Cities Index.
Attachment No. 3- Exhibit B - Cost Proposal

Fontana City Council
September 23, 2025

Document
Attachment No. 3- Exhibit B - Cost Proposal
Meeting
September 23, 2025
Body
Fontana City Council
Original file
258 KB
Text extracted from the city's file for reading and search. Open the original on fontana.legistar1.com. That file is the official record.

1027 East Curry Road, Tempe AZ 85288 – T: 480-446-9000 F: 480-446-9001 AZROC#155125 421 West Palmer Ave, Glendale, CA 91204 - T: 480-446-9000 F: 480-446-9001 CAROC#1042300

Cost Proposal

Thermoplastic Application

• Option 1
o Creative Paving Solutions will install Decorative thermoplastic per the plans and specs. ▪ Creative Paving Solutions will provide material, prepare the surface, and install 5,876 square feet of decorative thermoplastic per the plans and specifications. The product will be Geveko Markings interconnected Thermoplastic.
▪ Creative Paving will provide Traffic Control for our work areas. ▪ Pricing is based on applying 3 days’ worth of work. Any additional days not caused by Creative Paving Solutions will result in a mobilization charge of $5,500 per mobilization. ▪ Pricing does not include stamped traffic control plans and is based on a full closure of our work area during working hours. Phasing will be determined by the city.

Price for Option 1 is: $231,867.88 including applicable sales taxes.

• Option 2
o Creative Paving Solutions will install Decorative thermoplastic & an Epoxy Fortified Acrylic coating for asphalt sealing.
▪ Creative Paving Solutions will provide material, prepare the surface, and install 2,575 square feet of decorative thermoplastic per the plans and specifications. The product will be Geveko Markings interconnected Thermoplastic.
▪ Creative Paving Solutions will provide material, prepare the surface, and install 3,301 square feet of black Vehicular grade Epoxy Fortified Acrylic coating to seal the asphalt areas not covered by thermoplastic. This coating will be black to make up for the black thermoplastic. ▪ Creative Paving will provide Traffic Control for our work areas. ▪ Pricing is based on applying 3 days’ worth of work. Any additional days not caused by Creative Paving Solutions will result in a mobilization charge of $5,500 per mobilization. ▪ Pricing does not include stamped traffic control plans and is based on a full closure of our work area during working hours. Phasing will be determined by the city. ▪ Pricing in Option 2 does not include the black thermoplastic.

Price for Option 2 is: $119,802.64 including applicable sales taxes.

← All documents from this meeting