Text extracted from the city's file for reading and search. Open the original on fontana.legistar1.com. That file is the official record.

To: Contact:City Of Fontana
Valley and Poplar 30' Extension
Poplar and Valley, Fontana, CA
Project Name:

Address: 16489 Orange Way
Fontana, CA
Phone:

Project Location:

Bid Number: 09-08-25 Fontana
Bid Date: 09/08/2025
Total PriceUnit PriceUnitItem DescriptionItem # Estimated Quantity Notes:
• Pricing assumes performance of work while mobilized for the existing 55' work order, with simultaneous paving of both sections. • AC to be C2 PG 70-10 or 64-10. ARHM is not included and will incur additional cost if required. • PCC to be 560-C-3250.
• Epoxy or other coating for structural rebar is not included. • Replacement of traffic loops is not noted on the provided plans and is not included in this proposal. • Pricing will remain valid if accepted within 30 calendar days. • Payment to be received within 30 calendar days of billing date. • Billing retention not to exceed 5%.
• Pricing includes the California DIR prevailing wage rates in effect at the project advertisement date. If different wage rates are required, additional costs may be incurred.
• Pricing assumes construction water provided on-site by project and/or property owner. • Inspection fees are not included.
• Permit fees are not included.
• Differing site conditions and unforeseen utilities/improvements not identified in the bid documents are not included and may incur additional cost if encountered.
• Pricing assumes uninterrupted and unimpeded access to the work sit e during all working hours. Limited access may incur additional cost. • Working hours to be at least 8.5 consecutive hours per weekday. • Traffic control is included only for the scope of work covered by this proposal. • Traffic control to be per MUTCD standards. Engineered traffic control plans are not included. • Material and compaction testing are not included.
• Dewatering of any kind is not included unless otherwise specified in bid documents. • Field engineering, surveying and staking are not included. • We reserve the right to modify our pricing in response to any design, engineering, specification, or other changes made to the project after issuance of this proposal.
• Handling and/or disposal of hazardous materials is not included. • Anything not included in the bid documents is excluded from this proposal. • Anything not specifically included in this proposal is excluded.

Kyle Scribner
(909) 350-6530
ACCEPTED:

The above prices, specifications and conditions are satisfactory and are hereby accepted.

Buyer:

Signature:

Date of Acceptance:

CONFIRMED:

Gentry General Engineering, Inc
Authorized Signature:

Estimator: Dean Bates
(909) 330-1128 [email protected]
1 1.00 LS $40,522.13 $40,522.13Construct 30' Long, 2'x1.5' Reinforced Concrete Box Storm Drain Per Caltrans Standard D80, With 7' Wide
Pavement Replacement