COUNCIL STAFF REPORT (ID # 5573) DOC ID: 5573
Updated: 11/13/2025 5:44 AM by Dina Lewis Page 1
PEDESTRIAN CROSSING ENHANCEMENT PROJECT - Approval of Plans and Specifications and Award of Construction Contract to Sposeto Engineering Inc. in the Amount of $2,016,139 (including 10% Contingency) for the 2024 Pedestrian Crossing Enhancement Project (PWC 9078); Appropriation Actions; and Make Findings of CEQA Exemption
Contact Persons:
Name: Anthony Villanueva Hans Larsen
Title: Transportation Engineer I Public Works Director
Div/Dept: Public Works Public Works
Phone: 510-494-4778 510-494-4722
E-Mail: [email protected] [email protected]
Executive Summary: The purpose of this report is to initiate the construction of pedestrian crossing safety improvements at eight locations along Fremont Boulevard and Paseo Padre Parkway in support of Fremont’s Active Transportation Plan.
BACKGROUND: As part of the City’s traffic safety program, improving uncontrolled pedestrian crossings has been identified as a priority. Over the past ten years, approximately 35 crosswalk locations on major streets in Fremont have been improved using flashing beacons or signals. When activated, flashing beacons are highly effective at prompting drivers to yield to pedestrians. In May 2025, the City Council adopted the Active Transportation Plan (ATP) which included a five-year work plan that continues to prioritize pedestrian crossing enhancements along active transportation priority corridors, around schools, and connecting neighborhood walking destinations.
City staff has secured two State grants with a combined funding amount of $2.1 million to install pedestrian crosswalk flashing beacons at eight new locations: along Fremont Boulevard, specifically at Clough Avenue, Papazian Way, Adams Avenue, Michael Avenue, Crestwood Street, and Doane Street intersections; and along Paseo Padre Parkway at Dorne Place and at Mento Drive.
Key enhancement features identified for the proposed project include pedestrian actuated rapid-flashing beacons, high visibility crosswalks, ADA compliant curb ramps, concrete refuge median island, new connector sidewalks, and existing sidewalk repair near the crossings. These improvements are designed to improve visibility between drivers and crossing pedestrians, increase driver awareness to crossing pedestrians, and improve general accessibility for pedestrians at the crossing locations.
Construction of the project is planned to start in early 2026 and with completion in summer 2026.
DISCUSSION/ANALYSIS: Project design was started in 2024 and completed in September 2025. Bids for this project were opened on October 21, 2025. The bidders with their respective bid amounts are shown below. The Engineer’s Estimate is $2,500,000.00.
Council Staff Report (ID # 5573) Meeting of November 18, 2025 Updated: 11/13/2025 5:44 AM by Dina Lewis Page 2
Bidder Bid Amount
1. Sposeto Engineering Inc. $1,832,854.20*
2. FBD Vanguard Construction Inc. $1,923,768.20
3. Terocons Inc. $2,085,000.00
4. Redgwick Construction $2,207,512.00
5. Zara Construction Inc. $2,289,251.00**
6. Ray’s Electric $2,347,051.00**
7. S&H Construction Inc. $2,368,600.00
* Low bidder
**Mathematically corrected
The low bidder, Sposeto Engineering Inc., submitted a responsive bid and all documents are in order. The contractor is a responsible bidder experienced in this type of work and has satisfactorily completed similar types of bicycle and pedestrian facility improvements in the cities of Berkeley, San Leandro, Hayward, as well as a previous pedestrian crossing enhancement project in the City of Fremont.
Project Costs and Funding:
A summary of project costs and identified fund sources are as follows:
Estimated Project Costs:
Construction Contract Cost (Lowest Responsible Bid) $ 1,832,854 Construction Contract Contingency (10%) $ 183,285
Construction Inspection, Surveying and Administration (15%) $ 275,000
Total Estimated Project Construction Costs
$2,291,139
Source of Funding:
Currently Budgeted
PWC9078 – Fund 521 – Transportation Development Act (TDA) $ 405,771 PWC9078 – Fund 525 – Highway Safety Improvement Program (HSIP) 1,468,440
Proposed Additional Funding
PWC7953 – Fund 531 – Traffic Impact Fee $ 275,000
PWC8541 – Fund 519 – 2012 Measure B Bike/Pedestrian 18,641 PWC8884 – Fund 519 – 2012 Measure B Bike/Pedestrian 1,250 PWC8944 – Fund 520 – Measure BB Bike/Pedestrian 127,000
Total Funding Available
$2,296,102
FISCAL IMPACT: Additional funding is needed for the award of this contract. The project construction contract will be primarily funded by State grants (HSIP and TDA) and County Measure B and BB sales tax funds dedicated to improving bicycle and pedestrian facilities [administered by the Alameda County Transportation Commission (ACTC)]. Reallocation of funds is required to support project HSIP grant matching requirements, and for City staff time to provide construction inspection, construction management, and construction contract administration services for the project. Staff recommends reallocation of funds to Council Staff Report (ID # 5573) Meeting of November 18, 2025 Updated: 11/13/2025 5:44 AM by Dina Lewis Page 3
include reallocating $275,000 in Fund 531 from Traffic Improvement Program (PWC7953) to support City staff time, and a total of $146,891 of County Measure B and BB sales tax funds as noted above to provide for grant matching requirements.
With the recommended additional reallocation of funds to the project, there will be sufficient funds available for the estimated project cost.
ENVIRONMENTAL REVIEW: This project is categorically exempt from California Environmental Quality Act (CEQA) review pursuant to Section 21080.25 of the California Public Resources Code as a sustainable transportation project that implements pedestrian and bicycle facilities and improves multimodal safety and access for current and potential transit riders and is further exempt pursuant to CEQA Guidelines Section 15301 as the repair, maintenance or minor alteration of existing facilities involving no or negligible expansion of use beyond that presently existing.
ATTACHMENTS: None.
LINKS:
Project Plans:
https://www.fremont.gov/home/showdocument?id=19233&t=638977623025656246
Project Specifications:
https://www.fremont.gov/home/showdocument?id=19231&t=638977622972181070
RECOMMENDATION: Approval of the following actions related to the 2024 Pedestrian Crossing Enhancement Project (PWC9078):
1. Approve the plans and specifications for the project.
2. Accept the bid and award the construction contract to the lowest responsive and responsible bidder, Sposeto Engineering Inc., in the amount of $1,832,854.20, allocate a 10% contingency in the amount of $183,285 for a total construction contract amount of $2,016,139, and authorize the City Manager, or designee, to execute the contract.
3. Receive and appropriate $1,468,440 in HSIP grant funds to PWC9078-525.
4. Reallocate $275,000 from PWC7953-531 to PWC9078-531.
5. Reallocate $18,640.76 from PWC8541-519 to PWC9078-519.
6. Reallocate $1,250 from PWC8884-519 to PWC9078-519.
7. Reallocate $127,000 from PWC8944-520 to PWC9078-520.
8. Find that this project is exempt from California Environmental Quality Act (CEQA) review pursuant to Section 21080.25 of the California Public Resources Code as a sustainable transportation project that implements pedestrian and bicycle facilities and improves multimodal safety and access for current and potential transit riders and is further exempt pursuant to CEQA Guidelines Section 15301 as the repair, maintenance or minor alteration of existing facilities involving no or negligible expansion of use beyond that presently existing.