GRANT SCOPE/COST ESTIMATE FORM (CHECKLIST #5)
GRANT SCOPE/COST ESTIMATE FORM
/,,/74*'&+2'%4+/.334#24+.)/.0#)'
GRANT SCOPE I TE M S
+34'#%*0#2%',.5-$'2#%2'#)''34+-#4'&
'/(052%*#3'#.&%/34
+34'#%*
#.&
ES T IM A TED COST
/4#,34+-#4'&/34(/24*'
#.&
/4#,34+-#4'&
'15'34'&
-/5.4
34+-#4'&#-/5.4/(4*'
4/$'%*#2)'&4/
%#../4'8%''&
/(4*'
*'
5.&'234#.&34*#44*+3(/2-7+,,$'53'&4/'34#$,+3*4*''80'%4'&
&',+6'2#$,'3#.&4*#4#,,/(4*'
#.&
,+34'&/.4*+3(/2--534$'%/-0,'4'&#.&/0'.4/4*'05$,+%$'(/2'4*'(+.#,
0#9-'.47+,,$'-#&'
*'
#,3/5.&'234#.&34*#4./-/2'4*#.
/(4*'
#-/5.4-#9$'30'.4/.
%/343
''4*'
%*#24334#24+.)/.0#)'
$'(/2'%2'#4+.)#%/34'34+-#4'
""""""""""""""""""""""""""""""" """""""""
!
+).#452' #4'
Renovate existing traditional track and replace with an all weath $3275000.00 Renovate existing football/soccer field and replace with an all-w $1500000.00 Renovate existing field lighting and replace with LED lights and $650000.00 Construct two new family restrooms facilities to meet the needs $400000.00 Construction management costs for above items $400000.00 $6,225,000.00
$6,225,000.00
$6,225,000.00
$0