ADDENDUM No. TO CONSULTANT AGREEMENT
The consultant agreement dated for professional services between LUMOS & ASSOCIATES, INC., and for
(project name)
is hereby amended as follows:
Time and materials payment per current fee schedule (attached) not to exceed Lump sum payment
Other (specify)
Backcharge: Yes No. To Whom:
Job No.: Task No./Description:
ORIGINAL CONTRACT AMOUNT:
TOTAL PREVIOUS ADDENDUMS:
TOTAL THIS ADDENDUM:
REVISED CONTRACT AMOUNT:
All other terms and conditions remain unchanged.
PRINT PRINT
SIGN SIGN
TITLE TITLE
DATE DATE
Extra Work Authorization Form
COMPENSATION ARRANGEMENT
LUMOS & ASSOCIATES, INC. CLIENT
Copies to Client for signature; return one to Lumos & Associates, Inc. 3 June 15, 2026 City of Fort Bragg, CA Newman Reservoir Booster Pump Station See attached Change Order Request 3.
✔ $14,600 ✔ $20,700 11390.002 Task 2.12, 2.13, 2.14, 2.15 $198,600.00 $36,610.65 $35,300.00 $270,510.65 Aaron Brusatori, PE Gropu Manager June 15, 2026 Standard Fee Schedule
January 1, 2026
CA
• Fees for prevailing wage rate projects are available upon request or as required. • Map filing, checking, consulting, and other fees paid on behalf of the client shall be billed at cost plus fifteen percent (15%). • Overtime hours will be billed at 1.5 times the standard rate where applicable. • Survey and Field crew billing rates include standard field survey equipment and truck up to 30 mile radius, after which mileage rates apply
• Fees for depositions and testimony will be billed at two (2) times the standard billing rates Engineering Per Hour
Director $350
Group Manager / Senior Group Manager 330/340
Project / Senior Project Manager 280/300
Technical Lead / Senior Technical Lead 280/300
Staff / Project / Senior Hydrogeologist 225/235/255
Staff / Project / Senior Engineer 230/240/260
Project / Senior / Lead Project Coordinator 220/230/250 Project Designer I / II / III / IV / V 125/165/185/200/210 Structural Drafter I / II / III / IV / V 120/160/180/195/205 Hydrogeologist Tech I / II / III / IV / V 120/160/180/195/205 Construction Per Hour
Director $350
Group Manager 330
Assistant / Project / Senior Project Manager 250/280/300 Project / Senior Geotechnical Engineer 240/255
Construction Services Supervisor / Engineer 205/220
Project / Senior Project Coordinator 220/230
Geotechnician 195
Inspector / Senior Inspector (includes nuclear gauge) 185/200 Construction Technician I / II / III / IV 150/160/170/180 Materials Technician I / II / III / IV (includes nuclear gauge) 120/150/160/170 Surveying Per Hour
Director $350
Group Manager 330
Assistant / Project / Senior Project Manager 250/280/300 Associate / Staff / Project / Senior Surveyor 220/230/240/255 Project / Senior Project Coordinator 220/230
Photogrammetrist / Photogrammetry Manager 175/230
GIS Analyst 175
Surveying Technician I / II / III / IV/ V 125/165/185/195/205 Party Chief / Sr. Party Chief 220/240
Administrative & Other Services Per Hour
Administrative Support $135
Copy & Print Services Cost + 15%
Mileage (per mile) 0.90
These rates apply to services rendered through December 31, 2026. Services provided after this date will be invoiced according to the Standard Fee Schedule in effect at that time.
Standard Fee Schedule
January 1, 2026
CA
• Fees for prevailing wage rate projects are available upon request or as required. • Map filing, checking, consulting, and other fees paid on behalf of the client shall be billed at cost plus fifteen percent (15%). • Overtime hours will be billed at 1.5 times the standard rate where applicable. • Survey and Field crew billing rates include standard field survey equipment and truck up to 30 mile radius, after which mileage rates apply
• Fees for depositions and testimony will be billed at two (2) times the standard billing rates Engineering Per Hour
Director $350
Group Manager / Senior Group Manager 330/340
Project / Senior Project Manager 280/300
Technical Lead / Senior Technical Lead 280/300
Staff / Project / Senior Hydrogeologist 225/235/255
Staff / Project / Senior Engineer 230/240/260
Project / Senior / Lead Project Coordinator 220/230/250 Project Designer I / II / III / IV / V 125/165/185/200/210 Structural Drafter I / II / III / IV / V 120/160/180/195/205 Hydrogeologist Tech I / II / III / IV / V 120/160/180/195/205 Construction Per Hour
Director $350
Group Manager 330
Assistant / Project / Senior Project Manager 250/280/300 Project / Senior Geotechnical Engineer 240/255
Construction Services Supervisor / Engineer 205/220
Project / Senior Project Coordinator 220/230
Geotechnician 195
Inspector / Senior Inspector (includes nuclear gauge) 185/200 Construction Technician I / II / III / IV 150/160/170/180 Materials Technician I / II / III / IV (includes nuclear gauge) 120/150/160/170 Surveying Per Hour
Director $350
Group Manager 330
Assistant / Project / Senior Project Manager 250/280/300 Associate / Staff / Project / Senior Surveyor 220/230/240/255 Project / Senior Project Coordinator 220/230
Photogrammetrist / Photogrammetry Manager 175/230
GIS Analyst 175
Surveying Technician I / II / III / IV/ V 125/165/185/195/205 Party Chief / Sr. Party Chief 220/240
Administrative & Other Services Per Hour
Administrative Support $135
Copy & Print Services Cost + 15%
Mileage (per mile) 0.90
These rates apply to services rendered through December 31, 2026. Services provided after this date will be invoiced according to the Standard Fee Schedule in effect at that time.
Change Order Request 3