City of Fontana
User Fee Study Report
April 2019
User Fee Study
May 2025
i Comprehensive User Fee Study
TABLE OF CONTENTS
TABLE OF CONTENTS ................................. ................................................... ............. i Executive Summary ................................. ................................................... .............. 1 User Fee Background ............................... ................................................... ............. 2 Background .................................................................................................................................................. 2 California User Fee History .......................................................................................................................... 2 Additional Policy Considerations ................................................................................................................. 3 Study Objective ................................... ................................................... ................. 4 Scope of the Study ....................................................................................................................................... 4 Aim of the Report......................................................................................................................................... 5 Project Approach and Methodology .................. ................................................... ...... 6 Conceptual Approach................................................................................................................................... 6 Fully Burdened Hourly Rates........................................................................................................................ 6 Summary Steps of the Study ........................................................................................................................ 7 Allowable Costs ............................................................................................................................................ 7 Methodology ................................................................................................................................................ 8 Quality Control/Quality Assurance .............................................................................................................. 8 Reasons for cost increases/decreases over current fees............................................................................. 8 City Staff Contributions ................................................................................................................................ 9 Fontana User Fees ................................. ................................................... ............. 10 Cost Recovery............................................................................................................................................. 10 Subsidization .............................................................................................................................................. 10 Impact on Demand (Elasticity) ................................................................................................................... 11 Summary .................................................................................................................................................... 11 Building and Safety ............................... ................................................... .............. 12 Analysis ...................................................................................................................................................... 12 Code Compliance ................................... ................................................... ............. 13 Analysis ...................................................................................................................................................... 13 Fire District ..................................... ................................................... .................. 14 Analysis ...................................................................................................................................................... 14 Community Services .................................................. ........................................... 15
ii Comprehensive User Fee Study
Analysis ...................................................................................................................................................... 15 Environmental ..................................... ................................................... .............. 16 Analysis ...................................................................................................................................................... 16 Engineering ....................................... ................................................... ................ 17 Analysis ...................................................................................................................................................... 17 Police ............................................ ................................................... .................... 18 Analysis ...................................................................................................................................................... 18 Office of the City Clerk .......................... ................................................... .............. 19 Analysis ...................................................................................................................................................... 19 Planning .......................................... ................................................... .................. 20 Analysis ...................................................................................................................................................... 20 Finance ........................................... ................................................... .................. 21 Analysis ...................................................................................................................................................... 21 Development Services – Solid Waste, Stormwater .... ................................................. 2 2 Analysis ...................................................................................................................................................... 22 Appendix A – Total Allowable Cost to be Recovered . ................................................. 2 3 Appendix B – Fully Burdened Hourly Rates .......... ................................................... .. 24 Appendix C – Cost Recovery Analysis ............... ................................................... ..... 29
1 Comprehensive User Fee Study
Executive Summary
The City of Fontana engaged Willdan Financial Services (Willdan) to determine the full costs incurred by the City to support the various activities for which th e City charges user fees. Due to the complexity an d the breadth of performing a comprehensive review of fee s, Willdan employed a variety of fee methodologies to identify the full costs of individual fee and pr ogram activities. This report and the appendices h erein identify 100% full cost recovery for City services and the recommended level of recovery as determined through discussion with departmental staff. The re commended fees identified herein are either at or l ess than full cost recovery.
2 Comprehensive User Fee Study
User Fee Background
Background
As part of a general cost recovery strategy, local governments adopt user fees to fund programs and services that provide limited or no direct benefit to the community as a whole. As cities struggle to maintain levels of service and variability of demand, they have bec ome increasingly aware of subsidies provided by the General Fund and have implemented cost-recovery tar gets. To the extent that governments use general tax monies to provide individuals with private bene fits, and not require them to pay the full cost of the service (and, therefore, receive a subsidy), the government is limiting funds that may be available to provide other community-wide benefits. In effect, the gover nment is using community funds to pay for private benefits. Unlike most revenue sources, cities have more control over the level of user fees they charg e to recover costs, or the subsidies they can institute.
Fees in California are required to conform to the s tatutory requirements of the California Constitutio n, Proposition 218, Proposition 26, and the California Code of Regulations. The Code also requires that the City Council adopt fees by either ordinance or resolution, and that any fees in excess of the estimated total cost of rendering the related services must be appr oved by a popular vote of two-thirds of those elect ors voting because the charge would be considered a tax and not a fee. There are no fees suggested to be s et above the cost of service and as such a public vote is not required.
California User Fee History
Before Proposition 13, In times of fiscal shortages, California cities were able to raise property taxes, which funded everything from police and recreation to dev elopment-related services. However, this situation changed with the passage of Proposition 13 in 1978.
Proposition 13 established the era of revenue limitation in California local government. In subsequent years, the state saw a series of additional limitations to local government revenues. Proposition 4 (1979) defined the difference between a tax and a fee: a fee can be no greater than the cost of providing the service; and Proposition 218 (1996) further limited the impositi on of taxes for certain classes of fees. As a resul t, cities were required to secure a supermajority vote in ord er to enact or increase taxes. Due to the threshold s needed to increase local taxes, cities have less co ntrol and very few successful options for new reven ues.
The State of California took a series of actions in the 1990’s and 2000’s to improve the State’s fiscal situation, at the expense of local governments. In 2004-05, th e Educational Revenue Augmentation Funds (“ERAF”) take-away of property taxes and the reduction of Vehicle License Fees further reduced local tax revenues.
In addition, on November 2, 2010, California voters approved Proposition 26, the “Stop Hidden Taxes Initiative”, which is aimed at defining “regulatory fees” as a special tax rather than a fee, thus req uiring approval by two-thirds vote of local voters. These regulatory fees are typically intended to mitigate the societal and environmental impacts of a business or person’s activities. Proposition 26 contains seve n categories of exceptions. The fees analyzed as par t of a User Fee study typically fall under categori es one through five consisting of charges for specific ben efits, government service, regulatory need, for use of government property, or a fine/penalty.
3 Comprehensive User Fee Study
Additional Policy Considerations
State regulations require that municipalities update their fee schedules to reflect the actual costs of certain public services primarily benefiting users. User Fees recover costs associated with the provision of specific services benefiting the user, thereby typically reducing the use of General Fund monies for such purposes.
In addition to collecting the direct cost of labor and materials associated with processing and administering user services, it is common for local governments t o recover reasonable support costs. Support costs are those costs relating to a local government’s centra l service departments that are allocable to the loc al government’s operating departments. Central service s support cost allocations were incorporated using the resulting indirect overhead percentages determi ned through the City’s Cost Allocation Plan. This p lan was used in the User Fee study to account for the b urden placed upon central services by the operating departments in order to allocate a proportionate share of central service cost through the study.
As labor effort and costs associated with the provision of services fluctuate over time, a significant element in the development of any fee schedule is that it h as the flexibility to remain current. Therefore, i t is recommended that the City include an inflationary f actor in the resolution adopting the fee schedule t o allow the City Council, by resolution, to annually increase or decrease the fees.
The City may employ many different inflationary fac tors. The most commonly used inflator is some form of the Consumer Price Index (CPI) as it is widely w ell known and accepted. A similar inflator is the implicit price deflator for GDP, which is much like the CPI except that while the CPI is based on the same “bas ket” of goods and services every year, the price deflato rs’ “basket” can change year to year. Since the pr imary factor for the cost of a City’s services is usually the costs of the personnel involved, tying an infl ationary factor that connects more directly to the personnel costs can also be suitable if there is a clear method, or current practice of obtaining said factor.
Each City should use an inflator that they believe works the best for their specific situation and needs. It is also recommended that the City perform this interna l review annually with a comprehensive review of services and fees performed every five years, which would include adding, amending, or removing fees for programs/services.
4 Comprehensive User Fee Study
Study Objective
As the City of Fontana seeks to efficiently manage limited resources and adequately respond to increas ed service demands, it needs a variety of tools. A User Fee Study provides assurance that the City has the best information and the best resources available to mak e sound decisions, fairly and legitimately set fees , maintain compliance with state law and local polici es, and meet the needs of the City administration a nd its constituency. Given the limitations on raising revenue in local government, the City recognizes th at a User Fee Study is a very cost-effective way to unde rstand the total cost of services and identify pote ntial fee deficiencies. Essentially, a User Fee is a payment for a requested service provided by a local government that primarily benefits an individual or group.
The total cost of each service included in this ana lysis is based on the full cost of providing City s ervices, including direct salaries and benefits of City staff, direct departmental costs, and indirect costs from central service support. This study determines the full co st recovery fee for the City to provide each servic e; however, each fee is set at the City’s discretion, up to 100% of the total cost, as specified in this report.
The principal goal of the study was to help the Cit y determine the full cost of the services that the City provides. In addition, Willdan established a series of additional objectives including:
Developing a rational basis for setting fees
Identifying subsidy amount, if applicable, of each fee in the model Ensuring compliance with State law
Developing an updatable and comprehensive list of fees Maintaining accordance with City policies and goals
The study results will help the City better underst and its true costs of providing services and may se rve as a basis for making informed policy decisions regard ing the most appropriate fees, if any, to collect f rom individuals and organizations that require individualized services from the City.
Scope of the Study
The scope of this study encompasses a review and ca lculation of the user fees charged by the following Fontana departments and fee groups:
Building & Safety
Code Enforcement
Fire District
Community Services
Environmental
Engineering
Finance
Police
5 Comprehensive User Fee Study
Office of the City Clerk
Planning
Development Services – Solid Waste, Stormwater
The study involved the identification of existing a nd potential new fees, fee schedule restructuring, data collection and analysis, orientation and consultati on, quality control, communication and presentation s, and calculation of individual service costs (fees) or program cost recovery levels.
Aim of the Report
The User Fee Study focused on the cost of City serv ices, as City staff currently provide them at exist ing, known, or reasonably anticipated service and staff level needs. This report provides a summary of the study results, and a general description of the approach and methods Willdan and City staff used to determin e the recommended fee schedule. The report is not int ended to document all of the numerous discussions throughout the process, nor is it intended to provi de an influential dissertation on the qualities of the utilized tools, techniques, or alternative approaches.
6 Comprehensive User Fee Study
Project Approach and Methodology
Conceptual Approach
The basic concept of a User Fee Study is to determi ne the “reasonable cost” of each service provided by the City for which it charges a user fee. The full cost of providing a service may not necessarily become the City’s fee, but it serves as the objective basis as to the maximum amount that may be collected.
The standard fee limitation established in Californ ia law for such fees is the “estimated, reasonable cost” principle. In order to maintain compliance with the letter and spirit of this standard, every componen t of the fee study process included a related review. Th e use of budget figures, time estimates, and improvement valuation clearly indicates reliance upon estimates for some data.
Fully Burdened Hourly Rates
The total cost of each service included in this analysis is primarily based on the Fully Burdened Hourly Rates (FBHRs) that were determined for City personnel directly involved in providing services. The FBHRs include not only personnel salary and benefits, but also any costs that are reasonably ascribable to personnel. The cost elements that are included in the calculation of fully burdened rates are:
Salaries & benefits of personnel involved
Operating costs applicable to fee operations
Departmental support, supervision, and administration overhead Internal Service Costs charged to each department
Indirect City-wide overhead costs calculated through the Cost Allocation Plan An important factor in determining the fully burden ed rate is in the calculation of productive hours f or personnel. This calculation takes the available workable hours in a year of 2,080 and adjusts this fi gure to 1,650 productive or billable hours to account for c alculated or anticipated hours’ employees are invol ved in non-billable activities such as paid vacation, s ick leave, holidays, and other considerations as necessary.
Dividing the full cost, including overhead, of a po sition by the number of productive hours provides t he FBHR.
The FBHRs are then used in conjunction with time es timates, when appropriate for how a service is provided, to calculate a fee’s cost based on the pe rsonnel and the amount of their time that is involv ed in providing each service.
7 Comprehensive User Fee Study
Summary Steps of the Study
The process of the study is straightforward and simple in concept. The following list provides a summary of the study process steps:
Allowable Costs
This report identifies three types of costs that, w hen combined, constitute the fully burdened cost of a service (Appendix A) . Costs are defined as
direct labor, including salary and benefits,
departmental overhead costs, and the City’s
central services overhead, where
departmental and central service overhead
costs constitute support costs. These cost
types are defined as follows:
Direct Labor (Personnel Costs): The
costs related to staff salaries for
time spent directly on fee-related
services.
Departmental Overhead: A
proportional allocation of
departmental overhead costs,
including operation costs such as
supplies and materials that are necessary for the department to function. Central Services Overhead: These costs, as provided via the City’s Cost Alloca tion Plan, represent services provided by those Central Services Departm ents whose primary function is to support other City departments.
Data Analysis
Department Interviews
Time Estimates
Labor Costs
Cost Allocation Plan
Building Cost Layers
Direct Services
Indirect Services
Department Overhead
City-Wide Overhead
Set Fees
Define the Full Cost of
Services
Set Cost Recovery Policy
8 Comprehensive User Fee Study
Methodology
The two methods of analysis for calculating fees used in this report are the:
Case Study Method (Standard Unit Cost Build-Up Appr oach): This approach estimates the actual labor and material costs associated with providing a unit of service to a single user. This analysis is suitable when City staff time requirements do not vary drama tically for a service, or for special projects wher e the time and cost requirements are easy to identify at the project’s outset. Further, the method is effective in instances when a staff member from one department a ssists on an application, service or permit for another department on an as-needed basis. Costs are estimated based upon interviews with City staff regarding the time typically spent on tasks, a review of available records, and a time and materials analysis.
Programmatic Approach: In some instances, the underlying data is not available or varies widely, leaving a standard unit cost build-up approach impractical. In addition, market factors and policy concerns (a s opposed to actual costs) tend to influence rental based fee levels more than other types of services. Willdan employed a different methodology where appropriate to fit a programs’ needs and goals. Typical programmatic approach cases are facility use fees, penalties, and instances where a program cost is divided over the user base to obtain a per applicant cost for shared cost services.
Quality Control/Quality Assurance
All study components are interrelated, thus flawed data at any step in the process will cause the ulti mate results to be inconsistent and unsound. The element s of our Quality Control process for User Fee calculations include:
Involvement of knowledgeable City staff
Clear instructions and guidance to City staff
Reasonableness tests and validation
Normalcy/expectation ranges
FTE balancing
Internal and external reviews
Cross-checking
Reasons for cost increases/decreases over current f ees Within the fee tables in Appendix C , the differences are identified between the full c osts calculated through the study and the fee levels currently in e ffect. The reasons for differences between the two can arise from a number of possible factors including:
Previous fee levels may have been set at levels les s than full cost intentionally, based on policy decisions
Staffing levels and the positions that complete fee and service activity may vary from when the previous costs were calculated
9 Comprehensive User Fee Study
Personnel and materials costs could have increased at levels that differed from any inflationary factors used to increase fees since the last study
Costs that this study has identified as part of the full cost of services that may not have been accounted for in a previous study
o Departmental overhead and administration costs
o Internal Service Fund support costs
o Indirect central service overhead from the Cost Allocation Plan Changes in processes and procedures within a department, or the City as a whole Changes in the demand for services in a City may ha ve also changed the staffing or cost structure of departments over time
City Staff Contributions
As part of the study process, Willdan received tremendous support and cooperation from City staff, which contributed and reviewed a variety of components to the study, including:
Budget and other cost data
Staffing structures
Fee and service structures, organization, and descriptions Direct and indirect work hours (billable/non-billable) Time estimates to complete work tasks
Frequency and current fee levels
Review of draft results and other documentation
A User Fee Study requires significant involvement of the managers and line staff from the departments on top of their existing workloads and competing prior ities. The contributions from City staff were criti cal to this study. We would like to express our appreciati on to the City and its staff for their assistance, professionalism, positive attitudes, helpful suggestions, responsiveness, and overall cooperation.
10 Comprehensive User Fee Study
Fontana User Fees
Cost Recovery
The cost recovery models, by department/division fee type, are presented in detail in Appendix C . Full cost recovery is determined by summing the estimated amount of time each position (in increments of minutes or hours) spends to render a service. Time estimate s for each service rendered were obtained through interviews conducted with City staff for each depar tment/division fee included in the study. The resul ting cost recovery amount represents the total cost of p roviding each service. The City’s current fee being charged for each service, if applicable, is provided in this section, as well, for reference.
It is important to note that the time data used to determine the amount of time each employee spends assisting in the provision of the services listed o n the fee schedule is essential in identifying the total cost of providing each service, and will differ from Cit y to City depending on staffing, positions involved , experience on staff, the use of consultants, and th e policies and procedures in place for each City.
Specifically, in providing services, a number of em ployees are often involved in various aspects of th e process, spending anywhere from a few minutes to several hours on the service.
The primary goal of this study was to identify the cost of City services, to provide information to he lp the City make informed decisions regarding the actual fee levels and charges. The responsibility of determining the final fee levels is a complicated task. City st aff must consider many issues in formulating recommendations, and the City Council must consider those same issues and more in making the final decisions.
City staff assumes the responsibility to develop sp ecific fee level recommendations to present to the City Council. Unfortunately, there are no hard and fast rules to guide the City, since many of the considerations are based on the unique characteristics of the City of Fontana, and administrative and political discr etion.
However, in setting the level of full cost recovery for each fee, one should consider whether the serv ice solely benefits one end user or the general community.
Subsidization
Recalling the definition of a user fee helps guide decisions regarding subsidization. The general standard is that individuals (or groups) who receive a wholly p rivate benefit should pay 100% of the full cost of the services. In contrast, services that are simply public benefit should be funded entirely by the general fund’s tax dollars. Unfortunately, for the decision makers , some services fall into the range between these t wo extremes.
Further complicating the decision, opponents of fee s often assert that the activities subject to the f ees provide economic, cultural, “quality of life,” or other community benefits that exceed the costs to the City, but it is important to distinguish the difference b etween any purported possible benefits that may be conveyed through the result of activities of the se rvice receiver and the direct benefit being conveye d through the City providing the service to the requestor.
It is recommended the City consider such factors during its deliberations regarding appropriate fee levels.
11 Comprehensive User Fee Study
Of course, subsidization can be an effective public policy tool, since it can be used to reduce fees t o encourage certain activities (such as to ensure pub lic safety) or allow some people to be able to affo rd to receive services they otherwise could not at the fu ll cost. In addition, subsidies can be an appropria te and justifiable action, such as to allow citizens to rightfully access services, without overburdensome costs.
Despite the intent, it is important for the City an d public to understand that subsidies must be cover ed by another revenue source, typically the General Fund’ s other unobligated funds. Therefore, the general taxpayer will potentially help to fund private bene fits, and/or other City services will not have avai lable funds that are otherwise directed to cover fee subsidies.
Impact on Demand (Elasticity)
Economic principles of elasticity suggest that increased costs for services (higher fees) will eventually curtail the demand for the services; whereas lower fees may spark an incentive to utilize the services and encourage certain actions. Either of these conditi ons may be a desirable effect to the City. However, the level of the fees that would cause demand changes i s largely unknown. The cost of service study did no t attempt to evaluate the economic or behavioral impa cts of higher or lower fees; nevertheless, the City should consider the potential impacts of these issues when deciding on fee levels.
Summary
City staff is recommending setting user fees at 100% of the full cost identified in this study except for specific considerations where it makes sense based on how se rvice is provided such as trade fees within Buildin g that are often coupled together when provided, or f or the City xeroxing fee where the full cost would be considered prohibitive. City and departmental goal s, City Council priorities, policy initiatives, pas t performance, implementation issues, and other inter nal and external factors should influence staff recommendations and City Council decisions. In this case, the proper identification of additional serv ices (new or existing services) and the update to a consistent and comprehensive fee schedule were the primary objectives of this study. City staff has reviewed the full costs and identified the recommended fee levels for consideration by City Council. The attached appendices exhibit these unit fees individually.
The preceding sections provide background for each department, division, and fee group and the results of this study’s analysis of their fees. For the full list of each fee’s analysis, refer to Appendix C of this report.
12 Comprehensive User Fee Study
Building and Safety
Building and Safety promotes and maintains a safe a nd desirable living and working environment throughout the City of Fontana by administering fai r and unbiased enforcement of State and local laws to reduce hazards and eliminate blight that adversely affects the quality of life and safety of the residents and those who work in and visit the city.
Analysis
Willdan individually reviewed the services and prog rams associated with Building and Safety. The revi ew also consisted of an evaluation of existing services in an effort to update the fee schedule.
The analysis of Building and Safety services relied primarily upon a standard unit cost build-up appro ach, whereby we determined the reasonable cost of each f ee occurrence using staff time to recover the direc t cost of staff and pro-rata share of departmental costs, including indirect costs for County Central Services.
The analysis found that most services are currently set below the full cost of providing them. Staff h ave suggested reasonable fee adjustments to the fee schedule, and they are detailed in Appendix C . As a result, there would be:
an increase to 643 fees;
13 fees would decrease;
8 fees would remain as currently set;
1 new fee, Design review for Planning entitlement projects, would be added, and; the average change in fees would be an increase of 69%.
13 Comprehensive User Fee Study
Code Compliance
Code Compliance’s mission is to protect the health, safety, and welfare of the community members by obtaining compliance with the Fontana Municipal Code; to enhance the appearance of neighborhoods and business districts to prevent blight, protect prope rty values and enhance economic conditions. The goa l is to obtain voluntary compliance, whenever possible, by communication and education, while operating in a business-like manner.
Analysis
Willdan individually reviewed the services associated with Code Compliance. The review also consisted of an evaluation of existing services in an effort to update the fee schedule.
The analysis of the Code Compliance services relied primarily upon a standard unit cost build-up approach, whereby the reasonable cost of each fee occurrence was determined using staff time involved with providing the service to recover the direct cost of staff and the pro-rata share of departmental costs , including indirect costs for City Central Services. Willdan then compared the calculated full cost against the current fee amount to determine, if charged, whethe r the current fee is recovering the costs associate d with the requested service. The analysis found that most fees are currently set below the full cost of providing the service. It is recommended that the C ity set Code Compliance fees at the levels detailed in Appendix C . As a result, there would be:
An increase for 6 fees;
3 new fees would be added;
25 fees would remain as currently set, and;
the average change in fees would be an increase of 3%.
14 Comprehensive User Fee Study
Fire District
The Fontana Fire District serves the City of Fontan a and its sphere of influence. The District is serv ed by seven fire stations. The district’s administrative offices are located at 17001 Upland Avenue and the fire prevention offices are located at City Hall, 8353 S ierra Avenue. The District is staffed with 140 full -time personnel: 124 safety employees and 16 non-safety e mployees. Emergency response, administrative and support services are provided through a contract un der the umbrella of the San Bernardino County Fire Department.
Analysis
Willdan individually reviewed the services associated with the Fire District. The review also consisted of an evaluation of existing services in an effort to update the fee schedule.
The analysis of the Fire District services fee sect ion relied primarily upon a standard unit cost buil d-up approach, whereby the reasonable cost of each fee o ccurrence was determined using staff time involved with providing the service to recover the direct co st of staff and the pro-rata share of departmental costs, including indirect costs for City Central Services. Willdan then compared the calculated full cost against the current fee amount to determine, if charged, whethe r the current fee is recovering the costs associate d with the requested service. The analysis resulted in a combination of fees that are currently set below and above full cost. It is recommended that the City ad just fees and increase cost recovery to 100% for Fi re services as detailed in Appendix C . As a result, there would be:
An increase for 139 fees;
27 fees would decrease;
24 new fees would be added;
1 fee would remain as currently set, and;
the average change in fees would be an increase of 50% for existing services.
15 Comprehensive User Fee Study
Community Services
The Community Services Department is responsible fo r programs that promote active lifestyles and communities, support education and cultural awareness, and provide interactive recreational opportunities for Fontana residents of all ages. The department i s comprised of four divisions (Administration, Arts/Marketing/Youth Services, Events & Athletic Se rvices, and Facility & Senior Services) that work collectively to provide quality recreation, educati on and cultural art experiences for individuals, fa milies, and the community. Programs, services and events of fered by the department include special events, cultural arts, education and recreation classes, he alth and wellness activities, marketing and public communication efforts, youth and after school progr ams, sports, aquatics, facility management, and environmental and conservation programs. The department provides these programs, services, and events through 49 sports fields, 50 parks, 12 community ce nters, 7 miles of Pacific Electric Trail, 5 aquatic pool, waterslide, and splash pad centers, 5 outdoors sports pavilions and fitness circuits, 3 indoor fitness centers, 3 outdoor amphitheaters, 4 dog parks, 2 performing arts theaters, 2 skate parks, 1 gymnasium, and through partnerships with non-profit and service organizations throughout the county.
Analysis
No cost analysis was done on Community Services fees and all would remain as currently set as detailed in Appendix C.
16 Comprehensive User Fee Study
Environmental
The City of Fontana Environmental offers many programs to residents of Fontana in the areas of: Curbside Used Oil and Filter Collection, Fats, Oils, and Grease, Household Hazardous Waste, Pretreatment, Recycling, Stormwater, Street Sweeping, Solid Waste and Trash Collection, and Water Conservation Workshops Chino Basin Water Conservation District offers a variety of landscape workshops to help you conserve water outdoors.
Analysis
Willdan individually reviewed the services associated with Environmental. The review also consisted of an evaluation of existing services in an effort to update the fee schedule.
The analysis of the Environmental services relied p rimarily upon a standard unit cost build-up approac h, whereby the reasonable cost of each fee occurrence was determined using staff time involved with providing the service to recover the direct cost of staff and the pro-rata share of departmental costs , including indirect costs for City Central Services. Willdan then compared the calculated full cost against the current fee amount to determine, if charged, whethe r the current fee is recovering the costs associate d with the requested service. The analysis found that most flat rate fees are currently set below the full cost of providing the service. It is recommended that the City increase cost recovery to 100% for Environmental services as detailed in Appendix C . As a result, there would be:
An increase for 11 fees;
2 fees would decrease;
26 new fees would be added;
3 fees would remain as currently set, and;
the average change in fees would be a decrease of 53% for existing services.
17 Comprehensive User Fee Study
Engineering
The Public Works Department is responsible for cons tructing new infrastructure and maintaining existin g infrastructure within the City through aggressive c apital improvement, capital reinvestment and maintenance programs. The department’s core duties include engineering evaluation, implementation of new infrastructure, execution of programs and servi ces related to sewer, storm drains, refuse collecti on, recycling, water reclamation, streets, traffic, cit y trees, parks, streetscapes, graffiti abatement, p ublic buildings and fleet maintenance and replacement. Pu blic Works is organized into six divisions: Capital Projects, Fleet & Facilities, Land Development, Par ks & Landscape, Traffic Engineering and Streets & Utilities. The department manages 131 full-time emp loyees, numerous seasonal and parttime staff and multiple contract service providers while maintaini ng an “integrated service approach” by utilizing dedicated staff, contract services and construction contracts.
Analysis
Willdan individually reviewed the services associat ed with Engineering. The review also consisted of a n evaluation of existing services in an effort to update the fee schedule.
The analysis of the Engineering services relied pri marily upon a standard unit cost build-up approach, whereby the reasonable cost of each fee occurrence was determined using staff time involved with providing the service to recover the direct cost of staff and the pro-rata share of departmental costs , including indirect costs for City Central Services. Willdan then compared the calculated full cost against the current fee amount to determine, if charged, whethe r the current fee is recovering the costs associate d with the requested service. The analysis found that most fees are currently set below the full cost of providing service. Staff have suggested reasonable fee adjustments to the fee schedule, and they are detailed in Appendix C . As a result, there would be:
An increase for 40 fees;
1 fee would decrease;
72 new Engineering review fees would be added;
28 fees would remain as currently set, and;
The average fee change would be an increase of 29% for existing services.
18 Comprehensive User Fee Study
Police
The Police Department has 312 full time employees (217 sworn and 95 non-sworn) and is comprised of five (5) separate divisions: Office of the Chief of Poli ce, Administrative Services, Field Services, Specia l Operations, and Civilian Administration. In additio n to the main Police Facility there is a contact st ation located south of Interstate 10.
The Department’s vision statement reads “Dedicated to excellence and professionalism, we are committed to working with the people of Fontana to enhance th e safety and security of our diverse community” and their motto is “Service with Integrity.” The Depart ment follows a community-oriented policing philosophy which, through citizen involvement and participatio n, allows for the greatest impact in helping to add ress criminal and quality of life issues affecting the people of Fontana.
Analysis
Willdan individually reviewed the services associated with the Police Department. The review also consisted of an evaluation of existing services in an effort to update the fee schedule.
The analysis of the Police services relied primaril y upon a standard unit cost build-up approach for f ees, excluding penalties, whereby the reasonable cost of each fee occurrence was determined using staff tim e involved with providing the service to recover the direct cost of staff and the pro-rata share of departmental costs, including indirect costs for City Central Se rvices. Willdan then compared the calculated full cost against the current fee amount to determine, if cha rged, whether the current fee is recovering the cos ts associated with the requested service. The analysis found that fees are currently set below the full c ost of providing service. It is recommended that the City set Police fees at the levels detailed in Appendix C . As a result, there would be:
An increase for 18 fees;
3 fees would decrease
40 fees would remain as currently set, including animal fees, and; The average fee change would be an increase of 3%.
19 Comprehensive User Fee Study
Office of the City Clerk
The City Clerk’s Office serves as the historian for the City and the direct link to its citizens keepi ng them informed of official actions of City government. Th e department prepares City Council agendas, maintains complete and accurate official City records which i nclude records of all proceedings; maintains a curr ent Municipal Code; conducts all municipal elections as well as any special elections which may be called; files Campaign Statements and Statements of Economic Inte rests as required by the Fair Political Practices Commission (FPPC) and municipal law; publishes all ordinances adopted by the City Council; assists wit h legal noticing; administers the Oath of Allegiance to elected and appointed Commission members; and prepares Proclamations and certificates. This depar tment also accepts all liability claims, subpoenas filed against the City, and Public Record Requests.
Analysis
No cost analysis was done on the Office of the City Clerks fees and are recommended to remain as currently set as detailed in Appendix C. The services listed mainly pertain to reproduction of records and regulated subpoena fees.
20 Comprehensive User Fee Study
Planning
The Planning Department promotes economic development while maintaining customer service excellence.
It provides planning and staff support to the Planning Commission and assists the Planning Commission, the City Council, and the public in applying the community’s strategic growth and development vision as defined by the City Council through the goals and policies of the General Plan and the implementation of those policies through the Zoning and Development Code.
Analysis
Willdan individually reviewed the services and prog rams associated with the Planning Department. The review also consisted of an evaluation of existing services in an effort to update the fee schedule.
The analysis of Planning services relied primarily upon a standard unit cost build-up approach, whereby the reasonable cost of each fee occurrence was determin ed using staff time involved in providing services to recover the direct cost of staff and the pro-rata share of departmental costs, including indirect costs for City Central Services. Willdan then compared the calcul ated full cost against the current fee amount to determine, if charged, whether the current fee is r ecovering the costs associated with the requested service. The analysis found that current fee levels are subsidizing the cost for most services to a la rge degree. It is recommended that the City set Planning fees at the levels detailed in Appendix C . As a result, there would be:
An increase to 51 fees;
17 fees would decrease;
20 new fees would be added;
4 fees would change to a flat fee from a % based or cost fee; 1 fee would change to % based from a flat fee;
16 fees would remain as currently set, and;
the average fee change would be an increase of 11%.
21 Comprehensive User Fee Study
Finance
The Finance Department is responsible for managing and protecting the City’s financial assets while providing excellent customer service. The departmen t is comprised of five divisions (Administration, Accounting, Budget/Payroll, Customer Service and Pu rchasing). Responsibilities range from daily administration of City fiscal resources to long-ran ge financial planning. Financial policies, plans, a nd reporting systems support the operating departments in achieving their objectives and assure the City’ s long-term fiscal health.
Administration manages the treasury function and debt issuance. Accounting is responsible for the general ledger, accounts payable, fixed asset management, a nd special districts. Budget/Payroll prepares and monitors the operating budget, capital improvement program and payroll. Customer service handles accounts receivable, utility billing, business lice nse, passport services, dog licensing and cashierin g.
Purchasing is responsible for the procurement of materials, supplies and equipment, monitoring the P-Card program, providing for the disposal of surplus property, and overseeing the shipping and receiving services and City-wide postage.
Analysis
No cost analysis was done on the Finance fees and are recommended to remain as currently set as detailed in Appendix C. Most listed pertain to the Business License Tax.
22 Comprehensive User Fee Study
Development Services – Solid Waste, Stormwater
The services included in Solid Waste and Stormwater include inspection, compliance, abatement, and bin service fees.
Analysis
Willdan individually reviewed the services associat ed with Development Services – Solid Waste and Stormwater Fees. The review also consisted of an evaluation of existing services in an effort to update the fee schedule.
The analysis of the Solid Waste and Stormwater Fees services relied primarily upon a standard unit cos t build-up approach, whereby the reasonable cost of e ach fee occurrence was determined using staff time involved with providing the service to recover the direct cost of staff and the pro-rata share of departmental costs, including indirect costs for City Central Se rvices. Willdan then compared the calculated full cost against the current fee amount to determine, if cha rged, whether the current fee is recovering the cos ts associated with the requested service. The analysis found that current fee levels are subsidizing the cost for most services to a degree. It is recommended that the City increase cost recovery to 100% for Solid Waste and Stormwater services as detailed in
Appendix C . The bin service fees are listed in the schedule, but were not analyzed as part of this study. As a result, there would be:
12 new fees primarily relating to inspection and compliance would be added, and; The remaining fees, including Bin Services, would remain as currently set.
23 Comprehensive User Fee Study
Appendix A – Total Allowable Cost to be Recovered
Below are the total allowable costs that may be rec overed through User Fees; however, only a portion o f the total allowable cost is recovered as staff not only works on services related to User Fees, but also works on an array of other City functions during the operational hours of the City. The amounts listed below will not reconcile to City budgets as costs that should not be included in overhead for personnel in the application of determining fully burdened hourly rates were excluded. Examples of these costs are capital, debt, monetary transfers, contract costs, and any o ther costs that are charged directly to the service requestor.
City of Fontana - User Fee
Overhead Rate Calculations
Department
Total Personnel
Services
Department
Operations &
Administration
Direct
Overhead
%
Indirect
Allocation
%
101: Accounting 1,360,200 74,640 5% 0% 101: Admin Services Admin 492,990 113,040 23% 0% 101: Budget/Payroll 623,600 45,470 7% 0% 101: Building & Safety 1,972,200 852,420 43% 14% 101: Building & Safety Admin 607,640 34,540 6% 14% 101: City Manager's Office 871,450 228,300 26% 0% 101: Community Services 10,649,410 2,540,520 24% 16% 101: Customer Service 490,290 24,880 5% 0% 101: Development Svc Admin 849,020 132,210 16% 14% 101: Economic Development 163,240 134,380 82% 12% 101: Elected Officials 363,890 129,900 36% 0% 101: Engineering/PW 5,337,040 3,481,100 65% 33% 101: Engineering Administration 348,330 54,970 16% 0% 101: HR Administration 1,097,900 187,390 17% 0% 101: IT Administration 417,630 44,690 11% 0% 101: IT Operations & Support 2,027,030 70,400 3% 0% 101: IT Systems 2,179,470 76,260 3% 0% 101: Marketing & Communications 360,160 68,160 19% 0% 101: Mgmt Services Admin 577,860 72,630 13% 0% 101: Planning 2,250,790 631,640 28% 29% 101: Planning Administration 434,350 23,120 5% 0% 101: Police 65,333,140 8,633,430 13% 16% 101: Purchasing 549,450 25,970 5% 0% 101: Records and Elections 629,720 60,120 10% 0% 103: Facility Maintenance 1,385,190 722,420 52% 0% 125: Storm Water Compliance 143,180 6,000 4% 20% 210: Fontana Fire District 2,403,820 687,010 29% 13% 385: After School Program 3,690,360 133,480 4% 14% 622: Storm Drain 139,650 24,750 18% 29% 701: Sewer Maint & Operations 2,561,650 1,128,090 44% 7% 751: Fleet Operations 1,354,210 994,380 73% 6%
24 Comprehensive User Fee Study
Appendix B – Fully Burdened Hourly Rates
Below are fully burdened hourly rates of staff positions that provide for the services detailed in Appendix C. The FBHRs were used to determine the full cost of each service. They include the salary and benefit costs for each position as well as all applicable overhea d amounts for each position. When a central servic e department position works on a fee or project in th e purview of an operating department, the overhead rates of the operating department (shown in Appendix A ) will be applied to that central service positions’ salary and benefit rate for full cost recovery since indirect overhead cost only applies to non-central service functions of the City. For any user fee service re quest that is outside the scope of the fees detaile d in Appendix C , or for services for which there is no fee currently set, the City can charge up to the full cost of the FBHR for personnel involved.
25 Comprehensive User Fee Study
City of Fontana - User Fee
Fully Burdened Hourly Rate Calculation
Department Position
Fully Burdened
Hourly Rate
101: Accounting Acct - Accountant I $85.02
101: Accounting Acct - Accountant II $92.01
101: Accounting Acct - Accounting Manager $177.39
101: Accounting Acct - Accounting Supervisor $125.62
101: Accounting Acct - Accounting Technician-CH $76.47
101: Accounting Acct - Administrative Technician $63.65 101: Accounting Acct - Payroll Coordinator $109.55
101: Accounting Acct - Payroll Supervisor $98.50
101: Accounting Acct - Payroll Technician $70.30
101: Accounting Acct - Senior Accountant $107.05
101: Admin Services Admin Admin - Deputy City Manager $313.70 101: Admin Services Admin Admin - Executive Assistant $95.24 101: Building & Safety B&S - Administrative Clerk I $71.01 101: Building & Safety B&S - Building Inspector I $132.37 101: Building & Safety B&S - Building Inspector II $140.22 101: Building & Safety B&S - Permit Technician I $106.17 101: Building & Safety B&S - Permit Technician II $119.21 101: Building & Safety B&S - Plans Examiner I $148.15
101: Building & Safety B&S - Plans Examiner II $173.75
101: Building & Safety B&S - Senior Building Inspector $161.16 101: Building & Safety B&S - Senior Code Compliance Inspector $164.44 101: Building & Safety B&S - Senior Plans Examiner $177.57 101: Building & Safety Admin B&S Admin - Assistant Building Official $162.57 101: Building & Safety Admin B&S Admin - Director of Building & Safety $216.31 101: Building & Safety Admin B&S Admin - Permit Supervisor $144.30 101: Budget/Payroll Budget - Accounting Technician $78.21 101: Budget/Payroll Budget - Budget Analyst $93.00
101: Budget/Payroll Budget - Budget Analyst I $84.46
101: Budget/Payroll Budget - Budget Manager $166.40
101: Budget/Payroll Budget - Resource Budget Officer $133.64 101: City Manager's Office CM - City Manager $430.23 101: City Manager's Office CM - Executive Assistant to City Manager $143.21 101: City Manager's Office CM - Senior Management Analyst $177.28 101: Community Services CS - Administrative Clerk I $68.40 101: Community Services CS - Administrative Analyst II $140.22 101: Community Services CS - Administrative Assistant $84.96 101: Community Services CS - Administrative Clerk I $68.40 101: Community Services CS - Administrative Clerk II $74.29 101: Community Services CS - Administrative Technician $111.18 101: Community Services CS - Aquatics Coordinator $104.39 101: Community Services CS - Community Services Coordinator $106.55 101: Community Services CS - Community Services Director $278.23 101: Community Services CS - Community Services Manager $200.42
26 Comprehensive User Fee Study
City of Fontana - User Fee
Fully Burdened Hourly Rate Calculation
Department Position
Fully Burdened
Hourly Rate
101: Community Services CS - Community Services Supervisor $152.29 101: Community Services CS - Community Services Supervisor $167.88 101: Community Services CS - Marketing Specialist II $136.38 101: Community Services CS - Office Manager $137.02
101: Customer Service Customer - Account Clerk I $60.05 101: Customer Service Customer - Account Clerk II $61.88 101: Customer Service Customer - Administrative Technician $69.01 101: Customer Service Customer - Cashier $40.28
101: Customer Service Customer - Revenue Operations Manager $134.06 101: Development Svc Admin DS Admin - Admin & Finance Manager $208.92 101: Development Svc Admin DS Admin - Administrative Analyst I $99.70 101: Development Svc Admin DS Admin - Administrative Analyst II $142.89 101: Development Svc Admin DS Admin - Administrative Technician $82.95 101: Development Svc Admin DS Admin - Deputy City Manager $355.85 101: Development Svc Admin DS Admin - Economic Development Analyst $129.83 101: Development Svc Admin DS Admin - Executive Assistant $111.10 101: Development Svc Admin DS Admin - Homeless Solutions Manager $175.07 101: Development Svc Admin DS Admin - Management Analyst I $126.11 101: Development Svc Admin DS Admin - Management Analyst II $131.97 101: Development Svc Admin DS Admin - Senior Administrative Analyst $127.96 101: Development Svc Admin DS Admin - Senior Administrative Analyst $149.44 101: Engineering Administration Eng Admin - Director of Public Works/City Engineer $225.48 101: Engineering Administration Eng Admin - Engineering Technician II $93.93 101: Engineering Administration Eng Admin - Executive Assistant $93.79 101: Engineering/PW Eng/PW - Assistant Engineer $221.87 101: Engineering/PW Eng/PW - Associate Engineer $243.16 101: Engineering/PW Eng/PW - Associate Engineer $237.66 101: Engineering/PW Eng/PW - Engineering Manager $355.25 101: Engineering/PW Eng/PW - Engineering Technician I $147.24 101: Engineering/PW Eng/PW - Heavy Equipment Operator $194.08 101: Engineering/PW Eng/PW - Heavy Equipment Operator $158.83 101: Engineering/PW Eng/PW - Irrigation Technician $172.12 101: Engineering/PW Eng/PW - Landscape Technician I $184.88 101: Engineering/PW Eng/PW - Parks and Landscape Supervisor $255.52 101: Engineering/PW Eng/PW - Permit Technician I $141.17 101: Engineering/PW Eng/PW - Public Works Crew Leader $198.60 101: Engineering/PW Eng/PW - Public Works Inspection Supervisor $297.51 101: Engineering/PW Eng/PW - Public Works Inspector $201.45 101: Engineering/PW Eng/PW - Public Works Inspector $195.34 101: Engineering/PW Eng/PW - Public Works Maint Worker I $138.66 101: Engineering/PW Eng/PW - Public Works Maint Worker II $121.25 101: Engineering/PW Eng/PW - PW Maintenance Service Worker I $137.54 101: Engineering/PW Eng/PW - PW Maintenance Service Worker II $140.15
27 Comprehensive User Fee Study
City of Fontana - User Fee
Fully Burdened Hourly Rate Calculation
Department Position
Fully Burdened
Hourly Rate
101: Engineering/PW Eng/PW - Senior Civil Engineer $324.15 101: Engineering/PW Eng/PW - Senior Engineer $305.79
101: Engineering/PW Eng/PW - Senior Maintenance Service Worker $188.74 101: Engineering/PW Eng/PW - Senior Public Works Inspector $260.01 101: Engineering/PW Eng/PW - Senior Public Works Maint Worker $139.34 101: Engineering/PW Eng/PW - Senior PW Maintenance Worker $145.57 101: Engineering/PW Eng/PW - Traffic Engineering Technician $232.59 101: Engineering/PW Eng/PW - Traffic Signal Maintenance Supervisor $273.78 101: Engineering/PW Eng/PW - Traffic Signal Maintenance Technician I $212.95 101: Engineering/PW Eng/PW - Traffic Signal Maintenance Technician II $218.65 101: Engineering/PW Eng/PW - Tree Trimmer Specialist $188.55 101: Engineering/PW Eng/PW - Welder/Fabricator $174.78
101: HR Administration HR Admin - Benefits Analyst $104.88 101: HR Administration HR Admin - Human Resources & Risk Mgmt Director $213.81 101: HR Administration HR Admin - Human Resources Analyst $115.56 101: HR Administration HR Admin - Human Resources Clerk $65.24 101: HR Administration HR Admin - Human Resources Manager $153.52 101: HR Administration HR Admin - Human Resources Technician $85.73 101: HR Administration HR Admin - Senior Admin Assistant - Confidential $84.57 101: HR Administration HR Admin - Senior Human Resources Analyst $149.66 101: IT Administration IT Admin - Director of Innovation & Tech $206.98 101: IT Administration IT Admin - GIS Analyst $97.46
101: IT Administration IT Admin - GIS Specialist $76.96 101: IT Administration IT Admin - GIS Supervisor $148.95 101: IT Administration IT Admin - Senior Administrative Technician $108.14 101: IT Operations & Support IT Oper - Database Administrator $139.92 101: IT Operations & Support IT Oper - IT Customer Service Manager $127.11 101: IT Operations & Support IT Oper - IT Manager $170.06 101: IT Operations & Support IT Oper - IT System Specialist $84.55 101: IT Operations & Support IT Oper - IT System Technician $68.66 101: IT Operations & Support IT Oper - IT Systems Analyst $99.75 101: IT Operations & Support IT Oper - IT Systems Supervisor $162.38 101: IT Operations & Support IT Oper - IT Technician I $65.85 101: IT Operations & Support IT Oper - IT Technician II $73.12 101: IT Operations & Support IT Oper - Senior IT Systems Analyst $142.59 101: IT Operations & Support IT Oper - Senior IT Technician $83.00 101: IT Systems IT Sys - Business System Analyst $109.64 101: IT Systems IT Sys - Data Analyst $104.25
101: IT Systems IT Sys - IT Manager $135.98
101: IT Systems IT Sys - Senior Business System Analyst $137.20 101: IT Systems IT Sys - Senior Public Safety System Analyst $154.78 101: IT Systems IT Sys - Software Development Engineer $146.76 101: Mgmt Services Admin Mgmt - Deputy Finance Officer $208.53
28 Comprehensive User Fee Study
City of Fontana - User Fee
Fully Burdened Hourly Rate Calculation
Department Position
Fully Burdened
Hourly Rate
101: Mgmt Services Admin Mgmt - Management Services Director $236.95 101: Marketing & Communications Mktg - Marketing & Economic Dev Manager $154.02 101: Marketing & Communications Mktg - Marketing Specialist I $80.19 101: Marketing & Communications Mktg - Multimedia Production Specialist I $103.04 101: Marketing & Communications Mktg - Senior Production Coordinator $113.13 101: Planning Plan - Administrative Assistant $101.44
101: Planning Plan - Assistant Planner $131.84
101: Planning Plan - Associate Planner $160.28
101: Planning Plan - Planning Inspector $138.15
101: Planning Plan - Planning Manager $259.86
101: Planning Plan - Planning Technician $118.22
101: Planning Plan - Senior Landscape Planner $215.77
101: Planning Plan - Senior Planner $206.43
101: Planning Administration Plan Admin - Director of Planning $203.11 101: Planning Administration Plan Admin - Senior Administrative Technician $106.60 101: Police Police - Animal Services Officer I $95.96
101: Police Police - Animal Services Officer II $87.18
101: Police Police - Chief of Police $460.52
101: Police Police - Civilian Investigations Technician $106.17 101: Police Police - Community Outreach Coordinator $120.08 101: Police Police - Community Services Officer I $82.27 101: Police Police - Community Services Officer II $101.45 101: Police Police - Corporal/Advanced $231.23
101: Police Police - Court Liaison $109.68
101: Police Police - Dispatch Call Taker $86.03
101: Police Police - Dispatch Manager $156.76
101: Police Police - Dispatch Supervisor $134.51
101: Police Police - Dispatcher I $89.55
101: Police Police - Dispatcher II $106.51
101: Police Police - Executive Assistant $110.48
101: Police Police - Forensics Investigator $122.14
101: Police Police - Lead Property Control Clerk $113.67 101: Police Police - Lieutenant/Advanced $330.16
101: Police Police - Officer $160.60
101: Police Police - Officer $180.42
101: Police Police - Officer/Advanced $205.03
101: Police Police - Officer/Intermediate $186.51
101: Police Police - Officer/Trainee $144.89
101: Police Police - Police Administrative Analyst I $116.16 101: Police Police - Police Administrative Analyst II $142.93 101: Police Police - Police Administrative Assistant $89.10 101: Police Police - Police Administrative Technician $99.84 101: Police Police - Police Captain $385.39
29 Comprehensive User Fee Study
Appendix C – Cost Recovery Analysis
The following tables provide the results of the ana lysis, resulting full cost recovery amount, and recommended fees. For fees, services, and penalties in which the full cost, existing fee, and suggested fee is listed as “NA”, the amount or percentage was not calculable. This is most common when either the current or the suggested fee includes a variable co mponent that is not comparable on a one-to-one basi s, a full cost was not calculated (for penalties, fine s, market-based fees, or items not included in the study), or when there is not a current fee amount to compare against.
Building and Safety
Item No. ID # Title Description Type Category Current Fee/Charge Unit Full Cost Subsidy % Suggested Fee Fee Δ 1 1258 Administration Issuance fee, each permit. Plan C heck Plumbing Plan Check $45.00 $95.38 26% $71.00 $26.00 2 1259 Fixtures and Vents Plumbing fixture, trap or se t of fixtures in one trap, each. Plan Check Plumbing Plan Check $16.00 $43.44 26% $32.00 $16.00 3 1260 Fixtures and Vents Repair or alteration of drai nage or vent piping, each fixture. Plan Check Plumbin g Plan Check $16.00 $43.44 26% $32.00 $16.00 4 1261 Sewers, Disposal Systems and Interceptors Build ing sewer, per lot. Plan Check Plumbing Plan Check $11 3.00 $260.62 25% $195.00 $82.00 5 1262 Sewers, Disposal Systems and Interceptors Private sewage disposal system including seepage pit or leach lines, each system. Plan Check Plumbing Plan Check $113.00 $260.62 25% $195. 00 $82.00 6 1263 Sewers, Disposal Systems and Interceptors Industrial waste pretreatment interceptor, includin g its trap and vent, except kitchen-type grease interceptors functioning as fixture traps, each. Plan Check Plumbing Plan Check $113.00 $260.62 25% $195. 00 $82.00 7 1264 Sewers, Disposal Systems and Interceptors Repla cement seepage pit or leach lines. Plan Check Plumbin g Plan Check $113.00 $260.62 25% $195.00 $82.00 8 1265 Sewers, Disposal Systems and Interceptors Rainw ater/roof drains systems, per drain Plan Check Plumbi ng Plan Check $16.00 $43.44 26% $32.00 $16.00 9 1266 Water Piping and Water Heaters Installation, alteration or repair of water piping or water-treating equipment, or both. Plan Check Plumbing Plan Check $16.00 $43.44 26% $32.00 $ 16.00 10 1267 Water Piping and Water Heaters Water heater in cluding vent, each. Plan Check Plumbing Plan Check $16 .00 $43.44 26% $32.00 $16.00 11 1268 Gas Piping Systems Each gas piping system of o ne to five outlets. Plan Check Plumbing Plan Check $16 .00 $43.44 26% $32.00 $16.00 12 1269 Gas Piping Systems Each additional outlet, ove r five. Plan Check Plumbing Plan Check $16.00 $43.44 26% $32.00 $16.00 13 1270 Miscellaneous Each appliance or piece of equipment (regulated by the Plumbing Code but does not classified in other catagories). Plan Check Plumbing Plan Check $16.00 $43.44 26% $32.00 $ 16.00 14 1271 Lawn Sprinklers, Vacuum, Breakers and Backflow Prot ection Devices
Lawn sprinkler system on any one meter, including b ackflow protection devices, each system. 1 to 5 devices. Plan Check Plumbing Plan Check $16.00 $43.44 26% $32.00 $ 16.00 15 1272 Lawn Sprinklers, Vacuum, Breakers and Backflow Prot ection Devices
Lawn sprinkler system on any one meter, including b ackflow protection devices, each system. Over 5 devices. Plan Check Plumbing Plan Check $16.00 $43.44 26% $32.00 $16.00 16 1273 Swimming Pool & Spa Public Pool Plan Check Plumb ing Plan Check $16.00 $43.44 26% $32.00 $16.00 17 1274 Swimming Pool & Spa Public Spa Plan Check Plumbi ng Plan Check $16.00 $43.44 26% $32.00 $16.00 18 1275 Swimming Pool & Spa Private Pool Plan Check Plum bing Plan Check $16.00 $43.44 26% $32.00 $16.00 19 1276 Swimming Pool & Spa Private Pool & Spa Plan Che ck Plumbing Plan Check $16.00 $43.44 26% $32.00 $16.00 20 1277 Swimming Pool & Spa Private Spa Plan Check Plumb ing Plan Check $16.00 $43.44 26% $32.00 $16.00 21 1278 Other Plan Review Residential, per 250 sq. ft. Plan Check Plumbing Plan Check $6.00 $17.37 25% $13.00 $7 .00 22 1279 Other Plan Review Commercial/Industrial, per 2 50 sq. ft. Plan Check Plumbing Plan Check $2.00 $5.21 42 % $3.00 $1.00 23 1280 Other Plan Review Plan checks for which no fee is specifically indica ted, per hour (minimum 1 hour). Plan Check Plumbing Plan Check $75.00 $173.75 25% $130. 00 $55.00 24 1281 Administration Issuance fee, each permit Permit Plumbing Permit $46.00 $95.38 26% $71.00 $25.00 25 1282 Gas Meter Reset Residential, each. Permit Plumbi ng Permit $60.00 $140.22 25% $105.00 $45.00 26 1283 Gas Meter Reset Commercial/Industrial, each Per mit Plumbing Permit $81.00 $186.49 25% $139.00 $58.00 27 1284 Fixtures and Vents Plumbing fixture, trap or s et of fixtures in one trap, each. Permit Plumbing Per mit $29.00 $70.11 26% $52.00 $23.00 28 1285 Fixtures and Vents Repair or alteration of dra inage or vent piping, each fixture. Permit Plumbing P ermit $29.00 $70.11 26% $52.00 $23.00 29 1286 Sewers, Disposal Systems and Interceptors Buil ding sewer, each, per lot. Permit Plumbing Permit $29. 00 $70.11 26% $52.00 $23.00 30 1287 Sewers, Disposal Systems and Interceptors Private sewage disposal system including seepage pit or leach lines, each system Permit Plumbing Permit $93.00 $210.32 25% $157.00 $64.00 31 1288 Sewers, Disposal Systems and Interceptors Industrial waste pretreatment interceptor, includin g its trap and vent, except kitchen-type grease interceptors functioning as fixture traps, each. Permit Plumbing Permit $93.00 $210.32 25% $157.00 $64.00 32 1289 Sewers, Disposal Systems and Interceptors Repl acement seepage pit or leach lines Permit Plumbing Pe rmit $46.00 $105.16 26% $78.00 $32.00 33 1290 Sewers, Disposal Systems and Interceptors Rain water/roof drain system, per drain Permit Plumbing Pe rmit $18.00 $46.27 27% $34.00 $16.00 34 1291 Water Piping and Water Heaters Installation, alteration or repair of water piping or water-treating equipment, or both. Permit Plumbing Permit $123.00 $280.43 25% $210.00 $87.00 35 1292 Water Piping and Water Heaters Water heater in cluding vent, each Permit Plumbing Permit $29.00 $70.11 26% $52.00 $23.00 36 1293 Gas Piping Systems Each gas piping system of o ne to five outlets Permit Plumbing Permit $93.00 $210.3 2 25% $157.00 $64.00 37 1294 Gas Piping Systems Each additional outlet, ove r five. Permit Plumbing Permit $13.00 $35.05 26% $26.00 $ 13.00 38 1295 Miscellaneous Each appliance or piece of equipment (regulated by the Plumbing Code but not classified in other categories). Permit Plumbing Permit $29.00 $70.11 26% $52.00 $23.00 39 1296 Lawn Sprinklers, Vacuum Breakers and Backflow Prote ction Devices
Lawn sprinkler system on any one meter, including b ackflow protection devices, each system: 1 to 5 devices Permit Plumbing Permit $46.00 $105.16 26% $78.00 $32.00 40 1297 Lawn Sprinklers, Vacuum Breakers and Backflow Prote ction Devices
Lawn sprinkler system on any one meter, including b ackflow protection devices, each system: each additional over 5 devices. Permit Plumbing Permit $9.00 $23.84 29% $17.00 $8.00 41 1298 Swimming Pool & Spa Public Pool Permit Plumbing Permit $123.00 $280.43 25% $210.00 $87.00 42 1299 Swimming Pool & Spa Public Spa Permit Plumbing P ermit $123.00 $280.43 25% $210.00 $87.00 43 1300 Swimming Pool & Spa Private Pool Permit Plumbing Permit $92.00 $210.32 25% $157.00 $65.00 44 1301 Swimming Pool & Spa Private Pool & Spa Permit Pl umbing Permit $123.00 $280.43 25% $210.00 $87.00 45 1302 Swimming Pool & Spa Private Spa Permit Plumbing Permit $93.00 $210.32 25% $157.00 $64.00 46 1303 Other Inspection and Fee Inspection outside of normal business hours, 2 hour minimum. Permit Plumbi ng Permit $123.00 $280.43 25% $210.00 $87.00 47 1304 Other Inspection and Fee Re-inspection fee, 1 hour minimum. Permit Plumbing Permit $60.00 $140.22 25% $ 105.00 $45.00 48 1305 Other Inspection and Fee Inspections for which no fee is specifically indica ted, per hour, 1 hour minimum Permit Plumbing Permit $60.00 $140.22 25% $105.00 $45.00 49 1306 Permit per sq. ft. if not itemized Residential , per 250 sq. ft. Permit Plumbing Permit $9.00 $23.84 29 % $17.00 $8.00 50 1307 Permit per sq. ft. if not itemized Commercial/ Industrial, per 250 sq. ft. Permit Plumbing Permit $4. 00 $11.22 29% $8.00 $4.00 51 1308 Administration Issuance fee, each permit. Plan Check Mechanical Plan Check $45.00 $95.38 26% $71.00 $26. 00 52 1309 Furnaces Installation or relocation of each forced-air or gr avity furnace including ducts/vents attached to such appliance up to & including 100,000 Btu/h. Plan Check Mechanical Plan Check $16.00 $43.44 26% $32. 00 $16.00 53 1310 Furnaces Installation or relocation of each forced-air or gr avity furnace including ducts/vents attached to such appliance over 100,000 Btu/h. Plan Check Mechanical Plan Check $16.00 $43.44 26% $32.0 0 $16.00 54 1311 Furnaces Installation or relocation of each su spended heater or wall furnace Plan Check Mechanical Plan Check $16.00 $43.44 26% $32.00 $16.00 55 1312 Appliance Vent Installation, relocation or rep lacement of each appliance vent. Plan Check Mechanica l Plan Check $16.00 $43.44 26% $32.00 $16.00 30 Building and Safety
Item No. ID # Title Description Type Category Current Fee/Charge Unit Full Cost Subsidy % Suggested Fee Fee Δ 56 1313 Boiler, Compressor and Absorption System Installation or relocation of each boiler or compre ssor to and including 3 hp or each absorption system to and including 100,000 Btu/h. Plan Check Mechanical Plan Check $16.00 $43.44 26% $32. 00 $16.00 57 1314 Boiler, Compressor and Absorption System
Installation or relocation of each boiler or compre ssor to and including 3 hp to and including 15 hp or each absorption system over 100,000 Btu/h and including 500,000 Btu/h.
Plan Check Mechanical Plan Check $24.00 $57.34 25% $43.0 0 $19.00 58 1315 Boiler, Compressor and Absorption System
Installation or relocation of each boiler or compre ssor over 15 hp to and including 30 hp or each absorption system over 500,000 Btu/h and including 1,000,000 Btu/h.
Plan Check Mechanical Plan Check $29.00 $72.97 26% $54.0 0 $25.00 59 1316 Boiler, Compressor and Absorption System
Installation or relocation of each boiler or compre ssor over 30 hp to and including 50 hp or each absorption system over 1,000,000 Btu/h and including 1,750,000 Btu/h.
Plan Check Mechanical Plan Check $36.00 $86.87 25% $65.0 0 $29.00 60 1317 Boiler, Compressor and Absorption System Installation or relocation of each boiler or compre ssor over 50 hp or each absorption system over 1,750,000 Btu/h. Plan Check Mechanical Plan Check $43.00 $100.77 26% $75 .00 $32.00 61 1318 Air Handler Air-handling unit, including attached ducts to and including 10,000 cfm., each. Plan Check Mechanical Plan Check $16.00 $43.44 26% $32.0 0 $16.00 62 1319 Air Handler Air-handling unit, including attac hed ducts over 10,000 cfm., each Plan Check Mechanica l Plan Check $24.00 $57.34 25% $43.00 $19.00 63 1320 Evaporation Cooler Evaporation cooler other th an portable type. Plan Check Mechanical Plan Check $16 .00 $43.44 26% $32.00 $16.00 64 1321 Ventilation and Exhaust Ventilation fan connec ted to a single duct, each. Plan Check Mechanical Pla n Check $16.00 $43.44 26% $32.00 $16.00 65 1322 Ventilation and Exhaust Ventilation system which is not a portion of any he ating or cooling system, each. Plan Check Mechanical Plan Check $16.00 $43.44 26% $32.0 0 $16.00 66 1323 Ventilation and Exhaust Installation of each hood which is served by mechan ical exhaust, including ducts for such hood. Plan Check Mechanical Plan Check $16.00 $43.44 26% $32.0 0 $16.00 67 1324 Miscellaneous Each appliance or piece of equipment regulated by t he CMC but not classified in other appliance category. Plan Check Mechanical Plan Check $16.00 $43.44 26% $32.0 0 $16.00 68 1325 Other Inspection and Fee Plan check for which no fee is specifically indicat ed, per hour, minimum 1 hour. Plan Check Mechanical Plan Check $75.00 $173.75 25% $13 0.00 $55.00 69 1326 Other Inspection and Fee Residential, per 250 sq. ft. Plan Check Mechanical Plan Check $6.00 $17.37 25 % $13.00 $7.00 70 1327 Other Inspection and Fee Commercial/Industrial , per 250 sq. ft. Plan Check Mechanical Plan Check $2. 00 $5.21 42% $3.00 $1.00 71 1328 Administration Issuance fee, each permit Permit Mechanical Permit $46.00 $95.38 26% $71.00 $25.00 72 1329 Furnaces Installation or relocation of each forced-air or gr avity furnace including ducts/vents attached to such appliance up to and including 100,000 Btu/h Permit Mechanical Permit $29.00 $70.11 26% $52.00 $23.00 73 1330 Furnaces Installation or relocation of each forced-air or gr avity furnace including ducts/vents attached to such appliance over 100,000 Btu/h Permit Mechanical Permit $46.00 $105.16 26% $78.00 $32.00 74 1331 Furnaces Installation or relocation of each su spended heater or wall furnace Permit Mechanical Perm it $46.00 $105.16 26% $78.00 $32.00 75 1332 Appliance Vent Installation, relocation or rep lacement of each appliance vent. Permit Mechanical Pe rmit $13.00 $35.05 26% $26.00 $13.00 76 1333 Boiler, Compressor and Absorption System Installation or relocation of each boiler or compre ssor to and including 3 hp or each absorption system to and including 100,000 Btu/h. Permit Mechanical Permit $46.00 $105.16 26% $78.00 $32.00 77 1334 Boiler, Compressor and Absorption System
Installation or relocation of each boiler or compre ssor over 3 hp to and including 15 hp or each absorption system to and in cluding 100,000 Btu/h to and including 500,000 Btu/h
Permit Mechanical Permit $60.00 $140.22 25% $105.00 $45. 00 78 1335 Boiler, Compressor and Absorption System
Installation or relocation of each boiler or compre ssor over 15 hp to and including 30 hp or each absorption system to and in cluding 500,000 Btu/h to and including 1,000,000 Btu/h
Permit Mechanical Permit $77.00 $175.27 25% $131.00 $54.0 0 79 1336 Boiler, Compressor and Absorption System
Installation or relocation of each boiler or compre ssor over 30 hp to and including 50 hp or each absorption system over 1,000,000 Btu/h to and including 1,750,000 Btu/h
Permit Mechanical Permit $93.00 $210.32 25% $157.00 $64.0 0 80 1337 Boiler, Compressor and Absorption System Installation or relocation of each boiler or compre ssor over 50 hp or each absorption system over 1,750,000 Btu/h. Permit Mechanical Permit $109.00 $245.38 25% $184.00 $75 .00 81 1338 Air Handler Air-handling unit, including attached ducts to and including 10,000 cfm., each. Permit Mechanical Permit $13.00 $35.05 26% $26.00 $13.00 82 1339 Air Handler Air-handling unit, including attac hed ducts over 10,000 cfm., each. Permit Mechanical P ermit $29.00 $70.11 26% $52.00 $23.00 83 1340 Evaporation Cooler Evaporation cooler other th an portable type. Permit Mechanical Permit $46.00 $105. 16 26% $78.00 $32.00 84 1341 Ventilation and Exhaust Ventilation fan connec ted to a single duct, each. Permit Mechanical Permit $ 13.00 $35.05 26% $26.00 $13.00 85 1342 Ventilation and Exhaust Ventilation System which is not a portion of any he ating or cooling system, each. Permit Mechanical Permit $13.00 $35.05 26% $26.00 $13.00 86 1343 Ventilation and Exhaust Installation of each hood which is served by mechan ical exhaust, including ducts for such hood. Permit Mechanical Permit $13.00 $35.05 26% $26.00 $13.00 87 1344 Miscellaneous Each appliance or piece of equipment regulated by t he CMC but not classified in other appliance category Permit Mechanical Permit $29.00 $70.11 26% $52.00 $23.00 88 1345 Other Inspection and Fee Inspection outside of normal business hours (2 hour minimum). Permit Mecha nical Permit $123.00 $280.43 25% $210.00 $87.00 89 1346 Other Inspection and Fee Re-inspection fee (1 hour minimum). Permit Mechanical Permit $60.00 $140.22 25% $105.00 $45.00 90 1347 Other Inspection and Fee Inspections for which no fee is specifically indica ted, per hour (1 hour minimum). Permit Mechanical Permit $60.00 $140.22 25% $105.00 $45.0 0 91 1348 Permit per sq. ft. if not itemized Residential , per 250 sq. ft. Permit Mechanical Permit $9.00 $23.84 29% $17.00 $8.00 92 1349 Permit per sq. ft. if not itemized Commercial/ Industrial, per 250 sq. ft. Permit Mechanical Permit $ 4.00 $11.22 29% $8.00 $4.00 93 1350 Administration Issuance fee, each permit Plan C heck Electrical Plan Check $45.00 $95.38 26% $71.00 $26. 00 94 1351 Swimming Pool & Spa Public Pool Plan Check Elect rical Plan Check $75.00 $173.75 25% $130.00 $55.00 95 1352 Swimming Pool & Spa Public Spa Plan Check Electr ical Plan Check $75.00 $173.75 25% $130.00 $55.00 96 1353 Swimming Pool & Spa Private Pool Plan Check Elec trical Plan Check $36.00 $86.87 25% $65.00 $29.00 97 1354 Swimming Pool & Spa Private Pool & Spa Plan Che ck Electrical Plan Check $55.00 $130.31 26% $97.00 $42.0 0 98 1355 Swimming Pool & Spa Private Spa Plan Check Elect rical Plan Check $36.00 $86.87 25% $65.00 $29.00 31 Building and Safety
Item No. ID # Title Description Type Category Current Fee/Charge Unit Full Cost Subsidy % Suggested Fee Fee Δ 99 1356 Carnivals and Circuses Electrically driven rid es, each. Plan Check Electrical Plan Check $16.00 $43.4 4 26% $32.00 $16.00 100 1357 Carnivals and Circuses Attraction or display having lighting, each. Plan Check Electrical Plan Che ck $16.00 $43.44 26% $32.00 $16.00 101 1358 Temporary Power Service Power pole or pedesta l. Plan Check Electrical Plan Check $36.00 $86.87 25% $6 5.00 $29.00 102 1359 Temporary Power Service Subpole, each. Plan Ch eck Electrical Plan Check $5.00 $13.90 28% $10.00 $5.00 103 1360 Temporary Power Service Lighting and receptacles for construction sites, de corative lighting, Christmas tree sales lots, firework stands, etc. Plan Check Electrical Plan Check $36.00 $86.87 25% $65.0 0 $29.00 104 1361 Receptacle, Switch and Light Outlets First 20 fixtures Plan Check Electrical Plan Check $16.00 $43.4 4 26% $32.00 $16.00 105 1362 Receptacle, Switch and Light Outlets Addition al fixtures, each. Plan Check Electrical Plan Check $1 .00 $3.47 42% $2.00 $1.00 106 1363 Lighting Fixtures First 20 fixtures. Plan Chec k Electrical Plan Check $16.00 $43.44 26% $32.00 $16.00 107 1364 Lighting Fixtures Additional fixtures, each. P lan Check Electrical Plan Check $1.00 $3.47 42% $2.00 $1. 00 108 1365 Lighting Fixtures Pole or platform mounted li ghting fixtures, each. Plan Check Electrical Plan Che ck $11.00 $29.54 26% $22.00 $11.00 109 1366 Lighting Fixtures Theatrical-type lighting fi xtures or assemblies, each. Plan Check Electrical Pla n Check $5.00 $13.90 28% $10.00 $5.00 110 1367 Residential Appliances Appliances or receptac les not exceeding 1 hp in rating, each. Plan Check El ectrical Plan Check $5.00 $13.90 28% $10.00 $5.00 111 1368 Non-Residential Appliances Non-residential appliances and self-contained factory wired appliances not exceeding 1 hp or 1 (kw) in rating, each. Plan Check Electrical Plan Check $11.00 $29.54 26% $22. 00 $11.00 112 1369 Power Apparatus Motors, generators, transformers, cooking and/or baking equipment, rating in HP, each: 1 Plan Check Electrical Plan Check $5.00 $13.90 28% $10.00 $5.00 113 1370 Power Apparatus Motors, generators, transformers, cooking and/or baking equipment, rating in HP, each: 2 - 10. Plan Check Electrical Plan Check $11.00 $29.54 26% $22.0 0 $11.00 114 1371 Power Apparatus Motors, generators, transformers, cooking and/or baking equipment, rating in HP, each: 11 - 50. Plan Check Electrical Plan Check $16.00 $43.44 26% $32. 00 $16.00 115 1372 Power Apparatus Motors, generators, transformers, cooking and/or baking equipment, rating in HP, each: 51 - 100 Plan Check Electrical Plan Check $24.00 $57.34 25% $43.0 0 $19.00 116 1373 Power Apparatus Motors, generators, transformers, cooking and/or baking equipment, rating in HP, each: 101+ Plan Check Electrical Plan Check $29.00 $72.97 26% $54.0 0 $25.00 117 1374 Signs and Marquees One branch circuit, each Pl an Check Electrical Plan Check $16.00 $43.44 26% $32.00 $16.00 118 1375 Services Services of 600 volts or less and no t over 200 amps in rating, each. Plan Check Electrica l Plan Check $36.00 $86.87 25% $65.00 $29.00 119 1376 Services Services of 600 volts or less and ov er 200 amps to 1,000 amps in rating. Plan Check Elect rical Plan Check $55.00 $130.31 26% $97.00 $42.00 120 1377 Services Services over 600 volts or 1,000 amp s in rating, each. Plan Check Electrical Plan Check $7 5.00 $173.75 25% $130.00 $55.00 121 1378 Miscellaneous Electrical Apparatus, Conduits and Conductors Electrical Apparatus, Conduits and Conductors for which not specifically addressed, each. Plan Check Electrical Plan Check $36.00 $86.87 25% $65.0 0 $29.00 122 1380 Alternate Energy Photovoltaic, multi-family residence- first 1,000 sq. ft. of panel/collector area. Plan Check Electrical Plan Check $75.00 $173.75 25% $13 0.00 $55.00 123 1381 Alternate Energy Photovoltaic, multi-family residence- first 1,000 sq. ft. of panel/collector area plus per every 100 sq. ft. thereafter or fract ion there of. Plan Check Electrical Plan Check $11.00 $29.54 26% $22.0 0 $11.00 124 1382 Alternate Energy Photovoltaic, commercial/industrial- first 10,000 sq. ft. of panel/collector area. Plan Check Electrical Plan Check $113.00 $260.62 25% $19 5.00 $82.00 125 1383 Alternate Energy Photovoltaic, commercial/industrial- first 10,000 sq. ft. of panel/collector area plus per every 1,000 sq. ft. thereafter or fra ction there of. Plan Check Electrical Plan Check $16.00 $43.44 26% $32.0 0 $16.00 126 1384 Alternate Energy Other. Plan Check Electrical P lan Check $75.00 $173.75 25% $130.00 $55.00 127 1385 Other Plan Review Residential, per 250 sq. ft . Plan Check Electrical Plan Check $6.00 $17.37 25% $13.0 0 $7.00 128 1386 Other Plan Review Commercial/Industrial, per 250 sq. ft. Plan Check Electrical Plan Check $2.00 $5.2 1 42% $3.00 $1.00 129 1387 Other Plan Review Plan Checks for which no fee is specifically indica ted, per hour (1 hour minimum). Plan Check Electrical Plan Check $75.00 $173.75 25% $130 .00 $55.00 130 1388 Administration Issuance fee, each permit. Perm it Electrical Permit $46.00 $95.38 26% $71.00 $25.00 131 1389 Swimming Pool & Spa Public Pool Permit Electric al Permit $155.00 $350.54 25% $262.00 $107.00 132 1390 Swimming Pool & Spa Public Spa Permit Electrica l Permit $155.00 $350.54 25% $262.00 $107.00 133 1391 Swimming Pool & Spa Private Pool Permit Electri cal Permit $93.00 $210.32 25% $157.00 $64.00 134 1392 Swimming Pool & Spa Private Pool & Spa Permit E lectrical Permit $93.00 $210.32 25% $157.00 $64.00 135 1393 Swimming Pool & Spa Private Spa Permit Electric al Permit $93.00 $210.32 25% $157.00 $64.00 136 1394 Carnivals and Circuses 3 hours, includes one re-inspection. Permit Electrical Permit $187.00 $420.65 25% $315.00 $128.00 137 1395 Carnivals and Circuses Re-inspection over one , each. Permit Electrical Permit $60.00 $140.22 25% $105. 00 $45.00 138 1396 Temporary Power Service Power pole or pedesta l, each. Permit Electrical Permit $46.00 $105.16 26% $78 .00 $32.00 139 1397 Temporary Power Service Subpole, each. Permit E lectrical Permit $13.00 $35.05 26% $26.00 $13.00 140 1398 Temporary Power Service Lighting and receptacles for construction sites, de corative lighting, Christmas tree lots, firework stands, etc. Permit Electrical Permit $29.00 $70.11 26% $52.00 $23.00 141 1399 Receptacle, Switch and Light Outlets First 20 fixtures. Permit Electrical Permit $77.00 $175.27 25% $1 31.00 $54.00 142 1400 Receptacle, Switch and Light Outlets Addition al fixtures, each. Permit Electrical Permit $4.00 $11. 22 29% $8.00 $4.00 143 1401 Lighting Fixtures First 20 fixtures Permit Elec trical Permit $77.00 $175.27 25% $131.00 $54.00 144 1402 Lighting Fixtures Additional Fixtures, each. P ermit Electrical Permit $4.00 $11.22 29% $8.00 $4.00 145 1403 Lighting Fixtures Pole or platform mounted li ghting fixtures, each. Permit Electrical Permit $13.00 $35.05 26% $26.00 $13.00 146 1404 Lighting Fixtures Theatrical-type lighting fi xtures or assembles, each. Permit Electrical Permit $1 3.00 $35.05 26% $26.00 $13.00 147 1405 Residential Appliances Appliances or receptac les not exceeding 1 up in rating, each. Permit Electr ical Permit $13.00 $35.05 26% $26.00 $13.00 148 1406 Non-Residential Appliances Non-residential appliances and self-contained factory wired appliances not exceeding 1 hp or 1 (kw) in rating, each. Permit Electrical Permit $29.00 $70.11 26% $52.00 $23.00 149 1407 Power Apparatus Motors, generators, transformers, cooking and/or baking equipment, rating in HP, each: 1 Permit Electrical Permit $29.00 $70.11 26% $52.00 $23.00 150 1408 Power Apparatus Motors, generators, transformers, cooking and/or baking equipment, rating in HP, each: 2 - 10 Permit Electrical Permit $34.00 $81.33 26% $60.00 $26.00 151 1409 Power Apparatus Motors, generators, transformers, cooking and/or baking equipment, rating in HP, each: 11 - 50. Permit Electrical Permit $39.00 $93.94 25% $70.00 $31.00 32 Building and Safety
Item No. ID # Title Description Type Category Current Fee/Charge Unit Full Cost Subsidy % Suggested Fee Fee Δ 152 1410 Power Apparatus Motors, generators, transformers, cooking and/or baking equipment, rating in HP, each: 51 - 100. Permit Electrical Permit $46.00 $105.16 26% $78.00 $32.00 153 1411 Power Apparatus Motors, generators, transformers, cooking and/or baking equipment, rating in HP, each: 100+ Permit Electrical Permit $51.00 $116.38 25% $87.00 $36.00 154 1412 Signs and Marquees One branch circuit, each. P ermit Electrical Permit $46.00 $105.16 26% $78.00 $32.00 155 1413 Services Services of 600 volts or less and no t over 200 amps in rating, each. Permit Electrical Pe rmit $60.00 $140.22 25% $105.00 $45.00 156 1414 Services Services of 600 volts or less and ov er 200 amps to 1,000 amps in rating. Permit Electrica l Permit $93.00 $210.32 25% $157.00 $64.00 157 1415 Services Services over 600 volts of 1,000 amp s in rating, each. Permit Electrical Permit $123.00 $28 0.43 25% $210.00 $87.00 158 1416 Miscellaneous Electrical Apparatus, Conduits and Conductors Electrical apparatus, conduits and conductors for which not specifically addressed, each. Permit Electrical Permit $60.00 $140.22 25% $105.00 $45.0 0 159 1417 Electrical Meter Reset Residential. Permit Elec trical Permit $60.00 $140.22 25% $105.00 $45.00 160 1418 Electrical Meter Reset Commercial/Industrial. Permit Electrical Permit $93.00 $210.32 25% $157.00 $64.0 0 161 1420 Alternate Energy Photovoltaic, multi-family residence- first 1,000 sq. ft. of panel/collector area. Permit Electrical Permit $60.00 $140.22 25% $105.00 $45.0 0 162 1421 Alternate Energy Photovoltaic, multi-family residence- first 1,000 sq. ft. of panel/collector area plus per every 100 sq. ft. thereafter or fract ion there of. Permit Electrical Permit $13.00 $35.05 26% $26.00 $13.00 163 1422 Alternate Energy Photovoltaic, commercial/industrial- first 10,000 sq. ft. of panel/collector area. Permit Electrical Permit $155.00 $350.54 25% $262.00 $10 7.00 164 1423 Alternate Energy Photovoltaic, multi-family residence- first 1,000 sq. ft. of panel/collector area plus every 1,000 sq. ft. thereafter or fractio n there of. Permit Electrical Permit $13.00 $35.05 26% $26.00 $13.00 165 1424 Alternate Energy Other. Permit Electrical Permi t $60.00 $140.22 25% $105.00 $45.00 166 1425 Other Inspection and Fee Inspection outside o f normal business hours (2 hour minimum). Permit Elec trical Permit $123.00 $280.43 25% $210.00 $87.00 167 1426 Other Inspection and Fee Re-inspection fee, 1 hour minimum. Permit Electrical Permit $60.00 $140.22 25% $105.00 $45.00 168 1427 Other Inspection and Fee Inspections for which no fee is specifically indica ted, per hour (1 hour minimum). Permit Electrical Permit $80.00 $140.22 25% $105.00 $25.0 0 169 1428 Permit per sq. ft. if not Itemized Residentia l, per 250 sq. ft. Permit Electrical Permit $9.00 $23.8 4 29% $17.00 $8.00 170 1429 Permit per sq. ft. if not Itemized Commercial /Industrial, per 250 sq. ft. Permit Electrical Permit $4.00 $11.22 29% $8.00 $4.00 171 1430 Administration Issuance fee, each permit. Plan Check Grading Plan Check $45.00 $95.38 26% $71.00 $26.0 0 172 1431 Precision Grading First 10,000 sq. ft. Plan Ch eck Grading Plan Check $227.00 $521.25 25% $390.00 $163.0 0 173 1432 Precision Grading First 10,000 sq. ft. plus fee per every 1,000 sq. ft. thereafter or fraction there of (10,001 - 100,000). Plan Check Grading Plan Check $2.00 $0.52 0% $0.52 -$1.48 174 1433 Precision Grading 100,000 sq. ft. Plan Check Gr ading Plan Check $445.00 $1,042.50 25% $781.00 $336.00 175 1434 Precision Grading 100,000 sq. ft. plus fee for every 1,000 sq. ft. thereafter or fraction there of (100,001 - 500,000). Plan Check Grading Plan Check $0.50 $1.04 0% $1.04 $0.54 176 1435 Precision Grading 500,000 sq. ft. Plan Check Gr ading Plan Check $683.00 $1,563.74 25% $1,172.00 $489.00 177 1436 Precision Grading 500,000 sq. ft. plus fee per every 1,000 sq. ft. thereafter or fraction there of (500,001 - 1,000,000). Plan Check Grading Plan Check $0.40 $1.56 0% $1.56 $1.16 178 1437 Precision Grading 1,000,000 sq. ft. Plan Check Grading Plan Check $911.00 $2,084.99 25% $1,563.00 $652. 00 179 1438 Precision Grading 1,000,000 sq. ft. plus fee per every 1,000 sq. ft. thereafter or fraction there of (1,000,000+). Plan Check Grading Plan Check $0.20 $2.08 0% $2.08 $1.88 180 1439 Rough Grading First 10,000 sq. ft. Plan Check G rading Plan Check $151.00 $347.50 25% $260.00 $109.00 181 1440 Rough Grading First 10,000 sq. ft. plus fee per every 1,000 sq. ft. thereafter or fraction there of (10,001 - 100,000). Plan Check Grading Plan Check $2.00 $0.35 0% $0.35 -$1.65 182 1441 Rough Grading 100,000 sq. ft. Plan Check Gradin g Plan Check $378.00 $868.75 25% $651.00 $273.00 183 1442 Rough Grading 100,000 sq. ft. plus fee per every 1,000 sq. ft. thereafter or fraction there of (100,001 - 500,000). Plan Check Grading Plan Check $0.50 $0.87 0% $0.87 $0.37 184 1443 Rough Grading 500,000 sq. ft. Plan Check Gradin g Plan Check $607.00 $1,390.00 25% $1,042.00 $435.00 185 1444 Rough Grading 500,000 sq. ft. plus fee per every 1,000 sq. ft. thereafter or fraction there of (500,001 - 1,000,000). Plan Check Grading Plan Check $0.40 $1.39 0% $1.39 $0.99 186 1445 Rough Grading 1,000.000 sq. ft. Plan Check Grad ing Plan Check $834.00 $1,911.24 25% $1,433.00 $599.00 187 1446 Rough Grading 1,000.000 sq. ft. plus fee per every 1,000 sq. ft. thereafter or fraction there of (1,000,000+). Plan Check Grading Plan Check $0.20 $1.91 0% $1.91 $1.71 188 1447 Mass Grading First 500,000 sq. ft. Plan Check G rading Plan Check $607.00 $1,390.00 25% $1,042.00 $435. 00 189 1448 Mass Grading First 500,000 sq. ft. plus fee per every 100,000 sq. ft. thereafter or fraction there of (500,001 - 1,000,000). Plan Check Grading Plan Check $45.00 $1.39 0% $1.39 -$43. 61 190 1449 Mass Grading 1,000,000 sq. ft. Plan Check Gradi ng Plan Check $834.00 $1,911.24 25% $1,433.00 $599.00 191 1450 Mass Grading 1,000,000 sq. ft. plus fee per every 250,000 sq. ft. thereafter or fraction there of (1,000,000+). Plan Check Grading Plan Check $55.00 $1.91 0% $1.91 -$53 .09 192 1451 Paving First 10,000 sq. ft. Plan Check Grading Plan Check $151.00 $347.50 25% $260.00 $109.00 193 1452 Paving First 10,000 sq. ft. plus fee per every 1,000 sq. ft. thereafter or fraction there of (10,001 - 100,000). Plan Check Grading Plan Check $2.00 $0.35 0% $0.35 -$1.65 194 1453 Paving 100,000 sq. ft. Plan Check Grading Plan Check $378.00 $868.75 25% $651.00 $273.00 195 1454 Paving 100,000 sq. ft. plus fee per every 1,000 sq. ft. thereafter or fraction there of (100,001 - 500,000). Plan Check Grading Plan Check $0.50 $0.87 0% $0.87 $0.37 196 1455 Paving 500,000 sq. ft. Plan Check Grading Plan Check $607.00 $1,390.00 25% $1,042.00 $435.00 197 1456 Paving 500,000 sq. ft. plus fee per every 1,000 sq. ft. thereafter or fraction there of (500,001 - 1,000,000). Plan Check Grading Plan Check $0.40 $1.39 0% $1.39 $0.99 198 1457 Paving 1,000,000 sq. ft. Plan Check Grading Pla n Check $834.00 $1,911.24 25% $1,433.00 $599.00 199 1458 Paving 1,000,000 sq. ft. plus fee per every 1,000 sq. ft. thereafter or fraction there of (1,000,000+). Plan Check Grading Plan Check $0.20 $1.91 0% $1.91 $1.71 200 1459 On-Site Drainage System On-site drainage syst em, per lot/parcel plus below. Plan Check Grading Pla n Check $227.00 $521.25 25% $390.00 $163.00 33 Building and Safety
Item No. ID # Title Description Type Category Current Fee/Charge Unit Full Cost Subsidy % Suggested Fee Fee Δ 201 1460 On-Site Drainage System Inlet/catch basins, m anholes or receptacles, each. Plan Check Grading Plan Check $16.00 $43.44 26% $32.00 $16.00 202 1461 On-Site Sewer System On-site sewer system, pe r lot/parcel plus below. Plan Check Grading Plan Chec k $227.00 $521.25 25% $390.00 $163.00 203 1462 On-Site Sewer System Manholes & clean-outs, e ach. Plan Check Grading Plan Check $16.00 $43.44 26% $32. 00 $16.00 204 1463 Administration Issuance fee, each permit. Perm it Grading Permit $46.00 $95.38 26% $71.00 $25.00 205 1464 Precise Grading First 10,000 sq. ft. Permit Gra ding Permit $60.00 $140.22 25% $105.00 $45.00 206 1465 Precise Grading First 10,000 sq. ft. plus fee per every 1,000 sq. ft. thereafter or fraction there of (10,001 - 100,000). Permit Grading Permit $1.00 $0.14 0% $0.14 -$0.86 207 1466 Precise Grading 100,000 sq. ft. Permit Grading Permit $187.00 $420.65 25% $315.00 $128.00 208 1467 Precise Grading 100,000 sq. ft. plus fee per every 1,000 sq. ft. thereafter or fraction there of (100,001 - 500,000). Permit Grading Permit $0.28 $0.42 0% $0.42 $0.14 209 1468 Precise Grading 500,000 sq. ft. Permit Grading Permit $312.00 $701.08 25% $525.00 $213.00 210 1469 Precise Grading 500,000 sq. ft. plus fee per every 1,000 sq. ft. thereafter or fraction there of (500,001 - 1,000,000). Permit Grading Permit $0.44 $0.70 0% $0.70 $0.26 211 1470 Precise Grading 1,000,000 sq. ft. Permit Gradin g Permit $564.00 $1,261.95 25% $946.00 $382.00 212 1471 Precise Grading 1,000,000 sq. ft. plus fee per every 1,000 sq. ft. thereafter or fraction there of (1,000,000+). Permit Grading Permit $0.44 $1.26 0% $1.26 $0.82 213 1472 Rough Grading First 10,000 sq. ft. Permit Gradi ng Permit $60.00 $140.22 25% $105.00 $45.00 214 1473 Rough Grading First 10,000 sq. ft. plus fee per every 1,000 sq. ft. thereafter or fraction there of (10,001 - 100,000). Permit Grading Permit $0.62 $0.14 0% $0.14 -$0.48 215 1474 Rough Grading 100,000 sq. ft. Permit Grading Pe rmit $123.00 $280.43 25% $210.00 $87.00 216 1475 Rough Grading 100,000 sq. ft. plus fee per every 1,000 sq. ft. thereafter or fraction there of (100,001 - 500,000). Permit Grading Permit $0.28 $0.28 0% $0.28 $0.00 217 1476 Rough Grading 500,000 sq. ft. Permit Grading Pe rmit $250.00 $560.86 25% $420.00 $170.00 218 1477 Rough Grading 500,000 sq. ft. plus fee per every 1,000 sq. ft. thereafter or fraction there of (500,001 - 1,000,000). Permit Grading Permit $0.44 $0.56 0% $0.56 $0.12 219 1478 Rough Grading 1,000.000 sq. ft. Permit Grading Permit $502.00 $1,121.73 25% $841.00 $339.00 220 1479 Rough Grading 1,000.000 sq. ft. plus fee per every 1,000 sq. ft. thereafter or fraction there of (1,000,001+). Permit Grading Permit $0.44 $1.12 0% $1.12 $0.68 221 1480 Mass Grading First 500,000 sq. ft. Permit Gradi ng Permit $439.00 $981.51 25% $736.00 $297.00 222 1481 Mass Grading First 500,000 sq. ft. plus fee per every 50,000 sq. ft. thereafter or fraction there of (500,001 - 1,000,000). Permit Grading Permit $5.00 $0.98 0% $0.98 -$4.02 223 1482 Mass Grading 1,000,000 sq. ft. Permit Grading P ermit $502.00 $1,121.73 25% $841.00 $339.00 224 1483 Mass Grading 1,000,000 sq. ft. plus fee per every 100,000 sq. ft. thereafter or fraction there of (1,000,000+). Permit Grading Permit $123.00 $1.12 0% $1.12 -$121.88 225 1484 Paving First 10,000 sq. ft. Permit Grading Perm it $60.00 $140.22 25% $105.00 $45.00 226 1485 Paving First 10,000 sq. ft. plus fee per every 1,000 sq. ft. thereafter or fraction there of (10,001 - 100,000). Permit Grading Permit $0.62 $0.14 0% $0.14 -$0.48 227 1486 Paving 100,000 sq. ft. Permit Grading Permit $12 3.00 $280.43 25% $210.00 $87.00 228 1487 Paving 100,000 sq. ft. plus fee per every 1,000 sq. ft. thereafter or fraction there of (100,001 - 500,000). Permit Grading Permit $0.28 $0.28 0% $0.28 $0.00 229 1488 Paving 500,000 sq. ft. Permit Grading Permit $25 0.00 $560.86 25% $420.00 $170.00 230 1489 Paving 500,000 sq. ft. plus fee per every 1,000 sq. ft. thereafter or fraction there of (500,001 - 1,000,000). Permit Grading Permit $0.44 $0.56 0% $0.56 $0.12 231 1490 Paving 1,000,000 sq. ft. Permit Grading Permit $ 502.00 $1,121.73 25% $841.00 $339.00 232 1491 Paving 1,000,000 sq. ft. plus fee per every 1,000 sq. ft. thereafter or fraction there of (1,000,000+). Permit Grading Permit $0.44 $1.12 0% $1.12 $0.68 233 1492 On-Site Drainage System On-site drainage syst em, per lot/parcel plus below. Permit Grading Permit $ 123.00 $280.43 25% $210.00 $87.00 234 1493 On-Site Drainage System Inlet/catch basins, m anholes or receptacles, each. Permit Grading Permit $1 3.00 $35.05 26% $26.00 $13.00 235 1494 On-Site Sewer System On-site sewer system, pe r lot/parcel plus below. Permit Grading Permit $123.00 $280.43 25% $210.00 $87.00 236 1495 On-Site Sewer System Manholes & clean-outs, e ach. Permit Grading Permit $13.00 $35.05 26% $26.00 $13.00 237 1496 Administration Issuance fee, each permit Plan Check Sign Plan Check $45.00 $95.38 26% $71.00 $26.00 238 1497 Sign Wall-mounted Plan Check Sign Plan Check $11 3.00 $260.62 25% $195.00 $82.00 239 1498 Sign Pylon Plan Check Sign Plan Check $151.00 $34 7.50 25% $260.00 $109.00 240 1499 Sign Monument Plan Check Sign Plan Check $113.00 $260.62 25% $195.00 $82.00 241 1500 Sign Other Plan Check Sign Plan Check $113.00 $2 60.62 25% $195.00 $82.00 242 1501 Administration Issuance fee, each permit Plan Check Fencing Plan Check $45.00 $95.38 26% $71.00 $26.00 243 1502 Fencing Wood, not over 6 ft. in height. Plan C heck Fencing Plan Check $36.00 $86.87 25% $65.00 $29.00 244 1503 Fencing Chain link, not over 6 ft. in height. Plan Check Fencing Plan Check $36.00 $86.87 25% $65.00 $2 9.00 245 1504 Fencing Other, not over 6 ft. in height. Plan Check Fencing Plan Check $75.00 $173.75 25% $130.00 $55. 00 246 1505 Fencing Engineering fencing Plan Check Fencing Plan Check $151.00 $347.50 25% $260.00 $109.00 247 1506 Administration Issuance fee, each permit. Plan Check Wall Plan Check $45.00 $95.38 26% $71.00 $26.00 248 1507 Wall City standard garden masonry block wall, not over 6 ft. in height. Plan Check Wall Plan Check $36.00 $86.87 25% $65.00 $29.00 249 1508 Wall Combination wrought iron masonry per Cit y standard. Plan Check Wall Plan Check $36.00 $86.87 25 % $65.00 $29.00 250 1509 Wall Engineered masonry wall, not over 6 ft. in height. Plan Check Wall Plan Check $151.00 $347.50 25 % $260.00 $109.00 251 1510 Retaining Wall City standard retaining wall Pl an Check Wall Plan Check $36.00 $86.87 25% $65.00 $29.00 252 1511 Retaining Wall Engineered retaining wall Plan Check Wall Plan Check $151.00 $347.50 25% $260.00 $109.00 253 1512 Combination Retaining/Garden Wall City standa rd Plan Check Wall Plan Check $36.00 $86.87 25% $65.00 $2 9.00 254 1513 Combination Retaining/Garden Wall Engineered. Plan Check Wall Plan Check $151.00 $347.50 25% $260.00 $1 09.00 255 1514 Administration Issuance fee, each permit Permi t Sign Permit $46.00 $95.38 26% $71.00 $25.00 256 1515 Sign Wall-mounted. Permit Sign Permit $60.00 $140 .22 25% $105.00 $45.00 257 1516 Sign Pylon. Permit Sign Permit $187.00 $420.65 25% $315.00 $128.00 34 Building and Safety
Item No. ID # Title Description Type Category Current Fee/Charge Unit Full Cost Subsidy % Suggested Fee Fee Δ 258 1517 Sign Monument. Permit Sign Permit $93.00 $210.32 2 5% $157.00 $64.00 259 1518 Sign Other. Permit Sign Permit $60.00 $140.22 25% $105.00 $45.00 260 1519 Administration Issuance fee, each permit. Perm it Fencing Permit $46.00 $95.38 26% $71.00 $25.00 261 1520 Fencing Not over 6 ft. in height, for first 2 5 lf. Permit Fencing Permit $60.00 $140.22 25% $105.00 $45 .00 262 1521 Fencing Each additional 50 lf. or fraction th ere of. Permit Fencing Permit $13.00 $35.05 26% $26.00 $1 3.00 263 1522 Administration Issuance fee, each permit Permi t Wall Permit $46.00 $95.38 26% $71.00 $25.00 264 1523 Wall City standard garden masonry block wall, for first 25 lf. Permit Wall Permit $123.00 $280.43 25% $210.00 $87.00 265 1524 Wall City standard garden masonry block wall, each additional 50 lf or fraction there of. Permit Wall Permit $29.00 $70.11 26% $52.00 $23.00 266 1525 Wall Combination wrought iron masonry per Cit y standard for first 25 lf. Permit Wall Permit $123.00 $280.43 25% $210.00 $87.00 267 1526 Wall Combination wrought iron masonry per City standard, each additional 50 lf or fraction there of. Permit Wall Permit $29.00 $70.11 26% $52.00 $23.00 268 1527 Wall Engineered masonry wall up to 500 sq. ft . Permit Wall Permit $123.00 $280.43 25% $210.00 $87.00 269 1528 Wall Engineered masonry wall, each additional 100 sq. ft. Permit Wall Permit $13.00 $35.05 26% $26.00 $ 13.00 270 1529 Retaining Wall City standard retaining wall, for first 25 lf. Permit Wall Permit $123.00 $280.43 25% $ 210.00 $87.00 271 1530 Retaining Wall City standard retaining wall, each additional 50 lf or fraction there of. Permit Wa ll Permit $29.00 $70.11 26% $52.00 $23.00 272 1531 Retaining Wall Engineered retaining wall up t o 500 sq. ft. Permit Wall Permit $123.00 $280.43 25% $210 .00 $87.00 273 1532 Retaining Wall Engineered retaining wall, eac h additional 100 sq. ft. Permit Wall Permit $13.00 $35. 05 26% $26.00 $13.00 274 1533 Combination retaining/garden wall City standa rd combination retaining/garden wall, for first 25 lf. Permit Wall Permit $123.00 $280.43 25% $210.00 $87.00 275 1534 Combination retaining/garden wall City standard combination retaining/garden wall, each additional 50 lf or fraction there of. Permit Wall Permit $29.00 $70.11 26% $52.00 $23.00 276 1535 Combination retaining/garden wall Engineered retaining wall up to 500 sq. ft. Permit Wall Permit $1 23.00 $280.43 25% $210.00 $87.00 277 1536 Combination retaining/garden wall Engineered retaining wall, each additional 100 sq. ft. Permit Wa ll Permit $13.00 $35.05 26% $26.00 $13.00 278 1537 Administration Issuance fee, each permit. Plan Check Building Plan Check $45.00 $95.38 26% $71.00 $26. 00 279 1538 Re-Roof, Residential Composition/built-up, co ncrete or clay tile, Metal: up to 1,000 sq. ft. Plan Check Building Plan Check $75.00 $173.75 25% $130.00 $55 .00 280 1539 Re-Roof, Residential Composition/built-up, co ncrete or clay tile, Metal: 1,001 - 3,000 sq. ft. Pl an Check Building Plan Check $113.00 $260.62 25% $195.00 $82.00 281 1540 Re-Roof, Residential Composition/built-up, co ncrete or clay tile, Metal: over 3,000 sq. ft. Plan Check Building Plan Check $151.00 $347.50 25% $260.00 $10 9.00 282 1541 Re-Roof, Commercial/Industrial Composition/Bu ilt-up, Membrane (TPO) systems, other: up to 5,000 sq. ft. Plan Check Building Plan Check $151.00 $347.50 25% $260.00 $109.00 283 1542 Re-Roof, Commercial/Industrial Composition/Bu ilt-up, Membrane (TPO) systems, other: 5,001 - 10,000 sq. ft. Plan Check Building Plan Check $188.00 $434. 37 25% $325.00 $137.00 284 1543 Re-Roof, Commercial/Industrial Composition/Built-up, Membrane (TPO) systems, other: 10,001 - 50,000 sq. ft. Plan Check Building Plan Check $227.00 $521.25 25% $390. 00 $163.00 285 1544 Re-Roof, Commercial/Industrial Composition/Built-up, Membrane (TPO) systems, other: 50,001 - 100,000 sq. ft. Plan Check Building Plan Check $264.00 $608.12 25% $456. 00 $192.00 286 1545 Re-Roof, Commercial/Industrial Composition/Built-up, Membrane (TPO) systems, other: 100,001 - 500,000 sq. ft. Plan Check Building Plan Check $303.00 $695.00 25% $521 .00 $218.00 287 1546 Re-Roof, Commercial/Industrial Composition/Bu ilt-up, Membrane (TPO) systems, other: over 500,000 sq. ft. Plan Check Building Plan Check $340.00 $781.87 25% $586.00 $246.00 288 1547 Patio Cover, Residential Up to 500 sq. ft. Pla n Check Building Plan Check $36.00 $86.87 25% $65.00 $29. 00 289 1548 Patio Cover, Residential 501 - 1,500 sq. ft. P lan Check Building Plan Check $75.00 $173.75 25% $130.00 $55.00 290 1549 Patio Cover, Residential Over 1,500 sq. ft. Pl an Check Building Plan Check $113.00 $260.62 25% $195.0 0 $82.00 291 1550 Patio Enclosure Walls, Residential Up to 500 sq. ft. of wall area Plan Check Building Plan Check $3 6.00 $86.87 25% $65.00 $29.00 292 1551 Patio Enclosure Walls, Residential 501 - 1,50 0 sq. ft. of wall area. Plan Check Building Plan Chec k $75.00 $173.75 25% $130.00 $55.00 293 1552 Patio Enclosure Walls, Residential Over 1,500 sq. ft. of wall area. Plan Check Building Plan Check $113.00 $260.62 25% $195.00 $82.00 294 1553 Awning/Cover, Commercial/Industrial Up to 1,0 00 sq. ft. Plan Check Building Plan Check $151.00 $347. 50 25% $260.00 $109.00 295 1554 Awning/Cover, Commercial/Industrial 1,001 - 3 ,000 sq. ft. Plan Check Building Plan Check $188.00 $43 4.37 25% $325.00 $137.00 296 1555 Awning/Cover, Commercial/Industrial 3,001 - 5 ,000 sq. ft. Plan Check Building Plan Check $227.00 $5 21.25 25% $390.00 $163.00 297 1556 Awning/Cover, Commercial/Industrial 5,001 - 1 0,000 sq. ft. Plan Check Building Plan Check $264.00 $6 08.12 25% $456.00 $192.00 298 1557 Awning/Cover, Commercial/Industrial Over 10,0 00 sq. ft. Plan Check Building Plan Check $303.00 $695. 00 25% $521.00 $218.00 299 1558 Storage Shed, Residential Up to 300 sq. ft. Pl an Check Building Plan Check $36.00 $86.87 25% $65.00 $2 9.00 300 1559 Storage Shed, Residential 301 - 600 sq. ft. Pl an Check Building Plan Check $75.00 $173.75 25% $130.00 $ 55.00 301 1560 Storage Shed, Residential Over 600 sq. ft. Pla n Check Building Plan Check $113.00 $260.62 25% $195.00 $ 82.00 302 1561 Storage Tank, above ground Up to 499 gal. Plan Check Building Plan Check $151.00 $347.50 25% $260.00 $ 109.00 303 1562 Storage Tank, above ground Over 499 gal. Plan Check Building Plan Check $227.00 $521.25 25% $390.00 $16 3.00 304 1563 Trash Enclosure Up to 500 sq. ft. Plan Check Bu ilding Plan Check $75.00 $173.75 25% $130.00 $55.00 305 1564 Trash Enclosure Over 500 sq. ft. Plan Check Bui lding Plan Check $113.00 $260.62 25% $195.00 $82.00 306 1565 Storage/Pallet Racks Up to 30,000 sq. ft. in floor area, under 12 ft. in height. Plan Check Buildi ng Plan Check $227.00 $521.25 25% $390.00 $163.00 307 1566 Storage/Pallet Racks 30,001 sq. ft. and up to 100,000 sq. ft. in floor area, under 12 ft. in hei ght. Plan Check Building Plan Check $303.00 $695.00 25% $521.00 $218.00 308 1567 Storage/Pallet Racks 100,001 sq. ft. and more in floor area, under 12 ft. in height. Plan Check Bu ilding Plan Check $378.00 $868.75 25% $651.00 $273.00 309 1568 Storage/Pallet Racks Up to 30,000 sq. ft. in floor area, 12 ft. or more in height. Plan Check Buil ding Plan Check $303.00 $695.00 25% $521.00 $218.00 310 1569 Storage/Pallet Racks Over 30,000 sq. ft. and up to 100,000 sq. ft in floor area, 12 ft. or more in height. Plan Check Building Plan Check $378.00 $868.75 25% $651. 00 $273.00 311 1570 Storage/Pallet Racks Over 100,000 sq. ft. in floor area, 12 ft. or more in height. Plan Check Buil ding Plan Check $455.00 $1,042.50 25% $781.00 $326.00 312 1571 Paint Spray Booth Up to 20,000 sq. ft. Plan Ch eck Building Plan Check $303.00 $695.00 25% $521.00 $218. 00 313 1572 Paint Spray Booth Over 20,000 sq. ft. Plan Che ck Building Plan Check $378.00 $868.75 25% $651.00 $273.0 0 314 1573 Commercial Coach Up to 1,000 sq. ft. Plan Chec k Building Plan Check $151.00 $347.50 25% $260.00 $109.00 315 1574 Commercial Coach Over 1,000 sq. ft. Plan Check Building Plan Check $188.00 $434.37 25% $325.00 $137.00 316 1575 Dock Levelers/Doors Up to 10. Plan Check Buildi ng Plan Check $151.00 $347.50 25% $260.00 $109.00 317 1576 Dock Levelers/Doors Over 10, each additional P lan Check Building Plan Check $16.00 $43.44 26% $32.00 $1 6.00 318 1577 Cell Tower, Monopoles including Equipment Sh elter Each. Plan Check Building Plan Check $303.00 $695. 00 25% $521.00 $218.00 319 1578 Swimming Pool & Spa Public Pool Plan Check Buil ding Plan Check $75.00 $173.75 25% $130.00 $55.00 35 Building and Safety
Item No. ID # Title Description Type Category Current Fee/Charge Unit Full Cost Subsidy % Suggested Fee Fee Δ 320 1579 Swimming Pool & Spa Public Spa Plan Check Build ing Plan Check $75.00 $173.75 25% $130.00 $55.00 321 1580 Swimming Pool & Spa Private Pool Plan Check Bui lding Plan Check $36.00 $86.87 25% $65.00 $29.00 322 1581 Swimming Pool & Spa Private Pool & Spa Plan Ch eck Building Plan Check $55.00 $130.31 26% $97.00 $42.00 323 1582 Swimming Pool & Spa Private Spa Plan Check Buil ding Plan Check $36.00 $86.87 25% $65.00 $29.00 324 1583 Other Plan checks for which no fee is specifically indica ted, per hour (1 hour minimum). Plan Check Building Plan Check $75.00 $173.75 25% $130.0 0 $55.00 325 1584 Phasing Tract homes of single family dwelling s per lot. Plan Check Building Plan Check $75.00 $173.7 5 25% $130.00 $55.00 326 Deck/Balcony, Residential Up to 300 sf Plan Check B uilding & Safety $67.00 $53.08 27% $39.00 -$28.00 327 Deck/Balcony, Residential 301 + sf Plan Check Build ing & Safety $100.00 $53.08 27% $39.00 -$61.00 328 Light Standards / Flag Pole First 1 Light Standar d / Flag Pole Plan Check Building & Safety $67.00 $200 .29 25% $150.00 $83.00 329 Light Standards / Flag Pole Additional Light Stan dards / Flag Pole, each Plan Check Building & Safety $ 16.00 $200.29 25% $150.00 $134.00 330 1585 Administration Issuance fee, each permit Permi t Building Permit $46.00 $225.69 25% $169.00 $123.00 331 1586 Re-Roof, Residential Composition/built-up, co ncrete or clay tile, Metal: First 1,000 sq. ft. Perm it Building Permit $123.00 $280.43 25% $210.00 $87.00 332 1587 Re-Roof, Residential Composition/built-up, co ncrete or clay tile, Metal: 1,001 - 3,000 sq. ft. Pe rmit Building Permit $155.00 $350.54 25% $262.00 $107.00 333 1588 Re-Roof, Residential Composition/built-up, co ncrete or clay tile, Metal: 3,001+ sq. ft. Permit Bui lding Permit $187.00 $420.65 25% $315.00 $128.00 334 1589 Re-Roof, Commercial/Industrial Composition/bu ild-up, membrane (TPO) systems, other: first 5,000 sq. ft. Permit Building Permit $250.00 $560.86 25% $420.0 0 $170.00 335 1590 Re-Roof, Commercial/Industrial Composition/bu ild-up, membrane (TPO) systems, other: 5,001 - 10,000 sq. ft. Permit Building Permit $312.00 $701.08 25% $52 5.00 $213.00 336 1591 Re-Roof, Commercial/Industrial Composition/build-up, membrane (TPO) systems, other: 10,001 - 50,000 sq. ft. Permit Building Permit $375.00 $841.30 25% $630.00 $255.0 0 337 1592 Re-Roof, Commercial/Industrial Composition/build-up, membrane (TPO) systems, other: 50,001 - 100,000 sq. ft. Permit Building Permit $439.00 $981.51 25% $736.00 $297. 00 338 1593 Re-Roof, Commercial/Industrial Composition/build-up, membrane (TPO) systems, other: 100,001 - 500,000 sq. ft. Permit Building Permit $502.00 $1,121.73 25% $841.00 $339 .00 339 1594 Re-Roof, Commercial/Industrial Composition/bu ild-up, membrane (TPO) systems, other: 500,001 + sq. ft. Permit Building Permit $627.00 $1,402.16 25% $1,051 .00 $424.00 340 1595 Patio Cover, Residential First 500 sq. ft. Per mit Building Permit $187.00 $420.65 25% $315.00 $128.00 341 1596 Patio Cover, Residential 501 - 1,500 sq. ft. P ermit Building Permit $203.00 $455.70 25% $341.00 $138.00 342 1597 Patio Cover, Residential 1,501 + sq. ft. Permi t Building Permit $219.00 $490.76 25% $368.00 $149.00 343 1598 Patio Enclosure Walls, Residential First 500 sq. ft. of wall area Permit Building Permit $123.00 $2 80.43 25% $210.00 $87.00 344 1599 Patio Enclosure Walls, Residential 501 - 1,50 0 sq. ft. of wall area. Permit Building Permit $155.00 $350.54 25% $262.00 $107.00 345 1600 Patio Enclosure Walls, Residential 1,501 + sq . ft. of wall area. Permit Building Permit $187.00 $420 .65 25% $315.00 $128.00 346 1601 Awning/Cover, Commercial/Industrial First 1,0 00 sq. ft. Permit Building Permit $219.00 $490.76 25% $36 8.00 $149.00 347 1602 Awning/Cover, Commercial/Industrial 1,001 - 3 ,000 sq. ft. Permit Building Permit $250.00 $560.86 25% $ 420.00 $170.00 348 1603 Awning/Cover, Commercial/Industrial 3,001 - 5 ,000 sq. ft. Permit Building Permit $281.00 $630.97 25% $473.00 $192.00 349 1604 Awning/Cover, Commercial/Industrial 5,001 - 1 0,000 sq. ft. Permit Building Permit $312.00 $701.08 25% $525.00 $213.00 350 1605 Awning/Cover, Commercial/Industrial Over 10,0 00 sq. ft. Permit Building Permit $345.00 $771.19 25% $57 8.00 $233.00 351 1606 Storage Shed, Residential First 300 sq. ft. Pe rmit Building Permit $219.00 $490.76 25% $368.00 $149.00 352 1607 Storage Shed, Residential 301 - 600 sq. ft. Pe rmit Building Permit $250.00 $560.86 25% $420.00 $170.00 353 1608 Storage Shed, Residential 601 + sq. ft. Permit Building Permit $281.00 $630.97 25% $473.00 $192.00 354 1609 Storage Tank, Above Ground Up to 499 gal. Perm it Building Permit $123.00 $280.43 25% $210.00 $87.00 355 1610 Storage Tank, Above Ground 500 + gal. Permit Bu ilding Permit $155.00 $350.54 25% $262.00 $107.00 356 1611 Trash Enclosure First 500 sq. ft. Permit Buildi ng Permit $155.00 $350.54 25% $262.00 $107.00 357 1612 Trash Enclosure 501 + sq. ft. Permit Building P ermit $170.00 $385.59 25% $289.00 $119.00 358 1613 Storage/Pallet Racks Under 12 ft. in height: Up to 30,000 sq. ft. in floor area. Permit Building P ermit $219.00 $490.76 25% $368.00 $149.00 359 1614 Storage/Pallet Racks Under 12 ft. in height: 30,001 - 100,000 sq. ft. in floor area. Permit Buildi ng Permit $234.00 $525.81 25% $394.00 $160.00 360 1615 Storage/Pallet Racks Over 12 ft. in height: U p to 30,000 sq. ft. in floor area. Permit Building Pe rmit $265.00 $595.92 25% $446.00 $181.00 361 1616 Storage/Pallet Racks Over 12 ft. in height: 3 0,001 - 100,000 sq. ft. in floor area. Permit Buildin g Permit $297.00 $666.03 25% $499.00 $202.00 362 1617 Storage/Pallet Racks Over 12 ft. in height: 1 00,001 + sq. ft. Permit Building Permit $312.00 $701.08 25% $525.00 $213.00 363 1618 Paint Spray Booth Up to 20,000 sq. ft. Permit B uilding Permit $375.00 $841.30 25% $630.00 $255.00 364 1619 Paint Spray Booth 20,001 + sq. ft. Permit Build ing Permit $439.00 $981.51 25% $736.00 $297.00 365 1620 Commercial Coach Up to 1,000 sq. ft., each. Pe rmit Building Permit $219.00 $490.76 25% $368.00 $149.00 366 1621 Commercial Coach 1,001 + sq. ft., each Permit B uilding Permit $250.00 $560.86 25% $420.00 $170.00 367 1622 Dock Levelers/Doors Up to 10, each. Permit Buil ding Permit $250.00 $560.86 25% $420.00 $170.00 368 1623 Dock Levelers/Doors 11 +, each. Permit Building Permit $265.00 $595.92 25% $446.00 $181.00 369 1624 Cell Tower, Monopoles including Equipment Sh elter Up to 150 ft. in height. Permit Building Permit $ 345.00 $771.19 25% $578.00 $233.00 370 1625 Temporary Certificate of Occupancy Commercial /Industrial. Permit Building Permit $312.00 $513.82 25% $ 385.00 $73.00 371 1626 Duplicate Permit/Job Card Costs incurred in c reating a replacement permit/job card. Permit Buildin g Permit $18.00 $35.05 26% $26.00 $8.00 372 1627 Demolition Each structure/building Permit Build ing Permit $123.00 $280.43 25% $210.00 $87.00 373 1628 Swimming Pool & Spa Public Pool Permit Building Permit $250.00 $560.86 25% $420.00 $170.00 374 1629 Swimming Pool & Spa Public Spa. Permit Building Permit $250.00 $560.86 25% $420.00 $170.00 375 1630 Swimming Pool & Spa Private Pool. Permit Buildi ng Permit $187.00 $420.65 25% $315.00 $128.00 376 1631 Swimming Pool & Spa Private Pool & Spa Permit B uilding Permit $219.00 $490.76 25% $368.00 $149.00 377 1632 Swimming Pool & Spa Private Spa Permit Building Permit $187.00 $420.65 25% $315.00 $128.00 378 Deck/Balcony, Residential Up to 300 sf Permit Build ing & Safety $220.00 $447.19 25% $335.00 $115.00 379 Deck/Balcony, Residential 301 + sf Permit Building & Safety $277.00 $447.19 25% $335.00 $58.00 380 Light Standards / Flag Pole First 1 Light Standar d / Flag Pole Permit Building & Safety $55.00 $306.97 2 5% $230.00 $175.00 381 Light Standards / Flag Pole Additional Light Stan dards / Flag Pole, each Permit Building & Safety $18.0 0 $447.19 25% $335.00 $317.00 382 Rehab, Residential Each Building Permit Building & Safety $220.00 $473.73 25% $355.00 $135.00 383 1633 Other Inspections for which no fee is specifically indica ted, per hour (1 hour minimum). Permit Building Permit $60.00 $140.22 25% $105.00 $45.00 36 Building and Safety
Item No. ID # Title Description Type Category Current Fee/Charge Unit Full Cost Subsidy % Suggested Fee Fee Δ 384 1634 Administration Issuance fee, each permit. Plan Check Building: Tenant
Improvement(s) Plan
Check
$45.00 $95.38 26% $71.00 $26.00
385 1635 Tenant Improvement(s), Commercial/Industrial First 500 sq. ft. Plan Check Building: Tenant
Improvement(s) Plan
Check
$227.00 $521.25 25% $390.00 $163.00
386 1636 Tenant Improvement(s), Commercial/Industrial 501 - 1,500 sq. ft. Plan Check Building: Tenant
Improvement(s) Plan
Check
$352.00 $810.83 25% $608.00 $256.00
387 1637 Tenant Improvement(s), Commercial/Industrial 1,501 - 3,000 sq. ft. Plan Check Building: Tenant
Improvement(s) Plan
Check
$480.00 $1,100.41 25% $825.00 $345.00
388 1638 Tenant Improvement(s), Commercial/Industrial 3,001 - 5,000 sq. ft. Plan Check Building: Tenant
Improvement(s) Plan
Check
$607.00 $1,390.00 25% $1,042.00 $435.00
389 1639 Tenant Improvement(s), Commercial/Industrial 5,001 - 10,000 sq. ft. Plan Check Building: Tenant
Improvement(s) Plan
Check
$734.00 $1,679.58 25% $1,259.00 $525.00
390 1640 Tenant Improvement(s), Commercial/Industrial 10,001 - 30,000 sq. ft. Plan Check Building: Tenant
Improvement(s) Plan
Check
$1,114.00 $2,548.32 25% $1,911.00 $797.00
391 1641 Tenant Improvement(s), Commercial/Industrial 30,001 - 80,000 sq. ft. Plan Check Building: Tenant
Improvement(s) Plan
Check
$1,367.00 $3,127.49 25% $2,345.00 $978.00
392 1642 Tenant Improvement(s), Commercial/Industrial 80,001 - 150,000 sq. ft. Plan Check Building: Tenant
Improvement(s) Plan
Check
$1,621.00 $3,706.65 25% $2,779.00 $1,158.00
393 1643 Tenant Improvement(s), Commercial/Industrial 150,001 - 300,000 sq. ft. Plan Check Building: Tenant
Improvement(s) Plan
Check
$1,873.00 $4,285.82 25% $3,214.00 $1,341.00
394 1644 Tenant Improvement(s), Commercial/Industrial 300,001 - 500,000 sq. ft. Plan Check Building: Tenant
Improvement(s) Plan
Check
$2,127.00 $4,864.98 25% $3,648.00 $1,521.00
395 1645 Tenant Improvement(s), Commercial/Industrial 500,001 + sq. ft. Plan Check Building: Tenant
Improvement(s) Plan
Check
$2,382.00 $5,444.15 25% $4,083.00 $1,701.00
396 1646 Administration Issuance fee, each permit Permi t Building: Tenant Improvement(s) Permit $46.00 $95.38 26% $71.00 $25.00
397 1647 Tenant Improvement(s), Commercial/Industrial First 500 sq. ft. Permit Building: Tenant Improvement(s) Permit $229.00 $514.13 25% $385.00 $156.00 398 1648 Tenant Improvement(s), Commercial/Industrial 501 - 1,500 sq. ft. Permit Building: Tenant Improvement(s) Permit $439.00 $981.51 25% $736.00 $297.00 399 1649 Tenant Improvement(s), Commercial/Industrial 1,501 - 3,000 sq. ft. Permit Building: Tenant Improvement(s) Permit $649.00 $1,448.90 25% $1,086.00 $437.00 400 1650 Tenant Improvement(s), Commercial/Industrial 3,001 - 5,000 sq. ft. Permit Building: Tenant Improvement(s) Permit $858.00 $1,916.29 25% $1,437.00 $579.00 401 1651 Tenant Improvement(s), Commercial/Industrial 5,001 - 10,000 sq. ft. Permit Building: Tenant Improvement(s) Permit $1,069.00 $2,383.68 25% $1,787.00 $718.00 402 1652 Tenant Improvement(s), Commercial/Industrial 10,001 - 30,000 sq. ft. Permit Building: Tenant Improvement(s) Permit $1,279.00 $2,851.06 25% $2,138.00 $859.00 403 1653 Tenant Improvement(s), Commercial/IndustrialTenant Improvement(s), Commercial/Industrial 30,001 - 80,000 sq. ft. Permit Building: Tenant Improvement(s) Permit $1,486.00 $3,318.45 25% $2,488.00 $1,002.00 404 1654 Tenant Improvement(s), Commercial/Industrial 80,001 - 150,000 sq. ft. Permit Building: Tenant Improvement(s) Permit $1,696.00 $3,785.84 25% $2,839.00 $1,143.00 405 1655 Tenant Improvement(s), Commercial/Industrial 150,001 - 300,000 sq. ft. Permit Building: Tenant Improvement(s) Permit $1,907.00 $4,253.23 25% $3,189.00 $1,282.00 406 1656 Tenant Improvement(s), Commercial/Industrial 300,001 - 500,000 sq. ft. Permit Building: Tenant Improvement(s) Permit $2,117.00 $4,720.61 25% $3,540.00 $1,423.00 37 Building and Safety
Item No. ID # Title Description Type Category Current Fee/Charge Unit Full Cost Subsidy % Suggested Fee Fee Δ 407 1657 Tenant Improvement(s), Commercial/Industrial 500,001 + sq. ft. Permit Building: Tenant Improvement(s) Permit $2,976.00 $6,636.90 25% $4,977.00 $2,001.00 408 1658 Administration Application processing fee. Pla n Check Building Occupancies, Plan Check $45.00 $95.38 26% $71.00 $26.00
409 1659 A Occupancies Up to 1,000 sq. ft. Plan Check Building Occupancies, Plan Check $352.00 $810.83 25% $608.00 $256.00
410 1660 A Occupancies 1,001 - 5,000 sq. ft. Plan Check Building Occupancies, Plan Check $607.00 $1,390.00 25% $1,042.00 $435.00
411 1661 A Occupancies 5,001 - 10,000 sq. ft. Plan Chec k Building Occupancies, Plan Check $859.00 $1,969.16 25% $1,476.00 $617.00
412 1662 A Occupancies 10,001 - 50,000 sq. ft. Plan Che ck Building Occupancies, Plan Check $1,367.00 $3,127.49 25% $2,345.00 $978.00
413 1663 A Occupancies 50,001 - 100,000 sq. ft. Plan Ch eck Building Occupancies, Plan Check $1,873.00 $4,285.82 25% $3,214.00 $1,341.00
414 1664 A Occupancies 100,001 + sq. ft. Plan Check Building Occupancies, Plan Check $2,382.00 $5,444.15 25% $4,083.00 $1,701.00
415 1665 B Occupancies Up to 1,000 sq. ft. Plan Check Building Occupancies, Plan Check $352.00 $810.83 25% $608.00 $256.00
416 1666 B Occupancies 1,001 - 5,000 sq. ft. Plan Check Building Occupancies, Plan Check $607.00 $1,390.00 25% $1,042.00 $435.00
417 1667 B Occupancies 5,001 - 10,000 sq. ft. Plan Chec k Building Occupancies, Plan Check $859.00 $1,969.16 25% $1,476.00 $617.00
418 1668 B Occupancies 10,001 - 50,000 sq. ft. Plan Che ck Building Occupancies, Plan Check $1,367.00 $3,127.49 25% $2,345.00 $978.00
419 1669 B Occupancies 50,001 - 100,000 sq. ft. Plan Ch eck Building Occupancies, Plan Check $1,873.00 $4,285.82 25% $3,214.00 $1,341.00
420 1670 B Occupancies 100,001 + sq. ft. Plan Check Building Occupancies, Plan Check $2,382.00 $5,444.15 25% $4,083.00 $1,701.00
421 1671 E Occupancies Up to 1,000 sq. ft. Plan Check Building Occupancies, Plan Check $352.00 $810.83 25% $608.00 $256.00
422 1672 E Occupancies 1,001 - 5,000 sq. ft. Plan Check Building Occupancies, Plan Check $607.00 $1,390.00 25% $1,042.00 $435.00
423 1673 E Occupancies 5,001 - 10,000 sq. ft. Plan Chec k Building Occupancies, Plan Check $859.00 $1,969.16 25% $1,476.00 $617.00
424 1674 E Occupancies 10,001 - 50,000 sq. ft. Plan Che ck Building Occupancies, Plan Check $1,367.00 $3,127.49 25% $2,345.00 $978.00
425 1675 E Occupancies 50,001 - 100,000 sq. ft. Plan Ch eck Building Occupancies, Plan Check $1,873.00 $4,285.82 25% $3,214.00 $1,341.00
426 1676 E Occupancies 100,001 + sq. ft. Plan Check Building Occupancies, Plan Check $2,382.00 $5,444.15 25% $4,083.00 $1,701.00
427 1677 F Occupancies Up to 1,000 sq. ft. Plan Check Building Occupancies, Plan Check $352.00 $810.83 25% $608.00 $256.00
428 1678 F Occupancies 1,001 - 5,000 sq. ft. Plan Check Building Occupancies, Plan Check $607.00 $1,390.00 25% $1,042.00 $435.00
429 1679 F Occupancies 5,001 - 10,000 sq. ft. Plan Chec k Building Occupancies, Plan Check $859.00 $1,969.16 25% $1,476.00 $617.00
430 1680 F Occupancies 10,001 - 50,000 sq. ft. Plan Che ck Building Occupancies, Plan Check $1,367.00 $3,127.49 25% $2,345.00 $978.00
431 1681 F Occupancies 50,001 - 100,000 sq. ft. Plan Ch eck Building Occupancies, Plan Check $1,873.00 $4,285.82 25% $3,214.00 $1,341.00
432 1682 F Occupancies 100,001 - 200,000 sq. ft. Plan C heck Building Occupancies, Plan Check $2,382.00 $5,444.15 25% $4,083.00 $1,701.00
433 1683 F Occupancies 200,001 - 400,000 sq. ft. Plan C heck Building Occupancies, Plan Check $2,888.00 $6,602.48 25% $4,951.00 $2,063.00
434 1684 F Occupancies 400,001 - 600,000 sq. ft. Plan C heck Building Occupancies, Plan Check $3,395.00 $7,760.81 25% $5,820.00 $2,425.00
435 1685 F Occupancies 600,001 + sq. ft. Plan Check Building Occupancies, Plan Check $3,647.00 $8,339.97 25% $6,254.00 $2,607.00
436 1686 Administration Issuance fee, each permit Permi t Building Occupancies, Permit $46.00 $95.38 26% $71.00 $25.00
437 1687 A Occupancies Up to 1,000 sq. ft. Permit Building Occupancies, Permit $920.00 $2,056.50 25% $1,542.00 $622.00
438 1688 A Occupancies 1,001 - 5,000 sq. ft. Permit Building Occupancies, Permit $1,130.00 $2,523.89 25% $1,892.00 $762.00
439 1689 A Occupancies 5,001 - 10,000 sq. ft. Permit Building Occupancies, Permit $2,180.00 $4,860.83 25% $3,645.00 $1,465.00
440 1690 A Occupancies 10,001 - 50,000 sq. ft. Permit Building Occupancies, Permit $2,600.00 $5,795.60 25% $4,346.00 $1,746.00
441 1691 A Occupancies 50,001 - 100,000 sq. ft. Permit Building Occupancies, Permit $3,019.00 $6,730.38 25% $5,047.00 $2,028.00
38 Building and Safety
Item No. ID # Title Description Type Category Current Fee/Charge Unit Full Cost Subsidy % Suggested Fee Fee Δ 442 1692 A Occupancies 100,001 + sq. ft. Permit Building Occupancies, Permit $4,068.00 $9,067.32 25% $6,800.00 $2,732.00
443 1693 B Occupancies Up to 1,000 sq. ft. Permit Building Occupancies, Permit $920.00 $2,056.50 25% $1,542.00 $622.00
444 1694 B Occupancies 1,001 - 5,000 sq. ft. Permit Building Occupancies, Permit $1,130.00 $2,523.89 25% $1,892.00 $762.00
445 1695 B Occupancies 5,001 - 10,000 sq. ft. Permit Building Occupancies, Permit $2,180.00 $4,860.83 25% $3,645.00 $1,465.00
446 1696 B Occupancies 10,001 - 50,000 sq. ft. Permit Building Occupancies, Permit $2,600.00 $5,795.60 25% $4,346.00 $1,746.00
447 1697 B Occupancies 50,001 - 100,000 sq. ft. Permit Building Occupancies, Permit $3,019.00 $6,730.38 25% $5,047.00 $2,028.00
448 1698 B Occupancies 100,001 + sq. ft. Permit Building Occupancies, Permit $4,068.00 $9,067.32 25% $6,800.00 $2,732.00
449 1699 E Occupancies Up to 1,000 sq. ft. Permit Building Occupancies, Permit $1,130.00 $2,523.89 25% $1,892.00 $762.00
450 1700 E Occupancies 1,001 - 5,000 sq. ft. Permit Building Occupancies, Permit $2,180.00 $4,860.83 25% $3,645.00 $1,465.00
451 1701 E Occupancies 5,001 - 10,000 sq. ft. Permit Building Occupancies, Permit $2,600.00 $5,795.60 25% $4,346.00 $1,746.00
452 1702 E Occupancies 10,001 - 50,000 sq. ft. Permit Building Occupancies, Permit $3,019.00 $6,730.38 25% $5,047.00 $2,028.00
453 1703 E Occupancies 50,001 - 100,000 sq. ft. Permit Building Occupancies, Permit $3,438.00 $7,665.15 25% $5,748.00 $2,310.00
454 1704 E Occupancies 100,001 + sq. ft. Permit Building Occupancies, Permit $4,068.00 $9,067.32 25% $6,800.00 $2,732.00
455 1705 F Occupancies Up to 1,000 sq. ft. Permit Building Occupancies, Permit $920.00 $2,056.50 25% $1,542.00 $622.00
456 1706 F Occupancies 1,001 - 5,000 sq. ft. Permit Building Occupancies, Permit $1,130.00 $2,523.89 25% $1,892.00 $762.00
457 1707 F Occupancies 5,001 - 10,000 sq. ft. Permit Building Occupancies, Permit $2,180.00 $4,860.83 25% $3,645.00 $1,465.00
458 1708 F Occupancies 10,001 - 50,000 sq. ft. Permit Building Occupancies, Permit $2,600.00 $5,795.60 25% $4,346.00 $1,746.00
459 1709 F Occupancies 50,001 - 100,000 sq. ft. Permit Building Occupancies, Permit $3,019.00 $6,730.38 25% $5,047.00 $2,028.00
460 1710 F Occupancies 100,001 - 200,000 sq. ft. Permit Building Occupancies, Permit $3,124.00 $6,964.07 25% $5,223.00 $2,099.00
461 1711 F Occupancies 200,001 - 400,000 sq. ft. Permit Building Occupancies, Permit $3,438.00 $7,665.15 25% $5,748.00 $2,310.00
462 1712 F Occupancies 400,001 - 600,000 sq. ft. Permit Building Occupancies, Permit $3,858.00 $8,599.93 25% $6,449.00 $2,591.00
463 1713 F Occupancies 600,001 + sq. ft. Permit Building Occupancies, Permit $4,068.00 $9,067.32 25% $6,800.00 $2,732.00
464 1715 H Occupancies Up to 200 sq. ft. Plan Check Building Occupancies, Plan Check $607.00 $1,390.00 25% $1,042.00 $435.00
465 1716 H Occupancies 201 - 1,000 sq. ft. Plan Check Building Occupancies, Plan Check $859.00 $1,969.16 25% $1,476.00 $617.00
466 1717 H Occupancies 1,001 - 5,000 sq. ft. Plan Check Building Occupancies, Plan Check $1,367.00 $3,127.49 25% $2,345.00 $978.00
467 1718 H Occupancies 5,001 - 10,000 sq. ft. Plan Chec k Building Occupancies, Plan Check $2,127.00 $6,602.48 25% $4,951.00 $2,824.00
468 1719 H Occupancies 10,001 - 20,000 sq. ft. Plan Che ck Building Occupancies, Plan Check $2,888.00 $7,760.81 25% $5,820.00 $2,932.00
469 1720 H Occupancies 20,001 + sq. ft. Plan Check Building Occupancies, Plan Check $3,647.00 $8,339.97 25% $6,254.00 $2,607.00
470 1721 I Occupancies Up to 1,000 sq. ft. Plan Check Building Occupancies, Plan Check $1,114.00 $2,548.32 25% $1,911.00 $797.00
471 1722 I Occupancies 1,001 - 5,000 sq. ft. Plan Check Building Occupancies, Plan Check $1,621.00 $3,706.65 25% $2,779.00 $1,158.00
472 1723 I Occupancies 5,001 - 10,000 sq. ft. Plan Chec k Building Occupancies, Plan Check $1,873.00 $4,285.82 25% $3,214.00 $1,341.00
473 1724 I Occupancies 10,001 - 50,000 sq. ft. Plan Che ck Building Occupancies, Plan Check $2,636.00 $6,023.31 25% $4,517.00 $1,881.00
474 1725 I Occupancies 50,001 - 100,000 sq. ft. Plan Ch eck Building Occupancies, Plan Check $3,141.00 $7,181.64 25% $5,386.00 $2,245.00
475 1726 I Occupancies 100,001 + sq. ft. Plan Check Building Occupancies, Plan Check $4,916.00 $11,235.80 25% $8,426.00 $3,510.00 476 1727 L Occupancies Up to 1,000 sq. ft. Plan Check Building Occupancies, Plan Check $1,621.00 $3,706.65 25% $2,779.00 $1,158.00
39 Building and Safety
Item No. ID # Title Description Type Category Current Fee/Charge Unit Full Cost Subsidy % Suggested Fee Fee Δ 477 1728 L Occupancies 1,001 - 5,000 sq. ft. Plan Check Building Occupancies, Plan Check $1,873.00 $4,285.82 25% $3,214.00 $1,341.00
478 1729 L Occupancies 5,001 - 10,000 sq. ft. Plan Chec k Building Occupancies, Plan Check $2,127.00 $4,864.98 25% $3,648.00 $1,521.00
479 1730 L Occupancies 10,001 - 50,000 sq. ft. Plan Che ck Building Occupancies, Plan Check $2,888.00 $6,602.48 25% $4,951.00 $2,063.00
480 1731 L Occupancies 50,001 - 100,000 sq. ft. Plan Ch eck Building Occupancies, Plan Check $3,395.00 $7,760.81 25% $5,820.00 $2,425.00
481 1732 L Occupancies 100,001 + sq. ft. Plan Check Building Occupancies, Plan Check $3,647.00 $8,339.97 25% $6,254.00 $2,607.00
482 1733 M Occupancies Up to 1,000 sq. ft. Plan Check Building Occupancies, Plan Check $1,367.00 $3,127.49 25% $2,345.00 $978.00
483 1734 M Occupancies 1,001 - 5,000 sq. ft. Plan Check Building Occupancies, Plan Check $1,873.00 $4,285.82 25% $3,214.00 $1,341.00
484 1735 M Occupancies 5,001 - 10,000 sq. ft. Plan Chec k Building Occupancies, Plan Check $2,127.00 $4,864.98 25% $3,648.00 $1,521.00
485 1736 M Occupancies 10,001 - 50,000 sq. ft. Plan Che ck Building Occupancies, Plan Check $2,888.00 $6,602.48 25% $4,951.00 $2,063.00
486 1737 M Occupancies 50,001 - 100,000 sq. ft. Plan Ch eck Building Occupancies, Plan Check $3,395.00 $7,760.81 25% $5,820.00 $2,425.00
487 1738 M Occupancies 100,001 + sq. ft. Plan Check Building Occupancies, Plan Check $3,647.00 $8,339.97 25% $6,254.00 $2,607.00
488 1740 H Occupancies Up to 200 sq. ft. Permit Building Occupancies, Permit $711.00 $1,589.12 25% $1,191.00 $480.00
489 1741 H Occupancies 201 - 1,000 sq. ft. Permit Building Occupancies, Permit $1,130.00 $2,523.89 25% $1,892.00 $762.00
490 1742 H Occupancies 1,001 - 5,000 sq. ft. Permit Building Occupancies, Permit $2,390.00 $5,328.22 25% $3,996.00 $1,606.00
491 1743 H Occupancies 5,001 - 10,000 sq. ft. Permit Building Occupancies, Permit $3,019.00 $6,730.38 25% $5,047.00 $2,028.00
492 1744 H Occupancies 10,001 - 20,000 sq. ft. Permit Building Occupancies, Permit $4,068.00 $7,665.15 25% $5,748.00 $1,680.00
493 1745 H Occupancies 20,001 + sq. ft. Permit Building Occupancies, Permit $5,538.00 $9,067.32 25% $6,800.00 $1,262.00
494 1746 I Occupancies Up to 1,000 sq. ft. Permit Building Occupancies, Permit $1,069.00 $2,383.68 25% $1,787.00 $718.00
495 1747 I Occupancies 1,001 - 5,000 sq. ft. Permit Building Occupancies, Permit $1,341.00 $2,991.28 25% $2,243.00 $902.00
496 1748 I Occupancies 5,001 - 10,000 sq. ft. Permit Building Occupancies, Permit $1,550.00 $3,458.67 25% $2,594.00 $1,044.00
497 1749 I Occupancies 10,001 - 50,000 sq. ft. Permit Building Occupancies, Permit $2,390.00 $5,328.22 25% $3,996.00 $1,606.00
498 1750 I Occupancies 50,001 - 100,000 sq. ft. Permit Building Occupancies, Permit $3,438.00 $7,665.15 25% $5,748.00 $2,310.00
499 1751 I Occupancies 100,001 + sq. ft. Permit Building Occupancies, Permit $5,538.00 $12,339.03 25% $9,254.00 $3,716.00
500 1752 L Occupancies Up to 1,000 sq. ft. Permit Building Occupancies, Permit $1,550.00 $3,458.67 25% $2,594.00 $1,044.00
501 1753 L Occupancies 1,001 - 5,000 sq. ft. Permit Building Occupancies, Permit $1,760.00 $3,926.05 25% $2,944.00 $1,184.00
502 1754 L Occupancies 5,001 - 10,000 sq. ft. Permit Building Occupancies, Permit $2,390.00 $5,328.22 25% $3,996.00 $1,606.00
503 1755 L Occupancies 10,001 - 50,000 sq. ft. Permit Building Occupancies, Permit $3,438.00 $7,665.15 25% $5,748.00 $2,310.00
504 1756 L Occupancies 50,001 - 100,000 sq. ft. Permit Building Occupancies, Permit $4,487.00 $10,002.09 25% $7,501.00 $3,014.00
505 1757 L Occupancies 100,001 + sq. ft. Permit Building Occupancies, Permit $5,538.00 $12,339.03 25% $9,254.00 $3,716.00
506 1758 M Occupancies Up to 1,000 sq. ft. Permit Building Occupancies, Permit $711.00 $1,589.12 25% $1,191.00 $480.00
507 1759 M Occupancies 1,001 - 5,000 sq. ft. Permit Building Occupancies, Permit $1,130.00 $2,523.89 25% $1,892.00 $762.00
508 1760 M Occupancies 5,001 - 10,000 sq. ft. Permit Building Occupancies, Permit $2,180.00 $4,860.83 25% $3,645.00 $1,465.00
509 1761 M Occupancies 10,001 - 50,000 sq. ft. Permit Building Occupancies, Permit $3,019.00 $6,730.38 25% $5,047.00 $2,028.00
510 1762 M Occupancies 50,001 - 100,000 sq. ft. Permit Building Occupancies, Permit $3,438.00 $7,665.15 25% $5,748.00 $2,310.00
511 1763 M Occupancies 100,001 + sq. ft. Permit Building Occupancies, Permit $5,538.00 $12,339.03 25% $9,254.00 $3,716.00
40 Building and Safety
Item No. ID # Title Description Type Category Current Fee/Charge Unit Full Cost Subsidy % Suggested Fee Fee Δ 512 1765 R Occupancies Up to 500 sq. ft. Plan Check Building Occupancies, Plan Check $455.00 $1,042.50 25% $781.00 $326.00
513 1766 R Occupancies 501 - 1,200 sq. ft. Plan Check Building Occupancies, Plan Check $759.00 $1,737.49 25% $1,303.00 $544.00
514 1767 R Occupancies 1,201 - 2,000 sq. ft. Plan Check Building Occupancies, Plan Check $1,062.00 $2,432.49 25% $1,824.00 $762.00
515 1768 R Occupancies 2,001 - 3,000 sq. ft. Plan Check Building Occupancies, Plan Check $1,215.00 $2,779.99 25% $2,084.00 $869.00
516 1769 R Occupancies 3,001 - 4,500 sq. ft. Plan Check Building Occupancies, Plan Check $1,519.00 $3,474.99 25% $2,606.00 $1,087.00
517 1770 R Occupancies 4,501 - 6,000 sq. ft. Plan Check Building Occupancies, Plan Check $1,823.00 $4,169.99 25% $3,127.00 $1,304.00
518 1771 R Occupancies 6,001 - 10,000 sq. ft. Plan Chec k Building Occupancies, Plan Check $2,432.00 $5,559.98 25% $4,169.00 $1,737.00
519 1772 R Occupancies 10,001 - 25,000 sq. ft. Plan Che ck Building Occupancies, Plan Check $3,647.00 $8,339.97 25% $6,254.00 $2,607.00
520 1773 R Occupancies 25,001 - 50,000 sq. ft. Plan Che ck Building Occupancies, Plan Check $5,701.00 $13,031.21 25% $9,773.00 $4,072.00 521 1774 R Occupancies 50,001 + sq. ft. Plan Check Building Occupancies, Plan Check $7,603.00 $17,374.94 25% $13,031.00 $5,428.00 522 1775 S Occupancies Up to 1,000 sq. ft. Plan Check Building Occupancies, Plan Check $1,062.00 $2,432.49 25% $1,824.00 $762.00
523 1776 S Occupancies 1,001 - 5,000 sq. ft. Plan Check Building Occupancies, Plan Check $1,367.00 $3,127.49 25% $2,345.00 $978.00
524 1777 S Occupancies 5,001 - 10,000 sq. ft. Plan Chec k Building Occupancies, Plan Check $1,671.00 $3,822.49 25% $2,866.00 $1,195.00
525 1778 S Occupancies 10,001 - 50,000 sq. ft. Plan Che ck Building Occupancies, Plan Check $1,976.00 $4,517.48 25% $3,388.00 $1,412.00
526 1779 S Occupancies 50,001 - 100,000 sq. ft. Plan Ch eck Building Occupancies, Plan Check $2,280.00 $5,212.48 25% $3,909.00 $1,629.00
527 1780 S Occupancies 100,001 - 200,000 sq. ft. Plan C heck Building Occupancies, Plan Check $2,583.00 $5,907.48 25% $4,430.00 $1,847.00
528 1781 S Occupancies 200,001 - 400,000 sq. ft. Plan C heck Building Occupancies, Plan Check $2,888.00 $6,602.48 25% $4,951.00 $2,063.00
529 1782 S Occupancies 400,001 - 600,000 sq. ft. Plan C heck Building Occupancies, Plan Check $3,191.00 $7,297.48 25% $5,473.00 $2,282.00
530 1783 S Occupancies 600,001 + sq. ft. Plan Check Building Occupancies, Plan Check $3,496.00 $7,992.47 25% $5,994.00 $2,498.00
531 1784 U Occupancies Up to 500 sq. ft. Plan Check Building Occupancies, Plan Check $303.00 $695.00 25% $521.00 $218.00
532 1785 U Occupancies 501 - 1,000 sq. ft. Plan Check Building Occupancies, Plan Check $455.00 $1,042.50 25% $781.00 $326.00
533 1786 U Occupancies 1,001 - 1,500 sq. ft. Plan Check Building Occupancies, Plan Check $607.00 $1,390.00 25% $1,042.00 $435.00
534 1787 U Occupancies 1,501 + sq. ft. Plan Check Building Occupancies, Plan Check $759.00 $1,737.49 25% $1,303.00 $544.00
535 1789 R Occupancies Up to 500 sq. ft. Permit Building Occupancies, Permit $753.00 $1,682.59 25% $1,261.00 $508.00
536 1790 R Occupancies 501 - 1,200 sq. ft. Permit Building Occupancies, Permit $1,130.00 $2,523.89 25% $1,892.00 $762.00
537 1791 R Occupancies 1,201 - 2,000 sq. ft. Permit Building Occupancies, Permit $1,257.00 $2,804.32 25% $2,103.00 $846.00
538 1792 R Occupancies 2,001 - 3,000 sq. ft. Permit Building Occupancies, Permit $1,445.00 $3,224.97 25% $2,418.00 $973.00
539 1793 R Occupancies 3,001 - 4,500 sq. ft. Permit Building Occupancies, Permit $1,696.00 $3,785.84 25% $2,839.00 $1,143.00
540 1794 R Occupancies 4,501 - 6,000 sq. ft. Permit Building Occupancies, Permit $2,075.00 $4,627.14 25% $3,470.00 $1,395.00
541 1795 R Occupancies 6,001 - 10,000 sq. ft. Permit Building Occupancies, Permit $2,642.00 $5,889.08 25% $4,416.00 $1,774.00
542 1796 R Occupancies 10,001 - 25,000 sq. ft. Permit Building Occupancies, Permit $3,523.00 $7,852.11 25% $5,889.00 $2,366.00
543 1797 R Occupancies 25,001 - 50,000 sq. ft. Permit Building Occupancies, Permit $4,404.00 $9,815.14 25% $7,361.00 $2,957.00
544 1798 R Occupancies 50,001 + sq. ft. Permit Building Occupancies, Permit $5,347.00 $11,918.38 25% $8,938.00 $3,591.00
545 1799 S Occupancies Up to 1,000 sq. ft. Permit Building Occupancies, Permit $2,201.00 $4,907.57 25% $3,680.00 $1,479.00
546 1800 S Occupancies 1,001 - 5,000 sq. ft. Permit Building Occupancies, Permit $2,515.00 $5,608.65 25% $4,206.00 $1,691.00
41 Building and Safety
Item No. ID # Title Description Type Category Current Fee/Charge Unit Full Cost Subsidy % Suggested Fee Fee Δ 547 1801 S Occupancies 5,001 - 10,000 sq. ft. Permit Building Occupancies, Permit $2,830.00 $6,309.73 25% $4,732.00 $1,902.00
548 1802 S Occupancies 10,001 - 50,000 sq. ft. Permit Building Occupancies, Permit $3,460.00 $7,711.89 25% $5,783.00 $2,323.00
549 1803 S Occupancies 50,001 - 100,000 sq. ft. Permit Building Occupancies, Permit $4,090.00 $9,114.05 25% $6,835.00 $2,745.00
550 1804 S Occupancies 100,001 - 200,000 sq. ft. Permit Building Occupancies, Permit $5,347.00 $11,918.38 25% $8,938.00 $3,591.00
551 1805 S Occupancies 200,001 - 400,000 sq. ft. Permit Building Occupancies, Permit $6,922.00 $15,423.78 25% $11,567.00 $4,645.00
552 1806 S Occupancies 400,001 - 600,000 sq. ft. Permit Building Occupancies, Permit $8,495.00 $18,929.19 25% $14,196.00 $5,701.00
553 1807 S Occupancies 600,001 + sq. ft. Permit Building Occupancies, Permit $11,012.00 $24,537.84 25% $18,403.00 $7,391.00
554 1808 U Occupancies Up to 500 sq. ft. Permit Building Occupancies, Permit $375.00 $841.30 25% $630.00 $255.00
555 1809 U Occupancies 501 - 1,000 sq. ft. Permit Building Occupancies, Permit $502.00 $1,121.73 25% $841.00 $339.00
556 1810 U Occupancies 1,001 - 1,500 sq. ft. Permit Building Occupancies, Permit $627.00 $1,402.16 25% $1,051.00 $424.00
557 1811 U Occupancies 1,501 + sq. ft. Permit Building Occupancies, Permit $753.00 $1,682.59 25% $1,261.00 $508.00
558 1812 Administration Application processing fee Plan Check Building Disabled
Access Review Plan
Check
$45.00 $95.38 26% $71.00 $26.00
559 1813 Residential Up to 1,200 sq. ft. Plan Check
Building Disabled
Access Review Plan
Check
$36.00 $86.87 25% $65.00 $29.00
560 1814 Residential 1,201 - 2,000 sq. ft. Plan Check
Building Disabled
Access Review Plan
Check
$75.00 $173.75 25% $130.00 $55.00
561 1815 Residential 2,001 - 3,000 sq. ft. Plan Check
Building Disabled
Access Review Plan
Check
$113.00 $260.62 25% $195.00 $82.00
562 1816 Residential 3,001 - 4,500 sq. ft. Plan Check
Building Disabled
Access Review Plan
Check
$151.00 $347.50 25% $260.00 $109.00
563 1817 Residential 4,501 - 6,000 sq. ft. Plan Check
Building Disabled
Access Review Plan
Check
$188.00 $434.37 25% $325.00 $137.00
564 1818 Residential 6,001 - 10,000 sq. ft. Plan Check
Building Disabled
Access Review Plan
Check
$227.00 $521.25 25% $390.00 $163.00
565 1819 Residential 10,001 - 25,000 sq. ft. Plan Check Building Disabled
Access Review Plan
Check
$264.00 $608.12 25% $456.00 $192.00
566 1820 Commercial/Industrial First 500 sq. ft. Plan C heck Building Disabled
Access Review Plan
Check
$75.00 $173.75 25% $130.00 $55.00
567 1821 Commercial/Industrial 501 - 1,500 sq. ft. Plan Check Building Disabled
Access Review Plan
Check
$151.00 $347.50 25% $260.00 $109.00
568 1822 Commercial/Industrial 1,501 - 3,000 sq. ft. Pl an Check Building Disabled
Access Review Plan
Check
$227.00 $521.25 25% $390.00 $163.00
569 1823 Commercial/Industrial 3,001 - 5,000 sq. ft. Pl an Check Building Disabled
Access Review Plan
Check
$303.00 $695.00 25% $521.00 $218.00
570 1824 Commercial/Industrial 5,001 - 10,000 sq. ft. P lan Check Building Disabled
Access Review Plan
Check
$378.00 $868.75 25% $651.00 $273.00
571 1825 Commercial/Industrial 10,001 - 30,000 sq. ft. Plan Check Building Disabled
Access Review Plan
Check
$455.00 $1,042.50 25% $781.00 $326.00
572 1826 Commercial/Industrial 30,001 - 80,000 sq. ft. Plan Check Building Disabled
Access Review Plan
Check
$530.00 $1,216.25 25% $912.00 $382.00
573 1827 Commercial/Industrial 80,001 - 150,000 sq. ft . Plan Check Building Disabled
Access Review Plan
Check
$607.00 $1,390.00 25% $1,042.00 $435.00
42 Building and Safety
Item No. ID # Title Description Type Category Current Fee/Charge Unit Full Cost Subsidy % Suggested Fee Fee Δ 574 1828 Commercial/Industrial 150,001 - 300,000 sq. f t. Plan Check Building Disabled
Access Review Plan
Check
$683.00 $1,563.74 25% $1,172.00 $489.00
575 1829 Commercial/Industrial 300,001 - 500,000 sq. f t. Plan Check Building Disabled
Access Review Plan
Check
$759.00 $1,737.49 25% $1,303.00 $544.00
576 1830 Commercial/Industrial 500,001 + sq. ft. Plan C heck Building Disabled
Access Review Plan
Check
$834.00 $1,911.24 25% $1,433.00 $599.00
577 1831 Administration Application processing fee. Pla n Check State Energy Review Plan Check $45.00 $95.38 26% $71.00 $26.00
578 1832 Residential Up to 1,200 sq. ft. Plan Check State Energy Review Plan Check $36.00 $86.87 25% $65.00 $29.00
579 1833 Residential 1,201 - 2,000 sq. ft. Plan Check State Energy Review Plan Check $75.00 $173.75 25% $130.00 $55.00
580 1834 Residential 2,001 - 3,000 sq. ft. Plan Check State Energy Review Plan Check $113.00 $260.62 25% $195.00 $82.00
581 1835 Residential 3,001 - 4,500 sq. ft. Plan Check State Energy Review Plan Check $151.00 $347.50 25% $260.00 $109.00
582 1836 Residential 4,501 - 6,000 sq. ft. Plan Check State Energy Review Plan Check $188.00 $434.37 25% $325.00 $137.00
583 1837 Residential 6,001 - 10,000 sq. ft. Plan Check State Energy Review Plan Check $227.00 $521.25 25% $390.00 $163.00
584 1838 Residential 10,001 + sq. ft. Plan Check State Energy Review Plan Check $264.00 $608.12 25% $456.00 $192.00
585 1839 Commercial/Industrial Up to 500 sq. ft. Plan C heck State Energy Review Plan Check $36.00 $86.87 25% $65.00 $29.00
586 1840 Commercial/Industrial 501 - 1,500 sq. ft. Plan Check State Energy Review Plan Check $75.00 $173.75 25% $130.00 $55.00
587 1841 Commercial/Industrial 1,501 - 3,000 sq. ft. Pl an Check State Energy Review Plan Check $113.00 $260.62 25% $195.00 $82.00
588 1842 Commercial/Industrial 3,001 - 5,000 sq. ft. Pl an Check State Energy Review Plan Check $151.00 $347.50 25% $260.00 $109.00
589 1843 Commercial/Industrial 5,001 - 10,000 sq. ft. P lan Check State Energy Review Plan Check $188.00 $434.37 25% $325.00 $137.00
590 1844 Commercial/Industrial 10,001 - 30,000 sq. ft. Plan Check State Energy Review Plan Check $227.00 $521.25 25% $390.00 $163.00
591 1845 Commercial/Industrial 30,001 - 80,000 sq. ft. Plan Check State Energy Review Plan Check $264.00 $608.12 25% $456.00 $192.00
592 1846 Commercial/Industrial 80,001 - 150,000 sq. ft . Plan Check State Energy Review Plan Check $284.00 $651.56 25% $488.00 $204.00
593 1847 Commercial/Industrial 150,001 - 300,000 sq. f t. Plan Check State Energy Review Plan Check $303.00 $695.00 25% $521.00 $218.00
594 1848 Commercial/Industrial 300,001 - 500,000 sq. f t. Plan Check State Energy Review Plan Check $321.00 $738.44 25% $553.00 $232.00
595 1849 Commercial/Industrial 500,001 + sq. ft. Plan C heck State Energy Review Plan Check $340.00 $781.87 25% $586.00 $246.00
596 1850 Administration Issuance fee, each permit Permi t Building Disabled Access Permit $46.00 $95.38 26% $71.00 $25.00
597 1851 Residential Up to 1,200 sq. ft. Permit Building Disabled Access Permit $29.00 $70.11 26% $52.00 $23.00
598 1852 Residential 1,201 - 2,000 sq. ft. Permit Building Disabled Access Permit $60.00 $140.22 25% $105.00 $45.00
599 1853 Residential 2,001 - 3,000 sq. ft. Permit Building Disabled Access Permit $93.00 $210.32 25% $157.00 $64.00
600 1854 Residential 3,001 - 4,500 sq. ft. Permit Building Disabled Access Permit $123.00 $280.43 25% $210.00 $87.00
601 1855 Residential 4,501 - 6,000 sq. ft. Permit Building Disabled Access Permit $155.00 $350.54 25% $262.00 $107.00
602 1856 Residential 6,001 - 10,000 sq. ft. Permit Building Disabled Access Permit $187.00 $420.65 25% $315.00 $128.00
603 1857 Residential 10,001 - 25,000 sq. ft. Permit Building Disabled Access Permit $219.00 $490.76 25% $368.00 $149.00
604 1858 Commercial/Industrial First 500 sq. ft. Permit Building Disabled Access Permit $60.00 $140.22 25% $105.00 $45.00
605 1859 Commercial/Industrial 501 - 1,500 sq. ft. Perm it Building Disabled Access Permit $123.00 $280.43 25% $210.00 $87.00
606 1860 Commercial/Industrial 1,501 - 3,000 sq. ft. Pe rmit Building Disabled Access Permit $187.00 $420.65 25% $315.00 $128.00
607 1861 Commercial/Industrial 3,001 - 5,000 sq. ft. Pe rmit Building Disabled Access Permit $250.00 $560.86 25% $420.00 $170.00
43 Building and Safety
Item No. ID # Title Description Type Category Current Fee/Charge Unit Full Cost Subsidy % Suggested Fee Fee Δ 608 1862 Commercial/Industrial 5,001 - 10,000 sq. ft. P ermit Building Disabled Access Permit $312.00 $701.08 25% $525.00 $213.00
609 1863 Commercial/Industrial 10,001 - 30,000 sq. ft. Permit Building Disabled Access Permit $375.00 $841.30 25% $630.00 $255.00
610 1864 Commercial/Industrial 30,001 - 80,000 sq. ft. Permit Building Disabled Access Permit $439.00 $981.51 25% $736.00 $297.00
611 1865 Commercial/Industrial 80,001 - 150,000 sq. ft . Permit Building Disabled Access Permit $502.00 $1,121.73 25% $841.00 $339.00
612 1866 Commercial/Industrial 150,001 - 300,000 sq. f t. Permit Building Disabled Access Permit $564.00 $1,261.95 25% $946.00 $382.00
613 1867 Commercial/Industrial 300,001 - 500,000 sq. f t. Permit Building Disabled Access Permit $627.00 $1,402.16 25% $1,051.00 $424.00
614 1868 Commercial/Industrial 500,001 + sq. ft. Permit Building Disabled Access Permit $691.00 $1,542.38 25% $1,156.00 $465.00
615 1869 Administration Issuance fee, each permit. Perm it State Energy Permit $46.00 $95.38 26% $71.00 $25.00 616 1870 Residential Up to 1,200 sq. ft. Permit State En ergy Permit $29.00 $70.11 26% $52.00 $23.00 617 1871 Residential 1,201 - 2,000 sq. ft. Permit State Energy Permit $60.00 $140.22 25% $105.00 $45.00 618 1872 Residential 2,001 - 3,000 sq. ft. Permit State Energy Permit $93.00 $210.32 25% $157.00 $64.00 619 1873 Residential 3,001 - 4,500 sq. ft. Permit State Energy Permit $123.00 $280.43 25% $210.00 $87.00 620 1874 Residential 4,501 - 6,000 sq. ft. Permit State Energy Permit $155.00 $350.54 25% $262.00 $107.00 621 1875 Residential 6,001 - 10,000 sq. ft. Permit State Energy Permit $187.00 $420.65 25% $315.00 $128.00 622 1876 Residential 10,001 + sq. ft. Permit State Energ y Permit $219.00 $490.76 25% $368.00 $149.00 623 1877 Commercial/Industrial Up to 500 sq. ft. Permit State Energy Permit $29.00 $70.11 26% $52.00 $23.00 624 1878 Commercial/Industrial 501 - 1,500 sq. ft. Perm it State Energy Permit $60.00 $140.22 25% $105.00 $45.00 625 1879 Commercial/Industrial 1,501 - 3,000 sq. ft. Pe rmit State Energy Permit $93.00 $210.32 25% $157.00 $64.0 0 626 1880 Commercial/Industrial 3,001 - 5,000 sq. ft. Pe rmit State Energy Permit $123.00 $280.43 25% $210.00 $87. 00 627 1881 Commercial/Industrial 5,001 - 10,000 sq. ft. P ermit State Energy Permit $155.00 $350.54 25% $262.00 $1 07.00 628 1882 Commercial/Industrial 10,001 - 30,000 sq. ft. Permit State Energy Permit $187.00 $420.65 25% $315.00 $1 28.00 629 1883 Commercial/Industrial 30,001 - 80,000 sq. ft. Permit State Energy Permit $219.00 $490.76 25% $368.00 $1 49.00 630 1884 Commercial/Industrial 80,001 - 150,000 sq. ft . Permit State Energy Permit $234.00 $525.81 25% $394.00 $ 160.00 631 1885 Commercial/Industrial 150,001 - 300,000 sq. f t. Permit State Energy Permit $250.00 $560.86 25% $420.00 $170.00 632 1886 Commercial/Industrial 300,001 - 500,000 sq. f t. Permit State Energy Permit $265.00 $595.92 25% $446.00 $181.00 633 1887 Commercial/Industrial 500,001 + sq. ft. Permit State Energy Permit $281.00 $630.97 25% $473.00 $192.00 634 1888 State Energy Permit Residential: single famil y. Permit State Energy Permit $281.00 $630.97 25% $473.00 $192.00 635 1889 State Energy Permit Residential: multi family . Permit State Energy Permit $281.00 $630.97 25% $473.00 $ 192.00 636 1890 Computer Fee
Fee per square foot of building area for cost suppo rt, maintenance and amortization of Building & Safety's computer system unique to development activity.
Administrative Miscellaneous $0.50 NA NA $0.50 $0.00
637 1891 Training Fee
Fee per permit for providing continuing education f or the Building Inspectors, Plans Examiners and Building Officials as required by California Health & Safety Code, Section 18949.29, and as authorized by California Health & Safety Code, Section 18949.31.
Administrative Miscellaneous $4.00 $4.80 0% $4.80 $0.80 638 1892 Archive
Fee per sheet for Laser imaging of all issued permi ts, plans or other related document to keep as permanent records. (A sheet is a single page up to size "E" (36"x48") or 6 letter size (8.5"x11) pages).
Administrative Miscellaneous $3.00 $7.10 30% $5.00 $2.00 639 1893 Strong Motion Instrumentation Program (SMI) Pass through fee to State for seismic hazard mappin g and strong motion instrumentation. Administrative Pass Through
As specified in CA
Public Resources
Code, Division 2,
Chapter 8.
NA NA
As specified in CA
Public Resources Code,
Division 2, Chapter 8.
$0.00
640 1894 Pass Through- Building Standards Pass through fee to State to support the State Building Standard's Commission. Administrative Pass Through
As specified in CA
Health & Safety Code,
Division 13, Chapter
3. NA NA
As specified in CA
Health & Safety Code,
Division 13, Chapter 3.
$0.00
641 1895 Engineered and/or Consultant Plan Check Fee p aid for an Engineered and/or Consultant plan check. Administrative Building Direct Labor +
Approved Overhead
Rate
NA NA
Direct Labor +
Approved Overhead
Rate
$0.00
642 1896 Mobilehome Fees Fees for various permits for mobilehomes and access ory structures for mobilehomes. Administrative Mobilehome
As Specified in
Chapter 3, Title 25 of
the CA code of
Regulations.
NA NA
As Specified in Chapter
3, Title 25 of the CA
code of Regulations.
$0.00
643 1985 Plan Reproduction Process Fee Fee for processing the authorization for release of plans from Architect/Engineer/Designer of Record. Administrative Miscellaneous $22.00 $53.08 27% $39.00 $17 .00 644 2000 Plan Check Expedite (Consultant) Fee to expedite a plan check, typically requiring a consultant and Plans Examiner Overtime Administrative Plan Check Plan Check Fee + 50% NA NA Pla n Check Fee + 50% $0.00 645 2001 Archiving of Digital Documents Fee to archive digital documents Administrative Plan Check $25.00 $35 .50 27% $26.00 $1.00 646 2002 Photovoltaic - Single Family Residence
Fee for Residential, Single-Family Photovoltaic Sys tems 0-15kw, building plan check
Alternative
Energy Plan Check - Building $76.00 $173.75 25% $130.00 $54.00 647 2003 Photovoltaic - Single Family Residence Fee for Residential, Single-Family Photovoltaic Sys tems 0-15kw, electrical plan check
Alternative
Energy Plan Check - Electrical $76.00 $173.75 25% $130.00 $54.0 0 648 2004 Photovoltaic - Single Family Residence Fee for Residential, Single-Family Photovoltaic Sys tems 0-15kw, building inspection and permit
Alternative
Energy
Inspection/Permit -
Building $61.00 $86.87 25% $65.00 $4.00
44 Building and Safety
Item No. ID # Title Description Type Category Current Fee/Charge Unit Full Cost Subsidy % Suggested Fee Fee Δ 649 2005 Photovoltaic - Single Family Residence Fee for Residential, Single-Family Photovoltaic Sys tems 0-15kw, electrical inspection and permit
Alternative
Energy
Inspection/Permit -
Electrical $61.00 $86.87 25% $65.00 $4.00
650 2006 Incidental/Nuisance Inspection Fee for incide ntal/nuisance inspection Other Building $152.00 $280.43 25% $210.00 $58.00 651 2007 New Business Certificate of Occupancy - Exis ting Fee for a new Business Certificate of Occupancy at an existing building Other Building $181.00 $333.52 25% $250.00 $69.00 652 2021 Plan Check Expedite - In House Cost to expedite a plan check in house. Fee is 1.5 times that of the original plan check fee which varies per type of plan check. Administrative Plan Check Plan Check + 50% NA NA Plan Ch eck + 50% $0.00 653 2042 Investigation (Illegal Construction) Fee for special investigation inspection of work co mmenced without a permit. Investigation Administration Equal to Permit Fee NA NA E qual to Permit Fee $0.00 654 2043 Extension Request - Plan Check or Permit Fee to process requests to consider extension of time for plan checks and/or permits that have exceeded time allocated for respe ctive activity Extension Administration $123.00 $215.32 25% $161.00 $38. 00 655 2044 Window Replacement or Retrofit - Inspection Inspection fee for window replacement or window ret rofit within an existing structure. Fee if for 1st 6 windows plus $14 for ea ch additional Permit Building & Safety $186.00 $280.43 25% $210.00 $24. 00 656 2045 Window Replacement or Retrofit - Plan Check Plan check fee for the review and approval to repla ce windows within an existing structure Plan Check Building & Safety $75.00 $130.31 26% $97.00 $ 22.00 657 2046 Pavement Restriping - 1st 10,000 sf.
Plan check fee for the review/approval of restripin g existing parking lots to ensure conformance/compliance for ADA accessibility , energy costs, egress, and parking spaces. 1st 10,000 sf., plus $1.00 for each 1,000 ft. to 99,999 sf.
Plan Check Building & Safety $75.00 Plus $1 per 1,000
sf. Over 10,000 $130.31 26% $97.00 $22.00
658 2047 Pavement Restriping - 100,000-499,999 sf.
Plan check fee for the review/approval of restripin g existing parking lots to ensure conformance/compliance for ADA accessibility , energy costs, egress, and parking spaces. Greater than 100,000 sf., plus $0.50 for each 1,000 ft. to 499,999 sf.
Plan Check Building & Safety $151.00
plus $0.50 per
1,000 sf. To
499,999
$260.62 25% $195.00 $44.00
659 2048 Pavement Restriping - 500,000-999,999 sf.
Plan check fee for the review/approval of restripin g existing parking lots to ensure conformance/compliance for ADA accessibility , energy costs, egress, and parking spaces. Greater than 500,000 sf., plus $0.40 for each 1,000 ft. to 999,999 sf.
Plan Check Building & Safety $227.00
plus $0.40 per
1,000 sf. To
999,999
$347.50 25% $260.00 $33.00
660 2049 Pavement Restriping - 1,000,000 sf and above
Plan check fee for the review/approval of restripin g existing parking lots to ensure conformance/compliance for ADA accessibility , energy costs, egress, and parking spaces of 1,000,000 sf., plus $0.20 for each 1,000 ft. thereafter Plan Check Building & Safety $303.00
plus $0.20 per
1,000 sf.
Thereafter
$434.37 25% $325.00 $22.00
661 2050 Pavement Inspection - 1st 10,000 sf.
Inspection fee for restriping existing parking lots to ensure conformance/compliance for ADA accessibility, energ y codes, egress and parking spaces. Fee covers 1st 10,000 sf. Plus $0.62 per 1,000 sf. To 99,999 sf.
Permit Parking $60.00
first 10,000 sf. Plus
$0.62 per 1,000 sf.
To 99,000
$140.22 25% $105.00 $45.00
662 2051 Pavement Inspection - 100,000-499,999 sf.
Inspection fee for the review/approval of restripin g existing parking lots to ensure conformance/compliance for ADA accessibility , energy costs, egress, and parking spaces. Greater than 100,000 sf., plus $0.28 for each 1,000 ft. to 499,999 sf.
Permit Parking $123.00
plus $0.28 for
each 1,000 sf. To
999,999
$210.32 25% $157.00 $34.00
663 2052 Pavement Inspection - 500,000-999,999 sf.
Inspection fee for the review/approval of restripin g existing parking lots to ensure conformance/compliance for ADA accessibility , energy costs, egress, and parking spaces. Greater than 500,000 sf., plus $0.44 for each 1,000 ft. to 999,999 sf.
Permit Parking $250.00
plus $0.44 for each
1,000 sf to
1,000,000
$385.59 25% $289.00 $39.00
664 2053 Pavement Inspection 1,000,000 sf +
Inspection fee for the review/approval of restripin g existing parking lots to ensure conformance/compliance for ADA accessibility , energy costs, egress, and parking spaces of 1,000,000 sf., plus $0.44 for each 1,000 ft. thereafter Permit Parking $502.00 plus $0.44 for each
1,000 sf thereafter $560.86 25% $420.00 -$82.00
665 Design review for Planning entitlement projects Staff time to review plans associated with PAMS, MCNS, TUPS and other Planning entitlement projects Plan Check Building & Safety New $865.23 0% $865.00 NA 45 Code Compliance
Item
No. ID # Title Description Type Category Current Fee/Charge Unit Full Cost Subsidy % Suggested Fee Fee Δ 1 438 Code Reinspection's Cost of second reinspection and every inspection thereafter. Code Enforcement Inspection $95.00 NA NA $95.00 $0.00 2 558 Hearing Fee Cost incurred for the preparation, notification and recording of appeals of abatement related issues. Code Enforcement Abatement $917.00 NA NA $917.00 $0.00 3 559 Board Up/Clean Up Abatement Fee Cost incurred for administering the program to monitor abandoned or neglected properties Code Enforcement Abatement $407.00 NA NA $407.00 $0.00 4 560 Illegal Sign Abatement Fee Cost incurred in removing illegally placed signs. Fee is for $88.00 for the first sign and $5 for each additional sign removed. Code Enforcement Abatement $90.00 for 1st Sign & $5.00 for
each additional sign
thereafter
NA NA $90.00 $0.00
5 561 Nuisance Abatement Fee Fee for cost associated with the program to abate nuisances plus the cost of the contractor. Code Enforcement Abatement $454.00 + Contractor Cost NA NA $454.00 $0.00 6 562 Vehicle Abatement Fee Cost incurred in abating non-operational vehicles from private property. Code Enforcement Abatement $398.00 NA NA $398.00 $0.00 7 648 Administrative Lien Fee This fee is to recover costs for weed abatement services to private property owners of vacant or unmaintained properties. Code Enforcement Abatement $229.00 NA NA $229.00 $0.00 8 722 Warrant Fee Fee to recover cost associated with obtaining a warrant from the Superior Court to effectuate a Code Enforcement abatement order on private property. Code Enforcement Abatement $178.00 NA NA $178.00 $0.00 9 1ST REINSPECTION FEE The first initial inspection is free. This fee is for the first re-inspection we conduct on the property. CODE COMPLIANCE ABATEMENT $75.00 NA NA $78.00 $3.00 10 ADMIN OVERHEAD
This is something we bill for that takes the form of like a tax. According to previous Manager, the bill out rate would be rate by position according to current fee schedule including benefit cost, plus 13%
CODE COMPLIANCE ABATEMENT 13% of total bill NA NA 13% of total bill $0.00
11 BB&K REVIEW
This is the fee we charge customer if we have to request a Litigation Guarantee from City Attorney. The City Attorney charges us for the time they invest in obtaining/requesting this document. We, in return, charge the customer. (Cost recovery) CODE COMPLIANCE ABATEMENT $128.00 NA NA $128.00 $0.00
12 CHAIN This fee is if we need to resecure a property with chain. (Cost recovery) CODE COMPLIANCE ABATEMENT $15.00 NA NA $15.00 $0.00 13 DIRECTOR HOURS This is my hourly rate based on the current fee schedule. CODE COMPLIANCE ABATEMENT $118.47 NA NA $118.47 $0.00 14 INSPECTION HOURS This is the inspectors hourly rate based on the current fee schedule. CODE COMPLIANCE ABATEMENT $77.81 $121.28 27% $87.93 $10.12 15 LOCKS This fee is if we need to resecure a property with chain. (Cost recovery) CODE COMPLIANCE ABATEMENT $20.00 NA NA $20.00 $0.00 16 PHOTOS This is the fee for each photo taken. CODE COMPLIANCE ABATEMENT $0.50 NA NA $0.50 $0.00 17 MANAGER HOURS CODE COMPLIANCE ABATEMENT $44.39 $222.98 78% $50.16 $5.77 18 ADMINSTRATIVE ASSISTANT HOURS CODE COMPLIANCE ABATEMENT New $79.88 0% $79.88 NA 19 SENIOR HOURS CODE COMPLIANCE ABATEMENT $85.77 $153.55 37% $96.92 $11.15 20 SUPERVISOR HOURS CODE COMPLIANCE ABATEMENT $78.88 $180.12 51% $89.13 $10.25 21 INSPECTOR HOURS CODE COMPLIANCE ABATEMENT $44.58 $121.28 58% $50.38 $5.80 22 TRACTOR FEE WEED ABATEMENT FEE: This is the fee the weed contractor bills us for tractor work done to a property. CODE COMPLIANCE ABATEMENT QTY X 1.13 NA NA QTY X 1.13 $0.00 23 WATER TRUCK WEED ABATEMENT FEE: This is the fee the weed contractor bills us if a water truck is used. CODE COMPLIANCE ABATEMENT QTY X 1.13 NA NA QTY X 1.13 $0.00 24 RUBBISH WEED ABATEMENT FEE: This is the fee the weed contractor bills us for cleaning and removing rubbish off the property. CODE COMPLIANCE ABATEMENT QTY X 1.13 NA NA QTY X 1.13 $0.00 25 HANDWORK WEED ABATEMENT FEE: This is the fee the weed contractor bills us for any handwork done to the property. CODE COMPLIANCE ABATEMENT QTY X 1.13 NA NA QTY X 1.13 $0.00 26 DISPOSAL FEE WEED ABATEMENT FEE: This is the fee the weed contractor bills us for any trash dump trips. CODE COMPLIANCE ABATEMENT QTY X 1.13 NA NA QTY X 1.13 $0.00 27 INTEREST When a bill goes unpaid, we update the bill and add a 10% charge to the entire bill for interest. CODE COMPLIANCE ABATEMENT VARIES NA NA VARIES $0.00 28 LIT GUARANTEE This is the cost for the litigation guarantee document we received from attorney. (Cost recovery) CODE COMPLIANCE ABATEMENT VARIES NA NA VARIES $0.00 29 FILING FEES This is for all documents we record with the SB County Assessors office. We pay a fee for recording documents which vary by document. This fluctuates annually. (Cost Recovery) CODE COMPLIANCE ABATEMENT VARIES NA NA VARIES $0.00 30 ADMINISTRATIVE CITATION This depends on the number of violations being cited for and if it is the first, second, or third violation. CODE COMPLIANCE ABATEMENT VARIES NA NA VARIES $0.00 31 ABATEMENT COST This is the fee we charge customers when we need to call city contractor to conduct an abatement of any kind. This amount is what the contractor bills us which varies. (Cost Recovery) CODE COMPLIANCE ABATEMENT VARIES NA NA VARIES $0.00 32 SUPERVISING CODE COMPLIANCE INSPECTOR CODE COMPLIANCE ABATEMENT New $180.12 51% $89.13 NA 33 CODE COMPLIANCE TECHNICIAN CODE COMPLIANCE ABATEMENT New $121.28 58% $50.38 NA 34 IMPOUNDMENT FEE This is the fee we charge unpermitted street vendors for impounding their equipment. CODE COMPLIANCE ABATEMENT $232.00 NA NA $232.00 $0.00 35 HEAVY DUTY LOCK This is the charge for a heavy duty lock we use when securing a property CODE COMPLIANCE New NA NA $75.00 NA 46 Fire District
Item
No. ID # Title Description Type Category
Current
Fee/Charge Unit Full Cost Subsidy % Suggested Fee Fee Δ 1 1012 Archive Scan and Image
For the imaging and electronic archiving of fire plans. This involves the labor costs to prepare the documents for archiving OR the cost to have an outside vendor image the documents.
Other Service Fees Planning & Development Fees $27.00 $45.75 2% $45.00 $18.00 2 1013 Construction Plan Check Deposit,
Commercial/Industrial & Multi-Family Projects
For Fire District staff to perform plan check on a commerical, multi-family, or industrial project. Does not include the permit or inspection fees for these types of projects. Development Services Building Construction Fees $350.00 $716.98 0% $716.00 $366.00 3 1014 Construction Plan Check Deposit, Single Family
Residential Projects
For Fire District staff to perform plan check on a single family dwelling project. Does not include the permit or inspection fees for these types of projects. Development Services Building Construction Fees $90.00 $235.46 0% $235.00 $145.00 4 1015 Grading Plan Review For Fire District staff to review a grading plan, that is submitted through the Building and Safety Department, for fire department requirements. Development Services Building Construction Fees $191.00 $295.71 0% $295.00 $104.00 5 1016 Minor Use Permit For Fire District staff to review a Minor Use Permit application that is suibmitted to the City for review by the DAB. Development Services Planning Application Fees $181.00 $247.07 0% $247.00 $66.00 6 1017 Construction Plan Check Deposit, Miscellaneous
For Fire District staff to issue permits and perform an inspection of a miscellaneous project, such as a various types of equipment, small structures, or building systems, as well as poritions therof, that do not fall into any other permit category. REQUIRES PLAN
REVIEW/EVALUATION
Development Services Building Construction Fees $130.00 $428.00 0% $428.00 $298.00 7 1018 Pre-Application Meeting For Fire District staff to attend a Pre Application Meeting arranged by Planning Division with a prospective applicant and advise regarding fire protection requirements. Development Services Planning Application Fees $113.00 $536.91 0% $536.00 $423.00 8 1019 Tank Systems For Fire District staff to issue permits and perform inspections on above ground tanks and tank systems. Development Services Building Construction Fees $294.00 $494.15 0% $494.00 $200.00 9 1020 Conditional Use Permit Review For Fire District staff to review a Conditional Use Permit Application that is submitted to the City for DAB review. Development Services Planning Application Fees $521.00 $381.29 0% $381.00 -$140.00 10 1021 Single Family Residential Addition or Remodel
For Fire District staff to issue permits and perform inspections on a single family (custom) home - remodel or room addition project. Provides a reasonable cost break to the owner/builder.
Development Services Building Construction Fees $60.00 $423.12 0% $423.00 $363.00 11 1022 Multi Family Residential Per Unit For Fire District staff to issue permit and perform inspections of mulit-family (apartments, townhomes, etc.) projects. Fees assessed per unit. Development Services Building Construction Fees $53.00 $232.03 0% $232.00 $179.00 12 1023 Apartments, Hotel and Motel Buildings (1-15 units) Fee to perform inspections on Apartments, Hotel and Motel Buildings (1-15 units). Fee is per unit. SITE and COMMON AREAS ONLY, NO INDIVIDUAL UNITS UNLESS UNOCCUPIED.
Other Service Fees State & County Regulated Occupancy
Inspections $49.00 $356.58 0% $356.00 $307.00
13 1024 Apartments, Hotel and Motel Buildings (16+ units) Fee to perform inspections on Apartments, Hotel and Motel Buildings (16+ units). Fee is per unit. Other Service Fees State & County Regulated Occupancy Inspections $36.00 $425.89 0% $425.00 $389.00
14 1025
Care Facility pre-license inspection 1-25 (except
residential) Does not include R3.1 Residential, but it
does include R2.1 and R4
Fee for State & County Regulated Occupancy Inspections for Care Facility pre-license inspection 1-25 (except residential) Other Service Fees State & County Regulated Occupancy Inspections $55.00 $451.28 0% $451.00 $396.00
15 1026 Care Facility pre-license inspection 26+ Fee for State & County Regulated Occupancy Inspections for Care Facility pre-license inspection 26+ Other Service Fees State & County Regulated Occupancy Inspections $113.00 $451.28 0% $451.00 $338.00
16 1027 Day Care Facility (9+ persons) Fee for State & County Regulated Occupancy Inspections for Day Care Facility. 9+ persons. Other Service Fees State & County Regulated Occupancy Inspections $330.00 $451.28 0% $451.00 $121.00
17 1028 Detention Facility (per building) Fee for State & County Regulated Occupancy Inspections for Detention Facility, (per building) Other Service Fees State & County Regulated Occupancy Inspections $506.00 $361.79 0% $361.00 -$145.00
18 1029 Health Care/Nursing Facility (per building) Fee for State & County Regulated Occupancy Inspections for Health Care/Nursing Facility, (per building) Other Service Fees State & County Regulated Occupancy Inspections $297.00 $451.28 0% $451.00 $154.00
19 1030 High Rise (per story) Fee for State & County Regulated Occupancy Inspections for High Rise (per story) Other Service Fees State & County Regulated Occupancy Inspections $337.00 $223.18 0% $223.00 -$114.00
20 1032 Private School Fee for State & County Regulated Occupancy Inspections for Private Schools. Other Service Fees State & County Regulated Occupancy Inspections $538.00 $460.69 0% $460.00 -$78.00
21 1033 Residential Care Facility (7+ residents) Fee for State & County Regulated Occupancy Inspections for Residential Care Facilities (7+ residents) Other Service Fees State & County Regulated Occupancy Inspections $265.00 $381.97 0% $381.00 $116.00
22 1034 Additional Field Inspection (per hour) Fee to perform an additional field inspection (per hour). Other Service Fees Administrative Service Fees $100.00 $166.07 0% $166.00 $66.00 23 1039 Plan Resubmittal (each submittal after 2nd) Planning & Development Fee for Plan resubmittal. Fee is for each submittal of 2nd. Other Service Fees Planning & Development Fees $234.00 $383.77 0% $383.00 $149.00 24 1040 Reproduction of Responses, Cause & Origin Reports Reproduction of responses, cause and origin reports. Fee is per page Other Service Fees Administrative Service Fees $5.00 $89.49 1% $89.00 $84.00 25 1041 Revision of a Previously Approved Plan Planning & Development fee for revision of a previously approved plan. Other Service Fees Planning & Development Fees $196.00 $428.00 0% $428.00 $232.00 26 1059 After Hours Inspection (per hour) Administrative Charge for after hours inspection. Fee is per hour in addition to base fee assessed for inspection. Other Service Fees Administrative Charges $203.00 $398.48 0% $398.00 $195.00 27 1060 Alternate Method and Material Request ALTERNATE MEANS & METHODS Administrative Charge for alternate method and material request. Other Service Fees Administrative Charges $465.00 $719.81 0% $719.00 $254.00 28 1061 Time Extension Administrative Charge for time extension Other Service Fees Administrative Charges $92.00 NA NA $92.00 $0.00 29 1068 Aerosol Projects Annual permit fee for aerosol projects Annual Permit Fees High Hazard Permits $335.00 $406.63 0% $406.00 $71.00 30 1069 Aviation Facilities Annual permit fee for Aviation Facilities Annual Permit Fees High Hazard Permits $335.00 $524.05 0% $524.00 $189.00 31 1070 Energy Storage Systems Annual permit fee for battery systems Annual Permit Fees Medium Hazard Permits $291.00 $376.13 0% $376.00 $85.00 32 1071 Combustible Dust Producing Operations Annual permit fee for combustible dust producing operations Annual Permit Fees High Hazard Permits $335.00 $376.13 0% $376.00 $41.00 33 1072 Waste Handling Annual permit fee for waste handling Annual Permit Fees High Hazard Permits $335.00 $376.13 0% $376.00 $41.00 34 1073 Compressed Gases Annual permit fee for compressed gases Annual Permit Fees Medium Hazard Permits $291.00 $376.13 0% $376.00 $85.00 35 1074 Cryogens Fluids Annual permit fee for Cryogen Fluids Annual Permit Fees High Hazard Permits $335.00 $376.13 0% $376.00 $41.00 36 1075 Dry Cleaning Plants Annual permit fee for dry cleaning plants Annual Permit Fees Medium Hazard Permits $291.00 $376.13 0% $376.00 $85.00 37 1076 Explosives Annual permit fee for explosives Annual Permit Fees High Hazard Permits $335.00 $376.13 0% $376.00 $41.00 38 1079 Flammable or Combustible Liquid Annual permit fee for flammable or combustible liquids. Annual Permit Fees High Hazard Permits $335.00 $376.13 0% $376.00 $41.00 39 1080 Fumigation or Thermal Insecticidal Fogging Annual permit fee for fumigation or thermal insecticidal fogging. Annual Permit Fees Low Hazard Permits $232.00 $376.13 0% $376.00 $144.00 47 Fire District
Item
No. ID # Title Description Type Category
Current
Fee/Charge Unit Full Cost Subsidy % Suggested Fee Fee Δ 40 1081 Hazardous Materials Annual permit fee for hazardous materials Annual Permit Fees High Hazard Permits $335.00 $376.13 0% $376.00 $41.00 41 1082 High-Piled Storage Annual permit fee for high-piled storage Annual Permit Fees High Hazard Permits $335.00 $376.13 0% $376.00 $41.00 42 1083 Hot Works Operations Annual permit fee for hot works operations Annual Permit Fees High Hazard Permits $335.00 $376.13 0% $376.00 $41.00 43 1084 Liquefied Petroleum Gases Annual permit fee for liquefied petroleum gases Annual Permit Fees Medium Hazard Permits $291.00 $376.13 0% $376.00 $85.00 44 1085 Liquid or Gas Fuel Vehicle/Equipment in Assembly Building Annual permit fee for liquid or gas fuel vehicle/equipment in assembly building. Annual Permit Fees Low Hazard Permits $232.00 $376.13 0% $376.00 $144.00 45 1086 Magnesium Annual permit fee for magnesium. Annual Permit Fees High Hazard Permits $335.00 $376.13 0% $376.00 $41.00 46 1087 Motor Vehicle Fuel Dispensing Annual permit fee for motor vehicle fuel dispensing. Annual Permit Fees Medium Hazard Permits $291.00 $376.13 0% $376.00 $85.00 47 1088 Organic Coatings Annual permit fee for organic coatings Annual Permit Fees High Hazard Permits $335.00 $376.13 0% $376.00 $41.00 48 1089 Industrial Ovens Annual permit fee for industrial ovens. Annual Permit Fees Medium Hazard Permits $291.00 $376.13 0% $376.00 $85.00 49 1090 Pallet Yard Annual permit fee for pallet yard Annual Permit Fees Medium Hazard Permits $291.00 $376.13 0% $376.00 $85.00 50 1091 Places of Assembly with 300+ Occupants Annual permit fee for places of assembly with 300+ occupants. Annual Permit Fees High Hazard Permits $335.00 $376.13 0% $376.00 $41.00 51 1093 Radioactive Material Annual permit fee for radioactive materials Annual Permit Fees High Hazard Permits $404.00 $376.13 0% $376.00 -$28.00 52 1094 Repair Garage Annual permit fee for a repair garage Annual Permit Fees Medium Hazard Permits $291.00 $376.13 0% $376.00 $85.00 53 1095 Spraying or Dipping Annual permit fee for spraying or dipping Annual Permit Fees High Hazard Permits $335.00 $376.13 0% $376.00 $41.00 54 1096 Storage of Scrap Tires & Tire byproducts Annual permit fee for tire storage Annual Permit Fees High Hazard Permits $369.00 $376.13 0% $376.00 $7.00 55 1098 Automobile Wrecking Yards Annual permit fee for automobile wrecking yards Annual Permit Fees Low Hazard Permits $232.00 $376.13 0% $376.00 $144.00 56 1099 Floor Finishing Annual permit fee floor finishing. Annual Permit Fees Low Hazard Permits $232.00 $376.13 0% $376.00 $144.00 57 1101 Combustible Fiber Annual fee for combustible fiber. Annual Permit Fees Medium Hazard Permits $291.00 $376.13 0% $376.00 $85.00 58 1102 Misc. Combustible Storage Annual permit fee for misc combustible storage Annual Permit Fees Low Hazard Permits $232.00 $376.13 0% $376.00 $144.00 59 1103 Covered Mall Annual permit fee for a covered mall Annual Permit Fees Medium Hazard Permits $232.00 $376.13 0% $376.00 $144.00 60 1104 Fixed Hood & Duct Extinguishing Systems Annual permit fee for fixed hood & duct extinguishing systems Annual Permit Fees Low Hazard Permits $232.00 $376.13 0% $376.00 $144.00 61 1105 Lumber Yards and Wood Working Plants Annual permit fee for lumber yards and wood working plants Annual Permit Fees Medium Hazard Permits $291.00 $376.13 0% $376.00 $85.00 62 1106 Places of Assembly with less than 300 Occupants Annual permit fee for places of assembly with less than 300 occupants. Annual Permit Fees Low Hazard Permits $232.00 $376.13 0% $376.00 $144.00 63 1107 Refrigeration Equipment Annual permit fee for refrigeration equipment Annual Permit Fees Medium Hazard Permits $291.00 $376.13 0% $376.00 $85.00 64 1111 Open Flames and Candles Annual permit fee for open flames and candles. Annual Permit Fees Low Hazard Permits $232.00 $376.13 0% $376.00 $144.00 65 1113 Cellulose Nitrate Storage Annual permit fee for cellulose nitrate storage Annual Permit Fees Low Hazard Permits $232.00 $376.13 0% $376.00 $144.00 66 1115 Fruit and Crop Ripening Annual permit fee for fruit & crop ripening Annual Permit Fees Low Hazard Permits $232.00 $376.13 0% $376.00 $144.00 67 1119 Administrative Site Plan Fire District staff review of Planning Administrative Site Plan Application. Per Review, average 5 hours = X4 Development Services Planning Application Fees $584.00 $894.85 0% $894.00 $310.00 68 1120 Fuel Modification Plans Fire District staff review of fuel modification plans in conjunction with planning application. Per Review, average 5 hours= X4 Development Services Planning Application Fees $640.00 $894.85 0% $894.00 $254.00 69 1121 Tentative Parcel Map Fire District staff review of planning tentative parcel map application. Per Review, average 5 hours= X4 Development Services Planning Application Fees $417.00 $894.85 0% $894.00 $477.00 70 1122 Design Review Project Fire District Staff review of Planning Design Review Projects Application. Per Review, average 5 hours =X4 Development Services Planning Application Fees $909.00 $894.85 0% $894.00 -$15.00 71 1123 Specific Plan Fire District Staff review of Planning Specific Plans. Per Review, average 5 hours= X4 Development Services Planning Application Fees $963.00 $894.85 0% $894.00 -$69.00 72 1124 Tentative Tract Map Fire District Staff review of Planning Tentative Tract Maps Application. Per Review, average = Per Review, average, 4-5 hours =X5 Development Services Planning Application Fees $751.00 $715.88 0% $715.00 -$36.00 73 1130 Fireworks Booth Fire District Staff permit & inspection of temporary use permit for a fireworks booth. Development Services Special Event/ Temporary Use Fees $356.00 $661.77 0% $661.00 $305.00 74 1138 Single Family Tract Home Final Inspection, per lot Fire District permit and inspection of a single family tract home building construction permit. Fee is per lot., If only for shell, not accounting for Underground, Sprinklers, Alarms, etc
Development Services Building Construction Fees $72.00 $331.84 0% $331.00 $259.00 75 1139 Commercial/Industrial New Construction, 1 to 10,000 sq. ft.
Fire District permit and inspection of commercial/industrial new construction. 1 - 10,000 sq ft building construction. If only for shell, not accounting for Underground, Sprinklers, Alarms, etc
Development Services Building Construction Fees $599.00 $1,216.24 0% $1,216.00 $617.00 76 1140 Commercial/Industrial New Construction, 10,001 to 50,000 sq. ft.
Fire District permit and inspection of commercial/industrial new construction. 10,001 - 50,000 sq ft building construction. If only for shell, not accounting for Underground, Sprinklers, Alarms, etc
Development Services Building Construction Fees $764.00 $1,285.55 0% $1,285.00 $521.00 77 1141 Commercial/Industrial New Construction, 50,001 to 100,000 sq. ft.
Fire District permit and inspection of commercial/industrial new construction. 50,001 - 100,000 sq ft building construction. If only for shell, not accounting for Underground, Sprinklers, Alarms, etc
Development Services Building Construction Fees $968.00 $1,632.09 0% $1,632.00 $664.00 78 1142 Commercial/Industrial New Construction, 100,001 to 500,000 sq. ft.
Fire District permit and inspection of commercial/industrial new construction. 100,001 - 500,000 sq ft building construction. If only for shell, not accounting for Underground, Sprinklers, Alarms, etc
Development Services Building Construction Fees $1,213.00 $2,325.18 0% $2,325.00 $1,112.00 79 1143 Commercial/Industrial New Construction, 500,001 to 1,000,000 sq. ft.
Fire District permit and inspection of commercial/industrial new construction. 500,001 - 1,000,000 sq ft building construction. If only for shell, not accounting for Underground, Sprinklers, Alarms, etc
Development Services Building Construction Fees $1,457.00 $2,602.41 0% $2,602.00 $1,145.00 80 1144 Commercial/Industrial New Construction, 1,000,001 + sq. ft.
Fire District permit and inspection of commercial/industrial new construction. 1,000,001 + sq ft building construction. If only for shell, not accounting for Underground, Sprinklers, Alarms, etc.
Development Services Building Construction Fees $1,732.00 $2,325.18 0% $2,325.00 $593.00 81 1145 Commercial/Industrial Tenant Improvements, 5001 to 10,000 sq. ft. building construction permit
Fire District permit and inspection of commercial/industrial tenant improvements. 1 - 10,000 sq ft building construction permit. Development Services Building Construction Fees $343.00 $1,185.74 0% $1,185.00 $842.00 82 1146 Commercial/Industrial Tenant Improvements, 10,001 to 50,000 sq. ft.
Fire District permit and inspection of commercial/industrial tenant improvements. 10,001 - 50,000 sq ft building construction permit. Development Services Building Construction Fees $508.00 $1,324.36 0% $1,324.00 $816.00 83 1147 Commercial/Industrial Tenant Improvements, 50,001 to 100,000 sq. ft.
Fire District permit and inspection of commercial/industrial tenant improvements. 50,001 - 100,000 sq ft building construction permit. Development Services Building Construction Fees $637.00 $1,601.59 0% $1,601.00 $964.00 84 1148 Commercial/Industrial Tenant Improvements, 100,001 + sq. ft.
Fire District permit and inspection of commercial/industrial tenant improvements. 100,001 + sq ft building construction permit. Development Services Building Construction Fees $734.00 $1,878.82 0% $1,878.00 $1,144.00 48 Fire District
Item
No. ID # Title Description Type Category
Current
Fee/Charge Unit Full Cost Subsidy % Suggested Fee Fee Δ 85 1149 Battery System, per system Fire District permit and inspection of battery system. Fee is per system. Development Services Building Construction Fees $318.00 $570.27 0% $570.00 $252.00 86 1150 Dust Collection System, per system Fire District permit and inspection of dust collection system. Fee is per system. Development Services Building Construction Fees $335.00 $570.27 0% $570.00 $235.00 87 1151 Gas System, per system Fire District permit and inspection of gas system. Fee is per system. Development Services Building Construction Fees $355.00 $570.27 0% $570.00 $215.00 88 1152 Industrial Ovens, per system Fire District permit and inspection of industrial ovens. Fee is per system. Development Services Building Construction Fees $326.00 $570.27 0% $570.00 $244.00 89 1153 Refrigeration, per system Fire District permit and inspection of refrigeration system. Fee is per system. Development Services Building Construction Fees $355.00 $708.88 0% $708.00 $353.00 90 1154 Smoke Control System, per system Fire District permit and inspection of smoke control system. Fee is per system. Development Services Building Construction Fees $627.00 $847.50 0% $847.00 $220.00 91 1155 Spray Booths, per booth Fire District permit and inspection of spray booths. Fee is per booth. Development Services Building Construction Fees $355.00 $570.27 0% $570.00 $215.00 92 1157 Public Water Improvements, 1 to 10 appliances Fire District Staff review of public water improvements for 1-10 appliances. Review/Plan Check Only, NO INSPECTION Visual From Property Line, SGVWD Responsibility Development Services Engineering Fees $326.00 $585.43 0% $585.00 $259.00 93 1162 Single Family Residential Fire Sprinkler Permit & Inspection, 0 - 3,600 Sq. Ft.
Fee to issue a permit & perform inspections on a single family residential fire sprinkler system, 0 - 3,600 sq. ft. Development Services Fire Prevention Fees $153.00 $401.15 0% $401.00 $248.00 94 1163 Single Family Residential Fire Sprinkler Permit & Inspection, 3,601 - 5,000 Sq. Ft.
Fee to issue a permit & perform inspections on a single family residential fire sprinkler system, 3,301 - 5,000 sq. ft. Development Services Fire Prevention Fees $216.00 $539.77 0% $539.00 $323.00 95 1164 Single Family Residential Fire Sprinkler Permit & Inspection, 5,001+ Sq. Ft.
Fee to issue a permit & perform inspections on a single family residential fire sprinkler system, 5,001+ sq. ft. Development Services Fire Prevention Fees $392.00 $539.77 0% $539.00 $147.00 96 1168 Single Family Residential Fire Sprinkler System Modification
Fee to issue a permit & perform inspections on a single family residential fire sprinkler system modification Development Services Fire Prevention Fees $152.00 $516.41 0% $516.00 $364.00 97 1171 Multi-Family Residential Fire Sprinkler Permit & Inspection 1-50 Heads
Fee to issue a permit and perform inspections on a multi-family sprinkler system, 1-50 heads. Development Services Fire Prevention Fees $264.00 $802.30 0% $802.00 $538.00 98 1172 Multi-Family Residential Fire Sprinkler Permit & Inspection 51-100 Heads
Fee to issue a permit and perform inspections on a multi-family sprinkler system, 51-100 heads. Development Services Fire Prevention Fees $369.00 $802.30 0% $802.00 $433.00 99 1173 Multi-Family Residential Fire Sprinkler Permit & Inspection 101+ Heads
Fee to issue a permit and perform inspections on a multi-family sprinkler system, 101+ heads. Development Services Fire Prevention Fees $676.00 $802.30 0% $802.00 $126.00 100 1174 Multi-Family Residential Fire Sprinkler System Modification
Fee to issue a permit and perform inspections on a multi-family sprinkler system modification Development Services Fire Prevention Fees $230.00 $802.30 0% $802.00 $572.00 101 1180 Private Underground Fire Line- inspection per
appliance Fire District inspection for Private Underground Fire Lines. Inspection per appliance. Development Services Fire Prevention Fees $137.00 $184.37 0% $184.00 $47.00 102 1181 Commercial/Industrial Fire Sprinkler System Permit & Inspection, 21-100 Heads
Fee to issue permit and perform inspections on a new commercial/industrial fire sprinkler. 21-100 heads. Development Services Fire Prevention Fees $265.00 $570.27 0% $570.00 $305.00 103 1182 Commercial/Industrial Fire Sprinkler System Permit & Inspection, 101-200 Heads
Fee to issue permit and perform inspections on a new commercial/industrial fire sprinkler. 101-200 heads. Development Services Fire Prevention Fees $335.00 $570.27 0% $570.00 $235.00 104 1183 Commercial/Industrial Fire Sprinkler System Permit & Inspection, 201-350 Heads
Fee to issue permit and perform inspections on a new commercial/industrial fire sprinkler. 201-350 heads. Development Services Fire Prevention Fees $531.00 $570.27 0% $570.00 $39.00 105 1184 Comm/Indus- NFPA Fire Sprinkler- Each additional riser (in a multiple riser building)
Fire District Plan review and permit for new commercial/industrial fire sprinkler system in a multiple riser building - fee is per riser Development Services Fire Prevention Fees $376.00 $377.51 0% $377.00 $1.00 106 1185 Fire Pump Plan Check Fee to perform a plan review for fire pump. Development Services Fire Prevention Fees $341.00 $377.51 0% $377.00 $36.00 107 1186 Fire Pump Permit & Inspection Fee to issue a permit and perform an inspection on a fire pump. Development Services Fire Prevention Fees $486.00 $555.02 0% $555.00 $69.00 108 1187 Commercial/Industrial Fire Sprinkler Modifications 1-5 heads
Fee to issue permits & perform inspections on a modification to a commercial/industrial fire sprinkler system, 1-5 heads. Development Services Fire Prevention Fees $69.00 $539.77 0% $539.00 $470.00 109 1188 Commercial/Industrial Fire Sprinkler Modifications 6- 19 heads
Fee to issue permits & perform inspections on a modification to a commercial/industrial fire sprinkler system, 6-19 heads. Development Services Fire Prevention Fees $92.00 $539.77 0% $539.00 $447.00 110 1189 Commercial/Industrial Fire Sprinkler Modifications 20- 50 heads
Fee to issue permits & perform inspections on a modification to a commercial/industrial fire sprinkler system, 20-50 heads. Development Services Fire Prevention Fees $214.00 $539.77 0% $539.00 $325.00 111 1190 Commercial/Industrial Fire Sprinkler Modifications 50- 100 heads
Fee to issue permits & perform inspections on a modification to a commercial/industrial fire sprinkler system, 50-100 heads. Development Services Fire Prevention Fees $322.00 $539.77 0% $539.00 $217.00 112 1191 In-Rack Sprinkler Systems, Plan Review Fire District plan review for in-rack sprinkler systems. Fee is per riser. Development Services Fire Prevention Fees $422.00 $377.51 0% $377.00 -$45.00 113 1192 In-Rack Sprinkler Systems, inspection 1 - 10 sprinkler heads
Fire District permit inspection for in-rack sprinkler systems. 1 - 10 fire sprinkler heads.
Fee is per riser. Development Services Fire Prevention Fees $407.00 $539.77 0% $539.00 $132.00 114 1193 In-Rack Sprinkler Systems, inspection 11 - 20 sprinkler heads
Fire District permit inspection for in-rack sprinkler systems. 11 - 20 fire sprinkler heads.
Fee is per riser. Development Services Fire Prevention Fees $547.00 $539.77 0% $539.00 -$8.00 115 1194 In-Rack Sprinkler Systems, inspection 21 - 30 sprinkler heads
Fire District permit inspection for in-rack sprinkler systems. 21 - 30 fire sprinkler heads.
Fee is per riser. Development Services Fire Prevention Fees $654.00 $539.77 0% $539.00 -$115.00 116 1195 In-Rack Sprinkler Systems, inspection 31 + sprinkler heads
Fire District permit inspection for in-rack sprinkler systems. 31 + fire sprinkler heads. Fee is per riser. Development Services Fire Prevention Fees $763.00 $539.77 0% $539.00 -$224.00 117 1201 Fire Alarm- New System Plan Review, water flow monitoring
Fire District plan review of water flow monitoring Fire Alarm- New Systems. Fee is per system. Development Services Fire Prevention Fees $350.00 $377.51 0% $377.00 $27.00 118 1202 Fire Alarm, New System, Permit & Inspection 1-10 devices Fee to issue a permit and perform inspection for a new fire alarm system, 1-10 devices Development Services Fire Prevention Fees $287.00 $470.46 0% $470.00 $183.00 119 1203 Fire Alarm, New System, Permit & Inspection 11-50 devices Fee to issue a permit and perform inspection for a new fire alarm system, 11-50 devices Development Services Fire Prevention Fees $403.00 $678.38 0% $678.00 $275.00 120 1204 Fire Alarm, New System, Permit & Inspection 51-100 devices
Fee to issue a permit and perform inspection for a new fire alarm system, 51-100 devices Development Services Fire Prevention Fees $557.00 $1,094.23 0% $1,094.00 $537.00 121 1205 Fire Alarm, New System, Permit & Inspection, Each Add'l 10 devices
Fee to issue a permit and perform inspection for a new fire alarm system, each additional 10 devices Development Services Fire Prevention Fees $57.00 $277.23 0% $277.00 $220.00 122 1206 Fire Alarm- New System, plan review, manual &
automatic
Fire District plan review of fire alarms- new systems. Manual & Automatic. Fee is per system. Development Services Fire Prevention Fees $569.00 $519.55 0% $519.00 -$50.00 123 1211 Fire Alarm- Modifications, Plan Review Fire District plan review for fire alarm modifications Development Services Fire Prevention Fees $233.00 $654.74 0% $654.00 $421.00 124 1212 Fire Alarm Modifications, Permit & Inspection, 1-10 devices.
Fee to issue permit and perform inspections on fire alarm system modifications, 1-10 devices. Development Services Fire Prevention Fees $321.00 $401.15 0% $401.00 $80.00 49 Fire District
Item
No. ID # Title Description Type Category
Current
Fee/Charge Unit Full Cost Subsidy % Suggested Fee Fee Δ 125 1213 Fire Alarm Modifications, Permit & Inspection, ea add'l device over 10
Fee to issue permit and perform inspections on fire alarm system modifications, per each add'l device over 10. If already on site, longer if not. Development Services Fire Prevention Fees $52.00 $262.53 0% $262.00 $210.00 126 1216 Pre Engineered Fire Extinguisher System, Kitchen Hood, Permit and Inspection Fee to issue a permit and perform inspections on a hood & duct extinguishing system. Development Services Fire Prevention Fees $220.00 $401.15 0% $401.00 $181.00 127 1217 Fixed Extinguishing Systems- Special System Fire District plan review and permit inspection for fixed extinguishing systems. Special Extinguishing system. Fee is per system. Development Services Fire Prevention Fees $737.00 $685.24 0% $685.00 -$52.00 128 1218 High-Piled Combustible Storage, Plan Review Fee for Fire District to perform a plan check on high-piled combustible storage. Development Services Fire Prevention Fees $483.00 $519.55 0% $519.00 $36.00 129 1219 High-Piled Combustible Storage, 1 to 10,000 sq. ft. Fire District permit inspection for high-piled combustible storage. 1 - 10,000 sq. ft. Development Services Fire Prevention Fees $480.00 $322.99 0% $322.00 -$158.00 130 1220 High-Piled Combustible Storage, 10,001 to 50,000 sq. ft. Fire District permit inspection for high-piled combustible storage. 10,001 - 50,000 sq. ft. Development Services Fire Prevention Fees $580.00 $392.30 0% $392.00 -$188.00 131 1221 High-Piled Combustible Storage, 50,001 to 100,000 sq. ft.
Fire District permit inspection for high-piled combustible storage. 50,001 - 100,000 sq. ft. Development Services Fire Prevention Fees $682.00 $461.60 0% $461.00 -$221.00 132 1222 High-Piled Combustible Storage, 100,001 + sq. ft. Fire District permit inspection for high-piled combustible storage. Each add'l 10,000 sq. ft. over 100,001 q. ft. Development Services Fire Prevention Fees $426.00 $45.75 2% $45.00 -$381.00 133 1223 Technical Report Review Fee for Fire District to perform review of a Technical Analysis and Report. Development Services Fire Prevention Fees $492.00 $630.32 0% $630.00 $138.00 134 1897 Single Family Residential, Permit & Inspection For the Fire District Staff to issue a permit & perform an inspection on a single family residence, one unit. Development Services Building Construction Fees $189.00 $331.84 0% $331.00 $142.00 135 1898 Construction Plan Check Deposit, Tenant Improvement Fire District Staff to perform plan check on a tenant improvement project. Does not include the permit or inspection fees for these types of projects. Development Services Building Construction Fees $180.00 $213.07 0% $213.00 $33.00 136 1927 Alcohol & Drug Counseling Facility To perform an inspection on a alcohol & drug counseling facility. Other Services Fees State & County Regulated Occupancy Inspections $195.00 $238.43 0% $238.00 $43.00
137 1928 Commercial/Industrial Fire Sprinkler System Permit & Inspection, 350+ Heads
Fee to issue a permit and perform inspections on a new commercial/industrial fire sprinkler, 351+ heads. Development Services Fire Prevention Fees $702.00 $401.15 0% $401.00 -$301.00 138 1929 Commercial/Industrial Fire Sprinkler System Plan Check To perform a plan check on a new commercial/industrial fire sprinkler system. Development Services Fire Prevention Fees $389.00 $377.51 0% $377.00 -$12.00 139 1930 Commercial/Industrial Fire Sprinkler Plan Check, 1-20 Heads
Fee to issue a permit and perform inspections on a new commercial/industrial fire sprinkler, 1-20 heads. Development Services Fire Prevention Fees $195.00 $331.84 0% $331.00 $136.00 140 1931 Commercial/Industrial Fire Sprinkler Modification Plan Check Fee to plan check a modification to a commercial/industrial fire sprinkler system. Development Services Fire Prevention Fees $191.00 $377.51 0% $377.00 $186.00 141 1932 Commercial/Industrial Fire Sprinkler Modification 101- 350 Heads
Fee to issue a permit and perform inspections for a fire sprinkler modification, 101-350 heads. Development Services Fire Prevention Fees $423.00 $401.15 0% $401.00 -$22.00 142 1933
Commercial/Industrial Fire Sprinkler Modification 350+
Heads
Fee to issue a permit and perform inspections for a fire sprinkler modification, 350+ heads. Development Services Fire Prevention Fees $549.00 $470.46 0% $470.00 -$79.00 143 1934 Cutting and Welding Annual permit for cutting and welding Annual Permit Fees High Hazard Permits $335.00 $306.82 0% $306.00 -$29.00 144 1935
Fire Alarm- Modifications, Fire Alarm Panel Upgrade,
Cellular/Radio Communication Upgrades, with Permit
& Inspection
Fee to issue permit and perform inspections on fire alarm panel upgrade Development Services Fire Prevention Fees $222.00 $401.15 0% $401.00 $179.00 145 1936 HPM Facilities Annual permit fee for HPM Facilities Annual Permit Fees High Hazard Permits $335.00 $306.82 0% $306.00 -$29.00 146 1937 Miscellaneous Construction Inspection Fee to perform an inspection on a miscellaneous construction project. Development Services Building Construction Fees $174.00 $307.74 0% $307.00 $133.00 147 1938 Multi-Family Residential Fire Sprinkler Plan Check Fee to perform a multi-family residential fire sprinkler plan check. Development Services Fire Prevention Fees $341.00 $377.51 0% $377.00 $36.00 148 1939 Pre-Engineered Fire Extinguishing System Modification Fee to issue a permit and inspections on a hood and duct extinguishing system modification. Development Services Fire Prevention Fees $203.00 $685.24 0% $685.00 $482.00 149 1940 Pre-Engineered Fire Extinguishing System Plan Check Fee to perform a plan check of a pre-engineered fire extinguishing system. Development Services Fire Prevention Fees $254.00 $377.51 0% $377.00 $123.00 150 1941 Private Underground Fire Line Plan Check Fee to perform a plan check on a private underground fire line. Development Services Fire Prevention Fees $423.00 $448.53 0% $448.00 $25.00 151 1942 Production Facility Annual permit for production facility Annual Permit Fees Medium Hazard Permits $291.00 $306.82 0% $306.00 $15.00 152 1943 Pyroxylin Plastics Annual permit fee for pyroxylin plastics Annual Permit Fees Medium Hazard Permits $291.00 $306.82 0% $306.00 $15.00 153 1944 Roof Top Heliports Annual permit fee for roof top heliports Annual Permit Fees Medium Hazard Permits $291.00 $306.82 0% $306.00 $15.00 154 1945 Single Family Residential Fire Sprinkler Plan Check Fee to perform plan check on a single family dwelling sprinkler system. Development Services Fire Prevention Fees $249.00 $142.05 0% $142.00 -$107.00 155 1946 Special Event Application Fee for application and review process of a special event. Other Service Fees Special Event $123.00 $235.46 0% $235.00 $112.00 156 1947 Special Event Permit & Inspection Fee to issue a permit and perform an inspection of a special event. Per Hour Rate for Officer - Fire Marshal Other Service Fees Special Event Fees $172.00 $370.65 0% $370.00 $198.00 157 1948 Special Event Stand-By After Hours Fee to perform a standby-by inspection for a special event before or after business hours. Per Hour Rate for Officer - Fire Marshal Other Service Fees Special Events $155.00 $138.62 0% $138.00 -$17.00 158 1949 Special Event Stand-By per Hour Fee to perform a standby-by inspection for a special event- per hour. Per Hour Rate for Officer - Fire Marshal Other Service Fees Special Events $108.00 $138.62 0% $138.00 $30.00 159 1950 State/County Regulated Occupancy- Other Inspections (per hour)
Inspection of other state/county regulated occupancy inspections (per hour). Per Hour Rate for Officer - Fire Marshal Other Service Fees State & County Regulated Occupancy Inspections $100.00 $138.62 0% $138.00 $38.00
160 1951 Storage of Scrap Tires & Tire by Products Annual permit fee for storage of scrap tires and tire by products Annual Permit Fees Medium Hazard Permits $291.00 $306.82 0% $306.00 $15.00 161 1952 Tire Rebuilding Plants Annual permit for tire rebuilding plants Annual Permit Fees Medium Hazard Permits $291.00 $306.82 0% $306.00 $15.00 162 1967 Pallet Racks Fee for Fire District to perform inspections on pallet racks. Per Hour Rate for Officer - Fire Marshal Development Services Building Construction Fees $120.00 $307.74 0% $307.00 $187.00 163 1968 Photovoltaic Systems Fee for Fire District to perform inspections on photovoltaic systems. Per Hour Rate for Officer - Fire Marshal/ COMMERCIAL ONLY Development Services Building Construction Fees $220.00 $378.76 0% $378.00 $158.00 164 1969 Site Plan (public schools) Fee for Fire District to perform a plan check on a site plan for a public school. Development Services Fire Prevention Fees $285.00 $528.23 0% $528.00 $243.00 165 1970 Tank Systems Plan Check Fee for Fire District to perform a plan check on an Above Ground Tank (AST) or tank system. Development Services Fire Prevention Fees $375.00 $306.48 0% $306.00 -$69.00 166 1998 Commercial/Industrial Tenant Improvements, 1 to 5,000 sq. ft.
Fire District permit and inspection of commercial/industrial tenant improvements. 1 - 5,000 sq. ft. building construction permit Development Services Building Construction Fees $189.00 $401.15 0% $401.00 $212.00 50 Fire District
Item
No. ID # Title Description Type Category
Current
Fee/Charge Unit Full Cost Subsidy % Suggested Fee Fee Δ 167 2064 Inspection Cancellation Fee Fee for failure to notify Fire Department of cancellation within 24 hours of scheduled inspection. Other Service Fee Administrative $100.00 $138.62 0% $138.00 $38.00 168 ADDITIVE MANUFACTURING New annual operating permit, High Hazard ANNUAL PERMIT FEE High Hazard Permits New $376.13 0% $376.00 NA 169 EXHIBITS and TRADE SHOWS Special Event Permit Low Hazard Permits New $376.13 0% $376.00 NA 170 CARNIVAL and FAIRS Special Event Permit Medium Hazard Permits New $376.13 0% $376.00 NA 171 MOBILE of HYDROGEN FUELED VEHICLES Annual Operating Permit, High Hazard ANNUAL PERMIT FEE High Hazard Permits New $376.13 0% $376.00 NA 172 REPAIR GARAGES AND MOTOR FUEL DISPENSING
FACILITIES Annual Operating Permit, Medium Hazard ANNUAL PERMIT FEE Medium Hazard Permits New $376.13 0% $376.00 NA 173 TEMPORARY MEMBRANE STRUCTURES Special Event Permit Medium Hazard Permits New $376.13 0% $376.00 NA 174 OUTDOOR ASSEMBLY EVENT Special Event Permit Medium Hazard Permits New $376.13 0% $376.00 NA 175 Annual Operating Permit, Low Hazard ANNUAL PERMIT FEE Low Hazard Permits New $376.13 0% $376.00 NA 176 Open Flames and TORCHES Annual Operating Permit, High Hazard ANNUAL PERMIT FEE High Hazard Permits New $376.13 0% $376.00 NA 177 PYROTECHNIC SPECIAL EFFECTS MATERIAL Annual Operating Permit, High Hazard ANNUAL PERMIT FEE High Hazard Permits New $376.13 0% $376.00 NA 178 HPM FACILITIES Annual Operating Permit, High Hazard ANNUAL PERMIT FEE High Hazard Permits New $376.13 0% $376.00 NA 179 AMUSEMENT BUILDINGS New annual operating permit, Medium Hazard ANNUAL PERMIT FEE Medium Hazard Permits New $376.13 0% $376.00 NA 180 Apartment Annual Inspections New $376.13 0% $376.00 NA 181 Mobile Home Parks New $306.82 0% $306.00 NA
182 AB 38 Inspections, HFSZ and VHFSZ, Escrow
Requirement New $377.04 0% $377.00 NA
183 Beverage Co2 Monitoring Systems Plan Review Fee for Plan Review and Inspections New $376.13 0% $376.00 NA 184 Hotel and Motel Annual Inspections New $306.82 0% $306.00 NA 185 State Mandated School Inspections/ Public and Private New $306.82 0% $306.00 NA 186 I Occupancy Inspections, Acute Nursing, Kaiser
Hospital; which is a High Rise as well These occupancies are required to be inspected by the AHJ New $376.13 0% $376.00 NA 187 R2.1 and R4 Annual Inspections, Currently have Pre
Inspection Fees but not Annual Inspections These occupancies are required to be inspected by the AHJ New $376.13 0% $376.00 NA 188 Temporary Fire Water Line Inspections Rough&Hydro, Flush, Final- Currently, only plan review with NO INSPECTION FEES, per APPLIANCE RECOMMENDED, similar to Fire Underground Waterline New $306.82 0% $306.00 NA 189
Pre Inspection Fee for Large Day Care (8 to 14
children), R3.1, 6 or less client care and only time they can be charged because requirement for annuals,
roughly $289.00 in County
New $306.82 0% $306.00 NA
190 Additional Inspection Fee - During Business Hours New per hour $150.82 1% $150.00 NA 191 Additional Inspection Fee - After Business Hours New per hour (2
hr
minimum)
$301.63 0% $301.00 NA
51 Community Services
Item No. ID # Title Description Type Category Current Fee/Charge Unit Full Cost Subsidy % Suggested Fee Fee Δ 1 33 Group Size 1 to 50 Customers/2 hours Fee for group size 1 to 50 customers/2 hours. Fee is only applicable to the following aquatic facilities:
Miller, Don Day and Heritage, Martin Tutor Splash Park. Rental Aquatics $226.00 NA NA $226.00 $0.00 2 34 Group Size 51 to 100 Customers/2 hours
Fee for group size 51 to 100 customers/2 hours. Fee is only applicable to the following aquatic facilities:
Miller, Don Day, Heritage, Martin Tutor Splash Park. Rental Aquatics $310.00 NA NA $310.00 $0.00 3 35 Group Size 101 to 200 Customers/2 hours Fee for group size 101 to 200 customers/2 hours. Fee is only applicable to the following aquatic facilities: Miller, Don Day, Heritage, Martin Tutor Splash Park. Rental Aquatics $396.00 NA NA $396.00 $0.00 4 317 Amphitheater Rental Fee for hourly rental of the Seville Park Amphitheater for private events by individuals and/or organizations. Rental Amphitheater $27.00 NA NA $27.00 $0.00 5 325 Fontana Days Run - 5k Run - Individual Registration Fee This fee is to offset the cost incurred for the annual Fontana Days 5k Run. This was last revised in 2019. Events Half Marathon $55.00 NA NA $55.00 $0.00 6 327 Half Marathon/5K Late Registration Registration after the deadline for the Half Marathon/5K participants for the Fontana Days Run. Events Half Marathon $22.00 NA NA $22.00 $0.00 7 328 Children's Dash Registration Fee for children to participate in the Children's Dash Event at the Fontana Days Run. Events Half Marathon $15.00 NA NA $15.00 $0.00 8 335 Athletic Field Rental Without Lights- Private Youth Groups Hourly fee for athletic field rentals for private or for-profit youth groups. Sports Athletic Field $22.00 NA NA $22.00 $0.00 9 337 Athletic Field Usage Without Lights- Adults Hourly rate for adult use of an athletic field without lights. Sports Athletic Field $32.00 NA NA $32.00 $0.00 10 338 Athletic Field Usage With Lights- Adult Hourly rate for adult use of an athletic field with lights. Sports Athletic Field $50.00 NA NA $50.00 $0.00 11 349 Adult Volleyball Team fee to participate in adult volleyball program. Sports Adult $282.00 Team NA NA $282.00 $0.00 12 350 Adult Sports- Team Basketball Team fee for adult basketball program for one season which includes, but is not limited to, awards, staffing & equipment costs. Sports Adult $339.00 Team NA NA $339.00 $0.00 13 352 Men's, Women's or Co-Ed Slo-Pitch Softball Team fee to participate in adult softball program. Sports Adult $396.00 Team NA NA $396.00 $0.00 14 505 Family Fitness Walk Registration Participation fee for the Family Fitness Walk at the Fontana Days Run. Events Half Marathon $38.00 person NA NA $38.00 $0.00 15 510 Annual Membership Fee Annual senior (55+) membership fee to utilize amenities at the senior centers and Miller Fitness Center.
Memberships are valid 365 days from date of purchase.
Senior
Programs Membership $20.00 year NA NA $20.00 $0.00
16 511 Nutrition Program- Senior Senior Center Nutrition Program- Individual meal for Senior 55+ and/or disabled. Senior Programs Nutrition $4.00 person NA NA $4.00 $0.00
17 518 Swim Lessons Registration Fee is one session of swim lessons equivalent to five hours of instruction per participant. Aquatics Swim Lessons $55.00 NA NA $55.00 $0.00 18 519 Youth Recreational Swim for Neighborhood Pools Recreational swim admission fee for participants ages 2-17. Fee is for one session only & only applies to Neighborhood Pools: Miller, Don Day, Heritage. Aquatics Drop-In $3.00 NA NA $3.00 $0.00 19 520 Adult Open Swim Fee Admission fee for age 18 & over. Fee is only applicable at the following pools: Miller, Don Day, Heritage. Aquatics Drop-In $5.00 person NA NA $5.00 $0.00 20 521 Tiny Tot Program Registration Daily participant fee for Tiny Tot Programs at various locations. Registration requirement is minimum of two days per week. Tiny Tots Registration $12.00 NA NA $12.00 $0.00 21 523 Key Deposit Fee Fee for the issue of a safety deposit key(s) issued to user groups or customers utilizing City of Fontana Athletic Fields or Facilities. Security Miscellaneous $55.00 NA NA $55.00 $0.00 22 531 FASP Daily Registration Fee General Fund Sites Daily registration fee per participant of the Fontana After School Program sites that are not grant funded. FELP Registration $8.00 NA NA $8.00 $0.00
23 533 Transportation Program- One Way Trip Fee for one way trip transportation service for senior individuals over the age of 55 and disabled person 18 and older residing within the Fontana City limits.
Senior
Programs Transportation $2.00 person NA NA $2.00 $0.00
24 568 Refund Requests Fee to offset costs involved in refunding program fees prior to the start of the program. Administrativ e Miscellaneous $10.00 NA NA $10.00 $0.00
25 571 Youth Late Pick Up Fee This fee is to cover costs associated with parents arriving late to pick -up their participant at any City Program; $1.00 per minute fee, after first five minutes.
Administratio
n Miscellaneous $1.00 per participant
/per minute NA NA $1.00 $0.00
26 577 Drop-In Program/Activity Admission fee for one time program or activity at a Community Center, Neighborhood Center or Park. (ex. Arts & Crafts, Special Events, Etc.) Miscellaneous Drop-In $3.00 NA NA $3.00 $0.00 27 579 Center Dances/ Events Admission fee for drop in community center activities such as dances, special programs and special events. Events Drop-In $6.00 NA NA $6.00 $0.00
28 580 Trips and Excursions Fee for trips and excursions. Trips & Excursions Miscellaneous Cost + G & A Rate NA NA Cost + G & A Rate $0.00
29 581 Semi Private Swim Lesson Registration Fee for 5 hours of semi private swim lessons. Classes will consist of no more than 3 students per instructor. Aquatics Swim Lessons $83.00 NA NA $83.00 $0.00 30 596 Security Guard Fees Fee per hour associated with providing security guards during rental use of City facilities. Rental Security Guard Cost + G&A per hour NA NA Cost + G&A $0.00 31 618 Class 1-City of Fontana Sponsored Activities Fee for hourly rental of large rooms at the Neighborhood Centers for Class 1 usage (City sponsored activities). Rental Large Room No Charge NA NA No Charge $0.00 32 619 Class 2- Fontana non-profit - Large Room - Hourly Rate Fee for hourly rental of large rooms at the Neighborhood Centers for Class 2 usage (Fontana non-profit groups & other gov't agencies). Rental Large Room $55.00 NA NA $55.00 $0.00 33 620 Class 3- Fontana Residents - Large Room Fee for hourly rental of the large rooms at the Cypress and Don Day Neighborhood Centers for Class 3 usage (Residents). Rental Banquet Room $78.00 NA NA $78.00 $0.00 34 621 Class 4- Commercial or non-resident - Large Room Fee for hourly rental of the large rooms at the Cypress and Don Day Neighborhood Centers for Class 4 usage (Commercial & non-resident). Rental Banquet Room $118.00 NA NA $118.00 $0.00 35 624 Class 1-City of Fontana Sponsored Activities Fee for hourly rental of small rooms at the Neighborhood Centers for Class 1 usage (City sponsored activities). Rental Small Room No Charge NA NA No Charge #VALUE! 36 625 Class 2- Fontana non-profit - Small Room Fee for hourly rental of small rooms at the Neighborhood Centers for Class 2 usage (Fontana non-profit groups & other gov't agencies). Rental Small Room $27.00 per hour NA NA $27.00 $0.00 37 626 Class 3- Fontana Residents - Small Room Fee for hourly rental of small rooms at the Neighborhood Centers for Class 3 usage (Fontana residents). Rental Small Room $45.00 per hour NA NA $45.00 $0.00 52 Community Services
Item No. ID # Title Description Type Category Current Fee/Charge Unit Full Cost Subsidy % Suggested Fee Fee Δ 38 627 Class 4- Commercial or non-resident - Small Room Fee for hourly rental of the small rooms at the Neighborhood Centers for Class 4 usage (Commercial & non-resident). Rental Small Room $67.00 per hour NA NA $67.00 $0.00 39 628 Class 3- Fontana Residents - Small Room Fee for daily rental of small rooms at the Neighborhood Centers for Class 3 usage (Fontana residents). Rental Small Room $254.00 per day NA NA $254.00 $0.00 40 629 Class 4- Commercial or non-resident - Small Room Fee for daily rental of the small rooms at the Neighborhood Centers for Class 4 usage (Commercial & non- resident). Rental Small Room $396.00 per day NA NA $396.00 $0.00 41 656 Community Pools: Season Pass- Per Person Fee for season pass per person valid at the following aquatic facilities: Heritage Pool, Miller Pool, Don Day Pool & the Martin Tudor Splash Park. Aquatics Memberships $55.00 per person NA NA $55.00 $0.00 42 657 Community Pools: Season Pass- Family of Four Fee for season pass for family of 4 valid at the following aquatic facilities: Heritage Pool, Miller Pool, Don Day Pool & the Martin Tudor Splash Park. Aquatics Memberships $181.00 per family of 4 NA NA $181.00 $0.00 43 658 Community Pools: Season Pass- Additional Family Member Fee for season pass for additional family member valid at the following aquatic facilities: Heritage Pool, Miller Pool, Don Day Pool and the Martin Tudor Splash Park. Aquatics Memberships $45.00 per additional
family member
over 4
NA NA $45.00 $0.00
44 664 Forfeit Fee Adult sports forfeit deposit fee for all adult sports teams to ensure payment is available for game officials should a team not show up for regular scheduled league play. This fee is fully refundable Sports Adult $63.00 per team NA NA $63.00 $0.00 45 719 Mobile Recreation Rental Hourly Fee for providing Mobile Recreation programs to community organizations, businesses, and private parties (2 hour minimum). Rental Mobile
Recreation $140.00 NA NA $140.00 $0.00
46 723 Annual Pass - Transportation Program Fee for an annual pass for senior individuals over the age of 55 and disabled adults over the age of 18 residing within Fontana City limits.
Senior
Programs Transportation $36.00 NA NA $36.00 $0.00
47 742 Lifeguard Training Class Fee for Lifeguard Training Class participants. Upon completion of course participants will be certified in Lifeguarding, First Aid and CPR/AED for Lifeguards. Aquatics Training $203.00 NA NA $203.00 $0.00 48 744 Reservation Fee- Fontana Resident Fee to offset costs incurred in offering shelter rentals to Fontana residents at various parks. Shelter includes a full day rental per shelter. Rental Park Shelters $55.00 per shelter rental NA NA $55.00 $0.00 49 745 Reservation Fee- Non-Resident Fee to offset costs incurred in offering shelter rentals to non-residents at various parks. Rental Park Shelters $113.00 per shelter rental NA NA $113.00 $0.00 50 748 Miller Fitness Room and One (1) Hour Racquetball Fee for both a unlimited daily use of the fitness room and the use of the racquetball facility for one (1) hour Fitness Center Miscellaneous $5.00 per participant NA NA $5.00 $0.00 51 752 FASP Late Payment Fee (Non-Funded Site) Fee for registering for the program past the due date. After School Registration $10.00 NA NA $10.00 $0.00 52 769 Air Bouncer Permit Fee
This is recommended to offset the cost incurred by the City to offer special activity permits that allow air bouncers in parks and that bouncer companies hold all proper insurance coverage Air Bouncer Miscellaneous $27.00 NA NA $27.00 $0.00 53 770 Admin. Transfer Fee This fee is being recommended to offset the cost incurred by the City to make Recware registration transfers to class participants enrolled in recreation classes.
Administrativ
e Miscellaneous $5.00 NA NA $5.00 $0.00
54 774 Non-Resident Registration Fee for offering programs to non-residents. Administrativ e Non-Resident $12.00 NA NA $12.00 $0.00
55 785 Teen-Youth Membership Fee Annual membership fee for the Jack Builik Teen Center. Jack Bulik Teen Center Membership $5.00 NA NA $5.00 $0.00
56 786 FPAC- Senior- Monthly Pass Senior Monthly Swim Pass: Fee allows seniors (55+) to participate in any drop-in program at the Fontana Park Aquatic Center. Including water aerobics, lap swim/ water walking & recreational swim. Aquatics Seniors $27.00 NA NA $27.00 $0.00 57 790 Nutrition Program - Meal- Non Senior or Non-Resident Senior Center Nutrition Program - Individual Meal for Non-Senior 54 years and younger or Non-Resident of any age.
Senior
Programs Nutrition $6.00 person NA NA $6.00 $0.00
58 826 Program T-Shirt Fee Fee to provide event/program t-shirts at city-wide events/programs Administrativ e Miscellaneous Cost + G&A Rate NA NA Cost + G&A
Rate $0.00
59 855 Fontana Park Aquatic Center- Swim Team Lane Fee 1 hour lane rental fee for Swim Team's full use to conduct swim practice and conditioning. Includes 1 lane in a designated area of the competition pool during specified hours. Rental Aquatics $22.00 NA NA $22.00 $0.00 60 856 Employee Wellness Program Employee Wellness Program at City of Fontana Fitness Center. The annual fee is per employee. The fee will cover use of the fitness room, racquetball courts and basketball courts on an unlimited basis.
Employee
Wellness Miscellaneous $55.00 NA NA $55.00 $0.00
61 857 Educational Assembly at Nature Center A one hour long educational assembly for students or adults held at the Nature Center or of site when requested. (Group fee for 50-100 students). Nature Center Educational Assembly $140.00 NA NA $140.00 $0.00
62 859 Jessie Turner Fitness Center- Monthly Membership- Family of 4
Monthly fee for unlimited use for a family (immediate family members residing in the same household) up to 4, to use the fitness equipment and lockers at the Jessie Turner Health & Fitness Center.
Jessie Turner
Community
Center
Fitness
Membership $55.00 per family of 4
per month NA NA $55.00 $0.00
63 860 Fitness Center Monthly Membership- Single Participant Monthly unlimited use fee per person to use the fitness equipment and lockers at the City Fitness Centers. Ages 16 years & older. Fitness Center Membership $27.00 per person NA NA $27.00 $0.00 64 861 Jessie Turner Fitness Room - Daily Rate Daily rate fee per person to use the fitness equipment and lockers at the Jessie Turner Health & Fitness Center Fitness Center Miscellaneous $5.00 per person/hour NA NA $5.00 $0.00 65 862 Jessie Turner Fitness Center - Daily Rate - Senior Senior daily rate fee per person to use the fitness equipment and lockers at the Jessie Turner Health & Fitness Center Fitness Center Seniors $3.00 per senior/day NA NA $3.00 $0.00 66 863 Fitness Center - Monthly Rate - Senior Monthly fee per senior to use the fitness equipment and lockers at the Jessie Turner Health & Miller Fitness Center. Fitness Center Membership $15.00 NA NA $15.00 $0.00 67 867 Gym- Adult Daily Session Fee Fee for participants to use the Fontana Park Gymnasium during not City sponsored events or activities.
Open play sessions Monday-Sunday during center hours. Gymnasium Drop-In $3.00 NA NA $3.00 $0.00 68 868 Kid Watch Program A per hour fee for supervised youth recreational activities offered by an Neighborhood, specialty and Community Center while their parents are enrolled in a program. Miscellaneous Miscellaneous $5.00 NA NA $5.00 $0.00 69 871 Promotional Items Fee to offset and recover the cost for promotional items within the Community Services Depart. Which includes but not limited to cookbooks, pins, mugs, t-shirts, stickers, pads.
Administrativ
e Miscellaneous Cost + G&A Rate NA NA Cost + G&A
Rate $0.00
53 Community Services
Item No. ID # Title Description Type Category Current Fee/Charge Unit Full Cost Subsidy % Suggested Fee Fee Δ 70 872 Regional Event Vendor Fee for Vendor Participation in Regional events which have an estimated attendance greater than 5,000 people. Events are held at various locations throughout the City of Fontana at various times of the year. Events Vendor $60.00 NA NA $60.00 $0.00 71 873 Scout Badge Program Fee per person per badge required activities to earn various badges. Nature Center Miscellaneous $6.00 NA NA $6.00 $0.00 72 875 Specialty Youth Camp A one-week specialty camp that includes numerous hands-on activities, crafts, games, and one all-day field trip. (Example: Nature Center Camp) Camp Youth $113.00 NA NA $113.00 $0.00 73 876 Gym- Teen Daily Session Fee
Fee for participants to use the Fontana Park Gymnasium during Non-City sponsored events or activities.
Open play sessions Monday-Sunday during center hours. Fee is for participants ages 13-17. Proof of age is required.
Gymnasium Drop-In $1.00 NA NA $1.00 $0.00
74 878 Video Editing Fee - Advanced Per hour fee for advanced video editing. This includes editing of raw event footage, adding motion graphics, motion text, show opening, and music. KFON Staff $95.00 NA NA $95.00 $0.00 75 879 Video Editing Fee - Basic Per hour fee for advanced video editing. This includes editing of raw event footage, adding motion graphics, motion text, show opening, and music. KFON Staff $50.00 NA NA $50.00 $0.00 76 880 Adult Nature Workshop Fee per person for seminars and workshops in geology, botany, nature photography, etc. Nature Center Miscellaneous $6.00 NA NA $6.00 $0.00 77 881 Adult Sports- Team Soccer Team fee for adult soccer program for one season which includes, but is not limited to, awards, staffing & equipment. Sports Adult $339.00 NA NA $339.00 $0.00
78 882 Alcohol Deposit
Deposit for all rentals serving alcoholic beverages. Deposit is refundable to renter if no damage is incurred to the facility and if no additional personnel was needed due to the misuse of the Alcohol Policy. Any damages will be Cost + G&A rate.
Rental Security Deposit $500.00 NA NA $500.00 $0.00
79 883 Audio Visual Support Staff Per hour fee for sound and video support for events or activities. KFON Staff $197.00 NA NA $197.00 $0.00 80 885 Class 1 - Hourly Fee for hourly rental of the Library Auditorium. Class 1 usage - City of Fontana Sponsored Activities Rental Auditorium No Charge NA NA No Charge $0.00 81 887 Class 2 - Hourly Fee for hourly rental of the Library Auditorium. Class 2 usage - Fontana non profit groups and other government agencies. Rental Auditorium $140.00 NA NA $140.00 $0.00 82 889 Class 3 - Hourly
Fee for hourly rental of the Library Auditorium with two staff members onsite for Class 3 usage - Fontana residents. Rental Auditorium $197.00 NA NA $197.00 $0.00 83 891 Class 4 - Hourly Fee for hourly rental of the Library Auditorium. Class 4 usage - Non-residents and businesses. Rental Auditorium $282.00 NA NA $282.00 $0.00 84 892 Birthday Party Package Birthday party of up to three hours with a maximum of 30 children. Nature Center Miscellaneous $181.00 NA NA $181.00 $0.00 85 894 Catering Kitchen Fee - Class 1
Flat fee for kitchen use at Community & Neighborhood Center Banquet Facilities. Must be a licensed caterer who must furnish rental staff with a Fontana Business License. Class 1 usage - City of Fontana organized or sponsored activities.
Rental Catering Kitchen No Charge NA NA No Charge $0.00 86 896 Class 1 - 2/3 Banquet Use
Fee per hour (max 6hrs) for renting two of the three sections of the Community Center banquet room.
Rate is for weekday Monday 8am-Friday 5pm after which weekend rate applies. Class 1 usage - City of Fontana organized and/or sponsored activities.
Rental Banquet Room No Charge NA NA No Charge $0.00
87 897 Class 1 - 1/3 Banquet Use
Fee per hour (max 6hrs) for renting one of the three sections of the Community Center banquet room.
Rate is for weekday Monday 8am-Friday 5pm after which weekend rate applies. Class 1 usage - City of Fontana organized and/or sponsored activities.
Rental Banquet Room No Charge NA NA No Charge $0.00
88 898 Class 1 - Full Banquet Use
Fee per hour (max 6hrs) for renting three of the three sections of the Community Center banquet room.
Rate is for weekday Monday 8am-Friday 5pm after which weekend rate applies. Class 1 usage - City of Fontana organized and/or sponsored activities.
Rental Banquet Room No Charge NA NA No Charge $0.00
89 899 Class 1 - Meeting Room Weekday
Fee for hourly rental of meeting room at a Community Center with a minimum rental of two hours. Rate is for weekday Monday 8am-Friday 5pm after which weekend rate applies. Class 1 usage - City of Fontana organized and/or sponsored activities.
Rental Meeting Room No Charge NA NA No Charge $0.00
90 900 Class 2 - 2/3 Banquet Use
Fee per hour for renting two of the three sections of the Community Center banquet room. Rate is for weekday Monday 8am-Friday 5pm after which weekend rate applies. Class 2 usage - Fontana non-profit groups & other government agencies.
Rental Banquet Room $73.00 NA NA $73.00 $0.00
91 901 Class 2 - 1/3 Banquet Use
Fee per hour for renting one of the three sections of the Community Center banquet room. Rate is for weekday Monday 8am-Friday 5pm after which weekend rate applies. Class 2 usage - Fontana non-profit groups & other government agencies.
Rental Banquet Room $55.00 NA NA $55.00 $0.00
92 903 Class 2 - 2/3 Banquet Use
Fee per hour for renting two of the three sections of the Community Center banquet room. Rate is for weekend Friday 5pm-Sunday 10pm. Class 2 usage - Fontana non-profit groups & other government agencies.
Rental Banquet Room $90.00 NA NA $90.00 $0.00
93 904 Class 2 - Full Banquet Use
Fee per hour for renting three of the three sections of the Community Center banquet room. Rate is for weekday Monday 8am-Friday 5pm after which weekend rate applies. Class 2 usage - Fontana non-profit groups & other government agencies.
Rental Banquet Room $95.00 NA NA $95.00 $0.00
94 905 Class 2 - Full Banquet Use
Fee per hour for renting three of the three sections of the Community Center banquet room. Rate is for weekend Friday 5pm-Sunday 10pm. Class 2 usage - Fontana non-profit groups & other government agencies.
Rental Banquet Room $118.00 NA NA $118.00 $0.00
95 907 Class 2 - Meeting Room Weekday
Fee for hourly rental of meeting room at a Community Center with a minimum rental of two hours. Rate is for weekday Monday 8am-Friday 5pm after which weekend rate applies. Class 2 usage - Fontana non- profit groups & other government agencies.
Rental Meeting Room $45.00 NA NA $45.00 $0.00
96 908 Class 2 - Meeting Room Weekend
Fee for hourly rental of meeting room at a Community Center with a minimum rental of two hours. Rate is for weekend Friday 5p.m-Sunday 10pm. Class 2 usage - Fontana non-profit groups & other government agencies.
Rental Meeting Room $67.00 NA NA $67.00 $0.00
54 Community Services
Item No. ID # Title Description Type Category Current Fee/Charge Unit Full Cost Subsidy % Suggested Fee Fee Δ 97 909 Class 3 - 1/3 Banquet Use Fee per hour for renting three of the three sections of the Community Center banquet room. Rate is for weekday Monday 8am-Friday 5pm after which weekend rate applies. Class 3 usage - Fontana residents. Rental Banquet Room $100.00 NA NA $100.00 $0.00 98 910 Class 3 - 2/3 Banquet Use Fee per hour for renting two of the three sections of the Community Center banquet room. Rate is for weekend Friday 5pm-sunday 10pm. Class 3 usage - Fontana residents. Rental Banquet Room $158.00 NA NA $158.00 $0.00 99 912 Class 3 - 2/3 Banquet Use Fee per hour for renting two of the three sections of the Community Center banquet room. Rate is for weekday Monday 8am-Friday 5pm after which weekend rate applies. Class 3 usage - Fontana residents. Rental Banquet Room $135.00 NA NA $135.00 $0.00 100 913 Class 3 - Full Banquet Use Fee per hour for renting three of the three sections of the Community Center banquet room. Rate is for weekday Monday 8am-Friday 5pm after which weekend rate applies. Class 3 usage - Fontana residents. Rental Banquet Room $168.00 NA NA $168.00 $0.00 101 914 Class 3 - Full Banquet Use Fee per hour for renting two of the three sections of the Community Center banquet room. Rate is for weekend Friday 5pm-Sunday 10pm. Class 3 usage - Fontana residents. Rental Banquet Room $203.00 NA NA $203.00 $0.00 102 916 Class 3 - Meeting Room Weekday
Fee per hour for renting the meeting room at any Community Center. Rate is for weekday Monday 8am- Friday 5pm after which weekend rate applies. Class 3 usage - Fontana residents. Rental Meeting Room $55.00 NA NA $55.00 $0.00 103 917 Class 3 - Meeting Room Weekend Fee per hour for renting the meeting room at any Community Center. Rate is for weekend Friday 5p.m- Sunday 10pm. Class 3 usage - Fontana residents. Rental Meeting Room $78.00 NA NA $78.00 $0.00 104 918 Class 4 - 2/3 Banquet Use Fee per hour for renting two of the three sections of the Community Center banquet room. Rate is for weekend Friday 5pm-sunday 10pm. Class 4 usage - non-residents. Rental Banquet Room $181.00 NA NA $181.00 $0.00 105 919 Class 4 - 1/3 Banquet Use Fee per hour for renting one of the three sections of the Community Center banquet room. Rate is for weekday Monday 8am-friday 5pm after which weekend rate applies. Class 4 usage - Non-residents. Rental Banquet Room $123.00 NA NA $123.00 $0.00 106 921 Class 4 - 2/3 Banquet Use Fee per hour for renting two of the three sections of the Community Center banquet room. Rate is for weekday Monday 8am-friday 5pm after which weekend rate applies. Class 4 usage - Non-residents. Rental Banquet Room $158.00 NA NA $158.00 $0.00 107 923 Class 4 - Full Banquet Use Fee per hour for renting two of the three sections of the Community Center banquet room. Rate is for weekend Friday 5pm-sunday 10pm. Class 4 usage - non-residents. Rental Banquet Room $249.00 NA NA $249.00 $0.00 108 924 Class 4 - Meeting Room Weekday
Fee for hourly rental of meeting room at a Community Center with a minimum rental of two hours. Rate is for weekday Monday 8am-friday 5pm after which weekend rate applies. Class 4 usage - non-residents. Rental Meeting Room $67.00 NA NA $67.00 $0.00 109 925 Class 4 - Meeting Room Weekend Fee for hourly rental of meeting room at a Community Center with a minimum rental of two hours. Rate is for weekend Friday 5p.m-Sunday 10pm. Class 4 usage - non-residents. Rental Meeting Room $90.00 NA NA $90.00 $0.00 110 926 Community Event Vendor Vendor fee for community events which have an estimated attendance of between 2,000 - 5,000 people. Events are held at various locations throughout the City of Fontana at various times of the year. Events Vendor $32.00 NA NA $32.00 $0.00 111 927 Class 4 - Full Banquet Use Fee per hour for full use of the Community Center banquet facility. Rate is for weekday Monday 8am- friday 5pm after which weekend rate applies. Class 4 usage - Non-residents. Rental Banquet Room $214.00 NA NA $214.00 $0.00 112 929 Day Porter - Hourly
This fee is to off set the cost of day porter services rendered during events held at City Facilities, Parks as well as special events held by the City as per City contract.
Administrativ
e Staff Cost + G&A rate NA NA Cost + G&A
rate $0.00
113 930 Facility Cancellation Fee Fee for rental cancellations at least 60 days prior to the rental date after approval of application and a permit is generated. Rental Cancellation $168.00 NA NA $168.00 $0.00 114 931 Facility Deposit- Library Auditorium
Fee for deposit for all rentals in the Library Auditorium. Deposit is refundable to the renter if no damage is done to the facility and all fees are paid in full. Any damage to be billed at Cost +G&A rate. Rental Security Deposit $500.00 NA NA $500.00 $0.00 115 932 Facility Deposit - Rental Fees exceeding $500.00 Fee for rentals at Neighborhood Centers with a rental fee exceeding $500.00. Deposit is refundable to the renter if no damage is done to the facility and all fees are paid in full. Any damage to be billed at Cost + G&A rate.
Rental Security Deposit $500.00 NA NA $500.00 $0.00
116 933 Facility Deposit - Rental Fees less than $500.00 Fee for rentals at Neighborhood Centers with a rental fee less than $500.00. Deposit is refundable to the renter if no damage is done to the facility and all fees are paid in full. Any damage to be billed at Cost +G&A rate.
Rental Security Deposit $350.00 NA NA $350.00 $0.00
117 934 Facility Deposit - Small Meeting Room Fee for all rentals in small meeting rooms, deposit is refundable to the renter if no damage is done to the facility and all fees are paid in full. Any damage to be billed at Cost +G&A rate. Rental Security Deposit $150.00 NA NA $150.00 $0.00 118 935 School Field Trip Program Fee per person for school or non-profit organizations trips to the nature Center or staff to school. Nature Center Miscellaneous $6.00 NA NA $6.00 $0.00 119 937 Aquatic Event Fees Hourly rate (min 2 hrs) for full use of the Fontana Park Aquatic Center. Fee includes use of pool equipment; lane lines, timing systems, diving blocks, goal cages. Set up and clean up time not included. Rental Aquatics $226.00 NA NA $226.00 $0.00 120 938 FPAC Full Admission- ages 18+ Fee for all day use for persons 18 and over to utilize the waterslides and pools at the Fontana Park Aquatic Center. Aquatics Drop-In $7.00 NA NA $7.00 $0.00 121 939 FPAC Full Admission - ages 17 or less Fee for all day use for persons 17 or less to utilize the waterslides and pools at the Fontana Park Aquatic Center. Aquatics Drop-In $5.00 NA NA $5.00 $0.00
122 940 Rental - Group Size 0-99 for 1 hours 1 hour pool rental fee for full use of the Fontana Park Aquatic Center. Group not to exceed 99 individuals. Rental Aquatics $339.00 NA NA $339.00 $0.00 123 941 Rental - Group Size 100-199 for 1 hours 1 hour pool rental fee for full use of the Fontana Park Aquatic Center. Group not to exceed 199 individuals. Rental Aquatics $453.00 NA NA $453.00 $0.00 55 Community Services
Item No. ID # Title Description Type Category Current Fee/Charge Unit Full Cost Subsidy % Suggested Fee Fee Δ 124 942 Rental - Group Size 200-299 for 1 hours 1 hour pool rental fee for full use of the Fontana Park Aquatic Center. Group not to exceed 299 individuals. Rental Aquatics $566.00 NA NA $566.00 $0.00 125 944 Daily Drop-in Lap Swim/ Water Walking
Fee for one drop in daily session of lap swim during regular programming hours. The program is intended for participants ages 16-54 for the sole purpose of self-guided lap swimming and/or water walking.
Aquatics Adult $5.00 NA NA $5.00 $0.00
126 946 Junior Lifeguard Program- Monthly
Fee includes employment development in the Junior Lifeguard Program at any pool location within the City of Fontana. Fee is all inclusive for all physical and classroom activities, required manuals, t-shirt, and one field trip.
Aquatics Youth $168.00 participant NA NA $168.00 $0.00
127 948 Satellite Gallery Artist Showing Fee for artist to exhibit their art work at a City Satellite gallery (6-10 pieces) at Steelworkers' Auditorium or Senior Center for a short period of time (no more than 8 weeks). Art Miscellaneous $60.00 NA NA $60.00 $0.00 128 950 Sports Arena Daily Session Fee Daily fee to use the Fontana Park or Jack Bulik Sports Arena. Admission is free to persons less than 18 years old. Sports Arena Drop-In $3.00 per person NA NA $3.00 $0.00 129 951 Volunteer Lunch Free lunch for volunteers who work at the Senior Center for at least two hours in a single day. Limit one lunch per day. Volunteer Miscellaneous Free NA NA Free $0.00 130 952 Water Safety Instructor Course Fee for qualified patrons to participate in the ARC, Water Safety course. Upon successful completion of the 35 hour course participants will be trained Water Safety Instructors Aquatics Training $254.00 participant NA NA $254.00 $0.00 131 953 Water Polo Team - Monthly Dues Tiger Sharks focuses on teaching endurance, strength and the fundamental skills of playing water polo.
Participants will gain experience and knowledge necessary to compete. Aquatics Membership $67.00 NA NA $67.00 $0.00 132 954 Fountains, Pavilions, Courtyards & Stairways Fee for the hourly use/rental of fountains, pavilions, courtyards & stairways for private events. Fee does not include any equipment, insurance, permits, police services or cleanup. Rental Events $45.00 hour NA NA $45.00 $0.00 133 966 Activity Tournament Team Fee Fee for table / video game tournament play for participating groups of 1 to 5 for each activity throughout Fontana. Facilities Tournament $5.00 NA NA $5.00 $0.00 134 967 Adult Hockey Team Fee Team fee to participate in the Adult Hockey Program Sports Adult $396.00 NA NA $396.00 $0.00 135 969 Aquatics Under 2 Years Old Fee for participants under the age of 2 in to Recreational Swimming at any City pool with an adult paid admission, at no cost. Aquatics Drop-In Free NA NA Free $0.00 136 970 Aquatics Pavilion Table Reservation Fee includes use of one (1) picnic table during one (1) session of recreational swim. Date, time and location of table must be pre-determined. Rental Aquatics $15.00 NA NA $15.00 $0.00 137 972 Class 3- Banquet Room Rental-Hourly Rate Fee for hourly rental of the Banquet room at the Heritage Neighborhood Center for Class 3 usage- Fontana residents. Rental Banquet Room $123.00 NA NA $123.00 $0.00 138 973 Class 4- Banquet Room Rental-Hourly Rate Fee for hourly rental of the banquet room at the Heritage Neighborhood Centers for Class 4 usage (Commercial or Non-resident rental). Rental Banquet Room $152.00 NA NA $152.00 $0.00 139 974 Community Center Class 2- 1/3 banquet use weekday setup/ clean-up
Fee per hour for renting one of three sections of the Community Center banquet room for set-up and clean up hours only. Rate is for weekday Monday 8am-Friday 5pm after which weekend rate applies.
Class 2 usage.
Rental Banquet Room $27.00 NA NA $27.00 $0.00
140 975 Community Center Class 2- 2/3 banquet use weekday setup/ clean-up
Fee per hour for renting two of three sections of the Community Center banquet room for set-up and clean up hours only. Rate is for weekday Monday 8am-Friday 5pm after which weekend rate applies.
Class 2 usage.
Rental Banquet Room $45.00 NA NA $45.00 $0.00
141 976
Community Center Class 2- 2/3 banquet use weekend setup/ clean-up
clean-up
Fee per hour for renting two of three sections of the Community Center banquet room for set-up and clean up hours only. Rate is for weekend Friday 5pm- Sunday 10pm. Class 2 usage-Fontana non-profit groups & other government agencies.
Rental Banquet Room $55.00 NA NA $55.00 $0.00
142 977 Community Center Class 2- Full banquet use weekday setup/ clean-up
Fee per hour for renting three of three sections of the Community Center banquet room for set-up and clean up hours only. Rate is for weekday Monday 8am-Friday 5pm after which weekend rate applies.
Class 2 usage.
Rental Banquet Room $50.00 NA NA $50.00 $0.00
143 978 Community Center Class 2- Full banquet use weekend setup/ clean-up
Fee per hour for renting three of three sections of the Community Center banquet room for set-up and clean up hours only. Rate is for weekend Friday 5pm- Sunday 10pm. Class 2 usage-Fontana non-profit groups & other government agencies.
Rental Banquet Room $67.00 NA NA $67.00 $0.00
144 979 Community Center Class 2- Hourly fee for Gymnasium for Sporting Events
Fee per hour for renting the indoor gymnasium at the Community Center for sporting events. Minimum 4 hour rental required. Class 2 usage-local non-profit groups. Rental Gymnasium $197.00 NA NA $197.00 $0.00 145 980 Community & Neighborhood Centers Class 2,3,4 - Kitchen Rental Rate Flat rate for rental of the kitchens at the Neighborhood and Community Centers for Class 2,3,4 usage. Rental Kitchen $83.00 NA NA $83.00 $0.00 146 981 Community Center Class 3- 1/3 banquet use weekday setup/ clean-up
Fee per hour for renting one of three sections of the Community Center banquet room for set-up and clean up hours only. Rate is for weekday Monday 8am- Friday 5pm after which weekend rate applies.
Class 3 usage-Fontana residents.
Rental Banquet Room $60.00 NA NA $60.00 $0.00
147 982 Community Center Class 3-2/3 banquet use weekday setup/ clean-up
Fee per hour for renting two of three sections of the Community Center banquet room for set-up and clean up hours only. Rate is for weekday Monday 8am-Friday 5pm after which weekend rate applies.
Class 3 usage- Fontana residents
Rental Banquet Room $73.00 NA NA $73.00 $0.00
148 983 Community Center Class 3- 2/3 banquet use weekend setup/ clean-up
Fee per hour for renting two of three sections of the Community Center banquet room for set-up and clean up hours only. Rate is for weekend Friday 5pm- Sunday 10pm. Class 3 usage-Fontana residents Rental Banquet Room $90.00 NA NA $90.00 $0.00 149 984 Community Center Class 3- Full banquet use weekday setup/ clean-up
Fee per hour for renting three of three sections of the Community Center banquet room for set-up and clean up hours only. Rate is for weekday Monday 8am-Friday 5pm after which weekend rate applies.
Class 3 usage-Fontana residents.
Rental Banquet Room $90.00 NA NA $90.00 $0.00
150 985 Community Center Class 3-Full banquet use weekend setup/ clean-up
Fee per hour for renting three of three sections of the Community Center banquet room for set-up and clean up hours only. Rate is for weekend Friday 5pm- Sunday 10pm. Class 3 usage-Fontana residents Rental Banquet Room $90.00 NA NA $90.00 $0.00 56 Community Services
Item No. ID # Title Description Type Category Current Fee/Charge Unit Full Cost Subsidy % Suggested Fee Fee Δ 151 986 Community Center Class 3- Hourly fee for Gymnasium for sporting events.
Fee per hour for renting the indoor gymnasium at the Community Center for sporting events. Minimum 4 hour rental required. Class 3 usage-Fontana residents. Rental Gymnasium $226.00 NA NA $226.00 $0.00 152 987 Community Center Class 4-1/3 banquet use weekday setup/ clean-up
Fee per hour for renting one of three sections of the Community Center banquet room for set-up and clean up hours only. Rate is for weekday Monday 8am-Friday 5pm after which weekend rate applies.
Class 4 usage-Non-residents.
Rental Banquet Room $73.00 NA NA $73.00 $0.00
153 988 Community Center Class 4-2/3 banquet use weekday setup/ clean-up
Fee per hour for renting two of three sections of the Community Center banquet room for set-up and clean up hours only. Rate is for weekday Monday 8am- Friday 5pm after which weekend rate applies.
Class 4 usage-Non-residents.
Rental Banquet Room $90.00 NA NA $90.00 $0.00
154 989 Community Center Class 4-2/3 banquet use weekend setup/ clean-up
Fee per hour for renting two of three sections of the Community Center banquet room for set-up and clean up hours only. Rate is for weekend Friday 5pm- Sunday 10pm. Class 4 usage-Non-residents Rental Banquet Room $100.00 NA NA $100.00 $0.00 155 990 Community Center Class 4-Full banquet use weekday setup/ clean-up
Fee per hour for renting three of three sections of the Community Center banquet room for set-up and clean up hours only. Rate is for weekday Monday 8am-Friday 5pm after which weekend rate applies.
Class 4 usage-Non-residents.
Rental Banquet Room $100.00 NA NA $100.00 $0.00
156 991 Community Center Class 4- Full banquet use weekend setup/ clean-up
Fee per hour for renting three of three sections of the Community Center banquet room for set-up and clean up hours only. Rate is for weekend Friday 5pm- Sunday 10pm. Class 4 usage-Non-residents Rental Banquet Room $113.00 NA NA $113.00 $0.00 157 992 Community Center Class 4- Hourly fee for Gymnasium for Sporting Events.
Fee per hour for renting the indoor gymnasium at the Community Center for sporting events. Minimum 4 hour rental required. Class 4 usage non-Fontana residents. Rental Gymnasium $282.00 NA NA $282.00 $0.00 158 993 Community Center-Gym Deposit Trust deposit for renting the indoor gymnasium at the Community Centers. Rental Security Deposit $367.00 NA NA $367.00 $0.00 159 995 Drop-In Water Polo Daily Rate Drop-in daily rate for water polo at the Fontana Park Aquatic Center. Aquatics Drop-In $2.50 NA NA $2.50 $0.00 160 996 Fontana Park Aquatic Center Group Rates
Fee is intended for Fontana non-profit organizations with groups of 30 or more. Fee includes admission to the Fontana Park Aquatic Center recreational swim sessions as scheduled. Cost includes one (1) chaperone for every ten (10) children ages 7+.
Aquatics Group $4.00 NA NA $4.00 $0.00
161 997 Fontana Park Aquatic Center Monthly Swim Pass Fee allows participants to attend drop-in lap swim, water walking, water polo or recreational swim for a period of an entire calendar month at the Fontana Park Aquatic Center. Aquatics Membership $55.00 NA NA $55.00 $0.00 162 998 Fontana Days Run - Team - Individual 5k Registration Fee Fee for each individual member of team. This was last revised in 2019. Events Half Marathon $50.00 NA NA $50.00 $0.00 163 999 Multi-Use Sport Pavilion Hourly fee for use of the Sports Pavilion at Jack Bulik or Fontana Parks with lights to conduct organized sanctioned sports programming that includes games, scrimmages, bouts and practices. Rental Sports Pavilion $15.00 NA NA $15.00 $0.00 164 1000 Neighborhood Event Vendor Fee for Neighborhood events which have an estimated attendance of up to 2,000 people. Events will be held at various locations throughout the City of Fontana at various times of the year. Events Vendor $15.00 NA NA $15.00 $0.00 165 1001 Refreshments Fee to recover the cost for food and beverage items. Includes but is not limited to juice, coffee, pastries and pre packaged foods.
Administrativ
e Miscellaneous Cost + G & A NA NA Cost + G & A $0.00
166 1002 Replacement of Equipment and/or Supplies
Fee to recover the cost for replacement equipment and/or supplies. Equipment & supplies includes but is not limited to pool/billiards equipment, darts, cards, games and books.
Administrativ
e Miscellaneous Cost + G & A NA NA Cost + G & A $0.00
167 1007 Youth Workshop Fee per child to participate in structured educational and/or recreational activity. Miscellaneous Miscellaneous $5.00 NA NA $5.00 $0.00 168 1227 Adult Softball Tournament Team Fee Team fee to participate in an adult softball tournament. The fee includes but is not limited to regulation softball, "Chicago Softball" (Big Ball) and one-pitch tournaments Sports Tournament $168.00 NA NA $168.00 $0.00 169 1229 Aquatics Cabana Reservation Fee includes the use of 1 (one) cabana at the Aquatic Center or Heritage Pool during 1 (one) session of recreational swim. Date, time and location of cabana must be pre-determined. Rental Aquatics $113.00 NA NA $113.00 $0.00 170 1230 Athletic Field Usage with Lights- Private Youth Groups Hourly fee for athletic field rentals with lights for private or for-profit youth groups. Sports Athletic Fields $45.00 NA NA $45.00 $0.00 171 1231 Special Event/Dances- Senior/Disabled Fee for seniors age 55+ and/or disabled 18+ to participate at special events or dances Events Drop-In $4.00 NA NA $4.00 $0.00 172 1232 Community Garden Plot 12x32 (SMALL) Annual fee to offset the costs incurred by the City to provide community garden plots. Garden plots are located behind the Cypress and Josephine Knopf Centers. Rental Garden Plot $32.00 NA NA $32.00 $0.00 173 1233 Community Garden Plot 18x32 (MEDIUM) Annual fee to offset the costs incurred by the City to provide community garden plots. Garden plots are located behind the Cypress and Josephine Knopf Centers. Rental Garden Plot $45.00 NA NA $45.00 $0.00 174 1234 Community Garden Plot 24x32 (LARGE) Annual fee to offset the costs incurred by the City to provide community garden plots. Garden plots are located behind the Cypress and Josephine Knopf Centers. Rental Garden Plot $55.00 NA NA $55.00 $0.00 175 1236 Lifeguards Re-Certification Challenge Fee for student to take a skill and written exam to prove competency. No material swill be provided.
Open to anyone. Course will also include tests for CPR for Lifeguarding and or Title 22 components. Aquatics Training $113.00 NA NA $113.00 $0.00 176 1237 Masters Swim Team Registration Registration fee for monthly participation in the City of Fontana Master's Swim Team for participants ages 18+. Fee includes monthly pool use for practices and swim meets as scheduled. Aquatics Adult $55.00 NA NA $55.00 $0.00 177 1240 Pee Wee Sports- Program Fee for participation in a Pee Wee Sports Program including, but not limited to, soccer, t-ball, basketball and hockey. Sports Pee Wee $55.00 NA NA $55.00 $0.00
178 1241 Private Lesson Registration Fee Fee for 5 hours of private lessons. Class will consist of 1 student per instructor. Aquatics Swim Lessons $140.00 NA NA $140.00 $0.00 179 1242 Recreation Day Camp Program Daily participation fee for day camp programs at various City facilities and park locations. Youth Camp $22.00 NA NA $22.00 $0.00 180 1244 Security Deposit for Aquatic Rentals Trust deposit for renting an Aquatic Facility. Fontana Park Aquatic Center, Miller Pool, Don Day Pool, Heritage Pool and Martin Tudor Splash Park. Rental Security Deposit $150.00 NA NA $150.00 $0.00 181 1246 Senior Drop-In Swim Free Admission fee for ages 55+ at all aquatic facilities. Fee can be used for all drop in programs: aqua aerobics, lap swim, water walking, and recreational swim. Aquatics Drop-In $2.00 NA NA $2.00 $0.00 182 1248 Tennis Court Rental Hourly rate for rental of tennis courts. Intended for tennis use only. 2 hour maximum. Rental Tennis Court $5.00 NA NA $5.00 $0.00 183 1249 Training Certificate Replacement Fee for the replacement of one Red Cross Class Certification Aquatics Training $10.00 NA NA $10.00 $0.00 184 1250 Water Polo Team Tournament Team fee to offset the cost incurred in providing programming components for a water polo tournament. Aquatics Tournament $168.00 NA NA $168.00 $0.00 57 Community Services
Item No. ID # Title Description Type Category Current Fee/Charge Unit Full Cost Subsidy % Suggested Fee Fee Δ 185 1251 Youth and Teen Sports- Participant Fee for participation in one season of a scheduled Youth and Teen sport program. Fee applies to, but is not limited to, soccer, flag football, basketball, track & field and hockey. Sports Youth $78.00 NA NA $78.00 $0.00 186 1915 Artificial Turf Usage Hourly fee for the use of an artificial turf field. Fee is to be used in conjunction with hourly field usage fee appropriate for the user/renter. Sports Athletic Field $15.00 NA NA $15.00 $0.00 187 1916 Center Dances/Events- Reduced Rate Reduced admission fee for drop in Community/ Neighborhood Center activities such as dances, special programs & special events for underprivileged youth.
Community/N
eighborhood
Center
Drop-In $4.00 NA NA $4.00 $0.00
188 1917 Healthy Jr. Chef Cooking Class Cooking class with hands on experience for youth 8 to 14 years of age. Healthy Fontana Cooking $5.00 NA NA $5.00 $0.00
189 1918 KFON Studio Rental Hourly fee for studio use. A minimum of Four hours must be reserved. No special equipment, facility use only. KFON Rental $282.00 NA NA $282.00 $0.00
190 1919 Registration Processing Registration processing fee per transaction for programs & classes. Administrativ e Miscellaneous $3.00 NA NA $3.00 $0.00
191 1920 Special Events Application Processing fee to file a special event application. Fee is to be paid regardless of the application being approved or denied. Events Application $27.00 NA NA $27.00 $0.00 192 1954 Before School Program Before school youth program daily registration fee per participant, per day. Hours average 2.5 hours before school per site.
Before School
Program Registration $5.00 NA NA $5.00 $0.00
193 1955 Athletic Field Rental - RYNP Hourly Field Fee Hourly resident youth non-profit (RYNP) organization fee to use City of Fontana Athletic Fields for practices/game purposes. Hourly flat rate for use per field, per hour. Sports Athletic Field $1.50 NA NA $1.50 $0.00 194 1956 Class 2- Block Rate Fee for a Fontana non-profit group or government agency to rent the Steelworkers' Auditorium for a consecutive block of time (up to 6 hours). Rental Auditorium $764.00 NA NA $764.00 $0.00 195 1957 Class 3- Block Rate Fee for a Fontana resident to rent the Steelworkers' Auditorium a consecutive block of time (up to 6 hours). Rental Auditorium $1,071.00 NA NA $1,071.00 $0.00 196 1958 Class 4 - Block Rate Fee for a non-resident, commercial sponsored event, business, organization, association, union, or individual for profit to rent the Steelworkers' Auditorium for a consecutive block of time (up to 6 hours). Rental Auditorium $1,530.00 NA NA $1,530.00 $0.00 197 1959 Equipment Use Vendor This fee covers the cost for a vendor to utilize: an Ez-Up; 1 table and 2 chairs. Events City Events $15.00 NA NA $15.00 $0.00 198 1960 Annual Membership- Senior Annual fee per senior (aged 55 and over) to use the fitness equipment and lockers at the Jessie Turner Health & Miller Fitness Center. Fitness Center Miscellaneous $96.00 NA NA $96.00 $0.00 199 1961 Fontana Days Run - Half Marathon - Individual Registration Fee This fee is to offset the cost incurred for the annual Fontana Days Half Marathon Run. Events Half Marathon $67.00 NA NA $67.00 $0.00 200 1962 Fontana Days Run - Team - Individual Half Registration Fee Fee for each individual member of Half Marathon team. Events Half Marathon $60.00 NA NA $60.00 $0.00 201 1964 Martin Tutor Splash Park- Full Admission- Adult Full admission fee to the Martin Tudor Splash Park (MTSP) for participants ages 18-54. Fee applies to one (1) session of programming. Aquatics Drop-In $5.00 NA NA $5.00 $0.00 202 1965 Martin Tutor Splash Park- Full Admission- Child Full admission fee to the Martin Tudor Splash Park (MTSP) for participants ages 2-17. Fee applies to one (1) session of programming. Aquatics Drop-In $3.00 NA NA $3.00 $0.00 203 1966 Miller Fitness Center - Drop-In - Senior Drop-in rate for seniors (55+) for fitness session at the Miller Fitness Center to include fitness room and racquetball court. Fitness Center Drop-In $3.00 NA NA $3.00 $0.00 204 1988 4th of July Admission Fee Fee per participant for the 4th of July Event. Events Registration $7.00 NA NA $7.00 $0.00 205 1989 Aquatics Special Event Admission Admission fee for any Fontana Park Aquatic Center special event including dances and special programs (i.e. Aqua Prom, Doggy Dip, etc.). Admission includes use of facility contingent upon event layout. Aquatics Participant $10.00 NA NA $10.00 $0.00 206 1991 Auditorium Dark Day
Fee for daily rental to reserve auditorium during a non-rehearsal or non-performance day when equipment or props are left on site for a scheduled production and can not be used by another party.
Must have current rental agreement.
Rental Auditorium $339.00 NA NA $339.00 $0.00
207 1992 Extended Program- Hourly
Hourly rate for Supervised Youth Recreational Activities offered by any Neighborhood Community Center, or youth program, as a supplemental fee for participants wanting additional care outside scheduled program hours.
Administrativ
e Miscellaneous $5.00 NA NA $5.00 $0.00
208 1993 Gym- Replacement Wristband
Fee for replacement wristband at Fontana Park Basketball Gymnasium. Fee will be utilized when a participant's wristband is no longer securely fastened to the participant’s wrist. Fee applies to participants 13+ who previously paid daily drop-in fee.
Gymnasium Drop-In $1.00 NA NA $1.00 $0.00
209 1994 Masters Swim Meet- Team Registration Fee for an adult (18+) to compete in a Masters Swim Meet hosted by the City of Fontana. Fee used to offset the expense incurred when hosting a Meet.
Aquatic
Center Adult $27.00 NA NA $27.00 $0.00
210 1995 Miller Fitness Center Summer Monthly Membership Monthly membership fee per person to use the Miller Fitness Center’s amenities and blends access to the aquatic fitness programming. Membership only valid during Miller Pool’s operating months. Fitness Center Memberships $45.00 NA NA $45.00 $0.00 211 1996 Sports Late Registration Fee for registering for sports programs past the registration deadline. Fee offsets administrative impact of late additions and roster add-ons. Sports Youth $10.00 NA NA $10.00 $0.00 212 1997 Tot Play Registration Daily participation fee for Tot Play at both Community & Neighborhood Centers. Registration requirement is minimum two days per week. Tot Play Registration $8.00 NA NA $8.00 $0.00 213 1999 After Hours Specialty Program
Fee for activity or program at any Community Center, Neighborhood Center, or Park after normal programming hours for a duration of no less than eight (8) hours and not to exceed fourteen (14) hours (i.e. overnight camp, teen basketball lcok0in, etc.).
Community
Services Youth $55.00 per participant NA NA $55.00 $0.00 214 2013 Community Theatre Performance Admission One admission ticket to a City of Fontana community theatre production Arts Miscellaneous $15.00 NA NA $15.00 $0.00 215 2014 Contractor Restroom Building Service Fee to cover contractor costs scheduled to service one women's and one men restroom building per park during a sports related event or reservation that has more than 100 in projected attendance Sports Pavilion $55.00 NA NA $55.00 $0.00 58 Community Services
Item No. ID # Title Description Type Category Current Fee/Charge Unit Full Cost Subsidy % Suggested Fee Fee Δ 216 2015 Lifeguard Training with Title 22 Fee is for Lifeguard Training course with Title 22 component. Upon successful completion of the course, participants will receive Lifeguarding, CPR for Lifeguards, AED and First Aid (Title 22) Aquatics Training $282.00 NA NA $282.00 $0.00 217 2016 Miller Fitness Center Monthly Membership - Single Participant
Monthly unlimited use fee per participant aged 16 and older to use fitness equipment and racquetball courts specific to Miller Center only. Fitness Center Membership $15.00 NA NA $15.00 $0.00 218 2018 Teen Summer Camp Weekly camp fee that includes organized activities, swimming, transportation, and excursions for youth ages 11-15 Camp Youth $135.00 NA NA $135.00 $0.00
219 2019 Sports Pavilion - Private Event Rental
Hourly fee for use of a sports pavilion for a private rental/event that is not an organized sanctioned sport programming related game, bout, scrimmage or practice. Minimum 4 hour rental required Rental Sports Pavilion $197.00 NA NA $197.00 $0.00 220 2020 WSI Staff Rate Fee is for current or returning aquatic staff to receive training as American Red Cross Water Safety Instructor Aquatics Training $113.00 NA NA $113.00 $0.00 221 2023 Art Workshop Fee for one person to participate in a City of Fontana art workshop Arts Miscellaneous Cost + G & A NA NA Cost + G & A $0.00 222 2024 Fitness Center Annual Membership Annual unlimited use fee per person to use the fitness equipment and lockers at the Jessie Turner Fitness Center. Ages 16 years and older. Fitness Center Membership $254.00 NA NA $254.00 $0.00 223 2025 Idle Room Use Weekday - Class 2
Fee per hour to rent the banquet room for the time between event set-up and event start time. Rate Is for weekday Monday 8:00AM to Friday 5:00PM after which weekend rate applies. Class 2 usage - Fontana Non-Profit
Rental Banquet Room $22.00 NA NA $22.00 $0.00
224 2026 Idle Room Use Weekday - Class 3
Fee per hour to rent the banquet room for the time between event set-up and event start time. Rate Is for weekday Monday 8:00AM to Friday 5:00PM after which weekend rate applies. Class 2 usage - Residents
Rental Banquet Room $38.00 NA NA $38.00 $0.00
225 2027 Idle Room Use Weekday - Class 4
Fee per hour to rent the banquet room for the time between event set-up and event start time. Rate Is for weekday Monday 8:00AM to Friday 5:00PM after which weekend rate applies. Class 2 usage - Non- Residents
Rental Banquet Room $55.00 NA NA $55.00 $0.00
226 2028 Idle Room Use Weekend - Class 2 Fee per hour to rent the banquet room for the time between event set-up and event start time. Rate Is for weekday Friday 5:00PM to Sunday 10:00PM. Class 2 usage - Fontana Non-Profit Rental Banquet Room $38.00 NA NA $38.00 $0.00 227 2029 Idle Room Use Weekend - Class 3 Fee per hour to rent the banquet room for the time between event set-up and event start time. Rate Is for weekday Friday 5:00PM to Sunday 10:00PM. Class 2 usage - Fontana Residents Rental Banquet Room $55.00 NA NA $55.00 $0.00 228 2030 Idle Room Use Weekend - Class 4 Fee per hour to rent the banquet room for the time between event set-up and event start time. Rate Is for weekday Friday 5:00PM to Sunday 10:00PM. Class 2 usage - Non-Resident Rental Banquet Room $73.00 NA NA $73.00 $0.00 229 2031 Amphitheater Class 1 - Hourly Fee for hourly rental of the Miller Park Amphitheater by class 1 renter - City of Fontana Sponsored Activity Rental Rental Free NA NA Free $0.00
230 2032 Amphitheater Class 2 - Hourly
Fee for hourly rental of Miller Park Amphitheater by class 2 renter, City of Fontana Non-Profit groups and other government agencies; includes two part time staff, two security guards, and restroom cleaning fee.
Performing
Arts Rental $197.00 NA NA $197.00 $0.00
231 2033 Amphitheater Class 3 - Hourly Fee for hourly rental of Miller Park Amphitheater by class 3 renter, City of Fontana Residents; includes two part time staff, two security guards, and restroom cleaning fee.
Performing
Arts Rental $226.00 NA NA $226.00 $0.00
232 2034 Amphitheater Class 4 - Hourly
Fee for hourly rental of Miller Park Amphitheater by class 4 renter, non-resident, commercial sponsored event, business; includes two part time staff, two security guards, and restroom cleaning.
Performing
Arts Rental $396.00 NA NA $396.00 $0.00
233 2054 Youth Community Theater Participation Fee Youth Community Theater participation fee per child cast in youth community play (for ages 18 and under).
Performing
Arts Miscellaneous $17.00 NA NA $17.00 $0.00
234 2055 Community CPR, First Aid & AED Fee for students to take an instructor lead CPR, First Aid & AED class. Fee includes certification Aquatics Training $90.00 NA NA $90.00 $0.00 235 2056 Junior Lifeguard Community Pool Program - Monthly Fee includes youth development in the Junior Lifeguard Program at any community pool location n the City of Fontana. Fee includes all physical and classroom activities, required materials, t-shirts and field trips
Aquatics Youth $140.00 NA NA $140.00 $0.00
236 2057 DVD Duplication Cost for DVD and staff time for burning a DVD copy of an event that was covered by KFON KFON Staff $10.00 NA NA $10.00 $0.00 237 2058 Youth Community Theatre Playbill Message Personal message to a cast member in playbill for Community Theatre program; maximum of 40 characters per message Arts Miscellaneous $6.00 NA NA $6.00 $0.00 238 2059 Non-Resident Registration Fee for offering programs to non-residents with a resident address outside of Fontana Administrativ e Non-Resident $15.00 NA NA $15.00 $0.00
239 2074 Art Canvas Additional Charge Art Depot program activity, Workshop or Imagination Studio. Arts Miscellaneous $5.00 NA NA $5.00 $0.00 240 2075 Art Depot Gallery Artist Showing Fee for artist to exhibit their artwork at the Art Depot Gallery (10-20 art pieces) for a short period of time (no more than 4 weeks) as space is available. Arts Miscellaneous $67.00 NA NA $67.00 $0.00 241 2076 Art Party Package Additional Participant Fee for each additional participant that exceeds the Art Party Package of 12 participants at the Art Depot Gallery. Arts Miscellaneous $12.00 NA NA $12.00 $0.00 242 2077 Art Party Package Fee for a two hour art party package led by staff that includes a 1.5 hour art activity lesson(s) for up to 12 participants at the Art Depot Gallery. Arts Miscellaneous $208.00 NA NA $208.00 $0.00 243 2079 Small Group Rate Imagination Studio Program Activity Fee is per person with a group rate of seven people or more for a one time Imagination Studio art activity for one hour. Arts Miscellaneous $5.00 NA NA $5.00 $0.00 244 2080 Imagination Studio Drop-In Program Activity Fee for a one time Imagination Studio art activity for one hour led by the Art Depot Gallery staff per participant. Arts Miscellaneous $6.00 NA NA $6.00 $0.00 245 2081 Bridge to Lifeguard Offset cost for current Junior Lifeguards to become trained as Lifeguards. Aquatics Training $83.00 NA NA $83.00 $0.00 246 2082 Lifeguard Instructor Fee is for qualified patrons to participate in the ARC Lifeguard Instructor course. Upon successful completion of the 35 hour course, participants will be trained Lifeguard Instructors. Aquatics Training $339.00 NA NA $339.00 $0.00 59 Community Services
Item No. ID # Title Description Type Category Current Fee/Charge Unit Full Cost Subsidy % Suggested Fee Fee Δ 247 2083 Lifeguard Instructor/Trainer Review
Fee for current Lifeguard Instructors/ Trainers to take a skill and written exam to prove competency. No materials will be provided. This course may also include challenge test for basic level certifications.
Aquatics Training $146.00 NA NA $146.00 $0.00
248 2084 Aquatics Non-Resident Rental Fee Fee would be used for non-residents renting any pool. Sites include: Fontana Park Aquatic Center, Martin Tudor Splash Park, Miller, Don Day, Heritage Pools. Aquatics Rentals $55.00 NA NA $55.00 $0.00 249 2085 Pajama Paint Night Program Fee per person (Youth ages 3-17) to participate in a structured art and recreation workshop lasting up to two hours. Arts Miscellaneous $7.00 NA NA $7.00 $0.00
250 2086 Uniform/Jersey Replacement Fee for uniform replacement per item (shirt, jersey, shorts, etc.). Sports Uniform Replacement $10.00 NA NA $10.00 $0.00
251 2087 Snorkeling Class Fee for one (1) participant to get six (6) hours of snorkeling lessons. Aquatics Swim Lesson $27.00 NA NA $27.00 $0.00 252 2090 Horseshoe Pit - Non Profit Use Hourly fee of horseshoe pit rental for non-profit group use. Rental Horseshoe Pit $10.00 NA NA $10.00 $0.00 253 2091 Horseshoe Pit - Private Use Hourly fee of horseshoe pit rental for private use group. Rental Horseshoe Pit $15.00 NA NA $15.00 $0.00 254 2092 Large Group Rate Imagination Studio Program Activity Fee is per person with a group rate for seventy-five (75) people or more for a one time Imagination Studio art activity for one hour (group may be hosted in multiple sessions). Arts Miscellaneous $3.00 NA NA $3.00 $0.00 255 2093 Lifeguard Instructor/Instructor Trainer Review Fee for current Lifeguard Instructors/Instructor Trainers to take a skill and written exam to prove competency. Not materials will be provided. This course may also include challenge test for basic level certifications.
Aquatics Training $146.00 NA NA $146.00 $0.00
256 2094 Splashball Camp Registration fee for a one week (Mon-Thu) of Splashball Camp for youth ages 6-12 Aquatics Class $55.00 NA NA $55.00 $0.00 257 2095 Splashball Water Polo - Bimonthly Dues Registration fee for a two weeks of Splashball Class for children ages 5-10 years old Aquatics Class $55.00 NA NA $55.00 $0.00 258 2097 Tier 1 - RNYP Field Rental Rental Rate for Resident Youth Non-Profit Activities Sports Athletic Fields $1.00 Per Hour/Per Field NA NA $1.00 $0.00
259 2098 Tier 2 - RYL Field Rental Rental Rate for Resident Youth League activities Sports Athletic Fields $10.00 Per Hour/Per Field NA NA $10.00 $0.00
260 2098 Tier 2 - RYL Field Rental Rental Rate for Resident Youth League activities Sports Athletic Fields $22.00 Per Hour/Per Field with lights NA NA $22.00 $0.00
261 2098 Tier 2 - RYL Field Rental Rental Rate for Resident Youth League activities Sports Athletic Fields $7.50 Per Hour/Per Field Turf Fee NA NA $7.50 $0.00
262 2099 Tier 3 - RYSO Field Rental Rental rate for Resident Youth Sports Organization Sports Athletic Fields $15.00 Per Hour/Per Field NA NA $15.00 $0.00
263 2099 Tier 3 - RYSO Field Rental Rental rate for Resident Youth Sports Organization Sports Athletic Fields $32.00 Per Hour/Per Field with lights NA NA $32.00 $0.00
264 2099 Tier 3 - RYSO Field Rental Rental rate for Resident Youth Sports Organization Sports Athletic Fields $10.00 Per Hour/Per Field Turf Fee NA NA $10.00 $0.00
265 2100 Tier 4 - YSO Field Rental Hourly fee for Youth Sports Organizations rental for athletic field rentals Sports Athletic Fields $22.00 without lights NA NA $22.00 $0.00 266 2100 Tier 4 - YSO Field Rental Hourly fee for Youth Sports Organizations rental for athletic field rentals Sports Athletic Fields $44.00 without lights NA NA $44.00 $0.00 267 2100 Tier 4 - YSO Field Rental Hourly fee for Youth Sports Organizations rental for athletic field rentals Sports Athletic Fields $15.00 Artificial turf facility usage NA NA $15.00 $0.00
60 Environmental
Item
No. ID # Title Description Type Category Current Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 1 410 Wastewater Discharge Class I Permit Industrial/Commercial Fee for Wastewater Discharge Class I Permit Industrial/Commercial. Permit Waste Water $19.00/EDU Indust(30
EDU Cap) $5.15/EDU
Commercial
NA NA
$19.00/EDU Indust(30
EDU Cap) $5.15/EDU
Commercial
$0.00
2 412 Laboratory Analysis of Wastewater Sample Fee for Laboratory Analysis of Wastewater Sample. Permit Waste Water Cost of State Certified
Laboratory plus City
Overhead
$5.15/EDU
Commercial+City
Overhead
NA NA
Cost of State Certified
Laboratory plus City
Overhead
$5.15/EDU
Commercial+City
Overhead
$0.00
3 413 Pretreatment- Non-Compliance Meeting
Fee to offset the cost of conducting a meeting between the operator and City representative for the purpose of correcting the operator's non-compliance with permit requirements and/or violations of the Fontana Municipal Code.
Permit Waste Water $339.00 per meeting $676.37 0% $676.00 $337.00 4 2041 Electric Vehicle Charging Fee Fee to charge an electric vehicle at a City maintained facility. Fee is per Kwh. City may charge $5.00 per hour for any vehicle parked at a station 60 minutes after fully charged Equipment Equipment Usage $0.25 per Kwh NA NA $0.25 $0.00
5 Environmental Stormwater Industrial Fees
6 COMMERCIAL STORMWATER INSPECTION Fee will offset the cost to the City for inspection of commercial sites to determine compliance with NPDES Stormwater Permit. NPDES Stormwater $220.00 $392.62 0% $392.00 $172.00 7 INDUSTRIAL STORMWATER INSPECTION Fee will offset the cost to the City for inspection of commercial sites to determine compliance with NPDES Stormwater Permit. NPDES Stormwater $319.00 $518.50 0% $518.00 $199.00 8 NON-COMPLIANCE REINSPECTION
Hourly rate charged to offset the cost of conducting a follow-up inspection due to operator being found to be in non-compliance with NPDES requirements and/or Municipal Code.
NPDES Stormwater $110.00 per hour $401.13 0% $401.00 $291.00 9 ADD EMPLOYEE HOURLY RATE:
10 ENVIRONMENTAL CODE ONLY:
11 ENVIRONMENTAL CONTROL TECHNICIAN $68.71 $108.87 1% $108.00 $39.29 12 SR ENVIRONMENTAL CONTROL TECHNICIAN $68.25 $117.38 0% $117.00 $48.75 13 ENVIRONMENTAL CONTROL SPECIALIST New $133.83 1% $133.00 NA 14 Environmental Pretreatment Fees
15 Wastewater Permit Fee for Wastewater Discharge Permit Industrial/Commercial. Permit Waste Water New municipal code section 23-50 $564.43 13% $490.12 NA
16 Conditional Waiver Per FMC 23-50 Permit Waste Water New municipal code section 23-50 $451.31 13% $391.61 NA
17 Industrial pretreatment inspection, monitoring and laboratory costs Per FMC 23-50 Permit Waste Water New municipal code section 23-50 $446.26 10% $402.57 NA
18 Commercial Pretreatment inspection Per FMC 23-50 Permit Waste Water New municipal code section 23-50 $397.77 15% $336.93 NA
19 Non-Compliance Re-inspection
Hourly rate charged to offset the cost of conducting a follow-up inspection due to operator being found to be in non-compliance with permit requirements and/or Municipal Code.
Permit Waste Water $110.00 per hour municipal code
section 23-50 $288.07 13% $250.88 $140.88
20 Unauthorized discharges Penalty fee for discharges (no permit) Pretreatment
Enforcement Response
Program
Waste Water New municipal code
section 23-50 $450.13 13% $389.44 NA
21 Permit Limit Violations Penalty for exceeding City of Federal standards (pollutant limit) Pretreatment
Enforcement Response
Program
Waste Water New municipal code
section 23-50 $508.82 13% $442.99 NA
22 Violations of Conditional Waiver terms and conditions Penalty fee for failure to comply with Permit requirements and/or Municipal Code. Permit Waste Water New municipal code section 23-50 $338.19 13% $293.19 NA
23 Extra Staffing Requirement/Non-Compliance Monitoring Fee to offset the cost of extra staff conducting non-compliance monitoring to determine compliance with permit requirements and/or Municipal Code. Permit Waste Water $93.00 per hour municipal code section 23-526 $225.06 13% $194.72 $101.72
24 Illegal discharge to sanitary sewer Penalty fee for failure to comply with Permit requirements and/or Municipal Code. Permit Waste Water New municipal code section 23-50 $405.10 13% $351.99 NA
25 EDU survey Fee to offset the cost of conducting a Equivalent Dwelling Unit Survey at the request of property/business owner. Special Service Waste Water New Special Service $608.58 3% $591.34 NA 26 Environmental Stormwater Industrial Fees
27 Prohibited discharges to the stormwater conveyance system Penalty fee for failure to comply with NPDES requirements and/or Municipal Code.
Similar to Pretreatment Enforcement Response Plan. NPDES Stormwater New $450.13 0% $450.13 NA 28 Illicit connections to the storm drain system Penalty fee for failure to comply with NPDES requirements and/or Municipal Code.
Similar to Pretreatment Enforcement Response Plan. NPDES Stormwater $27.00 municipal code section 23-526 $180.04 13% $157.27 $130.27
29 Stormwater Non-Compliance Meeting
Fee to offset the cost of conducting a meeting between the operator and City representative for the purpose of correcting the operator's non-compliance with NPDES requirements and/or violations of the Fontana Municipal Code. Similar to Pretreatment Enforcement Response Plan.
NPDES Stormwater New $676.37 13% $586.38 NA
30 Extra Staffing Requirement/Non-Compliance Monitoring Fee to offset the cost of extra staff conducting non-compliance monitoring to determine compliance with NPDES permit and/or Municipal Code. NPDES Stormwater New per hour $225.06 13% $194.72 NA 31 Operating without Industrial General Permit Coverage (operating businesses) Fee to offset the cost of extra staff conducting non-compliance monitoring to determine compliance with NPDES permit, Senate Bill 205, and/or Municipal Code. Similar to Pretreatment Enforcement Response Plan.
NPDES Stormwater New SB-205 Mandate $413.61 11% $369.26 NA 32 Failure to comply with Senate Bill-205 mandates Fee to offset the cost of extra staff conducting non-compliance monitoring to determine compliance with NPDES permit, Senate Bill 205, and/or Municipal Code. NPDES Stormwater New SB-205 Mandate $413.61 11% $369.26 NA 33 Environmental Construction Storm Water Pollution Prevention Plan (SWPPP) Related Fees 34 Routine Inspection Fee will offset the cost to the City for inspection of construction sites to determine compliance with NPDES Stormwater Permit. NPDES Stormwater $319.00 NPDES mandate $551.41 12% $483.48 $164.48 35 Non-Compliance Re-inspection
Hourly rate charged to offset the cost of conducting a follow-up inspection due to operator being found to be in non-compliance with NPDES requirements and/or Municipal Code.
NPDES Stormwater $110.00 per hour NPDES mandate $425.81 13% $371.13 $261.13 36 Prohibited discharges to the stormwater conveyance system. Penalty fee for failure to comply with NPDES requirements and/or Municipal Code.
Similar to Pretreatment Enforcement Response Plan. NPDES Stormwater $5,000.00 $450.13 0% $450.13 -$4,549.87 61 Environmental
Item
No. ID # Title Description Type Category Current Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 37 Failure to install and maintain storm water BMP’s Penalty fee for failure to comply with NPDES requirements and/or Municipal Code.
Similar to Pretreatment Enforcement Response Plan. NPDES Stormwater $3,000.00 NPDES mandate $542.01 12% $476.02 -$2,523.98 38 Failure to obtain a SWPPP Penalty fee for failure to comply with NPDES requirements and/or Municipal Code.
Similar to Pretreatment Enforcement Response Plan. NPDES Stormwater New NPDES mandate $430.06 12% $379.76 NA 39 Failure to maintain Erosion Control Plan Penalty fee for failure to comply with NPDES requirements and/or Municipal Code.
Similar to Pretreatment Enforcement Response Plan. NPDES Stormwater New NPDES mandate $296.23 12% $262.16 NA 40 Violation of SWPPP terms and conditions Penalty fee for failure to comply with NPDES requirements and/or Municipal Code.
Similar to Pretreatment Enforcement Response Plan. NPDES Stormwater New NPDES mandate $496.98 12% $438.57 NA 41 Extra Staffing Requirement/Non-Compliance Monitoring Fee to offset the cost of extra staff conducting non-compliance monitoring to determine compliance with NPDES permit and/or Municipal Code. NPDES Stormwater New per hour $225.06 13% $194.72 NA 42 ENVIRONMENTAL STORMWATER WATER QUALITY MANAGEMENT PLAN (WQMP) FEES 43 WQMP INSPECTION Fee will offset the cost to the City for inspection of commercial/industrial sites to determine compliance with NPDES Stormwater Permit. NPDES Stormwater New NPDES mandate $505.21 12% $443.82 NA 44 NON-COMPLIANCE REINSPECTION
Hourly rate charged to offset the cost of conducting a follow-up inspection due to operator being found to be in non-compliance with NPDES requirements and/or Municipal Code.
NPDES Stormwater New per hour NPDES mandate $371.38 12% $326.21 NA 45 FAILURE TO INSTALL AND MAINTAIN STORM WATER BMP'S Penalty fee for failure to comply with NPDES requirements and/or Municipal Code. NPDES Stormwater New NPDES mandate $542.01 12% $476.02 NA 46 STORMWATER BMP VIOLATION Penalty fee for failure to comply with NPDES requirements and/or Municipal Code. NPDES Stormwater New NPDES mandate $430.06 12% $379.76 NA 47 FAILURE TO INSTALL WQMP STRUCTURAL EQUIPMENT (PER WQMP) Penalty fee for failure to comply with NPDES requirements and/or Municipal Code. NPDES Stormwater New NPDES mandate $542.01 12% $476.02 NA 48 Environmental Business License Inspection Fees
49 Business license inspection (required for Pretreatment permitting and Stormwater Senate Bill-205)
Fee will offset the cost to the City for inspecting industrial sites to determine compliance with Senate Bill 205. NPDES Stormwater New per hour SB-205 mandate $229.32 11% $203.36 NA 50 Plan review of Planning design review and entitlement projects Plan review for PAMS, MCNS, TUPS and other Planning entitlement projects Plan review New $234.75 9% $214.00 NA 62 Engineering
Item
No. ID # Title Description Type Category Current Fee/Charge Unit Full Cost Subsidy % Suggested Fee Unit Fee Δ 1 168 Tract Map Plan Check 1 - 10 Lots Tract Map Plan Check 1 - 10 Lots Plan Check Map $2,041.00 $5,660.88 20% $4,528.00 $2,487.00 2 169 Tract Map Plan Check- more than 10 lots Tract Ma p Plan Check- more than 10 lots Plan Check Map $2,041. 00 + $55.00/parcel over ten $5,767.35 20% $4,613.00 +$ 82.00/parcel over ten $2,572.00 3 170 Parcel Map Plan Check- 1- 5 Parcels Parcel Map Plan Check- 1- 5 Parcels Plan Check Map $2,041.00 $5,6 60.88 20% $4,528.00 $2,487.00 4 171 Parcel Map Plan Check- Over 5 parcels Parcel Map Plan Check- Over 5 parcels Plan Check Map $2,041.00 + $55.00/parcel over ten $5,767.35 20% $4,613.00 +$82.0 0/parcel over ten $2,572.00 5 173 Amending Map Amending Map Plan Check Map $2,041.00 $ 5,767.35 20% $4,613.00 $2,572.00 6 174 1-Construction Cost- Plan Check $0-$25,000.00 1 -Construction Cost- Plan Check $0-$25,000.00 Plan C heck Public Improvement $384.00 + 5% of construction c ost estimate $1,796.36 20% $1,437.00 + 5% of constructi on cost estimate $1,053.00 7 175 2-Construction Cost- Plan Check $25,001.00-$50 ,000.00 2-Construction Cost- Plan Check $25,001.00- $50,000.00 Plan Check Public Improvement $1,802.00 + 4% of construction cost estimate over $25,000.00 $4,194.81 20% $3,355.00
+ 4% of construction cost estimate over
$25,000.00 $1,553.00
8 176 3-Construction Cost- Plan Check $50,001.00-$15 0,000.00 3-Construction Cost- Plan Check $50,001.00 -$150,000.00 Plan Check Public Improvement $2,936.00 + 3.75% of construction cost estimate over $50,000.00 $7,110.06 20% $5,688.00 + 3.75% of construction cost estimate over $50,000.00 $2,752.00
9 177 4-Construction Cost- Plan Check $150,000.00-$2 50,000.00 4-Construction Cost- Plan Check $150,000. 00-$250,000.00 Plan Check Public Improvement $7,715.00 + 3.50% of construction cost over $150,000.00 $11,810.96 20% $9,448.00 + 3.50% of construction cost over $150,000.00 $1,733.00
10 178 5-Construction Cost- Plan Check $250,000.00-$ 500,000.00 5-Construction Cost- Plan Check $250,000 .00-$500,000.00 Plan Check Public Improvement $11,088. 00 + 3.00% of construction cost over $250,000.00 $15,504.63 28% $11,088.00 + 3.00% of construction cost over $250,000.00 $0.00
11 179 6-Construction Cost- Plan Check $500,001.00-$ 1,000,000.00 6-Construction Cost- Plan Check $500,0 01.00-$1,000,000.00 Plan Check Public Improvement $19, 240.00 + 2.50% of construction cost over $500,000.00 $24,010.00 20% $19,240.00 + 2.50% of construction cost over $500,000.00 $0.00
12 180 7-Construction Cost- Plan Check $1,000,001.00 and over 7-Construction Cost- Plan Check $1,000,001. 00 and over Plan Check Public Improvement $29,030.00 + 2.00% of construction cost estimates over $1,000,000 $37,654.36 23% $29,030.00 + 2.00% of construction cost estimates over $1,000,000 $0.00
13 183 Design Revision Reviews (For City Approved Pla ns) Design Revision Reviews (For City Approved Plans ) Plan Check Design Review $294.00 per sheet $778.12 20% $ 622.00 per sheet $328.00 14 186 1-Construction Cost permit fee $0-$25,000.00 P ermit for off-site construction cost- $0-$25,000. Pe rmit Construction $45.00 + 5% of construction cost $469 .58 20% $375.00 + 5% of construction cost $330.00 15 187 2-Construction Cost Permit Fee- $25,001.00-$5 0,000.00 Permit for off-site construction cost- $25, 001.00-$50,000.00. Permit Construction $1,462.00 + 4.50% of construction cost over $25,000.00 $1,932.59 24% $1,462.00 + 4.50% of construction cost over $25,000.00 $0.00
16 188 3-Construction Cost Permit Fee- $50,001.00-$7 5,000.00 Permit for off-site construction cost- $50, 001.00-$75,000.00. Permit Construction $2,738.00 + 4% of construction cost over $50,000.00 $3,248.08 16% $2,738.00 + 4% of construction cost over $50,000.00 $0.00
17 189 4-Construction Cost Permit Fee- $75,001.00-$1 00,000.00 Permit for off-site construction cost- $75 ,001-$100,000. Permit Construction $3,873.00 + 3.50% of construction cost over $75,000.00 $4,463.89 13% $3,873.00 + 3.50% of construction cost over $75,000.00 $0.00
18 190 5-Construction Cost Permit Fee- $100,001.00 a nd over Permit for off-site construction cost- $100, 001.00 and over. Permit Construction $4,886.00 + 3.0% of construction cost over $100,000.00 $5,679.71 14% $4,886.00 + 3.0% of construction cost over $100,000.00 $0.00
19 191 Minimum Inspection Fee Minimum inspection. Permi t Construction $181.00 $363.70 20% $290.00 $109.00 20 194 Weekend/Overtime Inspections Weekend/overtime i nspections Permit Public Improvement Inspection Fee + 50% NA NA Inspection Fee + 50% $0.00 21 199 Excavations under Blanket Permit
Blanket permit renewable annually to any public utility corporation for installation or maintenance of utility services (individual excavation fees still apply).
Permit Excavation $163.00 $305.01 20% $244.00 $81.00
22 203 Minimum Pavement Inspection Fee Minimum pavemen t inspection fee. Permit Construction $181.00 for 0-2,000 l.f. plus $110 each add'l 1,000 l.f. $305.01 20% $244.00 for 0-2,000 l.f. plus $105 each add'l 1,000 l.f. $63.00
23 217 IEUA- Residential Use Fee to provide funds for capital sewerage service projects necessary to maintain sewerage service within Residential Use areas in Fontana. Facilities Expansion Fee Sanitary Sewage Current IEUA Fee NA NA Current IEUA Fee $0.00 24 218 IEUA- Commercial/Industrial
Fee to provide funds for capital sewerage service projects necessary to maintain sewerage service within Commercial/ Industrial Use areas in Fontana.
Facilities Expansion Fee Sanitary Sewage Current IEUA Fee NA NA Current IEUA Fee $0.00 25 232 Variance Permit Fee for services necessitated by applications for transportation permits of unusually large or heavy loads. Permit
Building Moving & Oversize
Load $55.00 per hour for City employee $273.78 20% $219.00 pe r hour for City employee $164.00 26 233 Single Trip Fee for services necessitated by applications for transportation permits of oversized loads. Single trip. Permit Building Moving & Oversize Load $16.00 per load. California Department of
Transportation Permit. NA NA $16.00 per load $0.00
27 234 Annual Oversized Load Permits Fee for services necessitated by applications for transportation permits of any oversized loads. Annual fee. Permit
Building Moving & Oversize
Load $100.00 per first permit, $15 per each
additional vehicle. NA NA $90.00
per first permit, $15 per each additional
vehicle -$10.00
28 250 Certificate of Correction-Major Fee to issue a certificate of correction - major. Engineering Certif icate $680.00 $1,051.77 20% $841.00 $161.00 29 251 Certificate of Compliance Fee for the issuance of a certificate of compliance. Engineering Certifica te $566.00 $2,701.77 20% $2,161.00 $1,595.00 30 252 Certificate of Conditional Compliance Fee for C ertificate of Conditional Compliance. Engineering Cer tificate $566.00 $2,701.77 20% $2,161.00 $1,595.00 31 255 Final Hydrology Study Plan Check - 0 to 150 ac res Fee for Plan check of a Hydrology Study up to 15 0 acres Plan Check Studies $1,361.00 + $15/acre $5,048. 31 20% $4,038.00 + $25/acre $2,677.00 32 257 Information Research Fee charged for informatio n research done by engineering. Engineering Research $ 52.00 per hour (1/2 hour minimum) $73.62 21% $58.00 per hour (1/2 hour minimum) $6.00 33 259 Record Map Mylar Fee Fee for recording map myla r. Engineering Recording Current County Cost NA NA Curren t County Cost $0.00 34 260 R/W Legal Document Description Reviews/Process ing Fee for R/W Legal Document Description Reviews/P rocessing. Engineering Reviews $566.00 $2,516.93 20% $2,0 13.00 $1,447.00 35 263 Sewer Area Studies Fee for Sewer Area Studies. E ngineering Studies $1,133.00 + $10.00 per acre $1,934. 15 20% $1,547.00 + $10.00 per acre $414.00 36 264 Security Substitutions Fee for administrative process of substituting Subdivision Agreements and securities for City Council's approval. Engineering Substitutions $509.00 $955.25 20% $764.00 $25 5.00 37 268 Sewer Availability/Non-Availability Letter Fee for sewer availability/non-availability letter. Engi neering Letters $27.00 $220.86 20% $176.00 $149.00 38 269 Traffic Study Review Fee for review of traffic studies of more than 5 intersections or VMT analysis. Engineering Reviews Cost + G & A Rate, $1,410.00 minimum $9,102.12 0% Cost + G & A Rate,
$7,746.00 minimum $6,336.00
39 271 Right-of-Way Vacation - Summary Fee charged for services rendered related to vacations-summary. Eng ineering Vacation $907.00 + Advertising costs $1,285.7 6 20% $1,028.00 + Advertising costs $121.00 40 272 Right-of-Way Vacation - Full Fee for services r endered for vacations-full. Engineering Vacation $1,24 7.00 + Advertising costs $2,311.55 20% $1,849.00 + Adv ertising costs $602.00 41 563 Construction In-Lieu Agreement Fee for the deve lopment of the Construction in-lieu agreement. Engin eering Agreements Actual Cost ($5,000 Deposit Require d) NA NA Actual Cost ($5,000 Deposit Required) $0.00 42 638 Commercial Fee for properties provided sewer service by the City, with treatment by the City of Rialto. Facilities Expansion Fee Rialto Collection & Treatment Fees $0.15 Sq ft NA NA $0.15 Sq ft $0.00
43 639 Industrial Fee for properties provided sewer service by the City, with treatment by the City of Rialto. Facilities Expansion Fee Rialto Collection & Treatment Fees $0.10 Sq ft NA NA $0.10 Sq ft $0.00
44 640 Residential-Estate Fee for properties provided sewer service by the City, with treatment by the City of Rialto. Facilities Expansion Fee Rialto Collection & Treatment Fees $276.00 /Unit-Collection NA NA $276.00 /Unit-Collection $ 0.00 45 640 Residential-Estate Fee for properties provided sewer service by the City, with treatment by the City of Rialto. Facilities Expansion Fee Rialto Collection & Treatment Fees $1,301.00 /Unit-Treatment NA NA $1,301.00 /Unit-Treatmen t $0.00 46 641 Residential-SFR Fee for properties provided sewer service by the City, with treatment by the City of Rialto. Facilities Expansion Fee Rialto Collection & Treatment Fees $276.00 /Unit-Collection NA NA $276.00 /Unit-Collection $ 0.00 47 641 Residential-SFR Fee for properties provided sewer service by the City, with treatment by the City of Rialto. Facilities Expansion Fee Rialto Collection & Treatment Fees $1,301.00 /Unit-Treatment NA NA $1,301.00 /Unit-Treatmen t $0.00 48 642 Residential-MFR Fee for properties provided sewer service by the City, with treatment by the City of Rialto. Facilities Expansion Fee Rialto Collection & Treatment Fees $216.00 /Unit-Collection NA NA $216.00 /Unit-Collection $ 0.00 49 642 Residential-MFR Fee for properties provided sewer service by the City, with treatment by the City of Rialto. Facilities Expansion Fee Rialto Collection & Treatment Fees $1,011.00 /Unit-Treatment NA NA $1,011.00 /Unit-Treatmen t $0.00 50 651 Parking Study Review Fee for review and analysi s of a developer provided parking study. Engineering Reviews $282.00 $2,790.88 20% $2,232.00 $1,950.00 51 720 Specific Focus Traffic Study Review
Fee for the review of traffic studies performed specifically to focus on a traffic condition associated directly to a project site layout or its affect on existing traffic circulation. Includes VMT screening.
Engineering Reviews $566.00 $5,549.62 0% Cost + G & A Rate, $4,725.00 minimum 5 intersections or less $4,159.00
52 Repetitive Trip Fee for services necessitated by applications for transportation permits of oversized loads. Repetitive trip. Permit
Building Moving & Oversize
Load $90.00 NA NA $90.00 $0.00
53 955 Traffic Control Permit for lane closures Fee for staff to process the traffic control and lane closure permit application fee. Permit Construction $110.00 $245.69 20% $196.00 $86.00 54 1921 Construction Permit Processing Issuance fee, e ach permit.
Off-Site
Construction/Inspection
Permits
Construction $46.00 $70.59 35% $46.00 $0.00
63 Engineering
Item
No. ID # Title Description Type Category Current Fee/Charge Unit Full Cost Subsidy % Suggested Fee Unit Fee Δ 55 1924 Reversion to Acreage
Fee for plan check review of Reversion to Acreage for a parcel map more than 10 parcels (fee is calculated by base amount plus incremental time increases as number of lots increase).
Plan Check Maps $2,041.00 $4,051.16 20% $3,240.00 $1,199. 00 56 1986 Film Permit Application
Fee for Engineering staff to review and approve a Film Permit Application. (Fire District Special Events App Review fee of $110 is charged separately).
Permit Film Permit $113.00 $147.24 23% $113.00 $0.00
57 1987 Plan Check- Hourly Fee for plan check for which no fee is specifically indicated. Fee is per hour, 1 hour minimum. Plan Check Public Improvement $90.00 $243.16 20% $194.00 $104.00 58 2012 Appeal of Community Development Director's De cision Fee charged for services related to an appeal of the Community Development Director's decision regarding tree removal and/or relocation
Permit Tree Removal and/or
Relocation $509.00 $823.24 20% $658.00 $149.00
59 2022 Traffic Control and Signing/Striping Inspecti on Fee for the cost of inspection of traffic control, signing, striping, and cat- tracking. Fee is per day. Permit Construction $41.00 $343.35 20% $274.00 $233.00 60 2039 CFD Map Review Community Facilities District m ap review, in-house or consultant Plan Check Map $3,06 2.00 $3,596.24 15% $3,062.00 $0.00 61 2040 Stormwater Plan Check Fee - WQMP Required - A mendment Amendment of development plans and inspection for NPDES Stormwater Permit Compliance, in-house or consultant Plan Check Studies $1,020.00 $1,473.88 20% $1,179.00 $159 .00 62 2060 Traffic Signal Operations - Working Hours Fee for the cost of placing a traffic signal on flash or for temporary power on a per day basis, during work hours. Permit Traffic $191.00 $1,130.41 20% $904.00 $713.00 63 2062 Traffic Control Plan Check without signal Fee for the cost to review traffic control, detour, signing/striping, roadway alignment plans, and utility plans. No traffic signals involved. Plan Check Traffic $453.00 $820.83 20% $656.00 for first 5 sheets, then $150 per sheet over 5 sheets $203.00
64 2063 Traffic Signal Operations - After Hours Fee for the cost of placing a traffic signal on flash or for temporary power on a per day basis, after work hours. Fee is 150% of regular fee. Permit Traffic $282.00 $1,677.97 20% $1,342.00 $1,060.00 65 2103 Final Inspection Fee Fee for conducting final inspection of building permits, verifying receipt of fees and water quality related agreement. Engineering Inspection $37.00 $84.13 20% $67.00 $30.00 66 2104
Water Quality Management Plan Review Fee - Preliminary and Final
Fee for review and approval Preliminary and Final Water Quality Management Plan to comply with the State mandate. Replaces fees 1925 and 2038.
Engineering Studies $3,349.00 $4,337.81 23% $3,349.00 $0. 00 67 2105 Technology Fee Fee for computer software and h ardware of permitting program. Engineering Permit 5% o f All Permit Fee NA NA 5% of All Permit Fee $0.00 68 2106 Technology Fee Fee for computer software and h ardware of permitting program. Engineering Reviews 5% of All Permit Fee NA NA 5% of All Permit Fee $0.00 69 2107 Trip Generation/VMT/TIA Scoping Agreement Rev iew Fee for review and approve of trip generation, VMT or TIA Scoping analysis. Engineering Reviews $139.00 $710.50 20% $568.00 $429.00 70 Traffic Signal Inspection
Fee for traffic signal inspection including inspection of pole foundation, verification of new or modified traffic signal, cabinet, wiring, and provide all tech supports
Permit Traffic New $9,848.67 20% $7,878.00
NA
71 Traffic Signal/Interconnect Plan Check Fee Fee for reviewing new traffic signals and/or interconnect Plan Check Traffic New $2,839.51 20% $2,271.00 NA 72 Traffic Control Plan Check with signals
Fee for the cost to review traffic control, detour, signing/striping, roadway alignment plans, and utility plans when traffic signals are involved.
Plan Check Traffic New $1,368.39 20% $1,094.00 for first 5 sheets, then $150 per sheet over 5 sheets NA
73 Precise Grading Plan Check - 0 -10,000 sqft Precis e Grading Plan Check - 0-10,000 sqft Plan Check Gradi ng New $1,130.76 20% $904.00 + $50.00/1,000 sqft or fraction thereof NA
74 Precise Grading Plan Check - >10,000 sqft - 100,0 00 sqft Precise Grading Plan Check - >10,000 sqft - 100,000 sqft Plan Check Grading New $1,727.39 20% $1,381. 00 + $30.00/1,000 sqft or fraction thereof over 10,000 sqft NA
75 Precise Grading Plan Check - >100,000 sqft - 500, 000 sqft Precise Grading Plan Check - >100,000 sqft - 500,000 sqft Plan Check Grading New $4,877.59 20% $3,90 2.00 + $10.00/1,000 sqft or fraction thereof over 100,000 sqft NA
76 Precise Grading Plan Check - 500,000+ sqft Precise Grading Plan Check - 500,000+ sqft Plan Check Gradin g New $9,336.05 20% $7,468.00 + $5.00/1,000 sqft or fraction thereof over 500,000 sqft NA
77 Rough/Mass Grading Plan Check - 0 -10,000 sqft Rou gh/Mass Grading Plan Check - 10,000 sqft Plan Check G rading New $977.86 20% $782.00 + $40.00/1,000 sqft or fraction thereof NA 78 Rough/Mass Grading Plan Check - >10,000 sqft - 10 0,000 sqft Rough/Mass Grading Plan Check - >10,000 s qft - 100,000 sqft Plan Check Grading New $1,574.49 20% $ 1,259.00 + $25.00/1,000 sqft or fraction thereof over 10,000 sqft NA
79 Rough/Mass Grading Plan Check - >100,000 sqft - 5 00,000 sqft Rough/Mass Grading Plan Check - >100,000 sqft - 500,000 sqft Plan Check Grading New $4,151.02 20 % $3,320.00 + $5.00/1,000 sqft or fraction thereof over 100,000 sqft NA
80 Rough/Mass Grading Plan Check - 500,000+ sqft Roug h/Mass Grading Plan Check - 500,000+ sqft Plan Check Grading New $6,423.92 20% $5,139.00 + $2.50/1,000 sqft or fraction thereof over 500,000 sqft NA
81 Precise Grading Permit - 0 -10,000 sqft Precise Gr ading Permit - 0-10,000 sqft Permit Grading New $642.16 20% $513.00 + $40.00/1,000 sqft or fraction thereof NA 82 Precise Grading Permit - >10,000 sqft - 100,000 s qft Precise Grading Permit - >10,000 sqft - 100,000 sqft Permit Grading New $1,080.66 20% $864.00 + $15.00/1,000 sqft or fraction thereof over 10,000 sqft NA
83 Precise Grading Permit - >100,000 sqft - 500,000 sqft Precise Grading Permit - >100,000 sqft - 500,00 0 sqft Permit Grading New $2,628.91 20% $2,103.00 + $5.00/1,000 sqft or fraction thereof over 100,000 sqft NA
84 Precise Grading Permit - 500,000+ sqft Precise Gra ding Permit - 500,000+ sqft Permit Grading New $5,020.7 6 20% $4,016.00 + $2.50/1,000 sqft or fraction thereof over 500,000 sqft NA
85 Rough/Mass Grading Permit - 0 -10,000 sqft Rough/M ass Grading Permit - 10,000 sqft Permit Grading New $65 3.65 20% $522.00 + $30.00/1,000 sqft or fraction thereof NA 86 Rough/Mass Grading Permit - >10,000 sqft - 100,00 0 sqft Rough/Mass Grading Permit - >10,000 sqft - 10 0,000 sqft Permit Grading New $970.57 20% $776.00 + $10.00/1,000 sqft or fraction thereof over 10,000 sqft NA
87 Rough/Mass Grading Permit - >100,000 sqft - 500,0 00 sqft Rough/Mass Grading Permit - >100,000 sqft - 500,000 sqft Permit Grading New $2,139.64 20% $1,711.00 + $2.50/1,000 sqft or fraction thereof over 100,000 sqft NA
88 Rough/Mass Grading Permit - 500,000+ sqft Rough/Ma ss Grading Permit - 500,000+ sqft Permit Grading New $3 ,433.23 20% $2,746.00 + $2.00/1,000 sqft or fraction thereof over 500,000 sqft NA
89 Agreement Review Fee for the review and development of agreements the City will enter into with another party. Engineering Agreements New NA NA Actual Cost ($5,000 Dep osit Required) NA 90 Final Hydrology Study Plan Check - over 150 acres Fee for Plan check of a Hydrology Study over 150 acres Plan Check Studies New $9,520.50 20% $7,616.00 + $25/ acre NA 91 Preliminary Hydrology Plan Check - 0 to 150 acres Fee for Plan check of a Hydrology Study 0 to 150 acres Plan Check Studies New $1,649.85 20% $1,319.00 NA 92 Preliminary Hydrology Plan Check - over 150 acres Fee for Plan check of a Hydrology Study over 150 acres Plan Check Studies New $3,152.47 20% $2,521.00 + $25/ acre NA 93 Geotechnical Review Fee for review of Geotechnical Reports Engineering Reviews New $942.09 20% $753.00 NA 94 Engineering Plan Check for Building & Safety - Residential ADU Only Engineering Plan Check for Building & Safety - Residential ADU Only Plan Check Building New $243.16 20% $194 .00 NA 95 Engineering Plan Check for Building & Safety - Re sidential Engineering Plan Check for Building & Saf ety - Residential Plan Check Building New $486.33 20% $3 89.00 NA 96 Engineering Plan Check for Building & Safety - Co mmercial Engineering Plan Check for Building & Safet y - Commercial Plan Check Building New $729.49 20% $583.0 0 NA 97 Engineering Plan Check for Building & Safety - In dustrial Engineering Plan Check for Building & Safet y - Industrial Plan Check Building New $729.49 20% $583.0 0 NA 98 Engineering Plan Check for Building & Safety - Mi sc Engineering Plan Check for Building & Safety - Mi sc Plan Check Building New $729.49 20% $583.00 NA 99 Water Quality Management Plan - Inspection - Low Priority Fee for inspection of Water Quality Management Plan devices & facilities for sites less than 5 acres Engineering WQMP Permit New $727.41 20% $581.00 NA 100 Water Quality Management Plan - Inspection - Medium Priority
Fee for inspection of Water Quality Management Plan devices & facilities for sites 5 - 50 acres Engineering WQMP Permit New $1,704.08 20% $1,363.00 NA 101 Water Quality Management Plan - Inspection - Hig h Priority Fee for inspection of Water Quality Management Plan devices & facilities for sites greater than 50 acres Engineering WQMP Permit New $3,266.77 20% $2,613.00 NA 102 Engineering Additional Inspections for Temporary Occupancy Permit
Fee for the additional inspections needed as part of a temporary occupancy permit Permit TCO Permit New NA NA $5,000.00 Deposit NA 103
104 Consent Annexation - Engineering Review Engineeri ng Review Fee for 100% Annexation Engineering Annexat ions New $3,442.09 31% $2,360.00 NA Engineering Review for Planning Projects
64 Engineering
Item
No. ID # Title Description Type Category Current Fee/Charge Unit Full Cost Subsidy % Suggested Fee Unit Fee Δ 105 Out of Area Sewer Service /Irrevocable Agreement
Annexation (Existing) - Engineering Review
Engineering Review Fee charged for Out of Area Sewer Service or Irrevocable Agreement annexation (existing). Engineering Annexations New $2,712.60 25% $2,030.00 NA 106 Out of Area Sewer Service/Irrevocable Agreement Annexation (New) - Engineering Review
Engineering Review Fee charged for Out of Area Sewer Service or Irrevocable Agreement Annexation (New). Engineering Annexations New $2,712.60 25% $2,030.00 NA 107 Project Applicant Appeal - Engineering Review Eng ineering Review Fee for processing project applicant appeal. Engineering Appeals New $1,453.15 26% $1,080.00 NA 108 GP Amend. - Engineering Review Engineering Review Fee for General Plan Amendment. Engineering General Plan Amendment New $3,198.93 25% $2,390.00 NA 109 Development Code Amendment - Engineering Review E ngineering Review Fee for zoning code amendment. Eng ineering Zone Change New $2,537.89 25% $1,900.00 NA 110 DRS Individual Sign - Engineering Review Engineer ing Review Fee charged for Design Review for Individual Sign. Engineering Design Review New $1,147.36 77% $2 62.00 NA 111 Residential- 5 or greater D.U's - Engineering R eview Engineering Review Fee for Design Review - Res idential- over 5 D.U.s. Engineering Design Review New $ 3,685.25 31% $2,530.00 NA 112 Commercial/Industrial - Engineering Review Engine ering Review Fee for design review - Commercial/Industrial. Engineering Design Review New $3,685.25 31% $2,5 30.00 NA 113 Commercial/ Industrial - Engineering Review Engineering Review Fee for tentative parcel maps- commercial/industrial. Engineering Tentative Parcel Maps New $3,392.63 31% $2,3 40.00 NA 114 Tentative Parcel Map - Residential and Urban Lot Splits - Engineering Review
Engineering Review Fee for staff to administratively review and approve residential tentative parcel maps and urban lot splits Engineering Tentative Parcel Maps New $3,392.63 31% $2,3 40.00 NA 115 Lot Line Adjustment - Engineering Review Engineer ing Review Fee for lot line adjustment. Engineering T entative Parcel Maps New $3,589.48 25% $2,690.00 NA 116 Minor Modification - Engineering Review Engineeri ng Review Fee for tentative parcel map - minor modification. Engineering Tentative Parcel Maps New $1,939. 48 25% $1,450.00 NA 117 Major Modification - Engineering Review Engineering Review Fee charged for tentative parcel map major modification. Engineering Tentative Parcel Maps New $4,365.28 30% $3,0 40.00 NA 118 Revert to Acreage - Engineering Review Engineering Review Fee charged for tentative parcel map reversion to acreage. Engineering Tentative Parcel Maps New $1,939.48 25% $1,4 50.00 NA 119 P.U.D. 1-100 lots - Engineering Review Engineering Review Fee charged for tentative tract maps 1-100 lots- P.U.D.. Engineering Tentative Tract Maps New $1,939.48 25% $1,45 0.00 NA 120 Residential - Engineering Review Engineering Revi ew Fee charged for tentative tract maps - Residential Engineering Tentative Tract Maps New $2,974.75 30% $2, 080.00 NA 121 Minor Modification - Engineering Review Engineeri ng Review Fee for minor modification to tentative tract map. Engineering Tentative Tract Maps New $1,939.4 8 25% $1,450.00 NA 122 Major Modification - Engineering Review Engineering Review Fees charged for major modification of a tentative tract map. Engineering Tentative Tract Maps New $2,781.05 31% $1,92 0.00 NA 123 Amendment - Engineering Review Engineering Review fee for amending non-expired Administrative Site Plans currently not developed. Engineering Administrative Site Plan New $2,731.59 25% $ 2,040.00 NA 124 Administrative Site Plan - Major - Engineering R eview Engineering Review fee for project site and ar chitectural review. Engineering Administrative Site P lan New $3,878.95 31% $2,690.00 NA 125 Modification - Engineering Review Engineering Review fee for modifications to previously approved and developed Administrative Site Plans. Engineering Administrative Site Plan New $1,365.80 25% $ 1,020.00 NA 126 Temporary Use Permit - Engineering Review Enginee ring Review Fee for temporary use permits Engineerin g Miscellaneous New $2,731.59 25% $2,040.00 NA 127 Commercial/ Industrial - Engineering Review Engineering Review Fee charged for tentative tract maps - commercial/ industrial. Engineering Tentative Tract Maps New $3,878.95 31% $2,69 0.00 NA 128 Minor Modification - Engineering Review Engineering Review Fee for staff to review and approve minor modifications to design review applications. Engineering Design Review New $1,147.36 31% $790.00 NA 129 Preapplication - Engineering Review Engineering Fee to administratively review and conference with the applicant prior to submittal of an application. Engineering Miscellaneous New $1,456.06 25% $1,090.00 NA 130 Variance - Administrative - Engineering Review
Engineering Review Fee for permission to depart from zoning ordinances because of special circumstances unique to a specific property of project.
Approved administratively.
Engineering Miscellaneous New $1,390.53 31% $960.00 NA
131 Administrative Site Plan - Minor - Engineering R eview Engineering Review fee for accessory structures, site and architectural review (parking, guard shack, trash enclosure, etc.) Engineering Administrative Site Plan New $2,909.22 31% $ 2,020.00 NA 132 Appeal of Irrevocable Agreement to Annex - Engineering Review
Engineering Review Fee for an Appeal of Irrevocable Agreement to Annex (Sewer Service for New Development) Engineering Annexations New $1,365.80 25% $1,020.00 NA 133 Appeal - Engineering Review Engineering Review Fe e for processing appeal by non-applicant Engineering Appeals New $1,453.15 26% $1,080.00 NA 134 Commercial/Industrial - Engineering Review Engin eering Review Fee for C.U.P. - Commercial/Industrial Engineering Conditional Use Permits New $2,974.75 30% $2,080.00 NA 135 Residential - Engineering Review Engineering Review Processing fee for a residential conditional use permit Engineering Conditional Use Permits New $2,974.75 30% $2 ,080.00 NA 136 Surface Mining Reclamation Act - Engineering Rev iew Engineering Review Fee for C.U.P. for mining ope rations. Engineering Conditional Use Permits New $2,974 .75 30% $2,080.00 NA 137 DRS Planning Commission - Engineering Review Engineering Review Fee charged for staff to review and approve design reviews for signs which will be reviewed by the Planning Commission Engineering Design Review Sign New $1,147.36 31% $790.00 NA 138 Variance - Engineering Review Engineering Review Fee for Variance. Engineering Miscellaneous New $1,390. 53 31% $960.00 NA 139 Zone Change - Engineering Review Engineering Revi ew Fee for Zone Change Engineering Zone Change New $2,5 37.89 25% $1,900.00 NA 140
141 GIS Fee Fee to update City GIS database Engineerin g Plan check New of Plan Check Fee 5% 0% 5% of Plan Check Fee NA 142 GIS Fee Fee to update City GIS database Engineerin g Permit New of Permit Fee 5% 0% 5% of Permit Fee NA 143 Block Party Permit Fee for block party permit. Fee includes staff time for processing the permit and the use of city street barricades. Engineering Permit New $390.54 10% $352.00 NA 65 Police
Item
No. ID # Title Description Type Category Current Fee/Charge Unit Full Cost Subsidy % Suggested Fee Fee Δ 1 36 Second-hand Dealer/ Pawnbroker License
Renewal
Processing fee for a second-hand dealer/pawn broker license renewal. Process includes verifying bond license, background check. (Plus current DOJ filing fee) Processing fee for a second-hand dealer/pawn broker license renewal.
Administration License $84.00 $152.14 43% $87.00 $3.00
2 37 Tow Truck Driver Permit Fee for processing a tow truck driver permit. Includes background check, livescan services, and issuing permiUID. (Plus current DOJ Fee) Administration Permit $60.00 $162.48 60% $65.00 $5.00 3 298 Second-hand Dealer/ Pawnbroker License
Processing fee for a second-hand dealer/pawn broker license. Process includes verifying bond license, background check, and Livescan fingerprinting services. (Plus current DOJ Fee) Processing fee for a second-hand dealer/pawn broker license.
Administration License $103.00 $181.38 42% $106.00 $3.00 4 353 Block Party Permit Fee for block party permit. Fee includes staff time for processing the permit and the use of city street barricades. Traffic Permit $267.00 $266.48 0% $266.00 -$1.00 5 354 Concealed Weapon Permit Fee for concealed weapon permit. Administration Permit $242.00 per application $82.54 1% $82.00 -$160.00 6 355 Clearance Letters Fee for processing clearance letters, local background check. Administration Letters $24.00 NA NA $24.00 $0.00 7 356 Traffic Accident Report Fee for processing requests for copies of traffic accident reports. Traffic Reports $18.00 $128.08 86% $18.00 $0.00 8 360 Citation Correction (Non-Resident) Fee for citation correction (non-resident). Traffic Citation $16.00 $20.29 21% $16.00 $0.00 9 361 Taped Records Fee for costs and time for processing requests for taped records. Administration Multi-Media $50.00 $70.12 29% $50.00 $0.00 10 362 Photos Fee for processing requests for photos and cost of materials. Fee can vary due to additional photo duplicating needs ($18 minimum - varies depending on specific requests). Administration Multi-Media $25.00 $46.75 47% $25.00 $0.00 11 363 Traffic Collision Emergency response fee for DUI traffic collision. Traffic Response $480.00 $762.20 0% $762.00 $282.00 12 366 Crime Reports Fee for processing copies of crime reports. Administration Reports $18.00 $43.50 59% $18.00 $0.00 13 367 Emergency & Hazardous Material Responses
Actual recovery cost will be charged based upon circumstances of the response. Clean up materials at cost, labor billed at fully burdened rate and equipment for the response will be charged per user fee 2075.
Traffic Response Actual Cost for Services NA NA Actual Cost for Services $0.00
14 369 Gun Dealer License - New Application Fee
Processing fee for gun dealer license. The process includes verifying bond license, background check, and DOJ live-scan. Administration License $98.00 $178.21 43% $101.00 $3.00 15 371 License Fee for bicycle license. Administration License $11.00 $25.56 2% $25.00 $14.00 16 374 Immigration Letter Fee for processing request for immigration letter. This is a local background check. Administration Letters $24.00 NA NA $24.00 $0.00 17 375 Civil Subpoena Fee for Civil subpoena service set per Government Code Section 68097 .2 plus additional staff cost per code allowance. Administration Subpoenas $275.00 NA NA $275.00 $0.00 18 376 Repossession Fees Fee for processing repossession documents. Fee set by CA Government Code 2675 & 41612. Traffic Vehicle $15.00 NA NA $15.00 $0.00 19 378 Crime Statistical Research Fee Fee for crime statistical research. Administration Research $118.00 NA NA $118.00 $0.00 20 379 Gun Dealer License - Chain Store Renewal Processing fee for chain store gun dealer license renewal. The process includes verifying bond license, background check.and issuing permit. Administration License $82.00 $149.17 43% $85.00 $3.00 21 380 Gun Dealer License -Individual Renewal Individual: Processing gun dealer renewal. The process includes verifying bond license, background check, and DOJ live-scan. Administration License $82.00 $150.80 44% $85.00 $3.00 22 381 Franchise Tow Fee Franchise tow fee for each tow call Traffic Franchise Fees $191.00 per vehicle NA NA $191.00 $0.00 23 382 Altered Pet -1 Year Issuance and/or renewal of a 1-year license for a dog that is spayed/neutered Animal License $22.00 NA NA $22.00 $0.00 24 383 Altered Pet -2 Years Issuance and/or renewal of a 2-year license for a dog that is spayed/neutered Animal License $32.00 NA NA $32.00 $0.00 25 384 Altered Pet -3 Years Issuance and/or renewal of a 3-year license for a dog that is spayed/neutered Animal License $45.00 NA NA $45.00 $0.00 26 385 Altered Pet -1 Year, Sr Cit. Disc. (age 60) Issuance and/or renewal of a 1-year license for a dog that is spayed/neutered. Discount to Senior Citizens age 60+ Animal License $10.00 NA NA $10.00 $0.00 27 386 Unaltered Pet -1 Year Issuance and/or renewal of a 1-year license for a dog that is not spayed/neutered Animal License $83.00 NA NA $83.00 $0.00 28 387 Unaltered Pet -2 Years Issuance and/or renewal of a 2-year license for a dog that is not spayed/neutered Animal License $168.00 NA NA $168.00 $0.00 29 388 Unaltered Pet -3 Years Issuance and/or renewal of a 3-year license for a dog that is not spayed/neutered Animal License $249.00 NA NA $249.00 $0.00 30 389 Delinquent License Penalty Penalty for not licensing a dog (four months of age or over) within 30 days per Chapter 4 of the Fontana Municipal Code Sec. 4-96. Penalty does not apply to Senior Citizens age 60+ Animal License $22.00 NA NA $22.00 $0.00 31 390 Special Enforcement Detail Call Out Actual cost will be charged based upon circumstances of the call out. Equipment for the call out will be charged per user fee 2075. Traffic Response Actual cost for Services NA NA Actual cost for Services $0.00
32 403 Impound Storage Rate Rate charged for impound storage of all vehicles (24hours). Traffic Franchise Fees Not to exceed rates greater
than 115% of schedule rate
for towing as set by the
Ontario area C.H.P.
NA NA
Not to exceed rates
greater than 115% of
schedule rate for
towing as set by the
Ontario area C.H.P.
$0.00
33 404 Towing Rates City franchise tow charges. Traffic Franchise Fees Not to exceed rates greater
than 115% of schedule rate
for towing as set by Rancho
Office of CHP
NA NA
Not to exceed rates
greater than 115% of
schedule rate for
towing as set by
Rancho Office of CHP
$0.00
34 526 Tag Replacement The fee for replacement dog tag. Animal Miscellaneous $5.00 NA NA $5.00 $0.00 35 556 Altered Pet -2 Years, Sr Cit. Disc. (age 60) Issuance and/or renewal of a 2-year license for a dog that is spayed/neutered. Discount to Senior Citizens age 60+ Animal License $15.00 NA NA $15.00 $0.00 36 557 Altered Pet -3 Years, Sr Cit. Disc. (age 60) Issuance and/or renewal of a 3-year license for a dog that is spayed/neutered. Discount to Senior Citizens age 60+ Animal License $22.00 NA NA $22.00 $0.00 37 583 Transfer Fee Fee for a transfer in ownership of a dog tag for a specific dog. Animal Miscellaneous $5.00 NA NA $5.00 $0.00 38 593 Concealed Weapons Permit Renewal Fee for processing a concealed weapons permit renewal application. Penal Code Section 12054a limits the fee to $25.00 Administration Permit $25.00 NA NA $25.00 $0.00 66 Police
Item
No. ID # Title Description Type Category Current Fee/Charge Unit Full Cost Subsidy % Suggested Fee Fee Δ 39 644 Booking Fees County charge for booking. Administration Miscellaneous Varies-County charge NA NA Varies-County charge $0.00 40 645 Parking Citation Penalty Charge for penalty of parking citation. Traffic Citations Varies NA NA Varies $0.00 41 646 Parking Violations City code violations-parking Traffic Citations Varies NA NA Varies $0.00 42 647 Vehicle Code Fines Fines for vehicle code violations. Traffic Citations Varies NA NA Varies $0.00 43 734 Annual Review Fee for Taxicab Franchisee This fee is to recover the cost of an annual review of the taxicab franchisee. This will determine if the franchisee is complying with the regulations regarding taxicab and vehicle for hire services. Traffic Franchise Fees $1,918.00 NA NA $1,918.00 $1.00 44 735 Application fee for Taxicab Franchise
(Initial/Renewal)
This fee is to recover the administrative cost of processing a non-refundable application fee for a Taxicab franchise, initial or renewal. Traffic Franchise Fees $500.00 NA NA $500.00 $2.00 45 736 Taxicab Vehicle Inspection This fee is to recover the cost of vehicle inspection of taxicabs. The purpose of the inspection is to ensure the safety of the vehicle. Traffic Inspection $27.00 $82.01 0% $82.00 $55.00 46 741 Carnival/Circus Worker- New Applicant Fee Fee to recover the cost of processing individual carnival/circus workers. Administration Application Review $96.00 $173.52 45% $96.00 $0.00 47 854 Adult Oriented Business Application Fee Fee for the Police Department to process an adult oriented business applicant's background check. (Plus current DOJ Fee) Administration Application Review $97.00 $172.40 42% $100.00 $3.00 48 956
Business License Background check with Live-
Scan
Fee for a background check for business license applicant that requires DOJ Live-Scan fingerprinting. (Plus current DOJ Fee). Administration Application Review $99.00 $180.34 43% $102.00 $3.00 49 957 Business License Background check without
Live-Scan
Fee for a background check for business license applicant that does not require DOJ Live-Scan fingerprinting. Administration Application Review $76.00 $139.63 43% $79.00 $3.00 50 958 Carnival/Circus Worker- Returning Applicant
Fee
Fee to recover the cost of processing a renewal for individual carnival/circus workers. No Livescan services. Administration Application Review $82.00 $150.29 45% $82.00 $0.00 51 964 Tow Truck Driver Permit- Renewal/Transfer Fee for processing a renewal or a transfer from one company to another for tow truck driver permit. Administration Permit $49.00 $162.48 66% $55.00 $6.00 52 965 Adult Oriented Business - Renewal Fee for the Police Department to process a renewal for an adult oriented business. Administration Application Review $84.00 $137.56 37% $87.00 $3.00 53 1256 Replacement of Tow Driver Permit To replace lost, stolen or damaged tow driver permit. Administration Permit $47.00 $26.65 2% $26.00 -$21.00 54 1257 Traffic Citation Copy Fee for processing a certified copy of a traffic citation (moving violations and parking violations) upon request. Traffic Citation $15.00 $17.04 0% $17.00 $2.00 55 1953 Livescan Fingerprinting Fee Fee for providing fingerprint services by appointment for employment or personal reasons. Plus CA Department of Justice (DOJ) current processing fee. Administration Miscellaneous $24.00 32.00 DOJ Fee $34.85 2% $34.00 $10.00 56 2070 Low Cost Cat Surgery Clinic Fee to provide low-cost Spay & Neuter surgery clinics to cat owners. Surgery clinic fee provides cat spay or neuter, vaccines and microchip. Animal Clinic Fee $32.00 NA NA $32.00 $0.00 57 2071 Low Cost Dog Surgery Clinic
Fee to provide low-cost Spay & Neuter surgery clinics to dog owners. Surgery clinic fee provides spay or neuter, vaccines and microchip for dogs <35 lbs. For dogs > 53 lbs must purchase voucher for services rendered at the Riverside Animal Shelter.
Animal Clinic Fee $55.00 NA NA $55.00 $0.00
58 2072 Low Cost Vaccine Clinic Fee to provide low-cost vaccine clinics to cat and dog owners. Vaccines include: Rabies, Parvo virus, distemper, hepatitis, Bordetella, parainfluenza. Fee also includes microchip. Animal Clinic Fee $15.00 NA NA $15.00 $0.00 59 2073 Equipment Usage Fee to recover the City's cost of equipment used for reimbursable emergency response and special enforcement details. City by reference adopts the FEMA Schedule of Equipment Rates. Traffic Response FEMA RATES NA NA FEMA RATES $0.00 60 2088 Confiscated Firearms/Ammunition
Charge for administrative costs relating to the seizure, impounding, storage, or release of any firearm or ammunition (PC 33880). An extra charge will apply for each additional firearm involved in the same incident
Field Services Response $197.00 + $55.00 ea.
Additional Item $693.69 72% $197.00 $0.00
61 2089 Traffic Collision with Reconstruction Copy Traffic Collision Report with scene reconstruction. (Price is basic Traffic Collision Report fee plus number of copies in the report - Regular Copies .05 ea or Redacted Copies $2.25 ea.) Traffic Reports $18.00 $42.61 58% $18.00 $0.00 67 Office of the City Clerk
Item
No. ID # Title Description Type Category
Current
Fee/Charge Unit Full Cost Subsidy % Suggested Fee Fee Δ 1 3 Photocopies-Black & White
The cost of materials & time to produce copies (letter or legal). $0.20 for the first page and $.05 for each additional page when made on a copier w/a feeder.
Otherwise $.20/each page that is not run through a feeder.
Reproduction Copies $0.20
per original page and $0.05 per
additional page for multiple
copies.
NA NA $0.20 $0.00
2 450 Election Filing Forms The copy fee for any Statement of Economic 700 Forms and any campaign filing forms. Fee is set and can only be changed by the Secretary of State (SOS). Reproduction Copies $0.10 per page NA NA $0.10 $0.00 3 592 Photocopies-Color
The cost of materials & time to produce copies (letter or legal). $0.50 for the first page and $.40 for each additional page when made on a copier w/a feeder.
Otherwise $.50/each page that is not run through a feeder.
Reproduction Copies $0.50
per original page, and $0.40 per
page for each additional page for
multiple copies.
NA NA $0.50 $0.00
4 690 Subpoena Duces Tecum Specific fees for responding to Subpoenas Duces Tecum issued in a state court lawsuit as set by Evidence Code Section 1563. Reproduction Subpoenas $26.00 Clerical/hr/person NA NA $26.00 $0.00 5 690 Subpoena Duces Tecum Specific fees for responding to Subpoenas Duces Tecum issued in a state court lawsuit as set by Evidence Code Section 1563. Reproduction Subpoenas $0.10 Copy/pg >8 1/2 by 14 NA NA $0.10 $0.00 6 690 Subpoena Duces Tecum Specific fees for responding to Subpoenas Duces Tecum issued in a state court lawsuit as set by Evidence Code Section 1563. Reproduction Subpoenas $0.20 /pg microfilm docs NA NA $0.20 $0.00 7 690 Subpoena Duces Tecum Specific fees for responding to Subpoenas Duces Tecum issued in a state court lawsuit as set by Evidence Code Section 1563. Reproduction Subpoenas Actual costs Oversized docs., postage, storage. NA NA Actual costs $0.00
8 691 Subpoena Duces Tecum-
Attorney Service
Attorney service fees for responding to Subpoenas Duces Tecum issued in a state court lawsuit as set by Evidence Code Section 1563. Reproduction Subpoenas $15.00 + actual costs charged by a third party. NA NA $15.00 $0.00
9 Campaign Sign Deposit Refundable deposit for campaign signs Election $1,000.00 Per candidate NA NA $1,000.00 $0.00 68 Planning
Item
No. ID # Title Description Type Category Current Fee/Charge Unit Planning
Full Cost Planning Subsidy Planning Total Eng. Full Co st Eng.
Subsidy
Eng.
Total Suggested Fee Unit Fee Δ
1 476 Administrative Site Plan - Major Processing fee for project site and architectural review. Planning A dministrative Site Plan $4,197.00 $5,965.86 32% $4,050. 00 $3,878.95 31% $2,690.00 $6,740.00 $2,543.00 2 2069 Administrative Site Plan - Minor Processing fee for accessory structures, site and architectural review (parking, guard shack, trash enclosure, etc.) Planning Administrative Site Plan $1,133.00 $3,272.48 3 2% $2,210.00 $2,909.22 31% $2,020.00 $4,230.00 $3,097.00 3 475 Amendment Processing fee for amending non-expired Administrative Site Plans currently not developed. Planning Administrative Site Plan $736.00 $2,736.82 34% $1,810.00 $2,731.59 30% $1,900.00 $3,710.00 $2,974.00 4 477 Modification Processing fee for modifications to previously approved and developed Administrative Site Plans Planning Administrative Site Plan $1,008.00 $2,517.42 3 3% $1,680.00 $1,365.80 30% $950.00 $2,630.00 $1,622.00 5 791 Appeal of Irrevocable Agreement to Annex Appeal of Irrevocable Agreement to Annex (Sewer Service for New Development) Planning Annexations $2,551.00 $2,225.52 33% $1,500.00 $1 ,365.80 30% $950.00 $2,450.00 -$101.00 6 103 Consent Annexation Fee for 100% annexation. Plann ing Annexations $5,949.00 + LAFCO Fees $4,506.82 11% $3, 994.00 $3,442.09 31% $2,360.00 $6,354.00 + LAFCO Fees $4 05.00 7 105 Out of Area Sewer Service /Irrevocable Agreement
Annexation (Existing)
Fee charged for Out of Area Sewer Service or Irrevocable Agreement annexation (existing). Planning Annexations $556.00 + LAFCO Fees $2,297.15 33% $1,540.00 $2,712.60 33% $1,830.00 $3,370.00 + LAFCO Fee s $2,814.00 8 106 Out of Area Sewer Service/Irrevocable Agreement
Annexation (New)
Fee charged for Out of Area Sewer Service or Irrevocable Agreement Annexation (New). Planning Annexations $1,621.00 $2,297.15 33% $1,540.00 $2 ,712.60 33% $1,830.00 $3,370.00 + LAFCO Fees $1,749.00 9 108 Appeal Fee for processing appeal by non-applican t Planning Appeals $322.00 $2,108.04 33% $1,420.00 $1,453. 15 32% $990.00 $2,410.00 $2,088.00 10 107 Project Applicant Appeal Fee for processing pro ject applicant appeal. Planning Appeals 65% of Origina l Filing Fee with $485.00 maximum $2,108.04 33% $1,420.00 $1,453.15 32% $990.00 $2,410.00 NA 11 2108 Cannabis Application Fee Application fee for a new commercial cannabis business Planning Applicatio n Review $18,007.00 NA NA NA - NA N A $18,007.00 +$20,000 refundable legal deposit $0.00
12 2110 Cannabis Background Check Background check for a new commercial cannabis business Planning Applicat ion Review $308.00 NA NA NA - NA NA $308.00 $0.00 13 2109 Cannabis Zoning Request Fee for commercial bus iness zoning Planning Application Review $308.00 NA NA NA - NA NA $308.00 $0.00 14 2101
Applicant Initiated: Environmental Impact Reports,
Mitigated Negative Declaration, Addendum, or other
environmental document
Fee to review an Environmental Impact Report, Negative
Declaration, Mitigated Negative Declaration or Addendum Planning CEQA Cost + 25% Admin w/ Min $2k Deposit NA NA NA - NA NA
Cost + 25%
Admin w/ Min
$2k Deposit
$0.00
15 Staff Initiated : Environmental Impact Reports, Mitigated Negative Declaration, Addendum, or other environmental
document
Fee to prepare and review an Environmental Impact Report, Negative Declaration, Mitigated Negative Declaration or Addendum
Planning New NA NA NA - NA NA
Cost + 25% of the
cost for
Administration
with minimum
$2000 deposit
NA
16 133 Exemption Fee for staff to review and approve determinations of exemption. Planning CEQA $396.00 $1,484.82 33% $990.00 - NA $0.00 $990.00 $594.00 17 134 Initial Study Fee for staff to review and issue an initial study. Planning CEQA $2,722.00 $2,495.33 35% $1,630.00 - NA $0.00 $1,630.00 -$ 1,092.00 18 Mitigation Monitoring Implementation Fee for work associated with Mitigation Monitoring & Reporting Planning CEQA New NA NA NA - NA NA $500 0 min Administration Deposit NA 19 844 ABC License
Administratively review and present to Planning Commission for approval of a conditional use permit for a new Alcoholic Beverage License.
Planning Conditional Use Permits 1 $2,637.00 $3,340.58 34% $2,220.00 - NA $0.00 $2,220.00 -$417.00 20 567 ABC License with Existing C.U.P. Transfer of Al coholic Beverage License with existing C.U.P. Planni ng Conditional Use Permits $152.00 $967.43 31% $670.00 - NA $0.00 $670.00 $518.00 21 595 Conditional Use Permit Amendment Fee for the am endment of an existing Conditional Use Permit. Plann ing Conditional Use Permits 50% of Original Conditional Use Permit Fee NA NA NA - NA NA
50% of Original
Conditional Use
Permit Fee
$0.00
22 846 Commercial use in an existing building Processing fee for a conditional use permit application for commercial use in an existing building. Planning Conditional Use Permits 1 $1,384.00 $3,881.87 34% $2,580.00 - NA $0.00 $2,580.00 $1,196.00 23 119 Commercial/Industrial Fee for C.U.P. - Commerc ial/Industrial Planning Conditional Use Permits 1 $6,692.00 + $55/acre $7,596.81 34% $5,000.00 $2,974.75 3 0% $2,080.00 $7,080.00 + $100 per acre (surcharge capped at $5,000) $388.00
24 589 Residential Processing fee for a residential c onditional use permit Planning Conditional Use Permits 1 $5,274.00 + $22/D.U. $7,596.81 34% $5,000.00 $2,974.75 3 0% $2,080.00 $7,080.00 + $25 per DU (max surcharge $2,500) $1,806.00
25 1255 Residential Child Care- more than 7 children
Fee for staff to administratively review and present to Planning Commission for approval of a conditional use permit for Residential Child Care Facilities with more than 7 children.
Planning Conditional Use Permits $907.00 $1,781.80 34% $ 1,180.00 - NA $0.00 $1,180.00 $27 3.00 26 654 Surface Mining Reclamation Act Fee for C.U.P. f or mining operations. Planning Conditional Use Permit s Actual Costs + City-Wide G & A rate $7,596.81 34% $5, 000.00 $2,974.75 30% $2,080.00 $7,080.00 NA 27 138 De Minimis Finding (Negative Declaration)
County Filing Fee for De Minimis finding (negative declaration) for Dept. of Fish & Game. Fee is established per County schedule.
Planning Department of Fish &
Game $51.00 NA NA $75.00 - NA NA $50.00 C ounty Filing Fee -$1.00 28 140 Impact Project - Environmental Impact Report Pa ss Through Fee Planning Department of Fish & Game $4,051.25 NA NA NA - NA NA $4,051.2 5 County Filing Fee $0.00 29 139 Impact Project - Negative Declaration Pass Thro ugh Fee Planning Department of Fish & Game $2,916.75 NA NA NA - NA NA $2,916.7 5 County Filing Fee $0.00 30 Notice of Exemption - Clerk of the Board Fee County Filing fee for State Fish and Wildlife Fee for project recordation, fee established per County Schedule. Planning Department of Fish and Game $50.00 NA NA NA - NA NA $50.00 Count y Filing Fee $0.00 31 130 Commercial/Industrial Fee for design review - commercial/industrial Planning Design Review $12,393.0 0 + $113.00/Acre over 20 acres $11,988.16 34% $7,870.00 $3,685.25 31% $2,530.00 $10,400. 00 $250 per acre (surcharge capped at $5,000) -$1,993.00
32 481 DR Amendment Fee for Design Review Amendment. Pl anning Design Review 50% of Original Engineering & Planning Design Review Fee NA NA NA - NA NA 50% of Original Fee $0.00
33 653 Minor Modification Fee for staff to review and approve minor modifications to design review applications. Planning Design Review $975.00 $2,409.32 34% $1,590.00 $1 ,147.36 31% $790.00 $2,380.00 $1,405.00 69 Planning
Item
No. ID # Title Description Type Category Current Fee/Charge Unit Planning
Full Cost Planning Subsidy Planning Total Eng. Full Co st Eng.
Subsidy
Eng.
Total Suggested Fee Unit Fee Δ
34 127 Residential- 5 or greater D.U's Fee for Design Review - Residential- over 5 D.U.s. Planning Design Review $10,351.00 + $22/du $11,988.16 34% $7,870.00 $3,6 85.25 31% $2,530.00 $10,400.00 $25 per DU (max surcharge $2,500) $49.00
35 123 DRS Individual Sign Fee charged for Design Revi ew for Individual Sign. Planning Design Review Sign $4 23.00 $786.05 35% $510.00 $1,147.36 77% $262.00 $772.00 $34 9.00 36 124 DRS Planning Commission Fee charged for staff to review and approve design reviews for signs which will be reviewed by the Planning Commission Planning Design Review Sign $1,729.00 $2,449.93 34% $1,6 10.00 $1,147.36 31% $790.00 $2,400.00 $671.00 37 131 Development Agreement Fee for development agreement. Billed at actual cost plus G&A with a $10,000 minimum deposit. Planning Development Agreement Cost + G&A w/$10,000 min deposit NA NA NA - NA NA Cost + G&A + $10 ,000 legal deposit $0.00 38 Planning-Miscellaneous Deposit This is a deposit for the Planning Department to take in for miscellaneous items Planning Entitlement New NA NA NA - NA NA TBD NA 39 162 Final Inspection - Commercial/Industrial Fee charged at time building permits are issued for Commercial/Industrial. Planning Final Inspection $566.00 $1,021.01 34% $670.00 - NA $0.00 $670.00 $104.00 40 775 Final Inspection - Residential Fee is charged at the time building permits are issued for residential Planning Final Inspection $90.00 $1,021.01 34% $670.00 - NA $670.00 $580.00 41 480 Inspection Fee - C.U.P.Tattoo Establishments Annual inspection fee of Tattoo Establishments in conjunction with the conditions of approval contained within the C.U.P Planning Final Inspection $310.00 $260.53 31% $180.00 - NA $0.00 $180.00 -$130.00 42 1909 Massage Establishment Permit Consists of thoroughly reviewing the projects impact to the City and compliance with the municipal code. Planning Final Inspection $146.00 $1,038.33 35% $680.00 - NA $0.00 $680.00 $534.00 43 1910 Massage Technician Permit Consists of thoroughly reviewing the Technician is in compliance with the municipal code. Planning Final Inspection $146.00 $751.18 36% $480.00 - NA $0.00 $480.00 $334.00 44 110 GP Amend Fee for General Plan Amendment Planning General Plan Amendment $9,897.00 $13,221.87 34% $8,740. 00 $3,198.93 32% $2,180.00 $10,920.00 $1,023.00 45 284 Certificate of Appropriateness Fee to process C ertificate of Appropriateness Planning Historical Pr eservation $696.00 $3,015.56 34% $1,990.00 - NA $0.00 $1,990.00 $1,294.00 46 285 Certificate of Economic Hardship Fee to process Certificate of Economic Hardship. Planning Historica l Preservation $804.00 50% of Appropriateness NA NA NA - NA NA
50% of
Appropriateness
Fee
NA
47 2068 Re-Inspection - Commercial/Industrial Fee charged for inspection after building permits are issued for Commercial/Industrial, subsequent to Final inspection. Planning Inspection $282.00 $394.53 29% $282.00 - NA $0.00 $282.00 $0.00 48 847 ABC License Transfer or Revision Administratively review and approve minor use permit for a transfer or revision of an Alcoholic Beverage License. Planning Review Fees Minor Use Permit 1 $1,558.00 $2,397.97 34% $1,580.00 - NA $0.00 $1,580.00 $22.00 49 849 Commercial / Industrial Fee for review of mino r use permits Planning Review Fees Minor Use Permit 1 $1,842.00 $4,375.28 33% $2,950.00 - NA $0.00 $2,950.00 $1,108.00 50 963 Model Home Complex Fee for City staff to administratively review and approve minor use permits for Model Home Complex. Planning Review Fees Minor Use Permit 1 $907.00 $1,693.60 34% $1,120.00 - NA $0.00 $1,120.00 $213.00 51 828 Adult Oriented Business Review
Review and processing of an Adult Oriented Business application which covers additional background investigation. This is in addition to the standard new business fees to operate in the City.
Planning Miscellaneous $6,806.00 $6,727.12 34% $4,430.00 - NA $0.00 $4,430.00 -$2,376.00 52 161 Building Relocation Fee for Planning Commission review of a building to be relocated or located into the City of Fontana. Planning Miscellaneous $1,258.00 $3,422.75 35% $2,230.00 - NA $0.00 $2,230.00 $972.00 53 2113 Cannabis Change of Ownership Fee for a change in ownership of a commercial cannabis business Planning Miscellaneous $3,704.00 NA NA NA - NA NA $3,704.00 $0.00 54 2114 Cannabis Name Change Fee for name change only of a commercial cannabis business Planning Miscellane ous $2,366.00 $2,300.00 0% $2,300.00 - NA $0.00 $2,300.00 -$66.00 55 166 Conditions, Covenants & Restrictions (CC&R) Fee charged for conditions, covenants & restrictions review. Planning Miscellaneous Actual Cost + City-Wide G & A rate. $930.00 34% $610.00 - NA $0.00 $610.00 + $10,000 legal deposit NA 56 116 Density Bonus Fee for staff to review and appro ve Density Bonus applications. Planning Miscellaneous $6,466.00 $8,551.78 24% $6,466.00 - NA NA $6,466.00 $0.00 57 961 Directors Determination
A discretionary action by the Director of Planning to make determinations on proposed amendments to previously approve entitlements by the Planning Commission.
Planning Miscellaneous $368.00 $1,180.91 35% $770.00 - NA $0.00 $770.00 $402.00 58 163 Home Occupation Fee for staff to review and approve Home Based Business Occupation permits. Planning Miscellaneous $282.00 $118.22 15% $100.00 - NA $0.00 $100.00 -$182.00 59 44 Laser Imaging
Fee charged for laser imaging of all issued permits, plans or other related documents to keep as permanent archived
records. (Fee is based on average of 15 sheets imaged)
Archive Miscellaneous $32.00 $59.11 32% $40.00 - NA $0.00 $40.00 $8.00 60 529 Model Homes Sales Deposit
Refundable deposit for model homes and associated parking areas. Deposit is intended to recover the costs associated with converting model homes to saleable condition if required. Fee is per model & parking lot.
Planning Miscellaneous $2,500.00 /Model & Parking
Lot $2,038.53 32% $1,380.00 - NA $0.0 0 $1,380.00 + $25,000 refundable deposit -$1,120.00
61 842 Newspaper Public Notice Fee to recover the cost of newspaper filings when required Planning Miscella neous $197.00 $350.00 0% $350.00 - NA $0.00 $350.00 $153.00 62 164 Planning Commission Interpretation Fee for the interpretation given by the Planning Commission on an item. Planning Miscellaneous $651.00 $1,285.92 34% $850.00 - NA $0.00 $850.00 $199.00 63 843 Preapplication Meeting
The City's code requires City Staff to administratively review and conference with the applicant prior to submittal of an
application.
Planning Miscellaneous $1,133.00 $2,092.19 35% $1,370.00 $1,456.06 30% $1,020.00 $2,390.00 $1,257.00 64 2096 Recreational Indoor Marijuana Cultivation Annual permit fee for application and exterior inspection for recreational indoor marijuana cultivation. Planning Miscellaneous $27.00 $242.21 30% $170.00 - NA $0.00 $170.00 $143.00 65 839 Temporary Banner - 45 Day Temporary Sign
The City's amended Development Code includes a requirement for the City Staff to administratively review and approve temporary banners.
Planning Miscellaneous $55.00 $171.52 36% $110.00 - NA $0.00 $110.00 $55.00 66 483 Temporary Use Permit
The City's amended Development Code includes a requirement for the City Staff to administratively review and approve temporary use permits
Planning Miscellaneous $100.00 $2,364.86 32% $1,600.00 $2 ,731.59 30% $1,900.00 $3,500.00 $3,400.00 67 1911 Time Extension for Planning Cases Fee for time extension on Planning cases. Planning Miscellaneous 5 0% of Original Fee NA NA NA - NA N A 25% of Original Fee -25%
70 Planning
Item
No. ID # Title Description Type Category Current Fee/Charge Unit Planning
Full Cost Planning Subsidy Planning Total Eng. Full Co st Eng.
Subsidy
Eng.
Total Suggested Fee Unit Fee Δ
68 2008 TUP Food Truck Event
The City's amended Development code includes a requirement for staff to administratively review and approve temporary use permits for food truck events
Planning Miscellaneous $275.00 $879.82 32% $600.00 - NA $0.00 $600.00 $325.00 69 112 Variance 1 Fee for Variance. Planning Miscellaneous $3,713.00 $4,7 27.22 34% $3,120.00 $1,390.53 31% $960.00 $4,080.00 $367.0 0 70 850 Variance - Sign Fee for City staff to review and approve sign variances. Planning Miscellaneous $1, 281.00 $1,174.25 34% $780.00 - NA $0.00 $780.00 -$501.00 71 962 Variance - Administrative
Fee for permission to depart from zoning ordinances because of special circumstances unique to a specific property of project.
Approved administratively.
Planning Miscellaneous $2,495.00 $2,450.65 32% $1,670.00 $1,390.53 31% $960.00 $2,630.00 $135.00 72 594 Zoning Letter - Zoning Determination Fee associated with research, determination and issuance of a letter confirming a parcels zoning code. Planning Miscellaneous $146.00 $606.12 32% $410.00 - NA $0.00 $410.00 $264.00 73 851 Zoning Letters - Zoning Rebuild Fee associated with research, determination and issuance of a letter confirming a parcels zoning code. Planning Miscellaneous $339.00 $606.12 32% $410.00 - NA $0.00 $410.00 $71.00 74 2111 Cannabis Permit Fee for a commercial cannabis business permit. Planning Permit $9,363.00 NA NA NA - NA NA $9,363.00 $0.00 75 Landscape Permit Issuance Fee Fee to process the p ermit Planning New $118.22 15% $100.00 - NA $0.00 $100.00 Permit Fee NA 76 Landscape Plan Check - Residential - Single Lot La ndscape plan check for residential single lot Planni ng Plan Check New $1,603.86 36% $1,030.00 - NA $0.00 $1,030.00 NA 77 Landscape Plan Check - Residential Tract Developm ent Landscape plan check for sites Residential Devel opment Planning Plan Check New $2,035.40 36% $1,300.00 - NA $0.00 $1,300.00 + $25 per lot , incl. lettered NA 78 Landscape Plan Check - Commercial Development Land scape plan check for Commercial Development Planning Plan Check New $2,898.48 37% $1,820.00 - NA $0.00 $1,820.00 + $500 per acre NA 79 Landscape Plan Check - Industrial Development Land scape plan check for Industrial Development Planning Plan Check New $2,898.48 37% $1,820.00 - NA $0.00 $1,820.00 + $250 per acre NA 80 Landscape Plan Check - Other Landscape plan check Planning Plan Check New $2,466.94 37% $1,560.00 - NA $0.00 $1,560.00 NA 81 Planning Plan Check Fee Commercial Other Planning Plan Check Fee Commercial Other Planning Plan Check N ew $806.28 34% $530.00 - NA $0.00 $ 530.00 NA 82 Planning Plan Check Fee Commercial-Cell Site Plann ing Plan Check Fee Commercial-Cell Site Planning Pla n Check New $403.14 13% $350.00 - NA $0.00 $350.00 NA 83 Planning Plan Check Fee Industrial Non-Warehouse P lanning Plan Check Fee Industrial Non-Warehouse Plan ning Plan Check New $806.28 13% $701.00 - NA $0.00 $701.00 NA 84 Planning Plan Check Fee Industrial Warehouse Plann ing Plan Check Fee Industrial Warehouse Planning Plan Check New $1,209.42 35% $790.00 - NA $0.00 $790.00 NA 85 Planning Plan Check Fee Residential-ADU Planning P lan Check Fee Residential-ADU Planning Plan Check New $ 403.14 36% $260.00 - NA $0.00 $260 .00 NA 86 Planning Plan Check Fee Residential-Other Planning Plan Check Fee Residential-Other Planning Plan Check New $403.14 36% $260.00 - NA $0.00 $260.00 NA 87 Planning Plan Check Fee Residential-Phasing Planni ng Plan Check Fee Residential-Phasing Planning Plan C heck New $403.14 36% $260.00 - NA $ 0.00 $260.00 NA 88 Planning Plan Check Fee Residential-Stock Plans Pl anning Plan Check Fee Residential-Stock Plans Planni ng Plan Check New $403.14 36% $260.00 - NA $0.00 $260.00 NA 89 793 Plan Check Fee - Other Than Room Additions Plan Check Fee - Planning- Other Than Room Additions Pl anning Plan Check Fee $191.00 $346.26 31% $240.00 - NA $0.00 $240.00 $49.00 90 792 Plan Check Fee - Room Additions Plan Check Fee - Planning- Room Additions Only Planning Plan Check F ee $95.00 $173.13 31% $120.00 - NA $0.00 $120.00 $25.00 91 2112 Cannabis Permit Renewal Fee for renewal of a c ommercial cannabis business Planning Renewal $2,366.00 NA NA NA - NA $0.00 $2,366.00 $0.00 92 2115 Cannabis Appeal Deposit Deposit for the appeal of a commercial cannabis business decision. Planning Security Deposit $5,145.00 NA NA NA - NA $0.00 $5,145.00 $0.00 93 482 Specific Plan Amendment Fee for Specific Plan Amendment. Billed at actual cost with a minimum deposit required of $5,000.00. Planning Specific Plan Cost + $5,000 min deposit NA NA N A NA NA NA $15,000.00 Deposit NA 94 302 Specific Plan Amendment - Minor Fee charged for Specific Plan. Billed at actual cost with a minimum deposit of $20,000.00. Planning Specific Plan Cost + $20,000 min dep. NA NA NA NA NA NA $7,000.00 Deposit NA 95 141 Commercial/ Industrial Fee for a tentative parc el maps- commercial/industrial. Planning Tentative Parcel Maps 1 $7,412.00 + $113/Acre $7,271.81 35% $4,750.00 $3,392.63 31% $2,340.00 $7,090.00 + $50/Acre -$322.00 96 144 Lot Line Adjustment Fee for lot line adjustment . Planning Tentative Parcel Maps 1 $2,495.00 $2,410.88 34% $1,590.00 $3,589.48 28% $2,580.00 $4,170.00 $1,675.00 97 146 Major Modification Fee charged for tentative pa rcel map major modification. Planning Tentative Parcel Maps 1 $5,841.00 $4,426.57 34% $2,900.00 $4,365.28 30% $3,040.00 $5,940.00 $99.00 98 152 Minor Modification Fee for minor modification t o tentative parcel map. Planning Tentative Parcel Maps 1 $2,154.00 $3,418.72 34% $2,240.00 $1,939.48 31% $1,340.00 $3,580.00 $1,426.00 99 147 Revert to Acreage Fee charged for tentative par cel map reversion to acreage. Planning Tentative Parcel Maps 1 $2,382.00 $2,207.77 34% $1,450.00 $1,939.48 31% $1,340.00 $2,790.00 $408.00 100 142 Tentative Parcel Map - Residential and Urban Lot Splits Fee for staff to administratively review and approve residential tentative parcel maps and urban lot splits Planning Tentative Parcel Maps 1 $7,412.00 + $113/Acre $4,361.61 13% $3,813.00 $3,392.63 31% $2,340.00 $6,153.00 + $110/Acre -$1,259.00 101 525 Commercial/ Industrial Fee charged for tentat ive tract maps - commercial/ industrial Planning Tentative Tract Maps 1 $10,918.00 + 113/Acre $8,279.66 35% $5,410.00 $3,878.95 31% $2,690.00 $8,100.00 + $50/per lot -$2,818.00 102 153 Major Modification Fees charged for major modi fication of a tentative tract map. Planning Tentative Tract Maps 1 $4,740.00 $5,694.28 34% $3,740.00 $2,781.05 31% $1,920.00 $5,660.00 $920.00 103 145 Minor Modification Fee for tentative tract map - minor modification. Planning Tentative Tract Maps 1 $2,722.00 $3,418.72 34% $2,240.00 $1,939.48 31% $1,340.00 $3,580.00 $858.00 104 150 P.U.D. Fee charged for tentative tract maps - P.U.D. Planning Tentative Tract Maps 1 $7,911.00 + $168.00/Acre $10,620.35 34% $6,970.00 $1,93 9.48 31% $1,340.00 $8,310.00 + $25 per DU (max surcharge $2,500) $399.00
105 151 Residential Fee charged for tentative tract ma ps - Residential Planning Tentative Tract Maps 1 $11,627.00 + $55/ac $10,620.35 34% $6,970.00 $2,974.75 3 0% $2,080.00 $9,050.00 + $25 per DU (max surcharge $2,500) -$2,577.00
106 115 Development Code Amendment Fee for zoning code amendment. Planning Zone Change 2 $12,648.00 $13,268.12 34% $8,770.00 $2,537.89 31% $1,740. 00 $10,510.00 -$2,138.00 107 113 Zone Change Fee for Zone Change Planning Zone Change 2 $6,890.00 $8,708.63 34% $5,760.00 $2,537.89 31% $1,740.00 $7,500.00 $610.00 108 Temporary Use Permit for Fireworks Fee associate d with reviewing TUP for fireworks Planning New $472. 95 32% $320.00 - NA $0.00 $320.00 N A 109 Landscaping Inspection Fee Fee charged for final landscape inspections Planning Landscape Inspection Ne w $1,078.84 7% $1,007.00 - NA $1,7 40.00 $1,007.00 NA 110 Re-Inspection Landscape Fee Re-Inspection if addi tional landscape inspections are needed Planning Land scape Inspection New $215.77 7% $201.00 - NA $0.00 $201.00 NA Notes:
1. 25% Reduction when combined with either GPA, a DR, or ASP
2. 50% Reduction when combined with GPA or 25% Reduction when combined with DR or ASP 71 Finance
Item
No. ID # Title Description Type Category Current Fee/Charge Unit Full Cost Subsidy % Suggested Fee Fee Δ 1 288 License penalties License tax penalties for late filing of application. Business License Miscellaneous 20% per month (maximum 100%) NA NA 20% per month (maximum
100%) $0.00
2 289 Various Permits Fee for various permits. Business Services Miscellaneous Varies NA NA Varies $0.00 3 291 Fireworks Application Fee Application fee for firework sales. Business License Fireworks $50.00 per year NA NA $50.00 $0.00 4 292 Bad Check Charges Charges for dishonored checks returned by the bank. Business Services Miscellaneous $35.00 NA NA $35.00 $0.00 5 293 City Sewer Service Fee for City Sewer Service. Sewer Miscellaneous $11.59 /month per EDU NA NA $11.59 $0.00
6 294 Monthly Sewer Rates IEUA Passthrough fee for IEUA-Sewer Service. Sewer Miscellaneous Current IEUA Fee NA NA Current IEUA Fee $0.00 7 295 City Pretreatment Program Fee for City Pretreatment Program. Sewer Miscellaneous $5.15 per EDU NA NA $5.15 per EDU $0.00 8 296 Sewer Penalties Fee for Sewer late charges. Sewer Miscellaneous 10% of invoice amount NA NA 10% of invoice amount $0.00 9 297 Rialto Sewage Treatment Passthrough fee for service for Rialto Sewage Treatment. Sewer Miscellaneous Current Rialto Fee NA NA Current Rialto Fee $0.00 10 498 CFD Payoff Calculation Fee for CFD Payoff Calculation Payoff Calculation Service Fee Cost + G & A Rate NA NA Cost + G & A Rate $0.00 11 534 Retail Business License tax for retail business. Business License Business-New $50.00/$50,000grs. rcpts. +
$35.00 app. or $50.00 +
$.25 per $1,000 over
$50,000grs. + $35.00app.
NA NA
$50.00/$50,000grs. rcpts. +
$35.00 app. or $50.00 + $.25
per $1,000 over $50,000grs.
+ $35.00app.
$0.00
12 535 Retail Business License tax renewal for Retail Business. Business License Business-Renewal $50.00/$50,000grs. rcpts. +
$15.00app. or $50.00 + $.25
per $1,000 over $50,000grs.
+ $15.00app.
NA NA
$50.00/$50,000grs. rcpts. +
$15.00app. or $50.00 + $.25
per $1,000 over $50,000grs.
+ $15.00app.
$0.00
13 536 Warehouses/Manufacturing License tax for warehouses/manufacturing business. Business License Business-New $25.00/$25,000grs. rcpts. +
$35.00app. or $25.00 + $.30
per $1,000 over $25,000grs.
+ $35.00app.
NA NA
$25.00/$25,000grs. rcpts. +
$35.00app. or $25.00 + $.30
per $1,000 over $25,000grs.
+ $35.00app.
$0.00
14 537 Warehouses/Manufacturing License tax renewal for warehouses/manufacturing business. Business License Business-Renewal $25.00/$25,000grs. rcpts. +
$15.00app. or $25.00 + $.30
per $1,000 over $25,000grs.
+ $15.00app.
NA NA
$25.00/$25,000grs. rcpts. +
$15.00app. or $25.00 + $.30
per $1,000 over $25,000grs.
+ $15.00app.
$0.00
15 538 Contractors License tax for contractors. Business License Business-New $75.00/$100,000grs. rcpts.
+ $35.00 app. or $75.00 +
$.75 per $1,000 over
$100,000 + $35.00app.
NA NA
$75.00/$100,000grs. rcpts. +
$35.00 app. or $75.00 + $.75
per $1,000 over $100,000 +
$35.00app.
$0.00
16 539 Contractors License tax renewal for contractors. Business License Business-Renewal $75.00/$100,000grs. rcpts.
+ $15.00app. or $75.00 +
$.75 per $1,000 over
$100,00grs. + $15.00app.
NA NA
$75.00/$100,000grs. rcpts. +
$15.00app. or $75.00 + $.75
per $1,000 over $100,00grs.
+ $15.00app.
$0.00
17 540
Amusements or Recreational
Business License tax for amusements or recreational Business. Business License Business-New $25.00/$10,000 gross. rcpts.
+ $0.50 per $1,000 over
$10,000 + $35.00app.
NA NA
$25.00/$10,000 gross. rcpts.
+ $0.50 per $1,000 over
$10,000 + $35.00app.
$0.00
18 541
Amusements or Recreational
Business License tax renewal for amusements or recreational business. Business License Business-Renewal $25.00/$10,000grs. rcpts. +
$15.00app. or $100.00 +
$.50 per $1,000 over
$50,000 + $15.00app.+ PD
User Fee
NA NA
$25.00/$10,000grs. rcpts. +
$15.00app. or $100.00 +
$.50 per $1,000 over
$50,000 + $15.00app.+ PD
User Fee
$0.00
19 542 Solicitors, Peddlers, or
Canvassers License tax for solicitors, peddlers, or canvassers. Business License Business-New $50.00/$25,000grs. rcpts. +
$35.00app. or $50.00
+$1.00 per $1,000 over
$50,000 + $35.00app.
NA NA
$50.00/$25,000grs. rcpts. +
$35.00app. or $50.00
+$1.00 per $1,000 over
$50,000 + $35.00app.
$0.00
20 543 Solicitors, Peddlers, or
Canvassers License tax renewal for solicitors, peddlers, or canvassers. Business License Business-Renewal $50.00/$25,000grs. rcpts. +
$15.00app. or $25.00 +
$1.00 per $1,000 over
$50,000 + $15.00app.
NA NA
$50.00/$25,000grs. rcpts. +
$15.00app. or $25.00 +
$1.00 per $1,000 over
$50,000 + $15.00app.
$0.00
21 544
Professional and/or
primarily service related
businesses.
License tax for professional and/or primarily services related businesses. Business License Business-New $25.00/$25,000grs. rcpts. +
$35.00app. or $25.00 +
$1.00 per $1,000 over
$25,000 + $35.00app.
NA NA
$25.00/$25,000grs. rcpts. +
$35.00app. or $25.00 +
$1.00 per $1,000 over
$25,000 + $35.00app.
$0.00
22 545
Professional and/or
primarily service related
businesses
License tax renewal for professional and/or primarily service related businesses. Business License Business-Renewal $25.00/$25,000grs. rcpts. +
$15.00app. or $25.00 +
$1.00 per $1,000 over
$25,000grs. + $15.00app.
NA NA
$25.00/$25,000grs. rcpts. +
$15.00app. or $25.00 +
$1.00 per $1,000 over
$25,000grs. + $15.00app.
$0.00
72 Finance
Item
No. ID # Title Description Type Category Current Fee/Charge Unit Full Cost Subsidy % Suggested Fee Fee Δ 23 546
Business consisting of the
rental or leasing of real
property- Under $3,000 grs.
rcpts.
License tax for business consisting of the rental or leasing of real property. Business License Business-New $12.00/$3,000grs. rcpts. + $35.00 app. NA NA $12.00/$3,000grs. rcpts. +
$35.00 app. $0.00
24 547
Businesses consisting of the
rental or leasing of real
property-Under $3,000 grs.
Rcpts
License tax for businesses consisting of the rental or leasing of real property. Business License Business-Renewal $12.00/$3,000grs. rcpts. + $15.00app. NA NA $12.00/$3,000grs. rcpts. +
$15.00app. $0.00
25 548
Businesses consisting of the
rental or leasing of real
property- $3,001 to $10,000
grs. rcpts.
License tax for businesses consisting of the rental or leasing of real property. Business License Business-New Up to $10,000grs. rcpts.=
$12.00 + $1.50 per $1,000
over $3,000 + $35.00app.
NA NA
Up to $10,000grs. rcpts.=
$12.00 + $1.50 per $1,000
over $3,000 + $35.00app.
$0.00
26 549
Businesses consisting of the
rental or leasing of real
property- $3,001 to $10,000
grs. rcpts.
License tax renewal for businesses consisting of the rental or leasing of real property. Business License Business-Renewal
Up to $10,000grs. rcpts.=
$12.00 + $1.50 per $1,000
over $3,000 + $15.00app.
NA NA
Up to $10,000grs. rcpts.=
$12.00 + $1.50 per $1,000
over $3,000 + $15.00app.
$0.00
27 550
Businesses consisting of the
rental or leasing of real
property- $10,001 to $20,000
grs. rcpts.
License tax for businesses consisting of the rental or leasing of real property. Business License Business-New Up to $20,000grs. rcpts.=
$22.50 + $2.50 per $1,000
over $10,000 + $35.00app.
NA NA
Up to $20,000grs. rcpts.=
$22.50 + $2.50 per $1,000
over $10,000 + $35.00app.
$0.00
28 551
Businesses consisting of the
rental or leasing of real
property- $10,001 to $20,000
grs. rcpts.
License tax renewal for businesses consisting of the rental or leasing of real property. Business License Business-Renewal
Up to $20,000grs. rcpts.=
$22.50 + $2.50 per $1,000
over $10,000 + $15.00app.
NA NA
Up to $20,000grs. rcpts.=
$22.50 + $2.50 per $1,000
over $10,000 + $15.00app.
$0.00
29 552
Businesses consisting of the
rental or leasing of real
property- Over $20,000 grs.
rcpts.
License tax for businesses consisting of the rental or leasing of real property. Business License Business-New Over $20,000grs. rcpts.=
$47.50 + $3.50 per $1,000
over $20,000 + $35.00app.
NA NA
Over $20,000grs. rcpts.=
$47.50 + $3.50 per $1,000
over $20,000 + $35.00app.
$0.00
30 553
Businesses consisting of the
rental or leasing of real
property- Over $20,000 grs.
rcpts.
License tax renewal for businesses consisting of the rental or leasing of real property. Business License Business-Renewal
Over $20,000grs. rcpts.=
$47.50 + $3.50 per $1,000
over $20,000 + $15.00app.
NA NA
Over $20,000grs. rcpts.=
$47.50 + $3.50 per $1,000
over $20,000 + $15.00app.
$0.00
33 685 Firework Sales License tax for sale of fireworks. Business License Fireworks 3% of gross sales, but not less than $450.00 NA NA 3% of gross sales, but not
less than $450.00 $0.00
34 686 Massage Parlors -New License for Massage Parlors. Business License Massage $25.00/$25,000grs. Rcpts. +
$1.00 per $1,000 over
$25,000 + $35.00
application fee
NA NA
$25.00/$25,000grs. Rcpts. +
$1.00 per $1,000 over
$25,000 + $35.00
application fee
$0.00
35 687 Massage Parlors - Renewal License renewal for massage parlors. Business License Massage $25.00/$25,000grs. Rcpts. +
$1.00 per $1,000 over
$25,000 + $15.00 renewal
fee
NA NA
$25.00/$25,000grs. Rcpts. +
$1.00 per $1,000 over
$25,000 + $15.00 renewal
fee
$0.00
36 688 Massage Technician License for massage technician. Business License Massage $25.00/$25,000grs. Rcpts. +
$1.00 per $1,000 over
$25,000 + $35.00 new app
fee & $15.00 renewal fee
NA NA
$25.00/$25,000grs. Rcpts. +
$1.00 per $1,000 over
$25,000 + $35.00 new app
fee & $15.00 renewal fee
$0.00
37 689 Bingo Games License for the conduct of bingo games. Business License Miscellaneous $50.00 per year NA NA $50.00 per year $0.00 38 730 Passport Fee- Adult (age 16
or older) Passport application for adults (age 16 or older). Passport Services Passport Application Fee $110.00 Plus Application Fee NA NA Current Department of
State Fee $0.00
39 731 Passport Fee- Child (age 15
and under) Passport application fee for children (age 15 and under). Passport Services Passport Application Fee $80.00 Plus Application Fee NA NA Current Department of State Fee $0.00
40 732 Passport Expedite Fee Expedite fee returns passport to applicant within 14 days. Passport Services Passport Application Fee $60.00 + Passport Application Fee NA NA Current Department of
State Fee $0.00
41 733 Passport Express Mail Fee Express mail fee returns passport to applicant overnight upon completion and provides tracking mechanism. Passport Services Passport Application Fee Current express mail fee + passport application fee NA NA Current express mail fee + passport application fee $0.00
42 739 Notary Fee-Customer
Service Only
Fee to cover the costs of notary public services for customers of City Services only.
The City does not offer notary public services to the general public. Business Services Miscellaneous $15.00 NA NA $15.00 $0.00 43 740 New Business Listing
Fee to cover the cost of preparing a custom business listing report and mail or email to the requesting party. Cost of printing or copying the requested material is not included in this cost.
Business Services Miscellaneous $5.00 NA NA $5.00 $0.00 44 750 DMV Abstract Fee
This fee is for the cost of service to issue a State of California DMV Abstract of Record for individuals who pay a citation late and have had a "hold" placed on their vehicle registration.
Business Services Miscellaneous $11.00 NA NA $11.00 $0.00 73 Finance
Item
No. ID # Title Description Type Category Current Fee/Charge Unit Full Cost Subsidy % Suggested Fee Fee Δ 45 1971 Certified Access Specialist
State Surcharge
State mandated fee per Business License Application or Renewal for ADA Inspections. Business License CASP FUND $4.00 NA NA $4.00 $0.00 46 2065 Passport Application
Acceptance Fee
Fee for City staff to process Passport applications. Per U.S. Dept. of State, a fee of $35 per application may be charged by an acceptance facility. Passport Services Passport Application Fee $35.00 NA NA $35.00 $0.00 47 2066 Credit Card Processing Fee
Credit card processing fee of 2.5% will be added to all transactions that exceed $1,000. Fee is to recover costs charged to the City by the merchant servicer and is applicable to the entire credit card transaction amount.
Finance Miscellaneous 2.5% of transaction NA NA 2.5% of transaction $0.00 48 2067 County Recording Fee - Lien
Release
Pass through charges made by San Bernardino County Recorder to record lien release documents. Current charge is $13.00 per document. Subject to increase at County level. Fee revised
per G27361.3, 27361.4 and 27361.
Finance Miscellaneous County Rate NA NA County Rate $0.00 74 Development Services - Solid Waste, Storm Water
Item No. Title Description Type Category
Current
Fee/Charge Unit Full Cost Subsidy % Suggested Fee Fee Δ 1 SB 1383 Edible Food Recovery Service or
Organization Inspection Fee
Fee to offset the cost to the City for inspection of an edible food recovery service or organization to determine compliance with SB 1383 regulations.
Development Services -
Solid Waste Inspection New Flat #N/A #N/A #N/A NA
2 SB 1383 Tier One Edible Food Generator
Inspection Fee
Fee to offset the cost to the City for inspection of an edible food generator to determine compliance with SB 1383 regulations.
Development Services -
Solid Waste Inspection New Flat #N/A #N/A #N/A NA
3 SB 1383 Tier Two Edible Food Generator
Inspection Fee
Fee to offset the cost to the City for inspection of an edible food generator to determine compliance with SB 1383 regulations.
Development Services -
Solid Waste Inspection New Flat #N/A #N/A #N/A NA
4 SB 1383 Reinspection Fee Fee to offset the cost to the City for reinspection to determine compliance with SB 1383 regulations. Development Services - Solid Waste Compliance Fee New Flat #N/A #N/A #N/A NA
5 SB 1383 First Notice of Violation Penalty imposed if an organic waste generator, haul er, or regulated entity cannot achieve compliance within 60 days of the original notice to comply.
Development Services -
Solid Waste Compliance Fee New Penalty NA NA $50.00 -
$100.00 NA
6 SB 1383 Second Notice of Violation Penalty imposed if an organic waste generator, haul er, or regulated entity is found in violation of th e same SB 1383 requirement within a one year period.
Development Services -
Solid Waste Compliance Fee New Penalty NA NA $100.00 -
$200.00 NA
7 SB 1383 Third Notice of Violation Penalty imposed if an organic waste generator, haul er, or regulated entity is found in violation of th e same SB 1383 requirement within a one year period.
Development Services -
Solid Waste Compliance Fee New Penalty NA NA $250.00 -
$500.00 NA
8 SB 1383 Consultant Routine Inspection Fee Fee to offset the cost to the City for routine inspections conducted by a consultant on behalf of the City to determine compliance with SB 1383 regulations.
Development Services -
Solid Waste Inspection New #N/A #N/A #N/A NA
9 SB 1383 Consultant Reinspection Fee Fee to offset the cost to the City for reinspection's conducted by a consultant on behalf of the City to determine compliance with SB 1383 regulations.
Development Services -
Solid Waste Inspection New #N/A #N/A #N/A NA
10 SB 1383 Violation Notice - Staff Time Fee to offse t the cost to the City for staff time required to write and issue an SB 1383 Violation Notice Development Services - Solid Waste Compliance Fee New #N/A #N/A #N/A NA
11 Refuse Variance Application Fee
Fee paid to the City by a property owner to cover the costs associated with an administrative review and determination by city staff of a Refuse Variance Application.
Development Services -
Solid Waste Miscellaneous New Flat #N/A #N/A #N/A NA
12 Illegal Discharge/Spill Clean-up Fee
Fee based on cost of cleanup of illegally dischar ged or spilled materials in the public right of wa y. Fee is based on actual time, equipment, materials, and disposal by city staff, and/or the amount the contractor bills for the cleanup and disposal of discharged or spilled materials.
Development Services -
Storm Water Abatement New Varies NA NA Actual Cost NA
13 Trash - Barrel Development Services -
Solid Waste Bin Service 36.15 NA NA $36.15 $0.00
14 Trash - Senior Service Development Services -
Solid Waste Bin Service 28.92 NA NA $28.92 $0.00
15 Recycling - Barrel Development Services -
Solid Waste Bin Service N/C NA NA N/C $0.00
16 Green Waste - Barrel Development Services -
Solid Waste Bin Service N/C NA NA N/C $0.00
17 Residential Services Extra Trash Barrel Development Services - Solid Waste Bin Service 8.43 NA NA $8.43 $0.00
18 Extra Recycling Barrel Development Services -
Solid Waste Bin Service N/C NA NA N/C $0.00
19 Extra Green Waste Barrel Development Services -
Solid Waste Bin Service N/C NA NA N/C $0.00
20 Additional Service: Locking Barrel (trash only) Development Services - Solid Waste Bin Service 17.65 NA NA $17.65 $0.00
21 Additional Sevice:Locking Barrel Exchange (first free), does not apply to graffiti or damaged barrels Development Services - Solid Waste Bin Service 19.25 NA NA $19.25 $0.00
22 Additional Service: Locking Barrel Replacement (T rash) Development Services - Solid Waste Bin Service 100.59 NA NA $100.59 $0.00
23 1 Cubic Yard 1X Week Development Services -
Solid Waste Bin Service 117.07 NA NA $117.07 $0.00
24 1 Cubic Yard 2X Week Development Services -
Solid Waste Bin Service 188.93 NA NA $188.93 $0.00
25 1 Cubic Yard 3X Week Development Services -
Solid Waste Bin Service 248.59 NA NA $248.59 $0.00
26 Multi Family - Refuse 1 Cubic Yard 1 Cubic Yard 4X Week Development Services - Solid Waste Bin Service 310.81 NA NA $310.81 $0.00
27 1 Cubic Yard 5X Week Development Services -
Solid Waste Bin Service 368.92 NA NA $368.92 $0.00
28 1 Cubic Yard 6X Week Development Services -
Solid Waste Bin Service 431.22 NA NA $431.22 $0.00
29 1 Cubic Yard 7X Week Development Services -
Solid Waste Bin Service 517.81 NA NA $517.81 $0.00
75 Development Services - Solid Waste, Storm Water
Item No. Title Description Type Category
Current
Fee/Charge Unit Full Cost Subsidy % Suggested Fee Fee Δ 30 1.5 Cubic Yard 1X Week Development Services -
Solid Waste Bin Service 144.28 NA NA $144.28 $0.00
31 1.5 Cubic Yard 2X Week Development Services -
Solid Waste Bin Service 242.77 NA NA $242.77 $0.00
32 1.5 Cubic Yard 3X Week Development Services -
Solid Waste Bin Service 331.71 NA NA $331.71 $0.00
33 Multi Family - Refuse 1.5 Cubic Yard 1.5 Cubic Yard 4X Week Development Services - Solid Waste Bin Service 419.52 NA NA $419.52 $0.00
34 1.5 Cubic Yard 5X Week Development Services -
Solid Waste Bin Service 505.97 NA NA $505.97 $0.00
35 1.5 Cubic Yard 6X Week Development Services -
Solid Waste Bin Service 592.76 NA NA $592.76 $0.00
36 1.5 Cubic Yard 7X Week Development Services -
Solid Waste Bin Service 710.01 NA NA $710.01 $0.00
37 2 Cubic Yard 1X Week Development Services -
Solid Waste Bin Service 175.45 NA NA $175.45 $0.00
38 2 Cubic Yard 2X Week Development Services -
Solid Waste Bin Service 308.92 NA NA $308.92 $0.00
39 2 Cubic Yard 3X Week Development Services -
Solid Waste Bin Service 428.80 NA NA $428.80 $0.00
40 Multi Family - Refuse 2 Cubic Yard 2 Cubic Yard 4X Week Development Services - Solid Waste Bin Service 549.84 NA NA $549.84 $0.00
41 2 Cubic Yard 5X Week Development Services -
Solid Waste Bin Service 696.98 NA NA $696.98 $0.00
42 2 Cubic Yard 6X Week Development Services -
Solid Waste Bin Service 790.13 NA NA $790.13 $0.00
43 2 Cubic Yard 7X Week Development Services -
Solid Waste Bin Service 946.41 NA NA $946.41 $0.00
44 3 Cubic Yard 1X Week Development Services -
Solid Waste Bin Service 220.42 NA NA $220.42 $0.00
45 3 Cubic Yard 2X Week Development Services -
Solid Waste Bin Service 407.41 NA NA $407.41 $0.00
46 3 Cubic Yard 3X Week Development Services -
Solid Waste Bin Service 574.59 NA NA $574.59 $0.00
47 Multi Family - Refuse 3 Cubic Yard 3 Cubic Yard 4X Week Development Services - Solid Waste Bin Service 744.91 NA NA $744.91 $0.00
48 3 Cubic Yard 5X Week Development Services -
Solid Waste Bin Service 913.09 NA NA $913.09 $0.00
49 3 Cubic Yard 6X Week Development Services -
Solid Waste Bin Service 1,083.85 NA NA $1,083.85 $0.00
50 3 Cubic Yard 7X Week Development Services -
Solid Waste Bin Service 1,294.70 NA NA $1,294.70 $0.00
51 4 Cubic Yard 1X Week Development Services -
Solid Waste Bin Service 295.31 NA NA $295.31 $0.00
52 4 Cubic Yard 2X Week Development Services -
Solid Waste Bin Service 544.58 NA NA $544.58 $0.00
53 Multi Family - Refuse 4 Cubic Yard 4 Cubic Yard 3X Week Development Services - Solid Waste Bin Service 795.62 NA NA $795.62 $0.00
54 4 Cubic Yard 4X Week Development Services -
Solid Waste Bin Service 1,035.88 NA NA $1,035.88 $0.00
55 4 Cubic Yard 5X Week Development Services -
Solid Waste Bin Service 1,274.12 NA NA $1,274.12 $0.00
56 4 Cubic Yard 6X Week Development Services -
Solid Waste Bin Service 1,503.29 NA NA $1,503.29 $0.00
57 15 gallon 1X Week Development Services -
Solid Waste Bin Service 36.86 NA NA $36.86 $0.00
58 15 gallon 2X Week Development Services -
Solid Waste Bin Service 60.05 NA NA $60.05 $0.00
59 15 Gallon 3X Week Development Services -
Solid Waste Bin Service 78.75 NA NA $78.75 $0.00
60 15 Gallon 4X Week Development Services -
Solid Waste Bin Service 97.84 NA NA $97.84 $0.00
61 15 Gallon 5X Week Development Services -
Solid Waste Bin Service 125.53 NA NA $125.53 $0.00
62 15 Gallon 6X Week Development Services -
Solid Waste Bin Service 135.44 NA NA $135.44 $0.00
MultiFamily Mixed Organics 15 Gallon
76 Development Services - Solid Waste, Storm Water
Item No. Title Description Type Category
Current
Fee/Charge Unit Full Cost Subsidy % Suggested Fee Fee Δ 63 35 Gallon 1X Week Development Services -
Solid Waste Bin Service 37.99 NA NA $37.99 $0.00
64 35 Gallon 2X Week Development Services -
Solid Waste Bin Service 62.20 NA NA $62.20 $0.00
65 35 Gallon 3X Week Development Services -
Solid Waste Bin Service 81.94 NA NA $81.94 $0.00
66 35 Gallon 4X Week Development Services -
Solid Waste Bin Service 102.08 NA NA $102.08 $0.00
67 35 Gallon 5X Week Development Services -
Solid Waste Bin Service 130.80 NA NA $130.80 $0.00
68 35 Gallon 6X Week Development Services -
Solid Waste Bin Service 141.75 NA NA $141.75 $0.00
69 65 Gallon 1X Week Development Services -
Solid Waste Bin Service 39.64 NA NA $39.64 $0.00
70 65 Gallon 2X Week Development Services -
Solid Waste Bin Service 65.40 NA NA $65.40 $0.00
71 65 Gallon 3X Week Development Services -
Solid Waste Bin Service 86.69 NA NA $86.69 $0.00
72 65 Gallon 4X Week Development Services -
Solid Waste Bin Service 108.38 NA NA $108.38 $0.00
73 65 Gallon 5X Week Development Services -
Solid Waste Bin Service 138.66 NA NA $138.66 $0.00
74 65 Gallon 6X Week Development Services -
Solid Waste Bin Service 151.16 NA NA $151.16 $0.00
75 95 Gallon 1X Week Development Services -
Solid Waste Bin Service 41.28 NA NA $41.28 $0.00
76 95 Gallon 2X Week Development Services -
Solid Waste Bin Service 68.60 NA NA $68.60 $0.00
77 95 Gallon 3X Week Development Services -
Solid Waste Bin Service 91.44 NA NA $91.44 $0.00
78 95 Gallon 4X Week Development Services -
Solid Waste Bin Service 114.68 NA NA $114.68 $0.00
79 95 Gallon 5x Week Development Services -
Solid Waste Bin Service 146.51 NA NA $146.51 $0.00
80 95 Gallon 6X Week Development Services -
Solid Waste Bin Service 160.57 NA NA $160.57 $0.00
81 1 Cubic Yard 1X Week Development Services -
Solid Waste Bin Service 118.78 NA NA $118.78 $0.00
82 1 Cubic Yard 2X Week Development Services -
Solid Waste Bin Service 193.85 NA NA $193.85 $0.00
83 1 Cubic Yard 3X Week Development Services -
Solid Waste Bin Service 258.98 NA NA $258.98 $0.00
84 Commercial - Refuse - 1 Cubic Yard 1 Cubic Yard 4X Week Development Services - Solid Waste Bin Service 326.41 NA NA $326.41 $0.00
85 1 Cubic Yard 5X Week Development Services -
Solid Waste Bin Service 390.19 NA NA $390.19 $0.00
86 1 Cubic Yard 6X Week Development Services -
Solid Waste Bin Service 457.81 NA NA $457.81 $0.00
87 1 Cubic Yard 7X Week Development Services -
Solid Waste Bin Service 549.53 NA NA $549.53 $0.00
88 1.5 Cubic Yard 1X Week Development Services -
Solid Waste Bin Service 147.80 NA NA $147.80 $0.00
89 1.5 Cubic Yard 2X Week Development Services -
Solid Waste Bin Service 253.59 NA NA $253.59 $0.00
90 1.5 Cubic Yard 3X Week Development Services -
Solid Waste Bin Service 350.90 NA NA $350.90 $0.00
91 Commercial - Refuse - 1.5 Cubic Yard 1.5 Cubic Yard 4X Week Development Services - Solid Waste Bin Service 447.10 NA NA $447.10 $0.00
92 1.5 Cubic Yard 5X Week Development Services -
Solid Waste Bin Service 542.06 NA NA $542.06 $0.00
93 1.5 Cubic Yard 6X Week Development Services -
Solid Waste Bin Service 637.28 NA NA $637.28 $0.00
94 1.5 Cubic Yard 7X Week Development Services -
Solid Waste Bin Service 763.08 NA NA $763.08 $0.00
MultiFamily Mixed Organics 35 Gallon
MultiFamily Mixed Organics 65 Gallon
MultiFamily Mixed Organics 95 Gallon
77 Development Services - Solid Waste, Storm Water
Item No. Title Description Type Category
Current
Fee/Charge Unit Full Cost Subsidy % Suggested Fee Fee Δ 95 2 Cubic Yard 1X Week Development Services -
Solid Waste Bin Service 181.56 NA NA $181.56 $0.00
96 2 Cubic Yard 2X Week Development Services -
Solid Waste Bin Service 324.72 NA NA $324.72 $0.00
97 2 Cubic Yard 3X Week Development Services -
Solid Waste Bin Service 455.50 NA NA $455.50 $0.00
98 Commercial - Refuse - 2 Cubic Yard 2 Cubic Yard 4X Week Development Services - Solid Waste Bin Service 587.41 NA NA $587.41 $0.00
99 2 Cubic Yard 5X Week Development Services -
Solid Waste Bin Service 743.01 NA NA $743.01 $0.00
100 2 Cubic Yard 6X Week Development Services -
Solid Waste Bin Service 849.48 NA NA $849.48 $0.00
101 2 Cubic Yard 7X Week Development Services -
Solid Waste Bin Service 1,017.13 NA NA $1,017.13 $0.00
102 3 Cubic Yard 1X Week Development Services -
Solid Waste Bin Service 233.28 NA NA $233.28 $0.00
103 3 Cubic Yard 2X Week Development Services -
Solid Waste Bin Service 436.03 NA NA $436.03 $0.00
104 3 Cubic Yard 3X Week Development Services -
Solid Waste Bin Service 620.73 NA NA $620.73 $0.00
105 Commercial - Refuse - 3 Cubic Yard 3 Cubic Yard 4X Week Development Services - Solid Waste Bin Service 808.20 NA NA $808.20 $0.00
106 3 Cubic Yard 5X Week Development Services -
Solid Waste Bin Service 993.85 NA NA $993.85 $0.00
107 3 Cubic Yard 6X Week Development Services -
Solid Waste Bin Service 1,181.74 NA NA $1,181.74 $0.00
108 3 Cubic Yard 7X Week Development Services -
Solid Waste Bin Service 1,411.14 NA NA $1,411.14 $0.00
109 4 Cubic Yard 1X Week Development Services -
Solid Waste Bin Service 313.99 NA NA $313.99 $0.00
110 4 Cubic Yard 2X Week Development Services -
Solid Waste Bin Service 584.88 NA NA $584.88 $0.00
111 4 Cubic Yard 3X Week Development Services -
Solid Waste Bin Service 857.43 NA NA $857.43 $0.00
112 Commercial - Refuse - 4 Cubic Yard 4 Cubic Yard 4X Week Development Services - Solid Waste Bin Service 1,119.89 NA NA $1,119.89 $0.00
113 4 Cubic Yard 5X Week Development Services -
Solid Waste Bin Service 1,380.48 NA NA $1,380.48 $0.00
114 4 Cubic Yard 6X Week Development Services -
Solid Waste Bin Service 1,632.57 NA NA $1,632.57 $0.00
115 4 Cubic Yard 7X Week Development Services -
Solid Waste Bin Service 1,952.02 NA NA $1,952.02 $0.00
116 6 Cubic Yard 1X Week Development Services -
Solid Waste Bin Service 462.99 NA NA $462.99 $0.00
117 6 Cubic Yard 2X Week Development Services -
Solid Waste Bin Service 864.41 NA NA $864.41 $0.00
118 6 Cubic Yard 3X Week Development Services -
Solid Waste Bin Service 1,229.35 NA NA $1,229.35 $0.00
119 Commercial - Refuse - 6 Cubic Yard 6 Cubic Yard 4X Week Development Services - Solid Waste Bin Service 1,599.97 NA NA $1,599.97 $0.00
120 6 Cubic Yard 5X Week Development Services -
Solid Waste Bin Service 1,966.84 NA NA $1,966.84 $0.00
121 6 Cubic Yard 6X Week Development Services -
Solid Waste Bin Service 2,338.23 NA NA $2,338.23 $0.00
122 Commercial - Refuse - Temporary 3 Cubic
Yard (7 days)
3 Cubic Yard Temporary bin for 7 days Development Services - Solid Waste Bin Service 119.30 NA NA $119.30 $0.00
123 Commercial - Refuse - 95 gallon barrel 95 gallon barrel 1X Week Development Services - Solid Waste Bin Service 46.34 NA NA $46.34 $0.00
78 Development Services - Solid Waste, Storm Water
Item No. Title Description Type Category
Current
Fee/Charge Unit Full Cost Subsidy % Suggested Fee Fee Δ 124 3 Cubic Yard 1X Week Development Services -
Solid Waste+F121:G127 Bin Service 283.99 NA NA $283.99 $0.00 125 3 Cubic Yard 2X Week Development Services -
Solid Waste Bin Service 537.44 NA NA $537.44 $0.00
126 Compactor - Refuse - 3 Cubic Yard 3 Cubic Yard 3X Week Development Services - Solid Waste Bin Service 772.88 NA NA $772.88 $0.00
127 3 Cubic Yard 4X Week Development Services -
Solid Waste Bin Service 1,011.11 NA NA $1,011.11 $0.00
128 3 Cubic Yard 5X Week Development Services -
Solid Waste Bin Service 1,247.44 NA NA $1,247.44 $0.00
129 3 Cubic Yard 6X Week Development Services -
Solid Waste Bin Service 1,486.08 NA NA $1,486.08 $0.00
130 3 Cubic Yard 7X Week Development Services -
Solid Waste Bin Service 1,768.30 NA NA $1,768.30 $0.00
131 4 Cubic Yard 1X Week Development Services -
Solid Waste Bin Service 396.19 NA NA $396.19 $0.00
132 4 Cubic Yard 2X Week Development Services -
Solid Waste Bin Service 747.19 NA NA $747.19 $0.00
133 4 Cubic Yard 3X Week Development Services -
Solid Waste Bin Service 1,099.88 NA NA $1,099.88 $0.00
134 Compactor - Refuse - 4 Cubic Yard 4 Cubic Yard 4X Week Development Services - Solid Waste Bin Service 1,442.03 NA NA $1,442.03 $0.00
135 4 Cubic Yard 5X Week Development Services -
Solid Waste Bin Service 1,782.18 NA NA $1,782.18 $0.00
136 4 Cubic Yard 6X Week Development Services -
Solid Waste Bin Service 2,113.42 NA NA $2,113.42 $0.00
137 4 Cubic Yard 7X Week Development Services -
Solid Waste Bin Service 2,524.02 NA NA $2,524.02 $0.00
138 1.5 Cubic Yard 1X Week Development Services -
Solid Waste+F121:G127 Bin Service 124.84 NA NA $124.84 $0.00 139 1.5 Cubic Yard 2X Week Development Services -
Solid Waste Bin Service 205.17 NA NA $205.17 $0.00
140 1.5 Cubic Yard 3X Week Development Services -
Solid Waste Bin Service 276.49 NA NA $276.49 $0.00
141 Commercial - Green Waste 1.5 CY 1X WK 1.5 Cubic Yard 4X Week Development Services - Solid Waste Bin Service 346.66 NA NA $346.66 $0.00
142 1.5 Cubic Yard 5X Week Development Services -
Solid Waste Bin Service 415.49 NA NA $415.49 $0.00
143 1.5 Cubic Yard 6X Week Development Services -
Solid Waste Bin Service 484.61 NA NA $484.61 $0.00
144 1.5 Cubic Yard 7X Week Development Services -
Solid Waste Bin Service 586.13 NA NA $586.13 $0.00
145 1 Cubic Yard 1X Week Development Services -
Solid Waste Bin Service 150.05 NA NA $150.05 $0.00
146 1 Cubic Yard 2X Week Development Services -
Solid Waste Bin Service 259.35 NA NA $259.35 $0.00
147 1 Cubic Yard 3X Week Development Services -
Solid Waste Bin Service 355.57 NA NA $355.57 $0.00
148 Commercial - Green Waste 2 CY 1X WK 1 Cubic Yard 4X Week Development Services - Solid Waste Bin Service 452.97 NA NA $452.97 $0.00
149 1 Cubic Yard 5X Week Development Services -
Solid Waste Bin Service 575.49 NA NA $575.49 $0.00
150 1 Cubic Yard 6X Week Development Services -
Solid Waste Bin Service 645.90 NA NA $645.90 $0.00
151 1 Cubic Yard 7X Week Development Services -
Solid Waste Bin Service 781.20 NA NA $781.20 $0.00
79 Development Services - Solid Waste, Storm Water
Item No. Title Description Type Category
Current
Fee/Charge Unit Full Cost Subsidy % Suggested Fee Fee Δ 152 1 Cubic Yard 1X Week Development Services -
Solid Waste Bin Service 183.65 NA NA $183.65 $0.00
153 1 Cubic Yard 2X Week Development Services -
Solid Waste Bin Service 334.93 NA NA $334.93 $0.00
154 1 Cubic Yard 3X Week Development Services -
Solid Waste Bin Service 467.07 NA NA $467.07 $0.00
155 Commercial - Green Waste 3 CY 1X WK 1 Cubic Yard 4X Week Development Services - Solid Waste Bin Service 602.15 NA NA $602.15 $0.00
156 1 Cubic Yard 5X Week Development Services -
Solid Waste Bin Service 735.31 NA NA $735.31 $0.00
157 1 Cubic Yard 6X Week Development Services -
Solid Waste Bin Service 870.83 NA NA $870.83 $0.00
158 1 Cubic Yard 7X Week Development Services -
Solid Waste Bin Service 1,050.35 NA NA $1,050.35 $0.00
159 Commercial - Green Waste 65 gal Barrel 65 gal barrel 1X Week Development Services - Solid Waste Bin Service 31.65 NA NA $31.65 $0.00
160 1 Cubic Yard 1X Week Development Services -
Solid Waste Bin Service 87.32 NA NA $87.32 $0.00
161 1 Cubic Yard 2X Week Development Services -
Solid Waste Bin Service 129.34 NA NA $129.34 $0.00
162 1 Cubic Yard 3X Week Development Services -
Solid Waste Bin Service 160.28 NA NA $160.28 $0.00
163 Commercial- Extra Recycling Bin - 1 Cubic
Yard 1 Cubic Yard 4X Week Development Services -
Solid Waste Bin Service 193.67 NA NA $193.67 $0.00
164 1 Cubic Yard 5X Week Development Services -
Solid Waste Bin Service 223.22 NA NA $223.22 $0.00
165 1 Cubic Yard 6X Week Development Services -
Solid Waste Bin Service 256.80 NA NA $256.80 $0.00
166 1 Cubic Yard 7X Week Development Services -
Solid Waste Bin Service 315.97 NA NA $315.97 $0.00
167 1.5 Cubic Yard 1X Week Development Services -
Solid Waste Bin Service 99.55 NA NA $99.55 $0.00
168 1.5 Cubic Yard 2X Week Development Services -
Solid Waste Bin Service 154.57 NA NA $154.57 $0.00
169 1.5 Cubic Yard 3X Week Development Services -
Solid Waste Bin Service 200.59 NA NA $200.59 $0.00
170 Commercial- Extra Recycling Bin - 1.5 Cubic
Yard 1.5 Cubic Yard 4X Week Development Services -
Solid Waste Bin Service 245.44 NA NA $245.44 $0.00
171 1.5 Cubic Yard 5X Week Development Services -
Solid Waste Bin Service 288.98 NA NA $288.98 $0.00
172 1.5 Cubic Yard 6X Week Development Services -
Solid Waste Bin Service 332.80 NA NA $332.80 $0.00
173 1.5 Cubic Yard 7X Week Development Services -
Solid Waste Bin Service 409.01 NA NA $409.01 $0.00
174 2 Cubic Yard 1X Week Development Services -
Solid Waste Bin Service 116.31 NA NA $116.31 $0.00
175 2 Cubic Yard 2X Week Development Services -
Solid Waste Bin Service 191.88 NA NA $191.88 $0.00
176 2 Cubic Yard 3X Week Development Services -
Solid Waste Bin Service 254.35 NA NA $254.35 $0.00
177 Commercial- Extra Recycling Bin - 2 Cubic
Yard 2 Cubic Yard 4X Week Development Services -
Solid Waste Bin Service 318.02 NA NA $318.02 $0.00
178 2 Cubic Yard 5X Week Development Services -
Solid Waste Bin Service 406.81 NA NA $406.81 $0.00
179 2 Cubic Yard 6X Week Development Services -
Solid Waste Bin Service 443.48 NA NA $443.48 $0.00
180 2 Cubic Yard 7X Week Development Services -
Solid Waste Bin Service 545.05 NA NA $545.05 $0.00
80 Development Services - Solid Waste, Storm Water
Item No. Title Description Type Category
Current
Fee/Charge Unit Full Cost Subsidy % Suggested Fee Fee Δ 181 3 Cubic Yard 1X Week Development Services -
Solid Waste Bin Service 133.05 NA NA $133.05 $0.00
182 3 Cubic Yard 2X Week Development Services -
Solid Waste Bin Service 233.72 NA NA $233.72 $0.00
183 3 Cubic Yard 3X Week Development Services -
Solid Waste Bin Service 315.25 NA NA $315.25 $0.00
184 Commercial- Extra Recycling Bin - 3 Cubic
Yard 3 Cubic Yard 4X Week Development Services -
Solid Waste Bin Service 399.73 NA NA $399.73 $0.00
185 3 Cubic Yard 5X Week Development Services -
Solid Waste Bin Service 482.30 NA NA $482.30 $0.00
186 3 Cubic Yard 6X Week Development Services -
Solid Waste Bin Service 567.20 NA NA $567.20 $0.00
187 3 Cubic Yard 7X Week Development Services -
Solid Waste Bin Service 696.13 NA NA $696.13 $0.00
188 4 Cubic Yard 1X Week Development Services -
Solid Waste Bin Service 151.09 NA NA $151.09 $0.00
189 4 Cubic Yard 2X Week Development Services -
Solid Waste Bin Service 266.23 NA NA $266.23 $0.00
190 4 Cubic Yard 3X Week Development Services -
Solid Waste Bin Service 360.10 NA NA $360.10 $0.00
191 Commercial- Extra Recycling Bin - 4 Cubic
Yard 4 Cubic Yard 4X Week Development Services -
Solid Waste Bin Service 457.25 NA NA $457.25 $0.00
192 4 Cubic Yard 5X Week Development Services -
Solid Waste Bin Service 552.26 NA NA $552.26 $0.00
193 4 Cubic Yard 6X Week Development Services -
Solid Waste Bin Service 649.90 NA NA $649.90 $0.00
194 4 Cubic Yard 7X Week Development Services -
Solid Waste Bin Service 796.41 NA NA $796.41 $0.00
195 Commercial - Extra Recycling - 65 gallon barrel 6 5 gal barrel 1X Week Development Services - Solid Waste Bin Service 29.69 NA NA $29.69 $0.00
196 2 Cubic Yard 1X Week Development Services -
Solid Waste Bin Service 181.56 NA NA $181.56 $0.00
197 2 Cubic Yard 2X Week Development Services -
Solid Waste Bin Service 324.72 NA NA $324.72 $0.00
198 2 Cubic Yard 3X Week Development Services -
Solid Waste Bin Service 455.50 NA NA $455.50 $0.00
199 Commercial Food Waste - 2 Cubic Yard 2 Cubic Yar d 4X Week Development Services - Solid Waste Bin Service 587.41 NA NA $587.41 $0.00
200 2 Cubic Yard 5X Week Development Services -
Solid Waste Bin Service 743.01 NA NA $743.01 $0.00
201 2 Cubic Yard 6X Week Development Services -
Solid Waste Bin Service 849.48 NA NA $849.48 $0.00
202 2 Cubic Yard 7X Week Development Services -
Solid Waste Bin Service 1,017.13 NA NA $1,017.13 $0.00
203 35 gallon barrel 1X Week Development Services -
Solid Waste Bin Service 36.34 NA NA $36.34 $0.00
204 35 gallon barrel 2X Week Development Services -
Solid Waste Bin Service 62.60 NA NA $62.60 $0.00
205 35 gallon barrel 3X Week Development Services -
Solid Waste Bin Service 85.65 NA NA $85.65 $0.00
206 Commercial Food Waste - 35 gallon barrel 35 gall on barrel 4X Week Development Services - Solid Waste Bin Service 108.94 NA NA $108.94 $0.00
207 35 gallon barrel 5X Week Development Services -
Solid Waste Bin Service 138.52 NA NA $138.52 $0.00
208 35 gallon barrel 6X week Development Services -
Solid Waste Bin Service 155.10 NA NA $155.10 $0.00
209 35 gallon barrel 7X Week Development Services -
Solid Waste Bin Service 187.86 NA NA $187.86 $0.00
81 Development Services - Solid Waste, Storm Water
Item No. Title Description Type Category
Current
Fee/Charge Unit Full Cost Subsidy % Suggested Fee Fee Δ 210 65 gallon barrel 1X Week Development Services -
Solid Waste Bin Service 46.34 NA NA $46.34 $0.00
211 65 gallon barrel 2X Week Development Services -
Solid Waste Bin Service 82.55 NA NA $82.55 $0.00
212 65 gallon barrel 3X Week Development Services -
Solid Waste Bin Service 115.50 NA NA $115.50 $0.00
213 Commercial Food Waste - 65 gallon barrel 65 gall on barrel 4X Week Development Services - Solid Waste Bin Service 148.74 NA NA $148.74 $0.00
214 65 gallon barrel 5X Week Development Services -
Solid Waste Bin Service 188.23 NA NA $188.23 $0.00
215 65 gallon barrel 6X Week Development Services -
Solid Waste Bin Service 214.75 NA NA $214.75 $0.00
216 65 gallon barrel 7x Week Development Services -
Solid Waste Bin Service 257.42 NA NA $257.42 $0.00
217 Permanent Trash - 10 yard Roll-Off (8 Tons) Development Services - Solid Waste Bin Service 1,001.43 NA NA $1,001.43 $0.00
218 Permanent Trash - 20 yard Roll-Off (6 Tons) Development Services - Solid Waste Bin Service 805.45 NA NA $805.45 $0.00
219 Permanent Trash - 40 yard Roll-Off (4 Tons) Development Services - Solid Waste Bin Service 633.92 NA NA $633.92 $0.00
220 Permanent Trash - Compactor Roll-Off (6 Tons) Development Services - Solid Waste Bin Service 805.45 NA NA $805.45 $0.00
221 Temporary Trash 10 Yard Roll-Off (8 Tons) Development Services - Solid Waste Bin Service 1,001.43 NA NA $1,001.43 $0.00
222 Temporary Trash 20 Yard Roll-Off (6 Tons) Development Services - Solid Waste Bin Service 827.82 NA NA $827.82 $0.00
223 Temporary Trash 40 Yard Roll-Off (4 Tons) Development Services - Solid Waste Bin Service 654.25 NA NA $654.25 $0.00
224 Recycling Box 40 yard (plus disposal fees) Development Services - Solid Waste Bin Service 277.67 NA NA $277.67 $0.00
225 Roll Off Rental Fee Development Services -
Solid Waste Bin Service 39.08 NA NA $39.08 $0.00
226 Roll-Off & Compactor Services End Dump Fee (Hour ly Rate) Development Services - Solid Waste Bin Service 222.14 NA NA $222.14 $0.00
227 Relocation/Dry Run Fee (per occurrence 5 mile ra dius) Development Services - Solid Waste Bin Service 97.74 NA NA $97.74 $0.00
228 Tilthopper Development Services -
Solid Waste Bin Service 49.85 NA NA $49.85 $0.00
229 RO 40Yrd Retractable Lid Monthly Rental Development Services - Solid Waste Bin Service 279.99 NA NA $279.99 $0.00
230 Roll Off Liner Development Services -
Solid Waste Bin Service 127.22 NA NA $127.22 $0.00
231 Audit Bin Development Services -
Solid Waste Bin Service 180.70 NA NA $180.70 $0.00
232 Audit RO Development Services -
Solid Waste Bin Service 361.41 NA NA $361.41 $0.00
233 Receiver rental (per month) Development Services -
Solid Waste Bin Service 265.03 NA NA $265.03 $0.00
234 Compactor rental (per month) Development Services - Solid Waste Bin Service 371.05 NA NA $371.05 $0.00
82 Development Services - Solid Waste, Storm Water
Item No. Title Description Type Category
Current
Fee/Charge Unit Full Cost Subsidy % Suggested Fee Fee Δ 235 0 - 25 Feet 1X Week Development Services -
Solid Waste Bin Service 24.28 NA NA $24.28 $0.00
236 0 - 25 Feet 2X Week Development Services -
Solid Waste Bin Service 48.55 NA NA $48.55 $0.00
237 0 - 25 Feet 3X Week Development Services -
Solid Waste Bin Service 72.82 NA NA $72.82 $0.00
238 0 - 25 Feet 4X Week Development Services -
Solid Waste Bin Service 97.10 NA NA $97.10 $0.00
239 0 - 25 Feet 5X Week Development Services -
Solid Waste Bin Service 121.37 NA NA $121.37 $0.00
240 0 - 25 Feet 6X Week Development Services -
Solid Waste Bin Service 145.65 NA NA $145.65 $0.00
241 0 - 25 Feet 7X Week Development Services -
Solid Waste Bin Service 169.92 NA NA $169.92 $0.00
242 26 - 50 Feet 1X Week Development Services -
Solid Waste Bin Service 48.55 NA NA $48.55 $0.00
243 26 - 50 Feet 2X Week Development Services -
Solid Waste Bin Service 97.10 NA NA $97.10 $0.00
244 26 - 50 Feet 3X Week Development Services -
Solid Waste Bin Service 145.65 NA NA $145.65 $0.00
245 26 - 50 Feet 4X Week Development Services -
Solid Waste Bin Service 194.19 NA NA $194.19 $0.00
246 Special Services - Push Out Rates 26 - 50 Feet 5X Week Development Services - Solid Waste Bin Service 242.75 NA NA $242.75 $0.00
247 26 - 50 Feet 6X Week Development Services -
Solid Waste Bin Service 291.29 NA NA $291.29 $0.00
248 26 - 50 Feet 7X Week Development Services -
Solid Waste Bin Service 339.84 NA NA $339.84 $0.00
249 51 - 75 Feet 1X Week Development Services -
Solid Waste Bin Service 72.82 NA NA $72.82 $0.00
250 51 - 75 Feet 2X Week Development Services -
Solid Waste Bin Service 145.65 NA NA $145.65 $0.00
251 51 - 75 Feet 3X Week Development Services -
Solid Waste Bin Service 218.47 NA NA $218.47 $0.00
252 51 - 75 Feet 4X Week Development Services -
Solid Waste Bin Service 291.29 NA NA $291.29 $0.00
253 51 - 75 Feet 5X Week Development Services -
Solid Waste Bin Service 364.11 NA NA $364.11 $0.00
254 51 - 75 Feet 6X Week Development Services -
Solid Waste Bin Service 436.94 NA NA $436.94 $0.00
255 51 - 75 Feet 7X Week Development Services -
Solid Waste Bin Service 509.76 NA NA $509.76 $0.00
256 Over 75 Feet Development Services -
Solid Waste Bin Service $182.70 p/hour NA NA $182.70
p/hour $0.00
83 Development Services - Solid Waste, Storm Water
Item No. Title Description Type Category
Current
Fee/Charge Unit Full Cost Subsidy % Suggested Fee Fee Δ 257 Extra Pickup - Barrel - Scheduled Day Development Services - Solid Waste Bin Service 19.77 NA NA $19.77 $0.00
258 Extra Pickup - Barrel - Non-Scheduled Day Development Services - Solid Waste Bin Service 32.94 NA NA $32.94 $0.00
259 Extra Pickup - Bin - Scheduled Day Development Services - Solid Waste Bin Service 63.40 NA NA $63.40 $0.00
260 Extra Pickup - Bin - Non-Scheduled Day Development Services - Solid Waste Bin Service 89.73 NA NA $89.73 $0.00
261 Extra Pickup - Compactor - Scheduled Day Development Services - Solid Waste Bin Service 101.18 NA NA $101.18 $0.00
262 Extra Pickup - Compactor Non-Scheduled Day Development Services - Solid Waste Bin Service 127.51 NA NA $127.51 $0.00
263 Miscellaneous Services - Other Large/Bulky Item - Service Charge Development Services - Solid Waste Bin Service 41.52 NA NA $41.52 $0.00
264 Large/Bulky Item - per Item Charge Development Services - Solid Waste Bin Service 15.23 NA NA $15.23 $0.00
265 Contamination Fee - Recycling Development Services - Solid Waste Bin Service 68.05 NA NA $68.05 $0.00
266 Contamination Fee - Green Waste Development Services - Solid Waste Bin Service 68.05 NA NA $68.05 $0.00
267 Counter Balance Lid Development Services -
Solid Waste Bin Service 12.75 NA NA $12.75 $0.00
268 Locking Bars - Initial Setup Development Services - Solid Waste Bin Service 38.79 NA NA $38.79 $0.00
269 Locking Bars - Monthly Fee Development Services -
Solid Waste Bin Service 8.29 NA NA $8.29 $0.00
270 Barrel Exchange (first exchange free, charge do es not apply to graffiti or damaged barrels) Development Services - Solid Waste Bin Service 19.25 NA NA $19.25 $0.00
271 Miscellaneous Services - Residential / Commercia l Barrel replacement - residential customer damaged , commercial lost/stolen Development Services - Solid Waste Bin Service 82.94 NA NA $82.94 $0.00
272 Bin exchange (first exchange free, charge does n ot apply to graffiti or damaged bins Development Services - Solid Waste Bin Service 96.28 NA NA $96.28 $0.00
273 Bin replacement (+actual cost of bin, commercial lost / stolen) Development Services - Solid Waste Bin Service 106.66 NA NA $106.66 $0.00
84 27368 Via Industria, Suite 200
Temecula, California 92590-4856
800.755.6864 | Fax: 888.326.6864
951.587.3500 | Fax: 951.587.3510
www.willdan.com