Fee Description & Unit/Time Current Proposed Amnd
Commercial Service Franchised Effective 12/05/2011 510
Commercial Recycling & Green Waste Service Franchised Effective 12/05/2011 510 Roll Off Service Franchised Effective 10/31/2011 510
Multi-Family Service Franchised Effective 12/05/11 510
Commercial/Multi-Family Recycling Service Franchised Effective 12/05/11 510 SOLID WASTE, NON-BIN/COLLECTION SERVICES* 483
Single-family Residential
Basic service / per month
One 96-gallon container one day per week 25.37
Additional automated containers (12-month minimum) after first 96-gallon container:
64-gallon container / per month 7.43
96-gallon container / per month 10.25
96-gallon green waste container / per month 3.87
96-gallon recycling container / per month 3.74
Alternative service / per month
One 64-gallon container one day per week 19.20
Senior Citizen (62 years or older) meeting all the conditions listed 483 below / per month:
1 Service must be in name of senior citizen;
2 Occupants of residence must be senior citizen or
dependants of senior citizen;
3 Benefitting senior citizen must meet California Public Utilities Commission poverty level guidelines;
4 Benefitting senior citizen must notify the City when they no longer qualify.
Basic service / per month
One 96-gallon container one day per week 21.81
One 64-gallon container one day per week 16.51
Container Exchange 35.28 554
Container Exchange for New 64 gallon container 64.89
72.49 554 563
Container Exchange for New 96 gallon container 70.28 82.71 554 563 * Fee changes effective 09/01/09
** Rates shall be adjusted annually by staff during the budget process to reflect the rates in effect as per Reso. No. 2007-79
PUBLIC UTILITIES DEPARTMENT
All fees effective 07/01/2021 7/01/2022 unless otherwise noted MFS Amendment #560 #563 [10/28/20219:27 AM]
CITY OF FRESNO
MASTER FEE SCHEDULE
ENGINEERING, INSPECTION, AND STREET WORK
Fee Description & Unit/Time Current Proposed Amnd
Assessment Districts
City Attorney Review
Review and/or preparation of documents regarding Billable, or hourl y district formation and issuance of bonds; review and/or plus fringe, plus actual preparation of documents regarding district administration, direct costs (per hour, close out and legal research. (Costs for Assessment 1-hour minimum) Foreclosure proceedings are not included and will be
charged separately).
Deposits in advance would include requirement for fees paid up 100% of Estimated Cost front by Development–Security/Retainer, etc.
Finance Bond fee 1/4 of 1% of bonds sold
or $5,000, whichever is
greate
r
Application fee 10,000.00
Assessment District Apportionments
4 or less parcels 950.00
5 or more parcels 1,950.00
Assessment payoff quotation / per request 5.00
Assessment District Proceedings, All Districts All costs determined by Public Works
Director per district
Community Facilities Districts
Community Facility District No. 9
Annexation Processing Fee 3,600.00 528
Community Facility District No. 11 4,500.00 5,400.00 528 563 Annexation Processing Fee
Community Facility Maintenance Districts
Formation Processing Fee 7,500.00 528
*City Administration Only
Bond Performance 393
Performance bond for street work permit
Excavation and work in connection with sidewalks,
curbs, gutters, and driveway approaches
Minimum bond 25,000.00
Other excavation and work not in connection with
sidewalks, curbs, gutters, and driveway approaches
Minimum bond 25,000.00
PUBLIC WORKS DEPARTMENT
All fees effective 07/01/2021 07/01/2022 unless otherwise noted MFS Amendment #560 #563 [10/28/20219:31 AM
CITY OF FRESNO
MASTER FEE SCHEDULE
ENGINEERING, INSPECTION, AND STREET WORK
Fee Description & Unit/Time Current Proposed Amnd
Inspection, Street Work - continued
Manholes, drain inlets / each 104.00
Sewer mains (includes inspection of house-branch and trench 7.48 surface) / per linear foot
Sidewalks / per linear foo
t 0.69
Sidewalks, special (brick, etc.) / per square foot 0.93 Streetlights / each 88.00
Street, paved / per square foo
t 0.07
Traffic Control Field Inspection (based on 0.50 hr per inspection) 37.00 464 Water mains / per linear foot 7.48
Option based on construction cost of $10,000 or more See Inspection, Subdivision Legal Notices Posted by City
Minimum 30.00
Lot Line Adjustment
Application 1,094.41^ 563
Miscellaneous 409
Special Callout Service (Hourly overtime rate of assigned staff) 2 hour minium 103.00/min.
Special Project Evaluation*
2 hour minium 144.00/min.
Log in and distribution fee (fixed) 5.00
Special Research Request per hour plus copies 25.00 +
8 ½ x 11 per document copy 0.50
8 ½ x 14 per document copy 0.75
11 x 17 per document copy 0.75
Plotted document including maps and aerial photos per copy 2.50 Special Service Study Request per hour/2 hour minium 184.00/ min.
Equipment usage per hour 25.00
If 24 hour traffic count then fixed rate per unit used 150.00 Requests for services before 7am or after 5pm, or Saturday and 125.00 w/3 hr min Sunday
Monument Check
Lot 30.00
Minimum 200.00
* (Estimate will be provided to applicant upon submittal) ^ Adjusted on July 1 annually, beginning July 1, 2021 based on the 12 month percentage change in the U.S. Bureau of Labor Statistics Consumer Price Index (CPI) (Urban Wage Earners and Clerical Workers for the San Francisco-Oakland-Hayward area), for the most current month that data is available.
PUBLIC WORKS DEPARTMENT
All fees effective 07/01/2021 07/01/2022 unless otherwise noted MFS Amendment #560 #563 [10/28/20219:31 AM
CITY OF FRESNO
MASTER FEE SCHEDULE
ENGINEERING, INSPECTION, AND STREET WORK
Fee Description & Unit/Time Current Proposed Amnd
Street Work Inspection -- Public Utilities - continued
Each additional 100 linear feet or fraction +55.00
Rocksaw (includes backfill and paving)
100 linear feet or fraction 63.00
Television Inspection/Sewer
Viewing, Color
Per linear foot 0.85
Standby, Color
15-minute period or fraction 35.00
Traffic Signal Flash Request Fee 554
Flash activation and signal restore - Special Events* 287.16 Flash activation and signal restore 450.00
Traffic Study Review Fee 554
Level 1 - Qualitative analysis (i.e., trip generation comparison) 220.00 Level 2 - Quantitative analysis of up to 5 locations (intersections 525.00 and / or segments)
Level 3 - Quantitative analysis of more than 5 locations 780.00 (intersections and / or segments)
Level 4 - Traffic Study included as part of an Environmental Impact 1,055.00 Report (EIR) and EIR Transportation Chapter
Urban Growth Management (UGM) Fees See Development
Department–UGM Fees
Vacation -- Public street, alley, easement, and other public rights-of-way 456 Application/feasibility study / per application 450.00
Processing and legal noticing / per application 1,555.00 Agreement / each 310.00
Fire Department surcharge / per application 23.00
Verification of facilities, existing zoning, flood prone areas, and 205.00 similar development and record inquiries re-submission / per response
Voluntary Parcel Merger 625.90^ 563
* Special Events as specified in Resolution 2018-147 adopted by council June 21, 2018. ^ Adjusted on July 1 annually, beginning July 1, 2021 based on the 12 month percentage change in the U.S. Bureau of Labor Statistics Consumer Price Index (CPI) (Urban Wage Earners and Clerical Workers for the San Francisco-Oakland-Hayward area), for the most current month that data is available.
PUBLIC WORKS DEPARTMENT
All fees effective 07/01/2021 07/01/2022 unless otherwise noted MFS Amendment #560 #563 [10/28/20219:31 AM