30 VI. PUBLIC WORKS
See Deposit provisions as described in Article II of this Schedule. Deposits are shown for convenience only, are not part of the fee schedule, and are subject to change.

A. Engineering (Res. 2014-17)

1. Subdivision Map, Plan Check, and Street
Construction Inspection Services and Grading Permit

FEE DEPOSIT
393.42000.3759(SSP) a. Parcel Map and Improvement Plan Checking Services Job Cost $5,000 393.42000.3759(SST) b. Final Tract Map and Improvement Plan Checking Services Job Cost $15,000 393.42000.3759(SSC) c. Construction Inspection Services Job Cost 3% of Imp. Cost (1) 1 Year Warranty Inspection Job Cost $1,000
393.42000.3759(AMC) d. Amended Map or Certificate of Correction Job Cost $200 393.42000.3757(GRA) e. Land Grading, Excavations, and Fills Plan Check Fee (1) Subdivision (Not required (included in subdivision plan check fee) (2) Non-subdivision, 0-1,000 cu. yards (PC approved) Job Cost $600 393.42000.3757(GRA) f. Grading Permit Fee
(1) Subdivision – Included in subdivision inspection fee (2) Non-subdivision (up to 1,000 CY) $534 + $42
for each 1,000 CY
or fraction thereof
(3) Grading conducted as Fee equal to 1/2 of above section supervised grading (for grading permit)
g. Special Fault Zone Construction/Study Reports
Fee pursuant to Alquist-Priolo Geologic Hazard Zones Act.

Noise attenuation, geologic and special studies.
393.42000.3757 (1) City fee, each $75
702.42000.2200 (2) City consultant fee Actual Cost
393.42000.3729 h. Over the Counter Plan Review
A fee equivalent to the individual labor rate of the Engineer Tech II classification per 15 minutes. (Base salary of each staff member performing work times the multiplier specified in the annual operating budget). Fee to be charged for each 15 minutes of Engineering Division design review approval/plan check over the counter. Fee not applied to projects submitted for formal planning or design review.

CY=cubic yards; SF=square feet; LF=linear feet

2. Improvement Cost Estimate Units Unit Price
Various a. Roadway
(1) Paving (thoroughfare) SF $4.50
(2) Paving (residential street) SF $3.00
(3) 6" Curb and Gutter LF $12.80
(4) 8" Curb and Gutter LF $11.00
(5) Sidewalks SF $2.75
(6) Driveways SF $3.25
(7) Public Monument each $300
(8) Private Monument each $100
(9) Fire Hydrant each $2,500
(10) Barricades LF $30
(11) Street Signs each $150
(12) Valley Gutter LF $12.80
(13) Electroliers
(14) Underground of Overhead Utilities
-Major Streets
each
LF
$1,900
$200
-Minor Streets LF $100
(15) Utility Trenching LF $20
(16) On-site Grading CY $3
(17) Import/Off Hall Grading CY $10
(18) Underground Conduit LF $5.25
(19) 12" AC Trench Fill LF $16
b.
(20) Wheelchair Ramp
Storm Drainage
each
Units
$500
Unit Price
EXHIBIT “A”

MASTER FEE SCHEDULE UPDATE

PUBLIC WORKS DEPARTMENT
Proposed Changes in Pink
31 (1) 12" R.C.P. LF $30
(2) 15" R.C.P. LF $35
(3) 18" R.C.P. LF $40
(4) 21" R.C.P. LF $45
(5) 24" R.C.P. LF $50
(6) 27" R.C.P. LF $55
(7) 30" R.C.P. LF $60
(8) 33" R.C.P. LF $65
(9) 36" R.C.P. LF $70
(10) 39" R.C.P. LF $75
(11) 42" R.C.P. LF $80
(12) 48" R.C.P. LF $85
(13) 54" R.C.P. LF $100
(14) 60" R.C.P. LF $110
(15) Manholes Standard Size each $2,200
(16) Curb Inlet each $1,500
(17) 6' Chain Link Fence LF $10
(18) A.C.F.C. Manholes (Large Size) each $5,000
(19) Field Inlets each $800
(20) Enter Existing MH
c. Sanitary Sewers
(1) Sanitary Manholes
each
Units
each
$300
Unit Price
$2,200
(2) Sanitary Risers each $700
(3) V.C.P. 4" (house sewers) each $700
(4) V.C.P. 6" LF $30
(5) V.C.P. 8" LF $35
(6) V.C.P. 10" LF $40
(7) V.C.P. 12" LF $45
(8) V.C.P. 15"
d. Water System
(1) Water Service 1" w/meter
LF
Units
each
$55
Unit Price
$1,700
(2) A.C. 6" LF $25
(3) A.C. 8" LF $40
(4) A.C. 12" LF $55
(5) Blow-Off Valve each $800
(6) 6" Street Pipe LF $100
(7) Air Relief Valve
e. Miscellaneous
(1) Irrigation & Landscaping
each
Units
SF
$600
Unit Price
$3
(2) Masonry Wall 6' LF $56
(3) Masonry Wall 8' LF $61
(4) Masonry Wall 10' LF $72
(5) Masonry Wall 12'
f. Park Improvements
(1) PUD Improvements
LF
Units
acre
$80
Unit Price
$10,600
(2) PUD Pedway/Trailways acre $23,600
(3) Landscaping of miscellaneous
planter pockets and thorough-
SF $1
fare backup area
g. Engineering, Escalation, Project Size, and Contingency Factors Percentage factors for Engineering, Escalation, Project Size, and Contingency established by the Public Works Director will be included in all "improvement" cost estimates. The percentage factors shall be based on reasonable Engineering fees, the term of the contract, the project size, and the detail of the work that is known at the time the "improvement" cost estimate is made. 702.42000.2200 3. Security Instrument Evaluation by Outside Job Cost As negotiated, Legal Counsel Selected by City minimum of $200
Evaluation and approval of required security instruments offered as alternatives to surety bonds relating to subdivisions, street improvements and public works projects and other projects for which security is required.

4. Street Right-of-Way and Improvement Ordinance
393.42000.3799(SRW) a. Applications for formal estimate Job Cost 1% of Est. Imp.

Cost
393.42000.3799(SRV) b. Formal request for variance Job Cost $200 32 393.42000.3799(SRA) c. Appeal of Public Works Director's determination Job Cost $200 393.42000.3380(ENC) 5. Encroachment Permit Fee Schedule a. Curb, Gutter, Sidewalk, and Driveway
(1) Application Fee $150400
(2) Inspection Fee
(a) Curb and Gutter (minimum permit fee: $643)
≤60 LF min. charge $493820
>60 LF and up $493820 + $9.7711.14LF >60 LF
393.42000.3380(ENC) (b) Sidewalk (minimum permit fee: $590) ≤300 SF min. charge $440675
>300 SF and up $440675 + $2.202.50/SF >300 SF
393.42000.3380(ENC) (c) Driveway (minimum permit fee: $725) ≤60 SF $575915
>60 SF $575915 + $10.1211.50/SF of width >60 SF
(d) Planter Strip PCC Paving, All frontages $100
b. Paving (minimum permit fee: $1,007)
(1) Application Fee $150400
(2) Inspection Fee $8571,060
c. Excavations (minimum permit fee: $657)
Includes transverse and longitudinal trenches and other street excavation work including surface restorations.
(1) Application Fee $150400
(2) Inspection Fee
-Minor Permit (≤20 SF) $507625
-Major Permit (>20 SF) $1,0801,250
(3) Special Major Actual staff cost to inspect
d. Miscellaneous Structures (minimum permit fee: $470)
Includes manholes, storm water inlets, storm water outlets, electroliers, and underground vaults.
(1) Application Fee $150400/project
(2) Inspection Fee
(a) Small Structures (e.g., pull boxes, vaults, poles) $320385/structure (b) Manhole, street light, fire hydrant, electroliers $ 890960/structure (c) Miscellaneous structures Job cost Engineers Estimate (work requiring >20 days)
393.42000.3381 e. Transportation Permit (set by State)
(For transportation of overweight, overlength, overwide, and/or over- height vehicles or structures on City streets)
(1) Permit Fee $16*
(2) Annual Permit $90*/vehicle
*AB 1849 became effective July 1, 1990.

The bill limits local agency fees for transportation
permits to fees established by the
State Department of Transportation.
f. An alternate to a. through d. for utility work by utility companies is job cost
g. Storage of Materials in Right-of-Way Permit
Job Cost
(1) Application Fee $150
(2) Inspection Fee (≤2 days) $248
(3) Inspection Fee (>2 days) Job Cost
393.42000.3380(ENC) h. Underground Utility Exception
(1) Application Fee $150400
(2) Inspection Fee (minimum fee: $45) $15/pole
Authorized by City Engineer review
(1) Application Fee $150400
(2) Inspection Fee $404480
393.42000.3380(ENX) i. Additional or extra inspections required Job Cost $100 because permittee did not fully comply with
specific written instructions previously
communicated to him about the work.
393.42000.3380 (ECN) j. Street closure for “Block Party” $44 (one, 24-hour period)
393.42000.3380(ENC) k. Traffic Control
33 (1) Application Fee $262400
(2) Inspection Fee $240290
l. Dumpster/Drop Storage (minimum permit fee: $424)
(1) Application Fee $150400
(2) Inspection Fee $274430
m. Well Installation and Abandonment (minimum permit fee: $951) (1) Application Fee $150400
(2) Inspection Fee $801960
n. Access Over Public Right-of-Way (minimum permit fee: $309) (1) Application Fee $150400
(2) Inspection Fee $159290
o. Curb Painting (House Numbers) $50
393.42000.3703 6. Microfilming Street Improvement Plans, Parcel Map, and Subdivision Maps a. Tract or Parcel Map $25
(1) Per sheet to be filmed $2
b. Improvement Plans $25
(1) Per sheet to be filmed $2
001.42005.3767(NSF) 7. Nonessential Sign Installation Fee $100/installation 001.00000.3390 8. Interstate Truck Terminal Permit $400 Investigation and Permit Fee
001.00000.3390 9. Interstate Truck Terminal Trailblazer Sign $85/installation 393.42000.3758 10. Pole License Application Fee- effective January 2023 $437.09 3% annual escalation beginning January 2021 (Res. 2020-04, 1/14/2020) B. Parks FEE DEPOSIT
702.42000.2209 1. Street Tree Planting Program
a. Street tree, staking, ties, amendments, labor
and equipment $75
b. Administration and inspection $10
TOTAL PER TREE $85

2. On-Site Landscape Plan Checking and Inspection
393.42000.3769(LPM/LPS) a. Multi-Family Development, and/or Single Job Cost $5/DU Family (Townhouse/Condominium)
393.42000.3769(LPC) b. Commercial, industrial developments Job Cost $200 393.42000.3769(LPR) c. Reinspection Fee (incomplete work, Job Cost $100 phasing work, etc.)
C. Maintenance FEE DEPOSIT
001.42004.3767 1. Callout Charge (Admin. Costs)
For making emergency and property damage repairs, $200, plus cleanup of streets, and barricading hazardous individual labor conditions resulting from construction, rates and materials farming or other activities
001. 2. Temporary Barricades/Stop Signs
42005.3767 a. Per barricade/stop sign per day Rates based on most recent (24 hour period or fraction thereof) Caltrans “Labor Surcharge and Equipment Rental Rates”
publication.
http://www.dot.ca.gov/hq/construc/equipmnt.html
b. Charge for barricades/stop sign Replacement Cost
stolen, lost or damaged per
001.42005.3767
barricade/stop sign

3. Individual Labor Rates Salary+benefits+overhead
001.42005.3767 4. Equipment Rental Rates
(excluding driver)
Backhoe Rates based on most recent
Chain saw Caltrans “Labor Surcharge
Compressor and Equipment Rental Rates”
Dump truck publication.

Fork Lift http://www.dot.ca.gov/hq/construc/equipmnt.html Grader
Haz-Mat trailer
High ranger
34 Hydro jet rodder
Limb chipper
Loader - 1 yd. bucket
Loader - 3 yd. bucket
One ton truck
Overshot loader
Patch truck
Pickup truck/sedan
Roller
Spreader box
Stumper
Sweeper
Tractor D-4
Tractor w/loader
Trailer
Water Pump 3"
Water truck/VAC ALL
Welder
001.42005.3767 5. Materials - City Furnished Replacement Cost 001.42005.5134 Neighborhood Crime Watch Signs Replacement Cost, plus City “C” type pole (if needed), and materials individual labor rates 001.42005.3767 6. Contractor Services and Equipment Cost+20% adm. Fee*