Attachment 5 - Water and Wastewater 15-Year CIP Comparison

Foster City City Council
March 24, 2025

Document
Attachment 5 - Water and Wastewater 15-Year CIP Comparison
Meeting
March 24, 2025
Body
Foster City City Council
Original file
72 KB
Text extracted from the city's file for reading and search. Open the original on fostercity.primegov.com. That file is the official record.

ATTACHMENT 5 - WATER AND WASTEWATER 15-YEAR CIP COMPARISON 15-Year CIP Comparison
Fifteen Year Period
FY 24/25 - 38/39
Fifteen Year Period
FY 25/26 - 39/40
Increase
(Decrease) Notes
Water Enterprise:

Water Main Condition Assessment 250,000 500,000 250,000 1 Permanent Emergency Bypass Transmission Main on E. Third Ave 1,000,000 1,000,000 - 2 Large Water Valve Replacment (24-25) 1,500,000 1,500,000 - 2 Coating on 24-inch Transmission Main at Seal Slough Bridge 1,000,000 1,000,000 - 3 Assessment of Cathodic Protection Anode Beds 500,000 500,000 - 2 Water Facilities Seismic Vulnerability Assessment 125,000 125,000 - 2 Two Engines and Pump Replacement at Water Booster Pump Station 975,000 975,000 - 2 Chlorine Analyzers and Auto Flushers 700,000 700,000 - 2 East Hillsdale Boulevard Loop 138,000 138,000 - 2 Large Water Valve Replacment (Long-Term) 3,000,000 3,000,000 - 2 Recycled Water Connection 1,000,000 1,000,000 - 2 Water System Improvements Project 4,500,000 4,500,000 - 2 Water Tank Inspection and Recoating 3,500,000 3,500,000 - 2 Corporation Yard Fence Replacement/Rehabilitation - 500,000 500,000 4 Water Tank Lining and Structural Retrofit - 8,550,000 8,550,000 5 Total 18,188,000 27,488,000 9,300,000 Wastewater Enterprise:

Emergency Generator Replacements 3,900,000 2,000,000 (1,900,000) 6 Shell Bridge Sanitary Sewer Force Main Rehabilitation 500,000 500,000 - 2 Sanitary Sewer Lift Stations (Phase 6 and 7) 15,100,000 15,100,000 - 2 Sanitary Sewer Manhole Replacements 2,500,000 2,500,000 - 2 Overflow, Redundancy, Bypass, and Backup Power Study 1,100,000 1,100,000 - 2 Sanitary Sewer System Improvements 1,000,000 1,000,000 - 2 Wastewater Collection System Improvements 6,090,000 6,090,000 - 2 Sanitary Sewer Lift Stations (Phase 8 and 9) 11,900,000 11,900,000 - 2 Lift Station Electrical Control Upgrade 4,000,000 4,000,000 - 2 WWTP Joint Costs to be funded by surplus Operating Fund Working Capital 10,102,575 11,317,319 1,214,744 7 Wastewater Master Plan - 600,000 600,000 8 Corporation Yard Fence Replacement/Rehabilitation - 500,000 500,000 4 56,192,575 56,607,319 414,744
Detailed Analysis:

Note 1
Costs realigned to encompass specialty training. Project details in the Five-Year CIP.

Note 2
No funding changes recommended form FY 2024-2025 plan.

Note 3
No funding changes recommended from FY 2024-2025 plan; $500,000 from Water Capacity Fees Note 4
Project allocated to CIP City 50%, Water Capital 25% and Wastewater Capital 25%. Project details in the Five-Year CIP.

Note 5
Project details in the Five-Year CIP.

Note 6
Phase 1 (generator purchase) underway. Remaining funding for subsequent phases. Project details in the Five-Year CIP Note 7
EMID specific costs to be paid with enterprise revenues; Joint costs to be funded by surplus Operating Fund working capital.

Note 8
Wastewater Master Plan recommended to be updated every 20 years.