177
1 T-2 66" 244 100 Pro Development 593 2.8 210
1 T-2 78" 292 100 Pro Development 457 2.8 243
4 of 8
City of Fontana Master Plan
FONT-0121
Proposed Pipe Design Flows
AOS Project Name Pipe Size (in.
or ft)
Design Flow
(cfs)
Design Event
(years)
Design Flow
Method
Length
(ft)
Project Prioritization
Score Drainage Area (ac)
1 T-2 96" 1151 100 Pro Development 5482 2.8 610
1 T-2A 48" 184 100 Pro Development 1860 3.2 136
1 T-2A 60" 236 100 Pro Development 787 3.2 162
1 T-2A 36" 47 100 Rational 317 3.2 28
1 T-2A 42" 105 100 Rational 1824 3.2 81
1 T-2B 54" 249 100 Pro Development 2579 2.2 160
1 T-2B 60" 256 100 Pro Development 68 2.2 162
1 T-2B 36" 65 100 Rational 638 2.2 41
1 T-2B 42" 108 100 Rational 1353 2.2 81
1 T-2C 54" 104 100 Pro Development 2560 2.6 162
1 T-2C 36" 65 100 Rational 683 2.6 42
1 T-2C 42" 108 100 Rational 1339 2.6 82
1 T-3 60" 322 100 ICM 3985 1.6 297
1 T-3 66" 322 100 ICM 1519 1.6 297
1 T-3A 60" 344 100 ICM 3985 1.4 166
1 T-3A 36" 43 25 Rational 323 1.4 29
1 T-3A 42" 93 25 Rational 1822 1.4 84
1 T-3A 48" 123 25 Rational 1371 1.4 126
1 T-4 36" 35 25 Rational 415 1.8 30
1 T-4 42" 76 25 Rational 1800 1.8 88
1 T-4 48" 127 25 Rational 2575 1.8 175
1 T-5 84" 734 100 ICM 2532 1.6 393
1 T-5 54" 138 100 Rational 1646 1.6 112
1 T-5A 36" 44 25 Rational 1848 1 42
1 T-5A 42" 62 25 Rational 1380 1 63
1 T-5A 48" 78 25 Rational 1387 1 84
1 T-5B 78" 512 100 ICM 2417 1 19
1 T-5C 72" 539 100 ICM 1231 1.6 145
1 T-5C 36" 38 25 Rational 294 1.6 25
1 T-5C 42" 83 25 Rational 1064 1.6 72
1 T-5C 48" 90 25 Rational 798 1.6 81
1 T-5C 54" 123 25 Rational 1499 1.6 123
1 T-6 66" 319 100 ICM 1988 3.2 273
1 T-6 72" 684 100 ICM 1688 3.2 351
1 T-6A 36" 50 25 Rational 873 1.6 42
1 T-6A 42" 78 25 Rational 1325 1.6 74
1 T-6B 60" 321 100 ICM 1441 3.4 164
1 T-6B 36" 44 100 Rational 423 3.4 24
1 T-6B 42" 63 100 Rational 415 3.4 41
1 T-7 36" 64 25 Rational 2616 2.4 40
1 T-7 42" 108 25 Rational 2616 2.4 80
1 T-7 60" 147 25 Rational 1714 2.4 120
1 T-7 60" 217 25 Rational 1714 2.4 165
1 T-7A 36" 54 25 Rational 1312 2.4 45
1 T-7B 36" 49 25 Rational 316 2.4 40
1 T-7B 42" 83 25 Rational 688 2.4 80
1 T-7B 48" 113 25 Rational 670 2.4 120
1 T-8 54" 149 100 Rational 2627 2 125
1 T-8 66" 291 100 Rational 1309 2 243
1 T-8 72" 435 100 Rational 1334 2 364
1 T-8 78" 581 100 Rational 564 2 485
1 T-8A 36" 51 25 Rational 538 2 49
1 T-8A 42" 74 25 Rational 1132 2 81
1 T-8A 48" 101 25 Rational 1299 2 121
1 T-8B 36" 42 25 Rational 353 1.6 36
1 T-8B 42" 72 25 Rational 1466 1.6 81
1 T-8B 48" 98 25 Rational 1310 1.6 121
1 T-8C 36" 37 25 Rational 382 1.6 30
1 T-8C 42" 72 25 Rational 1637 1.6 80
1 T-8C 48" 97 25 Rational 1300 1.6 118
1 T-8D 36" 42 25 Rational 1324 1.6 38
1 T-8D 42" 73 25 Rational 784 1.6 84
1 T-8D 48" 102 25 Rational 2627 1.6 125
1 T-9 36" 47 25 Rational 513 1.6 46
1 T-9 42" 70 25 Rational 1153 1.6 80
1 T-9 48" 100 25 Rational 1324 1.6 119
1 T-9 66" 209 25 Rational 371 1.6 177
1 T-9A 36" 53 25 Rational 515 2.4 47
1 T-9A 42" 80 25 Rational 1135 2.4 80
1 T-9A 48" 109 25 Rational 1308 2.4 119
1 T-9A 54" 109 25 Rational 1308 2.4 119
5 of 8
City of Fontana Master Plan
FONT-0121
Proposed Pipe Design Flows
AOS Project Name Pipe Size (in.
or ft)
Design Flow
(cfs)
Design Event
(years)
Design Flow
Method
Length
(ft)
Project Prioritization
Score Drainage Area (ac)
1 WG-1 48" 89 100 Pro Development 1218 1 70
1 WG-2 36" 54 100 Pro Development 1322 1 39
1 WG-2 42" 65 100 Pro Development 986 1 52
1 WG-2 48" 84 100 Pro Development 648 1 73
1 WG-3 48" 33 100 Pro Development 606 1 21
6 of 8
City of Fontana Master Plan
FONT-0121
Proposed Pipe Design Flows
AOS Project Name Pipe Size (in.
or ft)
Design Flow
(cfs)
Design Event
(years)
Design Flow
Method Length (ft) Project Prioritization
Score
Drainage Area
(ac)
2 DZ-10 36" 46 25 Rational 685 1.8 39
2 DZ-10 42" 78 25 Rational 1414 1.8 77
2 DZ-10 48" 107 25 Rational 558 1.8 118
2 DZ-10 54" 129 25 Rational 1321 1.8 159
2 DZ-11 54" 141 100 Rational 1374 3.6 118
2 DZ-11 60" 369 100 ICM 1408 3.6 207
2 DZ-11A 36" 44 25 Rational 516 1.8 36
2 DZ-11A 42" 70 25 Rational 1000 1.8 68
2 DZ-11A 48" 97 25 Rational 1654 1.8 104
2 DZ-11B 36" 44 25 Rational 557 1.8 36
2 DZ-11B 42" 70 25 Rational 990 1.8 67
2 DZ-11B 48" 96 25 Rational 1056 1.8 103
2 DZ-12 60" 306 100 ICM 2612 3.2 196
2 DZ-12A 36" 43 25 Rational 448 1 35
2 DZ-12A 42" 68 25 Rational 2015 1 65
2 DZ-12A 48" 104 25 Rational 647 1 115
2 DZ-13 60" 290 100 ICM 849 3.2 157
2 DZ-13 66" 336 100 ICM 1548 3.2 202
2 DZ-13 84" 616 100 ICM 1081 3.2 398
2 DZ-14 54" 174 100 Rational 1307 2 156
2 DZ-14 66" 349 100 ICM 346 2 167
2 DZ-14 72" 357 100 ICM 1095 2 200
2 DZ-14A 36" 41 25 Rational 529 2.4 34
2 DZ-14A 42" 68 25 Rational 1983 2.4 65
2 DZ-14A 48" 105 25 Rational 661 2.4 116
2 DZ-15A 36" 38 25 Rational 489 2.4 31
2 DZ-15A 42" 64 25 Rational 996 2.4 60
2 DZ-15A 48" 87 25 Rational 975 2.4 90
2 DZ-16 2, 66" 347 100 ICM 1375 1.6 214
2 DZ-16 66" 341 100 ICM 2635 1.6 214
2 DZ-16A 36" 38 25 Rational 419 1.6 30
2 DZ-16A 42" 64 25 Rational 1799 1.6 59
2 DZ-16A 48" 100 25 Rational 850 1.6 111
2 DZ-4 108" 646 100 Pro Development 636 1 651
2 DZ-4 6' x 7' 405 100 Pro Development 110 1 83
2 DZ-4 84" 405 100 Pro Development 1649 1 83
2 DZ-7 36" 51 25 Rational 417 1.8 44
2 DZ-7 42" 79 25 Rational 970 1.8 84
2 DZ-7 48" 101 25 Rational 1317 1.8 125
2 DZ-8 72" 364 100 ICM 335 1.8 241
2 DZ-9 36" 48 25 Rational 549 1 42
2 DZ-9 42" 77 25 Rational 1472 1 82
2 DZ-9 48" 103 25 Rational 552 1 123
2 JH-1 84" 766 100 ICM 1382 1.6 466
2 JH-2 72" 236 100 ICM 1925 1 115
2 SR-1 2, 66" 664 100 ICM 1555 2.4 389
2 SR-2 14' x 6' 1092 100 ICM 617 3 807
2 SR-2 78" 943 100 ICM 2579 3 729
2 SR-2 84" 1092 100 ICM 1180 3 763
2 SR-3 84" 836 100 ICM 460 3 267
2 SR-3 96" 1100 100 ICM 852 3 321
2 SR-3 96" 1073 100 ICM 1769 3 427
2 SR-4 8' x 5' 356 100 ICM 1543 3 257
2 SS-10 66" 270 100 ICM 824 3.4 143
2 SS-11 48" 72 100 ICM 457 3 42
2 SS-11 60" 67 100 ICM 1200 3 124
2 SS-11 66" 265 100 ICM 618 3 161
2 SS-5 60" 123 100 ICM 2146 1.6 83
2 SS-6 60" 234 100 ICM 1236 1.8 121
2 SS-7 66" 251 100 ICM 1716 2.2 221
2 SS-8 36" 43 25 Rational 594 2.2 58
2 SS-8 42" 56 25 Rational 1296 2.2 111
2 SS-8 48" 88 25 Rational 576 2.2 32
2 SS-9 60" 238 100 ICM 1579 2.4 190
2 SS-9A 36" 40 25 Rational 925 2.4 63
2 SS-9A 42" 67 25 Rational 478 2.4 79
2 SS-9A 60" 240 25 ICM 1223 2.4 190
7 of 8
City of Fontana Master Plan
FONT-0121
Proposed Pipe Design Flows
AOS Project
Name
Pipe Size (in.
or ft) Design Flow (cfs) Design Event
(years)
Design Flow
Method Length (ft) Project Prioritization
Score
Drainage Area
(ac)
3 A-0 10' x 9' 2324 100 ICM 1505 1.4 1191
3 A-0A 84" 754 100 ICM 2192 1.8 367
3 A-0A 90" 858 100 ICM 584 1.8 397
3 A-0B 78" 438 100 ICM 782 1.8 203
3 A-0B 84" 488 100 ICM 1794 1.8 278
3 A-0C 36" 88 25 Rational 1280 1.8 44
3 A-0D 36" 41 25 Rational 476 1.8 19
3 A-0D 48" 69 25 Rational 548 1.8 32
3 A-1 36" 18 100 ICM 669 1.4 2
3 A-1 42" 46 100 ICM 1101 1.4 54
3 A-1A 36" 66 25 Rational 797 1 32
3 A-1A 48" 81 25 Rational 687 1 39
3 A-2 36" 55 25 Rational 886 1.8 31
3 A-2 54" 126 25 Rational 1125 1.8 70
3 A-2A 36" 69 25 Rational 851 1.8 36
3 A-2A 42" 85 25 Rational 177 1.8 44
3 A-2A 48" 100 25 Rational 874 1.8 52
3 A-3 90" 1396 100 ICM 4946 1.8 699
3 A-3 96" 1494 100 ICM 1242 1.8 757
3 A-3A 36" 71 25 Rational 674 1.8 36
3 A-3A 42" 117 25 Rational 1346 1.8 59
3 A-3B 96" 287 100 ICM 656 1 173
3 A-3C 66" 422 100 ICM 3507 1 330
3 A-4 36" 55 25 Rational 783 1 27
3 A-4 42" 107 25 Rational 637 1 52
3 B-1 36" 40 25 Rational 407 2 30
3 B-1 42" 112 25 Rational 868 2 57
3 B-1 42" 96 25 Rational 111 2 47
3 B-1 54" 242 25 Rational 562 2 159
3 B-1 54" 49 25 Rational 104 2 16
3 B-2 48" 84 25 Rational 1147 2.4 41
3 B-3 36" 65 25 Rational 398 2.4 32
3 B-3 42" 95 25 Rational 363 2.4 50
3 B-5 72" 653 100 ICM 1240 1.6 366
3 B-5A 36" 53 25 Rational 657 1.6 21
3 B-5A 42" 97 25 Rational 1053 1.6 46
3 B-5A 48" 138 25 Rational 1553 1.6 74
3 B-6 36" 88 25 Rational 201 1.6 44
3 B-7 36" 88 25 Rational 502 1.6 44
3 B-7 42" 97 25 Rational 641 1.6 49
3 B-8 36" 63 25 Rational 519 2.4 28
3 B-8 48" 97 25 Rational 994 2.4 47
3 C-0 60" 409 100 ICM 1297 1.6 153
3 C-0 72" 595 100 ICM 2586 1.6 223
3 C-2 66" 212 100 ICM 427 2.4 68
3 C-2 72" 265 100 ICM 521 2.4 79
3 C-4 60" 320 100 ICM 1209 2.2 149
3 C-4 66" 319 100 ICM 400 2.2 149
3 C-4 72" 319 100 ICM 628 2.2 149
3 C-5 60" 332 100 ICM 1600 3 152
3 C-6 42" 156 100 ICM 488 3 70
3 C-7 72" 631 100 ICM 2059 3 218
3 C-8 78" 485 100 Rational 1828 2.6 254
3 C-8A 42" 80 25 Rational 1331 2.6 37
3 C-8B 36" 72 25 Rational 660 2.6 32
3 C-8B 42" 97 25 Rational 1080 2.6 46
3 C-8B 48" 164 25 Rational 1450 2.6 98
3 C-8B 54" 210 25 Rational 1081 2.6 125
3 C-9 9' x 12' 2860 100 ICM 917 3 1241
3 HR-1 96" 1282 100 ICM 1378 3 706
8 of 8

January 25
APPENDIX 2 HYDRAULIC RESULTS SUMMARY
Existing Storm Drain Pipes Used For Capacity Analysis

Path: P:\F\FONT00000121\0600INFO\GS\Maps\ProposedCapitalImprovementProjects.aprx Existing Storm Drain Pipes For Capacity Analysis
All Areas of Study
Fontana
Alamo Dr
Day
Creek
Blvd
Day
CreekBlvd
Bluegrass
Ave
Stoneview
Rd
Wilson Ave
AlturaDr
Alvarado
Pl
Dapple Dr
Melon Dr
Indian
WellsPl
John L. Golden
Day Creek
Vintage Dr
Sugargum St
Carob
Ave
Banyan St
Day
Creek
Blvd
Arbor
Ln
Hess
Pl
Day
Creek
Blvd
Victoria
Gardens
Fire Station No.
3 Historic Winery
(Regina/Filippi)
Cultural
Center/Biane
Library
66 Day CreekBlvd
Juneberry Dr
Foothill
Marketplace
Concours St
6th St
Southern Pacific
RR
Shea Center Dr
Santa Ana St
Union PacificRailroad
Up
Railroad
S
Vintage
Ave
S
Vintage
Ave
E Francis St
Universe Dr
Decliff DrForest Service Rd
Encino
Ct
East EtiwandaCreek
EastAve
Etiw
anda
Ave
Etiwanda Ave
Etiw
anda
Ave
Daycreek Blvd
NOverlook Dr
23rd St
Amber Ln
Altura Dr
Arena Dr
Parke Cir
StillwaterPl
Wilson AveWilson Ave Wilson Ave
Summit
Intermediate
Etiwanda
Colony
Fire Station No.
6 210
Copley Dr
Victoria St
PecanAve
Carnesi Dr
N
Victoria
W
indrowsLoop
Highland Ave
C
ountryw
ood
Pl
Blue Gum Dr
ArapahoRd
Cherokee Rd
LaurelBlossom
Pl
Fisher Dr
DiCarlo
Pl
Pistache St
Plum
W
ay
Silver Sky Rd
Victoria
Park
Ln
EastAve
Etiw
anda
Ave
Banyan St
Etiwanda
15 W
Liberty
Pkwy
Miller Ave
Sutter Ct
Church St
Kew
Ave
Pecan
Ave
PinotPl
Mosaic Dr Colonial Dr
Garcia Dr
EastA
ve
EastAve
Baseline Rd
Victoria
Gardens
Ln
Victoria Arbors
Park
Perdew
Etiwanda Depot
Chaffey-Garcia
House
Post Office
Police
Substation
Catch
Basin
66 66
Ilex
St
Cottonw
ood
Ave
Napa St
Ivy Ave
Chatham Dr
Hickory
Ave
Flagstaff Dr
Joliet Dr
CornwallAve
Whittram Ave
Arrow Rte
Etiw
anda
Ave
Foothill Blvd
Kaiser
W
ay
Transportation
W
ay
Access
Rd
Access
Rd
Barrington
Ave
Vip Rd
6th St
San Bernardino Ave
Valley Blvd
N
Etiw
anda A
ve
Com
m
erce
Dr
4th St
Etiwanda
Ave
Souther n Pacific RR Union Pacific
10 10
Jasm
ine
St
Com
m
erce
Way
Com
m
erce
W
ay
Santa Ana St
Valley Blvd
Slover Ave
N
Etiw
anda
Ave
E Airport Dr
S
Etiw
anda
Ave
Fontana
Gateway
Dahlia St
Industry
Ave
Cham
pagne
Ave
Marlay AveE Francis St
Chablis
Ave
Jurupa St Jurupa Ave
S Etiwanda Ave
Inland AveVenture
D
r
Latour Ln
Philadelphia Ave Philadelphia AvePhiladelphia Ave
Colonbero Rd
Woodley Ridge Dr
Decliff Dr
Summit Ave
Regina Dr
EastEtiwanda
Creek
W
ardm
an
Bullock
Rd
Crescenta Way
San
Sevaine
Rd
Ridgeline
Pl
C
restline
Pl
Aggazzotti Rd
Frost Dr
Johnston
Pl
Cherry
Ave
Wilson Ave
Catch
Basin
210
15 15
Victoria St
Smokestone St
RaindropPl
Copley Dr
Fisher Dr
Gypsum Dr
Highland Ave
Cherry
Ave
Banyan St
Westgate
E
Liberty
Pkw
yW
Lincoln
Loop
Rd
E
Lincoln Loop
Rd
Heritage Cir
W
Yosemite Loop Rd
E
G
rand
Ave
Del Norte St
Marbella St
W Liberty Pkwy
W LibertyPkwy
Quail Ct
Rideout Ct
Pacific Electric Inland Empire Trl
Cherry
Ave
Baseline Ave
Heritage
Intermediate
School
Village Of
Heritage
Bur lington Nor ther n and Sante Fe Railroad
66 66
Calabash
Ave
Back Straight Rd
Ivy Ave
Owen StBanana
Ave
Alm
ond
Ave
W
Perimeter Rd
C
herry
Ave
Cherry
A
ve
Cherry
Ave
Whittram Ave
Arrow Rte Arrow Blvd
Foothill Blvd
Alm
ond
Ave
California Steel Way
BananaAve
S Perimeter Rd
Iris Dr
Calabash
Ave
WPerim
eter
Rd
San Bernardino Ave
Auto Club
Speedway
Kaiser Park
10 10
B
usiness
Dr
Santa Ana Ave
Banana
Ave
Alm
ond
Ave
Alm
ond
Ave
Calabash
Ave
Calabash
Ave
Slover Ave
Valley BlvdValley Blvd
Cherry
Ave
M
ulberry
Ave
Marlay Ave
Alm
ond
Ave
Calabash
Ave
Calabash
Ave
Chaparral Ave
CabernetDr
El Contento Ave
Hillcrest Dr
Jurupa Ave
M
ulberry
Ave
Cherry Ave
Cherry
Ave
Shadow Park
Chaparral Park
Oak Park
Kaiser High
School
Southridge
Middle School
Green Vista Dr
Vintage
Pl ChablisAve
Hadley
Dr
Tamarack Way
Weeping Willow Ln
Duncan Canyon Rd
Tahan
W
ay
Brookside
Ave
Coyote
C
anyon
Rd
FoxboroughDr
Bridlepath Dr
Coyote Canyon
15 Lytle
Creek
Rd
CoyoteCanyonRd
S Bridlepath Dr
Summit Ave
Summit Ave
Cherry
Ave
Fox Ridge Dr
W
ranglerDr
San
Sevaine
Rd
TenderfootDr
Deer Dr
Hawk St
HalfDom
e
Dr
RooseveltDr
ReaganDr
Saddlepeak Dr
Beech Ave
Rosena Park
East
David W Long
Elementary
Summit Heights
Hunter's Ridge
Preston Dr
Hem
lock
Ave
San
Sevaine
Rd
Walnut St
Walnut St
EarhartAve
Maine St Holiday Dr
Caroline St
Brant Dr
Curtis Ave
Larkstone St
Lytle
Creek
Rd
Rockwell Ave
Horizon St
ChantelDr
Sierra Lakes Pkwy
Sierra Lakes Pkwy
Walnut Ave
Beech
Ave
S Highland Ave
California
Landings
Beech
Ave
Hilton Dr
Hem
lock
Ave
Hem
lock
Ave
Andrea
St
Live
O
ak
Ave
San
Sevaine
R
d
Plum
rose
St
Sandhurst St
Bar Harbor Rd
M
cGuire
Ave
Sea
SaltAve
Miller Ave
Arosia Dr
Montanez St
M
yrtle
Pl
Beech
Ave
Beech
Ave
Sultana Ave
Begonia Dr
Village Pkwy
Miller Ave
Plum
aria
Dr
Baseline Ave Rancho
Fontana
Morningside
66 Sultana
Ave
Hemlock AveRedw
ood
Ave
Redw
ood
Ave
Elm
Ave
Ceres Ave
Yucca Ave
Live
O
ak
Ave
Live
O
ak
Ave
Reseda
A
ve
Heather
Ave
Valencia Ave
Country Ln
Seville Ave
Orchid St
Upland Ave
Ivy Ave
Merrill Ave
Whittram Ave
Beech
Ave
Beech
Ave
Arrow Blvd
Foothill BlvdFoothill Blvd
Hem
lock
Ave
Randall Ave
Hibiscus Ave
Pine Ave
Redw
ood
Ave
Elm
Ave
Sequoia Ave
Live
O
ak
Ave
Mallory Dr
Athol St
Iris Dr Iris Dr
Rosemary Dr
Hunter St
El Molino St
El Molino St
Sultana
Ave
Carmel St
Carob
Ave
Robinia
St
FontanaAve
San Bernardino Ave
B
eech
Ave
Sequoia Middle
School
Union Pacific
10 10BeechAve Beech
Ave
Hem
lockAve
Santa Ana Ave
Elm Ave Elm
Ave
Redw
ood
Ave
Redwood
Ave
Live
O
ak
Ave
Live
O
ak
Ave
Washington Dr
Boyle Ave
Boyle Ave
Manila St
Aliso Dr
Slover Ave
Valley Blvd
Southwest
Industrial Park
Beech
Ave
Hem
lock
Ave
Live
Oak
Ave
Elm
Ave
Elm
Ave
Village Dr
Coleen St
Canyon Crest Dr
Camellia Dr
Loyola
Ct
Redw
ood
Ave
Jurupa Ave
Southridge
Plaza
Southridge Park
Southridge
Village
Weeping Willow Ln
15 15
Coyote Canyon Rd LytleCreek
Rd
Duncan Canyon Rd
Citrus
Ave
AgaveAve
Blue Iris St
Caterpillar Dr
Coyote Canyon
Park
Summit AveSummit Ave Summit Ave
Citrus
Ave
Park House Dr
Edw
ard
Ave
Casa Grande Ave
Cypress
Ave
Pine
LeafAve
3 Mile Rd
Parkside Way
Magnolia Way
Delam
ar
D
r
Gardens St
Parry Peak Dr
Sierra Lakes
Golf Course
Fontana Park
Patricia Marrujo
Park
Summit High
School
Citrus Heights
North
Citrus Heights
South
210 210
Walnut St
Cataw
ba
Ave
Catawba Ave
MedinahSt
Augusta
Dr
Citrus
Ave
Los Cedros Ave
Cypress
Ave
Knox
Ave
Athena Dr
M
aloofAve
Allison Way
O
leander
Ave
Plum St
Highland Ave
Alm
eria
St
Jacaranda
Ave
Curtis Ave
Tokay
Ave
Walnut Ave
Cooper
Ave
Sierra Lakes Pkwy
Citrus
Ave
S Highland Ave
AB Miller High
School
Sierra Lakes
C
ypress
Ave
Alm
eria
Ave
Chase Rd
Lim
e
Ave
O
leander
Ave
AbigailPl
Virginia Dr
Elsa
Ct
Riley Dr
Celeste
Ave
Harvey Dr
Concord
Ave
San Jacinto Ave
Jackson Dr Jackson Dr
Montgomery Ave
Barbee St
Reed Dr
Date A
ve
Toyon
Ave
Paine St
Miller Ave
Citrus
Ave
Citrus
Ave
Baseline Ave
Almeria Middle
School
66 66
Cataw
ba
Ave
Tokay
Ave
Ceres Ave
Ceres Ave
Poplar
Ave
Date
St
Date
St
Seville AveLim
e
Ave
Ivy Ave
Orange Way
Upland Ave
Valencia Ave
Citrus
Ave
Merrill Ave
Almeria Ave
Fontana Ave
Foothill Blvd
Cypress Park
Cataw
ba
Ave
Dianthus Ave
Randall Ave
Poplar
Ave
Date
St
Hawthorne Ave
Mallory Dr
Mallory Dr
Athol St Athol S t
Athol St
Pine Ave
O
leander
Ave
Alm
eria
A
ve
Niagara
Ave
Hunter St
Iris Dr Iris Dr
Lim
e
Ave
Lim
e
Ave
Briarw
ood
Ave
Grevillea St
Citrus
Ave
FontanaAve
San Bernardino Ave
Cypress
Ave
Fontana High
School
Truman Middle
School
Citrus
Elementary
10 Oleander A
ve
PoplarAve Poplar
Ave
Cataw
ba
Ave
Catawba A
ve
Aliso Dr
Santa Ana Ave
Washington Dr
Boyle Ave Boyle Ave
Rose Ave
Tyrol Dr
Citrus
Ave
Citrus A
ve
Valley Blvd
Cypress
Ave
Cataw
ba
Ave
Cypress Ave
Gala Ave
CitrusAve
Windcrest Dr
Village Dr
Willow Dr
O
leander
Ave
Jurupa Ave
Cypress
AveCitrus
Ave
Catawba Park
15 Lytle Creek
Rd
Sycamore Creek Dr
Bur Oak Rd
Sierra
Ave
Nealeys Corner
15 W Terra Vista Dr
M
ango A
ve
Linde Vista Dr
Palm
etto
Ave
W
Via Bello Dr
Rim
a
Dr
Yarrow Ln
Sierra
Ave
N Riverside Ave
Clubhouse Dr
Colonial Dr
Wyndham Ln
Augusta
Dr
Escalon Dr
W Casa Grande Dr
Napa
Valley
Rd
Three Mile Rd
W Sunrise Dr
Summit AveSummit Ave
N
M
ango
Ave
La
Sierra
D
r
M
ango
A
ve
Almaden Dr
Alder
Ave
Sierra
Ave
Sierra
Ave
210
M
ango
Ave
Kaiser
AveCambria Ave
Palm
etto
Ave
Sierra
Ave
Walnut St
Augusta
D
r
N
Tam
arind
Ave
W Walnut Ave
Cerritos St
Fern St Fern St
Sierra
Ave
W Casmalia St
Ruble Middle
School
Walnut Village
Tam
arind
Ave
Elaine Dr
Palm
etto
Ave
Malaga St
Malaga St
M
ango
AveRamona Ave
Ramona Ave
Reed St
Reed St
Juniper
Ave
Paine St
Paine St
Fairview Rd
Kem
pster
Ave
Blanchard
Ave
Micallef St
Fairfax St
Barbee St
Barbee St
Barbee St
Wabash Ave Wabash Ave
Miller Ave
Sierra
Ave
Sierra
A
ve
Bill Martin Park
Metr olink
66 66
Tam
arind
Ave
Tam
arind
Ave
Juniper
Ave
Palm
etto
Ave
Pepper
Ave
Sewell Ave
Ceres Ave
Ceres Ave
Owen St
Upland Ave
BennettAve
Nuevo
Ave
Kaiser
Ave
Seville Ave
Seville Ave
Ivy Ave
Ivy Ave
Orchid Dr
Vine St
Spring St
Rosena
Ave
Chantry
Ave
Sierra
Ave
Arrow Blvd
Foothill Blvd
Civic Center
Veterans' Park
Seville Park and
Amphitheater
Fontana Middle
School
Fontana
Metrolink Plaza
Central
Fontana
Fontana
Tamarind A
ve
Tam
arind
Ave
Pine Ave
Palm
etto
Ave
Marygold Ave
Randall Ave
M
ango
Ave
Athol St
Athol St
Tullock St
Holly Dr
Hibiscus St
O
live
St
Hawthorne Ave
Em
erald
Ave
Pepper
Ave
Tangelo
Ave
Encina
Ave
Mallory Dr
Acacia
Ave
Manzanita Dr
Grevillea St
San Bernardino Ave
Sierra
Ave
Sierra
Ave
Jack Bulik Park
Cypress
Elementary
School
Kaiser Hospital
Union Pacific
10 10
Tam
arind
Ave
Santa Ana Ave
Saffron
St
Juniper
Ave
Juniper
Ave
Production
Ave
BennettDr
Boyle Ave
Valley Blvd
Slover Ave
Sierra
Ave
Inland Empire
Center
Sycamore Hills
Elementary
Empire Center
Underwood Dr
Jurupa Ave
Juniper
Ave
Volante
Dr
Tam
arind
Ave
Lacebark St
Eucalyptus St
Pear St
Sierra
A
ve
Jurupa Ave
Sierra
Ave
Obsidian
RdAmerican Elm RdWhite Ash Rd
LapisLn
Quartzite
Ln
Paakuma' Park
Lytle Creek Wash
AdlerAve
W Via Bello Dr
N Riverside Ave
Ethel Kucera
Middle School
W Casa Grande Dr
W Buena Vista Dr
N
Linden
Ave
Lowell St
Stonehurst Dr
W Coast Blvd
Summit Ave
N Maple
Ave
W Summit Ave
M
aple
Ave
W
Via Bello Dr
Banyon Ave
N Riverside Ave
N
LocustAve
Fergusson Park
Wilmer A Carter
High School
210
210
Vineyard Ave
Alder
Ave
N
Linden
Ave
N
Linden Ave
W Walnut Ave
Laurel Ave
LaurelAve
W Bohnert Ave
Renaissance Pkwy
W Casmalia St
LocustA
ve
Miro Way
Miro Way
A
lder
Ave
N
Linden
Ave
LaurelAve
Spohn
Ave
William
s
Rd
W
illiam
s
Rd
Fairfax St
W Victoria StFairview Dr
Barbee St Barbee StG
race
A
ve
N
M
aple
Ave
Grove Pl
Laguna Pl
Montgomery Ave
Farney Ave
Dum
ond
Dr
Ramona Ave M
aple
Ave
LocustAveAlder
Ave
W Base Line Rd
Miller Ave
Alder Middle
School
Metr olink
Granada Ave Granada Ave
LaurelAve
Bonnie Ln
Citron Ave
Citron Ave
Spohn Dr
Upland Ave
Seville Ave
Dorsey Way
Ivy Ave
N
Linden
Ave
McCauley St
M
aple
Ave
M
aple
Ave
LocustAve
Merrill Ave
W Rialto AveAlder
Ave
Arrow Blvd
W Merrill Ave
Foothill Blvd W Foothill Blvd
Pine Ave
Evergreen
Ln
Marygold Ave
Pinedale Ave
Randall Ave
LaurelAve
Palm
Ln
Hibiscus St
Athol St Athol St
El Molino St
Filbert St
Linden
Ave
M
aple
Ave
Alder
Ave
LocustAve
San Bernardino Ave
Union Pacific Railroad
10 Santa Ana Ave
Taylor Ave
LocustAve
Linden
AveA
lder
Ave
Mindanao St
LaurelAve
Otilla St
M
aple
A
ve
Ash St
Gregory St
Valley Blvd Valley Blvd
LocustAve
Slover Ave
Ayala Park
Walt
Zimmerman
School
Bloomington
High School
11th St
Alder
Ave
10th St
M
aple
Ave
Birch St
Birch
St
9th St
Jurupa Ave
Jurupa Ave
7th St
Arm
strong
Rd
LocustAve
Kessler Park
Ruth O Harris
Middle School
Sandra Dr
GailDr
J C Rd
Arm
strong
Rd
VerdemontRanch Rd
VerdemontRanch
Rd
GlenHelenRegional Park
Lytle Creek Wash
Institution Rd
N Riverside Ave
Sycamore Ave
N Orange Ave
NCedar
Ave
N Apple Ave
N
Apple Ave
N Palm AveW Summit Ave
N
Fillmore Ave
Olive Ave
Ayala Dr
Trapp
Elementary
School
Sunrise
Christian
Elementary
School
W Casmalia St
N
Arrow
head
Ave
W La Gloria Dr
N
Cedar
Ave
W Bohnert Ave
Ayala
Dr
W Casmalia St
Jerry Eaves
Park
Kolb Middle
School
N
Fitzgerald
Ave
W Rosewood St
N
Beechw
ood
Ave
W Grove St
N
DriftwoodAve
N
Larch
Ave Mason St
N
Brierw
ood
Ave
N
Cedar
Ave
W Base Line Rd
W Etiwanda Ave
AyalaDr
Renaissance
Center
Lorraine Pl
W 2nd St
S
Larch
Ave
N
Larch
Ave
S
Cedar
Ave
S
Cedar
Ave
W Rialto Ave
W Merrill Ave
N
Cedar
Ave
W Foothill BlvdW Foothill Blvd
S
Larch
Ave
W Alru St
O
rchard
St
W Mallory Dr
M
agnolia
St
M
agnolia
St
W Hawthorne St
Vine
St
W Granada St
Olive
St
O
live
St
Pomona Ave
Larch
Ave
Spruce
Ave
Grove Pl
Grove Pl
W Randall Ave
Cedar
Ave BloomingtonAve
S
Cedar
Ave
10 Larch
Ave
Otilla St
Spruce
Ave
Santa Ana Ave
Maple Ln
Orange St
Valencia
St
Manila St
Gregory St
Cedar
Ave C
edar Ave
Valley Blvd
Bloomington
Up
Railroad
Jurupa Ave
12th St
7th St
Appaloosa
Ln
6th St
13th St
Pepper St
4th St
8th St
PineSt
14th St
Oak
St
5th St
Touche Dr
Cedar
Ave
7th St
Green Acres
Memorial Park
Crestmore
Elementary
School
El Rivino Rd
C
astellano
RdRouner Dr
Crestmore
Heights
36"
42"
4 8 "
4 2 "
6 6
"
4 8
"
42"
36"
7 2
"
4 2 "
3 6 "
3 6
"
3 6 "
3 6 "
4 2
"
3 6 "
42"
72"
3 6
"
36"
36"
3 6
"
6 0 "
7 2
"
66"
66"
3 6 "
4 8 "
5 4
"
4 2
"
54"
4 2 "
36"
84"
42"
48"
6 6
"
36"
48"
36"
36"
5 4
"
42"
54"
60"
36"
42"
42"
42"
36"
36"
36"
45"
36"
4 2
"
42"
4 2 "
54"
36"
36"
48 36"
4 8
"
42"
36"
78"
36"
36"
66"
36"
36"
36"
42"
42"
3 6
"
36"
36" 36"
72"
4 2 "
4 8
"
36"
48"
42"
4 2 "
36"
36"
42"
42"
6 0
"
36"
3 6 "
36"
3 6
"
6 6 "
42"
36"
4 8
"
3 6
"
57"
78"
6 .
5 '
x
2 '
60"
4 2
"
3 6 "
6 6 "
54"
36"
3 6
"
36"
42"
36"
3 6
"
3 6
"
72"
54"
54"
66"
4 2
"
5 4 "
4 2 "
3 6
"
36"
36"
54"
4 8
"
66"
5 4
"
3 6
"
36"
36"
3 6 "
4 2 "
42"
7 8 "
36"
5 4 "
36"
4 2
"
48"
36"
60"
6 0
"
91"
96"
3 6 "
36"
36"
4 8 "
4 2 "
48"
3 6 "
72"
3 6
"
96"
60"
4 8 "
36"
3 6 "
48"
36"
3 6 "
60"
36"
4 2
"
4 8 "
9 1
"
3 6 "
5 4
"
36"
48"
4 2
"
3 6 "
4 8
"
54"
54"
2 x 18"
66"
3 6
"
3 6
"
36"
3 6 "
4 2 "
3 6 "
48"
42"
54"
78"
36"
4 2
"
3 6 "
48"
36"
60"
6 0
"
66"
2 x 30"
36"
6 0 "
60"
36"
78"
3 6
"
48"
4 8
"
4 8
4 8 "
60"
48"
36"
9 6 "
42"
66"
4 2
"
5 3 "
60"
36"
7 2
"
36"
5 4
"
60"
3 6 "
36"
3 6
"
84"
9 0
"
42"
72"
7 8
"
42"
54"
36"
5 4
"
36"
48"
36"
96"
6 0
"
36"
8 4 "
3 6 "
54"
66"
78"
3' x 4'
54"
72"
36"
48"
60"
5 ' x 1
0 '
1 0
2 "
4 8
"
1 0
8 "
3 6 "
48" 48"
42"
36"
36"
36"
42"
36"
39"
78"
36"
36"
48"
60"
48"
36"
36"
36"
60"
66"
4 8 "
4 8 "
42"
36"
36"
3 6
"
69"
48"
36"
4 2 "
54"
36"
3 9
"
36"
36"
48"
3 6 "
7 2 " 36"
36"
36"
36"
48"
42"
6 6
"
60"
3 6
"
42"
54"
66"
54"
36"
36"
4 8
"
36"
2 9 " x 4 5 "
3 6
"
48"
3 6
"
3 6 "
39"
7 2
"
48"45"
48"
36"
4 5 "
66"
60"
54"
3 6 "
48"
36"
5 4
"
60"
3 6
"
48"
60"
7 2
"
4 2
"
60"
36"
54"
5 4
"
36"
2 4
"
x
3 6
"
60"
3 6
"
39"
5 4 "
72"
3 9
"
36"
8 '
x
6 '
7 8
"
48"
72"
3 6 "
5 4
"
4 8
"
4 2
"
45"
54"
4 2
"
4 2 " 36"
36" 36"
14' x 9'
48"
6 6
"
78"
48"
60"
45"
42"
4 2 "
48"
6 0 "
48"
54"
8 4 "
78"
78"
3 6
"
7 2
"
42"
42"
7 8 "
42"
4 2 "
63"
7 '
x
1 2
'
3 9
"
2 ,
8 '
x
4 '
6 6 "
6 6 "
42"
8 '
x
5 '
60"
48"
42"
3 6 "
4 2
"
42"
6 ' x
1 0 '
75"
60"
3 6
"
78"
66"
4 2
"
66"
3 6
"
66"
36"
51"
4 8 "
48"
39"
42"
4 8
"
3 6
"
42"
6 6 "
54"
66"
6 0
"
54"
7 8
"
54"
48"
3 9
"
78"
3 6 "
45"
51"
60"
6 0
"
108"
7 2
"
72"
48"
3 9
"
36"
4 2
"
36" 36"
4 8
"
60"
48"
42"
54"
54"
4 8
"
42"
36"
4 2 "
96"
5 4
"
36"
4 2 "
54"
54"
66"
7 2 "
9 6 "
36"
75"
90"
3 6 "
42"
96"
9 0 "
60"66"
54"
84"
96"
48"
72"
42"
66"
54"
48"
4 2
"
54"
7 8 "
36"
48"
30"
3 6 "
42"
102"
90"
90"
68" x 43"
4 8 "
36"
7 2"
3 6
"
48"
72"
6 6
"
36"
2, 14' x 8'
54"
36"
81"
2, 10' x 8.5'
36"
3 6 "
36"
4 8
"
48"
4 8 "
4 2
"
72"
4 8
"
42"
3 6
"
66"
48"
54"
54"
2, 12' x 9'
4 2 "
3 6 "
5 7
"
4 5 "
3 6
"
42"
10' x 8'
36"
45"
42"
2, 12' x 6'
72"
4' x 6'
4 8 "
48"
4 8
"
36"
42"
72"
36"
3 6 "
7 2
"
42"
3 6 "
54"
12' x 6'
42"
36"
36"
3 6
"
36"
2, 8' x 8'
54"
36"
54"
6 6
"
36"
7 2
"
36"
6 6
"
36"
36"
2, 10' x 7'
48"
5 4 "
48"
39"
75"
4 2
"
48"
75"
48"
54"
9 6 "
2, 10' x 8'
6 6
"
38"
48"
9 6
"
36"
54"
3 6 "
48"
42"
39"
42"
54"
4 2
"
4 2
"
3 6
"
39"
42"
7 8
"
36"
5 4
"
54"
3 6 "
48"
36"
48"
36"
7 2 "
4 2 "
36"
5 4
"
36"
36"
4 2
"
42"
42"
36"
4 2 "
66"
4 8 "
72"
42"
36"
72"
3 6 "
3 6 "
42"
54"
48"
42"
51"
66"
36"
36"
48"
36"
42"
57"
36"
4 2
"
36"
54"
36"
36"
3 6
"
48"
8' x 8'
2, 10' x 8'
39"
72"
3 6 "
45"
48"
36"
36"
48"
36"
36"
4 2 "
36"
22" x 36"
6 9
"
42"
4 2
"
39"
4 8
"
36"
66"
36"
3 9
"
48"
5 7
"
4 8
"
42"
4 2
"
3 6 "
42"
3 6
"
4 2
"
42"
3 6 "
4 8
"
48"
3 6
"
48"
90"
48"
81"
6 0 "
4 ,
1 2
'
x
1 2
'
7 2
"
54"
36"
8 4 "
4 8
2, 10' x 8'
3 6 "
4 2 "
6 0 "
96"
48"
36"
3 6
"
48"
3 6
"
3 6 "
4 2 "
48" x 42"
36"
36"
36"
36"
2, 12' x 8'
4 2
"
3 6
"
2, 10' x 8'
60"
36"
3 6
"
4 2 "
75"
72"
6 0
"
3 9
"
42"
4 5 "
36"
96"
48"
5 4
"
36"
48"
2 ,
1 0
'
x 6 '
45"
30"
36"
36"
36"
48"
36"
4 2
"
5 4
"
6 0
"
48"
4 8
"
60"
36"
36"
42"
42"
4 2
"
39"
36"
51"
54"
7' x 4'
4 2
"
54"
4 2 "
45"
36"
4 8 "
60"
36"
36"
36"
1 0 2 "
39"
42"
2, 8' x 8'
36"
5 4
"
81"
72"
51"
45"
3 6
"
5 7
"
6 0
"
72"
36"
4 2
"
7 8
"
66"
45"
42"
5' x 12'
5 1 "
39"
48"
8' x 8'
42"
6 0
"
36"
84"
72"
60"
5 4
"
9' x 8'
78"
60"
1 0
8 "
54"
42"
5 1
"
39"
5 1
"
36"
48"
5' x 10'
78"
6 9 "
51"
60"
36"
51"
36"
66"
60"2, 9' x 8'
San Sevaine Channel
Etiwanda Creek Channel
Summit Avenue Storm Drain
N
e
a
l e
y
' s
C
o
r n
e
r
D
r
a
i n
E t i w a n
d
a
S p r e a d i n g G
r o
u
n
d
s
Lytle Creek Wash
R
i v
e
r
s
i d
e
G
r
o
i
n
#
2 ,
C
O
E
M
u l b e r r y
C
h
a n
n
e l
Henderson Channel
Riverside Groin #5, COE
Riverside Groin #3, COE
Riverside Groin #4, COE
S
a
n
S
e
v
a
i
n
e
S
p
r
e
a
d
i
n
g
G
r
o
u
n
d
s
East Fontana Storm Drain
Lower Etiwanda Creek Channel
H
a
w
k
e
r
-
C
r
a
w
f
o
r
d
C
h
a
n
n
e
l
I - 1 0 C h a n n e l
2 4
t h
S t r e e t S t o r m D r a i n
D
e
c l e
z
C h a n n e l
Highland Channel
W e s t F o n t a n a C h a n n e l
Cactus Channel
0 3,000 6,0001,500 Feet
Map Disclaimer:

The data provided hereon may be inaccurate or out of date and any person or entity who relies on said information for any purpose whatsoever does so solely at their own risk.

Neither the City of Fontana nor any agency, officer, or employee or either nor of any information provider warrants the accuracy, reliability of timeliness of any of the data provided hereon.

THIS INFORMATION IS PROVIDED ‘AS IS’ WITHOUT WARRANTY OF ANY KIND INCLUDING BY WAY OF ILLUSTRATION AND NOT OF LIMITATION THE IMPLIED WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE OR NON-INFRINGEMENT.

REFER TO CITY OF RIALTO

MASTER PLAN OF
DRAINAGE, AREA 3-3
AOS Boundary
Fontana Sphere of Influence
Existing Pipes (36-inch diameter and larger)
Regional Flood Control Channels
36"

REFER TO CITY OF RIALTO

MASTER PLAN OF
DRAINAGE, AREA 3-3
Legend
Critical Facility Flooding Data

City of Fontana Storm Drain Master Plan
FONT-0121
Critical Facility Flooding Data
Facility Type Facility Name Address Maximum Ponding Depth (ft) Hazmat ROBERTO M TRUCKING 15701 MANZANITA DRIVE, FONTANA, CA 92335 1.214 Hazmat ALAMEDA PAINTING CO., INC. 10207 ELM AVENUE, FONTANA, CA 92335-6322 0.822 Hazmat RUBEN BAROCIO 9982 CAROB AVE, FONTANA, CA 92335 0.611 Vulnerable Population-Adult Residential Care HERNANDEZ BOARD AND CARE 17754 E. UPLAND AVENUE, FONTANA, CA 0.55 Hazmat C & M STEEL 10312 ALMOND AVE, FONTANA, CA 92335 0.49 Vulnerable Population-Adult Residential Care PALMETTO FAMILY HOME 9169 PALMETTO AVENUE, FONTANA, CA 0.47 Vulnerable Population-Child Care FUSD/POPLAR ELEMENTARY 9937 POPLAR AVENUE, FONTANA, CA 0.465 Vulnerable Population-Child Care ALL START ACADEMY 10022 PALMETTO AVENUE, FONTANA, CA 0.463 Hazmat CIRCLE K STORE #349 7980 SIERRA ST, FONTANA, CA 92335 0.457 Hazmat MARYGOLD MWC 9725 ALDER AVE, BLOOMINGTON, CA 92316 0.441 Hazmat TRANS-WEST FORD TRUCK SALES INC 10150 CHERRY AVENUE, FONTANA, CA 92335 0.41 Hazmat ALAMEDA PAINTING CO INC 15567 VALLEY BL, FONTANA, CA 92335-6351 0.367 Hazmat JDC INDUSTRIES 15567 VALLEY BL, FONTANA, CA 92335-6351 0.367 Hazmat UTILITY TRAILER SALES CO 15567 VALLEY BLVD, FONTANA, CA 92335 0.367 Hazmat 17861 RB8 10238 CHERRY AVE, FONTANA, CA 92335 0.335 Hazmat ZIPPY LUBE-A-TRUCK #2 10238 CHERRY AVE., FONTANA, CA 92335- 0.335 Hazmat PIRATE TRUCKING RAFAEL PEREZ 17552 IRIS DR, BLOOMINGTON, CA 92316 0.333 School BIRCH CONTINUATION HIGH SCHOOL 7930 LOCUST AVENUE, FONTANA, CA 0.33 Vulnerable Population-Foster/Home Care MIA'S HOMES FOSTER FAMILY AGENCY 8285 SIERRA AVE, FONTANA, CA, 92335 0.318 Hazmat RUSH TRUCK CENTER FONTANA BODY SHOP 10122 ELM AVE, FONTANA, CA 92335 0.316 Vulnerable Population-Child Care FUSD-PORTER ELEMENTARY 8330 LOCUST AVENUE, FONTANA, CA 0.313 Hazmat UHAUL CENTER OF FONTANA 16823 FOTHILL BLVD, FONTANA, CA 92335-8400 0.31 Hazmat PACIFIC BELL 16816 ARROW BLVD, FONTANA, CA 92335 0.25 Hazmat JIFFY LUBE #12 8893 SIERRA AVE, FONTANA, CA 92335 0.245 Hazmat JIFFY LUBE #539 8893 SIERRA AVE, FONTANA, CA 92335- 0.245 Hazmat MACIAS TRUCK REPAIR 14959 VALLEY BLVD, FONTANA, CA 92335 0.239 Hazmat STEELCO INC. 17507 VALLEY BLVD., BLOOMINGTON, CA 92316 0.239 Hazmat THREE BROTHERS AUTO AND TRUCK RECYCLE 17565 VALLEY BLVD, BLOOMINGTON, CA 923161964 0.239 Railway Bridge STATE ROUTE 66 34.1067, -117.4633, FONTANA, CA 0.235 Vulnerable Population-Adult Residential Care ALEXANDER ILAGAN 9063 OLIVE ST., FONTANA, CA 0.233 Vulnerable Population-Adult Residential Care UNLICENSED 9063 OLIVE ST., FONTANA, CA 0.233 Vulnerable Population-Senior Care UNLICENSED 9063 OLIVE ST, FONTANA, CA, 92335 0.233 Hazmat EXPRESS AUTO REPAIR 8185 SIERRA AVE, FONTANA, CA 92335 0.223 Vulnerable Population-Child Care WEEKDAY NURSERY SCHOOL OF COMMUNITY CHURCH 8316 SIERRA AVENUE, FONTANA, CA 0.217 Hazmat GENERAL ENVIRONMENTAL MANAGEMENT INC 9980 CHERRY AVE, FONTANA, CA 923355219 0.217 Hazmat PRESTIGE STATIONS INC NO 0770 8898 SIERRA AVE, FONTANA, CA 92335 0.217 Hazmat FONTANA CITY YARD 17780 ARROW BLVD., FONTANA, CA 92335 0.209 Hazmat FONTANA SHERIFF SUBSTAION 17780 ARROW BLVD., FONTANA, CA 92335 0.209 Hazmat FOLLETTS CLEANERS 8676 WHEELER, FONTANA, CA 92335 0.207 Hazmat ARCO FACILITY NO 01815 10087 SIERRA AVE, FONTANA, CA 92335 0.202 Hazmat RIALTO USD AUTOSHOP 18150 FOOTHILL BLVD, FONTANA, CA 92335 0.199 Hazmat SUNRISE FORD D B A SUNRISE HYUNDAI 18150 FOOTHILL BLVD, FONTANA, CA 92335 0.199 Hazmat SIERRA ONE HOUR CLEANERS 8260 SIERRA AVE, FONTANA, CA 92335 0.197 Vulnerable Population-Senior Care MOUNTAIN VIEW RESIDENTIAL CARE 9073 OLIVE ST, FONTANA, CA, 92335 0.178 Vulnerable Population-Senior Care LA FUENTE LAVENDER 9545 TAMARIND AVE, FONTANA, CA, 92335 0.171 AOS 1 25-year
1 of 10
City of Fontana Storm Drain Master Plan
FONT-0121
Critical Facility Flooding Data
Facility Type Facility Name Address Maximum Ponding Depth (ft) AOS 1 25-year
Hazmat BIG RIG TRUCK REPAIR 14578 VALLEY BLVD, FONTANA, CA 92335 0.162 Hazmat PIPELINE TRUCKING CO 9875 ALMOND ST, FONTANA, CA 92335 0.159 Hazmat BOSCH KIA 10025 SIERRA AVE, FONTANA, CA 92335 0.146 Hazmat HARBOR FREIGHT TOOLS USA INC 8933 SIERRA AVE, FONTANA, CA 92335 0.144 Hazmat FONTANA MASONRY SUPPLY INC 17795 FOOTHILL BLVD, FONTANA, CA 92335 0.143 School Agape Christian, The 18202 FOOTHILL BLVD, FONTANA, CA 0.142 Hazmat ARTUROS TAILOR SHOP 8990 SIERRA AVE UNIT G, FONTANA, CA 92335-4769 0.139 Hazmat STEVES AUTO SALES 16874 FOOTHILL BLVD, FONTANA, CA 92335 0.132 Vulnerable Population-Child Care FUSD/PALMETTO ELEMENTARY SCHOOL 9325 PALMETTO AVENUE, FONTANA, CA 0.128 Hazmat SCHNEIDER NATIONAL 14392 VALLEY BLVD, FONTANA, CA 92335 0.121 Hazmat TIME OUT L L C D B A AM PM 11 10062 CHERRY AVE, FONTANA, CA 92335 0.116 Hazmat CIRCLE K STORE #489 14906VALLEY BLVD, FONTANA, CA 92335 0.102 Hazmat ADAMS CLEANERS & DRAPERIES 8827 SIERRA AVE, FONTANA, CA 92335 0.1 Hazmat VALLEY AUTO CENTER 15689 VALLEY BLVD, FONTANA, CA 92335 0.095 Hazmat EXECUTIVE CLEANERS 8923 SIERRA, FONTANA, CA 92335 0.093 School PALMETTO ELEMENTARY SCHOOL 9325 PALMETTO AVENUE, FONTANA, CA 0.086 Vulnerable Population-Foster/Home Care MASADA HOMES FFA 8485 TAMARIND AVE, FONTANA, CA, 92335 0.084 Vulnerable Population-Child Care ALTUS ACADEMY 205 N. MAPLE AVE., RIALTO, CA 0.079 Hazmat REPO RANCH 15836 VALLEY BLVD, FONTANA, CA 92335 0.076 Hazmat BUDGET TIRE AND AUTO REPAIR 8595 SIERRA, FONTANA, CA 92335-3839 0.073 School WORKFORCE PREP. CENTER 8442 SIERRA AVENUE, FONTANA, CA 0.069 Hazmat LUCKY GAS & FOOD 17312 FOOTHILL VLVD, FONTANA, CA 92335 0.067 Hazmat SOUTHWEST TRUCK REPAIR 14887 E VALLEY, FONTANA, CA 92335 0.065 Hazmat PEP BOYS #680 16711 VALLEY BLVD, FONTANA, CA 92335-6692 0.063 Vulnerable Population-Adult Residential Care KHEESA'S FAMILY HOME 17269 SAN BERNARDINO AVE., FONTANA, CA 0.054 Hazmat SIERRA VALERO, INC 10115 SIERRA AVE, FONTANA, CA 923356724 0.049 Hazmat TEXACO SERVICE STATION 10115 SIERRA AVE, FONTANA, CA 923356724 0.049 School Peace in the Valley Christian Academy 17487 ARROW BLVD, FONTANA, CA 0.048 School TED PORTER ELEMENTARY SCHOOL 8330 LOCUST AVENUE, FONTANA, CA 0.047 School POPLAR ELEMENTARY SCHOOL 9937 POPLAR AVENUE, FONTANA, CA 0.045 Hazmat JSS MARKET 14518 VALLEY BLVD, FONTANA, CA 92335 0.045 Hazmat ECONO LUBE N TUNE NO 79 9433 SIERRA AVE, FONTANA, CA 92335 0.043 Hazmat FONTANA CLEANERS 16960 FOOTHILL BLVD, FONTANA, CA 92335 0.043 Hazmat NICE RIVERSIDE INC 16960-C FOOTHILL BLVD, FONTANA, CA 92335 0.043 Hazmat GIBRALTAR TRANSMISSIONS 9429 SIERRA AVE, FONTANA, CA 92335 0.042 Hazmat PACIFIC BELL 17070 CERES ST, FONTANA, CA 92335-8611 0.042 School SOUTH TAMARIND ELEMENTARY SCHOOL 8561 TAMARIND AVENUE, FONTANA, CA 0.041 Hazmat RITE AID NO 5695 16910 FOOTHILL BLVD, FONTANA, CA 92335 3502 0.041 Vulnerable Population-Child Care FUSD/SOUTH TAMARIND ELEMENTARY 8561 TAMARIND AVE., FONTANA, CA 0.04 Hazmat AVILA AUTO BODY INC UNKNOWN, FONTANA, CA 92335 0.039 Hazmat WILLS TIRE AUTO CENTER 9439 SIERRA AVE, FONTANA, CA 92335 0.039 Hazmat FONTANA TRANSMISSION REPAIR 8445 JUNIPER AVE, FONTANA, CA 92335 0.036 Hazmat MAINE ENTERPRISES 14887 VALLEY BLVD, FONTANA, CA 92335 0.036 Hazmat MIDAS FONTANA 9413 SIERRA AVE, FONTANA, CA 92335 0.036 Hazmat BUTLER FLEET SERVICE 14714 VALLEY BLVD, FONTANA, CA 92335 0.034 2 of 10
City of Fontana Storm Drain Master Plan
FONT-0121
Critical Facility Flooding Data
Facility Type Facility Name Address Maximum Ponding Depth (ft) AOS 1 25-year
Hazmat CIRCLE K STORE #316 16617 MERRILL ST, FONTANA, CA 92335 0.033 Hazmat VIRGIL MOBILE REPAIR 10044 FONTANA AVENUE, FONTANA, CA 92335- 0.033 Hazmat AUTOZONE #5613 9535 SIERRA AVE, FONTANA, CA 92335-2414 0.032 Hazmat CALIFORNIA AUTOMOTIVE IND 16726 SPRING ST, FONTANA, CA 92335 0.032 Hazmat EXXON MOBIL OIL CORP 16925 FOOTHILL BLVD, FONTANA, CA 92335 0.031 Police Station SB Co. Sheriff - Fontana Station 17780 ARROW BLVD, FONTANA, CA 0.028 Hazmat CIRCLE K STORE #5802 16900 FOOTHILL BLVD, FONTANA, CA 92335 0.028 Hazmat TOSCO 30567 16900 FOOTHILL BLVD, FONTANA, CA 92335 0.028 Utility-Communication Facility TowerCo Assets LLC 9683 ALDER AVENUE, FONTANA, CA 0.027 Hazmat EXPO NUMBER 600 16721 VALLEY BLVD, FONTANA, CA 92335 0.026 Hazmat HA LO AUTOMOTIVE 9417 SIERRA AVE, FONTANA, CA 92335 0.026 Hazmat KRAGEN AUTO PARTS #1749 9800 SIERRA AVE, FONTANA, CA 92335-6719 0.02 Vulnerable Population-Adult Residential Care FIRST STEP FONTANA 8621 JUNIPER AVE. #101, FONTANA, CA 0.019 Vulnerable Population-Child Care FUSD/CYPRESS ELEMENTARY SCHOOL 9751 CYPRESS, FONTANA, CA 0.019 Hazmat DONS AUTO CENTER 16282 VALLY BLVD, FONTANA, CA 92335 0.019 Hazmat WINSTON TIRE FONTANA 9550 SIERRA AVE, FONTANA, CA 92335 0.019 School OLEANDER ELEMENTARY SCHOOL 8650 OLEANDER AVENUE, FONTANA, CA 0.018 Hazmat HOUSE OF HONDA 9530 SIERRA, FONTANA, CA 92335-2423 0.018 Hazmat KRAGEN AUTO PARTS #0341 16990 FOOTHILL BLVD, FONTANA, CA 92335- 0.018 Hazmat GEORGE'S SIERRA SHELL 9684 SIERRA AVE, FONTANA, CA 92335 0.015 Vulnerable Population-Child Care FUSD/OLEANDER ELEMENTARY 8650 OLEANDER AVENUE, FONTANA, CA 0.012 3 of 10
City of Fontana Storm Drain Master Plan
FONT-0121
Critical Facility Flooding Data
Facility Type Facility Name Address Maximum Ponding Depth (ft) Vulnerable Population-Child Care FUSD/CANYON CREST ELEMENTARY 11851 CHERRY AVENUE, FONTANA, CA 1.016 Hazmat SIERRA ALUMINUM CO 11711 PACIFIC AVENUE, FONTANA, CA 92337-6961 0.938 Hazmat SIERRA ALUMINUM FONTANA FINISHING OPERATION 11806 PACIFIC AVENUE, FONTANA, CA 92337-6962 0.938 Hazmat CLIFFSTAR CORPORATION/FONTANA 11751 PACIFIC AVE, FONTANA, CA 92337 0.93 School CANYON CREST ELEMENTARY SCHOOL 11851 CHERRY AVENUE, FONTANA, CA 0.642 Hazmat AMERICAN SECURITY PRODUCTS CO 11925 PACIFIC AVE, FONTANA, CA 92337-8205 0.574 Hazmat CURTIS 1000 10887 COMMERCE WAY STE A, FONTANA, CA 92337 0.506 School OAK PARK ELEMENTARY SCHOOL 14200 LIVE OAK AVENUE, FONTANA, CA 0.405 School CHAPARRAL ELEMENTARY SCHOOL 14000 SHADOW HILLS DRIVE, FONTANA, CA 0.391 Hazmat SOUTHERN CALIFORNIA SCREEN PRI 10680 MULBERRY AVE, FONTANA, CA 92337 0.335 Vulnerable Population-Child Care FUSD/OAK PARK 14200 LIVE OAK AVENUE, FONTANA, CA 0.292 School SOUTHRIDGE MIDDLE SCHOOL 14500 LIVE OAK AVENUE, FONTANA, CA 0.186 Vulnerable Population-Child Care FUSD-KAISER H.S. 11155 ALMOND AVENUE, FONTANA, CA 0.176 Hazmat AZTEC CONCRETE ACCESSORIES INC 10780 MULBERRY AVE, FONTANA, CA 92337 0.12 Hazmat GOLDEN W OIL CO INC 11040 CHERRY AVE, FONTANA, CA 92337-7119 0.109 Hazmat GENUINE PARTS COMPANY 11710 PACIFIC AVE, FONTANA, CA 92335 0.079 Hazmat METALCRAFT FONTANA FACILITY 10840 MULBERRY AVE, FONTANA, CA 92337 0.07 Hazmat R K M EQUIPMENT AND TRUCKING 10787 MULBERRY B, FONTANA, CA 92335 0.066 School KAISER HIGH SCHOOL 11155 ALMOND AVENUE 0.047
Hazmat SCRIPTO TOKAI CORPORATION 11591 ETIWANDA AVENUE, FONTANA, CA 92337-6927 0.046 Hazmat U S REDUCTION CO 11600 ETIWANDA AVE, FONTANA, CA 92337-6929 0.032 Hazmat RECTICEL FOAM CORP. 13215 MARLAY AVE., FONTANA, CA 92335 0.027 Hazmat THOMPSON BLDG MATERIALS 11027 CHERRY AVE, FONTANA, CA 92335 0.026 Hazmat WESTERN MANUFACTURING 11027 CHERRY AVE S E LOT, FONTANA, CA 923370917 0.026 Hazmat S & H CABINETS & MFG INC 10860 MULBERRY AVENUE, FONTANA, CA 92337-7027 0.025 Hazmat STARLITE RECLAMATION ENVIRONMENTAL SVCS 11225 MULBERRY AVE, FONTANA, CA 923370000 0.023 Hazmat TUTOR SALIBA CORP 11171 CHERRY AVE, FONTANA, CA 92337-7195 0.016 AOS 2 25-year
4 of 10
City of Fontana Storm Drain Master Plan
FONT-0121
Critical Facility Flooding Data
Facility Type Facility Name Address Maximum Ponding Depth (ft) Utility-Communication Facility SOUTHERN CALIFORNIA EDISON 4949 CITRUS AVENUE, FONTANA, CA 0.506 Vulnerable Population-Adult Residential Care UPCHURCH ARF-PINE VALLEY 5855 PINE VALLEY DR., FONTANA, CA 0.337 Vulnerable Population-Senior Care UPCHURCH ARF-PINE VALLEY 5855 PINE VALLEY DR, FONTANA, CA, 92336 0.337 Hazmat SOUTHERN CALIFORNIA GAS CO DUNCAN CANYON RD AND CITRIS AV, FONTANA, CA 92335 0.214 Vulnerable Population-Senior Care ABBY'S HOME 15554 ROCKWELL AVE, FONTANA, CA, 92336 0.208 Hazmat TARGET DISTRIBUTION CENTER T3806 3105 NORTH MANGO AVENUE, RIALTO, CA 92660 0.138 Hazmat JDK HOLDINGS INC 15218 SUMMIT AVE, FONTANA, CA 92336 0.106 Hazmat STATER BROS MARKETS #175 FALCON RIDGE 15222 SUMMIT AVE, FONTANA, CA 92336 0.046 Vulnerable Population-Senior Care BRENTWOOD ELDER CARE II 15986 Baltray Way, Fontana, CA, 92336 0.045 Hazmat CU PLUS PRODUCTS, LLC 15028 COYOTE CT, FONTANA, CA 92336 0.031 Hazmat KNOX STREET MERCURY 6133 KNOX STREET, FONTANA, CA 92336-4519 0.026 Hazmat CVS PHARMACY #8589 15286 SUMMIT AVE, FONTANA, CA 92336 0.021 Hazmat CHEVRON #211869 15160 SUMMIT AVE., FONTANA, CA 92336 0.019 Hazmat PACIFIC DIAZO PRODUCTS INC 6183 SIERRA AVENUE, UNITS 7 & 8, FONTANA, CA 92336-1201 0.017 Hazmat TARGET STORE T1958 15272 SUMMIT AVE, FONTANA, CA 92336 0.011 AOS 3 25-year
5 of 10
City of Fontana Storm Drain Master Plan
FONT-0121
Critical Facility Flooding Data
Facility Type Facility Name Address Maximum Ponding Depth (ft) Hazmat ROBERTO M TRUCKING 15701 MANZANITA DRIVE, FONTANA, CA 92335 0.788 Hazmat RUBEN BAROCIO 9982 CAROB AVE, FONTANA, CA 92335 0.759 Vulnerable Population-Adult Residential Care HERNANDEZ BOARD AND CARE 17754 E. UPLAND AVENUE, FONTANA, CA 0.629 School BIRCH CONTINUATION HIGH SCHOOL 7930 LOCUST AVENUE 0.592 Vulnerable Population-Child Care ALL START ACADEMY 10022 PALMETTO AVENUE, FONTANA, CA 0.559 Hazmat C & M STEEL 10312 ALMOND AVE, FONTANA, CA 92335 0.559 Hazmat ALAMEDA PAINTING CO., INC. 10207 ELM AVENUE, FONTANA, CA 92335-6322 0.546 Hazmat CIRCLE K STORE #349 7980 SIERRA ST, FONTANA, CA 92335 0.537 Vulnerable Population-Adult Residential Care PALMETTO FAMILY HOME 9169 PALMETTO AVENUE, FONTANA, CA 0.521 Hazmat MARYGOLD MWC 9725 ALDER AVE, BLOOMINGTON, CA 92316 0.516 Hazmat TRANS-WEST FORD TRUCK SALES INC 10150 CHERRY AVENUE, FONTANA, CA 92335 0.468 Hazmat PIRATE TRUCKING RAFAEL PEREZ 17552 IRIS DR, BLOOMINGTON, CA 92316 0.413 Hazmat ARCO FACILITY NO 01815 10087 SIERRA AVE, FONTANA, CA 92335 0.412 Hazmat 17861 RB8 10238 CHERRY AVE, FONTANA, CA 92335 0.392 Hazmat ZIPPY LUBE-A-TRUCK #2 10238 CHERRY AVE., FONTANA, CA 92335- 0.392 Vulnerable Population-Foster/Home Care MIA'S HOMES FOSTER FAMILY AGENCY 8285 SIERRA AVE, FONTANA, CA, 92335 0.37 Hazmat UHAUL CENTER OF FONTANA 16823 FOTHILL BLVD, FONTANA, CA 92335-8400 0.368 Vulnerable Population-Child Care FUSD-PORTER ELEMENTARY 8330 LOCUST AVENUE, FONTANA, CA 0.36 Railway Bridge STATE ROUTE 66 34.1067, -117.4633, FONTANA, CA 0.293 Hazmat PACIFIC BELL 16816 ARROW BLVD, FONTANA, CA 92335 0.292 Hazmat STEELCO INC. 17507 VALLEY BLVD., BLOOMINGTON, CA 92316 0.291 Hazmat THREE BROTHERS AUTO AND TRUCK RECYCLE 17565 VALLEY BLVD, BLOOMINGTON, CA 923161964 0.291 Hazmat MACIAS TRUCK REPAIR 14959 VALLEY BLVD, FONTANA, CA 92335 0.277 Vulnerable Population-Adult Residential Care ALEXANDER ILAGAN 9063 OLIVE ST., FONTANA, CA 0.276 Vulnerable Population-Adult Residential Care UNLICENSED 9063 OLIVE ST., FONTANA, CA 0.276 Vulnerable Population-Senior Care UNLICENSED 9063 OLIVE ST, FONTANA, CA, 92335 0.276 Hazmat BOSCH KIA 10025 SIERRA AVE, FONTANA, CA 92335 0.276 Hazmat RIALTO USD AUTOSHOP 18150 FOOTHILL BLVD, FONTANA, CA 92335 0.272 Hazmat SUNRISE FORD D B A SUNRISE HYUNDAI 18150 FOOTHILL BLVD, FONTANA, CA 92335 0.272 Vulnerable Population-Child Care WEEKDAY NURSERY SCHOOL OF COMMUNITY CHURCH 8316 SIERRA AVENUE, FONTANA, CA 0.262 Hazmat FONTANA CITY YARD 17780 ARROW BLVD., FONTANA, CA 92335 0.261 Hazmat FONTANA SHERIFF SUBSTAION 17780 ARROW BLVD., FONTANA, CA 92335 0.261 Hazmat JIFFY LUBE #12 8893 SIERRA AVE, FONTANA, CA 92335 0.26 Hazmat JIFFY LUBE #539 8893 SIERRA AVE, FONTANA, CA 92335- 0.26 Hazmat GENERAL ENVIRONMENTAL MANAGEMENT INC 9980 CHERRY AVE, FONTANA, CA 923355219 0.254 Hazmat EXPRESS AUTO REPAIR 8185 SIERRA AVE, FONTANA, CA 92335 0.253 Hazmat RUSH TRUCK CENTER FONTANA BODY SHOP 10122 ELM AVE, FONTANA, CA 923350000 0.241 Hazmat PRESTIGE STATIONS INC NO 0770 8898 SIERRA AVE, FONTANA, CA 92335 0.235 Hazmat BIG RIG TRUCK REPAIR 14578 VALLEY BLVD, FONTANA, CA 92335 0.231 Hazmat SIERRA ONE HOUR CLEANERS 8260 SIERRA AVE, FONTANA, CA 92335 0.231 Vulnerable Population-Senior Care MOUNTAIN VIEW RESIDENTIAL CARE 9073 OLIVE ST, FONTANA, CA, 92335 0.221 Hazmat FOLLETTS CLEANERS 8676 WHEELER, FONTANA, CA 92335 0.217 School Agape Christian, The 18202 FOOTHILL BLVD, FONTANA, CA 0.199 Vulnerable Population-Senior Care LA FUENTE LAVENDER 9545 TAMARIND AVE, FONTANA, CA, 92335 0.195 Hazmat FONTANA MASONRY SUPPLY INC 17795 FOOTHILL BLVD, FONTANA, CA 92335 0.191 AOS 1 100-year
6 of 10
City of Fontana Storm Drain Master Plan
FONT-0121
Critical Facility Flooding Data
Facility Type Facility Name Address Maximum Ponding Depth (ft) AOS 1 100-year
Hazmat PIPELINE TRUCKING CO 9875 ALMOND ST, FONTANA, CA 92335 0.179 Hazmat ARTUROS TAILOR SHOP 8990 SIERRA AVE UNIT G, FONTANA, CA 92335-4769 0.165 Hazmat STEVES AUTO SALES 16874 FOOTHILL BLVD, FONTANA, CA 92335 0.165 Hazmat HARBOR FREIGHT TOOLS USA INC 8933 SIERRA AVE, FONTANA, CA 92335 0.161 Vulnerable Population-Child Care FUSD/POPLAR ELEMENTARY 9937 POPLAR AVENUE, FONTANA, CA 0.16 Hazmat SCHNEIDER NATIONAL 14392 VALLEY BLVD, FONTANA, CA 92335 0.153 Hazmat TIME OUT L L C D B A AM PM 11 10062 CHERRY AVE, FONTANA, CA 92335 0.142 Vulnerable Population-Child Care FUSD/PALMETTO ELEMENTARY SCHOOL 9325 PALMETTO AVENUE, FONTANA, CA 0.139 Hazmat CIRCLE K STORE #489 14906VALLEY BLVD, FONTANA, CA 92335 0.13 Hazmat SIERRA VALERO, INC 10115 SIERRA AVE, FONTANA, CA 923356724 0.128 Hazmat TEXACO SERVICE STATION 10115 SIERRA AVE, FONTANA, CA 923356724 0.128 Hazmat MOUNTAIN VIEW TIRE/GOODYEAR 14373 BASELINE ROAD, FONTANA, CA 92336- 0.116 Hazmat ADAMS CLEANERS & DRAPERIES 8827 SIERRA AVE, FONTANA, CA 92335 0.111 Hazmat LUCKY GAS & FOOD 17312 FOOTHILL VLVD, FONTANA, CA 92335 0.11 Hazmat KAISER FOUNDATION HOSPITALS/ 9961 SIERRA AVENUE, FONTANA, CA 92335-6720 0.108 Hazmat KAISER PERMANENTE 9961 SIERRA AVE, FONTANA, CA 92335 0.108 Hazmat ALAMEDA PAINTING CO INC 15567 VALLEY BL, FONTANA, CA 92335-6351 0.107 Hazmat EXECUTIVE CLEANERS 8923 SIERRA, FONTANA, CA 92335 0.107 Hazmat JDC INDUSTRIES 15567 VALLEY BL, FONTANA, CA 92335-6351 0.107 Hazmat UTILITY TRAILER SALES CO 15567 VALLEY BLVD, FONTANA, CA 92335 0.107 Vulnerable Population-Child Care ALTUS ACADEMY 205 N. MAPLE AVE., RIALTO, CA 0.099 Hazmat AUTOZONE #2891 14343 BASELINE AVE, FONTANA, CA 92336- 0.099 Vulnerable Population-Foster/Home Care MASADA HOMES FFA 8485 TAMARIND AVE, FONTANA, CA, 92335 0.098 School PALMETTO ELEMENTARY SCHOOL 9325 PALMETTO AVENUE, FONTANA, CA 0.096 Hazmat BUDGET TIRE AND AUTO REPAIR 8595 SIERRA, FONTANA, CA 92335-3839 0.09 Hazmat PACIFIC BELL 17070 CERES ST, FONTANA, CA 92335-8611 0.087 School WORKFORCE PREP. CENTER 8442 SIERRA AVENUE, FONTANA, CA 0.083 Hazmat SOUTHWEST TRUCK REPAIR 14887 E VALLEY, FONTANA, CA 92335 0.077 Hazmat PEP BOYS #680 16711 VALLEY BLVD, FONTANA, CA 92335-6692 0.076 School Peace in the Valley Christian Academy 17487 ARROW BLVD, FONTANA, CA 0.066 Hazmat VIRGIL MOBILE REPAIR 10044 FONTANA AVENUE, FONTANA, CA 92335- 0.064 School TED PORTER ELEMENTARY SCHOOL 8330 LOCUST AVENUE, FONTANA, CA 0.061 School SOUTH TAMARIND ELEMENTARY SCHOOL 8561 TAMARIND AVENUE, FONTANA, CA 0.059 Hazmat CHEVRON STATION NO 209515 14526 BASELINE RD, FONTANA, CA 92336-1645 0.058 Hazmat FONTANA CLEANERS 16960 FOOTHILL BLVD, FONTANA, CA 92335 0.057 Hazmat NICE RIVERSIDE INC 16960-C FOOTHILL BLVD, FONTANA, CA 92335 0.057 Hazmat RITE AID NO 5695 16910 FOOTHILL BLVD, FONTANA, CA 92335 3502 0.056 Hazmat CIRCLE K STORE #316 16617 MERRILL ST, FONTANA, CA 92335 0.054 Hazmat ECONO LUBE N TUNE NO 79 9433 SIERRA AVE, FONTANA, CA 92335 0.054 Hazmat JSS MARKET 14518 VALLEY BLVD, FONTANA, CA 92335 0.054 Hazmat BUTLER FLEET SERVICE 14714 VALLEY BLVD, FONTANA, CA 92335 0.053 Hazmat AVILA AUTO BODY INC UNKNOWN, FONTANA, CA 92335 0.052 Hazmat GIBRALTAR TRANSMISSIONS 9429 SIERRA AVE, FONTANA, CA 92335 0.052 Vulnerable Population-Child Care FUSD/SOUTH TAMARIND ELEMENTARY 8561 TAMARIND AVE., FONTANA, CA 0.051 Hazmat MORGAN CORP 9993 ALMOND AVE, FONTANA, CA 92335 0.051 7 of 10
City of Fontana Storm Drain Master Plan
FONT-0121
Critical Facility Flooding Data
Facility Type Facility Name Address Maximum Ponding Depth (ft) AOS 1 100-year
Hazmat WILLS TIRE AUTO CENTER 9439 SIERRA AVE, FONTANA, CA 92335 0.048 Hazmat MAINE ENTERPRISES 14887 VALLEY BLVD, FONTANA, CA 92335 0.047 Hazmat EXXON MOBIL OIL CORP 16925 FOOTHILL BLVD, FONTANA, CA 92335 0.045 Hazmat FONTANA TRANSMISSION REPAIR 8445 JUNIPER AVE, FONTANA, CA 92335 0.045 Hazmat MIDAS FONTANA 9413 SIERRA AVE, FONTANA, CA 92335 0.045 Hazmat AUTOZONE #5613 9535 SIERRA AVE, FONTANA, CA 92335-2414 0.044 Police Station SB Co. Sheriff - Fontana Station 17780 ARROW BLVD, FONTANA, CA 0.043 Vulnerable Population-Adult Residential Care SEVILLE CARE CENTER 16186 SEVILLE AVE, FONTANA, CA 0.043 Hazmat CALIFORNIA AUTOMOTIVE IND 16726 SPRING ST, FONTANA, CA 92335 0.042 Hazmat CIRCLE K STORE #5802 16900 FOOTHILL BLVD, FONTANA, CA 92335 0.042 Hazmat TOSCO 30567 16900 FOOTHILL BLVD, FONTANA, CA 92335 0.042 Utility-Communication Facility TowerCo Assets LLC 9683 ALDER AVENUE, FONTANA, CA 0.042 Hazmat KRAGEN AUTO PARTS #1749 9800 SIERRA AVE, FONTANA, CA 92335-6719 0.038 Hazmat EXPO NUMBER 600 16721 VALLEY BLVD, FONTANA, CA 92335 0.035 Hazmat HA LO AUTOMOTIVE 9417 SIERRA AVE, FONTANA, CA 92335 0.033 Hazmat WINSTON TIRE FONTANA 9550 SIERRA AVE, FONTANA, CA 92335 0.031 School OLEANDER ELEMENTARY SCHOOL 8650 OLEANDER AVENUE, FONTANA, CA 0.026 Hazmat KRAGEN AUTO PARTS #0341 16990 FOOTHILL BLVD, FONTANA, CA 92335 0.026 Vulnerable Population-Child Care FUSD/CYPRESS ELEMENTARY SCHOOL 9751 CYPRESS, FONTANA, CA 0.025 Vulnerable Population-Adult Residential Care FIRST STEP FONTANA 8621 JUNIPER AVE. #101, FONTANA, CA 0.024 Hazmat HOUSE OF HONDA 9530 SIERRA, FONTANA, CA 92335-2423 0.024 Hazmat ARCO FACILITY NO 09693 16090 FOOTHILL BLVD, FONTANA, CA 92335 0.023 Hazmat DONS AUTO CENTER 16282 VALLY BLVD, FONTANA, CA 92335 0.023 Hazmat GEORGE'S SIERRA SHELL 9684 SIERRA AVE, FONTANA, CA 92335 0.022 Vulnerable Population-Adult Residential Care KHEESA'S FAMILY HOME 17269 SAN BERNARDINO AVE., FONTANA, CA 0.021 Vulnerable Population-Child Care FUSD/OLEANDER ELEMENTARY 8650 OLEANDER AVENUE, FONTANA, CA 0.017 Hazmat FONTANA CITY OF 16489 ORANGE WAY, FONTANA, CA 92335 0.017 Hazmat MOUNTAINEER CD - CITY OF FONTANA 16489 ORANGE WAY, FONTANA - CA 92335 0.017 Hazmat ROCK HONDA 9612 SIERRA AVE, FONTANA, CA 92335 0.016 EOC City of FONTANA EOC (in PD) 17005 UPLAND AVE, FONTANA, CA 0.015 Police Station Fontana Police Department (& EOC) 17005 UPLAND AVE, FONTANA, CA 0.015 Hazmat REPO RANCH 15836 VALLEY BLVD, FONTANA, CA 92335 0.013 Hazmat CVS PHARMACY NO 9619 9840 SIERRA AVE, FONTANA, CA 92335 0.012 Hazmat INTERSTATE EXPRESS INC 10010 BEECH AVENUE, FONTANA, CA 92335 0.012 Hazmat J AND F TRUCKING 15055 VALLEY BLVD, FONTANA, CA 923355000 0.012 Hazmat GASCO SERVICE STATION #595 16081 VALLEY BLVD, FONTANA, CA 92335 0.011 8 of 10
City of Fontana Storm Drain Master Plan
FONT-0121
Critical Facility Flooding Data
Facility Type Facility Name Address Maximum Ponding Depth (ft) School OAK PARK ELEMENTARY SCHOOL 14200 LIVE OAK AVENUE 1.606 Vulnerable Population-Child Care FUSD/OAK PARK 14200 LIVE OAK AVENUE, FONTANA, CA 1.234 Vulnerable Population-Child Care FUSD/CANYON CREST ELEMENTARY 11851 CHERRY AVENUE, FONTANA, CA 1.22 Hazmat SIERRA ALUMINUM CO 11711 PACIFIC AVENUE, FONTANA, CA 92337-6961 1.172 Hazmat SIERRA ALUMINUM FONTANA FINISHING OPERATION 11806 PACIFIC AVENUE, FONTANA, CA 92337-6962 1.172 Hazmat CLIFFSTAR CORPORATION/FONTANA 11751 PACIFIC AVE, FONTANA, CA 92337 1.14 School CANYON CREST ELEMENTARY SCHOOL 11851 CHERRY AVENUE 0.771 Hazmat CURTIS 1000 10887 COMMERCE WAY STE A, FONTANA, CA 92337 0.728 Hazmat AMERICAN SECURITY PRODUCTS CO 11925 PACIFIC AVE, FONTANA, CA 92337-8205 0.72 School CHAPARRAL ELEMENTARY SCHOOL 14000 SHADOW HILLS DRIVE 0.545 School SOUTHRIDGE MIDDLE SCHOOL 14500 LIVE OAK AVENUE 0.472 Vulnerable Population-Child Care FUSD-KAISER H.S. 11155 ALMOND AVENUE, FONTANA, CA 0.338 Hazmat CEMEX FONTANA PLANT 13220 SANTA ANA AVE, FONTANA, CA 92337 0.337 Hazmat SUPERIOR TRAILER WORK 13700 SLOVER AVE, FONTANA, CA 92335 0.245 Hazmat STARLITE RECLAMATION ENVIRONMENTAL SVCS 11225 MULBERRY AVE, FONTANA, CA 923370000 0.2 Hazmat GOLDEN W OIL CO INC 11040 CHERRY AVE, FONTANA, CA 92337-7119 0.182 Hazmat DURAN TRUCKING 11236 CITRUS AVE, FONTANA, CA 92337 0.179 Hazmat ZEPEDA BROTHERS 11236 CITRUS AVE, FONTANA, CA 92337 0.179 Hazmat AZTEC CONCRETE ACCESSORIES INC 10780 MULBERRY AVE, FONTANA, CA 92337 0.17 Hazmat PACIFIC CORRUGATED PIPE CO 13680 SLOVER AVENUE, FONTANA, CA 92335 0.168 Hazmat CLARK PACIFIC 13592 SLOVER AV, FONTANA, CA 92337-6978 0.165 Hazmat SCRIPTO TOKAI CORPORATION 11591 ETIWANDA AVENUE, FONTANA, CA 92337-6927 0.155 Hazmat METALCRAFT FONTANA FACILITY 10840 MULBERRY AVE, FONTANA, CA 92337 0.143 Hazmat U S REDUCTION CO 11600 ETIWANDA AVE, FONTANA, CA 92337-6929 0.126 Hazmat R K M EQUIPMENT AND TRUCKING 10787 MULBERRY B, FONTANA, CA 92335 0.122 Hazmat CAT CONTRACTING INC 10911 JASMINE ST, FONTANA, CA 92337 0.114 Hazmat RECTICEL FOAM CORP. 13215 MARLAY AVE., FONTANA, CA 92335 0.108 Hazmat GENUINE PARTS COMPANY 11710 PACIFIC AVE, FONTANA, CA 92335 0.105 School KAISER HIGH SCHOOL 11155 ALMOND AVENUE 0.104
Hazmat SOUTHERN CALIFORNIA SCREEN PRI 10680 MULBERRY AVE, FONTANA, CA 92337 0.097 Hazmat S & H CABINETS & MFG INC 10860 MULBERRY AVENUE, FONTANA, CA 92337-7027 0.078 Hazmat THOMPSON BLDG MATERIALS 11027 CHERRY AVE, FONTANA, CA 92335 0.075 Hazmat WESTERN MANUFACTURING 11027 CHERRY AVE S E LOT, FONTANA, CA 923370917 0.075 Hazmat FORCE OFFSHORE LLC 13052 DAHLIA ST, FONTANA, CA 92337 0.072 Hazmat BRAGG CRANE SVC 13188 DAHLIA ST, FONTANA, CA 92335 0.069 Hazmat FEDEX FREIGHT WEST INC 11153 MULBERRY, FONTANA, CA 92337-7030 0.04 Hazmat TUTOR SALIBA CORP 11171 CHERRY AVE, FONTANA, CA 92337-7195 0.035 Hazmat 30 MINUTE PHOTO SOUTHRIDGE PLAZA 11623 CHERRY AVE, FONTANA, CA 92337 0.028 Hazmat C L PHARRIS SAND & GRAVEL INC SUNWEST MATERIALS, FONTANA, CA 92337 0.023 Hazmat MCBEE FLEET SERVICE 11081 REDWOOD AVE, FONTANA, CA 92335 0.023 Hazmat RUAN LEASING COMPANY 13803 SANTA ANA AVENUE, FONTANA, CA 92337-7033 0.019 Hazmat NORCO RANCH INC 15750 JURUPA AVE, FONTANA, CA 92337 0.015 Hazmat DELTAMERCANTILE GROUP INC 10580 MULBERRY AVE, FONTANA, CA 92337 0.013 AOS 2 100-year
9 of 10
City of Fontana Storm Drain Master Plan
FONT-0121
Critical Facility Flooding Data
Facility Type Facility Name Address Maximum Ponding Depth (ft) Utility-Communication Facility SOUTHERN CALIFORNIA EDISON 4949 Citrus Avenue, FONTANA, CA 0.593 Vulnerable Population-Adult Residential Care UPCHURCH ARF-PINE VALLEY 5855 PINE VALLEY DR., FONTANA, CA 0.454 Vulnerable Population-Senior Care UPCHURCH ARF-PINE VALLEY 5855 Pine Valley Dr, Fontana, CA, 92336 0.454 Vulnerable Population-Senior Care ABBY'S HOME 15554 Rockwell Ave, Fontana, CA, 92336 0.342 Hazmat SOUTHERN CALIFORNIA GAS CO DUNCAN CANYON RD AND CITRIS AV, FONTANA, CA 92335 0.244 Hazmat JDK HOLDINGS INC 15218 SUMMIT AVE, FONTANA, CA 92336 0.22 Hazmat TARGET DISTRIBUTION CENTER T3806 3105 NORTH MANGO AVENUE, RIALTO, CA 92660 0.18 Hazmat STATER BROS MARKETS #175 FALCON RIDGE 15222 SUMMIT AVE, FONTANA, CA 92336 0.142 Hazmat PACIFIC DIAZO PRODUCTS INC 6183 SIERRA AVENUE, UNITS 7 & 8, FONTANA, CA 92336-1201 0.113 Hazmat CVS PHARMACY #8589 15286 SUMMIT AVE, FONTANA, CA 92336 0.082 Hazmat CU PLUS PRODUCTS, LLC 15028 COYOTE CT, FONTANA, CA 92336 0.08 Vulnerable Population-Senior Care BRENTWOOD ELDER CARE II 15986 Baltray Way, Fontana, CA, 92336 0.06 Hazmat CHEVRON #211869 15160 SUMMIT AVE., FONTANA, CA 92336 0.054 Hazmat KNOX STREET MERCURY 6133 KNOX STREET, FONTANA, CA 92336-4519 0.05 Hazmat TARGET STORE T1958 15272 SUMMIT AVE, FONTANA, CA 92336 0.046 Hazmat HOME DEPOT NO HD 6960 16005 SIERRA LAKES PKWY, FONTANA, CA 92336 0.039 Utility-Communication Facility Horizon Tower, LLC 6428 Catawba Avenue, Fontana, CA 0.016 AOS 3 100-year
10 of 10
Existing Conditions Flooding Depths, 25-Year Event

Existing Conditions Time to Inundation, 25-Year Event

Existing Conditions Flooding Depths, 100-Year Event

Existing Conditions Time to Inundation, 100-Year Event

Proposed Conditions Flooding Depths, 25-Year Event

NO FLOODING FOR 25-YEAR STORM

EVENT IN FULL STORM DRAIN

BUILDOUT
NO FLOODING FOR 25-YEAR STORM

EVENT IN FULL STORM DRAIN

BUILDOUT
AOS 2 25-year Flooding Depth (ft)
NO FLOODING FOR 25-YEAR STORM

EVENT IN FULL STORM DRAIN

BUILDOUT
Proposed Conditions Time to Inundation, 25-Year Event

NO FLOODING FOR 25-YEAR STORM

EVENT IN FULL STORM DRAIN

BUILDOUT
AOS 2 25-year Time to Inundation
(hours)
NO FLOODING FOR 25-YEAR STORM

EVENT IN FULL STORM DRAIN

BUILDOUT
NO FLOODING FOR 25-YEAR STORM

EVENT IN FULL STORM DRAIN

BUILDOUT
Proposed Conditions Flooding Depths, 100-Year Event

Proposed Conditions Time to Inundation, 100-Year Event

Proposed Pipe Design Flows

City of Fontana Master Plan
FONT-0121
Proposed Pipe Design Flows
AOS Project Name Pipe Size (in.
or ft)
Design Flow
(cfs)
Design Event
(years)
Design Flow
Method
Length
(ft)
Project Prioritization
Score Drainage Area (ac)
1 D-1A 42" 70 25 Rational 538 1 82
1 D-6 10' x 8' 1270 100 ICM 1986 1 2322
1 D-6A 36" 41 25 Rational 1314 1.4 35
1 D-6A 42" 41 25 Rational 1691 1.4 35
1 D-6A 54" 151 25 Rational 678 1.4 177
1 D-6B 36" 58 25 Rational 372 1.4 58
1 D-6B 42" 58 25 Rational 613 1.4 58
1 D-6B 48" 93 25 Rational 1296 1.4 113
1 D-6C 36" 43 25 Rational 1284 1 42
1 D-7 48" 127 100 Pro Development 444 1 92
1 D-7 54" 127 100 Pro Development 668 1 110
1 D-7 60" 211 100 Pro Development 947 1 136
1 E-0 102" 1408 100 ICM 7913 1 875
1 E-1 36" 59 25 Rational 783 1 42
1 E-1 42" 97 25 Rational 1169 1 82
1 E-1 48" 97 25 Rational 2643 1 82
1 E-1 54" 165 25 Rational 2643 1 162
1 E-2 66" 434 100 ICM 795 1.4 229
1 E-2 36" 62 25 Rational 687 1.4 47
1 E-2 42" 91 25 Rational 1149 1.4 83
1 E-2 48" 91 25 Rational 511 1.4 83
1 E-2 54" 134 25 Rational 1339 1.4 138
1 E-3 36" 61 25 Rational 881 1 47
1 E-3 42" 90 25 Rational 1141 1 81
1 E-3 48" 90 25 Rational 999 1 81
1 E-3 54" 130 25 Rational 1644 1 136
1 E-4 72" 602 100 ICM 952 2.2 324
1 E-4 36" 61 25 Rational 648 2.2 47
1 E-4 42" 91 25 Rational 1133 2.2 82
1 E-4 54" 149 25 Rational 1689 2.2 162
1 E-5 66" 147 100 Rational 1000 1.8 162
1 E-5 36" 61 25 Rational 471 1.8 47
1 E-5 42" 90 25 Rational 1137 1.8 81
1 E-5 54" 130 25 Rational 1647 1.8 136
1 E-6 72" 570 100 ICM 675 2.2 322
1 E-6 36" 61 25 Rational 320 2.2 46
1 E-6 42" 89 25 Rational 1179 2.2 80
1 E-6 54" 129 25 Rational 1969 2.2 135
1 E-7 36" 62 25 Rational 554 1 48
1 E-7 42" 90 25 Rational 1070 1 81
1 E-7 54" 134 25 Rational 1987 1 141
1 E-7 66" 134 25 Rational 668 1 141
1 F-1 72" 402 100 ICM 1333 3.2 205
1 F-1A 36" 47 25 Rational 721 2 41
1 F-1A 42" 76 25 Rational 681 2 60
1 F-1A 48" 101 25 Rational 650 2 80
1 F-1A 54" 125 25 Rational 996 2 99
1 F-1B 36" 41 25 Rational 709 1 35
1 F-1B 42" 60 25 Rational 686 1 62
1 F-1B 48" 72 25 Rational 963 1 81
1 F-2 36" 39 25 Rational 812 1 35
1 F-2 42" 58 25 Rational 641 1 62
1 F-2 48" 71 25 Rational 661 1 80
1 F-2 54" 120 100 Rational 1107 1 114
1 F-2 60" 127 100 Rational 274 1 124
1 F-3 36" 40 25 Rational 845 2.4 35
1 F-3 42" 58 25 Rational 631 2.4 61
1 F-3 48" 72 25 Rational 663 2.4 80
1 F-3 54" 348 100 ICM 528 2.4 193
1 F-3 66" 446 100 ICM 833 2.4 247
1 F-4 36" 27 25 Rational 477 4.4 45
1 F-4 42" 59 25 Rational 1311 4.4 87
1 F-5 36" 40 25 Rational 884 2.4 35
1 F-5 42" 58 25 Rational 703 2.4 59
1 F-5 72" 497 100 ICM 1969 2.4 242
1 F-5A 36" 40 25 Rational 830 3 35
1 F-5A 42" 58 25 Rational 602 3 58
1 F-6 36" 48 25 Rational 628 2 30
1 F-6 42" 96 25 Rational 1644 2 80
1 F-6 54" 126 25 Rational 1244 2 120
1 G-0 120" 1269 100 ICM 6602 1.6 700
1 of 8
City of Fontana Master Plan
FONT-0121
Proposed Pipe Design Flows
AOS Project Name Pipe Size (in.
or ft)
Design Flow
(cfs)
Design Event
(years)
Design Flow
Method
Length
(ft)
Project Prioritization
Score Drainage Area (ac)
1 G-0 54" 110 100 Rational 1319 1.6 153
1 G-1 36" 36 25 Rational 642 1.6 34
1 G-1 42" 66 25 Rational 1495 1.6 79
1 G-2 66" 420 100 ICM 1491 3.6 228
1 G-2 36" 51 25 Rational 541 3.6 36
1 G-2 54" 110 25 Rational 1162 3.6 107
1 G-2A 36" 37 25 Rational 521 3.6 34
1 G-2A 42" 63 25 Rational 1317 3.6 71
1 G-3 36" 38 25 Rational 665 1.6 35
1 G-3 42" 69 25 Rational 1481 1.6 80
1 G-4 66" 412 100 ICM 1441 3 235
1 G-4 36" 52 25 Rational 682 3 38
1 G-4 54" 112 25 Rational 1208 3 110
1 G-4A 36" 40 25 Rational 658 1.6 37
1 G-4A 42" 66 25 Rational 1320 1.6 75
1 G-5 36" 39 25 Rational 704 2.4 36
1 G-5 42" 69 25 Rational 1448 2.4 80
1 G-6 66" 446 100 ICM 1436 2.8 237
1 G-6 36" 56 25 Rational 808 2.8 42
1 G-6 54" 117 25 Rational 1218 2.8 117
1 G-6A 36" 41 25 Rational 674 2.4 39
1 G-6A 42" 69 25 Rational 1317 2.4 81
1 G-7 36" 43 25 Rational 775 1.6 42
1 G-7 54" 90 25 Rational 1194 1.6 117
1 G-7 60" 113 25 Rational 1458 1.6 161
1 H-0 72" 322 100 ICM 1325 1.6 240
1 H-0 78" 331 100 ICM 1325 1.6 372
1 H-0 84" 426 100 ICM 3894 1.6 481
1 H-0A 66" 240 100 Rational 681 1 303
1 J-1 78" 478 100 ICM 2512 2.2 274
1 J-1A 36" 52 25 Rational 661 3.6 49
1 J-1A 42" 74 25 Rational 1317 3.6 79
1 J-1A 42" 74 25 Rational 1013 3.6 79
1 J-1B 36" 49 25 Rational 796 1.6 50
1 J-1B 42" 69 25 Rational 1018 1.6 80
1 J-1B 54" 118 25 Rational 1323 1.6 160
1 J-1C 36" 46 25 Rational 658 2 46
1 J-1C 42" 69 25 Rational 1156 2 81
1 J-2 66" 328 100 ICM 3565 2.2 158
1 J-2 72" 319 100 ICM 556 2.2 191
1 J-2A 36" 46 25 Rational 649 1.8 46
1 J-2A 42" 69 25 Rational 1146 1.8 81
1 J-2A 60" 69 25 Rational 197 1.8 81
1 J-3 54" 382 100 ICM 1311 3 122
1 J-3 66" 380 100 ICM 1303 3 162
1 J-3 72" 379 100 ICM 926 3 195
1 J-3A 36" 41 25 Rational 485 2.4 39
1 J-3A 42" 69 25 Rational 1350 2.4 80
1 J-4 48" 112 25 Rational 1133 2.4 158
1 J-4A 36" 46 25 Rational 578 2.4 46
1 J-4A 42" 74 25 Rational 1326 2.4 88
1 J-4B 36" 38 25 Rational 592 3 35
1 J-4B 42" 62 25 Rational 1317 3 70
1 M-0 60" 232 100 ICM 1699 2.6 112
1 M-1 6' x 4' 271 100 ICM 250 2.6 115
1 M-1 60" 271 100 ICM 869 2.6 110
1 M-1A 36" 48 25 Rational 660 2.2 40
1 M-1A 42" 80 25 Rational 1231 2.2 80
1 M-2 48" 98 25 Rational 1083 3 115
1 M-2A 36" 41 25 Rational 544 2.2 38
1 M-2A 42" 72 25 Rational 1150 2.2 80
1 M-3 48" 95 25 Rational 1145 2.2 117
1 M-3A 36" 39 25 Rational 572 3.4 36
1 M-3A 42" 72 25 Rational 1459 3.4 81
1 M-4 36" 42 25 Rational 698 2.2 41
1 M-5A 36" 40 25 Rational 458 2.4 34
1 M-5A 42" 59 25 Rational 1393 2.4 57
1 M-5-A 2, 14' x 6' 3135 100 ICM 1281 3 1986
1 M-5B 60" 199 100 Rational 1329 3.8 194
1 M-5B 66" 254 100 Rational 1322 3.8 274
1 M-5B 72" 321 100 Rational 1322 3.8 400
2 of 8
City of Fontana Master Plan
FONT-0121
Proposed Pipe Design Flows
AOS Project Name Pipe Size (in.
or ft)
Design Flow
(cfs)
Design Event
(years)
Design Flow
Method
Length
(ft)
Project Prioritization
Score Drainage Area (ac)
1 M-5B 72" 332 100 Rational 2801 3.8 419
1 M-5-B 14' x 8' 2136 100 ICM 1877 2.4 1565
1 M-5-B 2, 14' x 6' 2501 100 ICM 1865 2.4 1946
1 M-5B-A 36" 46 25 Rational 335 2.4 45
1 M-5B-B 36" 44 25 Rational 690 2.4 40
1 M-5B-B 42" 73 25 Rational 1342 2.4 81
1 M-5B-C 36" 44 25 Rational 662 1.6 40
1 M-5B-C 42" 77 25 Rational 1348 1.6 80
1 M-5B-D 36" 48 25 Rational 728 1.6 40
1 M-5B-D 42" 80 25 Rational 1323 1.6 79
1 M-5B-E 36" 39 25 Rational 784 3.6 34
1 M-5B-E 42" 69 25 Rational 1313 3.6 69
1 M-5B-E 48" 102 25 Rational 1329 3.6 114
1 M-5C 36" 36 25 Rational 350 1.6 29
1 M-5C 42" 68 25 Rational 1319 1.6 69
1 M-5C 48" 81 25 Rational 1332 1.6 91
1 M-5-C 96" 1060 100 ICM 1869 2.4 697
1 M-5-C 96" 1366 100 ICM 1891 2.4 1326
1 M-5D 36" 25 25 Rational 801 1.8 20
1 M-5-D 36" 39 100 Rational 667 2.8 33
1 M-5-D 42" 63 100 Rational 1308 2.8 65
1 M-5-D 54" 86 100 Rational 3179 2.8 96
1 M-5-D 60" 145 100 Rational 2004 2.8 143
1 M-5E 60" 159 100 Rational 1312 4.2 159
1 M-5E 66" 207 100 Rational 1326 4.2 240
1 M-5E 72" 293 100 Rational 5471 4.2 410
1 M-5E 78" 328 100 Rational 5471 4.2 490
1 M-5-E 36" 34 25 Rational 692 2.4 21
1 M-5E-A 36" 38 25 Rational 511 2.2 36
1 M-5E-A 42" 56 25 Rational 812 2.2 60
1 M-5E-B 36" 49 25 Rational 493 2.2 49
1 M-5E-B 42" 69 25 Rational 1191 2.2 80
1 M-5E-C 36" 53 25 Rational 488 3 56
1 M-5E-C 42" 75 25 Rational 1175 3 90
1 M-5E-D 36" 49 25 Rational 589 2.8 50
1 M-5E-D 42" 69 25 Rational 1065 2.8 81
1 M-5E-E 36" 49 25 Rational 631 2.4 50
1 M-5E-E 42" 68 25 Rational 1030 2.4 80
1 M-5E-F 36" 56 25 Rational 650 2.4 50
1 M-5E-F 42" 80 25 Rational 1000 2.4 80
1 M-5F 36" 45 100 Rational 342 3 27
1 M-5F 42" 83 100 Rational 1312 3 67
1 M-5F 48" 114 100 Rational 1345 3 107
1 M-5F 60" 207 100 Rational 1135 3 249
1 M-5F 66" 222 100 Rational 1517 3 267
1 M-5F-A 36" 35 25 Rational 354 1.6 28
1 M-5F-A 42" 65 25 Rational 1328 1.6 68
1 M-5F-A 48" 89 25 Rational 1316 1.6 108
1 M-5F-A 54" 177 25 Rational 1328 1.6 143
1 M-5G 54" 155 100 Rational 1335 2.2 160
1 M-5G 66" 211 100 Rational 2646 2.2 240
1 M-5G-A 42" 60 25 Rational 1145 2.6 61
1 M-5G-B 36" 43 25 Rational 748 2.6 41
1 M-5G-B 42" 73 25 Rational 1309 2.6 80
1 M-5G-C 36" 42 25 Rational 727 2.2 40
1 M-5G-C 42" 72 25 Rational 1307 2.2 79
1 M-5H 72" 439 100 ICM 2829 3.2 239
1 M-5H 36" 46 25 Rational 347 3.2 28
1 M-5H 42" 84 25 Rational 1314 3.2 69
1 M-5H 48" 116 25 Rational 1335 3.2 111
1 M-5H 54" 141 25 Rational 1141 3.2 146
1 M-6A 72" 413 100 ICM 2630 2.2 450
1 M-6A 78" 408 100 ICM 1378 2.2 490
1 M-6B 66" 420 100 ICM 2646 2.2 210
1 M-6B 36" 41 100 Rational 334 2.2 24
1 M-6B 42" 81 100 Rational 1361 2.2 66
1 M-6B 48" 112 100 Rational 1289 2.2 105
1 M-6C 36" 38 25 Rational 320 3 35
1 M-6C 42" 69 25 Rational 1646 3 80
1 M-6C 48" 112 25 Rational 1309 3 160
1 M-6D 36" 32 25 Rational 340 2.6 25
3 of 8
City of Fontana Master Plan
FONT-0121
Proposed Pipe Design Flows
AOS Project Name Pipe Size (in.
or ft)
Design Flow
(cfs)
Design Event
(years)
Design Flow
Method
Length
(ft)
Project Prioritization
Score Drainage Area (ac)
1 M-6D 42" 62 25 Rational 1381 2.6 65
1 M-6D 48" 86 25 Rational 1273 2.6 105
1 M-6D 54" 86 25 Rational 1315 2.6 105
1 M-7A 84" 699 100 ICM 2678 2.6 540
1 M-7A 96" 698 100 ICM 1245 2.6 580
1 M-7B 72" 425 100 ICM 2661 2.8 377
1 M-7B 36" 42 100 Rational 396 2.8 23
1 M-7B 42" 93 100 Rational 1319 2.8 66
1 M-7B 48" 136 100 Rational 1338 2.8 108
1 M-7C 36" 41 25 Rational 632 2.6 39
1 M-7C 42" 73 25 Rational 1379 2.6 80
1 M-7C 54" 132 25 Rational 1370 2.6 163
1 M-7D 36" 42 25 Rational 652 2.2 40
1 M-7D 42" 69 25 Rational 1447 2.2 80
1 M-7D 54" 130 25 Rational 1393 2.2 165
1 M-7E 36" 30 25 Rational 335 2.6 23
1 M-7E 42" 61 25 Rational 1321 2.6 64
1 M-7E 48" 85 25 Rational 1350 2.6 103
1 M-7E 54" 85 25 Rational 1393 2.6 103
1 SS-0 54" 118 25 Rational 1087 3 131
1 SS-0 60" 222 25 Rational 197 3 208
1 SS-0A 36" 32 25 Rational 481 2.2 24
1 SS-0A 42" 65 25 Rational 1179 2.2 60
1 SS-0A 48" 104 25 Rational 1665 2.2 111
1 SS-0B 36" 52 25 Rational 500 2.4 45
1 SS-0B 42" 81 25 Rational 1191 2.4 81
1 SS-0B 48" 118 25 Rational 1651 2.4 131
1 SS-1 36" 44 25 Rational 1016 2.2 35
1 SS-2A 10' x 10' 886 100 Pro Development 1665 2.2 408
1 SS-2A 42" 65 100 Pro Development 683 2.2 13
1 SS-2A 72" 717 100 Pro Development 4809 2.2 274
1 SS-2A-1 36" 62 100 Pro Development 1815 2.2 39
1 SS-2A-1 42" 110 100 Pro Development 1218 2.2 69
1 SS-2A-1 48" 113 100 Pro Development 1037 2.2 73
1 SS-2A-1 54" 127 100 Pro Development 1377 2.2 108
1 SS-2A-2 48" 138 100 Pro Development 3246 2.2 77
1 SS-2A-3 36" 78 100 Pro Development 1643 2.2 19
1 SS-2A-3 36" 125 100 Pro Development 1081 2.2 42
1 SS-2A-3 72" 281 100 Pro Development 1702 2.2 144
1 SS-2B 36" 32 100 Rational 481 2.6 23
1 SS-2B 42" 71 100 Rational 1426 2.6 65
1 SS-2B 54" 160 100 Rational 1321 2.6 134
1 SS-2B 60" 221 100 Rational 1339 2.6 205
1 SS-2B 66" 278 100 Rational 1368 2.6 277
1 SS-2B 78" 378 100 Rational 2549 2.6 417
1 SS-2C 36" 50 100 Rational 619 2.2 41
1 SS-2C 42" 83 100 Rational 1286 2.2 79
1 SS-2C 60" 179 100 Rational 1318 2.2 155
1 SS-2C 66" 245 100 Rational 1338 2.2 235
1 SS-2C 72" 308 100 Rational 1569 2.2 318
1 SS-2C 78" 420 100 Rational 2518 2.2 479
1 SS-2D 36" 64 25 Rational 827 2.6 76
1 SS-2D 42" 75 25 Rational 2935 2.6 70
1 SS-2D 54" 134 25 Rational 1152 2.6 150
1 T-0 36" 62 25 Rational 725 3 41
1 T-0 42" 99 25 Rational 1278 3 80
1 T-0 54" 131 25 Rational 1272 3 120
1 T-0 54" 131 25 Rational 438 3 120
1 T-10 36" 52 25 Rational 496 2.2 46
1 T-10 42" 76 25 Rational 1186 2.2 81
1 T-10 48" 112 25 Rational 1745 2.2 129
1 T-11 36" 53 25 Rational 471 3 46
1 T-11 42" 81 25 Rational 1214 3 81
1 T-11 48" 119 25 Rational 1773 3 131
1 T-1A 60" 317 100 ICM 1215 3.6 171
1 T-1A 72" 318 100 ICM 952 3.6 171
1 T-1B 36" 48 25 Rational 719 3 41
1 T-1B 42" 80 25 Rational 1285 3 80
1 T-2 60" 244 100 Pro Development 285 2.8 177
1 T-2 66" 244 100 Pro Development 593 2.8 210
1 T-2 78" 292 100 Pro Development 457 2.8 243
4 of 8
City of Fontana Master Plan
FONT-0121
Proposed Pipe Design Flows
AOS Project Name Pipe Size (in.
or ft)
Design Flow
(cfs)
Design Event
(years)
Design Flow
Method
Length
(ft)
Project Prioritization
Score Drainage Area (ac)
1 T-2 96" 1151 100 Pro Development 5482 2.8 610
1 T-2A 48" 184 100 Pro Development 1860 3.2 136
1 T-2A 60" 236 100 Pro Development 787 3.2 162
1 T-2A 36" 32 100 Rational 317 3.2 28
1 T-2A 42" 69 100 Rational 1824 3.2 81
1 T-2B 54" 249 100 Pro Development 2579 2.2 160
1 T-2B 60" 256 100 Pro Development 68 2.2 162
1 T-2B 36" 47 100 Rational 638 2.2 41
1 T-2B 42" 77 100 Rational 1353 2.2 81
1 T-2C 54" 104 100 Pro Development 2560 2.6 162
1 T-2C 36" 46 100 Rational 683 2.6 42
1 T-2C 42" 75 100 Rational 1339 2.6 82
1 T-3 60" 322 100 ICM 3985 1.6 297
1 T-3 66" 322 100 ICM 1519 1.6 297
1 T-3A 60" 344 100 ICM 3985 1.4 166
1 T-3A 36" 43 25 Rational 323 1.4 29
1 T-3A 42" 93 25 Rational 1822 1.4 84
1 T-3A 48" 123 25 Rational 1371 1.4 126
1 T-4 36" 35 25 Rational 415 1.8 30
1 T-4 42" 76 25 Rational 1800 1.8 88
1 T-4 48" 127 25 Rational 2575 1.8 175
1 T-5 84" 734 100 ICM 2532 1.6 393
1 T-5 54" 125 100 Rational 1646 1.6 112
1 T-5A 36" 44 25 Rational 1848 1 42
1 T-5A 42" 62 25 Rational 1380 1 63
1 T-5A 48" 78 25 Rational 1387 1 84
1 T-5B 78" 512 100 ICM 2417 1 19
1 T-5C 72" 539 100 ICM 1231 1.6 145
1 T-5C 36" 38 25 Rational 294 1.6 25
1 T-5C 42" 83 25 Rational 1064 1.6 72
1 T-5C 48" 90 25 Rational 798 1.6 81
1 T-5C 54" 123 25 Rational 1499 1.6 123
1 T-6 66" 319 100 ICM 1988 3.2 273
1 T-6 72" 684 100 ICM 1688 3.2 351
1 T-6A 36" 50 25 Rational 873 1.6 42
1 T-6A 42" 78 25 Rational 1325 1.6 74
1 T-6B 60" 321 100 ICM 1441 3.4 164
1 T-6B 36" 37 100 Rational 423 3.4 24
1 T-6B 42" 43 100 Rational 415 3.4 24
1 T-7 36" 64 25 Rational 2616 2.4 40
1 T-7 42" 108 25 Rational 2616 2.4 80
1 T-7 60" 147 25 Rational 1714 2.4 120
1 T-7 60" 217 25 Rational 1714 2.4 165
1 T-7A 36" 54 25 Rational 1312 2.4 45
1 T-7B 36" 49 25 Rational 316 2.4 40
1 T-7B 42" 83 25 Rational 688 2.4 80
1 T-7B 48" 113 25 Rational 670 2.4 120
1 T-8 54" 132 100 Rational 2627 2 125
1 T-8 66" 258 100 Rational 1309 2 177
1 T-8 72" 384 100 Rational 1334 2 298
1 T-8 78" 515 100 Rational 564 2 419
1 T-8A 36" 51 25 Rational 538 2 49
1 T-8A 42" 74 25 Rational 1132 2 81
1 T-8A 48" 101 25 Rational 1299 2 121
1 T-8B 36" 42 25 Rational 353 1.6 36
1 T-8B 42" 72 25 Rational 1466 1.6 81
1 T-8B 48" 98 25 Rational 1310 1.6 121
1 T-8C 36" 37 25 Rational 382 1.6 30
1 T-8C 42" 72 25 Rational 1637 1.6 80
1 T-8C 48" 97 25 Rational 1300 1.6 118
1 T-8D 36" 42 25 Rational 1324 1.6 38
1 T-8D 42" 73 25 Rational 784 1.6 84
1 T-8D 48" 102 25 Rational 2627 1.6 125
1 T-9 36" 47 25 Rational 513 1.6 46
1 T-9 42" 70 25 Rational 1153 1.6 80
1 T-9 48" 100 25 Rational 1324 1.6 119
1 T-9 66" 209 25 Rational 371 1.6 177
1 T-9A 36" 53 25 Rational 515 2.4 47
1 T-9A 42" 80 25 Rational 1135 2.4 80
1 T-9A 48" 109 25 Rational 1308 2.4 119
1 T-9A 54" 109 25 Rational 1308 2.4 119
5 of 8
City of Fontana Master Plan
FONT-0121
Proposed Pipe Design Flows
AOS Project Name Pipe Size (in.
or ft)
Design Flow
(cfs)
Design Event
(years)
Design Flow
Method
Length
(ft)
Project Prioritization
Score Drainage Area (ac)
1 WG-1 48" 89 100 Pro Development 1218 1 70
1 WG-2 36" 54 100 Pro Development 1322 1 39
1 WG-2 42" 65 100 Pro Development 986 1 52
1 WG-2 48" 84 100 Pro Development 648 1 73
1 WG-3 48" 33 100 Pro Development 606 1 21
6 of 8
City of Fontana Master Plan
FONT-0121
Proposed Pipe Design Flows
AOS Project Name Pipe Size (in.
or ft)
Design Flow
(cfs)
Design Event
(years)
Design Flow
Method Length (ft) Project Prioritization
Score
Drainage Area
(ac)
2 DZ-10 36" 46 25 Rational 685 1.8 39
2 DZ-10 42" 78 25 Rational 1414 1.8 77
2 DZ-10 48" 107 25 Rational 558 1.8 118
2 DZ-10 54" 129 25 Rational 1321 1.8 159
2 DZ-11 54" 209 100 Rational 1374 3.6 118
2 DZ-11 60" 369 100 ICM 1408 3.6 207
2 DZ-11A 36" 44 25 Rational 516 1.8 36
2 DZ-11A 42" 70 25 Rational 1000 1.8 68
2 DZ-11A 48" 97 25 Rational 1654 1.8 104
2 DZ-11B 36" 44 25 Rational 557 1.8 36
2 DZ-11B 42" 70 25 Rational 990 1.8 67
2 DZ-11B 48" 96 25 Rational 1056 1.8 103
2 DZ-12 60" 306 100 ICM 2612 3.2 196
2 DZ-12A 36" 43 25 Rational 448 1 35
2 DZ-12A 42" 68 25 Rational 2015 1 65
2 DZ-12A 48" 104 25 Rational 647 1 115
2 DZ-13 60" 290 100 ICM 849 3.2 157
2 DZ-13 66" 336 100 ICM 1548 3.2 202
2 DZ-13 84" 616 100 ICM 1081 3.2 398
2 DZ-14 54" 170 100 Rational 1307 2 156
2 DZ-14 66" 349 100 ICM 346 2 167
2 DZ-14 72" 357 100 ICM 1095 2 200
2 DZ-14A 36" 41 25 Rational 529 2.4 34
2 DZ-14A 42" 68 25 Rational 1983 2.4 65
2 DZ-14A 48" 105 25 Rational 661 2.4 116
2 DZ-15A 36" 38 25 Rational 489 2.4 31
2 DZ-15A 42" 64 25 Rational 996 2.4 60
2 DZ-15A 48" 87 25 Rational 975 2.4 90
2 DZ-16 2, 66" 347 100 ICM 1375 1.6 214
2 DZ-16 66" 341 100 ICM 2635 1.6 214
2 DZ-16A 36" 38 25 Rational 419 1.6 30
2 DZ-16A 42" 64 25 Rational 1799 1.6 59
2 DZ-16A 48" 100 25 Rational 850 1.6 111
2 DZ-4 108" 646 100 Pro Development 636 1 651
2 DZ-4 6' x 7' 405 100 Pro Development 110 1 83
2 DZ-4 84" 405 100 Pro Development 1649 1 83
2 DZ-7 36" 51 25 Rational 417 1.8 44
2 DZ-7 42" 79 25 Rational 970 1.8 84
2 DZ-7 48" 101 25 Rational 1317 1.8 125
2 DZ-8 72" 364 100 ICM 335 1.8 241
2 DZ-9 36" 48 25 Rational 549 1 42
2 DZ-9 42" 77 25 Rational 1472 1 82
2 DZ-9 48" 103 25 Rational 552 1 123
2 JH-1 84" 766 100 ICM 1382 1.6 466
2 JH-2 72" 236 100 ICM 1925 1 115
2 SR-1 2, 66" 664 100 ICM 1555 2.4 389
2 SR-2 14' x 6' 1092 100 ICM 617 3 807
2 SR-2 78" 943 100 ICM 2579 3 729
2 SR-2 84" 1092 100 ICM 1180 3 763
2 SR-3 84" 836 100 ICM 460 3 267
2 SR-3 96" 1100 100 ICM 852 3 321
2 SR-3 96" 1073 100 ICM 1769 3 427
2 SR-4 8' x 5' 356 100 ICM 1543 3 257
2 SS-10 66" 270 100 ICM 824 3.4 143
2 SS-11 48" 72 100 ICM 457 3 42
2 SS-11 60" 67 100 ICM 1200 3 124
2 SS-11 66" 265 100 ICM 618 3 161
2 SS-5 60" 123 100 ICM 2146 1.6 83
2 SS-6 60" 234 100 ICM 1236 1.8 121
2 SS-7 66" 251 100 ICM 1716 2.2 221
2 SS-8 36" 43 25 Rational 594 2.2 58
2 SS-8 42" 56 25 Rational 1296 2.2 111
2 SS-8 48" 88 25 Rational 576 2.2 32
2 SS-9 60" 238 100 ICM 1579 2.4 190
2 SS-9A 36" 40 25 Rational 925 2.4 63
2 SS-9A 42" 67 25 Rational 478 2.4 79
2 SS-9A 60" 240 25 ICM 1223 2.4 190
7 of 8
City of Fontana Master Plan
FONT-0121
Proposed Pipe Design Flows
AOS Project
Name
Pipe Size (in.
or ft) Design Flow (cfs) Design Event
(years)
Design Flow
Method Length (ft) Project Prioritization
Score
Drainage Area
(ac)
3 A-0 10' x 9' 2324 100 ICM 1505 1.4 1191
3 A-0A 84" 754 100 ICM 2192 1.8 367
3 A-0A 90" 858 100 ICM 584 1.8 397
3 A-0B 78" 438 100 ICM 782 1.8 203
3 A-0B 84" 488 100 ICM 1794 1.8 278
3 A-0C 36" 88 25 Rational 1280 1.8 44
3 A-0D 36" 41 25 Rational 476 1.8 19
3 A-0D 48" 69 25 Rational 548 1.8 32
3 A-1 36" 18 100 ICM 669 1.4 2
3 A-1 42" 46 100 ICM 1101 1.4 54
3 A-1A 36" 66 25 Rational 797 1 32
3 A-1A 48" 81 25 Rational 687 1 39
3 A-2 36" 55 25 Rational 886 1.8 31
3 A-2 54" 126 25 Rational 1125 1.8 70
3 A-2A 36" 69 25 Rational 851 1.8 36
3 A-2A 42" 85 25 Rational 177 1.8 44
3 A-2A 48" 100 25 Rational 874 1.8 52
3 A-3 90" 1396 100 ICM 4946 1.8 699
3 A-3 96" 1494 100 ICM 1242 1.8 757
3 A-3A 36" 71 25 Rational 674 1.8 36
3 A-3A 42" 117 25 Rational 1346 1.8 59
3 A-3B 96" 287 100 ICM 656 1 173
3 A-3C 66" 422 100 ICM 3507 1 330
3 A-4 36" 55 25 Rational 783 1 27
3 A-4 42" 107 25 Rational 637 1 52
3 B-1 36" 40 25 Rational 407 2 30
3 B-1 42" 112 25 Rational 868 2 57
3 B-1 42" 96 25 Rational 111 2 47
3 B-1 54" 242 25 Rational 562 2 159
3 B-1 54" 49 25 Rational 104 2 16
3 B-2 48" 84 25 Rational 1147 2.4 41
3 B-3 36" 65 25 Rational 398 2.4 32
3 B-3 42" 95 25 Rational 363 2.4 50
3 B-5 72" 653 100 ICM 1240 1.6 366
3 B-5A 36" 53 25 Rational 657 1.6 21
3 B-5A 42" 97 25 Rational 1053 1.6 46
3 B-5A 48" 138 25 Rational 1553 1.6 74
3 B-6 36" 88 25 Rational 201 1.6 44
3 B-7 36" 88 25 Rational 502 1.6 44
3 B-7 42" 97 25 Rational 641 1.6 49
3 B-8 36" 63 25 Rational 519 2.4 28
3 B-8 48" 97 25 Rational 994 2.4 47
3 C-0 60" 409 100 ICM 1297 1.6 153
3 C-0 72" 595 100 ICM 2586 1.6 223
3 C-2 66" 212 100 ICM 427 2.4 68
3 C-2 72" 265 100 ICM 521 2.4 79
3 C-4 60" 320 100 ICM 1209 2.2 149
3 C-4 66" 319 100 ICM 400 2.2 149
3 C-4 72" 319 100 ICM 628 2.2 149
3 C-5 60" 332 100 ICM 1600 3 152
3 C-6 42" 156 100 ICM 488 3 70
3 C-7 72" 631 100 ICM 2059 3 218
3 C-8 78" 459 100 Rational 1828 2.6 254
3 C-8A 42" 80 25 Rational 1331 2.6 37
3 C-8B 36" 72 25 Rational 660 2.6 32
3 C-8B 42" 97 25 Rational 1080 2.6 46
3 C-8B 48" 164 25 Rational 1450 2.6 98
3 C-8B 54" 210 25 Rational 1081 2.6 125
3 C-9 9' x 12' 2860 100 ICM 917 3 1241
3 HR-1 96" 1282 100 ICM 1378 3 706
8 of 8

January 25
APPENDIX 3 CAPITAL PROJECT EXHIBITS
Path: P:\F\FONT00000121\0600INFO\GS\Maps\ProposedCapitalImprovementProjects.aprx Capital Improvement Project Prioritization Scores
All Areas of Study
Fontana
Alamo Dr
Day
Creek
Blvd
Day
CreekBlvd
Bluegrass
Ave
Stoneview
Rd
Wilson Ave
AlturaDr
Alvarado
Pl
Dapple Dr
Melon Dr
Indian
WellsPl
John L. Golden
Day Creek
Vintage Dr
Sugargum St
Carob
Ave
Banyan St
Day
Creek
Blvd
Arbor
Ln
Hess
Pl
Day
Creek
Blvd
Victoria
Gardens
Fire Station No.
3 Historic Winery
(Regina/Filippi)
Cultural
Center/Biane
Library
66 Day CreekBlvd
Juneberry Dr
Foothill
Marketplace
Concours St
6th St
Southern Pacific
RR
Shea Center Dr
Santa Ana St
Union PacificRailroad
Up
Railroad
S
Vintage
Ave
S
Vintage
Ave
E Francis St
Universe Dr
Decliff DrForest Service Rd
Encino
Ct
East EtiwandaCreek
EastAve
Etiw
anda
Ave
Etiwanda Ave
Etiw
anda
Ave
Daycreek Blvd
NOverlook Dr
23rd St
Amber Ln
Altura Dr
Arena Dr
Parke Cir
StillwaterPl
Wilson AveWilson Ave Wilson Ave
Summit
Intermediate
Etiwanda
Colony
Fire Station No.
6 210
Copley Dr
Victoria St
PecanAve
Carnesi Dr
N
Victoria
W
indrowsLoop
Highland Ave
C
ountryw
ood
Pl
Blue Gum Dr
ArapahoRd
Cherokee Rd
LaurelBlossom
Pl
Fisher Dr
DiCarlo
Pl
Pistache St
Plum
W
ay
Silver Sky Rd
Victoria
Park
Ln
EastAve
Etiw
anda
Ave
Banyan St
Etiwanda
15 W
Liberty
Pkwy
Miller Ave
Sutter Ct
Church St
Kew
Ave
Pecan
Ave
PinotPl
Mosaic Dr Colonial Dr
Garcia Dr
EastA
ve
EastAve
Baseline Rd
Victoria
Gardens
Ln
Victoria Arbors
Park
Perdew
Etiwanda Depot
Chaffey-Garcia
House
Post Office
Police
Substation
66 66
Ilex
St
Cottonw
ood
Ave
Napa St
Ivy Ave
Chatham Dr
Hickory
Ave
Flagstaff Dr
Joliet Dr
CornwallAve
Whittram Ave
Arrow Rte
Etiw
anda
Ave
Foothill Blvd
Kaiser
W
ay
Transportation
W
ay
Access
Rd
Access
Rd
Barrington
Ave
Vip Rd
6th St
San Bernardino Ave
Valley Blvd
N
Etiw
anda A
ve
Com
m
erce
Dr
4th St
Etiwanda
Ave
Souther n Pacific RR Union Pacific
10 1010
Jasm
ine
St
Com
m
erce
Way
Com
m
erce
W
ay
Santa Ana St
Valley Blvd
Slover Ave
N
Etiw
anda
Ave
E Airport Dr
S
Etiw
anda
Ave
Fontana
Gateway
Dahlia St
Industry
Ave
Cham
pagne
Ave
Marlay AveE Francis St
Chablis
Ave
Jurupa St Jurupa Ave
S Etiwanda Ave
Inland AveVenture
D
r
Latour Ln
Philadelphia Ave Philadelphia AvePhiladelphia Ave
Colonbero Rd
Woodley Ridge Dr
Decliff Dr
Summit Ave
Regina Dr
EastEtiwanda
Creek
W
ardm
an
Bullock
Rd
Crescenta Way
San
Sevaine
Rd
Ridgeline
Pl
C
restline
Pl
Aggazzotti Rd
Frost Dr
Johnston
Pl
Cherry
Ave
Wilson Ave
210
15 15
Victoria St
Smokestone St
RaindropPl
Copley Dr
Fisher Dr
Gypsum Dr
Highland Ave
Cherry
Ave
Banyan St
Westgate
E
Liberty
Pkw
yW
Lincoln
Loop
Rd
E
Lincoln Loop
Rd
Heritage Cir
W
Yosemite Loop Rd
E
G
rand
Ave
Del Norte St
Marbella St
W Liberty Pkwy
W LibertyPkwy
Quail Ct
Rideout Ct
Pacific Electric Inland Empire Trl
Cherry
Ave
Baseline Ave
Heritage
Intermediate
School
Village Of
Heritage
Bur lington Nor ther n and Sante Fe Railroad
66 66
Calabash
Ave
Back Straight Rd
Ivy Ave
Owen StBanana
Ave
Alm
ond
Ave
W
Perimeter Rd
C
herry
Ave
Cherry
A
ve
Cherry
Ave
Whittram Ave
Arrow Rte Arrow Blvd
Foothill Blvd
Alm
ond
Ave
California Steel Way
BananaAve
S Perimeter Rd
Iris Dr
Calabash
Ave
WPerim
eter
Rd
San Bernardino Ave
Auto Club
Speedway
Kaiser Park
10 10
B
usiness
Dr
Santa Ana Ave
Banana
Ave
Alm
ond
Ave
Alm
ond
Ave
Calabash
Ave
Calabash
Ave
Slover Ave
Valley BlvdValley Blvd
Cherry
Ave
M
ulberry
Ave
Marlay Ave
Alm
ond
Ave
Calabash
Ave
Calabash
Ave
Chaparral Ave
CabernetDr
El Contento Ave
Hillcrest Dr
Jurupa Ave
M
ulberry
Ave
Cherry Ave
Cherry
Ave
Shadow Park
Chaparral Park
Oak Park
Kaiser High
School
Southridge
Middle School
Green Vista Dr
Vintage
Pl ChablisAve
Hadley
Dr
Tamarack Way
Weeping Willow Ln
Duncan Canyon Rd
Tahan
W
ay
Brookside
Ave
Coyote
C
anyon
Rd
FoxboroughDr
Bridlepath Dr
Coyote Canyon
15 Lytle
Creek
Rd
CoyoteCanyonRd
S Bridlepath Dr
Summit Ave
Summit Ave
Cherry
Ave
Fox Ridge Dr
W
ranglerDr
San
Sevaine
Rd
TenderfootDr
Deer Dr
Hawk St
HalfDom
e
Dr
RooseveltDr
ReaganDr
Saddlepeak Dr
Beech Ave
Rosena Park
East
David W Long
Elementary
Summit Heights
Hunter's Ridge
Preston Dr
Hem
lock
Ave
San
Sevaine
Rd
Walnut St
Walnut St
EarhartAve
Maine St Holiday Dr
Caroline St
Brant Dr
Curtis Ave
Larkstone St
Lytle
Creek
Rd
Rockwell Ave
Horizon St
ChantelDr
Sierra Lakes Pkwy
Sierra Lakes Pkwy
Walnut Ave
Beech
Ave
S Highland Ave
California
Landings
Beech
Ave
Hilton Dr
Hem
lock
Ave
Hem
lock
Ave
Andrea
St
Live
O
ak
Ave
San
Sevaine
R
d
Plum
rose
St
Sandhurst St
Bar Harbor Rd
M
cGuire
Ave
Sea
SaltAve
Miller Ave
Arosia Dr
Montanez St
M
yrtle
Pl
Beech
Ave
Beech
Ave
Sultana Ave
Begonia Dr
Village Pkwy
Miller Ave
Plum
aria
Dr
Baseline Ave Rancho
Fontana
Morningside
66 Sultana
Ave
Hemlock AveRedw
ood
Ave
Redw
ood
Ave
Elm
Ave
Ceres Ave
Yucca Ave
Live
O
ak
Ave
Live
O
ak
Ave
Reseda
A
ve
Heather
Ave
Valencia Ave
Country Ln
Seville Ave
Orchid St
Upland Ave
Ivy Ave
Merrill Ave
Whittram Ave
Beech
Ave
Beech
Ave
Arrow Blvd
Foothill BlvdFoothill Blvd
Hem
lock
Ave
Randall Ave
Hibiscus Ave
Pine Ave
Redw
ood
Ave
Elm
Ave
Sequoia Ave
Live
O
ak
Ave
Mallory Dr
Athol St
Iris Dr Iris Dr
Rosemary Dr
Hunter St
El Molino St
El Molino St
Sultana
Ave
Carmel St
Carob
Ave
Robinia
St
FontanaAve
San Bernardino Ave
B
eech
Ave
Sequoia Middle
School
Union Pacific
10 10BeechAve Beech
Ave
Hem
lockAve
Santa Ana Ave
Elm Ave Elm
Ave
Redw
ood
Ave
Redwood
Ave
Live
O
ak
Ave
Live
O
ak
Ave
Washington Dr
Boyle Ave
Boyle Ave
Manila St
Aliso Dr
Slover Ave
Valley Blvd
Southwest
Industrial Park
Beech
Ave
Hem
lock
Ave
Live
Oak
Ave
Elm
Ave
Elm
Ave
Village Dr
Coleen St
Canyon Crest Dr
Camellia Dr
Loyola
Ct
Redw
ood
Ave
Jurupa Ave
Southridge
Plaza
Southridge Park
Southridge
Village
Weeping Willow Ln
15 15
Coyote Canyon Rd
Duncan Canyon Rd
LytleCreek
Rd
Citrus
Ave
AgaveAve
Blue Iris St
Caterpillar Dr
Coyote Canyon
Park
Summit AveSummit Ave Summit Ave
Citrus
Ave
Park House Dr
Edw
ard
Ave
Casa Grande Ave
Cypress
Ave
Pine
LeafAve
3 Mile Rd
Parkside Way
Magnolia Way
Delam
ar
D
r
Gardens St
Parry Peak Dr GodinezDr
Wibert Dr
Sierra Lakes
Golf Course
Fontana Park
Patricia Marrujo
Park
Summit High
School
Citrus Heights
North
Citrus Heights
South
210 210
Walnut St
Cataw
ba
Ave
Catawba Ave
MedinahSt
Augusta
Dr
Citrus
Ave
Los Cedros Ave
Cypress
Ave
Knox
Ave
Athena Dr
M
aloofAve
Allison Way
O
leander
Ave
Plum St
Highland Ave
Alm
eria
St
Jacaranda
Ave
Curtis Ave
Tokay
Ave
Walnut Ave
Cooper
Ave
Sierra Lakes Pkwy
Citrus
Ave
S Highland Ave
AB Miller High
School
Sierra Lakes
C
ypress
Ave
Alm
eria
Ave
Chase Rd
Lim
e
Ave
O
leander
Ave
AbigailPl
Virginia Dr
Elsa
Ct
Riley Dr
Celeste
Ave
Harvey Dr
Concord
Ave
San Jacinto Ave
Jackson Dr Jackson Dr
Montgomery Ave
Barbee St
Reed Dr
Date A
ve
Toyon
Ave
Paine St
Miller Ave
Citrus
Ave
Citrus
Ave
Baseline Ave
Almeria Middle
School
66 66
Cataw
ba
Ave
Tokay
Ave
Ceres Ave
Ceres Ave
Poplar
Ave
Date
St
Date
St
Seville AveLim
e
Ave
Ivy Ave
Orange Way
Upland Ave
Valencia Ave
Citrus
Ave
Merrill Ave
Almeria Ave
Fontana Ave
Foothill Blvd
Cypress Park
Cataw
ba
Ave
Dianthus Ave
Randall Ave
Poplar
Ave
Date
St
Hawthorne Ave
Mallory Dr
Mallory Dr
Athol St Athol S t
Athol St
Pine Ave
O
leander
Ave
Alm
eria
A
ve
Niagara
Ave
Hunter St
Iris Dr Iris Dr
Lim
e
Ave
Lim
e
Ave
Briarw
ood
Ave
Grevillea St
Citrus
Ave
FontanaAve
San Bernardino Ave
Cypress
Ave
Fontana High
School
Truman Middle
School
Citrus
Elementary
10 Oleander A
ve
PoplarAve Poplar
Ave
Cataw
ba
Ave
Catawba A
ve
Aliso Dr
Santa Ana Ave
Washington Dr
Boyle Ave Boyle Ave
Rose Ave
Tyrol Dr
Citrus
Ave
Citrus A
ve
Valley Blvd
Cypress
Ave
Cataw
ba
Ave
Cypress Ave
Gala Ave
CitrusAve
Windcrest Dr
Village Dr
Willow Dr
O
leander
Ave
Jurupa Ave
Cypress
AveCitrus
Ave
Catawba Park
15 Lytle Creek
Rd
Sycamore Creek Dr
Bur Oak Rd
Sierra
Ave
Nealeys Corner
15 W Terra Vista Dr
M
ango A
ve
Linde Vista Dr
Palm
etto
Ave
W
Via Bello Dr
Rim
a
Dr
Yarrow Ln
Sierra
Ave
N Riverside Ave
Clubhouse Dr
Colonial Dr
Wyndham Ln
Augusta
Dr
Escalon Dr
W Casa Grande Dr
Napa
Valley
Rd
Three Mile Rd
W Sunrise Dr
Summit Ave Summit Ave
N
M
ango
Ave
La
Sierra
D
r
M
ango
A
ve
Almaden Dr
Alder
Ave
Sierra
Ave
Sierra
Ave
210
M
ango
Ave
Kaiser
AveCambria Ave
Palm
etto
Ave
Sierra
Ave
Walnut St
Augusta
D
r
N
Tam
arind
Ave
W Walnut Ave
Cerritos St
Fern St Fern St
Sierra
Ave
W Casmalia St
Ruble Middle
School
Walnut Village
Tam
arind
Ave
Elaine Dr
Palm
etto
Ave
Malaga St
Malaga St
M
ango
AveRamona Ave
Ramona Ave
Reed St
Reed St
Juniper
Ave
Paine St
Paine St
Fairview Rd
Kem
pster
Ave
Blanchard
Ave
Micallef St
Fairfax St
Barbee St
Barbee St
Barbee St
Wabash Ave Wabash Ave
Miller Ave
Sierra
Ave
Sierra
A
ve
Bill Martin Park
Metr olink
66 66
Tam
arind
Ave
Tam
arind
Ave
Juniper
Ave
Palm
etto
Ave
Pepper
Ave
Sewell Ave
Ceres Ave
Ceres Ave
Owen St
Upland Ave
BennettAve
Nuevo
Ave
Kaiser
Ave
Seville Ave
Seville Ave
Ivy Ave
Ivy Ave
Orchid Dr
Vine St
Spring St
Rosena
Ave
Chantry
Ave
Sierra
Ave
Arrow Blvd
Foothill Blvd
Civic Center
Veterans' Park
Seville Park and
Amphitheater
Fontana Middle
School
Fontana
Metrolink Plaza
Central
Fontana
Fontana
Tamarind A
ve
Tam
arind
Ave
Pine Ave
Palm
etto
Ave
Marygold Ave
Randall Ave
M
ango
Ave
Athol St
Athol St
Tullock St
Holly Dr
Hibiscus St
O
live
St
Hawthorne Ave
Em
erald
Ave
Pepper
Ave
Tangelo
Ave
Encina
Ave
Mallory Dr
Acacia
Ave
Manzanita Dr
Grevillea St
San Bernardino Ave
Sierra
Ave
Sierra
Ave
Jack Bulik Park
Cypress
Elementary
School
Kaiser Hospital
Union Pacific
10 10
Tam
arind
Ave
Santa Ana Ave
Saffron
St
Juniper
Ave
Juniper
Ave
Production
Ave
BennettDr
Boyle Ave
Valley Blvd
Slover Ave
Sierra
Ave
Inland Empire
Center
Sycamore Hills
Elementary
Empire Center
Underwood Dr
Jurupa Ave
Juniper
Ave
Volante
Dr
Tam
arind
Ave
Lacebark St
Eucalyptus St
Pear St
Sierra
A
ve
Jurupa Ave
Sierra
Ave
Obsidian
RdAmerican Elm RdWhite Ash Rd
LapisLn
Quartzite
Ln
Paakuma' Park
Lytle Creek Wash
AdlerAve
W Via Bello Dr
N Riverside Ave
Ethel Kucera
Middle School
W Casa Grande Dr
W Buena Vista Dr
N
Linden
Ave
Lowell St
Stonehurst Dr
W Coast Blvd
Summit Ave
N Maple
Ave
W Summit Ave
M
aple
Ave
W
Via Bello Dr
Banyon Ave
N Riverside Ave
N
LocustAve
Fergusson Park
Wilmer A Carter
High School
210
210
Vineyard Ave
Alder
Ave
N
Linden
Ave
N
Linden Ave
W Walnut Ave
Laurel Ave
LaurelAve
W Bohnert Ave
Renaissance Pkwy
W Casmalia St
LocustA
ve
Miro Way
Miro Way
A
lder
Ave
N
Linden
Ave
LaurelAve
Spohn
Ave
William
s
Rd
W
illiam
s
Rd
Fairfax St
W Victoria StFairview Dr
Barbee St Barbee StG
race
A
ve
N
M
aple
Ave
Grove Pl
Laguna Pl
Montgomery Ave
Farney Ave
Dum
ond
Dr
Ramona Ave M
aple
Ave
LocustAveAlder
Ave
W Base Line Rd
Miller Ave
Alder Middle
School
Metr olink
Granada Ave Granada Ave
LaurelAve
Bonnie Ln
Citron Ave
Citron Ave
Spohn Dr
Upland Ave
Seville Ave
Dorsey Way
Ivy Ave
N
Linden
Ave
McCauley St
M
aple
Ave
M
aple
Ave
LocustAve
Merrill Ave
W Rialto AveAlder
Ave
Arrow Blvd
W Merrill Ave
Foothill Blvd W Foothill Blvd
Pine Ave
Evergreen
Ln
Marygold Ave
Pinedale Ave
Randall Ave
LaurelAve
Palm
Ln
Hibiscus St
Athol St Athol St
El Molino St
Filbert St
Linden
Ave
M
aple
Ave
Alder
Ave
LocustAve
San Bernardino Ave
Union Pacific Railroad
10 Santa Ana Ave
Taylor Ave
LocustAve
Linden
AveA
lder
Ave
Mindanao St
LaurelAve
Otilla St
M
aple
A
ve
Ash St
Gregory St
Valley Blvd Valley Blvd
LocustAve
Slover Ave
Ayala Park
Walt
Zimmerman
School
Bloomington
High School
11th St
Alder
Ave
10th St
M
aple
Ave
Birch St
Birch
St
9th St
Jurupa Ave
Jurupa Ave
7th St
Arm
strong
Rd
LocustAve
Kessler Park
Ruth O Harris
Middle School
Sandra Dr
GailDr
J C Rd
Arm
strong
Rd
VerdemontRanch Rd
VerdemontRanch
Rd
GlenHelenRegional Park
Lytle Creek Wash
Institution Rd
N Riverside Ave
Sycamore Ave
N Orange Ave
NCedar
Ave
N Apple Ave
N
Apple Ave
N Palm AveW Summit Ave
N
Fillmore Ave
Olive Ave
Ayala Dr
Trapp
Elementary
School
Sunrise
Christian
Elementary
School
W Casmalia St
N
Arrow
head
Ave
W La Gloria Dr
N
Cedar
Ave
W Bohnert Ave
Ayala
Dr
W Casmalia St
Jerry Eaves
Park
Kolb Middle
School
N
Fitzgerald
Ave
W Rosewood St
N
Beechw
ood
Ave
W Grove St
N
DriftwoodAve
N
Larch
Ave Mason St
N
Brierw
ood
Ave
N
Cedar
Ave
W Base Line Rd
W Etiwanda Ave
AyalaDr
Renaissance
Center
Lorraine Pl
W 2nd St
S
Larch
Ave
N
Larch
Ave
S
Cedar
Ave
S
Cedar
Ave
W Rialto Ave
W Merrill Ave
N
Cedar
Ave
W Foothill BlvdW Foothill Blvd
S
Larch
Ave
W Alru St
O
rchard
St
W Mallory Dr
M
agnolia
St
M
agnolia
St
W Hawthorne St
Vine
St
W Granada St
Olive
St
O
live
St
Pomona Ave
Larch
Ave
Spruce
Ave
Grove Pl
Grove Pl
W Randall Ave
Cedar
Ave BloomingtonAve
S
Cedar
Ave
10 Larch
Ave
Otilla St
Spruce
Ave
Santa Ana Ave
Maple Ln
Orange St
Valencia
St
Manila St
Gregory St
Cedar
Ave C
edar Ave
Valley Blvd
Bloomington
Up
Railroad
Jurupa Ave
12th St 12th St
7th St
Appaloosa
Ln
6th St
13th St
Pepper St
4th St
PineSt
14th St
8th St
Oak
St
5th St
Touche Dr
Cedar
Ave
7th St
Green Acres
Memorial Park
Crestmore
Elementary
School
El Rivino Rd
C
astellano
RdRouner Dr
Crestmore
Heights
SCG Transmission Line
SCG Transmission Line
SCG Transmission Line
12 ft. MWD Line
12 ft. MWD Line
12 ft. MWD Line
12 ft. MWD Line
12 ft. MWD Line
Victoria
Banana
San Sevaine 1
San Sevaine 3
San Sevaine 2
San Sevaine 5
Jurupa
Hickory
RP3-C1
Upper
Declez
(DZU)
Etiwanda
Conservation
RP3-C4
RP3-C3
Etiwanda
Debris
Basin
Rich
RP3-C2
Etiwanda
Conservation
San Sevaine 4
Merrill
Linden
36"
42"
60"
60"
4 8 "
4 2 "
6 6
"
42"
4 8
"
4 2
"
60"
36"
7 2
"
4 2 "
3 6
"
3 6 "
6 0
"
3 6 "
3 6 "
7 8
"
4 2
"3
6 "
3 6 "
42"
72"
3 6
"
72"
36"
36"
3 6
"
60"
66"
66"
48"
5 4 "
42"
78"
42"
36"
8 4
"
42"
48"
6 6
"
48"
36"
36"
36"
5 4
"
42"
60"
54"
60"
36"
42"
42"
3 6
"
36"
4 5
"
36"42"
4 2
"
3 6 "
4 2 "
36"
36"
36"
4 8
42"
7 8 "
36"
66"
4 8 "
36"
36"
36"
36"
36"
42"
3 6
"
36"
36" 36"
6 6
"
72"
42"
4 2 "
96"
6 6
"
4 8
"
4 8
"
42"
42"
36"
36"
42"
42"
60"
3 6
"
3 6
"
6 6 "
42"
4 8
"
3 6
"
36"
78"
6 .
5 '
x
2 '
6 0
"
4 2
"
36"
5 7
"
6 6 "
60"
54"
3 6 "
36"
42"
3 6
"
3 6 "
3 6
"
3 6
"
72"
5 4 "
54"
66"
4 2
"
54"
42"
3 6
"
36"
36"
54"
4 8
"
66"
4 8 "
5 4
"
60"
3 6
"
36"
36"
3 6 "
4 2 "
36"
42"
78"
36"
36"
42"
36"
60"
6 0
"
91"
96"
3 6 "
36"
36"
54"
48"
4 2 "
4 8
"
3 6 "
3 6
"
96"
48"
60"
4 8 "
3 6
"
3 6 "
4 8
"
36"
60"
36"
4 2
"
3 6 "
4 8 "
9 1
"
3 6 "
5 4
"
5 4
"
36"
36"
4 8 "
84"
4 2
"
36"
4 8
"
36"
5 4
"
54"
54"
2 x 18"
7 8
"
4 2 "
66"
3 6
"
3 6
"
36"
84"
36"
3 6 "
4 2 "
48"
42"
54"
78"
36"
4 2
"
36"
48"
36"
60"
6 0
"
66"
2 x 30"
3 6
"
36"
6 0 "
60"
36"
78"
6 6
"
3 6
"
48"
72"
48"
54"
4 8
4 8 "
60"
4 8 "
3 6 "
96"
54"
42"
66"
42"
42"
5 3 "
60"
7 2
"
36"
36"
7 2
"
4 8 "
36"
54"
60"
3 6 "
36"
36"
84"
66"
6 6
"
9 0
"
42"
72"
78"
42"
54"
36"
66"
5 4
"
66"
36"
4 8
"
36"
96"
6 0
"
66"
36"
B-6
C-6
A-3B
B-3
C-9
C-2
A-0D
B-7
B-2
B-5
B-1
A-0C
C-8A
HR-1
A-4
A-1A
A-0
B-8
C-5
A-1
C-8
A-2A
A-2
A-3A
C-7
C-4
A-0A
B-5A
A-0B
A-3C
C-0
C-8B
A-3
54"
42"
42"
36"
42"
36"
66"
36"
66"
36"
42"
36"
36"
72"
48"
54"
90"
72"
42"
42"
96"
36"
36"
36"
36"
48"
78"
36"
36"
36"
42"
48"
36"
9' x 12'
48"
42"
42"
54"
42"
54"
48"
60"
72"
96"
36"
60"
42"
42"
96"
48"
10' x 9'
48"
60"
84"
78"
72"
84"
72"
66"
90"
DZ-8
SS-10
SS-6
JH-1
SS-9A
SR-4
SR-1
SS-9
SS-7
JH-2
SS-5
SS-11
DZ-13
DZ-4
DZ-15A
SS-8
DZ-9
DZ-11B
DZ-12
DZ-7
DZ-14 DZ-11
DZ-16A
SR-3
DZ-12ADZ-14A
DZ-11A
DZ-10
DZ-16
SR-2
6' x 7'
36"
36"
36"
48"
84"
42"
36"
36"
36"
36"
48"
36"
48"
48"
36"
14' x 6'
66"
108"
48"48"
36"
66"
60"
96"
48"
36"
42"
48"
42"
42"
42"
48"
84"
72"
84"
60"
60"
60"
42"
54"
48"
54"
54"
2, 66"
84"
60"
42"
42"
8' x 5'
66"
2, 66"
60"
84"
48"
66"
96"
42"
72"
42" 42"
60"
78"
60"
66"
8 4 "
3 6 "
66"
78"
3' x 4'
54"
7 2
"
14' x 9'
36"
5' x 10'
1 0
2 "
48"
1 0 2 "
48"
42"
4 2 "
3 6
"
39"
78"
48"
60"
3 6 "
48"
36"
36"
60"
66"
36"
4 8 "
48"
54"
72"
36"
90"
42"
36"
36"
36"
3 6
"
48"
36"
54"
36"
3 9
"
36"
36"
48"
36"
7 2 " 36"
54"
36"
36"
3 6 "
48"
42"
4 8 "
66"
60"
3 6
"
42"
5 4
"
6 6
"
54"
36"
36"
4 8
"
36"
2 9 " x 4 5 "
3 6
"
48"
36"
14' x 9'
3 6 "
39"
45"
48"
14' x 9'
72"
48"
36"
4 5 "60"
1 0 8
"
54"
3 6 "
48"
36"
5 4
"
3 6 "
72"
66"
60"
7 2
"
4 2
"
60"
36"
7 2
"
60"
102"
54"
5 4 "
60"
3 6
"
45"
60"
39"
3 6
"
5 4 "
7 2
"
3 9
"
54"
36"
78"
8 '
x
6 '
7 8
"
48"
72"
66"
5 ' x 1
0 '
3 6 "
54"
4 8
"
4 2
"
45"
9 6
"
5 4
"
54"
42"
7 8
"
4 2 " 36"
36" 36"
14' x 9'
48"
66"
78"
48"
60"
4 5 "
60"
42"
4 2 "
48"
6 0 "
48"
54"
8 4 "
78"
78"
3 6
"
72"
42"
42"
7 8 "
42"
4 2 "
63"
7 '
x
1 2
'
3 9
"
2 ,
8 '
x
4 '
45"
48"
66"
6 6 "
48"
42"
48"
48"
8 '
x
5 '
60"
48"
42"
3 6 "
42"
42"
6 ' x 1 0 '
60"
75"
60"
3 6
"
54"
7 8 "66"
4 2
"
66"
3 6
"
66"
42"
36"
51"
4 8 "
48"
39"
42"
4 8
"
3 6
"
36"
42"
66"
66"
54"
66"
54"
6 0
"
54"
7 8 "
42"
54"
48"
3 9
"
78"
78"
3 6 "
45"
51"
60"
6 0
"
1 0
8 "
7 2
"
72"
14' x 9'
108"
48"
3 9
"
90"
36"
42"
36" 36"
69"
48"
60"
66"
4 8
"
7 2
"
42"
54"
54"
4 8
"
42"
36"
4 2 "
96"
5 4
"
36"
4 2 "
72"
54"
54"
66"
72"
72"
9 6 "
90"
48"
36"
75"
90"
36"
42"
72"
96"
96"
9 0 "
60"66"
72"
54"
8 4
"
96"
48"
72"
42"
66"
54"
48"
4 2
"
54"
7 8 "
36"
48"
30"
3 6 "
42"
102"
72"
90"
42"
90"
68" x 43"
4 8 "
3 6 "
72"
3 6
"
48"
54"
60"
36"
2, 14' x 8'
54"
36"
81"
2, 10' x 8.5'
36"
3 6 "
3 6
"
48"
48"
4 8 "
7 8
"
4 2
"
7 2
"
9 ' x 8 '
3 6
"
4 8
"
42"
54"
2, 12' x 9'
42"
6 6
"
4 8 "
2, 12' x 9'
42"
3 6 "
5 7
"
45"
3 6
"
42"
36"
45"
42"
2 , 1 2 ' x 6 '
7 2
"
4' x 6'
4 8 "
48"
4 8
"
6 0
"
36"
42"
72"
3 6
"
3 6 "
72"
42"
3 6 "
54"
36"
12' x 6'
42"
36"
36"
3 6
"
36"
2, 8' x 8'
54"
36"
54"
66"
7 2
"
36"
66"
2, 10' x 8.5' 3
6 "
36"
57"
36"
2, 10' x 7'
54"
48"
39"
75"
4 2
"
75"
48"
48"
96"
2, 10' x 8'
54"
38"
48"
2, 10' x 8'
96"
36"
6 6
"
54"
3 6 "
48"
4 2 "
39"
42"
54"
4 2
"
4 2
"
3 6
"
48"
39"
42"
7 8
"
3' x 3'
5 4
"
54"
3 6 "
72"
36"
36"
7 2 "
2, 10' x 8'
4 2 "
5 4
"
36"
78"
3 6 "
4 2
"
42"
42"
54"
36"
4 2 "
4 2
"
66"
4 8 "
72"
2, 10' x 8'
42"
36"
66"
72"
3 6 "
3 6 "
42"
54"
48"
51"
66"
42"
36"
48"
42"
57"
72"
36"
36"
4 2
"
36"
54"
36"
36"
36"
8' x 8'
2, 10' x 8'
48"
36"
72"
36"
45"
48"
36"
36"
48"
36"
36"
42"
4 8
"
42"
36"
22" x 36"
6 9
"
42"
4 2
"
3 9
"
36"
66"
4 8
"
3 6 "
3 9 "
48"
5 7
"
4 8
"
42"
42"
36"
42"
54"
48"
60"
3 6
"
42"
42"
3 6 "
48"
48"
66"
48"
90"
48"
10' x 8'
81"
4 ,
1 2
'
x
1 2
'
7 2
"
6 0 "
54"
3 6 "
36"
8 4 "
48"
4 8
2, 10' x 8'
36"
4 2 "
6 0 "
48"
3 6 "
96"
48"
3 6
"
48"
3 6
"
36"
4 2 "
72"
36"
1 0 8 "
3 6 "
36"
66"
3 6 "
36"
2, 12' x 8'
4 2
"
3 6
"
2, 10' x 8'
60"
36"
3 6
"
4 2 "
2, 12' x 8'
75"
36"
72"
6 0
"
3 9
"
42"
5 4
"
4 5 "
36"
96"
2, 10' x 8'
48"
5 4
"
36"
48"
2 ,
1 0
' x 6 '
9 0
"
45"
30"
36"
36"
36"
42"
48"
78"
36"
54"
42"
54"
6 0
"
48"
4 8
"
60"
36"
36"
42"
42"
4 2
"
7 2 "
39"
36"
60"
51"
7' x 4'
4 2
"
54"
54"
2, 10' x 8'
42"
4 5
"
36"
4 8 "
36"
60"
36"
36"
1 0 2 "
39"
42"
2, 8' x 8'
36"
5 4
"
48"
81"
7 2
"
51"
45"
57"
3 6
"
6 0
"
72"
96"
36"
4 2
"
7 8
"
66"
45"
42"
5' x 12'
72"
5 1 "
39"
48"
8' x 8'
42"
6 0
"
36"
36"84"
72"
9 6
"
60"
5 4
"
9' x 8'
78"
60"
51"
5 4
"
1 0
8 "
42"
5 1
"
39"
78"
51"
36"
48"
5' x 10'
78"
6 9 "
5 1
"
60"
36"
51"
48"
72"
42"
36"
66"
2, 12' x 8'2, 12' x 8'
36"
2, 10' x 8'
2, 9' x 8'2, 10' x 8' 60"
2, 8' x 8'2, 9' x 8'
M-5B-A
D-1A
WG-3
J-1A
E-7
E-6
H-0A
M-5-E
M-4
E-2
M-5D
E-1
T-6B
E-4
E-5
SS-1
M-2
M-1
J-4
M-5G-A
M-3
T-5C
WG-1
F-6
D-6C
SS-0
T-3A
T-7A
M-5E-A
F-1
F-3
M-5-A
F-2
G-6
G-4
G-2
E-3
M-5E-FM-5E-D M-5E-EM-5E-C
T-7B
M-5E-B
M-2A
M-0
T-0
F-4
J-1C
J-3A
G-2A
M-5A
J-4A
SS-2C
SS-2B
J-4B
M-1A
G-4A
D-6
G-6A
T-2B
J-2A
T-1B
M-5B-C
M-3A
T-2C
M-5B-B
M-5G-C
M-5B-D
M-5G-B
D-7
T-7
G-1
T-2A
G-3
SS-2A-3
G-5
T-1A
T-6A
D-6B
F-1B
T-5B
J-1
F-5A
M-5H
WG-2
T-8A
M-5C
F-1A
T-9
T-8B
J-1B
SS-2A-2
M-6C
T-8C
SS-0A SS-0B
M-7C
T-8D
M-5B-E
G-7
T-11 T-10
M-7D
J-3
F-5
D-6A
M-5-B
M-5-C
M-7A
M-5G
M-6A
J-2
T-3
T-5
T-9A
M-6D M-5F-A
T-6
M-7E
T-8
T-5A
T-4
SS-2D
SS-2A-1
M-6B M-5F
M-7B
H-0
M-5B
T-2
SS-2A
M-5-D
E-0
G-0
M-5E
60"
66"
60"
60"
6' x 4'
60"
60"
36"
36"
36"
36"
36"
36"
36"36"
36"
36"
36"
36"
36"
36"
36"
36"
36"
36"
42"
36"
36"
54"
48"
78"
78"
36"
36"
36"
36"
36"
36"
36"
36"36"
36"
36"
48"
36"
36" 36"
36"
54"
36"
42"
36"
36"
36"
36"
36"
72"
78"
36"
36"
36"
36"
66"
48"
42"
36"
36"
36"
36"
36"
36"
36"
48"
48"
36"
36"
36"
36"
36"
36"
36"
36"
48"
36"
48"
36"
36"
36"
66"
54"
48"
36"
36"
72"
54"
66"
36"
42"
36"
36"
42"
36"
36"
36"
36"
60"
36" 36"
36"
36"
36"
42"
36"
36"
36"
36"
42"
60"
66"
36"
48"
36"
42"
36"
42"
42"
54"
42"
36"
66"
42"
42"
60"
36"
36"
72"
60"
42"
72"
72"
48"
42"
54"
48"
42"
66"
60"
42"
36"
42"
42"
48"
42"
42"
54"
42"
48"
36"
54"
54"
42"
42"
48"
42"
60"
42"
36"
42"
54"
42"
48"
42"
42"
42"
42"
42"
54"
42"
42"
42"
42"
42"
42"
42"
54"
54"
42"
60"
42"
54"
48"
72"
42"
54"
96"
54"
48"
42"
36"
42"
42"
48"
48"
60"
48" 48"48"
66"
42"
42"
48"
54"
42"
66"
48"
48"
42"
54"
42"
60"
36"
42"
42"
36"
54"
48"
42"
42"
42"
42"
60"
42"
42"
54"
42"
42"
54"
36"
72"
78"
42"
54"
36"
48"
42"
66"
42"
42"
54"
42"
54"
66"
48"
48"
72"
72"
48"
54"
48"
42"
66"
54"
60"
42"
48"
42"
48"
42"
42"
2, 14' x 6'
42"
66"
54"
48"
54"
78"
42"
42"
42"
48"
54"
54"
42"
42"
66"
66"
60"
42"
42"
42"
60"
42"
42"66"42"
54"
66"
66"
72"
72"
42"
36"
42"
54"
42"
54"
54"
48"48"
10' x 10'
54"
42"
60"
72"
72"
48"
42"
48"
36"
42" 42"
48"
36"
48"
2, 14' x 6'
96"
14' x 8'
96"
54"
72"
10' x 8'
54"
60"
78"
78"
78"
78"
48"
54"
84"
54"
72"
66"
66"
66"
78"
72"
84"
60"
72"
72"72"
42"
54"
48"
66"
84"
72"
96"
120"
102"
F-0
San Sevaine Channel
Etiwanda Creek Channel
Summit Avenue Storm Drain
N
e
a
l e
y
' s C
o r n e r
D
r a
i n
E t i w a n
d
a
S p r e a d i n g G
r o
u
n
d
s
Lytle Creek Wash
R
i v
e
r s
i d
e
G
r
o
i n
#
2 ,
C
O
E
M u l b e r r y
C h a n n e l
Henderson Channel
Riverside Groin #5, COE
Riverside Groin #3, COE
Riverside Groin #4, COE
S
a
n
S
e
v
a
i
n
e
S
p
r
e
a
d
i
n
g
G
r
o
u
n
d
s
East Fontana Storm Drain
Lower Etiwanda Creek Channel
H
a
w
k
e
r
-
C
r
a
w
f
o
r
d
C
h
a
n
n
e
l
I - 1 0 C h a n n e l
2 4
t h
S t r e e t S t o r m D r a i n
D
e c l e z C h a n n e l
Highland Channel
W e s t F o n t a n a C h a n n e l
Cactus Channel
48 36
60 48
54 54
36 48
36 36
48 60
36 72
48 60
84 36
66 0 3,000 6,0001,500 Feet
Map Disclaimer:

The data provided hereon may be inaccurate or out of date and any person or entity who relies on said information for any purpose whatsoever does so solely at their own risk.

Neither the City of Fontana nor any agency, officer, or employee or either nor of any information provider warrants the accuracy, reliability of timeliness of any of the data provided hereon.

THIS INFORMATION IS PROVIDED ‘AS IS’ WITHOUT WARRANTY OF ANY KIND INCLUDING BY WAY OF ILLUSTRATION AND NOT OF LIMITATION THE IMPLIED WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE OR NON-INFRINGEMENT.

REFER TO CITY OF RIALTO

MASTER PLAN OF
DRAINAGE, AREA 3-3
AOS Boundary
Fontana Sphere of Influence
Existing Pipes (36-inch diameter and larger)
Regional Flood Control Channels
Metropolitan Water District Feeders
Gas Transmission Lines
Proposed Projects
100-Year
25-Year
Proposed Pipe Sizes (inches or feet)
Proposed Projects on Regional Facilities
Proposed Private Development Projects
Proposed Detention Basins
Existing Detention Basins
Existing Recharge Basins36"
36"

REFER TO CITY OF RIALTO

MASTER PLAN OF
DRAINAGE, AREA 3-3
Legend
Esri Community Maps Contributors, City of Fontana, California State Parks, Esri, TomTom, Garmin, SafeGraph, GeoTechnologies, Inc, METI/NASA, USGS, Bureau of Land Management, EPA, NPS, US Census Bureau, USDA, USFWS, City of Fontana, California State Parks, Esri, TomTom, Garmin, SafeGraph, GeoTechnologies, Inc, METI/NASA, USGS, Bureau of Land Management, EPA, NPS, US Census Bureau, USDA, USFWS, City of Rancho Cucamonga, California State Parks, Esri, TomTom, Garmin, FAO, NOAA, USGS, Bureau of Land Management, EPA, NPS, USFWS, Esri, USGS Victoria St
VintageDr
Blue Gum Dr
A rap aho Rd
Victoria Park Ln
EastAveDay
Creek
Blvd Etiw
anda
Ave
Etiwanda
15 W
Liberty
Pkwy
Miller Ave
Ilex
St
Napa S t
Cottonw
ood
Ave
N Mainstreet
Pecan
Ave
Arbor
Ln
Garcia Dr
Whittram Ave
Arrow Rte
EastA
ve
EastAve
Baseline Rd
Day
Creek
Blvd
Etiwanda Ave
V icto ria Gardens
Ln
Foothill Blvd
Foothill
Marketplace
Victoria
Gardens
EastEtiwanda Creek
10 Shea Center Dr
Concours St
K
aiser
W
ay Access
Rd
Barrington
Ave
6th St
San Bernardino Ave
Ontario Mills Pkwy
Valley Blvd
Slover Ave
N
Etiw
anda
Ave
E Airport Dr
4th St
Etiw
anda
Ave
15 Hem
lock
Ave
Walnu t St
Victoria St
S Highland Ave
Cherry
Ave
66 Sultana
Ave
E
Liberty
Pkwy
Hem
lock
Ave
Calabash
Ave
Back Straight Rd
W
Lincoln
Loop
Rd
E
Lincoln Loop
Rd
W
Yosemite Loop
Rd
W
Grand
Ave
Redw
ood
Ave
Miller Ave
Hilton Dr
Elm
Ave
Live
O
ak
Ave
Banana
Ave
W Libert y Pkwy
Bar Harbor Rd
A
lm
ond
Ave
W
Perimeter Rd
Beech
Ave
Beech Ave
Sultana AveCherry
Ave
Merrill Ave
Whittram Ave
Miller Ave
Baseline Ave
Arrow Rte Arrow Blvd
Foothill Blvd
McDermott Park
10 Hem
lock
Ave
Randall Ave
Alm
ond
Ave
Hibiscus Ave
Pine Ave
California Steel Way
Banana
Ave
Elm
Ave
M
arcona
Ave
Calabash
Ave
Live
O
ak
Ave
S Perimeter Rd
Athol St
Rosemary Dr
Washington Dr
Boyle Ave
Fontana Ave
Slover Ave
Beech
Ave
San Bernardino AveSan Bernardino Ave
Cherry
Ave
Cherry
Ave
Valley Blvd
Auto Club
Speedway
210
Walnut St
M
ango
Ave
Palm
etto
Ave
Juniper
Ave
M
aloofAve
O
leander
Ave
Alm
eria
St
Walnut Ave
Cooper Ave
Sierra
Ave
Citrus
Ave
S Highland Ave
S Highland Ave
W Casmalia St
Tam
arind
Ave
Cypress
Ave
O
leander
Ave
Juniper
Ave
Juniper
Ave
Palm
etto
Ave
Ceres Ave
Ceres Ave
Lim
e
Ave
Lim
e
Ave
Owen St
Upland Ave Upland Ave
Reed St
Ivy Ave Ivy Ave
Paine St
Alm
eria
Ave
Miller Ave
Sierra
Ave
Sierra
Ave
Sierra
Ave
Citrus
Ave
Arrow Blvd
Merrill Ave
Baseline Ave
Foothill BlvdFoothill Blvd Foothill Blvd
Font ana
Tam
arind
Ave
Juniper
Ave
Juniper
Ave
Cataw
ba
Ave
Pine Ave
Palm
etto
Ave
O
leander
Ave
O
leanderAve
Marygold Ave
Randall Ave M
ango
Ave
Poplar
Ave
Athol St
O
live
St
Date St
Washington Dr
Mallory Dr
Filbert St
Boyle Ave Boyle Ave Boyle Ave
Iris Dr
Lime Ave Acacia
Ave
Valley Blvd
Citrus
A
ve
Fontana Ave
Sierra
Ave
Sierra
Ave
Slover Ave
Palm Court
Shopping
Center
Inland Empire
Center
Cypress
Elementary
School
Kaiser Hospital
210
Alder
Ave
Alder
Ave
N
Linden
Ave
Laurel Ave
LaurelAve
Ayala
DrW Casmalia St
Re naissance Pkwy
LocustAve
Miro Way
N
Linden
Ave
LaurelAve
W 2nd St
S Linden Ave
Upland Ave
W Grove St
G
race
A
ve
M
aple
Ave
M
aple
Ave
N
Cedar Ave
LocustAve
Merrill Ave
Alder
Ave
W Base Line RdW Base Line Rd
W Etiwanda Ave
S
Cedar
Ave
W Rialto Ave
W Merrill Ave
Arrow Blvd
Miller Ave
W Foothill BlvdFoothill Blvd
10 Pine Ave
Taylor Ave
Evergreen
Ln
Marygold Ave
Larch
Ave
Pinedale Ave
Randall Ave
LaurelAve
Palm
Ln
Linden
Ave
Linden
Ave
S
Larch
Ave
W Alru St
Orange St
G
race
Ave
Valley Blvd Valley Blvd
LocustAve
Alder
Ave
Bloomington
SCG Transmission Line
SCG Transmission Line
SCG Transmission Line
12 ft. MWD Line
12 ft. MWD Line
12 ft. MWD Line
12 ft. MWD Line
Victoria
Banana
San
Sevaine 5
Hickory
Etiwanda
Conservation
Etiwanda
Conservation
Merrill
Linden
4 2
"
3 6
"
66"
6 6
"
42"
36"
42"
3 6
"
36"
6 6
"
42"
9 6 "
36"
4 8
"
60"
66"
3 6
"
3 6 " 48"
6 6
"
3 6
"
36"
60"
36"
36"
60"
54"
42"
36"
6 6
"
96"
42"
53"
36"
3 6 "
66"
7 2
"
60"
66"
C-5C-7
C-2
C-4
C-8B
C-8A
C-0C-8
60"
48"
60"
66"
66"
42"
72"
72"
72"
54"
42"
72"
78"
SS-9A DZ-10 DZ-9
DZ-7
DZ-16A DZ-15A
DZ-12A
DZ-14A
DZ-11A
DZ-11B
SS-5
42"
36" 42" 42" 42"
42" 42"42"
36"
36"
36"
36"
36"
36"
36"
36"
36"
60"
42"
36"
39"
42"
3 6
"
3 9
"
4 2 "
42"
42"
42"
60"
42"
4 8
"
36"
7 2"
3 6
"
48"
72"
36"
2, 14' x 8'
54"
36"
81"
2, 10' x 8.5'
36"
3 6 "
3 6
"
48"
48"
4 8 "
78"
4 2
"
72"
9 ' x 8 '
36"
4 8
"
54"
2, 12' x 9'
42"
66"
4 8 "
2, 12' x 9'
42"
3 6 "
5 7
"
4 5 "
3 6 "
42"
36"
45"
72"
48"
4' x 6'
4 8 "
4 8
"
6 0
"
36"
42"
72"
3 6
"
3 6 "
42"
36"
54"
12' x 6'
4 2 "
36"
36"
36"
3 6
"
2, 8' x 8'
54"
54"
66"
36"
72"
36"
6 6
"
3 6
"
57"
2, 10' x 7'
48"
5 4 "
48"
39"
75"
42"
42"
48"
75"
48"
54"
96"
2, 10' x 8'
66"
48"
2, 10' x 8'
96"
36"
54"
3 6 "
48"
42"
39"
42"
4 2
"
4 2
"
3 6
"
39"
42"
78"
3' x 3'
5 4
"
54"
3 6 "
72"
36"
7 2 "
2, 10' x 8'
4 2 "
5 4
"
36"
78"
3 6 "
4 2
"
42"
42"
54"
36"
4 2 "
42"
66"
72"
2, 10' x 8'
42"
3 6 "
36"
66"
72"
3 6
"
4 2 "
48"
42"
51"
66"
4 2 "
48"
36"
42"
57"
72"
36"
54"
36"
36"
48"
36"
36"
8' x 8'
36"
36"
45"
48"
36"
36"
48"
36"
36"
4 8
"
42"
36"
22" x 36"
6 9
"
42"
39"
48"
3 6 "
66"
36"
3 9
"
48"
5 7
"
4 8
"
42"
42"
36"
42"
5 4 "
48"
60"
3 6
"
4 2
"
42"
3 6 "
48"
48"
66"
48"
90"
48"
10' x 8'
81"
6 0 "
4 ,
1 2
'
x
1 2
'
72"
54"
3 6
"
36"
8 4 "
48"
2, 10' x 8'
6 0 "
42"
3 6 "
96"
48"
36"
48"
48"
3 6
"
3 6 "
42"
72"
48" x 42"
108"
36"
3 6 "
36"
66"
3 6 "
36"
2, 12' x 8'
3 6
"
42"
2, 10' x 8'
60"
36"
3 6
"
4 2 "
2, 12' x 8'
75"
3 6 "
72"
6 0
"
5 4
"
3 9
"
42"
4 5 "
3 6
"
96"
48"
54"
36"
48"
2 ,
1 0
'
x
6 '
9 0
"
45"
30"
36"
36"
36"
42"
48"
7 8
"
36"
54"
4 2
"
54"
60"
48"
4 8
"
60"
36"
36"
42"
42"
42"
72"
60"
51"
54"
7' x 4'
4 2
"
54"
4 2 "
2, 10' x 8'
45"
36"
4 8 "
60"
36"
36"
36"
1 0
2 "
39"
42"
2, 8' x 8'
36"
5 4
"
81"
72"
51"
45"
3 6
"
5 7
"
6 0
"
72"
9 6
"
36"
4 2
"
7 8
"
66"
45"
42"
5' x 12'
72"
5 1 "
39"
48"
8' x 8' 36"
6 0
"
42"
36"84"
72"
9 6
"
60"
5 4
"
9' x 8'
78"
5 1
"
5 4
"
1 0
8 "
42"
5 1
"
39"
78"
51"
36"
48"
5' x 10'
78"
6 9 "
5 1
"
60"
36"
51"
48"
72"
42"
36"
66"
2, 12' x 8'2, 12' x 8'
36"
2, 10' x 8'
2, 9' x 8'2, 10' x 8' 60"2, 8' x 8'2, 9' x 8'
M-5B-A
D-1A
WG-3
J-1A
E-7
E-6
H-0A
M-5-E
M-4
E-2
M-5D
E-1
T-6B
E-4
E-5
SS-1
M-2
M-1
J-4
M-5G-A
M-3
WG-1
T-5C
F-6
D-6C
SS-0
T-3A
T-7A
M-5E-A
F-1
F-3
M-5-A
F-2
G-6
G-4G-2
E-3
M-5E-FM-5E-D M-5E-E
M-5E-C
T-7B
M-5E-B
M-2A
M-0
T-0
F-4
J-1C
J-3A
G-2A
M-5A
J-4A
SS-2C
SS-2B
J-4B
M-1A
G-4A
D-6
G-6A
T-2B
J-2A
T-1B
M-5B-C
M-3A
T-2C
M-5B-B
M-5G-C
M-5B-D
M-5G-B
D-7
T-7
G-1
T-2A
G-3
SS-2A-3
G-5
T-1A
T-6A
D-6B
F-1B
T-5B
J-1
F-5A
M-5H
WG-2
T-8A
M-5C
F-1A
T-9
T-8B
J-1B
SS-2A-2
M-6C
T-8C
SS-0A SS-0B
M-7C
T-8D
M-5B-E
G-7
T-11 T-10
M-7D
J-3
F-5
D-6A
M-5-B
M-5-C
M-7A
M-5G
M-6A
J-2
T-3T-5
T-9A
M-6D
M-5F-A
T-6
M-7E
T-8
T-5A
SS-2D
T-4
SS-2A-1
M-6B
M-5F
M-7B
H-0
M-5B
T-2
SS-2A
M-5-D
E-0
G-0
M-5E
60"
66"
60"
60"
6' x 4'
60"
60"
36"
36"
36"
36"
36"
36"
36"36"
36"
36"
36"36"
36"
36"
36"
36"
36"
36"
42"
36"
36"
54"
48"
78"
78"
36"
36"
36"
36"
36"
36"
36"
36"36"
36"
36"
48"
36"
36" 36"
36"
54"
36"
42"
36"
36"
36"
36"
36"
72"
78"
36"
36"
36"
36"
66"
48"
42"
36"
36"
36"
36"
36"
36"
36"
48"
48"
36"
36"
36"
36"
36"
36"
36"
36"
48"
36"
48"
36"
36"
66"
36"
54"
48"
36"
36"
72"
54"
66"
36"
36"
42"
36"
42"
36"
36"
36"
36"
60"
36" 36"
36"
36"
36"
42"
36"
36"
36"
36"
42"
60"
66"
36"
48"
36"
42"
36"
42"
42"
54"
42"
36"
66"
42"
42"
60"
36"
36"
72"
60"
72"
42"
72"
48"
42"
54"
48"
42"
66"
60"
42"
36"
42"
42"
48"
42"
42"
42"
54"
48"
36"
54"
54"
42"
42"
48"
42"
60"
42"
36"
42"
54"
42"
48"
42"
42"
42"
42"
42"
54"
42"
42"
42"
42"
42"
42"
42"
54"
54"
42"
60"
54"
42"
48"
72"
42"
54"
96"
54"
48"
42"
36"
42"
42"
48"
48"
60"
48" 48"48"
66"
42"
54"
48"
42"
42"
66"
48"
48"
42"
54"
42"
36"
60"
36"
42"
42"
54"
48"
42"
42"
42"
42"
60"
42"
42"
54"
42"
42"
54"
36"
72"
42"
78"
54"
36"
48"
42"
42"
66"
42"
54"
42"
54"
48"
66"
48"
72"
72"
48"
54"
48"
42"
66"
54"
60"
42"
48"
42"
48"
42"
42"
2, 14' x 6'
42"
66"
54"
48"
78"
54"
42"
42"
42"
48"
42"
54"
54"
42"
66"66"
60"
42"
42"
42"
60"
42"
42"66"42"
54"
66"
66"
72"
72"
42"
36"
42"
54"
42"
54"
54"
48"48"
10' x 10'
54"
42"
60"
72"
72"
48"
42"
48"
36"
42" 42"
48"
36"
48"
2, 14' x 6'
96"
14' x 8'
96"
54"
72"
10' x 8'
54"
60"
78"
78"
78"
78"
48" 54"
84"
54"
72"
66"
66"
66"
78"
72"
84"
60"
72"
72"72"
42"
54"
48"
66"
84"
72"
96"
120"
102"
F-0
San Sevaine Channel
E
t
i
w
a
n
d
a
C
r
e
e
k
C
h
a
n
n
e
l
L
o
w
e
r
E
t
i
w
a
n
d
a
C
r
e
e
k
C
h
a
n
n
e
l
M u l b e r r y
C h a n n e l
East Fontana Storm Drain
I-10 Channel
Cactus Channel
Highland Channel
W e s t F o n t a n a C h a n n e l
Path: P:\F\FONT00000121\0600INFO\GS\Maps\ProposedCapitalImprovementProjects.aprx AOS Boundary
Fontana Sphere of Influence
Existing Pipes (36-inch diameter and larger)
Regional Flood Control Channels
Proposed Projects
100-Year
25-Year
Proposed Pipe Sizes (inches or feet)
Proposed Projects on Regional Facilities
Existing Detention Basins
Existing Recharge Basins
Metropolitan Water District Feeders
Gas Transmission Lines
AOS 1 Capital Projects
City of Fontana Storm Drain Master Plan
0 6,000 12,0003,000 Feet
36"
36"
Esri Community Maps Contributors, City of Fontana, California State Parks, Esri, TomTom, Garmin, SafeGraph, GeoTechnologies, Inc, METI/NASA, USGS, Bureau of Land Management, EPA, NPS, US Census Bureau, USDA, USFWS, City of Rancho Cucamonga, California State Parks, Esri, TomTom, Garmin, FAO, NOAA, USGS, Bureau of Land Management, EPA, NPS, USFWS, City of Fontana, County of Riverside, California State Parks, Esri, TomTom, Garmin, SafeGraph, GeoTechnologies, Inc, METI/NASA, USGS, Bureau of Land Management, EPA, NPS, US Census Bureau, USDA, USFWS, Esri, USGS EastEtiwanda Creek
10 Santa Ana St
K
aiser
W
ay Access
Rd
Barrington
Ave
6th St
San Bernardino Ave
Valley Blvd
Slover Ave
N
Etiw
anda
Ave
S
Etiw
anda
Ave
Etiw
anda
Ave
60 Dahlia St
Industry
Ave
Marlay Ave
Venture Dr
Inland Ave
C
St
B St
G
rapevine
St7th St
Dulles
Dr
D
e
Forest Cir
Jurupa Ave
Etiw
anda
Ave
S
Etiw
anda
Ave
10 Hem
lock
Ave
Hem
lock
Ave
Randall Ave
Alm
ond
Ave
Alm
ond
Ave
Business
Dr
Beech
Ave
Pine Ave
Santa Ana Ave Santa Ana Ave
Redw
ood
Ave
California Steel Way
Banana
Ave
Banana
Ave
Elm
Ave
Elm
Ave
M
arcona
Ave
Calabash
Ave
Calabash
Ave
Live
O
ak
Ave
Live
O
ak
Ave
S Perimeter Rd
Rosemary Dr
Washington Dr
Boyle Ave
Fontana Ave
Slover Ave
Beech
Ave
San Bernardino AveSan Bernardino Ave
Cherry
Ave
Cherry
Ave
Valley Blvd
M
ulberry
Ave
60 60
Beech Ave
Banana
A
ve
M arlay Ave
Elm
Ave
Canyon CrestDr
CabernetDr
Glenoak Pl
Ben Nevis Blvd
Cam
pbellSt Granit e Hill Dr
Philadelphia Ave
Jurupa Ave
M
ulberry
Ave
Country
Village
Rd
Southridge Park
Cam
pbellSt
Hastings Blvd
10 Tam
arind
Ave
Tam
arind
Ave
Juniper
Ave
Juniper
Ave
Catawba
Ave
Cataw
ba
Ave
Santa Ana Ave Santa Ana Ave
Palm
etto
Ave
O
leander
Ave
O
leanderAve
Marygold Ave
Randall Ave M
ango
Ave
Poplar
Ave Poplar Ave
O
live
St
Date
St
Washington Dr
Mallory Dr
Filbert St
Boyle Ave Boyle Ave Boyle Ave
Iris Dr
Lime Ave Acacia
Ave
Valley Blvd
Citrus
A
ve
Fontana Ave
Sierra
Ave
Sierra
Ave
Slover Ave
Palm Court
Shopping
Center
Inland Empire
Center
Cypress
Elementary
School
Kaiser Hospital
60 Jurupa Ave
Underwood Dr
Citrus AveVillag e Dr
Wil low Dr
Karen
Ln
27th
St
Scenic Dr
PyriteSt
Jurupa Ave
Sierra
Ave
Arm
strong
Rd

OAK QUARRY
Catawba Park
Jurupa
Mountains
Cultural Center
60 Granite Hill Dr
Florine
Ave
34th
St
36th
St
10 Santa Ana Ave
Pine Ave
Taylor Ave
Evergreen
Ln
Alder
Ave
Marygold Ave
Pinedale Ave
Randall Ave
Laurel Ave
LaurelAve
Palm
Ln
Linden
Ave
Linden
Ave
Orange St
M
aple
Ave
G
race
Ave
Valley Blvd Valley Blvd
Cedar
Ave
LocustAve
Locust Ave
Alder
Ave
Slover Ave Bloomington
Jurupa Ave
8th St
6th St
13th St
11th St
Alder
Ave
9th St
14th St
10th St
O
ak
St
Karen Ln
20th St 20th St
Sierra
Ave
GailDr
Loveland Dr
Rorim
erDr
LocustAve
Cedar
Ave
7th S t
Arm
strong
Rd
Crestmore
Heights
Sierra
Ave
SCG Transmission Line
12 ft. MWD Line
12 ft. MWD Line
Jurupa
RP3-C1
Upper
Declez
(DZU)
Etiwanda
Conservation
RP3-C4 RP3-C3
RP3-C2
Etiwanda
Conservation
DZ-8
SS-10
SS-6
JH-1
SS-9A
SR-4
SR-1
SS-9
SS-7
JH-2
SS-5
SS-11
DZ-13
DZ-4
DZ-15A
SS-8
DZ-9
DZ-11B
DZ-12
DZ-7
DZ-14
DZ-11
DZ-16A
SR-3
DZ-12ADZ-14A
DZ-11A
DZ-10
DZ-16
SR-2
36"
36"
36"
48"
84"
42"
36"
36"
36"
36"
48"
36"
48"
48"
36"
14' x 6'
66"
108"
48"
48"
36"
66"
60"
96"
48"
36"
42"
48"
42"
42"
42"
48"
84"
72"
84"
60"
60"
60"
42"
54"
48"
54"
54"
2, 66"
84"
60"
42"
42"
8' x 5'
66"
2, 66"
60"
84"
48"
66"
96"
42"
72"
42" 42"
60"
78"
60"
66"
8 4 "
3 6 "
6 6
"
78"
3' x 4'
54"
7 2
"
14' x 9'
36"
5' x 10'
102"
1 0 2 "
42"
36"
42"
36"
39"
78"
60"
48"
60"
48"
36"
36"
60"
36"
4 8 "
4 8 "
54"
90"
36"
36"
3 6
"
48"
42"
36"
54"
36"
3 9
"
36"
48"
7 2 "
36"
54"
36"
36"
3 6
"
72"
48"
42"
4 8 "
6 6 "
60"
3 6
"
42"
54"
6 6
"
36"
4 8
"
36"
3 6
"
48"
3 6
"
14' x 9'
36"
39"
72"
4 8 "45"
48"
14' x 9'
36"
4 5 "60"
54"
108"
3 6
"
48"
36"
5 4
"
60"
3 6
"
72"
66"
60"
7 2
"
4 2
"
60"
36"
72"
60"
102"
54"
5 4 "
24" x 36"
6 0 "
36"
45"
60"
3 6
"
39"
5 4
"
7 2
"
3 9
"
54"
36"
36"
78"
8 '
x
6 '
7 8 "
66"
48"
72"
5 ' x 1
0 '
3 6 "
54"
4 8
"
45"
9 6
"
54"
4 2
"
4 2 "
7 8
"
36"
36" 36"
14' x 9'
48"
6 6
"
78"
48"
60"
4 5 "
42"
4 2 "
6 0 "
48"
48"
54"
8 4
"
78"
78"
3 6
"
7 2
"
42"
42"
7 8 "
42"
4 2 "
63"
7 '
x
1 2
'
3 9
"
2 ,
8 '
x
4 '
45"
6 6 "
66"
48"
42"
48"
48"
8 '
x
5 '
60"
48"
42"
3 6 "
4 2
"
42"
6 ' x
1 0 '
60"
75"
60"
3 6
"
54"
78"
66"
4 2
"
66"
3 6
"
66"
42"
36"
51"
4 8 "
48"
39"
42"
4 8
"3
6 "
36"
42"
66"
66"
54"
66"
54"
6 0
"
5 4
"
7 8
"
4 2 "
54"
48"
3 9
"
78"
36"
78"
45"
51"
60"
6 0
"
1 0
8 "
7 2
"
72"
14' x 9'
108"
48"
3 9
"
90"
36"
42"
36"
69"
36"
48"
60"
66"
4 8
"
7 2
"
42"
54"
54"
4 8
"
42"
36"
4 2 "
96"
54"
36"
4 2 "
7 2
"
54"
54"
66"
7 2 "
72"
9 6 "
90"
48"
36"
75"
90"
3 6 "
42"
72"
9 6
"
96"
9 0 "
60"66"
72"
54"
8 4
"
96"
48"
72"
42"
66"
5 4
"
48"
42"
6 0
"
54"
7 8 "
36"
48"
30"
3 6 "
42"
102"
72"
90"
42"
90"
36"
54"
4' x 6'
12' x 6'
3 6
"
48"
66"
38"
3' x 3'
36"
54"
42"
42"
51"
36"
54"
42"
8 4 "
4 8
48" 48"
48" x 42"
66"
36"
42"
48"
48"
48"
60"
36"
36"
39"
78"
39"
36"
5' x 10'
M-5B-A
G-7
G-6G-5
G-4
G-3G-2
G-1
M-5B-E
M-5B-DM-5B-C
M-5B-B
M-5C
J-1A
M-4
M-5D
M-5-D
SS-2A-2 SS-2A-3
M-2
M-1
J-4
M-5G-A
M-3
M-5E-A
M-5-A
M-5E-FM-5E-D M-5E-EM-5E-C
M-5E-B
M-2A
M-0
J-1CM-5H
J-3A
J-4A
SS-2C
SS-2B
J-4B
M-1A
M-5F-A
J-2A
M-6D
M-3A
M-5G-CM-5G-B
M-7E
J-1
J-1B
M-6C
M-5FM-6B
M-7C
M-7B
M-7D
J-3
M-5-B
M-5-C
M-7A
M-5G
M-6A
J-2
SS-2D
M-5B
SS-2A
G-0
M-5E
60"
6' x 4'
36"
36"
36"
36"
36"
60"
36"
66"42"
36"
66"
42"
36"
72"
66"
42"
36"
36"
48"
36"
36"
42"
36"
42"
42"
36"
36"
36"
48"48"
36"
36"
36"
54"
36"
36"
36"
48"48"
42"
48"
36"
48"
36"
48" 48"
36"
36"
36"
42"
60"
60"
72"
42" 42" 42"
42"
48" 72"
42"
54"
48"
48"
60"54"
42"
48"
42"
42"
42"
42"42"
42"
96"
42"
66"
42"42"
48"
54"
60"
54"
42"
42"
60"
54"
54"
72"
78"
54"
42"
66"
54"
66"
54"
66"
60"
42"
2, 14' x 6'
66"
54"
78"
42"
54"
54"
42"
42"
42"
66"
72"
42"
10' x 10'
60"
2, 14' x 6'
96"
14' x 8'
96"
78"
78"
78"
72"
66"
66"
78"
72"
84"
72"
72"72"
42"
66"
72"
120"
L
o
w
e
r
E
t
i
w
a
n
d
a
C
r
e
e
k
C
h
a
n
n
e
l
M u l b e r r y
C h a n n e l
E
t
i
w
a
n
d
a
C
r
e
e
k
C
h
a
n
n
e
l
San Sevaine Channel
I - 1 0 C h a n n e l
Declez Channel
36 36
36 60
36 72
84 36
66 Path: P:\F\FONT00000121\0600INFO\GS\Maps\ProposedCapitalImprovementProjects.aprx AOS Boundary
Fontana Sphere of Influence
Existing Pipes (36-inch diameter and larger)
Regional Flood Control Channels
Proposed Projects
100-Year
25-Year
Proposed Pipe Sizes (inches or feet)
Proposed Private Development Projects
Proposed Detention Basins
Existing Detention Basins
Existing Recharge Basins
Metropolitan Water District Feeders
Gas Transmission Lines
AOS 2 Capital Projects
City of Fontana Storm Drain Master Plan
0 5,000 10,0002,500 Feet
36"
36"
Esri Community Maps Contributors, City of Fontana, California State Parks, Esri, TomTom, Garmin, SafeGraph, GeoTechnologies, Inc, METI/NASA, USGS, Bureau of Land Management, EPA, NPS, US Census Bureau, USDA, USFWS, City of Rancho Cucamonga, California State Parks, Esri, TomTom, Garmin, FAO, NOAA, USGS, Bureau of Land Management, EPA, NPS, USFWS, Esri, USGS Decliff Dr
East EtiwandaCreek
EastAve
Wilson Ave
Summit
Intermediate
Fire Station No.
6 Copley Dr
Highland Ave
Fisher Dr
Silver Sky Rd
EastAve
Colonbero Rd
Woodley Ridge Dr
Decliff Dr
Summit Ave
Regina Dr
EastEtiwanda
Creek
W
ardm
an
Bullock
Rd
Crescenta Way
San
Sevaine
Rd
Ridgeline
Pl
Aggazzotti Rd
Frost Dr
Johnston
Pl
Cherry
Ave
Wilson Ave
210
15 Copley Dr
Fisher Dr
Gypsum Dr
Highland Ave
Cherry Ave
Banyan St
Duncan Canyon Rd
Tahan
W
ay
Brookside
Ave
Coyote
C
anyon
Rd
FoxboroughDr
Bridlepath Dr
Coyote Canyon
15 Lytle
Creek
Rd
Coyote Canyon Rd
S Bridlepath Dr
Summit Ave
Fox Ridge Dr
W
rangler Dr
San
Sevaine
Rd
TenderfootDr
Deer Dr
Hawk St
RooseveltDr
ReaganDr
Saddlepeak Dr
Beech Ave
Rosena Park
East
David W Long
Elementary
Summit Heights
Hunter's Ridge
San
Sevaine
Rd
Brant Dr
Curtis Ave
Larkstone St
Lytle
Creek
Rd
Rockwell Ave
Horizon St
ChantelDr
Sierra Lakes P kwy
Sierra Lakes Pkwy
S Highland Ave
15 15
Coyote Canyon Rd
Duncan Canyon Rd
LytleCreek
Rd
Citrus
A
ve
AgaveAve
Blue Iris St
Caterpillar Dr
Coyote Canyon
Park
Summit AveSummit Ave Summit Ave
Citrus
Ave
Park House Dr
Edw
ard
Ave
Casa Grande Ave
Cypress
Ave
Pine
LeafAve
3 Mile R d
Parkside Way
M agnolia Way
Delam
ar
D
r
Gardens St
Parry Peak Dr Godinez Dr
Wibert Dr
Sierra Lakes
Golf Course
Fontana Park
Patricia Marrujo
Park
Summit High
School
Citrus Heights
North
Citrus Heights
South
210
MedinahSt
Augusta
Dr
Citrus
Ave
Knox
Ave
M
aloofAve
Highland Ave
Curtis Ave
Tokay
Ave
Cooper
Ave
Sierra Lakes Pkwy
S Highland Ave
Sierra Lakes
15 Lyt le Creek
Rd
Sycamore C reek Dr
Sierra
Ave
Nealeys Corner
15 W Terra Vista Dr
M
ango A
ve
Linde Vista Dr
Palm
etto
Ave
W Via Bello Dr
Rim
a
Dr
Yarrow Ln
Sierra
Ave
N Riverside Ave
Clubhouse Dr
C olonial Dr
Wyndham Ln
Augusta
Dr
Escalon Dr
W Casa Grande Dr
Napa
Valley
Rd
Three Mile Rd
W Sunrise Dr
Summit Ave Summit Ave
N
M
ango
Ave
La
Sierra
D
r
M
ango
A
ve
Almaden Dr
Alder
Ave
Sierra
Ave
Sierra
Ave
Kaiser
Ave
Sierra
Ave
Augusta
D
r
Sierra
Ave
W Casmalia St
American Elm RdWhite Ash Rd
Lytle Creek Wash
AdlerAve
N Riverside Ave
Ethel Kucera
Middle School
W Casa Grande Dr
W Buena Vista Dr
Lowell St
Stonehurst Dr
Summit Ave
Fergusson Park
210
AlderAve
LaurelAve
Renaissance Pkwy
W Casmalia St
SCG Transmission Line
12 ft. MWD Line
12 ft. MWD Line
San Sevaine 1
San
Sevaine 3
San Sevaine 2
San Sevaine 5
Etiwanda
Debris
Basin
Rich
San Sevaine 4 36"
42"
60"
60"
4 8 "
4 2 "
6 6
"
42"
4 8
"
4 2
"
6 0
"
36"
7 2
"
4 2 "
3 6
"
3 6 "
6 0
"
3 6 "
3 6 "
7 8
"
4 2
"
3 6
"
3 6 "
42"
72"
3 6
"
72"
36"
36"
3 6
"
60"
66"
66"
48"
5 4 "
42"
78"
4 2 "
36"
8 4
"
48"
6 6
"
36"
48"
36"
36"
3 6 "
5 4
"
42"
60"
54"
60"
36"
42"
3 6
"
36"
4 5
"
36"42"
4 2
"
3 6 "
42"
36"
36"
48 36"
4 8
"
42"
78"
36"
66"
36"
66"
36"
36"
3 6
"
36"
36" 36"
72"
42"
4 2 "
9 6 "
66"
4 8
"
4 8
"
42"
42"
36"
36"
36"
42"
42"
60"
36"
3 6
"
3 6
"
6 6 "
42"
4 8
"
3 6
"
36"
78"
6 .
5 '
x
2 '
60"
4 2
"
36"
5 7
"
6 6 "
6 0 "
54"
3 6 "
36"
42"
3 6
"
3 6 "
3 6
"
3 6
"
72"
5 4 "
54"
66"
4 2
"
42"
3 6
"
36"
36"
54"
4 8
"
66"
4 8 "
5 4
"
60"
3 6
"
36"
36"
3 6
"
3 6 "
4 2 "
42"
78"
36"
36"
42"
36"
60"
6 0
"
91"
96"
3 6 "
36"
36"
54"
48"
4 2 "
3 6 "
3 6
"
96"
48"
60"
4 8 "
3 6 "
3 6 "
48"
36"
42"
60"
36"
4 2
"
3 6 "
4 8 "
9 1
"
3 6 "
5 4
"
5 4
"
36"
4 8
"
84"
4 2
"
36"
4 8
"
36"
5 4
"
54"
54"
2 x 18"
7 8
"
4 2 "
66"
3 6
"
3 6
"
36"
84"
36"
3 6 "
4 2 "
48"
42"
54"
78"
36"
4 2
"
36"
48"
48"
36"
60"
6 0
"
66"
2 x 30"
3 6
"
36"
6 0 "
60"
36"
78"
6 6
"
3 6
"
48"
72"
48"
54"
4 8
4 8 "
60"
48"
36"
96"
54"
42"
66"
42"
42"
5 3 "
60"
72"
36"
36"
7 2
"
4 8 "
36"
54"
3 6 "
36"
36"
84"
66"
6 6
"
42"
9 0
"
72"
78"
42"
54"
36"
66"
5 4
"
66"
36"
4 8
"
36"
96"
60"
66"
36"
B-6
C-6
A-3B
B-3
C-9
C-2
A-0D
B-7
B-2
B-5
B-1
A-0C
C-8A
HR-1
A-4
A-1A
A-0
B-8
C-5
A-1
C-8
A-2A
A-2
A-3A
C-7
C-4
A-0A
B-5A
A-0B
A-3C
C-0
C-8B
A-3
54"
42"
42"
36"
42"
36"
66"
36"
66"
36"
42"
36"
36"
72"
48"
54"
90"
72"
42"
42"
96"
36"
36"
36"
36"
48"
78"
36"
36"
36"
42"
48"
36"
9' x 12'
48"
42"
42"
54"
42"
54"
48"
60"
72"
96"
36"
60"
42"
42"
96"
48"
10' x 9'
48"
60"
84"
78"
72"
84"
72"
66"
90"
36"
42"
48"
3 6 "
Lytle Creek Wash
E
t
i
w
a
n
d
a
C
r
e
e
k
C
h
a
n
n
e
l
Summit Avenue Storm Drain
E t i w a n d a S
p
r e
a
d
i n
g
G r o u n d s
R
i v
e
r s
i d
e
G
r
o
i n
#
2 ,
C
O
E
S
a
n
S
e
v
a
i
n
e
C
h
a
n
n
e
l
R i v e r s i d e G r o i n # 4 , C O E
2 4 t h S t r e e t S t o r m D r a i n
Henderson Channel
Riverside Groin #3, COE
S
a
n
S
e
v
a
i
n
e
S
p
r
e
a
d
i
n
g
G
r
o
u
n
d
s
C a c t u s C h a n n e l
H
a
w
k
e
r
-
C
r
a
w
f
o
r
d
C
h
a
n
n
e
l
Highland Channel
48 60
48 54
54 36
48 48
48 60
Path: P:\F\FONT00000121\0600INFO\GS\Maps\ProposedCapitalImprovementProjects.aprx AOS 3 Capital Projects
City of Fontana Storm Drain Master Plan
AOS Boundary
Fontana Sphere of Influence
Existing Pipes (36-inch diameter and larger)
Regional Flood Control Channels
Proposed Projects
100-Year
25-Year
Proposed Pipe Sizes (inches or feet)
Proposed Private Development Projects
Proposed Detention Basins
Existing Detention Basins
Existing Recharge Basins
Metropolitan Water District Feeders
Gas Transmission Lines
0 4,000 8,0002,000 Feet
36"
36"
AOS 1 Capital Project Cost Estimates

City of Fontana Storm Drain Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Project Cost Project Cost Project Cost Project Cost
D-1A $638,000.00 H-0 $16,558,000.00 M-5D $883,000.00 SS-2D $4,625,000.00 D-6 $20,519,000.00 H-0A $1,376,000.00 M-5E $27,493,000.00 T-0 $6,570,000.00 D-6A $4,675,000.00 J-1 $5,558,000.00 M-5E-A $1,543,000.00 T-10 $4,439,000.00 D-6B $3,028,000.00 J-1A $3,660,000.00 M-5E-B $1,985,000.00 T-11 $4,489,000.00 D-6C $1,459,000.00 J-1B $4,074,000.00 M-5E-C $1,960,000.00 T-1A $3,929,000.00 D-7 $3,131,000.00 J-1C $2,140,000.00 M-5E-D $1,931,000.00 T-1B $2,342,000.00 E-0 $27,459,000.00 J-2 $7,918,000.00 M-5E-E $1,936,000.00 T-2 $20,035,000.00 E-1 $10,120,000.00 J-2A $2,425,000.00 M-5E-F $1,914,000.00 T-2A $7,649,000.00 E-2 $6,511,000.00 J-3 $6,428,000.00 M-5F $8,724,000.00 T-2B $6,375,000.00 E-3 $6,394,000.00 J-3A $2,178,000.00 M-5F-A $5,968,000.00 T-2C $6,388,000.00 E-4 $6,764,000.00 J-4 $1,528,000.00 M-5G $7,041,000.00 T-3 $9,259,000.00 E-5 $6,409,000.00 J-4A $2,248,000.00 M-5G-A $1,450,000.00 T-3A $11,376,000.00 E-6 $6,249,000.00 J-4B $2,255,000.00 M-5G-B $2,428,000.00 T-4 $5,880,000.00 E-7 $6,321,000.00 M-0 $3,064,000.00 M-5G-C $2,473,000.00 T-5 $8,995,000.00 F-1 $2,821,000.00 M-1 $2,254,000.00 M-5H $11,553,000.00 T-5A $5,790,000.00 F-1A $4,093,000.00 M-1A $2,228,000.00 M-6A $8,300,000.00 T-5B $5,614,000.00 F-1B $2,986,000.00 M-2 $1,528,000.00 M-6B $8,904,000.00 T-5C $7,346,000.00 F-2 $4,982,000.00 M-2A $1,980,000.00 M-6C $4,254,000.00 T-6 $7,250,000.00 F-3 $4,898,000.00 M-3 $1,604,000.00 M-6D $6,021,000.00 T-6A $2,584,000.00 F-4 $2,134,000.00 M-3A $2,490,000.00 M-7A $10,749,000.00 T-6B $3,350,000.00 F-5 $5,824,000.00 M-4 $775,000.00 M-7B $9,501,000.00 T-7 $12,064,000.00 F-5A $3,272,000.00 M-5-A $42,209,000.00 M-7C $4,550,000.00 T-7A $1,434,000.00 F-6 $4,530,000.00 M-5-B $87,343,000.00 M-7D $4,736,000.00 T-7B $2,069,000.00 G-0 $31,966,000.00 M-5-C $11,275,000.00 M-7E $6,074,000.00 T-8 $10,190,000.00 G-1 $2,509,000.00 M-5-D $10,714,000.00 SS-0 $3,850,000.00 T-8A $3,685,000.00 G-2 $5,221,000.00 M-5-E $807,000.00 SS-0A $3,800,000.00 T-8B $3,920,000.00 G-2A $2,275,000.00 M-5A $2,295,000.00 SS-0B $4,371,000.00 T-8C $3,768,000.00 G-3 $2,518,000.00 M-5B $13,584,000.00 SS-1 $1,130,000.00 T-8D $5,920,000.00 G-4 $5,360,000.00 M-5B-A $377,000.00 SS-2A-1 $7,183,000.00 T-9 $4,593,000.00 G-4A $2,411,000.00 M-5B-B $2,380,000.00 SS-2A $28,483,000.00 T-9A $5,871,000.00 G-5 $2,514,000.00 M-5B-C $2,359,000.00 SS-2A-2 $4,513,000.00 WG-1 $1,625,000.00 G-6 $5,496,000.00 M-5B-D $2,398,000.00 SS-2A-3 $6,658,000.00 WG-2 $3,643,000.00 G-6A $2,435,000.00 M-5B-E $4,419,000.00 SS-2B $15,071,000.00 WG-3 $828,000.00 G-7 $5,223,000.00 M-5C $3,936,000.00 SS-2C $16,093,000.00 City of Fontana Storm Drain Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name D-1A
Units Quantities Unit Price * Item Total
1 Install 42" RCP FT 540 $588 318,000$
2 Manhole EA 1 $20,322 20,000$
3 Sawcut and Remove Existing AC Pavement SF 3,180 $2.66 8,000$ 4 Crushed Miscellaneous Base SF 3,180 $4 13,000$
5 Replace Asphalt Concrete Pavement SF 3,180 $2 6,000$
6 Traffic Control % 5% 18,000$
7 Erosion Control % 1% 4,000$
8 Moblilization/Demobilization % 10% 39,000$
426,000$
Engineering and Design % 10% 42,600$
Surveying & Staking & Geotechnical % 5% 21,000$
Construction Management/Staff % 10% 42,600$
106,000$
532,000$
20% 106,000$
638,000$
* All unit prices reflect 2024 costs.

CONTINGENCY

TOTAL PROJECT
Item No. Item Description Project Total

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
2 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name D-6
Units Quantities Unit Price * Item Total
1 Install 10' x 8' RCB FT 1,990 $4,491 8,937,000$
2 Manhole EA 5 $20,322 102,000$
3 Remove 14' x 8' RCB FT 850 $910 773,000$
4 Remove 12' x 8' RCB FT 1,990 $639 1,272,000$
5 Sawcut and Remove Existing AC Pavement SF 19,900 $2.66 53,000$ 6 Crushed Miscellaneous Base SF 19,900 $4 80,000$
7 Replace Asphalt Concrete Pavement SF 19,900 $2 40,000$ 8 Traffic Control % 5% 563,000$
9 Erosion Control % 1% 118,000$
10 Moblilization/Demobilization % 10% 1,194,000$
13,132,000$
Engineering and Design % 10% 1,313,000$
Surveying & Staking & Geotechnical % 5% 657,000$
Construction Management/Staff % 10% 1,313,000$
3,283,000$
16,415,000$
25% 4,104,000$
20,519,000$
+ Contingency increased to 25% due to major highway conflict * All unit prices reflect 2024 costs.

CONTINGENCY +

TOTAL PROJECT
Item No. Item Description Project Total

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
3 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name D-6A
Units Quantities Unit Price * Item Total
1 Install 36" RCP FT 1,320 $527 696,000$
2 Install 42" RCP FT 1,700 $588 1,000,000$
3 Install 54" RCP FT 680 $732 498,000$
4 Manhole EA 9 $20,322 183,000$
5 Sawcut and Remove Existing AC Pavement SF 21,740 $2.66 58,000$ 6 Crushed Miscellaneous Base SF 21,740 $4 87,000$
7 Replace Asphalt Concrete Pavement SF 21,740 $2 43,000$ 8 Traffic Control % 5% 128,000$
9 Erosion Control % 1% 27,000$
10 Moblilization/Demobilization % 10% 272,000$
2,992,000$
Engineering and Design % 10% 299,000$
Surveying & Staking & Geotechnical % 5% 150,000$
Construction Management/Staff % 10% 299,000$
748,000$
3,740,000$
25% 935,000$
4,675,000$
+ Contingency increased to 25% due to major highway, 12' water main, and SCG transmisson line conflict * All unit prices reflect 2024 costs.

CONTINGENCY +

TOTAL PROJECT
Item No. Item Description Project Total

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
4 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name D-6B
Units Quantities Unit Price * Item Total
1 Install 36" RCP FT 380 $527 200,000$
2 Install 42" RCP FT 620 $588 365,000$
3 Install 48" RCP FT 1,300 $656 853,000$
4 Manhole EA 6 $20,322 122,000$
5 Sawcut and Remove Existing AC Pavement SF 14,020 $2.66 37,000$ 6 Crushed Miscellaneous Base SF 14,020 $4 56,000$
7 Replace Asphalt Concrete Pavement SF 14,020 $2 28,000$ 8 Traffic Control % 5% 83,000$
9 Erosion Control % 1% 17,000$
10 Moblilization/Demobilization % 10% 176,000$
1,937,000$
Engineering and Design % 10% 194,000$
Surveying & Staking & Geotechnical % 5% 97,000$
Construction Management/Staff % 10% 194,000$
485,000$
2,422,000$
25% 606,000$
3,028,000$
+ Contingency increased to 25% due to major highway conflict * All unit prices reflect 2024 costs.

CONTINGENCY +

TOTAL PROJECT
Project TotalItem No. Item Description

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
5 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name D-6C
Units Quantities Unit Price * Item Total
1 Install 36" RCP FT 1,290 $527 680,000$
2 Manhole EA 3 $20,322 61,000$
3 Sawcut and Remove Existing AC Pavement SF 6,880 $2.66 18,000$ 4 Crushed Miscellaneous Base SF 6,880 $4 28,000$
5 Replace Asphalt Concrete Pavement SF 6,880 $2 14,000$ 6 Traffic Control % 5% 40,000$
7 Erosion Control % 1% 8,000$
8 Moblilization/Demobilization % 10% 85,000$
934,000$
Engineering and Design % 10% 93,000$
Surveying & Staking & Geotechnical % 5% 47,000$
Construction Management/Staff % 10% 93,000$
233,000$
1,167,000$
25% 292,000$
1,459,000$
+ Contingency increased to 25% due to major highway conflict * All unit prices reflect 2024 costs.

CONTINGENCY +

TOTAL PROJECT
Project TotalItem No. Item Description

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
6 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name D-7
Units Quantities Unit Price * Item Total
1 Install 48" RCP FT 450 $656 295,000$
2 Install 54" RCP FT 670 $732 490,000$
3 Install 60" RCP FT 950 $816 775,000$
4 Manhole EA 5 $20,322 102,000$
5 Sawcut and Remove Existing AC Pavement SF 14,680 $2.66 39,000$ 6 Crushed Miscellaneous Base SF 14,680 $4 59,000$
7 Replace Asphalt Concrete Pavement SF 14,680 $2 29,000$ 8 Traffic Control % 5% 89,000$
9 Erosion Control % 1% 19,000$
10 Moblilization/Demobilization % 10% 190,000$
2,087,000$
Engineering and Design % 10% 209,000$
Surveying & Staking & Geotechnical % 5% 104,000$
Construction Management/Staff % 10% 209,000$
522,000$
2,609,000$
20% 522,000$
3,131,000$
* All unit prices reflect 2024 costs.

CONTINGENCY

TOTAL PROJECT
Item No. Item Description Project Total

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
7 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name E-0
Units Quantities Unit Price * Item Total
1 Install 102" RCP FT 7,920 $1,753 13,884,000$
2 Manhole EA 20 $20,322 406,000$
3 Sawcut and Remove Existing AC Pavement SF 89,430 $2.66 238,000$ 4 Crushed Miscellaneous Base SF 89,430 $4 358,000$
5 Replace Asphalt Concrete Pavement SF 89,430 $2 179,000$ 6 Traffic Control % 5% 753,000$
7 Erosion Control % 1% 158,000$
8 Moblilization/Demobilization % 10% 1,598,000$
17,574,000$
Engineering and Design % 10% 1,757,000$
Surveying & Staking & Geotechnical % 5% 879,000$
Construction Management/Staff % 10% 1,757,000$
4,393,000$
21,967,000$
25% 5,492,000$
27,459,000$
+ Contingency increased to 25% due to major highway conflict * All unit prices reflect 2024 costs.

CONTINGENCY +

TOTAL PROJECT
Item No. Item Description Project Total

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
8 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name E-1
Units Quantities Unit Price * Item Total
1 Install 36" RCP FT 790 $527 416,000$
2 Install 42" RCP FT 1,170 $588 688,000$
3 Install 48" RCP FT 2,650 $656 1,738,000$
4 Install 54" RCP FT 2,650 $732 1,940,000$
5 Manhole EA 18 $20,322 366,000$
6 Sawcut and Remove Existing AC Pavement SF 46,540 $2.66 124,000$ 7 Crushed Miscellaneous Base SF 46,540 $4 186,000$
8 Replace Asphalt Concrete Pavement SF 46,540 $2 93,000$ 9 Traffic Control % 5% 278,000$
10 Erosion Control % 1% 58,000$
11 Moblilization/Demobilization % 10% 589,000$
6,476,000$
Engineering and Design % 10% 648,000$
Surveying & Staking & Geotechnical % 5% 324,000$
Construction Management/Staff % 10% 648,000$
1,620,000$
8,096,000$
25% 2,024,000$
10,120,000$
+ Contingency increased to 25% due to major highway conflict * All unit prices reflect 2024 costs.

CONTINGENCY +

TOTAL PROJECT
Item No. Item Description Project Total

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
9 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name E-2
Units Quantities Unit Price * Item Total
1 Install 36" RCP FT 690 $527 364,000$
2 Install 42" RCP FT 1,150 $588 676,000$
3 Install 48" RCP FT 520 $656 341,000$
4 Install 54" RCP FT 1,340 $732 981,000$
5 Install 66" RCP FT 800 $911 729,000$
6 Manhole EA 11 $20,322 224,000$
7 Sawcut and Remove Existing AC Pavement SF 29,540 $2.66 79,000$ 8 Crushed Miscellaneous Base SF 29,540 $4 118,000$
9 Replace Asphalt Concrete Pavement SF 29,540 $2 59,000$ 10 Traffic Control % 5% 179,000$
11 Erosion Control % 1% 38,000$
12 Moblilization/Demobilization % 10% 379,000$
4,167,000$
Engineering and Design % 10% 417,000$
Surveying & Staking & Geotechnical % 5% 208,000$
Construction Management/Staff % 10% 417,000$
1,042,000$
5,209,000$
25% 1,302,000$
6,511,000$
+ Contingency increased to 25% due to major highway conflict * All unit prices reflect 2024 costs.

CONTINGENCY +

TOTAL PROJECT
Item No. Item Description Project Total

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
10 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name E-3
Units Quantities Unit Price * Item Total
1 Install 36" RCP FT 890 $527 469,000$
2 Install 42" RCP FT 1,150 $588 676,000$
3 Install 48" RCP FT 1,000 $656 656,000$
4 Install 54" RCP FT 1,650 $732 1,208,000$
5 Manhole EA 12 $20,322 244,000$
6 Sawcut and Remove Existing AC Pavement SF 29,410 $2.66 78,000$ 7 Crushed Miscellaneous Base SF 29,410 $4 118,000$
8 Replace Asphalt Concrete Pavement SF 29,410 $2 59,000$ 9 Traffic Control % 5% 175,000$
10 Erosion Control % 1% 37,000$
11 Moblilization/Demobilization % 10% 372,000$
4,092,000$
Engineering and Design % 10% 409,000$
Surveying & Staking & Geotechnical % 5% 205,000$
Construction Management/Staff % 10% 409,000$
1,023,000$
5,115,000$
25% 1,279,000$
6,394,000$
+ Contingency increased to 25% due to major highway conflict * All unit prices reflect 2024 costs.

CONTINGENCY +

TOTAL PROJECT
Item No. Item Description Project Total

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
11 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name E-4
Units Quantities Unit Price * Item Total
1 Install 36" RCP FT 650 $527 343,000$
2 Install 42" RCP FT 1,140 $588 670,000$
3 Install 54" RCP FT 1,690 $732 1,237,000$
4 Install 72" RCP FT 960 $1,016 975,000$
5 Manhole EA 11 $20,322 224,000$
6 Sawcut and Remove Existing AC Pavement SF 30,170 $2.66 80,000$ 7 Crushed Miscellaneous Base SF 30,170 $4 121,000$
8 Replace Asphalt Concrete Pavement SF 30,170 $2 60,000$ 9 Traffic Control % 5% 186,000$
10 Erosion Control % 1% 39,000$
11 Moblilization/Demobilization % 10% 394,000$
4,329,000$
Engineering and Design % 10% 433,000$
Surveying & Staking & Geotechnical % 5% 216,000$
Construction Management/Staff % 10% 433,000$
1,082,000$
5,411,000$
25% 1,353,000$
6,764,000$
+ Contingency increased to 25% due to major highway conflict * All unit prices reflect 2024 costs.

CONTINGENCY +

TOTAL PROJECT
Item No. Item Description Project Total

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
12 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name E-5
Units Quantities Unit Price * Item Total
1 Install 36" RCP FT 480 $527 253,000$
2 Install 42" RCP FT 1,140 $588 670,000$
3 Install 54" RCP FT 1,650 $732 1,208,000$
4 Install 66" RCP FT 1,000 $911 911,000$
5 Manhole EA 11 $20,322 224,000$
6 Sawcut and Remove Existing AC Pavement SF 28,790 $2.66 77,000$ 7 Crushed Miscellaneous Base SF 28,790 $4 115,000$
8 Replace Asphalt Concrete Pavement SF 28,790 $2 58,000$ 9 Traffic Control % 5% 176,000$
10 Erosion Control % 1% 37,000$
11 Moblilization/Demobilization % 10% 373,000$
4,102,000$
Engineering and Design % 10% 410,000$
Surveying & Staking & Geotechnical % 5% 205,000$
Construction Management/Staff % 10% 410,000$
1,025,000$
5,127,000$
25% 1,282,000$
6,409,000$
+ Contingency increased to 25% due to major highway conflict * All unit prices reflect 2024 costs.

CONTINGENCY +

TOTAL PROJECT
Item No. Item Description Project Total

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
13 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name E-6
Units Quantities Unit Price * Item Total
1 Install 36" RCP FT 320 $527 169,000$
2 Install 42" RCP FT 1,180 $588 694,000$
3 Install 54" RCP FT 1,970 $732 1,442,000$
4 Install 72" RCP FT 680 $1,016 691,000$
5 Manhole EA 10 $20,322 203,000$
6 Sawcut and Remove Existing AC Pavement SF 26,450 $2.66 70,000$ 7 Crushed Miscellaneous Base SF 26,450 $4 106,000$
8 Replace Asphalt Concrete Pavement SF 26,450 $2 53,000$ 9 Traffic Control % 5% 171,000$
10 Erosion Control % 1% 36,000$
11 Moblilization/Demobilization % 10% 364,000$
3,999,000$
Engineering and Design % 10% 400,000$
Surveying & Staking & Geotechnical % 5% 200,000$
Construction Management/Staff % 10% 400,000$
1,000,000$
4,999,000$
25% 1,250,000$
6,249,000$
+ Contingency increased to 25% due to major highway conflict * All unit prices reflect 2024 costs.

CONTINGENCY +

TOTAL PROJECT
Item No. Item Description Project Total

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
14 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name E-7
Units Quantities Unit Price * Item Total
1 Install 36" RCP FT 560 $527 295,000$
2 Install 42" RCP FT 1,070 $588 629,000$
3 Install 54" RCP FT 1,990 $732 1,457,000$
4 Install 66" RCP FT 670 $911 610,000$
5 Manhole EA 11 $20,322 224,000$
6 Sawcut and Remove Existing AC Pavement SF 29,240 $2.66 78,000$ 7 Crushed Miscellaneous Base SF 29,240 $4 117,000$
8 Replace Asphalt Concrete Pavement SF 29,240 $2 58,000$ 9 Traffic Control % 5% 173,000$
10 Erosion Control % 1% 36,000$
11 Moblilization/Demobilization % 10% 368,000$
4,045,000$
Engineering and Design % 10% 405,000$
Surveying & Staking & Geotechnical % 5% 202,000$
Construction Management/Staff % 10% 405,000$
1,012,000$
5,057,000$
25% 1,264,000$
6,321,000$
+ Contingency increased to 25% due to major highway conflict * All unit prices reflect 2024 costs.

CONTINGENCY +

TOTAL PROJECT
Item No. Item Description Project Total

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
15 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name F-1
Units Quantities Unit Price * Item Total
1 Install 72" RCP FT 1,340 $1,016 1,361,000$
2 Manhole EA 3 $20,322 61,000$
3 Remove 48" RCP FT 530 $71 38,000$
4 Remove 54" RCP FT 650 $80 52,000$
5 Sawcut and Remove Existing AC Pavement SF 11,510 $2.66 31,000$ 6 Crushed Miscellaneous Base SF 11,510 $4 46,000$
7 Replace Asphalt Concrete Pavement SF 11,510 $2 23,000$ 8 Traffic Control % 5% 81,000$
9 Erosion Control % 1% 17,000$
10 Moblilization/Demobilization % 10% 171,000$
1,881,000$
Engineering and Design % 10% 188,000$
Surveying & Staking & Geotechnical % 5% 94,000$
Construction Management/Staff % 10% 188,000$
470,000$
2,351,000$
20% 470,000$
2,821,000$
* All unit prices reflect 2024 costs.

CONTINGENCY

TOTAL PROJECT
Item No. Item Description Project Total

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
16 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name F-1A
Units Quantities Unit Price * Item Total
1 Install 36" RCP FT 730 $527 385,000$
2 Install 42" RCP FT 690 $588 406,000$
3 Install 48" RCP FT 650 $656 426,000$
4 Install 54" RCP FT 1,000 $732 732,000$
5 Manhole EA 8 $20,322 163,000$
6 Remove 42" RCP FT 980 $62 61,000$
7 Sawcut and Remove Existing AC Pavement SF 19,210 $2.66 51,000$ 8 Crushed Miscellaneous Base SF 19,210 $4 77,000$
9 Replace Asphalt Concrete Pavement SF 19,210 $2 38,000$ 10 Traffic Control % 5% 117,000$
11 Erosion Control % 1% 25,000$
12 Moblilization/Demobilization % 10% 248,000$
2,729,000$
Engineering and Design % 10% 273,000$
Surveying & Staking & Geotechnical % 5% 136,000$
Construction Management/Staff % 10% 273,000$
682,000$
3,411,000$
20% 682,000$
4,093,000$
* All unit prices reflect 2024 costs.

CONTINGENCY

TOTAL PROJECT
Item No. Item Description Project Total

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
17 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name F-1B
Units Quantities Unit Price * Item Total
1 Install 36" RCP FT 710 $527 374,000$
2 Install 42" RCP FT 690 $588 406,000$
3 Install 48" RCP FT 970 $656 636,000$
4 Manhole EA 6 $20,322 122,000$
5 Remove 24" RCP FT 200 $35 7,000$
6 Remove 30" RCP FT 920 $44 40,000$
7 Sawcut and Remove Existing AC Pavement SF 14,070 $2.66 37,000$ 8 Crushed Miscellaneous Base SF 14,070 $4 56,000$
9 Replace Asphalt Concrete Pavement SF 14,070 $2 28,000$ 10 Traffic Control % 5% 85,000$
11 Erosion Control % 1% 18,000$
12 Moblilization/Demobilization % 10% 181,000$
1,990,000$
Engineering and Design % 10% 199,000$
Surveying & Staking & Geotechnical % 5% 100,000$
Construction Management/Staff % 10% 199,000$
498,000$
2,488,000$
20% 498,000$
2,986,000$
* All unit prices reflect 2024 costs.

CONTINGENCY

TOTAL PROJECT
Item No. Item Description Project Total

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
18 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name F-2
Units Quantities Unit Price * Item Total
1 Install 36" RCP FT 820 $527 432,000$
2 Install 42" RCP FT 650 $588 382,000$
3 Install 48" RCP FT 660 $656 433,000$
4 Install 54" RCP FT 1,110 $732 813,000$
5 Install 60" RCP FT 280 $816 228,000$
6 Manhole EA 9 $20,322 183,000$
7 Remove 36" RCP FT 720 $53 38,000$
8 Remove 39" RCP FT 850 $58 49,000$
9 Remove 42" RCP FT 320 $62 20,000$
10 Remove 48" RCP FT 1,080 $71 77,000$
11 Sawcut and Remove Existing AC Pavement SF 22,260 $2.66 59,000$ 12 Crushed Miscellaneous Base SF 22,260 $4 89,000$
13 Replace Asphalt Concrete Pavement SF 22,260 $2 45,000$ 14 Traffic Control % 5% 142,000$
15 Erosion Control % 1% 30,000$
16 Moblilization/Demobilization % 10% 302,000$
3,322,000$
Engineering and Design % 10% 332,000$
Surveying & Staking & Geotechnical % 5% 166,000$
Construction Management/Staff % 10% 332,000$
830,000$
4,152,000$
20% 830,000$
4,982,000$
Item No. Item Description Project Total

SUBTOTAL (CONSTRUCTION)
* All unit prices reflect 2024 costs.

SUBTOTAL COST

CONTINGENCY

TOTAL PROJECT

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)
19 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name F-3
Units Quantities Unit Price * Item Total
1 Install 36" RCP FT 850 $527 448,000$
2 Install 42" RCP FT 640 $588 376,000$
3 Install 48" RCP FT 670 $656 440,000$
4 Install 54" RCP FT 530 $732 388,000$
5 Install 66" RCP FT 840 $911 765,000$
6 Manhole EA 9 $20,322 183,000$
7 Sawcut and Remove Existing AC Pavement SF 23,040 $2.66 61,000$ 8 Crushed Miscellaneous Base SF 23,040 $4 92,000$
9 Replace Asphalt Concrete Pavement SF 23,040 $2 46,000$ 10 Traffic Control % 5% 140,000$
11 Erosion Control % 1% 29,000$
12 Moblilization/Demobilization % 10% 297,000$
3,265,000$
Engineering and Design % 10% 327,000$
Surveying & Staking & Geotechnical % 5% 163,000$
Construction Management/Staff % 10% 327,000$
817,000$
4,082,000$
20% 816,000$
4,898,000$
* All unit prices reflect 2024 costs.

CONTINGENCY

TOTAL PROJECT
Item No. Item Description Project Total

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
20 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name F-4
Units Quantities Unit Price * Item Total
1 Install 36" RCP FT 480 $527 253,000$
2 Install 42" RCP FT 1,320 $588 776,000$
3 Manhole EA 5 $20,322 102,000$
4 Sawcut and Remove Existing AC Pavement SF 10,320 $2.66 27,000$ 5 Crushed Miscellaneous Base SF 10,320 $4 41,000$
6 Replace Asphalt Concrete Pavement SF 10,320 $2 21,000$ 7 Traffic Control % 5% 61,000$
8 Erosion Control % 1% 13,000$
9 Moblilization/Demobilization % 10% 129,000$
1,423,000$
Engineering and Design % 10% 142,000$
Surveying & Staking & Geotechnical % 5% 71,000$
Construction Management/Staff % 10% 142,000$
355,000$
1,778,000$
20% 356,000$
2,134,000$
* All unit prices reflect 2024 costs.

CONTINGENCY

TOTAL PROJECT
Item No. Item Description Project Total

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
21 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name F-5
Units Quantities Unit Price * Item Total
1 Install 36" RCP FT 890 $527 469,000$
2 Install 42" RCP FT 710 $588 417,000$
3 Install 72" RCP FT 1,970 $1,016 2,002,000$
4 Manhole EA 9 $20,322 183,000$
5 Remove 39" RCP FT 590 $58 34,000$
6 Sawcut and Remove Existing AC Pavement SF 25,830 $2.66 69,000$ 7 Crushed Miscellaneous Base SF 25,830 $4 103,000$
8 Replace Asphalt Concrete Pavement SF 25,830 $2 52,000$ 9 Traffic Control % 5% 166,000$
10 Erosion Control % 1% 35,000$
11 Moblilization/Demobilization % 10% 353,000$
3,883,000$
Engineering and Design % 10% 388,000$
Surveying & Staking & Geotechnical % 5% 194,000$
Construction Management/Staff % 10% 388,000$
970,000$
4,853,000$
20% 971,000$
5,824,000$
* All unit prices reflect 2024 costs.

CONTINGENCY

TOTAL PROJECT
Item No. Item Description Project Total

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
22 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name F-5A
Units Quantities Unit Price * Item Total
1 Install 36" RCP FT 830 $527 437,000$
2 Install 42" RCP FT 610 $588 359,000$
3 Install 42" RCP FT 1,330 $588 782,000$
4 Manhole EA 7 $20,322 142,000$
5 Sawcut and Remove Existing AC Pavement SF 17,270 $2.66 46,000$ 6 Crushed Miscellaneous Base SF 17,270 $4 69,000$
7 Replace Asphalt Concrete Pavement SF 17,270 $2 35,000$ 8 Traffic Control % 5% 94,000$
9 Erosion Control % 1% 20,000$
10 Moblilization/Demobilization % 10% 198,000$
2,182,000$
Engineering and Design % 10% 218,000$
Surveying & Staking & Geotechnical % 5% 109,000$
Construction Management/Staff % 10% 218,000$
545,000$
2,727,000$
20% 545,000$
3,272,000$
* All unit prices reflect 2024 costs.

CONTINGENCY

TOTAL PROJECT
Item No. Item Description Project Total

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
23 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name F-6
Units Quantities Unit Price * Item Total
1 Install 36" RCP FT 630 $527 332,000$
2 Install 42" RCP FT 1,650 $588 970,000$
3 Install 54" RCP FT 1,250 $732 915,000$
4 Manhole EA 9 $20,322 183,000$
5 Sawcut and Remove Existing AC Pavement SF 21,760 $2.66 58,000$ 6 Crushed Miscellaneous Base SF 21,760 $4 87,000$
7 Replace Asphalt Concrete Pavement SF 21,760 $2 44,000$ 8 Traffic Control % 5% 129,000$
9 Erosion Control % 1% 27,000$
10 Moblilization/Demobilization % 10% 275,000$
3,020,000$
Engineering and Design % 10% 302,000$
Surveying & Staking & Geotechnical % 5% 151,000$
Construction Management/Staff % 10% 302,000$
755,000$
3,775,000$
20% 755,000$
4,530,000$
* All unit prices reflect 2024 costs.

CONTINGENCY

TOTAL PROJECT
Item No. Item Description Project Total

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
24 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name G-0
Units Quantities Unit Price * Item Total
1 Install 54" RCP FT 1,320 $732 966,000$
2 Install 120" RCP FT 6,610 $2,433 16,082,000$
3 Manhole EA 20 $20,322 406,000$
4 Sawcut and Remove Existing AC Pavement SF 94,020 $2.66 250,000$ 5 Crushed Miscellaneous Base SF 94,020 $4 376,000$
6 Replace Asphalt Concrete Pavement SF 94,020 $2 188,000$ 7 Traffic Control % 5% 913,000$
8 Erosion Control % 1% 192,000$
9 Moblilization/Demobilization % 10% 1,937,000$
21,310,000$
Engineering and Design % 10% 2,131,000$
Surveying & Staking & Geotechnical % 5% 1,066,000$
Construction Management/Staff % 10% 2,131,000$
5,328,000$
26,638,000$
20% 5,328,000$
31,966,000$
* All unit prices reflect 2024 costs.

CONTINGENCY

TOTAL PROJECT
Item No. Item Description Project Total

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
25 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name G-1
Units Quantities Unit Price * Item Total
1 Install 36" RCP FT 650 $527 343,000$
2 Install 42" RCP FT 1,500 $588 882,000$
3 Manhole EA 5 $20,322 102,000$
4 Sawcut and Remove Existing AC Pavement SF 12,280 $2.66 33,000$ 5 Crushed Miscellaneous Base SF 12,280 $4 49,000$
6 Replace Asphalt Concrete Pavement SF 12,280 $2 25,000$ 7 Traffic Control % 5% 72,000$
8 Erosion Control % 1% 15,000$
9 Moblilization/Demobilization % 10% 152,000$
1,673,000$
Engineering and Design % 10% 167,000$
Surveying & Staking & Geotechnical % 5% 84,000$
Construction Management/Staff % 10% 167,000$
418,000$
2,091,000$
20% 418,000$
2,509,000$
* All unit prices reflect 2024 costs.

CONTINGENCY

TOTAL PROJECT
Item No. Item Description Project Total

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
26 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name G-2
Units Quantities Unit Price * Item Total
1 Install 36" RCP FT 550 $527 290,000$
2 Install 54" RCP FT 1,170 $732 856,000$
3 Install 66" RCP FT 1,490 $911 1,357,000$
4 Manhole EA 8 $20,322 163,000$
5 Sawcut and Remove Existing AC Pavement SF 23,060 $2.66 61,000$ 6 Crushed Miscellaneous Base SF 23,060 $4 92,000$
7 Replace Asphalt Concrete Pavement SF 23,060 $2 46,000$ 8 Traffic Control % 5% 143,000$
9 Erosion Control % 1% 30,000$
10 Moblilization/Demobilization % 10% 304,000$
3,342,000$
Engineering and Design % 10% 334,000$
Surveying & Staking & Geotechnical % 5% 167,000$
Construction Management/Staff % 10% 334,000$
835,000$
4,177,000$
25% 1,044,000$
5,221,000$
+ Contingency increased to 25% due to SCG transmisson line conflict * All unit prices reflect 2024 costs.

CONTINGENCY +

TOTAL PROJECT
Item No. Item Description Project Total

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
27 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name G-2A
Units Quantities Unit Price * Item Total
1 Install 36" RCP FT 530 $527 279,000$
2 Install 42" RCP FT 1,320 $588 776,000$
3 Manhole EA 5 $20,322 102,000$
4 Sawcut and Remove Existing AC Pavement SF 10,590 $2.66 28,000$ 5 Crushed Miscellaneous Base SF 10,590 $4 42,000$
6 Replace Asphalt Concrete Pavement SF 10,590 $2 21,000$ 7 Traffic Control % 5% 62,000$
8 Erosion Control % 1% 13,000$
9 Moblilization/Demobilization % 10% 132,000$
1,455,000$
Engineering and Design % 10% 146,000$
Surveying & Staking & Geotechnical % 5% 73,000$
Construction Management/Staff % 10% 146,000$
365,000$
1,820,000$
25% 455,000$
2,275,000$
+ Contingency increased to 25% due to SCG transmisson line conflict * All unit prices reflect 2024 costs.

CONTINGENCY +

TOTAL PROJECT
Item No. Item Description Project Total

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
28 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name G-3
Units Quantities Unit Price * Item Total
1 Install 36" RCP FT 670 $527 353,000$
2 Install 42" RCP FT 1,490 $588 876,000$
3 Manhole EA 5 $20,322 102,000$
4 Sawcut and Remove Existing AC Pavement SF 12,330 $2.66 33,000$ 5 Crushed Miscellaneous Base SF 12,330 $4 49,000$
6 Replace Asphalt Concrete Pavement SF 12,330 $2 25,000$ 7 Traffic Control % 5% 72,000$
8 Erosion Control % 1% 15,000$
9 Moblilization/Demobilization % 10% 153,000$
1,678,000$
Engineering and Design % 10% 168,000$
Surveying & Staking & Geotechnical % 5% 84,000$
Construction Management/Staff % 10% 168,000$
420,000$
2,098,000$
20% 420,000$
2,518,000$
* All unit prices reflect 2024 costs.

CONTINGENCY

TOTAL PROJECT
Item No. Item Description Project Total

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
29 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name G-4
Units Quantities Unit Price * Item Total
1 Install 36" RCP FT 690 $527 364,000$
2 Install 54" RCP FT 1,210 $732 886,000$
3 Install 66" RCP FT 1,450 $911 1,321,000$
4 Manhole EA 8 $20,322 163,000$
5 Sawcut and Remove Existing AC Pavement SF 23,760 $2.66 63,000$ 6 Crushed Miscellaneous Base SF 23,760 $4 95,000$
7 Replace Asphalt Concrete Pavement SF 23,760 $2 48,000$ 8 Traffic Control % 5% 147,000$
9 Erosion Control % 1% 31,000$
10 Moblilization/Demobilization % 10% 312,000$
3,430,000$
Engineering and Design % 10% 343,000$
Surveying & Staking & Geotechnical % 5% 172,000$
Construction Management/Staff % 10% 343,000$
858,000$
4,288,000$
25% 1,072,000$
5,360,000$
+ Contingency increased to 25% due to SCG transmisson line conflict * All unit prices reflect 2024 costs.

CONTINGENCY +

TOTAL PROJECT
Item No. Item Description Project Total

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
30 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name G-4A
Units Quantities Unit Price * Item Total
1 Install 36" RCP FT 660 $527 348,000$
2 Install 42" RCP FT 1,320 $588 776,000$
3 Manhole EA 5 $20,322 102,000$
4 Sawcut and Remove Existing AC Pavement SF 11,280 $2.66 30,000$ 5 Crushed Miscellaneous Base SF 11,280 $4 45,000$
6 Replace Asphalt Concrete Pavement SF 11,280 $2 23,000$ 7 Traffic Control % 5% 66,000$
8 Erosion Control % 1% 14,000$
9 Moblilization/Demobilization % 10% 140,000$
1,544,000$
Engineering and Design % 10% 154,000$
Surveying & Staking & Geotechnical % 5% 77,000$
Construction Management/Staff % 10% 154,000$
385,000$
1,929,000$
25% 482,000$
2,411,000$
+ Contingency increased to 25% due to SCG transmisson line conflict * All unit prices reflect 2024 costs.

CONTINGENCY +

TOTAL PROJECT
Item No. Item Description Project Total

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
31 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name G-5
Units Quantities Unit Price * Item Total
1 Install 36" RCP FT 710 $527 374,000$
2 Install 42" RCP FT 1,450 $588 853,000$
3 Manhole EA 5 $20,322 102,000$
4 Sawcut and Remove Existing AC Pavement SF 12,310 $2.66 33,000$ 5 Crushed Miscellaneous Base SF 12,310 $4 49,000$
6 Replace Asphalt Concrete Pavement SF 12,310 $2 25,000$ 7 Traffic Control % 5% 72,000$
8 Erosion Control % 1% 15,000$
9 Moblilization/Demobilization % 10% 152,000$
1,675,000$
Engineering and Design % 10% 168,000$
Surveying & Staking & Geotechnical % 5% 84,000$
Construction Management/Staff % 10% 168,000$
420,000$
2,095,000$
20% 419,000$
2,514,000$
* All unit prices reflect 2024 costs.

CONTINGENCY

TOTAL PROJECT
Item No. Item Description Project Total

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
32 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name G-6
Units Quantities Unit Price * Item Total
1 Install 36" RCP FT 810 $527 427,000$
2 Install 54" RCP FT 1,220 $732 893,000$
3 Install 66" RCP FT 1,440 $911 1,312,000$
4 Manhole EA 9 $20,322 183,000$
5 Sawcut and Remove Existing AC Pavement SF 23,050 $2.66 61,000$ 6 Crushed Miscellaneous Base SF 23,050 $4 92,000$
7 Replace Asphalt Concrete Pavement SF 23,050 $2 46,000$ 8 Traffic Control % 5% 151,000$
9 Erosion Control % 1% 32,000$
10 Moblilization/Demobilization % 10% 320,000$
3,517,000$
Engineering and Design % 10% 352,000$
Surveying & Staking & Geotechnical % 5% 176,000$
Construction Management/Staff % 10% 352,000$
880,000$
4,397,000$
25% 1,099,000$
5,496,000$
+ Contingency increased to 25% due to SCG transmisson line conflict * All unit prices reflect 2024 costs.

CONTINGENCY +

TOTAL PROJECT
Item No. Item Description Project Total

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
33 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name G-6A
Units Quantities Unit Price * Item Total
1 Install 36" RCP FT 680 $527 358,000$
2 Install 42" RCP FT 1,320 $588 776,000$
3 Manhole EA 5 $20,322 102,000$
4 Sawcut and Remove Existing AC Pavement SF 11,390 $2.66 30,000$ 5 Crushed Miscellaneous Base SF 11,390 $4 46,000$
6 Replace Asphalt Concrete Pavement SF 11,390 $2 23,000$ 7 Traffic Control % 5% 67,000$
8 Erosion Control % 1% 14,000$
9 Moblilization/Demobilization % 10% 142,000$
1,558,000$
Engineering and Design % 10% 156,000$
Surveying & Staking & Geotechnical % 5% 78,000$
Construction Management/Staff % 10% 156,000$
390,000$
1,948,000$
25% 487,000$
2,435,000$
+ Contingency increased to 25% due to SCG transmisson line conflict * All unit prices reflect 2024 costs.

CONTINGENCY +

TOTAL PROJECT
Item No. Item Description Project Total

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
34 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name G-7
Units Quantities Unit Price * Item Total
1 Install 36" RCP FT 780 $527 411,000$
2 Install 54" RCP FT 1,200 $732 878,000$
3 Install 60" RCP FT 1,460 $816 1,191,000$
4 Manhole EA 9 $20,322 183,000$
5 Sawcut and Remove Existing AC Pavement SF 23,460 $2.66 62,000$ 6 Crushed Miscellaneous Base SF 23,460 $4 94,000$
7 Replace Asphalt Concrete Pavement SF 23,460 $2 47,000$ 8 Traffic Control % 5% 143,000$
9 Erosion Control % 1% 30,000$
10 Moblilization/Demobilization % 10% 304,000$
3,343,000$
Engineering and Design % 10% 334,000$
Surveying & Staking & Geotechnical % 5% 167,000$
Construction Management/Staff % 10% 334,000$
835,000$
4,178,000$
25% 1,045,000$
5,223,000$
+ Contingency increased to 25% due to SCG transmisson line conflict * All unit prices reflect 2024 costs.

CONTINGENCY +

TOTAL PROJECT
Item No. Item Description Project Total

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
35 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name H-0
Units Quantities Unit Price * Item Total
1 Install 72" RCP FT 1,330 $1,016 1,351,000$
2 Install 78" RCP FT 1,330 $1,133 1,507,000$
3 Install 84" RCP FT 3,900 $1,264 4,930,000$
4 Manhole EA 16 $20,322 325,000$
5 Remove 42" RCP FT 420 $62 26,000$
6 Remove 66" RCP FT 730 $99 72,000$
7 Remove 72" RCP FT 3,170 $108 342,000$
8 Sawcut and Remove Existing AC Pavement SF 61,260 $2.66 163,000$ 9 Crushed Miscellaneous Base SF 61,260 $4 245,000$
10 Replace Asphalt Concrete Pavement SF 61,260 $2 123,000$ 11 Traffic Control % 5% 454,000$
12 Erosion Control % 1% 95,000$
13 Moblilization/Demobilization % 10% 963,000$
10,596,000$
Engineering and Design % 10% 1,060,000$
Surveying & Staking & Geotechnical % 5% 530,000$
Construction Management/Staff % 10% 1,060,000$
2,650,000$
13,246,000$
25% 3,312,000$
16,558,000$
+ Contingency increased to 25% due to major highway conflict * All unit prices reflect 2024 costs.

CONTINGENCY +

TOTAL PROJECT
Item No. Item Description Project Total

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
36 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name H-0A
Units Quantities Unit Price * Item Total
1 Install 66" RCP FT 690 $911 629,000$
2 Manhole EA 2 $20,322 41,000$
3 Remove 36" RCP FT 690 $53 37,000$
4 Sawcut and Remove Existing AC Pavement SF 5,550 $2.66 15,000$ 5 Crushed Miscellaneous Base SF 5,550 $4 22,000$
6 Replace Asphalt Concrete Pavement SF 5,550 $2 11,000$ 7 Traffic Control % 5% 38,000$
8 Erosion Control % 1% 8,000$
9 Moblilization/Demobilization % 10% 80,000$
881,000$
Engineering and Design % 10% 88,000$
Surveying & Staking & Geotechnical % 5% 44,000$
Construction Management/Staff % 10% 88,000$
220,000$
1,101,000$
25% 275,000$
1,376,000$
+ Contingency increased to 25% due to major highway conflict * All unit prices reflect 2024 costs.

CONTINGENCY +

TOTAL PROJECT
Item No. Item Description Project Total

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
37 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name J-1
Units Quantities Unit Price * Item Total
1 Install 78" RCP FT 2,520 $1,133 2,855,000$
2 Manhole EA 6 $20,322 122,000$
3 Sawcut and Remove Existing AC Pavement SF 23,000 $2.66 61,000$ 4 Crushed Miscellaneous Base SF 23,000 $4 92,000$
5 Replace Asphalt Concrete Pavement SF 23,000 $2 46,000$ 6 Traffic Control % 5% 159,000$
7 Erosion Control % 1% 33,000$
8 Moblilization/Demobilization % 10% 337,000$
3,705,000$
Engineering and Design % 10% 371,000$
Surveying & Staking & Geotechnical % 5% 185,000$
Construction Management/Staff % 10% 371,000$
927,000$
4,632,000$
20% 926,000$
5,558,000$
* All unit prices reflect 2024 costs.

CONTINGENCY

TOTAL PROJECT
Item No. Item Description Project Total

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
38 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name J-1A
Units Quantities Unit Price * Item Total
1 Install 36" RCP FT 660 $527 348,000$
2 Install 42" RCP FT 2,330 $588 1,370,000$
3 Manhole EA 7 $20,322 142,000$
4 Sawcut and Remove Existing AC Pavement SF 17,210 $2.66 46,000$ 5 Crushed Miscellaneous Base SF 17,210 $4 69,000$
6 Replace Asphalt Concrete Pavement SF 17,210 $2 34,000$ 7 Traffic Control % 5% 100,000$
8 Erosion Control % 1% 21,000$
9 Moblilization/Demobilization % 10% 213,000$
2,343,000$
Engineering and Design % 10% 234,000$
Surveying & Staking & Geotechnical % 5% 117,000$
Construction Management/Staff % 10% 234,000$
585,000$
2,928,000$
25% 732,000$
3,660,000$
+ Contingency increased to 25% due to major highway conflict * All unit prices reflect 2024 costs.

CONTINGENCY +

TOTAL PROJECT
Item No. Item Description Project Total

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
39 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name J-1B
Units Quantities Unit Price * Item Total
1 Install 36" RCP FT 800 $527 422,000$
2 Install 42" RCP FT 1,020 $588 600,000$
3 Install 54" RCP FT 1,330 $732 974,000$
4 Manhole EA 8 $20,322 163,000$
5 Sawcut and Remove Existing AC Pavement SF 19,520 $2.66 52,000$ 6 Crushed Miscellaneous Base SF 19,520 $4 78,000$
7 Replace Asphalt Concrete Pavement SF 19,520 $2 39,000$ 8 Traffic Control % 5% 116,000$
9 Erosion Control % 1% 24,000$
10 Moblilization/Demobilization % 10% 247,000$
2,715,000$
Engineering and Design % 10% 272,000$
Surveying & Staking & Geotechnical % 5% 136,000$
Construction Management/Staff % 10% 272,000$
680,000$
3,395,000$
20% 679,000$
4,074,000$
* All unit prices reflect 2024 costs.

CONTINGENCY

TOTAL PROJECT
Item No. Item Description Project Total

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
40 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name J-1C
Units Quantities Unit Price * Item Total
1 Install 36" RCP FT 660 $527 348,000$
2 Install 42" RCP FT 1,160 $588 682,000$
3 Manhole EA 5 $20,322 102,000$
4 Sawcut and Remove Existing AC Pavement SF 10,340 $2.66 28,000$ 5 Crushed Miscellaneous Base SF 10,340 $4 41,000$
6 Replace Asphalt Concrete Pavement SF 10,340 $2 21,000$ 7 Traffic Control % 5% 61,000$
8 Erosion Control % 1% 13,000$
9 Moblilization/Demobilization % 10% 130,000$
1,426,000$
Engineering and Design % 10% 143,000$
Surveying & Staking & Geotechnical % 5% 71,000$
Construction Management/Staff % 10% 143,000$
357,000$
1,783,000$
20% 357,000$
2,140,000$
* All unit prices reflect 2024 costs.

CONTINGENCY

TOTAL PROJECT
Item No. Item Description Project Total

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
41 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name J-2
Units Quantities Unit Price * Item Total
1 Install 66" RCP FT 3,570 $911 3,252,000$
2 Install 72" RCP FT 560 $1,016 569,000$
3 Manhole EA 10 $20,322 203,000$
4 Remove 24" RCP FT 400 $35 14,000$
5 Remove 30" RCP FT 340 $44 15,000$
6 Sawcut and Remove Existing AC Pavement SF 33,520 $2.66 89,000$ 7 Crushed Miscellaneous Base SF 33,520 $4 134,000$
8 Replace Asphalt Concrete Pavement SF 33,520 $2 67,000$ 9 Traffic Control % 5% 217,000$
10 Erosion Control % 1% 46,000$
11 Moblilization/Demobilization % 10% 461,000$
5,067,000$
Engineering and Design % 10% 507,000$
Surveying & Staking & Geotechnical % 5% 253,000$
Construction Management/Staff % 10% 507,000$
1,267,000$
6,334,000$
25% 1,584,000$
7,918,000$
+ Contingency increased to 25% due to major highway conflict * All unit prices reflect 2024 costs.

CONTINGENCY +

TOTAL PROJECT
Item No. Item Description Project Total

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
42 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name J-2A
Units Quantities Unit Price * Item Total
1 Install 36" RCP FT 650 $527 343,000$
2 Install 42" RCP FT 1,150 $588 676,000$
3 Install 60" RCP FT 200 $816 163,000$
4 Manhole EA 5 $20,322 102,000$
5 Sawcut and Remove Existing AC Pavement SF 11,730 $2.66 31,000$ 6 Crushed Miscellaneous Base SF 11,730 $4 47,000$
7 Replace Asphalt Concrete Pavement SF 11,730 $2 23,000$ 8 Traffic Control % 5% 69,000$
9 Erosion Control % 1% 15,000$
10 Moblilization/Demobilization % 10% 147,000$
1,616,000$
Engineering and Design % 10% 162,000$
Surveying & Staking & Geotechnical % 5% 81,000$
Construction Management/Staff % 10% 162,000$
405,000$
2,021,000$
20% 404,000$
2,425,000$
* All unit prices reflect 2024 costs.

CONTINGENCY

TOTAL PROJECT
Item No. Item Description Project Total

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
43 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name J-3
Units Quantities Unit Price * Item Total
1 Install 54" RCP FT 1,320 $732 966,000$
2 Install 66" RCP FT 1,310 $911 1,193,000$
3 Install 72" RCP FT 930 $1,016 945,000$
4 Manhole EA 9 $20,322 183,000$
5 Sawcut and Remove Existing AC Pavement SF 27,670 $2.66 74,000$ 6 Crushed Miscellaneous Base SF 27,670 $4 111,000$
7 Replace Asphalt Concrete Pavement SF 27,670 $2 55,000$ 8 Traffic Control % 5% 176,000$
9 Erosion Control % 1% 37,000$
10 Moblilization/Demobilization % 10% 374,000$
4,114,000$
Engineering and Design % 10% 411,000$
Surveying & Staking & Geotechnical % 5% 206,000$
Construction Management/Staff % 10% 411,000$
1,028,000$
5,142,000$
25% 1,286,000$
6,428,000$
+ Contingency increased to 25% due to major highway conflict * All unit prices reflect 2024 costs.

CONTINGENCY +

TOTAL PROJECT
Item No. Item Description Project Total

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
44 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name J-3A
Units Quantities Unit Price * Item Total
1 Install 36" RCP FT 490 $527 258,000$
2 Install 42" RCP FT 1,350 $588 794,000$
3 Manhole EA 5 $20,322 102,000$
4 Sawcut and Remove Existing AC Pavement SF 10,550 $2.66 28,000$ 5 Crushed Miscellaneous Base SF 10,550 $4 42,000$
6 Replace Asphalt Concrete Pavement SF 10,550 $2 21,000$ 7 Traffic Control % 5% 62,000$
8 Erosion Control % 1% 13,000$
9 Moblilization/Demobilization % 10% 132,000$
1,452,000$
Engineering and Design % 10% 145,000$
Surveying & Staking & Geotechnical % 5% 73,000$
Construction Management/Staff % 10% 145,000$
363,000$
1,815,000$
20% 363,000$
2,178,000$
* All unit prices reflect 2024 costs.

CONTINGENCY

TOTAL PROJECT
Item No. Item Description Project Total

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
45 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name J-4
Units Quantities Unit Price * Item Total
1 Install 48" RCP FT 1,140 $656 748,000$
2 Manhole EA 3 $20,322 61,000$
3 Sawcut and Remove Existing AC Pavement SF 7,320 $2.66 19,000$ 4 Crushed Miscellaneous Base SF 7,320 $4 29,000$
5 Replace Asphalt Concrete Pavement SF 7,320 $2 15,000$ 6 Traffic Control % 5% 44,000$
7 Erosion Control % 1% 9,000$
8 Moblilization/Demobilization % 10% 93,000$
1,018,000$
Engineering and Design % 10% 102,000$
Surveying & Staking & Geotechnical % 5% 51,000$
Construction Management/Staff % 10% 102,000$
255,000$
1,273,000$
20% 255,000$
1,528,000$
* All unit prices reflect 2024 costs.

CONTINGENCY

TOTAL PROJECT
Item No. Item Description Project Total

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
46 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name J-4A
Units Quantities Unit Price * Item Total
1 Install 36" RCP FT 580 $527 306,000$
2 Install 42" RCP FT 1,330 $588 782,000$
3 Manhole EA 5 $20,322 102,000$
4 Sawcut and Remove Existing AC Pavement SF 10,910 $2.66 29,000$ 5 Crushed Miscellaneous Base SF 10,910 $4 44,000$
6 Replace Asphalt Concrete Pavement SF 10,910 $2 22,000$ 7 Traffic Control % 5% 64,000$
8 Erosion Control % 1% 13,000$
9 Moblilization/Demobilization % 10% 136,000$
1,498,000$
Engineering and Design % 10% 150,000$
Surveying & Staking & Geotechnical % 5% 75,000$
Construction Management/Staff % 10% 150,000$
375,000$
1,873,000$
20% 375,000$
2,248,000$
* All unit prices reflect 2024 costs.

CONTINGENCY

TOTAL PROJECT
Item No. Item Description Project Total

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
47 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name J-4B
Units Quantities Unit Price * Item Total
1 Install 36" RCP FT 600 $527 316,000$
2 Install 42" RCP FT 1,320 $588 776,000$
3 Manhole EA 5 $20,322 102,000$
4 Sawcut and Remove Existing AC Pavement SF 10,960 $2.66 29,000$ 5 Crushed Miscellaneous Base SF 10,960 $4 44,000$
6 Replace Asphalt Concrete Pavement SF 10,960 $2 22,000$ 7 Traffic Control % 5% 64,000$
8 Erosion Control % 1% 14,000$
9 Moblilization/Demobilization % 10% 137,000$
1,504,000$
Engineering and Design % 10% 150,000$
Surveying & Staking & Geotechnical % 5% 75,000$
Construction Management/Staff % 10% 150,000$
375,000$
1,879,000$
20% 376,000$
2,255,000$
* All unit prices reflect 2024 costs.

CONTINGENCY

TOTAL PROJECT
Item No. Item Description Project Total

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
48 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name M-0
Units Quantities Unit Price * Item Total
1 Install 60" RCP FT 1,700 $816 1,387,000$
2 Manhole EA 4 $20,322 81,000$
3 Remove 42" RCP FT 910 $62 56,000$
4 Remove 48" RCP FT 650 $71 46,000$
5 Sawcut and Remove Existing AC Pavement SF 12,750 $2.66 34,000$ 6 Crushed Miscellaneous Base SF 12,750 $4 51,000$
7 Replace Asphalt Concrete Pavement SF 12,750 $2 26,000$ 8 Traffic Control % 5% 84,000$
9 Erosion Control % 1% 18,000$
10 Moblilization/Demobilization % 10% 178,000$
1,961,000$
Engineering and Design % 10% 196,000$
Surveying & Staking & Geotechnical % 5% 98,000$
Construction Management/Staff % 10% 196,000$
490,000$
2,451,000$
25% 613,000$
3,064,000$
+ Contingency increased to 25% due to major highway conflict * All unit prices reflect 2024 costs.

CONTINGENCY +

TOTAL PROJECT
Item No. Item Description Project Total

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
49 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name M-1
Units Quantities Unit Price * Item Total
1 Install 60" RCP FT 870 $816 710,000$
2 Install 6' x 4' RCB FT 250 $1,323 331,000$
3 Manhole EA 3 $20,322 61,000$
4 Remove 48" RCP FT 840 $71 60,000$
5 Sawcut and Remove Existing AC Pavement SF 8,680 $2.66 23,000$ 6 Crushed Miscellaneous Base SF 8,680 $4 35,000$
7 Replace Asphalt Concrete Pavement SF 8,680 $2 17,000$ 8 Traffic Control % 5% 62,000$
9 Erosion Control % 1% 13,000$
10 Moblilization/Demobilization % 10% 131,000$
1,443,000$
Engineering and Design % 10% 144,000$
Surveying & Staking & Geotechnical % 5% 72,000$
Construction Management/Staff % 10% 144,000$
360,000$
1,803,000$
25% 451,000$
2,254,000$
+ Contingency increased to 25% due to major highway conflict * All unit prices reflect 2024 costs.

CONTINGENCY +

TOTAL PROJECT
Item No. Item Description Project Total

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
50 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name M-1A
Units Quantities Unit Price * Item Total
1 Install 36" RCP FT 660 $527 348,000$
2 Install 42" RCP FT 1,240 $588 729,000$
3 Manhole EA 5 $20,322 102,000$
4 Sawcut and Remove Existing AC Pavement SF 10,810 $2.66 29,000$ 5 Crushed Miscellaneous Base SF 10,810 $4 43,000$
6 Replace Asphalt Concrete Pavement SF 10,810 $2 22,000$ 7 Traffic Control % 5% 64,000$
8 Erosion Control % 1% 13,000$
9 Moblilization/Demobilization % 10% 135,000$
1,485,000$
Engineering and Design % 10% 149,000$
Surveying & Staking & Geotechnical % 5% 74,000$
Construction Management/Staff % 10% 149,000$
372,000$
1,857,000$
20% 371,000$
2,228,000$
* All unit prices reflect 2024 costs.

CONTINGENCY

TOTAL PROJECT
Item No. Item Description Project Total

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
51 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name M-2
Units Quantities Unit Price * Item Total
1 Install 48" RCP FT 1,090 $656 715,000$
2 Manhole EA 3 $20,322 61,000$
3 Sawcut and Remove Existing AC Pavement SF 7,000 $2.66 19,000$ 4 Crushed Miscellaneous Base SF 7,000 $4 28,000$
5 Replace Asphalt Concrete Pavement SF 7,000 $2 14,000$ 6 Traffic Control % 5% 42,000$
7 Erosion Control % 1% 9,000$
8 Moblilization/Demobilization % 10% 89,000$
977,000$
Engineering and Design % 10% 98,000$
Surveying & Staking & Geotechnical % 5% 49,000$
Construction Management/Staff % 10% 98,000$
245,000$
1,222,000$
25% 306,000$
1,528,000$
+ Contingency increased to 25% due to major highway conflict * All unit prices reflect 2024 costs.

CONTINGENCY +

TOTAL PROJECT
Item No. Item Description Project Total

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
52 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name M-2A
Units Quantities Unit Price * Item Total
1 Install 36" RCP FT 550 $527 290,000$
2 Install 42" RCP FT 1,150 $588 676,000$
3 Manhole EA 4 $20,322 81,000$
4 Sawcut and Remove Existing AC Pavement SF 9,690 $2.66 26,000$ 5 Crushed Miscellaneous Base SF 9,690 $4 39,000$
6 Replace Asphalt Concrete Pavement SF 9,690 $2 19,000$ 7 Traffic Control % 5% 57,000$
8 Erosion Control % 1% 12,000$
9 Moblilization/Demobilization % 10% 120,000$
1,320,000$
Engineering and Design % 10% 132,000$
Surveying & Staking & Geotechnical % 5% 66,000$
Construction Management/Staff % 10% 132,000$
330,000$
1,650,000$
20% 330,000$
1,980,000$
* All unit prices reflect 2024 costs.

CONTINGENCY

TOTAL PROJECT
Item No. Item Description Project Total

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
53 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name M-3
Units Quantities Unit Price * Item Total
1 Install 48" RCP FT 1,150 $656 754,000$
2 Manhole EA 3 $20,322 61,000$
3 Sawcut and Remove Existing AC Pavement SF 7,380 $2.66 20,000$ 4 Crushed Miscellaneous Base SF 7,380 $4 30,000$
5 Replace Asphalt Concrete Pavement SF 7,380 $2 15,000$ 6 Traffic Control % 5% 44,000$
7 Erosion Control % 1% 9,000$
8 Moblilization/Demobilization % 10% 93,000$
1,026,000$
Engineering and Design % 10% 103,000$
Surveying & Staking & Geotechnical % 5% 51,000$
Construction Management/Staff % 10% 103,000$
257,000$
1,283,000$
25% 321,000$
1,604,000$
+ Contingency increased to 25% due to major highway conflict * All unit prices reflect 2024 costs.

CONTINGENCY +

TOTAL PROJECT
Item No. Item Description Project Total

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
54 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name M-3A
Units Quantities Unit Price * Item Total
1 Install 36" RCP FT 580 $527 306,000$
2 Install 42" RCP FT 1,460 $588 858,000$
3 Manhole EA 5 $20,322 102,000$
4 Sawcut and Remove Existing AC Pavement SF 11,680 $2.66 31,000$ 5 Crushed Miscellaneous Base SF 11,680 $4 47,000$
6 Replace Asphalt Concrete Pavement SF 11,680 $2 23,000$ 7 Traffic Control % 5% 68,000$
8 Erosion Control % 1% 14,000$
9 Moblilization/Demobilization % 10% 145,000$
1,594,000$
Engineering and Design % 10% 159,000$
Surveying & Staking & Geotechnical % 5% 80,000$
Construction Management/Staff % 10% 159,000$
398,000$
1,992,000$
25% 498,000$
2,490,000$
+ Contingency increased to 25% due to major highway conflict * All unit prices reflect 2024 costs.

CONTINGENCY +

TOTAL PROJECT
Item No. Item Description Project Total

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
55 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name M-4
Units Quantities Unit Price * Item Total
1 Install 36" RCP FT 700 $527 369,000$
2 Manhole EA 2 $20,322 41,000$
3 Sawcut and Remove Existing AC Pavement SF 3,740 $2.66 10,000$ 4 Crushed Miscellaneous Base SF 3,740 $4 15,000$
5 Replace Asphalt Concrete Pavement SF 3,740 $2 7,000$
6 Traffic Control % 5% 22,000$
7 Erosion Control % 1% 5,000$
8 Moblilization/Demobilization % 10% 47,000$
516,000$
Engineering and Design % 10% 51,600$
Surveying & Staking & Geotechnical % 5% 26,000$
Construction Management/Staff % 10% 52,000$
129,600$
645,600$
20% 129,000$
774,600$
* All unit prices reflect 2024 costs.

CONTINGENCY

TOTAL PROJECT
Item No. Item Description Project Total

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
56 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name M-5-A
Units Quantities Unit Price * Item Total
1 Install Double 14' x 6' RCB FT 1,360 $16,722 22,742,000$ 2 Manhole EA 3 $20,322 61,000$
3 Sawcut and Remove Existing AC Pavement SF 40,800 $2.66 109,000$ 4 Crushed Miscellaneous Base SF 40,800 $4 163,000$
5 Replace Asphalt Concrete Pavement SF 40,800 $2 82,000$ 6 Traffic Control % 5% 1,158,000$
7 Erosion Control % 1% 243,000$
8 Moblilization/Demobilization % 10% 2,456,000$
27,014,000$
Engineering and Design % 10% 2,701,000$
Surveying & Staking & Geotechnical % 5% 1,351,000$
Construction Management/Staff % 10% 2,701,000$
6,753,000$
33,767,000$
25% 8,442,000$
42,209,000$
+ Contingency increased to 25% due to major highway conflict * All unit prices reflect 2024 costs.

CONTINGENCY +

TOTAL PROJECT
Item No. Item Description Project Total

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
57 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name M-5-B
Units Quantities Unit Price * Item Total
1 Install 14' x 8' RCB FT 1,880 $8,361 15,719,000$
2 Install Double 14' x 6' RCB FT 1,870 $16,722 31,270,000$ 3 Manhole EA 9 $20,322 183,000$
4 Sawcut and Remove Existing AC Pavement SF 86,180 $2.66 229,000$ 5 Crushed Miscellaneous Base SF 86,180 $4 345,000$
6 Replace Asphalt Concrete Pavement SF 86,180 $2 172,000$ 7 Traffic Control % 5% 2,396,000$
8 Erosion Control % 1% 503,000$
9 Moblilization/Demobilization % 10% 5,082,000$
55,899,000$
Engineering and Design % 10% 5,590,000$
Surveying & Staking & Geotechnical % 5% 2,795,000$
Construction Management/Staff % 10% 5,590,000$
13,975,000$
69,874,000$
25% 17,469,000$
87,343,000$
+ Contingency increased to 25% due to 12' water main conflict * All unit prices reflect 2024 costs.

CONTINGENCY +

TOTAL PROJECT
Item No. Item Description Project Total

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
58 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name M-5-C
Units Quantities Unit Price * Item Total
1 Install 96" RCP FT 3,760 $1,572 5,911,000$
2 Manhole EA 9 $20,322 183,000$
3 Sawcut and Remove Existing AC Pavement SF 40,270 $2.66 107,000$ 4 Crushed Miscellaneous Base SF 40,270 $4 161,000$
5 Replace Asphalt Concrete Pavement SF 40,270 $2 81,000$ 6 Traffic Control % 5% 322,000$
7 Erosion Control % 1% 68,000$
8 Moblilization/Demobilization % 10% 683,000$
7,516,000$
Engineering and Design % 10% 752,000$
Surveying & Staking & Geotechnical % 5% 376,000$
Construction Management/Staff % 10% 752,000$
1,880,000$
9,396,000$
20% 1,879,000$
11,275,000$
* All unit prices reflect 2024 costs.

CONTINGENCY

TOTAL PROJECT
Item No. Item Description Project Total

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
59 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name M-5-D
Units Quantities Unit Price * Item Total
1 Install 36" RCP FT 670 $527 353,000$
2 Install 42" RCP FT 1,310 $588 770,000$
3 Install 54" RCP FT 3,180 $732 2,328,000$
4 Install 60" RCP FT 2,010 $816 1,640,000$
5 Manhole EA 18 $20,322 366,000$
6 Sawcut and Remove Existing AC Pavement SF 48,560 $2.66 129,000$ 7 Crushed Miscellaneous Base SF 48,560 $4 194,000$
8 Replace Asphalt Concrete Pavement SF 48,560 $2 97,000$ 9 Traffic Control % 5% 294,000$
10 Erosion Control % 1% 62,000$
11 Moblilization/Demobilization % 10% 623,000$
6,856,000$
Engineering and Design % 10% 686,000$
Surveying & Staking & Geotechnical % 5% 343,000$
Construction Management/Staff % 10% 686,000$
1,715,000$
8,571,000$
25% 2,143,000$
10,714,000$
+ Contingency increased to 25% due to SCG transmisson line conflict * All unit prices reflect 2024 costs.

CONTINGENCY +

TOTAL PROJECT
Item No. Item Description Project Total

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
60 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name M-5-E
Units Quantities Unit Price * Item Total
1 Install 36" RCP FT 700 $527 369,000$
2 Manhole EA 2 $20,322 41,000$
3 Sawcut and Remove Existing AC Pavement SF 3,740 $2.66 10,000$ 4 Crushed Miscellaneous Base SF 3,740 $4 15,000$
5 Replace Asphalt Concrete Pavement SF 3,740 $2 7,000$
6 Traffic Control % 5% 22,000$
7 Erosion Control % 1% 5,000$
8 Moblilization/Demobilization % 10% 47,000$
516,000$
Engineering and Design % 10% 51,600$
Surveying & Staking & Geotechnical % 5% 26,000$
Construction Management/Staff % 10% 52,000$
129,600$
645,600$
25% 161,000$
806,600$
+ Contingency increased to 25% due to SCG transmisson line conflict * All unit prices reflect 2024 costs.

CONTINGENCY +

TOTAL PROJECT
Item No. Item Description Project Total

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
61 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name M-5A
Units Quantities Unit Price * Item Total
1 Install 36" RCP FT 460 $527 242,000$
2 Install 42" RCP FT 1,400 $588 823,000$
3 Manhole EA 5 $20,322 102,000$
4 Sawcut and Remove Existing AC Pavement SF 10,680 $2.66 28,000$ 5 Crushed Miscellaneous Base SF 10,680 $4 43,000$
6 Replace Asphalt Concrete Pavement SF 10,680 $2 21,000$ 7 Traffic Control % 5% 63,000$
8 Erosion Control % 1% 13,000$
9 Moblilization/Demobilization % 10% 134,000$
1,469,000$
Engineering and Design % 10% 147,000$
Surveying & Staking & Geotechnical % 5% 73,000$
Construction Management/Staff % 10% 147,000$
367,000$
1,836,000$
25% 459,000$
2,295,000$
+ Contingency increased to 25% due to SCG transmisson line conflict * All unit prices reflect 2024 costs.

CONTINGENCY +

TOTAL PROJECT
Item No. Item Description Project Total

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
62 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name M-5B
Units Quantities Unit Price * Item Total
1 Install 66" RCP FT 1,330 $911 1,212,000$
2 Install 72" RCP FT 4,130 $1,016 4,196,000$
3 Install 78" RCP FT 1,330 $1,133 1,507,000$
4 Manhole EA 17 $20,322 345,000$
5 Sawcut and Remove Existing AC Pavement SF 58,000 $2.66 154,000$ 6 Crushed Miscellaneous Base SF 58,000 $4 232,000$
7 Replace Asphalt Concrete Pavement SF 58,000 $2 116,000$ 8 Traffic Control % 5% 388,000$
9 Erosion Control % 1% 82,000$
10 Moblilization/Demobilization % 10% 823,000$
9,055,000$
Engineering and Design % 10% 906,000$
Surveying & Staking & Geotechnical % 5% 453,000$
Construction Management/Staff % 10% 906,000$
2,265,000$
11,320,000$
20% 2,264,000$
13,584,000$
* All unit prices reflect 2024 costs.

CONTINGENCY

TOTAL PROJECT
Item No. Item Description Project Total

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
63 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name M-5B-A
Units Quantities Unit Price * Item Total
1 Install 36" RCP FT 340 $527 179,000$
2 Manhole EA 1 $20,322 20,000$
3 Sawcut and Remove Existing AC Pavement SF 1,820 $2.66 5,000$ 4 Crushed Miscellaneous Base SF 1,820 $4 7,000$
5 Replace Asphalt Concrete Pavement SF 1,820 $2 4,000$
6 Traffic Control % 5% 11,000$
7 Erosion Control % 1% 2,000$
8 Moblilization/Demobilization % 10% 23,000$
251,000$
Engineering and Design % 10% 25,100$
Surveying & Staking & Geotechnical % 5% 13,000$
Construction Management/Staff % 10% 25,000$
63,100$
314,100$
20% 63,000$
377,100$
* All unit prices reflect 2024 costs.

CONTINGENCY

TOTAL PROJECT
Item No. Item Description Project Total

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
64 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name M-5B-B
Units Quantities Unit Price * Item Total
1 Install 36" RCP FT 690 $527 364,000$
2 Install 42" RCP FT 1,350 $588 794,000$
3 Manhole EA 5 $20,322 102,000$
4 Sawcut and Remove Existing AC Pavement SF 11,620 $2.66 31,000$ 5 Crushed Miscellaneous Base SF 11,620 $4 46,000$
6 Replace Asphalt Concrete Pavement SF 11,620 $2 23,000$ 7 Traffic Control % 5% 68,000$
8 Erosion Control % 1% 14,000$
9 Moblilization/Demobilization % 10% 144,000$
1,586,000$
Engineering and Design % 10% 159,000$
Surveying & Staking & Geotechnical % 5% 79,000$
Construction Management/Staff % 10% 159,000$
397,000$
1,983,000$
20% 397,000$
2,380,000$
* All unit prices reflect 2024 costs.

CONTINGENCY

TOTAL PROJECT
Item No. Item Description Project Total

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
65 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name M-5B-C
Units Quantities Unit Price * Item Total
1 Install 36" RCP FT 670 $527 353,000$
2 Install 42" RCP FT 1,350 $588 794,000$
3 Manhole EA 5 $20,322 102,000$
4 Sawcut and Remove Existing AC Pavement SF 11,510 $2.66 31,000$ 5 Crushed Miscellaneous Base SF 11,510 $4 46,000$
6 Replace Asphalt Concrete Pavement SF 11,510 $2 23,000$ 7 Traffic Control % 5% 67,000$
8 Erosion Control % 1% 14,000$
9 Moblilization/Demobilization % 10% 143,000$
1,573,000$
Engineering and Design % 10% 157,000$
Surveying & Staking & Geotechnical % 5% 79,000$
Construction Management/Staff % 10% 157,000$
393,000$
1,966,000$
20% 393,000$
2,359,000$
* All unit prices reflect 2024 costs.

Item No. Item Description Project Total

CONTINGENCY

TOTAL PROJECT

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
66 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name M-5B-D 100
Units Quantities Unit Price * Item Total
1 Install 36" RCP FT 730 $527 385,000$
2 Install 42" RCP FT 1,330 $588 782,000$
3 Manhole EA 5 $20,322 102,000$
4 Sawcut and Remove Existing AC Pavement SF 11,710 $2.66 31,000$ 5 Crushed Miscellaneous Base SF 11,710 $4 47,000$
6 Replace Asphalt Concrete Pavement SF 11,710 $2 23,000$ 7 Traffic Control % 5% 69,000$
8 Erosion Control % 1% 14,000$
9 Moblilization/Demobilization % 10% 145,000$
1,598,000$
Engineering and Design % 10% 160,000$
Surveying & Staking & Geotechnical % 5% 80,000$
Construction Management/Staff % 10% 160,000$
400,000$
1,998,000$
20% 400,000$
2,398,000$
* All unit prices reflect 2024 costs.

CONTINGENCY

TOTAL PROJECT
Item No. Item Description Project Total

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
67 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name M-5B-E
Units Quantities Unit Price * Item Total
1 Install 36" RCP FT 790 $527 416,000$
2 Install 42" RCP FT 1,320 $588 776,000$
3 Install 48" RCP FT 1,330 $656 872,000$
4 Manhole EA 9 $20,322 183,000$
5 Sawcut and Remove Existing AC Pavement SF 20,510 $2.66 55,000$ 6 Crushed Miscellaneous Base SF 20,510 $4 82,000$
7 Replace Asphalt Concrete Pavement SF 20,510 $2 41,000$ 8 Traffic Control % 5% 121,000$
9 Erosion Control % 1% 25,000$
10 Moblilization/Demobilization % 10% 257,000$
2,828,000$
Engineering and Design % 10% 283,000$
Surveying & Staking & Geotechnical % 5% 141,000$
Construction Management/Staff % 10% 283,000$
707,000$
3,535,000$
25% 884,000$
4,419,000$
+ Contingency increased to 25% due to major highway and SCG transmisson line conflict * All unit prices reflect 2024 costs.

CONTINGENCY +

TOTAL PROJECT
Item No. Item Description Project Total

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
68 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name M-5C
Units Quantities Unit Price * Item Total
1 Install 36" RCP FT 350 $527 184,000$
2 Install 42" RCP FT 1,320 $588 776,000$
3 Install 48" RCP FT 1,340 $656 879,000$
4 Manhole EA 8 $20,322 163,000$
5 Sawcut and Remove Existing AC Pavement SF 18,220 $2.66 48,000$ 6 Crushed Miscellaneous Base SF 18,220 $4 73,000$
7 Replace Asphalt Concrete Pavement SF 18,220 $2 36,000$ 8 Traffic Control % 5% 108,000$
9 Erosion Control % 1% 23,000$
10 Moblilization/Demobilization % 10% 229,000$
2,519,000$
Engineering and Design % 10% 252,000$
Surveying & Staking & Geotechnical % 5% 126,000$
Construction Management/Staff % 10% 252,000$
630,000$
3,149,000$
25% 787,000$
3,936,000$
+ Contingency increased to 25% due to SCG transmisson line conflict * All unit prices reflect 2024 costs.

CONTINGENCY +

TOTAL PROJECT
Item No. Item Description Project Total

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
69 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name M-5D
Units Quantities Unit Price * Item Total
1 Install 36" RCP FT 810 $527 427,000$
2 Manhole EA 2 $20,322 41,000$
3 Sawcut and Remove Existing AC Pavement SF 4,320 $2.66 11,000$ 4 Crushed Miscellaneous Base SF 4,320 $4 17,000$
5 Replace Asphalt Concrete Pavement SF 4,320 $2 9,000$
6 Traffic Control % 5% 25,000$
7 Erosion Control % 1% 5,000$
8 Moblilization/Demobilization % 10% 54,000$
589,000$
Engineering and Design % 10% 58,900$
Surveying & Staking & Geotechnical % 5% 29,000$
Construction Management/Staff % 10% 59,000$
146,900$
735,900$
20% 147,000$
882,900$
* All unit prices reflect 2024 costs.

CONTINGENCY

TOTAL PROJECT
Item No. Item Description Project Total

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
70 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name M-5E
Units Quantities Unit Price * Item Total
1 Install 60" RCP FT 1,320 $816 1,077,000$
2 Install 66" RCP FT 1,330 $911 1,212,000$
3 Install 72" RCP FT 5,480 $1,016 5,568,000$
4 Install 78" RCP FT 5,480 $1,133 6,209,000$
5 Manhole EA 34 $20,322 691,000$
6 Sawcut and Remove Existing AC Pavement SF 110,270 $2.66 293,000$ 7 Crushed Miscellaneous Base SF 110,270 $4 441,000$
8 Replace Asphalt Concrete Pavement SF 110,270 $2 221,000$ 9 Traffic Control % 5% 786,000$
10 Erosion Control % 1% 165,000$
11 Moblilization/Demobilization % 10% 1,666,000$
18,329,000$
Engineering and Design % 10% 1,833,000$
Surveying & Staking & Geotechnical % 5% 916,000$
Construction Management/Staff % 10% 1,833,000$
4,582,000$
22,911,000$
20% 4,582,000$
27,493,000$
* All unit prices reflect 2024 costs.

CONTINGENCY

TOTAL PROJECT
Item No. Item Description Project Total

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
71 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name M-5E-A
Units Quantities Unit Price * Item Total
1 Install 36" RCP FT 520 $527 274,000$
2 Install 42" RCP FT 820 $588 482,000$
3 Manhole EA 3 $20,322 61,000$
4 Sawcut and Remove Existing AC Pavement SF 7,600 $2.66 20,000$ 5 Crushed Miscellaneous Base SF 7,600 $4 30,000$
6 Replace Asphalt Concrete Pavement SF 7,600 $2 15,000$ 7 Traffic Control % 5% 44,000$
8 Erosion Control % 1% 9,000$
9 Moblilization/Demobilization % 10% 94,000$
1,029,000$
Engineering and Design % 10% 103,000$
Surveying & Staking & Geotechnical % 5% 51,000$
Construction Management/Staff % 10% 103,000$
257,000$
1,286,000$
20% 257,000$
1,543,000$
* All unit prices reflect 2024 costs.

CONTINGENCY

TOTAL PROJECT
Item No. Item Description Project Total

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
72 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name M-5E-B
Units Quantities Unit Price * Item Total
1 Install 36" RCP FT 500 $527 264,000$
2 Install 42" RCP FT 1,200 $588 706,000$
3 Manhole EA 4 $20,322 81,000$
4 Sawcut and Remove Existing AC Pavement SF 9,720 $2.66 26,000$ 5 Crushed Miscellaneous Base SF 9,720 $4 39,000$
6 Replace Asphalt Concrete Pavement SF 9,720 $2 19,000$ 7 Traffic Control % 5% 57,000$
8 Erosion Control % 1% 12,000$
9 Moblilization/Demobilization % 10% 120,000$
1,324,000$
Engineering and Design % 10% 132,000$
Surveying & Staking & Geotechnical % 5% 66,000$
Construction Management/Staff % 10% 132,000$
330,000$
1,654,000$
20% 331,000$
1,985,000$
* All unit prices reflect 2024 costs.

CONTINGENCY

TOTAL PROJECT
Item No. Item Description Project Total

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
73 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name M-5E-C
Units Quantities Unit Price * Item Total
1 Install 36" RCP FT 490 $527 258,000$
2 Install 42" RCP FT 1,180 $588 694,000$
3 Manhole EA 4 $20,322 81,000$
4 Remove 36" RCP FT 70 $53 4,000$
5 Sawcut and Remove Existing AC Pavement SF 9,550 $2.66 25,000$ 6 Crushed Miscellaneous Base SF 9,550 $4 38,000$
7 Replace Asphalt Concrete Pavement SF 9,550 $2 19,000$ 8 Traffic Control % 5% 56,000$
9 Erosion Control % 1% 12,000$
10 Moblilization/Demobilization % 10% 119,000$
1,306,000$
Engineering and Design % 10% 131,000$
Surveying & Staking & Geotechnical % 5% 65,000$
Construction Management/Staff % 10% 131,000$
327,000$
1,633,000$
20% 327,000$
1,960,000$
* All unit prices reflect 2024 costs.

CONTINGENCY

TOTAL PROJECT
Item No. Item Description Project Total

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
74 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name M-5E-D
Units Quantities Unit Price * Item Total
1 Install 36" RCP FT 590 $527 311,000$
2 Install 42" RCP FT 1,070 $588 629,000$
3 Manhole EA 4 $20,322 81,000$
4 Sawcut and Remove Existing AC Pavement SF 9,440 $2.66 25,000$ 5 Crushed Miscellaneous Base SF 9,440 $4 38,000$
6 Replace Asphalt Concrete Pavement SF 9,440 $2 19,000$ 7 Traffic Control % 5% 55,000$
8 Erosion Control % 1% 12,000$
9 Moblilization/Demobilization % 10% 117,000$
1,287,000$
Engineering and Design % 10% 129,000$
Surveying & Staking & Geotechnical % 5% 64,000$
Construction Management/Staff % 10% 129,000$
322,000$
1,609,000$
20% 322,000$
1,931,000$
* All unit prices reflect 2024 costs.

CONTINGENCY

TOTAL PROJECT
Item No. Item Description Project Total

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
75 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name M-5E-E
Units Quantities Unit Price * Item Total
1 Install 36" RCP FT 640 $527 337,000$
2 Install 42" RCP FT 1,030 $588 606,000$
3 Manhole EA 4 $20,322 81,000$
4 Sawcut and Remove Existing AC Pavement SF 9,470 $2.66 25,000$ 5 Crushed Miscellaneous Base SF 9,470 $4 38,000$
6 Replace Asphalt Concrete Pavement SF 9,470 $2 19,000$ 7 Traffic Control % 5% 55,000$
8 Erosion Control % 1% 12,000$
9 Moblilization/Demobilization % 10% 117,000$
1,290,000$
Engineering and Design % 10% 129,000$
Surveying & Staking & Geotechnical % 5% 65,000$
Construction Management/Staff % 10% 129,000$
323,000$
1,613,000$
20% 323,000$
1,936,000$
* All unit prices reflect 2024 costs.

Item No. Item Description Project Total

CONTINGENCY

TOTAL PROJECT

SUBTOTAL (CONSTRUCTION)

SUBTOTAL (ENGINEERING AND CONSTRUCTION ADMINISTRATION)

SUBTOTAL COST
76 of 136
City of Fontana Master Plan
FONT-0121
CIP Cost Estimates
AOS 1
Name M-5E-F
Units Quantities Unit Price * Item Total
1 Install 36" RCP FT 650 $527 343,000$
2 Install 42" RCP FT 1,000 $588 588,000$
3 Manhole EA 4 $20,322 81,000$
4 Sawcut and Remove Existing AC Pavement SF 9,350 $2.66 25,000$ 5 Crushed Miscellaneous Base SF 9,350 $4 37,000$
6 Replace Asphalt Concrete Pavement SF 9,350 $2 19,000$ 7 Traffic Control % 5% 55,000$
8 Erosion Control % 1% 11,000$
9 Moblilization/Demobilization % 10% 116,000$
1,275,000$
Engineering and Design % 10% 128,000$
Surveying & Staking & Geotechnical % 5% 64,000$
Construction Management/Staff % 10% 128,000$
320,000$
1,595,000$
20% 319,000$
1,914,000$
* All unit prices reflect 2024 costs.

CONTINGENCY

TOTAL PROJECT
Item No. Item Description Project Total