Cities Index.
Att 3 - Brelje and Race Proposal

Fort Bragg City Council
June 22, 2026

Document
Att 3 - Brelje and Race Proposal
Meeting
June 22, 2026
Body
Fort Bragg City Council
Pages
3
Original file
6.1 MB
Text extracted from the city's file for reading and search. Open the original on legistar1.granicus.com. That file is the official record.

Proposal for:

On-Call Engineering and Surveying Services
Prepared for:

City of Fort Bragg
Public Works Department
May 29, 2026
Brelje & Race Consulting Engineers
Proposal for On-Call Engineering and Surveying Services • City of Fort Bragg 1954
Brelje & Race Consulting
Engineers is formed in
Santa Rosa
2000s
Numerous capital projects
for Santa Rosa Junior
College
1980s
Airport Business Center
and Expansion of Airport
Treatment Plant and
Disposal Field
1960s
Engineering design
services for The Sea Ranch
and Oakmont
1970s
Cloverdale Treatment Plant
and Christian Life Center,
now the Luther Burbank
Center for the Arts
1990s
Advanced Wastewater
Treatment and Recycled
Water System for the Town
of Windsor
2010s
Large scale landmark
projects such as the
new AmericanAg Credit
Campus and Sutter Santa
Rosa Regional Hospital
Over 70 Years of Excellence, Innovation and Integrity
2020s
Major projects expanding and
upgrading essential public
infrastructure, ensuring a
bright future for Sonoma
County.

May 29, 2026
Chantell O’Neal
Assistant Director of Engineering
City of Fort Bragg
416 North Franklin Street
Fort Bragg, CA 95437
Subject: Proposal for On-Call Engineering & Surveying Services B&R Project No. 5070.00
Dear Ms. O’Neal,
Brelje & Race Consulting Engineers is pleased to submit this proposal to the City of Fort Bragg in response to the City’s Request for Proposals (RFP) to provide on-call engineering and land surveying services for various projects. With a complex network of public facilities and infrastructure and limited staff and financial resources, the City needs an engineering partner that can provide comprehensive services efficiently, accurately, and on time. Brelje & Race offers the City local experience and technical expertise from a creative team that excels in a wide array of civil engineering, land surveying, and environmental and regulatory compliance services.

Brelje & Race has extensive experience providing professional civil engineering and land surveying services to municipal clients throughout the North Coast region. Our proposed team brings experience as Acting District Engineer for several local water and wastewater districts, as well as providing peer review, plan check, and consulting civil design services to clients including the County of Sonoma and the Cities of Rohnert Park, Santa Rosa, and Petaluma. The stability of our firm, combined with the knowledge gained from over 70 years of local project work, ensures that the City will always receive responsive, dependable, and high-quality professional service from our team.

I will serve as the Principal-in-Charge for all City projects assigned to Brelje & Race under the Master Services Agreement. By having a consistent and familiar point of contact, we find we are able to provide our clients with the highest level of service. However, if I am unable to fulfill that role, please be assured that the entire Brelje & Race management staff have extensive engineering design and project management experience and will step in as necessary.

Brelje & Race proposes no exceptions to the indemnification, insurance, or other terms of the City’s standard professional services agreement. Should you have any questions or require further information regarding our qualifications, please feel free to contact me at (707) 636-3740 or [email protected]. I want to thank you for the opportunity to submit our qualifications to the City for professional engineering services. Our team is available to commence work immediately and we look forward to hearing from you.

Very truly yours,

BRELJE & RACE
___________________________________
M. Sean Jeane, P.E.

Senior Principal
enc.
(this page intentionally left blank)
Brelje & Race Consulting Engineers
Proposal for On-Call Engineering and Surveying Services • City of Fort Bragg Table of Contents
A. Firm Description....................................................................................1 B. Relevant Experience and References.................................................... 2 C. Key Personnel Qualifications...............................................................11 D. Scope of Work......................................................................................16 E. Budget and Schedule of Charges ........................................................20 F. Work Schedule.......................................................................................20 G. Insurance.............................................................................................. 21 H. Consultant Agreement.........................................................................22 Appendix A: Resumes
Appendix B: Rate Schedules
(this page intentionally left blank)
1 Brelje & Race Consulting Engineers
Proposal for On-Call Engineering and Surveying Services • City of Fort Bragg The Brelje & Race team is based in a single
office near the Sonoma County Airport.

Firm Description
Brelje & Race Consulting Engineers is a multi-disciplined firm offering a broad range of civil engineering planning and design, construction management, environmental permitting and land surveying services. Since our founding in Santa Rosa in 1954, we’ve earned a reputation as a leading civil engineering firm in the North Bay through our high-quality technical work and outstanding client service. A broad mix of clients and projects and our long history of service in the area have allowed Brelje & Race to develop a unique understanding of the issues involved in developing and completing successful projects in an environment of competing interests and robust regulatory oversight.

Brelje & Race operates out of a single office in Santa Rosa and is a S-Corporation registered in California. Our staff presently includes 14 professional engineers, two professional land surveyors, an environmental planning and permitting specialist, a Qualified Stormwater Developer and Practitioner (QSD/QSP), and a supporting group of CAD technicians, EITcredentialed engineering technicians, construction inspectors, and clerical personnel. The organization is extremely stable - most of the key members of our firm have been with us for over fifteen years.

Brelje & Race has built its well-deserved reputation through practical application of sound engineering principles and professional service. We also stay abreast of the latest developments in the industry and have the staff and expertise to successfully complete any project. Several of our senior engineering staff possess extensive experience in the design, permitting, and construction management of new facility construction, utility replacement and rehabilitation projects, and roadway and other infrastructure improvement projects. For seven decades our firm has provided these services to municipalities and local agencies throughout the North Coast.

Our professional culture strongly supports in-house consultations and peer review. Sharing information and collaboration are mainstays that have provided efficient and cost-effective design solutions, and addressed unique circumstances during construction. While specific individuals will be slated for specific project tasks, Brelje & Race’s significant depth of experience will be fully employed for City of Fort Bragg (City) on all projects.

Our objective is to provide the City with superior quality service and technically competent solutions. Brelje & Race will achieve that objective through application of the following fundamental concepts:
• Maintain great working relationships and open lines of communication with City staff
• Assemble the best team for every project
• Build upon past accomplishments and experience
• See every project through to successful completion
Primary Contact:

M. Sean Jeane, P.E., Senior Principal
707-636-3740, [email protected]
2 Brelje & Race Consulting Engineers
Proposal for On-Call Engineering and Surveying Services • City of Fort Bragg Relevant Experience and References
The following section provides references for clients for whom Brelje & Race has provided services similar to those sought by the City. Under each client listing, are a detailed description of a select project and a brief listing of other representative projects. We encourage you to contact our references to gain additional insight into the superior quality of service that Brelje & Race provides to all of our clients.

City of Rohnert Park
Water Storage Tank 8, Dual Pipelines and Multi-Use Access Road The City embarked on the construction of a new water
storage tank to meet growing demand from a major new
housing development. Brelje & Race assisted the City
with negotiating the project scope required to build the tank with the developer. Brelje & Race then provided
peer review of original designs, design services for site plan alterations and construction management for the
installation of the 900,000-gallon welded steel water
storage tank, half-mile underground dual 12-inch and 16- inch water pipelines, half-mile combination access road and multi-use path with a Contech steel and concrete
vehicular bridge and 300 ft long by 22 ft tall soil nail retaining wall. Initial site redesign allowed for future construction of a second water tank on site. Subsequent redesigns responded to site constraints that emerged during construction, realigning the access road/path and other improvements around protected resources. Brelje & Race
provided construction management and inspection services that kept the project on track while navigating complex requirements around protected cultural resources and
bridge construction over jurisdictional wetlands.

FEE
Design and CM/Inspection:
$1.12 million ($250,000 in
subconsultants)
DATES
2018-2020

CONSTRUCTION COST
Estimate: $4.35 million (by
others)
Actual: $6.39 million

PROJECT TEAM
Sean Jeane – Principal-inCharge and Construction
Manager
George Potter – Resident
Engineer / Construction
Inspector
Benjamin Bryant – Design
Engineer
Brennen Urbanek –
Engineering Technician
Additional project experience for the City of
Rohnert Park includes (listed in alphabetical
order):
• Sidewalk & Driveway Replacement, 2019-2020
• Rohnert Park Tank 9 Site Development, Design 2021-
2022, Construction Management 2022-2024
• SE Specific Plan Area Water Transmission Main,
2018-2020
• Sewer Interceptor Outfall Rehab - Ph. I-II
Construction Management, 2020-2023
• SOMO Village Area Modeling - Phase I 2020, Phase
II 2024

REFERENCES
Mark Henderson, Public Works Director
City of Rohnert Park
600 Enterprise Drive, Rohnert Park, CA 94928
(707) 588-3316, [email protected]
Justin Brandt, Deputy City Engineer
City of Rohnert Park
600 Enterprise Drive, Rohnert Park, CA 94928
(707) 588-2252, [email protected]

KEY PROJECT ELEMENTS
• Engineering Design
• Peer Review
• Environmental Consulting
• Construction Management
• Construction Inspection
• Land Surveying
• SSU Trunk Sewer Rehabilitation, 2019-2021
• Stadium Lands Specific Plan Area Pressure Analysis,
2022
• Trail to Crane Creek Regional Park, Design 2017-
2022, Construction Management 2022-current
• Valve Exercise and Flushing Program, 2017-2018
• Wet Well Lining Construction Management, 2018-
2019
• Well Facility Assessments & Design, 2020-2023
3 Brelje & Race Consulting Engineers
Proposal for On-Call Engineering and Surveying Services • City of Fort Bragg Temporary Bypass Pumping for the City of Santa Rosa
Crosstown Trunk Sewer Replacement
City of Santa Rosa
Cobblestone Drive Zone R2 to R4 Water Main Connection
Brelje & Race was selected to design an intertie between water system pressure zones R2 and R4 to correct suboptimal fire protection water flows. A new 10-inch HDPE intertie pipeline spanned approximately 1,100 LF
between Tillmont Way and Cobblestone Drive through
an easement across a private corporate campus. A new
PRV station was installed before the tie-in to maintain separate pressure zones. In addition, in order to isolate the Cobblestone Drive neighborhood water system to create a new pressure zone, approximately 174 LF of 8” diameter
PVC water pipe was installed near the southern end of the Cobblestone Drive loop.

Brelje & Race evaluated two alternative alignments for
the intertie and prepared construction documents for the preferred alignment. Brelje & Race also led environmental compliance, coordinating biological and cultural resource consultants, and preparing an Initial Study/Mitigated
Negative Declaration as required under CEQA. Our team
developed exhibits to support the right-of-way acquisition process and provided limited construction administration services.

FEE
$205,191
DATES
2017-2024

CONSTRUCTION COST
Estimate: $566,230
Actual: $523,132

PROJECT TEAM
Dave Coleman – Prinicpalin-Charge
Dyanna Stetina – Project
Manager
Ben Bryant – Design
Engineer
Justin Witt – Environmental
Planner

SERVICE CATEGORIES
• Engineering Design Services
• Planning & Asset Management
• CEQA Compliance
• Environmental Consulting Services
• Construction Administration
• Land Surveying
Additional project experience for the City of
Santa Rosa includes (listed in alphabetical
order):
• Albany, Clement, and Malano Sewer & Water
Replacement, 2021-2024
• Alvarado Avenue & Mt Olive Water & Sewer
Replacement, 2017-2020
• B St. Traffic Slurry Seal & Turn Pocket, 2021-current Backup Generators for Water & Wastewater Facilities,
2020-current
• Calistoga Road Reconstruction and Utility
Replacement, 2021-current

OTHER CLIENT REFERENCES
Sara Kozol, Supervising Engineer
City of Santa Rosa
69 Stony Circle, Santa Rosa, CA 95401
(707) 543-3866, [email protected]
Tracy Duenas, Supervising Engineer
City of Santa Rosa
69 Stony Circle, Santa Rosa, CA 95401
(707) 543-3952, [email protected]
Gregory Mariscal, Supervising Engineer
City of Santa Rosa
69 Stony Circle, Santa Rosa, CA 95401
(707) 543-3832, [email protected]
Mike Prinz, Deputy Director – Operations
City of Santa Rosa Subregional Operations
4300 Llano Road, Santa Rosa, CA 95407
(707) 543-3876, [email protected]
4 Brelje & Race Consulting Engineers
Proposal for On-Call Engineering and Surveying Services • City of Fort Bragg City of Santa Rosa New Backup Generator City of Santa Rosa Slater and Lewrosa Sewer & Water Replacement
• Cobblestone Drive Zone R2-R4 Connection, 2017-
2024
• Country Manor Lift Station Replacement,
2023-current
• Crosstown Trunk Sewer Replacement (3 Segments),
2020-2023
• CSR Reclamation Pump Station Building
Replacement, 2024-current
• Delta Pond and Pond 2 Inundation Mapping and
Emergency Action Plans, 2018-2020
• Dotti Farm Recycled Water Main Improvements,
2019-2024
• Evaluation & Assessment of Recycled Water
Discharge Infrastructure, 2021-current
• Fulton Rd Lift Station 11 Relocation, 2025-current
• Fulton Road Sewer Crossing at Santa Rosa Creek,
2018-current
• Geysers-Delta Connection Improvements, Design
2017-2022, Construction Management 2022-current
• Grosse Avenue Sewer and Water Replacement
Construction Management, 2019-2021
• Lake Ralphine & Fountaingrove Inundation Mapping
and Emergency Action Plans, 2021-2023
• Laguna Treatment Plant Potable Water
Improvements, 2023-current
• Llano Trunk Rehab Phase 1 Peer Review, 2025
• LTP Filter Valves & Actuators Replacement,
2021-current
• Meyers Dr Sewer & Water Improvements,
2025-current
• Pump Station 1 Retaining Wall Improvements, 2023-
2024
• Pump Station 9 Electrical Upgrades, 2022-current
R3 Antenna Mast, 2022-2024
• R5 Replacement Evaluation, 2023-current
• R7 Tank Concerns, 2023-current
• Rock Creek & Matanzas Water Main Replacement,
2020-current
• S3 Pump Station Improvements, 2013-2020
• S3 to R3 Telemetry Conduit, 2023-2024
• Santa Rosa Creek Trail Dutton Avenue Access,
2021-current
• Slater and Lewrosa Sewer and Water Construction
Inspection, 2021-2023
• Slope Protection for Ponds B, C, D and Delta Pond,
Design 2016-2019, Construction Management 2019-
2021
• Spring Creek Sewer Crossing Relocation,
2024-current
• Spring Lake Lift Station Improvements, 2014-2020
SWLID Design Example, 2022-2024
• Tank & Pump Station Seismic Upgrades, Phase 5,
2020-current
• Traffic Signalization at Hearn & Burbank CEQA
Review, 2022-current
• Water Station 4 Facility Assessment, 2021-current
• West College Wet Weather Emergency Pumps, design
2019-2022, Construction Management, 2022-2024
• WRP Flood Protection Design, 2017-current
5 Brelje & Race Consulting Engineers
Proposal for On-Call Engineering and Surveying Services • City of Fort Bragg City of Petaluma
Manor Lane Tank Rehabilitation
The City engaged Brelje & Race to provide engineering
design services for the rehabilitation of the 2.0 MG water storage tank on Manor Lane. Erected in 1990, welded
steel tank’s coating system had exceeded its useful life and showed signs of corrosion and deterioration. Brelje & Race conducted a visual inspection and prepared a
technical memorandum detailing the tank conditions
and recommended improvements. Brelje & Race also
coordinated inspection and recommendations from tank
seismic specialist Joe Engel. Brelje & Race prepared plans, specifications, and estimates for complete rehabilitation, including interior and exterior recoating, replacement or removal of degraded appurtenances and controls, and
structural and electrical improvements to comply with
current building code standards.

FEE
$87,500
DATES
Evaluation: 2017.

Design: 2020 to 2021.

Construction: 2022.

CONSTRUCTION COST
Estimate: $1,100,000
Actual: $1,347,440

PROJECT TEAM
Sean Jeane – Principalin-Charge and Project
Manager
George Potter – Design
Engineer
Additional project experience for the City of
Petaluma includes (listed in alphabetical order):
• Hardin Tank Rehabilitation, Design 2022-2024,
Construction Management 2024-current
• Oak Hill Tank Evaluation, 2015-2016
• Paula Lane Tank Rehabilitation, Design 2014-2016,
Construction Management 2016-2017
• Petaluma Airport Runway Drainage Improvements,
2023-current
• Petaluma Sports Complex Drainage Improvements,
2023-current

REFERENCES
Jonathan Sanglerat, Engineering/CIP Manager
City of Petaluma
202 N McDowell Blvd, Petaluma, CA 94954
(707) 778-4355, [email protected]
Dan Herrera, Senior Civil Engineer
City of Petaluma
202 N McDowell Blvd, Petaluma, CA 94954
(707) 778-4589, [email protected]
City of Petaluma Paula Lane Tank Rehabilitation City of Petaluma Hardin Tank Rehabilitation

SERVICE CATEGORIES
• Engineering Design Services
• Construction Management
• Construction Inspection
6 Brelje & Race Consulting Engineers
Proposal for On-Call Engineering and Surveying Services • City of Fort Bragg Sonoma County Water Agency (Sonoma Water)
Washington and Todd Creek Channels Retaining Wall Evaluation The Agency engaged Brelje & Race to evaluate failing
retaining walls at two locations: the Todd Creek Channel in Santa Rosa and the Washington Creek Channel in
Petaluma. For each Brelje & Race conducted a background document review and prepared a preliminary engineering
report summarizing initial conclusions, environmental
and permitting concerns, and recommended potential
repairs. An engineer’s estimate of probable construction costs for recommended repairs and recommended budgets
for further investigations and design efforts provided
the Agency with a project roadmap to address urgent
conditions.

The replacement retaining wall on the Washington Creek
Channel.

FEE
$32,729
DATES
2023-2024

CONSTRUCTION COST
Estimate: $980,000
(Washington Creek
Channel)
Actual: Not Available

PROJECT TEAM
Ben Bryant – Principalin-Charge and Project
Manager
Kevin Scalabrini – Design
Engineer
RGH Consultants
ZFA Structural Engineers Additional project experience for Sonoma Water includes (listed in alphabetical order):
• Channel Drive Bridge Repair, 2021-current
• Monte Rio & Villa Grande Wastewater Treatment
Study, 2021-current
• OCSD to Graton Feasibility Study, 2020-2022
• Inundation Mapping and Emergency Action Plans,
2020-2022
• River Diversion Structure Modernization,
2022-current
• Todd Channel Retaining Wall Repairs, 2023-current

REFERENCES
Alex Bodulow, Water Agency Engineer III
Sonoma Water
404 Aviation Blvd, Santa Rosa, CA 95403
(707) 806-8270, [email protected]
Dale Roberts, Principal Engineer
Sonoma Water
404 Aviation Blvd, Santa Rosa, CA 95403
(707) 547-1979, [email protected]
Detail of alignment alternatives identified as part of the Occidental to Graton Wastewater Pipeline Feasibility Study.

SERVICE CATEGORIES
• Engineering Design Services
• Planning & Asset Management
Brelje & Race has extensive experience
assisting local municipal clients under on-call
service agreements. Our firm currently provides
engineering design services for numerous local
agencies on an on-call basis, including the
following:
• City of Santa Rosa
• City of Rohnert Park
• City of Cotati
• City of Healdsburg
• Town of Windsor
• Sonoma County Water Agency
• Sonoma County Public Infrastructure
• Sonoma County Regional Parks Deparment
7 Brelje & Race Consulting Engineers
Proposal for On-Call Engineering and Surveying Services • City of Fort Bragg Town of Windsor
Brelje & Race has provided engineering design and construction management services to the Town of Windsor for the past 40 years. We have emphasized a high level of professional standards and service to our Client over these years.

Brelje & Race completed comprehensive Master Plans for the Town of Windsor in 1989 and in 2001, initiating the conversion of the wastewater treatment plant from secondary to tertiary, the creation of 80 million gallons of additional effluent storage, a significant change in the discharge location, and construction of an extensive recycled water irrigation system. EIRs on both of the Master Plans were certified, and the plans were used as a roadmap to develop the treatment plant and recycled water system. During that period the Town nearly tripled in size. The treatment plant, storage, discharge and recycled water irrigation systems, all designed by Brelje & Race, have proven to be very reliable; discharge violations are virtually nonexistent. Facilities include UV light disinfection, which has eliminated the requirement for chlorine disinfection, resulting in a safer working environment for operations staff and an effluent that is free of trihalomethanes (THMs). Brelje & Race has prepared several Reports of Waste Discharge and negotiated discharge permits with the Regional Board on behalf of the Town. Preliminary design reports were prepared for conversion of aerated ponds to extended air activated sludge. The report included an in-depth review of sequencing batch reactors and oxidation ditch technology; filter pilot testing and selection; selection of biosolids treatment and disposal alternatives; and comparison of disinfection alternatives. Engineering reports complying with the requirements of Title 22 were prepared for certification of the UV light disinfection system by the State Health Department and for the recycled water system.

Windsor’s wastewater treatment plant features flow equalization, automatic screening and grit removal, Biolac extended air activated sludge treatment with nitrogen removal, diurnal flow equalization, deep circular secondary clarifiers, chemical addition and flocculation facilities, tertiary clarifiers, continuous backwash moving bed upflow DynaSand filters and UV light disinfection. Brelje & Race designed the Town’s 80 million gallon effluent storage Pond No.7 and four effluent pump stations. Pressure control at the pump stations and in different distribution systems is achieved variously through a gravity surge control tank, large hydropneumatic tanks, and variable frequency drive pumping. An extensive recycled distribution system including more than 5 miles of 20-inch diameter pipe supplies water to more than 1400 acres of varied rural and urban uses.

Pond 5 Berm Repair
Constructed in 1971, Pond 5 holds 10% of the Town
wastewater treatment plant’s total effluent capacity and prevents the discharge of up to 14.4 MG of wet weather
flows on an annual basis. In 2019 a leak was observed
on the east embankment of Pond 5. Considering several
preliminary design alternatives, Brelje & Race determined that most cost-effective solution would be to install 1,400 LF of bentonite enhanced soil liner along the east and
west berms. This was accomplished through excavation
of existing slope protection and interior embankment
soils, refilling with a mix of the exiting soil and bentonite, compacting the backfill, and replacement of the rock slope protection.

Brelje & Race prepared plans, specifications, and estimates for the improvements, assisted with bidding, and provided construction management and inspection. Brelje & Race
ushered the project through an accelerated schedule to
ensure construction was complete before the start of the winter rainy season.

FEE
$210,700
DATES
March to September, 2020

CONSTRUCTION COST
Estimate: $650,713
Actual: $672,445

PROJECT TEAM
Dave Coleman – Principalin-Charge and Project
Manager
Ben Bryant – Design
Engineer
George Potter – Resident
Engineer.

SERVICE CATEGORIES
• Engineering Design Services
• Construction Management
• Construction Inspection
• Land Surveying
8 Brelje & Race Consulting Engineers
Proposal for On-Call Engineering and Surveying Services • City of Fort Bragg Additional project experience for the Town of
Windsor includes (listed in alphabetical order):
• Biosolids Monitoring, 2018-2020
• Blower Building Ventilation and Access
Improvements, 2018-2022
• CSA-31 Pump Station Rehabilitation, 2021-current
• Pond 10 Leak Repair, 2019-2020
• Recycled Water Master Plan, 2019-2020
• Recycled Water Storage & Outfall Assessment, 2021-
2023
• Recycled Water Transfer Improvements CM &
Inspection, 2022-current
• Recycled Water & Wastewater Storage Ponds &
Discharge Evaluation, 2023-current
• UV System Replacement, 2021-2025
• Water Reclamation Plant AWT Clarifier No. 1 &
2 Rehabilitation, Design 2019-2020, Construction
Management 2020-2022

REFERENCES
Dave Ernst, Wastewater Treatment Superintendent
Town of Windsor
8400 Windsor Road, Bldg 100, Windsor, CA 95492
(707) 838-5328, [email protected]
Carl Euphrat, Deputy Director of Engineering
Town of Windsor
8400 Windsor Road, Bldg 100, Windsor, CA 95492
(707) 838-1195, [email protected]
Garrett Broughton, Associate Civil Engineer
Town of Windsor
8400 Windsor Road, Bldg 100, Windsor, CA 95492
(707) 838-1211, [email protected]
Town of Windsor Wastewater Treatment UV Replacement
Town of Windsor Wastewater Pond 10 Leak Repair
Aerial View of the Town of Windsor Wastewater Treatment Plant Town of Windsor AWT Clarifier No. 1 Rehabilitation
9 Brelje & Race Consulting Engineers
Proposal for On-Call Engineering and Surveying Services • City of Fort Bragg City of Healdsburg
Cabernet Road Culvert Replacement
The City engaged Brelje & Race to prepare bid-ready
construction documents for the replacement of twin
corrugated metal stormwater culverts under Cabernet
Road. The failing culverts threatened the structural integrity of the road and caused significant land subsidence where the culverts daylighted into the open channel. The project replaced the culverts, converted the section experiencing significant land subsidence into an open channel,
and replaced the road surface adjoining the drainage
improvements.

The project was designed and built on an accelerated
timeline. Notice to proceed for design was issued in June of 2024 and construction documents, bid, award, and
construction were all completed by the end of September 2024. Services included land surveying and coordinating approvals from the Regional Water Quality Control Board.

FEE
$52,500
DATES
June to September, 2024

CONSTRUCTION COST
Estimate: $309,500
Actual: $294,799

PROJECT TEAM
Benjamin Bryant –
Principal-in-Charge and
Project Manager
Kevin Scalabrini – Design
Engineer
Additional project experience for the City of
Healdsburg includes (listed in alphabetical
order):
• Cost Analysis of Sewer & Water System Replacement,
2023-2024
• Grant Street Water System Improvements,
2024-current
• Healdsburg Avenue Sewer Replacement, 2018-2020
• March Ave Reconstruction & Pedestrian Upgrades,
2025-current

REFERENCE
Clay Thistle, Senior Civil Engineer
City of Healdsburg
401 Grove Street, Healdsburg, CA 95448
(707) 431-3391, [email protected]

SERVICE CATEGORIES
• Engineering Design Services
• Planning & Asset Management
• Land Surveying
10 Brelje & Race Consulting Engineers
Proposal for On-Call Engineering and Surveying Services • City of Fort Bragg City of Cotati
William Street and Olof Street Sewer Main Replacements
Brelje & Race provided engineering design and
construction management services for the replacement of approximately 1,400 LF of sewer main, six intermediate
manholes, and 25 service laterals. The existing decaying 8-inch and 10-inch diameter mains were replaced with 12- inch piping. During construction, Brelje & Race provided comprehensive construction management services and
performed daily construction observations, preparing daily reports, conducting the final inspection with City of Cotati staff, and preparing record drawings.

FEE
Design and CM: $135,000
DATES
Design:

Construction: June to
September 2020

CONSTRUCTION COST
Estimate: $727,835
Actual: $542,648

PROJECT TEAM
Brent Beazor –
Principal-in-Charge and
Construction Manager
George Potter – Resident
Engineer/Construction
Observation
Brian Gong – Design
Engineer Additional project experience for the City of
Cotati includes (listed in alphabetical order):
• Cotati Sewer Collection System Repairs, 2021-2025
• Cypress Avenue Sewer Repairs, 2023-2024
• St. Joseph Way Sewer and Water Main Replacements,
2016-2019
• Water System Operations Support, 2019-2022
• Well Site 1A Tank Improvements, 2016-2018

REFERENCE
Craig Scott, Director of Public Works, City of Cotati
201 W Sierra Ave, Cotati, CA 94931, (707) 665-3638,
[email protected]
City of Cotati Cypress Avenue Sewer Repairs City of Cotati Sewer Collection System Repairs

SERVICE CATEGORIES
• Engineering Design Services
• Construction Management
• Construction Inspection
• Land Surveying
11 Brelje & Race Consulting Engineers
Proposal for On-Call Engineering and Surveying Services • City of Fort Bragg Section C
Key Personnel Qualifications
Successful completion of any project requires technical competence and managerial skills in the assigned
personnel, development of a thorough work plan, and
an understanding of the client’s needs. For the City of Fort Bragg, we have assembled a team of highly qualified and experienced professionals whose skills meet these
requirements, and whose qualifications and responsibilities are suited to a wide variety of projects.

Senior Principal Sean Jeane will function as the Principalin-Charge for all projects assigned to Brelje & Race under a master services agreement. Sean has been with Brelje & Race for 31 years with 35 years of overall experience and has been serving in a project management role for more
than 25 of those years.

Sean has led on-call engineering and peer review services for local agencied and has served as Principal-in-Charge and Project Manager for numerous municipal projects.

When project size, scope, and scheduling necessitate
additional project oversight, Associate Principal Benjamin (Ben) Bryant, and Associate Civil Engineer Dyanna
Stetina, will act as Project Manager under Sean’s
supervision. Ben brings 17 years of civil engineering
experience, including civil design and construction
management for water storage and distribution, roadway
and pedestrian facilities, and hydraulic and hydrologic modeling projects. Dyanna brings 15 years of civil
engineering experience, primarily in the planning and
Figure 1: Team Organization Chart
Subconsultants
RGH Consultants
Geotechnical Engineering
ZFA Structural Engineers
Structural Engineering
15000 Inc.

Mech./Elec./Plumbing Engineering
EBA Engineering
Environmental Engineering
Other specialist subconsultants
as needed
Civil Design, Construction Management & General Engineering George Potter, P.E.

Senior Civil Engineer
Brennen Urbanek, P.E.

Civil Engineer
Brian Gong, P.E.

Civil Engineer
Addtl. Civil Engineers (6) &
Engineering Technicians (8)
Ryan Gleason, P.E.

Associate
Sophia Grubb, P.E.

Associate
Drafting Team (4) Construction Field
Technicians (2)
Land Surveying
Jeffrey Roach, P.L.S.

Survey Manager
Office & Field
Survey Personnel (3)
Environmental Compliance
Justin Witt
Senior Environmental Planner
Project Manager
Ben Bryant, P.E.

Associate Principal
Project Manager
Dyanna Stetina, P.E.

Associate Principal
Principal-in-Charge
Sean Jeane, P.E.

Senior Principal
Project Managers will
serve under the
supervision of Principals
when project size, scope,
and scheduling necessitate
additional oversight.
12 Brelje & Race Consulting Engineers
Proposal for On-Call Engineering and Surveying Services • City of Fort Bragg Table 1: Summary of Key Personnel Qualifications and Experience Team Member Qualifications and Experience
Sean Jeane, P.E.

Senior Principal
Role: Principal-in-Charge/Project Manager
Professional Civil Engineer CA No. 52402
• Over 35 years of civil engineering experience including 31 years with the firm. • Seasoned project manager in planning, design, construction management, and peer review for private and public agency projects including roadway improvements; potable water storage, pipeline, treatment, and pump stations; water well design and rehabilitation; wastewater treatment and pumping facilities; parks planning and pathways; drainage systems and erosion control; and earth retaining structures.

Ben Bryant, P.E.

Associate Principal
Role: Project Manager
Professional Civil Engineer CA No. 79218
• Associate Principal with 17 years of experience in the civil engineering field. • Design experience in a broad range of projects, including water storage and distribution, wastewater collection and treatment, stormwater management, roadways and pedestrian facilities, hydraulic and hydrologic modeling, and land development. • Resident engineering, construction management, and project start up assistance for public works projects, including water, wastewater, and storm drainage improvements.

Dyanna Stetina, P.E.

Associate Principal
Role: Project Manager
Professional Civil Engineer CA No. 83007
• Associate Principal with 15 years of civil engineering experience • Experienced with development of preliminary plan and profile drawings for project feasibility studies, capacity analysis and process design, equipment sizing and selection, piping layouts, plans and specifications preparation, cost estimating, and construction phase assistance
• Design engineer for local water and wastewater facility projects including:
» Water Storage Tank and Pipeline Replacements, Diamond A Mutual Water » Treatment Plant Facility Improvements, The Sea Ranch Water Company » Cobblestone Dr. R2 to R4 Water Main Connection, City of Santa Rosa design of water infrastructure, including treatment, storage, and distribution systems. Dyanna has served as Project
Manager for numerous engineering design, construction,
and permitting compliance projects.

Sean will also lead development review and plan check
for the City. Sean has provided these services for other local agencies, including the County of Sonoma and
Cities of Rohnert Park and Santa Rosa. When additional
capacity is needed, Associate Engineer Ryan Gleason
will also support with development review services.

Ryan brings 24 years of experience in site development, planning entitlements, and construction permitting and has supported Sean in providing on-call plan check services for the Sonoma County Permit and Resource Management
Department (Permit Sonoma).

Under Sean’s leadership, Brelje & Race offers a large
team of qualified design engineering and land surveying professionals with a wide range of expertise. Our staff have focused training and are specialists in specific aspects of civil engineering and related fields, including civil engineering design, preparing specifications, Geographic Information Systems (GIS) and related mapping, land
surveying and topographic mapping, environmental
planning and permitting, and resident engineering and
field inspection during construction. We have also included specialist subconsultants we commonly engage when
necessary for our public agency clients. Brelje & Race has a longstanding history of successful partnership with each firm, delivering numerous successful projects for local municipalities and agencies.

Figure 1 depicts the organizational structure of Brelje & Race listing key professional staff likely to be utilized for City projects. Related qualifications, experience, roles, and responsibilities of key personnel are summarized in the following team matrix. Detailed resumes are included in Appendix A.

Our supervisory and project management
team will be supported by the rest of our
qualified staff of over 35 professionals including
civil engineers, engineering technicians, an
environmental planner, several CAD drafters,
land surveyors, and a Qualified Stormwater
Developer (QSD).
13 Brelje & Race Consulting Engineers
Proposal for On-Call Engineering and Surveying Services • City of Fort Bragg Team Member Qualifications and Experience
Ryan Gleason, P.E.

Associate Civil Engineer
Role: Project Manager for Plan Check
Professional Civil Engineer CA No. 69215
• Associate with 24 years of experience in the arena of site development, planning entitlements, and construction permitting.
• Extensive experience in the design of roadways, site developments, and drainage/ storm water management.
• Proficient in applicable state and local standards relevant to civil site improvements, including stormwater permitting and compliance.

Sophia Grubb, P.E.

Associate Civil Engineer
Role: Managing Engineer
Professional Civil Engineer CA No. 87543
• Associate Civil Engineer with 12 years of experience in the design and construction management of water and wastewater facilities.
• Experienced with feasibility analysis, capacity studies, hydraulic modeling, equipment sizing and selection, piping layouts, plans and specifications preparation, cost estimating, and construction phase assistance.
• Recent and current experience planning and designing utility improvements includes:
» Meyers Drive Sewer and Water Replacement, City of Santa Rosa » Crosstown Trunk Sewer Lining, City of Santa Rosa
» Dotti Farm Recycled Water Main Improvement Project, City of Santa Rosa George Potter, P.E.

Senior Civil Engineer
Role: Resident Engineer/Field Inspector
Professional Civil Engineer CA No. 52700
• Senior Civil Engineer with 37 years of experience, primarily planning and designing water and wastewater projects, resident engineering, and construction observation. • Experienced in a broad range of projects including roadway paving, water storage and distribution, and facilities improvements (pump stations, roads, parking lots, treatment plants, and storage tanks).
• Specialized expertise in tank coatings design and construction observation, lead removal and hazardous waste. Certifications include Protective Coatings Inspector, HAZWOPER, and Confined Space.

Brian Gong, P.E.

Civil Engineer II
Role: Design Engineer
Professional Civil Engineer CA No. 88474
• Civil Engineer with 11 years of civil design experience in the water and wastewater fields including master planning, report preparation, cost estimation, and hydraulic calculations.
• Proficient with Arc GIS and asset database management for both water and wastewater treatment facilities.

Brennen Urbanek, P.E.

Civil Engineer II
Role: Design Engineer
Professional Civil Engineer CA No. 95239
• Civil Engineer with 11 years of civil design experience in site development, storm water mitigation, and pavement maintenance systems.
• Experience includes design of water distribution, water tank, and pathway projects for the Cities of Rohnert Park and Santa Rosa.
• Experienced with AutoCAD Civil 3D software to perform grading and drainage design.

Justin Witt
Senior Environmental Planner
• Senior Environmental Planner with 27 years of experience in project administration and preparing environmental review documents and environmental permits. • Skilled in preparation of CEQA documents (including EIRs, Initial Studies, review process, noticing requirements, and conducting public meetings). • Proficient at preparing and processing environmental permits related to the U.S. Army Corps of Engineers, Regional Water Quality Control Board, the California Department of Fish and Wildlife and US Fish and Wildlife Service.

Jeff Roach, L.S.

Survey Manager
Professional Land Surveyor CA No. 9158
• Professional Land Surveyor with 31 years of experience in the field. • Proficient in surveying boundary, topography, construction, utility, control, right of way, ALTA, and Flood Certificates for both public and private clients.

Table 1: Summary of Key Personnel Qualifications and Experience (continued) 14 Brelje & Race Consulting Engineers
Proposal for On-Call Engineering and Surveying Services • City of Fort Bragg Subconsultant Partners
Brelje & Race’s services will be supplemented by the specialized expertise of our team of subconsultants - all local firms based in the North Coast region. We have built strong relationships with each firm through years of collaboration on successful projects throughout the region. The following profiles briefly describe the experience and specialized services each firm offers.

RGH CONSULTANTS, INC.

Geotechnical Engineering
RGH Consultants is a privately owned S Corporation
founded in 1991 as a full-service firm with expertise
in geotechnical engineering, engineering geology, and
construction observation and testing. RGH currently
has 31 employees and has grown to become one of the
largest locally owned geotechnical engineering firms in the northern Bay Area. Headquartered in Santa Rosa, RGH
geotechnical testing laboratory is certified by the California Department of Transportation (Caltrans); the American
Association of State Highway and Transportation Officials (AASHTO) resource, formerly AMRL; the Cement
and Concrete Reference Laboratory (CCRL), which is a
division of ASTM International; the California Division of the State Architect (DSA); and the United States Army Corps of Engineers (USACE). RGH’s staff of professional engineers and geologists, field engineers and engineering technicians collectively have decades of experience in
geotechnical engineering, engineering geology, construction observation, and materials testing in northern California with an emphasis on work in Lake, Marin, Mendocino,
Napa, and Sonoma counties. These services have been
provided on public works projects including design and
construction of building expansions and remodels, new
structures, pavement rehabilitation, bridges, and parks.

RGH Consultants has extensive experience with public
works projects including design level geotechnical studies, geotechnical peer reviews, construction observation and testing, special inspections, and materials testing. RGH has developed a comprehensive working knowledge of
the soil and geologic conditions in the North Coast, and an understanding of the performance of projects after
construction. RGH’s knowledge and expertise allow
them to work closely with clients, design teams, and
contractors to develop geotechnical solutions that are
sound, practical, and cost-effective. RGH has successfully provided geotechnical engineering services as part of oncall contracts with the City of Petaluma, Napa Sanitation District, the City of Santa Rosa, The Town of Windsor,
and the County of Sonoma.

ZFA STRUCTURAL ENGINEERS
Structural Engineer
Since 1974, ZFA Structural Engineers (ZFA) has been
a trusted partner for public agencies, specializing in the structural analysis, design, and evaluation of public sector buildings and infrastructure projects across California.

With a robust team of over 90 employees, including
27 licensed Structural Engineers and 21 Professional
Engineers, ZFA offers extensive expertise in new
construction and the retrofit and revitalization of existing structures. ZFA’s comprehensive services include feasibility studies and sustainable design solutions, ensuring every project meets the highest standards. Notably, ZFA
holds a Master Services Agreement with the County of
Mendocino, emphasizing their commitment and capability
in providing exceptional structural engineering services to the public sector.
15 Brelje & Race Consulting Engineers
Proposal for On-Call Engineering and Surveying Services • City of Fort Bragg 15000 INC.

Mechanical Engineer
15000 Inc. was founded in 2004 with specific goals
in mind: to provide superior consulting mechanical
engineering services to Architects, owners, developers, and contractors.

To achieve this, their team focuses on a combination
of traditional and proven technologies coupled with a
clear eye towards the future of mechanical engineering, technological advances, green construction, and carbonfree installations.

They have provided mechanical engineering and design
services for several of the most energy efficient buildings in California; beginning with the first LEED Platinum
rated school building in California to several “CHPS”
school campuses through the state
15000 Inc. is a leader in sustainability and providing
innovative and efficient solutions for project specific applications. In addition to taking pride in their
craftsmanship, they feel honored to work with an
incredibly talented and creative client base. They work with some of the most prominent and successful firms
in California and beyond. Most of their work stems from past performances that have developed into long term
relationships.
15000 Inc. maintains active participation in numerous
industry organizations that require continuing education that keep them on the cutting edge of technology and
engineering, among them; American Society of Heating,
Refrigeration and Air Conditioning Engineers (ASHRAE),
United States Green Building Council (USGBC), American
Society of Plumbing Engineers (ASPE), American
Institute of Architects (AIA), Construction Specifications Institute (CSI), the AABC Commissioning Group (ACG)
and the National Fire Protection Association (NFPA).
15000 Inc. is equipped with resources and staff able to accommodate all project needs in a timely manner. The
firm’s staff include:
• 8 Staff, 2 Licensed Engineers
• Engineers Licensed in CA, NV, and UT
• LEED Accredited Professionals
• Certified Commissioning Firm
• CALGreen Special Inspection Accredited

EBA ENGINEERING
Hazardous Materials Assessment
EBA Engineers provides environmental services
that include site assessments, underground storage
tank evaluations, hydrogeologic investigations and
soil and groundwater remediation services. EBA also
has substantial experience in regulatory permitting,
environmental restoration, stormwater and surface water management.

EBA has been serving clients since 1979 as an engineering and environmental consulting firm. EBA’s staff of
engineers, geologists and environmental professionals have worked together to provide a comprehensive range of
management and engineering services to private and public sector clients. EBA is continually involved with state and local regulatory agencies and maintains an active awareness of current regulations pertaining to design, planning and environmental issues. The firm has extensive project
knowledge and experience working with the DTSC.

EBA has performed hundreds of Phase I Environmental
Site Assessments at a large variety of private, commercial, industrial agricultural and municipal properties to assess the existing and potential risks and liability associated with development, redevelopment or purchase of land and to
satisfy the site evaluation requirements of development requirements and lending institutions.

EBA has performed many Phase II site assessments in a
variety of site settings that include agricultural, residential, commercial, and industrial properties. Phase II assessments can be performed using a variety of available approaches including geophysical surveys, soil and groundwater
sampling, soil gas sampling and other investigative
procedures. Collected samples are submitted to a Statecertified analytical laboratory for analysis. 16 Brelje & Race Consulting Engineers
Proposal for On-Call Engineering and Surveying Services • City of Fort Bragg Scope of Work
Brelje & Race has consistently demonstrated the ability to provide superior quality consulting civil engineering and land surveying services. Our capabilities have made us a trusted partner to local agencies on a broad range of improvement projects. Specifically, our staff has the expertise to take on projects in the civil engineering and land surveying areas noted in the City’s RFP. We commonly engage subconsultants with expertise in structural
engineering, mechanical engineering, environmental
engineering related to environmental site assessment and remediation, and geotechnical engineering and materials testing when they are components of projects that we lead.

General Approach
No matter what category of service is being provided, we aim to achieve the following objectives:
• Accurate determination of project scope during the
early stages of the project.
• Select project team members that are experienced
with the work anticipated and that compliment the
capabilities of other members of the team.
• Conduct sufficient research to identify existing
conditions that have a potential to interfere with the
project objectives.
• Develop a reasonable project schedule and budget.
• Maintain regular communications with City staff and
subconsultants.
• Produce a complete, clear, and concise final product.

Each assignment will require a unique scope and approach.

The Project Manager will work closely with the City’s
Project Manager on each new assignment to arrive at the best possible methodology for successful implementation.

Cost Control and Scheduling
Establishing a project scope and budget are integral to every project we do. The project is discussed in depth with the client to provide a firm project understanding from which tasks can be derived. Staff and hours are assigned to each task based on consideration of specific challenges of the current project. Budgets from subconsultants are requested, if required, and reviewed for thoroughness
and appropriateness of cost. Based on these factors,
final budget estimates are presented to the client for their consideration.

Once approved, our project budgets are monitored
regularly and tracked closely. In addition to serving our clients’ needs, our meticulous budget management allows us to meet the rigorous reporting requirements mandated by State and Federal funding agencies.

Scheduling is often critical to project success. Our Project Managers are adept at evaluating the project needs and the client’s desired timeframe against our staffing resources and availability to prepare a schedule that is realistic yet meets project goals.

Preliminary Engineering Studies
Engineering planning services include a variety of tasks assisting the City to identify and develop appropriate
capital improvements to City infrastructure, identify the expected costs to fund those improvements, and help to
ensure the City receives the appropriate level of service and equipment for their planned expenditures. Our
services may include master planning reports such as
for water and wastewater systems, feasibility studies and engineering economic analyses, computerized hydraulic
modeling of water or recycled water distribution systems, sewer and storm drain modeling, and peer review and
value engineering of projects designed by others. Our team has also assisted with rate studies, the development of assessment districts, and engineering tasks in support of funding capital projects. Each of these services involves a wide range of potential approaches specific to the task at hand. Brelje & Race often performs these services for our local public agency clients.

Engineering Design Services
Brelje & Race employs engineering expertise, sound
planning, excellent communications and big-picture
awareness in our approach to capital improvement project design. We use these guiding principles along with the basic steps below to deliver high-quality construction documents that often exceed the client’s expectations.

Preliminary Design and Permitting

1. Review any available background and historical
information on the project, including geotechnical
assessments, conditional use permit and design review
approval, environmental documentation and other
data provided by City staff. Check project description
for consistency with approved environmental
documents.

2. Prepare for and attend a project kick-off meeting
with the City and design team members. Provide
schedule of tasks that identifies key milestones.

3. Review project site to observe conditions and
17 Brelje & Race Consulting Engineers
Proposal for On-Call Engineering and Surveying Services • City of Fort Bragg discuss potential difficulties including sensitivity of surrounding property owners to the project.

4. When necessary, coordinate design level geotechnical and hazardous material evaluations of the site and
proposed improvements and coordinate preparation
of reports detailing the findings.

5. Conduct field surveys and develop a site topographic plan for use as a project base plan.

6. Check existing record information relative to parcel boundaries, easements and rights-of-way that may be
affected by the project.

7. Review requirements associated with any public
agency review and approval processes (Regional
Water Quality Control Board, Department of Water
Resources, Division of Drinking Water, etc.).

8. Prepare preliminary improvement plans developed
to a 30% level and submit plans along with a design
memorandum and preliminary estimate of probable
construction cost for review and comment by
City staff. Design memorandum generally includes
elements such as special design considerations, any
right-of-way, easement, or boundary issues, permit
requirements, constraints and other considerations
stemming from environmental review.

9. Investigate potential conflicts with existing utilities and identify locations where potholing may be
recommended.

10.Prepare for and attend a design review meeting
to discuss preliminary project findings and
recommendations.

Construction Documents Preparation

1. Incorporate City staff document review comments
and design review meeting discussions into project
design.

2. Address any utility conflicts discovered during the
preliminary design phase.

3. Prepare an index of drawings expected to be required for the final construction documents package.

4. Perform all design calculations and engineering
analysis necessary and prepare improvement plans for
the project. Submit plans for review and comment to
the City at the 30%, 60%, 90% and 100% completion
levels.

5. Prepare draft technical specifications and submit
with the 60% completion level plans. Update and
submit technical specifications and include contract
documents with the 90% and 100% completion level
plans.

6. Incorporate recommendations made in the
geotechnical report.

7. Update the estimate of probable construction costs at the 60%, 90% and 100% completion level and submit
with improvement plans.

8. Prepare an estimate of working days necessary to
construct the project at the 60% and 90% completion
levels.

9. Prepare for and attend design review meetings
associated with the 60% and 90% completion levels.

10.Prepare submittal documents packages and assist City with obtaining any permits and approvals required
from other agencies.

11.Finalize improvement plans, technical specifications and contract documents. Provide stamped and
signed final mylar improvement plans, a stamped and
signed hard copy of the final technical specifications, contract documents and electronic versions of the
final plans and contract documents.

Bidding Assistance
After completion of final improvement plans, technical
specifications and contract documents, we often also
provide assistance during the bidding phase that includes the following tasks:

1. Respond to and maintain a log of questions from
prospective bidders.

2. Prepare addenda or drawing revisions in response to
bidder questions.

3. Attend the pre-bid conference.

Plan Check Review
From our long-gained experience, Brelje & Race has
learned that our clients are better served, and the
project goals are better achieved by providing one highly experienced individual to act as liaison and overall project manager for all City review work and coordinate the
efforts of our team members. By providing familiarity
and continuity, our approach allows our project manager to gain a complete understanding of the City’s internal protocols, priorities, and general expectations. In essence, our project manager becomes an extension of City staff
who can be relied upon to work independently, and be
trusted to reduce the work load of City staff members.

Project Manager Review
Our project manager will be the point of contact for all review work assigned to Brelje & Race by the City. When projects are sent to Brelje & Race for review, the project manager will perform a brief initial review to determine the breadth and scope of the review tasks and then
determine the appropriate staff person to perform the
detailed review. It is anticipated that for most projects, the staff person with the lightest current workload will be assigned in order to expedite the review.
18 Brelje & Race Consulting Engineers
Proposal for On-Call Engineering and Surveying Services • City of Fort Bragg However, for larger projects, or where special
circumstances require particular knowledge, the most
experienced and qualified person will be assigned
regardless of their current workload.

Staff Site Visit, Review & Comments Matrix
Staff assigned to a particular review will immediately
schedule a site visit in order to verify the conditions depicted in the plans and to better understand the specific details of the site. Prior to their visit, they will perform an initial plan review and become familiar with the project details. After their site visit they will complete their review of the plans and calculations and prepare redline mark-ups directly on one set of plans/calculation sheets for return to the City. Additional sets can be marked, or additional copies made, depending on City preferences. Comments
will be as thorough and complete as we can make them
as we feel it is important to get all comments on the plans during the initial review.

Notations provided will be for any item not meeting
the City’s standards, for items omitted, or items needing additional notes or specifications to fully comply with standards. There will not be any subjective commentary, aesthetic or design preference notations. Only objective, enforceable commentary relating to published standard
requirements will be offered. Should our reviewers have questions about the designs or calculations, they will
contact the design engineer directly to have those questions answered. All communications will be logged and notes
taken.

Comments from the plans will be compiled into an Excel
spreadsheet matrix listing various pertinent reference
information such as the sheet or page number the
comment can be found on, the item on the sheet the
comment pertains to (e.g. detail, notes, section, etc.), and the comment will be elaborated on further as compared to the brief notes marked on the plans or calculations. The matrix will be a convenient reference to both the design engineer and to us for ensuring all comments are addressed at the time of the resubmittal.

Quality Assurance & Document Return
The project manager will spend sufficient time to review all comments generated, ensuring they are appropriate,
and follow a standard for uniformity and clarity. Should there be revisions required, the project manager will either prepare the revisions directly, or route the documents back to the reviewer for them to make the revisions, depending on their extent and complexity. After all comments and the matrix are satisfactory, the project manager will prepare a brief cover letter and return all documents to the City.

PDF copies of all documents will be provided.

Second Review
After the design engineer has made corrections and
resubmits for final review, our project manager will hand the resubmitted plans and calculations directly to the
original reviewer. The original reviewer will then proceed to verify the completeness of the documents, ensuring
all original comments were addressed adequately. Unless there are significant changes in the design from the original submittal, the reviewer will focus only on the responses provided to the original comments and that they were fully addressed.

For completed plans (no comments) a brief (standard
format) letter will be prepared and returned to the City.

Should there be comments or items still not addressed,
those will be noted with redlines on the plans and returned to the City, with a brief letter outlining the extent and nature of the comments. Our project manager will review the work for quality assurance prior to sending any
correspondence back to the City.

Peer Review
As the design review and value engineering consultant,
Brelje & Race will check the work of the design engineer and provide recommendations for corrections and
improvements to the design with the intent of lowering
costs, providing a better or more constructible product and avoiding change order work or construction claims during the construction phase. Work will be sequenced much as
Brelje & Race designed improvements to the City of Santa Rosa’s S3 Pump Station Station (left) and designed and managed construction of ADA improvements for Sonoma County Transportation and Public Works in Occidental and Graton (right). 19 Brelje & Race Consulting Engineers
Proposal for On-Call Engineering and Surveying Services • City of Fort Bragg described for plan check review, with successive rounds based on the percent completion of project design and
active coordination with City staff.

Land Surveying
Since our founding in 1954, Brelje & Race has offered
complete land surveying services in the North Bay.

Over the last 70 years we have earned a reputation
for consistently delivering accurate and reliable survey products for our clients. We’re committed to providing
our clients the professional care and service that only fully licensed engineers and land surveyors can provide.

We offer qualified and licensed staff who utilize industry standard technologies like robotic total stations, GPS, digital levels, computer-aided-drafting, and GIS integration.

Our land surveying services for public agency clients
(including municipal public works departments) are
commonly a component of engineering design projects
led by our professional engineering staff. Accordingly, our team has well-established relationships with local agencies throughout the region built over many years of successfully delivering comprehensive and accurate mapping and land
surveying products.

The surveying department at Brelje & Race is truly a fullservice operation. Our land surveyors, survey technicians, field crews, AutoCAD professionals, civil engineers, and specialty subconsultants work together seamlessly to
produce a complete final product. The following details our experience, expertise, and approach:

Topographic Surveys
In preparing topographic surveys we verify horizontal and vertical datum and cross section locations and intervals (if needed), conduct field surveys, and compile mapping conforming to project specifications. Our team performs a quality control review of our finished product including performing a comparison to field photos and/or a field
verification.

Boundary and Right-of-Way Surveys
In performing boundary and right-of-way surveys, we
verify horizontal datum, determine availability and location of control monuments, compile ownership data for
the parcels included within and immediately adjoining
the project area (assessor parcel number, owner’s name, last recorded document number), and obtain copies of
recorded documents and maps that pertain to existing
parcel boundaries and/or right-of-way applicable to project area. Next, we conduct field surveys to locate existing monuments and property corners pertaining to parcel
boundaries and/or right of way. We prepare mapping
of existing boundaries and right-of-way, determine and
map the new right-of-way, and, if needed, prepare legal descriptions and plats for acquisitions.

Preparation of Corner Records or Records of
Survey
We prepare Corner Records or Records of Survey in
accordance with State of California law and any local
jurisdictional standards, submit a draft work product
to County Surveyor for checking, make any requested
revisions and once approved, forward document to County Recorder’s office for filing or recording, as appropriate.

Construction Staking or Verification of
Contractor-Provided Construction Staking
In construction staking or verifying construction staking performed by others, we start by obtaining hard and
electronic copies of improvement plans and information
regarding project control. If no project control is available, we establish the project control network that meets
construction specifications. Where control is available, we field check the control to verify that horizontal and vertical positions match published information. We
perform construction staking as specified in the project construction specifications, or in the case of verification surveys, perform surveys to confirm contractor-provided construction staking conforms to the project construction specifications. Finally, we provide the client point plots and cut sheets for all requested construction staking.

A significant portion of our surveying workload consists of construction surveying. As such, we have become
very adept at managing a varying workload. Our existing notification policy requires two working days’ notice so we do not anticipate a problem with performing services for the City on short notice, if needed. One of the reasons we can do so is that we always maintain a staff of at least two party chiefs, even when our workload only requires a single survey crew. This allows us the capability to immediately double our capabilities without having to engage an
additional party chief through the union hall. Chainmen are typically readily available and if not, apprentices can readily serve as second members on a crew when under the supervision of a party chief.

Brelje & Race offers 70 years of land surveying experience in the North Coast region.
20 Brelje & Race Consulting Engineers
Proposal for On-Call Engineering and Surveying Services • City of Fort Bragg Budget and Schedule of Charges
The time required to complete each project will depend
on the nature and scope of the project. Brelje & Race will respond to all City requests within one week to confirm availability and kick-off establishing the project scope and budget. Our Project Manager will work proactively with
City staff to define achievable project timelines based on City needs and staff availability. We will prioritize time from our Project Manager’s schedule over the two year
contract period to ensure capacity to serve the City. Note that while specific staff will be assigned to each project, the City will benefit from access to Brelje & Race’s staff of over 35 civil engineering, land surveying, and administrative professionals who can step in to support any project that may require additional staffing resources.

Plan Check Timelines
Given our planned approach, we estimate larger initial plan sets can be turned around and back to the City within ten working days (or less) based on the following operations:
• Plans are provided electronically in PDF format
alongside notification of a pending review by City
staff (additional time may be required to transmit
plans if only available in paper format).
• Plan sets and calculations will have a brief initial
review by the project manager and then be assigned
to the appropriate staff member for review. This will
occur by the end of the next business day after the
plans are received. A reviewer’s current workload
will be considered when assigning projects in order
to have the fastest turn-around time. If the project
includes aspects that require review by a particular
person, then the project will be assigned to that
person despite current workloads. This case is likely
Work Schedule
All services for the City will be performed on a time and materials basis based on hourly billing rates. For each City project we anticipate providing a fee estimate alongside a detailed scope of services under a task order agreement.

See current rate schedules for Brelje & Race and our team of specialist subconsultants provided in Appendix B.
to be uncommon as our staff are all capable of
performing most review aspects likely to be needed.
• For most projects, we anticipate needing three to
five days to schedule a site visit, complete the review with redline markups and prepare a written response
matrix with listed items needing correction. Of
course, each project will be different, and depending
upon the thoroughness of the plans submitted, the
review may go very quickly or take more time to
complete.
• The coordinator will do a final review for quality
assurance purposes, and either make corrections
directly or return to the reviewer for corrections as
necessary, and then prepare a cover letter and return
the package to the City. We anticipate the quality
assurance process to take no more than two days.
• Resubmittals turned in after the initial review will
be given directly to the original reviewer and only
checked to ensure the original comments were
addressed. A brief form letter will be prepared and
sent back to the City with our comments regarding
items needing further attention, if necessary. Only
items not addressed adequately will be noted. We
anticipate turning around plans resubmitted for
additional review within two to three days after they
are received unless significant changes have occurred.

Smaller plan sets with only one or two sheets will likely be turned around in three to five days, but all of our planned approach steps will be followed just the same.
21 Brelje & Race Consulting Engineers
Proposal for On-Call Engineering and Surveying Services • City of Fort Bragg Brelje & Race presents no objection to the insurance requirements as set forth in Section 5.0 of Exhibit A of the RFP. A current certificate of insurance is provided below for the City’s reference.

Insurance

ANY PROPRIETOR/PARTNER/EXECUTIVE
OFFICER/MEMBER EXCLUDED?

INSR ADDL SUBR LTR INSD WVD

PRODUCER CONTACT
NAME:

PHONE FAX (A/C, No, Ext): (A/C, No):

E-MAIL
ADDRESS:

INSURER A :

INSURED INSURER B :

INSURER C :

INSURER D :

INSURER E :

INSURER F :

POLICY NUMBER POLICY EFF POLICY EXP TYPE OF INSURANCE (MM/DD/YYYY) (MM/DD/YYYY) LIMITS

AUTOMOBILE LIABILITY

UMBRELLA LIAB

EXCESS LIAB

WORKERS COMPENSATION

AND EMPLOYERS' LIABILITY
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required)

AUTHORIZED REPRESENTATIVE
EACH OCCURRENCE $
DAMAGE TO RENTED CLAIMS-MADE OCCUR PREMISES (Ea occurrence) $ MED EXP (Any one person) $
PERSONAL & ADV INJURY $
GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $

PRO- POLICY JECT LOC PRODUCTS - COMP/OP AGG
OTHER: $

COMBINED SINGLE LIMIT
(Ea accident) $
ANY AUTO BODILY INJURY (Per person) $
OWNED SCHEDULED AUTOS ONLY AUTOS BODILY INJURY (Per accident) $ HIRED NON-OWNED PROPERTY DAMAGE AUTOS ONLY AUTOS ONLY (Per accident) $ $

OCCUR EACH OCCURRENCE
CLAIMS-MADE AGGREGATE $
DED RETENTION $

PER OTH- STATUTE ER
E.L. EACH ACCIDENT
E.L. DISEASE - EA EMPLOYEE $
If yes, describe under
DESCRIPTION OF OPERATIONS below E.L. DISEASE - POLICY LIMIT INSURER(S) AFFORDING COVERAGE NAIC #

COMMERCIAL GENERAL LIABILITY
Y / N
N / A (Mandatory in NH)

SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE

THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS.

THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS

CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.

THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS

CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.

IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.

If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).

COVERAGES CERTIFICATE NUMBER: REVISION NUMBER:

CERTIFICATE HOLDER CANCELLATION
ACORD 25 (2016/03) © 1988-2015 ACORD CORPORATION. All rights reserved.

CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY)
$
$
$
$
$
The ACORD name and logo are registered marks of ACORD
2/25/2026
License # 0E67768
(619) 400-1996
13056
Brelje & Race Consulting Engineers
475 Aviation Blvd., Suite 120
Santa Rosa, CA 95403
10847
A 1,000,000
X X PSB0001394 2/28/2026 2/28/2027 1,000,000
Limited Cont Liab 10,000
Serv Interest 1,000,000
2,000,000
2,000,000
Ded 0
A 1,000,000
X X PSA0001260 2/28/2026 2/28/2027
Comp.: $1,000 Coll.: $1,000
A 5,000,000
PSE0001273 2/28/2026 2/28/2027 5,000,000
0 A
X PSW0001181 9/1/2025 9/1/2026 1,000,000
1,000,000
1,000,000
B Professional Liab. PRB250093901 2/28/2026 Per Claim 2,000,000 B Ded.: $25K Per Claim PRB250093901 2/28/2026 2/28/2027 Aggregate 4,000,000 Re: Fort Bragg On-Call Engineering & Survey
City of Fort Bragg is Additional Insured with respect to General and Auto Liability per the attached endorsements as required by written contract. Insurance is Primary and Non-Contributory. Waiver of Subrogation applies to General Liability, Auto Liability and Workers' Compensation. 30 Days Notice of Cancellation with 10 Days Notice for Non-Payment of Premium in accordance with the policy provisions.

City of Fort Bragg
415 North Franklin Street
Fort Bragg, CA 95437
BREL&RA-01 MCCOWANA
IOA Insurance Services
3636 Nobel Drive
Suite 410
San Diego, CA 92122
Lea Coleman
[email protected]
RLI Insurance Company
CUMIS Insurance Society, Inc.

X
2/28/2027
X
X
X
X
X
X
X X
X
X
X
22 Brelje & Race Consulting Engineers
Proposal for On-Call Engineering and Surveying Services • City of Fort Bragg Brelje & Race has reviewed the City’s standard consultant services agreement attached as Exhibit A to the RFP. We propose no exception to the City’s standard provisions as stated.

Consultant Agreement
Brelje & Race Consulting Engineers
Proposal for On-Call Engineering and Surveying Services • City of Fort Bragg Resumes
Brelje & Race Consulting Engineers
Sean Jeane, P.E.

Benjamin Bryant, P.E.

Dyanna Stetina, P.E.

Ryan Gleason, P.E.

Sophia Grubb, P.E.

George Potter, P.E.

Brian Gong, P.E.

Brennen Urbanek, P.E.

Jeff Roach, L.S.

Justin Witt
RGH Consultants, Inc.

Eric Chase, G.E.

Jared Pratt, C.E.G.

ZFA Structural Engineers
Kevin Zucco, S.E.

Christian Botto, S.E.
15000 Inc.

Matt Torre, P.E.

EBA Engineering
David Noren
Kevin Coker
Max Kruzic
(this page intentionally left blank)
M. SEAN JEANE, P.E.

Sean Jeane is a Senior Principal with 35 years of civil engineering experience, including 31 years with Brelje & Race. Sean’s professional experience has spanned master planning, preparation of construction documents, and construction management for streets, sidewalks and walking/biking paths, potable water infrastructure, and wastewater treatment and conveyance facilities. His potable water portfolio has included both private and public clients in the areas of master planning, hydraulic modeling, treatment facilities, storage tanks, transmission and distribution piping, pump stations and municipal supply wells. His wastewater portfolio for municipal clients has covered various types of treatment facilities, sewer lift stations, sludge handling and drying, and sewer main rehabilitation.

More recently his design and project management experience has expanded to include roadway rehabilitation, accessibility improvements, ADA compliant pedestrian and bike paths, and other recreational/park facilities. Additional services he’s provided have included performing third-party grading and drainage review for the County of Sonoma and providing on- call construction management, peer review and value engineering assistance to the City of Rohnert Park and other clients.

Water Utility Planning and Design
City of Rohnert Park
• Water Storage Tank 8 and Transmission Mains
• Hydraulic Model Study Update
• Rohnert Park Expressway 16-inch Transmission Main
• Tank Exterior Recoating – Tanks 1, 3, 4, and 5
• Water System Hydraulic Model Study
• Water System Capital Improvement Program
• Commercial Meter Replacement, Phase III
City of Santa Rosa
• S3 Pump Station Pump and Emergency Generator Additions • Storage Reservoir Seismic Upgrades, Phases I and II
• Proctor Heights Water Storage Tanks and Pump Station
Callayomi County Water District, Middletown, CA
• Water Treatment Plant and Office Replacement
City of Petaluma
• Paula Lane Tank Evaluation and Rehabilitation
• Hardin Lane Tank Evaluation and Rehabilitation
• Manor Tank Evaluation and Rehabilitation
Camp Meeker Recreation and Park District, Occidental, CA • Water Supply Well, Treatment Plant, Transmission and Storage Valley of the Moon Water District
• Bolli Water Storage Tanks
• Hydraulic Model and Master Water Plan
• Water Mains Replacement Projects (Various)
Hopland Public Utilities District
• Hydraulic Model and Water Master Plan
Education
B.S., Civil Engineering,
California State University,
Chico, 1988
Registration
Professional Civil Engineer,
CA No. C52402 (1994)
Training/Certifications
Kentucky Pipe Networks,
University of Kentucky,
Haestad Methods Cybernet/
WaterCAD
MWH Soft H2ONet Water
Model Workshop
Professional Affiliations
American Council of
Engineering Companies,
North Coast Chapter, Past
President
American Water Works
Association
Leadership Santa Rosa Class
XXIV
Experience
Joined firm in 1995
Entered profession in 1991
M. SEAN JEANE, P.E.

Page 2 of 3 ends

• East and West Water Storage Tanks
Redwood Valley County Water District
• Water System Hydraulic Model and Planning Report
• Irrigation System Hydraulic Model and Planning Report Site Development/ADA Compliance/Trails and Pathways
Sonoma County Agricultural Preservation and Open Space District • North Sonoma Mountain Trail Staging Area and Equestrian Bridge City of Rohnert Park
• Water Storage Tank 8 and Transmission Mains Access Road with Spur Trail • Water Storage Tank 9 Pad and Retaining Wall Improvements • 2019 Sidewalk and Driveway Improvements
• Trail to Crane Creek Regional Park and ADA Improvements • Copeland Creek Bike Path Reconstruction
City of Santa Rosa
• B Street Rehabilitation and ADA Improvements
• Calistoga Road Reconstruction and ADA Improvements
• Proctor Heights ADA Walking Path
City of Petaluma
• Municipal Airport Drainage Improvements
• Sports Complex Drainage Investigation and Mitigation
County of Sonoma
• Graton and Occidental ADA Improvements, Phases I through III • Airport Closed Landfill Site Compost Facility Feasibility Study Plan Check / Peer Review
City of Santa Rosa
• Pierson Street Rehabilitation Project
• Plan Check of Private Development Projects (Various)
County of Sonoma Permit and Resource Management Department • Grading and Drainage Plan Checking Project Manager
City of Rohnert Park
• Eastside Trunk Sewer Phases II and III
• University District Programmatic Assistance
• Sewer and Water Rehabilitation Projects (Various)
Construction Management/Inspection
County of Sonoma
• Graton ADA Improvements, Phases I - III
City of Rohnert Park
• Water Storage Tank 8 and Transmission Mains
M. SEAN JEANE, P.E.

Page 3 of 3 ends

• Claussen Overcrossing and Highway 101 Sewer Lining
• 2016 Sewer Linings
• Adrian Sewer and Water Rehabilitation, Phases I and II • Alta-Almond Sewer and Water Rehabilitation
• Graton Rancheria Sewer Lift Station and Force Main Installation • Tanks 1, 3, 4 and 5 Exterior Recoating
• Tank 2 Interior Recoating
• Copeland Creek Bike Path Reconstruction
City of Santa Rosa
• Slater St and Lewrosa Wy Sewer and Water Replacement Inspection • Oakmont 12-inch Water Main Replacement
• S3 Pump Station Pumps and Emergency Generator Additions • Storage Reservoir Seismic Upgrades – Phase I and Phase II • Proctor Heights ADA Walking Path
Valley of the Moon Water District
• Bolli Water Storage Tanks A and B and Water Transmission Main • Water Main Replacement Projects (various)
Hidden Valley Lake Community Services District
• Water Storage Reliability Project
BENJAMIN BRYANT, P.E.

Benjamin (Ben) Bryant, an Associate Principal, has a broad range of experience in the fields of wastewater, water, and geotechnical engineering. His portfolio of municipal wastewater infrastructure projects includes feasibility studies, regulatory compliance, design, rehabilitation, engineering support during construction, peer review and project start-up and commissioning.

Ben has led many utility and embankment reservoir projects, comprised of scheduling, field exploration, geotechnical coordination, construction document development, bidding assistance, regulatory agency coordination and approval, hydraulic modeling, deep excavations, earthwork calculations, cost estimating, resident engineering, and construction management/inspection. He is accomplished at hydraulic modeling for evaluation of pressure and gravity flow pipe, and open channel flow systems.

Water
City of Santa Rosa
• Pump Station 1 Retaining Wall Improvements – Constructability Review and Design Revisions
• Albany, Clement, and Malano Water and Sewer Replacement • Rock Creek and Matanzas Water and Sewer Replacement
• Water Station 4 Facility Assessment
• Tank and Pump Station Seismic Upgrades Phase 5
• Reclamation Reservoirs Dam Breach Modeling and Emergency Action Plans
• Backup Generator Replacements – Water & Wastewater Facilities • Water Pump Station 9 Upgrades
• Brown Farm Water Pump Station 3 Modifications
• Station 13 Booster Pump Upgrades and Reservoir 12A Site Security Timber Cove County Water District
• Amanita Circle Water Main Replacement
• Ruoff Emergency Water Supply Well Source Water Permitting • Raw Water Pumping System Modifications
Forestville Water District
• Water System Asset Management Plan
• Young Ranch Storage Tank and Pressure Zone Control Modifications Town of Windsor
• Storage Tank Recoating and Access Improvements
City of Healdsburg
• Cost Analysis for Sewer & Water System Replacement
Yulupa Mutual Water District
• Source Water Well Permitting
• Iron and Manganese Removal System Design
City of Rohnert Park
• Anderson 53 Tank (Tank 8) and Transmission Main
Sonoma Water
• River Diversion Structure Modernization
Education
B.S., Civil Engineering,
California State University,
Chico, 2009
Registration
Professional Civil Engineer,
CA No. 79218
Certifications

LEED AP
Professional Affiliations
American Council of
Engineering Companies
California Water
Environment Association
U.S. Green Building Council
Wine Country Water Works
Association
Water Environment
Federation
Experience
Joined firm in 2009
Entered profession in 2009
BENJAMIN BRYANT, P.E.

Page 2 of 2 ends

Wastewater and Recycled Water
City of Santa Rosa
• Country Manor Lift Station Replacement
• Fulton Road Sewer Lift Station Relocation
• Llano Trunk Sewer Rehabilitation Phase 1 Peer Review
• Pierson Street Sewer and Water Replacement Peer Review • Laguna Plant Filter Valve and Actuator Replacements Phase 2 • Crosstown Trunk Sewer Lining
• Evaluation and Condition Assessment of Recycled Water Discharge Infrastructure
• Laguna Treatment Plant Flood Protection Project
• Reclamation Pump Station Building Replacement
• Geysers-Delta Connection Improvement Project
• Los Alamos Trunk Sewer Replacement, Preliminary Design and Segment 1 • West College Pond 1 Divider Levee
• Brown Farm Pond Drain Pipeline to Llano Trunk Sewer
• Spring Lake Lift Station Improvements and Geotechnical Corrections Lake County Special Districts
• Anderson Springs Sewer Improvements
Town of Windsor
• Effluent Storage Pond 5 Dike Emergency Repair
• Effluent Storage Pond 5 Outlet Piping
• Aeration Basin Air Piping Improvements
• Wastewater Treatment Plant Mapping
Forestville Water District
• Sewer Service Charge Methodology Modification, Study and Implementation
• Recycled Water Availability Evaluation
• Wastewater Treatment Plant Chlorination System
• Sewer System Planning Map and Modeling
• Sewer Inflow/Infiltration Compliance Project
Construction Management / Observation / Engineering
Support during Construction
City of Santa Rosa
• Pump Station 1 Retaining Wall Improvements
• Geysers-Delta Connection Improvement
• Slater Street and Lewrosa Way Sewer and Water Replacement Inspection • Grosse, El Camino, and Augustan Sewer and Water Replacement • Spring Lake Lift Station Improvements and Geotechnical Corrections • White Oak Drive Water Main Replacement
• Geysers Pipeline Stabilization – Pine Flat Road
• West College Pond 1 Divider Levee Project
Lake County Special Districts
• Anderson Springs Sewer Improvements
DYANNA STETINA, P.E.

Associate Principal Dyanna Stetina focuses in water, wastewater, and site development design. She has a strong background in demand/capacity estimating, evaluation/analysis, cost estimating, and contract preparation for water and wastewater treatment, supply, distribution, pump station and storage facilities. Her expertise also includes entitlements, site development, and stormwater management for private winery and vineyard projects.

Water
City of Santa Rosa
• Cobblestone Drive Zone R2-R4 Connection
• Silva Avenue and King Street Water Replacement
• King Street Sewer and Water Replacement
• Laguna Plant Potable Water Pressure System
Forestville Water District
• Young Tank Replacement
• Young Tank Turnover Control Valve Station
• Pressure Reducing Valve Assessment and Replacement
The Sea Ranch Water Company
• Treatment Plant Backwash Facility Improvements
• Reservoir Valve Improvements
Yulupa Mutual Water Company
• Water Main Replacement and Metering Project
• Upper Well Iron and Manganese Treatment Facility
• Upper Water Storage Tank Replacement
Diamond A Mutual Water Company
• Drought Relief Pipeline Replacement
• Zone 3 Tank Replacement
• Zone 1 Tank Replacement
• Zone 2 Tank Replacement
• Water System Mapping Update
Timber Cove County Water District
• Booster Pump Station Improvements
• Upper Koftinow Pipe Loop
• Source Capacity Planning Study
• Permit Amendment for TTHM Removal Equipment
Bodega Water Company
• Water System Improvements
Meyers Water Company
• Manganese Removal Treatment System and Public Water System Permit Amendment
Valley of the Moon Water District
• H2ONET Water Model
Education
B.S., Civil Engineering, and
Engineering & Public Policy
Carnegie Mellon University,
Pittsburgh, PA, 2011
Registration
Professional Civil Engineer,
CA No. 83007
Certifications
Construction Specifications
Institute – Construction
Documents Technologist
Professional Affiliations
American Society of Civil
Engineers – Redwood
Empire Branch
Past President
Wine Country Water Works
Association – Director
Experience
Joined firm in 2011
Entered profession in 2011
RYAN GLEASON, P.E.

Associate Civil Engineer Ryan Gleason has 24 years of experience in the planning, design, and construction administration of site development projects throughout the North Coast. His portfolio includes commercial, residential, healthcare, schools, wineries, and roadway projects. Ryan is proficient in compliance with stormwater regulations, including NPDES permitting, stormwater master planning, and the preparation of SWPPPs and stormwater mitigation plans. Ryan is adept at using AutoCAD Civil 3D for design and analysis.

Plan Check / Peer Review
• Grading and Drainage Plan Check, Permit Sonoma
Site Development
• Mendocino College EV Tech Renovation, Ukiah, CA
• Mendocino College North County Center Phase II, Willits, CA • Sonoma State University Parking Lot Reconstruction, Rohnert Park, CA • College of Marin Academic Center Building, Kentfield, CA • Vintage Oaks on the Town Green Mixed Use Development, Windsor, CA • Montgomery High School Classroom Addition, Santa Rosa, CA • Healdsburg High School, Healdsburg, CA
• Kaiser Medical Office Buildings, Santa Rosa, CA
Roadway New Construction and Improvements
• 5340 and 5352 Old Redwood Highway Improvement, County of Sonoma • King & Silva St Water/Sewer Replacement, City of Santa Rosa • Bell Village Old Redwood Highway Frontage Improvements, Town of Windsor
• Bell Village Commercial Site Development, Windsor, CA • Burbank Elementary School Offsite Improvements, Santa Rosa, CA • Old Redwood Highway / Cricklewood Frontage Improvements Santa Rosa, CA
• Sutter Medical Center, Santa Rosa, CA
ª Hwy 101 Offramp Improvements
ª Mark West Springs Road Improvements
ª Mark West Springs Road / Old Redwood Highway Intersection • Angela Center Water Line Improvements, Santa Rosa, CA • County of Sonoma ADA Improvements, Graton and Occidental, CA • Aviation Boulevard Crosswalk and ADA sidewalk improvements, Santa Rosa CA
• Skyfarm Unit 3 improvement plans and final map, Santa Rosa, CA • Airport Business Center Phase IV County Public Improvement Plans, Jetway and Aviation Boulevard, Santa Rosa, CA
Stormwater Management
Sutter Medical Center of Santa Rosa
• Sutter Medical Center Hospital Construction SWPPP Preparation • Stormwater Mitigation Plan Preparation
Luther Burbank Center for the Arts
• Maintenance Building Construction SWPPP Preparation
• Stormwater Mitigation Plan Preparation
Education
B.S., Civil Engineering,
California Polytechnic State
University, San Luis Obispo,
2002
Registration
Professional Civil Engineer,
CA No. C69215
Professional Affiliations
American Society of Civil
Engineers
American Institute of
Architects
Experience
Joined firm in 2008
Entered profession in 2002
SOPHIA GRUBB, M.S., P.E.

Sophia Grubb is an Associate Civil Engineer specializing in water and wastewater resources. Her responsibilities include feasibility analysis, process design, equipment sizing and selection, plans and specifications preparation, cost estimating, construction phase assistance, and production of operations and maintenance manuals. Sophia’s process expertise includes sewer capacity studies, hydraulic modeling, and piping layouts. She has collaborated with treatment facility operations staff to effect process improvement. Sophia is experienced in assisting clients with permitting and regulatory compliance, including preparing Reports of Waste Discharge.

Water
City of Santa Rosa
• Meyers Drive Sewer and Water Replacement
Callayomi County Water District
• Water Treatment Plant and Office Replacement
Alliance Redwoods Conference Grounds
• Dutch Bill Creek Water Conservation Project
• Potable and Non-Potable Water System Improvement Plans Occidental Community Services District
• Water Rate Study
Sonoma Raceway
• Drinking Water System Operations Plan Update
Camp Meeker Recreation and Park District
• Capital Improvement Plan
Stormwater
City of Cloverdale
• Healdsburg Avenue Storm Drain Relocation
Oakmont Senior Living
• Oakmont of San Rafael Stormwater Lift Station
Wastewater and Recycled Water
Sonoma West Holdings
• NPDES Permit Renewal Assistance
Town of Tiburon
• McKegney Field Recycled Water Feasibility Analysis
City of Rohnert Park
• Water and Wastewater Study for Graton Casino and Resort Expansion Mayacama Golf Club
• Report of Waste Discharge and Title 22 Engineering Report Notre Vue Estate Winery & Vineyards
• On-Call Wastewater Compliance Assistance
Education
M.S., Civil and
Environmental Engineering,
University of California,
Berkeley, 2015
B.S., Civil and Environmental
Engineering
University of California,
Davis, 2014
Registration
Professional Civil Engineer,
CA No. 87543
CSI Construction Document
Technologist
Professional Affiliations
American Society of Civil
Engineers
California Water
Environment Association
Tau Beta Pi
(Engineering Honor Society)
Toastmasters International
Experience
Joined firm in 2014
Entered profession in 2014
GEORGE W. POTTER III, P.E.

George Potter is a Senior Engineer with 37 years of civil engineering experience, primarily involved with the planning, design and construction management of water, wastewater, storm drainage, and roadway projects. He has also assumed the role of resident engineer for numerous infrastructure, utility piping, and water tank construction and recoating projects. George’s design experience includes the preparation of technical reports, construction plans, and specifications for sewer mains, wastewater lift stations, water main replacements, water storage tanks, and water pumping stations. As the Program Administrator in charge of Brelje & Race’s Injury and Illness Prevention Program, George manages employee work site hazard assessment education and development of Site Specific Health and Safety Plans for their construction site activities.

Construction Management and Inspection
Redwood Valley County Water District
• Water Infrastructure Retrofit Project
City of Santa Rosa
• Geysers Pipeline-Delta Pond Connection Improvements
• Slater St and Lewrosa Wy Sewer and Water Replacement
• Oakmont Water Main Replacements
• A Place to Play Recycled Water Irrigation Pump Station • Seismic Upgrades & Improvements, Tanks R2-A, R4B and R-14 • Geysers Recharge Pump Station Expansion
• Meadow Lane and Rohnert Park Pump Station Retrofits
City of Rohnert Park
• Water Storage Tank 8 and Transmission Mains
• Water Storage Tank No. 2 Interior Recoating
• Water Storage Tanks 1, 3, 4, and 5 Coatings
• Adrian Dr Sewer and Water Rehabilitation Phase 1
City of Cotati
• St. Joseph Sewer Line Replacement
• William St and Olof St Sewer Replacements
City of Cloverdale
• Water System Improvement Project Phase 2
• Clarifier and Filter Rehabilitations, Three Phases
• Ritter and South Crest Tank Design
• Hot Springs Tank Rehabilitation
City of Petaluma
• Paula Lane Tank Evaluation and Rehabilitation
• Hardin Lane Tank Evaluation and Rehabilitation
• Manor Tank Evaluation and Rehabilitation
Town of Windsor
• Welded Steel Water Storage Tank Rehabilitation – Lakewood Tanks I and II and Shiloh Tanks A, B and 4
• Storage Tank Warranty Recoating, Mayacama Golf Course • Welded Steel Water Storage Tank Rehabilitation – Lakewood Tank II and Shiloh Tanks A, B and IV
Education
M.S., Civil Engineering,
Brigham Young University,
Utah, 1989
B.S., Civil Engineering,
Brigham Young University,
Utah, 1988
Registration
Professional Civil Engineer,
CA No. C52700
TX No. 124507
Certifications
Basic Coatings Inspector,
Association for Materials
Protection and Performance
(AMPP), exp. 12/2027
Lead Paint Removal (SSPC- C3 Certification), 2/2011, 4- day onsite course by SSPC 24-Hour HAZWOPER
(Hazardous Waste
Operations and Emergency
Response), under 29 CFR
1910.120(e), 2/2011,
Compliance Solutions
8-Hour HAZWOPER
Refresher, 3/2025, Compliance Solutions
Confined Space Entry, under
29 CFR 1910.146, 7/2025, Compliance Solutions
Contractor Liability for
Public Entities, 5/2010, Risk
Management Solutions
Respirator Use, under 29
CFR 1910.134, 4/2011,
Compliance Solutions
Asphalt Inspector Series, 9.5
hours, 5/2020, Asphalt
Institute
Professional Affiliations
American Society of Civil
Engineers
American Water Works
Association
Association for Materials
Protection and Performance
Experience
Joined firm in 1989
Entered profession in 1989
GEORGE W. POTTER III, P.E.

Page 2 of 2 ends

North Marin Water District
• Water Treatment Plant Clear Wells Evaluation and Coating Callayomi County Water District
• Water Treatment Plant and System Upgrades
County of Sonoma
• Graton ADA Improvements, Phase I
Inverness Public Utility District
• Conner Tank Rehabilitation
Hidden Valley Lake Community Services District
• Water Storage Reliability Project
Water / Wastewater
City of Santa Rosa
• Jack London Elementary School
• A Place to Play Recycled Water Irrigation Pump Station Town of Windsor
• Lakewood Water Storage Tank Rehabilitation
City of Rohnert Park
• Water Storage Tanks 1, 3, 4, and 5 Coatings Evaluation Report • Water Storage Tank 8 and Transmission Mains
City of Petaluma
• Hardin Tank Evaluation and Rehabilitation
• Manor Tank Evaluation and Rehabilitation
• Wastewater Biosolids Removal Facility
Inverness Public Utility District
• Water Tank Evaluations
• Stockstill Tank Replacement
Bodega Water Company
• Water System Improvements
Loch Lomond Mutual Water Company
• Tank Rehabilitation
Yulupa Mutual Water Company
• Storage Tank Design
Russian River County Water District
• Four Water Tank Evaluations
Cobb Area Water District
• Tank Evaluations and Rehabilitations
• Seismic Retrofit of Starview, Lassen, and Bonanza Springs Storage Tanks Forestville Water District
• Hwy 116 Tank Evaluation and Rehabilitation
BRIAN J. GONG, P.E.

Brian Gong has 11 years of experience performing both technical work and field investigations for water and wastewater projects. His civil engineering experience includes master planning, predesign and design, asset management, cost estimation, and field observation of construction work. Brian’s expertise includes complex data analysis utilizing industry standard software, including ArcMap, InfoWater, HEC-RAS, AutoCAD, ArcGIS, Excel, and Access.

Water
City of Rohnert Park
• Tank 8, Multi-Use Access Road, and Pipeline
• Water System Hydraulic Model Study Update
• Southeast Water Main Improvements
• Water System Flushing Program
• Sonoma Mountain Village Modeling
• Redwood Drive Hotel Modeling
City of Petaluma
• Hardin Lane Tank Improvements and Seismic Upgrades
Forestville Water District
• PRV Repair and Replacement
• Water System GIS Update
Callayomi County Water District, Middletown
• Water Treatment Plant and Office Replacement Bid Docs City of Santa Rosa
• Meadow Lane Pond Inundation Modeling and Mapping and Emergency Action Plan
• Lake Ralphine & Fountaingrove Inundation Modeling and Mapping and Emergency Action Plan
• Tank & Pump Station Seismic Upgrades Phase 5
• Geysers Delta Connection Improvement
• Laguna Treatment Plant Flood Protection
• Robin Way Water System Consolidation
Sonoma Water
• Inundation Modeling and Mapping for Breach Scenarios at Five Dam Sites Construction Management
City of Rohnert Park
• Water Tank 8 Construction Management
Pathways Design/ADA Compliance
City of Rohnert Park
• Trail to Crane Creek Regional Park - Phases 1-B and 3 Site Development
Sonoma County Regional Parks
• Russian River Trail – Wohler Segment Planning Study
• Tolay Lake Regional Park Culvert Replacement
Education
M.S., Civil and
Environmental Engineering,
UC Berkeley, 2015
B.S., Environmental
Sciences, UC Berkeley, 2014
Registration
Professional Civil Engineer,
CA No. 88474
Certifications
Construction Specifications
Institute – Construction
Documents Technologist
Professional Affiliations
Construction Specifications
Institute, Redwood Empire
Experience
Joined firm in 2018
Entered profession in 2015
BRENNEN URBANEK, P.E.

Education
B.S., Civil Engineering,
California State University,
Chico, 2014
Registration
Professional Civil Engineer,
CA No. 95239
Professional Affiliations
American Society of Civil
Engineers
Experience
Joined firm in 2018
Entered profession in 2015
Brennen Urbanek has 11 years of civil engineering experience, including civil design for site development, water and wastewater infrastructure, ADA compliance, storm water mitigation, pavement maintenance systems, and construction management. Brennen’s civil design experience encompasses water, sewer and storm drainage utilities; grading and drainage; and earthwork calculation and cost estimating utilizing industry standard software including AutoCAD Civil 3D, Excel, and ArcGIS.

Project Experience
Hidden Valley Lake Community Services District
• Water Storage Reliability Project
Redwood Valley County Water District
• Redwood Valley Water Infrastructure Retrofit Project
City of Healdsburg
• Healdsburg Avenue Sewer Replacement
• March Avenue Reconstruction & Pedestrian Improvements City of Rohnert Park
• Sidewalk & Driveway Improvements
• Trail to Crane Creek Regional Park - Phases 1-B & 3
• Water Tank 8, Access Road, and Water Mains
Callayomi County Water District
• Water Treatment Plant Construction Services
County of Sonoma
• Occidental ADA Improvements, Phase 3
City of Santa Rosa
• Water Tank and Pump Station Seismic Upgrades Phase 5
• Albany, Clement, and Malano Water and Sewer Replacement • Rock Creek and Matanzas Sewer and Water Replacement
• Los Alamos Trunk Sewer Replacement
• Slater and Lewrosa Sewer and Water Replacement inspection • Santa Rosa Creek Trail Dutton Avenue Access
• B Street Slurry Seal
• Calistoga Road Rehabilitation
• Laguna Treatment Plant Flood Protection Project
City of Petaluma
• Municipal Airport Drainage Improvements
• Sports Complex Drainage Investigation and Mitigation
City of Cloverdale
• Washington Street ROW Extension
• Storm Drain Relocation
• City of Cloverdale Tentative Map
Alexander Valley Healthcare
• Alexander Valley Wellness Center Site Development
JEFF ROACH, P.L.S.

Education
A.A., Civil Survey
Technology, Santa Rosa
Junior College, 1995
Registration
Professional Land Surveyor
CA No. 9158
Experience
Joined firm in 2003
Entered profession in 1995
Survey Department Manager Jeff Roach is a California Professional Land Surveyor with 31 years of experience. Jeff is proficient in a broad range of survey products, including boundary, topography, construction, utility, control, right of way, ALTA, and Flood Certificates. Jeff has been a trusted member the Brelje & Race team since 2003, where he has earned a reputation for thoroughness and accuracy. Jeff has extensive field surveying experience, having served as Party Chief for hundreds of survey projects for both public and private clients. Below is a selection of projects on which Jeff has performed comprehensive land surveying services:

Municipal
City of Santa Rosa
• Laguna Treatment Plant Flood Protection Design Survey • Rock Creek and Matanzas Water Main Replacement Design Survey • Santa Rosa Creek Trail Dutton Avenue Access Design Survey City of Rohnert Park
• Southeast Specific Plan Area Water Transmission Main Design Survey • Sewer Interceptor Outfall Boundary Survey
• Anderson 53/Tank 8 Boundary Survey
• Trail to Crane Creek Regional Park Design Survey and Alignment Staking City of Cloverdale
• Washington Street Extension Right-of-Way Survey
Town of Windsor
• Pond 5 Berm Restoration Design Survey
City of Cotati
• William and Olof Sewer Main Replacement Design Survey • Sewer Collection System Repairs Design Survey
City of Petaluma
• Airport Taxiways A and B Topographic Survey
City of St. Helena
• St. Helena Flood Control Project
County of Sonoma Permitting and Resource Management Department • Retrace Survey of Kingsbury County Line of 1877
K-12 Schools and Higher Education
Mendocino Unified School District
• Mendocino High School Campus Modernization Topographic Survey Sonoma Valley Unified School District, Sonoma, CA
• Sonoma Valley High School Track and Field Replacement Design and Construction Surveys
• Sonoma Valley High School CTE Modernization Topographic Survey • Flowery Elementary School New Modulars Construction Survey • Altimira Middle School New Track and Field and Locker Rooms Design and Construction Surveys
• Woodland Star Charter School New Classrooms Design Survey • El Verano Elementary School Multipurpose Room Design Survey JEFF ROACH, P.L.S.

Page 2 of 2 ends

West Sonoma County Union High School District, Sebastopol, CA • Analy High School Aerial Topographic Survey
Gravenstein Union School District, Sebastopol, CA
• Hillcrest Middle School Campus Modernization Design Survey Bellevue Union School District, Santa Rosa, CA
• Kawana Springs Elementary School New Multipurpose Building Construction Survey
• Bellevue Elementary School Play Area Design Survey
• Meadow View Elementary School Campus Modernization Design Survey Roseland School District, Santa Rosa, CA
• Roseland Accelerated Middle School Construction Survey Petaluma City Schools
• Cherry Valley Elementary School Play Area Topographic Survey Old Adobe Union School District, Petaluma, CA
• Loma Vista Elementary School New Modulars Design Survey Santa Rosa City Schools
• Helen Lehman Elementary School New TK Building Design Survey and Boundary Resolution
• Piner High School Emergency Modulars Design and Construction Surveys • Manzanita Elementary School New TK Classrooms Design Survey • District Office Modernization Design Survey and Boundary Resolution San Rafael City Schools
• Terra Linda High School Street Frontage Improvements Design Survey Tamalpais Union High School District, Larkspur and Mill Valley, CA • Redwood High School Campus Modernization Design Survey • Tamalpais High School Campus Modernization Design Survey and Boundary Mapping
Boys & Girls Clubs of Sonoma-Marin, Santa Rosa, CA
• Roseland Boys & Girls Clubhouse Design and Construction Surveys Sonoma State University, Rohnert Park, CA
• Tuscany Village
• Green Music Center
Middletown Unified School District
• Coyote Valley Elementary School ADA Dropoff Topographic Survey • Middletown High School New Modulars Topographic Survey Kelseyville Unified School District
• Kelseyville High School New Athletic Field Design and Construction Surveys
Geyserville Unified School District
• Geyserville Elementary School Topographic Survey
West Side Union Elementary School District, Healdsburg, CA • West Side Elementary School Topographic Survey

JUSTIN WITT
Senior Environmental Planner Justin Witt has 27 years of experience in project administration and preparation of environmental review documents and environmental permits for public agencies and private clients. He is skilled in preparation of all California Environmental Quality Act (CEQA) documents including Environmental Impact Reports (EIRs), Initial Studies, Negative Declarations, and the CEQA-required public review processes, noticing requirements, and public meetings. Justin has prepared National Environmental Policy Act (NEPA) documents for numerous USDA-funded and State Water Board projects. He is proficient in preparing and processing environmental permits related to the U.S. Army Corps of Engineers, Regional Water Quality Control Board, the California Department of Fish and Wildlife and US Fish and Wildlife Service.

CEQA / NEPA
County of Mendocino
• Redwood Valley Water Infrastructure Retrofit Initial Study/MND/NEPA documentation
City of Cloverdale
• Water System Improvements Initial Study/MND/USDA NEPA City of Calistoga
• Water Treatment and Distribution Project Initial Study/MND/USDA NEPA
CEQA
City of Santa Rosa
• Santa Rosa Creek Trail Dutton Ave Access Initial Study/MND • South Fulton Road Trunk Sewer Repair Initial Study/MND • Sebastopol Road Widening, Southwest Santa Rosa Initial Study • Railroad Square Drainage Improvements Initial Study/MND • Los Alamos Trunk Sewer Replacement Initial Study/MND
• Oakmont Treatment Plant Sewer Relocation Initial Study/MND • S9 Pump Station Initial Study/MND
• T&L Micro General Plan and Zoning Amendment Initial Study/MND City of Rohnert Park
• Water Main Improvement Project Initial Study/MND
City of Healdsburg
• 255 Dry Creek and Grove Business Center Initial Study/MND City of Sonoma
• New Norrbom Road Water Tank Initial Study/MND
Sonoma County Regional Parks
• Guerneville River Park Project Initial Study/MND
• Ragle Ranch Regional Park Off-leash Dog Area Initial Study/MND Sonoma Valley Unified School District
• Flowery Elementary School Parking Lot
Education
M.A., Geography – Natural
Resources Management and
Environmental Planning, San
Francisco State University,
2003
B.A., Cultural Anthropology,
San Francisco State
University, 1997
Professional Affiliations
Association of
Environmental Professionals
North Bay Climate
Adaptation Initiative
Experience
Joined firm in 1999
Entered profession in 1999

JUSTIN WITT

Page 2 of 2 ends

• Sonoma Valley High School Parking Lot and Student Drop-off Initial Study/MND
• El Verano Elementary School Multipurpose Building
New Haven Unified School District, Union City
• Cesar Chavez Middle School Sports Fields and Drop-Off Categorical Exemption
Alameda Unified School District
• Wood Middle School Modernization, Phase 1 IS/MND
• Otis Elementary School Modernization IS/MND
Sacramento State University Office of Water Projects
• Palomino Estates Water System Improvements IS/MND
• Robin Way Water System Consolidation IS/MND
• Meadow Pointe Upper Lake Water System Consolidation IS/MND Sunrise Shore Mutual Water Company
• Water System Compliance and Sustainability project – assist lead agency with preparation of IS/MND
Konocti County Water District
• Lower Lake/Konocti Intertie IS/MND
Russian River County Water District
• Water Rights Petition Project Initial Study/MND
• Hacienda Annexation Initial Study/MND
Occidental Community Services District
• Water Service Zone Expansion Initial Study/MND
Sweetwater Springs County Water District
• Water Rights Petition for Extension of Time Initial Study/MND • Water Distribution and Storage Projects Initial Study/MND Special District Public Works Projects
• Kelly Mutual Water Company Water System Improvements Initial Study • Valley of the Moon Water District, Bolli Tank Project Initial Study Sonoma County Junior College District
• Shone Farm 8MG Recycled Water Reservoir Project Initial Study • B. Robert Burdo Culinary Arts Center Initial Study
• Lawrence A. Bertolini Student Services Center Initial Study • Frank P. Doyle Library Initial Study
• Petaluma Campus Phase II Supplemental EIR
• Warren G. Dutton Jr. Agriculture Pavilion Initial Study Roseland School District
• Roseland University Prep Initial Study
Bellevue Union School District
• Bellevue Elementary School Modernization Project Initial Study Brelje & Race Consulting Engineers
Proposal for On-Call Engineering and Surveying Services • City of Fort Bragg Mr. Chase has over 30 years of managing geotechnical services for public infrastructure projects including parks, schools, athletic fields, trails, pathways, parking lots, and roadways. Mr. Chase has worked with leading design teams and local agencies to develop sound and cost effective geotechnical and geologic
solutions/mitigations for projects that are identified to have problematic soils and bedrock conditions such as: expansive materials, compressible, or potentially liquefiable soils; slope stability issues; and faulting/potential seismic geologic hazards.

Mr. Chase is proficient in project coordination, communication, and completion with design team partners and federal, state, and local, municipalities. Specifically, management of knowledgeable RGH design engineers, geologists, and experienced technicians certified by NICET, ACI, and ICC.

Staff Engineer
1990 - 1992
Herzog Associates, Inc. l Petaluma, CA
B.S. Civil Engineering
California Polytechnic State
University, San Luis Obispo, CA
1990
California Civil Engineer,
CE 53150
California Geotechnical
Engineer, GE 2628

EDUCATION

REGISTRATIONS
ERIC G. CHASE
P r i n c i p a l G e o t e c h n i c a l E n g i n e e r / P r o j e c t M a n a g e r

PROFESSIONAL HISTORY
Principal Engineer
2000 - Present
RGH Consultants l Santa Rosa, CA
Senior Engineer
1992 - 2000
Geomatrix Consultants l San Francisco and Oakland, CA
ASCE – American Society of Civil
Engineers
Chi Epsilon Honor Society
Cal Poly Civil Engineering
Department Advisory Board
Member

AFFILIATIONS

RELATIVE EXPERIENCE
Bower Park Restoration and Improvements, Gualala, CA
Country Club Drive Rehabilitation, Rohnert Park, CA
Emergency 36-inch Transmission Replacement. Napa, CA
Third Street Rehabilitation, San Rafael, CA
First and F Street Bridge Replacement, Petaluma, CA Park, CA Fulton Road Widening (Guerneville to Piner Road), Santa Rosa, CA North McDowell Blvd Complete Streets Project, Petaluma, CA

REPRESENTATIVE PROJECTS
Mr. Pratt has provided geologic mapping and analysis for numerous Sonoma and Marin County projects and has
experience working in Alameda, San Francisco, Mendocino, Napa and Lake Counties. Mr. Pratt has managed several
hundred individual projects including geotechnical studies for capital improvement projects, roadway improvement,
commercial and residential development as well as
construction inspection and testing programs. He is extremely familiar with mapping and methods to locate, identify, and explore Bay Mud and soft soil deposits, having worked on dozens of Bay Mud projects throughout the North Bay area.

Mr. Pratt has also specialized in hillside construction and landslide evaluation studies as well as fault evaluations. He has extensive experience with grading projects including roadway preparation, building site improvements and landslide repair.

A.A. Natural Science
Ricks College, Idaho, 1993
Certified Engineering Geologist,
No. 2453
California Professional
Geologist, No. 7901
State of California Safety
Assessment Program Certified
Volunteer, No. 75881
Qualified SWPPP Developer
(QSD), No. GO2453

EDUCATION

REGISTRATIONS
JARED J. PRATT
P r i n c i p a l E n g i n e e r i n g G e o l o g i s t / P r o j e c t M a n a g e r

PROFESSIONAL HISTORY
Principal Engineering Geologist, Project Manger
2006 - Present
RGH Consultants l Santa Rosa, CA
Project Geologist, Project Manager
1999 - 2006
Kleinfelder Associates, Santa Rosa, CA
AEG – Association of Engineering
Geologists
Former San Francisco Chair
AEG – Association of Engineering
Geologists
ASCE - American Society of Civil
Engineers

AFFILIATIONS

REPRESENTATIVE EXPERIENCE
B.S. Geology
California State University
System: Sonoma State
University, California, 1999
First and F Street Bridge, Petaluma, CA
Sunrise Pickle Ball Courts, Rohnert Park Kotate Park Improvements, Cotati, CA
Browns Valley Road at Valley Glen Landslide, Napa, CA
Cooper Drive Slope Failure, Santa Rosa, CA
North McDowell Blvd Complete Streets, Petaluma, CA
Emergency 36-inch Transmission Replacement, Napa, CA

REPRESENTATIVE PROJECTS
www.zfa.com | [email protected]
KEVIN G. ZUCCO, SE, LEED AP
EXECUTIVE PRINCIPAL | PRINCIPAL-IN-CHARGE
Over the course of his 30+ year career in the industry, Kevin has performed structural design and analysis of public and civic structures throughout Northern California, including Mendocino County. He is adept in the planning, design, and management of large- and small-scale capital improvement projects ranging from structural assessments and evaluations to renovations and new construction.

Kevin applies his experience and enthusiasm for the industry to designing build-able and reliable public and essential facility structures with coherent and practical construction documents to meet all architectural design features. Kevin is adept in the use of the California Building Code’s Existing Structures chapter, the International Existing Building Code, California Historic Building Code, and most relevantly ASCE 41. He has evaluated and retrofit many existing buildings for continued occupancy and reuse in both Life Safety and Immediate Occupancy categories. Kevin developed ZFA’s program to use ASCE 41 as a tool for building evaluations. The standards have been applied across multiple jurisdictions to determine the effectiveness of original construction, to identify any structural deficiencies, to provide recommendations for retrofit, and to develop cost estimates for remodel and retrofit construction.

Kevin and ZFA staff are also FEMA trained to assist each other and our communities with weather-related events, hazardous-substance release, medical, terrorism, and threats of violence.

RELEVANT PROJECT EXPERIENCE
▪ County of Mendocino Structural MSA Mendocino County
▪ Mendocino Transit Authority – Administration Building Ukiah ▪ Millview County Water District Pumphouse Building Ukiah ▪ Hopland Pomo Indians - Education Center Hopland
▪ County of Sonoma Structural On-Call Sonoma County
▪ Department of General Services Structural On-Call Coastal Region ▪ City of Santa Rosa Structural On-Call Santa Rosa
▪ Vacaville Corporation Yard Vacaville
▪ West County Transportation Addition Santa Rosa
▪ San Ramon Public Safety Building San Ramon
▪ San Ramon Fire Station No. 34 Remodel San Ramon
▪ Napa Corporation Yard Napa
▪ Truckee Corporation Yard - Phase 3 Truckee
▪ Sunnyvale Corporation Yard Sunnyvale
▪ Lake County Transportation Yard Lower Lake
▪ San Rafael Corporation Yard San Rafael
▪ West Sacramento Corporation Yard West Sacramento
▪ West County Transit Authority O & M Facility Sonoma County ▪ HHSA - West Marin Service Center Point Reyes Station
▪ Sonoma County Water Agency Channel Dr. Bridge Repair Santa Rosa ▪ City of Rohnert Park Water Tank Assessments Rohnert Park ▪ City of Santa Rosa Pump Station 4 Evaluation Santa Rosa ▪ Sonoma County River Diversion Project Healdsburg

YEARS OF EXPERIENCE
▪ 31 years with ZFA
▪ 31 years total

EDUCATION
▪ B.S., Civil Engineering, 1992,
California Polytechnic State
University, San Luis Obispo

PROFESSIONAL

REGISTRATION
▪ CA Structural Engineer 4861
▪ CA Civil Engineer 57777
▪ United States Green
Building Council LEED AP
▪ State of California
Department of Emergency
Services Disaster Services
Worker Safety Assessment
Program ID #10826
▪ FEMA Urban Search and
Rescue Task Force 3
Structural Specialist

PROFESSIONAL

MEMBERSHIPS
▪ Structural Engineers
Association of Northern
California (SEAONC)
▪ SEAONC Sustainable
Design Committee Member
▪ Former City of Santa Rosa
Design Review Board
▪ Community College Facility
Coalition
RESUME
www.zfa.com | [email protected]
RESUME

CHRISTIAN BOTTO, SE
SENIOR ASSOCIATE | PROJECT MANAGER
Christian began his professional career first working in his native Central American, then at a Construction Management firm on SFO’s Boarding Area A project. He is a seasoned structural engineer with design experience on public, commercial, residential, and educational buildings. He is particularly passionate about retrofitting existing facilities to extend their service life in the communities they serve.

Christian uses a collaborative approach leveraging BIM technology to ensure a structural design is fully coordinated, buildable, and efficient. His experience includes the design and construction of several public projects as well as feasibility studies and evaluations. He works closely with clients to ensure their needs are integrated into a solution that works for both the approval agencies and the client.

Christian is a member of the California Emergency Management Agency (CAL EMA) Safety Assessment Program as a Disaster Service Worker which allows him to support the community in assisting in the review of structures after an earthquake or other natural disaster.

RELEVANT PROJECT EXPERIENCE
▪ Millview County Water District Pumphouse Building Ukiah ▪ Willits Warehouse & Distribution Willits
▪ Sonoma County Water Agency Channel Dr. Bridge Repair Santa Rosa ▪ City of Rohnert Park Water Tank Assessments Rohnert Park ▪ Fulton Sewer Improvements Rohnert Park
▪ City of Santa Rosa Pump Station 4 Evaluation Santa Rosa ▪ Sonoma County River Diversion Project Healdsburg
▪ City of Santa Rosa Generator Replacement Santa Rosa
▪ Santa Rosa Seismic Upgrades & Improvements Phase 5 Santa Rosa ▪ Hardin Tank Assessment Petaluma
▪ Channel Drive Bridge Review Santa Rosa
▪ Balletto Vineyards and Winery Patio Santa Rosa
▪ First and F Street Bridge Replacement Petaluma
▪ Petaluma Municipal Airport Hanger Repair Petaluma
▪ San Geronimo Creek Temporary Utility Crossing Lagunitas-Forest Knolls ▪ Calistoga Fire Alert Monopole Calistoga
▪ Petrified Forest Monopole Calistoga
▪ Soda Canyon Monopole Napa
▪ Santa Rosa Police Dept. Existing Monopole Evaluation Santa Rosa ▪ City of Santa Rosa Light Pole Anchor Bolt Repair Santa Rosa ▪ Las Gallinas Operations Control Center San Rafael
▪ City of Richmond Booker T Anderson Community Center Richmond ▪ Seapoint Remodel Manchester
▪ Private Manufacturing Facility Redwood Valley
▪ Windsor Odd Fellows Seismic Retrofit Windsor
▪ Pacifico Restaurant, URM Evaluation & Seismic Retrofit Calistoga

YEARS OF EXPERIENCE
▪ 17 years with ZFA
▪ 27 years total

EDUCATION
▪ B.S., Civil Engineering,
1998, San Francisco State
University, San Francisco

PROFESSIONAL

REGISTRATION
▪ CA Structural Engineer 6648
▪ CA Civil Engineer 81019
▪ State of California
Department of Emergency
Services Disaster Services
Worker Safety Assessment
Program ID #73268

PROFESSIONAL

MEMBERSHIPS
▪ Structural Engineers
Association of Northern
California (SEAONC)
▪ Existing Building Committee,
Chair
Rohnert Park, CA ● Palm Springs, CA ● Las Vegas, NV
www.15000inc.com ● P.O. Box 6028 ● Santa Rosa, CA ● (707) 577-0363 Matthew Torre, PE VP
Principal
Summary:

Matt joined 15000 Inc. in 2007 and acts as the
Senior Mechanical Engineer, Chief Operating
Officer, and Quality Control Manager. He has
been an irreplaceable addition since his first
day with the firm and quickly rose to the level
of Principal in 2014.

His responsibilities include establishing and
enforcing engineering standards as part of his
quality control duties, project management,
and Matt also leads our internal continuing
education program which culminates in our
annual Professional Development Week where
we educate ourselves and our staff in the latest
technologies, code interpretations and the
future of our industry.

Matt is an integral part of our lead design team
here at 15000 and lends his expertise and
talents to a variety of projects which range
from municipal to commercial through
education and hospitality facilities and beyond.

Recent Municipal Experience:

County of Sonoma: Master Services (2020-2025)
County of Sonoma: CSU Generator
County of Sonoma: MADF HVAC Replacement
County of Sonoma: Airport Admin Split System
City of Petaluma: Veteran’s Building MEP
City of Sonoma: Veteran’s Building MEP
City of Rohnert Park: Animal Shelter HVAC
City of Rohnert Park: BCA Implementation
City of Santa Rosa: City Hall Chiller Replacement
Town of Windsor: Buildings 200, 300 and 400 Remodel
Butte County: Courthouse Remodel
City of Palm Springs: Plan Check Services
City of Palm Springs: Inspection & Code Enforcement
Cal-Fire: Dormitory Remodel
Town of Sonoma: Depot Modernization MEP
Town of Sonoma: Veterans Memorial Remodel
Town of Sonoma: City Hall & Library Remodel
County of Sonoma: MADF Shower Modernization
County of Mendocino: Spanish Mountain Antenna
City of Santa Rosa: Finley Swim Center Remodel
Town of Fort Bragg: CV Starr Community Center Cx
Town of Petaluma: Corporation Yard
Count of Sonoma: Los Guilicos Remodel
PG&E: Eureka Sub-Station Remodel
PG&E: Santa Rosa Sub-Station Remodel
PG&E: San Ramon Sub-Station Remodel
Town of Suisun: Railroad Depot Modernization
Napa County: Courthouse Modernization
Contra Costa County: Fire Station #81 Remodel
Lake County: New Fire Station
Town of Willits: New Fire Station
Count of Sonoma: Electric Vehicle Standard Project
Professional Affiliations:

CA Professional Engineer: M36589
UT Professional Engineer: 10513390-2202
NV Professional Engineer: 26130
OR Professional Engineer: 106201PE
HI Professional Engineer: PE-21506
Member of ASHRAE, NFPA, USGBC, ASPE, CSI,
and AWWA
CSU Chico: Bachelor of Science, Civil Engineering
SFCC: Engineered Plumbing System
ACOM Certified
Contact Information:

Telephone: (707) 577-0363
Email: [email protected]

RELEVANT EXPERIENCE
 NEPA Environmental Assessments.
 CEQA Initial Studies, Categorical Exemptions, Mitigated Negative Declarations/Negative Declarations.
 Individual or nation-wide permit applications for Section 404 (US Army Corps of Engineers), Section 401 Water Quality Certification (San Francisco Bay Regional Water Quality Control Board), California Department of Fish and Wildlife Stream Bed Alteration Agreements, California Coastal Commission, BCDC Entitlements.
 Compliance monitoring including soil, groundwater, soil vapor and ambient air monitoring and sampling.
 Work plans for soil and groundwater investigations,
hydrogeologic evaluations, corrective action plans, and landfill closure documentation.
 Field work, including environmental investigations requiring UST removal and over-excavations, soil and groundwater sampling and analysis, surface and storm water sampling and analysis.  Phase I Environmental Site Assessments.
 Phase II Environmental Site Investigations.
 City of Santa Rosa Limited Phase 1 Environmental Site Assessment Services Master Agreement 2016 - Present
(completed 13 projects to date)

DAVID NOREN, REA
Vice President, Environmental Services Manager

SPECIALTY
Environmental Services

YEARS OF EXPERIENCE
34 YEARS WITH EBA
30 REGISTRATIONS
California Registered
Environmental Assessor
OSHA 40-hour Hazardous Waste
Activities Supervisor Training

EDUCATION
MS, Environmental
Management, University
of San Francisco
BS, Agricultural Science and
Management, University
of California, Davis

AFFILIATIONS
North Coast Regional Water
Quality Control Board
California Groundwater
Association
Santa Rosa Plain Groundwater
Sustainability Agency
Advisory Committee
Sonoma County Farm Bureau
Natural Resource Committee
Santa Rosa Junior
College Ag Trust
Mr. Noren is EBA’s Manager of Environmental Services with over 34 years of experience in environmental services and engineering. His expertise includes technical and management services for a wide range of environmental, hydrogeological, and solid waste landfill projects. He is well versed in permitting with local, State, and Federal agencies and in stormwater management sampling and reporting, various levels of regulatory permitting and water use studies, landfill closure, general property transfer and property development studies, and in the preparation of Categorical Exemptions, Initial Studies, Negative Declarations, and Mitigated Negative Declarations per CEQA and NEPA Environmental Assessments.

Mr. Noren is knowledgeable in the application of numerous investigative and treatment methodologies in a variety of geologic environments including the investigation and remediation of a diverse range of contaminated sites and municipal solid waste facilities.

Mr. Noren’s responsibilities include management and oversight of all environmental services.
 NEPA Environmental Assessments.
 CEQA Initial Studies, Categorical Exemptions, Mitigated Negative Declarations/Negative Declarations.
 Preparation of Work Plans for soil and groundwater
investigations, hydrogeologic evaluations, corrective action plans, and closure documentation.
 Compliance monitoring including soil, groundwater, soil vapor and ambient air monitoring and sampling.
 Field work, including environmental investigations requiring UST removal and over-excavations, soil and groundwater sampling and analysis, surface and storm water sampling and analysis.  Phase I Environmental Site Assessments.
 Phase II Environmental Site Investigations.
 Santa Rosa Behavioral Health Care Center Expansion CEQA Study, Santa Rosa
 Sam Jones Hall Annex Improvements CEQA Study, Santa Rosa  Pantheon Group Commercial Manufacturing & Distribution Facility CEQA Study, Eureka
 South Cloverdale Water Company Public Water System (PWS) Consolidation NEPA Study, Cloverdale
 Schukler Family Properties 19357 Sonoma Highway ESA,
Sonoma

KEVIN COKER, REA
Senior Environmental Scientist, CEQA Practitioner

SPECIALTY
Environmental Services /
CEQA Practitioner

YEARS OF EXPERIENCE
27 YEARS WITH EBA
7 REGISTRATIONS
California Registered
Environmental Assessor
OSHA 40-hour Hazardous
Waste Operation &
Emergency Response Training
OSHA 8-hour Hazardous
Waste Supervisor Training

EDUCATION
BA, Environmental Studies
& Planning / Hazardous
Materials Management,
Sonoma State University,
Rohnert Park, CA
CEQA Practitioner Training
Program, University of
California, Davis

AFFILIATIONS
Association of Environmental
Professionals
Mr. Coker has over 27 years of experience in the field of environmental assessments and investigations, and various levels of property transfer and property development studies. Mr. Coker has performed over 200 Phase 1 Environmental Site Assessments (ESAs) in northern California, as well as CEQA- and NEPA-related environmental reviews. Mr. Coker is accomplished in CEQA/ NEPA studies, work plans, summary reports, and related technical documents.

As a Senior Environmental Scientist and CEQA Practitioner, Mr.

Coker is expert in soil, groundwater, and soil-vapor investigations; environmental assessments; property development and land-use permitting and associated studies; data evaluation and interpretation.

Mr. Coker’s responsibilities include the oversight of project budgets, client and regulatory agency interactions, site investigation activities, and field and reporting programs.

RELEVANT EXPERIENCE
 Phase II Environmental Site Assessments for various municipal and private clients: Sonoma, Lake, Napa, Mendocino, and Humboldt Counties
 City of Santa Rosa Garage #9 UST Investigation & Remediation  City of Santa Rosa City Hall Annex Phase II ESA & Case Closure, Santa Rosa
 Sonoma County Landfill (LF) Post-closure Compliance, various facilities, Sonoma County
 Sonoma County Airport LF Post-closure Compliance, Sonoma County
 Annapolis LF Post-closure Compliance, Sonoma County
 Guerneville LF Post-closure Compliance, Sonoma County  Healdsburg LF Post-closure Compliance, Sonoma County
 Occidental LF Post-closure Compliance, Sonoma County
 Roblar LF Post-closure Compliance, Sonoma County
 Sonoma LF Post-closure Compliance, Sonoma County
 City of Ukiah LF Environmental Monitoring, Mendocino County  City of Ukiah Groundwater and Surface Water Investigation, Ukiah  City of Ukiah, UST Investigation, Remediation and Case Closure, Ukiah
 City of Ukiah, Former Leslie Street Gas Plant, Investigation and Remedial Planning, Ukiah
 City of Willits, UST Investigation, Remediation and Case Closure, Willits
MAX KRUZIC, PG, CHg, QSD
Senior Geologist / Hydrogeologist

SPECIALTY
Environmental Geology, Solid
Waste, & Hydrogeologic
Services

YEARS OF EXPERIENCE
15 YEARS WITH EBA
14 REGISTRATIONS
California Professional
Geologist, PG 9311
California Certified
Hydrogeologist, CHg 1062
Qualified Stormwater Developer
OSHA 40-hour Hazardous Waste
Activities Training
OSHA 8-hour Hazardous Waste
Supervisor Training

EDUCATION
BS, Earth Science, University of
California, Santa Cruz, CA

AFFILIATIONS
National Groundwater
Association
Mr. Kruzic is a professional geologist and certified hydrogeologist with 15 years of experience in the fields of environmental geology, solid waste, and hydrogeology. He is responsible for implementing and managing hydrogeologic, environmental and solid waste landfill projects. The nature and scope of these projects include surface and subsurface geologic investigations, hydrogeologic characterization, remedial investigations/feasibility studies, and implementation of monitoring and reporting programs.

Mr. Kruzic is knowledgeable in developing and implementing a wide variety of groundwater-based investigations including hydrogeologic studies and site characterization/remediation investigations for solid waste landfills and commercial facilities (i.e., fueling stations, dry cleaners, etc.). He oversees EBA’s groundwater monitoring programs for solid waste landfill sites in Sonoma and Mendocino counties. * Projects completed with previous firm.

Brelje & Race Consulting Engineers
Proposal for On-Call Engineering and Surveying Services • City of Fort Bragg Rate Schedules
Brelje & Race Consulting Engineers
RGH Consultants, Inc.

ZFA Structural Engineers
15000 Inc.

EBA Engineering
(this page intentionally left blank)
Brelje & Race Consulting Engineers
Proposal for On-Call Engineering and Surveying Services • City of Fort Bragg

SERVICES RATE SCHEDULE
EFFECTIVE MARCH 1, 2026

PROFESSIONAL SERVICES
Senior Principal ................................................................................................................ $285.00/hour Associate Principal ............................................................................................................ 265.00/hour Associate (Managing Engineer) ....................................................................................... 250.00/hour Senior Project Advisor ..................................................................................................... 250.00/hour Senior Engineer ................................................................................................................. 245.00/hour Engineer II ......................................................................................................................... 225.00/hour Engineer I ........................................................................................................................... 210.00/hour Engineering Technician II ............................................................................................... 190.00/hour Engineering Technician I ................................................................................................. 180.00/hour Senior Planner .................................................................................................................... 210.00/hour Planner ................................................................................................................................ 175.00/hour Senior Surveyor .................................................................................................................. 210.00/hour Surveyor .............................................................................................................................. 195.00/hour Senior Survey Technician ................................................................................................. 185.00/hour Survey Technician ............................................................................................................. 165.00/hour CAD Technician Supervisor ............................................................................................ 185.00/hour CAD Designer ................................................................................................................... 175.00/hour CAD Technician ................................................................................................................ 160.00/hour Engineering Intern ............................................................................................................ 130.00/hour Construction Engineer ..................................................................................................... 200.00/hour Construction Technician II.............................................................................................. 185.00/hour Construction Technician I ............................................................................................... 170.00/hour Technical Writer ................................................................................................................ 140.00/hour EXPERT WITNESS & MEDIATION SERVICES $600.00/hour

FIELD SURVEYING
One-man Party $315.00/hour
(Including Survey Equipment & Vehicle)
Two-man Party $400.00/hour
(Including Survey Equipment & Vehicle)
Three-man Party $525.00/hour
(Including Survey Equipment & Vehicle)
CLERICAL SERVICES $110.00/hour
OUTSIDE CONSULTANTS Cost + 10% Handling Charge
OUTSIDE PLOTTING AND REPRODUCTION Cost + 10% Handling Charge

IN-HOUSE PLOTTING
Vellum or Bond $10.00/sheet
Mylar 25.00/sheet
Note
To maintain transparent and predictable billing, Brelje & Race’s hourly rates include vehicle usage, surveying materials, incidental consumables, computer hardware, computer software, and information technology costs.

Santa Rosa Office
3501 Industrial Drive, Suite A
Santa Rosa, CA 95403
707-544-1072
Napa Office
1041 Jefferson St, Suite 4
Napa, CA 94559
707-252-8105
Geotechnical, Geological and Laboratory Services

SCHEDULE OF CHARGES
Effective January 1, 2026
Unless agreed otherwise, work is charged for on a time and expense basis in accordance with the following schedule of charges:

PERSONNEL
Principal .................................................................................................................................................................. $250/hour Associate ................................................................................................................................................................. $205/hour Senior Engineer/Geologist ...................................................................................................................................... $195/hour Project Engineer/Geologist ..................................................................................................................................... $175/hour Staff Engineer/Geologist ......................................................................................................................................... $150/hour Field Engineer.......................................................................................................................................................... $140/hour Field Engineer (Prevailing Wage) ............................................................................................................................ $180/hour Graphics .................................................................................................................................................................. $110/hour Administrative Support ............................................................................................................................................. $90/hour

EQUIPMENT
Seismic Site Class (ReMiNode) ……………………………………………………………………………………………………………………………. $500/day Slope Inclinometer Instrument ................................................................................................................................. $200/day Coring Machine ......................................................................................................................................................... $400/day Infiltration Test Apparatus…………………………………………………………………………………………………………………..……………….$200/day Sonic Echo Foundation Test Gauge……………………………………………………………………………………………………………………….$200/day Specialty Software (i.e. SLOPE/W, VolFlo)................................................................................................................. $70/hour

CONCRETE
Concrete Compression Testing - Set of 4 Cylinder Breaks................................................................................................ $200 Shotcrete Panel (Includes coring, compression testing of 4 cores, and disposal)............................................................ $400 Each Additional Cylinder Break ...........................................................................................................................................$50 Each Additional Core Break.............................................................................................................................................. $100 OTHER
Travel time is charged at regular rates. Vehicle mileage is charged at the current federal rate. For court appearance, expert witness testimony, or deposition the charge is $400 per hour for the principal, associate, and project level professional and $280 per hour for all others, payable in advance. Four and eight hour minimums apply for court appearance.

Time worked in excess of 8 hours per day and Saturday/night work will be charged at 1.5 times the hourly rate. Time worked in excess of 12 hours per day and Sundays/holidays will be charged at 2 times the hourly rate.

Outside services including laboratory analysis, consultants, subcontractors, equipment not listed above, outside reproduction, aerial photographs, meals, lodging, shipping and special equipment or services not listed above are charged at cost plus 10 percent.
► 2026 hourly rates
Executive Principal ........................................................................................ $285 Principal ....................................................................................................... $240 Associate Principal ........................................................................................ $215 Senior Associate ........................................................................................... $200 Associate....................................................................................................... $190 Senior Engineer............................................................................................. $170 Engineer........................................................................................................ $155 Engineer – Designer ..................................................................................... $135 Project BIM Manager..................................................................................... $155 Senior BIM Technician .................................................................................. $145 BIM Technician.............................................................................................. $125 Engineering Support........................................................................................ $85 Client Initials
15000 Inc. Initials  1
HOURLY RATES & REIMBURSABLE EXPENSES FOR 2024, 2025, & 2026 (E1) Principal Mechanical Engineering:  $260.00 / Hour
(L1) Principal Electrical Engineering:  $260.00 / Hour
(E2) Mechanical Engineering:  $240.00 / Hour
(L2) Electrical Engineering:  $240.00 / Hour
(D1) Senior Mechanical/Electrical Design:  $220.00 / Hour (D2) Mechanical/Electrical Design:  $210.00 / Hour
(3D) Building Information Modeling:  $210.00 / Hour
(CX) Commissioning Services:  $200.00 / Hour
(CG) CalGreen Special Inspector Activities:   $180.00 / Hour (EA) Energy Analysis:  $180.00 / Hour
(DR) Computer Aided Drafting:  $170.00 / Hour
Work performed on an hourly basis will be billed as noted above. Reimbursable expenses associated with all work will be billed as follows:

Mileage:  $0.55 / Mile
Sub‐Consultants:  Cost +15%
Shipping:  Cost +10%
All other expenses: Cost +15%
15000 Inc.
6085 state farm drive, #130
rohnert park, ca 94928
phone: 707.577.0363
fax: 707.577.0364

STANDARD SCHEDULE OF FEES
Principal Geologist / Principal Engineer $245 - $265 /hr.

Project Manager $170 - $225 /hr.

Senior Geologist / Senior Engineer $160 - $200 /hr.

Senior Project Geologist / Engineer $150 - $185 /hr.

Project Geologist / Project Engineer $145 - $180 /hr.

Staff Geologist / Staff Engineer $110 - $145 /hr.

CEQA Practitioner $200 /hr.

Survey: 3 Man Crew $400 /hr.

Survey: 2 Man Crew $315 /hr.

Survey Travel: 2 Man Crew $215 /hr.

Survey: 1 Man Crew $215 /hr.

Surveyor $185 - $215 /hr.

Survey Technician $140 - $160 /hr.

Senior Environmental Scientist / Specialist $140 - $185 /hr.

Environmental Scientist / Specialist $85 - $135 /hr.

Design Draftsperson $125 - $145 /hr.

Drafting Technician $105 - $165 /hr.

Clerical $75 /hr.

Administrative $80 /hr.

Systems Manager $90 /hr.

Depositions or court proceedings 200% of usual rates
Subconsultants Cost plus 15%
Prints and materials Cost plus 15%
Miscellaneous expenses Cost plus 15%
Prevailing wage rates may be adjusted based on DIR wage determinations.

Rates effective January - December 2026.

Fees may increase between 3% - 5% upon the start of each new fiscal year. 475 Aviation Blvd., Suite 120 • Santa Rosa, CA 95403 • v: 707-576-1322 • www.brce.com Water • Wastewater • Site Development • Land Surveying • Planning

← All documents from this meeting