Redwood Roofers Change Order 1

Fort Bragg City Council
October 28, 2024

Document
Redwood Roofers Change Order 1
Meeting
October 28, 2024
Body
Fort Bragg City Council
Original file
2.0 MB
Text extracted from the city's file for reading and search. Open the original on legistar1.granicus.com. That file is the official record.

BEDWOOD BOOI'DBS
CONTRACTOR'S LICENSE N UMBER 957 548
4 May zoz4
Roofing Bid:

Site Location:

City Of Fort Bragg
416 N. Franklin Street
Fort Bragg, CA 95437
Same As Above
Work Description: Lf Roof Additional Llyer Of Modified Bitumen odified bitumen over an underlayment of
nU"ritrss G-z base sheet fastened with a metal square headed simplex bitumen ,-,.rils ,s per manufacturer's specifications. r" layer of modified layer.o b" smooth and z"d layer to be granulated.

Cost of Labor & Materials: E8,78o. oo
payment: roo/o or gr,ooo (whi.hever is less) will be due upon the signing of the contract. Half of the rotal contract will be due upon the commencement of the work, and the balance will be due in full within 5 days from the completion of the work.

Payment Terms: Late fees past 3o days will be charg"d r,5o/o Per rrronth.

Customer shall pay all costs of collection, including without limitations, reasonable atto rne-y's fees. In addition ro any other right or rem.dy provided by law, if customer fails to pay for the services when due as listed aborre, Redwood Roofers has the option ,o ,r"". su.h failure to pay as a materials breach of this Contract, and rnay cancel this Contra.t and/or seek legal remedies.

DtsctatuEns
Any labor or materials not coaeredby thisbid yet found tobe necessdry to perform the contracted worh willbe done on d. time and materialsbasis, subject to the owner's approaal, Bid does not include any structural or rot repairq any necessdry carpentry to b-e- done on A TdlM basis subject to owner's approaal. Bid Includes remoaal of r layer of roofing unless otherwise stati:ed. lf additional layers of roofing are found, they will be ,r*oird on A TdlM basis. Bid does not include plywood unless otherwise stated, if plywood does not exist, it willbe required and willbe installed on dTdlMbasis. Bid 1 | , :: , City Of Fort Bragg | +to N. Franl<Lin St. I Fort Bragg, Calif. ss437 | Upper Roof 17851 NORTH H!GHWAY 1
FORT BRAGG, CALIFORNIA 95437
PHON E:7 07 .937 .17 OO FAX: 7 07 .937 .4345
A

BEDWOOD BOOI'DBS
CONTRACTOR'S LICENSE NUMBER 957 548
does not include any shylights or necessdry interior shylight worh unless otherwise stated; abid for interior finish cdrpentry'canbe proaided upon request. Redwood Roofers ,holi notbe held responsible foi -"popped -nails" or plaster/siding damage
resulting from any roofing *orlr, duit, diit ti debris in attic, minor damage to shrubs, driveways, walhwdys or patios, The contract price has been calculatedbased on the current prices for matrriil, as of the execution of this Agreemrrt. _contractor agrees to use his best efiorts to obtain the lowest possible prices from aaailable material suppliers' ln the eaent of stgnlfrcant delry or prici increase of material occurring during the performdnce of the contract thioughno fauh of thi Contractor, the contract sum' time of performdnce, and contract requirements shallbe equitabty adjustedby change order in accordance with the procrdun, of the contract documents. A change in price of an item of material shall b, ionridered significant when the price of an item increases 5'/o percent between the date of this contract-and the date of installation. Redusood Roofers maintains, at all times, General Liability lnsurance with a.$2'ooo,ooo.oo limit of liability ard Worlzers Compensation ln-surance. (Jpon Request, we shall furnish a certificate of insurance AS froof of this coaerage. Redwood roofers will arrange for the finoi roofing inspection. The i*oh, detector affidauit is the sole responsibility of -the
property owner. All wortz willbe done to the uniformbuilding code standards orbetter' All wortz witlbe done on d timely basis. The cost of thisbid is current for 3o days' WETVER OF CONTNACTUAT RICHT: TFIE FAILURE OF EITHER PARTY TO ENFoRCE ANY PRoVISION OF THIS CONTRACT SHALL NOT BE CONSTRUED AS A wAIVER oR LIMITATIoN OF THAT PARTY,S RIGHT TO SUBSEqTJENTLY ENFORCE

AND COMPEL STRICT COMPLIANCE WITH EVERY PROVISION OF
CoNtnACT.

BONDED AND FULLY INSURED
ESTaSLISHED IN r97z
I have read, understand, and agree to the terrrrs of this bid:
(Print) Date
akota Murray
eneral Manager
S ignature