Cities Index.
Attachment 8 - Building Maintenance Fund Narrative

Foster City City Council
March 23, 2026

Document
Attachment 8 - Building Maintenance Fund Narrative
Meeting
March 23, 2026
Body
Foster City City Council
Original file
323 KB
Text extracted from the city's file for reading and search. Open the original on fostercity.primegov.com. That file is the official record.

Attachment 8
Building Maintenance Fund

The Building Maintenance Fund captures and distributes the costs of City-wide Building Maintenance. Building Maintenance Division staff ensures that all City facilities are safe and clean by providing management, maintenance and inspection of City/District buildings and equipment, develop ongoing maintenance systems and procedures, provide efficient, timely and quality service to maintain the 161,110 square feet of diverse facilities for the hours of operation that meet community needs and industry standards.

In FY 2025-2026 Building Maintenance completed the following significant projects in addition to routine and emergency repair and preventative maintenance:

Police Department
Renovated hallways and men’s restrooms
Police Department Kitchen Remodel (CIP 301-711)
Converted the radio/interrogation room into a staff break room Renovated two holding rooms and installed new ceiling-mounted surveillance cameras Converted the former records room into an office for the Dispatch Office Replaced the HVAC unit serving the Dispatch computer room. Renovated the radar/body camera closet and improved the charging station area. Upgraded door access for two rooms from an electronic key system to a card-access system.
Upgraded lighting in select rooms, break rooms, and kitchen areas from fluorescent to LED
Repaired the exterior gym wall after a vehicle collision and installed parking bumpers to prevent recurrence.
Repaired the Police Department HVAC system.
Removed exterior window tint at the Police Department. Coordinated with IT to install wiring and a video system in the Police Station Corporation Yard
Completed Corporation Yard Exterior Painting (CIP 301-699) Installed four commercial-grade steel double doors
Repaired damaged wood throughout shop sheds
Set up a new Engineering office for an employee
Upgraded high-pole and wall-mounted exterior lights to LED Replaced the radiator unit in the Corporation Yard crane

City Hall
Sealed the rear side of City Hall to address exterior leaks Installed bird netting to protect the HVAC unit and filters from nesting and debris Converted fluorescent lighting to LED in in several areas Created a resting area in City Hall for Police Department Library and Community Center
Installed a new water cooler with bottle dispenser in the library Replaced the boiler expansion tank
Retrofitted lighting to LED in various areas including high-ceiling metal halide fixtures to LED throughout Community Center hallways

← All documents from this meeting