RECOMMENDATION
It is recommended that the City Council/EMID Board of Directors review and provide policy direction on the proposed updates to the Public Works Department Master Fees and Service Charges Schedule (MFS) for FY 2025-2026.
EXECUTIVE SUMMARY
Staff recommends increasing the deposits related to the existing items under “PWWA- 07 Temporary Hydrant Meter Application Fee & Deposit” and “PWWA-08 Water Deposit” to more successfully recover costs associated with the issuance of temporary water meters.
BACKGROUND/ ANALYSIS
During construction activities, private developers and the District need a way to access the water system and measure water used on the construction site. The Water Enterprise has a stock of temporary water meters that serve this purpose. The Temporary Water Meter fees PWWA-07 and PWWA-08 collectively capture three costs associated with the service: 1) the cost to administer the temporary water meter program; 2) the cost to procure, maintain and replace the temporary water meters; and 3) the cost for the water that is used. In order to ensure collection of the meter and water fees, the Water Enterprise charges a deposit, against which the costs are
3 1
1 9
deducted. When the meter is returned, any remaining funds are refunded to the customer.
Staff has observed an increase in the length of time that meters are being retained, and an increase in the number of instances that meters are not returned. In addition, as the price of water increases over time, staff recommends increasing the water deposit to ensure sufficient balance to cover the costs associated with the water used.
There are three charges associated with issuance of temporary water meters as detailed in Table 1 below and illustrated in the Temporary Hydrant Meter Application that is attached to this report.
Table 1: Public Work Department Recommendations for Adjusting Fees and Deposits Associated with Temporary Water Meters
Reference/Name FY 2024-25
Adopted
Amount
FY 2025-26
Recommended
Amount
Notes
PWWA-07
Application Fee
$97.47 $99.81 Permit fee is non-refundable. Increase
based on December 2024 CPI-U of 2.4%
PWWA-07
Meter Deposit
$1,557 $2,500 Recommended deposit to sufficiently
replace unreturned meters.
PWWA-07 Refunded No Change Return within 1 month 10% of deposit Meter Deposit based on Recommended Return within 3 months 15% of deposit Processing Charge issuance date Return within 6 months 20% of deposit of meter Return within 12 months 25% of deposit
PWWA-08
Water Deposit
$1,500 $2,000 Deposit for FY 25/26 covers $336.58 per
month for meter use plus actual units of
water consumed. (FY 25/26 amounts
proposed until adopted as part of Water
Rate Study).
Total Up-Front $97.47 non- $99.81 non-
Temporary Meter refundable fee, refundable fee,
Cost plus $3,057 plus $4,500
deposit deposit
Based on the recommended increases to the deposits and fees shown above, the minimum charge for use of a temporary water meter would increase from $568.37 to $686.39 for a one-month meter use with no water consumption (Permit Fee + Meter Deposit Processing + Monthly Meter Use). All other charges associated with temporary water meter use would remain within the control of the contractor based on their need for water and use of the meter.
CEQA
Not Applicable
FISCAL IMPACT
An increase in both the total fee collected and decrease in delinquent accounts is expected with the implementation of the fee structure, however the actual increase in 3 1
1 9
revenue will be dependent upon the use of the temporary water meters.
CITY COUNCIL VISION, MISSION, AND VALUE/PRIORITY AREA
Facilities and Infrastructure
ATTACHMENT
Attachment 1 – FY 2024-2025 Temporary Hydrant Meter Application Attachment 2 – FY 2024-2025 Master Fee Schedule, Page 10 ___
___
___
FISCAL YEAR 2024/2025 Attachment 1
CITY OF FOSTER CITY/ESTERO MUNICIPAL IMPROVEMENT DISTRICT
TEMPORARY HYDRANT METER APPLICATION
APPLICANT: DATE:
COMPANY: _PHONE:
ADDRESS:
EMAIL ADDRESS
CONTRACTOR’S LICENSE NO.: _ CLASS: EXP.:
FOSTER CITY BUSINESS LICENSE NO.: EXP.:
JOBSITE:
METER CONNECTION LOCATION:
NOTE THAT THE METER MAY NOT BE RELOCATED WITHOUT WRITTEN PERMISSION FROM THE DISTRICT.
PURPOSE OF SERVICE:
Customer must provide a reading at the end of each calendar quarter (March 31, June 30, Sept 30, and Dec 31) by emailing: the reading, company name and meter number to [email protected]. _ (initial) Meter must be returned to the District Corporation Yard (100 Lincoln Center Drive in Foster City, 650/286-8140) within seven (7) calendar days of the date permit expires. _ (initial) Failure to do so may result in forfeiture of all deposits. Charges will be assessed per the current adopted Master Fee Schedule. _ (initial)
Applicant’s Signature:
****************************************************************************************************************************
FOR CITY/DISTRICT USE ONLY
PERMIT EXPIRATION DATE (12 months from today)_
PERMIT FEE: Non-refundable $ 97.47 - WC
METER DEPOSIT: Balance refundable. Details on back. $ 1,557.00 - MD WATER DEPOSIT: Balance refundable. Details on back. $ 1,500.00 - WD TOTAL: (to be paid with application) $ 3,154.47
Application Approved: Date:
(PWM Staff)
Fee to SC S-23, Acct. 31-3470 Deposits to SC S-23, Acct. 31-2460 Monthly Charges to SC S-73, Acct. 31-3475 S:\CY Admin\Temp Hydrant Meter Forms\Temporary Hydrant Meter Application FY 2024-2025.doc Attachment 1
METER DEPOSIT REQUIRED: $1,557.00 Upon return of the hydrant meter in good condition, the contractor shall be entitled to a refund of the following percentages of the meter deposit if returned within the following period from the issuance date of the meter:
1 month or less 90%
3 months or less 85%
6 months or less 80%
12 months or less 75%
Meter must be returned or renewed at the end of 12 months. Failure to do so will result in an additional reduction of deposit by 10% of the original amount per month or portion thereof. Should the meter be found to be defective or damaged upon testing, the cost of repairs labor and material) shall be subtracted from the deposit. If the meter is lost, the entire meter deposit will be forfeited. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ WATER DEPOSIT REQUIRED: $1,500.00 Meter charge according to Master Fee Schedule for Fiscal Year 23/24 @ $315.20 shall be deducted from the water deposit each month. In addition, the water usage charge is as stated per Master Fee Schedule per unit (100 cubic feet or 748 gallons) for Fiscal Year 23/24 @ $6.47 per unit and shall be deducted from the deposit at the time incurred or when the meter is returned.
Date out Initial
METER SIZE: 3” Meter Number:
Checked out by:
PRINT NAME
Date Returned/Checked by:
Other Accessories
Meter Wrench $60
Charge as follows (if not returned)
Reducer, 2-1/2”x3/4” $40
Reducer, 2-1/2”x1-1/2” $35
Fire Hose, 6’ x 2-1/2” $140
Received by
Signature/Date
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
SERVICE
DATE
METER
READING
WATER
QUANTITY
COST OF
WATER USED
CHARGE
PER MONTH
TOTAL
CHARGES
DEPOSIT
BALANCE
$315.20
$
Date:
Received From:
City of Foster City
Temporary Water Hydrant Rental
Receipt
Receipt No.:
THREE THOUSAND ONE HUNDRED FIFTY-FOUR DOLLARS AND
FORTY-SEVEN CENTS $3,154.47
Check No. BY;
Send ORIGINAL to Finance; cc: Meter Binder, Applicant
Attachment 2
City of Foster City/Estero Municipal Improvement
District Master Fees & Service Charges Schedule
Fiscal Year 2024-25
REF. NO. REVENUE TITLE Fees
PWWA-05 Water Meters (including installation)
a. 3/4" Actual Meter Cost + $203 / hour installation fee (1 hour minimum) b. 1" Actual Meter Cost + $203 / hour installation fee (1 hour minimum) c. 1-1/2" Actual Meter Cost + $203 / hour installation fee (1 hour minimum) d. 2" Actual Meter Cost + $406/ hour installation fee (1 hour minimum) e. 3" Actual Meter Cost + $406/ hour installation fee (1 hour minimum) f. 4" Actual Meter Cost + $406/ hour installation fee (1 hour minimum) g. 6" Actual Meter Cost + $406/ hour installation fee (1 hour minimum) h. 8” and larger Water Meter Actual meter and labor cost PWWA-06 Fire Hydrant Testing (per hydrant) $276.55
PWWA-07 Temporary Hydrant Meter Application Fee & Deposit Application Fee $97.47
Meter Deposit $1,557.00
Meter Deposit processing
charge (based on issuance
date of meter)
Return within 1 month or less- charge 10% of
deposit Return within 3 months or less- charge
15% of deposit Return within 6 months or less-
charge 20% of deposit Return within 12
months or less- charge 25% of deposit
PWWA-08 Water Deposit $1,500.00
PWWA-09 (NEW) Water Neutrality Review Fee Actual Cost* Subject to a minimum $1,000 Deposit at time of review request
PWWW-01 Sewer/Wastewater Service
A. Sewer Service Monthly Service Rates:
1) Residential:
a) Single Family $133.49
b) Duplex (per dwelling unit) $112.13
c) Townhouse (per dwelling unit) $112.13
d) Apartment / Condominium (per dwelling unit) $112.13
2) Commercial/Institutional:
a) Low Strength (per unit of water billed) $5.61
b) Medium Strength (per unit of water billed) $8.53
c) High Strength (per unit of water billed) $24.26
B. Sewer Availability Charges
1) Parcels 1 acre and larger (per acre per year) $756.79 2) Parcels less than 1 acre (per acre per year) $386.43 PWM-01 Utility Street Use
PWM-02 Private Refuse Utility Street Use Per Franchise Agreement PWM-03 Street Lighting | NO |
PWM-04 Street and Easement Landscaping | CITY- |
PWM-05 Median Maintenance | WIDE |
PWM-06 Cul-de-Sac Maintenance | ASSESSMENTS |
PWM-07 Street Sweeping | AT |
PWM-08 Storm Drainage | THIS |
PWM-09 Neighborhood Park Maintenance | TIME |
PWM-10 Fat, Oil and Grease (FOG) Monitoring Program (Waste Discharge Permit Annual Fee) A. Class A (Industry) Waste Discharge Permit Annual Fee $728.22 per permit pass-through fee from San Mateo Source Control Inspectors
B. Class B (Restaurant) Waste Discharge Permit Annual Fee $526.82 per permit pass-through fee from San Mateo Source Control Inspectors
C. Analytical Services Fee Actual Cost pass-through fee from San Mateo Source Control Inspectors
[1]est. gpd = commercial customer's estimated gallons per day of indoor water use
[2]Estimated gallons per day of single family indoor water use [3]Strength factors based on baseline single family strengths of 240 mg/L of BOD and 240 mg/L of TSS
mg/L = milligrams/liter
BOD = Biochemical Oxygen
Demand TSS = Total
Suspended Solids
PWM-11 Sidewalk Maintenance Administration Fee
Tier 1 - R1 (Voluntary) $153.90 (Administrative Fee) + Actual Contractor Cost Tier 2 - R1 (Advanced) and All Other Zones $429.80 (Administrative Fee) + Actual Contractor Cost