Att 3 - RFP Response List

Fort Bragg City Council
September 11, 2023

Document
Att 3 - RFP Response List
Meeting
September 11, 2023
Body
Fort Bragg City Council
Original file
182 KB
Text extracted from the city's file for reading and search. Open the original on legistar1.granicus.com. That file is the official record.

Submitted By
Projects
Staffing/Experience
Timeframe
Hourly Rates
Bid
Comments
1 WhitChurch Engineering
610 9th Street
Fortuna, CA 95540
T: 707-725-6926
F:

Jeffrey Laikam, PE
[email protected]
www.whitchurchengineering.com
Review development plans and specifications, preliminary plats, final plats and construction drawings for public and private infrastructure Provided Engineering Services for ADA projects
Jeffrey Laikam, PE,
Engineering Manager,
22 years
Derek Long, PE,
Project Manager,
11 years
Brett Whitchurch, PE,
Structural Design Supervisor
13 years
Eric Allen, ME,
Mechanical Engineer
11 years
Terry O’Reilly,
Professional Engineer
25 years
6 months to bid ready design
Engineering Manager-$200
Project Manager/
Site Civil Design Lead-
$140
Structural Engineering
Supervisor-
$160
MEP Engineer- $125
Structural Designer-
$120
$203,000.00
No issues with insurance requirements.
2 Melton Design Group, Inc. (MDG)
820 Broadway St.

Chico, CA 95928
T: 530-899-1616
F:
[email protected]
Uniting existing baseball field redesign with new park, creating a cohesive, connected experience Storm water management, education and incorporation into park design Water conscious street selection
Renovated and improved turf playing field for sports
Greg Melton, RLA,
LEED AP, Principal Landscape Architect
35 Years
• Patrick Farrar, Senior Project Manager
30 Years
• Sarah Crossley, Senior Project Manager
8 Years
• Connor Melton, Project Manager
7 years
9 months to bid ready design
Principal Landscape Architect
$195
Senior Project Manager
$175
Project Manager
$155
Irrigation Specialist
$140
Senior Production Specialist
$125
Production Specialist
$105
Administration
$90
$246,500.00
No issues with insurance requirements.
3 Integra Planning + Landscape Architecture
1506 4th Street
Santa Rosa, CA 95404
T: 707-852-0500
F:
[email protected]
www.integrapla.com
Rehabilitate playground facilities
Detailed site analysis including drainage, sun shade ratios, major trees, vertical elements Ric J Hendricks, PLA,
ASLA, CPRS, CPSI, RQP, Prinicipal Landscape Architect
20 years
Michael A. Cook, PLA,
ASLA, CPRS, CPSI, CLIA, Principal Landscape Architect
20 years
8 months to bid ready design
Deposition/Court Appearance
$350
Principal
$175
Senior Planner
$155
Project Manager
$135
Planner
$125
Administration
$80
$373,606.00
No issues with insurance requirements
RFP Responses – Bainbridge Park Enhancement Project Page 2

CITY OF FORT BRAGG
RFP OPENING for Bainbridge Park Enhancement Project, PWP-00096 Written proposals were due by 2:00 PM, August 25, 2023. Three (3) timely proposals were received.