RESOLUTION NO. 2026-021
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF FONTANA, CALIFORNIA, ADOPTING A LIST OF PROJECTS FOR FISCAL YEAR 2026-27 FUNDED BY SB 1: THE ROAD REPAIR AND ACCOUNTABILITY ACT OF 2017.
WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017 (Chapter 5, Statutes of 2017) was passed by the Legislature and Signed into law by the Governor in April 2017 to address the significant multi-modal transportation funding shortfalls statewide; and WHEREAS, SB 1 includes accountability and transparency provisions that will ensure the residents of the City of Fontana are aware of the projects proposed for funding in our community and which projects have been completed each fiscal year; and WHEREAS, the City of Fontana must adopt by resolution a list of projects proposed to receive fiscal year funding from the Road Maintenance and Rehabilitation Account (RMRA), created by SB 1, which must include a description and the location of each proposed project, a proposed schedule for the project’s completion, and the estimated useful life of the improvement; and WHEREAS, the City of Fontana, will receive an estimated $6,149,643.00 in RMRA funding in Fiscal Year 2026-27 from SB 1; and WHEREAS, this is the tenth year in which the City of Fontana is receiving SB 1 funding and will enable the City of Fontana to continue essential road maintenance and rehabilitation projects, safety improvements, repairing and replacing aging bridges, and increasing access and mobility options for the traveling public that would not have otherwise been possible without SB 1; and WHEREAS, the City of Fontana has undergone a robust public process to ensure public input into our community’s transportation priorities/the project list; and WHEREAS, the City of Fontana used a Pavement Management System to develop the SB 1 project list to ensure revenues are being used on the most high-priority and cost-effective projects that also meet the communities priorities for transportation investment; and WHEREAS, the funding from SB 1 will help the City of Fontana maintain and rehabilitate up to 47 lane miles of streets/roads, and all of the required ADA curb ramp, curb and gutter, and striping upgrades throughout the City of Fontana this year and many more of similar projects into the future; and WHEREAS, the Final Report August 2021 California Statewide Local Streets and Roads Needs Assessment found that the City of Fontana streets and roads are “estimated” to be in “good” condition, and this revenue will help us maintain or increase the overall quality of our road system and over the next decade will keep our streets and roads in an “estimated good” condition, or bring our streets and roads into a “excellent” condition; and WHEREAS, the SB 1 project list and overall investment in our local streets and roads infrastructure with a focus on basic maintenance and safety, investing in complete streets infrastructure, and using cutting-edge technology, materials and practices, will have significant positive co-benefits statewide.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Fontana, California, as follows:
Section 1. Recitals. The foregoing recitals are true and correct.
Section 2. The following list of newly proposed projects will be funded in-part or solely with Fiscal Year 2026-27 Road Maintenance and Rehabilitation Account revenues:
Project Title: Southridge Grid 51 North Residential and Collector Streets Pavement Rehabilitation Project Description: Full depth removal, 2” mill & overlay, and/or slurry seal.
Project to include all pre-construction and construction costs, which include design, survey, Geotech, mill and overlay, pavement repairs, crack sealing, slurry seal, ADA ramp upgrades, curb and gutter, cross gutters, loops, striping, and testing, but may include additional work.
Project Location: Various residential and collector streets between Jurupa Avenue and Live Oak Avenue and between Cherry Avenue and Hemlock Avenue Estimated Pre-Construction Schedule: Start (07/26) – Completion (01/27) Estimated Construction Schedule: Start (02/27) – Completion (10/27) based on the component being funded with RMRA funds.
Estimated Project Useful Life: 7 to 15 years
Project Title: Grid 20 South Residential
Project Description: Full depth removal, 2” mill & overlay, and/or slurry seal.
Project to include all pre-construction and construction costs, which include design, survey, Geotech, mill and overlay, full depth removal and replacement, pavement repairs, crack sealing, slurry seal, ADA ramp upgrades, curb and gutter, cross gutters, loops, striping, and testing, but may include additional work.
Project Location: All residential streets between Miller Avenue and Foothill Avenue and between Citrus Avenue and Sierra Avenue Estimated Pre-Construction Schedule: Start (07/26) – Completion (01/27) Estimated Construction Schedule: Start (02/27) – Completion (10/27) based on the component being funded with RMRA funds.
Estimated Project Useful Life: 7 to 15 years
Project Title: Beech Avenue Pavement Rehabilitation
Project Description: 2” mill & overlay and/or slurry seal Project to include all pre-construction and construction costs, which include design, survey, Geotech, mill and overlay, pavement repairs, crack sealing, slurry seal, ADA ramp upgrades, curb and gutter, cross gutters, loops, striping, and testing, but may include additional work.
Project Location: Beech Avenue between the 15 Freeway Sierra Lakes Parkway Estimated Pre-Construction Schedule: Start (07/26) – Completion (01/27) Estimated Construction Schedule: Start (02/27) – Completion (10/27) based on the component being funded with RMRA funds.
Estimated Project Useful Life: 7 to 15 years
Project Title: Summit Avenue Pavement Rehabilitation
Project Description: 2” mill & overlay and/or slurry seal Project to include all pre-construction and construction costs, which include design, survey, Geotech, grind and overlay, pavement repairs, crack sealing, slurry seal, ADA ramp upgrades, curb and gutter, cross gutters, loops, striping, and testing, but may include additional work.
Project Location: Summit Avenue between Dakota Avenue and Citrus Avenue Estimated Pre-Construction Schedule: Start (07/26) – Completion (01/27) Estimated Construction Schedule: Start (02/27) – Completion (10/27) based on the component being funded with RMRA funds.
Estimated Project Useful Life: 7 to 15 years
Project Title: Canyon Crest Drive Pavement Rehabilitation Project Description: Full depth removal, 2” mill & overlay, and/or slurry seal Project to include all pre-construction and construction costs, which include design, survey, Geotech, grind and overlay, pavement repairs, crack sealing, slurry seal, ADA ramp upgrades, curb and gutter, cross gutters, loops, striping, and testing, but may include additional work.
Project Location: Canyon Crest Drive, from Cherry Avenue past Weeping Willow Lane to end of Cul-De-Sac Estimated Pre-Construction Schedule: Start (07/26) – Completion (01/27) Estimated Construction Schedule: Start (02/27) – Completion (10/27) based on the component being funded with RMRA funds.
Estimated Project Useful Life: 7 to 15 years
Project Title: Grid 35 ADA Curb Ramp Replacement
Project Description: Remove and replace non-compliant curb ramps Project to include all pre-construction and construction costs, which include design, survey, Geotech, grind and overlay, pavement repairs, crack sealing, slurry seal, ADA ramp upgrades, curb and gutter, cross gutters, loops, striping, and testing, but may include additional work.
Project Location: All non-compliant curb ramps between Merrill Avenue and San Bernardino Avenue and between Sierra Avenue and Alder Avenue Estimated Pre-Construction Schedule: Start (07/26) – Completion (01/27) Estimated Construction Schedule: Start (02/27) – Completion (10/27) based on the component being funded with RMRA funds.
Estimated Project Useful Life: 7 to 15 years
Project Title: Citywide Slurry Seal Pavement Maintenance Project Description: Slurry seal
Project to include all pre-construction and construction costs, which include design, survey, Geotech, pavement repairs, crack sealing, slurry seal, striping, and testing, but may include additional work.
Project Location: Various locations throughout the City Estimated Pre-Construction Schedule: Start (07/26) – Completion (01/27) Estimated Construction Schedule: Start (02/27) – Completion (10/27) based on the component being funded with RMRA funds.
Estimated Project Useful Life: 5 to 7 years
Project Title: Engineering Design Services for Citywide Caltrans Work Project Description: Engineering Design Services
Project to include all engineering design services, pre-construction and construction costs, which include design, survey, Geotech, Caltrans permit applications, coordination, and testing, but may include additional work.
Project Location: Various Under/Over crossing locations throughout the City at the I-15, I-10, and I-210 freeways Estimated Design Schedule: Start (8/26) – Completion (06/27) Estimated Construction Schedule: Start (TBD) – Completion (TBD) based on the component being funded with RMRA funds.
Estimated Project Useful Life: 7 to 15 years
Section 3. Effective Date. This Resolution shall become effective immediately.
Section 4. Severability. If any provision of this Resolution or the application of any such provision to any person or circumstance is held invalid, such invalidity shall not affect other provisions or applications of this Resolution that can be given effect without the invalid provision or application, and to this end, the provisions of this Resolution are severable. The City Council declares that it would have adopted this Resolution irrespective of the invalidity of any particular portion of this Resolution.
Section 5. Certification. The City Clerk shall certify to the adoption of this Resolution.
Section 6. Custodian of Records. The documents and materials that constitute the record of proceedings on which this Resolution is based are located at the City Clerk’s office located at 8353 Sierra Avenue, Fontana, CA 92335. The custodian of records is the City Clerk.
APPROVED AND ADOPTED this 14th day of April, 2026.
READ AND APPROVED AS TO LEGAL FORM:
___________________________________
City Attorney
I, Germaine Key, City Clerk of the City of Fontana, and Ex-Officio Clerk of the City Council, do hereby certify that the foregoing Resolution is the actual Resolution duly and regularly adopted by the City Council at a regular meeting held on the 14th day of April, 2026, by the following vote to-wit:
AYES:
NOES:
ABSENT:
ABSTAIN:
___________________________________
City Clerk of the City of Fontana
___________________________________
Mayor of the City of Fontana
ATTEST:
___________________________________
City Clerk
2 of 2
2 of 6
Resolution No. 2026-021