Exhibit A - Contract Change Order
Meeting
August 12, 2024
Body
Fort Bragg City Council
Original file
443 KB
Text extracted from the city's file for reading and search. Open the original on legistar1.granicus.com. That file is the official record.

ESTIMATE
GOC Construction & Roofing, Inc.
20725 Dennison Ln
Fort Bragg, CA 95437
[email protected]
+1 (707) 684-0942
https://www.gocconstruction.com
Bill to
City of Fort Bragg projects
416 N. Franklin St.

Fort Bragg, CA 95437
Ship to
City of Fort Bragg projects
416 N. Franklin St.

Fort Bragg, CA 95437
Estimate details
Estimate no.: 1766
Estimate date: 08/08/2024
Expiration date: 09/09/2024
Job Name: Change Order
Job Address: 141 N. Main St.
# Product or service Description Qty Rate Amount

1. Labor & Material The existing heat pumps are not properly installed, no curb no solid place of installation. We
propose to build 2 heat pump curbs for building
A (shingle one), labor and material included.
2 $2,700.00 $5,400.00
Note to customer
We hereby propose to furnish material and labor in accordance with the above specifications for the sum shown.

Any alteration or deviation from the above specifications involving extra cost will be billed as a change order.

ACCEPTANCE OF PROPOSAL The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work
as specified. Payment will be made as outlined above.

Total $5,400.00
Expiry
date
09/09/2024
Accepted date Accepted by

ESTIMATE
GOC Construction & Roofing, Inc.
20725 Dennison Ln
Fort Bragg, CA 95437
[email protected]
+1 (707) 684-0942
https://www.gocconstruction.com
Bill to
City of Fort Bragg projects
416 N. Franklin St.

Fort Bragg, CA 95437
Ship to
City of Fort Bragg projects
416 N. Franklin St.

Fort Bragg, CA 95437
Estimate details
Estimate no.: 1761
Estimate date: 08/01/2024
Expiration date: 08/16/2024
Job Name: Change Order
Job Address: 141 N. main St.
# Product or service Description Qty Rate Amount

1. Change Order Charge Order: Building E.

Under the TPO layer, we found a layer of gravel
impossible to identify during the bid process. The
gravel must be removed before installing the new
roofing material due to the extra weight of adding
two additional layers of material.

Labor/removal and disposal fee included.
1 $8,800.00 $8,800.00
Note to customer
We hereby propose to furnish material and labor in accordance with the above specifications for the sum shown.

Any alteration or deviation from the above specifications involving extra cost will be billed as a change order.

ACCEPTANCE OF PROPOSAL The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work
as specified. Payment will be made as outlined above.

Total $8,800.00
Expiry
date
08/16/2024
Accepted date Accepted by

ESTIMATE
GOC Construction & Roofing, Inc.
20725 Dennison Ln
Fort Bragg, CA 95437
[email protected]
+1 (707) 684-0942
https://www.gocconstruction.com
Bill to
City of Fort Bragg projects
416 N. Franklin St.

Fort Bragg, CA 95437
Ship to
City of Fort Bragg projects
416 N. Franklin St.

Fort Bragg, CA 95437
Estimate details
Estimate no.: 1760
Estimate date: 08/01/2024
Expiration date: 08/16/2024
Job Name: Change Order
Job Address: 141 N. Main St.
# Product or service Description Qty Rate Amount

1. Change Order Charge Order: Labor and material to attach a copper drainage pipe to the existing plastic one,
which is compatible with torch down material.
1 $980.00 $980.00
Note to customer
We hereby propose to furnish material and labor in accordance with the above specifications for the sum shown.

Any alteration or deviation from the above specifications involving extra cost will be billed as a change order.

ACCEPTANCE OF PROPOSAL The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work
as specified. Payment will be made as outlined above.

Total $980.00
Expiry
date
08/16/2024
Accepted date Accepted by

ESTIMATE
GOC Construction & Roofing, Inc.
20725 Dennison Ln
Fort Bragg, CA 95437
[email protected]
+1 (707) 684-0942
https://www.gocconstruction.com
Bill to
City of Fort Bragg projects
416 N. Franklin St.

Fort Bragg, CA 95437
Ship to
City of Fort Bragg projects
416 N. Franklin St.

Fort Bragg, CA 95437
Estimate details
Estimate no.: 1759
Estimate date: 08/01/2024
Expiration date: 08/16/2024
Job Name: Change Order
Job Address: 141 N. Main St.
# Product or service Description Qty Rate Amount

1. Change Order Charge Order: Dry rot (400 sqft approx.) between buildings A and B on the west side, we
found dry rot (siding and on top of window trim)
we propose to remove the existing T1-11 plain
siding and replace it with pre-prime Hardie
panels with 16 OC batten (2 1/2 x 3/4),
underlayment and SS nails. Replace all window
trims with 2x4 cedar. Labor and Material included
but excluding paint.
1 $16,500.00 $16,500.00
Note to customer
We hereby propose to furnish material and labor in accordance with the above specifications for the sum shown.

Any alteration or deviation from the above specifications involving extra cost will be billed as a change order.

ACCEPTANCE OF PROPOSAL The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work
as specified. Payment will be made as outlined above.

Total $16,500.00
Expiry
date
08/16/2024
Accepted date Accepted by