Cities Index.
Exhibit H - Dmitry Grudsky

Fremont City Council
September 1, 2026

Document
Exhibit H - Dmitry Grudsky
Meeting
September 1, 2026
Body
Fremont City Council
Original file
981 KB
Text extracted from the city's file for reading and search. Open the original on fremontcityca.iqm2.com. That file is the official record.

Dmitry Grudsky
In my preliminary design proposal, I am offering a color code for each stair flight. It will be determined by the dominant color in the wing wall mosaic design. The same color will cover the front of each wing wall. I am submitting twelve designs for the wing walls inside the stair flights. There is also a sample design for the outside surface of the wing walls. It consists of a lettering presenting the name of a particular native California flower.

Attached area a few samples of my local exterior mosaics.

A full portfolio of my public art projects is available on request.

Proposed Art for Wing Walls

Project Proposal Budget
Cover up 12 Wing Walls with tile mosaic.

Budget - $73.000,00

1 - Wing Wall budget
$6.083,00
$1.000,00 - graphic design
$1.500,00 – schematic drawing
$1.583,00 - tile layout
$1.000,00 - tile blocks preparation
$583,00 - tile installation

Materials
$2.000,00 - 540sq’ Nova Glaized Porcelain tile
$250.00 - Sanded grout
$350.00 - Grout sealer
Work Examples

← All documents from this meeting