Gilead Sciences, Inc.

Supplement to the Community Development Department General Application Gilead Campus Expansion Project
Updated: June 6, 2025

To: Foster City Community Development Director Sofia Mangalam

Gilead Sciences, Inc. (“Gilead”) presents this formal application for the proposed Gilead Campus Expansion Project (“Project”) in the Chess Drive/Hatch Drive area (“Property”) in the City of Foster City (“City”).

This letter serves as a supplement to the City’s Community Development Department General Application form. It is intended to clarify, expand upon, and formally submit Project details for the City’s review and entitlement processing. As of June 6, it has also been modified per City feedback.

Prior to this formal application, Gilead submitted a Preliminary Review application on February 14, 2025. (File No: PR2025-0003.) City staff provided formal feedback in writing on April 8, 2025, following internal review and a meeting of an Interdepartmental Evaluation Committee (IDEC) conducted with Gilead on March 5, 2025. This letter, as well as other relevant Project materials, incorporates and responds to that feedback. Additionally, Gilead is transmitting, concurrent to this formal application, a comprehensive response log to the City’s Preliminary Review feedback. This response log outlines how Gilead has addressed each comment and request for clarification raised during the Preliminary Review process.

This supplement provides the following sections: (1) Background, (2) Project Description, (3) Land Use Consistency, (4) Requested Entitlements, (5) California Environmental Quality Act (“CEQA”) Review and Environmental Assessment Form, (6) Submittals for Formal Application, and (7) Project Implementation Timeline.

1. Background
In 2005-2006, the City initiated a study of the Property in or der to promote new business development, especially biotechnology and high technology companies. In response to the study, the two property owners, Northwestern Mutual Life and Sea Cliff Prope rties (the “Original Owners”), proposed the Chess-Hatch Master Plan project (the “O riginal Project,” RZ-07-002 and DA-09-002), with the following:
 On November 2, 2009, the City certified the Final EIR (SCH #2008122065, EA-07-001) and adopted a Mitigation Mon itoring and Reporting Program for the Original Project.

Additionally, on November 2, 2009, the City ame nded its General Plan to designate the Property as Chess/Hatch Office Research.
 On January 24, 2011, the Original Owners submitted a proposal to revise the Original Project to substitute five multi-story structures a nd one single-story struct ure for the three multi- story structures previously proposed. On August 19, 2013, the City adopted the Addendum

9.1 Attachment 2 - Project Description

465

Page 2 ends

dated February 19, 2013 as an adequate e nvironmental document pursuant to CEQA via Resolution No. 2013-64.
 On September 3, 2013, the City approved a Master Development Agreement to develop the Chess Hatch Master Plan on the Chess-Hatc h Property via City Or dinance No. 574. The Master Development Agreement was recorded with the County of San Mateo on September 11, 2014 as Document No. 2014-082572, with an initial term of five years.  Additionally, on September 3, 2013, the City amended its zoning map for the Chess-Hatch Property, changing the zoning designation to CM/PD (Commercial Mix/Planned Development). It also approved a General Development Plan to allow up to 800,000 square feet of office, biotechnology, or research and development uses on the Chess-Hatch Property via City Ordinance No. 573.
 On April 17, 2014, the City’s Planning Commission approved Use Permit/Specific Development Plan (UP-13-004 and EA-07-001B) to allow the demolition of nine office buildings, comprising 146,000 square feet of development, and construction of 600,000 square feet of office devel opment area and up to 5,000 square feet of business supporting use in two towers and a connector building, and construction of tw o multi-story parking garages.
 On September 1, 2015, the Original Owners assigne d their interest as Developers in the Development Agreement to Gilead. On Janua ry 8, 2019, Gilead and the City signed a Memorandum of Extension, and the Initial Term of the Ma ster Development Agreement was extended to expire on September 7, 2024.

Ultimately, the Original Project was never constructed. On September 7, 2024, both the Use Permit/Specific Development Plan and the Master Development Agreement expired. The original nine office buildings, comprising 146,000 square feet of existing development, remain in use on the Chess-Hatch Property.

2. Project Description
Gilead proposes a new Project fo r the Property to support its long-te rm expansion in the City and fulfill the original vision for the Property. The Project builds on Gilead's integrated campus operations and aims to enhance Gilead’s research capabilities to support its growing pipeline.

The Gilead Campus Expansion Project proposes phased demolition of twelve existing office buildings (totaling 191,507 square feet
1), together with the constr uction of up to a maximum of 800,000 square feet of biotechnology or research and development us es, in addition to a single, standalone, multi-story parking garage.

Similar to the Original Project, the Project would proceed in tw o phases, as described below and depicted in concept in the attached Project Plans.

1 Note that the square footage of existing buildings is approximate.

9.1 Attachment 2 - Project Description

466

Page 3 ends

A. Phase One
In Phase One, eight of the tw elve existing office buildings, comprising approximately 123,536 square feet of development, would be demolished and a two-story building of up to approximately 200,000 square feet would be constructed.

In Phase One, the two-story building would be supported by surface parking. Based on Gilead’s anticipated parking needs and integration wi th its existing campus Transportation Demand Management/Transportation Systems Management (“TDM/TSM”) program, the parking proposed would require approval of a reduction in parking requirements under the provisions of Zoning Code Section 17.36.060. Gilead will submit a Parking Impact Analysis Report with the formal application to support the need for reduced parking.

The landscaping around the existing buildings w ould be removed and replaced, although some of the landscaping and trees would be retained until Phase Two is complete. Vehicular access to the property would be from Chess Drive. There are three driveways accessed from Chess Drive.

Additionally, a loading area is planned. A service road/fire lane encircles most of the site, providing emergency vehicle and service access to the rear of the property.

B. Phase Two
As shown conceptually in the attached Projec t Plans, Phase Two would consist of additional buildings up to a maximum of approximately 600,000 square feet, together with a multi-story parking garage. The new building would replace so me of the surface parking used in Phase One.

The remaining four existing build ings (approximately 67,971 square feet) would be demolished, and a multi-story parking garage would replace them, providing all of the necessary parking for the entire site.

3. Land Use Consistency
The Property is designated as Chess/Hatch Office Research in the Genera l Plan. The Property is zoned as CM/PD (Commercial Mix/Planned Devel opment). The Property is also subject to the Chess Hatch General Development Plan adopted in 2013.

The Project has been designed to comply with the General Plan and Zoning. Attachment A provides an initial consistency analysis with all applicab le General Plan designati ons and Zoning district regulations.

The Chess Hatch General Development Plan contains limitations and authorizations that are specific to the Original Project. The Chess Hatch General Development Plan requires revisions to allow for the Gilead Campus Expansion Pr oject. Notably, the new Project pr oposes to remove standalone office space as an approved use under the Gene ral Development Plan. However, there may be ancillary office space that is in support of biot echnology uses, while standalone office is proposed to be removed as a permitted us e within the General Development Plan. Similarly, other changes are intended to modernize the General Development Plan to bring it into conformance with the new Project. Attachment B provides a draft redline and annotations of the proposed revisions to the General Development Plan for the City’s review and feedback.

9.1 Attachment 2 - Project Description

467

Page 4 ends

The proposed revisions to the General Development Plan repr esent minimal adjustments to modernize outdated provisions ra ther than substantive policy changes. The existing General Development Plan was crafted in 2013 for the Original Project , which had a different design approach and site layout than the current proposa l more suited to the office product that was in demand at the time. The prescriptive language in the current General Development Plan references specific exhibits and design parameters that are no longer applicable to Gilead's proposed development approach, creating unnecessary constraints that serve to impede the Property’s development.

Provisions in the existing General Development Plan contain outdated references to expired agreements. The Master Development Agreement expired in September 2024, and multiple sections of the General Development Plan reference this expired agreement as the basis for ongoing obligations. These references create increased uncer tainty as they point to documents that are no longer operative.

The existing General Development Plan also contains overly prescriptive design standards that were tailored to a specific architectural approach contemplated in 2013. While the fundamental development parameters — including the 800,000 square foot maximum, height limits, and FAR requirements — remain unchanged, the specific layout requirements and design mandates in the current General Development Plan are unnecessa rily restrictiv e and prevent Gilead from implementing a more current design that still meet s all of the City's redevelopment goals for the Property.

The proposed amendments update outdated refere nces, remove provisi ons tied to expired agreements, and provide appropriate flexibility in site design while maintaining the substantive planning that the City intended. These revisions enable implementation of the Project while ensuring continued compliance with the City's vision for high-quality development on the Property.

4. Requested Entitlements

The following entitlements are anticipated to be required:
 an Amendment to the General Developm ent Plan for Chess-Hatch Master Plan for the Property.
 a Vesting Tentative Parcel Map for the Property. (The Project proposes the creation of four or fewer parcels and therefore qualifies under the Subdivision Map Act for a Vesting Tentative Parcel Map.)
 a Use Permit/Specific Development Plan for only Phase One. (As in the Original Project, a Use Permit/Specific Development Plan would be separately submitted for Phase Two in the future.)

For clarity, Gilead proposes to amend the existing General Development Plan that already applies to the entire Property, regardless of phasing. The existing General Development currently contemplates a project in two phases; similarly, the Project also proposes a project in two phases,

9.1 Attachment 2 - Project Description

468

Page 5 ends

modified to reflect a new design. Just as before with the originally approved Chess-Hatch project, Gilead is requesting a Use Permit/Specific Development Plan for only Phase One at this time.

Gilead will apply for Phase Two in the future.

5. CEQA Review and Environmental Assessment Form

The Background section above describes the CEQA review that has occurred to date. The proposed Project is similar in nature compared to the Original Project, and the Project is within the envelope of what was studied within the CEQA documents for the Original Project. Therefore, Gilead does not anticipate the Project to result in new significant impacts. Gilead has retained Lamphier- Gregory to assist with the preliminary environmental review and submitted initial recommendations for discussion with the City as a Memo on CEQA Compliance in conjunction with the Preliminary Review. Gilead prepared this solely for the City’s information and understands that the City will use its independent discretion to complete the formal CEQA analysis as Lead Agency. The memo on CEQA compliance will not accompany the formal application.

Gilead is enclosing the Environmental Assessment Form as requested by the City with regard to CEQA.

6. Submittals for Formal Application
Gilead is submitting a formal a pplication and materials to support the requested entitlements, as described in Section 4:
 Community Development Department General Application Form and Application Fee  Response Log to Preliminary Review (File No: PR2025-0003) Letter (received by Gilead on April 8, 2025)
 Current Preliminary Title Report
 Project and Land Use Tables
 Project Plans
 TDM Plan and TDM Checklist
 Vesting Tentative Parcel Map
 New Chess Facility (Phase 1) Use Permit Drawing Set
 Arborist Report
 Building Permit Acknowledgment Form
 Water Neutrality Documentation
 C.3 and C.6 Development Checklist
 Environmental Assessment Form

9.1 Attachment 2 - Project Description

469

Page 6 ends

 Parking Impact Analysis Report

In addition, a Transportation Impact Analysis is being prepared in conjunction with this submission and will be submitted after April 30, 2025.

Gilead also notes that the following checklist materials are not included with this submission.

Gilead is committed to continuing to work with the City to determine what, if any, additional information is appropriate to submit and the best timing for doing so. Gilead will provide any necessary supplemental materials once expectations have been clarified. These checklist materials are:
 Solid Waste Management Plan
 Landscape Project Application for Outdoor Water Conservation in Landscaping  Climate Action Plan Development Checklist
Lastly, Gilead has elected not to submit the following:
 Voluntary Architectural Plan Release Form

7. Project Implementation Timeline

The following is an estimated timeline for the implementation of the Gilead Campus Expansion Project. These dates are subject to adjustment based on City feedback and other circumstances.

The plan is structured to achieve Gilead’s goal of commissioning and occupying its Phase One building by the end of 2028. The following dates are structured to facilitate that outcome. Note that all dates in the future are approximate and subject to change.

A. Phase One

February 14, 2025 – Submission of Preliminary Review application to the City. File No: PR2025- 0003.

April 8, 2025 – Receipt of Preliminary Review feedback from the City.

April 30, 2025 – Formal application submission following Preliminary Review feedback.

First Quarter 2026 – Targeted entitlement approvals.

Second Quarter 2026 – Submission of building permits, with approval targeted by Fourth Quarter 2026.

Second Quarter 2026 – Demolition of selected existing structures begins.

9.1 Attachment 2 - Project Description

470

Page 7 ends

Fourth Quarter 2026 – Phase One construction commences.

First Quarter 2028 – Construction of the Phase One building and surface parking is completed.

Fourth Quarter 2028 – Gilead commissions and moves into its Phase One building, achieving the project’s targeted milestone.

B. Phase Two

The timing of Phase Two will be based on the successful completion of Phase One and Gilead’s evolving business needs.

***

Thank you for your consideration of this formal application for the Gilead Campus Expansion Project. Gilead looks forward to working closely with the City to ensure the successful implementation of this Project.

Sincerely,

Lucerne Tsang
Gilead Sciences, Inc.

CC:

Corinne Quigley, Gilead Sciences, Inc.

Mi Yang, Gilead Sciences, Inc.

Tamsen Plume, Holland & Knight LLP

9.1 Attachment 2 - Project Description

471

Page 8 ends

Attachment A: Consistency Analysis Chart

The following demonstrates the Project’s consistency with applicable policies and identifies proposed necessary revisions (in strikethrough and underline).

Requirement Consistency Analysis
The designation in the General Plan is Chess/Hatch Office Research.

Areas with this designation allow commercial,
office, industrial, biotechnology and other such
compatible uses including vehicle parking in
both parking structures and at-grade parking
lots on the project site.

Consistent. Gilead is proposing up to 800,000
square feet of development with biotechnology
uses.

Incompatible uses such as housing, schools,
day care, and other uses serving primarily
children are prohibited.

Consistent. No incompatible uses are
proposed.

Vertically and horizontally mixed-use
developments that maximize the use of land,
organize land uses and pedestrian/vehicular
circulation in a safe, logical and functional
manner and establish a safe, logical and
functional design relationship with adjacent
land uses is allowed within this designation.

Consistent. Gilead proposes uses consistent
with this designation.

Uses must meet the requirements of Chapter

17.68, General Performance Standards, of Title
17, Zoning, of the Foster City Municipal Code.

Consistent. These standards regulate fire
hazards, noise, vibration, air pollution, and
other performance standards. Gilead will meet
these standards with its project by design.

FARs for developments in this area would
range from 0.6 to 1.55 FAR.

Consistent. The total Floor Area Ratio, at full
project buildout, will be approximately 1.55.

The Zoning designation is C-M/PD (Commercial Mix/Planned Development).

The City of Foster City Zoning Map is hereby
amended to reclassify the +/- 11.9-acre land
bounded by Chess Drive, Foster City
Boulevard, and State Route 92 (APNs: 094-
010-100, - 500, -510) to change the Zoning
designation from M-1/PD (Light
Industrial/Planned Development) to C-M/PD
(Commercial Mix/Planned Development) with
a General Development Plan to allow up to
800,000 square feet of office, biotechnology, or
research and development uses and parking
structures and at-
grade parking lots, accessory
Consistent. Gilead is proposing up to 800,000
square feet of development with biotechnology
uses. Gilead proposes a revision via a proposed
General Development Plan Amendment to
reflect the change in scope of the Project.

Proposed Revision: The City of Foster City
Zoning Map is hereby amended to reclassify
the +/- 11.9-acre land bounded by Chess Drive,
Foster City Boulevard, and State Route 92
(APNs: 094-010-100, - 500, -510) to change

9.1 Attachment 2 - Project Description

472

Page 9 ends

uses, such as commercial, industrial or light
assembly uses which are incidental or
supportive to the primary office, biotechnology
or research and development uses, with up to
5,000 sq. ft. of the total Project square footage
to be used for retail, restaurant or other
business-supporting ancillary commercial
amenities, except that the following uses are
excluded: housing, schools, day care, and other
uses primarily serving children.
the Zoning designation from M-1/PD (Light
Industrial/Planned Development) to C-M/PD
(Commercial Mix/Planned Development) with
a General Development Plan to allow up to
800,000 square feet of office, biotechnology, or
research and development uses and parking
structures and at-grade parking lots, accessory
uses, such as commercial, industrial or light
assembly uses which are incidental or
supportive to the primary office, biotechnology
or research and development uses, with up to
5,000 sq. ft. of the total Project square footage
to be used for retail, restaurant or other
business-supporting ancillary commercial
amenities, except that the following uses are
excluded: housing, schools, day care, and other
uses primarily serving children.

17.36.060(B) Off-street parking requirements in a PD district.

When the planning commission has determined
that conditions allowing a deviation from the
total number of required off-street parking
spaces are present, the planning commission
may grant such deviation as deemed
appropriate, based upon the following
information provided by the applicant:

1. A parking analysis discussing all impacts
resulting from the deviation from usual off-
street parking requirements, including
alternative parking designs or strategies
considered, and why they were deemed
infeasible, if applicable, and alternatives for
mitigating negative impacts identified.

Consistent. Gilead will provide a Parking
Impact Analysis Report that will describe the
impacts of the proposed deviation from
standard off-street parking requirements in the
context of Gilead’s overall TDM strategy for
its integrated campus. This Report includes
consideration of alternative parking designs
and strategies, and explains why these
alternatives were deemed infeasible. It will also
include a list of TDM measures.

2. The parking analysis may include a clear,
documentable rationale describing how and
why the proposed parking will work at the
given site and specifically identifying where it
has been successfully used in other comparable
projects and cities, and/or any other
information as requested by staff and the
plannin
g commission.

Consistent. Gilead will submit a Parking
Impact Analysis Report and the required TDM
Plan and TDM Checklist, drawing from the
example of its Integrated Campus nearby in the
City of Foster City.

3. The parking analysis shall include a parking
demand study that demonstrates that the
parking demand for the proposed use is less
than the minimum off-street parkin
g required
Consistent. Gilead will include a Parking
Impact Analysis Report that demonstrates that
demand is less than the mandated requirement

9.1 Attachment 2 - Project Description

473

Page 10 ends

by Section 17.62.060. The parking demand
study shall be prepared by a licensed
transportation professional.
in Section 17.62.060, borrowing from its
experience managing transportation demand in
its integrated campus.

4. Any such request for reduction of off-street
parking capacity may be satisfied by providing
a transportation systems management plan
(TSM)/travel demand management (TDM)
program consistent with the requirements
outlined in Section 17.62.060(D)(3).

Consistent. Gilead will submit a TDM Plan
and TDM Checklist in conjunction with its
development. It will propose expanding the
Integrated Campus TDM to Chess Hatch.

General Development Plan Limitations for Chess-Hatch Master Plan.

The CM/PD (Commercial Mix/Planned
Development) District of the +11.89-acre lands
bounded by Foster City Boulevard, Chess
Drive, Foster City Lagoon and State Route 92
(APN: 094-010-100, -500, -510) is herewith
limited and specified as follows:

1. The development will include up to
800,000 sq. ft. of office, biotechnology,
or research and development uses as
more specifically described in Exhibit
A to Ordinance No. 573 and with
layout, height and setbacks generally as
depicted in Exhibit B to Ordinance No.
573.

Gilead proposes a revision via a proposed
General Development Plan Amendment, as the
layout, height, and setbacks depicted in Exhibit
B conform to an earlier plan for development
on the property.

Proposed Revision: The development will
include up to 800,000 sq. ft. of office,
biotechnology, or research and development
uses as more specifically described in Exhibit
A to Ordinance No. 573 and with layout,
height and setbacks generally as depicted in
Exhibit B to Ordinance No. 573.

2. Each Specific Development Plan/Use
Permit shall demonstrate compliance
with the Mitigation Measures included
in the Chess-Hatch Master Plan
Environmental Impact Report (SCH
2008122065), including any Addenda.

The language as presented is anchored to an
outdated CEQA compliance document.

Proposed Revision: Each Specific
Development Plan/Use Permit shall
demonstrate compliance with the Mitigation
Measures included in the Chess-Hatch Master
Plan Environmental Impact Report (SCH
2008122065), including any Addenda
mitigation measures, as identified in approvals
for the Project.

3. On-site traffic improvements shall be
included in conformance with the
Chess-Hatch Master Development
Agreement, or if the Agreement has
expired, with the Chess-Hatch Master
Plan Environmental Impact Report
The language as presented is anchored to an
outdated CEQA compliance document and an
expired Master Development Agreement.

Gilead proposes to delete.

Proposed Revision: On-site traffic
improvements shall be included in

9.1 Attachment 2 - Project Description

474

Page 11 ends

(SCH 2008122065), including any
Addenda.
conformance with the Chess-Hatch Master
Development Agreement, or if the Agreement
has expired, with the Chess-Hatch Master Plan
Environmental Impact Report (SCH
2008122065), including any Addenda.

4. The project shall contribute its fair
share contribution toward off-site
traffic improvements as identified in the
Chess-Hatch Master Development
Agreement, or if the Agreement has
expired, with the Chess-Hatch Master
Plan Environmental Impact Report
(SCH 2008122065), including any
Addenda.

The language as presented is anchored to an
outdated CEQA compliance document and an
expired Master Development Agreement.

Gilead proposes to delete.

Proposed Revision: The project shall
contribute its fair share contribution toward
off-site traffic improvements as identified in
the Chess-Hatch Master Development
Agreement, or if the Agreement has expired,
with the Chess-Hatch Master Plan
Environmental Impact Report (SCH
2008122065), including any Addenda.

5. The development shall contribute to the
operation of a peak-hour shuttle
consistent with the Transportation
Demand Management Plan required
with each Specific Development Plan in
conformance with the Chess-Hatch
Master Development Agreement, or if
the Agreement has expired, with the
Chess-Hatch Master Plan
Environmental Impact Report (SCH
2008122065), including any Addenda.

The language as presented is anchored to an
outdated CEQA compliance document and an
expired Master Development Agreement.

Proposed Revision: The development shall
contribute to the operation of a peak-hour
shuttle consistent with the operate a
Transportation Demand Management Plan
required with each Specific Development Plan
in conformance with the Chess-Hatch Master
Development Agreement, or if the Agreement
has expired, with the Chess-Hatch Master Plan
Environmental Impact Report (SCH
2008122065), including any Addenda
approvals for the Project.

6. Applications for each Specific
Development Plan/Use Permit shall
demonstrate compliance with the Chess
Hatch Design Principles Document,
dated 06.05.13, prepared by Valerio
Dewalt Train and Associates or as later
amended by the Planning Commission.

Consistent. Gilead proposes a project
consistent with the Chess Hatch Design
Principles Document. See below.

7. Phases of the development may be
constructed in any order, but each phase
shall be generally as illustrated in the
Proposed Revision: Gilead proposes to revise
the phasing diagram to reflect the current
project.

9.1 Attachment 2 - Project Description

475

Page 12 ends

phasing diagrams attached as Exhibit
D.

8. Each Specific Development Plan/Use
Permit application shall include the
Transportation Demand Management
Plan as required by the City/County
Association of Governments.

Consistent. Gilead will include a
Transportation Demand Management Plan as
required by C/CAG.

9. Until redevelopment of the property
occurs in accordance with this General
Development Plan, the existing M-
1/PD Zoning/General Development
Plan and Specific Development
Plan/Use Permit approvals shall govern
the uses of the property.

Consistent. As the property is redeveloped,
portions will remain in consistency with the
existing M-1/PD Zoning, until they are
redeveloped in the second phase.

Chess Hatch Design Principles Document, dated 06.05.13, prepared by Valerio Dewalt Train and Associates.

Maximum FAR: 1.55 Consistent. Gilead proposes a Project in two phases; upon full build-out, the Project’s FAR
will be approximately 1.55.

Maximum Building Height: 150 feet to 190
feet
Consistent. The Project as proposed does not
exceed this maximum building height.

Lot Coverage: Maintain significant public
open and green space, with the upper limit of
lot coverage governed by the success of the
design.

Consistent. Gilead proposes significant public
open and green space.

Context: Surfaces should not be monolithic,
they should have a sense of detail. Solids and
glass should be roughly equal, and the
composition balanced with an emphasis on the
horizontal.

Consistent. Gilead proposes buildings that will
adhere to these design principles, with surfaces
that have a sense of detail.

Site Coherence: The building should mark the
corner with a visual icon, and buffer pedestrian
zones and entries from freeway. The building
shape should serve to help transition from high
to the low scale of the neighborhood.

Consistent. Gilead proposes buildings that will
adhere to these design principles, with buffered
pedestrian zones, a transition from high to low
scale, and a visual icon at the corner.

Massing: There should be logic to how the
building meets the ground and the sky…and
what is in between.

Consistent. Gilead proposes buildings that will
adhere to these design principles, with logical
massing considerations.

Building Form: The building should be solid
and rectangular in form so that the floor plates
Consistent. Gilead proposes buildings that will
adhere to these design principles, with

9.1 Attachment 2 - Project Description

476

Page 13 ends

are similar in size. Any features such as curves,
angles, arcades and cantilevers should act as
punctuation to the overall design.
rectangular building forms and similar-sized
floor plates.

Integration: Parking should be part of the
overall building design, and signage should
never be an afterthought.

Consistent. Gilead proposes buildings that will
adhere to these design principles, with parking
integrated into the overall building design and
signage thoughtfully considered.

Landscape: The open space around the
building should create a sense of place and
welcome people for momentary experiences. It
should provide a place for people to sit and
gather.

Consistent. Gilead proposes buildings that will
adhere to these design principles, with open
spaces around the buildings that create a sense
of place and provide areas for people to sit and
gather.

Environmental Logic and Sustainability:

The overall design should respond to the
environment. Design should be driven by using
materials and methods that are low impact.

Consistent. Gilead proposes buildings that will
adhere to these design principles, with a focus
on using low-impact materials and methods to
drive sustainability in the design.

Relationship between Materials: There
should be a contrast between the natural
materials used and the highly finished ones.

There should be roughly equal parts of both in
the final design. All materials should be
interpreted in their most natural color.

Consistent. Gilead proposes buildings that will
adhere to these design principles, with contrast
between natural and finished materials and an
emphasis on natural color.

9.1 Attachment 2 - Project Description

477

Page 14 ends

Attachment B: Proposed Redline of General Development Plan

EXHIBIT A

GENERAL DEVELOPMENT PLAN NARRATIVE FOR CHESS HATCH MASTER PLAN

The City of Foster City Zoning Map is hereby amended to reclassify the +/- 11.9-acre land bounded by Chess Drive, Foster City Boulevard, and State Route 92 (APNs: 094-010-100, -500, -510) to change the Zoning designation from M-1/PD (Light Industrial/Planned Development) to C-M/PD (Commercial Mix/Planned Development) with a General Development Plan to allow up to 800,000 square feet of office, biotechnology, or research and development uses and parking structures and at-grade parking lots; accessory uses, such as commercial, industrial or light assembly uses which are incidental or supportive to the primary office, biotechnology or research and development uses; or other uses which, in the opinion of the planning director, are similar to and no more offensive than the above-listed uses; with up to 5,000 sq. ft. of the total Project square footage to be used for retail, restaurant or other business-supporting ancillary commercial amenities; except that the following uses are excluded: housing, schools, day care, and other uses primarily serving children.

9.1 Attachment 2 - Project Description

478

Page 15 ends

EXHIBIT C

GENERAL DEVELOPMENT PLAN LIMITATIONS FOR CHESS-HATCH MASTER PLAN (RZ-07-002)

The CM/PD (Commercial Mix/Planned Development) District of the ±11.89-acre lands bounded by Foster City Boulevard, Chess Drive, Foster City Lagoon and State Route 92 (APN: 094-010-100, - 500, -510) is herewith limited and specified as follows:

1. The development will include up to 800,000 sq. ft. of office, biotechnology, or research and development uses as more specifically described in Exhibit A to Ordinance No. 573 and with layout, height and setbacks generally as depicted in Exhibit B to Ordinance No. 573.

2. Each Specific Development Plan/Use Permit shall demonstrate compliance with the Mitigation Measures included in the Chess-Hatch Master Plan Environmental Impact Report (SCH 2008122065), including any Addenda mitigation measures, as identified in approvals for the Project.

3. On-site traffic improvements shall be included in conformance with the Chess-Hatch Master Development Agreement, or if the Agreement has expired, with the Chess-Hatch Master Plan Environmental Impact Report (SCH 2008122065), including any Addenda.

4. The project shall contribute its fair share contribution toward off-site traffic improvements as identified in the Chess-Hatch Master Development Agreement, or if the Agreement has expired, with the Chess-Hatch Master Plan Environmental Impact Report (SCH 2008122065), including any Addenda.

5.3.The development shall contribute to the operation of a peak-hour shuttle consistent with theoperate a Transportation Demand Management Plan required with each Specific Development Plan in conformance with the Chess-Hatch Master Development Agreement, or if the Agreement has expired, with the Chess-Hatch Master Plan Environmental Impact Report (SCH 2008122065), including any Addenda approvals for the Project.

6.4.Applications for each Specific Development Plan/Use Permit shall demonstrate compliance with the Chess Hatch Design Principles Document, dated 06.05.13, prepared by Valerio Dewalt Train and Associates or as later amended by the Planning Commission.

7.5.Phases of the development may be constructed in any order, but each phase shall be generally as illustrated in the phasing diagrams attached as Exhibit D.

8.6.Each Specific Development Plan/Use Permit application shall include the Transportation Demand Management Plan as required by the City/County Association of Governments.

9.7.Until redevelopment of the property occurs in accordance with this General Development Plan, the existing M-1/PD Zoning/General Development Plan and Specific Development Plan/Use Permit approvals shall govern the uses of the property.

9.1 Attachment 2 - Project Description

479

Page 16 ends

EXHIBIT B

GENERAL DEVELOPMENT PLAN GRAPHIC FOR CHESS-HATCH MASTER PLAN [INSERT NEW SITE PLAN HERE]

9.1 Attachment 2 - Project Description

480

Page 17 ends

9.1 Attachment 2 - Project Description

481

Page 18 ends

EXHIBIT D

PHASING EXHIBITS
[INSERT NEW PHASING EXHIBITS HERE]

9.1 Attachment 2 - Project Description

482

Ju
ly 28, 2023
Mi
Yang
333 Lakeside Drive
Foster City, CA 94404
[email protected]
Re: File No: PR2025-0003
Preliminary Application for General Development Plan Amendment and Use Permit for new R&D Building at 1155, 1165, and 1185 Chess Drive
Project Description: Preliminary Application for the redevelopment of an approximately 12- acre property on Chess Drive. The proposed project would involve a General Development Plan Amendment and the demolition and reconstruction of biotechnology/R&D buildings.

Dear Ms. Yang:

The Community Development Department is in receipt of your preliminary application for the proposed redevelopment on Chess Drive, in Foster City. We understand that Gilead is looking for preliminary feedback and guidance on entitlement requirements. On March 5, 2025, the members of the of the Interdepartmental Evaluation Committee (IDEC) reviewed information and/or plans for the project noted above. Based on the preliminary nature of the proposal, the following comments are being provided. The comments below are organized by department headings to enable you to identify the source and expertise of the comments.

Where there are comments which may require clarification, please feel free to contact the specific department directly.

Com
munity Development Department: Planning Division: Helen Gannon Telfer, Senior Planner

1. Project Description
a. The Cover Letter states that a General Development Plan (GDP) Amendment will be occurring during Phase One and Phase Two. Please note that the GDP application will apply to the entire site irrespective of phasing, and the Use Permit will be for Phase one.

2. General Development Plan Amendment
a. Pursuant to Chapter 17.72 of the Foster City Municipal Code, the Preliminary Review Application may be brought to a Study Session for review by City Council. Staff will be in touch on when/if the project will tentatively be scheduled for a Study Session.

3. California Environmental Quality Act (CEQA)
a. The City has requested environmental scopes and proposals from qualified environmental consulting firms for the preparation of an Initial Study. Staff will

9.1 Attachment 3 - IDEC Letter

483

File PR2025-0003

Page 2 ends

prov
ide an update as soon as a consultant and proposal has been chosen.

4. Water Neutrality – Estero Municipal Improvement District (EMID) a. The applicant shall work with EMID and comply with EMID Code 8.90 Water Neutrality Growth. For more information, please refer to https://www.fostercity.org/commdev/page/water-neutrality-guidebook. EMID may provide a “will serve” letter for the Use Permit. Please email for additional information: Yelena Capello at [email protected] directly.

5. Parking
a. Provide a Parking Analysis. The analysis should provide the total number of required parking spaces per the GDP and Foster City Municipal Code, how many parking spaces are to be provided, and reasoning for any reduced number of spaces.

6. Traffic Demand Management (TDM)
a. Please provide sufficient reasoning as to why Gilead cannot implement all required measures. The City also encourages you to fill out and submit the TDM Project Registration Form to aide us in monitoring compliance. Please also confirm which high quality transit services are located 0.5-3 miles away. b. Please confirm that the Master Campus TDM program will continue to be active, even with the termination of Gilead’s Master Campus DA.

7. Plans
a. Complete plans will be required for review at official time of submittal, including but not limited to:
i. Complete site plan
ii. Complete floor plans
iii. Roof plan
iv. Building cross sections and elevations
v. Full renderings, inclusive of proposed materials and colors vi. Grading and drainage plan
vii. Landscape plan
Publ
ic Works Department, Engineering Division, Ryan Marquez See attached comment letter.

San M
ateo County Fire, Michele Orque

1. Provide water flow analysis.

2. Provide hydrant locations.

3. Provide location of transmission lines in the fire access road.

Com
munity Development Department: Building Division: Chuck Venook, Chief Building Official

1. A Geotechnical Investigation and Soils Report will be required prior to Building Permit issuance.

2. The Geotechnical Engineer of Record will be required to provide a letter of conformance on the foundation design prior to Building Permit issuance.

3. A survey will be required by a CA licensed surveyor and provided to the Building Division locating the four corners of the foundation from the adjacent property lines prior to Building Permit issuance.

4. A CA registered design professional will be required to perform the plan design for Building

9.1 Attachment 3 - IDEC Letter

484

File PR2025-0003

Page 3 ends

Permit submittal.

5. The proposed building shall be fully compliant with ADA Regulations as prescribed in Chapter 11B in the CA Building Code.

6. The Building Division looks forward to the plan submittal under the 2025 Code Cycle.

NEXT STEPS

Submit a letter of response with revised plans, which must include a description of modifications to plans made and information submitted to address each of the comments above.

Upon receipt of the information listed above and any additional comments that are forthcoming from other departments, your application may be scheduled for a City Council Study Session Regular Meeting (staff will confirm) . After this review has taken place, staff or the City Council may have additional comments and may suggest design changes to your plans prior to receipt of an official application to the City.

Should you have any questions please do not hesitate to contact me at 650-286-3225 or [email protected].

Sincerely,

Helen Gannon Telfer, Senior Planner
Cc: Sofia Mangalam, Community Development Director

9.1 Attachment 3 - IDEC Letter

485

Public Works Department 610 Foster City Boulevard
Engineering Division Foster City, CA 94404
Phone: (650) 286-3270 Fax: (650) 345-4626

April 3, 2025

Address: 1165 Chess Drive

Application #: PR2025-0003

Reviewed By: Ryan Marquez

Plan Check Number: Preliminary GDP Amendment

NOTE:

These comments are preliminary and with full submittal of application, applicant can expect more detailed and robust comment list.

PLAN CHECK COMMENTS:

Kimley Horn Traffic Study

1. Study will undergo peer review upon resubmittal of official application.

2. Please provide current traffic volumes and analysis. Acknowledged 2017 and 2019 is pre covid but it is very outdated at this point and much has changed in the City.

3. Please provide trip generation numbers backup and compared with ITE. Would also like to understand number of spaces expected on site for both phases.

4. While LUC-F-1 states it will be necessary to accept LOS E & F on specific intersections, it does not preclude project mitigation for worsening conditions. Study shall analyze possibilities of improving heavily impacted intersections such that the delay is not worsened. Consider some of 2009 recommendations.

5. Add a discussion for the Cumulative conditions. A little more background and definition of what it includes.

6. The overall study is preliminary. It should clarify the background, setting and goal.

A. Is it a modification of the approved 2009 project? How so? Please discuss differences.

B. Does this study include Phase 1 or Phase 2 or both in the conclusion? What is the intent?

7. The conclusion – is this for Phase 1, or Phase 1 & 2? Please clarify in study.

8. Add descriptions of the following required and recommended trip reduction measures identified by the applicant on the TDM Checklist to the TDM Concept final letter:

A. provide TDM coordinator or contract thru 3rd party provider B. design streets to encourage bike/ped access
C. land dedication or capital improvements to transit
D. bike repair station

9. The existing level of service at Foster City Blvd-Chess Dr intersection at PM peak is LOS E. The Existing plus Phase 1 project conditions at the same intersection at PM peak will still have LOS E with increase in average delay. However, both Cumulative conditions through 2040, and Full project buildout conditions will have LOS F with significant average delays. Study with LOS and average delay data with the required and recommended TDM implemented at each condition is needed for review.

Plan Comments:

1. No utility plan was provided, please submit preliminary utility plans.

9.1 Attachment 3 - IDEC Letter

486

Public Works Department 610 Foster City Boulevard
Engineering Division Foster City, CA 94404
Phone: (650) 286-3270 Fax: (650) 345-4626
Vesting Tentative Map

1. Further peer review will be required upon full submittal.

2. It is unclear if there is a need for a tentative map as no parcels are be proposed to be created. Please provide SMA support for such map and narrative reason for needing tentative map.

3. It is unclear if the vesting tentative map is for all three parcels, the improvements are only shown on two parcels while the westerly parcel is shown as is.

4. Driveway near intersection of FCB & Chess will need to be removed, if not as part of phase I but as part of phase II as it is too close to intersection.

5. TM-100 index shows TM500 -900, but sheets are not on plan, please provide full TM including utility layouts.

6. Please see Section 16 of FCMC for tentative map requirements.

EMID Water & Sewer Comments

1. Water Supply Assessment will be required.

2. Water and Wastewater Capacity Studies needed - Acknowledgement that Mi Yang with Gilead has reached out for these separately.

3. Water Neutrality Compliance will need to be achieved as part of the project, with offset calculations being submitted as part of UP.

Attachments: None

9.1 Attachment 3 - IDEC Letter

487

Page 1 ends

kimley-horn.com 4637 Chabot Drive, Suite 300, Pleasanton, CA 94588 925 398 4840 Technical Memorandum
DATE: February 12, 2025
TO: Mi Yang
Master Planning
Gilead Sciences, Inc.
353 Vintage Park Drive
Foster City, CA 94404
FROM: Ben Huie, PE
Seitu Coleman, TE
Kimley-Horn and Associates, Inc.
4637 Chabot Drive
Pleasanton, CA 94588
SUBJECT: Gilead Sciences Campus Expansion Project & New Chess Facility – Preliminary Transportation Impact Study Results

1. Background Information
This technical memorandum summarizes the results of a transportation impact analysis (TIA) for a proposed Gilead Campus Expansion Project, including a phased development plan on the Chess Hatch Property (the “Project”) in Foster City (the “City”), California. The Project site is located west of State Route 92 (SR 92), north of Foster City Boulevard, east of Chess Drive, and south of a lagoon of Foster City Lake in an area known as the Chess/Hatch Office Research Site (seeFigure 1). The Project would be completed in two phases. Phase I would demolish eight existing office buildings and construct up to approximately 200,000 square-foot biotechnology research and development (R&D) building with surface parking to be used by Gilead Sciences (the “Project Applicant”). Phase II would construct an additional up to 600,000 square feet of space to be used for biotechnology R&D by the Project Applicant, together with a multi-story parking garage. Phases I and II would equate to a total of up to 800,000 square feet for biotechnology R&D and would be considered full buildout of the Project.

This TIA identifies potential impacts associated with the Project based on standards and methodologies established by Foster City and by the State of California Governor’s Office of Planning and Research (“OPR”).

The study includes evaluations of traffic operational conditions during the a.m. and p.m. peak hours for six study intersections. The study additionally addresses the potential transportation effects of the proposed Project to assist the City with Project planning and with the identification of potential conditions of approval of the Project.

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

488

Page 2 ends

kimley-horn.com 4637 Chabot Drive, Suite 300, Pleasanton, CA 94588 925 398 4840 Figure 1: Project Vicinity Map
Source: Google My Maps
N
Project Site
# = Study Intersection
#1
#2
#3
#4
#5
#6

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

489

Page 3 ends

kimley-horn.com 4637 Chabot Drive, Suite 300, Pleasanton, CA 94588 925 398 4840

2. Study Methodology
This section describes the study area and the specific locations on the local transportation network that were evaluated during the analysis. This section additionally describes the metrics and thresholds used to determine if Project effects on the local transportation network are inconsistent with local standards and plans.

2.1 STUDY AREA
A study area establishes specific locations where, or boundaries in which, a transportation impact analysis is conducted. Study areas allow transportation analyses to identify critical points on the local roadway network that might experience acute effects from a proposed development while avoiding unnecessary study of locations that would experience little to no effects from the proposed development.

The study area for this traffic study was determined based on the estimated peak hour trips added by the project to the nearby study intersections. The majority of the project trips are expected to be added to intersections located between the proposed project and the SR-92/Chess Drive/Metro Center Boulevard interchange. The following study intersections are listed below inTable 1.

Table 1: Study Intersections
# Intersection Existing Control Type
1 Foster City Boulevard & Chess Drive / Vintage Park Drive Signal 2 Vintage Park Drive & Chess Drive Signal
3 SR 92 Westbound Ramps & Chess Drive Signal
4 Foster City Boulevard & Chess Drive Signal
5 SR 92 Eastbound Ramps & Metro Center Boulevard Signal 6 Foster City Boulevard & Metro Center Boulevard / Triton Drive Signal

2.2 STUDY SCENARIOS
In accordance with discussions with the Project Applicant, this traffic study evaluates the following traffic scenarios:
l Existing Conditions – This scenario evaluates traffic conditions in the study area with existing traffic volumes. Existing volumes are from approved traffic studies for other development projects nearby the study area and were collected in October 2017 and May 2019. They represent traffic conditions from the pre-pandemic era, which typically have higher traffic volumes than the post-pandemic era. Existing roadway geometries and traffic controls were additionally used for this scenario.
l Existing plus Phase I Project Conditions – This scenario evaluates traffic conditions in the study area with Existing Conditions traffic volumes plus traffic associated with Phase I of the Project.

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

490

Page 4 ends

kimley-horn.com 4637 Chabot Drive, Suite 300, Pleasanton, CA 94588 925 398 4840 l Cumulative Conditions – This scenario evaluates traffic conditions in the study area with traffic volumes projected to the horizon year of 2040.
l Cumulative plus Full Project Buildout Conditions – This scenario evaluates traffic conditions in the study area with Cumulative Conditions traffic volumes plus traffic associated with full buildout of the Project (Phase I plus Phase II).

2.3 STUDY METRICS
Transportation impacts related to the proposed Project were evaluated for both compliance with applicable regulatory documents and environmental significance as defined in the California Environmental Quality Act (CEQA). In accordance with OPR’s2018 Technical Advisory on Evaluating Transportation Impacts in CEQA1 (the “Technical Advisory”), a quantitative vehicle miles traveled (VMT) assessment is the preferred methodology for determining the environmental significance of transportation impacts of development projects under CEQA. Effective July 1, 2020, vehicular delay on roadway segments and intersections qualitatively measured using the level of service (LOS) metric can no longer be used to determine the environmental significance of transportation impacts of development projects for CEQA purposes. However, the OPRTechnical Advisory does not exclude the use of LOS when determining consistency with plans and standards of local jurisdictions and agencies such as Foster City.

2.3.1 Vehicle Miles Traveled
VMT is a metric that quantifies vehicular travel volumes on transportation facilities. A quantity of 10 VMT could equate to one vehicle traveling 10 miles or 10 vehicles traveling one mile.

Senate Bill 743 of 2013 (“SB 743”) directs OPR to establish specific criteria for determining the significance of transportation impacts of development projects for CEQA purposes. The OPRTechnical Advisory provides such specific criteria but additionally allows local jurisdictions and agencies the discretion to set or apply their own thresholds of significance. As the City of Foster City has not established its own VMT standards, this traffic study defaults to the standards provided in the OPR Technical Advisory.

The OPR Technical Advisory contains the following criteria to screen out projects that are presumed to have a less-than-significant impact and would not require a full VMT analysis:
l Is a residential or office land use located near transit stations or stops, subject to applicability. l Is located within areas with low VMT.
l Is a small, local-serving land use that would generate or attract fewer than 110 trips per day. l Is an infill affordable housing land use.
1 Technical Advisory on Evaluating Transportation Impacts in CEQA, Governor’s Office of Planning and Research, State of California, December 2018.

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

491

Page 5 ends

kimley-horn.com 4637 Chabot Drive, Suite 300, Pleasanton, CA 94588 925 398 4840 Based on the above criteria, the proposed Project would not be screened out and requires a full VMT analysis.

2.3.2 Intersection Level of Service
Although CEQA now recognizes VMT as the primary analysis methodology for transportation impacts, it does not preclude local agencies from using LOS to establish operational standards for local roadway networks.

The LOS of an intersection is a qualitative measure used to describe operational conditions. LOS ranges from “A” (best), which represents minimal delays experienced by roadway users, to “F” (worst), which represents heavy delays experienced by roadway users and a facility that is operating at or near its functional capacity. LOS for this study were determined using methods defined in the Transportation Research Board’s Highway Capacity Manual, 7 th Edition (HCM 7 th Edition ). The HCM 7 th Edition includes procedures for analyzing side street stop controlled (SSSC), all-way stop controlled (AWSC), and signalized intersections. The SSSC procedure defines LOS as a function of average control delay for the worst minor street movement or major street left-turn. Conversely, the AWSC and signalized intersection procedures define LOS as the average control delay of all approaches weighted by volume.

Table 2 and Table 3 relate the operational characteristics associated with each LOS category for unsignalized and signalized intersections.

Table 2: Unsignalized Intersection Operational Characteristics Definitions LOS Delay
(sec/veh) Descriptions
A 0-10 Little or no delay
B >10-15 Short traffic delays
C >15-25 Average traffic delays
D >25-35 Long traffic delays
E >35-50 Very long traffic delays
F >50 Extreme delays potentially affecting other traffic movements in the intersection
Source: Transportation Research Board (2022), HCM 7th Edition, p. 20-6

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

492

Page 6 ends

kimley-horn.com 4637 Chabot Drive, Suite 300, Pleasanton, CA 94588 925 398 4840 Table 3: Signalized Intersection Operational Characteristics Definitions LOS Delay
(sec/veh) Descriptions
A 0-10
Free Flow/Insignificant Delays: No approach phase is fully utilized by traffic and no vehicle waits longer than one red indication. Most vehicles do not stop at all. Progression is extremely favorable and most vehicles arrive during the green phase.

B >10-20
Stable Operation/Minimal Delays: An occasional approach phase is fully utilized. Many drivers begin to feel somewhat restricted within platoons of vehicles. This level generally occurs with good progression, short cycle lengths, or both.

C >20-35
Stable Operation/Acceptable Delays: Major approach phases fully utilized. Most drivers feel somewhat restricted. Higher delays may result from fair progression, longer cycle lengths, or both. Individual cycle failures may begin to appear at this level, and the number of vehicles stopping is significant.

D >35-55
Approaching Unstable/Tolerable Delays: The influence of congestion becomes more noticeable. Drivers may have to wait through more than one red signal indication. Longer delays may result from some combination of unfavorable progression, long cycle lengths, or high v/c ratios. The proportion of vehicles not stopping declines, and individual cycle failures are noticeable.

E >55-80
Unstable Operation/Significant Delays: Volumes at or near capacity.

Vehicles may wait though several signal cycles. Long queues form upstream from intersection. These high delay values generally indicate poor progression, long cycle lengths, and high v/c ratios. Individual cycle failures are a frequent occurrence.

F >80
Forced Flow/Excessive Delays: Represents jammed conditions. Queues may block upstream intersections. This level occurs when arrival flow rates exceed intersection capacity, and is considered to be unacceptable to most drivers. Poor progression, long cycle lengths, and v/c ratios approaching

1.0 may contribute to these high delay levels.

Source: Transportation Research Board (2022), HCM 7th Edition, p. 19-16

2.4 THRESHOLDS OF DEFICIENCY
This section discusses the thresholds of deficiencies that apply to the Project.

2.4.1 Vehicles Miles Traveled
The OPR Technical Advisory provides the following VMT significance thresholds for various development projects:
l Residential projects exceeding a level of 15 percent below existing VMT per capita in the city or region may indicate a significant transportation impact. l Office projects exceeding a level of 15 percent below existing regional VMT per employee may indicate a significant transportation impact.

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

493

Page 7 ends

kimley-horn.com 4637 Chabot Drive, Suite 300, Pleasanton, CA 94588 925 398 4840 l Retail projects that result in a net increase in total VMT may indicate a significant transportation impact.

VMT methodologies typically lump land uses into the above three categories (even if those land uses do not fit the exact definitions of the three categories) based on demographic data and employment- based trip behavior associated with those land uses.

The characteristics of the land uses proposed by the Project would categorize the Project as an “Office” development. Thus, the Project would be considered to generate a significant transportation impact if its expected VMT per employee exceeds a level of 15 percent below the existing regional VMT per employee baseline.

2.4.2 Intersection Level of Service
The LOS analysis included in this study was prepared based on the standards and methodologies established by the City of Foster City. The Foster City General Plan establishes the following operational thresholds for its local roadway network:
l A minimum of LOS C during non-peak hours
l A minimum of LOS D during peak hours
l A minimum of LOS F during all hours at the following intersections:
n Foster City Boulevard & Chess Drive / Vintage Park Drive (Study Intersection 1) n Vintage Park Drive & Chess Drive (Study Intersection 2) n SR 92 Westbound Ramps & Chess Drive (Study Intersection 3) n Foster City Boulevard & Chess Drive (Study Intersection 4) n Foster City Boulevard & Metro Center Boulevard / Triton Drive (Study Intersection 6) The Foster City General Plan does not include guidance for when an intersection is already operating at unacceptable LOS. Therefore, in consistency with other approved TIAs, this study considers Project deficiencies to occur when:
l For facilities that currently operate at an acceptable LOS without the Project:
n The addition of Project-related traffic causes the LOS on a study facility to change from an acceptable LOS under “no Project” conditions to an unacceptable LOS under “with Project” conditions.
l For facilities that currently operate at an unacceptable LOS without the Project:
n A project deficiency occurs if the addition of Project traffic increases the average vehicle delay for a signalized intersection by four (4) seconds or more, or n A project deficiency occurs if the addition of Project traffic increases the average delay for an all-way stop controlled intersection by four (4) seconds or more and the intersection meets the peak hour signal warrant, or
n A project deficiency occurs if the addition of Project traffic increases the highest delayed side-street movement of a stop-controlled intersection by four (4) seconds or more and the intersection meets the peak hour signal warrant.

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

494

Page 8 ends

kimley-horn.com 4637 Chabot Drive, Suite 300, Pleasanton, CA 94588 925 398 4840 n For intersections that are allowed to operate at LOS F because they are necessary due to their role as access points to the freeway system, as stated in LUC-F-1 of the Land Use and Circulation Element of the Foster City General Plan, the increases in delay due to Project traffic added would not result in a deficiency.

3. Existing Conditions
This section describes the existing operating conditions of the study intersections prior to implementation of the proposed Project.

Peak hour turning movement counts for Existing Conditions were obtained from an approved traffic study for a development project nearby the study area2.

Existing lane geometries, control types, and signal timings at the study intersections were simulated using PTV Vistro software.

3.1 INTERSECTION LEVEL OF SERVICE
Traffic operations under Existing Conditions were evaluated at the study intersections. The results of the analysis are shown in Table 4.

All study intersections operate at LOS that are consistent with Foster City standards and plans.

Table 4: Existing Conditions Intersection Level of Service # Intersection
LOS
Criteria2
Existing
AM Peak PM Peak
LOS Delay1
(sec) LOS Delay1
(sec)
1 Foster City Boulevard / Vintage Park
Drive - Chess Drive F B 11.6 B 12.6
2 Vintage Park Drive / Chess Drive F C 34.4 D 50.6
3 SR-92 WB Ramps / Chess Drive F C 20.4 D 43.9
4 Foster City Boulevard / Chess Drive F C 32.3 D 51.0
5 SR-92 EB Ramps / Metro Center
Boulevard D D 37.9 D 40.9
6 Foster City Boulevard / Metro Center
Boulevard F D 42.1 D 39.1
Notes:

1. The average control delay is reported for signalized intersections.

2. Intersections that are operating below acceptable levels are shown in BOLD and significant impacts are highlighted.
2 Transportation Impact Analysis (TIA) for the Foster City Pilgrim Triton Master Plan Proposed Amendment to Phase C by Kittelson & Associates, Inc. dated July 2018. Volumes from this study were collected in October 2017.

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

495

Page 9 ends

kimley-horn.com 4637 Chabot Drive, Suite 300, Pleasanton, CA 94588 925 398 4840

4. Existing plus Phase I Project Conditions
This section describes the impacts of Phase I of the proposed Project at the study intersections and the surrounding roadway system. The Existing plus Project Conditions scenario consists of existing traffic volumes and roadway facilities plus new traffic generated by the proposed Project.

The amount of traffic added to the roadway system by the proposed Project is estimated using a three- step process:
l Trip Generation (Section 4.1) – Estimates the amount of traffic added to the roadway network; l Trip Distribution (Section 4.2) – Estimates the direction of travel to and from the Project site; and
l Trip Assignment ( Section 4.2) – Allocates Project-related traffic to specific street segments and intersection turning movements.

4.1 TRIP GENERATION
A trip generation evaluation typically refers to the Institute of Transportation Engineer’s (ITE) Trip Generation Manual, 11th Edition, which is a standard reference used by jurisdictions throughout the country to estimate the trip generation potential of proposed developments.

A trip is defined in the Trip Generation Manual as a single or one-directional vehicle movement with either the origin or destination at a project site. In other words, a trip can be either “to” or “from” the site and therefore, a single visitor to a site is counted as two trips.

Trips are typically calculated from trip rates in theTrip Generation Manual for times of the day and week during which a proposed development’s worst-case transportation impacts on the surrounding roadway network would be expected to occur. These time periods are typically the a.m. peak hour (generally between the hours of 7:00 a.m. to 9:00 a.m.) and the p.m. peak hour (generally between the hours of 4:00 p.m. to 6:00 p.m.) on a typical weekday.

For the purposes of this study, custom trip rates provided by the Project Applicant (rather than those from theTrip Generation Manual) were used to estimate Project-related trips to reflect the unique nature of the proposed land uses. These custom trip rates were derived and utilized in the Gilead Sciences Integrated Corporate Campus Master Plan Subsequent Environmental Impact Report3 (Gilead Campus Master Plan SEIR).

Note that a trip reduction of 23.3 percent was applied to the Project to reflect the implementation of the Gilead Integrated Campus transportation demand management (TDM) program. The TDM program is required to provide a minimum trip reduction of 23.3 percent for the Gilead Integrated Campus. Since the Project is an expansion of the Gilead Integrated Campus, the trip reduction was applied to the 3 Gilead Sciences Integrated Corporate Campus Master Plan Subsequent Environmental Impact Report , LSA, December 2012.

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

496

Page 10 ends

kimley-horn.com 4637 Chabot Drive, Suite 300, Pleasanton, CA 94588 925 398 4840 Project as well. A list of proposed amenities that would be provided by the TDM program is available in Appendix F.

Table 5 shows the trip generation of Phase I of the Project.

Phase I of the Project would generate approximately 1,244 daily trips, 51 trips (42 in, nine out) during the a.m. peak hour, and 72 trips (12 in, 60 out) during the p.m. peak hour.

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

497

Page 11 ends

kimley-horn.com 4637 Chabot Drive, Suite 300, Pleasanton, CA 94588 925 398 4840 Table 5: Phase I Project Trip Generation
Land Use Size (KSF)
Daily AM Peak Hour PM Peak Hour
Rate Total Rate In:Out In Out Total Rate In:Out In Out Total Phase I
Gilead Laboratory1 200.0 KSF 8.11 1,622 0.333 82:18 55 12 67 0.468 16:84 15 79 94 TDM2 Trip Reduction3 -23.3% -378 -13 -3 -16 -3 -19 -22
Net New Trips with Reductions +1,244 +42 +9 +51 +12 +60 +72 Notes:

1. The Project trip generation rates were provided by Gilead Sciences.

2. TDM = Transportation demand management

3. A trip reduction of 23.3% is applied to reflect the proposed TDM program for the Project.

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

498

Page 12 ends

kimley-horn.com 4637 Chabot Drive, Suite 300, Pleasanton, CA 94588 925 398 4840

4.2 TRIP DISTRIBUTION & TRIP ASSIGNMENT
Trip distribution is a process of estimating the directions of Project-related vehicular trips. The trip distribution of the Project was developed based on existing travel patterns, knowledge of the study area, and discussions with the Project Applicant.

The trip distribution for vehicles is listed below:
l Three percent to/from the north via Foster City Boulevard l 12 percent to/from the northeast via SR 92
l Six percent to/from the southeast via Foster City Boulevard l Four percent to/from the southeast via Shell Boulevard l Seven percent to/from the south via Edgewater Boulevard l 63 percent to/from the southwest via SR 92
l Five percent to/from the southwest via Fashion Island Boulevard The Project-related trips were assigned to specific turning movements of the study intersections using PTV Vistro software.

4.3 INTERSECTION LEVEL OF SERVICE
Traffic operations under Existing plus Phase I Project Conditions were evaluated at the study intersections. The results of the analysis are shown inTable 6.

All study intersections operate at LOS that are consistent with Foster City standards and plans.

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

499

Page 13 ends

kimley-horn.com 4637 Chabot Drive, Suite 300, Pleasanton, CA 94588 925 398 4840 Table 6: Existing plus Phase 1 Project Conditions Intersection Level of Service # Intersection LOS
Criteria2
Existing Existing + Phase I Project
AM Peak PM Peak AM Peak PM Peak
LOS Delay1
(sec) LOS Delay1
(sec) LOS Delay1
(sec) Var LOS Delay1
(sec) Var
1 Foster City Boulevard / Vintage
Park Drive - Chess Drive F B 11.6 B 12.6 B 11.7 +0.1 B 12.7 +0.1 2 Vintage Park Drive / Chess
Drive F C 34.4 D 50.6 C 34.4 0.0 D 52.7 +2.1
3 SR-92 WB Ramps / Chess
Drive F C 20.4 D 43.9 C 20.8 +0.4 D 47.2 +3.3
4 Foster City Boulevard / Chess
Drive F C 32.3 D 51.0 C 33.7 +1.4 E 69.7 +18.7
5 SR-92 EB Ramps / Metro
Center Boulevard D D 37.9 D 40.9 D 42.2 +4.3 D 40.9 0.0 6 Foster City Boulevard / Metro
Center Boulevard F D 42.1 D 39.1 D 43.0 +0.9 D 39.2 +0.1 Notes:

1. The average control delay is reported for signalized intersections.

2. Intersections that are operating below acceptable levels are shown in BOLD and significant impacts are highlighted.

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

500

Page 14 ends

kimley-horn.com 4637 Chabot Drive, Suite 300, Pleasanton, CA 94588 925 398 4840

5. Cumulative Conditions
This section describes the operating conditions of the study intersections prior to implementation of the proposed Project during the horizon year of 2040. A horizon year of 2040 was used to be consistent with other approved transportation impact studies.

Peak hour turning movement volumes for Cumulative Conditions were obtained from the same sources of the Existing Conditions peak hour turning movement counts (Section 3). Note that Cumulative plus Project Conditions volumes from the source study are considered Cumulative Conditions volumes in this study.

5.1 INTERSECTION LEVEL OF SERVICE
Traffic operations under Cumulative Conditions were evaluated at the study intersections. The results of the analysis are shown in Table 7.

All study intersections operate at LOS that are consistent with Foster City standards and plans.

Table 7: Cumulative Conditions Intersection Level of Service # Intersection LOS
Criteria
Cumulative
AM Peak PM Peak
LOS Delay1
(sec) LOS Delay1
(sec)
1 Foster City Boulevard / Vintage Park Drive - Chess
Drive F B 19.8 C 20.7
2 Vintage Park Drive / Chess Drive F D 37.1 D 50.5
3 SR-92 WB Ramps / Chess Drive F C 26.0 E 71.5
4 Foster City Boulevard / Chess Drive F F 91.6 F 107.9
5 SR-92 EB Ramps / Metro Center Boulevard D C 27.8 D 35.3 6 Foster City Boulevard / Metro Center Boulevard F E 57.2 D 48.5 Notes:

1. Intersections that are operating below acceptable levels are shown in BOLD.

2. The average control delay is reported for signalized intersections.

6. Cumulative plus Full Project Buildout Conditions
This section describes the impacts of full buildout of the proposed Project at the study intersections and the surrounding roadway system. The Cumulative plus Full Project Buildout Conditions scenario consists of cumulative traffic volumes and roadway facilities plus new traffic generated by full buildout of the proposed Project.

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

501

Page 15 ends

kimley-horn.com 4637 Chabot Drive, Suite 300, Pleasanton, CA 94588 925 398 4840

6.1 TRIP GENERATION
The trip generation process used for Phase I of the Project ( Section 4.1) was applied to the trip generation process for full buildout of the Project. This includes the applications of the same custom trip rates provided by the Project Applicant and the TDM trip reduction of 23.3 percent.

Table 8 shows the trip generation of full buildout of the Project.

Full buildout of the Project would generate approximately 4,976 daily trips, 204 trips (168 in, 36 out) during the a.m. peak hour, and 288 trips (47 in, 241 out) during the p.m. peak hour.

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

502

Page 16 ends

kimley-horn.com 4637 Chabot Drive, Suite 300, Pleasanton, CA 94588 925 398 4840 Table 8: Full Project Buildout Trip Generation
Land Use Size (KSF)
Daily AM Peak Hour PM Peak Hour
Rate Total Rate In:Out In Out Total Rate In:Out In Out Total Phase I
Gilead Laboratory1 200.0 KSF 8.11 1,622 0.333 82:18 55 12 67 0.468 16:84 15 79 94 TDM2 Trip Reduction3 -23.3% -378 -13 -3 -16 -3 -19 -22
Net New Trips with Reductions +1,244 +42 +9 +51 +12 +60 +72 Phase II
Gilead Laboratory1 600.0 KSF 8.11 4,866 0.333 82:18 164 36 200 0.468 16:84 45 236 281 TDM2 Trip Reduction3 -23.3% -1,134 -38 -9 -47 -10 -55 -65 Net New Trips with Reductions +3,732 +126 +27 +153 +35 +181 +216 Total New Trips +6,488 +219 +48 +267 +60 +315 +375
Total Reductions -1,512 -51 -12 -63 -13 -74 -87
Total Net Trips with Reductions +4,976 +168 +36 +204 +47 +241 +288 Notes:

1. The Project trip generation rates were provided by Gilead Sciences.

2. TDM = Transportation demand management

3. A trip reduction of 23.3% is applied to reflect the proposed TDM program for the Project .

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

503

Page 17 ends

kimley-horn.com 4637 Chabot Drive, Suite 300, Pleasanton, CA 94588 925 398 4840

6.2 TRIP DISTRIBUTION & TRIP ASSIGNMENT
The same trip distribution used for Phase I of the Project (Section 4.2) was used for full buildout of the Project.

The Project-related trips were assigned to specific turning movements of the study intersections using PTV Vistro software.

6.3 INTERSECTION LEVEL OF SERVICE
Traffic operations under Cumulative plus Full Project Buildout Conditions were evaluated at the study intersections. The results of the analysis are shown inTable 9.

All study intersections operate at LOS that are consistent with Foster City standards and plans.

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

504

Page 18 ends

kimley-horn.com 4637 Chabot Drive, Suite 300, Pleasanton, CA 94588 925 398 4840 Table 9: Cumulative plus Full Project Buildout Conditions Intersection Level of Service # Intersection LOS
Criteria
Cumulative Cumulative + Full Project Buildout
AM Peak PM Peak AM Peak PM Peak
LOS Delay1
(sec) LOS Delay1
(sec) LOS Delay1
(sec) Var LOS Delay1
(sec) Var
1 Foster City Boulevard / Vintage
Park Drive - Chess Drive F B 19.8 C 20.7 C 20.0 +0.2 C 20.9 +0.2 2 Vintage Park Drive / Chess Drive F D 37.1 D 50.5 D 37.1 0.0 D 51.3 +0.8 3 SR-92 WB Ramps / Chess Drive F C 26.0 E 71.5 C 26.8 +0.8 F 96.4 +24.9 4 Foster City Boulevard / Chess
Drive F F 91.6 F 107.9 F 93.2 +1.6 F 142.0 +34.1
5 SR-92 EB Ramps / Metro Center
Boulevard D C 27.8 D 35.3 C 28.3 +0.5 D 36.6 +1.3
6 Foster City Boulevard / Metro
Center Boulevard F E 57.2 D 48.5 E 67.0 +9.8 D 48.8 +0.3 Notes:

1. The average control delay is reported for signalized intersections.

2. Intersections that are operating below acceptable levels are shown in BOLD and significant impacts are highlighted.

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

505

19 kimley-horn.com 4637 Chabot Drive, Suite 300, Pleasanton, CA 94588 925 398 4840

7. Vehicle Miles Traveled
The VMT Estimation Tool developed by the City/County Association of Governments of San Mateo County (C/CAG) as part of its VMT/Greenhouse Gas (GHG) Model Mitigation Program was used for the VMT assessment of the proposed Project.

The VMT Estimation Tool determined the regional baseline of the Project to be 17.41 VMT per employee. A 15 percent reduction of this baseline leads to an upper significance threshold of 14.8 VMT per employee. According to the VMT Estimation Tool, the Project is estimated to generate approximately 16.2 VMT per employee, which exceeds the upper significance threshold by approximately 1.4 VMT per employee or 8.64 percent. The Project would therefore generate a significant transportation impact in the absence of a TDM program.

A TDM agreement between Foster City and the Project Applicant for the Gilead Integrated Campus is required to reduce vehicular transportation impacts of that project by at least 23.3 percent (seeSection

4.1). Application of the Gilead Integrated Campus TDM program to this project, which is a 23.3 percent reduction in Project VMT per employee, would result in a reduced Project VMT per employee of 12.43, which falls below the upper significance threshold of 14.8 VMT per employee. Based on the results of the VMT analysis, with application of the Gilead Integrated Campus TDM program to this site, project transportation impacts would be less than significant.

8. Conclusion
Based on the results of the VMT analysis, with application of the Gilead Integrated Campus TDM program to this site, project transportation impacts would be less than significant.

Based on the results of the traffic analysis, there are no Project deficiencies identified for LOS.

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

506

20 kimley-horn.com 4637 Chabot Drive, Suite 300, Pleasanton, CA 94588 925 398 4840 Appendix
Appendix A – Existing Conditions LOS Worksheets .................................................. A Appendix B – Existing plus Phase I Project Conditions LOS Worksheets ................. B Appendix C – Cumulative Conditions LOS Worksheets .............................................C Appendix D – Cumulative plus Full Project Buildout Conditions LOS Worksheets ....D Appendix E – C/CAG VMT Estimation Tool Report ................................................... E Appendix F – Gilead Sciences New Chess Facility TDM Concept ............................. F

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

507

A
kimley-horn.com 4637 Chabot Drive, Suite 300, Pleasanton, CA 94588 925 398 4840 Appendix A – Existing Conditions LOS Worksheets

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

508

0.403Volume to Capacity (v/c):

BLevel Of Service:

11.6Delay (sec / veh):
15 minutesAnalysis Period:

HCM 7th EditionAnalysis Method:

SignalizedControl Type:

Intersection 1: Foster City Boulevard/Vintage Park Drive-Chess Drive Intersection Level Of Service Report
YesYesYesYesCrosswalk
NoNoNoNoCurb Present

0.000.000.000.00Grade [%]

25.0030.0030.0030.00Speed [mph]

0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket
100.00100.00120.00160.00100.00110.00100.00100.00155.00100.00100.00215.00Entry Pocket Length [ft] 001101001001No. of Lanes in Entry Pocket

12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Chess DriveVintage Park DriveFoster City BoulevardFoster City BoulevardName Intersection Setup
12/3/2025Kimley-Horn
Scenario 1: 1 Existing AMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

509

0000Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
15113299311433049181257322Total Analysis Volume [veh/h] 43172838212531480Total 15-Minute Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor

0.87000.87000.87000.87000.87000.87000.87000.87000.87000.87000.87000.8700Peak Hour Factor 13103258271228743161094280Total Hourly Volume [veh/h]
000000000000Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000000000000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor

0.00Proportion of CAVs [%]

2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 13103258271228743161094280Base Volume Input [veh/h]
Chess DriveVintage Park DriveFoster City BoulevardFoster City BoulevardName Volumes
22/3/2025Kimley-Horn
Scenario 1: 1 Existing AMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

510

0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft]

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoPedestrian Recall
NoNoNoNoNoNoMaximum Recall
NoNoNoNoNoNoMinimum Recall

0.01.20.00.01.20.01.22.61.60.02.91.6l2, Clearance Lost Time [s]

0.02.00.00.02.00.02.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk

0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 01800180181800120Pedestrian Clearance [s]
050050550050Walk [s]

0.03.00.00.03.00.03.03.03.00.03.03.0Vehicle Extension [s] 050050536709062Split [s]

0.01.00.00.01.00.01.01.00.50.01.00.5All red [s]

0.02.20.00.02.20.02.23.63.10.03.93.1Amber [s]
030003003030403030Maximum Green [s]
040040484084Minimum Green [s]
--------Lead--LeadLead / Lag
Auxiliary Signal Groups
040030325061Signal Group
SplitSplitSplitSplitSplitSplitPermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing

0.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference

0.0Offset [s]
Fully actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
120Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
32/3/2025Kimley-Horn
Scenario 1: 1 Existing AMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

511

13.381.2210.613.0011.0339.2339.5322.22124.89124.9694.4795th-Percentile Queue Length [ft/ln]

0.540.050.420.120.441.571.580.895.005.003.7895th-Percentile Queue Length [veh/ln]

7.440.685.901.676.1321.7921.9612.3569.3969.4252.4850th-Percentile Queue Length [ft/ln]

0.300.030.240.070.250.870.880.492.782.782.1050th-Percentile Queue Length [veh/ln] YesNoYesNoNoNoNoYesYesNoNoCritical Lane Group
CBBBBBBCAABLane Group LOS

25.5717.0117.8915.9817.5411.0511.0424.369.749.7115.17d, Delay for Lane Group [s/veh]

0.530.060.320.080.310.360.360.630.770.770.76X, volume / capacity Lane Group Results

1.001.001.001.001.001.001.001.001.001.001.00PF, progression factor

1.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio

0.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]

8.800.472.030.341.700.460.457.921.541.522.79d2, Incremental Delay [s]

1.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.110.110.110.110.110.110.110.110.110.110.11k, delay calibration

16.7716.5415.8615.6415.8410.6010.5916.448.208.1912.38d1, Uniform Delay [s] 49519010610147748478828832425c, Capacity [veh/h]
16971781158918701781184318701781186118701781s, saturation flow rate [veh/h]

0.020.000.020.000.020.090.090.030.340.340.18(v / s)_i Volume / Saturation Flow Rate

0.030.030.060.060.060.260.260.040.440.440.24g / C, Green / Cycle 1122299215158g_i, Effective Green Time [s]

1.201.201.201.201.202.602.601.602.902.901.60l2, Clearance Lost Time [s]

0.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]

3.203.203.203.203.204.604.603.604.904.903.60L, Total Lost Time per Cycle [s] 3535353535353535353535C, Cycle Length [s]
CLRCLCCLCCLLane Group
Lane Group Calculations
42/3/2025Kimley-Horn
Scenario 1: 1 Existing AMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

512

Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh] 15.17 9.72 9.74 24.36 11.04 11.05 17.54 15.98 17.89 17.01 25.57 25.57 Movement LOS B A A C B B B B B B C C
d_A, Approach Delay [s/veh] 10.82 12.70 17.48 24.68
Approach LOS B B B C
d_I, Intersection Delay [s/veh] 11.59
Intersection LOS B
Intersection V/C 0.403
Other Modes
g_Walk,mi, Effective Walk Time [s] 9.0 9.0 9.0 9.0
M_corner, Corner Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s] 9.61 9.61 9.61 9.61
I_p,int, Pedestrian LOS Score for Intersectio 2.630 2.579 2.329 2.100 Crosswalk LOS B B B B
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h] 4878 1800 229 229 d_b, Bicycle Delay [s] 36.13 0.17 13.67 13.67
I_b,int, Bicycle LOS Score for Intersection 2.877 1.884 1.673 1.607 Bicycle LOS C A A A
----------------Ring 4
----------------Ring 3
--------------65Ring 2
------------4321Ring 1
Sequence
52/3/2025Kimley-Horn
Scenario 1: 1 Existing AMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

513

0.311Volume to Capacity (v/c):

CLevel Of Service:

34.4Delay (sec / veh):
15 minutesAnalysis Period:

HCM 7th EditionAnalysis Method:

SignalizedControl Type:

Intersection 2: Vintage Park Drive/Chess Drive
Intersection Level Of Service Report
YesYesYesYesCrosswalk
NoNoNoNoCurb Present

0.000.000.000.00Grade [%]

30.0030.0030.0030.00Speed [mph]

0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket
100.00100.00215.00100.00100.00145.00100.00100.00280.00100.00100.00225.00Entry Pocket Length [ft] 001001001101No. of Lanes in Entry Pocket

12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Chess DriveChess DriveVintage Park DriveVintage Park DriveName Intersection Setup
62/3/2025Kimley-Horn
Scenario 1: 1 Existing AMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

514

0000Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
1123801971371535028551693391159Total Analysis Volume [veh/h] 2895493438137144239840Total 15-Minute Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor

0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 1033501811261414626511586360146Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000000000000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor

0.00Proportion of CAVs [%]

2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1033501811261414626511586360146Base Volume Input [veh/h] Chess DriveChess DriveVintage Park DriveVintage Park DriveName Volumes
72/3/2025Kimley-Horn
Scenario 1: 1 Existing AMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

515

0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft]

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoNoPedestrian Recall
NoNoNoNoNoNoNoNoMaximum Recall
NoNoNoNoNoNoNoNoMinimum Recall

0.02.21.60.02.21.60.02.22.11.71.71.6l2, Clearance Lost Time [s]

0.02.02.00.02.02.00.02.02.02.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk

0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 02000180020021210Pedestrian Clearance [s]
050050050550Walk [s]

0.03.03.00.03.03.00.03.03.03.03.03.0Vehicle Extension [s] 04632025110114333326Split [s]

0.01.00.50.01.00.50.01.00.51.01.00.5All red [s]

0.03.23.10.03.23.10.03.23.62.72.73.1Amber [s]
0355053003520656555Maximum Green [s]
044044044444Minimum Green [s]
--Lead--Lag--Lead--LeadLead / Lag
Auxiliary Signal Groups
047083025661Signal Group
PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing

0.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference

0.0Offset [s]
Fully actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
110Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
82/3/2025Kimley-Horn
Scenario 1: 1 Existing AMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

516

92.8399.33244.8771.2577.3275.7957.4557.1527.23108.7234.7234.7207.895th-Percentile Queue Length [ft/ln]

3.713.979.792.853.093.032.302.291.094.359.399.398.3195th-Percentile Queue Length [veh/ln]

51.5755.18145.8439.5842.9642.1031.9231.7515.1360.42138.2138.2118.550th-Percentile Queue Length [ft/ln]

2.062.215.831.581.721.681.281.270.612.425.535.534.7450th-Percentile Queue Length [veh/ln] NoNoYesYesNoNoYesNoNoNoNoNoYesCritical Lane Group
AAEBBEEEEDDDELane Group LOS

7.137.0956.0910.8410.7070.2960.8358.3277.6145.3651.6251.6257.25d, Delay for Lane Group [s/veh]

0.200.200.860.150.140.780.610.560.640.440.790.790.83X, volume / capacity Lane Group Results

1.001.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor

1.001.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio

0.000.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]

0.390.369.120.340.2717.728.866.4523.661.445.445.449.10d2, Incremental Delay [s]

1.001.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.500.500.110.500.500.110.110.110.110.110.110.110.11k, delay calibration

6.746.7346.9610.5010.4452.5751.9851.8653.9543.9246.1846.1848.15d1, Uniform Delay [s] 11651262229927108964677525211249249191c, Capacity [veh/h] 1726187017811591187017811669187017811589187018701781s, saturation flow rate [veh/h]

0.140.140.110.090.080.030.020.020.010.060.100.100.09(v / s)_i Volume / Saturation Flow Rate

0.680.680.130.580.580.040.040.040.010.130.130.130.11g / C, Green / Cycle 7474146464444215151512g_i, Effective Green Time [s]

2.202.201.602.202.201.602.202.202.101.701.701.701.60l2, Clearance Lost Time [s]

0.000.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]

4.204.203.604.204.203.604.204.204.103.703.703.703.60L, Total Lost Time per Cycle [s] 110110110110110110110110110110110110110C, Cycle Length [s] CCLCCLCCLRCCLLane Group
Lane Group Calculations
92/3/2025Kimley-Horn
Scenario 1: 1 Existing AMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

517

Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh] 57.25 51.62 45.36 77.61 58.91 60.83 70.29 10.70 10.84 56.09 7.11 7.13 Movement LOS E D D E E E E B B E A A
d_A, Approach Delay [s/veh] 52.11 62.48 19.52 21.12
Approach LOS D E B C
d_I, Intersection Delay [s/veh] 34.37
Intersection LOS C
Intersection V/C 0.311
Other Modes
g_Walk,mi, Effective Walk Time [s] 9.0 9.0 9.0 9.0
M_corner, Corner Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s] 46.37 46.37 46.37 46.37
I_p,int, Pedestrian LOS Score for Intersectio 2.632 2.570 2.488 2.496 Crosswalk LOS B B B B
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h] 533 124 378 760 d_b, Bicycle Delay [s] 29.61 48.41 36.17 21.15
I_b,int, Bicycle LOS Score for Intersection 2.090 1.641 1.840 2.128 Bicycle LOS B A A B
----------------Ring 4
----------------Ring 3
------------8765Ring 2
------------4321Ring 1
Sequence
102/3/2025Kimley-Horn
Scenario 1: 1 Existing AMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

518

0.479Volume to Capacity (v/c):

CLevel Of Service:

20.4Delay (sec / veh):
15 minutesAnalysis Period:

HCM 7th EditionAnalysis Method:

SignalizedControl Type:

Intersection 3: SR-92 WB Ramps/Chess Drive
Intersection Level Of Service Report
NoYesNoYesCrosswalk
NoNoNoNoCurb Present

0.000.000.000.00Grade [%]

30.0030.0030.0030.00Speed [mph]

0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket
500.00100.00480.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 101000000000No. of Lanes in Entry Pocket

12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Route 92 West RampOffice driveway Chess Dr Chess DrName Intersection Setup
112/3/2025Kimley-Horn
Scenario 1: 1 Existing AMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

519

0100Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
78638418417210206761851401Total Analysis Volume [veh/h] 197910514125219021350Total 15-Minute Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor

0.93000.93000.93000.93000.93000.93000.93000.93000.93000.93000.93000.9300Peak Hour Factor 7313538941629192708791301Total Hourly Volume [veh/h]
0001002004300Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000000000000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor

0.00Proportion of CAVs [%]

1.301.301.301.301.301.301.301.301.301.301.301.30Heavy Vehicles Percentage [%]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 731353895162111927081221301Base Volume Input [veh/h]
Route 92 West RampOffice driveway Chess Dr Chess DrName Volumes
122/3/2025Kimley-Horn
Scenario 1: 1 Existing AMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

520

0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft]

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoPedestrian Recall
NoNoNoNoNoMaximum Recall
NoNoNoNoNoMinimum Recall

3.52.50.00.01.70.00.03.50.02.12.20.0l2, Clearance Lost Time [s]

2.02.00.00.02.00.00.02.00.02.02.00.0l1, Start-Up Lost Time [s] NoNoYesYesRest In Walk

0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 120001700120000Pedestrian Clearance [s]
500050050000Walk [s]

3.03.00.00.03.00.00.03.00.03.03.00.0Vehicle Extension [s] 432700200043047200Split [s]

2.01.00.00.00.50.00.02.00.01.01.00.0All red [s]

3.53.50.00.03.20.00.03.50.03.13.20.0Amber [s]
553000300055030300Maximum Green [s]
10500400100560Minimum Green [s]
------------Lead / Lag
Auxiliary Signal Groups
820040080610Signal Group
UnsignaPermissPermissPermissPermissPermissPermissPermissPermissProtectePermissPermissControl Type Phasing & Timing

12.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference

51.0Offset [s]
Fully actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
110Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
132/3/2025Kimley-Horn
Scenario 1: 1 Existing AMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

521

269.11267.5336.52117.10223.16223.1637.66188.1995th-Percentile Queue Length [ft/ln]

10.7610.701.464.688.938.931.517.5395th-Percentile Queue Length [veh/ln] 164.07162.8820.2965.06129.75129.7520.92104.5550th-Percentile Queue Length [ft/ln]

6.566.520.812.605.195.190.844.1850th-Percentile Queue Length [veh/ln] NoYesYesNoNoYesNoYesCritical Lane Group
DDEBBBCELane Group LOS

52.1852.2371.9411.7913.7913.7928.9456.97d, Delay for Lane Group [s/veh]

0.840.840.650.200.370.370.100.80X, volume / capacity
Lane Group Results

1.001.001.001.001.001.001.001.00PF, progression factor

1.001.001.001.001.001.001.001.00Rp, platoon ratio

0.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]

6.736.7818.290.431.031.030.068.05d2, Incremental Delay [s]

1.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.110.110.110.500.500.500.110.11k, delay calibration

45.4545.4553.6611.3712.7612.7628.8948.91d1, Uniform Delay [s] 27327135106910261026812176c, Capacity [veh/h]
18051791181718651791179128291880s, saturation flow rate [veh/h]

0.130.130.010.120.210.210.030.08(v / s)_i Volume / Saturation Flow Rate

0.150.150.020.570.570.570.290.09g / C, Green / Cycle
171726363633110g_i, Effective Green Time [s]

2.502.501.703.503.503.502.102.20l2, Clearance Lost Time [s]

0.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]

4.504.503.705.505.505.504.104.20L, Total Lost Time per Cycle [s] 110110110110110110110110C, Cycle Length [s]
CLCCCLRCLane Group
Lane Group Calculations
142/3/2025Kimley-Horn
Scenario 1: 1 Existing AMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

522

Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh] 56.97 56.97 28.94 13.79 11.79 11.79 71.94 71.94 71.94 52.21 52.18 0.00 Movement LOS E E C B B B E E E D D
d_A, Approach Delay [s/veh] 46.43 13.35 71.94 20.06
Approach LOS D B E C
d_I, Intersection Delay [s/veh] 20.41
Intersection LOS C
Intersection V/C 0.479
Other Modes
g_Walk,mi, Effective Walk Time [s] 9.0 0.0 22.0 0.0
M_corner, Corner Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s] 46.42 0.00 35.25 0.00
I_p,int, Pedestrian LOS Score for Intersectio 2.547 0.000 1.753 0.000 Crosswalk LOS B F A F
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h] 287 681 296 409 d_b, Bicycle Delay [s] 40.39 23.94 39.98 34.85
I_b,int, Bicycle LOS Score for Intersection 2.003 2.367 1.599 2.312 Bicycle LOS B B A B
----------------Ring 4
----------------Ring 3
------------846-Ring 2
--------------21Ring 1
Sequence
152/3/2025Kimley-Horn
Scenario 1: 1 Existing AMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

523

0.613Volume to Capacity (v/c):

CLevel Of Service:

32.3Delay (sec / veh):
15 minutesAnalysis Period:

HCM 7th EditionAnalysis Method:

SignalizedControl Type:

Intersection 4: Foster City Boulevard/Chess Drive
Intersection Level Of Service Report
NoYesYesYesCrosswalk
NoNoNoNoCurb Present

0.000.000.000.00Grade [%]

30.0035.0025.0030.00Speed [mph]

0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket
100.00100.00510.00180.00100.0080.00100.00100.00100.00100.00100.0095.00Entry Pocket Length [ft] 001101001101No. of Lanes in Entry Pocket

12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Foster City BoulevardFoster City BoulevardChess DriveChess DriveName Intersection Setup
162/3/2025Kimley-Horn
Scenario 1: 1 Existing AMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

524

0000Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
1558938194429933251948061322Total Analysis Volume [veh/h] 39223205117511651201581Total 15-Minute Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 1558938194429933251948061322Total Hourly Volume [veh/h] 39002300100000Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000000000000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor

0.00Proportion of CAVs [%]

2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1948938196729934251948061322Base Volume Input [veh/h]
Foster City BoulevardFoster City BoulevardChess DriveChess DriveName Volumes
172/3/2025Kimley-Horn
Scenario 1: 1 Existing AMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

525

0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.040.040.040.040.040.00.040.00.00.00.00.0Detector Length [ft]

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoPedestrian Recall
YesNoNoNoNoNoMaximum Recall
NoNoNoNoNoNoMinimum Recall

0.02.62.51.72.91.60.02.10.00.01.70.0l2, Clearance Lost Time [s]

0.02.02.02.02.02.00.02.00.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk

0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 023001000230000Pedestrian Clearance [s]
050000040000Walk [s]

0.03.03.03.03.03.00.03.00.00.03.00.0Vehicle Extension [s] 038314215803200420Split [s]

0.01.01.00.51.00.50.01.00.00.00.50.0All red [s]

0.03.63.53.23.93.10.03.10.00.03.20.0Amber [s]
0655530352003500300Maximum Green [s]
064464060040Minimum Green [s]
--Lead--Lead------Lead / Lag
2,3Auxiliary Signal Groups
061325040030Signal Group
PermissPermissPermissOverlapPermissProtecteSplitSplitSplitSplitSplitSplitControl Type Phasing & Timing

0.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference

90.0Offset [s]
Fully actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
120Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
182/3/2025Kimley-Horn
Scenario 1: 1 Existing AMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

526

401.26396.43305.8419.39158.417.3740.4627.10611.81193.99193.2495th-Percentile Queue Length [ft/ln]

16.0515.8612.230.786.340.291.621.0824.477.767.7395th-Percentile Queue Length [veh/ln] 267.22263.35192.1710.7788.014.0922.4815.05439.83108.55108.0250th-Percentile Queue Length [ft/ln]

10.6910.537.690.433.520.160.900.6017.594.344.3250th-Percentile Queue Length [veh/ln] YesNoNoNoNoYesYesNoYesNoNoCritical Lane Group
CCCACFEEECCLane Group LOS

23.4322.7121.968.2934.8898.3059.2757.8168.1131.8331.87d, Delay for Lane Group [s/veh]

0.580.560.630.040.300.440.380.260.960.340.34X, volume / capacity Lane Group Results

1.001.001.001.001.001.001.001.001.001.001.00PF, progression factor

1.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio

0.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]

2.722.352.320.080.7838.563.101.9027.800.340.35d2, Incremental Delay [s]

1.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.500.500.500.500.500.110.110.110.430.110.11k, delay calibration

20.7220.3619.648.2134.1059.7456.1755.9140.3131.4831.51d1, Uniform Delay [s] 9009471301101099477572502571562c, Capacity [veh/h]
17771870260915893560178118351781158918081781s, saturation flow rate [veh/h]

0.290.280.310.030.080.000.020.010.300.110.11(v / s)_i Volume / Saturation Flow Rate

0.510.510.510.640.280.000.040.040.320.320.32g / C, Green / Cycle 6161617634055383838g_i, Effective Green Time [s]

2.602.600.000.002.901.602.102.101.701.701.70l2, Clearance Lost Time [s]

0.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]

4.604.604.603.704.903.604.104.103.703.703.70L, Total Lost Time per Cycle [s] 120120120120120120120120120120120C, Cycle Length [s]
CCLRCLCLRCLLane Group
Lane Group Calculations
192/3/2025Kimley-Horn
Scenario 1: 1 Existing AMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

527

Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh] 31.85 31.83 68.11 57.81 59.27 59.27 98.30 34.88 8.29 21.96 23.01 23.43 Movement LOS C C E E E E F C A C C C
d_A, Approach Delay [s/veh] 52.02 58.68 32.05 22.58
Approach LOS D E C C
d_I, Intersection Delay [s/veh] 32.31
Intersection LOS C
Intersection V/C 0.613
Other Modes
g_Walk,mi, Effective Walk Time [s] 4.0 9.0 8.0 0.0
M_corner, Corner Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s] 56.12 51.39 52.32 0.00
I_p,int, Pedestrian LOS Score for Intersectio 3.013 2.366 2.803 0.000 Crosswalk LOS C B C F
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h] 638 465 168 556 d_b, Bicycle Delay [s] 27.86 35.39 50.38 31.30
I_b,int, Bicycle LOS Score for Intersection 2.984 1.639 1.864 3.132 Bicycle LOS C A A C
----------------Ring 4
----------------Ring 3
--------------65Ring 2
------------4321Ring 1
Sequence
202/3/2025Kimley-Horn
Scenario 1: 1 Existing AMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

528

0.417Volume to Capacity (v/c):

DLevel Of Service:

37.9Delay (sec / veh):
15 minutesAnalysis Period:

HCM 7th EditionAnalysis Method:

SignalizedControl Type:

Intersection 5: SR-92 EB Ramps/Metro Center Boulevard
Intersection Level Of Service Report
NoYesNoNoCrosswalk
NoNoNoNoCurb Present

0.000.000.000.00Grade [%]

30.0035.0035.0015.00Speed [mph]

0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket
100.00100.0090.00100.00100.00290.00640.00100.00600.00100.00100.00100.00Entry Pocket Length [ft] 001002101000No. of Lanes in Entry Pocket

12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Metro Center BoulevarMetro Center BoulevarSR-92 RampsParking Lot AccessName Intersection Setup
212/3/2025Kimley-Horn
Scenario 1: 1 Existing AMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

529

0000Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
13118238312763296499711422Total Analysis Volume [veh/h] 334610132167412243411Total 15-Minute Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor

0.97000.97000.97000.97000.97000.97000.97000.97000.97000.97000.97000.9700Peak Hour Factor 12717737312361287489421422Total Hourly Volume [veh/h]
690010015400700Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000000000000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor

0.00Proportion of CAVs [%]

1.901.901.901.901.901.901.901.901.901.901.901.90Heavy Vehicles Percentage [%]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 19617737412361441489422122Base Volume Input [veh/h]
Metro Center BoulevarMetro Center BoulevarSR-92 RampsParking Lot AccessName Volumes
222/3/2025Kimley-Horn
Scenario 1: 1 Existing AMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

530

0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.040.040.00.040.040.040.040.00.00.040.00.0Detector Length [ft]

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoPedestrian Recall
NoNoNoNoYesNoMaximum Recall
NoNoNoNoNoNoMinimum Recall

0.02.51.60.02.51.61.63.00.00.02.20.0l2, Clearance Lost Time [s]

0.02.02.00.02.02.02.02.00.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk

0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0000170000000Pedestrian Clearance [s]
000060000000Walk [s]

0.03.03.00.03.03.03.03.00.00.03.00.0Vehicle Extension [s] 0301804836363600180Split [s]

0.01.00.50.01.00.50.51.00.00.01.00.0All red [s]

0.03.53.10.03.53.13.14.00.00.03.20.0Amber [s]
0352504030306000400Maximum Green [s]
0440444100040Minimum Green [s]
--Lead--Lead------Lead / Lag
4,5Auxiliary Signal Groups
061025540030Signal Group
PermissPermissProtectePermissPermissProtectePermissPermissPermissPermissPermissPermissControl Type Phasing & Timing

12.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference

30.0Offset [s]
Fully actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
120Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
232/3/2025Kimley-Horn
Scenario 1: 1 Existing AMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

531

76.4181.1483.4465.2447.3447.4645.25141.01529.26531.0125.506.3495th-Percentile Queue Length [ft/ln]

3.063.253.342.611.891.901.815.6421.1721.241.020.2595th-Percentile Queue Length [veh/ln]

42.4545.0846.3636.2526.3026.3725.1478.34371.26372.7114.173.5250th-Percentile Queue Length [ft/ln]

1.701.801.851.451.051.051.013.1314.8514.910.570.1450th-Percentile Queue Length [veh/ln] YesNoNoNoNoNoYesNoNoYesYesNoCritical Lane Group
BBBFBBECDDEELane Group LOS

19.5919.4819.4380.1918.5418.5361.8328.5244.8545.1578.6560.67d, Delay for Lane Group [s/veh]

0.140.130.130.770.080.080.570.290.800.800.580.14X, volume / capacity Lane Group Results

1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor

1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio

0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]

0.400.340.3122.200.180.174.550.7510.0910.3319.942.34d2, Incremental Delay [s]

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.500.500.500.110.500.500.110.500.500.500.110.11k, delay calibration

19.2019.1419.1257.9918.3618.3657.2827.7834.7634.8258.7258.33d1, Uniform Delay [s] 7198038464984885511110046386352428c, Capacity [veh/h]
159117751871178218561871346128161791178215911826s, saturation flow rate [veh/h]

0.060.060.060.020.030.030.020.110.280.290.010.00(v / s)_i Volume / Saturation Flow Rate

0.450.450.450.030.460.460.030.360.360.360.020.02g / C, Green / Cycle 54545435555443434322g_i, Effective Green Time [s]

2.502.502.501.602.502.501.603.003.003.002.202.20l2, Clearance Lost Time [s]

0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]

4.504.504.503.604.504.503.605.005.005.004.204.20L, Total Lost Time per Cycle [s] 120120120120120120120120120120120120C, Cycle Length [s] RCCLCCLRCLRCLane Group
Lane Group Calculations
242/3/2025Kimley-Horn
Scenario 1: 1 Existing AMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

532

Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh] 60.67 60.67 78.65 45.01 44.85 28.52 61.83 18.53 18.54 80.19 19.45 19.57 Movement LOS E E E D D C E B B F B B
d_A, Approach Delay [s/veh] 74.66 41.29 32.67 26.07
Approach LOS E D C C
d_I, Intersection Delay [s/veh] 37.88
Intersection LOS D
Intersection V/C 0.417
Other Modes
g_Walk,mi, Effective Walk Time [s] 0.0 0.0 31.0 0.0
M_corner, Corner Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s] 0.00 0.00 33.01 0.00
I_p,int, Pedestrian LOS Score for Intersectio 0.000 0.000 2.609 0.000 Crosswalk LOS F F B F
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h] 230 517 725 425 d_b, Bicycle Delay [s] 47.00 33.01 24.39 37.22
I_b,int, Bicycle LOS Score for Intersection 1.601 3.985 1.720 1.906 Bicycle LOS A D A A
----------------Ring 4
----------------Ring 3
--------------65Ring 2
------------4321Ring 1
Sequence
252/3/2025Kimley-Horn
Scenario 1: 1 Existing AMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

533

0.599Volume to Capacity (v/c):

DLevel Of Service:

42.1Delay (sec / veh):
15 minutesAnalysis Period:

HCM 7th EditionAnalysis Method:

SignalizedControl Type:

Intersection 6: Foster City Boulevard/Metro Center Boulevard Intersection Level Of Service Report
YesNoYesNoCrosswalk
NoNoNoNoCurb Present

0.000.000.000.00Grade [%]

35.0035.0025.0035.00Speed [mph]

0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket
100.00100.00100.00100.00100.00210.00170.00100.0050.00240.00100.00150.00Entry Pocket Length [ft] 101101101101No. of Lanes in Entry Pocket

12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Foster City BoulevardFoster City BoulevardMetro Center BoulevardMetro Center BoulevardName Intersection Setup
262/3/2025Kimley-Horn
Scenario 1: 1 Existing AMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

534

0000Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
53955131974671373218552223183457Total Analysis Volume [veh/h] 132393324117348021135646114Total 15-Minute Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 53955131974671373218552223183457Total Hourly Volume [veh/h] 130097001730022300Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000000000000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor

0.00Proportion of CAVs [%]

2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 669551311944671374948552446183457Base Volume Input [veh/h] Foster City BoulevardFoster City BoulevardMetro Center BoulevardMetro Center BoulevardName Volumes
272/3/2025Kimley-Horn
Scenario 1: 1 Existing AMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

535

0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.040.040.00.00.00.00.00.00.00.00.00.0Detector Length [ft]

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoPedestrian Recall
YesNoYesNoNoNoNoMaximum Recall
NoNoNoNoNoNoNoMinimum Recall

0.02.61.60.02.61.60.01.70.01.62.20.0l2, Clearance Lost Time [s]

0.02.02.00.02.02.00.02.00.02.02.00.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk

0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0190020001000270Pedestrian Clearance [s]
050050050050Walk [s]

0.03.03.00.03.03.00.03.00.03.03.00.0Vehicle Extension [s] 0362403220025024390Split [s]

0.01.00.50.01.00.50.00.50.00.51.00.0All red [s]

0.03.63.10.03.63.10.03.20.03.13.20.0Amber [s]
0403004025030030400Maximum Green [s]
064064060460Minimum Green [s]
--Lead--Lead------Lead / Lag
1,4Auxiliary Signal Groups
061025030140Signal Group
PermissPermissProtectePermissPermissProtecteSplitSplitSplitOverlapSplitSplitControl Type Phasing & Timing

0.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference

0.0Offset [s]
Semi-actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
120Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
282/3/2025Kimley-Horn
Scenario 1: 1 Existing AMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

536

337.50321.33188.3844.60150.57198.49452.0499.1359.56102.35103.05264.2295th-Percentile Queue Length [ft/ln]

13.5012.857.541.786.027.9418.083.972.384.094.1210.5795th-Percentile Queue Length [veh/ln] 216.77204.16104.6524.7883.65111.79308.1155.0733.0956.8657.25160.3850th-Percentile Queue Length [ft/ln]

8.678.174.190.993.354.4712.322.201.322.272.296.4250th-Percentile Queue Length [veh/ln] YesNoNoNoNoYesYesNoNoNoNoYesCritical Lane Group
DCECCEEDDCDDLane Group LOS

36.7134.8760.7428.0129.9463.0975.8639.2438.1827.8039.3045.73d, Delay for Lane Group [s/veh]

0.560.560.780.100.280.820.910.210.130.230.230.60X, volume / capacity Lane Group Results

1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor

1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio

0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]

3.781.957.620.220.419.6730.261.120.690.120.713.55d2, Incremental Delay [s]

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.500.500.110.500.500.110.500.500.500.110.500.50k, delay calibration

32.9332.9253.1227.7829.5353.4145.6038.1237.4827.6838.5942.18d1, Uniform Delay [s] 60511831689321688166352414394980779757c, Capacity [veh/h] 182035601781281350941781158918701781281335603459s, saturation flow rate [veh/h]

0.190.190.070.030.090.080.200.050.030.080.050.13(v / s)_i Volume / Saturation Flow Rate

0.330.330.090.330.330.090.220.220.220.350.220.22g / C, Green / Cycle 404011404011272727422626g_i, Effective Green Time [s]

2.602.601.602.602.601.601.701.701.700.002.202.20l2, Clearance Lost Time [s]

0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]

4.604.603.604.604.603.603.703.703.703.604.204.20L, Total Lost Time per Cycle [s] 120120120120120120120120120120120120C, Cycle Length [s] CCLRCLRCLRCLLane Group
Lane Group Calculations
292/3/2025Kimley-Horn
Scenario 1: 1 Existing AMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

537

Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh] 45.73 39.30 27.80 38.18 39.24 75.86 63.09 29.94 28.01 60.74 35.43 36.71 Movement LOS D D C D D E E C C E D D
d_A, Approach Delay [s/veh] 39.73 64.78 36.15 38.40
Approach LOS D E D D
d_I, Intersection Delay [s/veh] 42.09
Intersection LOS D
Intersection V/C 0.599
Other Modes
g_Walk,mi, Effective Walk Time [s] 0.0 9.0 0.0 9.0
M_corner, Corner Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s] 0.00 51.34 0.00 51.34
I_p,int, Pedestrian LOS Score for Intersectio 0.000 2.726 0.000 2.972 Crosswalk LOS F B F C
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h] 580 355 457 523 d_b, Bicycle Delay [s] 30.25 40.59 35.73 32.71
I_b,int, Bicycle LOS Score for Intersection 2.456 2.601 1.999 2.193 Bicycle LOS B B A B
----------------Ring 4
----------------Ring 3
--------------65Ring 2
------------4321Ring 1
Sequence
302/3/2025Kimley-Horn
Scenario 1: 1 Existing AMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

538

0.446Volume to Capacity (v/c):

BLevel Of Service:

12.6Delay (sec / veh):
15 minutesAnalysis Period:

HCM 7th EditionAnalysis Method:

SignalizedControl Type:

Intersection 1: Foster City Boulevard/Vintage Park Drive-Chess Drive Intersection Level Of Service Report
YesYesYesYesCrosswalk
NoNoNoNoCurb Present

0.000.000.000.00Grade [%]

25.0030.0030.0030.00Speed [mph]

0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket
100.00100.00120.00160.00100.00110.00100.00100.00155.00100.00100.00215.00Entry Pocket Length [ft] 001101001001No. of Lanes in Entry Pocket

12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Chess DriveVintage Park DriveFoster City BoulevardFoster City BoulevardName Intersection Setup
12/3/2025Kimley-Horn
Scenario 1: 1 Existing PMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

539

0000Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
3021131891717281078431820019Total Analysis Volume [veh/h] 75347447269115505Total 15-Minute Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor

0.94000.94000.94000.94000.94000.94000.94000.94000.94000.94000.94000.9400Peak Hour Factor 2820121781616261013401718818Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000000000000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor

0.00Proportion of CAVs [%]

2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 2820121781616261013401718818Base Volume Input [veh/h]
Chess DriveVintage Park DriveFoster City BoulevardFoster City BoulevardName Volumes
22/3/2025Kimley-Horn
Scenario 1: 1 Existing PMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

540

0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft]

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoPedestrian Recall
NoNoNoNoNoNoMaximum Recall
NoNoNoNoNoNoMinimum Recall

0.01.20.00.01.20.00.02.61.60.02.91.6l2, Clearance Lost Time [s]

0.02.00.00.02.00.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk

0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0180018001800120Pedestrian Clearance [s]
050050050050Walk [s]

0.03.00.00.03.00.00.03.03.00.03.03.0Vehicle Extension [s] 0800290067240484Split [s]

0.01.00.00.01.00.00.01.00.50.01.00.5All red [s]

0.02.20.00.02.20.00.03.63.10.03.93.1Amber [s]
0500260062200430Maximum Green [s]
040040084084Minimum Green [s]
--------Lead--LeadLead / Lag
Auxiliary Signal Groups
040030025061Signal Group
SplitSplitSplitSplitSplitSplitPermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing

0.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference

0.0Offset [s]
Fully actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
120Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
32/3/2025Kimley-Horn
Scenario 1: 1 Existing PMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

541

23.244.5967.984.754.73135.56136.5821.4021.3021.520.0095th-Percentile Queue Length [ft/ln]

0.930.182.720.190.195.425.460.860.850.860.0095th-Percentile Queue Length [veh/ln]

12.912.5537.772.642.6375.3175.8811.8911.8311.950.0050th-Percentile Queue Length [ft/ln]

0.520.101.510.110.113.013.040.480.470.480.0050th-Percentile Queue Length [veh/ln] YesNoYesNoNoYesNoNoNoNoNoCritical Lane Group
CBBBBBBCAAFLane Group LOS

22.9617.1518.5313.2713.3011.4711.4526.128.688.660.00d, Delay for Lane Group [s/veh]

0.570.070.720.050.050.760.760.610.170.1710000.0X, volume / capacity Lane Group Results

1.001.001.001.001.001.001.001.001.001.001.00PF, progression factor

1.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio

0.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]

5.600.153.680.070.051.631.618.360.130.120.00d2, Incremental Delay [s]

1.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.110.110.110.110.110.110.110.110.110.110.11k, delay calibration

17.3617.0014.8413.2013.249.849.8417.758.558.540.00d1, Uniform Delay [s] 89193263309357728735706286460c, Capacity [veh/h]
16941417158918701417185318701781181718701781s, saturation flow rate [veh/h]

0.030.010.120.010.010.300.300.020.060.060.01(v / s)_i Volume / Saturation Flow Rate

0.050.050.160.160.160.390.390.040.350.350.00g / C, Green / Cycle 226661515113130g_i, Effective Green Time [s]

1.201.201.201.201.202.602.601.602.902.900.00l2, Clearance Lost Time [s]

0.002.000.000.002.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]

3.203.203.203.203.204.604.603.604.904.900.00L, Total Lost Time per Cycle [s] 3737373737373737373737C, Cycle Length [s]
CLRCLCCLCCLLane Group
Lane Group Calculations
42/3/2025Kimley-Horn
Scenario 1: 1 Existing PMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

542

Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh] 0.00 8.67 8.68 26.12 11.46 11.47 13.30 13.27 18.53 17.15 22.96 22.96 Movement LOS A A A C B B B B B B C C
d_A, Approach Delay [s/veh] 7.98 12.01 17.73 21.78
Approach LOS A B B C
d_I, Intersection Delay [s/veh] 12.57
Intersection LOS B
Intersection V/C 0.446
Other Modes
g_Walk,mi, Effective Walk Time [s] 9.0 9.0 9.0 9.0
M_corner, Corner Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s] 10.77 10.77 10.77 10.77
I_p,int, Pedestrian LOS Score for Intersectio 2.567 2.549 2.155 1.931 Crosswalk LOS B B B A
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h] 2307 3340 1381 257 d_b, Bicycle Delay [s] 0.44 8.38 1.79 14.19
I_b,int, Bicycle LOS Score for Intersection 1.755 2.508 1.928 1.665 Bicycle LOS A B A A
----------------Ring 4
----------------Ring 3
--------------65Ring 2
------------4321Ring 1
Sequence
52/3/2025Kimley-Horn
Scenario 1: 1 Existing PMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

543

0.622Volume to Capacity (v/c):

DLevel Of Service:

50.6Delay (sec / veh):
15 minutesAnalysis Period:

HCM 7th EditionAnalysis Method:

SignalizedControl Type:

Intersection 2: Vintage Park Drive/Chess Drive
Intersection Level Of Service Report
YesYesYesYesCrosswalk
NoNoNoNoCurb Present

0.000.000.000.00Grade [%]

30.0030.0030.0030.00Speed [mph]

0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket
100.00100.00215.00100.00100.00145.00100.00100.00280.00100.00100.00225.00Entry Pocket Length [ft] 001001001101No. of Lanes in Entry Pocket

12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Chess DriveChess DriveVintage Park DriveVintage Park DriveName Intersection Setup
62/3/2025Kimley-Horn
Scenario 1: 1 Existing PMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

544

0000Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
5223943423312311232032454849224Total Analysis Volume [veh/h] 15623868362880811371256Total 15-Minute Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor

0.83000.83000.83000.83000.83000.83000.83000.83000.83000.83000.83000.8300Peak Hour Factor 418578284275199326626945541186Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000000000000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor

0.00Proportion of CAVs [%]

2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 418578284275199326626945541186Base Volume Input [veh/h] Chess DriveChess DriveVintage Park DriveVintage Park DriveName Volumes
72/3/2025Kimley-Horn
Scenario 1: 1 Existing PMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

545

0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.040.040.00.040.040.00.040.040.040.040.040.0Detector Length [ft]

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoNoPedestrian Recall
NoNoNoNoNoNoNoNoMaximum Recall
NoNoNoNoNoNoNoNoMinimum Recall

0.02.21.60.02.21.60.02.22.11.61.71.6l2, Clearance Lost Time [s]

0.02.02.00.02.02.00.02.02.02.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk

0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0200018002000210Pedestrian Clearance [s]
050050050050Walk [s]

0.03.03.00.03.03.00.03.03.03.03.03.0Vehicle Extension [s] 0258031140292982626Split [s]

0.01.00.50.01.00.50.01.00.50.51.00.5All red [s]

0.03.23.10.03.23.10.03.23.63.12.73.1Amber [s]
0214027100252542222Maximum Green [s]
044044044444Minimum Green [s]
--Lag--Lead--Lead--LeadLead / Lag
Auxiliary Signal Groups
047083025761Signal Group
PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing

0.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference

0.0Offset [s]
Fully actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
110Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
82/3/2025Kimley-Horn
Scenario 1: 1 Existing PMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

546

80.4180.71271.59281.17259.8036.95209.73224.19398.73336.0336.049.77279.495th-Percentile Queue Length [ft/ln]

3.223.2310.8611.2510.391.488.398.9715.9513.4413.441.9911.1895th-Percentile Queue Length [veh/ln]

44.6744.84153.24173.24157.0420.53119.93130.51265.20215.6215.627.65171.950th-Percentile Queue Length [ft/ln]

1.791.796.136.936.280.824.805.2210.618.628.621.116.8850th-Percentile Queue Length [veh/ln] NoNoYesYesNoNoNoNoYesNoYesNoNoCritical Lane Group
BBFCCEDDEEEDELane Group LOS

18.4118.41263.0125.9723.7973.3435.9435.8464.1459.7259.7236.5958.95d, Delay for Lane Group [s/veh]

0.140.141.320.510.420.670.480.480.920.880.880.130.87X, volume / capacity Lane Group Results

1.001.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor

1.001.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio

0.000.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]

0.350.35210.352.731.6219.900.850.7721.0716.8616.860.1613.00d2, Incremental Delay [s]

1.001.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.500.500.470.500.500.110.110.110.300.260.260.110.17k, delay calibration

18.0618.0652.6623.2422.1753.4435.0935.0743.0742.8642.8636.4345.95d1, Uniform Delay [s] 8248307167379235427468354311311366257c, Capacity [veh/h] 1856187017811589187017811707187017811589158918701781s, saturation flow rate [veh/h]

0.060.060.050.220.180.010.120.120.180.170.170.030.13(v / s)_i Volume / Saturation Flow Rate

0.440.440.040.420.420.020.250.250.200.200.200.200.14g / C, Green / Cycle 494944646228282222222216g_i, Effective Green Time [s]

2.202.201.602.202.201.602.202.202.101.701.701.701.60l2, Clearance Lost Time [s]

0.000.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]

4.204.203.604.204.203.604.204.204.103.703.703.703.60L, Total Lost Time per Cycle [s] 110110110110110110110110110110110110110C, Cycle Length [s] CCLCCLCCLRCCLLane Group
Lane Group Calculations
92/3/2025Kimley-Horn
Scenario 1: 1 Existing PMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

547

Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh] 58.95 36.59 59.72 64.14 35.87 35.94 73.34 23.79 25.97 263.01 18.41 18.41 Movement LOS E D E E D D E C C F B B
d_A, Approach Delay [s/veh] 58.13 48.00 26.50 89.81
Approach LOS E D C F
d_I, Intersection Delay [s/veh] 50.63
Intersection LOS D
Intersection V/C 0.622
Other Modes
g_Walk,mi, Effective Walk Time [s] 9.0 9.0 9.0 9.0
M_corner, Corner Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s] 46.30 46.30 46.30 46.30
I_p,int, Pedestrian LOS Score for Intersectio 2.720 2.473 2.556 2.608 Crosswalk LOS B B B B
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h] 406 451 488 379 d_b, Bicycle Delay [s] 34.89 32.93 31.40 36.10
I_b,int, Bicycle LOS Score for Intersection 2.237 2.183 2.134 1.825 Bicycle LOS B B B A
----------------Ring 4
----------------Ring 3
------------8765Ring 2
------------4321Ring 1
Sequence
102/3/2025Kimley-Horn
Scenario 1: 1 Existing PMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

548

0.520Volume to Capacity (v/c):

DLevel Of Service:

43.9Delay (sec / veh):
15 minutesAnalysis Period:

HCM 7th EditionAnalysis Method:

SignalizedControl Type:

Intersection 3: SR-92 WB Ramps/Chess Drive
Intersection Level Of Service Report
NoYesNoYesCrosswalk
NoNoNoNoCurb Present

0.000.000.000.00Grade [%]

30.0030.0030.0030.00Speed [mph]

0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket
500.00100.00480.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 101000000000No. of Lanes in Entry Pocket

12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Route 92 West RampOffice driveway Chess Dr Chess DrName Intersection Setup
112/3/2025Kimley-Horn
Scenario 1: 1 Existing PMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

549

0100Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
2122833221111889815452820Total Analysis Volume [veh/h]
53121153047245136700Total 15-Minute Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor

0.93000.93000.93000.93000.93000.93000.93000.93000.93000.93000.93000.9300Peak Hour Factor 1972773201011759125072620Total Hourly Volume [veh/h]
00010000027300Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000000000000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor

0.00Proportion of CAVs [%]

1.301.301.301.301.301.301.301.301.301.301.301.30Heavy Vehicles Percentage [%]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1972774201011759127802620Base Volume Input [veh/h]
Route 92 West RampOffice driveway Chess Dr Chess DrName Volumes
122/3/2025Kimley-Horn
Scenario 1: 1 Existing PMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

550

0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft]

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoPedestrian Recall
NoNoNoNoNoMaximum Recall
NoNoNoNoNoMinimum Recall

0.02.50.00.01.70.00.03.50.02.12.20.0l2, Clearance Lost Time [s]

0.02.00.00.02.00.00.02.00.02.02.00.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk

0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 000017001201000Pedestrian Clearance [s]
000050050500Walk [s]

0.03.00.00.03.00.00.03.00.03.03.00.0Vehicle Extension [s] 02700200043047200Split [s]

0.01.00.00.00.50.00.02.00.01.01.00.0All red [s]

0.03.50.00.03.20.00.03.50.03.13.20.0Amber [s]
03000300055030300Maximum Green [s]
0500400100560Minimum Green [s]
------------Lead / Lag
Auxiliary Signal Groups
020040080610Signal Group
UnsignaPermissPermissPermissPermissPermissPermissPermissPermissProtectePermissPermissControl Type Phasing & Timing

12.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference

51.0Offset [s]
Fully actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
110Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
132/3/2025Kimley-Horn
Scenario 1: 1 Existing PMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

551

100.16100.1389.62261.11714.69714.69287.25322.6495th-Percentile Queue Length [ft/ln]

4.014.013.5810.4428.5928.5911.4912.9195th-Percentile Queue Length [veh/ln]

55.6455.6349.79158.03526.53526.53177.88205.1850th-Percentile Queue Length [ft/ln]

2.232.231.996.3221.0621.067.128.2150th-Percentile Queue Length [veh/ln] NoNoYesNoNoYesYesNoCritical Lane Group
FFFDEECCLane Group LOS

99.5299.60109.3741.4057.3657.3625.1131.11d, Delay for Lane Group [s/veh]

0.680.680.750.270.740.740.360.32X, volume / capacity
Lane Group Results

1.001.001.001.001.001.001.001.00PF, progression factor

1.001.001.001.001.001.001.001.00Rp, platoon ratio

0.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]

12.0812.1620.710.967.287.280.150.95d2, Incremental Delay [s]

1.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.110.110.110.500.500.500.110.50k, delay calibration

87.4487.4488.6640.4450.0850.0824.9630.16d1, Uniform Delay [s] 6363486956636631503886c, Capacity [veh/h]
17951791182618791791179128291880s, saturation flow rate [veh/h]

0.020.020.020.100.270.270.190.15(v / s)_i Volume / Saturation Flow Rate

0.030.030.030.370.370.370.530.47g / C, Green / Cycle
6656868689786g_i, Effective Green Time [s]

2.502.501.703.503.503.502.102.20l2, Clearance Lost Time [s]

0.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]

4.504.503.705.505.505.504.104.20L, Total Lost Time per Cycle [s] 183183183183183183183183C, Cycle Length [s]
CLCCCLRCLane Group
Lane Group Calculations
142/3/2025Kimley-Horn
Scenario 1: 1 Existing PMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

552

Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh] 31.11 31.11 25.11 57.36 41.40 41.40 109.37 109.37 109.37 99.56 99.52 0.00 Movement LOS C C C E D D F F F F F
d_A, Approach Delay [s/veh] 27.15 54.78 109.37 30.01
Approach LOS C D F C
d_I, Intersection Delay [s/veh] 43.93
Intersection LOS D
Intersection V/C 0.520
Other Modes
g_Walk,mi, Effective Walk Time [s] 9.0 0.0 9.0 0.0
M_corner, Corner Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s] 82.90 0.00 82.90 0.00
I_p,int, Pedestrian LOS Score for Intersectio 2.991 0.000 1.770 0.000 Crosswalk LOS C F A F
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h] 172 409 178 245 d_b, Bicycle Delay [s] 76.56 58.01 76.14 70.56
I_b,int, Bicycle LOS Score for Intersection 3.375 2.525 1.621 1.700 Bicycle LOS C B A A
----------------Ring 4
----------------Ring 3
------------846-Ring 2
--------------21Ring 1
Sequence
152/3/2025Kimley-Horn
Scenario 1: 1 Existing PMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

553

0.382Volume to Capacity (v/c):

DLevel Of Service:

51.0Delay (sec / veh):
15 minutesAnalysis Period:

HCM 7th EditionAnalysis Method:

SignalizedControl Type:

Intersection 4: Foster City Boulevard/Chess Drive
Intersection Level Of Service Report
NoYesYesYesCrosswalk
NoNoNoNoCurb Present

0.000.000.000.00Grade [%]

30.0035.0025.0030.00Speed [mph]

0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket
100.00100.00510.00180.00100.0080.00100.00100.00100.00100.00100.0095.00Entry Pocket Length [ft] 001101001101No. of Lanes in Entry Pocket

12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Foster City BoulevardFoster City BoulevardChess DriveChess DriveName Intersection Setup
162/3/2025Kimley-Horn
Scenario 1: 1 Existing PMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

554

0000Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
152076921539962316110801338Total Analysis Volume [veh/h] 452173382491140270310Total 15-Minute Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 152076921539962316110801338Total Hourly Volume [veh/h]
400820010041800Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000000000000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor

0.00Proportion of CAVs [%]

2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 19207692235996241611084181338Base Volume Input [veh/h]
Foster City BoulevardFoster City BoulevardChess DriveChess DriveName Volumes
172/3/2025Kimley-Horn
Scenario 1: 1 Existing PMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

555

0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.040.040.040.040.040.00.00.00.00.00.00.0Detector Length [ft]

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoPedestrian Recall
YesNoNoNoNoNoMaximum Recall
NoNoNoNoNoNoMinimum Recall

0.02.62.51.72.91.60.02.10.00.01.70.0l2, Clearance Lost Time [s]

0.02.02.02.02.02.00.02.00.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk

0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 023001000230000Pedestrian Clearance [s]
050000040000Walk [s]

0.03.03.03.03.03.00.03.00.00.03.00.0Vehicle Extension [s] 0552720421403100200Split [s]

0.01.01.00.51.00.50.01.00.00.00.50.0All red [s]

0.03.63.53.23.93.10.03.10.00.03.20.0Amber [s]
0655530352003500300Maximum Green [s]
064464040040Minimum Green [s]
--Lead--Lead------Lead / Lag
2,3Auxiliary Signal Groups
061325040030Signal Group
PermissPermissPermissOverlapPermissProtecteSplitSplitSplitSplitSplitSplitControl Type Phasing & Timing

0.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference

90.0Offset [s]
Fully actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
120Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
182/3/2025Kimley-Horn
Scenario 1: 1 Existing PMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

556

47.8948.99178.89150.11697.475.90247.33162.950.0036.8836.7495th-Percentile Queue Length [ft/ln]

1.921.967.166.0027.900.249.896.520.001.481.4795th-Percentile Queue Length [veh/ln]

26.6127.2299.3883.40491.223.28147.6890.530.0020.4920.4150th-Percentile Queue Length [ft/ln]

1.061.093.983.3419.650.135.913.620.000.820.8250th-Percentile Queue Length [veh/ln] NoNoNoNoYesNoYesNoNoNoYesCritical Lane Group
AABCFFEEAEELane Group LOS

7.177.1719.8727.8582.20113.1966.5259.080.0056.7356.77d, Delay for Lane Group [s/veh]

0.090.090.460.251.060.410.830.570.000.160.17X, volume / capacity Lane Group Results

1.001.001.001.001.001.001.001.001.001.001.00PF, progression factor

1.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio

0.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]

0.140.140.990.2133.3347.118.422.680.000.480.51d2, Incremental Delay [s]

1.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.500.500.500.110.110.110.110.110.110.110.11k, delay calibration

7.037.0318.8827.6448.8766.0858.1056.410.0056.2456.26d1, Uniform Delay [s] 1250128015186149395198190136157153c, Capacity [veh/h]
18261870242915893560178118641781158918251781s, saturation flow rate [veh/h]

0.060.060.280.100.280.000.090.060.000.010.01(v / s)_i Volume / Saturation Flow Rate

0.690.690.690.390.260.000.110.110.090.090.09g / C, Green / Cycle 919191513501414111111g_i, Effective Green Time [s]

2.602.600.000.002.901.602.102.101.701.701.70l2, Clearance Lost Time [s]

0.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]

4.604.604.603.704.903.604.104.103.703.703.70L, Total Lost Time per Cycle [s] 133133133133133133133133133133133C, Cycle Length [s]
CCLRCLCLRCLLane Group
Lane Group Calculations
192/3/2025Kimley-Horn
Scenario 1: 1 Existing PMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

557

Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh] 56.75 56.73 0.00 59.08 66.52 66.52 113.19 82.20 27.85 19.87 7.17 7.17 Movement LOS E E A E E E F F C B A A
d_A, Approach Delay [s/veh] 56.75 63.56 75.03 16.79
Approach LOS E E E B
d_I, Intersection Delay [s/veh] 51.04
Intersection LOS D
Intersection V/C 0.382
Other Modes
g_Walk,mi, Effective Walk Time [s] 4.0 9.0 8.0 0.0
M_corner, Corner Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s] 62.36 57.61 58.55 0.00
I_p,int, Pedestrian LOS Score for Intersectio 3.498 2.371 2.871 0.000 Crosswalk LOS C B C F
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h] 246 406 560 760 d_b, Bicycle Delay [s] 51.01 42.13 34.39 25.48
I_b,int, Bicycle LOS Score for Intersection 2.333 2.010 2.577 2.317 Bicycle LOS B B B B
----------------Ring 4
----------------Ring 3
--------------65Ring 2
------------4321Ring 1
Sequence
202/3/2025Kimley-Horn
Scenario 1: 1 Existing PMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

558

0.462Volume to Capacity (v/c):

DLevel Of Service:

40.9Delay (sec / veh):
15 minutesAnalysis Period:

HCM 7th EditionAnalysis Method:

SignalizedControl Type:

Intersection 5: SR-92 EB Ramps/Metro Center Boulevard
Intersection Level Of Service Report
NoYesNoNoCrosswalk
NoNoNoNoCurb Present

0.000.000.000.00Grade [%]

30.0035.0035.0015.00Speed [mph]

0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket
100.00100.0090.00100.00100.00290.00640.00100.00600.00100.00100.00100.00Entry Pocket Length [ft] 001002101000No. of Lanes in Entry Pocket

12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Metro Center BoulevarMetro Center BoulevarSR-92 RampsParking Lot AccessName Intersection Setup
212/3/2025Kimley-Horn
Scenario 1: 1 Existing PMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

559

0000Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
6521048526552030411114512Total Analysis Volume [veh/h]
16326216613071284131Total 15-Minute Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor

0.97000.97000.97000.97000.97000.97000.97000.97000.97000.97000.97000.9700Peak Hour Factor 6321018525750429410814492Total Hourly Volume [veh/h]
340001001500700Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000000000000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor

0.00Proportion of CAVs [%]

1.901.901.901.901.901.901.901.901.901.901.901.90Heavy Vehicles Percentage [%]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 9721018625750444410821492Base Volume Input [veh/h]
Metro Center BoulevarMetro Center BoulevarSR-92 RampsParking Lot AccessName Volumes
222/3/2025Kimley-Horn
Scenario 1: 1 Existing PMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

560

0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.040.040.00.040.040.040.040.00.00.040.00.0Detector Length [ft]

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoPedestrian Recall
NoNoNoNoYesNoMaximum Recall
NoNoNoNoNoNoMinimum Recall

0.02.51.60.02.51.61.63.00.00.02.20.0l2, Clearance Lost Time [s]

0.02.02.00.02.02.02.02.00.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk

0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 000017101000000Pedestrian Clearance [s]
000065500000Walk [s]

0.03.03.00.03.03.03.03.00.00.03.00.0Vehicle Extension [s] 0301804836363600180Split [s]

0.01.00.50.01.00.50.51.00.00.01.00.0All red [s]

0.03.53.10.03.53.13.14.00.00.03.20.0Amber [s]
0352504030306000400Maximum Green [s]
0440444100040Minimum Green [s]
--Lead--Lead------Lead / Lag
Auxiliary Signal Groups
061025540030Signal Group
PermissPermissProtectePermissPermissProtectePermissPermissPermissPermissPermissPermissControl Type Phasing & Timing

12.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference

30.0Offset [s]
Fully actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
120Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
232/3/2025Kimley-Horn
Scenario 1: 1 Existing PMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

561

356.7356.7105.416.4197.8698.45306.7513.4553.7153.6320.2683.3995th-Percentile Queue Length [ft/ln]

14.2714.274.220.663.913.9412.270.542.152.150.813.3495th-Percentile Queue Length [veh/ln] 231.8231.858.569.1254.3754.69192.877.4729.8429.7911.2546.3350th-Percentile Queue Length [ft/ln]

9.279.272.340.362.172.197.710.301.191.190.451.8550th-Percentile Queue Length [veh/ln] NoYesNoNoNoNoYesNoNoYesNoYesCritical Lane Group
DDCFBBDCCCEELane Group LOS

43.4643.4631.2890.4718.1118.1151.0127.2228.0928.0957.3567.66d, Delay for Lane Group [s/veh]

0.670.670.180.570.150.150.840.030.100.100.220.70X, volume / capacity Lane Group Results

1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor

1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio

0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]

7.137.130.6931.130.360.363.280.060.330.331.6410.83d2, Incremental Delay [s]

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.500.500.500.110.500.500.110.500.500.500.110.11k, delay calibration

36.3336.3330.5859.3417.7517.7547.7327.1527.7627.7655.7156.83d1, Uniform Delay [s] 487487573148858916169325925906576c, Capacity [veh/h]
159115911871178218591871346128161788178215911868s, saturation flow rate [veh/h]

0.200.200.060.000.070.070.150.010.030.030.010.03(v / s)_i Volume / Saturation Flow Rate

0.310.310.310.010.480.480.180.330.330.330.040.04g / C, Green / Cycle 373737157572140404055g_i, Effective Green Time [s]

2.502.502.501.602.502.501.603.003.003.002.202.20l2, Clearance Lost Time [s]

0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]

4.504.504.503.604.504.503.605.005.005.004.204.20L, Total Lost Time per Cycle [s] 120120120120120120120120120120120120C, Cycle Length [s] RCCLCCLRCLRCLane Group
Lane Group Calculations
242/3/2025Kimley-Horn
Scenario 1: 1 Existing PMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

562

Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh] 67.66 67.66 57.35 28.09 28.09 27.22 51.01 18.11 18.11 90.47 31.28 43.46 Movement LOS E E E C C C D B B F C D
d_A, Approach Delay [s/veh] 65.51 27.91 39.76 42.30
Approach LOS E C D D
d_I, Intersection Delay [s/veh] 40.86
Intersection LOS D
Intersection V/C 0.462
Other Modes
g_Walk,mi, Effective Walk Time [s] 0.0 0.0 31.0 0.0
M_corner, Corner Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s] 0.00 0.00 33.01 0.00
I_p,int, Pedestrian LOS Score for Intersectio 0.000 0.000 2.630 0.000 Crosswalk LOS F F B F
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h] 230 517 725 425 d_b, Bicycle Delay [s] 47.00 33.01 24.39 37.22
I_b,int, Bicycle LOS Score for Intersection 1.682 1.824 2.212 2.470 Bicycle LOS A A B B
----------------Ring 4
----------------Ring 3
--------------65Ring 2
------------4321Ring 1
Sequence
252/3/2025Kimley-Horn
Scenario 1: 1 Existing PMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

563

0.407Volume to Capacity (v/c):

DLevel Of Service:

39.1Delay (sec / veh):
15 minutesAnalysis Period:

HCM 7th EditionAnalysis Method:

SignalizedControl Type:

Intersection 6: Foster City Boulevard/Metro Center Boulevard Intersection Level Of Service Report
YesNoYesNoCrosswalk
NoNoNoNoCurb Present

0.000.000.000.00Grade [%]

35.0035.0025.0035.00Speed [mph]

0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket
100.00100.00100.00100.00100.00210.00170.00100.0050.00240.00100.00150.00Entry Pocket Length [ft] 101101101101No. of Lanes in Entry Pocket

12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Foster City BoulevardFoster City BoulevardMetro Center BoulevardMetro Center BoulevardName Intersection Setup
262/3/2025Kimley-Horn
Scenario 1: 1 Existing PMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

564

0000Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
515472343646151981741186276130103Total Analysis Volume [veh/h] 13137599115450443016193326Total 15-Minute Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 515472343646151981741186276130103Total Hourly Volume [veh/h] 13003650094007700Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000000000000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor

0.00Proportion of CAVs [%]

2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 6454723472961519826811862153130103Base Volume Input [veh/h] Foster City BoulevardFoster City BoulevardMetro Center BoulevardMetro Center BoulevardName Volumes
272/3/2025Kimley-Horn
Scenario 1: 1 Existing PMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

565

0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.040.040.00.00.00.00.00.00.040.040.00.0Detector Length [ft]

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoPedestrian Recall
YesNoYesNoNoNoNoMaximum Recall
NoNoNoNoNoNoNoMinimum Recall

0.02.61.60.02.61.60.01.70.01.62.20.0l2, Clearance Lost Time [s]

0.02.02.00.02.02.00.02.00.02.02.00.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk

0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0190020001000270Pedestrian Clearance [s]
050050050050Walk [s]

0.03.03.00.03.03.00.03.00.03.03.00.0Vehicle Extension [s] 0362403220025024390Split [s]

0.01.00.50.01.00.50.00.50.00.51.00.0All red [s]

0.03.63.10.03.63.10.03.20.03.13.20.0Amber [s]
0403004025030030400Maximum Green [s]
064064060460Minimum Green [s]
--Lead--Lead------Lead / Lag
1,4Auxiliary Signal Groups
061025030140Signal Group
PermissPermissProtectePermissPermissProtecteSplitSplitSplitOverlapSplitSplitControl Type Phasing & Timing

0.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference

43.0Offset [s]
Semi-actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
120Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
282/3/2025Kimley-Horn
Scenario 1: 1 Existing PMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

566

202.54195.95300.33193.07207.14263.68224.40145.3173.6230.8073.9158.1495th-Percentile Queue Length [ft/ln]

8.107.8412.017.728.2910.558.985.812.941.232.962.3395th-Percentile Queue Length [veh/ln] 114.71109.96187.92107.90118.05159.97130.6780.7340.9017.1141.0632.3050th-Percentile Queue Length [ft/ln]

4.594.407.524.324.726.405.233.231.640.681.641.2950th-Percentile Queue Length [veh/ln] NoNoYesYesNoNoYesNoNoNoYesNoCritical Lane Group
CCECCEDDDCDDLane Group LOS

31.6830.8859.7334.0733.0161.0548.9442.6840.4123.3640.2539.87d, Delay for Lane Group [s/veh]

0.340.340.890.410.390.870.540.310.170.070.180.15X, volume / capacity Lane Group Results

1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor

1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio

0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]

1.540.779.621.450.719.746.252.101.020.030.550.45d2, Incremental Delay [s]

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.500.500.110.500.500.110.500.500.500.110.500.50k, delay calibration

30.1430.1150.1032.6232.3051.3242.7040.5839.3923.3339.7039.42d1, Uniform Delay [s] 595118326487815892283243813631083718697c, Capacity [veh/h] 179035601781281350941781158918701781281335603459s, saturation flow rate [veh/h]

0.110.110.130.130.120.110.110.060.030.030.040.03(v / s)_i Volume / Saturation Flow Rate

0.330.330.150.310.310.130.200.200.200.380.200.20g / C, Green / Cycle 404018383815242424462424g_i, Effective Green Time [s]

2.602.601.602.602.601.601.701.701.700.002.202.20l2, Clearance Lost Time [s]

0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]

4.604.603.604.604.603.603.703.703.703.604.204.20L, Total Lost Time per Cycle [s] 120120120120120120120120120120120120C, Cycle Length [s] CCLRCLRCLRCLLane Group
Lane Group Calculations
292/3/2025Kimley-Horn
Scenario 1: 1 Existing PMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

567

Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh] 39.87 40.25 23.36 40.41 42.68 48.94 61.05 33.01 34.07 59.73 31.10 31.68 Movement LOS D D C D D D E C C E C C
d_A, Approach Delay [s/veh] 35.97 45.36 38.06 39.19
Approach LOS D D D D
d_I, Intersection Delay [s/veh] 39.14
Intersection LOS D
Intersection V/C 0.407
Other Modes
g_Walk,mi, Effective Walk Time [s] 0.0 9.0 0.0 9.0
M_corner, Corner Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s] 0.00 51.34 0.00 51.34
I_p,int, Pedestrian LOS Score for Intersectio 0.000 2.585 0.000 2.900 Crosswalk LOS F B F C
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h] 580 355 457 523 d_b, Bicycle Delay [s] 30.25 40.59 35.73 32.71
I_b,int, Bicycle LOS Score for Intersection 1.878 2.299 2.408 2.024 Bicycle LOS A B B B
----------------Ring 4
----------------Ring 3
--------------65Ring 2
------------4321Ring 1
Sequence
302/3/2025Kimley-Horn
Scenario 1: 1 Existing PMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

568

B
kimley-horn.com 4637 Chabot Drive, Suite 300, Pleasanton, CA 94588 925 398 4840 Appendix B – Existing plus Phase I Project Conditions LOS Worksheets

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

569

0.404Volume to Capacity (v/c):

BLevel Of Service:

11.6Delay (sec / veh):
15 minutesAnalysis Period:

HCM 7th EditionAnalysis Method:

SignalizedControl Type:

Intersection 1: Foster City Boulevard/Vintage Park Drive-Chess Drive Intersection Level Of Service Report
YesYesYesYesCrosswalk
NoNoNoNoCurb Present

0.000.000.000.00Grade [%]

25.0030.0030.0030.00Speed [mph]

0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket
100.00100.00120.00160.00100.00110.00100.00100.00155.00100.00100.00215.00Entry Pocket Length [ft] 001101001001No. of Lanes in Entry Pocket

12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Chess DriveVintage Park DriveFoster City BoulevardFoster City BoulevardName Intersection Setup
12/3/2025Kimley-Horn
Scenario 8: 8 Existing AM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

570

0000Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
15113299311433151181257322Total Analysis Volume [veh/h] 43172838313531480Total 15-Minute Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor

0.87000.87000.87000.87000.87000.87000.87000.87000.87000.87000.87000.8700Peak Hour Factor 13103258271228844161094280Total Hourly Volume [veh/h]
000000000000Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000000011000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor

0.00Proportion of CAVs [%]

2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 13103258271228743161094280Base Volume Input [veh/h]
Chess DriveVintage Park DriveFoster City BoulevardFoster City BoulevardName Volumes
22/3/2025Kimley-Horn
Scenario 8: 8 Existing AM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

571

0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft]

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoPedestrian Recall
NoNoNoNoNoNoMaximum Recall
NoNoNoNoNoNoMinimum Recall

0.01.20.00.01.20.01.22.61.60.02.91.6l2, Clearance Lost Time [s]

0.02.00.00.02.00.02.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk

0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 01800180181800120Pedestrian Clearance [s]
050050550050Walk [s]

0.03.00.00.03.00.03.03.03.00.03.03.0Vehicle Extension [s] 050050536709062Split [s]

0.01.00.00.01.00.01.01.00.50.01.00.5All red [s]

0.02.20.00.02.20.02.23.63.10.03.93.1Amber [s]
030003003030403030Maximum Green [s]
040040484084Minimum Green [s]
--------Lead--LeadLead / Lag
Auxiliary Signal Groups
040030325061Signal Group
SplitSplitSplitSplitSplitSplitPermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing

0.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference

0.0Offset [s]
Fully actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
120Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
32/3/2025Kimley-Horn
Scenario 8: 8 Existing AM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

572

13.411.2210.643.0111.0639.3939.6923.05125.62125.6994.8295th-Percentile Queue Length [ft/ln]

0.540.050.430.120.441.581.590.925.025.033.7995th-Percentile Queue Length [veh/ln]

7.450.685.911.676.1521.8822.0512.8169.7969.8352.6850th-Percentile Queue Length [ft/ln]

0.300.030.240.070.250.880.880.512.792.792.1150th-Percentile Queue Length [veh/ln] YesNoYesNoNoNoNoYesYesNoNoCritical Lane Group
CBBBBBBCAABLane Group LOS

25.6217.0517.9316.0217.5811.0411.0324.339.779.7415.21d, Delay for Lane Group [s/veh]

0.530.060.320.080.310.360.360.630.770.770.76X, volume / capacity Lane Group Results

1.001.001.001.001.001.001.001.001.001.001.00PF, progression factor

1.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio

0.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]

8.810.482.040.341.700.450.447.881.551.532.80d2, Incremental Delay [s]

1.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.110.110.110.110.110.110.110.110.110.110.11k, delay calibration

16.8116.5815.9015.6815.8810.5910.5916.468.228.2212.42d1, Uniform Delay [s] 49519010610147948681827831425c, Capacity [veh/h]
16971781158918701781184318701781186118701781s, saturation flow rate [veh/h]

0.020.000.020.000.020.090.090.030.340.340.18(v / s)_i Volume / Saturation Flow Rate

0.030.030.060.060.060.260.260.050.440.440.24g / C, Green / Cycle 1122299216168g_i, Effective Green Time [s]

1.201.201.201.201.202.602.601.602.902.901.60l2, Clearance Lost Time [s]

0.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]

3.203.203.203.203.204.604.603.604.904.903.60L, Total Lost Time per Cycle [s] 3535353535353535353535C, Cycle Length [s]
CLRCLCCLCCLLane Group
Lane Group Calculations
42/3/2025Kimley-Horn
Scenario 8: 8 Existing AM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

573

Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh] 15.21 9.76 9.77 24.33 11.04 11.04 17.58 16.02 17.93 17.05 25.62 25.62 Movement LOS B A A C B B B B B B C C
d_A, Approach Delay [s/veh] 10.86 12.75 17.53 24.73
Approach LOS B B B C
d_I, Intersection Delay [s/veh] 11.63
Intersection LOS B
Intersection V/C 0.404
Other Modes
g_Walk,mi, Effective Walk Time [s] 9.0 9.0 9.0 9.0
M_corner, Corner Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s] 9.65 9.65 9.65 9.65
I_p,int, Pedestrian LOS Score for Intersectio 2.630 2.579 2.329 2.101 Crosswalk LOS B B B B
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h] 4866 1796 229 229 d_b, Bicycle Delay [s] 35.92 0.18 13.72 13.72
I_b,int, Bicycle LOS Score for Intersection 2.877 1.886 1.673 1.607 Bicycle LOS C A A A
----------------Ring 4
----------------Ring 3
--------------65Ring 2
------------4321Ring 1
Sequence
52/3/2025Kimley-Horn
Scenario 8: 8 Existing AM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

574

0.312Volume to Capacity (v/c):

CLevel Of Service:

34.4Delay (sec / veh):
15 minutesAnalysis Period:

HCM 7th EditionAnalysis Method:

SignalizedControl Type:

Intersection 2: Vintage Park Drive/Chess Drive
Intersection Level Of Service Report
YesYesYesYesCrosswalk
NoNoNoNoCurb Present

0.000.000.000.00Grade [%]

30.0030.0030.0030.00Speed [mph]

0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket
100.00100.00215.00100.00100.00145.00100.00100.00280.00100.00100.00225.00Entry Pocket Length [ft] 001001001101No. of Lanes in Entry Pocket

12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Chess DrChess DriveVintage Park DriveVintage Park DriveName Intersection Setup
62/3/2025Kimley-Horn
Scenario 8: 8 Existing AM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

575

0000Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
1123801981371555028551696391159Total Analysis Volume [veh/h] 2895493439137144249840Total 15-Minute Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor

0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 1033501821261434626511588360146Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
001020000200Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor

0.00Proportion of CAVs [%]

2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1033501811261414626511586360146Base Volume Input [veh/h] Chess DrChess DriveVintage Park DriveVintage Park DriveName Volumes
72/3/2025Kimley-Horn
Scenario 8: 8 Existing AM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

576

0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft]

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoNoPedestrian Recall
NoNoNoNoNoNoNoNoMaximum Recall
NoNoNoNoNoNoNoNoMinimum Recall

0.02.21.60.02.21.60.02.22.11.71.71.6l2, Clearance Lost Time [s]

0.02.02.00.02.02.00.02.02.02.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk

0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 02000180020021210Pedestrian Clearance [s]
050050050550Walk [s]

0.03.03.00.03.03.00.03.03.03.03.03.0Vehicle Extension [s] 04632025110114333326Split [s]

0.01.00.50.01.00.50.01.00.51.01.00.5All red [s]

0.03.23.10.03.23.10.03.23.62.72.73.1Amber [s]
0355053003520656555Maximum Green [s]
044044044444Minimum Green [s]
--Lead--Lag--Lead--LeadLead / Lag
Auxiliary Signal Groups
047083025661Signal Group
PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing

0.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference

0.0Offset [s]
Fully actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
110Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
82/3/2025Kimley-Horn
Scenario 8: 8 Existing AM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

577

92.8099.30245.0171.9978.1175.8457.4657.1627.26112.5234.7234.7207.895th-Percentile Queue Length [ft/ln]

3.713.979.802.883.123.032.302.291.094.509.399.398.3295th-Percentile Queue Length [veh/ln]

51.5555.17145.9539.9943.4042.1331.9231.7515.1462.55138.3138.3118.550th-Percentile Queue Length [ft/ln]

2.062.215.841.601.741.691.281.270.612.505.535.534.7450th-Percentile Queue Length [veh/ln] NoNoYesYesNoNoYesNoNoNoNoNoYesCritical Lane Group
AAEBBEEEEDDDELane Group LOS

7.137.0955.5610.9210.7870.3860.8658.3377.7545.5451.6451.6457.28d, Delay for Lane Group [s/veh]

0.200.200.850.150.140.780.620.560.640.450.790.790.83X, volume / capacity Lane Group Results

1.001.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor

1.001.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio

0.000.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]

0.390.368.730.340.2717.818.886.4723.801.525.465.469.12d2, Incremental Delay [s]

1.001.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.500.500.110.500.500.110.110.110.110.110.110.110.11k, delay calibration

6.736.7346.8310.5710.5152.5751.9851.8653.9544.0146.1846.1848.16d1, Uniform Delay [s] 11651262232926108764677525211249249191c, Capacity [veh/h] 1726187017811593187017811669187017811589187018701781s, saturation flow rate [veh/h]

0.140.140.110.090.080.030.020.020.010.060.100.100.09(v / s)_i Volume / Saturation Flow Rate

0.680.680.130.580.580.040.040.040.010.130.130.130.11g / C, Green / Cycle 7474146464444215151512g_i, Effective Green Time [s]

2.202.201.602.202.201.602.202.202.101.701.701.701.60l2, Clearance Lost Time [s]

0.000.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]

4.204.203.604.204.203.604.204.204.103.703.703.703.60L, Total Lost Time per Cycle [s] 110110110110110110110110110110110110110C, Cycle Length [s] CCLCCLCCLRCCLLane Group
Lane Group Calculations
92/3/2025Kimley-Horn
Scenario 8: 8 Existing AM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

578

Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh] 57.28 51.64 45.54 77.75 58.93 60.86 70.38 10.78 10.92 55.56 7.10 7.13 Movement LOS E D D E E E E B B E A A
d_A, Approach Delay [s/veh] 52.12 62.52 19.55 21.01
Approach LOS D E B C
d_I, Intersection Delay [s/veh] 34.35
Intersection LOS C
Intersection V/C 0.312
Other Modes
g_Walk,mi, Effective Walk Time [s] 9.0 9.0 9.0 9.0
M_corner, Corner Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s] 46.37 46.37 46.37 46.37
I_p,int, Pedestrian LOS Score for Intersectio 2.632 2.570 2.488 2.620 Crosswalk LOS B B B B
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h] 533 124 378 760 d_b, Bicycle Delay [s] 29.60 48.41 36.17 21.14
I_b,int, Bicycle LOS Score for Intersection 2.093 1.641 1.842 2.129 Bicycle LOS B A A B
----------------Ring 4
----------------Ring 3
------------8765Ring 2
------------4321Ring 1
Sequence
102/3/2025Kimley-Horn
Scenario 8: 8 Existing AM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

579

0.484Volume to Capacity (v/c):

CLevel Of Service:

20.5Delay (sec / veh):
15 minutesAnalysis Period:

HCM 7th EditionAnalysis Method:

SignalizedControl Type:

Intersection 3: SR-92 WB Ramps/Chess Drive
Intersection Level Of Service Report
NoYesNoYesCrosswalk
NoNoNoNoCurb Present

0.000.000.000.00Grade [%]

30.0030.0030.0030.00Speed [mph]

49.210.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 100000000000No. of Lanes in Exit Pocket
500.00100.00480.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 101000000000No. of Lanes in Entry Pocket

12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Office driveway Chess Dr Chess DrName
Intersection Setup
112/3/2025Kimley-Horn
Scenario 8: 8 Existing AM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

580

0100Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
79138418417210208768851441Total Analysis Volume [veh/h] 198910514125219221360Total 15-Minute Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor

0.93000.93000.93000.93000.93000.93000.93000.93000.93000.93000.93000.9300Peak Hour Factor 7363538941629193714791341Total Hourly Volume [veh/h]
0001002004300Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
500000016040Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor

0.00Proportion of CAVs [%]

1.301.301.301.301.301.301.301.301.301.301.301.30Heavy Vehicles Percentage [%]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 731353895162111927081221301Base Volume Input [veh/h]
Office driveway Chess Dr Chess DrName
Volumes
122/3/2025Kimley-Horn
Scenario 8: 8 Existing AM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

581

0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft]

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoPedestrian Recall
NoNoNoNoNoMaximum Recall
NoNoNoNoNoMinimum Recall

3.52.50.00.01.70.00.03.50.02.12.20.0l2, Clearance Lost Time [s]

2.02.00.00.02.00.00.02.00.02.02.00.0l1, Start-Up Lost Time [s] NoNoYesYesRest In Walk

0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 120001700120000Pedestrian Clearance [s]
500050050000Walk [s]

3.03.00.00.03.00.00.03.00.03.03.00.0Vehicle Extension [s] 432700200043047200Split [s]

2.01.00.00.00.50.00.02.00.01.01.00.0All red [s]

3.53.50.00.03.20.00.03.50.03.13.20.0Amber [s]
553000300055030300Maximum Green [s]
10500400100560Minimum Green [s]
------------Lead / Lag
Auxiliary Signal Groups
820040080610Signal Group
UnsignaPermissPermissPermissPermissPermissPermissPermissPermissProtectePermissPermissControl Type Phasing & Timing

12.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference

51.0Offset [s]
Fully actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
110Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
132/3/2025Kimley-Horn
Scenario 8: 8 Existing AM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

582

269.11267.5336.52119.13226.47226.4737.52192.3695th-Percentile Queue Length [ft/ln]

10.7610.701.464.779.069.061.507.6995th-Percentile Queue Length [veh/ln] 164.07162.8820.2966.19132.19132.1920.84107.3950th-Percentile Queue Length [ft/ln]

6.566.520.812.655.295.290.834.3050th-Percentile Queue Length [veh/ln] NoYesYesNoNoYesNoYesCritical Lane Group
DDEBBBCELane Group LOS

52.1852.2371.9411.9413.9913.9928.7656.80d, Delay for Lane Group [s/veh]

0.840.840.650.200.380.380.100.80X, volume / capacity
Lane Group Results

1.001.001.001.001.001.001.001.00PF, progression factor

1.001.001.001.001.001.001.001.00Rp, platoon ratio

0.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]

6.736.7818.290.431.061.060.068.02d2, Incremental Delay [s]

1.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.110.110.110.500.500.500.110.11k, delay calibration

45.4545.4553.6611.5012.9312.9328.7048.78d1, Uniform Delay [s] 27327135106410221022818181c, Capacity [veh/h]
18051791181718651791179128291880s, saturation flow rate [veh/h]

0.130.130.010.120.210.210.030.08(v / s)_i Volume / Saturation Flow Rate

0.150.150.020.570.570.570.290.10g / C, Green / Cycle
171726363633211g_i, Effective Green Time [s]

2.502.501.703.503.503.502.102.20l2, Clearance Lost Time [s]

0.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]

4.504.503.705.505.505.504.104.20L, Total Lost Time per Cycle [s] 110110110110110110110110C, Cycle Length [s]
CLCCCLRCLane Group
Lane Group Calculations
142/3/2025Kimley-Horn
Scenario 8: 8 Existing AM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

583

Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh] 56.80 56.80 28.76 13.99 11.94 11.94 71.94 71.94 71.94 52.21 52.18 0.00 Movement LOS E E C B B B E E E D D
d_A, Approach Delay [s/veh] 46.44 13.53 71.94 19.97
Approach LOS D B E B
d_I, Intersection Delay [s/veh] 20.52
Intersection LOS C
Intersection V/C 0.484
Other Modes
g_Walk,mi, Effective Walk Time [s] 9.0 0.0 22.0 0.0
M_corner, Corner Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s] 46.42 0.00 35.25 0.00
I_p,int, Pedestrian LOS Score for Intersectio 2.549 0.000 1.753 0.000 Crosswalk LOS B F A F
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h] 287 681 296 409 d_b, Bicycle Delay [s] 40.39 23.94 39.98 34.85
I_b,int, Bicycle LOS Score for Intersection 2.010 2.375 1.599 2.312 Bicycle LOS B B A B
----------------Ring 4
----------------Ring 3
------------846-Ring 2
--------------21Ring 1
Sequence
152/3/2025Kimley-Horn
Scenario 8: 8 Existing AM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

584

0.627Volume to Capacity (v/c):

CLevel Of Service:

32.8Delay (sec / veh):
15 minutesAnalysis Period:

HCM 7th EditionAnalysis Method:

SignalizedControl Type:

Intersection 4: Foster City Boulevard/Chess Drive
Intersection Level Of Service Report
NoYesYesYesCrosswalk
NoNoNoNoCurb Present

0.000.000.000.00Grade [%]

30.0030.0025.0030.00Speed [mph]

0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket
100.00100.00510.00180.00100.0080.00100.00100.00100.00100.00100.0095.00Entry Pocket Length [ft] 001101001101No. of Lanes in Entry Pocket

12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Foster City BoulevardFoster City BoulevardChess Drive Chess DrName Intersection Setup
162/3/2025Kimley-Horn
Scenario 8: 8 Existing AM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

585

0000Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
1828938194429943322248070322Total Analysis Volume [veh/h] 46223205117511861201881Total 15-Minute Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 1828938194429943322248070322Total Hourly Volume [veh/h] 45002300100000Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
3300001073090Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor

0.00Proportion of CAVs [%]

2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1948938196729934251948061322Base Volume Input [veh/h]
Foster City BoulevardFoster City BoulevardChess Drive Chess DrName Volumes
172/3/2025Kimley-Horn
Scenario 8: 8 Existing AM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

586

0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.040.040.040.040.040.00.040.00.00.00.00.0Detector Length [ft]

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoPedestrian Recall
YesNoNoNoNoNoMaximum Recall
NoNoNoNoNoNoMinimum Recall

0.02.62.51.72.91.60.02.10.00.01.70.0l2, Clearance Lost Time [s]

0.02.02.02.02.02.00.02.00.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk

0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 023001000230000Pedestrian Clearance [s]
050000040000Walk [s]

0.03.03.03.03.03.00.03.00.00.03.00.0Vehicle Extension [s] 038314215803200420Split [s]

0.01.01.00.51.00.50.01.00.00.00.50.0All red [s]

0.03.63.53.23.93.10.03.10.00.03.20.0Amber [s]
0655530352003500300Maximum Green [s]
064464060040Minimum Green [s]
--Lead--Lead------Lead / Lag
2,3Auxiliary Signal Groups
061325040030Signal Group
PermissPermissPermissOverlapPermissProtecteSplitSplitSplitSplitSplitSplitControl Type Phasing & Timing

0.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference

90.0Offset [s]
Fully actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
120Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
182/3/2025Kimley-Horn
Scenario 8: 8 Existing AM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

587

419.57411.78308.3920.06160.879.1650.6931.25611.76197.97197.2095th-Percentile Queue Length [ft/ln]

16.7816.4712.340.806.430.372.031.2524.477.927.8995th-Percentile Queue Length [veh/ln] 281.90275.64194.1411.1489.375.0928.1617.36439.80111.41110.8650th-Percentile Queue Length [ft/ln]

11.2811.037.770.453.570.201.130.6917.594.464.4350th-Percentile Queue Length [veh/ln] YesNoNoNoNoYesYesNoYesNoNoCritical Lane Group
CCCADFEEECCLane Group LOS

24.4023.4322.338.4235.1893.9859.7357.6468.1031.9231.97d, Delay for Lane Group [s/veh]

0.600.570.630.040.300.460.440.280.960.340.35X, volume / capacity Lane Group Results

1.001.001.001.001.001.001.001.001.001.001.00PF, progression factor

1.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio

0.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]

3.052.542.380.080.8034.323.691.9727.790.360.37d2, Incremental Delay [s]

1.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.500.500.500.500.500.110.110.110.430.110.11k, delay calibration

21.3520.8919.958.3434.3859.6656.0455.6740.3131.5631.60d1, Uniform Delay [s] 8879401292100698398078502572562c, Capacity [veh/h]
17641870261015893560178118421781158918121781s, saturation flow rate [veh/h]

0.300.290.310.030.080.000.020.010.300.110.11(v / s)_i Volume / Saturation Flow Rate

0.500.500.500.630.280.000.040.040.320.320.32g / C, Green / Cycle 6060607633155383838g_i, Effective Green Time [s]

2.602.600.000.002.901.602.102.101.701.701.70l2, Clearance Lost Time [s]

0.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]

4.604.604.603.704.903.604.104.103.703.703.70L, Total Lost Time per Cycle [s] 120120120120120120120120120120120C, Cycle Length [s]
CCLRCLCLRCLLane Group
Lane Group Calculations
192/3/2025Kimley-Horn
Scenario 8: 8 Existing AM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

588

Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh] 31.95 31.92 68.10 57.64 59.73 59.73 93.98 35.18 8.42 22.33 23.81 24.40 Movement LOS C C E E E E F D A C C C
d_A, Approach Delay [s/veh] 51.84 58.92 32.46 23.23
Approach LOS D E C C
d_I, Intersection Delay [s/veh] 32.75
Intersection LOS C
Intersection V/C 0.627
Other Modes
g_Walk,mi, Effective Walk Time [s] 4.0 9.0 8.0 0.0
M_corner, Corner Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s] 56.12 51.39 52.32 0.00
I_p,int, Pedestrian LOS Score for Intersectio 3.108 2.375 2.760 0.000 Crosswalk LOS C B C F
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h] 638 465 168 556 d_b, Bicycle Delay [s] 27.86 35.39 50.38 31.30
I_b,int, Bicycle LOS Score for Intersection 2.998 1.655 1.865 3.159 Bicycle LOS C A A C
----------------Ring 4
----------------Ring 3
--------------65Ring 2
------------4321Ring 1
Sequence
202/3/2025Kimley-Horn
Scenario 8: 8 Existing AM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

589

0.425Volume to Capacity (v/c):

DLevel Of Service:

38.8Delay (sec / veh):
15 minutesAnalysis Period:

HCM 7th EditionAnalysis Method:

SignalizedControl Type:

Intersection 5: SR-92 EB Ramps/Metro Center Boulevard
Intersection Level Of Service Report
NoYesNoNoCrosswalk
NoNoNoNoCurb Present

0.000.000.000.00Grade [%]

30.0035.0030.0015.00Speed [mph]

0.000.000.000.000.000.0049.210.000.000.000.000.00Exit Pocket Length [ft] 000000100000No. of Lanes in Exit Pocket
100.00100.0090.00100.00100.00290.00640.00100.00600.00100.00100.00100.00Entry Pocket Length [ft] 001002101000No. of Lanes in Entry Pocket

12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Metro Center BoulevardMetro Center BoulevarParking Lot AccessName Intersection Setup
212/3/2025Kimley-Horn
Scenario 8: 8 Existing AM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

590

0000Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
13218238313063296499981422Total Analysis Volume [veh/h] 334610132167412249411Total 15-Minute Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor

0.97000.97000.97000.97000.97000.97000.97000.97000.97000.97000.97000.9700Peak Hour Factor 12817737312661287489681422Total Hourly Volume [veh/h]
690010015400700Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
1000300026000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor

0.00Proportion of CAVs [%]

1.901.901.901.901.901.901.901.901.901.901.901.90Heavy Vehicles Percentage [%]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 19617737412361441489422122Base Volume Input [veh/h]
Metro Center BoulevardMetro Center BoulevarParking Lot AccessName Volumes
222/3/2025Kimley-Horn
Scenario 8: 8 Existing AM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

591

0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.040.040.00.040.040.040.040.00.00.040.00.0Detector Length [ft]

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoPedestrian Recall
NoNoNoNoYesNoMaximum Recall
NoNoNoNoNoNoMinimum Recall

0.02.51.60.02.51.61.63.00.00.02.20.0l2, Clearance Lost Time [s]

0.02.02.00.02.02.02.02.00.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk

0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0000170000000Pedestrian Clearance [s]
000060000000Walk [s]

0.03.03.00.03.03.03.03.00.00.03.00.0Vehicle Extension [s] 0301804836363600180Split [s]

0.01.00.50.01.00.50.51.00.00.01.00.0All red [s]

0.03.53.10.03.53.13.14.00.00.03.20.0Amber [s]
0352504030306000400Maximum Green [s]
0440444100040Minimum Green [s]
--Lead--Lead------Lead / Lag
4,5Auxiliary Signal Groups
061025540030Signal Group
PermissPermissProtectePermissPermissProtectePermissPermissPermissPermissPermissPermissControl Type Phasing & Timing

12.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference

30.0Offset [s]
Fully actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
120Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
232/3/2025Kimley-Horn
Scenario 8: 8 Existing AM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

592

76.6881.3983.7565.2448.4848.5945.25142.70555.60557.5625.506.3495th-Percentile Queue Length [ft/ln]

3.073.263.352.611.941.941.815.7122.2222.301.020.2595th-Percentile Queue Length [veh/ln]

42.6045.2246.5336.2526.9327.0025.1479.28393.04394.6614.173.5250th-Percentile Queue Length [ft/ln]

1.701.811.861.451.081.081.013.1715.7215.790.570.1450th-Percentile Queue Length [veh/ln] YesNoNoNoNoNoYesNoNoYesYesNoCritical Lane Group
BBBFBBECDDEELane Group LOS

19.6019.4919.4480.1918.5618.5561.8328.5246.4346.7778.6560.67d, Delay for Lane Group [s/veh]

0.140.130.130.770.080.080.570.290.820.820.580.14X, volume / capacity Lane Group Results

1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor

1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio

0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]

0.400.340.3122.200.180.184.550.7511.3011.5719.942.34d2, Incremental Delay [s]

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.500.500.500.110.500.500.110.500.500.500.110.11k, delay calibration

19.2019.1519.1257.9918.3818.3757.2827.7835.1335.1958.7258.33d1, Uniform Delay [s] 7198028464984885511110046386352428c, Capacity [veh/h]
159117741871178218571871346128161790178215911826s, saturation flow rate [veh/h]

0.060.060.060.020.040.040.020.110.290.290.010.00(v / s)_i Volume / Saturation Flow Rate

0.450.450.450.030.460.460.030.360.360.360.020.02g / C, Green / Cycle 54545435555443434322g_i, Effective Green Time [s]

2.502.502.501.602.502.501.603.003.003.002.202.20l2, Clearance Lost Time [s]

0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]

4.504.504.503.604.504.503.605.005.005.004.204.20L, Total Lost Time per Cycle [s] 120120120120120120120120120120120120C, Cycle Length [s] RCCLCCLRCLRCLane Group
Lane Group Calculations
242/3/2025Kimley-Horn
Scenario 8: 8 Existing AM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

593

Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh] 60.67 60.67 78.65 46.61 46.43 28.52 61.83 18.55 18.56 80.19 19.46 19.57 Movement LOS E E E D D C E B B F B B
d_A, Approach Delay [s/veh] 74.66 42.61 32.46 26.06
Approach LOS E D C C
d_I, Intersection Delay [s/veh] 38.82
Intersection LOS D
Intersection V/C 0.425
Other Modes
g_Walk,mi, Effective Walk Time [s] 0.0 0.0 31.0 0.0
M_corner, Corner Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s] 0.00 0.00 33.01 0.00
I_p,int, Pedestrian LOS Score for Intersectio 0.000 0.000 2.609 0.000 Crosswalk LOS F F B F
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h] 230 517 725 425 d_b, Bicycle Delay [s] 47.00 33.01 24.39 37.22
I_b,int, Bicycle LOS Score for Intersection 1.601 4.030 1.722 1.907 Bicycle LOS A D A A
----------------Ring 4
----------------Ring 3
--------------65Ring 2
------------4321Ring 1
Sequence
252/3/2025Kimley-Horn
Scenario 8: 8 Existing AM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

594

0.608Volume to Capacity (v/c):

DLevel Of Service:

42.3Delay (sec / veh):
15 minutesAnalysis Period:

HCM 7th EditionAnalysis Method:

SignalizedControl Type:

Intersection 6: Foster City Boulevard/Metro Center Boulevard Intersection Level Of Service Report
YesNoYesNoCrosswalk
NoNoNoNoCurb Present

0.000.000.000.00Grade [%]

35.0035.0025.0035.00Speed [mph]

0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket
100.00100.00100.00100.00100.00210.00170.00100.0050.00240.00100.00150.00Entry Pocket Length [ft] 101101101101No. of Lanes in Entry Pocket

12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Foster City BoulevardFoster City BoulevardMetro Center BoulevardMetro Center BoulevardName Intersection Setup
262/3/2025Kimley-Horn
Scenario 8: 8 Existing AM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

595

0000Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
53959131974691373218552223183486Total Analysis Volume [veh/h] 132403324117348021135646122Total 15-Minute Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 53959131974691373218552223183486Total Hourly Volume [veh/h] 130098001730022300Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
0401200000029Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor

0.00Proportion of CAVs [%]

2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 669551311944671374948552446183457Base Volume Input [veh/h] Foster City BoulevardFoster City BoulevardMetro Center BoulevardMetro Center BoulevardName Volumes
272/3/2025Kimley-Horn
Scenario 8: 8 Existing AM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

596

0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.040.040.00.00.00.00.00.00.00.00.00.0Detector Length [ft]

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoPedestrian Recall
YesNoYesNoNoNoNoMaximum Recall
NoNoNoNoNoNoNoMinimum Recall

0.02.61.60.02.61.60.01.70.01.62.20.0l2, Clearance Lost Time [s]

0.02.02.00.02.02.00.02.00.02.02.00.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk

0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0190020001000270Pedestrian Clearance [s]
050050050050Walk [s]

0.03.03.00.03.03.00.03.00.03.03.00.0Vehicle Extension [s] 0362403220025024390Split [s]

0.01.00.50.01.00.50.00.50.00.51.00.0All red [s]

0.03.63.10.03.63.10.03.20.03.13.20.0Amber [s]
0403004025030030400Maximum Green [s]
064064060460Minimum Green [s]
--Lead--Lead------Lead / Lag
1,4Auxiliary Signal Groups
061025030140Signal Group
PermissPermissProtectePermissPermissProtecteSplitSplitSplitOverlapSplitSplitControl Type Phasing & Timing

0.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference

0.0Offset [s]
Semi-actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
120Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
282/3/2025Kimley-Horn
Scenario 8: 8 Existing AM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

597

338.94322.65188.3844.60151.28198.49452.0499.1359.56102.35103.05281.0195th-Percentile Queue Length [ft/ln]

13.5612.917.541.786.057.9418.083.972.384.094.1211.2495th-Percentile Queue Length [veh/ln] 217.90205.19104.6524.7884.04111.79308.1155.0733.0956.8657.25173.1250th-Percentile Queue Length [ft/ln]

8.728.214.190.993.364.4712.322.201.322.272.296.9250th-Percentile Queue Length [veh/ln] YesNoNoNoNoYesYesNoNoNoNoYesCritical Lane Group
DCECCEEDDCDDLane Group LOS

36.7834.9260.7428.0129.9563.0975.8639.2438.1827.8039.3046.75d, Delay for Lane Group [s/veh]

0.570.570.780.100.280.820.910.210.130.230.230.64X, volume / capacity Lane Group Results

1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor

1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio

0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]

3.821.967.620.220.419.6730.261.120.690.120.714.16d2, Incremental Delay [s]

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.500.500.110.500.500.110.500.500.500.110.500.50k, delay calibration

32.9632.9553.1227.7829.5453.4145.6038.1237.4827.6838.5942.59d1, Uniform Delay [s] 60511831689321688166352414394980779757c, Capacity [veh/h] 182035601781281350941781158918701781281335603459s, saturation flow rate [veh/h]

0.190.190.070.030.090.080.200.050.030.080.050.14(v / s)_i Volume / Saturation Flow Rate

0.330.330.090.330.330.090.220.220.220.350.220.22g / C, Green / Cycle 404011404011272727422626g_i, Effective Green Time [s]

2.602.601.602.602.601.601.701.701.700.002.202.20l2, Clearance Lost Time [s]

0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]

4.604.603.604.604.603.603.703.703.703.604.204.20L, Total Lost Time per Cycle [s] 120120120120120120120120120120120120C, Cycle Length [s] CCLRCLRCLRCLLane Group
Lane Group Calculations
292/3/2025Kimley-Horn
Scenario 8: 8 Existing AM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

598

Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh] 46.75 39.30 27.80 38.18 39.24 75.86 63.09 29.95 28.01 60.74 35.48 36.78 Movement LOS D D C D D E E C C E D D
d_A, Approach Delay [s/veh] 40.48 64.78 36.14 38.43
Approach LOS D E D D
d_I, Intersection Delay [s/veh] 42.28
Intersection LOS D
Intersection V/C 0.608
Other Modes
g_Walk,mi, Effective Walk Time [s] 0.0 9.0 0.0 9.0
M_corner, Corner Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s] 0.00 51.34 0.00 51.34
I_p,int, Pedestrian LOS Score for Intersectio 0.000 2.726 0.000 2.973 Crosswalk LOS F B F C
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h] 580 355 457 523 d_b, Bicycle Delay [s] 30.25 40.59 35.73 32.71
I_b,int, Bicycle LOS Score for Intersection 2.479 2.601 2.000 2.195 Bicycle LOS B B B B
----------------Ring 4
----------------Ring 3
--------------65Ring 2
------------4321Ring 1
Sequence
302/3/2025Kimley-Horn
Scenario 8: 8 Existing AM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

599

0.357Volume to Capacity (v/c):

CLevel Of Service:

30.5Delay (sec / veh):
15 minutesAnalysis Period:

HCM 7th EditionAnalysis Method:

SignalizedControl Type:

Intersection 7: Shell Boulevard/Metro Center Boulevard
Intersection Level Of Service Report
YesYesYesYesCrosswalk
NoNoNoNoCurb Present

0.000.000.000.00Grade [%]

30.0030.0015.0030.00Speed [mph]

0.000.000.000.000.000.00100.000.000.000.000.000.00Exit Pocket Length [ft] 000000100000No. of Lanes in Exit Pocket
210.00100.00210.00100.00100.0090.00100.00100.0090.00100.00100.00170.00Entry Pocket Length [ft] 102001001001No. of Lanes in Entry Pocket

12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Metro Center BoulevarMetro Center BoulevardParking Lot AccessShell BoulevardName Intersection Setup
312/3/2025Kimley-Horn
Scenario 8: 8 Existing AM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

600

0000Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
14432257921230511928253Total Analysis Volume [veh/h]
3108642331010023263Total 15-Minute Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor

0.87000.87000.87000.87000.87000.87000.87000.87000.87000.87000.87000.8700Peak Hour Factor 12376224801070411807220Total Hourly Volume [veh/h]
000000000000Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000020000100Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor

0.00Proportion of CAVs [%]

2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 12376224801050411797220Base Volume Input [veh/h]
Metro Center BoulevarMetro Center BoulevardParking Lot AccessShell BoulevardName Volumes
322/3/2025Kimley-Horn
Scenario 8: 8 Existing AM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

601

0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.040.040.00.040.040.00.040.040.00.040.040.0Detector Length [ft]

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoNoPedestrian Recall
NoNoNoNoNoNoNoNoMaximum Recall
NoNoNoNoNoNoNoNoMinimum Recall

0.02.52.50.02.51.50.02.51.50.02.51.5l2, Clearance Lost Time [s]

0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk

0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0160023001800140Pedestrian Clearance [s]
050050050050Walk [s]

0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 049250240061903548Split [s]

0.01.01.00.01.00.50.01.00.50.01.00.5All red [s]

0.03.53.50.03.53.00.03.53.00.03.53.0Amber [s]
045210200021603145Maximum Green [s]
066064064064Minimum Green [s]
--Lead--Lead--Lead--LeadLead / Lag
Auxiliary Signal Groups
047083025061Signal Group
PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing

0.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference

0.0Offset [s]
Fully actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
120Cycle Length [s]
-Signal Coordination Group
YesLocated in CBD
Intersection Settings
332/3/2025Kimley-Horn
Scenario 8: 8 Existing AM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

602

6.17105.77177.5869.1572.400.0012.041.48103.258.39308.4495th-Percentile Queue Length [ft/ln]

0.254.237.102.772.900.000.480.064.130.3412.3495th-Percentile Queue Length [veh/ln]

3.4358.7698.6538.4240.220.006.690.8257.364.66194.1850th-Percentile Queue Length [ft/ln]

0.142.353.951.541.610.000.270.032.290.197.7750th-Percentile Queue Length [veh/ln] NoNoYesYesNoNoYesNoNoNoYesCritical Lane Group
AAEBBAFEDDDLane Group LOS

7.929.2656.0914.9914.820.0081.3659.9438.8836.1350.89d, Delay for Lane Group [s/veh]

0.020.210.780.140.130.000.450.020.280.020.80X, volume / capacity Lane Group Results

1.001.001.001.001.001.001.001.001.001.001.00PF, progression factor

1.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio

0.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]

0.030.233.900.370.290.0022.230.110.480.025.11d2, Incremental Delay [s]

1.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.500.500.110.500.500.110.110.110.110.110.12k, delay calibration

7.899.0352.1914.6214.530.0059.1359.8338.4036.1145.78d1, Uniform Delay [s] 914204833176488201361323380318c, Capacity [veh/h]
14313204311314561683160314671275143116831275s, saturation flow rate [veh/h]

0.010.130.080.070.070.000.000.000.060.000.20(v / s)_i Volume / Saturation Flow Rate

0.640.640.110.520.520.000.010.000.230.230.22g / C, Green / Cycle 7777136363010272726g_i, Effective Green Time [s]

2.502.502.502.502.500.002.501.502.502.501.50l2, Clearance Lost Time [s]

0.000.000.000.000.000.000.002.000.000.002.00l1_p, Permitted Start-Up Lost Time [s]

4.504.504.504.504.500.004.503.504.504.503.50L, Total Lost Time per Cycle [s] 120120120120120120120120120120120C, Cycle Length [s]
RCLCCLCLRCLLane Group
Lane Group Calculations
342/3/2025Kimley-Horn
Scenario 8: 8 Existing AM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

603

Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh] 50.89 36.13 38.88 59.94 81.36 81.36 0.00 14.84 14.99 56.09 9.26 7.92 Movement LOS D D D E F F A B B E A A
d_A, Approach Delay [s/veh] 47.43 78.30 14.90 26.35
Approach LOS D E B C
d_I, Intersection Delay [s/veh] 30.53
Intersection LOS C
Intersection V/C 0.357
Other Modes
g_Walk,mi, Effective Walk Time [s] 9.0 9.0 9.0 9.0
M_corner, Corner Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s] 51.32 51.32 51.32 51.32
I_p,int, Pedestrian LOS Score for Intersectio 2.452 2.150 2.851 2.739 Crosswalk LOS B B C B
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h] 508 100 325 742 d_b, Bicycle Delay [s] 33.36 54.14 42.07 23.74
I_b,int, Bicycle LOS Score for Intersection 2.142 1.571 1.737 2.140 Bicycle LOS B A A B
----------------Ring 4
----------------Ring 3
------------8765Ring 2
------------4321Ring 1
Sequence
352/3/2025Kimley-Horn
Scenario 8: 8 Existing AM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

604

0.453Volume to Capacity (v/c):

CLevel Of Service:

34.2Delay (sec / veh):
15 minutesAnalysis Period:

HCM 7th EditionAnalysis Method:

SignalizedControl Type:

Intersection 8: Vintage Park Drive/Metro Center Boulevard Intersection Level Of Service Report
YesYesYesYesCrosswalk
NoNoNoNoCurb Present

0.000.000.000.00Grade [%]

35.0035.0030.0030.00Speed [mph]

0.000.000.000.000.000.000.000.000.00220.000.000.00Exit Pocket Length [ft] 000000000100No. of Lanes in Exit Pocket
140.00100.00260.00100.00100.00150.00100.00100.00270.00100.00100.00200.00Entry Pocket Length [ft] 101001001001No. of Lanes in Entry Pocket

12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Metro Center BoulevardMetro Center BoulevardVintage Park DriveVintage Park DriveName Intersection Setup
362/3/2025Kimley-Horn
Scenario 8: 8 Existing AM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

605

0000Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
3721488294259237142133110315111Total Analysis Volume [veh/h] 9337212465593633288133Total 15-Minute Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor

0.90000.90000.90000.90000.90000.90000.90000.90000.90000.90000.90000.9000Peak Hour Factor 335133748523321312812099284610Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000022100000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor

0.00Proportion of CAVs [%]

2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 335133748523121112712099284610Base Volume Input [veh/h] Metro Center BoulevardMetro Center BoulevardVintage Park DriveVintage Park DriveName Volumes
372/3/2025Kimley-Horn
Scenario 8: 8 Existing AM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

606

0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.040.040.00.040.040.040.040.040.00.040.040.0Detector Length [ft]

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoNoNoPedestrian Recall
NoNoNoNoNoNoNoNoNoMaximum Recall
NoNoNoNoNoNoNoNoNoMinimum Recall

0.02.51.50.02.51.51.51.71.50.02.21.5l2, Clearance Lost Time [s]

0.02.02.00.02.02.02.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk

0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0160019101017001710Pedestrian Clearance [s]
050055550055Walk [s]

0.03.03.00.03.03.03.03.03.00.03.03.0Vehicle Extension [s] 04924055292922140114Split [s]

0.01.00.50.01.00.50.51.00.50.01.00.5All red [s]

0.03.53.00.03.53.03.02.73.00.03.23.0Amber [s]
0452105126261811074Maximum Green [s]
065065564064Minimum Green [s]
--Lead--Lag--Lead--LagLead / Lag
Auxiliary Signal Groups
047083325061Signal Group
PermissPermissProtectePermissPermissProtecteProtectePermissProtectePermissPermissProtecteControl Type Phasing & Timing

0.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference

0.0Offset [s]
Fully actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
120Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
382/3/2025Kimley-Horn
Scenario 8: 8 Existing AM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

607

232.4437.60123.4965.9370.90295.50183.13194.89179.8159.1259.4015.4095th-Percentile Queue Length [ft/ln]

9.301.504.942.642.8411.827.337.807.192.362.380.6295th-Percentile Queue Length [veh/ln] 136.6020.8968.6036.6339.39184.21101.74109.2099.9032.8433.008.5650th-Percentile Queue Length [ft/ln]

5.460.842.741.471.587.374.074.374.001.311.320.3450th-Percentile Queue Length [veh/ln] YesNoNoNoNoYesNoNoYesYesNoNoCritical Lane Group
BBEAAEDEEEEELane Group LOS

14.4710.6266.226.826.7856.1048.8063.1673.9461.1459.5356.66d, Delay for Lane Group [s/veh]

0.400.070.760.150.140.850.570.810.820.520.470.16X, volume / capacity Lane Group Results

1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor

1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio

0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]

1.260.0710.720.260.236.982.039.4019.345.333.861.02d2, Incremental Delay [s]

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.500.500.110.500.500.110.110.110.200.110.110.11k, delay calibration

13.2110.5655.516.566.5549.1346.7753.7654.6055.8055.6755.64d1, Uniform Delay [s] 937209810711691283280250163135788870c, Capacity [veh/h] 158935601781170318701781158918701781164718701781s, saturation flow rate [veh/h]

0.230.040.050.100.100.130.090.070.060.020.020.01(v / s)_i Volume / Saturation Flow Rate

0.590.590.060.690.690.160.160.090.080.050.050.04g / C, Green / Cycle 7171782821919109665g_i, Effective Green Time [s]

2.502.501.502.502.501.501.501.701.502.202.201.50l2, Clearance Lost Time [s]

0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]

4.504.503.504.504.503.503.503.703.504.204.203.50L, Total Lost Time per Cycle [s] 120120120120120120120120120120120120C, Cycle Length [s] RCLCCLRCLCCLLane Group
Lane Group Calculations
392/3/2025Kimley-Horn
Scenario 8: 8 Existing AM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

608

Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh] 56.66 59.83 61.14 73.94 63.16 48.80 56.10 6.79 6.82 66.22 10.62 14.47 Movement LOS E E E E E D E A A E B B
d_A, Approach Delay [s/veh] 59.89 60.94 26.60 20.57
Approach LOS E E C C
d_I, Intersection Delay [s/veh] 34.20
Intersection LOS C
Intersection V/C 0.453
Other Modes
g_Walk,mi, Effective Walk Time [s] 9.0 9.0 9.0 9.0
M_corner, Corner Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s] 51.31 51.31 51.31 51.31
I_p,int, Pedestrian LOS Score for Intersectio 2.393 2.519 2.518 2.658 Crosswalk LOS B B B B
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h] 113 305 842 742 d_b, Bicycle Delay [s] 53.37 43.07 20.11 23.73
I_b,int, Bicycle LOS Score for Intersection 1.636 2.195 2.046 2.056 Bicycle LOS A B B B
----------------Ring 4
----------------Ring 3
------------8765Ring 2
------------4321Ring 1
Sequence
402/3/2025Kimley-Horn
Scenario 8: 8 Existing AM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

609

0.447Volume to Capacity (v/c):

BLevel Of Service:

12.6Delay (sec / veh):
15 minutesAnalysis Period:

HCM 7th EditionAnalysis Method:

SignalizedControl Type:

Intersection 1: Foster City Boulevard/Vintage Park Drive-Chess Drive Intersection Level Of Service Report
YesYesYesYesCrosswalk
NoNoNoNoCurb Present

0.000.000.000.00Grade [%]

25.0030.0030.0030.00Speed [mph]

0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket
100.00100.00120.00160.00100.00110.00100.00100.00155.00100.00100.00215.00Entry Pocket Length [ft] 001101001001No. of Lanes in Entry Pocket

12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Chess DriveVintage Park DriveFoster City BoulevardFoster City BoulevardName Intersection Setup
12/3/2025Kimley-Horn
Scenario 8: 8 Existing PM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

610

0000Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
3121131891717281078431820119Total Analysis Volume [veh/h] 85347447269115505Total 15-Minute Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor

0.94000.94000.94000.94000.94000.94000.94000.94000.94000.94000.94000.9400Peak Hour Factor 2920121781616261013401718918Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
100000000010Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor

0.00Proportion of CAVs [%]

2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 2820121781616261013401718818Base Volume Input [veh/h]
Chess DriveVintage Park DriveFoster City BoulevardFoster City BoulevardName Volumes
22/3/2025Kimley-Horn
Scenario 8: 8 Existing PM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

611

0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft]

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoPedestrian Recall
NoNoNoNoNoNoMaximum Recall
NoNoNoNoNoNoMinimum Recall

0.01.20.00.01.20.00.02.61.60.02.91.6l2, Clearance Lost Time [s]

0.02.00.00.02.00.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk

0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0180018001800120Pedestrian Clearance [s]
050050050050Walk [s]

0.03.00.00.03.00.00.03.03.00.03.03.0Vehicle Extension [s] 0800290067240484Split [s]

0.01.00.00.01.00.00.01.00.50.01.00.5All red [s]

0.02.20.00.02.20.00.03.63.10.03.93.1Amber [s]
0500260062200430Maximum Green [s]
040040084084Minimum Green [s]
--------Lead--LeadLead / Lag
Auxiliary Signal Groups
040030025061Signal Group
SplitSplitSplitSplitSplitSplitPermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing

0.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference

0.0Offset [s]
Fully actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
120Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
32/3/2025Kimley-Horn
Scenario 8: 8 Existing PM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

612

23.744.5968.084.764.74135.86136.8821.4221.4521.670.0095th-Percentile Queue Length [ft/ln]

0.950.182.720.190.195.435.480.860.860.870.0095th-Percentile Queue Length [veh/ln]

13.192.5537.822.642.6375.4876.0411.9011.9212.040.0050th-Percentile Queue Length [ft/ln]

0.530.101.510.110.113.023.040.480.480.480.0050th-Percentile Queue Length [veh/ln] YesNoYesNoNoYesNoNoNoNoNoCritical Lane Group
CBBBBBBCAAFLane Group LOS

23.0517.1518.5513.2913.3111.4911.4726.148.698.680.00d, Delay for Lane Group [s/veh]

0.580.070.720.050.050.760.760.610.170.1710000.0X, volume / capacity Lane Group Results

1.001.001.001.001.001.001.001.001.001.001.00PF, progression factor

1.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio

0.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]

5.680.143.690.070.051.631.628.370.130.120.00d2, Incremental Delay [s]

1.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.110.110.110.110.110.110.110.110.110.110.11k, delay calibration

17.3717.0014.8613.2113.269.859.8517.778.568.550.00d1, Uniform Delay [s] 90193263309357728735706286460c, Capacity [veh/h]
16921417158918701417185318701781181718701781s, saturation flow rate [veh/h]

0.030.010.120.010.010.300.300.020.060.060.01(v / s)_i Volume / Saturation Flow Rate

0.050.050.160.160.160.390.390.040.340.340.00g / C, Green / Cycle 226661515113130g_i, Effective Green Time [s]

1.201.201.201.201.202.602.601.602.902.900.00l2, Clearance Lost Time [s]

0.002.000.000.002.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]

3.203.203.203.203.204.604.603.604.904.900.00L, Total Lost Time per Cycle [s] 3737373737373737373737C, Cycle Length [s]
CLRCLCCLCCLLane Group
Lane Group Calculations
42/3/2025Kimley-Horn
Scenario 8: 8 Existing PM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

613

Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh] 0.00 8.69 8.69 26.14 11.48 11.49 13.31 13.29 18.55 17.15 23.05 23.05 Movement LOS A A A C B B B B B B C C
d_A, Approach Delay [s/veh] 7.99 12.03 17.75 21.87
Approach LOS A B B C
d_I, Intersection Delay [s/veh] 12.60
Intersection LOS B
Intersection V/C 0.447
Other Modes
g_Walk,mi, Effective Walk Time [s] 9.0 9.0 9.0 9.0
M_corner, Corner Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s] 10.79 10.79 10.79 10.79
I_p,int, Pedestrian LOS Score for Intersectio 2.567 2.549 2.155 1.932 Crosswalk LOS B B B A
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h] 2304 3336 1379 257 d_b, Bicycle Delay [s] 0.43 8.35 1.80 14.21
I_b,int, Bicycle LOS Score for Intersection 1.756 2.508 1.928 1.667 Bicycle LOS A B A A
----------------Ring 4
----------------Ring 3
--------------65Ring 2
------------4321Ring 1
Sequence
52/3/2025Kimley-Horn
Scenario 8: 8 Existing PM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

614

0.624Volume to Capacity (v/c):

DLevel Of Service:

51.2Delay (sec / veh):
15 minutesAnalysis Period:

HCM 7th EditionAnalysis Method:

SignalizedControl Type:

Intersection 2: Vintage Park Drive/Chess Drive
Intersection Level Of Service Report
YesYesYesYesCrosswalk
NoNoNoNoCurb Present

0.000.000.000.00Grade [%]

30.0030.0030.0030.00Speed [mph]

0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket
100.00100.00215.00100.00100.00145.00100.00100.00280.00100.00100.00225.00Entry Pocket Length [ft] 001001001101No. of Lanes in Entry Pocket

12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Chess DriveChess DriveVintage Park DriveVintage Park DriveName Intersection Setup
62/3/2025Kimley-Horn
Scenario 8: 8 Existing PM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

615

0000Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
5227963423332311232032454949224Total Analysis Volume [veh/h] 15724868362880811371256Total 15-Minute Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor

0.83000.83000.83000.83000.83000.83000.83000.83000.83000.83000.83000.8300Peak Hour Factor 418880284276199326626945641186Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
032010000100Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor

0.00Proportion of CAVs [%]

2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 418578284275199326626945541186Base Volume Input [veh/h] Chess DriveChess DriveVintage Park DriveVintage Park DriveName Volumes
72/3/2025Kimley-Horn
Scenario 8: 8 Existing PM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

616

0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.040.040.00.040.040.00.040.040.040.040.040.0Detector Length [ft]

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoNoPedestrian Recall
NoNoNoNoNoNoNoNoMaximum Recall
NoNoNoNoNoNoNoNoMinimum Recall

0.02.21.60.02.21.60.02.22.11.61.71.6l2, Clearance Lost Time [s]

0.02.02.00.02.02.00.02.02.02.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk

0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0200018002000210Pedestrian Clearance [s]
050050050050Walk [s]

0.03.03.00.03.03.00.03.03.03.03.03.0Vehicle Extension [s] 0258031140292982626Split [s]

0.01.00.50.01.00.50.01.00.50.51.00.5All red [s]

0.03.23.10.03.23.10.03.23.63.12.73.1Amber [s]
0214027100252542222Maximum Green [s]
044044044444Minimum Green [s]
--Lag--Lead--Lead--LeadLead / Lag
Auxiliary Signal Groups
047083025761Signal Group
PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing

0.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference

0.0Offset [s]
Fully actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
110Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
82/3/2025Kimley-Horn
Scenario 8: 8 Existing PM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

617

81.9782.27281.52281.31261.4936.95209.66224.10398.73336.6336.649.75279.495th-Percentile Queue Length [ft/ln]

3.283.2911.2611.2510.461.488.398.9615.9513.4713.471.9911.1895th-Percentile Queue Length [veh/ln]

45.5445.71159.39173.35158.3220.53119.88130.45265.20216.1216.127.64171.950th-Percentile Queue Length [ft/ln]

1.821.836.386.936.330.824.805.2210.618.658.651.116.8850th-Percentile Queue Length [veh/ln] NoNoYesYesNoNoNoNoYesNoYesNoNoCritical Lane Group
BBFCCEDDEEEDELane Group LOS

18.4618.45275.4326.0023.8673.3435.9135.8164.1459.7859.7836.5758.95d, Delay for Lane Group [s/veh]

0.140.141.350.510.420.670.480.480.920.880.880.130.87X, volume / capacity Lane Group Results

1.001.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor

1.001.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio

0.000.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]

0.360.35222.772.741.6419.900.850.7721.0716.9316.930.1613.00d2, Incremental Delay [s]

1.001.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.500.500.490.500.500.110.110.110.300.260.260.110.17k, delay calibration

18.1018.1052.6623.2722.2253.4435.0635.0443.0742.8542.8536.4045.95d1, Uniform Delay [s] 8248307167279135427468354312312367257c, Capacity [veh/h] 1856187017811589187017811707187017811589158918701781s, saturation flow rate [veh/h]

0.060.060.050.220.180.010.120.120.180.170.170.030.13(v / s)_i Volume / Saturation Flow Rate

0.440.440.040.420.420.020.250.250.200.200.200.200.14g / C, Green / Cycle 494944646228282222222216g_i, Effective Green Time [s]

2.202.201.602.202.201.602.202.202.101.701.701.701.60l2, Clearance Lost Time [s]

0.000.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]

4.204.203.604.204.203.604.204.204.103.703.703.703.60L, Total Lost Time per Cycle [s] 110110110110110110110110110110110110110C, Cycle Length [s] CCLCCLCCLRCCLLane Group
Lane Group Calculations
92/3/2025Kimley-Horn
Scenario 8: 8 Existing PM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

618

Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh] 58.95 36.57 59.78 64.14 35.84 35.91 73.34 23.86 26.00 275.43 18.46 18.46 Movement LOS E D E E D D E C C F B B
d_A, Approach Delay [s/veh] 58.17 47.98 26.54 93.67
Approach LOS E D C F
d_I, Intersection Delay [s/veh] 51.20
Intersection LOS D
Intersection V/C 0.624
Other Modes
g_Walk,mi, Effective Walk Time [s] 9.0 9.0 9.0 9.0
M_corner, Corner Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s] 46.30 46.30 46.30 46.30
I_p,int, Pedestrian LOS Score for Intersectio 2.721 2.473 2.557 2.713 Crosswalk LOS B B B B
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h] 406 451 488 379 d_b, Bicycle Delay [s] 34.89 32.93 31.40 36.10
I_b,int, Bicycle LOS Score for Intersection 2.238 2.183 2.135 1.830 Bicycle LOS B B B A
----------------Ring 4
----------------Ring 3
------------8765Ring 2
------------4321Ring 1
Sequence
102/3/2025Kimley-Horn
Scenario 8: 8 Existing PM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

619

0.533Volume to Capacity (v/c):

DLevel Of Service:

45.1Delay (sec / veh):
15 minutesAnalysis Period:

HCM 7th EditionAnalysis Method:

SignalizedControl Type:

Intersection 3: SR-92 WB Ramps/Chess Drive
Intersection Level Of Service Report
NoYesNoYesCrosswalk
NoNoNoNoCurb Present

0.000.000.000.00Grade [%]

30.0030.0030.0030.00Speed [mph]

49.210.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 100000000000No. of Lanes in Exit Pocket
500.00100.00480.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 101000000000No. of Lanes in Entry Pocket

12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Office driveway Chess DrChess DriveName
Intersection Setup
112/3/2025Kimley-Horn
Scenario 8: 8 Existing PM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

620

0100Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
21328332211119410225452840Total Analysis Volume [veh/h] 53121153048255136710Total 15-Minute Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor

0.93000.93000.93000.93000.93000.93000.93000.93000.93000.93000.93000.9300Peak Hour Factor 1982773201011809505072640Total Hourly Volume [veh/h]
00010000027300Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
1000000538020Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor

0.00Proportion of CAVs [%]

1.301.301.301.301.301.301.301.301.301.301.301.30Heavy Vehicles Percentage [%]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1972774201011759127802620Base Volume Input [veh/h]
Office driveway Chess DrChess DriveName
Volumes
122/3/2025Kimley-Horn
Scenario 8: 8 Existing PM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

621

0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft]

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoPedestrian Recall
NoNoNoNoNoMaximum Recall
NoNoNoNoNoMinimum Recall

0.02.50.00.01.70.00.03.50.02.12.20.0l2, Clearance Lost Time [s]

0.02.00.00.02.00.00.02.00.02.02.00.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk

0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 000017001201000Pedestrian Clearance [s]
000050050500Walk [s]

0.03.00.00.03.00.00.03.00.03.03.00.0Vehicle Extension [s] 02700200043047200Split [s]

0.01.00.00.00.50.00.02.00.01.01.00.0All red [s]

0.03.50.00.03.20.00.03.50.03.13.20.0Amber [s]
03000300055030300Maximum Green [s]
0500400100560Minimum Green [s]
------------Lead / Lag
Auxiliary Signal Groups
020040080610Signal Group
UnsignaPermissPermissPermissPermissPermissPermissPermissPermissProtectePermissPermissControl Type Phasing & Timing

12.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference

51.0Offset [s]
Fully actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
110Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
132/3/2025Kimley-Horn
Scenario 8: 8 Existing PM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

622

100.16100.1389.62268.57754.93754.93287.25324.8595th-Percentile Queue Length [ft/ln]

4.014.013.5810.7430.2030.2011.4912.9995th-Percentile Queue Length [veh/ln]

55.6455.6349.79163.67560.75560.75177.88206.9050th-Percentile Queue Length [ft/ln]

2.232.231.996.5522.4322.437.128.2850th-Percentile Queue Length [veh/ln] NoNoYesNoNoYesYesNoCritical Lane Group
FFFDEECCLane Group LOS

99.5299.60109.3741.5859.3359.3325.1131.16d, Delay for Lane Group [s/veh]

0.680.680.750.280.770.770.360.32X, volume / capacity
Lane Group Results

1.001.001.001.001.001.001.001.00PF, progression factor

1.001.001.001.001.001.001.001.00Rp, platoon ratio

0.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]

12.0812.1620.711.018.458.450.150.96d2, Incremental Delay [s]

1.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.110.110.110.500.500.500.110.50k, delay calibration

87.4487.4488.6640.5850.8950.8924.9630.20d1, Uniform Delay [s] 6363486956636631503886c, Capacity [veh/h]
17951791182618791791179128291880s, saturation flow rate [veh/h]

0.020.020.020.100.290.290.190.15(v / s)_i Volume / Saturation Flow Rate

0.030.030.030.370.370.370.530.47g / C, Green / Cycle
6656868689786g_i, Effective Green Time [s]

2.502.501.703.503.503.502.102.20l2, Clearance Lost Time [s]

0.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]

4.504.503.705.505.505.504.104.20L, Total Lost Time per Cycle [s] 183183183183183183183183C, Cycle Length [s]
CLCCCLRCLane Group
Lane Group Calculations
142/3/2025Kimley-Horn
Scenario 8: 8 Existing PM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

623

Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh] 31.16 31.16 25.11 59.33 41.58 41.58 109.37 109.37 109.37 99.56 99.52 0.00 Movement LOS C C C E D D F F F F F
d_A, Approach Delay [s/veh] 27.18 56.49 109.37 29.90
Approach LOS C E F C
d_I, Intersection Delay [s/veh] 45.11
Intersection LOS D
Intersection V/C 0.533
Other Modes
g_Walk,mi, Effective Walk Time [s] 9.0 0.0 9.0 0.0
M_corner, Corner Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s] 82.90 0.00 82.90 0.00
I_p,int, Pedestrian LOS Score for Intersectio 2.992 0.000 1.770 0.000 Crosswalk LOS C F A F
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h] 172 409 178 245 d_b, Bicycle Delay [s] 76.56 58.01 76.14 70.56
I_b,int, Bicycle LOS Score for Intersection 3.378 2.564 1.621 1.700 Bicycle LOS C B A A
----------------Ring 4
----------------Ring 3
------------846-Ring 2
--------------21Ring 1
Sequence
152/3/2025Kimley-Horn
Scenario 8: 8 Existing PM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

624

0.406Volume to Capacity (v/c):

ELevel Of Service:

58.0Delay (sec / veh):
15 minutesAnalysis Period:

HCM 7th EditionAnalysis Method:

SignalizedControl Type:

Intersection 4: Foster City Boulevard/Chess Drive
Intersection Level Of Service Report
NoYesYesYesCrosswalk
NoNoNoNoCurb Present

0.000.000.000.00Grade [%]

30.0030.0025.0030.00Speed [mph]

0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket
100.00100.00510.00180.00100.0080.00100.00100.00100.00100.00100.0095.00Entry Pocket Length [ft] 001101001101No. of Lanes in Entry Pocket

12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Foster City BoulevardFoster City BoulevardChess Drive Chess DrName Intersection Setup
162/3/2025Kimley-Horn
Scenario 8: 8 Existing PM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

625

0000Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
232076921539962420412301638Total Analysis Volume [veh/h] 652173382491151310410Total 15-Minute Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 232076921539962420412301638Total Hourly Volume [veh/h]
600820010041800Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
100000014315030Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor

0.00Proportion of CAVs [%]

2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 19207692235996241611084181338Base Volume Input [veh/h]
Foster City BoulevardFoster City BoulevardChess Drive Chess DrName Volumes
172/3/2025Kimley-Horn
Scenario 8: 8 Existing PM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

626

0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.040.040.040.040.040.00.00.00.00.00.00.0Detector Length [ft]

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoPedestrian Recall
YesNoNoNoNoNoMaximum Recall
NoNoNoNoNoNoMinimum Recall

0.02.62.51.72.91.60.02.10.00.01.70.0l2, Clearance Lost Time [s]

0.02.02.02.02.02.00.02.00.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk

0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 023001000230000Pedestrian Clearance [s]
050000040000Walk [s]

0.03.03.03.03.03.00.03.00.00.03.00.0Vehicle Extension [s] 0552720421403100200Split [s]

0.01.01.00.51.00.50.01.00.00.00.50.0All red [s]

0.03.63.53.23.93.10.03.10.00.03.20.0Amber [s]
0655530352003500300Maximum Green [s]
064464040040Minimum Green [s]
--Lead--Lead------Lead / Lag
2,3Auxiliary Signal Groups
061325040030Signal Group
PermissPermissPermissOverlapPermissProtecteSplitSplitSplitSplitSplitSplitControl Type Phasing & Timing

0.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference

90.0Offset [s]
Fully actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
120Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
182/3/2025Kimley-Horn
Scenario 8: 8 Existing PM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

627

55.6457.54198.47159.55763.966.05306.13186.110.0040.3540.1595th-Percentile Queue Length [ft/ln]

2.232.307.946.3830.560.2412.257.440.001.611.6195th-Percentile Queue Length [veh/ln]

30.9131.97111.7888.64535.143.36192.39103.390.0022.4222.3150th-Percentile Queue Length [ft/ln]

1.241.284.473.5521.410.137.704.140.000.900.8950th-Percentile Queue Length [veh/ln] NoNoNoNoYesNoYesNoNoNoYesCritical Lane Group
AACCFFEEAEELane Group LOS

8.388.3721.5129.4997.36116.0666.9557.510.0058.4558.50d, Delay for Lane Group [s/veh]

0.090.090.470.251.090.410.860.530.000.170.18X, volume / capacity Lane Group Results

1.001.001.001.001.001.001.001.001.001.001.00PF, progression factor

1.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio

0.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]

0.160.151.080.2246.4947.988.671.900.000.510.54d2, Incremental Delay [s]

1.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.500.500.500.110.110.110.110.110.110.110.11k, delay calibration

8.228.2220.4329.2750.8768.0758.2855.610.0057.9457.96d1, Uniform Delay [s] 1199124214736019115242231137158154c, Capacity [veh/h]
18051870242815893560178118641781158918321781s, saturation flow rate [veh/h]

0.060.060.280.100.280.000.110.070.000.010.02(v / s)_i Volume / Saturation Flow Rate

0.670.670.670.380.260.000.130.130.090.090.09g / C, Green / Cycle 919191523501818121212g_i, Effective Green Time [s]

2.602.600.000.002.901.602.102.101.701.701.70l2, Clearance Lost Time [s]

0.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]

4.604.604.603.704.903.604.104.103.703.703.70L, Total Lost Time per Cycle [s] 137137137137137137137137137137137C, Cycle Length [s]
CCLRCLCLRCLLane Group
Lane Group Calculations
192/3/2025Kimley-Horn
Scenario 8: 8 Existing PM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

628

Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh] 58.49 58.45 0.00 57.51 66.95 66.95 116.06 97.36 29.49 21.51 8.38 8.38 Movement LOS E E A E E E F F C C A A
d_A, Approach Delay [s/veh] 58.48 63.44 88.37 18.23
Approach LOS E E F B
d_I, Intersection Delay [s/veh] 58.05
Intersection LOS E
Intersection V/C 0.406
Other Modes
g_Walk,mi, Effective Walk Time [s] 4.0 9.0 8.0 0.0
M_corner, Corner Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s] 64.37 59.61 60.55 0.00
I_p,int, Pedestrian LOS Score for Intersectio 3.601 2.384 2.832 0.000 Crosswalk LOS D B C F
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h] 239 394 543 738 d_b, Bicycle Delay [s] 52.99 44.06 36.25 27.21
I_b,int, Bicycle LOS Score for Intersection 2.338 2.107 2.577 2.325 Bicycle LOS B B B B
----------------Ring 4
----------------Ring 3
--------------65Ring 2
------------4321Ring 1
Sequence
202/3/2025Kimley-Horn
Scenario 8: 8 Existing PM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

629

0.466Volume to Capacity (v/c):

DLevel Of Service:

40.9Delay (sec / veh):
15 minutesAnalysis Period:

HCM 7th EditionAnalysis Method:

SignalizedControl Type:

Intersection 5: SR-92 EB Ramps/Metro Center Boulevard
Intersection Level Of Service Report
NoYesNoNoCrosswalk
NoNoNoNoCurb Present

0.000.000.000.00Grade [%]

30.0030.0030.0015.00Speed [mph]

0.000.000.000.000.000.0049.210.000.000.000.000.00Exit Pocket Length [ft] 000000100000No. of Lanes in Exit Pocket
100.00100.0090.00100.00100.00290.00640.00100.00600.00100.00100.00100.00Entry Pocket Length [ft] 001002101000No. of Lanes in Entry Pocket

12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Metro Center BoulevarParking Lot AccessName
Intersection Setup
212/3/2025Kimley-Horn
Scenario 8: 8 Existing PM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

630

0000Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
6561078526652030412014512Total Analysis Volume [veh/h]
16427216613071304131Total 15-Minute Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor

0.97000.97000.97000.97000.97000.97000.97000.97000.97000.97000.97000.9700Peak Hour Factor 6361048525850429411614492Total Hourly Volume [veh/h]
343001001500700Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
730010008000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor

0.00Proportion of CAVs [%]

1.901.901.901.901.901.901.901.901.901.901.901.90Heavy Vehicles Percentage [%]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 9721018625750444410821492Base Volume Input [veh/h]
Metro Center BoulevarParking Lot AccessName
Volumes
222/3/2025Kimley-Horn
Scenario 8: 8 Existing PM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

631

0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.040.040.00.040.040.040.040.00.00.040.00.0Detector Length [ft]

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoPedestrian Recall
NoNoNoNoYesNoMaximum Recall
NoNoNoNoNoNoMinimum Recall

0.02.51.60.02.51.61.63.00.00.02.20.0l2, Clearance Lost Time [s]

0.02.02.00.02.02.02.02.00.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk

0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 000017101000000Pedestrian Clearance [s]
000065500000Walk [s]

0.03.03.00.03.03.03.03.00.00.03.00.0Vehicle Extension [s] 0301804836363600180Split [s]

0.01.00.50.01.00.50.51.00.00.01.00.0All red [s]

0.03.53.10.03.53.13.14.00.00.03.20.0Amber [s]
0352504030306000400Maximum Green [s]
0440444100040Minimum Green [s]
--Lead--Lead------Lead / Lag
Auxiliary Signal Groups
061025540030Signal Group
PermissPermissProtectePermissPermissProtectePermissPermissPermissPermissPermissPermissControl Type Phasing & Timing

12.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference

30.0Offset [s]
Fully actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
120Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
232/3/2025Kimley-Horn
Scenario 8: 8 Existing PM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

632

359.5359.5108.716.4199.74100.34308.7713.6158.7358.6520.2683.3995th-Percentile Queue Length [ft/ln]

14.3814.384.350.663.994.0112.350.542.352.350.813.3495th-Percentile Queue Length [veh/ln] 234.0234.060.409.1255.4155.74194.437.5632.6332.5811.2546.3350th-Percentile Queue Length [ft/ln]

9.369.362.420.362.222.237.780.301.311.300.451.8550th-Percentile Queue Length [veh/ln] NoYesNoNoNoNoYesNoNoYesNoYesCritical Lane Group
DDCFBBDCCCEELane Group LOS

43.7143.7131.3990.4718.1218.1250.9227.2228.1928.1957.3567.66d, Delay for Lane Group [s/veh]

0.670.670.190.570.150.150.840.030.100.110.220.70X, volume / capacity Lane Group Results

1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor

1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio

0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]

7.297.290.7231.130.370.363.230.060.360.361.6410.83d2, Incremental Delay [s]

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.500.500.500.110.500.500.110.500.500.500.110.11k, delay calibration

36.4236.4230.6759.3417.7517.7547.6927.1527.8327.8355.7156.83d1, Uniform Delay [s] 487487572148858916179325925906576c, Capacity [veh/h]
159115911871178218591871346128161788178215911868s, saturation flow rate [veh/h]

0.210.210.060.000.070.070.150.010.030.030.010.03(v / s)_i Volume / Saturation Flow Rate

0.310.310.310.010.480.480.180.330.330.330.040.04g / C, Green / Cycle 373737157572140404055g_i, Effective Green Time [s]

2.502.502.501.602.502.501.603.003.003.002.202.20l2, Clearance Lost Time [s]

0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]

4.504.504.503.604.504.503.605.005.005.004.204.20L, Total Lost Time per Cycle [s] 120120120120120120120120120120120120C, Cycle Length [s] RCCLCCLRCLRCLane Group
Lane Group Calculations
242/3/2025Kimley-Horn
Scenario 8: 8 Existing PM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

633

Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh] 67.66 67.66 57.35 28.19 28.19 27.22 50.92 18.12 18.12 90.47 31.39 43.71 Movement LOS E E E C C C D B B F C D
d_A, Approach Delay [s/veh] 65.51 28.00 39.68 42.49
Approach LOS E C D D
d_I, Intersection Delay [s/veh] 40.86
Intersection LOS D
Intersection V/C 0.466
Other Modes
g_Walk,mi, Effective Walk Time [s] 0.0 0.0 31.0 0.0
M_corner, Corner Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s] 0.00 0.00 33.01 0.00
I_p,int, Pedestrian LOS Score for Intersectio 0.000 0.000 2.606 0.000 Crosswalk LOS F F B F
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h] 230 517 725 425 d_b, Bicycle Delay [s] 47.00 33.01 24.39 37.22
I_b,int, Bicycle LOS Score for Intersection 1.682 1.838 2.213 2.479 Bicycle LOS A A B B
----------------Ring 4
----------------Ring 3
--------------65Ring 2
------------4321Ring 1
Sequence
252/3/2025Kimley-Horn
Scenario 8: 8 Existing PM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

634

0.409Volume to Capacity (v/c):

DLevel Of Service:

39.1Delay (sec / veh):
15 minutesAnalysis Period:

HCM 7th EditionAnalysis Method:

SignalizedControl Type:

Intersection 6: Foster City Boulevard/Metro Center Boulevard Intersection Level Of Service Report
YesNoYesNoCrosswalk
NoNoNoNoCurb Present

0.000.000.000.00Grade [%]

35.0035.0025.0030.00Speed [mph]

0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket
100.00100.00100.00100.00100.00210.00170.00100.0050.00240.00100.00150.00Entry Pocket Length [ft] 101101101101No. of Lanes in Entry Pocket

12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Foster City BoulevardFoster City BoulevardMetro Center BoulevardMetro Center BoulevarName Intersection Setup
262/3/2025Kimley-Horn
Scenario 8: 8 Existing PM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

635

0000Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
515482343696201981741186276130112Total Analysis Volume [veh/h] 13137599215550443016193328Total 15-Minute Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 515482343696201981741186276130112Total Hourly Volume [veh/h] 13003700094007700Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
0101050000009Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor

0.00Proportion of CAVs [%]

2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 6454723472961519826811862153130103Base Volume Input [veh/h] Foster City BoulevardFoster City BoulevardMetro Center BoulevardMetro Center BoulevarName Volumes
272/3/2025Kimley-Horn
Scenario 8: 8 Existing PM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

636

0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.040.040.00.00.00.00.00.00.040.040.00.0Detector Length [ft]

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoPedestrian Recall
YesNoYesNoNoNoNoMaximum Recall
NoNoNoNoNoNoNoMinimum Recall

0.02.61.60.02.61.60.01.70.01.62.20.0l2, Clearance Lost Time [s]

0.02.02.00.02.02.00.02.00.02.02.00.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk

0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0190020001000270Pedestrian Clearance [s]
050050050050Walk [s]

0.03.03.00.03.03.00.03.00.03.03.00.0Vehicle Extension [s] 0362403220025024390Split [s]

0.01.00.50.01.00.50.00.50.00.51.00.0All red [s]

0.03.63.10.03.63.10.03.20.03.13.20.0Amber [s]
0403004025030030400Maximum Green [s]
064064060460Minimum Green [s]
--Lead--Lead------Lead / Lag
1,4Auxiliary Signal Groups
061025030140Signal Group
PermissPermissProtectePermissPermissProtecteSplitSplitSplitOverlapSplitSplitControl Type Phasing & Timing

0.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference

43.0Offset [s]
Semi-actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
120Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
282/3/2025Kimley-Horn
Scenario 8: 8 Existing PM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

637

202.85196.24300.31195.50208.67263.68224.40145.3173.6231.1974.6064.0195th-Percentile Queue Length [ft/ln]

8.117.8512.017.828.3510.558.985.812.941.252.982.5695th-Percentile Queue Length [veh/ln] 114.94110.17187.91109.64119.16159.97130.6780.7340.9017.3341.4435.5650th-Percentile Queue Length [ft/ln]

4.604.417.524.394.776.405.233.231.640.691.661.4250th-Percentile Queue Length [veh/ln] NoNoYesYesNoNoYesNoNoNoYesNoCritical Lane Group
CCECCEDDDCDDLane Group LOS

31.6930.8959.7234.1733.0661.0548.9442.6840.4123.3640.2540.02d, Delay for Lane Group [s/veh]

0.340.340.890.420.390.870.540.310.170.070.180.16X, volume / capacity Lane Group Results

1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor

1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio

0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]

1.540.779.621.480.729.746.252.101.020.030.550.49d2, Incremental Delay [s]

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.500.500.110.500.500.110.500.500.500.110.500.50k, delay calibration

30.1530.1250.1032.6932.3451.3242.7040.5839.3923.3339.7039.53d1, Uniform Delay [s] 595118326487815892283243813631083718697c, Capacity [veh/h] 179035601781281350941781158918701781281335603459s, saturation flow rate [veh/h]

0.110.110.130.130.120.110.110.060.030.030.040.03(v / s)_i Volume / Saturation Flow Rate

0.330.330.150.310.310.130.200.200.200.380.200.20g / C, Green / Cycle 404018383815242424462424g_i, Effective Green Time [s]

2.602.601.602.602.601.601.701.701.700.002.202.20l2, Clearance Lost Time [s]

0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]

4.604.603.604.604.603.603.703.703.703.604.204.20L, Total Lost Time per Cycle [s] 120120120120120120120120120120120120C, Cycle Length [s] CCLRCLRCLRCLLane Group
Lane Group Calculations
292/3/2025Kimley-Horn
Scenario 8: 8 Existing PM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

638

Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh] 40.02 40.25 23.36 40.41 42.68 48.94 61.05 33.06 34.17 59.72 31.11 31.69 Movement LOS D D C D D D E C C E C C
d_A, Approach Delay [s/veh] 36.13 45.36 38.08 39.18
Approach LOS D D D D
d_I, Intersection Delay [s/veh] 39.15
Intersection LOS D
Intersection V/C 0.409
Other Modes
g_Walk,mi, Effective Walk Time [s] 0.0 9.0 0.0 9.0
M_corner, Corner Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s] 0.00 51.34 0.00 51.34
I_p,int, Pedestrian LOS Score for Intersectio 0.000 2.585 0.000 2.901 Crosswalk LOS F B F C
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h] 580 355 457 523 d_b, Bicycle Delay [s] 30.25 40.59 35.73 32.71
I_b,int, Bicycle LOS Score for Intersection 1.885 2.299 2.416 2.025 Bicycle LOS A B B B
----------------Ring 4
----------------Ring 3
--------------65Ring 2
------------4321Ring 1
Sequence
302/3/2025Kimley-Horn
Scenario 8: 8 Existing PM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

639

0.419Volume to Capacity (v/c):

DLevel Of Service:

35.0Delay (sec / veh):
15 minutesAnalysis Period:

HCM 7th EditionAnalysis Method:

SignalizedControl Type:

Intersection 7: Shell Boulevard/Metro Center Boulevard
Intersection Level Of Service Report
YesYesYesYesCrosswalk
NoNoNoNoCurb Present

0.000.000.000.00Grade [%]

35.0030.0015.0030.00Speed [mph]

0.000.000.000.000.000.00100.000.000.000.000.000.00Exit Pocket Length [ft] 000000100000No. of Lanes in Exit Pocket
210.00100.00210.00100.00100.0090.00100.00100.0090.00100.00100.00170.00Entry Pocket Length [ft] 102001001001No. of Lanes in Entry Pocket

12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
312/3/2025Kimley-Horn
Scenario 8: 8 Existing PM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

640

0000Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
6864251995461553676023574237Total Analysis Volume [veh/h] 17166501364131715591859Total 15-Minute Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor

0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 6359231835021449625521668218Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
021010000000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor

0.00Proportion of CAVs [%]

2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 6357221835011449625521668218Base Volume Input [veh/h]
Name
Volumes
322/3/2025Kimley-Horn
Scenario 8: 8 Existing PM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

641

0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.040.040.00.040.040.00.040.040.00.040.040.0Detector Length [ft]

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoNoPedestrian Recall
NoNoNoNoNoNoNoNoMaximum Recall
NoNoNoNoNoNoNoNoMinimum Recall

0.02.52.50.02.51.50.02.51.50.02.51.5l2, Clearance Lost Time [s]

0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk

0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0160023001800140Pedestrian Clearance [s]
050050050050Walk [s]

0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 035605324016803730Split [s]

0.01.00.50.01.00.50.01.00.50.01.00.5All red [s]

0.03.54.00.03.53.00.03.53.00.03.53.0Amber [s]
031204921012503327Maximum Green [s]
066064064064Minimum Green [s]
--Lead--Lead--Lead--LeadLead / Lag
Auxiliary Signal Groups
047083025061Signal Group
PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing

0.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference

0.0Offset [s]
Fully actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
120Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
332/3/2025Kimley-Horn
Scenario 8: 8 Existing PM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

642

32.5514.5017.42218.65233.6526.73183.08128.07279.7883.77313.1895th-Percentile Queue Length [ft/ln]

1.300.580.708.759.351.077.325.1211.193.3512.5395th-Percentile Queue Length [veh/ln]

18.088.059.68126.44137.5014.85101.7171.15172.1846.54197.8450th-Percentile Queue Length [ft/ln]

0.720.320.395.065.500.594.072.856.891.867.9150th-Percentile Queue Length [veh/ln] NoNoYesYesNoNoYesNoNoNoYesCritical Lane Group
AAEBBEEFDDELane Group LOS

9.359.0158.4213.4413.3378.6564.27110.9248.8540.3662.83d, Delay for Lane Group [s/veh]

0.070.030.260.350.350.590.820.900.750.200.88X, volume / capacity Lane Group Results

1.001.001.001.001.001.001.001.001.001.001.00PF, progression factor

1.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio

0.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]

0.140.021.390.960.8719.9210.3553.473.660.2613.00d2, Incremental Delay [s]

1.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.500.500.110.500.500.110.110.240.110.110.16k, delay calibration

9.218.9857.0312.4712.4658.7353.9257.4645.2040.1049.83d1, Uniform Delay [s] 980219597101111112514767315371269c, Capacity [veh/h]
15893560345917021870178117351781158918701781s, saturation flow rate [veh/h]

0.040.020.010.210.210.010.070.030.150.040.13(v / s)_i Volume / Saturation Flow Rate

0.620.620.030.590.590.010.090.040.200.200.15g / C, Green / Cycle 7474371712104242418g_i, Effective Green Time [s]

2.502.502.502.502.501.502.501.502.502.501.50l2, Clearance Lost Time [s]

0.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]

4.504.504.504.504.503.504.503.504.504.503.50L, Total Lost Time per Cycle [s] 120120120120120120120120120120120C, Cycle Length [s]
RCLCCLCLRCLLane Group
Lane Group Calculations
342/3/2025Kimley-Horn
Scenario 8: 8 Existing PM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

643

Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh] 62.83 40.36 48.85 110.92 64.27 64.27 78.65 13.36 13.44 58.42 9.01 9.35 Movement LOS E D D F E E E B B E A A
d_A, Approach Delay [s/veh] 53.77 79.82 14.67 17.02
Approach LOS D E B B
d_I, Intersection Delay [s/veh] 35.03
Intersection LOS D
Intersection V/C 0.419
Other Modes
g_Walk,mi, Effective Walk Time [s] 9.0 9.0 9.0 9.0
M_corner, Corner Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s] 51.30 51.30 51.30 51.30
I_p,int, Pedestrian LOS Score for Intersectio 2.478 2.187 2.532 2.771 Crosswalk LOS B B B C
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h] 542 192 809 509 d_b, Bicycle Delay [s] 31.87 49.02 21.27 33.34
I_b,int, Bicycle LOS Score for Intersection 2.461 1.857 2.187 1.689 Bicycle LOS B A B A
----------------Ring 4
----------------Ring 3
------------8765Ring 2
------------4321Ring 1
Sequence
352/3/2025Kimley-Horn
Scenario 8: 8 Existing PM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

644

0.609Volume to Capacity (v/c):

DLevel Of Service:

39.2Delay (sec / veh):
15 minutesAnalysis Period:

HCM 7th EditionAnalysis Method:

SignalizedControl Type:

Intersection 8: Vintage Park Drive/Metro Center Boulevard Intersection Level Of Service Report
YesYesYesYesCrosswalk
NoNoNoNoCurb Present

0.000.000.000.00Grade [%]

35.0035.0030.0030.00Speed [mph]

0.000.000.000.000.000.000.000.000.00220.000.000.00Exit Pocket Length [ft] 000000000100No. of Lanes in Exit Pocket
140.00100.00260.00100.00100.00150.00100.00100.00270.00100.00100.00200.00Entry Pocket Length [ft] 101001001001No. of Lanes in Entry Pocket

12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Vintage Park DriveName
Intersection Setup
362/3/2025Kimley-Horn
Scenario 8: 8 Existing PM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

645

0000Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
38518245514471411721503088421529Total Analysis Volume [veh/h] 964511131123543387721547Total 15-Minute Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor

0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 35416741474111301581382837719827Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
020011200000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor

0.00Proportion of CAVs [%]

2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 35416541474101291561382837719827Base Volume Input [veh/h] Vintage Park DriveName
Volumes
372/3/2025Kimley-Horn
Scenario 8: 8 Existing PM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

646

0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.040.040.00.040.040.040.040.040.00.040.040.0Detector Length [ft]

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoNoNoPedestrian Recall
NoNoNoNoNoNoNoNoNoMaximum Recall
NoNoNoNoNoNoNoNoNoMinimum Recall

0.02.51.50.02.51.51.51.71.50.02.21.5l2, Clearance Lost Time [s]

0.02.02.00.02.02.02.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk

0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0160019001700170Pedestrian Clearance [s]
050050050050Walk [s]

0.03.03.00.03.03.03.03.03.00.03.03.0Vehicle Extension [s] 028100351818463802013Split [s]

0.01.00.50.01.00.50.51.00.50.01.00.5All red [s]

0.03.53.00.03.53.03.02.73.00.03.23.0Amber [s]
02470311515423501610Maximum Green [s]
065065564064Minimum Green [s]
--Lead--Lag--Lead--LeadLead / Lag
Auxiliary Signal Groups
047083325061Signal Group
PermissPermissProtectePermissPermissProtecteProtectePermissProtectePermissPermissProtecteControl Type Phasing & Timing

0.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference

0.0Offset [s]
Fully actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
120Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
382/3/2025Kimley-Horn
Scenario 8: 8 Existing PM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

647

332.5068.6774.14165.25170.20185.98234.81155.88383.14204.87210.6752.5495th-Percentile Queue Length [ft/ln]

13.302.752.976.616.817.449.396.2415.338.198.432.1095th-Percentile Queue Length [veh/ln] 212.8738.1541.1991.8094.56103.32138.3686.60252.77116.40120.6129.1950th-Percentile Queue Length [ft/ln]

8.511.531.653.673.784.135.533.4610.114.664.821.1750th-Percentile Queue Length [veh/ln] YesNoNoNoNoNoYesNoYesYesNoNoCritical Lane Group
CBEBBDECEEEFLane Group LOS

27.9419.9876.1715.5615.5251.9859.6733.7759.5359.8757.9286.38d, Delay for Lane Group [s/veh]

0.550.120.770.250.250.610.840.280.900.800.760.77X, volume / capacity Lane Group Results

1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor

1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio

0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]

3.110.1518.660.630.612.638.710.2912.277.675.9227.98d2, Incremental Delay [s]

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.500.500.110.500.500.110.110.110.170.110.110.11k, delay calibration

24.8319.8357.5114.9314.9249.3550.9633.4847.2552.2052.0058.39d1, Uniform Delay [s] 699156659967100223020553034318320137c, Capacity [veh/h] 158935601781180418701781158918701781169718701781s, saturation flow rate [veh/h]

0.240.050.030.140.140.080.110.080.170.090.080.02(v / s)_i Volume / Saturation Flow Rate

0.440.440.030.540.540.130.130.280.190.110.110.02g / C, Green / Cycle 5353464641616342313132g_i, Effective Green Time [s]

2.502.501.502.502.501.501.501.701.502.202.201.50l2, Clearance Lost Time [s]

0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]

4.504.503.504.504.503.503.503.703.504.204.203.50L, Total Lost Time per Cycle [s] 120120120120120120120120120120120120C, Cycle Length [s] RCLCCLRCLCCLLane Group
Lane Group Calculations
392/3/2025Kimley-Horn
Scenario 8: 8 Existing PM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

648

Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh] 86.38 58.48 59.87 59.53 33.77 59.67 51.98 15.54 15.56 76.17 19.98 27.94 Movement LOS F E E E C E D B B E B C
d_A, Approach Delay [s/veh] 61.30 53.43 23.58 29.12
Approach LOS E D C C
d_I, Intersection Delay [s/veh] 39.23
Intersection LOS D
Intersection V/C 0.609
Other Modes
g_Walk,mi, Effective Walk Time [s] 9.0 9.0 9.0 9.0
M_corner, Corner Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s] 51.30 51.30 51.30 51.30
I_p,int, Pedestrian LOS Score for Intersectio 2.427 2.582 2.548 2.743 Crosswalk LOS B B B B
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h] 263 705 509 392 d_b, Bicycle Delay [s] 45.21 25.13 33.35 38.77
I_b,int, Bicycle LOS Score for Intersection 1.830 2.599 2.087 2.065 Bicycle LOS A B B B
----------------Ring 4
----------------Ring 3
------------8765Ring 2
------------4321Ring 1
Sequence
402/3/2025Kimley-Horn
Scenario 8: 8 Existing PM - Plus 200,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

649

C
kimley-horn.com 4637 Chabot Drive, Suite 300, Pleasanton, CA 94588 925 398 4840 Appendix C – Cumulative Conditions LOS Worksheets

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

650

0.622Volume to Capacity (v/c):

BLevel Of Service:

19.8Delay (sec / veh):
15 minutesAnalysis Period:

HCM 7th EditionAnalysis Method:

SignalizedControl Type:

Intersection 1: Foster City Boulevard/Vintage Park Drive-Chess Drive Intersection Level Of Service Report
YesYesYesYesCrosswalk
NoNoNoNoCurb Present

0.000.000.000.00Grade [%]

25.0030.0030.0030.00Speed [mph]

0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket
100.00100.00120.00160.00100.00110.00100.00100.00155.00100.00100.00215.00Entry Pocket Length [ft] 001101001001No. of Lanes in Entry Pocket

12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Chess DriveVintage Park DriveFoster City BoulevardFoster City BoulevardName Intersection Setup
12/6/2025Kimley-Horn
Scenario 1: 1 Cumulative AMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

651

0000Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
3111329913330444185181538431Total Analysis Volume [veh/h] 83172337111465384108Total 15-Minute Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor

0.87000.87000.87000.87000.87000.87000.87000.87000.87000.87000.87000.8700Peak Hour Factor 2710325811626386161161338375Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000000000000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor

0.00Proportion of CAVs [%]

2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 2710325811626386161161338375Base Volume Input [veh/h]
Chess DriveVintage Park DriveFoster City BoulevardFoster City BoulevardName Volumes
22/6/2025Kimley-Horn
Scenario 1: 1 Cumulative AMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

652

0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft]

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoPedestrian Recall
NoNoNoNoNoNoMaximum Recall
NoNoNoNoNoNoMinimum Recall

0.01.20.00.01.20.01.22.61.60.02.91.6l2, Clearance Lost Time [s]

0.02.00.00.02.00.02.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk

0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 01800180181800120Pedestrian Clearance [s]
050050550050Walk [s]

0.03.00.00.03.00.03.03.03.00.03.03.0Vehicle Extension [s] 080018018372207660Split [s]

0.01.00.00.01.00.01.01.01.00.01.01.0All red [s]

0.02.20.00.02.20.02.23.62.60.03.92.6Amber [s]
050014014321807156Maximum Green [s]
040040484084Minimum Green [s]
--------Lead--LeadLead / Lag
Auxiliary Signal Groups
040030325061Signal Group
SplitSplitSplitSplitSplitSplitPermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing

0.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference

0.0Offset [s]
Fully actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
120Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
32/6/2025Kimley-Horn
Scenario 1: 1 Cumulative AMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

653

37.832.1017.445.2691.95103.43105.42126.49330.90329.63247.4795th-Percentile Queue Length [ft/ln]

1.510.080.700.213.684.144.225.0613.2413.199.9095th-Percentile Queue Length [veh/ln]

21.011.179.692.9251.0857.4658.5770.27211.62210.62147.7950th-Percentile Queue Length [ft/ln]

0.840.050.390.122.042.302.342.818.468.425.9150th-Percentile Queue Length [veh/ln] YesNoNoNoYesNoNoYesYesNoNoCritical Lane Group
DCCCCBBCBBCLane Group LOS

44.6828.8825.6024.8531.9015.6215.6031.2916.4816.3725.27d, Delay for Lane Group [s/veh]

0.720.050.180.050.720.380.370.780.860.860.86X, volume / capacity Lane Group Results

1.001.001.001.001.001.001.001.001.001.001.00PF, progression factor

1.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio

0.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]

15.420.310.510.105.270.370.365.582.552.474.41d2, Incremental Delay [s]

1.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.110.110.110.110.110.110.110.110.110.110.11k, delay calibration

29.2728.5725.0924.7526.6215.2415.2425.7113.9313.8920.86d1, Uniform Delay [s] 5863164193184624639237904908502c, Capacity [veh/h]
16541781158918701781182918701781186218701781s, saturation flow rate [veh/h]

0.030.000.020.000.070.130.130.100.420.420.24(v / s)_i Volume / Saturation Flow Rate

0.040.040.100.100.100.340.340.130.490.490.28g / C, Green / Cycle 2266621218303017g_i, Effective Green Time [s]

1.201.201.201.201.202.602.601.602.902.901.60l2, Clearance Lost Time [s]

0.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]

3.203.203.203.203.204.604.603.604.904.903.60L, Total Lost Time per Cycle [s] 6161616161616161616161C, Cycle Length [s]
CLRCLCCLCCLLane Group
Lane Group Calculations
42/6/2025Kimley-Horn
Scenario 1: 1 Cumulative AMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

654

Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh] 25.27 16.42 16.48 31.29 15.61 15.62 31.90 24.85 25.60 28.88 44.68 44.68 Movement LOS C B B C B B C C C C D D
d_A, Approach Delay [s/veh] 18.34 20.01 30.46 43.63
Approach LOS B C C D
d_I, Intersection Delay [s/veh] 19.85
Intersection LOS B
Intersection V/C 0.622
Other Modes
g_Walk,mi, Effective Walk Time [s] 9.0 9.0 9.0 9.0
M_corner, Corner Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s] 22.22 22.22 22.22 22.22
I_p,int, Pedestrian LOS Score for Intersectio 2.762 2.742 2.407 2.165 Crosswalk LOS C B B B
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h] 2327 1060 484 157 d_b, Bicycle Delay [s] 0.82 6.75 17.55 25.95
I_b,int, Bicycle LOS Score for Intersection 3.199 2.103 1.842 1.634 Bicycle LOS C B A A
----------------Ring 4
----------------Ring 3
--------------65Ring 2
------------4321Ring 1
Sequence
52/6/2025Kimley-Horn
Scenario 1: 1 Cumulative AMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

655

0.520Volume to Capacity (v/c):

DLevel Of Service:

37.1Delay (sec / veh):
15 minutesAnalysis Period:

HCM 7th EditionAnalysis Method:

SignalizedControl Type:

Intersection 2: Vintage Park Drive/Chess Drive
Intersection Level Of Service Report
YesYesYesYesCrosswalk
NoNoNoNoCurb Present

0.000.000.000.00Grade [%]

30.0030.0030.0030.00Speed [mph]

0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket
100.00100.00215.00100.00100.00145.00100.00100.00280.00100.00100.00225.00Entry Pocket Length [ft] 001001001101No. of Lanes in Entry Pocket

12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Chess DriveChess DriveVintage Park DriveVintage Park DriveName Intersection Setup
62/6/2025Kimley-Horn
Scenario 1: 1 Cumulative AMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

656

0000Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
274391201141180866212834158978164Total Analysis Volume [veh/h] 689850354521153283924541Total 15-Minute Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor

0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 252360185130166795711831145900151Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000000000000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor

0.00Proportion of CAVs [%]

2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 252360185130166795711831145900151Base Volume Input [veh/h] Chess DriveChess DriveVintage Park DriveVintage Park DriveName Volumes
72/6/2025Kimley-Horn
Scenario 1: 1 Cumulative AMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

657

0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft]

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoNoPedestrian Recall
NoNoNoNoNoNoNoNoMaximum Recall
NoNoNoNoNoNoNoNoMinimum Recall

0.02.21.60.02.21.60.02.22.11.71.71.6l2, Clearance Lost Time [s]

0.02.02.00.02.02.00.02.02.02.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk

0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 02000180020021210Pedestrian Clearance [s]
050050050550Walk [s]

0.03.03.00.03.03.00.03.03.03.03.03.0Vehicle Extension [s] 03827024120259515134Split [s]

0.01.01.00.01.01.00.01.01.01.01.01.0All red [s]

0.03.22.60.03.22.60.03.23.12.72.72.6Amber [s]
0342302090214474731Maximum Green [s]
044044044444Minimum Green [s]
--Lead--Lag--Lead--LeadLead / Lag
Auxiliary Signal Groups
047083025661Signal Group
PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing

0.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference

0.0Offset [s]
Fully actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
110Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
82/6/2025Kimley-Horn
Scenario 1: 1 Cumulative AMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

658

227.14252.92246.94122.05133.47120.9496.12100.1456.19149.9487.0487.0211.195th-Percentile Queue Length [ft/ln]

9.0910.129.884.885.344.843.844.012.256.0019.4819.488.4595th-Percentile Queue Length [veh/ln] 132.68151.87147.3967.8174.1567.1953.4055.6431.2283.32336.5336.5120.950th-Percentile Queue Length [ft/ln]

5.316.075.902.712.972.692.142.231.253.3313.4613.464.8450th-Percentile Queue Length [veh/ln] YesNoNoNoNoYesNoNoYesNoNoYesNoCritical Lane Group
CBDCCEDDECDDELane Group LOS

20.0519.8354.8922.2121.9562.6337.0836.8779.6830.8444.2444.2455.96d, Delay for Lane Group [s/veh]

0.400.400.850.230.220.790.270.250.790.340.890.890.82X, volume / capacity Lane Group Results

1.001.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor

1.001.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio

0.000.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]

1.541.338.270.830.6711.720.410.3426.290.427.147.148.19d2, Incremental Delay [s]

1.001.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.500.500.110.500.500.110.110.110.110.110.160.160.11k, delay calibration

18.5118.5046.6221.3821.2750.9136.6636.5353.3930.4237.0937.0947.78d1, Uniform Delay [s] 77389423765476110934538643468550550199c, Capacity [veh/h] 1617187017811607187017811673187017811589187018701781s, saturation flow rate [veh/h]

0.190.190.110.090.090.050.060.050.020.100.260.260.09(v / s)_i Volume / Saturation Flow Rate

0.480.480.130.410.410.060.210.210.020.290.290.290.11g / C, Green / Cycle 535315454572323332323212g_i, Effective Green Time [s]

2.202.201.602.202.201.602.202.202.101.701.701.701.60l2, Clearance Lost Time [s]

0.000.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]

4.204.203.604.204.203.604.204.204.103.703.703.703.60L, Total Lost Time per Cycle [s] 110110110110110110110110110110110110110C, Cycle Length [s] CCLCCLCCLRCCLLane Group
Lane Group Calculations
92/6/2025Kimley-Horn
Scenario 1: 1 Cumulative AMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

659

Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh] 55.96 44.24 30.84 79.68 36.92 37.08 62.63 21.96 22.21 54.89 19.85 20.05 Movement LOS E D C E D D E C C D B C
d_A, Approach Delay [s/veh] 44.09 43.45 30.64 28.04
Approach LOS D D C C
d_I, Intersection Delay [s/veh] 37.11
Intersection LOS D
Intersection V/C 0.520
Other Modes
g_Walk,mi, Effective Walk Time [s] 9.0 9.0 9.0 9.0
M_corner, Corner Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s] 46.37 46.37 46.37 46.37
I_p,int, Pedestrian LOS Score for Intersectio 2.752 2.718 2.511 2.552 Crosswalk LOS C B B B
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h] 860 378 360 615 d_b, Bicycle Delay [s] 17.87 36.17 36.98 26.40
I_b,int, Bicycle LOS Score for Intersection 2.632 1.744 1.895 2.274 Bicycle LOS B A A B
----------------Ring 4
----------------Ring 3
------------8765Ring 2
------------4321Ring 1
Sequence
102/6/2025Kimley-Horn
Scenario 1: 1 Cumulative AMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

660

0.555Volume to Capacity (v/c):

CLevel Of Service:

26.0Delay (sec / veh):
15 minutesAnalysis Period:

HCM 7th EditionAnalysis Method:

SignalizedControl Type:

Intersection 3: SR-92 WB Ramps/Chess Drive
Intersection Level Of Service Report
NoYesNoYesCrosswalk
NoNoNoNoCurb Present

0.000.000.000.00Grade [%]

30.0030.0030.0030.00Speed [mph]

0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket
500.00100.00480.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 101000000000No. of Lanes in Entry Pocket

12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Route 92 West RampOffice driveway Chess Dr Chess DrName Intersection Setup
112/6/2025Kimley-Horn
Scenario 1: 1 Cumulative AMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

661

0100Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
12032365412419227694652102Total Analysis Volume [veh/h] 301616301155717316521Total 15-Minute Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor

0.93000.93000.93000.93000.93000.93000.93000.93000.93000.93000.93000.9300Peak Hour Factor 11192160812418211645601952Total Hourly Volume [veh/h]
0000004003200Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000000000000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor

0.00Proportion of CAVs [%]

1.301.301.301.301.301.301.301.301.301.301.301.30Heavy Vehicles Percentage [%]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 11192160812422211645921952Base Volume Input [veh/h]
Route 92 West RampOffice driveway Chess Dr Chess DrName Volumes
122/6/2025Kimley-Horn
Scenario 1: 1 Cumulative AMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

662

0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft]

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoPedestrian Recall
NoNoNoNoNoMaximum Recall
NoNoNoNoNoMinimum Recall

2.53.50.00.01.70.00.02.50.02.12.10.0l2, Clearance Lost Time [s]

2.02.00.00.02.00.00.02.00.02.02.00.0l1, Start-Up Lost Time [s] NoNoYesYesRest In Walk

0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 120001700120000Pedestrian Clearance [s]
500050050000Walk [s]

3.03.00.00.03.00.00.03.00.03.03.00.0Vehicle Extension [s] 44420070044022220Split [s]

1.01.00.00.01.00.00.01.00.01.01.00.0All red [s]

3.54.50.00.02.70.00.03.50.03.13.10.0Amber [s]
40360040040018180Maximum Green [s]
10500400100560Minimum Green [s]
------------Lead / Lag
Auxiliary Signal Groups
820040080610Signal Group
UnsignaPermissPermissPermissPermissPermissPermissPermissPermissProtectePermissPermissControl Type Phasing & Timing

12.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference

51.0Offset [s]
Fully actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
120Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
132/6/2025Kimley-Horn
Scenario 1: 1 Cumulative AMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

663

407.03406.3614.80182.04256.41256.4126.46301.6195th-Percentile Queue Length [ft/ln]

16.2816.250.597.2810.2610.261.0612.0695th-Percentile Queue Length [veh/ln] 271.84271.298.22101.13154.49154.4914.70188.9150th-Percentile Queue Length [ft/ln]

10.8710.850.334.056.186.180.597.5650th-Percentile Queue Length [veh/ln] NoYesYesNoNoYesNoYesCritical Lane Group
EEFBBBCELane Group LOS

56.3656.4492.7917.6819.5219.5223.1670.82d, Delay for Lane Group [s/veh]

0.890.890.560.260.380.380.060.88X, volume / capacity
Lane Group Results

1.001.001.001.001.001.001.001.00PF, progression factor

1.001.001.001.001.001.001.001.00Rp, platoon ratio

0.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]

10.4410.5233.400.681.241.240.0219.45d2, Incremental Delay [s]

1.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.170.170.110.500.500.500.110.24k, delay calibration

45.9245.9259.3816.9918.2818.2823.1451.37d1, Uniform Delay [s] 381380139369039031092241c, Capacity [veh/h]
17971791178518551791179128291880s, saturation flow rate [veh/h]

0.190.190.000.130.190.190.020.11(v / s)_i Volume / Saturation Flow Rate

0.210.210.010.500.500.500.390.13g / C, Green / Cycle
252516161614615g_i, Effective Green Time [s]

3.503.501.702.502.502.502.102.10l2, Clearance Lost Time [s]

0.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]

5.505.503.704.504.504.504.104.10L, Total Lost Time per Cycle [s] 120120120120120120120120C, Cycle Length [s]
CLCCCLRCLane Group
Lane Group Calculations
142/6/2025Kimley-Horn
Scenario 1: 1 Cumulative AMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

664

Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh] 70.82 70.82 23.16 19.52 17.68 17.68 92.79 92.79 92.79 56.40 56.36 0.00 Movement LOS E E C B B B F F F E E
d_A, Approach Delay [s/veh] 59.64 19.04 92.79 21.26
Approach LOS E B F C
d_I, Intersection Delay [s/veh] 26.02
Intersection LOS C
Intersection V/C 0.555
Other Modes
g_Walk,mi, Effective Walk Time [s] 9.0 0.0 22.0 0.0
M_corner, Corner Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s] 51.33 0.00 40.01 0.00
I_p,int, Pedestrian LOS Score for Intersectio 2.593 0.000 1.747 0.000 Crosswalk LOS B F A F
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h] 298 658 67 608 d_b, Bicycle Delay [s] 43.43 27.00 56.09 29.05
I_b,int, Bicycle LOS Score for Intersection 2.069 2.338 1.571 2.677 Bicycle LOS B B A B
----------------Ring 4
----------------Ring 3
------------846-Ring 2
--------------21Ring 1
Sequence
152/6/2025Kimley-Horn
Scenario 1: 1 Cumulative AMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

665

0.917Volume to Capacity (v/c):

FLevel Of Service:

91.6Delay (sec / veh):
15 minutesAnalysis Period:

HCM 7th EditionAnalysis Method:

SignalizedControl Type:

Intersection 4: Foster City Boulevard/Chess Drive
Intersection Level Of Service Report
NoYesYesYesCrosswalk
NoNoNoNoCurb Present

0.000.000.000.00Grade [%]

30.0035.0025.0030.00Speed [mph]

0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket
100.00100.00510.00180.00100.0080.00100.00100.00100.00100.00100.0095.00Entry Pocket Length [ft] 001101001101No. of Lanes in Entry Pocket

12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Foster City BoulevardFoster City BoulevardChess DriveChess DriveName Intersection Setup
162/6/2025Kimley-Horn
Scenario 1: 1 Cumulative AMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

666

0000Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
3361247735472925996457619196509Total Analysis Volume [veh/h] 843121841273152161415549127Total 15-Minute Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 3361247735472925996457619196509Total Hourly Volume [veh/h] 84002600200000Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000000000000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor

0.00Proportion of CAVs [%]

2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 42012477357329259116457619196509Base Volume Input [veh/h] Foster City BoulevardFoster City BoulevardChess DriveChess DriveName Volumes
172/6/2025Kimley-Horn
Scenario 1: 1 Cumulative AMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

667

0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.040.040.040.040.040.00.040.00.00.00.00.0Detector Length [ft]

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoPedestrian Recall
YesNoNoNoNoNoMaximum Recall
NoNoNoNoNoNoMinimum Recall

0.02.62.52.92.91.60.01.60.00.02.90.0l2, Clearance Lost Time [s]

0.02.02.02.02.02.00.02.00.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk

0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 023001000230000Pedestrian Clearance [s]
050000040000Walk [s]

0.03.03.03.03.03.00.03.00.00.03.00.0Vehicle Extension [s] 071315225801000520Split [s]

0.01.01.01.01.01.00.01.00.00.01.00.0All red [s]

0.03.63.53.93.92.60.02.60.00.03.90.0Amber [s]
06655472050600470Maximum Green [s]
064464060040Minimum Green [s]
--Lead--Lead------Lead / Lag
2,3Auxiliary Signal Groups
061325040030Signal Group
PermissPermissPermissOverlapPermissProtecteSplitSplitSplitSplitSplitSplitControl Type Phasing & Timing

0.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference

90.0Offset [s]
Fully actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
120Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
182/6/2025Kimley-Horn
Scenario 1: 1 Cumulative AMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

668

1593.521413.73374.0022.54192.79117.95108.3781.97643.93292.01293.6995th-Percentile Queue Length [ft/ln]

63.7456.5514.960.907.714.724.333.2825.7611.6811.7595th-Percentile Queue Length [veh/ln] 1080.99984.93245.5212.52107.6965.5360.2145.54466.77181.53182.8250th-Percentile Queue Length [ft/ln]

43.2439.409.820.504.312.622.411.8218.677.267.3150th-Percentile Queue Length [veh/ln] YesNoNoNoNoYesYesNoYesNoNoCritical Lane Group
FFDADFEEDCCLane Group LOS
194.77155.2241.109.4151.29104.5562.9859.4843.8125.3325.53d, Delay for Lane Group [s/veh]

1.321.230.810.050.550.900.680.550.920.460.47X, volume / capacity Lane Group Results

1.001.001.001.001.001.001.001.001.001.001.00PF, progression factor

1.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio

0.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 155.42115.877.710.094.0046.917.514.4710.870.420.46d2, Incremental Delay [s]

1.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.500.500.500.500.500.190.110.110.220.110.11k, delay calibration

39.3539.3533.399.3247.2957.6455.4755.0232.9424.9125.07d1, Uniform Delay [s] 60064590897353365107104670771750c, Capacity [veh/h]
17401870275415893560178118301781158918291781s, saturation flow rate [veh/h]

0.450.420.270.030.080.030.040.030.390.190.20(v / s)_i Volume / Saturation Flow Rate

0.340.340.340.610.150.040.060.060.420.420.42g / C, Green / Cycle 4141417418477515151g_i, Effective Green Time [s]

2.602.600.000.002.901.601.601.602.902.902.90l2, Clearance Lost Time [s]

0.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]

4.604.604.604.904.903.603.603.604.904.904.90L, Total Lost Time per Cycle [s] 120120120120120120120120120120120C, Cycle Length [s]
CCLRCLCLRCLLane Group
Lane Group Calculations
192/6/2025Kimley-Horn
Scenario 1: 1 Cumulative AMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

669

Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh] 25.47 25.33 43.81 59.48 62.98 62.98 104.55 51.29 9.41 41.10 169.67 194.77 Movement LOS C C D E E E F D A D F F
d_A, Approach Delay [s/veh] 34.02 61.44 54.24 132.54
Approach LOS C E D F
d_I, Intersection Delay [s/veh] 91.57
Intersection LOS F
Intersection V/C 0.917
Other Modes
g_Walk,mi, Effective Walk Time [s] 4.0 9.0 8.0 0.0
M_corner, Corner Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s] 56.09 51.36 52.29 0.00
I_p,int, Pedestrian LOS Score for Intersectio 2.924 2.449 2.921 0.000 Crosswalk LOS C B C F
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h] 785 107 335 1106 d_b, Bicycle Delay [s] 22.16 53.80 41.61 11.99
I_b,int, Bicycle LOS Score for Intersection 3.744 1.777 1.909 3.541 Bicycle LOS D A A D
----------------Ring 4
----------------Ring 3
--------------65Ring 2
------------4321Ring 1
Sequence
202/6/2025Kimley-Horn
Scenario 1: 1 Cumulative AMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

670

0.565Volume to Capacity (v/c):

CLevel Of Service:

27.8Delay (sec / veh):
15 minutesAnalysis Period:

HCM 7th EditionAnalysis Method:

SignalizedControl Type:

Intersection 5: SR-92 EB Ramps/Metro Center Boulevard
Intersection Level Of Service Report
NoYesNoNoCrosswalk
NoNoNoNoCurb Present

0.000.000.000.00Grade [%]

30.0035.0035.0015.00Speed [mph]

0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket
100.00100.0090.00100.00100.00290.00640.00100.00600.00100.00100.00100.00Entry Pocket Length [ft] 001002101000No. of Lanes in Entry Pocket

12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Metro Center BoulevarMetro Center BoulevarSR-92 RampsParking Lot AccessName Intersection Setup
212/6/2025Kimley-Horn
Scenario 1: 1 Cumulative AMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

671

0000Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
1552804832191063093813211944Total Analysis Volume [veh/h] 397012155277710330511Total 15-Minute Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor

0.97000.97000.97000.97000.97000.97000.97000.97000.97000.97000.97000.9700Peak Hour Factor 1502724732121033003712811844Total Hourly Volume [veh/h] 810010016100900Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000000000000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor

0.00Proportion of CAVs [%]

1.901.901.901.901.901.901.901.901.901.901.901.90Heavy Vehicles Percentage [%]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 2312724742121034613712812744Base Volume Input [veh/h]
Metro Center BoulevarMetro Center BoulevarSR-92 RampsParking Lot AccessName Volumes
222/6/2025Kimley-Horn
Scenario 1: 1 Cumulative AMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

672

0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.040.040.00.040.040.040.040.00.00.040.00.0Detector Length [ft]

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoPedestrian Recall
NoNoNoNoYesNoMaximum Recall
NoNoNoNoNoNoMinimum Recall

0.02.51.60.02.51.61.63.00.00.02.20.0l2, Clearance Lost Time [s]

0.02.02.00.02.02.02.02.00.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk

0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0000170000000Pedestrian Clearance [s]
000060000000Walk [s]

0.03.03.00.03.03.03.03.00.00.03.00.0Vehicle Extension [s] 025120231010770080Split [s]

0.01.01.00.01.01.01.01.00.00.01.00.0All red [s]

0.03.52.60.03.52.62.64.00.00.03.20.0Amber [s]
020801866720040Maximum Green [s]
0440444100040Minimum Green [s]
--Lead--Lead------Lead / Lag
4,5Auxiliary Signal Groups
061025540030Signal Group
PermissPermissProtectePermissPermissProtectePermissPermissPermissPermissPermissPermissControl Type Phasing & Timing

12.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference

30.0Offset [s]
Fully actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
120Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
232/6/2025Kimley-Horn
Scenario 1: 1 Cumulative AMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

673

181.4195.8198.278.61137.32137.6175.4078.97428.05428.7732.9712.3795th-Percentile Queue Length [ft/ln]

7.267.847.933.145.495.503.023.1617.1217.151.320.4995th-Percentile Queue Length [veh/ln] 100.8109.9111.543.6776.2976.4541.8943.87288.72289.3018.326.8750th-Percentile Queue Length [ft/ln]

4.034.404.461.753.053.061.681.7511.5511.570.730.2750th-Percentile Queue Length [veh/ln] YesNoNoNoNoNoYesNoNoYesYesNoCritical Lane Group
DDDEDDEBBBEELane Group LOS

49.8648.7448.5674.7544.3544.3361.2110.3717.2217.2774.9460.84d, Delay for Lane Group [s/veh]

0.470.460.460.770.320.320.670.180.620.620.600.22X, volume / capacity Lane Group Results

1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor

1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio

0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]

5.594.604.4417.362.352.334.850.232.662.6816.632.97d2, Incremental Delay [s]

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.500.500.500.110.500.500.110.500.500.500.110.11k, delay calibration

44.2744.1444.1157.3942.0142.0056.3610.1414.5614.5958.3257.87d1, Uniform Delay [s] 283325333633513531581724109410913236c, Capacity [veh/h] 159118261871178218631871346128161787178215911826s, saturation flow rate [veh/h]

0.080.080.080.030.060.060.030.110.380.380.010.00(v / s)_i Volume / Saturation Flow Rate

0.180.180.180.030.190.190.050.610.610.610.020.02g / C, Green / Cycle 21212142323574747422g_i, Effective Green Time [s]

2.502.502.501.602.502.501.603.003.003.002.202.20l2, Clearance Lost Time [s]

0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]

4.504.504.503.604.504.503.605.005.005.004.204.20L, Total Lost Time per Cycle [s] 120120120120120120120120120120120120C, Cycle Length [s] RCCLCCLRCLRCLane Group
Lane Group Calculations
242/6/2025Kimley-Horn
Scenario 1: 1 Cumulative AMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

674

Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh] 60.84 60.84 74.94 17.24 17.22 10.37 61.21 44.34 44.35 74.75 48.64 49.78 Movement LOS E E E B B B E D D E D D
d_A, Approach Delay [s/veh] 70.76 15.97 49.79 51.58
Approach LOS E B D D
d_I, Intersection Delay [s/veh] 27.85
Intersection LOS C
Intersection V/C 0.565
Other Modes
g_Walk,mi, Effective Walk Time [s] 0.0 0.0 72.0 0.0
M_corner, Corner Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s] 0.00 0.00 9.60 0.00
I_p,int, Pedestrian LOS Score for Intersectio 0.000 0.000 2.608 0.000 Crosswalk LOS F F B F
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h] 67 1200 308 342 d_b, Bicycle Delay [s] 56.06 9.60 42.92 41.25
I_b,int, Bicycle LOS Score for Intersection 1.619 4.577 1.831 2.025 Bicycle LOS A E A B
----------------Ring 4
----------------Ring 3
--------------65Ring 2
------------4321Ring 1
Sequence
252/6/2025Kimley-Horn
Scenario 1: 1 Cumulative AMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

675

0.735Volume to Capacity (v/c):

ELevel Of Service:

57.2Delay (sec / veh):
15 minutesAnalysis Period:

HCM 7th EditionAnalysis Method:

SignalizedControl Type:

Intersection 6: Foster City Boulevard/Metro Center Boulevard Intersection Level Of Service Report
YesNoYesNoCrosswalk
NoNoNoNoCurb Present

0.000.000.000.00Grade [%]

35.0035.0025.0035.00Speed [mph]

0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket
100.00100.00100.00100.00100.00210.00170.00100.0050.00240.00100.00150.00Entry Pocket Length [ft] 101101101101No. of Lanes in Entry Pocket

12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Foster City BoulevardFoster City BoulevardMetro Center BoulevardMetro Center BoulevardName Intersection Setup
262/6/2025Kimley-Horn
Scenario 1: 1 Cumulative AMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

676

0000Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
51112820010360015533215154222286762Total Analysis Volume [veh/h] 132825026150398338145672191Total 15-Minute Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 51112820010360015533215154222286762Total Hourly Volume [veh/h] 1300104001790022200Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000000000000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor

0.00Proportion of CAVs [%]

2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 64112820020760015551115154444286762Base Volume Input [veh/h] Foster City BoulevardFoster City BoulevardMetro Center BoulevardMetro Center BoulevardName Volumes
272/6/2025Kimley-Horn
Scenario 1: 1 Cumulative AMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

677

0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.040.040.00.00.00.00.00.00.00.00.00.0Detector Length [ft]

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoPedestrian Recall
YesNoYesNoNoNoNoMaximum Recall
NoNoNoNoNoNoNoMinimum Recall

0.02.61.60.02.61.60.02.20.01.62.20.0l2, Clearance Lost Time [s]

0.02.02.00.02.02.00.02.00.02.02.00.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk

0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0190020001000270Pedestrian Clearance [s]
050050050050Walk [s]

0.03.03.00.03.03.00.03.00.03.03.00.0Vehicle Extension [s] 0372502916032025410Split [s]

0.01.01.00.01.01.00.01.00.01.01.00.0All red [s]

0.03.62.60.03.62.60.03.20.02.63.20.0Amber [s]
0322202412028022370Maximum Green [s]
064064060460Minimum Green [s]
--Lead--Lead------Lead / Lag
1,4Auxiliary Signal Groups
061025030140Signal Group
PermissPermissProtectePermissPermissProtecteSplitSplitSplitOverlapSplitSplitControl Type Phasing & Timing

0.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference

0.0Offset [s]
Semi-actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
120Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
282/6/2025Kimley-Horn
Scenario 1: 1 Cumulative AMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

678

493.59455.73288.0360.09238.28277.17485.09193.0565.1289.59175.04519.3295th-Percentile Queue Length [ft/ln]

19.7418.2311.522.409.5311.0919.407.722.603.587.0020.7795th-Percentile Queue Length [veh/ln] 341.96311.10178.4833.39140.93170.20335.00107.8836.1849.7797.25363.0850th-Percentile Queue Length [ft/ln]

13.6812.447.141.345.646.8113.404.321.451.993.8914.5250th-Percentile Queue Length [veh/ln] YesNoNoNoNoYesYesNoNoNoNoYesCritical Lane Group
EDEDDFEDDCDELane Group LOS

58.8052.1568.4239.7944.5097.9478.5343.5539.7721.1742.3673.43d, Delay for Lane Group [s/veh]

0.830.830.860.160.520.920.920.360.130.180.350.97X, volume / capacity Lane Group Results

1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor

1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio

0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]

14.868.2214.390.531.6440.9130.612.310.680.071.2024.88d2, Incremental Delay [s]

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.500.500.190.500.500.350.500.500.500.110.500.50k, delay calibration

43.9443.9454.0239.2542.8657.0347.9141.2439.0921.1141.1648.55d1, Uniform Delay [s] 48494323364211631683614254051257812788c, Capacity [veh/h] 182935601781281350941781158918701781281335603459s, saturation flow rate [veh/h]

0.220.220.110.040.120.090.210.080.030.080.080.22(v / s)_i Volume / Saturation Flow Rate

0.270.270.130.230.230.090.230.230.230.450.230.23g / C, Green / Cycle 343417292912292929572929g_i, Effective Green Time [s]

2.602.601.602.602.601.602.202.202.200.002.202.20l2, Clearance Lost Time [s]

0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]

4.604.603.604.604.603.604.204.204.203.604.204.20L, Total Lost Time per Cycle [s] 127127127127127127127127127127127127C, Cycle Length [s] CCLRCLRCLRCLLane Group
Lane Group Calculations
292/6/2025Kimley-Horn
Scenario 1: 1 Cumulative AMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

679

Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh] 73.43 42.36 21.17 39.77 43.55 78.53 97.94 44.50 39.79 68.42 54.21 58.80 Movement LOS E D C D D E F D D E D E
d_A, Approach Delay [s/veh] 57.30 64.79 53.59 56.44
Approach LOS E E D E
d_I, Intersection Delay [s/veh] 57.21
Intersection LOS E
Intersection V/C 0.735
Other Modes
g_Walk,mi, Effective Walk Time [s] 0.0 9.0 0.0 9.0
M_corner, Corner Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s] 0.00 54.82 0.00 54.82
I_p,int, Pedestrian LOS Score for Intersectio 0.000 2.771 0.000 3.035 Crosswalk LOS F C F C
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h] 580 438 384 510 d_b, Bicycle Delay [s] 32.03 38.74 41.44 35.23
I_b,int, Bicycle LOS Score for Intersection 2.791 2.741 2.089 2.325 Bicycle LOS C B B B
----------------Ring 4
----------------Ring 3
--------------65Ring 2
------------4321Ring 1
Sequence
302/6/2025Kimley-Horn
Scenario 1: 1 Cumulative AMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

680

0.000Volume to Capacity (v/c):

ALevel Of Service:

0.0Delay (sec / veh):
15 minutesAnalysis Period:

HCM 7th EditionAnalysis Method:

SignalizedControl Type:

Intersection 7: Shell Boulevard/Metro Center Boulevard
Intersection Level Of Service Report
YesYesYesYesCrosswalk
NoNoNoNoCurb Present

0.000.000.000.00Grade [%]

35.0035.0015.0030.00Speed [mph]

0.000.000.000.000.000.00100.000.000.000.000.000.00Exit Pocket Length [ft] 000000100000No. of Lanes in Exit Pocket
210.00100.00210.00100.00100.0090.00100.00100.0090.00100.00100.00170.00Entry Pocket Length [ft] 102001001001No. of Lanes in Entry Pocket

12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Metro Center BoulevardMetro Center BoulevardParking Lot AccessShell BoulevardName Intersection Setup
312/6/2025Kimley-Horn
Scenario 1: 1 Cumulative AMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

681

0000Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
000000000000Total Analysis Volume [veh/h]
000000000000Total 15-Minute Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor

0.87000.87000.87000.87000.87000.87000.87000.87000.87000.87000.87000.8700Peak Hour Factor 000000000000Total Hourly Volume [veh/h]
000000000000Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000000000000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor

0.00Proportion of CAVs [%]

2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 000000000000Base Volume Input [veh/h]
Metro Center BoulevardMetro Center BoulevardParking Lot AccessShell BoulevardName Volumes
322/6/2025Kimley-Horn
Scenario 1: 1 Cumulative AMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

682

0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.040.040.00.040.040.00.040.040.00.040.040.0Detector Length [ft]

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoNoPedestrian Recall
NoNoNoNoNoNoNoNoMaximum Recall
NoNoNoNoNoNoNoNoMinimum Recall

0.02.52.50.02.51.50.02.51.50.02.51.5l2, Clearance Lost Time [s]

0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk

0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0160023001800140Pedestrian Clearance [s]
050050050050Walk [s]

0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 049250240061903548Split [s]

0.01.01.00.01.00.50.01.00.50.01.00.5All red [s]

0.03.53.50.03.53.00.03.53.00.03.53.0Amber [s]
045210200021603145Maximum Green [s]
066064064064Minimum Green [s]
--Lead--Lead--Lead--LeadLead / Lag
Auxiliary Signal Groups
047083025061Signal Group
PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing

0.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference

0.0Offset [s]
Fully actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
120Cycle Length [s]
-Signal Coordination Group
YesLocated in CBD
Intersection Settings
332/6/2025Kimley-Horn
Scenario 1: 1 Cumulative AMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

683

0.000.000.000.000.000.000.000.000.000.000.0095th-Percentile Queue Length [ft/ln]

0.000.000.000.000.000.000.000.000.000.000.0095th-Percentile Queue Length [veh/ln]

0.000.000.000.000.000.000.000.000.000.000.0050th-Percentile Queue Length [ft/ln]

0.000.000.000.000.000.000.000.000.000.000.0050th-Percentile Queue Length [veh/ln] NoNoNoNoNoNoNoNoNoNoNoCritical Lane Group
AAAAAAAAAAALane Group LOS

0.000.000.000.000.000.000.000.000.000.000.00d, Delay for Lane Group [s/veh]

0.000.000.000.000.000.000.000.000.000.000.00X, volume / capacity Lane Group Results

1.001.001.001.001.001.001.001.001.001.001.00PF, progression factor

1.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio

0.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]

0.000.000.000.000.000.000.000.000.000.000.00d2, Incremental Delay [s]

1.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.500.500.110.500.500.110.110.110.110.110.11k, delay calibration

0.000.000.000.000.000.000.000.000.000.000.00d1, Uniform Delay [s] 1239277511443144300601161c, Capacity [veh/h]
14313204311316831683160316831275143116831275s, saturation flow rate [veh/h]

0.000.000.000.000.000.000.000.000.000.000.00(v / s)_i Volume / Saturation Flow Rate

0.870.870.000.860.860.000.000.000.000.000.00g / C, Green / Cycle 1041040103103000000g_i, Effective Green Time [s]

2.502.502.502.502.500.002.501.502.502.501.50l2, Clearance Lost Time [s]

0.000.000.000.000.000.000.002.000.000.002.00l1_p, Permitted Start-Up Lost Time [s]

4.504.504.504.504.500.004.503.504.504.503.50L, Total Lost Time per Cycle [s] 120120120120120120120120120120120C, Cycle Length [s]
RCLCCLCLRCLLane Group
Lane Group Calculations
342/6/2025Kimley-Horn
Scenario 1: 1 Cumulative AMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

684

Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh] 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Movement LOS A A A A A A A A A A A A
d_A, Approach Delay [s/veh] 0.00 0.00 0.00 0.00
Approach LOS A A A A
d_I, Intersection Delay [s/veh] 0.00
Intersection LOS A
Intersection V/C 0.000
Other Modes
g_Walk,mi, Effective Walk Time [s] 9.0 9.0 9.0 9.0
M_corner, Corner Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s] 51.33 51.33 51.33 51.33
I_p,int, Pedestrian LOS Score for Intersectio 2.315 2.146 2.315 2.609 Crosswalk LOS B B B B
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h] 508 100 325 742 d_b, Bicycle Delay [s] 33.37 54.14 42.08 23.74
I_b,int, Bicycle LOS Score for Intersection 1.560 1.560 1.560 1.560 Bicycle LOS A A A A
----------------Ring 4
----------------Ring 3
------------8765Ring 2
------------4321Ring 1
Sequence
352/6/2025Kimley-Horn
Scenario 1: 1 Cumulative AMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

685

0.000Volume to Capacity (v/c):

ALevel Of Service:

0.0Delay (sec / veh):
15 minutesAnalysis Period:

HCM 7th EditionAnalysis Method:

SignalizedControl Type:

Intersection 8: Vintage Park Drive/Metro Center Boulevard Intersection Level Of Service Report
YesYesYesYesCrosswalk
NoNoNoNoCurb Present

0.000.000.000.00Grade [%]

35.0035.0030.0030.00Speed [mph]

0.000.000.000.000.000.000.000.000.00220.000.000.00Exit Pocket Length [ft] 000000000100No. of Lanes in Exit Pocket
140.00100.00260.00100.00100.00150.00100.00100.00270.00100.00100.00200.00Entry Pocket Length [ft] 101001001001No. of Lanes in Entry Pocket

12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Metro Center BoulevardMetro Center BoulevardVintage Park DriveVintage Park DriveName Intersection Setup
362/6/2025Kimley-Horn
Scenario 1: 1 Cumulative AMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

686

0000Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
000000000000Total Analysis Volume [veh/h]
000000000000Total 15-Minute Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor

0.90000.90000.90000.90000.90000.90000.90000.90000.90000.90000.90000.9000Peak Hour Factor 000000000000Total Hourly Volume [veh/h]
000000000000Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000000000000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor

0.00Proportion of CAVs [%]

2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 000000000000Base Volume Input [veh/h]
Metro Center BoulevardMetro Center BoulevardVintage Park DriveVintage Park DriveName Volumes
372/6/2025Kimley-Horn
Scenario 1: 1 Cumulative AMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

687

0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.040.040.00.040.040.040.040.040.00.040.040.0Detector Length [ft]

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoNoNoPedestrian Recall
NoNoNoNoNoNoNoNoNoMaximum Recall
NoNoNoNoNoNoNoNoNoMinimum Recall

0.02.51.50.02.51.51.51.71.50.02.21.5l2, Clearance Lost Time [s]

0.02.02.00.02.02.02.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk

0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0160019101017001710Pedestrian Clearance [s]
050055550055Walk [s]

0.03.03.00.03.03.03.03.03.00.03.03.0Vehicle Extension [s] 04924055292922140114Split [s]

0.01.00.50.01.00.50.51.00.50.01.00.5All red [s]

0.03.53.00.03.53.03.02.73.00.03.23.0Amber [s]
0452105126261811074Maximum Green [s]
065065564064Minimum Green [s]
--Lead--Lag--Lead--LagLead / Lag
Auxiliary Signal Groups
047083325061Signal Group
PermissPermissProtectePermissPermissProtecteProtectePermissProtectePermissPermissProtecteControl Type Phasing & Timing

0.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference

0.0Offset [s]
Fully actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
120Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
382/6/2025Kimley-Horn
Scenario 1: 1 Cumulative AMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

688

0.000.000.000.000.000.000.000.000.000.000.000.0095th-Percentile Queue Length [ft/ln]

0.000.000.000.000.000.000.000.000.000.000.000.0095th-Percentile Queue Length [veh/ln]

0.000.000.000.000.000.000.000.000.000.000.000.0050th-Percentile Queue Length [ft/ln]

0.000.000.000.000.000.000.000.000.000.000.000.0050th-Percentile Queue Length [veh/ln] NoNoNoNoNoNoNoNoNoNoNoNoCritical Lane Group
AAAAAAAAAAAALane Group LOS

0.000.000.000.000.000.000.000.000.000.000.000.00d, Delay for Lane Group [s/veh]

0.000.000.000.000.000.000.000.000.000.000.000.00X, volume / capacity Lane Group Results

1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor

1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio

0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]

0.000.000.000.000.000.000.000.000.000.000.000.00d2, Incremental Delay [s]

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.500.500.110.500.500.110.110.110.110.110.110.11k, delay calibration

0.000.000.000.000.000.000.000.000.000.000.000.00d1, Uniform Delay [s] 138030921162416241110008c, Capacity [veh/h]
158935601781187018701781158918701781187018701781s, saturation flow rate [veh/h]

0.000.000.000.000.000.000.000.000.000.000.000.00(v / s)_i Volume / Saturation Flow Rate

0.870.870.000.870.870.000.000.000.000.000.000.00g / C, Green / Cycle 10410401041040000001g_i, Effective Green Time [s]

2.502.501.502.502.501.501.501.701.502.202.201.50l2, Clearance Lost Time [s]

0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]

4.504.503.504.504.503.503.503.703.504.204.203.50L, Total Lost Time per Cycle [s] 120120120120120120120120120120120120C, Cycle Length [s] RCLCCLRCLCCLLane Group
Lane Group Calculations
392/6/2025Kimley-Horn
Scenario 1: 1 Cumulative AMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

689

Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh] 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Movement LOS A A A A A A A A A A A A
d_A, Approach Delay [s/veh] 0.00 0.00 0.00 0.00
Approach LOS A A A A
d_I, Intersection Delay [s/veh] 0.00
Intersection LOS A
Intersection V/C 0.000
Other Modes
g_Walk,mi, Effective Walk Time [s] 9.0 9.0 9.0 9.0
M_corner, Corner Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s] 51.33 51.33 51.33 51.33
I_p,int, Pedestrian LOS Score for Intersectio 2.315 2.315 2.315 2.468 Crosswalk LOS B B B B
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h] 113 305 842 742 d_b, Bicycle Delay [s] 53.39 43.09 20.12 23.75
I_b,int, Bicycle LOS Score for Intersection 1.560 1.560 1.560 1.560 Bicycle LOS A A A A
----------------Ring 4
----------------Ring 3
------------8765Ring 2
------------4321Ring 1
Sequence
402/6/2025Kimley-Horn
Scenario 1: 1 Cumulative AMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

690

0.641Volume to Capacity (v/c):

CLevel Of Service:

20.7Delay (sec / veh):
15 minutesAnalysis Period:

HCM 7th EditionAnalysis Method:

SignalizedControl Type:

Intersection 1: Foster City Boulevard/Vintage Park Drive-Chess Drive Intersection Level Of Service Report
YesYesYesYesCrosswalk
NoNoNoNoCurb Present

0.000.000.000.00Grade [%]

25.0030.0030.0030.00Speed [mph]

0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket
100.00100.00120.00160.00100.00110.00100.00100.00155.00100.00100.00215.00Entry Pocket Length [ft] 001101001001No. of Lanes in Entry Pocket

12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Chess DriveVintage Park DriveFoster City BoulevardFoster City BoulevardName Intersection Setup
12/6/2025Kimley-Horn
Scenario 1: 1 Cumulative PMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

691

0000Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
146211318917351201347611831435Total Analysis Volume [veh/h] 3653474930337155789Total 15-Minute Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor

0.94000.94000.94000.94000.94000.94000.94000.94000.94000.94000.94000.9400Peak Hour Factor 137201217816331131266571729533Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000000000000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor

0.00Proportion of CAVs [%]

2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 137201217816331131266571729533Base Volume Input [veh/h] Chess DriveVintage Park DriveFoster City BoulevardFoster City BoulevardName Volumes
22/6/2025Kimley-Horn
Scenario 1: 1 Cumulative PMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

692

0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft]

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoPedestrian Recall
NoNoNoNoNoNoMaximum Recall
NoNoNoNoNoNoMinimum Recall

0.01.20.00.01.20.00.02.61.60.02.91.6l2, Clearance Lost Time [s]

0.02.00.00.02.00.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk

0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0180018001800120Pedestrian Clearance [s]
050050050050Walk [s]

0.03.00.00.03.00.00.03.03.00.03.03.0Vehicle Extension [s] 02200240068230547Split [s]

0.01.00.00.01.00.00.01.01.00.01.01.0All red [s]

0.02.20.00.02.20.00.03.62.60.03.92.6Amber [s]
01900200064190494Maximum Green [s]
040040084084Minimum Green [s]
--------Lead--LeadLead / Lag
Auxiliary Signal Groups
040030025061Signal Group
SplitSplitSplitSplitSplitSplitPermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing

0.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference

0.0Offset [s]
Fully actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
120Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
32/6/2025Kimley-Horn
Scenario 1: 1 Cumulative PMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

693

124.807.88135.499.8020.48342.06344.3254.8059.1259.7532.4995th-Percentile Queue Length [ft/ln]

4.990.325.420.390.8213.6813.772.192.362.391.3095th-Percentile Queue Length [veh/ln]

69.334.3875.275.4511.38220.34222.1130.4532.8533.1918.0550th-Percentile Queue Length [ft/ln]

2.770.183.010.220.468.818.881.221.311.330.7250th-Percentile Queue Length [veh/ln] YesNoYesNoNoYesNoNoNoNoYesCritical Lane Group
CCCCCBBDBBDLane Group LOS

33.5224.6531.9623.5523.9318.3818.0445.1211.1511.1445.28d, Delay for Lane Group [s/veh]

0.790.060.790.060.130.860.860.770.200.200.68X, volume / capacity Lane Group Results

1.001.001.001.001.001.001.001.001.001.001.00PF, progression factor

1.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio

0.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]

6.340.105.580.090.212.832.5914.590.120.1214.24d2, Incremental Delay [s]

1.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.110.110.110.110.110.110.110.110.110.110.11k, delay calibration

27.1824.5626.3823.4623.7115.5515.4630.5311.0311.0231.04d1, Uniform Delay [s] 2122332412832708408647981282752c, Capacity [veh/h]
16201781158918701781181718701781183518701781s, saturation flow rate [veh/h]

0.100.010.120.010.020.400.400.030.090.090.02(v / s)_i Volume / Saturation Flow Rate

0.130.130.150.150.150.460.460.040.440.440.03g / C, Green / Cycle 881010103030328282g_i, Effective Green Time [s]

1.201.201.201.201.202.602.601.602.902.901.60l2, Clearance Lost Time [s]

0.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]

3.203.203.203.203.204.604.603.604.904.903.60L, Total Lost Time per Cycle [s] 6464646464646464646464C, Cycle Length [s]
CLRCLCCLCCLLane Group
Lane Group Calculations
42/6/2025Kimley-Horn
Scenario 1: 1 Cumulative PMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

694

Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh] 45.28 11.15 11.15 45.12 18.19 18.38 23.93 23.55 31.96 24.65 33.52 33.52 Movement LOS D B B D B B C C C C C C
d_A, Approach Delay [s/veh] 14.40 19.28 30.20 32.88
Approach LOS B B C C
d_I, Intersection Delay [s/veh] 20.70
Intersection LOS C
Intersection V/C 0.641
Other Modes
g_Walk,mi, Effective Walk Time [s] 9.0 9.0 9.0 9.0
M_corner, Corner Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s] 23.82 23.82 23.82 23.82
I_p,int, Pedestrian LOS Score for Intersectio 2.658 2.679 2.217 1.999 Crosswalk LOS B B B A
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h] 1525 1969 646 584 d_b, Bicycle Delay [s] 1.82 0.01 14.76 16.14
I_b,int, Bicycle LOS Score for Intersection 1.862 2.820 1.957 1.857 Bicycle LOS A C A A
----------------Ring 4
----------------Ring 3
--------------65Ring 2
------------4321Ring 1
Sequence
52/6/2025Kimley-Horn
Scenario 1: 1 Cumulative PMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

695

0.787Volume to Capacity (v/c):

DLevel Of Service:

50.5Delay (sec / veh):
15 minutesAnalysis Period:

HCM 7th EditionAnalysis Method:

SignalizedControl Type:

Intersection 2: Vintage Park Drive/Chess Drive
Intersection Level Of Service Report
YesYesYesYesCrosswalk
NoNoNoNoCurb Present

0.000.000.000.00Grade [%]

30.0030.0030.0030.00Speed [mph]

0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket
100.00100.00215.00100.00100.00145.00100.00100.00280.00100.00100.00225.00Entry Pocket Length [ft] 001001001101No. of Lanes in Entry Pocket

12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Chess DriveChess DriveVintage Park DriveVintage Park DriveName Intersection Setup
62/6/2025Kimley-Horn
Scenario 1: 1 Cumulative PMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

696

0000Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
3428712735334129371881457559155234Total Analysis Volume [veh/h] 8723288857932201141403958Total 15-Minute Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor

0.83000.83000.83000.83000.83000.83000.83000.83000.83000.83000.83000.8300Peak Hour Factor 2823810529328324308731379464129194Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000000000000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor

0.00Proportion of CAVs [%]

2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 2823810529328324308731379464129194Base Volume Input [veh/h] Chess DriveChess DriveVintage Park DriveVintage Park DriveName Volumes
72/6/2025Kimley-Horn
Scenario 1: 1 Cumulative PMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

697

0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.040.040.00.040.040.00.040.040.040.040.040.0Detector Length [ft]

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoNoPedestrian Recall
NoNoNoNoNoNoNoNoMaximum Recall
NoNoNoNoNoNoNoNoMinimum Recall

0.02.21.60.02.21.60.02.22.11.61.71.6l2, Clearance Lost Time [s]

0.02.02.00.02.02.00.02.02.02.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk

0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0200018002000210Pedestrian Clearance [s]
050050050050Walk [s]

0.03.03.00.03.03.00.03.03.03.03.03.0Vehicle Extension [s] 028120301404940122819Split [s]

0.01.01.00.01.01.00.01.01.01.01.01.0All red [s]

0.03.22.60.03.22.60.03.23.12.62.72.6Amber [s]
0249026100453692415Maximum Green [s]
044044044444Minimum Green [s]
--Lag--Lead--Lead--LeadLead / Lag
Auxiliary Signal Groups
047083025761Signal Group
PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing

0.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference

0.0Offset [s]
Fully actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
110Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
82/6/2025Kimley-Horn
Scenario 1: 1 Cumulative PMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

698

151.46155.01221.23427.33363.5146.73639.79610.56510.65291.3291.3154.6342.495th-Percentile Queue Length [ft/ln]

6.066.208.8517.0914.541.8725.5924.4220.4311.6511.656.1813.7095th-Percentile Queue Length [veh/ln]

84.1586.12128.34288.14237.2125.96463.29438.79355.94181.0181.085.90220.650th-Percentile Queue Length [ft/ln]

3.373.445.1311.539.491.0418.5317.5514.247.247.243.448.8250th-Percentile Queue Length [veh/ln] NoNoYesYesNoNoYesNoNoNoNoNoYesCritical Lane Group
CCFEDEDDEDDCFLane Group LOS

30.1530.0694.6261.5646.4275.2550.7242.0556.4141.5841.5834.0983.26d, Delay for Lane Group [s/veh]

0.290.280.930.870.720.730.930.880.930.700.700.330.94X, volume / capacity Lane Group Results

1.001.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor

1.001.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio

0.000.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]

1.291.2244.1222.239.0021.8318.3910.7017.754.104.100.4136.44d2, Incremental Delay [s]

1.001.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.500.500.300.500.500.110.380.340.300.200.200.110.38k, delay calibration

28.8628.8350.5039.3337.4253.4232.3331.3538.6537.4837.4833.6846.83d1, Uniform Delay [s] 55557613640447540655725494398398468249c, Capacity [veh/h] 1802187017811589187017811689187017811589158918701781s, saturation flow rate [veh/h]

0.090.090.070.220.180.020.360.340.260.180.180.080.13(v / s)_i Volume / Saturation Flow Rate

0.310.310.080.250.250.020.390.390.280.250.250.250.14g / C, Green / Cycle 343482828243433028282815g_i, Effective Green Time [s]

2.202.201.602.202.201.602.202.202.101.701.701.701.60l2, Clearance Lost Time [s]

0.000.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]

4.204.203.604.204.203.604.204.204.103.703.703.703.60L, Total Lost Time per Cycle [s] 110110110110110110110110110110110110110C, Cycle Length [s] CCLCCLCCLRCCLLane Group
Lane Group Calculations
92/6/2025Kimley-Horn
Scenario 1: 1 Cumulative PMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

699

Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh] 83.26 34.09 41.58 56.41 44.42 50.72 75.25 46.42 61.56 94.62 30.10 30.15 Movement LOS F C D E D D E D E F C C
d_A, Approach Delay [s/veh] 50.65 48.99 54.97 48.39
Approach LOS D D D D
d_I, Intersection Delay [s/veh] 50.46
Intersection LOS D
Intersection V/C 0.787
Other Modes
g_Walk,mi, Effective Walk Time [s] 9.0 9.0 9.0 9.0
M_corner, Corner Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s] 46.36 46.36 46.36 46.36
I_p,int, Pedestrian LOS Score for Intersectio 2.839 2.687 2.626 2.663 Crosswalk LOS C B B B
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h] 442 815 469 433 d_b, Bicycle Delay [s] 33.38 19.32 32.22 33.77
I_b,int, Bicycle LOS Score for Intersection 2.342 2.970 2.156 1.929 Bicycle LOS B C B A
----------------Ring 4
----------------Ring 3
------------8765Ring 2
------------4321Ring 1
Sequence
102/6/2025Kimley-Horn
Scenario 1: 1 Cumulative PMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

700

0.669Volume to Capacity (v/c):

ELevel Of Service:

71.5Delay (sec / veh):
15 minutesAnalysis Period:

HCM 7th EditionAnalysis Method:

SignalizedControl Type:

Intersection 3: SR-92 WB Ramps/Chess Drive
Intersection Level Of Service Report
NoYesNoYesCrosswalk
NoNoNoNoCurb Present

0.000.000.000.00Grade [%]

30.0030.0030.0030.00Speed [mph]

0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket
500.00100.00480.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 101000000000No. of Lanes in Entry Pocket

12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Route 92 West RampOffice driveway Chess Dr Chess DrName Intersection Setup
112/6/2025Kimley-Horn
Scenario 1: 1 Cumulative PMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

701

0100Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
248411124735424713056142960Total Analysis Volume [veh/h] 621281129162326153740Total 15-Minute Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor

0.93000.93000.93000.93000.93000.93000.93000.93000.93000.93000.93000.9300Peak Hour Factor 231410324433423012145712750Total Hourly Volume [veh/h]
00010010030700Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000000000000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor

0.00Proportion of CAVs [%]

1.301.301.301.301.301.301.301.301.301.301.301.30Heavy Vehicles Percentage [%]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 231410334433523012148782750Base Volume Input [veh/h]
Route 92 West RampOffice driveway Chess Dr Chess DrName Volumes
122/6/2025Kimley-Horn
Scenario 1: 1 Cumulative PMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

702

0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft]

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoPedestrian Recall
NoNoNoNoNoMaximum Recall
NoNoNoNoNoMinimum Recall

0.03.50.00.01.70.00.02.50.02.12.10.0l2, Clearance Lost Time [s]

0.02.00.00.02.00.00.02.00.02.02.00.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk

0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 000017001201000Pedestrian Clearance [s]
000050050500Walk [s]

0.03.00.00.03.00.00.03.00.03.03.00.0Vehicle Extension [s] 01500110090050500Split [s]

0.01.00.00.01.00.00.01.00.01.01.00.0All red [s]

0.04.50.00.02.70.00.03.50.03.13.10.0Amber [s]
0100070085046460Maximum Green [s]
0500400100560Minimum Green [s]
------------Lead / Lag
Auxiliary Signal Groups
020040080610Signal Group
UnsignaPermissPermissPermissPermissPermissPermissPermissPermissProtectePermissPermissControl Type Phasing & Timing

12.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference

51.0Offset [s]
Fully actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
120Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
132/6/2025Kimley-Horn
Scenario 1: 1 Cumulative PMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

703

142.84142.75203.35363.301250.951250.95342.16362.4795th-Percentile Queue Length [ft/ln]

5.715.718.1314.5350.0450.0413.6914.5095th-Percentile Queue Length [veh/ln]

79.3679.31115.30237.05968.29968.29220.42236.3950th-Percentile Queue Length [ft/ln]

3.173.174.619.4838.7338.738.829.4650th-Percentile Queue Length [veh/ln] NoNoYesNoNoYesYesNoCritical Lane Group
FFFDFFCCLane Group LOS
105.57105.71104.8348.04105.99105.9927.6734.85d, Delay for Lane Group [s/veh]

0.760.760.820.381.031.030.410.35X, volume / capacity
Lane Group Results

1.001.001.001.001.001.001.001.00PF, progression factor

1.001.001.001.001.001.001.001.00Rp, platoon ratio

0.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]

14.4214.5514.951.6443.8243.820.181.10d2, Incremental Delay [s]

1.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.110.110.110.500.500.500.110.50k, delay calibration

91.1591.1689.8846.4062.1662.1627.4933.75d1, Uniform Delay [s] 76751026636336331491858c, Capacity [veh/h]
17971791183518751791179128291880s, saturation flow rate [veh/h]

0.030.030.050.130.360.360.220.16(v / s)_i Volume / Saturation Flow Rate

0.040.040.060.350.350.350.530.46g / C, Green / Cycle
881168686810188g_i, Effective Green Time [s]

3.503.501.702.502.502.502.102.10l2, Clearance Lost Time [s]

0.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]

5.505.503.704.504.504.504.104.10L, Total Lost Time per Cycle [s] 192192192192192192192192C, Cycle Length [s]
CLCCCLRCLane Group
Lane Group Calculations
142/6/2025Kimley-Horn
Scenario 1: 1 Cumulative PMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

704

Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh] 34.85 34.85 27.67 105.99 48.04 48.04 104.83 104.83 104.83 105.64 105.57 0.00 Movement LOS C C C F D D F F F F F
d_A, Approach Delay [s/veh] 30.01 96.64 104.83 35.11
Approach LOS C F F D
d_I, Intersection Delay [s/veh] 71.49
Intersection LOS E
Intersection V/C 0.669
Other Modes
g_Walk,mi, Effective Walk Time [s] 9.0 0.0 9.0 0.0
M_corner, Corner Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s] 87.40 0.00 87.40 0.00
I_p,int, Pedestrian LOS Score for Intersectio 3.081 0.000 1.799 0.000 Crosswalk LOS C F A F
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h] 477 889 76 99 d_b, Bicycle Delay [s] 55.77 29.69 89.07 86.93
I_b,int, Bicycle LOS Score for Intersection 3.568 2.844 1.700 1.749 Bicycle LOS D C A A
----------------Ring 4
----------------Ring 3
------------846-Ring 2
--------------21Ring 1
Sequence
152/6/2025Kimley-Horn
Scenario 1: 1 Cumulative PMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

705

0.567Volume to Capacity (v/c):

FLevel Of Service:
107.9Delay (sec / veh):
15 minutesAnalysis Period:

HCM 7th EditionAnalysis Method:

SignalizedControl Type:

Intersection 4: Foster City Boulevard/Chess Drive
Intersection Level Of Service Report
NoYesYesYesCrosswalk
NoNoNoNoCurb Present

0.000.000.000.00Grade [%]

30.0035.0025.0030.00Speed [mph]

0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket
100.00100.00510.00180.00100.0080.00100.00100.00100.00100.00100.0095.00Entry Pocket Length [ft] 001101001101No. of Lanes in Entry Pocket

12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Foster City BoulevardFoster City BoulevardChess DriveChess DriveName Intersection Setup
162/6/2025Kimley-Horn
Scenario 1: 1 Cumulative PMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

706

0000Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
702557521841184144234624703744Total Analysis Volume [veh/h] 18641884629641187620911Total 15-Minute Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 702557521841184144234624703744Total Hourly Volume [veh/h] 18009900110048700Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000000000000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor

0.00Proportion of CAVs [%]

2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 88255752283118414533462474873744Base Volume Input [veh/h] Foster City BoulevardFoster City BoulevardChess DriveChess DriveName Volumes
172/6/2025Kimley-Horn
Scenario 1: 1 Cumulative PMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

707

0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.040.040.040.040.040.00.00.00.00.00.00.0Detector Length [ft]

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoPedestrian Recall
YesNoNoNoNoNoMaximum Recall
NoNoNoNoNoNoMinimum Recall

0.02.62.52.92.91.60.01.60.00.02.90.0l2, Clearance Lost Time [s]

0.02.02.02.02.02.00.02.00.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk

0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 023001000230000Pedestrian Clearance [s]
050000040000Walk [s]

0.03.03.03.03.03.00.03.00.00.03.00.0Vehicle Extension [s] 0572752471903400520Split [s]

0.01.01.01.01.01.00.01.00.00.01.00.0All red [s]

0.03.63.53.93.92.60.02.60.00.03.90.0Amber [s]
0535547421603000470Maximum Green [s]
064464040040Minimum Green [s]
--Lead--Lead------Lead / Lag
2,3Auxiliary Signal Groups
061325040030Signal Group
PermissPermissPermissOverlapPermissProtecteSplitSplitSplitSplitSplitSplitControl Type Phasing & Timing

0.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference

90.0Offset [s]
Fully actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
120Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
182/6/2025Kimley-Horn
Scenario 1: 1 Cumulative PMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

708

120.00129.05303.16218.821279.4833.89814.24391.480.0071.4970.6495th-Percentile Queue Length [ft/ln]

4.805.1612.138.7551.181.3632.5715.660.002.862.8395th-Percentile Queue Length [veh/ln]

66.6771.69190.10126.57876.7618.83567.46259.410.0039.7239.2450th-Percentile Queue Length [ft/ln]

2.672.877.605.0635.070.7522.7010.380.001.591.5750th-Percentile Queue Length [veh/ln] NoNoNoNoYesNoYesNoNoNoYesCritical Lane Group
BBDCFFFEAEELane Group LOS

14.5114.4937.0934.05185.28108.62155.0669.620.0067.3867.48d, Delay for Lane Group [s/veh]

0.150.150.620.301.270.661.130.740.000.220.23X, volume / capacity Lane Group Results

1.001.001.001.001.001.001.001.001.001.001.00PF, progression factor

1.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio

0.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]

0.310.282.360.26125.9129.5489.697.890.000.610.66d2, Incremental Delay [s]

1.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.500.500.500.110.180.110.500.270.110.110.11k, delay calibration

14.2114.2034.7433.7959.3779.0865.3761.730.0066.7866.82d1, Uniform Delay [s] 10381120121762093021342332157183175c, Capacity [veh/h]
17331870222215893560178118351781158918611781s, saturation flow rate [veh/h]

0.090.090.340.120.330.010.210.140.000.020.02(v / s)_i Volume / Saturation Flow Rate

0.600.600.600.390.260.010.190.190.100.100.10g / C, Green / Cycle 969696634223030161616g_i, Effective Green Time [s]

2.602.600.000.002.901.601.601.602.902.902.90l2, Clearance Lost Time [s]

0.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]

4.604.604.604.904.903.603.603.604.904.904.90L, Total Lost Time per Cycle [s] 161161161161161161161161161161161C, Cycle Length [s]
CCLRCLCLRCLLane Group
Lane Group Calculations
192/6/2025Kimley-Horn
Scenario 1: 1 Cumulative PMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

709

Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh] 67.47 67.38 0.00 69.62 155.06 155.06 108.62 185.28 34.05 37.09 14.50 14.51 Movement LOS E E A E F F F F C D B B
d_A, Approach Delay [s/veh] 67.43 121.83 164.37 30.28
Approach LOS E F F C
d_I, Intersection Delay [s/veh] 107.90
Intersection LOS F
Intersection V/C 0.567
Other Modes
g_Walk,mi, Effective Walk Time [s] 4.0 9.0 8.0 0.0
M_corner, Corner Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s] 76.39 71.59 72.54 0.00
I_p,int, Pedestrian LOS Score for Intersectio 3.699 2.472 2.970 0.000 Crosswalk LOS D B C F
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h] 586 378 524 652 d_b, Bicycle Delay [s] 40.14 52.82 43.76 36.49
I_b,int, Bicycle LOS Score for Intersection 2.497 2.626 2.781 2.463 Bicycle LOS B B C B
----------------Ring 4
----------------Ring 3
--------------65Ring 2
------------4321Ring 1
Sequence
202/6/2025Kimley-Horn
Scenario 1: 1 Cumulative PMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

710

0.609Volume to Capacity (v/c):

DLevel Of Service:

35.3Delay (sec / veh):
15 minutesAnalysis Period:

HCM 7th EditionAnalysis Method:

SignalizedControl Type:

Intersection 5: SR-92 EB Ramps/Metro Center Boulevard
Intersection Level Of Service Report
NoYesNoNoCrosswalk
NoNoNoNoCurb Present

0.000.000.000.00Grade [%]

30.0035.0035.0015.00Speed [mph]

0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket
100.00100.0090.00100.00100.00290.00640.00100.00600.00100.00100.00100.00Entry Pocket Length [ft] 001002101000No. of Lanes in Entry Pocket

12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Metro Center BoulevarMetro Center BoulevarSR-92 RampsParking Lot AccessName Intersection Setup
212/6/2025Kimley-Horn
Scenario 1: 1 Cumulative PMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

711

0000Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
7412411419392676358277226113Total Analysis Volume [veh/h] 18560459816992695153Total 15-Minute Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor

0.97000.97000.97000.97000.97000.97000.97000.97000.97000.97000.97000.9700Peak Hour Factor 7192341418380656348269215913Total Hourly Volume [veh/h] 3870050019001200Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000000000000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor

0.00Proportion of CAVs [%]

1.901.901.901.901.901.901.901.901.901.901.901.90Heavy Vehicles Percentage [%]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 11062341423380656538269335913Base Volume Input [veh/h]
Metro Center BoulevarMetro Center BoulevarSR-92 RampsParking Lot AccessName Volumes
222/6/2025Kimley-Horn
Scenario 1: 1 Cumulative PMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

712

0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.040.040.00.040.040.040.040.00.00.040.00.0Detector Length [ft]

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoPedestrian Recall
NoNoNoNoYesNoMaximum Recall
NoNoNoNoNoNoMinimum Recall

0.02.51.60.02.51.61.63.00.00.02.20.0l2, Clearance Lost Time [s]

0.02.02.00.02.02.02.02.00.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk

0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 000017101000000Pedestrian Clearance [s]
000065500000Walk [s]

0.03.03.00.03.03.03.03.00.00.03.00.0Vehicle Extension [s] 0542007137371800110Split [s]

0.01.01.00.01.01.01.01.00.00.01.00.0All red [s]

0.03.52.60.03.52.62.64.00.00.03.20.0Amber [s]
049170663434130070Maximum Green [s]
0440444100040Minimum Green [s]
--Lead--Lead------Lead / Lag
Auxiliary Signal Groups
061025540030Signal Group
PermissPermissProtectePermissPermissProtectePermissPermissPermissPermissPermissPermissControl Type Phasing & Timing

12.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference

30.0Offset [s]
Fully actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
120Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
232/6/2025Kimley-Horn
Scenario 1: 1 Cumulative PMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

713

304.9304.9192.325.2283.0184.28377.6122.56224.05223.7431.12116.3295th-Percentile Queue Length [ft/ln]

12.2012.207.691.013.323.3715.100.908.968.951.244.6595th-Percentile Queue Length [veh/ln] 191.5191.5107.314.0146.1246.82248.3812.53130.41130.1817.2964.6250th-Percentile Queue Length [ft/ln]

7.667.664.300.561.841.879.940.505.225.210.692.5850th-Percentile Queue Length [veh/ln] NoYesNoNoNoNoYesNoNoYesNoYesCritical Lane Group
CCCEAADDEEEELane Group LOS

24.4924.4920.2679.437.297.2948.3948.7471.5871.6456.0567.66d, Delay for Lane Group [s/veh]

0.500.500.280.580.160.160.880.110.720.720.260.74X, volume / capacity Lane Group Results

1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor

1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio

0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]

2.372.370.7820.570.280.283.360.7220.0420.111.5711.70d2, Incremental Delay [s]

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.500.500.500.110.500.500.110.500.500.500.110.12k, delay calibration

22.1222.1219.4858.867.017.0145.0348.0151.5351.5354.4855.96d1, Uniform Delay [s] 745745876241248126877231319819885100c, Capacity [veh/h] 159115911871178218411871346128161787178215911855s, saturation flow rate [veh/h]

0.230.230.130.010.110.110.200.010.080.080.010.04(v / s)_i Volume / Saturation Flow Rate

0.470.470.470.010.680.680.220.110.110.110.050.05g / C, Green / Cycle 565656281812713131366g_i, Effective Green Time [s]

2.502.502.501.602.502.501.603.003.003.002.202.20l2, Clearance Lost Time [s]

0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]

4.504.504.503.604.504.503.605.005.005.004.204.20L, Total Lost Time per Cycle [s] 120120120120120120120120120120120120C, Cycle Length [s] RCCLCCLRCLRCLane Group
Lane Group Calculations
242/6/2025Kimley-Horn
Scenario 1: 1 Cumulative PMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

714

Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh] 67.66 67.66 56.05 71.61 71.58 48.74 48.39 7.29 7.29 79.43 20.26 24.49 Movement LOS E E E E E D D A A E C C
d_A, Approach Delay [s/veh] 65.00 69.11 32.85 24.24
Approach LOS E E C C
d_I, Intersection Delay [s/veh] 35.30
Intersection LOS D
Intersection V/C 0.609
Other Modes
g_Walk,mi, Effective Walk Time [s] 0.0 0.0 13.0 0.0
M_corner, Corner Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s] 0.00 0.00 47.70 0.00
I_p,int, Pedestrian LOS Score for Intersectio 0.000 0.000 2.738 0.000 Crosswalk LOS F F B F
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h] 113 217 1108 825 d_b, Bicycle Delay [s] 53.39 47.70 11.93 20.71
I_b,int, Bicycle LOS Score for Intersection 1.738 2.119 2.461 2.701 Bicycle LOS A B B B
----------------Ring 4
----------------Ring 3
--------------65Ring 2
------------4321Ring 1
Sequence
252/6/2025Kimley-Horn
Scenario 1: 1 Cumulative PMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

715

0.503Volume to Capacity (v/c):

DLevel Of Service:

48.5Delay (sec / veh):
15 minutesAnalysis Period:

HCM 7th EditionAnalysis Method:

SignalizedControl Type:

Intersection 6: Foster City Boulevard/Metro Center Boulevard Intersection Level Of Service Report
YesNoYesNoCrosswalk
NoNoNoNoCurb Present

0.000.000.000.00Grade [%]

35.0035.0025.0035.00Speed [mph]

0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket
100.00100.00100.00100.00100.00210.00170.00100.0050.00240.00100.00150.00Entry Pocket Length [ft] 101101101101No. of Lanes in Entry Pocket

12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Foster City BoulevardFoster City BoulevardMetro Center BoulevardMetro Center BoulevardName Intersection Setup
262/6/2025Kimley-Horn
Scenario 1: 1 Cumulative PMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

716

0000Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
7661521543988818619318265109308193Total Analysis Volume [veh/h] 191545411022247484616277748Total 15-Minute Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 7661521543988818619318265109308193Total Hourly Volume [veh/h] 1900439001040011000Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000000000000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor

0.00Proportion of CAVs [%]

2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 9561521587888818629718265219308193Base Volume Input [veh/h] Foster City BoulevardFoster City BoulevardMetro Center BoulevardMetro Center BoulevardName Volumes
272/6/2025Kimley-Horn
Scenario 1: 1 Cumulative PMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

717

0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.040.040.00.00.00.00.00.00.040.040.00.0Detector Length [ft]

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoPedestrian Recall
YesNoYesNoNoNoNoMaximum Recall
NoNoNoNoNoNoNoMinimum Recall

0.02.61.60.02.61.60.02.20.01.61.70.0l2, Clearance Lost Time [s]

0.02.02.00.02.02.00.02.00.02.02.00.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk

0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0190020001000270Pedestrian Clearance [s]
050050050050Walk [s]

0.03.03.00.03.03.00.03.00.03.03.00.0Vehicle Extension [s] 0412904231033029160Split [s]

0.01.01.00.01.01.00.01.00.01.01.00.0All red [s]

0.03.62.60.03.62.60.03.20.02.62.70.0Amber [s]
0362503728029025120Maximum Green [s]
064064060460Minimum Green [s]
--Lead--Lead------Lead / Lag
1,4Auxiliary Signal Groups
061025030140Signal Group
PermissPermissProtectePermissPermissProtecteSplitSplitSplitOverlapSplitSplitControl Type Phasing & Timing

0.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference

43.0Offset [s]
Semi-actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
120Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
282/6/2025Kimley-Horn
Scenario 1: 1 Cumulative PMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

718

255.74250.15326.77255.73327.61281.64323.02279.3997.5546.57224.80140.5995th-Percentile Queue Length [ft/ln]

10.2310.0113.0710.2313.1011.2712.9211.183.901.868.995.6295th-Percentile Queue Length [veh/ln] 153.98149.79208.40153.98209.05173.60205.48171.8854.1925.87130.9678.1050th-Percentile Queue Length [ft/ln]

6.165.998.346.168.366.948.226.882.171.035.243.1250th-Percentile Queue Length [veh/ln] NoNoYesNoYesNoYesNoNoNoYesNoCritical Lane Group
DDEDDEFEDCEDLane Group LOS

36.4235.4273.6439.5039.7569.9682.1066.3253.6822.2958.1954.12d, Delay for Lane Group [s/veh]

0.390.380.880.490.550.870.820.650.250.090.570.37X, volume / capacity Lane Group Results

1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor

1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio

0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]

1.880.9315.741.901.3210.6625.6311.352.190.034.291.97d2, Incremental Delay [s]

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.500.500.200.500.500.110.500.500.500.110.500.50k, delay calibration

34.5434.5057.8937.6038.4359.3056.4754.9651.4922.2653.9152.15d1, Uniform Delay [s] 597120324689916272132372792651241542526c, Capacity [veh/h] 176735601781281350941781158918701781281335603459s, saturation flow rate [veh/h]

0.130.130.120.160.170.100.120.100.040.040.090.06(v / s)_i Volume / Saturation Flow Rate

0.340.340.140.320.320.120.150.150.150.440.150.15g / C, Green / Cycle 464619444416202020602121g_i, Effective Green Time [s]

2.602.601.602.602.601.602.202.202.200.001.701.70l2, Clearance Lost Time [s]

0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]

4.604.603.604.604.603.604.204.204.203.603.703.70L, Total Lost Time per Cycle [s] 137137137137137137137137137137137137C, Cycle Length [s] CCLRCLRCLRCLLane Group
Lane Group Calculations
292/6/2025Kimley-Horn
Scenario 1: 1 Cumulative PMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

719

Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh] 54.12 58.19 22.29 53.68 66.32 82.10 69.96 39.75 39.50 73.64 35.67 36.42 Movement LOS D E C D E F E D D E D D
d_A, Approach Delay [s/veh] 50.49 71.37 43.39 44.75
Approach LOS D E D D
d_I, Intersection Delay [s/veh] 48.54
Intersection LOS D
Intersection V/C 0.503
Other Modes
g_Walk,mi, Effective Walk Time [s] 0.0 9.0 0.0 9.0
M_corner, Corner Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s] 0.00 59.80 0.00 59.80
I_p,int, Pedestrian LOS Score for Intersectio 0.000 2.653 0.000 2.983 Crosswalk LOS F B F C
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h] 180 420 546 531 d_b, Bicycle Delay [s] 56.75 42.73 36.20 36.94
I_b,int, Bicycle LOS Score for Intersection 2.154 2.457 2.633 2.068 Bicycle LOS B B B B
----------------Ring 4
----------------Ring 3
--------------65Ring 2
------------4321Ring 1
Sequence
302/6/2025Kimley-Horn
Scenario 1: 1 Cumulative PMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

720

0.000Volume to Capacity (v/c):

ALevel Of Service:

0.0Delay (sec / veh):
15 minutesAnalysis Period:

HCM 7th EditionAnalysis Method:

SignalizedControl Type:

Intersection 7: Shell Boulevard/Metro Center Boulevard
Intersection Level Of Service Report
YesYesYesYesCrosswalk
NoNoNoNoCurb Present

0.000.000.000.00Grade [%]

35.0035.0015.0030.00Speed [mph]

0.000.000.000.000.000.00100.000.000.000.000.000.00Exit Pocket Length [ft] 000000100000No. of Lanes in Exit Pocket
210.00100.00210.00100.00100.0090.00100.00100.0090.00100.00100.00170.00Entry Pocket Length [ft] 102001001001No. of Lanes in Entry Pocket

12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
312/6/2025Kimley-Horn
Scenario 1: 1 Cumulative PMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

721

0000Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
000000000000Total Analysis Volume [veh/h]
000000000000Total 15-Minute Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor

0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 000000000000Total Hourly Volume [veh/h]
000000000000Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000000000000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor

0.00Proportion of CAVs [%]

2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 000000000000Base Volume Input [veh/h]
Name
Volumes
322/6/2025Kimley-Horn
Scenario 1: 1 Cumulative PMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

722

0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.040.040.00.040.040.00.040.040.00.040.040.0Detector Length [ft]

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoNoPedestrian Recall
NoNoNoNoNoNoNoNoMaximum Recall
NoNoNoNoNoNoNoNoMinimum Recall

0.02.52.50.02.51.50.02.51.50.02.51.5l2, Clearance Lost Time [s]

0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk

0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0160023001800140Pedestrian Clearance [s]
050050050050Walk [s]

0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 035605324016803730Split [s]

0.01.00.50.01.00.50.01.00.50.01.00.5All red [s]

0.03.54.00.03.53.00.03.53.00.03.53.0Amber [s]
031204921012503327Maximum Green [s]
066064064064Minimum Green [s]
--Lead--Lead--Lead--LeadLead / Lag
Auxiliary Signal Groups
047083025061Signal Group
PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing

0.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference

0.0Offset [s]
Fully actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
120Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
332/6/2025Kimley-Horn
Scenario 1: 1 Cumulative PMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

723

0.000.000.000.000.000.000.000.000.000.000.0095th-Percentile Queue Length [ft/ln]

0.000.000.000.000.000.000.000.000.000.000.0095th-Percentile Queue Length [veh/ln]

0.000.000.000.000.000.000.000.000.000.000.0050th-Percentile Queue Length [ft/ln]

0.000.000.000.000.000.000.000.000.000.000.0050th-Percentile Queue Length [veh/ln] NoNoNoNoNoNoNoNoNoNoNoCritical Lane Group
AAAAAAAAAAALane Group LOS

0.000.000.000.000.000.000.000.000.000.000.00d, Delay for Lane Group [s/veh]

0.000.000.000.000.000.000.000.000.000.000.00X, volume / capacity Lane Group Results

1.001.001.001.001.001.001.001.001.001.001.00PF, progression factor

1.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio

0.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]

0.000.000.000.000.000.000.000.000.000.000.00d2, Incremental Delay [s]

1.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.500.500.110.500.500.110.110.110.110.110.11k, delay calibration

0.000.000.000.000.000.000.000.000.000.000.00d1, Uniform Delay [s] 13763082016041604100111c, Capacity [veh/h]
15893560345918701870178118701781158918701781s, saturation flow rate [veh/h]

0.000.000.000.000.000.000.000.000.000.000.00(v / s)_i Volume / Saturation Flow Rate

0.870.870.000.860.860.000.000.000.000.000.00g / C, Green / Cycle 1041040103103000000g_i, Effective Green Time [s]

2.502.502.502.502.501.502.501.502.502.501.50l2, Clearance Lost Time [s]

0.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]

4.504.504.504.504.503.504.503.504.504.503.50L, Total Lost Time per Cycle [s] 120120120120120120120120120120120C, Cycle Length [s]
RCLCCLCLRCLLane Group
Lane Group Calculations
342/6/2025Kimley-Horn
Scenario 1: 1 Cumulative PMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

724

Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh] 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Movement LOS A A A A A A A A A A A A
d_A, Approach Delay [s/veh] 0.00 0.00 0.00 0.00
Approach LOS A A A A
d_I, Intersection Delay [s/veh] 0.00
Intersection LOS A
Intersection V/C 0.000
Other Modes
g_Walk,mi, Effective Walk Time [s] 9.0 9.0 9.0 9.0
M_corner, Corner Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s] 51.33 51.33 51.33 51.33
I_p,int, Pedestrian LOS Score for Intersectio 2.315 2.146 2.315 2.609 Crosswalk LOS B B B B
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h] 542 192 808 508 d_b, Bicycle Delay [s] 31.89 49.04 21.29 33.37
I_b,int, Bicycle LOS Score for Intersection 1.560 1.560 1.560 1.560 Bicycle LOS A A A A
----------------Ring 4
----------------Ring 3
------------8765Ring 2
------------4321Ring 1
Sequence
352/6/2025Kimley-Horn
Scenario 1: 1 Cumulative PMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

725

0.000Volume to Capacity (v/c):

ALevel Of Service:

0.0Delay (sec / veh):
15 minutesAnalysis Period:

HCM 7th EditionAnalysis Method:

SignalizedControl Type:

Intersection 8: Vintage Park Drive/Metro Center Boulevard Intersection Level Of Service Report
YesYesYesYesCrosswalk
NoNoNoNoCurb Present

0.000.000.000.00Grade [%]

35.0035.0030.0030.00Speed [mph]

0.000.000.000.000.000.000.000.000.00220.000.000.00Exit Pocket Length [ft] 000000000100No. of Lanes in Exit Pocket
140.00100.00260.00100.00100.00150.00100.00100.00270.00100.00100.00200.00Entry Pocket Length [ft] 101001001001No. of Lanes in Entry Pocket

12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
362/6/2025Kimley-Horn
Scenario 1: 1 Cumulative PMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

726

0000Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
000000000000Total Analysis Volume [veh/h]
000000000000Total 15-Minute Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor

0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 000000000000Total Hourly Volume [veh/h]
000000000000Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000000000000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor

0.00Proportion of CAVs [%]

2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 000000000000Base Volume Input [veh/h]
Name
Volumes
372/6/2025Kimley-Horn
Scenario 1: 1 Cumulative PMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

727

0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.040.040.00.040.040.040.040.040.00.040.040.0Detector Length [ft]

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoNoNoPedestrian Recall
NoNoNoNoNoNoNoNoNoMaximum Recall
NoNoNoNoNoNoNoNoNoMinimum Recall

0.02.51.50.02.51.51.51.71.50.02.21.5l2, Clearance Lost Time [s]

0.02.02.00.02.02.02.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk

0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0160019001700170Pedestrian Clearance [s]
050050050050Walk [s]

0.03.03.00.03.03.03.03.03.00.03.03.0Vehicle Extension [s] 028100351818463802013Split [s]

0.01.00.50.01.00.50.51.00.50.01.00.5All red [s]

0.03.53.00.03.53.03.02.73.00.03.23.0Amber [s]
02470311515423501610Maximum Green [s]
065065564064Minimum Green [s]
--Lead--Lag--Lead--LeadLead / Lag
Auxiliary Signal Groups
047083325061Signal Group
PermissPermissProtectePermissPermissProtecteProtectePermissProtectePermissPermissProtecteControl Type Phasing & Timing

0.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference

0.0Offset [s]
Fully actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
120Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
382/6/2025Kimley-Horn
Scenario 1: 1 Cumulative PMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

728

0.000.000.000.000.000.000.000.000.000.000.000.0095th-Percentile Queue Length [ft/ln]

0.000.000.000.000.000.000.000.000.000.000.000.0095th-Percentile Queue Length [veh/ln]

0.000.000.000.000.000.000.000.000.000.000.000.0050th-Percentile Queue Length [ft/ln]

0.000.000.000.000.000.000.000.000.000.000.000.0050th-Percentile Queue Length [veh/ln] NoNoNoNoNoNoNoNoNoNoNoNoCritical Lane Group
AAAAAAAAAAAALane Group LOS

0.000.000.000.000.000.000.000.000.000.000.000.00d, Delay for Lane Group [s/veh]

0.000.000.000.000.000.000.000.000.000.000.000.00X, volume / capacity Lane Group Results

1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor

1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio

0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]

0.000.000.000.000.000.000.000.000.000.000.000.00d2, Incremental Delay [s]

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.500.500.110.500.500.110.110.110.110.110.110.11k, delay calibration

0.000.000.000.000.000.000.000.000.000.000.000.00d1, Uniform Delay [s] 138030910162416240091110c, Capacity [veh/h]
158935601781187018701781158918701781187018701781s, saturation flow rate [veh/h]

0.000.000.000.000.000.000.000.000.000.000.000.00(v / s)_i Volume / Saturation Flow Rate

0.870.870.000.870.870.000.000.000.000.000.000.00g / C, Green / Cycle 10410401041040010000g_i, Effective Green Time [s]

2.502.501.502.502.501.501.501.701.502.202.201.50l2, Clearance Lost Time [s]

0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]

4.504.503.504.504.503.503.503.703.504.204.203.50L, Total Lost Time per Cycle [s] 120120120120120120120120120120120120C, Cycle Length [s] RCLCCLRCLCCLLane Group
Lane Group Calculations
392/6/2025Kimley-Horn
Scenario 1: 1 Cumulative PMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

729

Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh] 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Movement LOS A A A A A A A A A A A A
d_A, Approach Delay [s/veh] 0.00 0.00 0.00 0.00
Approach LOS A A A A
d_I, Intersection Delay [s/veh] 0.00
Intersection LOS A
Intersection V/C 0.000
Other Modes
g_Walk,mi, Effective Walk Time [s] 9.0 9.0 9.0 9.0
M_corner, Corner Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s] 51.33 51.33 51.33 51.33
I_p,int, Pedestrian LOS Score for Intersectio 2.315 2.315 2.315 2.468 Crosswalk LOS B B B B
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h] 263 705 508 392 d_b, Bicycle Delay [s] 45.23 25.15 33.37 38.79
I_b,int, Bicycle LOS Score for Intersection 1.560 1.560 1.560 1.560 Bicycle LOS A A A A
----------------Ring 4
----------------Ring 3
------------8765Ring 2
------------4321Ring 1
Sequence
402/6/2025Kimley-Horn
Scenario 1: 1 Cumulative PMGilead Chess Hatch
Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

730

D
kimley-horn.com 4637 Chabot Drive, Suite 300, Pleasanton, CA 94588 925 398 4840 Appendix D – Cumulative plus Full Project Buildout Conditions LOS Worksheets

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

731

0.625Volume to Capacity (v/c):

CLevel Of Service:

20.0Delay (sec / veh):
15 minutesAnalysis Period:

HCM 7th EditionAnalysis Method:

SignalizedControl Type:

Intersection 1: Foster City Boulevard/Vintage Park Drive-Chess Drive Intersection Level Of Service Report
YesYesYesYesCrosswalk
NoNoNoNoCurb Present

0.000.000.000.00Grade [%]

25.0030.0030.0030.00Speed [mph]

0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket
100.00100.00120.00160.00100.00110.00100.00100.00155.00100.00100.00215.00Entry Pocket Length [ft] 001101001001No. of Lanes in Entry Pocket

12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Chess DriveVintage Park DriveFoster City BoulevardFoster City BoulevardName Intersection Setup
12/6/2025Kimley-Horn
Scenario 9: 9 Cumulative AM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

732

0000Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
3211329913330447189181539431Total Analysis Volume [veh/h] 83172337112475385108Total 15-Minute Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor

0.87000.87000.87000.87000.87000.87000.87000.87000.87000.87000.87000.8700Peak Hour Factor 2810325811626389164161339375Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
100000033010Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor

0.00Proportion of CAVs [%]

2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 2710325811626386161161338375Base Volume Input [veh/h]
Chess DriveVintage Park DriveFoster City BoulevardFoster City BoulevardName Volumes
22/6/2025Kimley-Horn
Scenario 9: 9 Cumulative AM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

733

0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft]

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoPedestrian Recall
NoNoNoNoNoNoMaximum Recall
NoNoNoNoNoNoMinimum Recall

0.01.20.00.01.20.01.22.61.60.02.91.6l2, Clearance Lost Time [s]

0.02.00.00.02.00.02.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk

0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 01800180181800120Pedestrian Clearance [s]
050050550050Walk [s]

0.03.00.00.03.00.03.03.03.00.03.03.0Vehicle Extension [s] 080018018372207660Split [s]

0.01.00.00.01.00.01.01.01.00.01.01.0All red [s]

0.02.20.00.02.20.02.23.62.60.03.92.6Amber [s]
050014014321807156Maximum Green [s]
040040484084Minimum Green [s]
--------Lead--LeadLead / Lag
Auxiliary Signal Groups
040030325061Signal Group
SplitSplitSplitSplitSplitSplitPermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing

0.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference

0.0Offset [s]
Fully actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
120Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
32/6/2025Kimley-Horn
Scenario 9: 9 Cumulative AM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

734

39.202.1117.605.3192.83104.71106.72130.20334.59333.30249.6795th-Percentile Queue Length [ft/ln]

1.570.080.700.213.714.194.275.2113.3813.339.9995th-Percentile Queue Length [veh/ln]

21.781.179.782.9551.5758.1759.2972.33214.50213.49149.4350th-Percentile Queue Length [ft/ln]

0.870.050.390.122.062.332.372.898.588.545.9850th-Percentile Queue Length [veh/ln] YesNoNoNoYesNoNoYesYesNoNoCritical Lane Group
DCCCCBBCBBCLane Group LOS

45.4029.0525.7925.0432.1615.6315.6231.4316.6516.5325.52d, Delay for Lane Group [s/veh]

0.730.050.180.050.720.380.370.790.860.860.86X, volume / capacity Lane Group Results

1.001.001.001.001.001.001.001.001.001.001.00PF, progression factor

1.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio

0.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]

15.950.310.510.105.340.370.365.612.592.514.49d2, Incremental Delay [s]

1.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.110.110.110.110.110.110.110.110.110.110.11k, delay calibration

29.4628.7425.2824.9426.8215.2615.2525.8214.0714.0321.03d1, Uniform Delay [s] 5963164193184629643240903907501c, Capacity [veh/h]
16531781158918701781182918701781186218701781s, saturation flow rate [veh/h]

0.030.000.020.000.070.130.130.110.420.420.24(v / s)_i Volume / Saturation Flow Rate

0.040.040.100.100.100.340.340.130.480.480.28g / C, Green / Cycle 2266621218303017g_i, Effective Green Time [s]

1.201.201.201.201.202.602.601.602.902.901.60l2, Clearance Lost Time [s]

0.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]

3.203.203.203.203.204.604.603.604.904.903.60L, Total Lost Time per Cycle [s] 6262626262626262626262C, Cycle Length [s]
CLRCLCCLCCLLane Group
Lane Group Calculations
42/6/2025Kimley-Horn
Scenario 9: 9 Cumulative AM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

735

Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh] 25.52 16.59 16.65 31.43 15.62 15.63 32.16 25.04 25.79 29.05 45.40 45.40 Movement LOS C B B C B B C C C C D D
d_A, Approach Delay [s/veh] 18.53 20.11 30.71 44.34
Approach LOS B C C D
d_I, Intersection Delay [s/veh] 20.03
Intersection LOS C
Intersection V/C 0.625
Other Modes
g_Walk,mi, Effective Walk Time [s] 9.0 9.0 9.0 9.0
M_corner, Corner Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s] 22.44 22.44 22.44 22.44
I_p,int, Pedestrian LOS Score for Intersectio 2.763 2.744 2.407 2.166 Crosswalk LOS C B B B
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h] 2310 1053 481 156 d_b, Bicycle Delay [s] 0.74 6.91 17.76 26.17
I_b,int, Bicycle LOS Score for Intersection 3.200 2.109 1.842 1.636 Bicycle LOS C B A A
----------------Ring 4
----------------Ring 3
--------------65Ring 2
------------4321Ring 1
Sequence
52/6/2025Kimley-Horn
Scenario 9: 9 Cumulative AM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

736

0.520Volume to Capacity (v/c):

DLevel Of Service:

37.1Delay (sec / veh):
15 minutesAnalysis Period:

HCM 7th EditionAnalysis Method:

SignalizedControl Type:

Intersection 2: Vintage Park Drive/Chess Drive
Intersection Level Of Service Report
YesYesYesYesCrosswalk
NoNoNoNoCurb Present

0.000.000.000.00Grade [%]

30.0030.0030.0030.00Speed [mph]

0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket
100.00100.00215.00100.00100.00145.00100.00100.00280.00100.00100.00225.00Entry Pocket Length [ft] 001001001101No. of Lanes in Entry Pocket

12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Chess DrChess DriveVintage Park DriveVintage Park DriveName Intersection Setup
62/6/2025Kimley-Horn
Scenario 9: 9 Cumulative AM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

737

0000Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
274393203141189866212834164978164Total Analysis Volume [veh/h] 689851354721153284124541Total 15-Minute Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor

0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 252362187130174795711831151900151Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
022080000600Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor

0.00Proportion of CAVs [%]

2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 252360185130166795711831145900151Base Volume Input [veh/h] Chess DrChess DriveVintage Park DriveVintage Park DriveName Volumes
72/6/2025Kimley-Horn
Scenario 9: 9 Cumulative AM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

738

0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft]

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoNoPedestrian Recall
NoNoNoNoNoNoNoNoMaximum Recall
NoNoNoNoNoNoNoNoMinimum Recall

0.02.21.60.02.21.60.02.22.11.71.71.6l2, Clearance Lost Time [s]

0.02.02.00.02.02.00.02.02.02.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk

0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 02000180020021210Pedestrian Clearance [s]
050050050550Walk [s]

0.03.03.00.03.03.00.03.03.03.03.03.0Vehicle Extension [s] 03827024120259515134Split [s]

0.01.01.00.01.01.00.01.01.01.01.01.0All red [s]

0.03.22.60.03.22.60.03.23.12.72.72.6Amber [s]
0342302090214474731Maximum Green [s]
044044044444Minimum Green [s]
--Lead--Lag--Lead--LeadLead / Lag
Auxiliary Signal Groups
047083025661Signal Group
PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing

0.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference

0.0Offset [s]
Fully actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
110Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
82/6/2025Kimley-Horn
Scenario 9: 9 Cumulative AM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

739

227.89253.72248.84126.22137.90120.9496.10100.1256.19156.3486.8486.8211.195th-Percentile Queue Length [ft/ln]

9.1210.159.955.055.524.843.844.002.256.2519.4719.478.4595th-Percentile Queue Length [veh/ln] 133.24152.47148.8170.1276.6167.1953.3955.6231.2286.86336.4336.4120.950th-Percentile Queue Length [ft/ln]

5.336.105.952.803.062.692.142.221.253.4713.4613.464.8450th-Percentile Queue Length [veh/ln] YesNoNoNoNoYesNoNoYesNoNoYesNoCritical Lane Group
CBDCCEDDECDDELane Group LOS

20.0719.8654.8322.3922.1262.6337.0636.8679.6830.9844.2044.2055.96d, Delay for Lane Group [s/veh]

0.400.400.850.240.230.790.270.250.790.350.890.890.82X, volume / capacity Lane Group Results

1.001.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor

1.001.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio

0.000.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]

1.551.338.270.860.7011.720.410.3426.290.457.127.128.19d2, Incremental Delay [s]

1.001.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.500.500.110.500.500.110.110.110.110.110.160.160.11k, delay calibration

18.5318.5246.5621.5321.4250.9136.6536.5253.3930.5337.0837.0847.78d1, Uniform Delay [s] 77389423965475810934638643468551551199c, Capacity [veh/h] 1617187017811614187017811673187017811589187018701781s, saturation flow rate [veh/h]

0.190.190.110.100.090.050.060.050.020.100.260.260.09(v / s)_i Volume / Saturation Flow Rate

0.480.480.130.410.410.060.210.210.020.290.290.290.11g / C, Green / Cycle 535315454572323332323212g_i, Effective Green Time [s]

2.202.201.602.202.201.602.202.202.101.701.701.701.60l2, Clearance Lost Time [s]

0.000.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]

4.204.203.604.204.203.604.204.204.103.703.703.703.60L, Total Lost Time per Cycle [s] 110110110110110110110110110110110110110C, Cycle Length [s] CCLCCLCCLRCCLLane Group
Lane Group Calculations
92/6/2025Kimley-Horn
Scenario 9: 9 Cumulative AM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

740

Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh] 55.96 44.20 30.98 79.68 36.91 37.06 62.63 22.15 22.39 54.83 19.88 20.07 Movement LOS E D C E D D E C C D B C
d_A, Approach Delay [s/veh] 44.02 43.44 30.60 28.09
Approach LOS D D C C
d_I, Intersection Delay [s/veh] 37.07
Intersection LOS D
Intersection V/C 0.520
Other Modes
g_Walk,mi, Effective Walk Time [s] 9.0 9.0 9.0 9.0
M_corner, Corner Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s] 46.37 46.37 46.37 46.37
I_p,int, Pedestrian LOS Score for Intersectio 2.753 2.718 2.513 2.668 Crosswalk LOS C B B B
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h] 860 378 360 615 d_b, Bicycle Delay [s] 17.87 36.17 36.98 26.40
I_b,int, Bicycle LOS Score for Intersection 2.637 1.744 1.903 2.277 Bicycle LOS B A A B
----------------Ring 4
----------------Ring 3
------------8765Ring 2
------------4321Ring 1
Sequence
102/6/2025Kimley-Horn
Scenario 9: 9 Cumulative AM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

741

0.571Volume to Capacity (v/c):

CLevel Of Service:

26.8Delay (sec / veh):
15 minutesAnalysis Period:

HCM 7th EditionAnalysis Method:

SignalizedControl Type:

Intersection 3: SR-92 WB Ramps/Chess Drive
Intersection Level Of Service Report
NoYesNoYesCrosswalk
NoNoNoNoCurb Present

0.000.000.000.00Grade [%]

30.0030.0030.0030.00Speed [mph]

49.210.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 100000000000No. of Lanes in Exit Pocket
500.00100.00480.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 101000000000No. of Lanes in Entry Pocket

12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Office driveway Chess Dr Chess DrName
Intersection Setup
112/6/2025Kimley-Horn
Scenario 9: 9 Cumulative AM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

742

0100Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
12252365412419231718652252Total Analysis Volume [veh/h] 306616301155818016561Total 15-Minute Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor

0.93000.93000.93000.93000.93000.93000.93000.93000.93000.93000.93000.9300Peak Hour Factor 11392160812418215668602092Total Hourly Volume [veh/h]
0000004003200Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
200000004230140Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor

0.00Proportion of CAVs [%]

1.301.301.301.301.301.301.301.301.301.301.301.30Heavy Vehicles Percentage [%]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 11192160812422211645921952Base Volume Input [veh/h]
Office driveway Chess Dr Chess DrName
Volumes
122/6/2025Kimley-Horn
Scenario 9: 9 Cumulative AM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

743

0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft]

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoPedestrian Recall
NoNoNoNoNoMaximum Recall
NoNoNoNoNoMinimum Recall

2.53.50.00.01.70.00.02.50.02.12.10.0l2, Clearance Lost Time [s]

2.02.00.00.02.00.00.02.00.02.02.00.0l1, Start-Up Lost Time [s] NoNoYesYesRest In Walk

0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 120001700120000Pedestrian Clearance [s]
500050050000Walk [s]

3.03.00.00.03.00.00.03.00.03.03.00.0Vehicle Extension [s] 44420070044022220Split [s]

1.01.00.00.01.00.00.01.00.01.01.00.0All red [s]

3.54.50.00.02.70.00.03.50.03.13.10.0Amber [s]
40360040040018180Maximum Green [s]
10500400100560Minimum Green [s]
------------Lead / Lag
Auxiliary Signal Groups
820040080610Signal Group
UnsignaPermissPermissPermissPermissPermissPermissPermissPermissProtectePermissPermissControl Type Phasing & Timing

12.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference

51.0Offset [s]
Fully actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
120Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
132/6/2025Kimley-Horn
Scenario 9: 9 Cumulative AM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

744

407.03406.3614.80188.97269.47269.4726.08323.8695th-Percentile Queue Length [ft/ln]

16.2816.250.597.5610.7810.781.0412.9595th-Percentile Queue Length [veh/ln] 271.84271.298.22104.98164.35164.3514.49206.1350th-Percentile Queue Length [ft/ln]

10.8710.850.334.206.576.570.588.2550th-Percentile Queue Length [veh/ln] NoYesYesNoNoYesNoYesCritical Lane Group
EEFBCCCELane Group LOS

56.3656.4492.7918.2920.3720.3722.5972.83d, Delay for Lane Group [s/veh]

0.890.890.560.270.400.400.060.89X, volume / capacity
Lane Group Results

1.001.001.001.001.001.001.001.00PF, progression factor

1.001.001.001.001.001.001.001.00Rp, platoon ratio

0.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]

10.4410.5233.400.731.361.360.0221.90d2, Incremental Delay [s]

1.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.170.170.110.500.500.500.110.28k, delay calibration

45.9245.9259.3817.5719.0119.0122.5650.94d1, Uniform Delay [s] 381380139228898891114256c, Capacity [veh/h]
17971791178518561791179128291880s, saturation flow rate [veh/h]

0.190.190.000.130.200.200.020.12(v / s)_i Volume / Saturation Flow Rate

0.210.210.010.500.500.500.390.14g / C, Green / Cycle
252516060604716g_i, Effective Green Time [s]

3.503.501.702.502.502.502.102.10l2, Clearance Lost Time [s]

0.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]

5.505.503.704.504.504.504.104.10L, Total Lost Time per Cycle [s] 120120120120120120120120C, Cycle Length [s]
CLCCCLRCLane Group
Lane Group Calculations
142/6/2025Kimley-Horn
Scenario 9: 9 Cumulative AM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

745

Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh] 72.83 72.83 22.59 20.37 18.29 18.29 92.79 92.79 92.79 56.40 56.36 0.00 Movement LOS E E C C B B F F F E E
d_A, Approach Delay [s/veh] 61.65 19.83 92.79 21.03
Approach LOS E B F C
d_I, Intersection Delay [s/veh] 26.79
Intersection LOS C
Intersection V/C 0.571
Other Modes
g_Walk,mi, Effective Walk Time [s] 9.0 0.0 22.0 0.0
M_corner, Corner Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s] 51.33 0.00 40.01 0.00
I_p,int, Pedestrian LOS Score for Intersectio 2.597 0.000 1.747 0.000 Crosswalk LOS B F A F
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h] 298 658 67 608 d_b, Bicycle Delay [s] 43.43 27.00 56.09 29.05
I_b,int, Bicycle LOS Score for Intersection 2.094 2.362 1.571 2.677 Bicycle LOS B B A B
----------------Ring 4
----------------Ring 3
------------846-Ring 2
--------------21Ring 1
Sequence
152/6/2025Kimley-Horn
Scenario 9: 9 Cumulative AM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

746

0.971Volume to Capacity (v/c):

FLevel Of Service:

93.2Delay (sec / veh):
15 minutesAnalysis Period:

HCM 7th EditionAnalysis Method:

SignalizedControl Type:

Intersection 4: Foster City Boulevard/Chess Drive
Intersection Level Of Service Report
NoYesYesYesCrosswalk
NoNoNoNoCurb Present

0.000.000.000.00Grade [%]

30.0030.0025.0030.00Speed [mph]

0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket
100.00100.00510.00180.00100.0080.00100.00100.00100.00100.00100.0095.00Entry Pocket Length [ft] 001101001101No. of Lanes in Entry Pocket

12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Foster City BoulevardFoster City BoulevardChess Drive Chess DrName Intersection Setup
162/6/2025Kimley-Horn
Scenario 9: 9 Cumulative AM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

747

0000Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
43912477354729262109166619230509Total Analysis Volume [veh/h] 1103121841273163231715558127Total 15-Minute Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 43912477354729262109166619230509Total Hourly Volume [veh/h] 110002600200000Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
1290000312790340Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor

0.00Proportion of CAVs [%]

2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 42012477357329259116457619196509Base Volume Input [veh/h] Foster City BoulevardFoster City BoulevardChess Drive Chess DrName Volumes
172/6/2025Kimley-Horn
Scenario 9: 9 Cumulative AM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

748

0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.040.040.040.040.040.00.040.00.00.00.00.0Detector Length [ft]

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoPedestrian Recall
YesNoNoNoNoNoMaximum Recall
NoNoNoNoNoNoMinimum Recall

0.02.62.52.92.91.60.01.60.00.02.90.0l2, Clearance Lost Time [s]

0.02.02.02.02.02.00.02.00.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk

0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 023001000230000Pedestrian Clearance [s]
050000040000Walk [s]

0.03.03.03.03.03.00.03.00.00.03.00.0Vehicle Extension [s] 071315225801000520Split [s]

0.01.01.01.01.01.00.01.00.00.01.00.0All red [s]

0.03.63.53.93.92.60.02.60.00.03.90.0Amber [s]
06655472050600470Maximum Green [s]
064464060040Minimum Green [s]
--Lead--Lead------Lead / Lag
2,3Auxiliary Signal Groups
061325040030Signal Group
PermissPermissPermissOverlapPermissProtecteSplitSplitSplitSplitSplitSplitControl Type Phasing & Timing

0.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference

90.0Offset [s]
Fully actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
160Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
182/6/2025Kimley-Horn
Scenario 9: 9 Cumulative AM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

749

1788.801565.04443.7725.17216.15213.17215.66125.55908.85409.30412.1295th-Percentile Queue Length [ft/ln]

71.5562.6017.751.018.658.538.635.0236.3516.3716.4895th-Percentile Queue Length [veh/ln] 1253.261144.38301.4113.98124.61118.43124.2569.75692.99273.65275.9150th-Percentile Queue Length [ft/ln]

50.1345.7812.060.564.984.744.972.7927.7210.9511.0450th-Percentile Queue Length [veh/ln] YesNoNoNoNoYesYesNoYesNoNoCritical Lane Group
FFDADFFEEDDLane Group LOS
173.26129.4346.298.2450.37276.3897.6776.2168.0535.6836.00d, Delay for Lane Group [s/veh]

1.251.150.780.040.331.260.820.550.960.490.51X, volume / capacity Lane Group Results

1.001.001.001.001.001.001.001.001.001.001.00PF, progression factor

1.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio

0.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 124.7780.946.250.071.01198.6124.033.9322.040.510.56d2, Incremental Delay [s]

1.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.500.500.500.500.500.380.240.110.380.110.11k, delay calibration

48.4948.4940.048.1749.3677.7773.6472.2746.0135.1735.45d1, Uniform Delay [s] 674736946108988049123120647748725c, Capacity [veh/h]
17131870250415893560178118381781158918351781s, saturation flow rate [veh/h]

0.490.450.290.030.080.030.050.040.390.200.21(v / s)_i Volume / Saturation Flow Rate

0.390.390.390.690.250.030.070.070.410.410.41g / C, Green / Cycle 6363631104041111656565g_i, Effective Green Time [s]

2.602.600.000.002.901.601.601.602.902.902.90l2, Clearance Lost Time [s]

0.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]

4.604.604.604.904.903.603.603.604.904.904.90L, Total Lost Time per Cycle [s] 160160160160160160160160160160160C, Cycle Length [s]
CCLRCLCLRCLLane Group
Lane Group Calculations
192/6/2025Kimley-Horn
Scenario 9: 9 Cumulative AM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

750

Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh] 35.91 35.68 68.05 76.21 97.67 97.67 276.38 50.37 8.24 46.29 143.63 173.26 Movement LOS D D E E F F F D A D F F
d_A, Approach Delay [s/veh] 50.52 89.19 80.38 119.45
Approach LOS D F F F
d_I, Intersection Delay [s/veh] 93.15
Intersection LOS F
Intersection V/C 0.971
Other Modes
g_Walk,mi, Effective Walk Time [s] 4.0 9.0 8.0 0.0
M_corner, Corner Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s] 76.04 71.24 72.19 0.00
I_p,int, Pedestrian LOS Score for Intersectio 3.185 2.495 2.875 0.000 Crosswalk LOS C B C F
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h] 589 80 251 830 d_b, Bicycle Delay [s] 39.82 73.71 61.15 27.37
I_b,int, Bicycle LOS Score for Intersection 3.800 1.838 1.912 3.648 Bicycle LOS D A A D
----------------Ring 4
----------------Ring 3
--------------65Ring 2
------------4321Ring 1
Sequence
202/6/2025Kimley-Horn
Scenario 9: 9 Cumulative AM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

751

0.599Volume to Capacity (v/c):

CLevel Of Service:

28.3Delay (sec / veh):
15 minutesAnalysis Period:

HCM 7th EditionAnalysis Method:

SignalizedControl Type:

Intersection 5: SR-92 EB Ramps/Metro Center Boulevard
Intersection Level Of Service Report
NoYesNoNoCrosswalk
NoNoNoNoCurb Present

0.000.000.000.00Grade [%]

30.0035.0030.0015.00Speed [mph]

0.000.000.000.000.000.0049.210.000.000.000.000.00Exit Pocket Length [ft] 000000100000No. of Lanes in Exit Pocket
100.00100.0090.00100.00100.00290.00640.00100.00600.00100.00100.00100.00Entry Pocket Length [ft] 001002101000No. of Lanes in Entry Pocket

12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Metro Center BoulevardMetro Center BoulevarParking Lot AccessName Intersection Setup
212/6/2025Kimley-Horn
Scenario 9: 9 Cumulative AM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

752

0000Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
1582814832291063093814301944Total Analysis Volume [veh/h] 397012157277710357511Total 15-Minute Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor

0.97000.97000.97000.97000.97000.97000.97000.97000.97000.97000.97000.9700Peak Hour Factor 1532734732221033003713871844Total Hourly Volume [veh/h] 820010016100900Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
410010000106000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor

0.00Proportion of CAVs [%]

1.901.901.901.901.901.901.901.901.901.901.901.90Heavy Vehicles Percentage [%]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 2312724742121034613712812744Base Volume Input [veh/h]
Metro Center BoulevardMetro Center BoulevarParking Lot AccessName Volumes
222/6/2025Kimley-Horn
Scenario 9: 9 Cumulative AM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

753

0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.040.040.00.040.040.040.040.00.00.040.00.0Detector Length [ft]

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoPedestrian Recall
NoNoNoNoYesNoMaximum Recall
NoNoNoNoNoNoMinimum Recall

0.02.51.60.02.51.61.63.00.00.02.20.0l2, Clearance Lost Time [s]

0.02.02.00.02.02.02.02.00.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk

0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0000170000000Pedestrian Clearance [s]
000060000000Walk [s]

0.03.03.00.03.03.03.03.00.00.03.00.0Vehicle Extension [s] 025120231010770080Split [s]

0.01.01.00.01.01.01.01.00.00.01.00.0All red [s]

0.03.52.60.03.52.62.64.00.00.03.20.0Amber [s]
020801866720040Maximum Green [s]
0440444100040Minimum Green [s]
--Lead--Lead------Lead / Lag
4,5Auxiliary Signal Groups
061025540030Signal Group
PermissPermissProtectePermissPermissProtectePermissPermissPermissPermissPermissPermissControl Type Phasing & Timing

12.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference

30.0Offset [s]
Fully actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
120Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
232/6/2025Kimley-Horn
Scenario 9: 9 Cumulative AM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

754

183.4197.4199.978.61144.10144.4075.4080.74487.70488.5832.9712.3795th-Percentile Queue Length [ft/ln]

7.347.908.003.145.765.783.023.2319.5119.541.320.4995th-Percentile Queue Length [veh/ln] 101.9111.0112.843.6780.0680.2241.8944.85337.14337.8618.326.8750th-Percentile Queue Length [ft/ln]

4.084.444.511.753.203.211.681.7913.4913.510.730.2750th-Percentile Queue Length [veh/ln] YesNoNoNoNoNoYesNoNoYesYesNoCritical Lane Group
DDDEDDEBBBEELane Group LOS

49.9948.8748.6774.7544.6344.6161.2110.3718.6018.6674.9460.84d, Delay for Lane Group [s/veh]

0.480.460.460.770.330.330.670.180.670.670.600.22X, volume / capacity Lane Group Results

1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor

1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio

0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]

5.684.694.5217.362.502.484.850.233.293.3216.632.97d2, Incremental Delay [s]

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.500.500.500.110.500.500.110.500.500.500.110.11k, delay calibration

44.3144.1844.1557.3942.1342.1256.3610.1415.3215.3558.3257.87d1, Uniform Delay [s] 283325333633513531581724109410913236c, Capacity [veh/h] 159118231871178218631871346128161787178215911826s, saturation flow rate [veh/h]

0.090.080.080.030.060.060.030.110.410.410.010.00(v / s)_i Volume / Saturation Flow Rate

0.180.180.180.030.190.190.050.610.610.610.020.02g / C, Green / Cycle 21212142323574747422g_i, Effective Green Time [s]

2.502.502.501.602.502.501.603.003.003.002.202.20l2, Clearance Lost Time [s]

0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]

4.504.504.503.604.504.503.605.005.005.004.204.20L, Total Lost Time per Cycle [s] 120120120120120120120120120120120120C, Cycle Length [s] RCCLCCLRCLRCLane Group
Lane Group Calculations
242/6/2025Kimley-Horn
Scenario 9: 9 Cumulative AM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

755

Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh] 60.84 60.84 74.94 18.63 18.60 10.37 61.21 44.62 44.63 74.75 48.76 49.90 Movement LOS E E E B B B E D D E D D
d_A, Approach Delay [s/veh] 70.76 17.20 49.82 51.67
Approach LOS E B D D
d_I, Intersection Delay [s/veh] 28.33
Intersection LOS C
Intersection V/C 0.599
Other Modes
g_Walk,mi, Effective Walk Time [s] 0.0 0.0 72.0 0.0
M_corner, Corner Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s] 0.00 0.00 9.60 0.00
I_p,int, Pedestrian LOS Score for Intersectio 0.000 0.000 2.610 0.000 Crosswalk LOS F F B F
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h] 67 1200 308 342 d_b, Bicycle Delay [s] 56.06 9.60 42.92 41.25
I_b,int, Bicycle LOS Score for Intersection 1.619 4.757 1.839 2.029 Bicycle LOS A E A B
----------------Ring 4
----------------Ring 3
--------------65Ring 2
------------4321Ring 1
Sequence
252/6/2025Kimley-Horn
Scenario 9: 9 Cumulative AM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

756

0.771Volume to Capacity (v/c):

ELevel Of Service:

67.0Delay (sec / veh):
15 minutesAnalysis Period:

HCM 7th EditionAnalysis Method:

SignalizedControl Type:

Intersection 6: Foster City Boulevard/Metro Center Boulevard Intersection Level Of Service Report
YesNoYesNoCrosswalk
NoNoNoNoCurb Present

0.000.000.000.00Grade [%]

35.0035.0025.0035.00Speed [mph]

0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket
100.00100.00100.00100.00100.00210.00170.00100.0050.00240.00100.00150.00Entry Pocket Length [ft] 101101101101No. of Lanes in Entry Pocket

12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Foster City BoulevardFoster City BoulevardMetro Center BoulevardMetro Center BoulevardName Intersection Setup
262/6/2025Kimley-Horn
Scenario 9: 9 Cumulative AM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

757

0000Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
51114220010660415533215154222286878Total Analysis Volume [veh/h] 132865027151398338145672220Total 15-Minute Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 51114220010660415533215154222286878Total Hourly Volume [veh/h] 1300106001790022200Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
014054000000116Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor

0.00Proportion of CAVs [%]

2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 64112820020760015551115154444286762Base Volume Input [veh/h] Foster City BoulevardFoster City BoulevardMetro Center BoulevardMetro Center BoulevardName Volumes
272/6/2025Kimley-Horn
Scenario 9: 9 Cumulative AM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

758

0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.040.040.00.00.00.00.00.00.00.00.00.0Detector Length [ft]

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoPedestrian Recall
YesNoYesNoNoNoNoMaximum Recall
NoNoNoNoNoNoNoMinimum Recall

0.02.61.60.02.61.60.02.20.01.62.20.0l2, Clearance Lost Time [s]

0.02.02.00.02.02.00.02.00.02.02.00.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk

0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0190020001000270Pedestrian Clearance [s]
050050050050Walk [s]

0.03.03.00.03.03.00.03.00.03.03.00.0Vehicle Extension [s] 0372502916032025410Split [s]

0.01.01.00.01.01.00.01.00.01.01.00.0All red [s]

0.03.62.60.03.62.60.03.20.02.63.20.0Amber [s]
0322202412028022370Maximum Green [s]
064064060460Minimum Green [s]
--Lead--Lead------Lead / Lag
1,4Auxiliary Signal Groups
061025030140Signal Group
PermissPermissProtectePermissPermissProtecteSplitSplitSplitOverlapSplitSplitControl Type Phasing & Timing

0.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference

0.0Offset [s]
Semi-actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
120Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
282/6/2025Kimley-Horn
Scenario 9: 9 Cumulative AM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

759

502.28463.00288.0361.92239.75277.17485.09193.0565.1289.59175.04718.3295th-Percentile Queue Length [ft/ln]

20.0918.5211.522.489.5911.0919.407.722.603.587.0028.7395th-Percentile Queue Length [veh/ln] 349.07317.00178.4834.40142.03170.20335.00107.8836.1849.7797.25494.3350th-Percentile Queue Length [ft/ln]

13.9612.687.141.385.686.8113.404.321.451.993.8919.7750th-Percentile Queue Length [veh/ln] YesNoNoNoNoYesYesNoNoNoNoYesCritical Lane Group
EDEDDFEDDCDFLane Group LOS

59.7252.7968.4239.8544.5697.9478.5343.5539.7721.1742.36117.03d, Delay for Lane Group [s/veh]

0.840.840.860.170.520.920.920.360.130.180.351.11X, volume / capacity Lane Group Results

1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor

1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio

0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]

15.638.7114.390.551.6640.9130.612.310.680.071.2068.01d2, Incremental Delay [s]

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.500.500.190.500.500.350.500.500.500.110.500.50k, delay calibration

44.0844.0854.0239.3042.9057.0347.9141.2439.0921.1141.1649.03d1, Uniform Delay [s] 48494323364211631683614254051257812788c, Capacity [veh/h] 182935601781281350941781158918701781281335603459s, saturation flow rate [veh/h]

0.220.220.110.040.120.090.210.080.030.080.080.25(v / s)_i Volume / Saturation Flow Rate

0.270.270.130.230.230.090.230.230.230.450.230.23g / C, Green / Cycle 343417292912292929572929g_i, Effective Green Time [s]

2.602.601.602.602.601.602.202.202.200.002.202.20l2, Clearance Lost Time [s]

0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]

4.604.603.604.604.603.604.204.204.203.604.204.20L, Total Lost Time per Cycle [s] 127127127127127127127127127127127127C, Cycle Length [s] CCLRCLRCLRCLLane Group
Lane Group Calculations
292/6/2025Kimley-Horn
Scenario 9: 9 Cumulative AM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

760

Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh] 117.03 42.36 21.17 39.77 43.55 78.53 97.94 44.56 39.85 68.42 54.94 59.72 Movement LOS F D C D D E F D D E D E
d_A, Approach Delay [s/veh] 86.27 64.79 53.55 57.05
Approach LOS F E D E
d_I, Intersection Delay [s/veh] 67.01
Intersection LOS E
Intersection V/C 0.771
Other Modes
g_Walk,mi, Effective Walk Time [s] 0.0 9.0 0.0 9.0
M_corner, Corner Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s] 0.00 54.82 0.00 54.82
I_p,int, Pedestrian LOS Score for Intersectio 0.000 2.771 0.000 3.038 Crosswalk LOS F C F C
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h] 580 438 384 510 d_b, Bicycle Delay [s] 32.03 38.74 41.44 35.23
I_b,int, Bicycle LOS Score for Intersection 2.886 2.741 2.094 2.333 Bicycle LOS C B B B
----------------Ring 4
----------------Ring 3
--------------65Ring 2
------------4321Ring 1
Sequence
302/6/2025Kimley-Horn
Scenario 9: 9 Cumulative AM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

761

0.006Volume to Capacity (v/c):

DLevel Of Service:

37.9Delay (sec / veh):
15 minutesAnalysis Period:

HCM 7th EditionAnalysis Method:

SignalizedControl Type:

Intersection 7: Shell Boulevard/Metro Center Boulevard
Intersection Level Of Service Report
YesYesYesYesCrosswalk
NoNoNoNoCurb Present

0.000.000.000.00Grade [%]

30.0030.0015.0030.00Speed [mph]

0.000.000.000.000.000.00100.000.000.000.000.000.00Exit Pocket Length [ft] 000000100000No. of Lanes in Exit Pocket
210.00100.00210.00100.00100.0090.00100.00100.0090.00100.00100.00170.00Entry Pocket Length [ft] 102001001001No. of Lanes in Entry Pocket

12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Metro Center BoulevarMetro Center BoulevardParking Lot AccessShell BoulevardName Intersection Setup
312/6/2025Kimley-Horn
Scenario 9: 9 Cumulative AM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

762

0000Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
001070000500Total Analysis Volume [veh/h]
000020000100Total 15-Minute Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor

0.87000.87000.87000.87000.87000.87000.87000.87000.87000.87000.87000.8700Peak Hour Factor 001060000400Total Hourly Volume [veh/h]
000000000000Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
001060000400Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor

0.00Proportion of CAVs [%]

2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 000000000000Base Volume Input [veh/h]
Metro Center BoulevarMetro Center BoulevardParking Lot AccessShell BoulevardName Volumes
322/6/2025Kimley-Horn
Scenario 9: 9 Cumulative AM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

763

0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.040.040.00.040.040.00.040.040.00.040.040.0Detector Length [ft]

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoNoPedestrian Recall
NoNoNoNoNoNoNoNoMaximum Recall
NoNoNoNoNoNoNoNoMinimum Recall

0.02.52.50.02.51.50.02.51.50.02.51.5l2, Clearance Lost Time [s]

0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk

0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0160023001800140Pedestrian Clearance [s]
050050050050Walk [s]

0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 049250240061903548Split [s]

0.01.01.00.01.00.50.01.00.50.01.00.5All red [s]

0.03.53.50.03.53.00.03.53.00.03.53.0Amber [s]
045210200021603145Maximum Green [s]
066064064064Minimum Green [s]
--Lead--Lead--Lead--LeadLead / Lag
Auxiliary Signal Groups
047083025061Signal Group
PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing

0.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference

0.0Offset [s]
Fully actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
120Cycle Length [s]
-Signal Coordination Group
YesLocated in CBD
Intersection Settings
332/6/2025Kimley-Horn
Scenario 9: 9 Cumulative AM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

764

0.000.001.150.400.400.000.000.0010.170.000.0095th-Percentile Queue Length [ft/ln]

0.000.000.050.020.020.000.000.000.410.000.0095th-Percentile Queue Length [veh/ln]

0.000.000.640.220.220.000.000.005.650.000.0050th-Percentile Queue Length [ft/ln]

0.000.000.030.010.010.000.000.000.230.000.0050th-Percentile Queue Length [veh/ln] NoNoYesNoYesNoNoNoYesNoNoCritical Lane Group
AAEAAAAAFAALane Group LOS

0.000.0071.891.391.390.000.000.0082.300.000.00d, Delay for Lane Group [s/veh]

0.000.000.160.000.000.000.000.000.430.000.00X, volume / capacity Lane Group Results

1.001.001.001.001.001.001.001.001.001.001.00PF, progression factor

1.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio

0.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]

0.000.0012.120.000.000.000.000.0023.080.000.00d2, Incremental Delay [s]

1.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.500.500.110.500.500.110.110.110.110.110.11k, delay calibration

0.000.0059.771.391.390.000.000.0059.220.000.00d1, Uniform Delay [s] 1228275061427142701360121460c, Capacity [veh/h]
14313204311316831683160316831275143116831275s, saturation flow rate [veh/h]

0.000.000.000.000.000.000.000.000.000.000.00(v / s)_i Volume / Saturation Flow Rate

0.860.860.000.850.850.000.010.000.010.010.00g / C, Green / Cycle 1031030102102010110g_i, Effective Green Time [s]

2.502.502.502.502.500.002.501.502.502.501.50l2, Clearance Lost Time [s]

0.000.000.000.000.000.000.002.000.000.002.00l1_p, Permitted Start-Up Lost Time [s]

4.504.504.504.504.500.004.503.504.504.503.50L, Total Lost Time per Cycle [s] 120120120120120120120120120120120C, Cycle Length [s]
RCLCCLCLRCLLane Group
Lane Group Calculations
342/6/2025Kimley-Horn
Scenario 9: 9 Cumulative AM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

765

Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh] 0.00 0.00 82.30 0.00 0.00 0.00 0.00 1.39 1.39 71.89 0.00 0.00 Movement LOS A A F A A A A A A E A A
d_A, Approach Delay [s/veh] 82.30 0.00 1.39 71.89
Approach LOS F A A E
d_I, Intersection Delay [s/veh] 37.93
Intersection LOS D
Intersection V/C 0.006
Other Modes
g_Walk,mi, Effective Walk Time [s] 9.0 9.0 9.0 9.0
M_corner, Corner Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s] 51.33 51.33 51.33 51.33
I_p,int, Pedestrian LOS Score for Intersectio 2.316 2.146 2.316 2.611 Crosswalk LOS B B B B
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h] 508 100 325 742 d_b, Bicycle Delay [s] 33.37 54.14 42.08 23.74
I_b,int, Bicycle LOS Score for Intersection 1.568 1.560 1.565 1.560 Bicycle LOS A A A A
----------------Ring 4
----------------Ring 3
------------8765Ring 2
------------4321Ring 1
Sequence
352/6/2025Kimley-Horn
Scenario 9: 9 Cumulative AM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

766

0.004Volume to Capacity (v/c):

DLevel Of Service:

41.8Delay (sec / veh):
15 minutesAnalysis Period:

HCM 7th EditionAnalysis Method:

SignalizedControl Type:

Intersection 8: Vintage Park Drive/Metro Center Boulevard Intersection Level Of Service Report
YesYesYesYesCrosswalk
NoNoNoNoCurb Present

0.000.000.000.00Grade [%]

35.0035.0030.0030.00Speed [mph]

0.000.000.000.000.000.000.000.000.00220.000.000.00Exit Pocket Length [ft] 000000000100No. of Lanes in Exit Pocket
140.00100.00260.00100.00100.00150.00100.00100.00270.00100.00100.00200.00Entry Pocket Length [ft] 101001001001No. of Lanes in Entry Pocket

12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Metro Center BoulevardMetro Center BoulevardVintage Park DriveVintage Park DriveName Intersection Setup
362/6/2025Kimley-Horn
Scenario 9: 9 Cumulative AM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

767

0000Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
000077200000Total Analysis Volume [veh/h]
000022100000Total 15-Minute Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor

0.90000.90000.90000.90000.90000.90000.90000.90000.90000.90000.90000.9000Peak Hour Factor 000066200000Total Hourly Volume [veh/h]
000000000000Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
000066200000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor

0.00Proportion of CAVs [%]

2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 000000000000Base Volume Input [veh/h]
Metro Center BoulevardMetro Center BoulevardVintage Park DriveVintage Park DriveName Volumes
372/6/2025Kimley-Horn
Scenario 9: 9 Cumulative AM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

768

0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.040.040.00.040.040.040.040.040.00.040.040.0Detector Length [ft]

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoNoNoPedestrian Recall
NoNoNoNoNoNoNoNoNoMaximum Recall
NoNoNoNoNoNoNoNoNoMinimum Recall

0.02.51.50.02.51.51.51.71.50.02.21.5l2, Clearance Lost Time [s]

0.02.02.00.02.02.02.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk

0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0160019101017001710Pedestrian Clearance [s]
050055550055Walk [s]

0.03.03.00.03.03.03.03.03.00.03.03.0Vehicle Extension [s] 04924055292922140114Split [s]

0.01.00.50.01.00.50.51.00.50.01.00.5All red [s]

0.03.53.00.03.53.03.02.73.00.03.23.0Amber [s]
0452105126261811074Maximum Green [s]
065065564064Minimum Green [s]
--Lead--Lag--Lead--LagLead / Lag
Auxiliary Signal Groups
047083325061Signal Group
PermissPermissProtectePermissPermissProtecteProtectePermissProtectePermissPermissProtecteControl Type Phasing & Timing

0.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference

0.0Offset [s]
Fully actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
120Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
382/6/2025Kimley-Horn
Scenario 9: 9 Cumulative AM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

769

0.000.000.000.250.2512.963.490.000.000.000.000.0095th-Percentile Queue Length [ft/ln]

0.000.000.000.010.010.520.140.000.000.000.000.0095th-Percentile Queue Length [veh/ln]

0.000.000.000.140.147.201.940.000.000.000.000.0050th-Percentile Queue Length [ft/ln]

0.000.000.000.010.010.290.080.000.000.000.000.0050th-Percentile Queue Length [veh/ln] NoNoNoNoNoYesNoNoNoNoNoNoCritical Lane Group
AAAAAEEAAAAALane Group LOS

0.000.000.001.041.0476.4863.300.000.000.000.000.00d, Delay for Lane Group [s/veh]

0.000.000.000.000.000.430.140.000.000.000.000.00X, volume / capacity Lane Group Results

1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor

1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio

0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]

0.000.000.000.000.0017.344.320.000.000.000.000.00d2, Incremental Delay [s]

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.500.500.110.500.500.110.110.110.110.110.110.11k, delay calibration

0.000.000.001.041.0459.1458.980.000.000.000.000.00d1, Uniform Delay [s] 13673061116241624161410008c, Capacity [veh/h]
158935601781187018701781158918701781187018701781s, saturation flow rate [veh/h]

0.000.000.000.000.000.000.000.000.000.000.000.00(v / s)_i Volume / Saturation Flow Rate

0.860.860.000.870.870.010.010.000.000.000.000.00g / C, Green / Cycle 10310301041041100001g_i, Effective Green Time [s]

2.502.501.502.502.501.501.501.701.502.202.201.50l2, Clearance Lost Time [s]

0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]

4.504.503.504.504.503.503.503.703.504.204.203.50L, Total Lost Time per Cycle [s] 120120120120120120120120120120120120C, Cycle Length [s] RCLCCLRCLCCLLane Group
Lane Group Calculations
392/6/2025Kimley-Horn
Scenario 9: 9 Cumulative AM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

770

Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh] 0.00 0.00 0.00 0.00 0.00 63.30 76.48 1.04 1.04 0.00 0.00 0.00 Movement LOS A A A A A E E A A A A A
d_A, Approach Delay [s/veh] 0.00 63.30 38.76 0.00
Approach LOS A E D A
d_I, Intersection Delay [s/veh] 41.83
Intersection LOS D
Intersection V/C 0.004
Other Modes
g_Walk,mi, Effective Walk Time [s] 9.0 9.0 9.0 9.0
M_corner, Corner Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s] 51.33 51.33 51.33 51.33
I_p,int, Pedestrian LOS Score for Intersectio 2.315 2.317 2.319 2.469 Crosswalk LOS B B B B
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h] 113 305 842 742 d_b, Bicycle Delay [s] 53.39 43.09 20.12 23.75
I_b,int, Bicycle LOS Score for Intersection 1.560 1.563 1.571 1.560 Bicycle LOS A A A A
----------------Ring 4
----------------Ring 3
------------8765Ring 2
------------4321Ring 1
Sequence
402/6/2025Kimley-Horn
Scenario 9: 9 Cumulative AM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

771

0.644Volume to Capacity (v/c):

CLevel Of Service:

20.9Delay (sec / veh):
15 minutesAnalysis Period:

HCM 7th EditionAnalysis Method:

SignalizedControl Type:

Intersection 1: Foster City Boulevard/Vintage Park Drive-Chess Drive Intersection Level Of Service Report
YesYesYesYesCrosswalk
NoNoNoNoCurb Present

0.000.000.000.00Grade [%]

25.0030.0030.0030.00Speed [mph]

0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket
100.00100.00120.00160.00100.00110.00100.00100.00155.00100.00100.00215.00Entry Pocket Length [ft] 001101001001No. of Lanes in Entry Pocket

12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Chess DriveVintage Park DriveFoster City BoulevardFoster City BoulevardName Intersection Setup
12/6/2025Kimley-Horn
Scenario 10: 10 Cumulative PM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

772

0000Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
150211318917351201348621831835Total Analysis Volume [veh/h] 3853474930337155809Total 15-Minute Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor

0.94000.94000.94000.94000.94000.94000.94000.94000.94000.94000.94000.9400Peak Hour Factor 141201217816331131267581729933Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
400000011040Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor

0.00Proportion of CAVs [%]

2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 137201217816331131266571729533Base Volume Input [veh/h] Chess DriveVintage Park DriveFoster City BoulevardFoster City BoulevardName Volumes
22/6/2025Kimley-Horn
Scenario 10: 10 Cumulative PM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

773

0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft]

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoPedestrian Recall
NoNoNoNoNoNoMaximum Recall
NoNoNoNoNoNoMinimum Recall

0.01.20.00.01.20.00.02.61.60.02.91.6l2, Clearance Lost Time [s]

0.02.00.00.02.00.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk

0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0180018001800120Pedestrian Clearance [s]
050050050050Walk [s]

0.03.00.00.03.00.00.03.03.00.03.03.0Vehicle Extension [s] 02200240068230547Split [s]

0.01.00.00.01.00.00.01.01.00.01.01.0All red [s]

0.02.20.00.02.20.00.03.62.60.03.92.6Amber [s]
01900200064190494Maximum Green [s]
040040084084Minimum Green [s]
--------Lead--LeadLead / Lag
Auxiliary Signal Groups
040030025061Signal Group
SplitSplitSplitSplitSplitSplitPermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing

0.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference

0.0Offset [s]
Fully actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
120Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
32/6/2025Kimley-Horn
Scenario 10: 10 Cumulative PM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

774

128.837.93136.989.9120.71346.11348.3655.8460.8261.4732.8195th-Percentile Queue Length [ft/ln]

5.150.325.480.400.8313.8413.932.232.432.461.3195th-Percentile Queue Length [veh/ln]

71.574.4176.105.5111.51223.51225.2831.0233.7934.1518.2350th-Percentile Queue Length [ft/ln]

2.860.183.040.220.468.949.011.241.351.370.7350th-Percentile Queue Length [veh/ln] YesNoYesNoNoYesNoNoNoNoYesCritical Lane Group
CCCCCBBDBBDLane Group LOS

33.6724.7232.2723.7724.1618.5718.2345.0411.3111.3045.71d, Delay for Lane Group [s/veh]

0.790.050.790.060.130.870.860.770.210.200.68X, volume / capacity Lane Group Results

1.001.001.001.001.001.001.001.001.001.001.00PF, progression factor

1.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio

0.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]

6.340.095.630.090.222.852.6114.270.120.1214.38d2, Incremental Delay [s]

1.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.110.110.110.110.110.110.110.110.110.110.11k, delay calibration

27.3424.6326.6423.6823.9415.7115.6230.7711.1911.1831.33d1, Uniform Delay [s] 2162382402832698408648081082552c, Capacity [veh/h]
16191781158918701781181718701781183518701781s, saturation flow rate [veh/h]

0.110.010.120.010.020.400.400.030.090.090.02(v / s)_i Volume / Saturation Flow Rate

0.130.130.150.150.150.460.460.050.440.440.03g / C, Green / Cycle 991010103030329292g_i, Effective Green Time [s]

1.201.201.201.201.202.602.601.602.902.901.60l2, Clearance Lost Time [s]

0.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]

3.203.203.203.203.204.604.603.604.904.903.60L, Total Lost Time per Cycle [s] 6565656565656565656565C, Cycle Length [s]
CLRCLCCLCCLLane Group
Lane Group Calculations
42/6/2025Kimley-Horn
Scenario 10: 10 Cumulative PM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

775

Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh] 45.71 11.31 11.31 45.04 18.38 18.57 24.16 23.77 32.27 24.72 33.67 33.67 Movement LOS D B B D B B C C C C C C
d_A, Approach Delay [s/veh] 14.55 19.47 30.49 33.04
Approach LOS B B C C
d_I, Intersection Delay [s/veh] 20.90
Intersection LOS C
Intersection V/C 0.644
Other Modes
g_Walk,mi, Effective Walk Time [s] 9.0 9.0 9.0 9.0
M_corner, Corner Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s] 24.11 24.11 24.11 24.11
I_p,int, Pedestrian LOS Score for Intersectio 2.659 2.681 2.218 2.001 Crosswalk LOS B B B B
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h] 1511 1951 640 579 d_b, Bicycle Delay [s] 1.94 0.02 15.02 16.41
I_b,int, Bicycle LOS Score for Intersection 1.866 2.822 1.957 1.863 Bicycle LOS A C A A
----------------Ring 4
----------------Ring 3
--------------65Ring 2
------------4321Ring 1
Sequence
52/6/2025Kimley-Horn
Scenario 10: 10 Cumulative PM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

776

0.793Volume to Capacity (v/c):

DLevel Of Service:

51.3Delay (sec / veh):
15 minutesAnalysis Period:

HCM 7th EditionAnalysis Method:

SignalizedControl Type:

Intersection 2: Vintage Park Drive/Chess Drive
Intersection Level Of Service Report
YesYesYesYesCrosswalk
NoNoNoNoCurb Present

0.000.000.000.00Grade [%]

30.0030.0030.0030.00Speed [mph]

0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket
100.00100.00215.00100.00100.00145.00100.00100.00280.00100.00100.00225.00Entry Pocket Length [ft] 001001001101No. of Lanes in Entry Pocket

12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Chess DriveChess DriveVintage Park DriveVintage Park DriveName Intersection Setup
62/6/2025Kimley-Horn
Scenario 10: 10 Cumulative PM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

777

0000Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
3430113735334329371881457561155234Total Analysis Volume [veh/h] 8753488867932201141403958Total 15-Minute Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor

0.83000.83000.83000.83000.83000.83000.83000.83000.83000.83000.83000.8300Peak Hour Factor 2825011429328524308731379466129194Total Hourly Volume [veh/h] 000000000000Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
0129020000200Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor

0.00Proportion of CAVs [%]

2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 2823810529328324308731379464129194Base Volume Input [veh/h] Chess DriveChess DriveVintage Park DriveVintage Park DriveName Volumes
72/6/2025Kimley-Horn
Scenario 10: 10 Cumulative PM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

778

0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.040.040.00.040.040.00.040.040.040.040.040.0Detector Length [ft]

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoNoPedestrian Recall
NoNoNoNoNoNoNoNoMaximum Recall
NoNoNoNoNoNoNoNoMinimum Recall

0.02.21.60.02.21.60.02.22.11.61.71.6l2, Clearance Lost Time [s]

0.02.02.00.02.02.00.02.02.02.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk

0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0200018002000210Pedestrian Clearance [s]
050050050050Walk [s]

0.03.03.00.03.03.00.03.03.03.03.03.0Vehicle Extension [s] 028120301404940122819Split [s]

0.01.01.00.01.01.00.01.01.01.01.01.0All red [s]

0.03.22.60.03.22.60.03.23.12.62.72.6Amber [s]
0249025100453692415Maximum Green [s]
044044044444Minimum Green [s]
--Lag--Lead--Lead--LeadLead / Lag
Auxiliary Signal Groups
047083025761Signal Group
PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing

0.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference

0.0Offset [s]
Fully actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
110Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
82/6/2025Kimley-Horn
Scenario 10: 10 Cumulative PM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

779

158.83162.55257.85427.33366.1046.73639.79610.56510.65292.6292.6154.6342.495th-Percentile Queue Length [ft/ln]

6.356.5010.3117.0914.641.8725.5924.4220.4311.7011.706.1813.7095th-Percentile Queue Length [veh/ln]

88.2490.30155.17288.14239.2625.96463.29438.79355.94182.0182.085.90220.650th-Percentile Queue Length [ft/ln]

3.533.616.2111.539.571.0418.5317.5514.247.287.283.448.8250th-Percentile Queue Length [veh/ln] NoNoYesYesNoNoYesNoNoNoNoNoYesCritical Lane Group
CCFEDEDDEDDCFLane Group LOS

30.3430.25116.1161.5646.6375.2550.7242.0556.4141.6941.6934.0983.26d, Delay for Lane Group [s/veh]

0.300.291.010.870.720.730.930.880.930.700.700.330.94X, volume / capacity Lane Group Results

1.001.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor

1.001.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio

0.000.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]

1.361.3065.3322.239.1721.8318.3910.7017.754.184.180.4136.44d2, Incremental Delay [s]

1.001.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.500.500.340.500.500.110.380.340.300.200.200.110.38k, delay calibration

28.9828.9550.7839.3337.4753.4232.3331.3538.6537.5137.5133.6846.83d1, Uniform Delay [s] 55657613640447540655725494398398468249c, Capacity [veh/h] 1804187017811589187017811689187017811589158918701781s, saturation flow rate [veh/h]

0.090.090.080.220.180.020.360.340.260.180.180.080.13(v / s)_i Volume / Saturation Flow Rate

0.310.310.080.250.250.020.390.390.280.250.250.250.14g / C, Green / Cycle 343482828243433028282815g_i, Effective Green Time [s]

2.202.201.602.202.201.602.202.202.101.701.701.701.60l2, Clearance Lost Time [s]

0.000.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]

4.204.203.604.204.203.604.204.204.103.703.703.703.60L, Total Lost Time per Cycle [s] 110110110110110110110110110110110110110C, Cycle Length [s] CCLCCLCCLRCCLLane Group
Lane Group Calculations
92/6/2025Kimley-Horn
Scenario 10: 10 Cumulative PM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

780

Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh] 83.26 34.09 41.69 56.41 44.42 50.72 75.25 46.63 61.56 116.11 30.29 30.34 Movement LOS F C D E D D E D E F C C
d_A, Approach Delay [s/veh] 50.69 48.99 55.05 55.21
Approach LOS D D E E
d_I, Intersection Delay [s/veh] 51.31
Intersection LOS D
Intersection V/C 0.793
Other Modes
g_Walk,mi, Effective Walk Time [s] 9.0 9.0 9.0 9.0
M_corner, Corner Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s] 46.36 46.36 46.36 46.36
I_p,int, Pedestrian LOS Score for Intersectio 2.841 2.687 2.629 2.762 Crosswalk LOS C B B C
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h] 442 815 469 433 d_b, Bicycle Delay [s] 33.38 19.32 32.22 33.77
I_b,int, Bicycle LOS Score for Intersection 2.343 2.970 2.158 1.949 Bicycle LOS B C B A
----------------Ring 4
----------------Ring 3
------------8765Ring 2
------------4321Ring 1
Sequence
102/6/2025Kimley-Horn
Scenario 10: 10 Cumulative PM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

781

0.718Volume to Capacity (v/c):

FLevel Of Service:

96.4Delay (sec / veh):
15 minutesAnalysis Period:

HCM 7th EditionAnalysis Method:

SignalizedControl Type:

Intersection 3: SR-92 WB Ramps/Chess Drive
Intersection Level Of Service Report
NoYesNoYesCrosswalk
NoNoNoNoCurb Present

0.000.000.000.00Grade [%]

30.0030.0030.0030.00Speed [mph]

49.210.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 100000000000No. of Lanes in Exit Pocket
500.00100.00480.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 101000000000No. of Lanes in Entry Pocket

12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Office driveway Chess DrChess DriveName
Intersection Setup
112/6/2025Kimley-Horn
Scenario 10: 10 Cumulative PM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

782

0100Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
255411124735427014696143000Total Analysis Volume [veh/h] 641281129167367153750Total 15-Minute Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor

0.93000.93000.93000.93000.93000.93000.93000.93000.93000.93000.93000.9300Peak Hour Factor 237410324433425113665712790Total Hourly Volume [veh/h]
00010010030700Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
600000021152040Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor

0.00Proportion of CAVs [%]

1.301.301.301.301.301.301.301.301.301.301.301.30Heavy Vehicles Percentage [%]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 231410334433523012148782750Base Volume Input [veh/h]
Office driveway Chess DrChess DriveName
Volumes
122/6/2025Kimley-Horn
Scenario 10: 10 Cumulative PM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

783

0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft]

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoPedestrian Recall
NoNoNoNoNoMaximum Recall
NoNoNoNoNoMinimum Recall

0.03.50.00.01.70.00.02.50.02.12.10.0l2, Clearance Lost Time [s]

0.02.00.00.02.00.00.02.00.02.02.00.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk

0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 000017001201000Pedestrian Clearance [s]
000050050500Walk [s]

0.03.00.00.03.00.00.03.00.03.03.00.0Vehicle Extension [s] 01500110090050500Split [s]

0.01.00.00.01.00.00.01.00.01.01.00.0All red [s]

0.04.50.00.02.70.00.03.50.03.13.10.0Amber [s]
0100070085046460Maximum Green [s]
0500400100560Minimum Green [s]
------------Lead / Lag
Auxiliary Signal Groups
020040080610Signal Group
UnsignaPermissPermissPermissPermissPermissPermissPermissPermissProtectePermissPermissControl Type Phasing & Timing

12.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference

51.0Offset [s]
Fully actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
120Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
132/6/2025Kimley-Horn
Scenario 10: 10 Cumulative PM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

784

142.84142.75203.35395.771598.831598.83342.16367.3295th-Percentile Queue Length [ft/ln]

5.715.718.1315.8363.9563.9513.6914.6995th-Percentile Queue Length [veh/ln]

79.3679.31115.30262.831165.801165.80220.42240.2250th-Percentile Queue Length [ft/ln]

3.173.174.6110.5146.6346.638.829.6150th-Percentile Queue Length [veh/ln] NoNoYesNoNoYesYesNoCritical Lane Group
FFFDFFCCLane Group LOS
105.57105.71104.8348.96150.91150.9127.6734.96d, Delay for Lane Group [s/veh]

0.760.760.820.411.161.160.410.35X, volume / capacity
Lane Group Results

1.001.001.001.001.001.001.001.00PF, progression factor

1.001.001.001.001.001.001.001.00Rp, platoon ratio

0.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]

14.4214.5514.951.9088.7488.740.181.12d2, Incremental Delay [s]

1.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.110.110.110.500.500.500.110.50k, delay calibration

91.1591.1689.8847.0662.1662.1627.4933.83d1, Uniform Delay [s] 76751026636336331491858c, Capacity [veh/h]
17971791183518761791179128291880s, saturation flow rate [veh/h]

0.030.030.050.150.410.410.220.16(v / s)_i Volume / Saturation Flow Rate

0.040.040.060.350.350.350.530.46g / C, Green / Cycle
881168686810188g_i, Effective Green Time [s]

3.503.501.702.502.502.502.102.10l2, Clearance Lost Time [s]

0.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]

5.505.503.704.504.504.504.104.10L, Total Lost Time per Cycle [s] 192192192192192192192192C, Cycle Length [s]
CLCCCLRCLane Group
Lane Group Calculations
142/6/2025Kimley-Horn
Scenario 10: 10 Cumulative PM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

785

Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh] 34.96 34.96 27.67 150.91 48.96 48.96 104.83 104.83 104.83 105.64 105.57 0.00 Movement LOS C C C F D D F F F F F
d_A, Approach Delay [s/veh] 30.06 134.88 104.83 34.51
Approach LOS C F F C
d_I, Intersection Delay [s/veh] 96.41
Intersection LOS F
Intersection V/C 0.718
Other Modes
g_Walk,mi, Effective Walk Time [s] 9.0 0.0 9.0 0.0
M_corner, Corner Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s] 87.40 0.00 87.40 0.00
I_p,int, Pedestrian LOS Score for Intersectio 3.086 0.000 1.799 0.000 Crosswalk LOS C F A F
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h] 477 889 76 99 d_b, Bicycle Delay [s] 55.77 29.69 89.07 86.93
I_b,int, Bicycle LOS Score for Intersection 3.574 2.998 1.700 1.749 Bicycle LOS D C A A
----------------Ring 4
----------------Ring 3
------------846-Ring 2
--------------21Ring 1
Sequence
152/6/2025Kimley-Horn
Scenario 10: 10 Cumulative PM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

786

0.664Volume to Capacity (v/c):

FLevel Of Service:
142.0Delay (sec / veh):
15 minutesAnalysis Period:

HCM 7th EditionAnalysis Method:

SignalizedControl Type:

Intersection 4: Foster City Boulevard/Chess Drive
Intersection Level Of Service Report
NoYesYesYesCrosswalk
NoNoNoNoCurb Present

0.000.000.000.00Grade [%]

30.0030.0025.0030.00Speed [mph]

0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket
100.00100.00510.00180.00100.0080.00100.00100.00100.00100.00100.0095.00Entry Pocket Length [ft] 001101001101No. of Lanes in Entry Pocket

12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Foster City BoulevardFoster City BoulevardChess Drive Chess DrName Intersection Setup
162/6/2025Kimley-Horn
Scenario 10: 10 Cumulative PM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

787

0000Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
1002557521841184154651930904744Total Analysis Volume [veh/h] 2564188462964121307701211Total 15-Minute Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 1002557521841184154651930904744Total Hourly Volume [veh/h] 25009900110048700Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
37000014173620100Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor

0.00Proportion of CAVs [%]

2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 88255752283118414533462474873744Base Volume Input [veh/h] Foster City BoulevardFoster City BoulevardChess Drive Chess DrName Volumes
172/6/2025Kimley-Horn
Scenario 10: 10 Cumulative PM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

788

0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.040.040.040.040.040.00.00.00.00.00.00.0Detector Length [ft]

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoPedestrian Recall
YesNoNoNoNoNoMaximum Recall
NoNoNoNoNoNoMinimum Recall

0.02.62.51.62.91.60.01.60.00.01.60.0l2, Clearance Lost Time [s]

0.02.02.02.02.02.00.02.00.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk

0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 023001000230000Pedestrian Clearance [s]
050000040000Walk [s]

0.03.03.03.03.03.00.03.00.00.03.00.0Vehicle Extension [s] 0572752471903400520Split [s]

0.01.01.01.01.01.00.01.00.00.01.00.0All red [s]

0.03.63.52.63.92.60.02.60.00.02.60.0Amber [s]
0535547421603000470Maximum Green [s]
064464040040Minimum Green [s]
--Lead--Lead------Lead / Lag
2,3Auxiliary Signal Groups
061325040030Signal Group
PermissPermissPermissOverlapPermissProtecteSplitSplitSplitSplitSplitSplitControl Type Phasing & Timing

0.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference

90.0Offset [s]
Fully actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
120Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
182/6/2025Kimley-Horn
Scenario 10: 10 Cumulative PM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

789

127.86140.48297.09217.851261.8636.031632.32535.360.0081.9476.7595th-Percentile Queue Length [ft/ln]

5.115.6211.888.7150.471.4465.2921.410.003.283.0795th-Percentile Queue Length [veh/ln]

71.0378.04185.43125.86866.8620.021067.26376.290.0045.5242.6450th-Percentile Queue Length [ft/ln]

2.843.127.425.0334.670.8042.6915.050.001.821.7150th-Percentile Queue Length [veh/ln] NoNoNoNoYesNoYesNoNoYesNoCritical Lane Group
BBDCFFFFAEELane Group LOS

14.2314.2036.4133.45179.48107.85359.9091.640.0067.1167.10d, Delay for Lane Group [s/veh]

0.170.160.610.291.260.671.630.920.000.250.25X, volume / capacity Lane Group Results

1.001.001.001.001.001.001.001.001.001.001.00PF, progression factor

1.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio

0.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]

0.350.312.300.26120.8329.52295.2528.150.000.720.74d2, Incremental Delay [s]

1.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.500.500.500.110.180.110.500.400.110.110.11k, delay calibration

13.8913.8834.1133.1958.6578.3364.6563.500.0066.3966.36d1, Uniform Delay [s] 10221129122662593922347335157184176c, Capacity [veh/h]
16931870222115893560178118431781158918701781s, saturation flow rate [veh/h]

0.100.100.340.120.330.010.310.170.000.030.02(v / s)_i Volume / Saturation Flow Rate

0.600.600.600.390.260.010.190.190.100.100.10g / C, Green / Cycle 969696634223030161616g_i, Effective Green Time [s]

2.602.600.000.002.901.601.601.601.601.601.60l2, Clearance Lost Time [s]

0.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]

4.604.604.603.604.903.603.603.603.603.603.60L, Total Lost Time per Cycle [s] 159159159159159159159159159159159C, Cycle Length [s]
CCLRCLCLRCLLane Group
Lane Group Calculations
192/6/2025Kimley-Horn
Scenario 10: 10 Cumulative PM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

790

Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh] 67.10 67.11 0.00 91.64 359.90 359.90 107.85 179.48 33.45 36.41 14.21 14.23 Movement LOS E E A F F F F F C D B B
d_A, Approach Delay [s/veh] 67.10 265.06 159.28 29.29
Approach LOS E F F C
d_I, Intersection Delay [s/veh] 141.96
Intersection LOS F
Intersection V/C 0.664
Other Modes
g_Walk,mi, Effective Walk Time [s] 4.0 9.0 8.0 0.0
M_corner, Corner Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s] 75.68 70.88 71.83 0.00
I_p,int, Pedestrian LOS Score for Intersectio 3.820 2.518 2.921 0.000 Crosswalk LOS D B C F
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h] 608 382 529 658 d_b, Bicycle Delay [s] 38.58 52.13 43.09 35.85
I_b,int, Bicycle LOS Score for Intersection 2.513 3.020 2.782 2.494 Bicycle LOS B C C B
----------------Ring 4
----------------Ring 3
--------------65Ring 2
------------4321Ring 1
Sequence
202/6/2025Kimley-Horn
Scenario 10: 10 Cumulative PM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

791

0.625Volume to Capacity (v/c):

DLevel Of Service:

36.6Delay (sec / veh):
15 minutesAnalysis Period:

HCM 7th EditionAnalysis Method:

SignalizedControl Type:

Intersection 5: SR-92 EB Ramps/Metro Center Boulevard
Intersection Level Of Service Report
NoYesNoNoCrosswalk
NoNoNoNoCurb Present

0.000.000.000.00Grade [%]

30.0030.0030.0015.00Speed [mph]

0.000.000.000.000.000.0049.210.000.000.000.000.00Exit Pocket Length [ft] 000000100000No. of Lanes in Exit Pocket
100.00100.0090.00100.00100.00290.00640.00100.00600.00100.00100.00100.00Entry Pocket Length [ft] 001002101000No. of Lanes in Entry Pocket

12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Metro Center BoulevarParking Lot AccessName
Intersection Setup
212/6/2025Kimley-Horn
Scenario 10: 10 Cumulative PM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

792

0000Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
7612561419395676358308226113Total Analysis Volume [veh/h] 19064459916992775153Total 15-Minute Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor

0.97000.97000.97000.97000.97000.97000.97000.97000.97000.97000.97000.9700Peak Hour Factor 7382481418383656348299215913Total Hourly Volume [veh/h] 3970050019001200Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
291400300030000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor

0.00Proportion of CAVs [%]

1.901.901.901.901.901.901.901.901.901.901.901.90Heavy Vehicles Percentage [%]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 11062341423380656538269335913Base Volume Input [veh/h]
Metro Center BoulevarParking Lot AccessName
Volumes
222/6/2025Kimley-Horn
Scenario 10: 10 Cumulative PM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

793

0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.040.040.00.040.040.040.040.00.00.040.00.0Detector Length [ft]

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoPedestrian Recall
NoNoNoNoYesNoMaximum Recall
NoNoNoNoNoNoMinimum Recall

0.02.51.60.02.51.61.63.00.00.02.20.0l2, Clearance Lost Time [s]

0.02.02.00.02.02.02.02.00.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk

0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 000017101000000Pedestrian Clearance [s]
000065500000Walk [s]

0.03.03.00.03.03.03.03.00.00.03.00.0Vehicle Extension [s] 0542007137371800110Split [s]

0.01.01.00.01.01.01.01.00.00.01.00.0All red [s]

0.03.52.60.03.52.62.64.00.00.03.20.0Amber [s]
049170663434130070Maximum Green [s]
0440444100040Minimum Green [s]
--Lead--Lead------Lead / Lag
Auxiliary Signal Groups
061025540030Signal Group
PermissPermissProtectePermissPermissProtectePermissPermissPermissPermissPermissPermissControl Type Phasing & Timing

12.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference

30.0Offset [s]
Fully actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
120Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
232/6/2025Kimley-Horn
Scenario 10: 10 Cumulative PM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

794

314.2314.2203.325.2286.0587.36380.3322.74255.56255.2331.12116.3295th-Percentile Queue Length [ft/ln]

12.5712.578.131.013.443.4915.210.9110.2210.211.244.6595th-Percentile Queue Length [veh/ln] 198.6198.6115.314.0147.8148.54250.5412.63153.85153.6017.2964.6250th-Percentile Queue Length [ft/ln]

7.957.954.610.561.911.9410.020.516.156.140.692.5850th-Percentile Queue Length [veh/ln] NoYesNoNoNoNoYesNoNoYesNoYesCritical Lane Group
CCCEAADDEEEELane Group LOS

24.8424.8420.5379.437.307.3048.3148.7479.4879.5556.0567.66d, Delay for Lane Group [s/veh]

0.510.510.290.580.160.160.870.110.800.800.260.74X, volume / capacity Lane Group Results

1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor

1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio

0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]

2.502.500.8520.570.280.283.320.7227.4627.531.5711.70d2, Incremental Delay [s]

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.500.500.500.110.500.500.110.500.500.500.110.12k, delay calibration

22.3322.3319.6958.867.027.0244.9948.0152.0252.0254.4855.96d1, Uniform Delay [s] 744744876241248126877331319819885100c, Capacity [veh/h] 159115911871178218411871346128161787178215911855s, saturation flow rate [veh/h]

0.240.240.140.010.110.110.200.010.090.090.010.04(v / s)_i Volume / Saturation Flow Rate

0.470.470.470.010.680.680.220.110.110.110.050.05g / C, Green / Cycle 565656281812713131366g_i, Effective Green Time [s]

2.502.502.501.602.502.501.603.003.003.002.202.20l2, Clearance Lost Time [s]

0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]

4.504.504.503.604.504.503.605.005.005.004.204.20L, Total Lost Time per Cycle [s] 120120120120120120120120120120120120C, Cycle Length [s] RCCLCCLRCLRCLane Group
Lane Group Calculations
242/6/2025Kimley-Horn
Scenario 10: 10 Cumulative PM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

795

Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh] 67.66 67.66 56.05 79.52 79.48 48.74 48.31 7.30 7.30 79.43 20.53 24.84 Movement LOS E E E E E D D A A E C C
d_A, Approach Delay [s/veh] 65.00 76.45 32.73 24.51
Approach LOS E E C C
d_I, Intersection Delay [s/veh] 36.61
Intersection LOS D
Intersection V/C 0.625
Other Modes
g_Walk,mi, Effective Walk Time [s] 0.0 0.0 13.0 0.0
M_corner, Corner Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s] 0.00 0.00 47.70 0.00
I_p,int, Pedestrian LOS Score for Intersectio 0.000 0.000 2.703 0.000 Crosswalk LOS F F B F
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h] 113 217 1108 825 d_b, Bicycle Delay [s] 53.39 47.70 11.93 20.71
I_b,int, Bicycle LOS Score for Intersection 1.738 2.170 2.463 2.738 Bicycle LOS A B B B
----------------Ring 4
----------------Ring 3
--------------65Ring 2
------------4321Ring 1
Sequence
252/6/2025Kimley-Horn
Scenario 10: 10 Cumulative PM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

796

0.507Volume to Capacity (v/c):

DLevel Of Service:

48.8Delay (sec / veh):
15 minutesAnalysis Period:

HCM 7th EditionAnalysis Method:

SignalizedControl Type:

Intersection 6: Foster City Boulevard/Metro Center Boulevard Intersection Level Of Service Report
YesNoYesNoCrosswalk
NoNoNoNoCurb Present

0.000.000.000.00Grade [%]

35.0035.0025.0030.00Speed [mph]

0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket
100.00100.00100.00100.00100.00210.00170.00100.0050.00240.00100.00150.00Entry Pocket Length [ft] 101101101101No. of Lanes in Entry Pocket

12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Foster City BoulevardFoster City BoulevardMetro Center BoulevardMetro Center BoulevarName Intersection Setup
262/6/2025Kimley-Horn
Scenario 10: 10 Cumulative PM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

797

0000Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
7661921546090718619318265109308226Total Analysis Volume [veh/h] 191555411522747484616277757Total 15-Minute Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 7661921546090718619318265109308226Total Hourly Volume [veh/h] 1900461001040011000Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
040431900000033Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor

0.00Proportion of CAVs [%]

2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 9561521587888818629718265219308193Base Volume Input [veh/h] Foster City BoulevardFoster City BoulevardMetro Center BoulevardMetro Center BoulevarName Volumes
272/6/2025Kimley-Horn
Scenario 10: 10 Cumulative PM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

798

0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.040.040.00.00.00.00.00.00.040.040.00.0Detector Length [ft]

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoPedestrian Recall
YesNoYesNoNoNoNoMaximum Recall
NoNoNoNoNoNoNoMinimum Recall

0.02.61.60.02.61.60.02.20.01.62.20.0l2, Clearance Lost Time [s]

0.02.02.00.02.02.00.02.00.02.02.00.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk

0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0190020001000270Pedestrian Clearance [s]
050050050050Walk [s]

0.03.03.00.03.03.00.03.00.03.03.00.0Vehicle Extension [s] 0412904231033029310Split [s]

0.01.01.00.01.01.00.01.00.01.01.00.0All red [s]

0.03.62.60.03.62.60.03.20.02.63.20.0Amber [s]
0362503728029025260Maximum Green [s]
064064060460Minimum Green [s]
--Lead--Lead------Lead / Lag
1,4Auxiliary Signal Groups
061025030140Signal Group
PermissPermissProtectePermissPermissProtecteSplitSplitSplitOverlapSplitSplitControl Type Phasing & Timing

0.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference

43.0Offset [s]
Semi-actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
120Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
282/6/2025Kimley-Horn
Scenario 10: 10 Cumulative PM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

799

257.14251.48326.71267.73334.75281.64323.02279.3997.5547.15227.38169.3095th-Percentile Queue Length [ft/ln]

10.2910.0613.0710.7113.3911.2712.9211.183.901.899.106.7795th-Percentile Queue Length [veh/ln] 155.04150.79208.35163.03214.62173.60205.48171.8954.1926.19132.8694.0550th-Percentile Queue Length [ft/ln]

6.206.038.336.528.586.948.226.882.171.055.313.7650th-Percentile Queue Length [veh/ln] NoNoYesNoYesNoYesNoNoNoYesNoCritical Lane Group
DDEDDEFEDCEELane Group LOS

36.4735.4673.6040.0239.9969.9682.1066.3253.6822.2858.9155.79d, Delay for Lane Group [s/veh]

0.390.390.870.510.560.870.820.650.250.090.580.44X, volume / capacity Lane Group Results

1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor

1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio

0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]

1.900.9315.722.081.3810.6625.6311.352.190.034.602.70d2, Incremental Delay [s]

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.500.500.200.500.500.110.500.500.500.110.500.50k, delay calibration

34.5734.5357.8937.9438.6159.3056.4754.9651.4922.2554.3253.09d1, Uniform Delay [s] 597120324689816272132372792651241530515c, Capacity [veh/h] 176835601781281350941781158918701781281335603459s, saturation flow rate [veh/h]

0.130.130.120.160.180.100.120.100.040.040.090.07(v / s)_i Volume / Saturation Flow Rate

0.340.340.140.320.320.120.150.150.150.440.150.15g / C, Green / Cycle 464619444416202020602020g_i, Effective Green Time [s]

2.602.601.602.602.601.602.202.202.200.002.202.20l2, Clearance Lost Time [s]

0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]

4.604.603.604.604.603.604.204.204.203.604.204.20L, Total Lost Time per Cycle [s] 137137137137137137137137137137137137C, Cycle Length [s] CCLRCLRCLRCLLane Group
Lane Group Calculations
292/6/2025Kimley-Horn
Scenario 10: 10 Cumulative PM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

800

Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh] 55.79 58.91 22.28 53.68 66.32 82.10 69.96 39.99 40.02 73.60 35.71 36.47 Movement LOS E E C D E F E D D E D D
d_A, Approach Delay [s/veh] 51.61 71.37 43.59 44.73
Approach LOS D E D D
d_I, Intersection Delay [s/veh] 48.78
Intersection LOS D
Intersection V/C 0.507
Other Modes
g_Walk,mi, Effective Walk Time [s] 0.0 9.0 0.0 9.0
M_corner, Corner Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s] 0.00 59.80 0.00 59.80
I_p,int, Pedestrian LOS Score for Intersectio 0.000 2.653 0.000 2.987 Crosswalk LOS F B F C
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h] 391 420 546 531 d_b, Bicycle Delay [s] 44.32 42.73 36.20 36.94
I_b,int, Bicycle LOS Score for Intersection 2.181 2.457 2.667 2.071 Bicycle LOS B B B B
----------------Ring 4
----------------Ring 3
--------------65Ring 2
------------4321Ring 1
Sequence
302/6/2025Kimley-Horn
Scenario 10: 10 Cumulative PM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

801

0.003Volume to Capacity (v/c):

CLevel Of Service:

23.7Delay (sec / veh):
15 minutesAnalysis Period:

HCM 7th EditionAnalysis Method:

SignalizedControl Type:

Intersection 7: Shell Boulevard/Metro Center Boulevard
Intersection Level Of Service Report
YesYesYesYesCrosswalk
NoNoNoNoCurb Present

0.000.000.000.00Grade [%]

35.0030.0015.0030.00Speed [mph]

0.000.000.000.000.000.00100.000.000.000.000.000.00Exit Pocket Length [ft] 000000100000No. of Lanes in Exit Pocket
210.00100.00210.00100.00100.0090.00100.00100.0090.00100.00100.00170.00Entry Pocket Length [ft] 102001001001No. of Lanes in Entry Pocket

12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Name
Intersection Setup
312/6/2025Kimley-Horn
Scenario 10: 10 Cumulative PM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

802

0000Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
0105020000100Total Analysis Volume [veh/h]
021010000000Total 15-Minute Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor

0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 095020000100Total Hourly Volume [veh/h]
000000000000Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
095020000100Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor

0.00Proportion of CAVs [%]

2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 000000000000Base Volume Input [veh/h]
Name
Volumes
322/6/2025Kimley-Horn
Scenario 10: 10 Cumulative PM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

803

0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.040.040.00.040.040.00.040.040.00.040.040.0Detector Length [ft]

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoNoPedestrian Recall
NoNoNoNoNoNoNoNoMaximum Recall
NoNoNoNoNoNoNoNoMinimum Recall

0.02.52.50.02.51.50.02.51.50.02.51.5l2, Clearance Lost Time [s]

0.02.02.00.02.02.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk

0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0160023001800140Pedestrian Clearance [s]
050050050050Walk [s]

0.03.03.00.03.03.00.03.03.00.03.03.0Vehicle Extension [s] 035605324016803730Split [s]

0.01.00.50.01.00.50.01.00.50.01.00.5All red [s]

0.03.54.00.03.53.00.03.53.00.03.53.0Amber [s]
031204921012503327Maximum Green [s]
066064064064Minimum Green [s]
--Lead--Lead--Lead--LeadLead / Lag
Auxiliary Signal Groups
047083025061Signal Group
PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing

0.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference

0.0Offset [s]
Fully actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
120Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
332/6/2025Kimley-Horn
Scenario 10: 10 Cumulative PM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

804

0.000.353.940.110.110.000.000.003.130.000.0095th-Percentile Queue Length [ft/ln]

0.000.010.160.000.000.000.000.000.130.000.0095th-Percentile Queue Length [veh/ln]

0.000.202.190.060.060.000.000.001.740.000.0050th-Percentile Queue Length [ft/ln]

0.000.010.090.000.000.000.000.000.070.000.0050th-Percentile Queue Length [veh/ln] NoYesNoNoNoNoNoNoYesNoNoCritical Lane Group
AAEAAAAAFAALane Group LOS

0.001.1162.531.381.380.000.000.00100.580.000.00d, Delay for Lane Group [s/veh]

0.000.000.190.000.000.000.000.000.290.000.00X, volume / capacity Lane Group Results

1.001.001.001.001.001.001.001.001.001.001.00PF, progression factor

1.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio

0.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]

0.000.003.380.000.000.000.000.0040.820.000.00d2, Incremental Delay [s]

1.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.500.500.110.500.500.110.110.110.110.110.11k, delay calibration

0.001.1159.151.381.380.000.000.0059.760.000.00d1, Uniform Delay [s] 137330762715861586130341c, Capacity [veh/h]
15893560345918701870178118701781158918701781s, saturation flow rate [veh/h]

0.000.000.000.000.000.000.000.000.000.000.00(v / s)_i Volume / Saturation Flow Rate

0.860.860.010.850.850.000.000.000.000.000.00g / C, Green / Cycle 1041041102102000000g_i, Effective Green Time [s]

2.502.502.502.502.501.502.501.502.502.501.50l2, Clearance Lost Time [s]

0.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]

4.504.504.504.504.503.504.503.504.504.503.50L, Total Lost Time per Cycle [s] 120120120120120120120120120120120C, Cycle Length [s]
RCLCCLCLRCLLane Group
Lane Group Calculations
342/6/2025Kimley-Horn
Scenario 10: 10 Cumulative PM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

805

Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh] 0.00 0.00 100.58 0.00 0.00 0.00 0.00 1.38 1.38 62.53 1.11 0.00 Movement LOS A A F A A A A A A E A A
d_A, Approach Delay [s/veh] 100.58 0.00 1.38 21.59
Approach LOS F A A C
d_I, Intersection Delay [s/veh] 23.73
Intersection LOS C
Intersection V/C 0.003
Other Modes
g_Walk,mi, Effective Walk Time [s] 9.0 9.0 9.0 9.0
M_corner, Corner Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s] 51.33 51.33 51.33 51.33
I_p,int, Pedestrian LOS Score for Intersectio 2.316 2.146 2.317 2.612 Crosswalk LOS B B B B
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h] 542 192 808 508 d_b, Bicycle Delay [s] 31.89 49.04 21.29 33.37
I_b,int, Bicycle LOS Score for Intersection 1.561 1.560 1.561 1.572 Bicycle LOS A A A A
----------------Ring 4
----------------Ring 3
------------8765Ring 2
------------4321Ring 1
Sequence
352/6/2025Kimley-Horn
Scenario 10: 10 Cumulative PM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

806

0.009Volume to Capacity (v/c):

FLevel Of Service:
305.0Delay (sec / veh):
15 minutesAnalysis Period:

HCM 7th EditionAnalysis Method:

SignalizedControl Type:

Intersection 8: Vintage Park Drive/Metro Center Boulevard Intersection Level Of Service Report
YesYesYesYesCrosswalk
NoNoNoNoCurb Present

0.000.000.000.00Grade [%]

35.0035.0030.0030.00Speed [mph]

0.000.000.000.000.000.000.000.000.00220.000.000.00Exit Pocket Length [ft] 000000000100No. of Lanes in Exit Pocket
140.00100.00260.00100.00100.00150.00100.00100.00270.00100.00100.00200.00Entry Pocket Length [ft] 101001001001No. of Lanes in Entry Pocket

12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration
WestboundEastboundSouthboundNorthboundApproach
Vintage Park DriveName
Intersection Setup
362/6/2025Kimley-Horn
Scenario 10: 10 Cumulative PM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

807

0000Bicycle Volume [bicycles/h]
0000v_ab, Corner Pedestrian Volume [ped/h]
0000v_ci, Inbound Pedestrian Volume crossing mi
0000v_co, Outbound Pedestrian Volume crossing
0000v_di, Inbound Pedestrian Volume crossing m
0000v_do, Outbound Pedestrian Volume crossing
000000000000Local Bus Stopping Rate [/h]
000000000000On-Street Parking Maneuver Rate [/h]
NoNoNoNoNoNoNoNoPresence of On-Street Parking
01000221000000Total Analysis Volume [veh/h]
020011200000Total 15-Minute Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor

0.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.92000.9200Peak Hour Factor 090022900000Total Hourly Volume [veh/h]
000000000000Right Turn on Red Volume [veh/h]
000000000000Other Volume [veh/h]
000000000000Existing Site Adjustment Volume [veh/h]
000000000000Pass-by Trips [veh/h]
000000000000Diverted Trips [veh/h]
090022900000Site-Generated Trips [veh/h]
000000000000In-Process Volume [veh/h]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor

0.00Proportion of CAVs [%]

2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%]

1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 000000000000Base Volume Input [veh/h]
Vintage Park DriveName
Volumes
372/6/2025Kimley-Horn
Scenario 10: 10 Cumulative PM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

808

0Pedestrian Clearance [s]
0Pedestrian Walk [s]
0Pedestrian Signal Group
Exclusive Pedestrian Phase

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.040.040.00.040.040.040.040.040.00.040.040.0Detector Length [ft]

0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoNoNoPedestrian Recall
NoNoNoNoNoNoNoNoNoMaximum Recall
NoNoNoNoNoNoNoNoNoMinimum Recall

0.02.51.50.02.51.51.51.71.50.02.21.5l2, Clearance Lost Time [s]

0.02.02.00.02.02.02.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk

0.00.00.00.00.00.00.00.00.00.00.00.0Delayed Vehicle Green [s] 0160019001700170Pedestrian Clearance [s]
050050050050Walk [s]

0.03.03.00.03.03.03.03.03.00.03.03.0Vehicle Extension [s] 028100351818463802013Split [s]

0.01.00.50.01.00.50.51.00.50.01.00.5All red [s]

0.03.53.00.03.53.03.02.73.00.03.23.0Amber [s]
02470311515423501610Maximum Green [s]
065065564064Minimum Green [s]
--Lead--Lag--Lead--LeadLead / Lag
Auxiliary Signal Groups
047083325061Signal Group
PermissPermissProtectePermissPermissProtecteProtectePermissProtectePermissPermissProtecteControl Type Phasing & Timing

0.00Lost time [s]
SingleBandPermissive Mode
Lead Green - Beginning of First GreenOffset Reference

0.0Offset [s]
Fully actuatedActuation Type
Time of Day Pattern CoordinatedCoordination Type
Pattern 1Active Pattern
120Cycle Length [s]
-Signal Coordination Group
NoLocated in CBD
Intersection Settings
382/6/2025Kimley-Horn
Scenario 10: 10 Cumulative PM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

809

0.000.340.000.070.075.3843.880.000.000.000.000.0095th-Percentile Queue Length [ft/ln]

0.000.010.000.000.000.221.760.000.000.000.000.0095th-Percentile Queue Length [veh/ln]

0.000.190.000.040.042.9924.380.000.000.000.000.0050th-Percentile Queue Length [ft/ln]

0.000.010.000.000.000.120.980.000.000.000.000.0050th-Percentile Queue Length [veh/ln] NoYesNoNoNoNoYesNoNoNoNoNoCritical Lane Group
AAAAAFFAAAAALane Group LOS

0.001.090.001.041.04100.92710.540.000.000.000.000.00d, Delay for Lane Group [s/veh]

0.000.000.000.000.000.392.170.000.000.000.000.00X, volume / capacity Lane Group Results

1.001.001.001.001.001.001.001.001.001.001.001.00PF, progression factor

1.001.001.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio

0.000.000.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s]

0.000.000.000.000.0041.22650.730.000.000.000.000.00d2, Incremental Delay [s]

1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor

0.500.500.110.500.500.110.110.110.110.110.110.11k, delay calibration

0.001.090.001.041.0459.7059.810.000.000.000.000.00d1, Uniform Delay [s] 137630810162416245591110c, Capacity [veh/h]
158935601781187018701781158918701781187018701781s, saturation flow rate [veh/h]

0.000.000.000.000.000.000.010.000.000.000.000.00(v / s)_i Volume / Saturation Flow Rate

0.870.870.000.870.870.000.000.000.000.000.000.00g / C, Green / Cycle 10410401041040010000g_i, Effective Green Time [s]

2.502.501.502.502.501.501.501.701.502.202.201.50l2, Clearance Lost Time [s]

0.000.000.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s]

4.504.503.504.504.503.503.503.703.504.204.203.50L, Total Lost Time per Cycle [s] 120120120120120120120120120120120120C, Cycle Length [s] RCLCCLRCLCCLLane Group
Lane Group Calculations
392/6/2025Kimley-Horn
Scenario 10: 10 Cumulative PM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

810

Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh] 0.00 0.00 0.00 0.00 0.00 710.54 100.92 1.04 1.04 0.00 1.09 0.00 Movement LOS A A A A A F F A A A A A
d_A, Approach Delay [s/veh] 0.00 710.54 50.98 1.09
Approach LOS A F D A
d_I, Intersection Delay [s/veh] 305.01
Intersection LOS F
Intersection V/C 0.009
Other Modes
g_Walk,mi, Effective Walk Time [s] 9.0 9.0 9.0 9.0
M_corner, Corner Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped] 0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s] 51.33 51.33 51.33 51.33
I_p,int, Pedestrian LOS Score for Intersectio 2.315 2.317 2.321 2.470 Crosswalk LOS B B B B
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h] 263 705 508 392 d_b, Bicycle Delay [s] 45.23 25.15 33.37 38.79
I_b,int, Bicycle LOS Score for Intersection 1.560 1.576 1.563 1.568 Bicycle LOS A A A A
----------------Ring 4
----------------Ring 3
------------8765Ring 2
------------4321Ring 1
Sequence
402/6/2025Kimley-Horn
Scenario 10: 10 Cumulative PM - Plus 800,000 SFGilead Chess Hatch Version 2023 (SP 0-8)
Generated with

9.1 Attachment 4 - Preliminary Traffic Impact Study Results

811

E
kimley-horn.com 4637 Chabot Drive, Suite 300, Pleasanton, CA 94588 925 398 4840 Appendix E – C/CAG VMT Estimation Tool Report

9.1 Attachment 4 - Preliminary Traffic Impact Study Results