CITY OF FORTUNA
PROPOSED FEE SCHEDULE
FISCAL YEAR 2024-2025
Page
ADMINISTRATIVE FEE SCHEDULE
1. ASSESSMENT FEES 1
2. BUSINESS LICENSE TAXES 1
3. MISCELLANEOUS ADMINISTRATIVE FEES 4
4. NOTARIAL SERVICES 5
5. ADMINISTRATIVE ADJUSTMENTS 5
BUILDING FEE SCHEDULE
1. OVER THE COUNTER PERMITS 6
2. MECHANICAL PERMIT FEES 9
3. ELECTRICAL PERMIT FEES 12
4. PLUMBING PERMIT FEES 16
5. GRADING PERMIT FEES 19
6. UNIT BASED BUILDING PERMIT FEES 21
7. MISCELLANEOUS 25
8. ADMINISTRATIVE ADJUSTMENTS 25
COMMUNITY DEVELOPMENT FEE SCHEDULE
1. DEVELOPMENT REVIEW - LAND USE AND DEVELOPMENT FEES 26
2. DEVELOPMENT REVIEW - SEISMIC FEE 29
3. DEVELOPMENT REVIEW - DRAINAGE FEES 29
4. DEVELOPMENT REVIEW - TRAFFIC IMPACT FEES 30
5. DEVELOPMENT REVIEW - ARTERIAL AND COLLECTOR RD. EXTENSIONS 31
6. ADMINISTRATIVE ADJUSTMENTS 31
PARKS FEE SCHEDULE
1. PARK USE FEES 32
2. RECREATION HALL FEES 34
3. PAVILION USE FEES 35
4. ADMINISTRATIVE ADJUSTMENTS 36
RECREATION FEE SCHEDULE
1. RECREATION CLASS CONTRACTOR FEES 37
2. RECREATION PROGRAM FEES 37
3. ADMINISTRATIVE ADJUSTMENTS 38
Table of Contents
POLICE FEE SCHEDULE
1. ANIMAL CONTROL 39
2. POLICE FEES 40
3. PARKING PENALTY ASSESSMENTS 42
4. ADMINISTRATIVE ADJUSTMENTS 43
RIVER LODGE & MONDAY CLUB FEE SCHEDULE
1. RIVER LODGE 44
2. MONDAY CLUB 48
TRANSIT 49
WATER & WASTEWATER FEE SCHEDULE
1. SEWER SERVICE CHARGES 50
2. SPECIAL AGREEMENTS - BOD - TSS - FLOW 51
3. DISCHARGE FEES 52
4. STORM DRAIN MAINTENANCE SERVICE CHARGES 52
5. WATER SERVICE CHARGES 53
6. OTHER WATER SERVICE CHARGES 54
7. BACKFLOW PREVENTION DEVICES 55
8. HYDRANT METER DEPOSIT 55
9. SALE OF BULK WATER 55
10. STANDBY FIRE SERVICE CAPACITY CHARGE 56
11. INSTALLATION FEES FOR WATER SYSTEM 56
12. WATER METER CAPITAL CONNECITON FEES 58
13. WASTEWATER CAPITAL CONNECTION FEES 59
14. INSTALLATION FEES FOR SEWER CLEANOUT 60
15. ADMINISTRATIVE ADJUSTMENTS 60
WATER & WASTEWATER LABORATORY FEE SCHEDULE
1. WATER AND WASTEWATER LABORATORY FEES 61
2. ADMINISTRATIVE ADJUSTMENTS 61
CITY OF FORTUNA
BUILDING FEE SCHEDULE
Fee Description Est. Time
(in min.) FY 23-24 Fee
Proposed
Changes FY 24-25 Fee
1. OVER THE COUNTER PERMITS
A. Administrative and Miscellaneous Fees
Travel and Documentation 60 $ 96.54 4.80% $ 101.18
B. Mechanical Permit Fees
Issuance Mechanical Fee (Added to each Permit) 30 $ 48.28 4.80% $ 50.60 Stand Alone Mechanical Plan Check & Inspection See CBO See CBO See CBO Furnaces, New (F.A.U.) 90 $ 144.80 4.80% $ 151.76
Furnaces (Wall) 60 $ 96.54 4.80% $ 101.18
Furnaces, Replace (F.A.U.) 60 $ 96.54 4.80% $ 101.18
Heater (Wall) 60 $ 96.54 4.80% $ 101.18
Appliance Vent / Chimney (Only) 60 $ 96.54 4.80% $ 101.18 Refrigeration Compressor 60 $ 96.54 4.80% $ 101.18
Boiler - up to 500k BTU 60 $ 96.54 4.80% $ 101.18
Boiler - greater than 500k BTU and less than 2,000k BTU 90 $ 144.80 4.80% $ 151.76 Boiler - greater than 2,000k BTU 120 $ 193.07 4.80% $ 202.34 Chiller 75 $ 120.68 4.80% $ 126.48
Fan Coil Unit 60 $ 96.54 4.80% $ 101.18
Heat Pump (Package Unit) 60 $ 96.54 4.80% $ 101.18
Heater (Unit, Radiant, etc.) 60 $ 96.54 4.80% $ 101.18
Air Handler w/ducts to 10k CFM 60 $ 96.54 4.80% $ 101.18 Air Handler w/ducts more than 10k CFM 75 $ 120.68 4.80% $ 126.48 Duct Work only 60 $ 96.54 4.80% $ 101.18
Evaporative Cooler 60 $ 96.54 4.80% $ 101.18
Make-up Air System 60 $ 96.54 4.80% $ 101.18
Moisture Exhaust Duct (Clothes Dryer) 60 $ 96.54 4.80% $ 101.18 Variable Air Volume Box (Including Duct Work) 60 $ 96.54 4.80% $ 101.18 Vent Fan (Single Duct) 60 $ 96.54 4.80% $ 101.18
Vent System 75 $ 120.68 4.80% $ 126.48
Exhaust Hood and Duct (RESIDENTIAL) 60 $ 96.54 4.80% $ 101.18 Non-Residential Incinerator 120 $ 193.07 4.80% $ 202.34 6 CITY OF FORTUNA
BUILDING FEE SCHEDULE
Fee Description Est. Time
(in min.) FY 23-24 Fee
Proposed
Changes FY 24-25 Fee
Refrigerator Condenser Remote 60 $ 96.54 4.80% $ 101.18 Walk-in Box / Refrigerator Coil 105 $ 168.94 4.80% $ 177.05 Gas System (First Outlet) 60 $ 96.54 4.80% $ 101.18
Gas Outlets (Each Additional) 15 $ 24.14 4.80% $ 25.30
Other Mechanical Inspections (per hour) 60 $ 96.54 4.80% $ 101.18 Other Mechanical Fees Actual Cost Actual Cost
C. Plumbing / Gas Permit Fees
Issuance Plumbing Fee (Added to each Permit) 30 $ 48.28 4.80% $ 50.60 Stand Alone Plumbing Plan Check & Inspection See CBO See CBO See CBO Bathtub 60 $ 96.54 4.80% $ 101.18
Floor Drain 60 $ 96.54 4.80% $ 101.18
Gas System (First Outlet) 60 $ 96.54 4.80% $ 101.18
Gas Outlets (Each Additional) 15 $ 24.14 4.80% $ 25.30
Building Sewer 60 $ 96.54 4.80% $ 101.18
Grease Trap (inside building) 90 $ 144.80 4.80% $ 151.76 Grease Interceptors / Pump - less then 1500 ga. (Out side building) 180 $ 289.60 4.80% $ 303.51 Grease Interceptors / Pump - 1500 ga. & up (Out side building) 240 $ 386.13 4.80% $ 404.67 Lavatory (First Fixture) 60 $ 96.54 4.80% $ 101.18
Lavatory (Each Additional Fixture) 30 $ 48.28 4.80% $ 50.60 Laundry Tubs 60 $ 96.54 4.80% $ 101.18
Backflow Preventer (First 5) 60 $ 96.54 4.80% $ 101.18
Backflow Preventer (More than 5), each 5 $ 8.06 4.80% $ 8.45 Receptor (Floor Sink, Cup Sink) 60 $ 96.54 4.80% $ 101.18 Roof Drain 60 $ 96.54 4.80% $ 101.18
Shower Drain 60 $ 96.54 4.80% $ 101.18
Sink - Kitchen 60 $ 96.54 4.80% $ 101.18
Sink - Other 60 $ 96.54 4.80% $ 101.18
Urinal 60 $ 96.54 4.80% $ 101.18
7 CITY OF FORTUNA
BUILDING FEE SCHEDULE
Fee Description Est. Time
(in min.) FY 23-24 Fee
Proposed
Changes FY 24-25 Fee
Washing Machine Standpipe 60 $ 96.54 4.80% $ 101.18
Water Closet (First Fixture) 60 $ 96.54 4.80% $ 101.18
Water Closet (Each Additional Fixture) 20 $ 32.19 4.80% $ 33.74 Residential / Small Commercial Water Heater (First Heater) (50% Credit Included in Fee)
60 $ 48.28 4.80% $ 50.60
Commercial Water Heater (First Heater) 60 $ 96.54 4.80% $ 101.18 Water Heater (Each Additional Heater) 35 $ 56.32 4.80% $ 59.03 Water Pipe Repair / Replacement 60 $ 96.54 4.80% $ 101.18 Water Service 60 $ 96.54 4.80% $ 101.18
Water Softener 60 $ 96.54 4.80% $ 101.18
Drain-Vent Repair / Alterations 60 $ 96.54 4.80% $ 101.18 Hose Bib 60 $ 96.54 4.80% $ 101.18
Drinking Fountain 60 $ 96.54 4.80% $ 101.18
Solar Water System: (solar panels, tanks, water treatment equ.) (PER LAYOUT)
Actual Cost Actual Cost
Graywater Systems (per hour) 60 $ 96.54 4.80% $ 101.18
Initial installation and testing for a reclaimed water system (per hour)
60 $ 96.54 4.80% $ 101.18
Other Plumbing and Gas Inspections (per hour) 60 $ 96.54 4.80% $ 101.18 Other Plumbing and Gas Fees Actual Cost Actual Cost
D. Electrical Permit Fees
ISSUANCE ELECTRICAL FEE (Added to each permit) 30 $ 48.28 4.80% $ 50.60 Stand Alone Electrical Plan Check & Inspection See CBO See CBO See CBO Services - residential (swap-out old to new)
Service (100 to 150 amps) 60 $ 96.54 4.80% $ 101.18
Service (150 to 200 amps) 90 $ 144.80 4.80% $ 151.76
Service (200 up amps) 120 $ 193.07 4.80% $ 202.34
Temporary power Service/Pole (each) 60 $ 96.54 4.80% $ 101.18 Other Electrical Inspections (per hour) 60 $ 96.54 4.80% $ 101.18 8 CITY OF FORTUNA
BUILDING FEE SCHEDULE
Fee Description FY 23-24 Fee
Proposed
Changes FY 24-25 Fee
2. MECHANICAL PERMIT FEES
A. Permit Issuance Fee
For the issuance of each Mechanical permit $ 48.28 4.80% $ 50.60 For issuing each supplemental permit for which the original permit has not expired, been canceled or finaled
$ 15.05 4.80% $ 15.78
UNIT FEE SCHEDULE - to be added to each building permit. (NOTE: The following fees do not include the permit-issuing fee )
Per Unit Price Per Unit Price
B. Furnaces
For the installation or relocation of each forced-air or gravity-type furnace or burner. including ducts and vents attached to such appliance Up to and including 100,000 Btulh $ 57.85 4.80% $ 60.63 Over 100,000 BtuIh $ 64.36 4.80% $ 67.45
For the installation or relocation of each floor furnace, including vent $ 57.85 4.80% $ 60.63 For the installation or relocation of each suspended heater, recessed wall heater or floor-mounted unit heater.
$ 57.85 4.80% $ 60.63
C. Appliance Venting
For the installation, relocation or replacement of each appliance vent installed and not included in an appliance permit
$ 15.05 4.80% $ 15.78
D. Repair or Additions
For the repair of, alteration of, or addition to each heating appliance, refrigeration unit, cooling unit, absorption unit, or each heating, cooling, absorption or evaporative cooling system, including installation of controls regulated by the Mechanical Code
$ 28.51 4.80% $ 29.88
9 CITY OF FORTUNA
BUILDING FEE SCHEDULE
Fee Description FY 23-24 Fee
Proposed
Changes FY 24-25 Fee
E. Boilers, Compressors and Absorption Systems
Installation or relocation of each boiler or compressor:
Up to and including 3HP (10.6 kW) $ 30.58 4.80% $ 32.05 Over 3HP (10.6 kW) up to and including 15HP (52.7 kW) $ 56.39 4.80% $ 59.10 Over 15HP (52.7 kW) up to and including 30HP (105.5 kW) $ 77.35 4.80% $ 81.07 Over 30HP (105.5 kW) up to and including 50HP (176 kW) $ 115.14 4.80% $ 120.67 Over 50HP (176 kW) $ 192.50 4.80% $ 201.74
Installation or relocation of each absorption system:
Up to and including 100,000 Btulh $ 30.58 4.80% $ 32.05 Over 100,000 Btulh (29.3 kW) up to and including 500,000 Btulh (146.6 kW) $ 56.39 4.80% $ 59.10 Over 500,000 Btulh (146.6 kW) up to and including 1,000,000 BtuIh (293. I kW)
$ 77.35 4.80% $ 81.07
Over 1,000,000 Btulh (273.1 kW) up to and including 1,750,000 BtuIh (512.9 kW)
$ 115.14 4.80% $ 120.67
Over 1.750,000 Btulh (512.9 kW) $ 192.50 4.80% $ 201.74 F. Air Handlers
For each air-handling unit up to and including 10,000 cubic feet per minute (cfrn)(4719 Us), including ducts attached thereto
$ 22.18 4.80% $ 23.25
For each air-handling unit over 10,000cfrn (4719 Us)* $ 38.31 4.80% $ 40.15 G. Evaporate Coolers / Hood Make-up Air
Evaporative Coolers For each evaporative cooler other than portable type $ 22.18 4.80% $ 23.25 *Note: This fee does not apply to an air-handling unit which is a portion of a factory-assembled appliance, cooling unit, evaporative cooler or absorption unit for which a permit is required elsewhere in the Mechanical Code. 10 CITY OF FORTUNA
BUILDING FEE SCHEDULE
Fee Description FY 23-24 Fee
Proposed
Changes FY 24-25 Fee
H. Ventilation and Exhaust
For each ventilation fan connected to a single duct $ 13.99 4.80% $ 14.67 For each ventilation system which is not a portion of any heating or airconditioning system authorized by a permit $ 22.18 4.80% $ 23.25 For the installation of each hood which served by mechanical exhaust, including the ducts for such hood
$ 22.18 4.80% $ 23.25
I. Miscellaneous
For each appliance or piece of equipment regulated by the Mechanical Code but not classed in other appliance categories, or for which the fee is listed in the table
$ 22.40 4.80% $ 23.48
J. Other Inspection Fees
Inspections outside of normal business hours, per hour * (Min. Charge - 2 Hrs.) $ 96.54 4.80% $ 101.18 Re-Inspection fee assed under provision of FMC, per hour * (Min. Charge - 1 Hr.)
$ 96.54 4.80% $ 101.18
Inspection for which no fee is specifically indicated, per hour* (Min. Charge - 1 Hr.)
$ 96.54 4.80% $ 101.18
Additional plan review required by changes, additions or revisions to the plans or to plans for which and initial review has been completed * (Min. Charge - 1/2 Hr.)
$ 96.54 4.80% $ 101.18
*Or the total hourly cost to the jurisdiction, whichever is the greatest. The total hourly cost shall include Supervision, Overhead, Equipment, Hourly wages and benefits of the employees involved. 11 CITY OF FORTUNA
BUILDING FEE SCHEDULE
Fee Description FY 23-24 Fee Proposed
Changes FY 24-25 Fee
3. ELECTRICAL PERMIT FEES
A. Permit Issuance Fee
For the issuance of each Electrical permit $ 48.28 4.80% $ 50.60 For issuing each supplemental permit for which the original permit has not expired, been canceled or finaled
$ 13.99 4.80% $ 14.67
B. New Residential Buildings
Single and Two Family: For new single-and two-family residential buildings constructed at the same time, not including the area of garages, carports, and accessory buildings, per S.F.
$ 0.110 4.80% $ 0.116
Multifamily: For new multifamily buildings (apartments and condominiums) having three or more dwelling units constructed at the same time, not including the area of garages, carports and accessory building, per S.F. $ 0.099 4.80% $ 0.104
C. Private Swimming Pools
For new private, swimming pools for single-family and multifamily occupancies, including a complete system of necessary branch circuit wiring, bonding, grounding, underwater lighting, water pumping and other similar electrical equipment directly related to the operation of a swimming pool, each pool $ 146.34 4.80% $ 153.37
D. Carnivals and Circuses
For electrical generators and electrically driven rides, each $ 45.40 4.80% $ 47.58 For mechanically driven rides and walk-through attractions or displays having electric lighting, each
$ 13.99 4.80% $ 14.67
SYSTEM FEE SCHEDULE - to be added to each building permit. (NOTE: The following fees do not include the permit-issuing fee.) The following fees shall include all wiring and electrical equipment in or on each building, or other electrical equipment on the same premises constructed at the same time.
Carnivals, circuses, or other traveling shows or exhibitions utilizing transportable-type rides, booths, displays and attractions. 12 CITY OF FORTUNA
BUILDING FEE SCHEDULE
Fee Description FY 23-24 Fee Proposed
Changes FY 24-25 Fee
For a system of area and booth lighting, each $ 13.99 4.80% $ 14.67 For permanently installed rides, booths, displays and attractions. Refer to the Unit Fee Schedule
Refer to the Unit
Fee Schedule
E. Temporary Power Services
For a temp. service pole, inc all pole or pedestal-mounted receptacle outlets and appurtenances, each
$ 95.59 4.80% $ 100.18
For a temporary distribution system and temporary lighting and receptacle outlets for construction sites, decorative lights, Christmas tree sales lots, fireworks stands, etc., each
$ 23.72 4.80% $ 24.86
F. Receptacle, Switch Light Fixtures and Light Outlets
First 20 fixtures, each $ 2.12 4.80% $ 2.23
Additional fixtures, each $ 1.43 4.80% $ 1.50
For pole or platform-mounted light fixtures, each $ 2.12 4.80% $ 2.23 For theatrical-type lighting fixtures or assemblies, each $ 2.12 4.80% $ 2.23 G. Residential Appliances
For fixed residential appliances or receptacle outlets for same, including wallmounted electric ovens; counter-mounted cooking tops; electric ranges; selfcontained room, console or through-wall conditioners; space heaters; food waste grinders; dishwashers; washing machines; water heaters; clothes dryers; or other motor-operated appliances not exceeding 1 horsepower (HP) in rating, each
$ 9.22 4.80% $ 9.67
NOTE: For other types of air conditioners and other appliances having larger electrical ratings, see Power Apparatus.
UNIT FEE SCHEDULE - to be added to each building permit. (NOTE: The following fees do not include the permit-issuing fee.) For receptacle, switch, light or other outlets at which current is used or controlled, except services, feeders and meters and for lighting fixtures, sockets or other lamp-holding devices.
13 CITY OF FORTUNA
BUILDING FEE SCHEDULE
Fee Description FY 23-24 Fee Proposed
Changes FY 24-25 Fee
H. Non-Residential Appliances
For nonresidential appliances and self-contained factory-wired, nonresidential appliances not exceeding 1 horsepower (HP), kilowatt (kW) or (kVA), in rating, including medical and dental devices; food, beverage and ice cream cabinets; illuminated show cases; drinking vending machines; laundry machines; or other similar types of equipment, each
$ 9.22 4.80% $ 9.67
I. Power Apparatus
Up to and including 1, each $ 9.22 4.80% $ 9.67
Over 1 and not over 10, each $ 23.73 4.80% $ 24.87
Over 10 and not over 50, each $ 47.54 4.80% $ 49.83
Over 50 and not over 100, each $ 95.59 4.80% $ 100.18
Over 100, each $ 143.74 4.80% $ 150.64
J. Busways
For trolley and plug-in-type busways, each 100 feet or fraction thereof $ 13.99 4.80% $ 14.67 NOTE: For equipment or appliances having more than one motor, transformer, heater, etc., the sum of the combined ratings may be used.
NOTE: An additional fee required for lighting fixtures, motors and other appliances that are connected to troney and plug-in-type busways. A fee is not required for portable.
NOTE: These fees include all switches, circuit breakers, contaetors, thermostats, relays and other directly related controlled equipment.
NOTE: For other types of air conditioners and other appliances having larger electrical ratings, see Power Apparatus.
For motors, generators, transformers, rectifiers, synchronous conveners, capacitors, industrial heating, AC and heat pumps, cooking or baking equipment and other apparatus, as follows: Rating m horsepower (HP), kilowatts (kW), kilovolt-amperes (kVA) or kilovolt-amperesreactive (kY AR). 14 CITY OF FORTUNA
BUILDING FEE SCHEDULE
Fee Description FY 23-24 Fee Proposed
Changes FY 24-25 Fee
K. Signs, Outline, Lighting and Marquees
For signs, outline lighting systems or marquees supplied from one branch circuit, each
$ 47.54 4.80% $ 49.83
For additional branch circuits within the same sign, outline lighting system or marquee, each
$ 9.22 4.80% $ 9.67
L. Services
For services of 600 volts or less and not over 200 amperes in rating, each $ 58.83 4.80% $ 61.66 For services of 600 volts or less and over 200 amperes to 1,000 amperes, each $ 119.94 4.80% $ 125.70 For services over 600 volts or over 1,000 amperes in rating, each $ 239.87 4.80% $ 251.39 M. Miscellaneous Apparatus, Conduits and Conductors
For electrical apparatus, conduits and conductors for which a permit is required but for which no fee is herein set forth
$ 35.11 4.80% $ 36.80
N. Other Inspection and Fees
Inspections outside of normal business hours, per hour * (Min. Charge - 2 Hrs.) $ 96.54 4.80% $ 101.18 Re-Inspection fee assed under provision of FMC, per hour * (Min. Charge - 1 Hr.) $ 96.54 4.80% $ 101.18 Inspection for which no fee is specifically indicated, per hour* (Min. Charge - 1 Hr.)
$ 96.54 4.80% $ 101.18
Additional plan review required by changes, additions or revisions to the plans or to plans for which and initial review has been completed * (Min. Charge - 1/2 Hr.)
$ 96.54 4.80% $ 101.18
NOTE: This fee is not applicable when a fee is paid for one or more services, outlets, fixtures, appliances, power apparatus, busways, signs or other equipment.
*Or the total hourly cost to the jurisdiction, whichever is the greatest. The total hourly cost shall include Supervision, Overhead, Equipment, Hourly wages and benefits of the employees involved. 15 CITY OF FORTUNA
BUILDING FEE SCHEDULE
Fee Description FY 23-24 Fee
Proposed
Changes FY 24-25 Fee
4. PLUMBING PERMIT FEES
A. Permit Issuance Fee
For the issuance of each plumbing permit $ 48.28 4.80% $ 50.60 For issuing each supplemental permit for which the original permit has not expired, been canceled or final
$ 13.99 4.80% $ 14.67
UNIT FEE SCHEDULE - to be added to each building permit. (NOTE: The following fees do not include the permit-issuing fee )
Per Unit Price Per Unit Price
B. Fixtures and Vents
For each plumbing fixture or trap or set of fixtures on one trap (incl: water, drain piping, backflow protection)
$ 18.95 4.80% $ 19.86
For repair or alteration of drainage or vent piping, each fixture $ 9.22 4.80% $ 9.67 C. Sewer, Disposal Systems and Interceptors
For each building, trailer sewer $ 47.61 4.80% $ 49.90
For each private sewage disposal system $ 94.01 4.80% $ 98.53 For each Industrial waste pretreatment interceptor, including its trap and vent, excepting kitchen-type grease interceptors Functioning as fixture traps $ 286.73 4.80% $ 300.50
Rainwater systems - per drain (inside building) $ 18.95 4.80% $ 19.86 D. Water Piping System
For installation, alteration, or repair of water piping or water-treating equipment, or both, each
$ 9.22 4.80% $ 9.67
For each water heater including vent; for vents only, See Mechanical Permit Fees
$ 23.73 4.80% $ 24.87
E. Gas Piping and Water Heaters
For each gas piping system of one to five outlets $ 11.87 4.80% $ 12.44 for each additional outlet over five, each $ 2.12 4.80% $ 2.23 16 CITY OF FORTUNA
BUILDING FEE SCHEDULE
Fee Description FY 23-24 Fee
Proposed
Changes FY 24-25 Fee
F. Lawn Sprinkler, Vacuum Breakers and Backflow Protection Devices For each lawn sprinkler system on any one meter, including backflow protection devices thereof
$ 28.59 4.80% $ 29.97
For atmospheric-type vacuum breakers or backflow protection devices not included in item 1:
1 to 5 devices $ 23.73 4.80% $ 24.87
More them 5 devices, each $ 4.33 4.80% $ 4.54
For each backflow-protection devices other then atmospheric-type vacuum breaker:
2 inch and smaller $ 23.73 4.80% $ 24.87
Over 2 inches $ 47.61 4.80% $ 49.90
G. Swimming Pools
For each swimming pool and spa:
Private Pool (Residential) (up to 400 s.f.) $ 1,100.00 4.80% $ 1,153.00 Private Pool (Residential) (over 401 s.f.) $ 1,244.00 4.80% $ 1,304.00 Private Spa (Residential) $ 432.00 4.80% $ 453.00
Public Pool (Commercial) (up to 400 s.f.) ADA $ 1,292.00 4.80% $ 1,355.00 Public Pool (Commercial) (over 400 s.f.) ADA $ 1,482.00 4.80% $ 1,554.00 Public Spa (Commercial) ADA $ 575.00 4.80% $ 603.00
H. Fire Sprinkler System
New Fire Sprinkler System, per S.F. (Min fee cost $350.00) $ 0.17 4.80% $ 0.18 Rework Existing Fire Sprinkler System Actual Cost Actual Cost I. Miscellaneous
For each appliance or pieces of equipment regulated by the (CPC) California Plumbing Code but not classed in other appliance categories, or for which the fee is listed in the table
$ 20.60 4.80% $ 21.59
17 CITY OF FORTUNA
BUILDING FEE SCHEDULE
Fee Description FY 23-24 Fee
Proposed
Changes FY 24-25 Fee
J. Other Inspection and Fees
Inspections outside of normal business hours, per hour * (Min. Charge - 2 Hrs.) $ 96.54 4.80% $ 101.18 Re-Inspection fee assed under provision of FMC, per hour * (Min. Charge - 1 Hr.)
$ 96.54 4.80% $ 101.18
Inspection for which no fee is specifically indicated, per hour* (Min. Charge - 1 Hr.)
$ 96.54 4.80% $ 101.18
Additional plan review required by changes, additions or revisions to the plans or to plans for which and initial review has been completed * (Min. Charge - 1/2 Hr.)
$ 96.54 4.80% $ 101.18
*Or the total hourly cost to the jurisdiction, whichever is the greatest. The total hourly cost shall include Supervision, Overhead, Equipment, Hourly wages and benefits of the employees involved. 18 CITY OF FORTUNA
BUILDING FEE SCHEDULE
Fee Description FY 23-24 Fee
Proposed
Changes FY 24-25 Fee
5. GRADING PERMIT FEES
A. Permit Issuance Fee
For the issuance of each Grading permit $ 48.28 4.80% $ 50.60 For issuing each supplemental permit for which the original permit has not expired, been canceled or final
$ 13.99 4.80% $ 14.67
UNIT FEE SCHEDULE - to be added to each building permit. (NOTE: The following fees do not include the permit-issuing fee.)
Per Unit Price Per Unit Price
B. Grading Plan Review
1 cubic yard to 100 cubic yards $ 45.42 4.80% $ 47.61
101 to 1,000 cubic yards $ 71.41 4.80% $ 74.84
1,001 to 10,000 cubic $ 95.04 4.80% $ 99.61
10,001 to 100,000 cubic yards
Base Charge $ 95.04 4.80% $ 99.61
For each additional 10,000 cubic yards or fraction thereof $ 47.30 4.80% $ 49.58 100,001 to 200,000 cubic yards
Base Charge $ 520.63 4.80% $ 545.63
For each additional 10,000 cubic yards or fraction thereof $ 39.12 4.80% $ 41.00 200,001 cubic yards or more
Base Charge $ 872.44 4.80% $ 914.32
For each additional 10,000 cubic yards or fraction thereof $ 14.01 4.80% $ 14.69 C. Grading Permit Fees
1 cubic yard to 50 cubic yards $ 45.42 4.80% $ 47.61
51 to 100 cubic yards $ 71.41 4.80% $ 74.84
101 to 1,000 cubic yards
Base Charge $ 71.41 4.80% $ 74.84
For each additional 100 cubic yards or fraction thereof $ 33.80 4.80% $ 35.43 NOTE: ADA path of travel, onsite structures i.e. trash enclosures, retaining walls, and ect will be charged at building fee structure and/or hours per task.
19 CITY OF FORTUNA
BUILDING FEE SCHEDULE
Fee Description FY 23-24 Fee
Proposed
Changes FY 24-25 Fee
1,001 to 10,000 cubic yards
Base Charge $ 375.41 4.80% $ 393.43
For each additional 1,000 cubic yards or fraction thereof $ 28.01 4.80% $ 29.36 10,001 to 100,000 cubic yards
Base Charge $ 627.38 4.80% $ 657.50
For each additional 10,000 cubic yards or fraction thereof $ 127.39 4.80% $ 133.51 100,001 cubic yards or more
Base Charge $ 1,773.05 4.80% $ 1,858.16
For each additional 10,000 cubic yards or fraction thereof $ 70.47 4.80% $ 73.86 D. Other Inspection and Fees
Inspections outside of normal business hours, per hour * (Min. Charge - 2 Hrs.) $ 96.54 4.80% $ 101.18 Re-Inspection fee assed under provision of FMC, per hour * (Min. Charge - 1 Hr.)
$ 96.54 4.80% $ 101.18
Inspection for which no fee is specifically indicated, per hour* (Min. Charge - 1 Hr.)
$ 96.54 4.80% $ 101.18
Additional plan review required by changes, additions or revisions to the plans or to plans for which and initial review has been completed * (Min. Charge - 1/2 Hr.)
$ 96.54 4.80% $ 101.18
NOTE: ADA path of travel, onsite structures i.e. trash enclosures, retaining walls, and ect will be charged at building fee structure and/or hours per task.
*Or the total hourly cost to the jurisdiction, whichever is the greatest. The total hourly cost shall include Supervision, Overhead, Equipment, Hourly wages and benefits of the employees involved. 20 CITY OF FORTUNA
BUILDING FEE SCHEDULE
6. UNIT BASED BUILDING PERMIT FEES
Average ROW A ROW B ROW C
Plan Check/ Average Mult. By Average II-A II-B, III-B
Process Inspection Total Hrly Rate Average Cost per I-A III-A IV Hours Hours Time 101.18$ Square Ft Square Ft I-B V-A V-B "A" Restaurant / Theater / Church / 17.00 23.00 40.00 $4,047 1,000 $4.05 $4.86 $4.05 $3.24 Auditorium 38.00 62.00 100.00 $10,118 5,000 $2.02 $2.43 $2.02 $1.62
59.00 99.00 158.00 $15,986 10,000 $1.60 $1.92 $1.60 $1.28
97.00 161.00 258.00 $26,104 20,000 $1.31 $1.57 $1.31 $1.04 "A" Tenant Improvement 9.00 11.50 20.50 $2,074 1,000 $2.07 $2.49 $2.07 $1.66
19.00 31.00 50.00 $5,059 5,000 $1.01 $1.21 $1.01 $0.81
28.50 49.75 78.25 $7,917 10,000 $0.79 $0.95 $0.79 $0.63
48.50 80.75 129.25 $13,078 20,000 $0.65 $0.78 $0.65 $0.52 "B" Office 16.50 21.50 38.00 $3,845 1,000 $3.84 $4.61 $3.84 $3.08
32.00 55.00 87.00 $8,803 5,000 $1.76 $2.11 $1.76 $1.41
56.00 86.00 142.00 $14,368 10,000 $1.44 $1.72 $1.44 $1.15
88.00 141.00 229.00 $23,170 20,000 $1.16 $1.39 $1.16 $0.93 "B" Tenant Improvement 9.00 11.00 20.00 $2,024 1,000 $2.02 $2.43 $2.02 $1.62
16.00 27.50 43.50 $4,401 5,000 $0.88 $1.06 $0.88 $0.70
28.00 43.00 71.00 $7,184 10,000 $0.72 $0.86 $0.72 $0.57
44.00 70.00 114.00 $11,535 20,000 $0.58 $0.69 $0.58 $0.46 "E" Non Public 17.00 23.00 40.00 $4,047 1,000 $4.05 $6.07 $5.06 $4.05 (Pre-School - Daycare) 38.00 62.00 100.00 $10,118 5,000 $2.02 $3.04 $2.53 $2.02 (Schools - Religion) 59.00 99.00 158.00 $15,986 10,000 $1.60 $2.40 $2.00 $1.60
97.00 161.00 258.00 $26,104 20,000 $1.31 $1.96 $1.63 $1.31 "E" Tenant Improvement 9.00 11.50 20.50 $2,074 1,000 $2.07 $3.11 $2.59 $2.07
19.00 31.00 50.00 $5,059 5,000 $1.01 $1.52 $1.26 $1.01
28.50 49.75 78.25 $7,917 10,000 $0.79 $1.19 $0.99 $0.79
48.50 80.75 129.25 $13,078 20,000 $0.65 $0.98 $0.82 $0.65 "F-1" Factory and industrial, 14.00 18.00 32.00 $3,238 1,000 $3.24 $3.89 $3.24 $2.59 (MODERATE HAZARD) 23.00 37.00 60.00 $6,071 5,000 $1.21 $1.46 $1.21 $0.97
34.00 53.00 87.00 $8,803 10,000 $0.88 $1.06 $0.88 $0.70
42.00 88.00 130.00 $13,153 20,000 $0.66 $0.79 $0.66 $0.53 "F-1" Tenant Improvement 9.00 10.00 19.00 $1,922 1,000 $1.92 $2.31 $1.92 $1.54 Factory and industrial, 12.00 19.00 31.00 $3,137 5,000 $0.63 $0.75 $0.63 $0.50 (MODERATE HAZARD) 18.00 27.00 45.00 $4,553 10,000 $0.46 $0.55 $0.46 $0.36
22.00 45.00 67.00 $6,779 20,000 $0.34 $0.41 $0.34 $0.27 "F-2" Factory and industrial, 14.00 18.00 32.00 $3,238 1,000 $3.24 $3.89 $3.24 $2.59 (LOW HAZARD) 23.00 37.00 60.00 $6,071 5,000 $1.21 $1.46 $1.21 $0.97 (LOW HAZARD) 34.00 53.00 87.00 $8,803 10,000 $0.88 $1.06 $0.88 $0.70
42.00 88.00 130.00 $13,153 20,000 $0.66 $0.79 $0.66 $0.53 "F-2" Tenant Improvement 9.00 10.00 19.00 $1,922 1,000 $1.92 $2.31 $1.92 $1.54 Factory and industrial, 12.00 19.00 31.00 $3,137 5,000 $0.63 $0.75 $0.63 $0.50 (LOW HAZARD) 18.00 27.00 45.00 $4,553 10,000 $0.46 $0.55 $0.46 $0.36
22.00 45.00 67.00 $6,779 20,000 $0.34 $0.41 $0.34 $0.27 "H-1" High Hazards; 14.00 18.00 32.00 $3,238 500 $6.48 $7.77 $6.48 $5.18 "H-2" Detonation hazard; Health hazards 18.00 22.00 40.00 $4,047 1,000 $4.05 $4.86 $4.05 $3.24 "H-3" Hazard from accelerated burning; 22.75 42.25 65.00 $6,577 2,500 $2.63 $3.16 $2.63 $2.10 "H-4" Material that readily support combust.; 35.00 65.00 100.00 $10,118 5,000 $2.02 $2.43 $2.02 $1.62 "H-1" Tenant Improvement - High Hazards; 9.00 9.00 18.00 $1,821 500 $3.64 $4.37 $3.64 $2.91 "H-2" Detonation hazard; Health hazards 9.50 10.50 20.00 $2,024 1,000 $2.02 $2.43 $2.02 $1.62 "H-3" Hazard from accelerated burning; 14.00 18.00 32.00 $3,238 2,500 $1.30 $1.55 $1.30 $1.04 "H-4" Material that readily support combust.; 17.00 32.00 49.00 $4,958 5,000 $0.99 $1.19 $0.99 $0.79 Type of Construction
Modifier
Occupancy
Type Building Use
21 CITY OF FORTUNA
BUILDING FEE SCHEDULE
6. UNIT BASED BUILDING PERMIT FEES
Average ROW A ROW B ROW C
Plan Check/ Average Mult. By Average II-A II-B, III-B
Process Inspection Total Hrly Rate Average Cost per I-A III-A IV Hours Hours Time 101.18$ Square Ft Square Ft I-B V-A V-B Type of Construction
Modifier
Occupancy
Type Building Use
"H-5" High Explosive 15.50 22.50 38.00 $3,845 500 $7.69 $7.69 $6.41 $5.13
20.00 27.50 47.50 $4,806 1,000 $4.81 $4.81 $4.01 $3.20
26.00 49.00 75.00 $7,589 2,500 $3.04 $3.04 $2.53 $2.02
35.00 68.00 103.00 $10,422 5,000 $2.08 $2.08 $1.74 $1.39 "H-5" Tenant Improvement 10.00 14.00 24.00 $2,428 500 $4.86 $4.86 $4.05 $3.24 High Explosive 11.00 15.00 26.00 $2,631 1,000 $2.63 $2.63 $2.19 $1.75
13.00 23.00 36.00 $3,642 2,500 $1.46 $1.46 $1.21 $0.97
17.00 34.00 51.00 $5,160 5,000 $1.03 $1.03 $0.86 $0.69
"I - 1.2" Heath Care Centers / Assist Living 21.00 31.00 52.00 $5,261 1,000 $5.26 $5.26 $4.38 $3.51
39.00 78.00 117.00 $11,838 5,000 $2.37 $2.37 $1.97 $1.58
68.00 111.00 179.00 $18,111 10,000 $1.81 $1.81 $1.51 $1.21
92.00 169.00 261.00 $26,408 20,000 $1.32 $1.32 $1.10 $0.88 "I - 1.2" Tenant Improvement 11.00 16.00 27.00 $2,732 1,000 $2.73 $2.73 $2.28 $1.82 (Heath Care Centers / Assist Living) 20.00 39.00 59.00 $5,970 5,000 $1.19 $1.19 $0.99 $0.80
34.00 55.50 89.50 $9,056 10,000 $0.91 $0.91 $0.75 $0.60
46.00 84.00 130.00 $13,153 20,000 $0.66 $0.66 $0.55 $0.44 "I-3" Jail 15.50 23.00 38.50 $3,895 500 $7.79 $9.35 $7.79 $6.23
26.00 40.00 66.00 $6,678 2,500 $2.67 $3.21 $2.67 $2.14
34.00 69.00 103.00 $10,422 5,000 $2.08 $2.50 $2.08 $1.67 "M" Store / Mercantile 16.50 21.50 38.00 $3,845 1,000 $3.84 $5.77 $4.81 $3.84
31.00 51.00 82.00 $8,297 5,000 $1.66 $2.49 $2.07 $1.66
45.00 86.00 131.00 $13,255 10,000 $1.33 $1.99 $1.66 $1.33
57.00 141.00 198.00 $20,034 20,000 $1.00 $1.50 $1.25 $1.00
77.00 198.00 275.00 $27,825 50,000 $0.56 $0.83 $0.70 $0.56
99.00 281.00 380.00 $38,448 100,000 $0.38 $0.58 $0.48 $0.38 "M" Tenant Improvement 9.00 12.00 21.00 $2,125 1,000 $2.12 $3.19 $2.66 $2.12 (Store) 14.50 24.50 39.00 $3,946 5,000 $0.79 $1.18 $0.99 $0.79 (Full store remodel) 20.00 41.00 61.00 $6,172 10,000 $0.62 $0.93 $0.77 $0.62
28.00 68.00 96.00 $9,713 20,000 $0.49 $0.73 $0.61 $0.49
36.00 96.00 132.00 $13,356 50,000 $0.27 $0.40 $0.33 $0.27
48.00 128.00 176.00 $17,808 100,000 $0.18 $0.27 $0.22 $0.18 "M" Convenient Store / Vehicle Fuel Disp. 12.00 12.00 24.00 $2,428 300 $8.09 $9.71 $8.09 $6.48 NOTE: see Fuel Canopy in "S-2" 16.00 18.00 34.00 $3,440 750 $4.59 $5.50 $4.59 $3.67
21.00 28.00 49.00 $4,958 1,500 $3.31 $3.97 $3.31 $2.64
25.00 39.00 64.00 $6,476 3,000 $2.16 $2.59 $2.16 $1.73
"M" Tenant Improvement 8.00 10.00 18.00 $1,821 300 $6.07 $7.28 $6.07 $4.86 Convenient Store / Vehicle Fuel Disp 9.50 11.00 20.50 $2,074 750 $2.77 $3.32 $2.77 $2.21 ` 12.00 14.00 26.00 $2,631 1,500 $1.75 $2.10 $1.75 $1.40
14.50 19.00 33.50 $3,390 3,000 $1.13 $1.36 $1.13 $0.90
"R-1" Hotel / Motel / Apartment 16.00 37.00 53.00 $5,363 1,500 $3.58 $4.29 $3.58 $2.86 "R-2.1" 49.00 111.00 160.00 $16,189 7,500 $2.16 $2.59 $2.16 $1.73
84.00 210.00 294.00 $29,747 15,000 $1.98 $2.38 $1.98 $1.59 107.00 311.00 418.00 $42,293 30,000 $1.41 $1.69 $1.41 $1.13 "R-1" Tenant Improvement 13.00 16.00 29.00 $2,934 1,500 $1.96 $2.35 $1.96 $1.56 "R-2.1" or Remodels 30.00 54.00 84.00 $8,499 7,500 $1.13 $1.36 $1.13 $0.91
42.00 104.00 146.00 $14,772 15,000 $0.98 $1.18 $0.98 $0.79
50.00 130.00 180.00 $18,212 30,000 $0.61 $0.73 $0.61 $0.49 22 CITY OF FORTUNA
BUILDING FEE SCHEDULE
6. UNIT BASED BUILDING PERMIT FEES
Average ROW A ROW B ROW C
Plan Check/ Average Mult. By Average II-A II-B, III-B
Process Inspection Total Hrly Rate Average Cost per I-A III-A IV Hours Hours Time 101.18$ Square Ft Square Ft I-B V-A V-B Type of Construction
Modifier
Occupancy
Type Building Use
"R-3" Dwellings - Single Family / Duplex 7.60 14.00 21.60 $2,185 1,000 $2.19 N/A N/A $2.19
10.00 17.25 27.25 $2,757 1,500 $1.84 N/A N/A $1.84
12.30 18.50 30.80 $3,116 2,000 $1.56 N/A N/A $1.56
16.75 23.00 39.75 $4,022 3,000 $1.34 N/A N/A $1.34
20.50 26.25 46.75 $4,730 4,000 $1.18 N/A N/A $1.18
23.25 28.50 51.75 $5,236 5,000 $1.05 N/A N/A $1.05
24.75 30.25 55.00 $5,565 6,000 $0.93 N/A N/A $0.93
"R-3" Dwellings - Repeats of Project 4.00 14.00 18.00 $1,821 1,000 $1.82 N/A N/A $1.82 (Build the same home within the 4.30 17.25 21.55 $2,180 1,500 $1.45 N/A N/A $1.45 same subdivision ONLY during 4.80 18.50 23.30 $2,357 2,000 $1.18 N/A N/A $1.18 the same adopted code cycle). 5.00 23.00 28.00 $2,833 3,000 $0.94 N/A N/A $0.94
5.00 26.25 31.25 $3,162 4,000 $0.79 N/A N/A $0.79
6.00 28.50 34.50 $3,491 5,000 $0.70 N/A N/A $0.70
6.25 30.25 36.50 $3,693 6,000 $0.62 N/A N/A $0.62
"R-3" Dwellings 5.50 7.50 13.00 $1,315 1,000 $1.32 N/A N/A $1.32 Remodel/Improvements 6.00 8.75 14.75 $1,492 1,500 $0.99 N/A N/A $0.99
7.00 9.50 16.50 $1,669 2,000 $0.83 N/A N/A $0.83
8.00 12.00 20.00 $2,024 3,000 $0.67 N/A N/A $0.67
9.00 13.25 22.25 $2,251 4,000 $0.56 N/A N/A $0.56
9.75 14.75 24.50 $2,479 5,000 $0.50 N/A N/A $0.50
10.25 16.00 26.25 $2,656 6,000 $0.44 N/A N/A $0.44
S-1 (Mod Hazard Storage) 13.00 17.00 30.00 $3,035 1,000 $3.04 $3.64 $3.04 $2.43 S-2 (Low Hazard Storage) 22.00 36.00 58.00 $5,868 5,000 $1.17 $1.41 $1.17 $0.94 (Open Parking Garage) 33.00 53.00 86.00 $8,701 10,000 $0.87 $1.04 $0.87 $0.70 (Aircraft Hanger) 41.00 88.00 129.00 $13,052 20,000 $0.65 $0.78 $0.65 $0.52 S-1 Tenant Improvement 9.00 10.00 19.00 $1,922 1,000 $1.92 $2.31 $1.92 $1.54 S-2 12.00 19.00 31.00 $3,137 5,000 $0.63 $0.75 $0.63 $0.50
18.00 27.00 45.00 $4,553 10,000 $0.46 $0.55 $0.46 $0.36
22.00 45.00 67.00 $6,779 20,000 $0.34 $0.41 $0.34 $0.27 "S-2" Canopy / Porte-cochere / 6.00 4.50 10.50 $1,062 100 $10.62 $12.75 $10.62 $8.50 Fuel Dispensing cover 6.00 6.00 12.00 $1,214 500 $2.43 $2.91 $2.43 $1.94 (Commercial) 6.00 8.00 14.00 $1,417 1,000 $1.42 $1.70 $1.42 $1.13
6.50 8.50 15.00 $1,518 2,000 $0.76 $0.91 $0.76 $0.61
"U" Residential Garage - ATTACHED 2.50 3.50 6.00 $607 100 $6.07 $9.11 $7.59 $6.07 (Constructed during new home) 3.00 5.00 8.00 $809 500 $1.62 $2.43 $2.02 $1.62 (up to 3,000sf max.) 3.75 5.50 9.25 $936 1,000 $0.94 $1.40 $1.17 $0.94
4.50 6.50 11.00 $1,113 2,000 $0.56 $0.83 $0.70 $0.56
5.00 7.25 12.25 $1,239 3,000 $0.41 $0.62 $0.52 $0.41
"U" Residential Garage - DETACHED 4.00 6.50 10.50 $1,062 100 $10.62 $15.94 $13.28 $10.62 Stand Allow Construction 5.00 7.00 12.00 $1,214 500 $2.43 $3.64 $3.04 $2.43 (up to 3,000sf max.) 6.50 8.75 15.25 $1,543 1,000 $1.54 $2.31 $1.93 $1.54
8.00 11.00 19.00 $1,922 2,000 $0.96 $1.44 $1.20 $0.96
9.25 13.00 22.25 $2,251 3,000 $0.75 $1.13 $0.94 $0.75
"U" Residential Carport/Porch - ATTACHED 1.00 1.50 2.50 $253 100 $2.53 $3.79 $3.16 $2.53 (Constructed during new home) 1.50 2.00 3.50 $354 200 $1.77 $2.66 $2.21 $1.77
1.75 2.25 4.00 $405 300 $1.35 $2.02 $1.69 $1.35
2.00 2.50 4.50 $455 400 $1.14 $1.71 $1.42 $1.14
2.25 2.75 5.00 $506 500 $1.01 $1.52 $1.26 $1.01
23 CITY OF FORTUNA
BUILDING FEE SCHEDULE
6. UNIT BASED BUILDING PERMIT FEES
Average ROW A ROW B ROW C
Plan Check/ Average Mult. By Average II-A II-B, III-B
Process Inspection Total Hrly Rate Average Cost per I-A III-A IV Hours Hours Time 101.18$ Square Ft Square Ft I-B V-A V-B Type of Construction
Modifier
Occupancy
Type Building Use
"U" Carport / Porch / Agg. Cover 3.00 3.00 6.00 $607 50 $12.14 $18.21 $15.18 $12.14 Stand Allow Construction 3.00 4.00 7.00 $708 100 $7.08 $0.00 $0.00 $7.08
4.00 4.00 8.00 $809 500 $1.62 $0.00 $0.00 $1.62
5.00 5.50 10.50 $1,062 1,000 $1.06 $0.00 $0.00 $1.06
6.25 6.50 12.75 $1,290 2,000 $0.65 $0.00 $0.00 $0.65
6.75 7.00 13.75 $1,391 3,000 $0.46 $0.00 $0.00 $0.46
SHELL BUILDINGS
"B" Shell 10.50 14.00 24.50 $2,479 1,000 $2.48 $2.97 $2.48 $1.98 (Office) 27.50 42.25 69.75 $7,057 5,000 $1.41 $1.69 $1.41 $1.13
47.75 73.75 121.50 $12,293 10,000 $1.23 $1.48 $1.23 $0.98
80.75 124.00 204.75 $20,717 20,000 $1.04 $1.24 $1.04 $0.83 "A" Shell 11.00 16.25 27.25 $2,757 1,000 $2.76 $3.31 $2.76 $2.21 (Restaurant / Theater / Church / 32.25 49.00 81.25 $8,221 5,000 $1.64 $1.97 $1.64 $1.32 Auditorium / 55.50 85.75 141.25 $14,292 10,000 $1.43 $1.72 $1.43 $1.14
92.65 142.75 235.40 $23,818 20,000 $1.19 $1.43 $1.19 $0.95 "M" Shell 11.00 11.50 22.50 $2,277 1,000 $2.28 $2.73 $2.28 $1.82 store 19.75 30.25 50.00 $5,059 5,000 $1.01 $1.21 $1.01 $0.81
34.50 53.25 87.75 $8,879 10,000 $0.89 $1.07 $0.89 $0.71
60.00 92.25 152.25 $15,405 20,000 $0.77 $0.92 $0.77 $0.62 114.00 175.50 289.50 $29,292 50,000 $0.59 $0.70 $0.59 $0.47 146.00 238.75 384.75 $38,929 100,000 $0.39 $0.47 $0.39 $0.31 24 CITY OF FORTUNA
BUILDING FEE SCHEDULE
Fee Description FY 23-24 Fee
Proposed
Changes FY 24-25 Fee
7. MISCELLANEOUS
A. Construction & Demolition Debris Diversion
Qualifying Covered Administrative Fee $ 175.00 $ 175.00 Qualifying Covered Residential Deposit* $ 500.00 $ 500.00 Qualifying Covered Nonresidential Deposit* Greater of 0.25% Project Cost or
$500
Greater of 0.25%
Project Cost or
$500
Appeals - Staff Level $ 250.00 $ 250.00
Appeals - City Council Level $ 500.00 $ 500.00
8. ADMINISTRATIVE ADJUSTMENTS
The City Manager shall have the authority to adjust the aforementioned fees when special circumstances indicate that the fee being charged according to this Resolution is clearly inappropriate. In addition, the City Manager shall have the authority to determine the fee amount for a City service that is not addressed in this Resolution based upon the actual cost of providing the service and / or the actual cost for the City to issue a permit.
* Upon project completion and the determination of compliance with Ordinance 2023-762 by the Building Official, deposits will be refunded.
25 CITY OF FORTUNA
COMMUNITY DEVELOPMENT FEE SCHEDULE
Fee Description FY 23-24 Fee
Proposed
Changes FY 24-25 Fee
1. DEVELOPMENT REVIEW - LAND USE AND DEVELOPMENT FEES
FIXED FEE
Zoning Clearance $100.00 $25.00 $125.00
Short Term Rental $100.00 $300.00 $400.00
Accessory Dwelling Unit (ADU) Permit $200.00 $100.00 $300.00 Cottage Industry/Home Occupation Permit NEW FEE $75.00
Notice of Cultivation $100.00 $50.00 $150.00
Pre-Application Meeting $0.00 $0.00 $0.00
Burn Down / Zoning Verification Letter NEW FEE $150.00
Address Assignment NEW FEE $150.00
Sign Permit NEW FEE $250.00
ACTUAL COST
Design Review $225.00 $775.00 $1,000.00
Conditional Use Permit—Exempt from CEQA $300.00 $400.00 $700.00 Conditional Use Permit—Not exempt from CEQA $650.00* $550.00 $1,200.00 Lot Line Adjustment $325.00 $925.00 $1,250.00
Variance $375.00* $475.00 $850.00
Minor Subdivision $525.00* $2,975.00 $3,500.00
Map or Permit Extension $150.00 $550.00 $700.00
Permit Modification or Amendment $200.00* $500.00 $700.00 Lot Merger NEW FEE $1,100.00
State Density Bonus NEW FEE $240.00
Appeal of Planning Commission Decision to the City Council $425.00 $300.00 $725.00 Appeal of Administrative Decision to Planning Commission $200.00 $450.00 $650.00 Fee amounts for "Actual Cost" permits represent a non-refundable deposit due at application. The applicant is responsible for all charges (at fully burdened staff rates and third-party costs) exceeding the deposit. Any additional monies due must be paid prior to project approval or granting of a Building Permit Certificate of Occupancy. All fixed fee and actual cost permits will be assessed a 3% surcharge for the update and maintenance of the permit database and software and a 10% surcharge to administer and implement the General Plan. Additionally, projects requiring a Planning Commission or City Council Public Hearing will be assessed a 15% administrative fee and $300 public noticing fee.
26 CITY OF FORTUNA
COMMUNITY DEVELOPMENT FEE SCHEDULE
Fee Description FY 23-24 Fee
Proposed
Changes FY 24-25 Fee
Major Subdivision $625.00* $4,675.00 $5,300.00
Zone Reclassifications (also called Re-Zoning) $775.00* $525.00 $1,300.00 General or Specific Plan Amendment $775.00* $825.00 $1,600.00 Annexations $775.00* $3,725.00 $4,500.00
CEQA EIR Actual cost $3,000.00
CEQA Negative Declaration or Mitigated Negative Declaration NEW FEE $2,500.00 CEQA Initial Study Actual cost $1,000.00
Surveyor Map Checking Actual cost Actual cost
Outside City Limits Connection to Water/Wastewater System $1,000.00 $500.00 $1,500.00 Certificate of Compliance $500.00* $1,300.00 $1,800.00
SB 9 2-Unit Development $450.00 $650.00 $1,100.00
SB-9 Lot Split $1,000.00 $2,300.00 $3,300.00
ADMINISTRATIVE HEARING
Use Permit $200.00 REMOVE
ASSEMBLAGE USE PERMIT (Per 17.54.070)
Under 500 $125.00 REMOVE
500+ $275.00 REMOVE
Modifications & Extensions $150.00 REMOVE
Appeal of a Decision $425.00 REMOVE
SMALL CELL WIRELESS FACILITIES
Application Fee (up to 5 small wireless facilities as defined by 47 C.F.R. §
1.6002)
$500.00 $500.00
Each Additional Small Wireless Facility $100.00 $100.00 Lease of City Facilities for Small Cell Wireless Installation, including Right of Way Access Fee or Fee for attachment to City-owned Structures $270 per year $270 per year
New Pole Installation in the City Right of Way $1,000.00 $1,000.00
CITY MAP CHECKING
Parcel Map $325.00* $325.00*
Final Map $425.00* $425.00*
27 CITY OF FORTUNA
COMMUNITY DEVELOPMENT FEE SCHEDULE
Fee Description FY 23-24 Fee
Proposed
Changes FY 24-25 Fee
ENGINEERING PLAN CHECKING
$0 to $100,000 1.00% of
improvement
cost*
1.00% of
improvement
cost*
$100,001 to $200,000 0.75% of
improvement
cost*
0.75% of
improvement
cost*
Greater than $200,000 0.50% of
improvement
cost*
0.50% of
improvement
cost*
ENGINEERING INSPECTION FEE
$0 to $100,000 1.00% of
improvement
cost*
1.00% of
improvement
cost*
$100,001 to $200,000 0.75% of
improvement
cost*
0.75% of
improvement
cost*
Greater than $200,000 0.50% of
improvement
cost*
0.50% of
improvement
cost*
Record Drawings (As-built) Deposit $3,000.00 $3,000.00
Conditions of Approval Compliance Deposit equal to
permit fee*
Deposit equal to
permit fee*
Subdivision Construction Agreement $500.00 plus
bonding
$500.00 plus
bonding
Abandonment of a Right-of-Way $275.00 $275.00
Rebate and Payback Agreements $325.00 $325.00
Special Engineering Studies & Review Actual cost Actual cost Encroachment Permit (project value under $5,000) $75.00 $75.00 Encroachment Permit (project value $5,000 and over) $125.00 $125.00 28 CITY OF FORTUNA
COMMUNITY DEVELOPMENT FEE SCHEDULE
Fee Description FY 23-24 Fee
Proposed
Changes FY 24-25 Fee
Oversize Load Permit $75.00 $75.00
Special Events Permit $75.00 $75.00
Nonprofit $50.00 $50.00
Street Closure Permit $75.00 $75.00
Nonprofit $50.00 $50.00
Chamber of Commerce Holiday Signage $25.00 $25.00
Overhead Banners in Public Right-of-way $50.00 $50.00
Downtown Parking In-Lieu Fee $2,180.00 $2,180.00
2. DEVELOPMENT REVIEW - SEISMIC FEE & SB1473 FEE
Group R-3 (Residential) occupancies, as defined in the current California Residential Code, one to three stories in height, except hotels and motels $13.00 per
$100,000.00
(min. of $0.50)
$13.00 per
$100,000.00
(min. of $0.50)
All other buildings as defined in the California Building Code $28.00 per $100,000.00
(min. of $0.50)
$28.00 per
$100,000.00
(min. of $0.50)
SB 1473 - Charged per $25,000 valuation $ 1.00 $ 1.00
3. DEVELOPMENT REVIEW - DRAINAGE FEE
*To be charged at an hourly rate. Amount shown is to be used as a deposit. Staff efforts will be charged at staff’s fully burdened rate plus overhead rate. Additional deposit will be collected once the fee shown is reached. Maximum fee will be no more than one additional deposit or twice the percentage shown.
The following fees shall be collected by the City of Fortuna prior to the filing of any parcel map, final map, or prior to the issuance of any building permit. These fees shall be paid into the City's Drainage Facilities Fund. 29 CITY OF FORTUNA
COMMUNITY DEVELOPMENT FEE SCHEDULE
Fee Description FY 23-24 Fee
Proposed
Changes FY 24-25 Fee
A. Subdivisions
Vacant Parcels, charged per parcel $ 600.00 $ 600.00
Parcels developed prior to 1985, charged per square foot for all impervious surface coverage on the parcel
$ 0.32 $ 0.32
B. Building Permits
Drainage Fee*, charged per square foot of impervious surface coverage** created.
$ 0.32 $ 0.32
4. DEVELOPMENT REVIEW - TRAFFIC IMPACT FEES
A. Traffic impact fees - Home Avenue
Subdivisions, charged per parcel $ 2,137.50 $ 2,137.50
Building Permits, charged per new dwelling. * A customer shall receive a credit for any fees paid under section 4 (A) titled "Subdivisions". $ 4,275.00 $ 4,275.00
* A drainage fee calculated upon the issuance of a building permit shall be reduced by the amount of the drainage fee paid for drainage improvements constructed for the parcel. The reduced building permit drainage fee shall only apply to the initial building permit approved for the development of the parcel. All subsequent building permits for the construction of buildings or additions and modifications shall pay the building permit drainage fee for that additional work. ** The amount of impervious surface coverage created by new structures included in building permit applications or existing when a subdivision application is approved shall be determined by the Building Official. Impervious surface coverage shall include residential dwellings and accessory structures, commercial buildings, garages, carports, parking lots, driveways, sidewalks, and other such impermeable surfaces.
The following fees shall be collected by the City of Fortuna from all property located on Home Ave. or any street or private drive that connects to Home Ave. as described in Resolution 90-14 prior to the filing of any parcel map, final map, or prior to the issuance of any building permit for a dwelling.
30 CITY OF FORTUNA
COMMUNITY DEVELOPMENT FEE SCHEDULE
Fee Description FY 23-24 Fee
Proposed
Changes FY 24-25 Fee
B. Traffic impact fees - Hillside Drive
Subdivisions, charged per parcel $ 1,310.00 $ 1,310.00
Building Permits, charged per new dwelling. * A customer shall receive a credit for any fees paid under section 4 (B) titled "Subdivisions". $ 2,620.00 $ 2,620.00
5. DEVELOPMENT REVIEW - ARTERIAL AND COLLECTOR ROAD EXTENSIONS AND EXPANSIONS Subdivisions, charged per vacant parcel $ 305.00 $ 305.00 Building Permits, charged per new dwelling. * A customer shall receive a credit for any fees paid under section 5 titled "Subdivisions". $ 610.00 $ 610.00
6. ADMINISTRATIVE ADJUSTMENTS
The City Manager shall have the authority to adjust the aforementioned fees when special circumstances indicate that the fee being charged according to this Resolution is clearly inappropriate. In addition, the City Manager shall have the authority to determine the fee amount for a City service that is not addressed in this Resolution based upon the actual cost of providing the service and / or the actual cost for the City to issue a permit.
The following fees shall be collected by the City of Fortuna from all property located on Hillside Drive or any street or private drive that connects to Hillside Drive as described in Resolution 95-07 prior to the filing of any parcel map, final map, or prior to the issuance of any building permit for a dwelling.
A fee established under this Section shall be for all residential developments within the City with the exception of those properties that pay the Home Avenue Fee or the Hillside Drive Fee.
31 CITY OF FORTUNA
WATER AND WASTEWATER LABORATORY FEE SCHEDULE
Fee Description FY 23-24 Fee
Proposed
Changes FY 24-25 Fee
1. WATER AND WASTEWATER LABORATORY FEES
A. Lab Tests
BOD $ 50.00 $ 50.00
TSS / MLSS $ 42.50 $ 42.50
Coliform PA $ 35.00 $ 35.00
Coliform Quanti-Tray $ 40.00 $ 40.00
Coliform 3 x 5 $ 60.00 $ 60.00
Cancellation Fee $ 20.00 $ 20.00
Percent & Volatile Solids $ 25.00 $ 25.00
Electrical Conductivity $ 27.50 $ 27.50
Turbidity $ 35.00 $ 35.00
2. ADMINISTRATIVE ADJUSTMENTS
The City Manager shall have the authority to adjust the aforementioned fees when special circumstances indicate that the fee being charged according to this Resolution is clearly inappropriate. In addition, the City Manager shall have the authority to determine the fee amount for a City service that is not addressed in this Resolution based upon the actual cost of providing the service and / or the actual cost for the City to issue a permit.
61