GENERAL PLAN ANNUAL PROGRESS REPORT – 2023
Introduction

State law requires all cities and counties in California to adopt a General Plan, comprised at minimum of seven mandated “Elements,” that addresses physical development within its jurisdiction.

The table below shows the State-mandate elements and their counterparts in the Foster City General Plan.

State-Mandated Elements Corresponding Foster City General Plan Elements
Last Updated
Land Use
Circulation
Land Use and Circulation Element Full adoption February 1, 2016.

Updated some policies to be consistent with
National Pollutant Discharge Elimination
System (NPDES) Permit related to green
infrastructure on September 3, 2019.

Housing Housing Adopted May 2023.

Open Space Parks and Open Space September 2009.

Conservation Conservation Full adoption in September 2009.

Updated some policies to be consistent with
National Pollutant Discharge Elimination
System (NPDES) Permit related to green
infrastructure on September 3, 2019.

Safety Local Hazard Mitigation Plan (LHMP) and
Safety Element Update
LHMP on December 13, 2021.

Safety Element was updated and adopted in
August 2023.

Noise Noise May 1993.

General Plan Implementation

This Annual Progress Report was presented to the Planning Commission on February 15, 2024, and City Council on March 4, 2024. Planning Department staff worked with other City departments in assessing the programs of the different Elements of the General Plan and prepared this General Plan Annual Progress Report. The table below includes measures associated with the implementation of the General Plan with specific reference to individual elements of the General Plan:

PROGRAM PROGRAM DESCRIPTION STATUS/PROGRESS IN 2023 DEPT CHAPTER 3: LAND USE AND CIRCULATION ELEMENT-ADOPTED FEBRUARY 1, 2016 LUC-A-3-a
Continue Code Enforcement Program. The City will continue its code enforcement program to ensure that residential, commercial and industrial properties are maintained. This responsibility will include, but not be limited to, periodic spot checks of property throughout the City and follow-up investigation of property maintenance complaints.

Property maintenance standards shall be enforced, including weed abatement, painting/staining of buildings, trash and debris removal from yards, and planting and maintenance of landscaping.

Responsibility: Community Development Department.

Timeframe: Current and ongoing.

The City initiated the “See-Click-Fix”
program in 2016 to more efficiently
handle complaints and enforcement.

Code enforcement of property
maintenance standards is an ongoing
responsibility of the Community
Development Department.

In 2023, See-Click-Fix handled 1,477
cases.

Promotion of See-Click-Fix and other
communications were expanded
through:
● Dedicated social media posts
on a monthly basis from
August 2023-December 2023
via Facebook and Twitter
● Videos – Mayoral Minute
Episode 1 (1/26/23), Foster City
@ Work Episode 3 (9/14/23
and 9/28/23)
● Community Annual Report was
promoted in the newsletter
12/14/23 and 12/28/23
CDD
LUC-C-12-a
Periodic Monitoring of Land Uses Throughout the City.

Periodically monitor land uses throughout the City to determine when changes in land use may be appropriate, actual land use practices, economic practicality of maintaining current land uses and level of property maintenance. Specific future actions might include:
a. Revitalization of older neighborhood retail centers.

On November 2, 2023, the Planning
Commission approved a Use Permit to
allow the demolition of an existing
20,737 square foot building and
construction of a new 190,000 square
foot, five-story, research and
CDD-CM
PROGRAM PROGRAM DESCRIPTION STATUS/PROGRESS IN 2023 DEPT b. Changes in land use designations and zoning where necessary to respond to changes in economic conditions and/or City needs.
c. Meeting with property owners to discuss possible
redevelopment opportunities and constraints, especially in the Chess Drive/Hatch Drive area and along the northeast side of Foster City Boulevard.

Responsibility: Planning and Code Enforcement Division and Planning Commission.

Timeframe: Current and ongoing.
development building in the south
campus of the Gilead Sciences
Integrated Campus Master Plan located
at 331 Lakeside Drive (UP2023-0079).

In 2023, the City rezoned several sites
listed in the sites inventory in the
Housing Element 2023-31 to be
consistent with the capacity in the sites
inventory. These zoning map changes
are explained in Housing Element
Appendix D. Links to the various
ordinances are in Housing Element
Appendix H.

LUC-E-2-a
Plan Consultation and Consistency. Maintenance, planning, and design of projects affecting the transportation system shall be consistent with local bicycle, pedestrian, transit, multimodal, and other relevant plans, except that where such consistency cannot be achieved without negative consequences, consistency shall not be required if the head of the relevant department provides written approval explaining the basis of such deviation.

Responsibility: Community Development Department and Public Works Department
Timeframe: Current and Ongoing
Ongoing. All City projects proposed in
the Capital Improvement Program each
Fiscal Year are developed consistent
with the General Plan and also reviewed
by the Planning Commission for
consistency. Work on a bicycle and
pedestrian master plan is scheduled to
begin in FY 2024-25.

PW
CDD
LUC-E-2-b
Street Network/Connectivity. As feasible, Foster City shall incorporate Complete Streets infrastructure into existing streets to improve the safety and convenience of users and to create employment, with the particular goal of creating a connected network of facilities accommodating each category of users and increasing connectivity across jurisdictional boundaries and for existing and anticipated future areas of travel origination or destination.

Ongoing. All City and development
projects incorporate, where feasible,
Complete Streets infrastructure.

Council approved installation of
sharrows on Class III bike routes to be
installed as streets have pavement
rehabilitation.

PW
CDD
PROGRAM PROGRAM DESCRIPTION STATUS/PROGRESS IN 2023 DEPT

Responsibility: Community Development Department and Public Works Department
Timeframe: Current and Ongoing
In August 2023, CIP 703 constructed
new bike lanes along Shell Blvd. from
Shell Bridge to Beach Park Blvd.

LUC-E-2-c
Bicycle and Pedestrian Advisory Consultation. Transportation projects shall be reviewed by the Traffic Review Committee early in the planning and design stage, to provide comments and recommendations regarding Complete Streets features to be incorporated into the project.

Ongoing. Traffic related items (traffic
improvement requests, relevant CIP
projects, etc.) are taken to the Traffic
Review Committee for
recommendation to the City Council
prior to approval.

On February 9, 2021, the City Council
approved the installation of a
temporary Class II Bikeway along
Edgewater Boulevard between Beach
Park Blvd. and Baffin Street to provide
another alternative route for cyclists
while the Levee Improvement Project
is under construction. The temporary
Class II Bikeway was installed in
March 2021 and will be considered for
permanent installment at the
completion of the Levee Project
anticipated in January 2024.

PW
CDD
LUC-E-2-d
Evaluation. All relevant agencies or departments shall perform evaluations of how well the streets and transportation network of Foster City are serving each category of users by collecting baseline data and collecting follow-up data on a regular basis.

The Metropolitan Transportation
Commission’s Pavement Management
Technical Assistance Program (P-
TAP) provides the City with various
resources to understand its pavement
condition. Through P-TAP, pavement
consultants are hired to inspect City
streets and update the PMP database
every two to three years. The program
PW
CDD
PROGRAM PROGRAM DESCRIPTION STATUS/PROGRESS IN 2023 DEPT helps determine the most cost-
effective treatment to extend the life of
the roadways. The City was awarded
a PTAP grant for the FY23-24. The
pavement assessment for FY23-24 is
being performed by Adhara Systems,
Inc. and is anticipated to be completed
by June 2024.

LUC-E-2-e
Leadership Approval for Exemptions. Projects that seek Complete Streets and/or Green Streets exemptions must provide written finding of why accommodations for all modes that were not included in the project and signed off by the Public Works Director or equivalent high level staff person. Projects that are granted exceptions must be made publicly available for review. Federal guidance on exceptions can be found from the Federal Highway Administration (FHWA) Accommodating Bicycle and Pedestrian Travel
http://www.fhwa.dot.gov/environment/bicycle_pedestrian/guidance/desi gn_guidance/design.cfm
No requests for exemption from
Complete Streets requirements were
received in 2023.

PW
CDD

LUC-E-7-a
Transit System Infrastructure. The City will work with transit providers to facilitate the maintenance and upgrade of the transit system infrastructure to enhance public use, including:
a. Transit stops and bus lanes that are safe, convenient, clean and efficient;
b. Accessible transit stops that have clearly marked street- level designation;
c. Transit stops that are safe, sheltered, clean, and well lit;

d. Transit stops that are located along corridors within mixed-use or transit-oriented development areas.
e. Use of Green Infrastructure and Green Streets features where applicable.

In 2023/2024 Staff participated in
SamTrans Bus Stop Improvement Plan
(BSIP) Public Agency Working Group
meetings and reviewed Draft Bus Stop
Design Guidelines.

PW
CDD
PROGRAM PROGRAM DESCRIPTION STATUS/PROGRESS IN 2023 DEPT LUC-E-7-b
Public Transit Information. The City will provide information regarding public transit at City Hall, the Recreation Center, the City’s web site, and other locations to promote the use of public transit.

Public transit information is provided at
City buildings and on the City’s website.

CDD
CM
LUC-E-7-b

Designation of New Bus Routes. The City will work with transit providers to designate new bus routes, provide curbside space for bus stops, and require major commercial/industrial developments along bus routes to accommodate buses in their circulation plans.

Bus turnouts or shelters will also be required to be provided by the development.

In August 2023, Staff attended
SamTrans Bus Stop Improvement Plan
(BSIP) Public Agency Working Group
meetings and reviewed Draft Bus Stop
Design Guidelines.

PW
CM
CDD
LUC-E-8-a
Bicycle and Pedestrian Access. Make it a condition of approval that new, large-scale developments address transit, biking and walking access to the site.

Ongoing as a part of development
review. In 2023, the City adopted bicycle
parking requirements and development
standards for bicycle parking and
storage facilities.

CDD
LUC-E-8-b
Development Standards for Bicycles. The City will establish standards for new development and redevelopment projects to support bicycle use, including:
a. Develop standards for safe pedestrian and
bicyclist accommodations, including:
i. “Complete Streets” policies that foster equal access by all users in the roadway design;
“Green Streets” policies that serve to treat stormwater and include additional environmental benefits;
iii. Bicycle and pedestrian access internally and in connection to other areas through easements;
iv. Safe access to public transportation and other non- motorized uses through construction of dedicated paths; v. Safe road crossings at major intersections.

Development of standards are
included in the Bicycle, Pedestrian and
Intersection Evaluation Study prepared
in 2017 and adopted by the City
Council on February 5, 2018. A Bicycle
and Pedestrian Master Plan is
scheduled to begin work in FY24-25.

Ongoing. Council approved installation
of sharrows on Class III bike routes to
be installed as streets have pavement
rehabilitation.

In 2023, the City adopted bicycle
parking requirements and development
standards for bicycle parking and
storage facilities.

PW
CDD
PD

LUC-E-9-a Pedestrian and Bicycle Safety. Provide safe and convenient access for pedestrians and bicyclists to, across, and along major roadways. The A Bicycle, Pedestrian and Intersection
Study was prepared in 2017 and
PW
PROGRAM PROGRAM DESCRIPTION STATUS/PROGRESS IN 2023 DEPT City shall conduct a study of all intersections in the City from a comprehensive perspective which would consider the needs of pedestrians, bicyclists and motorists. The study will include an examination of potential options to address not only current conditions but also conditions anticipated by future development, including enforcement of traffic laws applicable to pedestrians and bicycles. The City will also prepare a study that reviews highly used intersections by pedestrians that are going to Foster City schools and recreational amenities such as the levee and parks and identify ways to increase pedestrian safety at those intersections.
adopted by the City Council on
February 5, 2018.

Council approved installation of
sharrows on Class III bike routes to be
installed as streets have pavement
rehabilitation.

Ongoing. The City continues to
implement improvements as
recommended from the Study.

A Bicycle and Pedestrian Master Plan
is schedule to begin work in FY24-25.

As part of the Levee Improvements
Project, a temporary Class II Bikeway
along Beach Park Blvd between Teal
Street and Foster City Boulevard was
installed to provide an alternative route
for cyclists while the Levee
Improvements Project is under
construction through January 2024.

CDD
PD
LUC-E-9-b
Bicycle Route and Pedestrian Path Improvement Program. The City shall conduct a study with the following goals: 1) identify bike routes that may need enhancements that would increase cyclist safety going to schools, parks, shopping center or civic areas; and 2) identify major thoroughfares and any enhancements to those roadways that would allow cyclists to get to the levee and other common destinations safely. The purpose of the bicycle route system is to connect major work, shopping, school, civic, and recreational destinations throughout the City, while avoiding as many of the most heavily used street segments as possible.

A Bicycle, Pedestrian, and Intersection
improvement Study was prepared in
2017 and adopted by the City Council on
February 5, 2018.

Council approved installation of
sharrows on Class III bike routes to be
installed as streets have pavement
rehabilitation.

The City continues to implement
improvements as recommended from
the Study.

PW
CDD
PR
PROGRAM PROGRAM DESCRIPTION STATUS/PROGRESS IN 2023 DEPT A Bicycle and Pedestrian Master Plan is
scheduled to begin work in FY24-25.

LUC-F-1-a
System Monitoring. The City will monitor traffic and congestion to determine when and where the City needs new transportation or circulation facilities in order to increase access and efficiency.

Ongoing.

Construction of the Traffic Signals at
various Intersections – CIP 301-681, was
completed and Notice of Completion is
planned for February 2024.

PW

LUC-F-1-b
Signal Synchronization. The City will review signal timing programs to enhance traffic flow and efficiency and determine where emissions reduction benefits can be demonstrated, including maintenance of the synchronization system, and will coordinate with adjoining jurisdictions as needed to optimize transit operation while maintaining a free flow of traffic.

Ongoing PW

LUC-F-1-c
Periodically Monitor Traffic Conditions. The City will periodically monitor traffic conditions on arterial and selected collector streets to determine levels of service and safety conditions. Traffic counts will be updated and visual monitoring performed regularly at all major street intersections to determine levels of service, safety conditions, and if additional traffic control measures are warranted or if changes in the sequence of traffic signal cycles are necessary.

Ongoing
Construction of the Traffic Signals at
various Intersections – CIP 301-681, was
completed and Notice of Completion
planned for February 2024.

PW

LUC-F-1-d
Traffic Calming. Develop guidelines for traffic calming techniques, as needed, including incorporation of Green Infrastructure (including Green Streets features).

Speed Survey (E&TS) conducted in
November of 2023 to evaluate existing
speed limits. On December 18, 2023, the
City Council adopted the speed limits in
the 2023 E&TS.

The City has been working in
conjunction with the San Mateo County
Transportation Authority (SMCTA),
City/County Association of
Governments (C/CAG), Caltrans, and
the City of San Mateo on the US
101/SR 92 Interchange Area
Improvement Project (Short-Term
PW
CDD

PROGRAM PROGRAM DESCRIPTION STATUS/PROGRESS IN 2023 DEPT project) and the US-101/SR-92 Direct
Connector (Long-Term project).

Council approved installation of
sharrows on Class III bike routes to be
installed as streets have pavement
rehabilitation.

A Bicycle, Pedestrian, and Intersection
Study was prepared in 2017 and
adopted by the City Council on
February 5, 2018. A Bicycle and
Pedestrian Master Plan will be prepared
in FY24-25.

The City continues to implement
improvements as recommended from the
Bike and Pedestrian Study.

A Bicycle and Pedestrian Master Plan is
scheduled to begin work in FY24-25.

LUC-F-2-a
Implementation of Traffic Reduction Programs.

As appropriate, require new non-residential developments to include a traffic reduction strategy with a variety of methods to reduce single- occupancy vehicles, provided programs exist.

Transportation Demand Management
programs are required in all new non-
residential developments.

CM
CDD
LUC-F-3-a
Employer Shuttle Fair-Share. Include as a condition of approval that employers shall fund, at a level commensurate with the transit demand, new or expanded employee shuttle services to transit hubs on the Peninsula and, if applicable, in the East Bay.

Responsibility: Community Development Department
Timeframe: Upon adoption of the Land Use and Circulation Element Ongoing as part of development review. CDD
LUC-F-3-b
Vintage Park Transit Service. As areas are redeveloped, the City shall encourage transit providers to re-route bus lines or designate a new bus line to serve employees of this development, as appropriate.

Gilead Sciences has instituted a robust
Transportation Demand Management
program, including the launch of the
CDD
PROGRAM PROGRAM DESCRIPTION STATUS/PROGRESS IN 2023 DEPT The City has provided some existing curbside areas for bus stops, and new ones shall be provided by the developer as needed. The City shall consult with SamTrans and AC Transit to determine the optimum routes for a new bus line(s).

Responsibility: Community Development Department and Public Works Department.

Timeframe: Prior to completion of Vintage Park.

Gilead Commuter Bus Program on
December 1, 2016. Every year CDD staff
reviews TDM monitoring letter sent by
Gilead to ensure that the project is well
below the vehicle trip threshold as stated
in the TDM plan.

LUC-G-1-a
Parking Requirements. Re-evaluate parking requirements in the Zoning Ordinance to ensure that they are adequate but not excessive, in order to ensure that they do not unnecessarily increase the cost of developments or promote a surplus of parking.

Responsibility: Planning and Code Enforcement Division
Timeframe: Upon completion of the Land Use and Circulation Element Update.

On December 18, 2023, the City Council
approved amendments to the Municipal
Code to reduce guest parking
requirements by 50% to ensure that they
do not unnecessarily increase the cost of
developments or promote a surplus of
parking.

CDD
LUC-G-2-a
Low Emission Vehicles. The City will support and promote the use of low-emission vehicles, by:
a. Encouraging the necessary infrastructure to encourage the use of low-emission vehicles (LEV) and clean alternative fuels, such as development of electric vehicle charging facilities and conveniently located alternative fueling stations;
b. Encouraging new construction to include vehicle access to properly wired outdoor receptacles to accommodate LEV and/or plug in electric hybrids (PHEV);
c. Encouraging transportation fleet standards to achieve the lowest emissions possible.

Responsibility: City Manager’s Office, Community Development Department, Public Works Department, Parks and Recreation Department and other fleet operators
Private EV charging initiatives have
been included as eligible projects for
Community Benefit funding.

In FY23-24, the City Council approved
participating in the Peninsula Clean
Energy Gov EV Program, which will be
identifying and planning for the
infrastructure requirements and vehicle
capacity to increase the EV share in the
City’s fleet during 2024.

In 2023, 148 solar permits and 30 EV
charging stations permits were issued –
all in private homes.

The City reviews the requirements for all
new vehicles purchased for its own fleet
CDD
CM
PW
PARKS

PROGRAM PROGRAM DESCRIPTION STATUS/PROGRESS IN 2023 DEPT Timeframe: As appropriate with new or modified development. to determine whether there is an EV or hybrid option for the type of use needed.

The 2023 Draft Climate Action Plan
(CAP) Update includes measures
related to decarbonizing transportation
in Foster City, specifically increasing
the share of ZEV passenger vehicles to
30%. Additionally, the CAP includes
encouragement for bicycling and
micromobility as an alternative to
vehicle travel, further decreasing
vehicle emissions.

LUC-H-1-a
Green Building Guidelines and Incentives. The City will support the use of green building practices by:
a. Providing information, marketing, training, and technical assistance about green building practices;
b. Considering guidelines for green building practices in residential and commercial development; and
c. Implementing sustainable practices where feasible in public buildings and spaces.

Responsibility: Community Development Department
Timeframe: Upon completion of the Land Use and Circulation Element Update
In 2023, the City established “Express
Plan Review” for all Solar and Electric
Charging permits. A total of 148 Solar
permits were issued, 30 EV Charging
electrical permits were issued, and a
total of 12 solar rebates were issued in
2023.

PW
CDD

LUC-H-2-a
Climate Action Plan. The City will prepare, adopt and implement a comprehensive Climate Action Plan (CAP) to achieve its fair share of statewide emissions reductions for the 2020 timeframe consistent with AB32. The CAP will specify the strategies, measures and actions to be taken for each inventory sector (transportation, electricity, solid waste, etc.) to achieve the overall emission reduction target, and include an adaptive management process that can incorporate new technology and In 2023, the City conducted extensive
community outreach in conjunction with
consultants and the Citizens
Sustainability Advisory Committee. The
Draft 2023 Foster City Climate Action
Plan Update was completed in
November 2023, incorporating measures
CDD
CM
PROGRAM PROGRAM DESCRIPTION STATUS/PROGRESS IN 2023 DEPT respond when goals are not being met.

Responsibility: City Manager’s Office and Community Development Department
Timeframe: Upon completion of the Land Use and Circulation Element Update
to lower the City’s Greenhouse Gas
emissions to 49% below 2005 levels by
2030.

LUC-H-2-b
Vehicle Idling. The City will enforce State idling laws for commercial vehicles, including delivery and construction vehicles.

Responsibility: Police Department
Timeframe: Current and Ongoing
Ongoing – largely complaint driven. POLICE
LUC-H-5-a
Tree and Landscape Program. Include requirements for tree and landscape planting in all new developments and redevelopment in design review and landscape guidelines.

Responsibility: Community Development Department
Timeframe: Upon completion of the Land Use and Circulation Element Update
Ongoing during development review. CDD
LUC-I-1-a
Enhance existing retail centers & opportunities. Promote retail opportunities through coordinated sign guidelines and way-finding programs to create a “sense of place” in older shopping centers.

Responsibility: Community Development Department
Timeframe: Upon completion of the Land Use and Circulation Element Sign Guidelines for various shopping
centers have been amended to enhance
retail opportunities, including review of
guidelines for;
Marketplace in 2017-18:

Edgewater Place: 1/15/2015
Marlin Cove: 8/16/01
Parkside Towers: 6/3/2015
Pilgrim Triton: 3/31/2016
CDD
CM
PROGRAM PROGRAM DESCRIPTION STATUS/PROGRESS IN 2023 DEPT Foster Square: 11/3/2016
Marketplace: 1/11/18
Illumina: 11/1/18
Beach Park Plaza 1/17/19
Metro Center: 11/4/2021
LUC-K-1-a
Monitor Neighborhood Retail Centers. To determine the viability of existing neighborhood retail centers, the City will monitor vacancies and the physical condition of these centers. A General Plan amendment would be necessary at the time conversion to any other use is considered.

Responsibility: Planning and Code Enforcement Division.

Timeframe: Current and ongoing.

In 2023 CDD staff has continued to
proactively monitor, respond to
complaints, and work closely with the
property managers of each of the 9 retail
centers located in Foster City. CDD staff
has conducted daily site visits to a retail
center and has received voluntary
compliance by property
owners/managers.

CDD
LUC-L-5-a
Parks Facilities Plan. The City shall adopt and regularly review a Parks Facilities Plan which addresses the need for new, and maintenance of existing, park facilities. This plan will be used as a basis for establishing needed park in-lieu fees and review of the City’s adopted Capital Improvements Program.

Responsibility: Parks and Recreation Department, Public Works Department and City Council.

Timeframe: Current and ongoing.

Ongoing as part of annual Capital
Improvements Plan.

The Recreation Center Rebuild Project
(RCRP) completed the Design
Development Phase on December 18,
2023, when Council approved the final
design and affirmed the project budget.

Per City Council direction, staff is
preparing to bring back the Project
budget for the City Council to consider
funding options to address the budget
shortage. A Temporary Facilities Plan
went to Council on November 6, 2023
for review and was accepted by the City
Council. Staff will prepare a Final
Temporary Facilities Plan for a City
PARKS
PROGRAM PROGRAM DESCRIPTION STATUS/PROGRESS IN 2023 DEPT Council meeting in February 2024 for
the City Council to approve a Request
for Proposal (RFP) for modular units.

The current Recreation Center is
expected to close at the end of August
2024 and operations transferred to
alternate buildings for the two-year
closure. The opening of the new
Recreation Center is anticipated to be
in June of 2026.

Staff developed an RFP for the Park
Master Plan project consultant and was
approved by the City Council at their
December 18, 2023, regular meeting.

The RFP is expected to be published in
January 2024 with a consultant hired by
May 2024.

LUC-L-9-a
Child Care Facility Regulations. Amend Title 17, Zoning, to require a Use Permit for large family day care homes providing care for nine to 14 children and day care centers providing care to over 14 children.

Responsibility: Community Development Department.

Timeframe: Begin amendment after update of Land Use and Circulation Element.

Completed CDD
LUC-L-10-a
Fire Department Annual Inspections. The Fire Department shall perform annual inspections and review new business license applications of all businesses in Foster City. The inspections should ensure, among other things, that all hazardous materials are handled properly and pertinent information regarding the materials is provided to the City.

Responsibility: Fire Department.

Ongoing. In 2023, SMC Fire had 108
inspections for new businesses across
San Mateo, Foster City, and Belmont. For
Foster City, SMC Fire reviewed 656 plans
and conducted 281 construction
inspections.

FIRE
PROGRAM PROGRAM DESCRIPTION STATUS/PROGRESS IN 2023 DEPT Timeframe: Current and ongoing.

LUC-L-11-a
Water System Improvements. Evaluate the condition and capacity of the water system each year to determine whether to include improvements to the water system in the Capital Improvement Program.

Responsibility: District Board, Public Works Department.

Timeframe: During annual Capital Improvement Program review.

Ongoing. Projects are added to the
Capital Improvement Program as
needed.

A Potable Water System Risk and
Resilience Assessment and updated
Emergency Response Plan were
certified to the Environmental
Protection Agency (EPA) in June and
December 2021 respectively. A
Tabletop Exercise of the Emergency
Response Plan was conducted in
October 2023 and an “After Action”
report was developed to guide future
improvement activities.

PW

LUC-L-13-a
Wastewater System Improvements. Evaluate the condition and capacity of the wastewater system each year to determine whether to include improvements to the wastewater system in the Capital Improvement Program.

Responsibility: District Board, Public Works Department.

Timeframe: During annual Capital Improvement Program review.

Ongoing. The Wastewater Collection
System Master plan was completed
and accepted by Council May 2020.

The study addresses repairs and
improvements over the next 20-year
period. Implementation of the projects
into the budget is ongoing.

Foster City is working with the City of
San Mateo to construct improvements
at the jointly owned wastewater
treatment plant. Startup and
commissioning of new treatment
facilities is targeted to be completed by
Summer 2024, followed by retrofit of
existing facilities and commissioning of
the integrated WWTP by the end of
2024.

PW

PROGRAM PROGRAM DESCRIPTION STATUS/PROGRESS IN 2023 DEPT CHAPTER 4: HOUSING ELEMENT – ADOPTED MAY 2023, REVIEW TABLE D OF THE APR FOR ALL HE PROGRAMS

CHAPTER 5: PARKS OPEN SPACE AND CONSERVATION ELEMENT – ADOPTED SEPTEMBER 2009 PC-a Periodic Recreation User Surveys. Encourage feedback from recreation program participants, facility users and the general community with periodic surveys.

Responsibility: Parks and Recreation Department.

Timeline: Current and ongoing.

In 2023, user surveys were conducted
during the design phase process of the
Recreation Center. Parks will conduct a
user survey in December regarding public
preference for a community garden.

PARKS
PC-b Respond to Changing Recreation Needs. Expand and diversify classes and activities to address new recreation trends and changing community needs.

Responsibility: Parks and Recreation Department.

Timeline: Current and ongoing.

Ongoing

PARKS
PC-c Implement the City of Foster City Bikeway System Report.

Implement the City of Foster City Bikeway System Report, adopted by the City Council on January 7, 1991.

Responsibility: Parks and Recreation Department, Public Works Department.

Timeline: Current and ongoing.

A Bicycle, Pedestrian and Intersection
Study was prepared in 2017 and
adopted by the City Council on
February 5, 2018. Implementation of
improvements is ongoing.

Council approved installation of
sharrows on Class III bike routes to be
installed as streets have pavement
rehabilitation.

The San Mateo County Civil Grand Jury
released a report on July 10, 2023,
recommending that all Cities update or
generate a new Bicycle and Pedestrian
Master Plan consistent with the C/CAG
PW
PARKS

PROGRAM PROGRAM DESCRIPTION STATUS/PROGRESS IN 2023 DEPT San Mateo County Comprehensive
Bicycle and Pedestrian Plan. In its
response to the Civil Grand Jury, Foster
City committed to do so by June 30,
2025.

PC-d Improve Facilities. Perform maintenance and specific improvements to parks and recreation facilities as identified in the Capital Improvement Program Five Year Plan.

Responsibility: Parks and Recreation Department, Parks and Recreation Committee.

Timeline: Current and Ongoing, Long-term
The Recreation Center Rebuild Project
(RCRP) completed the Design
Development Phase on December 18,
2023 when Council approved the final
design and affirmed the project budget.

Per City Council direction, staff is
preparing to bring back the Project
budget for the City Council to consider
funding options to address the budget
shortage. A Temporary Facilities Plan
went to Council on November 6, 2023 for
review and was accepted by the City
Council. Staff will prepare a Final
Temporary Facilities Plan for a City
Council meeting in February 2024 for the
City Council to approve a Request for
Proposal (RFP) for modular units. The
current Recreation Center is expected to
close at the end of August 2024 and
operations transferred to alternate
buildings for the two-year closure. The
opening of the new Recreation Center is
anticipated to be in June of 2026.

Staff developed an RFP for the Park
Master Plan project consultant and was
approved by the City Council at their
December 18, 2023, regular meeting.

The RFP is expected to be published in
January 2024 with a consultant hired by
PARKS

PROGRAM PROGRAM DESCRIPTION STATUS/PROGRESS IN 2023 DEPT May 2024.

PC-e Park Inspections. Perform and document monthly inspections of park amenities and infrastructure.

Responsibility: Parks and Recreation Department.

Timeline: Current and ongoing.

Ongoing PARKS
PC-f Playfield Inspections. Inspect playfields during weekly maintenance.

Responsibility: Parks and Recreation Department.

Timeline: Current and ongoing.

Ongoing PARKS
PC-g Levee Pedway Maintenance. Maintain the levee pedway, repairing and resurfacing when necessary.

Responsibility: Parks and Recreation Department, Public Works Department.

Timeline: Current and ongoing.

Construction is complete. Quarterly
inspections and landscape maintenance
will resume.

In September 2020, the construction of
the Levee Protection Planning and
Improvements Project (CIP 327-657)
began. Sheet pile installation for Phases
1, 2, and 3 is complete as well as
approximately 3 miles of concrete cap
work. The project is anticipated to be
complete in January 2024.

PARKS
PW

PC-h Existing Pedway Enhancement. Enhance the existing pedway system by providing observation points, water fountains, additional and replacement landscaping, trash cans, additional paved access points with hand rails and additional benches along the pathways.

Responsibility: Parks and Recreation Department, Public Works Department.

Timeline: Financing is undetermined, long-term.

Construction of the Levee Protection
Planning and Improvements Project CIP
327-657 will be completed in February
2024. The completed 6.5-mile pathway
ranges from 14-18 feet in width and
includes separate pedestrian and bicycle
lanes in each direction. New signage,
trash, and recycling containers,
observation points benches, picnic
tables, interpretive signage, and bicycle
PARKS
PW

PROGRAM PROGRAM DESCRIPTION STATUS/PROGRESS IN 2023 DEPT fix-it stations are installed along the
completed pathway.

PC-i Senior Activities. Maintain the existing senior center and continue to provide programs, activities and services to seniors at this facility.

Responsibility: Parks and Recreation Department.

Timeline: Current and ongoing.

Ongoing PARKS
PC-j Special Needs. Require that any improvements to open space lands be designed to accommodate people with special needs.

Responsibility: Community Development Department, Parks and Recreation Department.

Timeline: During Plan Review.

Ongoing PARKS
CDD
PC-k Public Access. Require dedication of open space lands or public access easements as a part of new development or redevelopment along the Bay or the Belmont Slough.

Responsibility: Community Development Department.

Timeline: During Plan Review.

Ongoing CDD
PC-l Wetlands Enhancement. Improve wetland areas in accordance with state and federal regulations to enhance the natural characteristics of the wetlands.

Responsibility: Community Development Department.

Timeline: During Plan Review.

Ongoing CDD
PROGRAM PROGRAM DESCRIPTION STATUS/PROGRESS IN 2023 DEPT PC-m Median Strip Planting. Continue to maintain median strip planting along major roadways and bridges in Metro Center, residential neighborhoods, and industrial areas in accordance with the Median Development Master Plan.

Responsibility: Parks and Recreation Department.

Timeframe: Current and Ongoing.

Ongoing PARKS
PC-n Architectural Review. Review all new development or improvement proposals through the City of Foster City’s architectural review process for: (1) Impacts on access to sunlight on public areas; (2) provision of street furniture and attractive landscaping in public open spaces; and (3) impacts on waterfront views.

Responsibility: Community Development Department, Parks and Recreation Department, Planning Commission and City Council.

Timeline: During Plan Review.

Ongoing CDD
PC-o Youth and Teen Activities. Continue to evaluate classes, services and programs for youth and teens and make changes when necessary to meet the changing recreational needs of these age groups.

Responsibility: Parks and Recreation Department
Timeframe: Current and Ongoing.

In 2023, seasonal camp field trips have
been brought back after three summers
without trips due to the COVID-19
pandemic. Wednesday enrichment has
been expanded to all four Foster City
elementary schools and Vibe amenities
have been upgraded.

PARKS
PC-p Youth Advisory Committee. Use the Youth Advisory Committee to promote meaningful involvement of the City of Foster City’s youth in evaluating park and recreation facilities and services.

Responsibility: City Council, Parks and Recreation Department Timeframe: Current and Ongoing
The Committee’s 2023 goals were to
encourage waste consciousness by
creating a challenge and hosting an event
at the library. The Committee also hosted
a fundraiser with all donations going to a
food bank.

PARKS
PC-r Parks and Recreation Committee. Use the Parks and Recreation Committee to advise the City of Foster City and the Parks and Ongoing PARKS
PROGRAM PROGRAM DESCRIPTION STATUS/PROGRESS IN 2023 DEPT Recreation Department on proposed park projects and recreational programs.

Responsibility: Parks and Recreation Department
Timeframe: Current and Ongoing.

PC-s Shoreline Band. Work with the Bay Conservation Development Commission and the Association of Bay Area Governments to protect and enhance the 100-foot shoreline band for conservation and recreation.

Responsibility: Community Development Department and the Parks and Recreation Department.

Timeline: Current and Ongoing.

BCDC requirements have been
conducted as part of the development of
the plans for the Levee Improvement
project.

CDD
PARKS
PC-t Court Resurfacing. Resurface and paint tennis and basketball courts every five years or as necessary in conjunction with the CIP Five Year plan.

Responsibility: Parks and Recreation Department
Timeline: Current and Ongoing.

Ongoing PARKS
PC-v Bay Trail. Work with the Bay Conservation Development Commission and all other applicable agencies to develop a Bay Trail System.

Responsibility: Community Development Department and the Parks and Recreation Department
Timeframe: Current and Ongoing.

Ongoing PARKS-
CDD
PC-x Cultural Arts. Seek to provide a wide variety of cultural arts in the City of Foster City through classes, concerts, and special events.

Responsibility: Parks and Recreation Department
Ongoing

The City continues to offer enriching
classes and supports cultural events
through the Interdepartmental Evaluation
Committee (IDEC) process.

PARKS
PROGRAM PROGRAM DESCRIPTION STATUS/PROGRESS IN 2023 DEPT Timeframe: Current and Ongoing.

PC-y Special Events. Work with organizations to hold a wide variety of special events in the City of Foster City including the Art and Wine Festival, Fourth of July Celebration, Concert in the Park Series and other special events.

Responsibility: Parks and Recreation Department and City Council.

Timeframe: Current and Ongoing.

Ongoing
City staff continue to work with
partnering organizations to support City
sponsored and non-City sponsored
programming through the City’s
interdepartmental Evaluation Committee
(IDEC) process.

PARKS
PC-z Recreation Programs and Services Outreach. Provide information on the available classes and programs offered through the City of Foster City by using The Guide, handouts at City Hall and the Recreation Center and by posting information on the City of Foster City’s web page.

Responsibility: Parks and Recreation Department
Timeframe: Current and Ongoing.

Ongoing PARKS
PC-qq

Lagoons and Waterways: Recreational Opportunities. Promote the use of the lagoon for recreational purposes by allowing special events to occur on the lagoon, maintaining public beaches and boat ramps for access to the lagoon and maintaining the lagoon for use by boaters and windsurfers.

Responsibility: Parks and Recreation Department
Timeframe: Current and Ongoing.

Ongoing. The City continues to prioritize
lagoon safety messaging through a
targeted “Be Aware and Share” public
education campaign to promote
awareness of all recreational lagoon
users – swimmers and boaters.

PARKS
PC-bb Shared Use Facilities. Continue to work with the San Mateo-Foster City School District to share facilities with the school district and provide activities and programs at schools within the City of Foster City.

Responsibility: Parks and Recreation Department
Timeframe: Current and Ongoing
The Joint Use Agreement (JUA) between
SMFC School District and City of Foster
City was executed on May 1, 2023. Staff
worked with the district on providing
space on City’s sports fields for Bowditch
Middle School’s afterschool sports teams
during construction of the Recreation
PARKS
PROGRAM PROGRAM DESCRIPTION STATUS/PROGRESS IN 2023 DEPT Center. The district also agreed to host a
middle school cross country meeting
along the Bay Trail. Foster City Parks and
Recreation Department was the recipient
of the School District’s City Partnership
Award. Quarterly check-ins between city
staff and school district staff will be
provided to ensure communication lines
are open.

PC-cc Maintenance of Lagoon Pathways. Develop a program to identify which parties are responsible for maintenance of the areas adjacent to the lagoon.

Responsibility: Public Works/Engineering Department; Parks and Recreation Department, and the Community Development Department Timing: Long-term
Ongoing PARKS
PW
CDD

CHAPTER 6: NOISE ELEMENT – ADOPTED MAY 1993
N-a Noise Ordinance and Vehicular Noise Abatement Publicity and Staff Training. Provide publicity regarding the Noise Ordinance and train Police, Public Works and Community Development Department personnel as needed in the use of noise measurement equipment to enforce the Noise Ordinance and vehicular noise standards, and to monitor noise levels throughout the City.

Responsibility: Police Department, Community Development Department and Public Works Department.

Timeline: Ongoing
Ongoing POLICE
PROGRAM PROGRAM DESCRIPTION STATUS/PROGRESS IN 2023 DEPT N-c Purchase of City Vehicles and Equipment. The City will consider noise criteria in the purchase of new vehicles, their components and other equipment.

Responsibility: City Manager’s Department.

Timeline: Ongoing
Ongoing CM
PARKS
N-d Regulation of Special Events. The City will evaluate and improve control mechanisms to minimize the noise impacts of special events, including:
a. Planning for overflow potential (parking, crowds).
b. Establishment of citation mechanism.
c. Establishment of a formal review of past performance. d. Informing neighborhood residents about events.

Responsibility: Community Development Department, Police and Public Works Departments.

Timeline: 1993 and ongoing.

Ongoing. Special events are vetted
through IDEC to ensure minimal
community disruption and sufficient
notification is provided to the community.

The City’s Security Policy and ordinance
was updated by the Police Department.

CDD
POLICE
N-e Coordination of Complaint Information and Enforcement. The City will establish improved coordination of complaint information between the Planning, Police and Public Works Departments and will continue code enforcement programs.

Responsibility: Community Development Department, Police Department and Public Works Department.

Timeline: Ongoing
The City initiated the Foster City
Access “See-Click-Fix” program in
2016 to more efficiently handle
complaints and enforcement. Code
enforcement of property maintenance
standards is an ongoing responsibility
of the Community Development
Department.

In 2023, See-Click-Fix handled 1,477
total cases from all departments.

P.D. continues to respond to See-Click-
Fix reports of graffiti, parking complaints,
and traffic-related complaints.

Complaints received via email are vetted
CDD
POLICE
PROGRAM PROGRAM DESCRIPTION STATUS/PROGRESS IN 2023 DEPT and routed to the appropriate point of
contact.

N-f

Recology Contract. The City will review the hours of refuse collection operation for Recology and will establish and enforce performance standards as appropriate.

Responsibility: City Manager’s Department and City Council Timeline: Annually
In 2017, the City Council approved an
Amended and Restated Franchise
Agreement with Recology from January
1, 2021 to December 31, 2035, which
continues existing regulation of collection
hours. Staff continue to work with
reporting parties to ensure that collection
is maintained within allowable hours.

PW

N-g Airport Noise Mitigation. The City will work with the relevant agencies to minimize adverse noise impacts associated with expansion and ongoing operations at the San Francisco International Airport.

Responsibility: City Council
Timeline: Ongoing.

State law requires that once an airport
land use commission has adopted or
amended an ALUCP, local agencies
amend their general plans and any
applicable specific plans, as necessary,
in order to be consistent with the
ALUCP. Thus, staff included language
regarding ALUCP in the Safety Element
which was adopted on August 21, 2023.

ALUCP identifies portions of Foster City
within Airport Influence Areas A and B.

As described in the ALUCP, for Area A,
a real estate disclosure is required. For
areas of the city within Area B the Airport
Land Use Commission (the C/CAG
Board) would exercise its statutory duties
to review proposed land use policy
actions, including land development
proposals. The real estate disclosure
requirements would also be required.

All new residential development projects,
other than additions and accessory
dwelling units (ADUs), within the
CM
PROGRAM PROGRAM DESCRIPTION STATUS/PROGRESS IN 2023 DEPT Overflight Notification Zone 2 shall
incorporate a recorded overflight
notification requirement as a condition of
approval to provide a permanent form of
overflight notification to all future
property owners.

CHAPTER 7: SAFETY ELEMENT – ADOPTED AUGUST 2023
S-1.1 Ensure effective emergency response through established procedures, ongoing training programs, periodic exercises of the City's Emergency Operations Plan, and mutual aid agreements.

a. Maintain the City's Emergency Operations Plan, indicating responsibilities and procedures for responding to an emergency. b. Participate in general mutual-aid agreements and agreements with adjoining jurisdictions for cooperative response to fires, floods, earthquakes, and other disasters.

A Potable Water System Risk and
Resilience Assessment and updated
Emergency Response Plan were
certified to the Environmental Protection
Agency (EPA) in Juen and December
2021. A Tabletop Exercise of the
Emergency Response Plan was
conducted in October 2023 and an “After
Action” report was developed to guide
future activities.

FIRE
CDD
S-1.2 Plan for and provide facilities and materials anticipated to be needed to respond to emergencies.

Maintain the local government's emergency operations center in a full functional state of readiness.

As an infrastructure operator, designate a backup Emergency Operations Center with redundant communications systems.

Pre-position emergency power generation capacity (or have generation rental/lease agreement for these generators) in critical buildings to maintain continuity of government and services.

Ensure that critical intersection lights function following a loss of power by installing and maintaining battery back-ups and emergency generators.

Generators and pumps are inspected
and maintained year-round and funding
is set aside in the Equipment
Replacement Fund for proactive
replacement to ensure that equipment is
always ready to be deployed.

In 2023, standard operating procedures
for winter storm preparation were
reviewed and refined to ensure that the
City’s infrastructure is prepared for the
Winter Storm season.

FIRE
POLICE
PW

PROGRAM PROGRAM DESCRIPTION STATUS/PROGRESS IN 2023 DEPT Develop a plan for speeding the repair and functional restoration of water and wastewater systems through stockpiling of shoring materials, temporary pumps, surface pipelines, portable hydrants, and other supplies.

Provide emergency power at critical City facilities such as major sewer lift stations and lagoon pumps.

S-1.3 Provide police services necessary to maintain community order and public safety.

Provide adequate personnel, training, and equipment to support the provision of police services.

Review proposals for new and modified buildings for compliance with crime prevention requirements.

Ongoing POLICE
S-1.4 Prepare a recovery framework (prior to a disaster event) to help guide actions and priorities during and after a disaster event occurs.

Prepare a recovery framework (prior to a disaster event) to help guide actions and priorities during and after a disaster event occurs.

Consider and adopt regulations to guide response and recovery of City operations following a disaster event.

A Potable Water System Risk and
Resilience Assessment and updated
Emergency Response Plan were
certified to the Environmental Protection
Agency (EPA) in June and December
2021. A Tabletop Exercise of the
Emergency Response Plan was
conducted in October 2023 and an “After
Action” report was developed to guide
future activities.

FIRE
POLICE
CM
S-1.5 Anticipate the potential for disasters and ensure the ability to respond promptly, efficiently, and effectively, to provide continuity of services during and after an emergency.

Ongoing ALL

S-1.6 Minimize risks of potential hazards in the vicinity of SFO and San Carlos Airports.

State law requires that once an airport
land use commission has adopted or
amended an ALUCP, local agencies
amend their general plans and any
applicable specific plans, as necessary,
in order to be consistent with the
CDD

PROGRAM PROGRAM DESCRIPTION STATUS/PROGRESS IN 2023 DEPT Comply with the project referral, airspace protection, real estate transaction disclosure and overflight notification policies of the SFO and San Carlos ALUCPs
ALUCP. Thus, staff included language
regarding ALUCP in the Safety Element
which was adopted on August 21, 2023.

ALUCP identifies portions of Foster City
within Airport Influence Areas A and B.

As described in the ALUCP, for Area A,
a real estate disclosure is required. For
areas of the city within Area B the Airport
Land Use Commission (the C/CAG
Board) would exercise its statutory duties
to review proposed land use policy
actions, including land development
proposals. The real estate disclosure
requirements would also be required.

All new residential development projects,
other than additions and accessory
dwelling units (ADUs), within the
Overflight Notification Zone 2 shall
incorporate a recorded overflight
notification requirement as a condition of
approval to provide a permanent form of
overflight notification to all future
property owners.

S-1.7 Offer information and programs regarding emergency preparedness.

Continue to provide emergency preparedness classes and Community Emergency Response Team (CERT) training.

Continue educating the public about emergency preparedness, including schools, businesses, and community groups.

Ongoing FIRE

PROGRAM PROGRAM DESCRIPTION STATUS/PROGRESS IN 2023 DEPT S-1.8 Offer information and programs regarding seismic and geologic hazards, potential effects on buildings, and ways to mitigate these risks.

Include seismic safety education in City public education programs.

Assess non-structural seismic hazards as part of annual inspections of businesses.

Work with homeowners' associations to educate the need for earthquake- resistant connections when pipes enter and exit bridges and encourage the retrofit of these facilities.

Maintain a geotechnical report library at City Hall.

In 2023, SMC Fire began to conduct
annual vegetation/landscape inspection
of single-family homes.

CDD
FIRE
S-1.9 Educate the Public about Fire Hazards.

Provide fire education/prevention programs to the public, including schools, businesses, and community groups, through publications, training classes, and other means.

Ongoing FIRE

S-1.10 Educate the Public about Crime Prevention
Provide crime prevention programs to educate and involve the community, including but not limited to Security Surveys, Community Education, Social Media Outreach, and through the FC Civics Academy and FCPD Community Academy.

Ongoing POLICE
S-1.11 All new residential development projects other than additions and accessory dwelling units (ADUs) within Overflight Notification Zone 2 for the San Carlos Airport shall incorporate a recorded overflight notification requirement as a condition of approval pursuant to the San Carlos Comprehensive Airport Land Use Compatibility Plan for Environs of San Carlos Airport (San Carlos Airport Final ALUCP).

State law requires that once an airport
land use commission has adopted or
amended an ALUCP, local agencies
amend their general plans and any
applicable specific plans, as necessary,
in order to be consistent with the
ALUCP. Thus, staff included language
regarding ALUCP in the Safety Element
which was adopted on August 21, 2023.

CDD
PROGRAM PROGRAM DESCRIPTION STATUS/PROGRESS IN 2023 DEPT ALUCP identifies portions of Foster City
within Airport Influence Areas A and B.

As described in the ALUCP, for Area A,
a real estate disclosure is required. For
areas of the city within Area B the Airport
Land Use Commission (the C/CAG
Board) would exercise its statutory duties
to review proposed land use policy
actions, including land development
proposals. The real estate disclosure
requirements would also be required.

All new residential development projects,
other than additions and accessory
dwelling units (ADUs), within the
Overflight Notification Zone 2 shall
incorporate a recorded overflight
notification requirement as a condition of
approval to provide a permanent form of
overflight notification to all future
property owners.

S-1.12 Ensure adequate evacuation capacity and infrastructure is available for existing and new development.

Develop an Evacuation Master Plan that identifies routes, potential hazard incidents, and criteria regarding capacity, safety, and viability.

Ongoing initiative with the Police
Department through the
Genasys/Zonehaven software.

Zonehaven is a planning app that allows
for the zoning of an area to create
evacuation routes. The app allows for
the identification of strategically
important facilities and locations that will
facilitate an evacuation is needed. The
plans have been created, locations
identified, and routes plotted and are
available to the Police Department and
PW
FIRE
PROGRAM PROGRAM DESCRIPTION STATUS/PROGRESS IN 2023 DEPT Fire Department. Plans are revisited
periodically.

S-1.13 In areas with inadequate access or without at least two evacuation routes, provide adequate mitigation actions to address the deficiencies required by the Fire Code and State law.

Identify existing and planned residential developments in hazard areas that do not have at least two emergency evacuation routes.

Ongoing initiative with the Police
Department through the
Genasys/Zonehaven software.

Zonehaven is a planning app that allows
for the zoning of an area to create
evacuation routes. The app allows for
the identification of strategically
important facilities and locations that will
facilitate an evacuation is needed. The
plans have been created, locations
identified, and routes plotted and are
available to the Police Department and
Fire Department. Plans are revisited
periodically.

PW
FIRE

S-1.14 Identify and map evacuation routes (primary and secondary), evacuation zones, and key constraints for use by emergency management staff and first responders.

Ongoing initiative with the Police
Department through the
Genasys/Zonehaven software.

Zonehaven is a planning app that allows
for the zoning of an area to create
evacuation routes. The app allows for
the identification of strategically
important facilities and locations that will
facilitate an evacuation is needed. The
plans have been created, locations
identified, and routes plotted and are
available to the Police Department and
Fire Department. Plans are revisited
periodically.

FIRE
POLICE
PROGRAM PROGRAM DESCRIPTION STATUS/PROGRESS IN 2023 DEPT S-1.15 Coordinate with Caltrans and the County of San Mateo regarding transportation-related projects that can address potential roadway network issues and constraints.

Ongoing. Staff discussions occur
monthly through C/CAG meetings.

PW
CM

S-1.16 Prioritize roadway and storm drain infrastructure retrofitting and enhancement projects along primary evacuation routes.

Ongoing PW

S-1.17 Ensure all new development and redevelopment provides adequate ingress/egress for emergency access and evacuation.

Ongoing. Achieved through plan check
review process.

CDD
FIRE
S-1.18 Ensure all new developments and redevelopments include multiple points of ingress/egress.

Ongoing. Achieved through plan check
review process.

CDD
FIRE
S-1.19 Identify and construct additional evacuation routes in areas of high hazard concern or limited mobility.

Ongoing initiative with the Police
Department through the
Genasys/Zonehaven software.

Zonehaven is a planning app that allows
for the zoning of an area to create
evacuation routes. The app allows for
the identification of strategically
important facilities and locations that will
facilitate an evacuation is needed. The
plans have been created, locations
identified, and routes plotted and are
available to the Police Department and
Fire Department. Plans are revisited
periodically.

FIRE
CDD
S-1.20 Monitor changes to hazard conditions and vulnerabilities to ensure the accessibility or viability of evacuation routes in the future.

Ongoing initiative with the Police
Department through the
Genasys/Zonehaven software.

Zonehaven is a planning app that allows
for the zoning of an area to create
FIRE
POLICE
PROGRAM PROGRAM DESCRIPTION STATUS/PROGRESS IN 2023 DEPT evacuation routes. The app allows for
the identification of strategically
important facilities and locations that will
facilitate an evacuation is needed. The
plans have been created, locations
identified, and routes plotted and are
available to the Police Department and
Fire Department. Plans are revisited
periodically.

S-1.22 Develop an education and outreach program on the potential evacuation scenarios and activities that residents and businesses can do to better prepare for these events.

SMC Fire in conjunction with San Mateo
County Department of Emergency
Management is developing such a
project.

FIRE

CHAPTER 8: CONSERVATION ELEMENT – ADOPTED MAY 2003 and UPDATED SEPTEMBER 2019 C-a

Water Saving Landscaping and Irrigation. Promote the use of low- water-use landscaping and irrigation devices in parks, and during review of new projects and modifications to existing developments.

Responsibility: Community Development Department, Parks and Recreation Department.

Timeline: Current and ongoing.

Ongoing

● Green infrastructure plan has
been developed to guide
construction of green
infrastructure as part of new
development
● Outdoor water use ordinance in
place
● Conservation-based water rates
● Water conservation rebates
● Free water use audits
● Outdoor Water Use checklists
for new development
● City website
● AMI system to generate water
consumption reports
PW
CDD

PROGRAM PROGRAM DESCRIPTION STATUS/PROGRESS IN 2023 DEPT C-b

Property Owner Water Saving Techniques. Encourage all property owners to implement the following conservation techniques: utilize drought tolerant plant materials, limit turf areas to 25% of landscaping, limit hours of the day for watering, retrofit with water-conserving fixtures, retrofit existing bathrooms and install new bathrooms with ultra low-flow toilets and water-conserving shower heads, and incorporate Green Infrastructure measures and design features in all applicable projects (including modifications to existing facilities) and processes whenever possible.

Responsibility: Community Development Department, Public Works Department.

Timeline: During Plan Review/prepare brochure following adoption of this Element
Ongoing
● Review of landscape plans
● Conservation-based water rates
● Indoor Water Use checklist
● Outdoor Water Use checklist
● Rebates for replacement of turf
and purchase of low water use
appliances
● City website
PW
CDD
C-c

Water Emergencies. Declare a state of water emergency when mandatory water conservation and/or water rationing is necessary and prepare newsletter articles and brochures to educate customers about water conservation.

Responsibility: District Board, City Manager’s Department, Public Works Department.

Timeline: As needed.

The District Board declared a water
shortage emergency condition in June
2022, and resided the declaration in July
2023 in response to respective
declaration by the California State Water
Resources Control Board.

EMID is continuing participation in the
Bay Area Water Supply & Conservation
Agency’s negotiation for a drought
implementation plan to allocate water
among San Francisco Public Utilities
Commission’s wholesale water
customers (also called a Tier 2 plan).

PW

C-d

Water Conservation Plan. Update the City’s Water Conservation Plan.

This plan describes the water system, and water supply and demand within the District service area.

Responsibility: Public Works Department.

The Urban Water Management Plan was
revised and adopted in July 2021 with
plans for an update in FY24-25.

The Draft 2023 Foster City Climate
Action Plan Update includes the target to
PW

PROGRAM PROGRAM DESCRIPTION STATUS/PROGRESS IN 2023 DEPT Timeline: 1993. Reduce water consumption by 5% by
2030 and 15% by 2045.

C-e

Water Quality. Continue existing programs to conserve and protect water quality in accordance with accepted standards and applicable law, permits, policy, and plans (including the Green Infrastructure Plan to be adopted in 2019) including the Municipal Regional Stormwater Permit (MRP) and associated regulations, as may be amended or succeeded.

Foster incorporation of Green Infrastructure and Green Streets design and measures whenever possible to maintain and improve water quality.

Responsibility: Public Works Department.

Timeline: Current and ongoing.

Ongoing PW
C-f

Lagoon Water Quality. Continue to implement the Lagoon Management Plan in order to conserve and protect lagoon water quality by exchanging water with the Bay, with additional water quality testing sites and monitoring bacteria levels throughout the lagoon system.

Responsibility: Public Works Department.

Timeline: Current and ongoing.

Ongoing PW
C-g

Lagoon Views and Recreational Opportunities. Conserve and protect the Foster City Lagoon System by maintaining accessibility for views and recreational opportunities.

Responsibility: Community Development Department.

Timeline: During Plan Review
Ongoing CDD
C-h

Public Information. Conserve and protect the Foster City Lagoon System by educating the public about problems caused by disposal of toxic wastes into the storm water system and the problems which result from feeding waterfowl.

Ongoing
Included in the Draft 2023 Foster City
Climate Action Plan Update are Climate
Resiliency and Leadership Goals. These
goals are to educate and support the
whole community to live sustainably and
PW
CDD
PROGRAM PROGRAM DESCRIPTION STATUS/PROGRESS IN 2023 DEPT Responsibility: Public Works Department, Community Development Department.

Timeline: Prepare brochure following adoption of this Element to prepare for and adapt to a rising sea
level and climate change.

C-i

Water Quality Discharge. Conserve and protect the quality of the water that is discharged into the San Francisco Bay through implementation of the Lagoon Management Plan. Ensure compliance with all requirements of the Municipal Regional Stormwater Permit (MRP) and associated regulations, as may be amended or succeeded.

Integrate Green Infrastructure features wherever practicable, consistent with the Green Infrastructure Plan to be adopted in 2019, for treatment of stormwater prior to entry to San Francisco Bay.

Responsibility: Public Works Department.

Timeline: Current and ongoing
Ongoing PW

C-j Air Quality Impacts. Review proposed projects for their potential to affect air quality conditions.

Responsibility: Community Development Department.

Timeline: During Plan Review
Ongoing for each development project. CDD
C-k Air Pollution Sensitive Land Uses. To the extent feasible, separate air pollution sensitive land uses from sources of air pollution.

Responsibility: Community Development Department.

Timeline: During Plan Review
Ongoing for each development project. CDD
C-l TSM Ordinance Enforcement. Enforce the City’s Transportation Systems Management (TSM) Ordinance for existing and proposed businesses with more than 25 employees to promote use of SamTrans, vanpools, carpools and flextime working hours for employees.

Responsibility: Community Development Department.

Ongoing. Included in Climate Action
Plan. Various developments are required
to submit annual TDM progress reports
per their previously approved
development permits.

CDD
PROGRAM PROGRAM DESCRIPTION STATUS/PROGRESS IN 2023 DEPT Timeline: Current and ongoing
C-m Reduction in Automobile Trips. Encourage Foster City residents and employees to consolidate and/or eliminate motor vehicle trips as often as possible.

Responsibility: Community Development Agency, Planning Division.

Timeline: Prepare brochure following adoption of this Element City continues to promote regional
events such as Great Race for Clean
Air and Bike to Work Day as well as
promoting Commute.org.

New projects are reviewed for progress
in meeting the goals of Transportation
Demand Management (TDM) programs
currently in place; new development
project applications (such as a
proposed new hotel), are reviewed for
their capacity to incorporate new TDM
programs.

The Draft 2023 Foster City Climate Action
Plan Update includes measures and
actions to reduce vehicle miles travelled
commuting to work by encouraging
alternate means of transportation beyond
Single-Occupancy Vehicles.

CDD
C-n Coordination with Other Agencies in Air Quality Improvements.

Coordinate review of large projects with local, regional and state agencies to improve air quality.

Responsibility: Community Development Department.

Timeline: During Plan Review
Ongoing.

Actions taken to reduced auto-oriented
design, such as providing flexibility in
parking requirements in the Planned
Development combining district, in
addition to encouraged of preparation of
TDM programs, which both encourage
use of alternatives to transportation by
private vehicle and therefore reduce
environmental impacts related to air
pollution.

CDD
PROGRAM PROGRAM DESCRIPTION STATUS/PROGRESS IN 2023 DEPT C-o Title 24. Construct new buildings and additions to energy efficiency standards according to Title 24 of the California State Model Code.

Responsibility: Community Development Department.

Timeline: During Plan Review
Ongoing implementation of the energy
conservation requirements in
conformance with the California Energy
Code and CALGreen continued.

Included in Climate Action Plan.

CDD
C-p Solar Heating and Cooling. Encourage installation of solar panels for heating and cooling with solar energy.

Responsibility: Community Development Department.

Timeline: During Plan Review
Ongoing. The City offers “Express Plan
Checks” for Solar and EV Charging
station permits. In 2023, 148 solar
permits and 30 EV charging stations
permits were issued.

The 2023 Draft Foster City CAP Update
includes the goal to decarbonize existing
and commercial buildings with a target to
increase residential and commercial
solar installations. Additionally, the CAP
Update includes a target to continue
providing carbon-free electricity options
to the community and maintain
Peninsula Clean Energy opt-out rates of
less than 3%.

City joined Peninsula Clean Energy to
provide opportunity for all energy
customers to purchase power from
renewable sources and enrolled all City
facilities in the ECO-100 100%
renewable and carbon-free energy
option.

CDD
C-q Solar Heating for Pools. Encourage property owners to heat all new and existing spas and swimming pools with solar energy.

Responsibility: Community Development Department.

Ongoing CDD
PROGRAM PROGRAM DESCRIPTION STATUS/PROGRESS IN 2023 DEPT Timeline: During Plan Review
C-r Energy Information and Outreach. Continue to expand and monitor information about energy conservation and establish a public outreach program to inform Foster City residents and businesses about the availability and importance of the information.

Responsibility: Community Development Department.

Timeline: Prepare brochure following adoption of this Element The City continued to participate in
Energy Upgrade California, publicizing
the availability of rebates and public
information meetings about the
program through its Social Media
accounts.

The City continues to authorize several
PACE financing options for residential
and non-residential buildings.

The 2023 Draft Foster City CAP
Update includes goals and measures
related to community outreach and
energy conservation.

City partners with Peninsula Clean
Energy (PCE) to encourage residents
to “opt-up” to PCE’s ECO-100, their
100% renewable energy product.

The City annually participates in the
SunShares program to educate the
public on rooftop solar and zero-
emission vehicle discounts.

The City has offered a Solar Rebate
Program for single-family residences
since 2016.

CDD
CM
C-s

Citywide Recycling Program. Continue the citywide residential recycling program for single stream recycling of glass, aluminum and newspaper and establish a citywide commercial recycling program for white paper and cardboard.

Ongoing programs.

Included in the Draft 2023 Foster City
CAP Update is the goal to increase the
diversion of materials from landfills and
PW

PROGRAM PROGRAM DESCRIPTION STATUS/PROGRESS IN 2023 DEPT Responsibility: City Manager’s Department, Community Development Department.

Timeline: Current and ongoing
the target to significantly reduce organic
waste to landfills.

C-u

Recycling Information. Inform all Foster City residents and businesses about recycling opportunities.

Responsibility: Community Development Department.

Timeline: Current and ongoing

Ongoing programs.

Annually, green events are promoted
and widely used by the community. In
2023, two document destruction
(shred), one e-waste collection, six
compost give-aways, and the annual
coats for kids events were held. The
City continued to provide recycling
education through its website, direct
mail, social media and contacts from its
franchised hauler, JPA administrator
and contract staff.

Community outreach is a central
component to encouraging residents
and businesses. These efforts are
included in the Draft 2023 Foster City
CAP Update.

PW

C-v

Recycling Bins Incentives. Waive fees and simplify the review process for trash enclosures around recycling bins.

Responsibility: Community Development Department.

Timeline: Current and ongoing.

Ongoing programs.

PW
C-w City Procurement. Prepare a City-wide procurement policy for the purchase of recycled products.

Responsibility: City Manager's Department.

Ongoing programs. Included in Climate
Action Plan.

CM
PROGRAM PROGRAM DESCRIPTION STATUS/PROGRESS IN 2023 DEPT Timeline: December 1993.

C-x

Public Viewing Areas. Expand public opportunities to learn about wetland areas and endangered species by creating public viewing areas with exhibits.

Responsibility: Community Development Department.

Timeline: Within three years following Element Adoption Ongoing CDD
C-y

Wetland Habitat. Protect wetland habitat from human disturbance by posting signs prohibiting trespassing on vegetation typical of wetland areas.

Responsibility: Community Development Department, Parks and Recreation Department.

Timeline: Within one year following Element Adoption.

Ongoing CDD
C-z

57 Acre Wildlife Refuge. Prohibit development within 57 acre wildlife refuge.

Responsibility: Community Development Department.

Timeline: During Plan Review.

Ongoing CDD
C-aa

Projects in the Vicinity of Shoreline Band. Strictly control development proposals in the vicinity of the shoreline band.

Responsibility: Community Development Department.

Timeline: During Plan Review.

Ongoing CDD
C-bb

National Pollution Discharge Elimination System (NPDES) Stormwater Management Plan. Continue working with the county- wide task force to develop and implement a stormwater management plan to satisfy NPDES requirements. Review all new development and redevelopment, significant building and/or site modifications, and any projects which require right-of-way improvement or dedication for Ongoing
The City has adopted a Green
Infrastructure Program and has
amended its General Plan to include
goals, policies, and objectives which
PW
PROGRAM PROGRAM DESCRIPTION STATUS/PROGRESS IN 2023 DEPT opportunity of incorporation of Green Infrastructure (Including Green Streets) design, features, and measures. Green Infrastructure and Green Streets design shall be incorporated to the maximum extent practicable in conformance with the City’s Green Infrastructure Plan to be adopted in 2019 and for consistency and compliance with the Municipal Regional Stormwater Permit (MRP) and as directed by the State Water Resources Board; the Regional Water Quality Control Board, San Francisco Bay Region; the San Mateo Countywide Water Pollution Prevention Program; the Flood and Sea Level Rise Resiliency Agency, once formed; and standards of any relevant policymaking organization.

Responsibility: Public Works Department.

Timeline: Current and ongoing.
encourage use of environmentally-
friendly methods for treatment of
stormwater; Green Infrastructure Plan
provides conformance with requirements
of the Municipal Regional Stormwater
Permit through NPDES.

Additional Content:

Other related efforts and actions completed in 2023 that illustrate planning and development activity within the City are listed below:

• Interagency or Intergovernmental Coordination
o RICAPS - Foster City has participated in this San Mateo County Intergovernmental Coordination group for environmental sustainability.
o BAWSCA – Foster City has participated in this Intergovernmental group on water sustainability planning. o 21 Elements – Foster City participated in this Intergovernmental group in San Mateo County to collaborate on the Housing Element and housing issues.
o ALUC – Foster City coordinated the Safety Element policies to provide required overflight notification. o SamTrans - In 2023/2024 Staff participated in SamTrans Bus Stop Improvement Plan (BSIP) Public Agency Working Group meetings and reviewed Draft Bus Stop Design Guidelines. • Implementation of Mitigation Measures from the General Plan EIR:
o Created a draft of the Climate Action Plan
o Adopted an updated Safety Element (Mitigation Measure #3.7-7) • Equity Planning Considerations: The City included geographic targeting for improving housing choices in several Housing Element 2023-2031 programs.