Resolution 2024-XX Page 1 of 4
RESOLUTION NO. 2024-XX
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
FREMONT ADOPTING A LIST OF PROJECTS FOR FISCAL
YEAR 2024 -25 FUNDED BY SENATE BILL 1: THE ROAD
REPAIR AND ACCOUNTABILITY ACT OF 2017 __________
WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017 (Chapter 5, Statutes of 2017), California Streets and Highways Code Section 2030 et seq., was passed by the Legislature and signed into law by the Governor in April 2017 to address the significant multi-modal transportation funding shortfalls statewide; and
WHEREAS, SB 1 includes accountability and transparency provisions that will ensure the residents of the City of Fremont are aware of the projects proposed for funding in our community and which projects have been completed each fiscal year; and
WHEREAS, the City of Fremont must adopt by resolution a list of projects proposed to receive fiscal year funding from the Road Maintenance and Rehabilitation Account (RMRA), created by SB 1, which must include a description and the location of each proposed project, a proposed schedule for the project’s completion, and the estimated useful life of the improvement; and
WHEREAS, the City of Fremont will receive an estimated $5.9 million in RMRA funding in Fiscal Year 2024-25 from SB 1; and
WHEREAS, this is the eighth year in which the City of Fremont is receiving SB 1 funding which will enable the City of Fremont to continue essential road maintenance and rehabilitation projects, safety improvements, repairing and replacing aging bridges, and increasing access and mobility options for the traveling public that would not have otherwise been possible without SB 1 funding; and
WHEREAS, the City of Fremont has undergone a robust public process to ensure public input into our community’s transportation priorities/the project list; and
WHEREAS, the City of Fremont used a Pavement Management System to develop the SB 1 project list to ensure revenues are being used on the most high-priority and cost-effective projects that also meet the community’s priorities for transportation investment; and
Resolution 2024-XX Page 2 of 4
WHEREAS, the funding from SB 1 will help the City of Fremont maintain and rehabilitate 14 segments of streets throughout the City of Fremont this year and similar projects into the future; and
WHEREAS, the 2023 California Statewide Local Streets and Roads Needs Assessment found that the City of Fremont’s streets and roads are in a “good” condition, and this revenue will help increase the overall quality of our road system and the maintenance of our streets and roads over the next decade; and
WHEREAS, implementation of the SB 1 project list and overall investment in our local streets and roads infrastructure with a focus on basic maintenance and safety, investing in complete streets infrastructure, and using cutting-edge technology, materials and practices, will have significant positive co-benefits statewide.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF FREMONT RESOLVES AS FOLLOWS:
SECTION 1. The foregoing recitals are true and correct.
SECTION 2. The following previously proposed and adopted projects may also utilize Fiscal Year 2024-25 Road Maintenance and Rehabilitation Account revenues in their delivery. With the relisting of these projects in the adopted fiscal year resolution, the City of Fremont is reaffirming to the public and the State our intent to fund these projects with Road Maintenance and Rehabilitation Account revenues:
Project Location and Description
Estimated
Useful Life
Anticipated
Construction
Date
Pavement Rehabilitation (PWC 8234-X)
Project Locations:
1. Fremont Boulevard (northbound) – Ferry Lane
to Darwin Dr
2. Paseo Padre Parkway – Country Drive to
Walnut Avenue
3. Stevenson Boulevard – Sundale Drive to
Fremont Boulevard
4. Fremont Boulevard Frontage – Eugene Street
to Copeland Lane
5. Olive Avenue – Schofield Drive to 300’ east of
Schofield Drive
10-15 years Summer to Winter
2025
Resolution 2024-XX Page 3 of 4
Project Location and Description
Estimated
Useful Life
Anticipated
Construction
Date
6. Washington Boulevard – Weigand Court to
Paseo Padre Parkway
7. Blacow Road – Osgood Road to 300’ west of
Osgood Road
8. South Grimmer Boulevard – Business Center
Drive to Fremont Boulevard
9. Auto Mall Parkway – Fremont Boulevard to
Osgood Road
10. Mission Boulevard (southbound) – Grimmer
Boulevard to Paseo Padre Parkway
11. Warm Springs Boulevard – Brown Road to
Mission Boulevard
12. Albrae Street – Stewart Avenue to 1000’ east
of Christy Street
13. Boscell Road – Stewart Avenue to Auto Mall
Parkway
14. Lakeview Boulevard – Gateway Boulevard to
Fremont Boulevard
Project Description: Perform pavement
rehabilitation treatments consisting of localized base
repairs or overlays to 14 street segments consisting of 8 centerline miles of roadway and covering 1.7 million
square feet of pavement surface.
Project Location and Description Estimated
Useful Life
Anticipated
Construction
Date
Paseo Padre Parkway Safety Improvements (PWC
9092)
Project Location: Paseo Padre between Dorne Place
and Olive Avenue
Project Description: Provide intersection safety
improvements at Covington Drive and Olive Avenue
that include pedestrian and bicycle safety elements
and landscape features.
20-30 years 2026
(SB1 funds to be
used to partially
fund construction
during the FY
2024-25)
Resolution 2024-XX Page 4 of 4
ADOPTED_______________, 2024 by the City Council of the City of Fremont by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
_________________________________
Mayor
ATTEST:
__________________________________
City Clerk
APPROVED AS TO FORM:
_________________________________
City Attorney