Attachment 3 - Construction Photographs

Foster City City Council
June 16, 2025

Document
Attachment 3 - Construction Photographs
Meeting
June 16, 2025
Body
Foster City City Council
Original file
8.3 MB
Text extracted from the city's file for reading and search. Open the original on fostercity.primegov.com. That file is the official record.

Area 51 Headworks Piping
April 4, 2025

January 8, 2025

January through March 2025 PAGE 15

Area 51 Preliminary Screens Area
April 4, 2025

January 8, 2025

January through March 202 5 PAGE 16

Area 51 Electrical Room
April 4, 2025

January 8, 2025

January through March 202 5 PAGE 1 7

Area 51 Dumpster Bay
April 4, 2025

January 8, 2025

Area 51 Grit Washers
April 4, 2025

January 8, 2025

January through March 202 5 PAGE 19

Area 64 Odor Control Area
April 4, 2025

January 08, 2025

January through March 2025 PAGE 20

Area 52 Primary Clarifiers

April 4, 2025

January 08, 2025

January through March 20254 P A G E 21

View Inside the Electrical Room for Area 56
April 4, 2025

January 8, 2025

January through March 2025 Page 22

View inside the Membrane Permeate Pump Room Area 56
April 4, 2025

January 8, 2025

January through March 2025 Page 23

Area 56 MBR Cartridge Trains
April 4, 2025

January 8, 2025

January through March 2025 Page 24

Area 56 Blowers Room
April 4, 2025

January 08, 2025

January through March 2025 Page 25

View of Area 80 – Ongoing Work
April 4, 2025

January 8. 2025

January through March 2025 Page 26

Area 80 Admin Building Exterior North elevation.

April 4, 2025

January 8, 2025

January through March 2025 Page 27

East Elevation
April 4, 2025

January 8, 2025

January through March 2025 Page 28

Area 80 Admin. Bldg. - South Elevation
April 5, 2025

January 8, 2025

January through March 2025 Page 29

View of the Warehouse
April 4, 2025

January 2, 2025

January through March 2025 Page 30

IAP2
Hopper
April 4, 2025

January 2, 2025

January through March 2025 P A G E 33

Piping
April 4, 2025

January 2, 2025

January through March 2025 P A G E 34

IAP3
Site Waste Station Site
April 4, 2025

January 2, 2025

January through March 2025 P A G E 37

Effluent Pump Station Site- Drilling Wet Well
April 4, 2025

January 2, 2025

January through March 2025 P A G E 38