Cities Index.
CV Starr floors quote

Fort Bragg City Council
January 22, 2024

Document
CV Starr floors quote
Meeting
January 22, 2024
Body
Fort Bragg City Council
Original file
16 KB
Text extracted from the city's file for reading and search. Open the original on legistar1.granicus.com. That file is the official record.

LATOOF PAINTING INC.

PO BOX 1699 LIC. # 709032
MENDOCINO. CA. 95460 707-937-5032
[email protected]
FOR: City of Fort Bragg 12/22/23
AT: CV Starr Community Center 300 S. Lincoln St.

Fort Bragg, CA
INTERIOR WORK: Floor finish system installation.

Men’s Locker Room, Woman’s Locker Room, Front Hall Mem’s & Woman’s Bathrooms (2) Remove existing coatings from concrete floor and cove.

Uniform profiling floor preparation to ICRI CSP 2-3, to approximately equal 80 grit sandpaper.

Benjamin Moore brand Corotech performance epoxy floor coatings system as specified by on site field representative. Submittals upon request.

Non skid additive incorporated between top coats.

Samples provided.

Settling cracks in concrete slab will be mitigated but will not completely disappear.

This contractor to supply all labor, equipment and materials for above work.

Cost For Above $87,405.00
As discussed, customer to remove and reinstall privacy stalls and benches for above work.

← All documents from this meeting