Redwood Roofers Change Order 3

Fort Bragg City Council
October 28, 2024

Document
Redwood Roofers Change Order 3
Meeting
October 28, 2024
Body
Fort Bragg City Council
Original file
2.5 MB
Text extracted from the city's file for reading and search. Open the original on legistar1.granicus.com. That file is the official record.

BEDWOOD BOOBEBS
CONTRACTOR'S LICENSE NUMBER 957 548
City Of Fort Bragg
416 N. Franklin Street
Fort Bragg, CA 95437
Same As Above
r7 October zoz4
Roofing Bid:

Site Location:

Work Description: Gym Roof RePair
r. Cut into existing T.P.O. roof to prop erly install z3A" HPWX plate fastened with z" #r5 thread with a #3 Philips head to roof decking. z. Apply 6o mill T.P.O. (thermoplastic polyolefin) single ply membrane over seams PRN.

3. Installation of T-joint covers over all areas where roof decking penetrations have punctured the membrane roo {ing.

4. Properly detail existing T.P.O. flashing i.e.: edge flashing, clad metal flashing, ins ide/outside corners, screws, plates, t-joint covers, and through wall scuppers.

I. Properly detatl out existing drainage scuPpers to help factlttate ProPer dr arn age.

6. Remove all debris created in the roofing process to the county landfill.

Cost of Labor & Materials: g 8,672.oo
disclaimer- NO warranty. repairs and partial replacements are not guaranteed. redwood roofers will rnake every attempt to ensure that the work perforrned addresses the roofing issues as described in this bid, but we will rnake no warranty that the application and services will rneet your requirernents. at no event will redwood roofers be liable to you or anyone else for any repairs made or any action taken or any damages. no advice or information, whether oral or written shall create any tyPe of guarantee.

Payment: roo/o or gl,ooo (whichever is less) will be due uPon the signing of the conrract. Half of the total contract will be due upon the commencement of the work, and the balance will be due in full within 5 days frorn the cornpletion of the work.
1 I , : City Of Fort Bragg | +to N. Franl<Lin St. I Fort Bragg, CaLif. ss437 I Gy, Roof Repair 17851 NORTH HIGHWAY 1
FORT BRAGG, CALIFORNIA 95437
PHON Ez7 07 .937 .17 OO FAX: 7 07 .937 .4345

EBDWOOD BOOBEBS
CONTRACTOR's LICENSE NUMBER 957 548
Payment Terms: Late fees past 3o days will be charged r. 5o/o Pet rnonth.

Customer shall pay all costs of collection, including without limitations, reasonable attorney's fees. In addition to any other right or rern"dy provided by law, if customer fails ro pay for the services when due us listed aborre, Redwood Roofers has the option to rreat such failure to pay as a materials breach of this Contract, and may cancel this Contra ct and/or seek legal remedies.

DrscralMERS
Any labor or materials not coaeredby this bid yet found to be necessary to perform the contracted worh will be done on a time and materials basis, subject to the owner's dpproaal. Bid does not include any structural or rot repdirsl any necessdry carpentry to be done on A TdlMbasis subject to owner's approaal. Bid Includes remoaal of r layer of roofing unless otherwise stated. lf additional layers of roofing are found, they will be remoaed on aTdlMbasis. Bid does not include plywoodunless otherwise stated, if plywood does not exist, it willbe required andwillbe installed on dTUMbasis. Bid does not include any shylights or necessdry interior slzylight worh unless otherwise stated; abid for interior finish carpentry canbe proaided upon request. Redwood Roofers shall not be held responsible for "popped nails" or plaster/siding damage resulting from any roofing worlt, dust, dirt or debris in attic, minor damage to shrubs, driaeways, wallzwdys or patios. The contract price hasbeen calculatedbased on the current prices for materials as of the execution of this Agreement, Contractor agrees to use his best efforts to obtain the lowest possible prices from aaailable material suppliers. ln the eaent of significant delay or price increase of material occurring during the performunce of the contract through no fault of the Contractor, the contract sum, time of performunce, and contract requirements shallbe equitably adjustedby change order in accordance with the procedures of the contract documents. A change in price of an item of material shall be considered significant when the price of an item increases 5o/o percent between the date of this contract and the date of installation. Redwood Roofers maintains, at all times, General Liability lnsurance with a gz,ooo,ooo.oo limit of liability and Worhers Compensation lnsurance. T-)pon Request, we shall furnish a certificate of insurance as proof of this coaerdge. Redwood roofers will drrange for the final roofing inspection. The smolte detector affidauit is the sole responsibility of the property owner. All worlt willbe done to the uniformbuilding code standards orbetter.

All worlt willbe done on d timely basis. The cosf of thisbid is current for 3o days, 2l City Of Fort Bragg | +to N. Franl<Lin St. I Fort Bragg, Calif. s5437 I Gy, Roof Repair 17851 NORTH HIGHWAY 1
FORT BRAGG, CALIFORNIA 95437
PHON E:7 07 .937 .17 OO FAX: 7 07 .937 .434s
A
NDDIyOOD BOOI.DBS
CONTRACTOR'S LICENSE NUMBER 957 548
WaIvuR oF CoNTnRCTUAL RTcH:r: TgT FAILURE OF EITHER PARTY TO ENFoRCE ANY PRoVISIoN oF THIs CoNIRACT SHALL NoT BE CONSTRUED AS A wAIVER oR LIMITATIoN oF THAT PARTY,S RIGHT TO SUBSEqUENTLY ENFORCE AND COMPEL STRICT COMPLIANCE WITFI EVERY PROVISION OF-II{IS CoNrnACT.

BONDED AND FULLY INSURED
EsregusHED IN r97z
I have read, understand, and agree to the terms of this bid:
atr<ota Murray
S ignature (Print) Date eneral Manager
31, , , City Of Fort Braggl +to N. Franklin St. I Fort Bragg, Catif. ss437 I Gy* Roof Repair 17851 NORTH HIGHWAY 1
FORT BRAGG, CALTFORNIA 95437
PHON E:7O7 .937 .17OO FAX: 7O7 .937 .4345