ALBRAE INDUSTRIAL PROJECT

1 ST

ADDENDUM

TO THE GLOBE PLANNED DISTRICT

EIR AND SUPPLEMENTAL EIR
STATE CLEARINGHOUSE NUMBER 2005042146

Lead Agency:

City of Fremont
Community Development Department
39550 Liberty St.

Fremont, CA 94538

Prepared By:

Lamphier–Gregory, Inc.
4100 Redwood Rd, STE 20A - #601
Oakland, CA 94619

January 2022

Albrae Industrial Project – The Globe Planned District Addendum Page i Table of Contents
page
I.  Background, Purpose, and Organization ...................... ...................................................... 1 II.  Project Description  ....................................... ..................................................................... 4 III.  Summary of CEQA Findings  ................................. ............................................................. 15 IV.   Environmental Checklist .................................. ................................................................ 16 Overview.................................................................................................................................. 16 A. Aesthetics  ............................................................................................................................ 17 B. Agricultural and Forest Resources ...................................................................................... 20 C. Air Quality  ............................................................................................................................ 23 D. Biological Resources  ............................................................................................................ 29 E. Cultural and Tribal Cultural Resources ................................................................................ 33 F. Geology and Soils  ................................................................................................................. 39 G. Greenhouse Gas Emissions ................................................................................................. 44 H. Hazards and Hazardous Materials and Wildfire ................................................................. 48 I. Hydrology and Water Quality  ............................................................................................... 55 J. Land Use  ............................................................................................................................... 59 K. Mineral Resources  ............................................................................................................... 61 L. Noise .................................................................................................................................... 63 M. Population & Housing ........................................................................................................ 67 N. Public Services & Recreation .............................................................................................. 69 O. Transportation and Circulation  ........................................................................................... 71 P. Utilities and Service Systems and Energy  ............................................................................ 78 Q. Mandatory Findings of Significance  .................................................................................... 82 Attachments
A:   Standard Development Requirements and Mitigation Monitoring  and Reporting Program B:   Air Quality and Greenhouse Gas Emissions Analysis
C:   Cultural Resource Assessment
D:   Transportation Impact Analysis
Figures
Figure 1: Project Location  ....................................................................................................................... 9 Figure 2: Existing Conditions ................................................................................................................ 10 Figure 3: Site Plan  ................................................................................................................................. 11 Figure 4: Elevations, Building 1 ............................................................................................................ 12 Figure 5: Elevations, Building 2 ............................................................................................................ 13 Figure 6: Elevations, Building 3 ............................................................................................................ 14 Tables
Table 1: Current Project Construction Period Criteria Pollutant Emissions  ......................................... 25 Table 2: Operational Criteria Pollutant Emissions  ................................................................................ 27 Table 3: Project Trip Generation .......................................................................................................... 75 Table 4: Project Daily Vehicle Miles Traveled Summary ...................................................................... 75

Albrae Industrial Project – The Globe Planned District Addendum Page 1 I. Background, Purpose, and Organization
Background and Previous Environmental Review
The Globe Planned District was conceptualized in the 2000s as r evitalization of an approximately 31‐ acre  industrial  area  with  largely  vacant  warehouse  and  commercial  buildings  as  a  multi‐cultural retail and entertainment destination.

As part of the approval process leading up to the Globe Planned  District approvals, a General Plan Amendment was approved in 2006 to re‐designate the site from In dustrial to Regional Commercial, for which an Environmental Impact Report (EIR) was prepared and  certified. This included an Initial Study  in  2005,  a  Draft  EIR  in  2005,  and  a  Final  EIR  in  2006.  For  subsequent  approval  of  the  Globe Planned  District  rezoning  in  2007,  a  Supplemental  EIR  was  prepared  in  2006  that  tiered  from  the earlier 2006 EIR. The Supplementa l EIR reflected minor changes  to the previously analyzed project, and no additional mitigation was deemed necessary. Together, th ese prior CEQA review documents (all  listed  under  State  Clearinghouse  Number  2005042146)  are  referred  to  as  the  “Prior  EIR”.  The Prior  EIR  is  hereby  incorporated  by  reference  and  can  be  obtain ed  from  the  City  of  Fremont Community Development Services Center at 39550 Liberty St., Fre mont, CA 94538, and on the City of  Fremont  website  at:  https://www.fremont.gov/430/Environmental‐Review  under  the  “Fremont Albrae Industrial” project. Referenced and additional project m aterials can also be accessed in those locations.

The Globe Planned District allowed for up to 557,900 square fee t of gross floor area (GFA), including 469,900 square feet of commercial GFA, and 88,000 square feet of mini‐storage GFA.

Since  approval  of  the  Globe  Planned  District,  the  parcels  fronting  Stevenson  Boulevard  developed generally as conceptualized under the Globe Planned District; t he remainder of the Planned District has not. The current project is located on the 22.48‐acre porti on of the Planned District that had not developed according to the Globe concept.

As  noted  above,  the  previous  approvals  included  an  Amendment  to t h e  F r e m o n t  G e n e r a l  P l a n  t o reflect  the  proposed  Globe  Planned  District.  The  Fremont  General  Plan  has  since  been  updated consistent  with  the  Globe  Planned  District.  The  Fremont  General   Plan  Update  EIR  (SCH  No. 2010082060)  is  hereby  incorporated  by  reference  and  can  be  obtained  from  the  City  of  Fremont Community  Development  Services  Center  available  in‐person  at  the  City  of  Fremont  Development Services  Center  at  39550  Liberty  St.,  Fremont,  CA  94538  and  onl ine  at www.fremont.gov/generalplan.

Standard Development Requirements
S i n c e  t h e  P r i o r  E I R ,  t h e  C i t y  o f  F r e m o n t  h a s  e s t a b l i s h e d  s t a n d ard  development  requirements  to address  resource  protection  (Fremont  Municipal  Code  Chapter  18.218).  These  requirements  apply to air quality (construction‐related emissions), biological res ources (special‐status species), cultural resources  (notification  of  affiliated  California  Native  American  Tribes  and  accidental  discovery  of cultural resources), and noise (construction‐related noise).

T h e  p r o p o s e d  p r o j e c t  w o u l d  c o m p l y  w i t h  t h e s e  s t a n d a r d  d e v e l o p m ent  requirements,  which  are detailed in the relevant sections (see Construction Activities  and Schedule, below and Sections: C(b)‐

Page 2 ends

Air Quality, D(d)‐Biological Res ources, E(b)‐Cultural Resources , F(c) Geology and Soils, H(b) Hazards and Hazardous Materials and Wildfire, L(a)‐ Noise) and are included in full in Appendix A.

Purpose
The purpose of this CEQA document is to analyze the current pro ject to determine if it qualifies for an Addendum pursuant to Public R esources Code Section 21166 and  State CEQA Guidelines Section 15164 such that no additional environmental review is required.

The  current  project  is  a  modification  of  a  22.48‐acre  portion  of  The  Globe  Planned  District  (see Background  and  Previous  Environmental  Review  above).  This  portio n  h a d  n o t  d e v e l o p e d  p e r  T h e Globe  Planned  District  concept  and  is  currently  unoccupied.  The   current  project  represents  a reversion of the site designation back to industrial and related uses (see Project Description below).

CEQA Guidelines section 15164 spec ifies that an addendum to an  adopted EIR may be prepared if only  minor  technical  changes  or  additions  are  necessary  or  none  of  the  conditions  described  in Section 15162 calling for the preparation of a subsequent EIR or negative declaration have occurred.

Section  15162  specifies  that  no  subsequent  EIR  shall  be  prepare d  unless  one  or  more  of  the following conditions are met:

1)  Substantial  changes  are  proposed  in  the  project  which  will  r equire  major  revisions  of  the previous  EIR  or  negative  declaration  due  to  the  involvement  of new  significant  environmental effects or a substantial increase in the severity of previously identified significant effects; 2)  Substantial  changes  occur  with  respect  to  the  circumstances  under  which  the  project  is undertaken which will require major revisions of the previous E IR or negative declaration due to the  involvement  of  new  significant  environmental  effects  or  a  s ubstantial  increase  in  the severity of previously identified significant effects; or 3)  New  information  of  substantia l  importance,  which  was  not  known  and  could  not  have  been known  with  the  exercise  of  reasonable  diligence  at  the  time  the   previous  EIR  or  negative declaration was certified as complete or the negative declaration was adopted, shows any of the following:

A)  The  project  will  have  one  or  more  significant  effects  not  discussed  in  the  previous  EIR  or negative declaration;
B)  Significant effects previousl y examined will be substantiall y more severe than shown in the previous EIR or negative declaration;
C)  Mitigation  measures  or  alternatives  previously  found  not  to  be  feasible  would  in  fact  be feasible, and would substantially reduce one or more significan t effects of the project, but the project proponents decline to adopt the mitigation measure  or alternative; or mitigation measures  or  alternatives  which  are  considerably  different  from  those  analyzed  in  the previous  EIR  or  negative  declaration  would  substantially  reduce o n e  o r  m o r e  s i g n i f i c a n t effects  on  the  environment,  but  the  project  proponents  decline to  adopt  the  mitigation measure or alternative.

Albrae Industrial Project – The Globe Planned District Addendum Page 3 The Environmental Checklist contained in this document summarizes the impact findings of the Prior EIR,  which  is  the  underlying  EIR  for  the  proposed  project,  and assesses  whether  impacts  of  the p r o p o s e d  p r o j e c t  w o u l d  f a l l  w i t h i n  t h o s e  i d e n t i f i e d  i n  t h e  P r i or  E I R  o r  w h e t h e r  n e w  o r  m o r e significant environmental impacts than those identified in the  Prior EIR are identified which would trigger the need for a Subsequent EIR.

Organization
Section I, Background, Purpose, and Organization (this section).

Section II, Project Description details the proposed project.

Section III, Summary of CEQA Findings summarizes the findings of this document.

Section  IV,  Environmental  Checklist  details  the  potential  envir onmental  impacts  of  the  project, including  the  impact  findings  of  the  Prior  EIR  and  relevant  Standard  Development  Requirements (SDRs) or Mitigation Measures (MMs) and explains whether the cu rrent project would cause new or more significant environmental impacts than those identified in the Prior EIR.

Attachment  A  includes  full  text  of  the  SDRs  and  MMs  applicable  to  the  current  project  in  the proposed Standard Development Requirements and Mitigation Monitoring and Reporting Program.

Page 4 ends

II. Project Description
Project Characteristics

1. Project Title:   Fremont Albrae Industrial Project

2. Lead Agency Name and Address:  City of Fremont
Community Development Department
39550 Liberty St.

Fremont, CA 94538

3. Contact Person and Phone Number:  Mark Hungerford, Associate Planner (510) 494‐4541
[email protected]

4. Project Location:  6000 Stevenson Boulevard and 40451 through 40525 Albrae Street, Fremont, CA
APNs: 531‐416‐003, ‐004, ‐005, ‐006

5. Project Sponsor’s Names and Address:  Scannell Properties San Francisco Bay Area Office
3468 Mt. Diablo Blvd.

Suite B‐115
Lafayette, CA 94549
Contact: Mac Carlsen
925.298.5204
[email protected]

6. General Plan Designations:  Regional Commercial (REG COM) (existing) Tech Industrial (proposed)

7. Zoning:   Planned District: The Globe (P‐2006‐10)  (existing) Planned District P‐2021‐160 (proposed)

8. Description of Project:   Addressed below

9. Surrounding Land Uses and Setting:   Addressed below

10. Other Public Agencies whose Approval is Required:

No  other  public  agency  approvals  are  required  for the proposed project.
1 1 .  H a v e  C a l i f o r n i a  Na t i v e  A m e r i c a n  t r i b e s  t r a d i t i o n a l l y  a n d  c ulturally  affiliated  with  the  project area  requested  consultation  pursuant  to  Public  Resources  Code  §21080.3.1?  If  so,  is  there  a plan for consultation that includes, for example, the determina tion of significance of impacts to tribal cultural resources, procedures regarding confidentiality, etc.? As discussed further under Section IV.E: Cultural and Tribal Cu ltural Resources, the California Native American tribes traditionally and culturally affiliated with th e project area were contacted to inform them of the project and so they may request consultation.

Albrae Industrial Project – The Globe Planned District Addendum Page 5 Project Site and Vicinity
Project Site
The  22.48‐acre  project  site  is  l ocated  within  the  31.48‐acre  Gl obe  Planned  District,  which  was approved by the City of Fremont in 2007 to allow for redevelopm ent of an industrially‐zoned area as a multi‐cultural retail and ente rtainment destination. Project  site addresses include 6000 Stevenson Boulevard and 40451 through 40525 Albrae Street. The location of the project is shown in Figure 1.

The remainder of the Globe Planned District is adjacent to the  northwest of the current project site.

These parcels fronting Stevenson Boulevard have been developed  generally as conceptualized under the Globe Planned District, with small format cultural restaurant, retail, and commercial spaces.

The  project  site  is  currently  unused  though  two  structures  are present.  On  the  northeastern  side along Albrae Street is a currently‐vacant approximately 80,000‐ square‐foot commercial building that was originally constructed in 1987 as a Home Depot. To the sout hwest of that is the remnant of a 1960‐constructed  manufacturing  building.  The  remnant  structure is  approximately  320  feet  wide and 250 feet long to cover approximately 80,000 square feet of  concrete floor surface. The remnant structure has a flat roof and lacks wall coverings so the steel  frame structure is visible. The existing condition of the project site is shown in Figure 2.

Surrounding Land Uses
Much of the project vicinity is developed with light industrial  and commercial uses. Residential uses begin  over  1,000  feet  from  the  project  site,  to  the  west  of  Stevenson  Boulevard  in  the  City  of Newark, and to the north on the other side of I‐880, in the City of Fremont Irvington area.

Surrounding  sites  include  commercial  establishments  and  restaurants.  East  of  the  project  site  on Encyclopedia are a cluster of three buildings that contain two  semiconductor manufacturers and an electronic component manufacturer.

Proposed Project
The  proposed  project  would  replace  existing  vacant  industrial  /  commercial  development  at  the

22.36‐acre project site with a total of 396,500 square feet of  warehouse, R&D manufacturing, and associated  office  uses  in  three  buildings.  See  the  project  site   plan  and  elevations  in  Figures  3 through 6.

Under  the  current  project,  the  applicant  seeks  to  amend  the  General  Plan  designation  of  a  22.48‐ acre portion of The Globe site from Regional Commercial to Tech  Industrial, and to rezone this same property  from  the  Globe  Planned  District  (P‐2006‐10)  to  a  new  Planned  District  (P‐2021‐160)  that follows the land use and development standards of the I‐T Tech Industrial zoning district.

Development pursuant to the project would include the following new buildings:

Building 1 at the southeast part of the site, which would consist of an a pproximately 190,503 square foot  warehouse  building  (including  approximately  8,000  square  fe e t  o f  o f f i c e  s p a c e  f o r the warehouse use) located along the site’s Albrae Street frontage

Page 6 ends

Building  2  at  the  southwest  part  of  the  site,  which  would  consist  of  an  approximately  157,783 square  foot  warehouse  building  (including  approximately  6,500  s quare  feet  of  office space for the warehouse use) located along the site’s Encyclopedia Circle frontage Building  3  at  the  northwest  part  of  the  site,  which  would  consist  of  approximately  10,000  square feet  of  office  and  approximately  36,839  square  feet  of  industrial  R&D/manufacturing space located on the Albrae Street frontage
Overall, the project would provide approximately 24,500 square  feet of office, 333,786 square feet of warehouse, and 36,839 square feet of industrial R&D/manufacturing space. 713 automobile parking spaces would be provided in surface park ing lots along internal drive aisles.

Truck docks would be located along the southwest side of Buildi ng 1 (38 bays), the northeast side of Building 2 (38 bays), and the southeast side of Building 3 (6 bays).

Comparison to The Globe Planned District (P-2006‐10)
The  impacts  of  the  entitled  project  were  evaluated  in  the  Prior   EIR  and  included  development assumptions  of  50,000  square  feet  of  Quality  Restaurant  and  412 ,252  square  feet  of  Regional Shopping Center on a 31.48 acre site.
102,000 square feet of Regional Shopping Center has already bee n constructed on 9 acres along the Stevenson Boulevard frontage.

The  remaining  envisioned  50,000  square  feet  of  Quality  Restaurant  and  310,252  square  feet  of Regional  Shopping  Center  were  not  built  and  the  remaining  22.48   acres  of  The  Globe  Planned District is vacant today.

The current project is proposing that the 22.48 acres of The Globe Planned District that has not been developed according to that plan instead be developed with the uses currently proposed.

Improvements and Landscaping
Access and Circulation
Access  to  the  site  would  be  provided  directly  through  two  driveways  on  Albrae  Street,  and  three driveways  on  Encyclopedia  Circle .  Internal  circulation  would  in clude  drive  aisles  between  and around all buildings and would connect to internal circulation  of the two adjacent developed parcels along Stevenson Boulevard, as well as maintaining circulation a ccess to the developed parcels to the east.

Utilities, Services, and Stormwater
The  proposed  project  would  include  utility  connections  to  existing  services  within  the  project  site and to adjacent existing services, which is anticipated to include the following:

Water Supply:   Alameda County Water District
Fire Protection:  City of Fremont Fire Department
Sanitary Sewer:   Union Sanitary District
Storm Drain:   City  of  Fremont,  Alameda  County  Flood  Control  Dis trict,  and  Alameda  County Water Control District

Albrae Industrial Project – The Globe Planned District Addendum Page 7 Gas and Electricity:   Pacifi c Gas and Electric (PG&E) Solid Waste:  Republic Services
Telephone:   AT&T
The  proposed  stormwater  system  includes  lined  bioretention  basins,  which  would  allow  natural cleaning  and  slowing  of  stormwater  prior  to  release  into  the  City’s  stormwater  system  without impacting site contamination (see Section H: Hazards & Hazardous Materials).

Landscaping
There are 28 trees on or near the project site. None of them ar e slated for removal as a part of this p r o j e c t .  A p p r o x i m a t e l y  2 0 7  t r e e s  w o u l d  b e  p l a n t e d  a s  p a r t  o f  t he  proposed  project.  A  total  of 129,907 square feet of landscaping is proposed, including lands caped bioretention areas. Trees and landscaping  would  be  distributed  throughout  the  site,  primarily  around  the  proposed  buildings, along drive aisles, and along adjacent public roadways.

Construction Activities and Schedule
Construction  of  the  project  is  projected  to  take  approximately  12  months  to  complete.  The applicants  had  originally  noted  a  target  start  date  of  August  2021,  which  was  incorporated  in  this analysis.  However,  a  later  start  date  would  have  the  same  or  reduced  impacts  (due  to  increasing emissions controls) and would not change the conclusions in this document.

Site grading activities would involve 35,995 cubic yards of cut  and 46,983 cubic yards of fill, mostly balanced on site. A total of 10,988 cubic yards of soil would be imported to the site.

Per  Fremont  Municipal  Code  (FM P)  18.218.050(c),  a  construction  management  plan  must  be submitted to the City for review and approval:

FMC  18.218.050(c):  Construction  Man agement  Plan.  Prior  to  the  i ssuance  of  the  first construction‐related  permit  for  a  new  development  project,  the project  applicant  and  his/her general contractor shall submit a construction management plan  (CMP) for review and approval by  the  planning  and  building  divisions  and  other  relevant  city departments,  such  as  the  fire department and the public works department, as directed. The CM P shall contain measures to minimize  potential  construction  impacts  including  measures  to  comply  with  all  construction‐ related  conditions  of  approval  (and  mitigation  measures  if  applicable)  such  as  dust  control, construction  emissions,  hazardous  materials,  construction  days/ hours,  construction  traffic control,  waste  reduction  and  recycling,  erosion  and  sedimentati on  control,  storm  water pollution  prevention,  noise  control,  complaint  management,  and  cultural  and  tribal  cultural resource  management  as  applicable.  The  CMP  shall  provide  projec t‐specific  information including descriptive procedures, approval documentation, and d rawings (such as a site logistics plan,  fire  safety  plan,  construction  phasing  plan,  proposed  truck  routes,  traffic  control  plan, complaint management plan, construction worker parking plan, an d litter/debris clean‐up plan) that specify how potential construction impacts will be minimiz ed and how each construction‐ related requirement will be satisfied throughout construction of the project.

Page 8 ends

AB52 Notification
I n  c o n f o r m a n c e  w i t h  t h e  r e q u i r e m e n t s  o f  P u b l i c  R e s o u r c e s  C o d e  section  21080.3.1,  notice  of  the proposed project was sent by certified mail and email on July 7 , 2021 to the fifteen Native American tribal representatives whose names and contact information were  provided by the Native American Heritage Commission. To date, no requests for consultation purs uant to AB52 have been received.

Additional details are provided in Section E, Cultural and Tribal Cultural Resources.

Project Approvals
This Addendum is intended to cover all the discretionary action s required for implementation of the project.  These  include,  without  limitation:  the  following  discretionary  approvals  from  the  City  of Fremont:
 General Plan Amendment (from Regional Commercial to Tech Industrial)  Rezoning (from Preliminary and Precise Planned District P‐2006‐10 to Preliminary and Precise Planned District P‐2021‐160)
 Tentative Parcel Map (#11171)
Other Public Agencies Requiring Approval
This  Addendum  covers  all  project  approvals,  without  limitations,  including,  among  other  things, acceptance of the Updated Risk M anagement Plan by the San Franc isco Bay Regional Water Quality Control  Board,  acceptance  of  stormwater  plans,  and  will‐serve  l etters  from  service  and  utility providers.

Albrae Industrial Project – The Globe Planned District Addendum Page 9

Figure 1: Project Location
Source: Fehr & Peers, April 2021, Transportation Demand Management Plan and Project Plan Set, dated 12/10/21

Page 10 ends

Figure 2: Existing Conditions
Source: Project Plan Set, dated 12/10/21

Albrae Industrial Project – The Globe Planned District Addendum Page 11

Figure 3: Site Plan
Source: Project Plan Set, dated 12/10/21

Page 12 ends

Figure 4: Elevations, Building 1
Source: Project Plan Set, dated 12/10/21

Albrae Industrial Project – The Globe Planned District Addendum Page 13

Figure 5: Elevations, Building 2
Source: Project Plan Set, dated 12/10/21

Page 14 ends

Figure 6: Elevations, Building 3
Source: Project Plan Set, dated 12/10/21

Albrae Industrial Project – The Globe Planned District Addendum Page 15 III. Summary of CEQA Findings
Given the substantial evidence included in this Addendum docume nt and attachments and the Prior EIR, the current project would not require subsequent analysis to th e Prior EIR pursuant to CEQA Guidelines Section  15162,  for  the  following  reasons  and  supported  by  the  a nalyses  and  conclusions  of  the environmental checklist contained herein:
( 1 )  T h e  c u r r e n t  p r o j e c t  w o u l d  n o t  r e s u l t  i n  n e w  s i g n i f i c a n t  e nvironmental  effects  or  a  substantial increase in the severity of previously identified significant effects; (2)   There  are  no  changes  in  circumstances  that  would  result  in  the  involvement  of  new  significant environmental  effects  or  a  substantial  increase  in  the  severity  of  previously  identified  significant effects; and
(3)   There  is  no  new  information  resulting  in  a  new  significant e f f e c t  n o t  d i s c u s s e d  i n  n e w  s i g n i f i c a n t environmental  effects,  a  substantial  increase  in  the  severity  o f  previously  identified  significant effects, or a change in the feasibility (or acceptance) of mitigation measures.

While  the  project  has  been  revised  since  the  Prior  EIR,  this  as sessment  has  determined  that  this Addendum, in conjunction with the Prior EIR, serve to satisfy r equirements under CEQA and no further documentation  is  required  per  CEQA  Guidelines  Sections  15164  an d  15162.  This  addendum  only includes  necessary  minor  technical  changes  and  none  of  the  conditions  described  in  CEQA  Guideline section 15162 requiring the preparation of a subsequent EIR or negative declaration have occurred.

M a r k   H u n g e r f o r d ,   A s s o c i a t e   P l a n n e r City of Fremont, Community Development

Page 16 ends

IV. ENVIRONMENTAL CHECKLIST
Overview
The  Environmental  Checklist  below  compares  potential  environment a l  i m p a c t s  o f  t h e  p r o j e c t  t o  t h e findings  of  the  Prior  EIR  (The  Globe  Planned  District  SCH  No.  2005042146),  notes  whether  the  project would  result  in  new  significant  impacts  or  impacts  substantially  greater  or  more  severe  than  those previously  identified  in  the  Prior  EIR,  and  includes  an  explanation  substantiating  the  findings  for  each topic.  It  uses  the  abbreviation  SU  for  Significant  and  Unavoidab l e, L T S  f or  l e ss t h an si g n i f ican t , L T S w / MMs for impacts that are reduced to LTS with implementation of  identified mitigation measures (MMs), and NI for when No Impact was identified in the Prior EIR. If SDRs are applicable, these are indicated.

The  checklist  also  lists  mitigation  measures  applicable  to  the current  project  impacts.  A  full  list  of  the applicable  MMs  can  be  found  in  Attachment  A,  Standard  Development  Requirements  and  Mitigation Monitoring  and  Reporting  Program  (SDR/MMRP).  Project  materials  and  more  detail  regarding  the impacts and mitigation from the Prior EIR is available within t hose complete documents available from the City of Fremont Community Development Department at 39550 L iberty St., Fremont, CA 94538, and on  the  City  of  Fremont  website  at:  https://www.fremont.gov/430/ Environmental‐Review  under  the “Fremont Albrae Industrial” project.

When a dash (‐‐) appears in the checklist below, it means that  the Prior EIR did not identify impacts or MMs related to that environmental topic.

Albrae Industrial Project – The Globe Planned District Addendum Page 17 A. Aesthetics

Impacts
Related To:

Prior EIR
Findings with
Implementation
of MM (If
Required)

PROJECT
Relationship to Prior
EIR Findings
Applicable SDRs or MMs
Project Level
of Significance
Equal or
Less
Severity
Substantial
Increase in
Severity
a. Scenic Vistas   LTS  ☒  ☐  ‐‐  LTS
b. Scenic Resources  NI  ☒  ☐  ‐‐  NI
c. Visual Character   NI  ☒  ☐  ‐‐  NI
d.  Light or Glare  NI  ☒  ☐  ‐‐  NI
Discussion
Aesthetic Changes from The Globe Planned District
As  under  The  Globe  Planned  District,  existing  structures  on  the  project  site  would  be  demolished  and replaced with new buildings. Project plans and elevations can be seen in Figures 3 through 5.

Scenic Vistas
a)   Would the project have a subs tantial adverse effect on a scenic vista? Same  Conclusion  (conclusion  remains  LTS) :  The  current  project  would  not  change  the  less‐than‐ significant conclusion as there are no scenic vistas across the  site from nearby locations and the project would not be prominent in scenic vistas from more distant locat ions. Therefore, the potential to impact views  is  generally  the  same  as  under  The  Globe  Planned  District  despite  revisions  to  the  specifics  of building massing and location.

The Prior EIR concluded that The Globe Planned District would n ot have a significant impact on scenic vistas because “preservation of  existing vistas will be maintai ned through the site plan and architectural review  process”.  The  Fremont  General  Plan  indicates  that  scenic   vistas  would  be  views  of  creeks, baylands, hillsides, and ridgelines from public spaces. 1 The project site itself is in a developed area and would not itself be considered a natural resource. The area in  which the project is located is generally flat and views across the site toward natural resources are alr eady predominantly blocked by other area development and landscaping. While there is the potential that  the project could be visible from more distant,  higher‐elevation  locations,  due  to  the  distance,  the  p r o j e c t  d e v e l o p m e n t  w o u l d  n o t  b e p r o m i n e n t  i n  t h o s e  v i e w s .  T h e r e f o r e ,  t h e  p r o j e c t  w o u l d  n o t  h a v e  the  potential  to  significantly  impact scenic  vistas.  The  conclusion  of  less‐than‐significant  in  regard  t o  s c e n i c  v i s t a s  w o u l d  r e m a i n  t h e  s a m e even with the specific massing and location of buildings proposed with the current project.

For  the  above  reasons,  the  proposed  project  would  not  result  in s i g n i f i c a n t  i m p a c t s  r e l a t e d  t o  s c e n i c vistas not previously identified in the EIR or addressed throug h uniformly applied development policies or standards and no further environmental review is necessary for this topic.

1 Fremont General Plan, Chapter 4: Community Character.

Page 18 ends

Scenic Resources
b)  Would  the  project  substantially  damage  scenic  resources,  incl u d ing , b u t  n ot  l i m i t e d  t o, t r ee s, r oc k outcroppings, and historic buildings within a state scenic highway? Same  Conclusion  (conclusion  remains  NI) :  The  current  project  would  not  change  the  no  impact c o n c l u s i o n  r e l a t e d  t o  s c e n i c  h i ghways,  as  the  lack  of  scenic  designation  of  the  nearby  highways  is  the same as under The Globe Planned District.

The  Prior  EIR  concluded  that  The  Globe  Planned  District  would  no t  h a v e  a n  i m p a c t  r e l a t e d  t o  s c e n i c highways. The State Scenic Highway Program was consulted to confirm that there remain no state scenic highways in the vicinity of the project site. The closest desig nated or eligible state scenic highways are I‐ 680, over 2 miles to the east, and CA‐84 north of Route 238, be ginning over 4 miles to the north. 2 The project site is not within a designated or eligible state scenic highway corridor. Therefore, the conclusion of  no  impact  in  regard  to  resources  within  a  state  scenic  highwa y  w o u l d  r e m a i n  t h e  s a m e  w i t h  t h e current project.

For  the  above  reasons,  the  proposed  project  would  not  result  in s i g n i f i c a n t  i m p a c t s  r e l a t e d  t o  s c e n i c resources  not  previously  identified  in  the  EIR  or  addressed  through  uniformly  applied  development policies or standards and no further environmental review is necessary for this topic.

Visual Character
c)   Would the project substantially degrade the existing visual  character or quality of public views of the site  and  its  surroundings?  (Public  views  are  those  that  are  experienced  from  publicly  accessible vantage  points.)  If  the  project  is  in  an  urbanized  area,  would the  project  conflict  with  applicable zoning and other regulations governing scenic quality?
Same  Conclusion  (conclusion  remains  NI) :  The  current  project  would  not  change  the  no  impact conclusion  as  re‐development  consistent  with  applicable  design  criteria  would  not  be  considered  a degradation of character or quality of the environment.

The  Prior  EIR  concluded  that  The  Globe  Planned  District  would  not  have  an  impact  related  to  visual character noting, “It is anticipated that the project will impr ove the visual character and quality of the site by eliminating sub‐standard structures with new, modern de velopment. The entitlement process for this  project  includes  a  Planned  District  Major  Amendment  and  wi ll  be  subject  to  site  plan  and architectural  approval  by  the  City  of  Fremont’s  Planning  Commission,  and  will  be  scrutinized  for  its design  compatibility  with  surrounding  developments.”  Consistent  with  the  previous  assessment,  the current project will be subject to site plan and architectural  approval and the conclusion of no impact in regard to visual character would remain the same with the current project.

For  the  above  reasons,  the  proposed  project  would  not  result  in  significant  impacts  related  to  visual character  not  previously  identified  in  the  EIR  or  addressed  through  uniformly  applied  development policies or standards and no further environmental review is necessary for this topic.

2   CalTrans, State Scen ic Highway website, available at: https://dot.ca.gov/programs/design/lap‐landscape‐ architecture‐and‐community‐livability/lap‐liv‐i‐scenic‐highways.

Albrae Industrial Project – The Globe Planned District Addendum Page 19 Light and Glare
d)   Would the project create a new source of substantial light  or glare which would adversely affect day or nighttime views in the area?
Same  Conclusion  (conclusion  remains  NI) :  The  current  project  would  not  change  the  no  impact conclusion  as  the  proposed  lighting  levels  and  potential  for  lig h t  a n d  g l a r e  w o u l d  b e  c o n s i s t e n t  w i t h lighting standards and design guidelines and typical of existin g surrounding commercial/industrial urban development.

The Prior EIR concluded that The Globe Planned District would n ot have an impact related to light and glare noting, “On‐site lighting will be reviewed through the De velopment Organization (building permit) review process to ensure adequate light levels that do not spil l onto adjacent properties.” The proposed site uses may be operable 24 hours a day, which could increase  lighting in the area. However, consistent with the previous assessment, the current project will be subject to standard review of proposed lighting (per  FMC  Section  18.50.050(e))  to  prevent  illumination  of  adjoining  properties  or  objectionable  visual impacts on other properties or the streets and the conclusion o f no impact in regard to light and glare would remain the same with the current project.

For the above reasons, the proposed project would not result in  significant impacts related to lights and glare not previously identified in the EIR or addressed through  uniformly applied development policies or standards and no further environmental review is necessary for this topic.

Page 20 ends

B. Agricultural and Forest Resources

Impacts Related
To:

Prior EIR
Findings with
Implementation
of MM (If
Required)

PROJECT
Relationship to Prior
EIR Findings
Applicable SDRs or MMs
Project Level
of Significance
Equal or
Less
Severity
Substantial
Increase in
Severity
a. Convert Farmland  NI  ☒  ☐  ‐‐  NI
b. Conflict with
Agricultural
Designation
NI  ☒  ☐  ‐‐  NI
c. Conflict with Forest
Designation1
NI  ☒  ☐  ‐‐  NI
d.  Convert Forest1 N I   ☒  ☐  ‐‐  NI
e.  Indirect Conversion
of Agricultural or
Forest Land
1 NI  ☒  ☐  ‐‐  NI
1   Note that forest resources were not explicitly assessed in the Prior EIR, which under CEQA is a presumption that the project would not have a significant impact, as discussed below.

Discussion
Agriculture and Forest Resources  Changes from The Globe Planned  District Since  analysis  of  The  Globe  Planned  District,  CEQA  thresholds  ha v e  b e e n  a d d e d  t o  m a k e  i t  c l e a r  t h a t forest  resources  would  be  considered  in  addition  to  agricultural  resources.  There  have  been  no  other changes relevant to this topic.

Convert Farmland
a)   Would the project convert Prime Farmland, Unique Farmland,  or Farmland of Statewide Importance (Farmland),  as  shown  on  the  maps  prepared  pursuant  to  the  Farmland  Mapping  and  Monitoring Program of the California Resources Agency, to non‐agricultural use? Same  Conclusion  (NI):  There  have  been  no  changes  in  circumstance  or  new  information   related  to Farmland ‐ which does not occur in the project area  ‐ and there   would be no  change to the no impact conclusion related to these topics.

The  Prior  EIR  concluded  that  no  part  of  the  project  site  is  des ignated  as  Prime  Farmland,  Unique Farmland,  or  Farmland  of  Statewide  Importance  (Farmland),  and  w o u l d  t h e r e f o r e  n o t  i n v o l v e  t h e conversion of such lands. The project is a currently developed  site located in an urbanized area and the prior conclusions remain applicable.

For  the  above  reasons,  the  proposed  project  would  not  result  in s i g n i f i c a n t  i m p a c t s  r e l a t e d  t o  t h e conversion  of  farmland  not  previously  identified  in  the  EIR  or  addressed  through  uniformly  applied development policies or standards and no further environmental review is necessary for this topic.

Albrae Industrial Project – The Globe Planned District Addendum Page 21 Conflict with Agricultural Designation
b)   Would the project conflict wi th existing zoning for agricultural use, or a Williamson Act contract? Same  Conclusion  (NI):  There  have  been  no  changes  in  circumstance  or  new  information   related  to agriculture zoning or Williamson Act contracts ‐ which do not o ccur in the project area ‐ and there would be no change to the no impact conclusion related to these topics.

T h e  P r i o r  E I R  c o n c l u d e d  t h a t  t h e  p r o j e c t  w o u l d  n o t  i n v o l v e  t h e  conversion  of  farmland  and  does  not include  properties  under  Williamson  Act  contract.  The  project  s ite  is  currently  zoned  as  Regional Commercial,  with  a  proposed  zone  of  Tech  Industrial,  neither  of  w h i c h  a l l o w s  f o r  c o m m e r c i a l agricultural use and there are no Williamson Act contracts in p lace at the project site. The project is a currently developed site located in an urbanized area and the prior conclusions remain applicable.

For  the  above  reasons,  the  proposed  project  would  not  result  in  s i g n i f i c a n t  i m p a c t s  r e l a t e d  t o  a n agricultural use zoning conflict or a conflict with a Williamso n Act contract not previously identified in the  EIR  or  addressed  through  uniformly  applied  development  poli cies  or  standards  and  no  further environmental review is necessary for this topic.

Conflict with Forest Designation
c)   Would the project conflict with existing zoning for, or cau se rezoning of, forest land (as defined in Public Resources Code section 12220(g)), timberland (as defined  by Public Resources Code section 4526),  or  timberland  zoned  Timberland  Production  (as  defined  by   Government  Code  section 51104(g))?
Same Conclusion (NI): There have been no changes in circumstance or new information  related to forest resources  ‐  which  do  not  occur  in  the  project  area  ‐  and  there would  be  no  change  to  the  no  impact conclusion related to these topics.

No part of the project site is zoned as forest land, timberland, or Timberland Production. The project site is currently zoned as Regional Commercial, with a proposed zone of Tech Industrial.

For the above reasons, the proposed project would not result in  significant impacts related to a forest land  or  timberland  zoning  conflict  not  previously  identified  in  the  EIR  or  addressed  through  uniformly applied  development  policies  or  standards  and  no  further  environmental  review  is  necessary  for  this topic.

Convert Forest
d)   Would the project result in  the loss of forest land or conversion of forest land to non‐forest use? Same Conclusion (NI): There have been no changes in circumstance or new information  related to forest resources  ‐  which  do  not  occur  in  the  project  area  ‐  and  there would  be  no  change  to  the  no  impact conclusion related to these topics.

T h e  p r o j e c t  i s  l o c a t e d  i n  a n  u r b a n i z e d  a r e a .  N o  p a r t  o f  t h e  s i te  is  mapped  as,  zoned  for,  or  currently being used for forestry purposes.

Page 22 ends

For  the  above  reasons,  the  proposed  project  would  not  result  in  s i g n i f i c a n t  i m p a c t s  r e l a t e d  t o conversion  of  forest  land  not  previously  identified  in  the  EIR or  addressed  through  uniformly  applied development policies or standards and no further environmental review is necessary for this topic.

Indirect Conversion of Agr icultural or Forest Land
e)   Would the project involve other changes in the existing env ironment which, due to their location or nature, could result in conversion of Farmland, to non‐agricult ural use or conversion of forest land to non‐forest use?
Same  Conclusion  (NI):  There  have  been  no  changes  in  circumstance  or  new  information   related  to agriculture and forest resources ‐ which do not occur in the pr oject area ‐ and there would be no change to the no impact conclusion related to these topics.

The Prior EIR concluded that the project would not result in in direct conversion of agricultural or forest land.  The  project  is  located  in  an  urbanized  area,  with  no  adjacent  farmland,  agricultural  land,  forest land, or timberland and the prior conclusions remain applicable.

For  the  above  reasons,  the  proposed  project  would  not  result  in s i g n i f i c a n t  i m p a c t s  r e l a t e d  t o  t h e indirect  conversion  or  loss  of  farmland,  agricultural  land,  for est  land,  or  timberland  not  previously identified in the EIR or addressed through uniformly applied de velopment policies or standards and no further environmental review is necessary for this topic.

Albrae Industrial Project – The Globe Planned District Addendum Page 23 C. Air Quality

Impacts
Related To:

Prior EIR
Findings with
Implementation
of MM (If
Required)

PROJECT
Relationship to Prior
EIR Findings
Applicable SDRs or MMs
Project Level
of
Significance
Equal or
Less
Severity
Substantial
Increase in
Severity
a.   Conflict with Air
Quality Plan
LTS  ☒  ☐  ‐‐  LTS
b. Criteria Air
Pollutants
(Construction
Period)
LTS w/MM  ☒  ☐
SDR FMC 18.218.050(a) Construction
Related Emissions (supersedes MM 3.1.1:

Dust Control Measures)
LTS
(Operational)  SU w/MM  ☒  ☐  MM 3.1.2: Reduce Vehicle Trips  SU w/MM c.   Sensitive
Receptors
LTS  ☒  ☐  ‐‐  LTS
d. Odors

NI  ☒  ☐  ‐‐  NI
Discussion
Air Quality Setting Changes from The Globe Planned District Since the Prior EIR, the Bay Area Air Quality Management Distri ct (BAAQMD) has updated its CEQA Air Quality  Guidelines  (BAAQMD  Guidelines),  which  assists  lead  agencies  in  evaluating  and  mitigating  air quality impacts. The latest draft of the BAAQMD guidelines was  issued in May 2017. The recommended emissions model with which to quantify project emissions has also been updated.

Since the Prior EIR, the Bay Area Clean Air Plan has undergone  regular updates. The latest 2017 update to the Clean Air Plan includes similar but updated control measures as discussed below.

A quantification of project emissions and comparison to emissio ns under the Globe Planned District has been prepared as follows.

Air  quality  consultant  Illingworth  &  Rodkin  prepared  an  Air  Qua lity  and  Greenhouse  Gas  Emissions Analysis for the current project as referenced in this document and included in full as Attachment B.

Conflict with Air Quality Plan
a)   Would the project conflict wi th or obstruct implementation of the applicable air quality plan? Same  Conclusion  (conclusion  remains  LTS) :  The  current  project  would  not  change  the  less‐than‐ significant conclusion related to conflict with an Air Quality Plan.

The  Prior  EIR  concluded  that  The  Globe  Planned  District  would  h a v e  a  l e s s ‐ t h a n ‐ s i g n i f i c a n t  i m p a c t related  to  conflict  with  the  air  quality  plan  noting,  “The  request  for  a  General  Plan  Amendment  will modify  the  overall  land  use  of  the  site.  The  existing  General  P lan  designation  allows  large  scale commercial  uses.  The  new  designation  would  allow  a  combination of  large  scale  commercial,  retail, assembly uses and restaurants. Although the specific nature of uses on site will change, the General Plan anticipates this site for commercial uses.  Therefore, the redevelopment of the site is consistent with the

Page 24 ends

Fremont  General  Plan  in  terms  of  increasing  the  amount  of  development  on  site,  and  not  conflicting with  an  air  quality  plan.”  Consistent  with  the  previous  assessme n t ,  t h e  c u r r e n t  p r o j e c t  w o u l d  a g a i n revise the  particulars of development  at the site while still r epresenting anticipated redevelopment at that location.

The Clean Air Plan is the regional air quality plan, and has been regularly updated since the Prior EIR. The latest update to the plan, adopted in April 2017, is the 2017 B ay Area Clean Air Plan. BAAQMD currently r e c o m m e n d s  a n a l y z i n g  a  p r o j e c t ’ s  c o n s i s t e n c y  w i t h  c u r r e n t  a i r  quality  plan  primary  goals  and  control measures. The impact would be significant if the project would  conflict with or obstruct attainment of the primary goals or implementation of the control measures.

The  primary  goals  of  the  Bay  Area  2017  Clean  Air  Plan  are  to  attain  all  state  and  national  air  quality standards,  eliminate  disparities  among  Bay  Area  communities  in  cancer  health  risk  from  toxic  air contaminants, and reduce Bay Area greenhouse gas emissions to 4 0 percent below 1990 levels by 2030. (This last standard is addressed in Section G: Greenhouse Gas Emissions.) The  current  project  would  be  required  to  comply  with  all  applicable  rules  and  regulations  related  to emissions  and  health  risk  and,  as  detailed  under  the  “Criteria Air  Pollutants”  topic  below,  would  have reduced emissions from what would have occurred under developme nt of The Globe Planned District as originally proposed and therefor e would not result in conflict  with the primary goals of the 2017 Clean Air Plan.

Many of the Clean Air Plan’s control measures are targeted to a rea‐wide improvements, large stationary source reductions, or large employers and these are not applica ble to the proposed project. However, the project would be consistent with all rules and regulations  related to construction activities and the proposed  development  would  meet  current  standards  of  energy  and w a t e r  e f f i c i e n c y  ( C l e a n  A i r  P l a n Energy  Control  Measure  EN1  and  Water  Control  Measure  WR2)  and  r ecycling  and  green  waste requirements  (Clean  Air  Plan  Waste  Management  Control  Measures  WA3  and  WA4)  and  does  not conflict  with  applicable  control  measures  aimed  at  improving  ac cess/connectivity  for  bicycles  and pedestrians (Clean Air Plan Transportation Control Measure TR9) or any other control measures.

The  project,  therefore,  would  be  consistent  with  the  Clean  Air Plan  and  have  a  less‐than‐significant i m p a c t  i n  t h i s  r e g a r d .  W h i l e  t h e  C l e a n  A i r  P l a n  a n d  B A A Q M D  r e c ommendations  for  determining consistency have been updated since the Prior EIR, this conclusion is consistent with the Prior EIR.

For the above reasons, the proposed project would  not result in  significant impacts related to conflict with  an  air  quality  plan  not  previously  identified  in  the  EIR  or  addressed  through  uniformly  applied development policies or standards and no further environmental review is necessary for this topic.

Criteria Air Pollutants
b)   Would  the  project  result  in  a  cumulatively  considerable  net  increase  of  any  criteria  pollutant  for which the project region is non‐attainment under an applicable  federal or state ambient air quality standard?
Construction Period
Reduced Conclusion (conclusion was revised from LTS w/MM to LTS ): While the Prior EIR had identified an  impact  and  mitigation  related  to  construction‐period  pollutants  and  required  Mitigation  Measure

3.1.1,  standard  development  requirement  FMC  18.218.050  (a)  supersedes  the  Mitigation  Measure  and

Albrae Industrial Project – The Globe Planned District Addendum Page 25 with  it,  the  project  would  have  a  less‐than‐significant  impact  with  respect  to  construction  period pollutants with compliance with applicable regulations.

A s  n o t e d  i n  t h e  P r i o r  E I R ,  c o n s t r u c t i o n  a c t i v i t i e s  c o u l d  r e s u l t  in  construction  dust  and  emissions.

However, consistent with common practice at the time, as tempor ary emissions expected to already be included in area planning, construction emissions were not quan tified.  Mitigation Measure 3.1.1: Dust Control  Measures,  was  applied  to  minimize  construction  dust  and  emissions  and  the  resulting  level  of significance  related  to  construction  period  emissions  was  determined  to  be  less  than  significant  with mitigation.

BAAQMD has now adopted construction period emissions thresholds  and recommends quantification to determine  significance.  The  Illingworth  &  Rodkin  Emissions  Anal ysis  (Attachment  B)  has  quantified project emissions per current BAAQMD guidance as shown in Table 1.

Table 1: Current Project Construction Period Criteria Pollutant Emissions (Pounds per Day) Description
Reactive
Organic Gases
Nitrogen
Oxides
Particulate
Matter (PM10)*
Fine Particulate
Matter (PM2.5) *
Maximum Average Daily Emissions   33  31  2  1
BAAQMD Daily Thresholds  54  54  82  54
Exceeds Threshold?  No  No  No  No
* Applies to exhaust emissions only
Source: Illingworth & Rodkin, Air Quality and Greenhouse Gas Emissions Analysis, 2020, summarized from Table 4.

Construction‐period  emissions  levels  are  below  current  BAAQMD  t hresholds  presented  in  Table  1.

However,  BAAQMD  considers  dust  generated  by  grading  and  construc t i on ac t i vi t ie s t o be  a si g n i f i c ant impact  associated  with  project  development  if  uncontrolled  and  recommends  implementation  of construction  mitigation  measures  to  reduce  construction‐related  emissions  and  dust  for  all  projects, regardless  of  comparison  to  their  construction‐period  threshold s.  These  recommendations  are consistent  with  the  City  of  Fremont’s  standard  development  requ irements  relating  to  construction period emissions:

FMC  18.218.050(a)  Construction  Related  Emissions.  The  following  construction  measures,  as periodically  amended  by  BAAQMD,  are  required  for  all  proposed  d evelopment  projects  to reduce construction‐related fugitive dust and exhaust emissions:
(A)    All  exposed  surfaces  (e.g.,  parking  areas,  staging  areas,   soil  piles,  graded  areas,  and unpaved access roads) shall be watered two times daily. (B)      All haul trucks transporting soil, sand, or other loose material off site shall be covered. ( C )     A l l  v i s i b l e  m u d  o r  d i r t  t r a c k ‐ o u t  o n t o  a d j a c e n t  public  roads  shall  be  removed  using  wet power vacuum street sweepers at least once per  day. The  use  of  dry power sweeping is prohibited.
(D)      All vehicle speeds on unpaved roads shall be limited to 15 miles per hour.

Page 26 ends

(E)      All  roadways,  driveways,  and  sidewalks  to  be  paved  shal l  be  completed  as  soon  as possible. Building pads shall be laid as soon as possible after  grading unless seeding or soil binders are used.
(F)    Idling  times  shall  be  minimized  either  by  shutting  equipm ent  off  when  not  in  use  or reducing the maximum idling time to five minutes (as required b y the California airborne toxics  control  measure  Title  13,  Section  2485  of  California  Code  of  Regulations  (CCR)).

Clear signage shall be provided for construction workers at all access points. ( G )    A l l  c o n s t r u c t i o n  e q u i p m e n t  s h a l l  b e  m a i n t a i n e d  a n d  p r o p e rly  tuned  in  accordance  with manufacturer’s specifications. All equipment shall be checked b y a certified mechanic and determined to be running in proper condition prior to operation. ( H )    A  publicly  visible  sign  shall  be  posted  with  the  telephone  number a n d  p e r s o n  t o  c o n t a c t regarding dust complaints. This person shall respond and take c orrective action within 48 hours.  BAAQMD’s  phone  number  shall  also  be  visible  to  ensure  co mpliance  with applicable regulations.

FMC  18.218.050(a)  fully  supersedes  Mitigation  Measure  3.1.1:  Dus t  C o n t r o l  M e a s u r e s  f r o m  t h e  P r i o r EIR. Consistent with the Prior EIR analysis, the current projec t would result in construction period dust and emissions, the impacts of which would be reduced through im plementation of construction‐period dust control measures identifie d in FMC 18.218.050(a). The conc lusion of a less‐than‐significant impact with mitigation in regard to construction emissions would be do wngraded to less‐then‐significant with the current project.

Operational Period
Same Conclusion (conclusion remains SU w/ MM) : The current project would not change Impact 3.2.2 and  the  significant  and  unavoidable  with  mitigation  conclusion  related  to  operational‐period  criteria pollutant emissions.

For operational emissions, the P rior EIR quantified operational  emissions using the URBEMIS model and determined  The  Globe  Planning  District  would  have  emissions  abo ve  significance  threshold  levels.

Mitigation  Measure  3.1.2:  Reduce  Vehicle  Trips  was  identified  to  reduce  emissions,  but  the  reduction would not be sufficient to reduce emissions below significance  thresholds and therefore the impact was determined to be significant and unavoidable.

Prior EIR Mitigation Measure 3.1.2: Reduce Vehicle  Trips. The f ollowing are feasible mitigation measures identified by the BAAQMD for commercial development:
•   Provide transit facilities, e. g., bus bulbs/turnouts, benches, shelters, etc. •   Provide bicycle land and/or p aths, connected to community‐wide network. •   Provide  sidewalks  and/or  paths,  connected  to  adjacent  land  u ses,  transit  stops,  and/or community‐wide network.
•   Provide secure and conveniently located bicycle storage. •   Provide preferential parking  for electric or alternatively‐fueled vehicles. •   Implement  feasible  TDM  measures  including  a  ride‐matching  pr ogram,  coordination  with regional ridesharing organizations and provision of transit information.

Albrae Industrial Project – The Globe Planned District Addendum Page 27 Mitigation Measure 3.1.2 identified physical on‐site improvemen ts to promote pedestrians and bicycle use, improvements  to transit facilities, preferential  parking f or electric or alternatively‐fueled vehicles, and  implementation  of  Transportation  Demand  Management  (TDM)  measures  as  feasible.  Mitigation Measure 3.1.2 would remain applicable to the current project. T here are currently no transit facilities or l i n e s  a l o n g  t h e  c u r r e n t  p r o j e c t ’ s  f r o n t a g e ,  s o  n o  t r a n s i t  i m p r ovements  are  planned  as  a  part  of  the current  project.  On‐site  improvements  for  pedestrians  and  bicycles  as  well  as  electric  vehicle  parking stalls (10+%) and “Clean Air”/ vanpool stalls (8+%) are identif ied on the project plans and would meet or exceed current City requiremen ts. Section 18.50.050 of the Frem ont Municipal Code now includes TDM requirements for new developments in the City of Fremont. The p reliminary TDM Plan prepared by the applicants calculated that considering the project uses and loc ation, and the available transit service and pedestrian and bicycle facilities in the area, with implementat ion of feasible TDM measures, the project would be able to achieve a 2 to 4 percent reduction in single‐o ccupancy vehicle trips. The Prior EIR had estimated that Mitigation Measure 3.1.2 could reduce emissions  by 5 to 10 percent, which is consistent with  identified  reductions  in  single‐occupancy  vehicle  trips  (2  to  4  percent)  combined  with  electrical vehicle and clean air vehicle use (10+% of parking stalls) under the current project.

The  emissions  for  the  current  project  were  quantified  using  the   currently‐recommended  emissions model,  CalEEMod,  and  compared  to the  emissions  from  the  Prior  EI R ,  a s  d e t a i l e d  i n  t h e  I l l i n g w o r t h  & Rodkin Emissions Analysis (Attachment B). A summary of these results is shown in Table 2.

Table 2: Operational Criteria Pollutant Emissions (Pounds per Day) Description
Reactive
Organic Gases
Nitrogen
Oxides
Particulate
Matter (PM10)
Fine Particulate
Matter (PM2.5)
Current BAAQMD Daily
Significance Thresholds   54  54  82  54
The Globe Planned District 1  129  130  111  <111 2
Exceeds Threshold?  Yes  Yes  Yes  (Yes)  2
Current Industrial Project  43  67  47  <47 2
Exceeds Threshold?  No  Yes  No  No
Difference  ‐86  ‐63  ‐64  ‐ <80 2
1 The Globe Planned District daily trips shown are from the Prior EIR and incorporate the portion of the site that the current project is on. 2 There were no thresholds for PM2.5 at the time of the Prior EIR and it was not explicitly assessed.  Since PM2.5 is a fraction of PM10 and therefore could have been known as such at the time, those emissions are reported as less than or “<” the PM10 value for comparison in this table.

Source: Illingworth & Rodkin, Air Quality and Greenhouse Gas Emissions Analysis, 2020, summarized from Table 5.

As shown in Table 2, in all cases, emissions that would result from the current project are less than those that  would  have  resulted  from  The  Globe  Planned  District.  There fore,  the  impact  with  respect  to operational criteria pollutants is equal or less than that iden tified in the Prior EIR, Mitigation Measure

3.1.2 would remain applicable to the current project, and the c onclusions of significant and unavoidable with mitigation would remain the same for the current project.

Page 28 ends

Sensitive Receptors
c)   Would the project expose sen sitive receptors to substantial pollutant concentrations? Same  Conclusion  (conclusion  remains  LTS) :  The  current  project  would  not  change  the  less‐than‐ significant conclusion related to exposure of sensitive receptors.

As noted in the Prior EIR, while some of the emissions from the  project would be toxic air contaminants, especially diesel emissions during construction, the bulk of the emissions would occur at the project site, which is not proximate to sensitive receptors so the impact was considered less‐than‐significant.

Illingworth & Rodkin re‐assessed this topic in the Emissions Re port (Attachment B) to verify significance conclusions for the current project. According to current stand ards, emissions from project construction c o u l d  i m p a c t  s e n s i t i v e  r e c e p t o r s  a s  w e l l  a s  o p e r a t i o n a l  t r u c k  traffic  and  diesel‐powered  emergency generators  on  site.  BAAQMD  Guidelines  recommend  quantification  of  impacts  to  sensitive  receptors within  1,000  feet  of  the  project  site.  Illingworth  &  Rodkin  conc l u d e  t h a t  b e c a u s e  t h e  c l o s e s t  s e n s i t i v e receptors are over 1,000 feet from the project site, impacts on  sensitive receptors would be considered to be below current significance threshold levels.

Therefore,  as  under  the  Prior  EIR,  the  current  project  is  not  c lose  enough  to  substantially  impact sensitive receptors and the conclusion of a less‐than‐significa nt impact in that regard would remain the same with the current project.

For the above reasons, the proposed project would not result in  significant impacts related to sensitive receptors  not  previously  identified  in  the  EIR  or  addressed  through  uniformly  applied  development policies or standards and no further environmental review is necessary for this topic.

Odors
d)   Would  the  project  result  in  other  emissions  (such  as  those leading  to  odors)  adversely  affecting  a substantial number of people?
Same  Conclusion  (conclusion  remains  NI) :  The  current  project  would  not  change  the  no  impact conclusion related to odors.

As  noted  in  the  Prior  EIR,  the  project  site  is  surrounded  by  similar  uses  and  is  located  distant  enough from sensitive receptors not to have the potential to result in  a significant impact with respect to odors.

This  remains  true  for  the  current  project.  Therefore,  consistent  w i t h  t h e  P r i o r  E I R ,  t h e  p r o j e c t  w o u l d have no impact related to odors.

For the above reasons, the proposed project would not result in  significant impacts related to odors not previously  identified  in  the  EIR  or  addressed  through  uniformly   applied  development  policies  or standards and no further environmental review is necessary for this topic.

Albrae Industrial Project – The Globe Planned District Addendum Page 29 D. Biological Resources

Impacts
Related To:

Prior EIR
Findings with
Implementation
of MM (If
Required)

PROJECT
Relationship to Prior
EIR Findings
Applicable SDRs or MMs
Project Level
of
Significance
Equal or
Less
Severity
Substantial
Increase in
Severity
a.   Special‐Status
Species
NI  ☒  ☐  SDR FMC 18.218.050(b)(2): Nesting
Birds, SDR FMC 18.218.050(b)(3):

Roosting Bats
NI
b. Riparian/Sensitive
Habitat
NI  ☒  ☐  ‐‐  NI
c.   Wetlands  NI  ☒  ☐  ‐‐  NI
d. Wildlife Corridors/
Nursery Sites
NI  ☒  ☐  ‐‐  NI
e. Conflict with Local
Biological Policies
LTS  ☒  ☐  ‐‐  LTS
f.  Conflict with
Conservation Plans
NI  ☒  ☐  ‐‐  NI
Discussion
Biological Resources Changes fro m The Globe Planned District The  current  condition  of  the  site  with  respect  to  biological  resources  was  updated  per  the  following technical reports, which are available as part of project application materials.

A Biological Site Visit and follow‐up was performed by biologis ts at Johnson Marigot Consulting for the current applicants, dated 6/15/21 and 7/7/21.

A  Tree  Inventory  Report  was  performed  by  HortScience/Bartlett  Consulting  for  the  current  applicants, dated 9/20/20.

Special‐Status Species
a)   Would the project have a subs tantial adverse effect, either directly or through habitat modifications, on any species identified as a candidate, sensitive, or special  status species in local or regional plans, policies, or regulations, or by the California Department of Fi sh and Game or U.S. Fish and Wildlife Service?
Same  Conclusion  (NI):  There  have  been  no  changes  in  circumstance  or  new  information   related  to special‐status species ‐ which do not occur in the project area  ‐ and there would be no change to the no impact conclusion related to this topic.

As noted in the Prior EIR, “There are no known special status s pecies or any protected riparian habitats or wetlands located on the projec t site. The existing site is p aved and developed and contains little, if any, habitat capable of supporting burrowing owls.” A Biologica l Site Visit and follow‐up was performed in  June  and  July  2021  to  assess  current  site  conditions  and  confirm  conclusions.  Due  to  the  highly disturbed nature of the site, only one special‐status plan or w ildlife species has the potential to occur at

Page 30 ends

the  site:  Congdon’s  tarplant  ( Centromadia  parryi  ssp.  congdonii);  however,  the  biological  follow‐up confirmed that this species is not present at the site.

The Biology Report noted that “the open, sparsely vegetated por tions of the Property provide suitable nesting  habitat  for  ground‐nesting  birds.  Similarly,  the  abandoned  structures  on  the  Property  provide suitable nesting habitat for birds and suitable roosting habita t for bats.”  The City of Fremont’s Standard Development Requirements for nesting birds and roosting bats would apply:

FMC  18.218.050(b)(2):  Nesting  Birds.  New  development  projects  w ith  the  potential  to  impact nesting  birds  through  tree  or  shrub  removal  shall  implement  the   following  measures  prior  to removal of any trees/shrubs, grading, or ground disturbing activities:
(A)   Avoidance. Proposed projects shall avoid construction act ivities during the bird nesting season (February 1st through August 31st).
(B)  Preconstruction Surveys. If construction activities are sc heduled during the nesting season, a qualified  biologist  shall  conduct  a  preconstruction  survey  to  i dentify  any  potential  nesting activity.  The  biologist  shall  determine  the  number  and  time  fram e  ( p r i o r  t o  c o n s t r u c t i o n )  o f surveys to be conducted.
(C)    Protective  Buffer  Zone(s).  If  the  survey  indicates  the  presence  of  nesting  birds,  protective buffer  zones  shall  be  established  around  the  nests.  The  size  of   the  buffer  zone  shall  be recommended  by  the  biologist  in  consultation  with  the  CDFW  depending  on  the  species  of nesting bird and level of potential disturbance.
(D)   Initiation of Construction Activities. The buffer zones s hall remain in place until the young have fledged  and  are  foraging  independently.  A  qualified  biologist  shall  monitor  the  nests  closely until it is determined the nests are no longer active, at which  time construction activities may commence within the buffer area.

FMC 18.218.050(b)(3): Roosting Bats . New development with poten tial to impact special‐status or roosting  bat  species  through  demolition  of  existing  structures o r  r e m o v a l  o f  t r e e s  o n  s i t e  s h a l l conduct the following measures prior to demolition:
( A )    P r e c o n s t r u c t i o n  S u r v e y s .  A  q u a l i f i e d  b i o l o g i s t  s h a l l  c o n duct  a  preconstruction  survey  during seasonal periods of bat activity (mid‐February through mid‐Octo ber) to determine suitability of structure(s) or trees as bat roost habitat.
( B )   P r o t e c t i v e  B u f f e r  Z o n e ( s ) .  I f  a c t i v e  b a t  r o o s t s  a r e  f o u n d  on  site,  a  suitable  buffer  from construction shall be established per the biologist. The biolog ist shall determine the species of bats present and the type of roost.
( C )    M i t i g a t i o n  a n d  E x c l u s i o n .  I f  t h e  b a t s  a r e  i d e n t i f i e d  a s  common  species,  and  the  roost  is  not being  used  as  a  maternity  roost  or  hibernation  site,  the  bats  may  be  evicted  using  methods developed  by  a  qualified  biologist.  If  special‐status  bat  species  are  found  present,  or  if  the roost  is  determined  to  be  a  maternity  roost  or  hibernation  site f o r  a n y  s p e c i e s ,  t h e n  t h e qualified  biologist  shall  develop  a  bat  mitigation  and  exclusion  p l a n  t o  c o m p e n s a t e  f o r  l o s t roost. The site shall not be disturbed until CDFW approves the mitigation plan.

Albrae Industrial Project – The Globe Planned District Addendum Page 31 For the above reasons, the proposed project would not result in  significant impacts related to special‐ status species not previously identified in the EIR or addresse d through uniformly applied development policies or standards and no further environmental review is necessary for this topic.

Riparian/Sensitive Habitat
b)   Would  the  project  have  a  substantial  adverse  effect  on  any  riparian  habitat  or  other  sensitive natural community identified in local or regional plans, polici es, or regulations, or by the California Department of Fish and Game or US Fish and Wildlife Service? Same  Conclusion  (NI):  There  have  been  no  changes  in  circumstance  or  new  information   related  to riparian/sensitive habitats ‐ which do not occur in the project  area ‐ and there would be no change to the no impact conclusion related to these topics.

As noted above, the Prior EIR stated that the project site was  paved and there were no riparian habitats.

T h e  f o l l o w ‐ u p  v i s i t  n o t e d  t h a t  s o m e  p a v e m e n t  a t  t h e  s i t e  h a s  b een  removed  and  the  site  is  currently characterized  by  sparse  ruderal  (weedy)  vegetation  within  heavily  compacted  and  gravely  soils,  large gravel piles, and abandoned structures.

For the above reasons, the proposed project would not result in significant impacts related to riparian or sensitive  habitats  not  previously  identified  in  the  EIR  or  addr essed  through  uniformly  applied development policies or standards and no further environmental review is necessary for these topics.

Wetlands
c)   Would  the  project  have  a  substantial  adverse  effect  on  stat e  o r  f e d e r a l l y  p r o t e c t e d  w e t l a n d s (including,  but  not  limited  to,  marsh,  vernal  pool,  coastal,  et c.)  through  direct  removal,  filling, hydrological interruption, or other means?
Same  Conclusion  (NI):  There  have  been  no  changes  in  circumstance  or  new  information   related  to wetlands‐  which  do  not  occur  in  the  project  area  ‐  and  there  would  be  no  change  to  the  no  impact conclusion related to this topic.

As noted in the Prior EIR, the project site contains no wetland s. While the biologists noted at the follow up  visit  that  water  accumulates  in  topographically  low  areas  on  t h e  s i t e ,  t h e r e  a r e  n o  i n d i c a t o r s (vegetation  types,  soil  characteristics,  surface  signs)  either  at  the  site  or  visible  on  aerial  imagery throughout the year that would indicate the site would qualify as a wetland or waters of the U.S.

For the above reasons, the proposed project would not result in  significant impacts related to wetlands not  previously  identified  in  the  EIR  or  addressed  through  uniformly  applied  development  policies  or standards and no further environmental review is necessary for this topic.

Wildlife Corridors/ Nursery Sites
d)   Would the project interfere  substantially with the movement of any native resident or migratory fish or wildlife species or with established native resident or migr atory wildlife corridors, or impede the use of native wildlife nursery sites?
Same  Conclusion  (NI):  There  have  been  no  changes  in  circumstance  or  new  information   related  to wildlife corridors or nursery sites ‐ which do not occur in the  project area ‐ and there would be no change to the no impact conclusion related to these topics.

Page 32 ends

As noted in the Prior EIR, the project site is fully developed  and characterized by an urban setting and is entirely  surrounded  by  similar  development.  As  such,  the  project  site  does  not  have  the  capability  to function as a substantial wildlife corridor or wildlife nursery site.

For  the  above  reasons,  the  proposed  project  would  not  result  in si g n i f i c ant  i mp ac t s r e l at e d t o w i ld l i f e corridors  or  nursery  sites  not  previously  identified  in  the  EIR  or  addressed  through  uniformly  applied development policies or standards and no further environmental review is necessary for this topic.

Local Biological Policies
e)   Would the project conflict with any local policies or ordin ances protecting biological resources, such as a tree preservation policy or ordinance?
Same Conclusion (conclusion remains LTS) : As under the Prior EIR, the project would be subject to the City’s  Tree  Preservation  Ordinance  and  the  current  project  would  not  change  the  less‐than‐significant impact conclusion related to local biological policies.

As noted in the Prior EIR, “There are no significant trees located on site, although it is possible that some smaller trees may be removed during  site construction. A tree s urvey will be required  prior to project approval to determine if mitigation is needed for any trees rem oved from the site. The tree survey and resulting mitigation, if required, will conform to the City’s Tree Preservation Ordinance.” The Tree Inventory Report prepared for the current project indi cates that there are 28 trees at/near the p r o j e c t  s i t e ,  a l l  o f  w h i c h  h a v e  d i a m e t e r s  g r e a t e r  t h a n  6  i n c h e s  and  would  meet  the  definition  of “protected”  trees  subject  to  removal  permit  and  replacement  pro visions  under  the  City’s  Tree Preservation  Ordinance.  The  trees  are  located  outside  the  immediate  development  area,  including  6 trees along Albrae Street, 21 trees along the southeastern prop erty line, and one tree on Encyclopedia Circle.  All  existing  trees  are  currently  proposed  to  remain  with  implementation  of  construction‐period protection measures as detailed in the Tree Inventory Report. I f any tree removal was determined at a later date, it would be required to conform to the City’s Tree Preservation Ordinance.

Therefore,  as  under  the  Prior  EIR,  the  current  project  would  conform  to  the  City’s  Tree  Preservation Ordinance  and  the  conclusion  of  a  less‐than‐significant  impact with  respect  to  local  biological  policies would remain the same with the current project.

Conflict with Conservation Plans
f)   Would  the  project  conflict  with  the  provisions  of  an  adopted  Habitat  Conservation  Plan,  Natural Community Conservation Plan, or other approved local, regional, or state habitat conservation plan? Same  Conclusion  (NI):  There  have  been  no  changes  in  circumstance  or  new  information   related  to conflict  with  conservation  plans  and  there  would  be  no  change  to  the  no  impact  conclusion  related  to these topics.

Just as under the Prior EIR, there are no conservation plans that cover the project site.

For the above reason, the propos ed project would not result in  significant impacts related to conflicts with  conservation  plans  not  previously  identified  in  the  EIR  or  addressed  through  uniformly  applied development policies or standards and no further environmental review is necessary for this topic.

Albrae Industrial Project – The Globe Planned District Addendum Page 33 E. Cultural and Tribal Cultural Resources

Impacts
Related To:

Prior EIR
Findings with
Implementation
of MM (If
Required)

PROJECT
Relationship to Prior
EIR Findings
Applicable SDRs or MMs
Project Level
of
Significance
Equal or
Less
Severity
Substantial
Increase in
Severity
a. Historical
Resource
NI   ☒  ☐  ‐‐  NI
b. Archaeological
Resource
LTS   ☒  ☐

SDR FMC 18.218.050(d)(2): Accidental
Discovery of Cultural Resources.

LTS
c. Human Remains  NI  ☒  ☐  NI
d. Tribal Cultural
Resources 1
LTS   ☒  ☐  LTS
e. Paleontological
Resource 2
NI   ☒  ☐  NI
1  Note that Tribal Cultural Resou rces are now called out as a separate topic under CEQA but under the Prior EIR would have been addressed as part of the Cultural Resources topics. Prior EIR findings were applied from previous conclusions.
2  Note that Paleontological Resou rces are now included under the Geology and Soils section, but are addressed here as they were under the Prior EIR.

Discussion
Cultural and Tribal Cultural Resources Setting Changes from The  Globe Planned District T h e r e  h ave be e n  n o c h ang e s t o t he  cul t u r al  an d  t r ib al  c u lt u r al  resources  environmental  setting  of  the project  site,  and  the  details  of  the  current  project  do  not  change  the  potential  for  cultural  and  tribal cultural resources impacts.

Since the Prior EIR, the Native American Historic Resource Protection Act (Assembly Bill 52 or AB 52) was passed, which is intended to minimize conflict between Native A merican and development interests. AB 52 adds "tribal cultural resources" to the specific cultural re sources analyzed under CEQA. As had been s t a n d a r d  p r ac t i c e  a t  t h e  t i m e ,  t h e  P r i o r  E I R  c o n s i d e r e d  t r i b a l  c u l t u r a l  r e s o u r c e s  a s  p a r t  o f  t h e  c u l t u r al resources analysis, so they are discussed in this section.

T o  c o n f i r m  t h e  c u r r e n t  c o n d i t i o n  o f  t h e  s i t e  w i t h  r e s p e c t  t o  c ultural  and  tribal  cultural  resources,  a Cultural Resource Assessment was prepared by PaleoWest for this  analysis, including a literature review and records search of the Northwest Information Center (NWIC) a t Sonoma State University, a survey of the  site,  and  a  historic  assessmen t  of  the  existing  structures.  The  Cultural  Resource  Assessment  is included as Attachment C to this document.

Additionally,  a  search  of  the  Sacred  Lands  Files  by  the  Native American  Heritage  Commission  (NAHC) w a s  r e q u e s t e d  ( i n c l u d e d  i n  A t t a c h m e n t  C ) .  N o  t r i b e s  h a v e  r e q u e sted  consultation  for  area  projects under AB 52, however as recommended by the NAHC, certified lett ers and emails were sent on July 7, 2021, to contacts for all the local tribes to notify them of th e project and  providing an opportunity to provide input. One tribal representative expressed interest in  possible consultation following the initial letters, and on August 11, 2021, was emailed the completed Cult ural Resources Assessment. There was

Page 34 ends

no further request from the tribal representative in response t o that email nor to the follow up email sent on September 1, 2021.

Historical Resources
a)  Would  the  project  cause  a  substantial  adverse  change  in  the  significance  of  a  historical  resource pursuant to Public Resources Section 15064.5?
Same Conclusion (conclusion remains NI): The current project would not change the less‐than‐significant conclusion related to cultural and tribal cultural resources.

The project includes the demolition and removal of an existing 1960‐constructed manufacturing building remnant  and  the  1987‐constructed  commercial  building.  The  1987‐constructed  commercial  building  is not  historic  age  (50+  years)  and  no  additional  assessment  was  necessary  for  that  building.  While  the 1960‐constructed  building  remnant  was  not  historic  age  during  preparation  of  the  Prior  EIR  –  which correctly indicated there were no historic resources at the pro ject site ‐ it is now over 50 years of age so has been assessed for its potential significance as a historical resource as discussed below.

The remnant structure was originally constructed in 1960 as a s emi‐truck trailer manufacturing building and  office  for  Trailmobile  Corp  but  was  subsequently  sold  and  u sed  by  other  tenants  for  other manufacturing,  warehouse,  and  retail  purposes,  which  had  included  substantial  renovations  over  the years. It appears that the partial demolition occurred in 2018/ 2019 leaving the structure in its current state. It is approximately 320  feet wide and 250 feet long to c over approximately 80,000 square feet of concrete floor surface. The remnant structure has a flat roof a nd lacks wall coverings so the steel frame structure is visible.

The Cultural Resources Assessmen t (Attachment C) has determined  that although the structure is over 50  years  old,  the  1960  commercial building  remnant  does  not  appear  eligible  for  listing  as  a  historic r e s o u r c e  o n  t h e  s t a t e  o r  n a t i o n a l  r e g i s t e r  b e c a u s e  i t  i s  n o t  a ssociated  with  important  events,  is  not associated with the lives of important persons, is not a distin ctive work, and does not yield information important to prehistory or history. (See Attachment C for additional detail.) Demolition of all existing structures is proposed as it was und er The Globe Planned District, and while o n e  o f  t h o s e  s t r u c t u r e s  i s  n o w  h i s t o r i c ‐ a g e ,  i t  i s  n o t  a  s i g n i ficant  historical  resource.  Therefore,  the conclusion of no impact with respect to historical resources un der the Prior EIR would remain the same with the current project.

For the above reasons, the proposed project would not result in  significant impacts related to historical resources  not  previously  identified  in  the  EIR  or  addressed  through  uniformly  applied  development policies or standards and no further environmental review is necessary for this topic.

Archeological Resources
b)   Would  the  project  cause  a  substantial  adverse  change  in  the   significance  of  an  archaeological resource pursuant to Public Resources Section 15064.5?
Same  Conclusion  (conclusion  remains  LTS) :  The  current  project  would  not  change  the  less‐than‐ significant conclusion related to archeological resources.

The Prior EIR concluded that The Globe Planned District would n ot have a significant impact related to cultural resources, noting, “No known significant historical, p aleontological or archaeological resource,

Albrae Industrial Project – The Globe Planned District Addendum Page 35 site structure or object has been identified either on the proj ect site or in the general area of the project site.  There  are  no  known  unique  cultural  resources,  and  therefo r e ,  n o  p o t e n t i a l  f o r  r e s t r i c t i o n s .

However,  should  any  human  remains  or  historical  or  unique  archaeological  resources  be  discovered during  site  development  work,  the  provisions  of  CEQA  Guidelines,  Section  15064.5.(e)  and  (f)  will  be followed to reduce impacts to a non‐significant level.” The referenced CEQA Guideline sections detail steps to be taken  in the event of accidental discovery of cultural resources or human remains. These same measures have b een subsequently formalized as the following Standard Development Requirement:

FMC 18.218.050(d)(2): Accidental Discovery of Cultural Resources.  The following requirements shall be  met  to  address  the  potential  for  accidental  discovery  of  cul tural  resources  during  ground disturbing excavation:
( A )   T h e  p r o j e c t  p r o p o n e n t  s h a l l  i n c l u d e  a  n o t e  o n  a n y  p l a n s  t ha t  r e q u i r e  g r o u n d  d i s t u r b i n g excavation that there is a potential for exposing buried cultural resources. ( B )    T h e  p r o j e c t  p r o p o n e n t  s h a l l  r e t a i n  a  p r o f e s s i o n a l  a r c h a e ologist  to  provide  a  preconstruction briefing to supervisory personnel of any excavation contractor  to alert them to the possibility of exposing buried cultural resources, including significant pr ehistoric archaeological resources.

The briefing shall discuss any cultural resources, including ar chaeological objects, that could be exposed, the need to stop excavation at the discovery, and the  procedures to follow regarding discovery protection and notification of the project proponent and archaeological team. (C)    In the event that any human remains or historical, archa eological or paleontological resources are discovered during ground disturbing excavation, the provisions of CEQA Guidelines Sections 15064.5(e)  and  (f),  and  of  subsection  (c)(2)(D)  of  this  section,  requiring  cessation  of  work, notification, and immediate evaluation shall be followed. (D)    If  resources  are  discovered  during  ground  disturbing  activ ities  that  may  be  classified  as historical, unique archaeological, or tribal cultural resources , ground disturbing activities shall cease immediately, and the planning manager shall be notified.  The resources will be evaluated by a qualified archaeologist and, in the planning manager’s dis cretion, a tribal cultural monitor.

If  the  resources  are  determined  to  be  historical,  unique  archae ological,  or  tribal  cultural resources, then a plan for avoiding the resources shall be prep ared. If avoidance is infeasible, then all significant cultural materials recovered shall be, as  necessary and at the discretion of the consulting archaeologist, subject to scientific analysis, p rofessional museum curation, and documentation  according  to  current  professional  standards.  Any  plan  for  avoidance  or mitigation shall be subject to the approval of the planning manager. (E)    As used herein, “historical resource” means a historical  resource as defined by CEQA Guidelines Section 15064.5(a); “unique archae ological resource” means uniq ue archaeological resource as defined by Cal. Pub. Res. Code §  21083.2(g); and “tribal cultur al resource” means tribal cultural resource  as  defined  by  Cal.  Pub.  Res.  Code  §  21074.  Collectivel y ,  t h e s e  t e r m s  d e s c r i b e “significant cultural materials.”
The project would be required to implement Standard Development  Requirement FMC 18.218.050(d)(2) in the event of accidental discovery of cultural resources and  the impact of the project would be less‐ than‐significant.

Page 36 ends

For  the  above  reasons,  the  proposed  project  would  not  result  in  s i g n i f i c a n t  i m p a c t s  r e l a t e d  t o archeological  resources  not  previously  identified  in  the  EIR  or  addressed  through  uniformly  applied development policies or standards and no further environmental review is necessary for this topic.

Human Remains
c)   Would  the  project  disturb  any  human  remains,  including  thos e  interred  outside  of  formal cemeteries?
Same Conclusion (conclusion remains NI): The current project would not change the less‐than‐significant conclusion related to human remains.

The Prior EIR concluded that The Globe Planned District would n ot have a significant impact related to cultural resources, noting, “No known significant historical, p aleontological or archaeological resource, site structure or object has been identified either on the proj ect site or in the general area of the project site.  There  are  no  known  unique  cultural  resources,  and  therefo r e ,  n o  p o t e n t i a l  f o r  r e s t r i c t i o n s .

However,  should  any  human  remains  or  historical  or  unique  archaeological  resources  be  discovered during  site  development  work,  the  provisions  of  CEQA  Guidelines,  Section  15064.5.(e)  and  (f)  will  be followed to reduce impacts to a non‐significant level.” The referenced CEQA Guideline sections detail steps to be taken  in the event of accidental discovery of human remains. These same measures have been subsequently forma lized as a Standard Development Requirement FMC 18.218.050(d)(2)(C), as detailed above.

The project would be required to implement Standard Development  Requirement FMC 18.218.050(d)(2) in the event of accidental discovery of cultural resources and  the impact of the project would be less‐ than‐significant.

For  the  above  reasons,  the  proposed  project  would  not  result  in s i g n i f i c a n t  i m p a c t s  r e l a t e d  t o  h u m a n remains  not  previously  identified  in  the  EIR  or  addressed  throu gh  uniformly  applied  development policies or standards and no further environmental review is necessary for this topic.

Tribal Cultural Resources
d)   Cause a substantial adverse change in the significance of a  tribal cultural resource, defined in Public Resources  Code  section  21074  as  either  a  site,  feature,  place,  cultural  landscape  that  is geographically defined in terms of the size and scope of the la ndscape, sacred place, or object with cultural value to a California Native American tribe, and that is:
i)  Listed or eligible for listing in the California Register of  Historical Resources, or in a local register of historical resources as defined in Public Resources Code section 5020.1(k), or ii)   A  resource  determined  by  the  lead  agency,  in  its  discretio n  and  supported  by  substantial evidence,  to  be  significant  pursuant  to  criteria  set  forth  in  subdivision  (c)  of  Public  Resources Code Section 5024.1. In applying the criteria set forth in subd ivision (c) of Public Resource Code Section  5024.1,  the  lead  agency  shall  consider  the  significance o f  t h e  r e s o u r c e  t o  a  C a l i f o r n i a Native American tribe.

Same  Conclusion  (conclusion  remains  LTS) :  The  current  project  would  not  change  the  less‐than‐ significant conclusion related to tribal cultural resources.

Albrae Industrial Project – The Globe Planned District Addendum Page 37 City of Fremont Standard Development Requirement FMC 18.218.050 (d)(1) requires notification of the project be sent to the local tribal contacts.

FMC 18.218.050(d)(1): Notification, Affiliated California Nativ e  American Tribes. Within 14 days of determining  that  an  application  for  a  project  is  complete  or  a  d e c i s i o n  b y  t h e  c i t y  i s  m a d e  t o undertake a project, the  city shall provide formal notification  to the designated contact or a tribal representative  of  traditionally  and  culturally  affiliated  California  Native  American  tribes  that  have r e q u e s t e d  t o  r e c e i v e  s u c h  n o t i c e  f r o m  t h e  c i t y .  T h e  w r i t t e n  n o tification  shall  include  a  brief description of the proposed project and its location, project c ontact information, and a notification that the California Native American tribe has 30 days to reques t consultation pursuant to Cal. Pub.

Res. Code § 64352.4.

U p o n  r e q u e s t ,  t h e  N a t i v e  A m e r i c a n  H e r i t a g e  C o m m i s s i o n  p r o v i d e d  contact  information  for  fifteen Native  American  tribal  representatives.  Notice  of  the  proposed project  was  sent  by  certified  mail  and email to all fifteen contacts on July 7, 2021. The City respond ed to a request for additional information on  August  11,  2021.  To  date,  no  requests  for  consultation  or  mit i g at i on  h ave  b e e n  r e c ei ved .  S t an d ar d Development Requirement FMC 18.218.050(d)(1) has been satisfied for this project.

The Prior EIR concluded that The Globe Planned District would n ot have a significant impact related to cultural resources, noting, “No known significant historical, p aleontological or archaeological resource, site structure or object has been identified either on the proj ect site or in the general area of the project site.  There  are  no  known  unique  cultural  resources,  and  therefo r e ,  n o  p o t e n t i a l  f o r  r e s t r i c t i o n s .

However,  should  any  human  remains  or  historical  or  unique  archaeological  resources  be  discovered during  site  development  work,  the  provisions  of  CEQA  Guidelines,  Section  15064.5.(e)  and  (f)  will  be followed to reduce impacts to a non‐significant level.” The referenced CEQA Guideline sections detail steps to be taken  in the event of accidental discovery of underground resources or human remains. These same measures hav e been subsequently formalized as Standard Development Requirement FMC 18.218.050(d)(2).

The project would be required to implement Standard Development  Requirement FMC 18.218.050(d)(2) in the event of accidental discovery of tribal cultural resourc es and the impact of the project would be less‐than‐significant.

For  the  above  reasons,  the  proposed  project  would  not  result  in s i g n i f i c a n t  i m p a c t s  r e l a t e d  t o  t r i b a l cultural  resources  not  previously  identified  in  the  EIR  or  addr essed  through  uniformly  applied development policies or standards and no further environmental review is necessary for this topic.

Paleontological Resources
e)   Directly or indirectly destr oy a unique paleontological resource or site or unique geologic feature? Same  Conclusion  (conclusion  remains  NI) :  The  current  project  would  not  change  the  no  impact conclusion related to paleontological resources.

The Prior EIR concluded that The Globe Planned District would n ot have a significant impact related to paleontological  resources,  noting,  “No  known  significant  historical,  paleontological  or  archaeological resource, site structure or object has been identified either o n the project site or in the general area of the  project  site.  There  are  no  known  unique  cultural  resources,   and  therefore,  no  potential  for restrictions.    However,  should  any  human  remains  or  historical or  unique  archaeological  resources  be

Page 38 ends

discovered during site development work, the provisions of CEQA  Guidelines, Section 15064.5.(e) and (f) will be followed to reduce impacts to a non‐significant level.” The referenced CEQA Guideline sections detail steps to be taken  in the event of accidental discovery of underground  resources.  These  same  measures  have  been  subsequent ly  formalized  as  Standard Development Requirement FMC 18.218.050(d)(2), as detailed above.

The project would be required to implement Standard Development  Requirement FMC 18.218.050(d)(2) in the event of accidental discovery of paleontological resourc es and the impact of the project would be less‐than‐significant.

For  the  above  reasons,  the  proposed  project  would  not  result  in  s i g n i f i c a n t  i m p a c t s  r e l a t e d  t o paleontological  resources  not  previously  identified  in  the  EIR or  addressed  through  uniformly  applied development policies or standards and no further environmental review is necessary for this topic.

Albrae Industrial Project – The Globe Planned District Addendum Page 39 F. Geology and Soils

Impacts
Related To:
1 Prior EIR
Findings with
Implementation
of MM (If
Required)

PROJECT
Relationship to Prior
EIR Findings
Applicable SDRs or MMs
Project Level
of
Significance
Equal or
Less
Severity
Substantial
Increase in
Severity
a.   Seismic Hazards   LTS  ☒  ☐  SDR FMC 18.218.050(e)  LTS b. Soil Erosion  NI  ☒  ☐  ‐‐  NI
c. Unstable Soil  LTS  ☒  ☐  SDR FMC 18.218.050(e)  LTS d. Expansive Soil  LTS  ☒  ☐  SDR FMC 18.218.050(e)  LTS e. Septic Tanks  NI  ☒  ☐  ‐‐  NI
1 Note that the current CEQA Guidelines include paleontological resources in this section. That topic has been addressed under Section E. Cultural and Tribal Cultural Resources instead, as it was in the Prior EIR.

Discussion
Geology and Soils Setting Changes from The Globe Planned Distri ct The  current  project  would  be  required  to  meet  current  rules  and  regulation,  including  the  updated California  Building  Code.  These  regular  updates  to  regulatory  d ocuments  would  not  change  the conclusions of the Prior EIR.

There  have  been  no  changes  to  the  geology  and  soils  at  the  proj ect  site,  however  the  geological characteristics of the site and relationship to the currently p roposed development was assessed in the following technical reports, which are available as part of project application materials.

A Report of Expected Geotechnical Conditions and Geotechnical Peer Review Response was prepared by Terracon for the current applicants, dated 8/26/2020 and 4/8/2021.

Seismic Hazards
a)   Would the project directly or indirectly cause potential su bstantial adverse effects, including the risk of loss, injury, or death involving:
i)  Rupture  of  a  known  earthquake  fault,  as  delineated  on  the  mo st  recent  Alquist‐Priolo Earthquake  Fault  Zoning  Map  issued  by  the  State  Geologist  for  th e  a r e a  o r  b a s e d  o n  o t h e r substantial  evidence  of  a  known  fault?  (Refer  to  Division  of  Mi nes  and  Geology  Special Publication 42)
ii)   Strong seismic ground shaking?
iii)   Seismic‐related ground failure, including liquefaction? iv)   Landslides?
Same  Conclusion  (conclusion  remains  LTS):  As  under  the  Prior  EIR,  the  project  would  be  subject  to regulatory  requirements  to  address  regional  seismicity  and  the specific  conditions  at  the  site  and  the current project would not change the less‐than‐significant impa ct conclusion related to seismic hazards and unstable or expansive soils.

Page 40 ends

The Prior EIR concluded that The Globe Planned District would n ot have a significant impact related to s e i s m i c  h a z a r d s ,  n o t i n g ,  “ T h e  p r o j e c t  s i t e  i s  l o c a t e d  i n  a  s e i smic  area  and  in  a  liquefaction  zone  as identified by the State of California Geologic Survey. Because  of this location any proposed construction will require the adoption of appropriate engineering design in  conformance with geotechnical standards for  construction.  A  geotechnical  study  and  peer  review  by  the  City’s  geotechnical  consultant  will  be performed prior to the issuance of building permits.”
The  Geotechnical  Report  completed  for  the  current  project  confirmed  and  expanded  upon  previous known  conditions  at  the  site,  as  follows.  There  are  no  known  faults  at  the  project  site.  Due  to  the relatively flat vicinity, landslides are not a hazard to the si te. Soils subject to liquefaction are known to be located in the area and were studied at the site. The antici pated potential total liquefaction‐induced settlement  was  calculated  to  be  about  ½  to  2½  inches  and  differential  settlement  to  be  about  1  inch over  100  feet.  The  proposed  foundation  and  construction  specific s  w o u l d  a d d r e s s  s i t e  c h a r a c t e r i s t i c s , including  use  of  chemically‐treated  or  non‐expansive  fill  under  building  slabs,  and  the  exact  details would  be  confirmed  during  required  design‐level  review.    This  has  been  formalized  as  the  following Standard Development Requirement:

FMC 18.218.050(e): Geology and Soils . New development projects  with the potential to expose people or structures to substantial adverse effects, including  the risk of loss, injury, or death due to  seismic  activity  and  potential  seismic‐related  ground  shakin g  including  liquefaction,  if  so determined by a site‐specific geotechnical study prepared to the satisfaction of the city engineer o r  h i s / h e r  d e s i g n e e ,  s h a l l  i m p l e m e n t  t h e  f o l l o w i n g  m e a s u r e s  p r ior  to  or  during  project construction, as applicable.
(A)    The  project  geotechnical  consultant  shall  review  all  geotechnical  aspects  of  the  project building and grading plans (i.e., site preparation and grading,  site drainage improvements, and  design  parameters  for  foundations,  and  retaining  walls).  The  consultant  shall  verify that their recommendations, including those regarding the need  for further evaluation for potential liquefaction and the pr esence and lateral extent of a ny undocumented fill as well as  laboratory  testing  for  corrosive  soil,  have  been  properly  conducted  and  any  necessary design  measures  are  incorporated  into  the  construction  plans.  T he  results  of  the  plan review shall be summarized by the geotechnical consultant in a  letter and submitted to the city engineer prior to issuance of building permits for the project. ( B )   T h e  p r o j e c t  g e o t e c h n i c a l  c onsultant  shall  inspect,  test  (a s  needed),  and  approve  all geotechnical  aspects  of  project  construction.  The  inspections  s hall  include,  but  not necessarily be limited to: site preparation and grading, site surface and subsurface drainage improvements, and excavations for foundations and retaining wal ls prior to the placement of  steel  and  concrete.  The  results  of  these  inspections  and  the  as‐built  conditions  of  the project  shall  be  summarized  by  the  project  geotechnical  consult ant  in  a  letter  and submitted to the city building official/city engineer for review prior to final (as‐built) project approval.

To further address and reduce impacts related to potential seis mic activity and liquefaction, all grading,  foundations,  and  structures  for  the  proposed  project  w ould  be  required  to  be engineered  and  designed  in  conformance  with  applicable  geotechn ical  and  soil  stability standards as required by the California Building Code (CBC), as adopted by the city.

Albrae Industrial Project – The Globe Planned District Addendum Page 41 The  project  would  be  required  to  implement  Standard  Development  Requirement  FMC  18.218.050(e) requiring site‐specific geotechnical study and the impact of the project would be less‐than‐significant.

Consistent  with  conclusions  in  the  Prior  EIR,  the  project  will  need  to  comply  with  site‐specific geotechnical  recommendations,  now  f o r m a l i z e d  a s  S t a n d a r d  D e v e l opment  Requirement  FMC

18.218.050(e).  Therefore,  the  conclusion  of  a  less‐than‐signifi cant  impact  with  respect  to  seismic hazards under the Prior EIR would remain the same with the current project.

For  the  above  reasons,  the  proposed  project  would  not  result  in si g n i f i c ant  i mp ac t s r e l at e d t o se i sm i c hazards  not  previously  identified  in  the  EIR  or  addressed  throu gh  uniformly  applied  development policies or standards and no further environmental review is necessary for this topic.

Soil Erosion
b)   Would the project result in substantial soil erosion or the  loss of topsoil, creati ng substantial risks to life, property, or creek/waterways?
Same  Conclusion  (conclusion  remains  NI) :  As  under  the  Prior  EIR,  the  project  would  be  subject  to regulatory requirements to include best management practices to  reduce soil erosion potential and the current project would not change the no impact conclusion related to soil erosion.

As  an  urban  site,  the  project  would  largely  involve  the  soil  being  covered  by  buildings  and  pavement, consistent  with  the  prior  development  of  the  site.  Under  these circumstances,  soil  erosion  could  have the  potential  to  occur  during  construction  activities  and  as  a result  of  runoff  from  landscaped  areas  if not properly controlled. Prevention of soil erosion is addresse d through implementation of stormwater pollution prevention measures, which are regulatory requirement s. As noted in the Prior EIR under the Hydrology and Water Quality sect ion, “Best Management Practices  for stormwater pollution prevention are intended to achieve compliance with the  goals of the Alamed a County Urban Storm Water Runoff Program  in  conformance  with  the  Federal  National  Pollutant  Discharge  Elimination  System  (NPDES) program established by the Clean Water Act.”
As under The Globe Planned District, the project would be requi red to implement stormwater pollution prevention measures – which include measures to prevent soil er osion ‐ under regulatory requirements during both the construction‐period and for ongoing operations.  Therefore, the conclusion of no impact with respect to soil erosion under the Prior EIR would remain the same with the current project.

For  the  above  reasons,  the  proposed  project  would  not  result  in s i g n i f i c a n t  i m p a c t s  r e l a t e d  t o  s o i l erosion  not  previously  identified  in  the  EIR  or  addressed  throu gh  uniformly  applied  development policies or standards and no further environmental review is necessary for this topic.

Unstable Soil
c )  W o u l d  t h e  p r o j e c t  b e  l o c a t e d  o n  a  g e o l o g i c  u n i t  o r  s o i l  t h a t i s  u n s t a b l e ,  o r  t h a t  w o u l d  b e c o m e unstable  as  a  result  of  the  project,  and  potentially  result  in on‐  or  off‐site  landslide,  lateral  spreading, subsidence, liquefaction or collapse?
Same  Conclusion  (conclusion  remains  LTS):  As  under  the  Prior  EIR,  the  project  would  be  subject  to regulatory  requirements  to  address  specific  conditions  at  the  site  and  the  current  project  would  not change the less‐than‐significant impact conclusion related to unstable soils.

Page 42 ends

The Prior EIR concluded that The Globe Planned District would n ot have a significant impact related to unstable soil, noting, “…any pro posed construction will require  the adoption of appropriate engineering design  in  conformance  with  geotechnical  standards  for  construction.  A  geotechnical  study  and  peer review by the City’s geotechnical consultant will be performed prior to the issuance of building permits.” The  Geotechnical  Report  completed  for  the  current  project  confirmed  and  expanded  upon  previous known  conditions  at  the  site,  as  follows.  Soils  subject  to  liquefaction  and  expansion  are  known  to  be located  in  the  area  and  were  studied  at  the  site.  The  anticipated  potential  total  liquefaction‐induced settlement  was  calculated  to  be  about  ½  to  2½  inches  and  differential  settlement  to  be  about  1  inch over  100  feet.  The  proposed  foundation  and  construction  specific s  w o u l d  a d d r e s s  s i t e  c h a r a c t e r i s t i c s , including  use  of  chemically‐treated  or  non‐expansive  fill  under  building  slabs,  and  the  exact  details would be confirmed during required design‐level review.

Consistent  with  conclusions  in  the  Prior  EIR,  the  project  will  need  to  comply  with  site‐specific geotechnical  recommendations,  now  f o r m a l i z e d  a s  S t a n d a r d  D e v e l opment  Requirement  FMC

18.218.050(e).  Therefore,  the  conclusion  of  a  less‐than‐significant  impact  with  respect  to  unstable  soil under the Prior EIR would remain the same with the current project.

For the above reasons, the proposed project would not result in  significant impacts related to unstable soil not previously identified in  the EIR or addressed through  uniformly applied development policies or standards and no further environmental review is necessary for this topic.

Expansive Soil
d)   Would the project be located on expansive soil, as defined  in Table 18‐1‐B of the Uniform Building Code (1994), creating substantial direct or indirect risks to life or property? Same  Conclusion  (conclusion  remains  LTS):  As  under  the  Prior  EIR,  the  project  would  be  subject  to regulatory  requirements  to  address  regional  seismicity  and  the specific  conditions  at  the  site  and  the current project would not change the less‐than‐significant impact conclusion related to expansive soils.

The Prior EIR concluded that The Globe Planned District would n ot have a significant impact related to expansive  soil,  noting,  “The  project  site  is  located  in  a  seism ic  area  and  in  a  liquefaction  zone  as identified by the State of California Geologic Survey. Because  of this location any proposed construction will require the adoption of appropriate engineering design in  conformance with geotechnical standards for  construction.  A  geotechnical  study  and  peer  review  by  the  City’s  geotechnical  consultant  will  be performed prior to the issuance of building permits.”
The  Geotechnical  Report  completed  for  the  current  project  confirmed  and  expanded  upon  previous known  conditions  at  the  site,  as  follows.  Soils  subject  to  liquefaction  and  expansion  are  known  to  be located  in  the  area  and  were  studied  at  the  site.  The  proposed foundation  and  construction  specifics would  address  site  characteristics,  including  use  of  chemically ‐treated  or  non‐expansive  fill  under building slabs, and the exact details would be confirmed during required design‐level review.

Consistent  with  conclusions  in  the  Prior  EIR,  the  project  will need  to  meet  regulatory  requirements  to comply  with  the  California  Building  Code  and  FMC  18.218.050(e)  and  project‐specific  geotechnical recommendations  and  building  permit  requirements  to  address  reg ional  seismicity  and  the  specific conditions  at  the  site.  Therefore,  the  conclusion  of  a  less‐tha n‐significant  impact  with  respect  to expansive soils under the Prior EIR would remain the same with the current project.

Albrae Industrial Project – The Globe Planned District Addendum Page 43 For the above reasons, the proposed project would not result in  significant impacts related to expansive soil not previously identified in  the EIR or addressed through  uniformly applied development policies or standards and no further environmental review is necessary for this topic.

Septic Tanks
e)   Would  the  project  have  soils  incapable  of  adequately  suppor ting  the  use  of  septic  tanks  or alternative waste water disposal systems where sewers are not a vailable for the disposal of waste water?
Same  Conclusion  (conclusion  remains  NI) :  The  current  project  would  not  change  the  no  impact conclusion related to septic systems as the project area is ser viced by the city’s sewer system, which has not changed since The Globe Planned District.

As  under  The  Globe  Planned  District,  no  septic  tanks  are  proposed.  Therefore,  the  conclusion  of  no impact with respect to septic tanks under the Prior EIR would remain the same with the current project.

For  the  above  reason,  the  propose d  p r o j e c t  w o u l d  n o t  r e s u l t  i n  s i g n i f i c a n t  i m p a c t s  r e l a t e d  t o  s e p t i c tanks not previously identified in the EIR or addressed through  uniformly applied development policies or standards and no further environmental review is necessary for this topic.

Page 44 ends

G. Greenhouse Gas Emissions

Impacts
Related To:

Prior EIR
Findings with
Implementation
of MM (If
Required)

PROJECT
Relationship to Prior
EIR Findings
Applicable SDRs or MMs
Project Level
of
Significance
Equal or
Less
Severity
Substantial
Increase in
Severity
a.   GHG Emissions  ‐‐  1   ☒  ☐  ‐‐  ‐‐
b. Conflict with GHG
Reduction Plans
‐‐ 1  ☒  ☐  ‐‐  ‐‐
1 Note that GHG topics were not formally assessed in the Prior EIR. As shown in this table, the project impact under these topics would be equal to or less severe than what would have been identified under the Prior EIR.

Discussion
Greenhouse  gas  (GHG)  emissions  were  not  expressly  addressed  in  the  Prior  EIR.  However,  since information on climate change and greenhouse gas emissions was  known, or could have been known by that time, it is not “new information” as specifically defined  under CEQA that would trigger preparation of a subsequent or supplemental EIR.

However,  a  comparison  between  GHG  emissions  under  the  Globe  Pla nned  District  and  the  current project is provided for comparison purposes as follows.

Illingworth  &  Rodkin  prepared  an  Air  Quality  and  Greenhouse  Gas E m i s s i o n s  A n a l y s i s  f o r  t h e  c u r r e n t project as referenced in this document and included in full as Attachment C.

Greenhouse Gas Emissions Setting Changes from The Globe Planned  District The  regulatory  environment  related  to  greenhouse  gas  emissions has  evolved  since  the  Prior  EIR  was approved. A summary of regulations and policies related to greenhouse gas emissions and global climate change is presented below.

Federal and State Regulatory Changes
The  Kyoto  Protocol  was  an  international  treaty  that  commits  state  parties  to  reduce  greenhouse  gas emissions, based on the scientific consensus that global warmin g is occurring and that human‐made CO₂ emissions  are  driving  it.  Originated  in  the  late  1990s,  by  the t i m e  o f  t h e  P r i o r  E I R ,  o v e r  5 0  n a t i o n s worldwide had ratified its climate change‐related policies. How ever, the United States has opted for a voluntary  and  incentive‐based  approach  toward  emissions  reductio n s  i n  l i e u  o f  t h e  K y o t o  P r o t o c o l ’ s mandatory framework.

In  June  2005,  Governor  Schwarzenegger  established  California’s  greenhouse  gas  emissions  reduction targets in Executive Order (EO) S‐3‐05. The EO established the following goals: greenhouse gas emissions should be reduced to 2000 levels by 2010; to 1990 levels by 202 0; and to 80 percent below 1990 levels by  2050.  California’s  major  initiatives  for  reducing  greenhouse  gas  emissions  are  outlined  in  Assembly Bill  32,  the  “Global  Warming  Solutions  Act,”  passed  by  the  California  State  legislature  on  August  31, 2006, which codified EO S‐3‐05 along with other related legislation.

Albrae Industrial Project – The Globe Planned District Addendum Page 45 CEQA  Guideline  amendments  providing  guidance  to  public  agencies   regarding  the  analysis  and mitigation of the effects of greenhouse gas emissions in CEQA documents went into effect in 2010.

State  Senate  Bill  32  was  passed  in  2016,  which  codified  a  2030 GHG  emissions  reduction  target  of  40 percent below 1990 levels.

Regional Regulatory Changes
Since The Prior EIR, the Bay Area Air Quality Management Distri ct (BAAQMD) has updated its CEQA Air Quality  Guidelines  (BAAQMD  Guidel i n e s ) ,  w h i c h  a s s i s t  l e a d  a g e n cies  in  evaluating  and  mitigating  air quality  impacts.  The  latest  draft  of  the  BAAQMD  guidelines  was  issued  in  May  2017  and  includes thresholds related to GHG emissions.

The regional Bay Area Clean Air  Plan is regularly updated inclu ding multiple updates since the Prior EIR, with 2017 being the most recent version.

Local Regulatory Changes
On  November  13,  2012,  the  City  of  Fremont  adopted  a  Climate  Action  Plan  (CAP)  with  guidelines  of reaching  a  target  reduction  of  25%  below  baseline  2005  GHG  emis sions  levels  by  2020  includes strategies to achieve greenhouse gas emission reductions charac terized along a ‘continuum of actions’ for  intervention  by  the  City.  The  CAP  is  intended  to  build  upon  existing  environmental  preservation, public health, and energy saving efforts.

GHG Emissions
a)  Would the project generate greenhouse gas emissions, either  directly or indirectly, that may have a significant impact on the environment?
Same  Conclusion  (Equal  or  Less  Severity):  While  not  specifically  analyzed  in  the  Prior  EIR,  the  current project would have less GHG emissions than development under The Globe Planned District.

The  project’s  GHG  emissions  were  modeled  using  CalEEMod,  as  disc u s s e d  i n  s e c t i o n  3 :  A i r  Q u a l i t y .  A summary  of  the  results  are  included  below  and  the  CalEEMod  inpu t  and  output  can  be  found  in Attachment C.

Annual  emissions  from  the  project  are  predicted  to  be  5,779  MT of  CO2e,  compared  to  15,214MT  of CO2e for the entitled retail s hopping center in the year 2023.  The 2030 GHG emissions for the proposed project  would  be  5,096  MT  of  CO2e  and  for  the  entitled  retail  it  would  be  13,507  MT  of  CO2e.  The proposed project would have less operational GHG emissions than the entitled retail land use.

Greenhouse  gas  (GHG)  emissions  were  not  expressly  addressed  in the  Prior  EIR,  which  was  prepared when  this  topic  was  not  customarily  evaluated  under  CEQA.  However,  since  information  on  climate change  and  greenhouse  gas  emissions  was  known,  or  could  have  bee n  k n o w n  b y  t h a t  t i m e ,  i t  i s  n o t “new information” as specifically defined under CEQA and thus i s not  required to be analyzed as part of this Addendum. However, this analysis demonstrates that the cur rent project would have reduced GHG emissions than what would have been quantified for The Globe Planned District.

Page 46 ends

For  the  above  reasons,  the  proposed  project  would  not  result  in s i g n i f i c a n t  i m p a c t s  r e l a t e d  t o  G H G emissions not previously identified in the Prior EIR or address ed through uniformly applied development policies or standards and no further environmental review is necessary for this topic.

Consistency with GHG Reduction Plans
b)   Would the project conflict with an applicable plan, policy  or regulation adopted for the purpose of reducing the emissions of greenhouse gases?
Same Conclusion (Conclusions remains LTS) : While Greenhouse Gas Reduction Plans has been adopted since the Prior EIR, the current project would be consistent wi th relevant plans and the impact would be the same or reduced from that under The Globe Planned District.

The  Prior  EIR  concluded  that  The  Globe  Planned  District  would  h a v e  a  l e s s ‐ t h a n ‐ s i g n i f i c a n t  i m p a c t related  to  conflict  with  the  air  quality  plan,  noting,  “The  request  for  a  General  Plan  Amendment  will modify  the  overall  land  use  of  the  site.  The  existing  General  P lan  designation  allows  large  scale commercial  uses.  The  new  designation  would  allow  a  combination of  large  scale  commercial,  retail, assembly uses and restaurants. Although the specific nature of uses on site will change, the General Plan anticipates this site for commercial uses.  Therefore, the redevelopment of the site is consistent with the Fremont  General  Plan  in  terms  of  increasing  the  amount  of  development  on  site,  and  not  conflicting with  an  air  quality  plan.”  Consistent  with  the  previous  assessme n t ,  t h e  c u r r e n t  p r o j e c t  w o u l d  a g a i n revise the  particulars of development  at the site while still r epresenting anticipated redevelopment at that location.

Since  the  Prior  EIR,  the  City  adopted  a  GHG  reduction  plan  in  2012,  known  as  the  City  of  Fremont C l i m a t e  A c t i o n  P l a n  ( “ F r e m o n t  C A P ” ) .  M a n y  o f  t h e  F r e m o n t  C A P ’ s  e m i s s i o n  r e d u c t i o n  a c t i o n s  a r e targeted to city‐wide strategies that are not directly applicab le to the proposed project except through compliance  with  related  regulations.  The  project  would  comply  w ith  City  requirements  related  to facilities for pedestrians and bicyclists and carpoolers (relat ed to Fremont CAP actions L‐A2, L‐R1, L‐R3, and  L‐P2),  would  meet  or  exceed  requirements  for  tree  planting,   lighting  efficiencies,  and  water c o n s e r v a t i o n  /  e f f i c i e n c i e s  ( r e l a t e d  t o  F r e m o n t  C A P  a c t i o n s  E ‐ P2 ,  E ‐ R 2 ,  W ‐ C 1 ,  a n d  W ‐ C 6 ) ,  a n d  w o u l d comply with construction and oper ational solid waste reduction  requirements (related to Fremont CAP actions  SW‐A5,  SW‐R‐1,  SW‐R2,  SW‐A8,  and  SW‐A9).  The  current  project  would  not  conflict  with  or obstruct the Fremont CAP.

The Clean Air Plan is the regional air quality plan, and has been regularly updated since the Prior EIR. The latest update to the plan, adopted in April 2017, is the 2017 B ay Area Clean Air Plan. BAAQMD currently r e c o m m e n d s  a n a l y z i n g  a  p r o j e c t ’ s  c o n s i s t e n c y  w i t h  c u r r e n t  a i r  quality  plan  primary  goals  and  control measures. The impact would be significant if the project would  conflict with or obstruct attainment of the primary goals or implementation of the control measures.

The  primary  goals  of  the  Bay  Area  2017  Clean  Air  Plan  are  to  attain  all  state  and  national  air  quality standards,  eliminate  disparities  among  Bay  Area  communities  in  cancer  health  risk  from  toxic  air contaminants, and reduce Bay Area greenhouse gas emissions to 4 0 percent below 1990 levels by 2030. (This last standard is addressed in Section G: Greenhouse Gas Emissions.) The  current  project  would  be  required  to  comply  with  all  applicable  rules  and  regulations  related  to emissions  and  health  risk  and,  as  detailed  under  the  “Criteria Air  Pollutants”  topic  below,  would  have reduced emissions from what would have occurred under developme nt of The Globe Planned District as

Albrae Industrial Project – The Globe Planned District Addendum Page 47 originally proposed and therefor e would not result in conflict  with the primary goals of the 2017 Clean Air Plan.

Many of the Clean Air Plan’s control measures are targeted to a rea‐wide improvements, large stationary source  reductions,  or  large  employers  and  these  are  not  directly  applicable  to  the  proposed  project.

However, the project would be consistent with all rules and reg ulations related to construction activities and the proposed development would meet current standards of en ergy and water efficiency (Clean Air Plan  Energy  Control  Measure  EN1  and  Water  Control  Measure  WR2) and  recycling  and  green  waste requirements  (Clean  Air  Plan  Waste  Management  Control  Measures  WA3  and  WA4)  and  does  not conflict  with  applicable  control  measures  aimed  at  improving  ac cess/connectivity  for  bicycles  and pedestrians (Clean Air Plan Transportation Control Measure TR9) or any other control measures.

The project, therefore, would be consistent with the Fremont CA P and Clean Air Plan and have a less‐ than‐significant impact in this regard. While the regulatory pl ans have been updated since the Prior EIR, this conclusion is consistent with the Prior EIR.

For  the  above  reasons,  the  proposed  project  would  not  result  in  s i g n i f i c a n t  i m p a c t s  r e l a t e d  t o c o n s i s t e n c y  w i t h  G H G  r e d u c t i o n  p l a n s  n o t  p r e v i o u s l y  i d e n t i f i e d  in  the  Prior  EIR  or  addressed  through uniformly applied development policies or standards and no furt her environmental review is necessary for this topic.

Page 48 ends

H. Hazards and Hazardous Materials and Wildfire

Impacts
Related To:

Prior EIR
Findings with
Implementation
of MM (If
Required)

PROJECT
Relationship to Prior
EIR Findings
Applicable SDRs or MMs
Project Level
of
Significance
Equal or
Less
Severity
Substantial
Increase in
Severity
a.   Routine Hazardous
Materials Use
NI  ☒  ☐  ‐‐  NI
b. Risk of Upset  LTS w/MM  ☒  ☐  SDR FMC 18.218.050(f) (Supersedes MM 3.2.1A: PCB Removal
and Disposal)
( MM 3.2.1B: Maintain Access to All
Existing Groundwater Monitoring
Wells, MM 3.2.1C: Ongoing
Groundwater Monitoring/ Reporting
have previously been satisfied and are
no longer applicable)
MM 3.2.2: Preparation and
Implementation of an Emergency
Action Plan
MM 3.2.3: Survey and Properly Handle
Materials from Structures that May
Contain Asbestos or Lead‐Based Paint
LTS w/MM
c. Hazardous
Materials within a ¼‐
mile of a School
NI  ☒  ☐  ‐‐  NI
d. Hazardous
Materials Site
LTS w/MM  ☒  ☐  SDR FMC 18.218.050(f)
(Supersedes MM 3.2.1A: PCB Removal
and Disposal)
( MM 3.2.1B: Maintain Access to All
Existing Groundwater Monitoring
Wells, MM 3.2.1C: Ongoing
Groundwater Monitoring/ Reporting
have previously been satisfied and are
no longer applicable)
LTS w/MM
e. Airport Hazards  NI  ☒  ☐  ‐‐  NI
f.  Emergency Access
Routes
NI  ☒  ☐  ‐‐  NI
g.   Wildfire 1 N I   ☒  ☐  ‐‐  NI
1 Note that the current CEQA Guidelines include wildfire as an independent section. This topic has been addressed here as it was in the Prior EIR.

Discussion
Hazards and Hazardous Materials  Setting Changes from The Globe  Planned District As  discussed  in  this  section,  an  Updated  Risk  Management  Plan  has  been  prepared  for  the  project  by Farallon  Consulting,  dated  Septe mber  17,  2021  and  available  as  part  of  the  project  files.  Unless otherwise indicated, the information in this section is from the Updated Risk Management Plan.

Albrae Industrial Project – The Globe Planned District Addendum Page 49 The  project  site  contains  contamination  from  releases  of  indust rial  constituents  associated  with historical uses. The site underwent remedial actions for site c ontamination to the satisfaction of the San Francisco  Bay  Regional  Water  Quality  Control  Board  (Water  Board,  the  regulatory  agency  overseeing hazardous materials issues at th is site), which issued a No Fur ther Action determination (NFA) October 17,  2016.  The  NFA  determination  was  contingent  on  placing  a  deed  restriction  on  the  site  (allowing commercial  or industrial land uses only), which was recorded wi th Alameda County on April 27, 2016; and managing future earthwork ac tivities in accordance with  the  Risk Management Plan (RMP), dated May 2015, prepared by SCA Environ mental, Inc.; an d the Addendum  to RMP dated September 1, 2016, prepared by Roger Shanks Consulting.

Although  residual  concentrations  of  petroleum  hydrocarbons  and  trichloroethylene  in  groundwater continued to exceed Environmental Screening Levels (ESLs), the  Water Board’s 2016 NFA determination concluded  that  because  the  site  deed  restriction  prohibits  the use  of  groundwater  for  any  purposes, groundwater  at  the  site  has  been  adequately  remediated  and  appropriately  managed,  and  use  of  the monitoring wells was discontinued.

To summarize, current contamination of concern at the site includes the following:
 PCBS, lead, nickel, arsenic, and ethylbenzene in soil on the former Home Depot parking lot;  PCBs in soil in the former ramp/platform area;
 Lead in soil beneath and around the perimeter of the former Home Depot Building; and  Benzene in soil gas beneath the former Home Depot Building.

Since  the  Prior  EIR,  the  CEQA  Guidelines  have  been  updated  to  i nclude  more  detailed  threshold questions related to wildfire impacts in its own section. As ha d been standard practice at the time, the P r i o r  E I R  c o n s i d e r e d  w i l d f i r e  r i s k  a s  p a r t  o f  t h e  h a z a r d s  a n d  hazards  materials  section,  so  this  topic  is discussed  here. The expanded wildfire considerations apply  to p rojects in areas that are very high fire severity zones, which does not apply to the project, so are not further detailed.

Routine Hazardous Materials Use
a)   Would the project create a significant hazard to the public  or the environment through the routine transport, use, or disposal of hazardous materials?
Same  Conclusion  (conclusion  remains  NI) :  The  current  project  would  be  required  to  comply  with applicable  regulations,  plans  and  programs,  related  to  any  routine  use  of  hazardous  materials,  which remains unchanged since the Prior EIR.

This section pertains to recurring transportation, use or dispo sal of hazardous materials as part of long term  operation.  Short‐term  transportation,  use  or  disposal  of  h azardous  materials  related  to construction and development is discussed in the following sections.

W h i l e  s p e c i f i c  t e n a n t s  h a v e  n o t  y e t  b e e n  i d e n t i f i e d ,  R & D  l a b o r at o r i e s  a r e  l i k e l y  t o  h a n d l e  m a t e r i a l s considered to be biological haza rds, chemical hazards and/or ca rry a risk of fire or explosion. Office uses would  involve  household  hazardous  waste  such  as  cleaners  and  ve hicle  components.  The  risk  of accidental upset and environmental contamination from routine t ransport, storage, use and disposal of hazardous  and  potentially  hazardous  materials  to  the  public  and  e n v i r o n m e n t  w o u l d  b e  m i t i g a t e d

Page 50 ends

through  compliance  with  applicable  laws  and  regulations,  adhere nce  to  fire  and  safety  codes,  and participation in the County’s requisite Hazardous Materials Business Plan program, as applicable.

Therefore, consistent with conclusions in the Prior EIR, with c ompliance with applicable regulations for routine  handling  of  hazardous  materials,  the  project  would  not  have  an  impact  related  to  routine hazardous materials use.

For the above reasons, the proposed project would  not result in  significant impacts related to routine hazardous  materials  use  not  previously  identified  in  the  EIR  or  addressed  through  uniformly  applied development policies or standards and no further environmental review is necessary for this topic.

Risk of Upset
b)   Would the project create a significant hazard to the public  or the environment through reasonably foreseeable  upset  and  accident  conditions  involving  the  release  of  hazardous  materials  into  the environment?
Same Conclusion (conclusion remains LTS w/ MM) : The current project would not change the less‐than‐ significant  with  mitigation  conclusion  related  to  risk  of  upset  from  the  Prior  EIR,  as  the  potential  for hazardous  building  materials  in  structures  to  be  demolished  or during  operations  remain  unchanged since  The  Globe  Planned  District.  (Existing  site  contamination i s  fu rt h e r d i sc u ss e d  u nd e r t he  H a z a rdo u s Materials Site topic.)
See  the  Hazardous  Materials  Site  topic  for  discussion  relating to  site  contamination,  for  which  there could be risk of upset during construction activities as noted in that topic.

In addition to contamination of the site soil and groundwater,  due to the age of existing buildings at the site, they could contain hazardous building materials such as l ead‐based paint and asbestos‐containing materials. MM 3.2.3: Survey and Properly Handle Materials from  Structures that May Contain Asbestos or Lead‐Based Paint from the Prior EIR would remain applicable  to the project and requires assessment and proper handling of any hazardous building materials prior to demolition.

Prior EIR Mitigation Measure 3.2.3: Survey and Properly Handle  Materials from Structures that May Contain  Asbestos  or  Lead‐Based  Paint.  Prior  to  demolition  or  renovation  of structures  built  before 1978,  a  survey  for  the  presence  of  asbestos‐containing  material s  (ACM)  shall  be  conducted  by Asbestos  Hazard  Emergency  Respons e  A c t  ( A H E R A ) ‐ c e r t i f i e d  p e r s o nnel,  trained  according  to  state and federal regulations. Structures shall also be surveyed for  the presence of lead‐based paint. If the results  of  the  survey  detect  the  presence  of  lead‐based  paint, construction  shall  be  performed  in accordance with the Lead in Construction Standard (8 Cal. Code  of regulations Section 5132.1). ACM will be removed in accordance with the requirements of Cal OSHA  (8 Cal. Code of regulations 5129) and the Bay Area Air Quality Management District (BAAQMD).

The Prior EIR also identified MM 3.2.2: Preparation and Impleme ntation of an Emergency Action Plan to require development and implementation of a plan to be activate d in the event of an accidental release of hazardous substances at a nearby facility.

Prior EIR Mitigation Measure 3.2.2: Preparation and Implementat ion of an Emergency Action Plan.

As a condition of Project Approval, the Project Applicant shall be required to develop and implement an Emergency Action Plan to be activated at the Project site in  the event of an accidental release of hazardous substances at any facility near the Project site. Suc h a plan may identify measures to be

Albrae Industrial Project – The Globe Planned District Addendum Page 51 taken to enable those at the Project site to “shelter in place”  as necessary, and shall be approved by the  Fremont  Fire  Department  prior  to  the  issuance  of  any  Certificate  of  Occupancy  at  the  Project site.

The  Prior  EIR  noted  that  the  pro ject  site’s  soil  and  groundwater  contained  contamination.  Existing contamination at the site is discussed in detail under the topi c of Hazardous Materials Sites below but because  construction  could  result  in  accidental  upset  of  site  contamination,  Standard  Development Requirement FMC 18.218.050(f) would be applicable under this to pic as well, requiring remediation of known contaminants and implementation of a soil management plan as appropriate.

Consistent  with  conclusions  in  the  Prior  EIR,  with  implementation  of  MM  3.2.3:  Survey  and  Properly Handle  Materials  from  Structures  that  May  Contain  Asbestos  or  L ead‐Based  Paint  to  address appropriate handling of any hazardous building materials, 3.2.2 : Preparation and Implementation of an Emergency Action Plan to address operational use of hazardous m aterials, and Standard Development Requirement  FMC  18.218.050(f)  requiring  remediation  as  appropriate  (as  discussed  further  under  the topic of Hazardous Materials Sites), the project impact would be less‐than‐significant with mitigation.

For the above reasons, the proposed  project would  not result in  significant impacts related to risks of upset  not  previously  identified  in  the  EIR  as  addressed  through   mitigation  measures  or  addressed through  uniformly  applied  development  policies  or  standards  and  no  further  environmental  review  is necessary for this topic.

Hazardous Materials Near Schools
c)   Would  the  project  emit  hazardous  emissions  or  handle  hazardous  or  acutely  hazardous  materials, substances, or waste within one‐quarter mile of an existing or proposed school? Same  Conclusion  (conclusion  remains  NI) :  The  current  project  would  not  change  the  no  impact conclusion related to hazardous materials near schools as the s ite is not located within one‐quarter mile of a school.

Consistent with the no impact conclusion in the Prior EIR, whil e there are schools located to the west of the project site in Newark, they are located one quarter mile or more from the project site.

For the above reasons, the proposed project would not result in  significant impacts related to hazardous materials  near  schools  not  previously  identified  in  the  EIR  or  addressed  through  uniformly  applied development policies or standards and no further environmental review is necessary for this topic.

Hazardous Materials Site
d)   Would  the  project  be  located  on  a  site  which  is  included  on  a  list  of  hazardous  materials  sites compiled  pursuant  to  Government  Code  Section  65962.5  and,  as  a  result,  would  it  create  a significant hazard to the public or the environment?
Same Conclusion (conclusion remains LTS w/ MM) : The current project would not change the less‐than‐ significant with mitigation conclusion related to a hazardous m aterials site as the need to appropriately handle former contamination at the site has not changed since The Globe Planned District.

The Prior EIR noted that the project site’s soil and groundwate r contained contamination. As discussed above,  some  remediation  and  further  characterization  has  since b e e n  u n d e r t a k e n  a t  t h e  s i t e  a n d  a n Updated RMP (the document that addresses how to handle site contamination) has been prepared.

Page 52 ends

This  Updated  RMP  provides  protocols  for  managing  contamination that  may  be  encountered  during future improvements or redevelopment activities conducted at the site, including:
 Communication requirements;
 Health and safety requirements;
 Soil management;
 Groundwater management;
 Stormwater management;
 Unanticipated subsurface conditions; and
 RMP reporting requirements.

Based on updated assessments and the currently proposed project , the Updated RMP determined that historical  environmental  conditions  appear  consistent  with  those  identified  at  the  time  of  the  NFA determination, and appear adequately remediated and appropriate ly managed through implementation of the Updated RMP.

As noted above, the need for groundwater monitoring has been di scontinued at the site per the Water Board’s  determination  that  the  groundwater  at  the  site  has  been   adequately  remediated  and appropriately managed. MMs 3.2.1B and 3.2.1C related to the mon itoring wells have been satisfied and are no longer applicable to the project.

The  Prior  EIR  required  Mitigation  Measure  3.2.1A:  PCB  Removal  and  Disposal  to  address  existing  site contamination.  The  City  has  since  adopted  the  following  Standard  Development  Requirement,  which supersede Mitigation Measure 3.2.1A:

FMC  18.218.050(f):  Hazardous  Materials.  New  development  projects  with  the  potential  to  create  a significant hazard to the public or the environment through rea sonably foreseeable upset and accident conditions involving the release of hazardous materials into th e environment, if so determined by a site‐ specific  environmental  site  assessment  prepared  to  the  satisfaction  of  the  fire  marshal  or  planning manager, shall implement the following measures prior to or during project construction, as applicable:
( A )    A  s o i l  m a n a g e m e n t  p l a n  ( S M P )  s h a l l  b e  d e v e l o p e d  t o  p r o v i de  guidelines  for  the  appropriate handling  and  management  of  soil  with  known  contaminants  or  reco gnized  environmental condition  (REC)  concentrations  above  the  applicable  screening  l evels  recommended  in  the California Department of Toxic Substances Control (DTSC) Office  of Human and Ecological Risk (HERO)  guidance  document  Human  Health  Risk  Assessment  or  similar  document  provided  by DTSC.

Prior  to  issuance  of  building  and/or  grading  permits  for  site  development,  remediation  work  to remove  known  contaminants  or  RECs  at  the  subject  property  shall   be  implemented  to  the satisfaction  of  the  Alameda  County  Water  District  (ACWD),  city  o f  F r e m o n t  f i r e  d e p a r t m e n t , California  Department  of  Toxic  Substance  Control  (DTSC),  or  oth er  appropriate  agency  having jurisdiction, depending on the location (e.g., depth) and the t ype of REC found and the jurisdictional purview  of  the  agencies.  Completion  of  the  remediation  work  and p r oc u r eme n t  of  an  ap p r op r i ate closure document or written statement that the remediation work has been satisfactorily completed and  without  further  conditions  or  obligations  shall  be  submitted  to  the  satisfaction  of  the  city  of Fremont  community  development  department.  Compliance  with  this m i t i g a t i o n  m a y  r e q u i r e  t h e

Albrae Industrial Project – The Globe Planned District Addendum Page 53 applicant  or  their  agent  to  complete  a  preliminary  endangerment   report,  voluntary  cleanup agreement  or  other  documentation  as  determined  by  the  appropria te  agency  and  receive concurrence that the site’s RECs have been resolved.

The  applicant  would  implement  this  requirement  through  implemen tation  of  the  Updated  RMP.

Consistent  with  conclusions  in  the  Prior  EIR  (and  RMP),  the  Upd ated  RMP  concludes  that  with implementation  of  the  RMP  including  deed  restriction  (commercia l  and  industrial  uses  only)  and considering the specifics of the proposed project, “historical environmental conditions appear consistent w i t h  t h ose  i de n t i f i ed  at  t he  t i m e  of  t h e [ W at e r  Boar d ’s N o F u r ther  Action]  determination,  and  appear adequately remediated and appropriately managed.”
Consistent  with  conclusions  in  the  Prior  EIR,  with  implementati on  of  Standard  Development Requirement FMC 18.218.050(f) requiring remediation as appropri ate, the project impact would be less‐ than‐significant with mitigation.

Consistent  with  conclusions  in  the  Prior  EIR,  with  implementation  of  an  Updated  RMP,  the  project impact with respect to Hazardous Materials Sites would be less‐than‐significant with mitigation.

For the above reasons, the proposed project would not result in  significant impacts related to hazardous materials  sites  not  previously  identified  in  the  EIR  as  address ed  through  mitigation  measures  or addressed through uniformly applied development policies or sta ndards and no further environmental review is necessary for this topic.

Airport Hazards
e)   For a project located within an airport land use plan or, w here such a plan has not been adopted, within two miles of a public airport or public use airport, wou ld the project result in a safety hazard or excessive noise for people residing or working in the project area? Same  Conclusion  (conclusion  remains  NI) :  The  current  project  would  not  change  the  no  impact conclusion related to airport hazards because the project site  is not located near an airport, consistent with conclusions for The Globe Planned District.

The  project  site  is  not  located  within  two  miles  of  any  public a i r p o r t ,  o r  i n  t h e  v i c i n i t y  o f  a  p r i v a t e airstrip.  The  San  Jose  International  Airport,  located  about  10 miles  away,  is  the  closest  airport  to  the project  site.  As  such,  there  are  no  associated  airport  land  use  plans  applicable  to  the  site,  and  the project would not result in a safety hazard or excessive airport noise for people working at the site.

For  the  above  reasons,  the  proposed  project  would  not  result  in s i g n i f i c a n t  i m p a c t s  r e l a t e d  t o  a i r p o r t hazards  not  previously  identified  in  the  EIR  or  addressed  throu gh  uniformly  applied  development policies or standards and no further environmental review is necessary for this topic.

Emergency Access Routes
f )   W o u l d  t h e  p r o j e c t  i m p a i r  i m p l e m e n t a t i o n  o f  o r  p h y s i c a l l y  i n terfere  with  an  adopted  emergency response plan or emergency evacuation plan?
Same  Conclusion  (conclusion  remains  NI) :  The  current  project  would  not  change  the  no  impact conclusion as the current project is redevelopment of an existi ng site and would not substantially change major access and evacuation routes, which has not changed since The Globe Planned District.

Page 54 ends

The project is required to comply with the California Fire Code ’s access requirements. Additionally, the City  of  Fremont  actively  maintains  a  Disaster  Management  Operations  Plan,  and  the  project  has  been reviewed  by  the  Fire  Department t o  e n s u r e  t h a t  e m e r g e n c y  r e s p o nse  is  not  constrained.  Compliance with these City standards would ensure that the project would n ot have an impact related to emergency response and evacuation planning, which is consistent with conclusions in the Prior EIR.

For  the  above  reasons,  the  proposed  project  would  not  result  in  s i g n i f i c a n t  i m p a c t s  r e l a t e d  t o emergency  access  routes  not  previously  identified  in  the  EIR  or  addressed  through  uniformly  applied development policies or standards and no further environmental review is necessary for this topic.

Wildfire
g)   Would  the  project  expose  people  or  structures,  either  directly  or  indirectly,  to  a  significant  risk  of loss, injury or death involving wildland fires?
Same  Conclusion  (conclusion  remains  NI) :  The  current  project  would  not  change  the  no  impact conclusion  as  the  project  site  is  in  a  developed  area  and  the  lack  of  wildfire  risk  in  the  vicinity  has  not changed since The Globe Planned District.

Wildfire risks occur at the interface of wild lands and develop ment. The project site is not located in or near state responsibility areas or lands classified as very hig h fire hazard severity zones.3 Consistent with conclusions in the Prior EIR, the project would not have an impact with respect to wildfire.

For the above reasons, the proposed project would not result in  significant impacts related to wildfire not  previously  identified  in  the  EIR  or  addressed  through  uniformly  applied  development  policies  or standards and no further environmental review is necessary for this topic.

3   CalFire, Very High Fire Hazard Severity Zone map, available a t: https://osfm.fire.ca.gov/divisions/wildfire‐ planning‐engineering/wildland‐hazards‐building‐codes/fire‐hazard‐severity‐zones‐maps/

Albrae Industrial Project – The Globe Planned District Addendum Page 55 I. Hydrology and Water Quality

Impacts
Related To:

Prior EIR
Findings with
Implementation
of MM (If
Required)

PROJECT
Relationship to Prior
EIR Findings
Applicable SDRs or MMs
Project Level
of
Significance
Equal or
Less
Severity
Substantial
Increase in
Severity
a. Water Quality  LTS w/MM  ☒  ☐  (MM 3.2.1B: Maintain Access to all Existing Groundwater Monitoring
Wells, and MM 3.2.1C: Ongoing
Groundwater Monitoring and
Reporting have previously been
satisfied and are no longer applicable)
LTS
b. Groundwater  LTS  ☒  ☐  ‐‐  LTS
c. Alter Drainage  LTS  ☒  ☐  ‐‐  LTS
d. Inundation  LTS  ☒  ☐  ‐‐  LTS
e. Water Plans  LTS  ☒  ☐  ‐‐  LTS
Discussion
Hydrology and Water Quality Setti ng Changes from The Globe Plan ned District Regulations  regarding  handling  of  stormwater  are  addressed  thro ugh  statewide  rules  and  the  local implementation of those rules, including the Statewide National  Pollutant Discharge Elimination System (NPDES).  These  regulations  and  associated  local  permits  and  implementation  guidelines  are  regularly updated and the current project would conform to current requirements.

Water Quality
a)   Would the project violate an y water quality standards or waste discharge requirements or otherwise substantially degrade surface or ground water quality?
Reduced Conclusion (conclusion was revised from LTS w/ MM to LT S): While the Prior EIR had identified an impact and mitigation related to groundwater contamination a nd monitoring wells at the site, these measures  have  been  satisfied  and  the  monitoring  wells  are  no  longer  used.  The  current  project  would have  a  less‐than‐significant  impact  with  respect  to  water  quali ty  with  compliance  with  applicable regulations.

The Prior EIR noted existing groundwater contamination at the s ite and referenced the need for ongoing groundwater monitoring and remediation due to prior contaminati on. However, since the Prior EIR, the Water  Board  (the  regulatory  agency  overseeing  hazardous  material s  i s s u e s  a t  t h i s  s i t e )  i s s u e d  a  N o Further  Action  determination  in  2016,  including  a  conclusion  that  groundwater  at  the  site  has  been adequately remediated and appropriately managed, and use of the  monitoring wells was discontinued.

Therefore, related MM 3.2.1B: Maintain Access to all Existing G roundwater Monitoring Wells, and MM

3.2.1C:  Ongoing  Groundwater  Monitoring  and  Reporting  have  previ ously  been  satisfied  and  are  no longer applicable to the project.

As discussed further under the Alter Drainage topic below, the  project represents redevelopment of an urban  site  and  is  required  to  comply  with  relevant  requirements  related  to  water  quality  and  water quality plans including implementation of plans for stormwater control and pollution prevention.

Page 56 ends

Consistent  with  the  previous  assessment  (other  than  regarding  monitoring  wells,  which  are  no  longer active),  the  proposed  development  is  consistent  with  the  type  of  development  historically  at  the  site and would comply with current water quality regulations and the impact would be less than significant.

For  the  above  reasons,  the  proposed  project  would  not  result  in s i g n i f i c a n t  i m p a c t s  r e l a t e d  t o  w a t e r quality not previously identified in the EIR or addressed throu gh uniformly applied development policies or standards and no further environmental review is necessary for this topic.

Groundwater
b)   Would  the  project  substantially  decrease  groundwater  suppli es  or  interfere  substantially  with groundwater recharge such that the project may impede sustainab le groundwater management of the basin?
Same  Conclusion  (conclusion  remains  LTS) :  T h e  c u r r e n t  p r o j e c t  w o u l d  n o t  c h a n g e  t h e  l e s s  t h a n significant  impact  conclusion  related  to  groundwater  as  development  under  the  current  project  would not  result  in  the  potential  for  groundwater  depletion,  which  has  not  changed  since  The  Globe  Planned District.

The Prior EIR concluded that The Globe Planned District would n ot have a significant impact related to groundwater.  The  project  does  not  involve  excavation  that  would   affect  groundwater.  Dewatering a c t i v i t i e s  a r e  n o t  a n t i c i p a t e d  t o  b e  n e c e s s a r y ,  b u t  i f  s u b s e q u ently  determined  to  be  required,  any dewatering activities associated with the proposed project must  comply with requirements established by the San Francisco Bay Regional Water Quality Control Board t o ensure that such activities would not result in substantial changes in groundwater flow or quality. F ollowing construction, the project would not  substantially  change  impervi ous  surface  area  and  would  not  have  a  substantial  impact  on groundwater  recharge.  Therefore,  the  conclusion  of  a  less  than  significant  impact  in  regard  to groundwater would remain the same with the current project.

For  the  above  reasons,  the  proposed  project  would  not  result  in  s i g n i f i c a n t  i m p a c t s  r e l a t e d  t o groundwater not previously identified in the EIR or addressed t hrough uniformly applied development policies or standards and no further environmental review is necessary for this topic.

Alter Drainage
c)   Would  the  project  substantially  alter  the  existing  drainage   pattern  of  the  site  or  area,  including through  the  alteration  of  the  course  of  a  stream  or  river,  or  through  the  addition  of  impervious surfaces, in a manner which would:
i)  result in substantial erosio n or siltation on‐ or off‐site; ii)   substantially  increase  the  rate  or  amount  of  surface  runoff  in  a  manner  which  would  result  in flooding on‐ or off‐site;
iii)   create  or  contribute  runoff  water  which  would  exceed  the  capacity  of  existing  or  planned stormwater drainage systems or provide substantial additional sources of polluted runoff; or Same  Conclusion  (conclusion  remains  LTS) :  T h e  c u r r e n t  p r o j e c t  w o u l d  n o t  c h a n g e  t h e  l e s s  t h a n significant impact conclusion related to alteration of drainage  as development under the current project would not substantially alter drainage at the site and could co mply with current stormwater regulations.

Albrae Industrial Project – The Globe Planned District Addendum Page 57 While the regulations have been updated since The Globe Planned  District, the conclusions would remain the same.

The Prior EIR concluded that The Globe Planned District would n ot have a significant impact related to altering drainage, noting, “New impervious surface area will no t be created through the redevelopment o f  t h e  s i t e .  I t  i s  n o t  a n t i c i p a t e d  t h a t  r e d e v e l o p m e n t  o f  t h e  s ite  will  increase  stormwater  runoff...  Best Management  Practices  for  stormwater  pollution  prevention  are  intended  to  achieve  compliance  with the goals of the Alameda County Urban Storm Water Runoff Progra m in conformance with the Federal National Pollutant Discharge Elimination System (NPDES) program  established by the Clean Water Act.

This will reduce potential impacts [to] insignificant levels.” The  project  site  is  currently  not  being  used,  with  existing  buildings  and  pavement  partially  removed.

H o w e v e r ,  a s  n o t e d  i n  t h e  P r i o r  E I R ,  t h e  s i t e  h a s  h i s t o r i c a l l y  been  fully  developed  and  largely  covered with buildings and pavement. The proposed project would redevel op the site and add landscaping and stormwater  control  areas  consistent  with  current  regulations.  Following  development,  the  site  would include approximately 715,885 square feet of impervious area, r epresenting approximately 74% of the site.  The  proposed  stormwater  system  includes  lined  bioretention  basins,  which  would  allow  natural cleaning  and  slowing  of  stormwater  prior  to  release  into  the  Ci ty’s  stormwater  system  without impacting site contamination (see Section H: Hazards & Hazardous Materials).

As  discussed  under  the  topic  Water  Quality  and  Water  Plans  above ,  t h e  p r o j e c t  i s  r e q u i r e d  t o  c o m p l y with  current  regulations  including  implementation  of  a  SWPPP  to  address  construction‐period  runoff and a SCP to address operational runoff. With compliance with a pplicable regulations, the project would not represent a substantial alteration of the drainage patterns or flow from the site.

Consistent  with  the  Prior  EIR  conclusions,  the  proposed  development  is  consistent  with  the  type  of development  historically  at  the  site  and  would  comply  with  current  regulations  and  the  impact  with respect to altering drainage would be less than significant.

For  the  above  reasons,  the  proposed  project  would  not  result  in si g n i f i c ant  i mp ac t s r e l at ed t o al t e r e d drainage  not  previously  identified  in  the  EIR  or  addressed  thro ugh  uniformly  applied  development policies or standards and no further environmental review is necessary for this topic.

Inundation
d)   Would the project in flood hazard, tsunami or seiche zones,  risk release of pollutants due to project inundation?
Same  Conclusion  (conclusion  remains  LTS):  The  current  project  would  not  change  the  not  significant conclusions related to flooding and other inundation as the pro ject site is not within a flood hazard area or subject to inundation hazards, which has not substantially changed since The Globe Planned District.

The  Prior  EIR  concludes  the  project  would  not  have  a  significant  impact  with  respect  to  flooding  but notes, “The site is located in the western portion of the Fremo nt between Interstate 880 and the Bay.

T h e  p r o x i m i t y  o f  t h e  B a y  m a y  h a v e  a  s i g n i f i c a n t  e f f e c t  i n  t h e  event  of  a  catastrophic  event,  although unlikely.” Hazard mapping has been updated since the Prior EIR as discussed below.

Page 58 ends

Based  on  Federal  Emergency  Manag ement  Agency  (FEMA)  Flood  Insur ance  Rate  Maps  (FIRMs),  no portion  of  the  project  site  is  located  within  100‐year  flood  hazard  boundaries,  a  Special  Flood  Hazard Area (100‐year floodplain) or other Areas of Flood Hazard (e.g., the 500‐year [or 2%] flood zone).4 Areas that are highly susceptible to tsunami inundation tend to  be low‐lying coastal areas such as tidal flats, marshlands and former Bay margins that have been artific ially filled. Because of its location at the southern  end  of  the  San  Francisco  Bay  and  the  shallowness  of  the  Bay  along  the  Fremont  waterfront, the project site is not located within a tsunami inundation are a.5 Seiches are not considered a hazard in the San Francisco Bay. The project site is not protected by a l evee. Sea level rise of 16 inches by 2050, and  55  inches  by  2100,  has  been  predicted  by  the  San  Francisco Bay  Conservation  and  Development Commission (BCDC). Even without i mplementation of shoreline pro tection measures such as levees, the increase in sea level associated with the predicted 2100 rise w ould not result in flooding of the project site, which is about 25‐30 feet above sea level.

Therefore,  consistent  with  the  Prior  EIR  conclusions,  the  propo sed  development  would  not  have  a significant impact with respect to flooding and other inundation.

For  the  above  reasons,  the  proposed  project  would  not  result  in  s i g n i f i c a n t  i m p a c t s  r e l a t e d  t o inundation  not  previously  identified  in  the  EIR  or  addressed  through  uniformly  applied  development policies or standards and no further environmental review is necessary for this topic.

Water Plans
e)   Would  the  project  conflict  with  or  obstruct  implementation  of  a  water  quality  control  plan  or sustainable groundwater management plan?
Same  Conclusion  (conclusion  remains  LTS) :  T h e  c u r r e n t  p r o j e c t  w o u l d  n o t  c h a n g e  t h e  l e s s  t h a n significant impact conclusion related to water plans as the cur rent project would be required to follow all applicable water quality regulations, which has not changed since The Globe Planned District.

As discussed further under the Alter Drainage topic above, the  project represents redevelopment of an urban  site  and  is  required  to  comply  with  relevant  requirements  related  to  water  quality  and  water quality  plans  including  implementation  of  plans  for  stormwater  control  and  pollution  prevention.

Consistent  with  the  previous  assessment,  the  proposed  development  is  consistent  with  the  type  of development  historically  at  the  site  and  would  comply  with  current  water  quality  regulations  and  the impact would be less than significant.

For  the  above  reasons,  the  proposed  project  would  not  result  in s i g n i f i c a n t  i m p a c t s  r e l a t e d  t o  w a t e r plans not previously identified in the EIR or addressed through  uniformly applied development policies or standards and no further environmental review is necessary for this topic.

4   Federal Emergency Management Agency (FEMA), effective 8/3/200 9, Flood Insurance Rate Map (FIRM), Map Number 06001C0463G, available at https://www.fema.gov/flood‐maps. 5   California Geological Survey, et al., Tsunami Inundation Maps  for Emergency Planning

Albrae Industrial Project – The Globe Planned District Addendum Page 59 J. Land Use

Impacts
Related To:

Prior EIR
Findings with
Implementation
of MM (If
Required)

PROJECT
Relationship to Prior
EIR Findings
Applicable SDRs or MMs
Project Level
of
Significance
Equal or
Less
Severity
Substantial
Increase in
Severity
a.   Division of an
Existing Community
NI  ☒  ☐  ‐‐  NI
b. Conflict with Land
Uses / Land Use
Plans
NI  ☒  ☐  ‐‐  NI
Discussion
Land Use Setting Changes from The Globe Planned District Approval of The Globe Planned District involved changes to the  General Plan designation and zoning of the site consistent with the proposed development. The current  project would again require changes to the General Plan designation and zoning of the site to allow for the proposed development.

Since the Prior EIR, the City’s General Plan was updated in 201 1. The proposed designation is consistent with the current General Plan, as discussed in subsection b) below.

Division of an Existing Community
a)   Would the project physically  divide an established community? Same  Conclusion  (NI):  T h e  c u r r e n t  p r o j e c t  w o u l d  n o t  c h a n g e  t h e  n o  i m p a c t  c o n c l u s i o n a s  t h e  p r o j e c t would  involve  construction  of  on  an  already  urbanized  site,  which  has  not  changed  since  The  Globe Planned District.

As  under  The  Globe  Planned  District,  the  site  does  not  act  to  connect  an  established  community  and development  of  the  site  would  not  result  in  physical  division  of  an  established  community.  Therefore, t h e  c o n c l u s i o n  o f  n o  i m p ac t  w i t h  r e s p e c t  t o  d i v i s i o n  o f  a n  e s t ablished  community  under  the  Prior  EIR would remain the same with the current project.

For the above reasons, the proposed project would not result in  significant impacts related to division of a n  e x i s t i n g  c o m m u n i t y  n o t  p r e v i o u s l y  i d e n t i f i e d  i n  t h e  E I R  o r  addressed  through  uniformly  applied development policies or standards and no further environmental review is necessary for this topic.

Conflict with Land Use Plans
b)   Would the project cause a significant environmental impact  due to a conflict with any land use plan, policy, or regulation adopted for the purpose of avoiding or mitigating an environmental effect? Same  Conclusion  (NI):  The  current  project  would  not  change  the  no  impact  conclusion  as  there  are  no conflicts with land uses/land use plans, which has not changed since The Globe Planned District.

The  Prior  EIR  concluded  that  The  Globe  Planned  District  would  no t  h a v e  a n  i m p a c t  r e l a t e d  t o  c o n f l i c t with  land  use  plans  noting,  “The  change  of  land  use  is  needed  t o  accommodate  the  proposed

Page 60 ends

development and specific uses. The elements of the project will  be evaluated against and be consistent with  the  new  General  Plan  designation.  The  project  will  not  phy sically  divide  an  established community…”
Based  on  the  City’s  preliminary  review,  the  project  would  confo rm  to  the  proposed  General  Plan designation  of  Industrial  Tech  (which  primarily  applies  to  R&D,   “clean  and  green”  tech,  software facilities,  and  warehousing/distri bution  uses),  and  would  be  co nsistent  with  the  land  use  and development  standards  of  the  I‐T  zoning  district.  The  majority of  surrounding  uses  east  of  Stevenson Boulevard fall under the Industrial and Innovation category and  such uses would therefore be consistent with the general use and character of the area.

While representing a change to the General Plan designation of  the site, the project is consistent with the following General Plan goals and policies:

Land  Use  Element:  2‐1.11  (Infill  Emphasis),  2‐2.1  (Opportunity Areas  for  Growth  and  Change),  2‐4.6 (Conversion of Older Shopping Centers and Commercial Uses), and 2‐5.1 (Land Supply and Job Growth).

Economic Development Element: 6‐1.1 (Increasing the Tax Base), 6‐1.4 (Large Sales Tax and Employment Generators),  6‐3.1  (Diverse  Industrial  and  Technology  Uses),  and  6‐3.2  (Attracting  Emerging  Growth Industries).

Mobility  Element:  3‐4.4  (Mitigati ng  Development  Impacts),  and  3 ‐6.6  (Trucking  and  Land  Use Compatibility).

Consistent with the conclusions in the Prior EIR, the current project requires changes to the General Plan designation  and  zoning  of  the  site  consistent  with  the  proposed d e v e l o p m e n t  b u t  w o u l d  b e  g e n e r a l l y consistent  with  the  goals  and  policies  of  the  General  Plan  and  would  not  cause  a  significant environmental  impact  due  to  a  conflict  with  any  land  use  plan, policy,  or  regulation  adopted  for  the purpose of avoiding or mitigating an environmental effect.

For the above reasons, the proposed project would  not result in  significant impacts related to conflict with  land  use  plans  not  previously  identified  in  the  EIR  or  add ressed  through  uniformly  applied development policies or standards and no further environmental review is necessary for this topic.

Albrae Industrial Project – The Globe Planned District Addendum Page 61 K. Mineral Resources

Impacts
Related To:

Prior EIR
Findings with
Implementation
of MM (If
Required)

PROJECT
Relationship to Prior
EIR Findings
Applicable SDRs or MMs
Project Level
of Significance
Equal or
Less
Severity
Substantial
Increase in
Severity
a. Loss of Mineral
Resources
NI  ☒  ☐  ‐‐  NI
b. Loss of Mineral
Recovery Sites
NI  ☒  ☐  ‐‐  NI
Discussion
Loss of Mineral Resources
a)   Would  the  project  result  in  the  loss  of  availability  of  a  kn o w n  m i n e r a l  r e s o u r c e  t h a t  w o u l d  b e  o f value to the region and the residents of the state?
Same  Conclusion  (NI):  There  have  been  no  changes  in  circumstance  or  new  information   related  to mineral resources, which are not known to occur on the project site, and there would be no change to the no impact conclusion related to mineral resources.

The Prior EIR concluded that there were no known mineral resour ces with the potential to be affected by The Globe Planned District, which would therefore not have a n impact related to mineral resources.

The U.S. Geological Survey was consulted to confirm that there  remain no known mineral resources in the  vicinity  of  the  project  site.6 T h e r e f o r e ,  t h e  c o n c l u s i o n  o f  n o  i m p a c t  i n  r e g a r d  t o  m i n e r a l  r esources from the Prior EIR would remain the same with the current project.

For  the  above  reasons,  the  proposed  project  would  not  result  in s i g n i f i c a n t  i m p a c t s  r e l a t e d  t o  l o s s  o f mineral  resources  not  previously  identified  in  the  EIR  or  addre ssed  through  uniformly  applied development policies or standards and no further environmental review is necessary for this topic.

Loss of Mineral Recovery Sites
b)   Would the project result in the loss of availability of a l ocally important mineral resource recovery site delineated on a local general plan, specific plan or other land use plan? Same  Conclusion  (NI):  There  have  been  no  changes  in  circumstance  or  new  information   related  to mineral recovery sites, which are not known to occur on the pro ject site, and there would be no change to the no impact conclusion related to mineral recovery sites.

The  Prior  EIR  concluded  that  there  were  no  known  mineral  recovery  sites  with  the  potential  to  be affected  by  The  Globe  Planned  District,  which  would  therefore  no t  h a v e  a n  i m p a c t  r e l a t e d  t o  m i n e r a l recovery sites. The project site is not within any of the miner al resource sectors identified in the City of

6   U.S. Geological Survey, Mineral  Resources Data System: U.S. Geological Survey, Reston, Virginia. Accessed September 2021, at: http://tin.er.usgs.gov/mrds/

Page 62 ends

Fremont  General  Plan. 7 T h e  p r o j e c t  w o u l d  h a v e  n o  i m p a c t  o n  t h e  l o s s  o f  m i n e r a l  r e s o u rces  as designated on a local general plan, specific plan, or other lan d use plan. Therefore, the conclusion of no impact in regard to mineral recovery sites from the Prior EIR w ould remain the same with the current project.

For the above reasons, the proposed project would not result in  significant impacts related to mineral recovery sites not previously identified in the EIR or addresse d through uniformly applied development policies or standards and no further environmental review is necessary for this topic.

7 City of Fremont, 2011. City of Fremont General Plan. Land Use Element. Adopted December 2011. Available:
https://fremont.gov/generalplan. Accessed January 5, 2022.

Albrae Industrial Project – The Globe Planned District Addendum Page 63 L. Noise

Impacts
Related To:

Prior EIR
Findings with
Implementation
of MM (If
Required)

PROJECT
Relationship to Prior
EIR Findings
Applicable SDRs or MMs
Project Level
of
Significance
Equal or
Less
Severity
Substantial
Increase in
Severity
a.   Noise  NI  ☒  ☐  SDR FMC 18.218.050(g): Noise  NI
b. Vibration  NI  ☒  ☐  SDR FMC 18.218.050(g): Noise  NI c. Airport Noise  NI  ☒  ☐  ‐‐  NI
Discussion
Noise Setting Changes from The Globe Planned District
The  noise  environment  has  not  changed  substantially  from  that  asse sse d  i n  t he  Pr i or  E IR  an d  r em ai n s primarily  characterized  by  transportation  noise  from  vehicular traffic  and  railroads.  Other  sources  of noise  include  industry,  mechanical  equipment  on  buildings,  recr eational  activities,  and  intermittent construction noise.8
A few of the adjacent businesses to the southeast, which began  operations between 2005 and 2014, are potentially sensitive to vibration, including 40919/40931 Encyc lopedia – Neophotonics (semiconductor manufacturing);  40939  Encyclopedia   –  Clean  Sciences  Technology  (electronic  component manufacturing);  and  40969  Encyclopedia  –  Celestica  Precision  Ma chines  (semiconductor manufacturing). These are addressed in the analysis below.

Noise
a)   Would the project result in generation of a substantial tem porary or permanent increase in ambient noise levels in the vicinity of the project in excess of standa rds established in the local general plan or noise ordinance, or applicable standards of other agencies? Same  Conclusion  (conclusion  remains  NI) :  The  potential  for  loud  cons truction  activities  has  not substantially changed since The Globe Planned District and ther e would be no change to the no impact conclusion related to noise.

The  Prior  EIR  concluded  that  The  Globe  Planned  District  would  no t  h a v e  a n  i m p a c t  r e l a t e d  t o  n o i s e noting, “The proposed project is located in a developed urban a rea near existing commercial and light industrial  uses.  There  is  no  evidence  that  noise  levels  would  be  significantly  increased  or  cause  an impact to adjacent properties. Residential uses are not located  within the vicinity of the project site, and there is no evidence that people visiting the project site woul d be exposed to noise levels in excess of the standards established by the General Plan.”
Consistent  with  the  conclusions  of  the  Prior  EIR,  the  project  v icinity  remains  characterized  by commercial  and  light  industrial  uses  with  compatible  noise  levels.  The  project  would  be  required  to comply  with  applicable  regulatory  requirements  under  the  City’s   General  Plan  and  nose  ordinance

8 City of Fremont General Plan EIR, pp. 4‐160 through 4‐165.

Page 64 ends

(chapter 9.25 of the City of Fremont Municipal Code), and the C ity’s allowable construction hours, and the City’s Standard Development Requirement:

FMC  18.218.050(g):  Noise.    To  reduce  the  potential  for  noise  im pacts  during  construction,  the following requirements shall be implemented:
(A)    Construction  equipment  shall  be  well‐maintained  and  used  j udiciously  to  be  as  quiet  as practical.
(B)   Construction, exc avating, grading, and filling activities (including the loading  and unloading of materials, truck movements, and warming of equipment motors) sh all be limited as provided in Section 18.160.010.
(C)    All internal combustion engine‐driven equipment shall be  equipped with mufflers, which are in good condition and appropriate for the equipment.
(D)    The  contractor  shall  utilize  “quiet”  models  of  air  compre ssors  and  other  stationary  noise sources where technology exists.
( E)    L oad i n g , st ag i n g  ar e as, st at i on ar y  n oi se  g e n e r at i n g  eq u i pment,  etc.,  shall  be  located  as  far  as feasible from sensitive receptors.
(F)    The contractor shall comply with Air Resource Board idli ng prohibitions of unnecessary idling of internal combustion engines.
(G)    Signs  shall  be  posted  at  the  construction  site  that  include  permitted  construction  days  and hours, a day and evening contact number for the job site, and a  contact number for the project sponsor  in  the  event  of  noise  complaints.  The  applicant  shall  designate  an  on‐site  complaint and enforcement manager to track and respond to noise complaints. (H)   Temporary noise barriers, such as solid plywood fences, s hall be installed around construction sites  adjacent  to  operational  businesses,  residences  or  noise‐sensitive  land  uses,  unless  an existing wall or other barrier provides equivalent noise attenu ation. (Ord. 27‐2016 § 37, 12‐6‐ 16; Ord. 23‐2018 § 41, 10‐2‐18; Ord. 05‐2021 § 52, 4‐20‐21.) Therefore, the conclusion of no impact in regard to noise from the Prior EIR would remain the same with the current project.

For the above reasons, the proposed project would not result in  significant impacts related to noise not previously  identified  in  the  EIR  or  addressed  through  uniformly   applied  development  policies  or standards and no further environmental review is necessary for this topic.

Groundborne Vibration or Noise
b)  Would  the  project  result  in  generation  of  excessive  groundborne  vibration  or  groundborne  noise levels?
Same  Conclusion  (conclusion  remains  NI) :  The  potential  for  excessive  groundborne  vibration  or groundborne noise has not substantially changed since The Globe  Planned District and there would be no change to the no impact conclusion related to groundborne vi bration or noise.

Albrae Industrial Project – The Globe Planned District Addendum Page 65 The  Prior  EIR  concluded  that  The  Globe  Planned  District  would  no t  h a v e  a n  i m p a c t  r e l a t e d  t o  n o i s e noting, “The proposed project is located in a developed urban a rea near existing commercial and light industrial  uses.  There  is  no  evidence  that  noise  levels  would  be  significantly  increased  or  cause  an impact to adjacent properties. Residential uses are not located  within the vicinity of the project site, and there is no evidence that people visiting the project site woul d be exposed to noise levels in excess of the standards established by the General Plan.”
Consistent  with  the  conclusions  of  the  Prior  EIR,  the  project  v icinity  remains  characterized  by commercial  and  light  industrial  us es.  As  noted  above,  the  adjac ent  development  to  the  southeast includes  buildings  engaging  in  semiconductor  and  electronic  com ponent  manufacturing  –  processes which can be sensitive to vibrations. These buildings are locat ed as close as about 55 feet to the closest project property line, with their own internal driveway circula tion and loading areas in between. Their internal  processes  would  already  be  appropriately  isolated  from  t h e i r  o w n  o n ‐ s i t e  v i b r a t i o n s  f r o m building operations and truck traffic and loading.

The  proposed  project  uses  would  not  be  sources  of  substantial  o ff‐site  operational  groundborne v i b r a t i o n  o r  n o i s e  e x c e p t  t h o u g h  t r u c k  t r a f f i c ,  w h i c h  c a n  c a u s e  some  localized  groundborne  vibration and  noise.  While  project  operations  could  involve  truck  traffic  as  about  60  feet  from  the  adjacent buildings, their own truck traffic and loading is already closer than that. Therefore, the project would not result  in  operational  groundborne  vibration  or  noise  at  potentia l l y  s e n s i t i v e  r e c e p t o r s  a t  l e v e l s  h i g h e r than that existing and accommodated by their existing processes.

Groundborne  vibration  and  noise has  the  potential  to  be  generated  during  construction  activities  at levels that could impact off‐site uses during high‐vibration co nstruction activities such as pile driving – which is not proposed – and use of vibratory rollers. The proje ct has proposed use of a small vibratory roller9 only in the drive aisle adjacent to the southeastern project b oundary with the vibration sensitive uses and this will be a condition of project approval. A small  vibratory roller in vibration mode slightly exceeds those of a loaded truck at a distance of 25 feet away.  At the distance of at least 55 feet to the nearest vibration sensitive building, groundborne vibration would be the same or less than that from the adjacent  buildings  own  truck  traffic  and  loading  docks.  Therefo re,  the  project  would  not  result  in construction‐period  groundborne  vibration  or  noise  at  potentiall y  s e n s i t i v e  r e c e p t o r s  a t  l e v e l s  h i g h e r than that existing and accommodated by their existing processes.10 A s  d i s c u s s e d  a b o v e ,  t h e  p r o j e c t  w o u l d  c o m p l y  w i t h  t h e  a p p l i c a b le  construction  hours  in  the  City’s Municipal  Code,  which  would  limit  the  hours  during  which  constr uction‐related  vibration  could  be produced. Additionally, the project would adhere to the standar d development requirement related to noise‐generating  equipment.  While  this  requirement  is  not  speci fically  designed  to  address construction‐related vibration, certain facets of the requireme nt would also reduce vibration impacts on neighboring uses. These include keeping construction equipment well‐maintained, locating staging areas away from sensitive receptors, and providing contact informatio n for a designated person to respond to complaints.

9   Small vibratory rollers are s ometimes also called smooth drum rollers and are specifically not dual drum rollers.
10   Conclusions are based on personal correspondence with Michael  Thill, Acoustical Consultant, Illingworth & Rodkin in November 2021, including the following information: Illingworth & Rodkin measured vibration levels produced by a small vibratory roller. The vibratory mode produced vibration levels of 0.087 in/sec PPV at 25 feet, which is slightly higher than that of a loaded truck.

Page 66 ends

For  the  above  reasons,  the  proposed  project  would  not  result  in  s i g n i f i c a n t  i m p a c t s  r e l a t e d  t o groundborne  vibration  or  noise  not  previously  identified  in  the  EIR  or  addressed  through  uniformly applied  development  policies  or  standards  and  no  further  environmental  review  is  necessary  for  this topic.

Airport Noise
c)   For  a  project  located  within  the  vicinity  of  a  private  airstrip  or  an  airport  land  use  plan  or,  where such a plan has not been adopted, within two miles of a public  airport or public use airport, would the project expose people residing or working in the project area to excessive noise levels? Same  Conclusion  (conclusion  remains  NI) :  The  current  project  would  not  change  the  no  impact conclusion as the site is outside the area significantly impact ed by aircraft noise, which has not changed since The Globe Planned District.

The  project  site  is  not  located  proximate  to  a  public  or  private  airport  and  remains  well  outside  noise impact  areas  of  Bay  Area  airport  land  use  plans.  Therefore,  the  conclusion  of  no  impact  in  regard  to airport noise from the Prior EIR would remain the same with the current project.

For  the  above  reasons,  the  proposed  project  would  not  result  in s i g n i f i c a n t  i m p a c t s  r e l a t e d  t o  a i r p o r t noise not previously identified  in the EIR or addressed through  uniformly applied development policies or standards and no further environmental review is necessary for this topic.

Albrae Industrial Project – The Globe Planned District Addendum Page 67 M. Population & Housing

Impacts
Related To:

Prior EIR
Findings with
Implementation
of MM (If
Required)

PROJECT
Relationship to Prior
EIR Findings
Applicable SDRs or MMs
Project Level
of
Significance
Equal or
Less
Severity
Substantial
Increase in
Severity
a.   Population Growth  NI  ☒  ☐  ‐‐  NI
b. Displacement of
Housing or People
NI  ☒  ☐  ‐‐  NI
Discussion
Population and Housing Setting Ch anges from The Globe Planned D istrict The relevant planning document for this project and the analysi s at issue is the City’s Housing Element under its General Plan. The Housing Element was last adopted in  2015 and incorporates the Association of Bay Area Governments’ (ABAG)  Regional Housing Needs Allocati on (RHNA) for South San Francisco.

Like  other  local  and  regional  planning  documents,  the  City’s  Housing  Element  and  General  Plan  are regularly updated.

Population Growth
a)   Would  the  project  induce  substantial  unplanned  population  growth  in  an  area,  either  directly  (for example, by proposing new homes and businesses) or indirectly ( for example, through extension of roads or other infrastructure)?
Same  Conclusion  (conclusion  remains  NI) :  The  current  project  would  not  change  the  no  impact conclusion  as  the  site  does  not  currently  propose  housing  and  represents  redevelopment  of  an  urban employment site and this has not changed since The Globe Planned District.

The Prior EIR concluded that The Globe Planned District would n ot have an impact related to population and housing noting, “The proposed project does not include resi dential uses nor is it proposed on a site that has existing residential uses. The project is not anticipated to alter the location, distribution, density or growth rate of human populations. The proposed project will not have any impact on existing housing stock.”
The proposed project would redevelop a site historically utiliz ed for industrial / warehouse / and office uses with similar types of uses and related employment. Consistent with the conclusions of the Prior EIR, the project would therefore not result in substantial unplanned population growth and the conclusion of no impact in regard to population from the Prior EIR would remain the same with the current project.

For  the  above  reasons,  the  proposed  project  would  not  result  in  s i g n i f i c a n t  i m p a c t s  r e l a t e d  t o population  growth  not  previously  identified  in  the  EIR  or  addre ssed  through  uniformly  applied development policies or standards and no further environmental review is necessary for this topic.

Displacement of People or Housing
b)   Would  the  project  displace  substantial  numbers  of  existing  people  or  housing,  necessitating  the construction of replacement housing elsewhere?

Page 68 ends

Same  Conclusion  (conclusion  remains  NI) :  The  current  project  would  not  change  the  no  impact conclusion  as  the  site  does  not  currently  contain  housing  and  represents  redevelopment  of  an  urban employment site and this has not changed since The Globe Planned District.

The  Prior  EIR  concluded  that  The  Globe  Planned  District  would  not  h ave  an  im p act  r e l at ed  t o h ou si n g noting,  “The  proposed  project  does  not  include  residential  uses n o r  i s  i t  p r o p o s e d  o n  a  s i t e  t h a t  h a s existing  residential  uses.  The  project  is  not  anticipated  to  alter  the  location,  distribution,  density  or growth rate of human populations. The proposed project will not  have any impact on existing housing stock.”
The proposed project would redevelop a site historically utiliz ed for industrial / warehouse / and office uses with similar types of uses and related employment. Consistent with the conclusions of the Prior EIR, the project would therefore not displace people or housing and  the conclusion of no impact in regard to population and housing from the Prior EIR would remain the same with the current project.

For  the  above  reasons,  the  proposed  project  would  not  result  in  s i g n i f i c a n t  i m p a c t s  r e l a t e d  t o displacement of people or housi ng not previously identified in  the EIR or addressed through uniformly applied  development  policies  or  standards  and  no  further  environmental  review  is  necessary  for  this topic.

Albrae Industrial Project – The Globe Planned District Addendum Page 69 N. Public Services & Recreation

Impacts
Related To:

Prior EIR
Findings with
Implementation
of MM (If
Required)

PROJECT
Relationship to Prior
EIR Findings
Applicable SDRs or MMs
Project Level
of Significance
Equal or
Less
Severity
Substantial
Increase in
Severity
a. Public Services  LTS  ☒  ☐  ‐‐  LTS
b. Recreation  NI  ☒  ☐  ‐‐  NI
Discussion
Public Services and Recreation Setting Changes from The Globe P lanned District Area‐wide development has continued throughout the vicinity and  public service and recreation plans, operations, and development fee programs are regularly assessed and updated.

Public Services
a)  Would  the  project  result  in  substantial  adverse  physical  impacts  associated  with  the  provision  of new or physically altered  governmental facilities, need for new  or physically altered governmental facilities,  the  construction  of  which  could  cause  significant  e nvironmental  impacts,  in  order  to maintain  acceptable  service  ratios,  response  times  or  other  performance  objectives  for  any  of  the following public services: fire protection, police protection, schools, parks? Same  Conclusion  (conclusion  remains  LTS):  The  current  project  would  not  change  the  no  significant impact conclusions as the potential to increase demand for serv ices has not substantially changed since The Globe Planned District.

The Prior EIR concluded that The Globe Planned District would n ot have a significant impact related to public services noting, “Because the project site contains exis ting commercial uses, it is not anticipated that redevelopment of the site would cause a significant burden  on public services, although demand is expected to slightly increase. The project will be required to  comply with all conditions of the Police and Fire Department, including fire alarm and suppression systems in all new buildings.” The proposed project would redevelop a site historically utiliz ed for industrial / warehouse / and office uses  with  similar  types  of  uses  and  related  employment  and  use of  services  and  would  comply  with applicable  requirements  and  fee  programs  related  to  public  services.  Therefore,  the  conclusion  of  no s i g n i f i c a n t  i m p a c t s  i n  r e g a r d  t o  p u b l i c  s e r v i c e s  f r o m  t h e  P r i o r E I R  w o u l d  r e m a i n  t h e  s a m e  w i t h  t h e current project.

For  the  above  reasons,  the  proposed  project  would  not  result  in  significant  impacts  related  to  public services  not  previously  identified  in  the  EIR  or  addressed  thro ugh  uniformly  applied  development policies or standards and no further environmental review is necessary for this topic.

Recreation
b)   Would  the  project  increase  the  use  of  existing  neighborhood   and  regional  parks  or  other recreational  facilities  such  that  substantial  physical  deterioration  of  the  facility  would  occur  or  be

Page 70 ends

accelerated or include recreational facilities or require the c onstruction or expansion of recreational facilities which might have an adverse physical effect on the environment? Same  Conclusion  (conclusion  remains  NI):  The  current  project  would  not  change  the  no  significant impact  conclusions  as  the  potential  to  increase  demand  for  recreation  has  not  substantially  changed since The Globe Planned District.

The Prior EIR concluded that The Globe Planned District would n ot have a significant impact related to public services and recreation noting, “The project is not anti cipated to create a demand or impact local schools and/or park facilities… The project site is not located near park facilities, nor does it contain uses that  would  rely  upon  recreational  facilities.  The  proposed  project  will  have  no  significant  impact  on neighborhood or regional parks, and will not affect existing recreational opportunities.” The proposed project would redevelop a site historically utiliz ed for industrial / warehouse / and office uses  with  similar  types  of  uses  and  related  employment  and  use of  services  and  would  comply  with applicable  requirements  and  fee  programs  related  to  recreation.   Therefore,  the  conclusion  of  no significant impacts in regard to recreation from the Prior EIR  would remain the same with the current project.

For the above reasons, the proposed project would not result in  significant impacts related to recreation not  previously  identified  in  the  EIR  or  addressed  through  uniformly  applied  development  policies  or standards and no further environmental review is necessary for this topic.

Albrae Industrial Project – The Globe Planned District Addendum Page 71 O. Transportation

Impacts
Related To:

Prior EIR
Findings with
Implementation
of MM (If
Required)

PROJECT
Relationship to Prior
EIR Findings
Applicable SDRs or MMs
Project Level
of
Significance
Equal or
Less
Severity
Substantial
Increase in
Severity
a.   Circulation System
Plans and Facilities
LTS w/MM  ☒  ☐  ‐‐  LTS
b. Transportation
Impacts
LTS w/MM  ☒  ☐  ‐‐  LTS
c.  Hazards  NI  ☒  ☐  ‐‐  NI
d. Emergency Access   NI  ☒  ☐  ‐‐  NI
1 Note that Energy was not formally assessed in the Prior EIR. As shown in this table, the project impact under this topic would not be significant and is equal to or less severe than what would have been identified under the Prior EIR.

Discussion
Transportation Setting Changes fr om The Globe Planned District Since the adoption of the Prior EIR, the California Natural Res ources Agency certified and adopted new CEQA Guidelines in 2018 to implement the requirements of Califo rnia Senate Bill (SB) 743. Specifically, SB  743  and  the  resulting  CEQA  Guideline  section  15064.3  changed t h e  C E Q A  t r a n s p o r t a t i o n  i m p a c t analysis  significance  criteria  to  eliminate  auto  delay,  level  of  service  (LOS),  and  similar  measures  of vehicular capacity or traffic congestion  as a basis for determi ning significant impacts under CEQA. The changes in CEQA Guidelines to implement SB 743 present vehicle miles traveled (VMT) as an appropriate measure  of  transportation  impacts.  These  requirements  are  incor porated  into  the  City  of  Fremont Vehicle Miles Traveled Analysis Approach and Mitigation Summary Report (April 2020).

W h i l e  t h e  P r i o r  E I R  i d e n t i f i e d  l e v e l  o f  s e r v i c e ‐ b a s e d  i m p a c t s  and  mitigation  measures,  these  are  not applicable to the current project  under current CEQA law and ar e therefore not further discussed in this analysis. The assessment under subsection b) instead addresses VMT‐based analysis.

A Transportation Impact Analysis has been prepared for the proj ect by Fehr & Peers, dated January 3, 2022,  as  referenced  in  this  document  and  included  as  Attachment  D.  Unless  otherwise  indicated,  the information in this section is from the Transportation Impact Analysis.

Circulation System Conflict
a)   Would  the  project  conflict  with  a  program,  plan,  ordinance  or  policy  addressing  the  circulation system, including transit, roadway, bicycle, and pedestrian facilities? Reduced Conclusion (conclusion was revised from LTS w/ MM to LT S): While the Prior EIR had identified impacts  and  mitigation  related  to  vehicular  capacity  or  traffic  c o n g e s t i o n ,  t h e s e  m e t r i c s  a r e  n o t considered  for  the  analysis  of  this  topic  under  current  laws.  A n  assessment  of  the  current  project demonstrates  the  project  would  have  a  less‐than‐significant  impact  with  respect  to  circulation  system conflict.

Page 72 ends

The Transportation Impact Analysis included a consideration of this topic for the current project with the following conclusions:

Bicycle Access and Circulation
Existing bicycle facilities in the vicinity of the project include:
•   Class  II  buffered  bicycle  lanes  on  eastbound  Stevenson  Boule vard  west  of  Cedar  Boulevard,  and Class II bicycle lanes on westbound Stevenson Street west of Balentine Drive •   Intermittent Class II bicycle  lanes on Stevenson Boulevard east of Albrae Street •   Class II bicycle lanes on Balen tine Drive north of Stevenson Boulevard •   Class II bicycle lanes on Albra e Street south of Stevenson Boulevard •   Class II bicycle lanes on Boyce Road and Cherry Street The City of Fremont’s 2018 Bicycle Master Plan proposes the following near the project site:
•   Upgrade the existing Class II  bicycles lanes on Boyce Road to Class IV separated bikeway Considering the uses at the site, the project is expected to ge nerate minimal bicycle trips. Most cyclists are expected to use Stevenson Boulevard and Albrae Street to access the site.

Bicycle Parking
Per City of Fremont Municipal Code Section 18.183.135, the proj ect is required to provide the following bicycle parking:
•   Long‐term bicycle parking = 1, plus 5% of required automobil e parking for tenants or occupants •   Short‐term bicycle parking = 4, plus 5% of required automobi le parking for visitors Where long‐term bicycle  parking  is  defined  as  bicycle  lockers,  indoor  bicycle  storage,  or  similar  facilities  protected from the weather and with a higher degree of security designed  to serve primarily employees who l e a v e  t h e i r  b i k e s  f o r  l o n g e r  p e r i o d s  o f  t i m e s ,  a n d  s h o r t ‐ t e r m  bicycle  parking  is  defined  as  bicycle racks designed to serve visitors who leave their bikes for relatively short periods of time.

The  project  will  provide  on‐site  bicycle  parking  as  required  by  the  Code.  Considering  the  automobile parking requirements for the project, each project building is  required to provide the following bicycle parking spaces:
•   Building 1: 17 long‐term and 20 short‐term bicycle parking s paces •   Building 2: 14 long‐term and 17 short‐term bicycle parking s paces •   Building 3: 9 long‐term and 12 short‐term bicycle parking sp aces

Albrae Industrial Project – The Globe Planned District Addendum Page 73 Pedestrian Access and Circulation
I n  t h e  v i c i n i t y  o f  t h e  p r o j e c t ,  m o s t  s t r e e t s  p r o v i d e  a  s i d e w a l k o n  a t  l e a s t  o n e  s i d e  o f  t h e  s t r e e t .  T h e existing sidewalks adjacent to the project site are described below:
•   Albrae  Street  currently  provides  a  nine‐foot  sidewalk  north of  the  p r oj e ct  si t e on  th e  we st si d e  of the street. Adjacent to the project side, intermittent sidewalk s with a landscaping strip are currently provided. It is recommended that the project provide a continuo us five‐foot sidewalk with four feet of landscaping along the project frontage on Albrae Street. •   Encyclopedia  Circle  provides  a  4 . 5 ‐ f o o t  s i d e w a l k  o n  t h e  e a s t s i d e  o f  t h e  s t r e e t  a l o n g  t h e  n o r t h portion of the project frontage and no sidewalk along the south  portion of the project frontage. It is r e c o m m e n d e d  t h a t  t h e  p r o j e c t  p r o v i d e  a  c o n t i n u o u s  f i v e ‐ f o o t  s i dewalk  along  the  project  frontage on Encyclopedia Circle.
•   Main Street provides intermittent eight‐foot sidewalks on bo th sides of the street that connect the site to Stevenson Boulevard.

The signalized Albrae Street/Stevenson Boulevard intersection p rovides marked crosswalks, pedestrian signal  heads  with  pushbuttons,  and  one  curb  ramp  per  corner  on  all  approaches,  except  the  east approach  of  the  intersection.  The  unsignalized  study  intersections  on  Stevenson  Boulevard  at  Main Street  and  Encyclopedia  do  not  provide  marked  crosswalks  across S t e v e n s o n  B o u l e v a r d ,  o r  t h e  s i d e streets.

The project site would provide sidewalks within the project site adjacent to all three buildings, which can be used to walk between the project buildings, parking facilities within the site, and the sidewalks on the adjacent streets.

Roadways
As  discussed  under  subsection  b),  the  project  is  consistent  wit h  City  of  Fremont  VMT  targets.  As discussed  under  subsection  c),  all  access  locations  would  provi de  adequate  sight  distance  between vehicles  entering  or  exiting  the  site  and  pedestrians  on  the  adjacent  sidewalks  and  vehicles  in  both directions of the adjacent streets.

Transit Access
As of September 2021, no bus service is provided on the streets  adjacent to the project site. The nearest bus stops to the project are on both directions of Stevenson Bo ulevard just west of Main Street. The bus stop is served by AC Transit Line 216 which provides service to  various destinations in Fremont, Newark, and Union City, including the Fremont and Union City BART Stati ons. No amenities are provided at these bus  stops.  Access  between  the  bus  stop  on  eastbound  Stevenson  Boulevard  and  the  project  site  is provided by walking along the sidewalks on Main Street or Albra e Street. Access between the bus stop on westbound Stevenson Boulevard and the project site is provid ed by walking along Albrae Street and crossing Stevenson Boulevard at the signalized Albrae Street/ Stevenson Boulevard intersection.

Page 74 ends

Circulation System Conclusions
As discussed above, the project would provide access and circul ation for passenger automobiles, trucks, bicycles, and pedestrians in and around the site consistent wit h relevant requirements and policies and would not have a significant impact in this regard.

Additionally,  as  discussed  under  section  C:  Air  Quality,  Mitigat i o n  M e a s u r e  3 . 1 . 2  r e q u i r e s  p h y s i c a l  o n ‐ site  improvements  to  promote  pedestrians  and  bicycle  use,  impro vements  to  transit  facilities, preferential  parking  for  electric  or  alternatively‐fueled  vehicles,  and  implementation  of  Transportation Demand  Management  (TDM)  measures as feasible. Mitigation  Measure 3.1.2 would remain applicable to  the  current  project  and  the  applicants  have  prepared  a  preli m i n a r y  T D M  P l a n  t o  m e e t  t h i s requirement.

For the above reasons, the proposed project would not result in significant impacts related to circulation s y s t e m  c o n f l i c t s  n o t  p r e v i o u s l y  i d e n t i f i e d  i n  t h e  E I R  o r  a d d r e ssed  through  uniformly  applied development policies or standards and no further environmental review is necessary for this topic.

Transportation Impacts
b)   Would the project conflict or be inconsistent with CEQA Guidelines section 15064.3, subdivision (b)? Reduced Conclusion (conclusion was revised from LTS w/ MM to LT S): While the Prior EIR had identified impacts  and  mitigation  related  to  level  of  service,  current  laws  require  analysis  on  a  VMT  basis,  which demonstrates  the  project  would  have  a  less‐than‐significant  imp act  with  respect  to  transportation impacts.

The  State  Office  of  Planning  and  Research’s  (OPR)  Technical  Advisory  on  Evaluating  Transportation Impacts in CEQA recommends evaluating VMT impacts using an effi ciency‐based version of the metric, s u c h  a s  V M T  p e r  r e s i d e n t  f o r  r e s i d e n t i a l  d e v e l o p m e n t s  o r  V M T  p er  employee  for  office  or  other employment‐based developments. Consistent with OPR’s guidelines , City of Fremont uses the metric of home‐work  VMT  per  employee  for  evaluating  the  impacts  of  employ ment‐based  uses,  such  as  the proposed  project.  The  home‐work  VMT  per  employee  measures  all  o f  the  commute  trips  between homes and workplaces and divides that total distance by the number of employees at the site.

Based  on  the  City  of  Fremont  guidelines,  the  following  significance  thresholds  are  applicable  to  the project:
•   Office Uses: 15% below the regional average VMT per employee •   Industrial Uses: The regional average VMT per employee The  VMT  for  the  project  has  been  estimated  using  the  Alameda  County  Transportation  Commission (CTC) Travel Demand Model. The Alameda CTC Model, which covers the entire nine county Bay Area, is a regional  travel  demand  model  that  uses  socio‐economic  data  and  roadway  and  transit  network assumptions to forecast traffic  volumes, transit ridership, and  VMT using a four‐step modeling process that includes trip generation, trip distribution, mode split, and trip assignment. This process accounts for changes  in  travel  patterns  due  to  future  growth  and  expected  changes  in  the  transportation  network.

This analysis uses the latest version of the Alameda CTC Model,  which was released in May 2019. The Model  is  based  on  the  Metropolitan  Transportation  Commission  (M TC)  Plan  Bay  Area  2040  (i.e., Sustainable Communities Strategy) transportation network and la nd uses for 2020. Different areas are expressed  geographically  in  transportation  analysis  zones  (TAZ) ,  which  are  used  in  transportation

Albrae Industrial Project – The Globe Planned District Addendum Page 75 planning models for transportation analysis and other planning purposes. The TAZ in which the project is located is TAZ 906.

The project  VMT is based upon trips. Table 3 presents project  t rips and a comparison against trips for this area under the Prior EIR for comparison purposes.

Table 3: Project Trip Generation
Land Use  Size (KSF) 1  Daily Trips
AM Peak Hour PM Peak Hour
In Out Total In  Out  Total
Office2  24.5  240 43 7 50 5  25  30
Warehouse3  333.8  2,150 235 55 290 156  245  401
Manufacturing4  36.8  280 18 5 23 8  17  25
Truck Traffic Adjustment5    210 27 6 33 9  13  22
Total Project Trips    2,880 323 73 396 178  300  478
The Globe (Project Site)6    14,170 N/A N/A N/A 398  431  829 Notes:

1.  KSF = thousand square feet

2.  ITE Trip Generation (Tenth Ed ition) land use category 710 (General Office Building in General Urban/Suburban Setting)

3.  ITE Trip Generation (Tenth Ed ition Supplement) land use category 155 (High‐Cube Fulfillment Center Warehouse (Sort) in General Urban/Suburban Setting)

4.  ITE Trip Generation (Tenth Ed ition) land use category 140 (Manufacturing in General Urban/Suburban Setting)

5.  Based on ITE Trip Generation (Tenth Edition Supplement), lan d use category 156 (High‐Cube Parcel Hub Warehouse in General Urban/Suburban Setting), truck trip generation rates applied to the warehouse and manufacturing components of the project assumes a passenger car equivalent of 2.0 for the truck trips.

6.  Estimated daily trips for the  entitled project on the currently proposed project site based on the total daily trips for the EIR project in The Globe General Plan Amendment Draft EIR (2005), Appendix B.

Source: Fehr & Peers, Transportation Impact Analysis, dated January 3, 2022, Summarized from Tables 3 and 4. (Attachment D)

As shown in Table 3, it is estimated that the project would gen erate about 2,880 daily, and 396 AM and 478  PM  peak  hour  net  new  trips.  As  also  shown  in  the  table,  this  is  a  substantially  lower  amount  of traffic than would have occurred for this site under The Globe Planned Development.

T ab l e  4 su mm ar i z e s t he  e st i m at ed  h om e ‐ w or k  VMT  p e r  e mp l oy e e  u n der  year  2020  conditions  for  the project  based  on  the  results  of  the  Alameda  CTC  Model  and  compa res  the  results  to  the  City  of Fremont’s thresholds applicable to the project.

Table 4: Project Daily Vehicle Miles Traveled Summary

Home‐Based VMT per Employee
year 2020
Project (TAZ 906)  13.5
Bay Area Regional Average
(threshold for industrial uses)  18.1
Exceeds Threshold? No
15% below Bay Area Regional Average
(threshold for office uses)  15.4
Exceeds Threshold? No
Source:  Fehr  &  Peers,  Transportation  Impact  Analysis,  dated  January  3,  2022,  Table  1 and  surrounding  text. (Attachment D)

Page 76 ends

I t  i s  e s t i m a t e d  t h a t  t h e  p r o j e c t  e m p l o y e e s  w o u l d  h a v e  a n  a v e r a ge  home‐work  VMT  of  13.5  miles  per employee  per  day  in  2020,  which  is  more  than  15%  below  the  regio n a l  a v e r a g e  V M T  p e r  e m p l o y e e .

Since the project is consistent with the City of Fremont Genera l Plan, the cumulative VMT impact of the project  is  less  than  significant.  Therefore,  the  project  would h a v e  a  l e s s  t h a n  s i g n i f i c a n t  i m p a c t  w i t h respect to VMT.

For  the  above  reasons,  the  proposed  project  would  not  result  in  s i g n i f i c a n t  i m p a c t s  r e l a t e d  t o transportation  impacts  not  previously  identified  in  the  EIR  or  addressed  through  uniformly  applied development policies or standards and no further environmental review is necessary for this topic.

Traffic Hazards
c)   Would  the  project  substantially  increase  hazards  due  to  a  g eometric  design  feature  (e.g.,  sharp curves or dangerous intersections) or incompatible use (e.g., farm equipment)? Same  Conclusion  (conclusion  remains  NI) :  The  current  project  would  not  change  the  no  impact conclusion as the project would meet applicable safety standard s and that has not substantially changed since The Globe Planned District.

Vehicles would access the project site through the following six access points:
•   A new driveway on Albrae Street opposite the existing Walmar t driveway. This driveway would be 26  feet  wide  and  accommodate  passenger  vehicles  only.  Currently,  t h i s  s e g m e n t  o f  A l b r a e  S t r e e t provides one motor vehicle lane and one bicycle lane in each di rection and a center two‐way left‐ turn lane.
•   The  project  would  have  access  to  the  existing  driveway  on  Albrae  Street  just  north  of  the  project site.  This  driveway  would  be  shared  with  the  adjacent  shopping  c e n t e r  a n d  u s e d  p r i m a r i l y  b y passenger vehicles driving to and from Building 3.
•   A new driveway in the northwest corner of the project site o n Encyclopedia Circle, just south of the northeast  bend  in  Encyclopedia  Circle  would  be  40  feet  wide  and  accommodate  both  passenger vehicles and trucks.
•   A new driveway in the southwest corner of the project site o n Encyclopedia Circle would be 40 feet wide and accommodate both passenger vehicles and trucks. •   A new driveway on the west side of the project site on Encyc lopedia Circle midway between the two other driveways would be 26 feet wide and accommodate passenger vehicles only. •   The project would also have direct access on Main Street on  the north side of the project site. The access  point  would  have  a  center  median  and  provide  13‐foot  lanes  in  each  direction  to  minimize potential  conflicts  between  trucks  and  passenger  vehicles  and  pedestrians  accessing  the  adjacent shopping center.

The  Transportation  Impact  Analysis  assessed  the  safety  of  these  access  points.  All  six  access  locations would provide adequate sight distance between vehicles entering  or exiting the site and pedestrians on the adjacent sidewalks and vehicles in both directions of the adjacent streets.

Albrae Industrial Project – The Globe Planned District Addendum Page 77 The project driveways would provide access to the surface parki ng spaces provided throughout the site.

All  parking  spaces  would  be  perpendicular  spaces  along  two‐way  drive  aisles.  The  drive  aisles  that accommodate  only  passenger  vehicles  would  be  generally  26  feet wide,  which  is  adequate  space  for two‐way  circulation  and  would  a ccommodate  passenger  vehicles  ma neuvering  into  and  out  of  the parking spaces. The drive aisles  that would also accommodate  tr ucks would be generally 40 feet wide which would provide adequate space for truck circulation as wel l as passenger vehicle access. Based on a review of the site plan, the project parking lot would provid e adequate sight distance throughout the site.

A s  d i s c u s s e d  a b o v e ,  t h e  p r o j e c t  w o u l d  n o t  r e s u l t  i n  a  t r a f f i c  hazard  and  would  not  have  a  significant impact in this regard.

For  the  above  reasons,  the  proposed  project  would  not  result  in s i g n i f i c a n t  i m p a c t s  r e l a t e d  t o  t r a f f i c hazards  not  previously  identified  in  the  EIR  or  addressed  throu gh  uniformly  applied  development policies or standards and no further environmental review is necessary for this topic.

Emergency Access
d)   Would the project result in inadequate emergency access? Same  Conclusion  (conclusion  remains  NI) :  The  current  project  would  not  change  the  no  impact conclusion  because  the  requirement  to  provide  adequate  emergenc y  access  has  not  substantially changed since The Globe Planned District.

T h e  p r o p o s e d  p r o j e c t  w o u l d  n o t  r e r o u t e  o r  c h a n g e  a n y  o f  t h e  c i ty  streets  in  its  vicinity  that  would impact  emergency  vehicle  access  to  nearby  properties.  As  discussed  under  subsection  c)  above,  the project  would  provide  access  suitable  for  truck  traffic,  which would  also  include  emergency  vehicles.

Consistent with the conclusions of the Prior EIR, the project would have no impact with regard to For  the  above  reasons,  the  proposed  project  would  not  result  in  s i g n i f i c a n t  i m p a c t s  r e l a t e d  t o emergency  access  not  previously  identified  in  the  EIR  or  addres sed  through  uniformly  applied development policies or standards and no further environmental review is necessary for this topic.

Page 78 ends

P. Utilities and Service Systems and Energy

Impacts
Related To:

Prior EIR
Findings with
Implementation
of MM (If
Required)

PROJECT
Relationship to Prior
EIR Findings
Applicable SDRs or MMs
Project Level
of
Significance
Equal or
Less
Severity
Substantial
Increase in
Severity
a.   New or Expanded
Facilities
LTS  ☒  ☐  ‐‐  LTS
b. Water Supplies  NI  ☒  ☐  ‐‐  NI
c.  Wastewater
Capacity
NI  ☒  ☐  ‐‐  NI
d‐e. Solid Waste   NI  ☒  ☐  ‐‐  NI
f. Energy 1 ‐ ‐ 1   ☒  ☐  ‐‐  LTS
1 Note that Energy was not formally assessed in the Prior EIR. As shown in this table, the project impact under this topic would not be significant and is equal to or less severe than what would have been identified under the Prior EIR.

Discussion
Utilities and Service Systems Setting Changes from The Globe Pl anned District Area‐wide  development  has  continued  throughout  the  vicinity  and   utilities  plans,  services,  and development fees are regularly assessed and updated.

California Assembly Bill (AB) 341 now requires businesses that  generate 4 or more cubic yards of waste per week to recycle. AB 1826 requires all businesses to subscribe to organics recycling service.

New or Expanded Facilities
a)   Would the project require or result in the relocation or co nstruction of new or expanded water, or wastewater treatment or storm water drainage, electric power, n atural gas, or telecommunications facilities, the construction or relocation of which could cause significant environmental effects? Same  Conclusion  (conclusion  remains  LTS):  The  current  project  would  not  change  the  no  significant impact conclusion related to new or expanded facilities as the need for new or expanded facilities has not substantially changed since The Globe Planned District.

The Prior EIR concluded that The Globe Planned District would n ot have a significant impact related to utilities  and  service  systems  noting,  “All  applicable  utilities  and  services  required  for  this  project  have been,  or  will  be  made  available.  Appropriate  review  of  the  util ity  systems  for  the  project  will  be conducted during the Development Organization (Building Permit)  review to ensure adequate capacity and  facilities.  The  project  will  integrate  the  goals  of  the  Alameda  County  Urban  Runoff  Clean  Water Program. Implementation of these measures will reduce any potential impact to insignificant levels.” The proposed project would redevelop a site historically utiliz ed for industrial / warehouse / and office uses  with  similar  types  of  uses  and  related  employment  and  use of  services  and  would  comply  with applicable  requirements.  Therefore,  the  conclusion  of  no  significant  impacts  with  regard  to  new  or expanded services from the Prior EIR would remain the same with the current project.

Albrae Industrial Project – The Globe Planned District Addendum Page 79 For  the  above  reasons,  the  proposed  project  would  not  result  in si g n i f i c ant  i mp ac t s r e l at ed t o n e w  or expanded  facilities  not  previously  identified  in  the  EIR  or  add ressed  through  uniformly  applied development policies or standards and no further environmental review is necessary for this topic.

Water Supplies
b)   Would  the  project  have  sufficient  water  supplies  available  t o  s e r v e  t h e  p r o j e c t  a n d  r e a s o n a b l y foreseeable future development during normal, dry and multiple dry years? Same  Conclusion  (conclusion  remains  NI):  The  current  project  would  not  change  the  no  significant impact  conclusions  as  the  potential  for  demand  to  exceed  the  water  availability  has  not  substantially changed since The Globe Planned District.

A s  n o t e d  i n  t h e  P r i o r  E I R ,  t h e  s i z e  o f  t h e  p r o j e c t  d o e s  n o t  t r igger  a  need  for  a  project‐specific  Water Supply  Assessment  and  the  project  would  be  required  to  conform  to  all  current  utility‐related regulations including those related to water efficiency.

For  the  above  reasons,  the  proposed  project  would  not  result  in s i g n i f i c a n t  i m p a c t s  r e l a t e d  t o  w a t e r supplies  not  previously  identified  in  the  EIR  or  addressed  thro ugh  uniformly  applied  development policies or standards and no further environmental review is necessary for this topic.

Wastewater Capacity
c)   Would the project result in a determination by the wastewat er treatment provider which serves or may  serve  the  project  that  it  has  adequate  capacity  to  serve  the  project’s  projected  demand  in addition to the provider’s existing commitments?
Same  Conclusion  (conclusion  remains  NI):  The  current  project  would  not  change  the  no  significant impact conclusions as the potential to exceed wastewater capaci ty has not substantially changed since The Globe Planned District.

The Prior EIR concluded that The Globe Planned District would n ot have a significant impact related to utilities  and  service  systems  noting,  “All  applicable  utilities  and  services  required  for  this  project  have been,  or  will  be  made  available.  Appropriate  review  of  the  util ity  systems  for  the  project  will  be conducted during the Development Organization (Building Permit)  review to ensure adequate capacity and  facilities.  The  project  will  integrate  the  goals  of  the  Alameda  County  Urban  Runoff  Clean  Water Program. Implementation of these measures will reduce any potential impact to insignificant levels.” The proposed project would redevelop a site historically utiliz ed for industrial / warehouse / and office uses  with  similar  types  of  uses  and  related  employment  and  use of  services  and  would  comply  with applicable requirements. Therefore, the conclusion of no signif icant impacts with regard to wastewater capacity from the Prior EIR would remain the same with the current project.

For  the  above  reasons,  the  proposed  project  would  not  result  in  s i g n i f i c a n t  i m p a c t s  r e l a t e d  t o wastewater  capacity  not  previously  identified  in  the  EIR  or  add ressed  through  uniformly  applied development policies or standards and no further environmental review is necessary for this topic.

Solid Waste Generation
d)   Would  the  project  generate  solid  waste  in  excess  of  State  or  local  standards,  or  in  excess  of  the capacity of local infrastructure, or otherwise impair the attainment of solid waste reduction goals?

Page 80 ends

Same  Conclusion  (conclusion  remains  NI):  The  current  project  would  not  change  the  no  significant impact conclusions as the potential to generate excessive solid waste has not substantially changed since The Globe Planned District.

The Prior EIR concluded that The Globe Planned District would n ot have a significant impact related to utilities  and  service  systems  noting,  “All  applicable  utilities  and  services  required  for  this  project  have been  or  will  be  made  available.  Appropriate  review  of  the  utili ty  systems  for  the  project  will  be conducted during the Development Organization (Building Permit)  review to ensure adequate capacity and  facilities.  The  project  will  integrate  the  goals  of  the  Alameda  County  Urban  Runoff  Clean  Water Program. Implementation of these measures will reduce any potential impact to insignificant levels.” The  project  would  be  required  to  conform  to  all  current  utility ‐related  regulations  including  those related to solid waste reduction.

For  the  above  reasons,  the  proposed  project  would  not  result  in s i g n i f i c a n t  i m p a c t s  r e l a t e d  t o  s o l i d waste  generation  not  previously  identified  in  the  EIR  or  addres sed  through  uniformly  applied development policies or standards and no further environmental review is necessary for this topic.

Solid Waste Regulations
e)   Would  the  project  comply  with  federal,  state,  and  local  management  and  reduction  statutes  and regulations related to solid waste?
Same  Conclusion  (conclusion  remains  NI):  The  current  project  would  not  change  the  no  significant impact conclusions as the potential to conflict with solid wast e regulations has not substantially changed since The Globe Planned District.

The Prior EIR concluded that The Globe Planned District would n ot have a significant impact related to utilities  and  service  systems  noting,  “All  applicable  utilities  and  services  required  for  this  project  have been,  or  will  be  made  available.  Appropriate  review  of  the  util ity  systems  for  the  project  will  be conducted during the Development Organization (Building Permit)  review to ensure adequate capacity and  facilities.  The  project  will  integrate  the  goals  of  the  Alameda  County  Urban  Runoff  Clean  Water Program. Implementation of these measures will reduce any potential impact to insignificant levels.” The size of the project does not trigger a need for a project‐s pecific Water Supply Assessment and the project would be required to conform to all current utility‐rel ated regulations including those related to water and energy efficiency, and solid waste reduction.

The proposed project would redevelop a site historically utiliz ed for industrial / warehouse / and office uses  with  similar  types  of  uses  and  related  employment  and  use of  services  and  would  comply  with applicable requirements. Therefore, the conclusion of no signif icant impacts with regard to solid waste regulations from the Prior EIR would remain the same with the current project.

For  the  above  reasons,  the  proposed  project  would  not  result  in s i g n i f i c a n t  i m p a c t s  r e l a t e d  t o  s o l i d waste  regulations  not  previously  identified  in  the  EIR  or  addre ssed  through  uniformly  applied development policies or standards and no further environmental review is necessary for this topic.

Albrae Industrial Project – The Globe Planned District Addendum Page 81 Energy
f)  Would the project result in potentially significant environm ental impact due to wasteful, inefficient, or unnecessary consumption of energy resources, during project  construction or operation? Would the project conflict with or obstruct a state or local plan for renewable energy or energy efficiency? Same Conclusion (conclusion remains LTS) : The Prior EIR did not explicitly address energy (assumed LTS) but  both  The  Globe  Planned  District  and  the  current  project  wou ld  comply  with  applicable  energy efficiency regulations.

The  project  would  be  considered  to  have  a  significant  impact  related  to  energy  use  if  it  would  violate applicable federal, state and lo cal statutes and regulations re lating to energy standards and/or if energy consumption  increases  resulting  from  the  project  would  trigger the  need  or  expanded  off‐site  energy facilities.

The  current  project  would  be  required  by  the  City  to  comply  wit h  all  standards  of  Title  24  of  the California  Code  of  Regulations  and  the  new  California  Green  Building  Standards  Code  (CALGREEN),  as applicable,  aimed  at  the  incorporation  of  energy‐conserving  des ign  and  construction.  PG&E i n f r a s t r u c t u r e  e x i s t s  o n  t h e  c u r r e n t  p r o j e c t  s i t e ,  a n d  a n y  o n ‐ site  and  immediately  adjacent improvements  and  extensions  required  to  accommodate  the  redevelopment  would  be  determined  in consultation with PG&E prior to  installation. The project is co nsistent with the types of uses that were historically located at the site and are located in the vicinity and by itself would not result in the need for new or expanded off‐site facilities. Therefore, although the pr oject could incrementally increase energy consumption,  it  would  conform  to ap p l i c ab l e  r e q ui r e m e nt s t o av oid  wasteful  or  inefficient  energy  use and would not result in a significant impact related to the energy use.

For  the  above  reasons,  the  proposed  project  would  not  result  in s i g n i f i c a n t  i m p a c t s  r e l a t e d  t o  e n e r g y not  previously  identified  in  the  EIR  or  addressed  through  uniformly  applied  development  policies  or standards and no further environmental review is necessary for this topic.

Page 82 ends

Q. Mandatory Findings of Significance

Impacts
Related To:

Prior EIR
Findings with
Implementation
of MM (If
Required)

PROJECT
Relationship to Prior
EIR Findings
Applicable SDRs or MMs
Project Level
of Significance
Equal or
Less
Severity
Substantial
Increase in
Severity
a. Environmental
Quality
LTS w/MM  ☒  ☐  SDRs FMC 18.218.050(b)(2), ‐(b)(3), ‐
(d)(1), ‐(d)(2)
NI
b. Cumulative
Impacts
SU w/MM  ☒ ☐ SDRs FMC 18.218.050(a),‐(b)(2), ‐
(b)(3), ‐(c), ‐(d)(1), ‐(d)(2), ‐(e), ‐(f), ‐
(g)
MMs 3.1.2, 3.2.2
SU w/MM
c. Adverse Effects on
Human Beings
LTS w/MM  ☒  ☐  SDRs FMC 18.218.050(a), ‐(c), ‐(e), ‐
(f), ‐(g)
MMs 3.1.2, 3.2.2, 3.2.3
LTS w/MM
Environmental Quality
a )     D o e s  t h e  p r o j e c t  h a v e  t h e  p o t e n t i a l  t o  s u b s t a n t i a l l y  d e g r a de  the  quality  of  the  environment, substantially  reduce  the  habitat  of  a  fish  or  wildlife  species,  cause  a  fish  or  wildlife  population  to drop below self‐sustaining levels, threaten to eliminate a plan t or animal community, substantially reduce  the  number  or  restrict  the  range  of  a  rare  or  endangered  plant  or  animal  or  eliminate important examples of the major periods of California history or prehistory? Same  Conclusion  (conclusion  remains  NI):  The  current  project  would  not  change  the  no  significant impact  conclusions  as  the  potential  for  impacts  related  to  environmental  quality  has  not  substantially changed since The Globe Planned District.

With the implementation of the City’s Standard Development Requ irements to protect nesting birds and roosting bats during construction and to address the potential  discovery of currently unknown cultural, tribal cultural, or paleontological resources at the site, the  project would not degrade the quality of the environment,  substantially  reduce  the  habitat  of  a  fish  or  wild life  species,  cause  a  fish  or  wildlife population to drop below self‐sus taining levels, or threaten to  eliminate a plant or animal community.

The project would not impact r are or endangered wildlife specie s, or eliminate important examples of the major periods of California history or prehistory.

For  the  above  reasons,  the  proposed  project  would  not  result  in  s i g n i f i c a n t  i m p a c t s  r e l a t e d  t o environmental  quality  not  previously  identified  in  the  EIR  or  a ddressed  through  uniformly  applied development policies or standards and no further environmental review is necessary for this topic.

Cumulative Impacts
b)  Does  the  project  have  impacts  that  are  individually  limited,   but  cumulatively  considerable? (“Cumulatively considerable” means that the incremental effects  of a project are considerable when viewed in connection with the effects of past projects, the eff ects of other current projects, and the effects of probable future projects)?

Albrae Industrial Project – The Globe Planned District Addendum Page 83 Same Conclusion (conclusion remains SU w/ MM) : The current project would not change the SU impact with  respect  to  operational  emissions  and  the  significant  and  unavoidable  with  mitigation  conclusion related to operational‐period criteria pollutant emissions, which is a cumulative impact.

The impact with respect to operational emissions would remain s ignificant and unavoidable even with the  implementation  of  mitigation.  Other  significant  impacts  requiring  mitigation  would  occur  in  the topics of Air Quality and Hazardous Materials. As noted through out this analysis, the project would have the same or reduced impacts from the Prior EIR.

For  the  above  reasons,  the  proposed  project  would  not  result  in  s i g n i f i c a n t  i m p a c t s  r e l a t e d  t o c u m u l a t i v e  i m p a c t s  n o t  p r e v i o u s l y  i d e n t i f i e d  i n  t h e  E I R  o r  a d d ressed  through  uniformly  applied development policies or standards and no further environmental review is necessary for this topic.

Adverse Effects on Human Beings
c)   Does the project have environmental effects which will caus e substantial adverse effects on human beings, either directly or indirectly?
Same  Conclusion  (conclusion  remains  LTS  w/MM) :  The  current  project  would  not  change  the  no significant impact conclusions as the potential for adverse eff ects on human beings has not substantially changed since The Globe Planned District.

The project would not result in substantial adverse effects on human beings, either directly or indirectly.

The City’s Standard Development Requirements would minimize the  potential for safety impacts related to  construction‐period  emissions,  site  and  soil  hazards,  distur bance  of  site  contaminants,  and construction‐period noise.

Impacts and mitigation from the Prior EIR would remain applicab le related to reduction of vehicle trips and related emissions, hazardous building materials, and respon se in the event of release of hazardous substances.  As  noted  throughout  this  analysis,  the  project  would  h a v e  t h e  s a m e  o r  r e d u c e d  i m p a c t s from the Prior EIR.

For the above reasons, the proposed project would not result in  significant impacts related to adverse e f f e c t s  o n  h u m a n  b e i n g s  n o t  p r e v i o u s l y  i d e n t i f i e d  i n  t h e  E I R  o r  addressed  through  uniformly  applied development policies or standards and no further environmental review is necessary for this topic.

Page 84 ends

DOCUMENT PREPARERS
Lamphier ‐Gregory, Inc.
(Primary Report Preparers)
Rebecca Auld, Vice President
4100 Redwood Road, STE 20A ‐ #601
Oakland, CA 94619
510‐535‐6690

City of Fremont
This  document  was  prepared  in  consultation  with  City  of  Fremont  staff,  including  Mark  Hungerford, Associate Planner.

SOURCES

1.   City of Fremont, Globe Planned District Environmental Revie w (SCH No. 2005042146), including an Initial Study (2005), Draft EIR (2005), Final EIR (2006) and Supplemental EIR (2006). Available at https://www.fremont.gov/430/Environmental‐Review under the “Fremont Albrae Industrial” project.

2.   City of Fremont, Fremont Gen eral Plan Update EIR, December 13, 2011. Available at https://fremont.gov/398/General‐Plan.

3.   City of Fremont, Fremont Muni cipal Code, Title 18 Planning and Zoning, Ch. 18.218 Standard Development Requirements to Address Resource Protection. Available at https://www.codepublishing.com/CA/Fremont/#!/Fremont18/Fremont18218.html.

5.   CalTrans, State Scenic H ighway website, available at: https://dot.ca.gov/programs/design/lap‐ landscape‐architecture‐and‐community‐livability/lap‐liv‐i‐scenic‐highways.

6.   California Department of  Conservation, 2018. Williamson Act Status Report. Available at . https://www.conservation.ca.gov/dlrp/wa/Pages/stats_reports.aspx.

7.   Bay Area Air Quality Manage ment District, May 2017, California Environmental Quality Act Air Quality Guidelines.

8.   Bay Area Air Quality Manage ment District, June 2, 2010, News Release http://www.baaqmd.gov/~/media/Files/Communications%20and%20Outreach/Publications/New s%20Releases/2010/ceqa_100602.ashx

9.   Illingworth & Rodkin, Novembe r 9, 2020, Air Quality and Greenhouse Gas Emissions Analysis.

10.   Johnson Marigot Consulting,  LLC, June 15, 2021, Site Visit Summary – 40714 Albrae Street, Fremont, CA.

11.   Johnson Marigot Consulting,  LLC, July 7, 2021, personal correspondence email.

12.   HortScience/Bartlett Consul ting, September 2020, Tree Inventory Report.

13.   Terracon, August 26, 2020, Re port of Expected Geotechnical Conditions.

14.   Farallon Consulting, Novembe r 23, 2020, Phase I Environmental Site Assessment Report.

15.   Farallon Consulting, September 17, 2021, Updated Risk Mana gement Plan.

Albrae Industrial Project – The Globe Planned District Addendum Page 85

16.   CalFire, Very High Fire Hazard Severity Zone map, availabl e at:
https://osfm.fire.ca.gov/divisions/wildfire‐planning‐engineering/wildland‐hazards‐building‐ codes/fire‐hazard‐severity‐zones‐maps/

17.   Federal Emergency Management Agency (FEMA), effective 8/3/ 2009, Flood Insurance Rate Map (FIRM), Map Number 06001C0463G, available at https://www.fema.gov/flood‐maps.

18.   California Geological Survey, et al., Tsunami Inundation M aps for Emergency Planning

19.   U.S. Geological Survey, Mineral Resources Data System: U.S . Geological Survey, Reston, Virginia.

Available at: http://tin.er.usgs.gov/mrds/.

20.   City of Fremont, 2011. City  of Fremont General Plan. Land Use Element. Adopted December 2011.

Available: https://fremont.gov/generalplan.

22.   Fehr & Peers, January 3, 2022,  Transportation Impact Analysis.

23.   Fehr & Peers, April 2021, Trans portation Demand Management Plan.

STANDARD DEVELOPMENT REQUIREMENTS AND

MITIGATION MONITORING AND REPORTING PROGRAM

ATTACHMENT A
to the
Albrae Industrial Project

1st Addendum
to The Globe Planned District
EIR and Supplemental EIR

Albrae Industrial Project – The Globe Planned District Addendum SDRMMRP  Page A‐1 STANDARD DEVELOPMENT REQUIREMENTS AND MITIGATION
MONITORING AND REPORTING PROGRAM
This Standard Development Requirements and Mitigation Monitoring and Reporting Program (SDR / MMRP is in compliance with Section 15097 of the CEQA Guidelines, which requires that the Lead Agency “adopt a program for monitoring or reporting on the revisions which it has required in the project and the measures it has imposed to mitigate or avoid significant environmental effects.” The SDR / MMRP lists applicable mitigation measures (“MM”) from the Prior EIR (The Globe) and identifies mitigation monitoring requirements, as well as applicable City Standard Development Requirements (“SDR”).

The first column identifies the SDR and MM.

The second column identifies the monitoring schedule or timing applicable to the project.

The third column names the party responsible for monitoring the required action for the project.

The City of Fremont will oversee monitoring and documenting the implementation of mitigation measures. The project applicant or its construction contractors is responsible for fully understanding and effectively implementing all of the mitigation measures contained within this SDR / MMRP.

Standard Development Requirements/Mitigation Measures
Mitigation Implementation/Monitoring
When
Required  Implementation   Monitoring/
Inspection
FMC 18.218.050(a) Construction Related Emissions. The following construction measures, as periodically amended by BAAQMD, are required for all proposed development projects to reduce construction‐related fugitive dust and exhaust emissions:
(A)    All exposed surfaces (e.g., parking areas, staging areas, soil piles, graded areas, and unpaved access roads) shall be watered two times daily.
(B)    All haul trucks transporting soil, sand, or other loose material off site shall be covered.
(C)    All visible mud or dirt track‐out onto adjacent public roads shall be removed using wet power vacuum street
sweepers at least once per day. The use of dry power
sweeping is prohibited.
(D)    All vehicle speeds on unpaved roads shall be limited to 15 miles per hour.
(E)    All roadways, driveways, and sidewalks to be paved shall be completed as soon as possible. Building pads shall be laid as soon as possible after grading unless seeding or soil binders are used.
(F)    Idling times shall be minimized either by shutting equipment off when not in use or reducing the maximum
idling time to five minutes (as required by the California airborne toxics control measure Title 13, Section 2485 of California Code of Regulations (CCR)). Clear signage shall be provided for construction workers at all access points.

During
construction
Project Sponsor  City of Fremont
Building Division
Albrae Industrial Project – The Globe Planned District Addendum SDRMMRP  Page A‐2 Standard Development Requirements/Mitigation Measures
Mitigation Implementation/Monitoring
When
Required  Implementation   Monitoring/
Inspection
(G)    All construction equipment shall be maintained and properly tuned in accordance with manufacturer’s
specifications. All equipment shall be checked by a
certified mechanic and determined to be running in proper condition prior to operation.
(H)    A publicly visible sign shall be posted with the telephone number and person to contact regarding dust complaints.

This person shall respond and take corrective action within 48 hours. BAAQMD’s phone number shall also be visible to ensure compliance with applicable regulations.

FMC 18.218.050(b)(2): Nesting Birds. New development projects with the potential to impact nesting birds through tree or shrub removal shall implement the following measures prior to removal of any trees/shrubs, grading, or ground disturbing activities:
(A)    Avoidance. Proposed projects shall avoid construction activities during the bird nesting season (February 1st through August 31st).
(B)    Preconstruction Surveys. If construction activities are scheduled during the nesting season, a qualified biologist shall conduct a preconstruction survey to identify any
potential nesting activity. The biologist shall determine the number and time frame (prior to construction) of surveys to be conducted.
(C)    Protective Buffer Zone(s). If the survey indicates the presence of nesting birds, protective buffer zones shall be established around the nests. The size of the buffer zone shall be recommended by the biologist in consultation
with the CDFW depending on the species of nesting bird
and level of potential disturbance.
(D)    Initiation of Construction Activities. The buffer zones shall remain in place until the young have fledged and are
foraging independently. A qualified biologist shall monitor the nests closely until it is determined the nests are no longer active, at which time construction activities may commence within the buffer area.

Prior to
approval of
construction‐
related
permit

Project Sponsor  City of Fremont
Building Division

FMC 18.218.050(b)(3): Roosting Bats. New development with potential to impact special‐status or roosting bat species through demolition of existing structures or removal of trees on site shall conduct the following measures prior to demolition:
(A)    Preconstruction Surveys. A qualified biologist shall conduct a preconstruction survey during seasonal periods of bat activity (mid‐February through mid‐October) to determine suitability of structure(s) or trees as bat roost habitat. (B)    Protective Buffer Zone(s). If active bat roosts are found on site, a suitable buffer from construction shall be
established per the biologist. The biologist shall determine the species of bats present and the type of roost.
(C)    Mitigation and Exclusion. If the bats are identified as common species, and the roost is not being used as a
maternity roost or hibernation site, the bats may be
Prior to
approval of
construction‐
related
permit

Project Sponsor  City of Fremont
Building Division

Albrae Industrial Project – The Globe Planned District Addendum SDRMMRP  Page A‐3 Standard Development Requirements/Mitigation Measures
Mitigation Implementation/Monitoring
When
Required  Implementation   Monitoring/
Inspection
evicted using methods developed by a qualified biologist.

If special‐status bat species are found present, or if the roost is determined to be a maternity roost or hibernation site for any species, then the qualified biologist shall develop a bat mitigation and exclusion plan to compensate for lost roost. The site shall not be disturbed until CDFW approves the mitigation plan.

FMC 18.218.050(c): Construction Management Plan. Prior to the issuance of the first construction‐related permit for a new development project, the project applicant and his/her general contractor shall submit a construction management plan (CMP) for review and approval by the planning and building divisions and other relevant city departments, such as the fire department and the public works department, as directed. The CMP shall contain measures to minimize potential construction impacts including measures to comply with all construction‐related conditions of approval (and mitigation measures if applicable) such as dust control, construction emissions, hazardous materials, construction days/hours, construction traffic control, waste reduction and recycling, erosion and sedimentation control, storm water pollution prevention, noise control, complaint management, and cultural and tribal cultural resource management as applicable. The CMP shall provide project‐ specific information including descriptive procedures, approval documentation, and drawings (such as a site logistics plan, fire safety plan, construction phasing plan, proposed truck routes, traffic control plan, complaint management plan, construction worker parking plan, and litter/debris clean‐up plan) that specify how potential construction impacts will be minimized and how each construction‐ related requirement will be satisfied throughout construction of the project.

Prior to
approval of
construction‐
related
permit

Project Sponsor  City of Fremont
Building Division

FMC 18.218.050(d)(1): Notification, Affiliated California Native American Tribes. Within 14 days of determining that an application for a project is complete or a decision by the city is made to undertake a project, the city shall provide formal notification to the designated contact or a tribal representative of traditionally and culturally affiliated California Native American tribes that have requested to receive such notice from the city. The written notification shall include a brief description of the proposed project and its location, project contact information, and a notification that the California Native American tribe has 30 days to request consultation pursuant to Cal.

Pub. Res. Code § 64352.4.

During
environmenta
l review
City  COMPLETED
FMC 18.218.050(d)(2): Accidental Discovery of Cultural Resources.

The following requirements shall be met to address the potential for accidental discovery of cultural resources during ground disturbing excavation:
(A)    The project proponent shall include a note on any plans that require ground disturbing excavation that there is a potential for exposing buried cultural resources.
(B)    The project proponent shall retain a professional archaeologist to provide a preconstruction briefing to
supervisory personnel of any excavation contractor to alert During
construction
Project Sponsor  City of Fremont
Building Division
Albrae Industrial Project – The Globe Planned District Addendum SDRMMRP  Page A‐4 Standard Development Requirements/Mitigation Measures
Mitigation Implementation/Monitoring
When
Required  Implementation   Monitoring/
Inspection
them to the possibility of exposing buried cultural
resources, including significant prehistoric archaeological resources. The briefing shall discuss any cultural resources, including archaeological objects, that could be exposed, the need to stop excavation at the discovery, and the
procedures to follow regarding discovery protection and notification of the project proponent and archaeological team.
(C)    In the event that any human remains or historical, archaeological or paleontological resources are discovered during ground disturbing excavation, the provisions of
CEQA Guidelines Sections 15064.5(e) and (f), and of
subsection (c)(2)(D) of this section, requiring cessation of work, notification, and immediate evaluation shall be
followed.
(D)    If resources are discovered during ground disturbing activities that may be classified as historical, unique archaeological, or tribal cultural resources, ground
disturbing activities shall cease immediately, and the
planning manager shall be notified. The resources will be evaluated by a qualified archaeologist and, in the planning manager’s discretion, a tribal cultural monitor. If the resources are determined to be historical, unique
archaeological, or tribal cultural resources, then a plan for avoiding the resources shall be prepared. If avoidance is infeasible, then all significant cultural materials recovered shall be, as necessary and at the discretion of the
consulting archaeologist, subject to scientific analysis, professional museum curation, and documentation
according to current professional standards. Any plan for avoidance or mitigation shall be subject to the approval of the planning manager.
(E)    As used herein, “historical resource” means a historical resource as defined by CEQA Guidelines Section
15064.5(a); “unique archaeological resource” means
unique archaeological resource as defined by Cal. Pub. Res.

Code § 21083.2(g); and “tribal cultural resource” means tribal cultural resource as defined by Cal. Pub. Res. Code § 21074. Collectively, these terms describe “significant
cultural materials.”
FMC 18.218.050(e): Geology and Soils. New development projects with the potential to expose people or structures to substantial adverse effects, including the risk of loss, injury, or death due to seismic activity and potential seismic‐related ground shaking including liquefaction, if so determined by a site‐specific geotechnical study prepared to the satisfaction of the city engineer or his/her designee, shall implement the following measures prior to or during project construction, as applicable.
(A)    The project geotechnical consultant shall review all geotechnical aspects of the project building and grading plans (i.e., site preparation and grading, site drainage improvements, and design parameters for foundations,
Prior to
approval of
construction‐
related
permit
Project Sponsor  City of Fremont
Building Division
Albrae Industrial Project – The Globe Planned District Addendum SDRMMRP  Page A‐5 Standard Development Requirements/Mitigation Measures
Mitigation Implementation/Monitoring
When
Required  Implementation   Monitoring/
Inspection
and retaining walls). The consultant shall verify that their recommendations, including those regarding the need for further evaluation for potential liquefaction and the
presence and lateral extent of any undocumented fill as well as laboratory testing for corrosive soil, have been properly conducted and any necessary design measures
are incorporated into the construction plans. The results of the plan review shall be summarized by the geotechnical consultant in a letter and submitted to the city engineer prior to issuance of building permits for the project.
(B)    The project geotechnical consultant shall inspect, test (as needed), and approve all geotechnical aspects of project construction. The inspections shall include, but not
necessarily be limited to: site preparation and grading, site surface and subsurface drainage improvements, and
excavations for foundations and retaining walls prior to the placement of steel and concrete. The results of these inspections and the as‐built conditions of the project shall be summarized by the project geotechnical consultant in a letter and submitted to the city building official/city engineer for review prior to final (as‐built) project
approval.

To further address and reduce impacts related to potential seismic activity and liquefaction, all grading, foundations, and structures for the proposed project would be required to be engineered and designed in conformance with applicable geotechnical and soil stability standards as required by the California Building Code (CBC), as adopted by the city.

FMC 18.218.050(f): Hazardous Materials. New development projects with the potential to create a significant hazard to the public or the environment through reasonably foreseeable upset and accident conditions involving the release of hazardous materials into the environment, if so determined by a site‐specific environmental site assessment prepared to the satisfaction of the fire marshal or planning manager, shall implement the following measures prior to or during project construction, as applicable:
(A)    A soil management plan (SMP) shall be developed to provide guidelines for the appropriate handling and
management of soil with known contaminants or
recognized environmental condition (REC) concentrations above the applicable screening levels recommended in the California Department of Toxic Substances Control (DTSC) Office of Human and Ecological Risk (HERO) guidance
document Human Health Risk Assessment or similar
document provided by DTSC.

Prior to issuance of building and/or grading permits for site development, remediation work to remove known contaminants or RECs at the subject property shall be implemented to the satisfaction of the Alameda County Water District (ACWD), city of Fremont fire department, California Department of Toxic Substance Control (DTSC), or other appropriate agency having jurisdiction, depending on the location (e.g., depth) and the type of REC found and the jurisdictional During
construction
Project Sponsor  City of Fremont
Building Division
Albrae Industrial Project – The Globe Planned District Addendum SDRMMRP  Page A‐6 Standard Development Requirements/Mitigation Measures
Mitigation Implementation/Monitoring
When
Required  Implementation   Monitoring/
Inspection
purview of the agencies. Completion of the remediation work and procurement of an appropriate closure document or written statement that the remediation work has been satisfactorily completed and without further conditions or obligations shall be submitted to the satisfaction of the city of Fremont community development department. Compliance with this mitigation may require the applicant or their agent to complete a preliminary endangerment report, voluntary cleanup agreement or other documentation as determined by the appropriate agency and receive concurrence that the site’s RECs have been resolved.

FMC 18.218.050(g): Noise.  To reduce the potential for noise impacts during construction, the following requirements shall be implemented:
(A)    Construction equipment shall be well‐maintained and used judiciously to be as quiet as practical.
(B)    Construction, excavating, grading, and filling activities (including the loading and unloading of materials, truck movements, and warming of equipment motors) shall be
limited as provided in Section 18.160.010.
(C)    All internal combustion engine‐driven equipment shall be equipped with mufflers, which are in good condition and appropriate for the equipment.
(D)    The contractor shall utilize “quiet” models of air compressors and other stationary noise sources where
technology exists.
(E)    Loading, staging areas, stationary noise generating equipment, etc., shall be located as far as feasible from sensitive receptors.
(F)    The contractor shall comply with Air Resource Board idling prohibitions of unnecessary idling of internal combustion engines.
(G)    Signs shall be posted at the construction site that include permitted construction days and hours, a day and evening contact number for the job site, and a contact number for the project sponsor in the event of noise complaints. The applicant shall designate an on‐site complaint and
enforcement manager to track and respond to noise
complaints.
(H)    Temporary noise barriers, such as solid plywood fences, shall be installed around construction sites adjacent to operational businesses, residences or noise‐sensitive land uses, unless an existing wall or other barrier provides equivalent noise attenuation. (Ord. 27‐2016 § 37, 12‐6‐16; Ord. 23‐2018 § 41, 10‐2‐18; Ord. 05‐2021 § 52, 4‐20‐21.) During
construction
Project Sponsor  City of Fremont
Building Division
MITIGATION MEASURE 3.1.2: Reduce Vehicle Trips. The following are feasible mitigation measures identified by the BAAQMD for commercial development:
• Provide transit facilities, e.g., bus bulbs/turnouts, benches, shelters, etc.
• Provide bicycle land and/or paths, connected to community‐wide Preliminary
approval prior
to
construction
permits
Project Sponsor  City of Fremont
Planning Division
Albrae Industrial Project – The Globe Planned District Addendum SDRMMRP  Page A‐7 Standard Development Requirements/Mitigation Measures
Mitigation Implementation/Monitoring
When
Required  Implementation   Monitoring/
Inspection
network.
• Provide sidewalks and/or paths, connected to adjacent land uses, transit stops, and/or community‐wide network.
• Provide secure and conveniently located bicycle storage. • Provide preferential parking for electric or alternatively‐fueled vehicles.
• Implement feasible TDM measures including a ride‐matching program, coordination with regional ridesharing organizations and provision of transit information.

MITIGATION MEASURE 3.2.2: Preparation and Implementation of an Emergency Action Plan. As a condition of Project Approval, the Project Applicant shall be required to develop and implement an Emergency Action Plan to be activated at the Project site in the event of an accidental release of hazardous substances at any facility near the Project site. Such a plan may identify measures to be taken to enable those at the Project site to “shelter in place” as necessary, and shall be approved by the Fremont Fire Department prior to the issuance of any Certificate of Occupancy at the Project site.

Prior to
issuance of
Certificate of
Occupancy for
any given
building
Project Sponsor  Fremont Fire
Department
MITIGATION MEASURE 3.2.3: Survey and Properly Handle Materials from Structures that May Contain Asbestos or Lead‐Based Paint.

Prior to demolition or renovation of structures built before 1978, a survey for the presence of asbestos‐containing materials (ACM) shall be conducted by Asbestos Hazard Emergency Response Act (AHERA)‐ certified personnel, trained according to state and federal regulations.

Structures shall also be surveyed for the presence of lead‐based paint.

If the results of the survey detect the presence of lead‐based paint, construction shall be performed in accordance with the Lead in Construction Standard (8 Cal. Code of regulations Section 5132.1).

ACM will be removed in accordance with the requirements of Cal OSHA (8 Cal. Code of regulations 5129) and the Bay Area Air Quality Management District (BAAQMD).

During
construction
Project Sponsor  City of Fremont