REF. NO. REVENUE TITLE Fee
City of Foster City/Estero Municipal Improvement District Master Fees & Service Charges Schedule
Fiscal Year 2023-24
PWWA-05 Water Meters (including installation)
a. 3/4" Actual Meter Cost + $198 / hour installation fee (1 hour minimum) b. 1" Actual Meter Cost + $198 / hour installation fee (1 hour minimum) c. 1-1/2" Actual Meter Cost + $198 / hour installation fee (1 hour minimum) d. 2" Actual Meter Cost + $396/ hour installation fee (1 hour minimum) e. 3" Actual Meter Cost + $396/ hour installation fee (1 hour minimum) f. 4" Actual Meter Cost + $396/ hour installation fee (1 hour minimum) g. 6" Actual Meter Cost + $396/ hour installation fee (1 hour minimum) h. 8” and larger Water Meter Actual meter and labor cost PWWA-06 Water Conservation Measures Violation
First Violation $100.00
Second Violation $200.00
Third and Subsequent Violation(s) within one year $500.00 per violation Reactivating water service due to water conservation measures violation $100.00 per reactivation PWWA-07 Fire Hydrant Testing (per hydrant) $269.55
PWWA-08 Temporary Hydrant Meter Application Fee & Deposit Application Fee $95.00
Meter Deposit $1,557.00
Meter Deposit processing charge
(based on issuance date of meter)
Return within 1 month or less- charge 10% of deposit
Return within 3 months or less- charge 15% of deposit
Return within 6 months or less- charge 20% of deposit
Return within 12 months or less- charge 25% of deposit
Water Deposit $1,500.00
Water Usage Charge See PWWA-01
Meter Charge See PWWA-06
PWWW-01 Sewer/Wastewater Service
A. Sewer Service Monthly Service Rates:
1) Residential:
a) Single Family $130.87
b) Duplex (per dwelling unit) $109.93
c) Townhouse (per dwelling unit) $109.93
d) Apartment / Condominium (per dwelling unit) $109.93 2) Commercial/Institutional:
a) Low Strength (per unit of water billed) $5.50
b) Medium Strength (per unit of water billed) $8.36
c) High Strength (per unit of water billed) $23.78
B. Sewer Availability Charges
1) Parcels 1 acre and larger (per acre per year) $741.95 2) Parcels less than 1 acre (per acre per year) $378.85 PWM-01 Utility Street Use
PWM-02 Private Refuse Utility Street Use Per Franchise Agreement PWM-03 Street Lighting | NO |
PWM-04 Street and Easement Landscaping | CITY- |
PWM-05 Median Maintenance | WIDE |
PWM-06 Cul-de-Sac Maintenance | ASSESSMENTS |
PWM-07 Street Sweeping | AT |
PWM-08 Storm Drainage | THIS |
PWM-09 Neighborhood Park Maintenance | TIME |
PWM-10 Fat, Oil and Grease (FOG) Monitoring Program (Waste Discharge Permit Annual Fee) A. Class A (Industry) Waste Discharge Permit Annual Fee $687.00 per permit pass-through fee from San Mateo Source Control Inspectors
B. Class B (Restaurant) Waste Discharge Permit Annual Fee $497.00 per permit pass-through fee from San Mateo Source Control Inspectors
C. Analytical Services Fee Actual Cost pass-through fee from San Mateo Source Control Inspectors
[1] est. gpd = commercial customer's estimated gallons per day of indoor water use [2] Estimated gallons per day of single family indoor water use [3] Strength factors based on baseline single family strengths of 240 mg/L of BOD and 240 mg/L of TSS
mg/L = milligrams/liter
BOD = Biochemical Oxygen Demand
TSS = Total Suspended Solids
PWM-11 Sidewalk Maintenance Administration Fee
Tier 1 - R1 (Voluntary) $150 (Administrative Fee) + Actual Contractor Cost Tier 2 - R1 (Advanced) and All Other Zones $419 (Administrative Fee) + Actual Contractor Cost
Attachment 9 - Page 9 of FY 24 Master Fees and Service Charges Schedule (ref. PW-11)
Foster City City Council
June 3, 2024
- Document
- Attachment 9 - Page 9 of FY 24 Master Fees and Service Charges Schedule (ref. PW-11)
- Meeting
- June 3, 2024
- Body
- Foster City City Council
- Pages
- 9
- Original file
- 692 KB
Text extracted from the city's file for reading and search. Open the original on fostercity.primegov.com. That file is the official record.
Page 9 of 21 ends