Type of
Change
Fee
Change Current Annual Annual Change Comments
SOLID WASTE RATES**
Fee Description & Unit/Time Current Proposed Amnd
Container Exchange for New 64 gallon container 64.89 72.49 554 563 Increase 7.60 41,000.00 15,500.00 Container Exchange for New 96 gallon container 70.28 82.71 554 563 Increase 12.43 45,600.00 18,800.00
ENGINEERING, INSPECTION, AND STREET WORK
Fee Description & Unit/Time Current Proposed Amnd
Community Facilities Districts
Community Facility District No. 11 4,500.00 5,400.00 528 563 Increase 900.00 90,000.00 20,000.00 Annexation Processing Fee
ENGINEERING, INSPECTION, AND STREET WORK
Fee Description & Unit/Time Current Proposed Amnd
Lot Line Adjustment
Application 1,094.41^ 563 0.00 0.00
^ Adjusted on July 1 annually, beginning July 1, 2021 based on the 12 month percentage change in the U.S. Bureau of Labor Statistics Consumer Price Index (CPI) (Urban Wage Earners and Clerical Workers for the San Francisco-Oakland-Hayward area), for the most current month that data is available.
ENGINEERING, INSPECTION, AND STREET WORK
Fee Description & Unit/Time Current Amnd
Voluntary Parcel Merger 625.90^ 563 Move 0.00 0.00
^ Adjusted on July 1 annually, beginning July 1, 2021 based on the 12 month percentage change in the U.S. Bureau of Labor Statistics Consumer Price Index (CPI) (Urban Wage Earners and Clerical Workers for the San Francisco-Oakland-Hayward area), for the most current month that data is available.
NEW CONSTRUCTION, COMMERCIAL TENANT IMPROVEMENTS, RESIDENTIAL ADDITIONS Proposed • All Mechanical, Plumbing, Electrical and Energy Plan Check Items associated with the New Construction projects are included in the square foot base Plan Check and Inspection Fees of the Project Text Clarification.
MISCELLANEOUS ITEMS, including RESIDENTIAL REMODELS & MINOR ALTERATIONS Proposed • All Mechanical, Plumbing, Electrical and Energy Plan Check Items associated with these Construction projects are included in the square foot base Plan Check and Inspection Fees of the Project Text Clarification.
MISCELLANEOUS ITEMS, including RESIDENTIAL REMODELS & MINOR ALTERATIONS REMODELS & MINOR ALTERATIONS are listed in the following table. Proposed Note: Also see Planning and Development Section of Fire Department Fees for Fire Related Plan Check and Permit/Inspection Fees
Fee Description & Unit/Time
Plan
Check
Fee $^
Inspect
Fee $^ Amnd
Fence or Wall (wood, chain link, wrought iron)
>6 feet in height, 1st 100 lf 197.85 147.86
Each additional 100 lf 0.00 147.86 24.99 Decrease (122.87) Fence or Freestanding Wall (masonry / garden)
City Standard, 1st 100 l.f. 141.62 271.78 160.36 Decrease (111.42) FY 2023 Proposed Master Fee Schedule Updates - Summary
Exhibit
"A" Page
Redline Changes
01 DPU
Charged to customers requesting "new" carts to replace fully operational carts for aesthetic purposes only. Based on cost for cart, driver, clerical, overhead and vehicle maintenance. 05 Planning
02 PW Increase based on adjusted processing timelines.
03 PW Move Moved from Planning & Development. See Exhibit "A" page 20. 04 PW Moved from Planning and Development. See Exhibit "A" page
19.Move
Correcting fee calculations from 2019 fee study. Time
allotments in study were entered in reverse order on
spreadsheet and should be adjusted.
06 Planning
07 Planning
Type of
Change
Fee
Change Current Annual Annual Change Comments
FY 2023 Proposed Master Fee Schedule Updates - Summary
Exhibit
"A" Page
Redline Changes
01 DPU
Each additional 100 lf 0.00 210.34 24.99 Decrease (185.35) Engineered Wall, 1st 100 lf 197.85 221.80 271.78 Increase 49.98 Each additional 100 lf 0.00 86.43 210.34 Increase 123.91 Grading (Cut and Fill) - Plan Check + As-Grade
0-100 Cubic Yards (Cut or Fill - whichever is greater) 546.68 N/A New Hourly 101-1,000 CY 660.19 N/A New Hourly
1,001-10,000 CY 801.80 N/A New Hourly
10,001 CY and over 971.53 N/A New Hourly
MISCELLANEOUS ITEMS, including RESIDENTIAL REMODELS & MINOR ALTERATIONS REMODELS & MINOR ALTERATIONS are listed in the following table. Proposed Note: Also see Planning and Development Section of Fire Department Fees for Fire Related Plan Check and Permit/Inspection Fees
Fee Description & Unit/Time continued
Plan
Check
Fee $^
Inspect
Fee $^ Amnd
Retaining Wall (concrete or masonry)
First 50 lf 197.85 160.36 221.80 Increase 61.44
Each additional 50 lf 0.00 24.99 86.43 Increase 61.44
Signs
with electric 93.72 150.99 111.42 Increase 57.27
without electric 150.99 93.72 73.93 Decrease (57.27)
MECHANICAL PLUMBING AND ELECTRICAL - STAND ALONE PROJECTS Proposed
• At the discretion of the Development Director/Designee, fee rates may be adjusted, when special circumstances are found to exist, to reflect the actual cost of processing. • For all building services not listed in the building sections or for services determined by the City Building Official to be beyond the regular effort established in this fee schedule, a $123.91^ blended hourly rate applies.
Plan Check & Inspection/Permit Fees for MECHANICAL, PLUMBING AND ELECTRICAL Stand Alone Projects are listed in the following table
Note: Also see Planning and Development Section of Fire Department Fees for Fire Related Plan Check and Permit/Inspection Fees
Fee Description & Unit/Time
Plan Check
Fee $ ^
PlanCheck
Inspect Fee $
^ Amnd
Text Correction.
MECHANICAL PLUMBING AND ELECTRICAL - STAND ALONE PROJECTS Plan Check & Inspection/Permit Fees for MECHANICAL, PLUMBING AND ELECTRICAL Stand Alone Projects are listed in the following table Proposed Note: Also see Planning and Development Section of Fire Department Fees for Fire Related Plan Check and Permit/Inspection Fees
Fee Description & Unit/Time
Plan Check
Fee $^
PlanCheck
Inspect Fee $
^ Amnd
Text Correction
560 563
Residential Photovotaic Systems - each - 92.68 Delete Previously replaced legacy fee. See Exhibit "A" page 7.
Correcting fee calculations from 2019 fee study. Time
allotments in study were entered in reverse order on
spreadsheet and should be adjusted.
Adds inspection fees. 15 to 25% of the 250 As-Grade Plan Reviews are not accurately draw/detail constructed onsite conditons. City goes out as needed to inspect and verify. 08 Planning
Correcting fee calculations from 2019 fee study. Time
allotments in study were entered in reverse order on
spreadsheet and should be adjusted.
Fee positions were swapped in 2019 fee study.
hourly rate
(page 75)
07 Planning
09 Planning
10 Planning
Type of
Change
Fee
Change Current Annual Annual Change Comments
FY 2023 Proposed Master Fee Schedule Updates - Summary
Exhibit
"A" Page
Redline Changes
01 DPU
MECHANICAL PLUMBING AND ELECTRICAL - STAND ALONE PROJECTS Plan Check & Inspection/Permit Fees for MECHANICAL, PLUMBING AND ELECTRICAL Stand Alone Projects are listed in the following table Proposed Note: Also see Planning and Development Section of Fire Department Fees for Fire Related Plan Check and Permit/Inspection Fees
Fee Description & Unit/Time
Plan Check
Fee $^
PlanCheck
Inspect Fee $
^ Amnd
Text Correction.
11 Planning
Type of
Change
Fee
Change Current Annual Annual Change Comments
FY 2023 Proposed Master Fee Schedule Updates - Summary
Exhibit
"A" Page
Redline Changes
01 DPU
MECHANICAL PLUMBING AND ELECTRICAL - STAND ALONE PROJECTS Plan Check & Inspection/Permit Fees for MECHANICAL, PLUMBING AND ELECTRICAL Stand Alone Projects are listed in the following table Proposed Note: Also see Planning and Development Section of Fire Department Fees for Fire Related Plan Check and Permit/Inspection Fees
Fee Description & Unit/Time
Plan Check
Fee $^
PlanCheck
Inspect Fee $
^ Amnd
560 563 Text Clarification.
Onsite Water 6" 4" & Over (per lineal ft) 1.65 Text Correction.
Proposed
•
Text Clarification / correction.
•
Increase 7.72 Missed in FY 2022 update. This correction makes the fee uniform with other instances in the MFS.
LAND USE, ZONING, AND LAND DIVISION
Fee Description & Unit/Time Current Proposed Amnd
Moderate Revised exhibit / per request (no routing or limited routing 553.97^ 563 for unsubstantial changes to Fire or DPW only required) Moderate RE includes: Reapplication fee for subsequent
owners, Fences on a single-family reversed corner lot,
Larg-family day-care home (FMC 12-306-N-42) Plus hourly Text consulting fee as required (all amendments) 1 hour minimum* Minor Revised exhibit / hourly rate 168.00 194.72^ 563 Increase 26.72 12 Planning
COMPLEX MECHANICAL & ONSITE PLUMBING STAND-ALONE PERMITS Based on hourly rate which was updated in FY 2022. Fee will now match other areas of the MFS.
13 Planning
LAND USE, ZONING, AND SUBDIVISION
Fee reductions noted with "**" are available for encouragement of "inner city" projects in the area described below (indicated by "IC", "IC-H", "IC-P" and “IC-HT” in "Acct" column) (314th and 330th Amendment, 12/06/94 and 11/29/96, respectively). Exception: Inner City fee reductions shall not apply to any Alcoholic Beverage Conditional Use Permit (ABCUP) or to applications where uses would contain 3 or more pool tables and or billiard tables (327th Amendment, Resolution No. 96-100, 05/07/96).
For all Planning and Land Section Services not listed in the Land Use and Zoning, and Subdividion sections or for services determined by the Director to be beyond the regular effort established in this fee schedule, a $187.00 194.72^ blended hourly rate applies.
14 Planning
No longer required.
Type of
Change
Fee
Change Current Annual Annual Change Comments
FY 2023 Proposed Master Fee Schedule Updates - Summary
Exhibit
"A" Page
Redline Changes
01 DPU
LAND USE AND ZONING
Fee Description & Unit/Time Current Proposed Amnd
Development Permit (DP) 11,011.77**^ 560
NOTE: Site Plan Review Fees shown with asterisks (**) will be reduced by 50 percent for inner-City areas.
Fire Prevention fee / per application 247.00
Police Site Plan review / per application (exclude senior 210.00 409 citizen functions)
Traffic Engineering review / per application 525
Level 1 31.00
Level 2 275.00
Level 3 518.00
Level 4 1036.00
Amendment to approved DP 560 563
NOTE: Fees shown with asterisks (**) will be reduced by 50 percent for inner-City areas.
Amendment 6,991.30^
Major Revised exhibit / per request (routing required) 2,757.37** ^ Moderate Revised exhibit / per request (no routing or limited 553.97** ^ routing for unsubstantial changes to Fire or DPW only required) plus hourly consulting fee as required (all Amendments) 1 hour minimum* Minor Revised exhibit / hourly rate 174.94 194.72^ Increase 19.78 Rear yard encroachment 194.72^ 560
Deviation Application ** 560 563 Text Clarification - indicating inner-City area discount. 15 Planning
Relocated
from
another
Planning
MFS
section.
See
Exhibit
"A" page
25. Relocated from another Planning & Development MFS section.
See Exhibit "A" page 18.
Based on hourly rate which was updated in FY 2022. Fee will now match other areas of the MFS.
Type of
Change
Fee
Change Current Annual Annual Change Comments
FY 2023 Proposed Master Fee Schedule Updates - Summary
Exhibit
"A" Page
Redline Changes
01 DPU
LAND USE AND ZONING
Fee Description & Unit/Time Current Proposed Amnd
Encroachment 560 563
Rear yard encroachment See Site Plan Development Permit Review Fees Text Updated language.
Environmental Assessment Fee (all private and non-entitlement public projects) 560 563 NOTE: Environmental Assessment fees
shown with asterisks (**) will bereduced by 50 percent Text Correction. for the inner-City areas.
Categorical Exemption / per application 583.13**^ 563 Text Correction.
Application/Filing Fees (on Fining of Conformity Negative Declarations, 563 Text Correction.
Mitigating Negative Declaration)
County lerk Clerk filing fee/application + filing fees. 50.00 464 563 Text Correction.
LAND USE AND ZONING
Fee Description & Unit/Time Current Proposed Amnd
NOTE: Rezone fees shown with asterisks(**) 563
will be reduces reduced by 50 percent for the inner-city areas. Text Correction. 16 Planning
17 Planning
Type of
Change
Fee
Change Current Annual Annual Change Comments
FY 2023 Proposed Master Fee Schedule Updates - Summary
Exhibit
"A" Page
Redline Changes
01 DPU
LAND USE AND ZONING
Fee Description & Unit/Time Current Proposed Amnd
Development Permit (DP) 11,011.77**^ 560
NOTE: Site Plan Review Fees shown with asterisks (**) will be reduced by 50 percent for inner-City areas.
Fire Prevention fee / per application 247.00
Police Site Plan review / per application (exclude senior 210.00 409 citizen functions)
Traffic Engineering review / per application 525
Level 1 31.00
Level 2 275.00
Level 3 518.00
Level 4 1036.00
Amendment to approved DP 560
NOTE: Fees shown with asterisks (**) will be reduced by 50 percent for inner-City areas.
Amendment 6,991.30^
Major Revised exhibit / per request (routing required) 2,757.37** ^ Moderate Revised exhibit / per request (no routing or limited 553.97** ^ routing for unsubstantial changes to Fire or DPW only required) plus hourly consulting fee as required (all Amendments) 1 hour minimum* Minor Revised exhibit / hourly rate 174.94^
Rear yard encroachment 194.72^ 560
LAND USE AND ZONING
Fee Description & Unit/Time Current Proposed Amnd
Corrected Exhibits (all SPRs) after first two 679.97^ 560 563 Text Updated as this applies to all exhibits.
Voluntary Parcel Merger 652.90^ 560 Move Moved to PW. See Exhibit "A" page 4.
SUBDIVISION
Fee Description & Unit/Time Current Proposed Amnd
Lot Line Adjustment - 560
Application 1,094.41^
20 Planning Move Moved to PW. See Exhibit "A" page 3.
18 Planning
Move Relocated within Planning & Development MFS. See Exhibit "A" page 15
19 Planning