Roofing Bid:
Site Location:
�
REDWOOD ROOFERS
CONTRACTOR'S LICENSE NUMBER 957548
City Of Fort Bragg
416 N. Franklin Street
Fort Bragg, Calif. 95437
Same As Above
2.1 November 2.02.4
Work Description: City Hall Custom Stainless-Steel Downspouts
1. Remove existing two (z) galvanized downspouts.
z. Installation of two (z) custom fabricated 304 stainless-steel 3'' x 4 1/8" downspouts on both sides (north and south) of building.
3. Installation of necessary stainless-steel gutter straps. Straps to be secured to the building using stainless-steel screws.
4. Remove all debris created in the roofing process the county landfill.
Cost of Labor & Materials:
Payment: IOO/o or $1,000 (whichever is less) will be due upon the signing of the contract. Half of total contract will be due upon the commencement of the work, and the balance will be due in full within 5 days from the completion of the work.
Payment Terms: Late fees past 30 days will be charged 1.50/o per month.
Customer shall pay all costs of collection, including without limitations, reasonable attorney's fees. In addition to any other right or remedy provided by law, if customer fails to pay for the services when due as listed above, Redwood Roofers has the option to treat such failure to pay as a materials breach of this Contract, and may cancel this Contract and/ or seek legal remedies.
DISCLAIMERS
Any labor or materials not covered by this bid yet found to be necessary to perform the contracted worh will be done on a time and materials basis, subject to the owner's approval. Bid does not include any structural or rot repairs; any necessary carpentry to be done on a Te.rM basis subject to owner's approval. Bid Includes removal of I layer of 1 IP ,J g e City Of Fort Bragg I 416 N. Franklin St I Fort Bragg, Calif. 95437 I Downspouts 17851 NO RTH HIGHWAY 1
FORT BRAGG, CALIFORNIA 95437
PHONE:707 .937.1700 FAX:707.937.4345