GOC Construction & Roofing, Inc.
20725 Dennison Lane
Fort Bragg, CA 95437
(707) 684-0942
[email protected]

ADDRESS
City of Fort Bragg projects
416 N. Franklin St.

Fort Bragg, CA 95437
Estimate 1701
DATE 05/09/2024

JOB NAME JOB ADDRESS
Fire Station Roof 141 N. Main St.

DATE DESCRIPTION AMOUNT
Item# Section A
Roof replacement with standard 30-year asphalt shingles (15 sqrs approx.).

Complete tear off existing roofing materials, install new synthetic underlayment, new 30- year asphalt shingles with SS nails, flashing, and roof components, wall cap to be reused.
26,880.00
Item# Section B
Modified Bitumen (Mod Bit) Roof replacement (40 sqrs approx.).

Complete tear off existing material and install one layer of base sheet (smooth) and one layer of cap sheet (granulated).

For a proper installation we'll be removing and reinstalling the same siding. 50,600.00
Item# Section C
Thermoplastic Polyolefin (TPO) Roof replacement (25 sqrs approx.), including all plumbing penetrations and all components compatible with the TPO material. Wall cap to be reused.
24,240.00
Item# Section D
Thermoplastic Polyolefin (TPO) Roof replacement (37 sqrs approx.), including all plumbing penetrations and all components compatible with the TPO material. Wall cap to be reused.
25,440.00
Item# Section E
Modified Bitumen (Mod Bit) Roof replacement (55 sqrs approx.) Complete tear off existing material and install one layer of base sheet (smooth) and one layer of cap sheet (granulated).
42,550.00
Section C alternative $27,900.00
Modified Bitumen (Mod Bit) Roof replacement (25sqrs approx.) Complete tear off existing material and install one layer of base sheet (smooth) and one layer of cap sheet (granulated). Including all components. Wall cap to be reused.

0.00 DATE DESCRIPTION AMOUNT
Section D alternative $29,500.00
Modified Bitumen (Mod Bit) Roof replacement (37 sqrs approx.). Complete tear off existing material and install one layer of base sheet (smooth) and one layer of cap sheet (granulated), including all plumbing penetrations and all components. Wall cap to be reused.

0.00 We hereby propose to furnish material and labor in accordance with the above specifications for the sum shown.

Any alteration or deviation from the above specifications involving extra cost will be billed as a change order.

ACCEPTANCE OF PROPOSAL The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work
as specified. Payment will be made as outlined above.

TOTAL $169,710.00