Cities Index.
Attachment 1 - Recreation Center Boardwalk and Waterfront Master Plan Slide Deck

Foster City City Council
March 18, 2024

Document
Attachment 1 - Recreation Center Boardwalk and Waterfront Master Plan Slide Deck
Meeting
March 18, 2024
Body
Foster City City Council
Original file
29.1 MB
Text extracted from the city's file for reading and search. Open the original on fostercity.primegov.com. That file is the official record.

RECREATION CENTER WATERFRONT MASTER PLAN: DRAFT
MARCH 2024 GROUP 4 SWA
..

RECREATION CENTER WATERFRONT MASTER PLAN: DRAFT
MARCH 2024 GROUP 4 • SWA
.

CONTENTS Introduction
Public Preferences
Master Plans
• Master Plan
• Master Plan Variation

Reference

CONTENTS
RECREATION CENTER WATERFRONT MASTER PLAN: DRAFT
MARCH 2024 GROUP 4 • SWA
.

During reviews of the concept design for the Recreation Center Rebuild, several City Council members, Planning Commissioners, and Parks & Recreation Committee members discussed wanting to more strongly connect the Recreation Center with the Lagoon -- physically and programmatically -- and further activate Leo J Ryan Park’s waterfront. This master plan, which is the result of those discussions, provides a vision for the 1000 feet of the Leo J Ryan Park waterfront between the amphitheater and boat shed, along the Recreation Center, bocce courts and The Vibe teen center.

The master plan starts by showcasing what currently occurs in the Lagoon along the waterfront, from strolling to dragon boat and crew races to lantern festivals, and then looks regionally and globally at how other cities use and sculpt their waterfronts. In discussion with the Recreation Center Task Force, Planning Commissioners, and Parks & Recreation Committee members, the design team identified a range of waterfront features and activities that would take advantage of Foster City’s unique waterway and Leo J Ryan Park’s lagoon frontage. The City and design team then shared these waterfront features and activities with the public to survey the public’s preferences. The design team then used the public preference survey results to inform and refine initial explorations into a preferred master plan, plus one variation.

The master plan strengthens the connectivity of the well-used and beloved waterfront boardwalk, by completing a continuous multiuse path inland of the amphitheater, and completing a continuous dockside path including around the lagoon side of the amphitheater stage. The master plan also adds waterfront terraces for socializing and lingering alongside the Recreation Center, a signature southerly terminus and overlook for the popular boardwalk, and expanded people-powered watercraft facilities at the boat shed. The master plan variation further expands the waterfront terraces and further expands facilities at the boat shed and boat launch for both people-powered and electric watercraft. The estimated project cost for the Master Plan and Master Plan Variation ranges from 8.7 to 10.3 million dollars.

A reference section at the end of report shows the range of initial explorations.

INTRODUCTION: EXECUTIVE SUMMARY

CONCEPT A
RECREATION CENTER WATERFRONT MASTER PLAN: DRAFT
MARCH 2024 GROUP 4 • SWA
.

EXAMPLE IDEA FOR ACTIVATING WATERFRONT

EXISTING WATERFRONT
INTRODUCTION: EXAMPLE OF INITIAL EXPLORATIONS
RECREATION CENTER WATERFRONT MASTER PLAN: DRAFT
MARCH 2024 GROUP 4 • SWA
.

Duffy BoatingKayakingSwimming
Water Lantern Festival Rubber Ducky RaceRowing
Dragon Boat RaceDragon Boat RaceDragon Boat Race
INTRODUCTION: EXISTING WATERFRONT EVENTS
RECREATION CENTER WATERFRONT MASTER PLAN: DRAFT
MARCH 2024 GROUP 4 • SWA
.

INTRODUCTION: INITIAL EXPLORATIONS -- WATERFRONT FEATURES Steps into the WaterBoat DockMarina
Floating IslandWater ActivitiesNatural Edge
Outlook TerraceWaterfront LoungeOpen Water Pool
RECREATION CENTER WATERFRONT MASTER PLAN: DRAFT
MARCH 2024 GROUP 4 • SWA
.

Dipping Your Toe into the WaterWalking / Sitting / OutlookingWater Movie Theatre Duffy BoatingSailingOpen Water Swimming
KayakingSunbathingDeck Lounging
INTRODUCTION: INITIAL EXPLORATIONS -- WATERFRONT ACTIVITIES RECREATION CENTER WATERFRONT MASTER PLAN: DRAFT
MARCH 2024 GROUP 4 • SWA
.

PUBLIC PREFERENCES: WATERFRONT FEATURES

RECREATION CENTER WATERFRONT MASTER PLAN: DRAFT
MARCH 2024 GROUP 4 • SWA
.

PUBLIC PREFERENCES: WATERFRONT FEATURES

RECREATION CENTER WATERFRONT MASTER PLAN: DRAFT
MARCH 2024 GROUP 4 • SWA
.

PUBLIC PREFERENCES: WATERFRONT ACTIVITIES

RECREATION CENTER WATERFRONT MASTER PLAN: DRAFT
MARCH 2024 GROUP 4 • SWA
.

PUBLIC PREFERENCES: WATERFRONT ACTIVITIES
RECREATION CENTER WATERFRONT MASTER PLAN: DRAFT
0 50 100 150
MARCH 2024 GROUP 4 • SWA
.

MASTER PLAN: EXISTING CONDITIONS
RECREATION CENTER WATERFRONT MASTER PLAN: DRAFT
0 50 100 150
MARCH 2024 GROUP 4 • SWA
.

MASTER PLAN: PROPOSED RECREATION CENTER
RECREATION CENTER WATERFRONT MASTER PLAN: DRAFT
0 50 100 150
MARCH 2024 GROUP 4 • SWA
.

MASTER PLAN: PROPOSED BOARDWALK CONNECTIVITY

MULTIUSE PATH

DOCKSIDE PATH
RECREATION CENTER WATERFRONT MASTER PLAN: DRAFT
0 50 100 150
MARCH 2024 GROUP 4 • SWA
.

MASTER PLAN: WATER TERRACES + BOARDWALK OVERLOOK + BOAT SHED DOCK

RECREATION CENTER WATERFRONT MASTER PLAN: DRAFT
0 50 100 150
MARCH 2024 GROUP 4 • SWA
.

MASTER PLAN VARIATION: GRAND WATER TERRACES + BOARDWALK TERMINUS + WATERCRAFT DOCK

RECREATION CENTER WATERFRONT MASTER PLAN: DRAFT
MARCH 2024 GROUP 4 • SWA
.
0 4 8 12
MASTER PLAN: ENLARGEMENT AT WATER TERRACES
RECREATION CENTER WATERFRONT MASTER PLAN: DRAFT
MARCH 2024 GROUP 4 • SWA
.
0 4 8 12
MASTER PLAN: ENLARGEMENT AT BOARDWALK OVERLOOK
RECREATION CENTER WATERFRONT MASTER PLAN: DRAFT
MARCH 2024 GROUP 4 • SWA
.
0 4 8 12
MASTER PLAN VARIATION: ENLARGEMENT AT GRAND WATER TERRACES RECREATION CENTER WATERFRONT MASTER PLAN: DRAFT
MARCH 2024 GROUP 4 • SWA
.
0 4 8 12
MASTER PLAN VARIATION: ENLARGEMENT AT WATERCRAFT DOCK
RECREATION CENTER WATERFRONT MASTER PLAN: DRAFT
MARCH 2024 GROUP 4 • SWA
.

MASTER PLAN: BOARDWALK SECTIONS
SECTION C: EXISTING
SECTION B: EXISTINGSECTION A: EXISTING
SECTION C: PROPOSED
SECTION B: PROPOSEDSECTION A: PROPOSED

MULTIUSE
PATH

SHIFT DOCK CLEATS

TO EDGE OF LAGOON

ADD MULTIUSE PATH ALONGSIDE

DOCKSIDE PATH

REPLACE POST & CHAIN WITH

BULLRAIL WITH DOCK CLEATS

MULTIUSE
PATH

DOCKSIDE
PATH

DOCKSIDE
PATH

DOCKSIDE
PATH
C B
A
RECREATION CENTER WATERFRONT MASTER PLAN: DRAFT
MARCH 2024 GROUP 4 • SWA
.

BOARDWALK ENHANCEMENTS FLOATING BOAT DOCK FLOATING BOAT DOCK + BOARDWALK OVERLOOK FLOATING POOL DECK + BOARDWALK OUTLOOK FLOATING “BEACH” + MARINA WATER TERRACES + MARINA + NATURE ISLAND REFERENCE: INITIAL EXPLORATIONS -- PLANS
RECREATION CENTER WATERFRONT MASTER PLAN: DRAFT
MARCH 2024 GROUP 4 • SWA
.

REFERENCE: INITIAL EXPLORATIONS -- SECTIONS

FLOATING BOAT DOCK

FLOATING POOL DECK
FLOATING “BEACH”

WATER TERRACES
RECREATION CENTER WATERFRONT MASTER PLAN: DRAFT
MARCH 2024 GROUP 4 • SWA
.

REFERENCE: SCALE OF PEOPLE POWERED & ELECTRIC WATER USES 0 10 20 30

← All documents from this meeting