Draft Report
Fire Development Impact Fee
Program Nexus Study Update—
2022

Prepared for:

City of Fresno

Prepared by:

Economic & Planning Systems, Inc. (EPS)

June 2022

EPS #212007

Table of Contents
Executive Summary ...................................................................... 1 Overview ........................................................................................... 1 Background ....................................................................................... 1 Purpose ............................................................................................. 2 Proposed Update to the Fire Fees .......................................................... 3 Report Organization ............................................................................ 3 Service Population and Employees and Development Assumptions ....... 7 Existing and Future Population and Employment ...................................... 7 Development Assumptions ................................................................. 10 Capital Improvement Program ....................................................... 13 Overview ......................................................................................... 13 Fire CIP and Nexus Study Capital Improvement Plan .............................. 13 Cost Allocation ............................................................................ 22 Introduction ..................................................................................... 22 FFD Capital Costs Allocation ............................................................... 22 Administration .................................................................................. 25 Implementation ........................................................................... 26 Applicability of Fee Program ............................................................... 26 Fee Exemptions ................................................................................ 27 Fee Credits or Adjustments ................................................................ 27 Reimbursement to Developers ............................................................ 28 Periodic Inflation Adjustment and Fee Review ....................................... 28 Fee Administration ............................................................................ 29 Five-Year Review .............................................................................. 29 AB 1600 Nexus Findings ............................................................... 30 Authority ......................................................................................... 30 Summary of Nexus Findings ............................................................... 30 AB 602 Requirements ........................................................................ 32

Appendices
Appendix A: Population and Employment Backup
Appendix B: Land Acquisition and Facilities Construction Costs Appendix C: Fire Facilities and Apparatus Bond Financing Appendix D: Fresno Fire Department Service Call Activity Appendix E: Capital Improvement Plan
List of Tables and Map
Table 1. Summary of Proposed Fire Fees ........................................................ 4 Table 2. Comparison of Existing and Proposed Fire Fees ................................... 5 Table 3. Summary of Growth Projections ........................................................ 8 Table 4. Detailed Population and Employment Projections ............................... 11 Table 5. Key Demographic Assumptions ....................................................... 12 Table 6. Summary of Fire Capital Improvement Program ................................ 15 Table 7. Existing Fire Facilities .................................................................... 17 Table 8. Existing Fire Apparatus and Equipment ............................................ 18 Table 9. Planned Fire Facilities .................................................................... 20 Table 10. Planned Fire Apparatus and Equipment .......................................... 21 Table 11. Fire Improvements Cost per Resident/Employee .............................. 23 Table 12. Fire Improvements Cost Allocation ................................................ 24

Map 1. Fresno Planning Area ........................................................................ 9

Report: Fire Development Impact Fee Program Nexus Study Update—2022 June 2022
Economic & Planning Systems, Inc. (EPS) 1
Executive Summary
Overview
The City of Fresno (City) retained Economic & Planning Systems, Inc. (EPS) to prepare this 2022 Fire Development Impact Fee Program Nexus Study Update (2022 Nexus Study). The City implemented the Fire Development Impact Fee Program (Fire Fee Program) in 2005 and recently updated it in 2016 and 2019.

EPS prepared the required Fire Development Impact Fee Nexus Studies (2016 Nexus Study and 2019 Nexus Study) for both recent updates. This 2022 Nexus Study provides an update to the existing Fire Facilities Development Impact Fees (Fire Fees) and establishes the legally required findings necessary to implement the updated Fire Fees.

Background
In December 2014, the City adopted a new General Plan that establishes growth projections through the General Plan Horizon year of 2035, as well as through buildout of the General Plan. The General Plan also includes policies and implementation actions for police and fire protection services. The 2016 Nexus Study was prepared to update the Fire Fee Program to reflect the development projections and public service policies laid out in the General Plan, as well as the associated updated Fresno Fire Department (FFD) Capital Improvement Plan (CIP) that outlined the planned capital costs for the FFD through 2035.

After approval of the 2016 Nexus Study, the City reviewed the Fire CIP costs used to derive the Fire Fees in that study and found that the fire station construction cost estimates were substantially lower than recent bids for similar facilities.

In addition, to facilitate the timely construction of fire stations to serve new development, the City determined that additional bond funding would be needed over the level included in the 2016 Study. Consequently, the 2019 Nexus Study was prepared as an interim update to the Fire Fee Program to reflect increased facility construction costs and bond financing costs and to ensure that Fire Fees were set at levels that would provide adequate revenue for the City to construct stations when needed to serve new development.

After reviewing the 2019 Nexus Study and evaluating the amount of fees collected under the original fee, the City determined that the Fire Fees should be updated.

This 2022 Nexus Study serves as the basis for updating the existing Fire Fees to reflect updated population and employment projections through 2035 and

Report: Fire Development Impact Fee Program Nexus Study Update—2022 June 2022
2 Economic & Planning Systems, Inc. (EPS)
updated fire facilities and equipment costs to be funded by the Fire Fees, while still reflecting the 2014 General Plan policies and standards. This report details the calculation of the new fees and provides the legal justification for updating the fees.

Purpose
The purpose of this 2022 Nexus Study is to update the Fire Fees and establish the legally required nexus (or reasonable relationship) between the City’s projected population and employment (service population) in 2035 and the fire facilities that will be required to serve those residents and employees.

The nexus requirements for imposing development impact fees were established under Assembly Bill 1600 (AB 1600) legislation, as codified by the Mitigation Fee Act (California Government Code section 66000 et. seq.). This section of the Mitigation Fee Act sets forth the procedural requirements for establishing and collecting development impact fees. These procedures require that “a reasonable relationship, or nexus, must exist between a governmental exaction and the purpose of the condition.”
Specifically, each local agency imposing a fee must perform the following tasks:
 Identify the purpose of the fee.
 Identify how the fee is to be used.
 Determine how a reasonable relationship exists between the fee’s use and the type of development project on which the fee is imposed.  Determine how a reasonable relationship exists between the need for the public facility and the type of development project on which the fee is imposed.
 Demonstrate a reasonable relationship between the amount of the fee and the cost of the public facilities or portion of the public facilities attributable to development on which the fee is imposed.

Further, Assembly Bill 602 was passed and signed by the Governor in 2021 detailing additional requirements required for nexus studies. Specifically, Government Code Section 66016.5 was added that establishes “standards and practices” for a local agency that conducts and impact fee nexus study. This nexus study includes requisite information to comply with the provisions of Government Code Section 66016.5.

Report: Fire Development Impact Fee Program Nexus Study Update—2022 June 2022
Economic & Planning Systems, Inc. (EPS) 3
Proposed Update to the Fire Fees
The proposed update to the Fire Fees is based on the allocation of the updated Fire CIP costs to the projected City population and employment in the General Plan Horizon year of 2035. The CIP costs include both the value of existing facilities and the estimated costs of new facilities. The total facilities costs are allocated to the total projected residents and employees in 2035. This cost allocation serves as the basis for updating the estimated Fire Fees charged to new development. The Fire Fee to be collected for each residential and commercial land use is calculated based on each land use’s relative demand for fire services.

The Fire Fees will not fund construction of capital facility improvements required to cure existing level-of-service deficiencies.

Table 1 summarizes the proposed fees by land use. The fees are collected per dwelling unit for residential uses and per 1,000 building square feet for nonresidential uses. The fees include a base amount and a 2 percent administrative component for the City to administer the fee program.

Table 2 compares the existing and proposed Fire Fees. The proposed Fire Fees reflect increases for the residential land uses and decreases for the commercial land uses. The overall cost per persons served (residents and employees) increased modestly by under 5 percent. However, there was a cost shift from commercial to residential uses because of updated persons per household factors and annual residential calls for service per dwelling unit used to calculate the Fire Fees. Each of these factors increased as compared to earlier estimates. These assumptions will be detailed in later chapters of this report.

Report Organization
This report is divided into 6 chapters and 5 appendices:
 Chapter 1 is this introduction and executive summary.  Chapter 2 details the estimated population and employment projections.  Chapter 3 describes the FFD CIP, capital needs, and costs to be funded by the Fire Fee Program.
 Chapter 4 provides the cost allocation methodology and calculates the Fire Fees.
 Chapter 5 describes how the Fire Fee Program will be implemented and updated.
 Chapter 6 provides the nexus findings for the Fire Fee Program.

DRAFT
Table 1
Fresno Fire Impact Fee Program Update
Summary of Proposed Fire Fees
Item Base Fee
Admin. Total

2.0%
Source Table 12
Residential
Single-Family $2,240 $45 $2,285
Multifamily $1,709 $34 $1,743
Nonresidential
Retail $590 $12 $602
Office $675 $13 $688
Industrial $337 $7 $344

summ_fee
Source: City of Fresno and EPS
per dwelling unit
per 1,000 bldg. sq. ft.

Fire Fee
Prepared by EPS 3/31/2022 Z:\Shared\Projects\SAC\212000\212007 Fresno Nexus Studies\Task 2 Fire and Police\Models\212007 Fire m8.xlsx 4 DRAFT
Table 2
Fresno Fire Impact Fee Program Update
Comparison of Existing and Proposed Fire Fees
Proposed
Fee [1]
Existing
Fee [1] Difference
Percentage
Difference
Residential
Single-Family $2,285 $2,061 $224 11%
Multifamily $1,743 $1,556 $187 12%
Nonresidential
Retail $602 $721 ($119) (17%)
Office $688 $824 ($136) (17%)
Industrial $344 $413 ($69) (17%)
fee comp
Source: City of Fresno and EPS
[1] Includes 2% administration fee.
per 1,000 bldg. sq. ft.
per dwelling unit
Prepared by EPS 3/31/2022 Z:\Shared\Projects\SAC\212000\212007 Fresno Nexus Studies\Task 2 Fire and Police\Models\212007 Fire m8.xlsx 5 Report: Fire Development Impact Fee Program Nexus Study Update—2022 June 2022
6 Economic & Planning Systems, Inc. (EPS)
 Appendix A includes population and employment backup calculations.  Appendix B includes backup for land acquisition and facilities construction costs.
 Appendix C details the estimated financing costs for fire facilities construction.
 Appendix D contains the detailed FFD service call activity data.  Appendix E is the CIP.

Report: Fire Development Impact Fee Program Nexus Study Update—2022 June 2022
Economic & Planning Systems, Inc. (EPS) 7
Service Population and Employees and
Development Assumptions
Population and employment projections are a significant variable used in this 2022 Nexus Study Update. The base Fire Fees are established by allocating the costs of the facilities and equipment needed to serve the City in 2035 to the total projected residents and employees in 2035, estimating cost factors per resident and per employee, and then using these factors to estimate fees to charge to new development.

This chapter presents population and employment estimates for 2021 and 2035, as well as population and employment density factors used to establish the fees for the various land uses.

Existing and Future Population and
Employment
Table 3 summarizes the population and employment estimates for 2021 and 2035 and estimates the growth between 2021 and 2035. The FFD serves the incorporated City and unincorporated areas fully enclosed in the City, which are referred to as “County Islands.”
Projected growth in the FFD service area through 2035 will occur in the following three areas:

1. Existing incorporated areas.

2. County Islands.

3. Unincorporated areas located beyond the City limits in the Sphere of Influence (SOI).

Map 1 is from the current Fresno General Plan and shows the entire Fresno Planning Area, including the City, County Island, and SOI boundaries. A key growth assumption in this report is that all development that occurs in unincorporated areas within the boundaries of the Fresno SOI but beyond the City limits will annex into the City by 2035. It is assumed that the County Islands will not incorporate, but the FFD will continue to serve these areas. In 2035, the FFD is projected to serve approximately 771,000 residents and 277,000 employees.

DRAFT
Table 3
Fresno Fire Impact Fee Program Update
Summary of Growth Projections (2021-2035) [1]
Item
Fresno
SOI
Fire
Service Area
[2] [3]
Population
Existing (2021) 593,980 586,770
Projected (2035) [4] 771,000 771,000
Projected Growth 177,020 184,230
Employment
Existing (2021) 222,230 219,509
Projected (2035) [4] 276,529 276,529
Projected Growth 54,299 57,020
lu sum
Source: City of Fresno and EPS
[1] See Table 4 for detail.
[2] Fresno SOI includes incorporated City, County Islands, and other unincorporated areas outside the City boundaries.
[3] Fire Service Area includes incorporated City and County Islands. [4] It is assumed that unincorporated areas except County Islands will incorporate by 2035.

Prepared by EPS 3/31/2022 Z:\Shared\Projects\SAC\212000\212007 Fresno Nexus Studies\Task 2 Fire and Police\Models\212007 Fire m8.xlsx 8 Downtown Planning Area
BRT Corridors Outside
Downtown Planning Area
Established Neighborhoods
South of Shaw
Established Neighborhoods
North of Shaw
South Industrial Area
Established Neighborhoods
DA-1 North
DA-1 South
DA-2 North
DA-2 South
DA-3 Southeast
DA-4 East

DA-4 West
Development Areas
180
41 99
168
180
99 41
Figure I-3:

Residential Capacity
Allocation
0 2 4
MILES
11/2
Planning Area Boundary
Sphere of Influence
City Limits
Railroad lines
Airports
DA-1
North
DA-4
West
DA-1
South
DA-3
DA-4
East
DA-2
South
DA-2
North
South Industrial
Downtown
Established Neighborhoods
South of Shaw
Established
Neighborhoods
South of Shaw
Established Neighborhoods
North of Shaw
Source: City of Fresno
San J o a q uin Riv e r
Note: The Corridor along Shaw
Avenue is to be supported by
enhanced bus service.

SHAW AVE SHAW AVE

HERNDON AVE HERNDON AVE

BLACKSTONE AVE

WILLOW AVE

ASHLAN AVE

SHIELDS AVE

MCKINLEY AVE

CEDAR AVE

SHIELDS AVESHIELDS AVE

MCKINLEY AVE

KINGS CANYON RD

HIGHLAND AVEKINGS CANYON RD

OLIVE AVE OLIVE AVE

BUTLER AVE

JENSEN AVE

NORTH AVENORTH AVE

JENSEN AVE

KEARNEY BLVD

BELMONT AVE BELMONT AVE

BULLARD AVE

NEES AVE

SHEPHERD AVE

GRANTLAND AVE

GARFIELD AVE

BLYTHE AVE
BLYTHE
AVE

BRAWLEY
AVE

MARKS AVE

CLINTON AVE

BRAWLEY AVE
POLK
AVE

MARKS AVE

WEST AVE PALM AVE

WEBER AVE

GOLDEN STATE BLVD

FRESNO ST
WALNUT
AVE

FIG AVE CENTRAL AVE

AMERICAN AVE
PEACH
AVE

CEDAR AVE

CHESTNUT AVE

CHESTNUT
AVE

CLOVIS AVE
CLOVIS
AVE

FOWLER AVE

TEMPERANCE AVE

JENSEN AVETEMPERANCE
AVE

FIRST ST

FIRST ST

BLACKSTONE AVE

FRESNO ST

GOLDEN STATE BLVD
H ST

VAN NESS AVE

BARSTOW AVE
FRIANT
RD

CALIFORNIA AVE

FRUIT AVE

DE WOLFE AVE

COPPER AVE

FT WASHINGTON RD

FIRST ST

ASHLAN AVE
FOWLER
AVE

MAROA AVE

CHURCH AVE

ANNADALE

ELM AVE

CHERRY AVEEAST AVE

ORANGE AVE

MAPLE AVE WILLOW AVE
FRUIT
AVE
WEST
AVE

HUGHES AVE

CLINTON AVE CLINTON AVE

DAKOTA AVE

VAN NESS AVE

ALLUVIAL AVE

BEHYMER AVE

PERRIN AVE

TEAGUE AVE

GETTYSBURG AVEGETTYSBURG AVE

VETERANS

AUDUBON DR
BRYAN
AVE

HAYES AVE

CORNELIA AVE

VALENTINE AVE

CHESTNUT
AVE

TULARE AVE

MCKINLEY AVE

BULLARD AVE

WHITESBRIDGE AVE

MAPLE AVE
Fresno Yosemite
International
Airport
California
State University
Fresno
Fresno-Clovis
Regional Wastewater
Reclamation Facility (RWRF)

FIGARDEN
DR
Map 1
Fresno Planning Area
9 Report: Fire Development Impact Fee Program Nexus Study Update—2022 June 2022
10 Economic & Planning Systems, Inc. (EPS)
Table 4 provides the details of the estimated 2021 and projected 2035 population and employment for the fire service area. This table includes a detailed accounting of the sources of the population and employment data, which are summarized below:
 Map Atlas Fresno Existing Conditions Report (August 2011).  Population data from the California Department of Finance (DOF).  Employ
ment data from the California Employment Development Department (EDD).
 Emp
loyment data from the US Census Bureau.
 City General Plan.
 2016 Nexus Study.

Note that the government and education employment estimates are deducted from the total employment estimates because public uses will not pay development impact fees. See Appendix A for details on City employment estimates.

Development Assumptions
The Fire Fee is assessed on several subcategories of new residential and nonresidential development. The fee rates are established by allocating costs to residents and employees, establishing a cost per resident and a cost per employee, and then using density factors to convert those costs to fees per dwelling unit or 1,000 nonresidential building square feet.

Table 5 shows the population and employment density assumptions used to establish the proposed Fire Fee for each residential and nonresidential development category. For the residential land uses, persons-per-household factors are used in the fee calculations. For the nonresidential land uses, building- square-feet-per-employee factors are used in the fee calculations. The calculation of the persons-per-household factors is detailed in Appendix A.

DRAFT
Table 4
Fresno Fire Impact Fee Program Update
Detailed Population and Employment Projections (2021-2035) Item Existing 2035 Growth Existing 2035 Growth
Population
Incorporated City 546,770 731,000 184,230 546,770 731,000 184,230 County "Islands" Located In City 40,000 40,000 0 40,000 40,000 0 Other Unincorporated Areas Outside City 7,210 0 (7,210) 0 0 0 TOTAL 593,980 771,000 177,020 586,770 771,000 184,230
Employment
Incorporated City 251,705 321,242 69,537 251,705 321,242 69,537 County "Islands" Located In City 15,988 15,988 0 15,988 15,988 0 Other Unincorporated Areas Outside City 3,319 0 (3,319) 0 0 0 Subtotal 271,012 337,230 66,218 267,693 337,230 69,537
Less: Government and Education (approx. 18%) (48,782) (60,701) (11 ,919) (48,185) (60,701) (12,516) TOTAL 222,230 276,529 54,299 219,509 276,529 57,021
lu
Sources of Data:

Population
City Existing Population: California Department of Finance (1/1/21) 2035 Projected Population: Fresno General Plan (12/18/14). Assumes General Plan projection excludes County Islands.

County Islands Existing Population: Map Atlas Fresno Existing Conditions Report (August 2011) Other Unincorporated Areas Outside City Population: 2016 Fire and Police Nexus Study.

Employment
Existing
City: based on US Census Bureau and California EDD data: See Table A-2.

County Islands: assumed employment same as in 2016 Nexus Study.

Other Unincorporated Areas Outside City Existing Employment: same ratio of employment to population as for City.

Growth
City: Fresno General Plan (108,000: 50,000 retail, 32,500 office, 25,500: other) - growth from 2014-2021 + growth from unincorporated areas incorporating.

See Table A-2 for total employment growth from 2014-2021 in Fresno SOI. 2035
City: Existing plus growth employment.

Government and Education Employment (existing, growth, and 2035) estimated as follows:
1) County education and government employees as percent of total County employment from EDD (Sep. 2021) 2) Percent from previous step multiplied by total employment Assumes that County Islands will not annex by 2035 and that all other unincorporated areas will annex by 2035.

Fresno SOI Fire Service Area
Prepared by EPS 3/31/2022 Z:\Shared\Projects\SAC\212000\212007 Fresno Nexus Studies\Task 2 Fire and Police\Models\212007 Fire m8.xlsx 11 DRAFT
Table 5
Fresno Fire Impact Fee Program Update
Key Demographic Assumptions
Item Land Use Factor
Persons per Household
Single-Family 3.33
Multifamily 2.54
Building Square Feet per Employee
Retail 400
Office 350
Industrial 700
assump
Sources:

PPH: US Census American Community Survey 2015-2019
See Table A-1.

Bldg. Sq. Ft. per Emp.: 2016 Fresno Fire and Police Nexus Studies Prepared by EPS 3/31/2022 Z:\Shared\Projects\SAC\212000\212007 Fresno Nexus Studies\Task 2 Fire and Police\Models\212007 Fire m8.xlsx 12 Report: Fire Development Impact Fee Program Nexus Study Update—2022 June 2022
Economic & Planning Systems, Inc. (EPS) 13
Capital Improvement Program
Overview
The City provides fire services through an existing system of stations, vehicles, and equipment. Anticipated citywide development occurring through 2035 requires construction of new stations and procurement of additional vehicles and equipment so that the FFD can continue to provide timely responses to calls for medical, fire, and other emergencies. Planned facility needs are determined by the FFD based on response time requirements. The City General Plan includes an urban growth standard that requires new development to be located within a four- minute response service area of a fire station. This chapter details the costs of all existing and planned improvements included in the Fire CIP provided by the FFD.

Replacement costs are estimated for existing facilities, vehicles, and equipment.

Some of the existing improvements were funded through bond financing, and the associated remaining financing costs are included in the existing improvements cost estimates.

The FFD provided inventories of planned facilities, vehicles, and equipment needed to serve development through 2035, and cost estimates were developed for all improvements. It is assumed that all future fire stations, other facilities, and vehicles will be partially funded through bond financing. The associated financing costs are estimated and included in the planned improvements cost estimates to be included in the Fire Fee Program.

All costs in this 2022 Nexus Study Update are expressed in 2022 dollars and are based on the best available cost estimates at this time. If costs change significantly, or if other funding sources become available, the cost estimates and fees will be adjusted accordingly. The City periodically will conduct a review of improvement costs and will make necessary adjustments to the fee.

Fire CIP and Nexus Study Capital
Improvement Plan
The newly enacted AB 602 added California Government Code Section 66016.5 that requires “Large jurisdictions (as defined in Section 66016.5) shall adopt a capital improvement plan as part of the nexus study.”
Appendix E includes the capital improvement plan that is being adopted by the City with this nexus study. This section, as well as the information in Appendices C and E describes the approximate location, size, time of availability and estimated cost of all facilities or improvements to be funded with the Fire Report: Fire Development Impact Fee Program Nexus Study Update—2022 June 2022
14 Economic & Planning Systems, Inc. (EPS)
Fees. Table E-1 identifies the planned size, location and estimated cost of proposed fire station facilities. Fire apparatus and equipment identified in Table E-2 would be acquired as needed when stations are constructed, and as new firefighters and personnel are added, for which the equipment is identified.

To derive estimated bond financing costs, the City provided estimates on the timing of future facilities. As shown on Table C-5, the City estimates every three years that one new facility, facility expansion and replacement station would be constructed.

Summary
Table 6 summarizes the existing and planned Fire CIP improvements and associated costs. The total cost estimate of $583.9 million includes approximately $206.7 million for existing improvements and $377.2 million for future improvements. These costs include the costs of existing and planned facilities, apparatus, and equipment, as well as the associated financing costs for bond- funded facilities and apparatus. The financing costs for both existing and future bond debt service are detailed in Appendix C and summarized below.

In 2017, the City issued $32.1 million in bonds to refund 2009 bonds for existing police and fire improvements, with $15.5 million for fire facilities and the remainder for police facilities. Fire Fee Program revenues will be used to pay for 49 percent of the associated debt service, and the City General Fund will be used to pay for the remaining 51 percent. This percentage split is based on a deficiency analysis conducted as part of the 2005 Fire & Police Facilities Impact Fees Nexus Study. Consistent with this percentage split, the City provided a debt service schedule for 49 percent, or approximately $7.6 million, of the existing fire facilities bonds. The remaining financing costs for this existing debt service are included in the Fire Fee Program costs.

For all future facility construction and apparatus, it is assumed that 70 percent of the costs will be bond-funded and that all of the associated financing costs will be funded by the Fire Fees. The bond funded construction costs include site improvement and parking, building construction, and soft costs. Future facility land acquisition costs are not assumed to be bond funded.

DRAFT
Table 6
Fresno Fire Impact Fee Program Update
Summary of Fire Capital Improvement Program (2022 $)
Item Source Fire Facilities
Existing Improvements
Facilities
Table 7 $168,843,930
Apparatus and Equipment Table 8 $36,906,000
Financing Cost Table C-1 $940,000
Total $206,689,930
Planned Improvements
Facilities Table 9 $244,455,100
Apparatus and Equipment Table 10 $31,274,000
Financing Cost Table C-2 $101,500,000
Total $377,229,100
Total Improvements
Facilities $413,299,030
Apparatus and Equipment $68,180,000
Financing Cost $102,440,000
Total $583,919,030
sum cost
Source: Fresno Fire Department and EPS
Prepared by EPS 3/31/2022 Z:\Shared\Projects\SAC\212000\212007 Fresno Nexus Studies\Task 2 Fire and Police\Models\212007 Fire m8.xlsx 15 Report: Fire Development Impact Fee Program Nexus Study Update—2022 June 2022
16 Economic & Planning Systems, Inc. (EPS)
Existing Improvements
Facilities
Table 7 details the existing FFD facilities and associated costs. The FFD currently operates out of the headquarters facility, 20 existing fire stations, a maintenance facility, and a training facility. However, the maintenance (shop) facility, training facility, and three stations are planned for replacement with new buildings by 2035. The costs of these facilities slated for replacement are excluded from Table 7 because the estimated costs of the new replacement facilities are included in the total planned facilities cost. It is assumed that the existing facilities to be replaced will be sold and that the revenue generated will be used to offset the cost of existing deficiencies and to help fund the portion of facilities needed by the existing population.

The existing facility cost estimates include both land acquisition and construction costs. Backup for these costs is provided in Appendix B and is based on land and construction costs for recently acquired land and recently constructed stations, as well as estimates provided by the FFD. The land acquisition and construction cost assumptions used to estimate the replacement value of existing facilities are summarized below:
 Land acquisition cost: $210,000 per acre
 Site improvement and parking cost: $332,000 per acre.  Building construction cost: $736 per building square foot  Soft cost: 25 percent of the sum of site improvement, parking, and building construction costs.

Apparatus and Equipment
Table 8 details the existing FFD apparatus and equipment and associated costs.

As shown on this table, the FFD has several different types of vehicles, including fire engines, trucks and sports utility vehicles, water tenders, and other specialized vehicles. In addition, the FFD provides sets of personal protective equipment for all firefighters. The number of equipment sets shown on Table 8 is based on the number of FFD sworn officers in 2021. All unit costs in this table were provided by the FFD.

DRAFT
Table 7
Fresno Fire Impact Fee Program Update
Existing Fire Facilities (2022 $)
Item Location Acres
Cost
per Acre
Cost
per Acre Value Sq. Ft.

Cost per
Sq. Ft. [1] Value
Soft
Costs
Formula A B C=A*B D E=A*D F G H=F*G I=E+H J=I*25% K=I+J C+K Planned to Remain
Headquarters Tulare & H Street 2.43 $210,000 $510,300 $332,000 $806,760 22,000 $736 $16,192,000 $16,998,760 $4,249,690 $21,248,450 $21,758,750 Station 1 Jackson & Hammond 0.83 $210,000 $174,300 $332,000 $275,560 7,625 $736 $5,612,000 $5,887,560 $1,471,890 $7,359,450 $7,533,750 Station 2 West & Fir 0.44 $210,000 $92,400 $332,000 $146,080 5,700 $736 $4,195,200 $4,341,280 $1,085,320 $5,426,600 $5,519,000 Station 3 Fresno & E Street 0.34 $210,000 $71,400 $332,000 $112,880 12,550 $736 $9,236,800 $9,349,680 $2,337,420 $11,687,100 $11,758,500 Station 4 First & Tulare 0.47 $210,000 $98,700 $332,000 $156,040 14,360 $736 $10,568,960 $10,725,000 $2,681,250 $13,406,250 $13,504,950 Station 5 Fresno & Shields 0.61 $210,000 $128,100 $332,000 $202,520 5,280 $736 $3,886,080 $4,088,600 $1,022,150 $5,110,750 $5,238,850 Station 7 Cherry & Jensen 1.10 $210,000 $231,000 $332,000 $365,200 5,915 $736 $4,353,440 $4,718,640 $1,179,660 $5,898,300 $6,129,300 Station 8 Cedar & Butler 0.40 $210,000 $84,000 $332,000 $132,800 6,956 $736 $5,119,616 $5,252,416 $1,313,104 $6,565,520 $6,649,520 Station 9 Clinton & Fruit 0.73 $210,000 $153,300 $332,000 $242,360 7,625 $736 $5,612,000 $5,854,360 $1,463,590 $7,317,950 $7,471,250 Station 11 Fres no & Wrenwood 0.67 $210,000 $140,700 $332,000 $222,440 12,400 $736 $9,126,400 $9,348,840 $2,337,210 $11,686,050 $11,826,750 Station 13 Millbrook & Nees 0.70 $210,000 $147,000 $332,000 $232,400 7,300 $736 $5,372,800 $5,605,200 $1,401,300 $7,006,500 $7,153,500 Station 14 Polk & Escalon 0
.92 $210,000 $193,200 $332,000 $305,440 9,263 $736 $6,817,568 $7,123,008 $1,780,752 $8,903,760 $9,096,960 Station 15 Clovis & Park Cir Dr. 1.00 $210,000 $210,000 $332,000 $332,000 9,698 $736 $7,137,728 $7,469,728 $1,867,432 $9,337,160 $9,547,160 Station 16 Clin ton & Polk 0.92 $210,000 $193,200 $332,000 $305,440 9,698 $736 $7,137,728 $7,443,168 $1,860,792 $9,303,960 $9,497,160 Station 17 Maple & International 1.10 $210,000 $231,000 $332,000 $365,200 9,698 $736 $7,137,728 $7,502,928 $1,875,732 $9,378,660 $9,609,660 Station 18 Shaw & Bryan 1.94 $210,000 $407,400 $332,000 $644,080 10,678 $736 $7,859,008 $8,503,088 $2,125,772 $10,628,860 $11,036,260 Station 19 Belmont & Marks 0.83 $210,000 $174,300 $332,000 $275,560 9,698 $736 $7,137,728 $7,413,288 $1,853,322 $9,266,610 $9,440,910 Station 20 Gettys burg & Wishon 0.50 $210,000 $105,000 $332,000 $166,000 6,260 $736 $4,607,360 $4,773,360 $1,193,340 $5,966,700 $6,071,700 Total 13.50 $3,345,300 $5,288,760 172,704 $127,110,144 $132,398,904 $33,099,726 $165,498,630 $168,843,930 Planned to Be Replaced [2]
Shop Facility Fres no & E Street 1.04
Training Facility Fresno & E Street 0.70
Station 6 Gettysburg & Rowell 0.39
Station 10 Westover & Aircorp Way 1.00
Station 12 Mar ks & Acacia 0.34
Total 3.47 $0
TOTAL $168,843,930
CIP_fire1
Source: Fresno Fire Department
[1] Cost per building square foot based on costs for recently constructed public safety buildings and estimates from the FFD. See Table B-1. [2] These facilities are planned for replacement by 2035 with permanent buildings. Therefore, they are excluded from the list of existing facilities.

Subtotal
Structure
Value
TOTAL

REPLACEMENT
VALUE
Existing
Fire Facilities
Excluded [2]Excluded [2]
Site Imp. & Parking

LAND ACQUISITION CONSTRUCTION
Building Total
Structure
Value
Excluded [2]
Total Land
Value
Prepared by EPS 3/31/2022 Z:\Shared\Projects\SAC\212000\212007 Fresno Nexus Studies\Task 2 Fire and Police\Models\212007 Fire m8.xlsx 17 DRAFT
Table 8
Fresno Fire Impact Fee Program Update
Existing Fire Apparatus and Equipment (2022 $)
Item Number Replacement Cost
Engines [1] 20 $889,000 $17,780,000 FFD estimate in 2021 Fire Trucks [1] 5 $1,402,000 $7,010,000 FFD estimate in 2021 Squads [1] 0 $160,000 $0 FFD estimate in 2021
Patrol Rigs [2] 2 $345,000 $690,000 FFD estimate in 2021 Breathing Support Super Vac [2] 1 $265,000 $265,000 2019 Fire Impact Fee Nexus Study; escalated at 3% a year for 2 years.

Brush Rigs [2] 2 $371,000 $742,000 2019 Fire Impact Fee Nexus Study ; escalated at 3% a year for 2 years.

Decon Hazmat Trailer [2] 1 $945, 000 $945,000 FFD est imate in 2021 Water Tenders [3] 2 $451,000 $902,000 2019 Fire Impact Fee Nexus St udy; escalated at 3% a year for 2 years.

Super Vacs [2] 2 $557,000 $1,114,000 2019 Fire Impact Fee Nexus Stu dy; escalated at 3% a year for 2 years.

SUVs/Trucks [2] 15 $90,000 $1,350,000 FFD estimate in 2021 COMM/Command Unit [2] 1 $530,000 $530,000 2019 Fire Impact Fee Nexu s Study; escalated at 3% a year for 2 years.

Water Rescue Vehicle [3] 2 $100, 000 $200,000 FFD Draft Master Plan 2020-2035 (6/13/19): 2022$ Aircraft Rescue and Firefighting Vehicle [3] 2 $881,000 $1,762,000 FFD Draft Master Plan 2020-2035 (6/13/19): $935,000 in 2023 discounted by 3% annually for 1 year.

Universal Search and Rescue (USAR) Vehicle [3] 1 $840,000 $840,000 FFD Draft Master Plan 2020-2035 (6/13/19): $945,000 in 2025 discounted by 3% annually for 3 years.

Personal Equipment [4] 347 $8,000 $2,776,000 2019 Fire Impact Fee N exus Study; escalated at 3% a year for 2 years.

TOTAL $36,906,000
cip_fire2
Source: Fresno Fire Department; EPS.
[1] Number from 2021 Fresno Fire Department Response Maps [2] Number from 2019 Fire Impact Fee Nexus Study.
[3] Number from 2020 Fresno Fire Department Annual Report. [4] Number of personal equipment sets = number of sworn officers in 2021; provided by FFD.

Replacement
Cost per Unit
Existing Fire Apparatus and Equipment
Total
Cost
Prepared by EPS 3/31/2022 Z:\Shared\Projects\SAC\212000\212007 Fresno Nexus Studies\Task 2 Fire and Police\Models\212007 Fire m8.xlsx 18 Report: Fire Development Impact Fee Program Nexus Study Update—2022 June 2022
Economic & Planning Systems, Inc. (EPS) 19
Planned Improvements
Facilities
Table 9 details the future planned FFD facilities and associated costs needed to provide adequate service to the City’s residents and employees through the General Plan buildout horizon year of 2035. The planned facilities include eleven new fire stations, the replacement of three existing stations, the replacement of the shop and training facilities, and the expansion of seven existing fire stations.

The estimated facilities costs include both land acquisition and construction costs.

The land acquisition cost per acre and the site improvement and parking costs per acre are the same as those detailed above for existing facilities, with the exception that expanded facilities do not require land acquisition. The building construction cost estimates for new and replacement facilities are the same as those for existing facilities. For expanded facilities, a ten percent higher building construction cost of $810 per square foot is assumed.

Apparatus and Equipment
Table 10 details the additional FFD apparatus and equipment, and associated costs, needed to provide adequate service to the City’s residents and employees through the General Plan buildout horizon year of 2035. This planned apparatus and equipment include eleven fire engines, 6 fire trucks, 15 trucks and sports utility vehicles, several other specialized vehicles, and 278 personal equipment sets. The number of additional personal equipment sets needed is based on the General Plan standard of 0.81 firefighters per 1,000 residents. The planned apparatus and equipment unit costs were provided by the FFD.

DRAFT
Table 9
Fresno Fire Impact Fee Program Update
Planned Fire Facilities (2022 $)
Item Location
Improvement
Type Acres
Cost
per Acre
Total Land
Value
Cost
per Acre Value Sq. Ft.

Cost per
Sq. Ft. [1] Value
Soft
Costs
Formula A B C=A*B D E=A*D F G H=F*G I=E+H J=I*25% K=I+J C+K New, Replacement, and Expansion
Shop Facility Undetermined Replacement 5.00 $210,000 $1,050,000 $332,000 $1,660,000 40,000 $736 $29,440,000 $31,100,000 $7,775,000 $38,875,000 $39,925,000 Training Facility [1] Undetermined Replacement 25.00 $210,000 - - $4,636,872 - - $15,363,128 $20,000,000 $5,000,000 $25,000,000 $25,000,000 Station 2 West & Fir Expansion - $210,000 $0 $332,000 $0 3,450 $810 $2,794,500 $2,794,500 $698,625 $3,493,125 $3,493,125 Station 5 Fresno & Shields Expansion - $210,000 $0 $332,000 $0 3,450 $810 $2,794,500 $2,794,500 $698,625 $3,493,125 $3,493,125 Station 6 Gettysburg & Rowell Replacement 1.50 $210,000 $315,000 $332,000 $498,000 9,600 $736 $7,065,600 $7,563,600 $1,890,900 $9,454,500 $9,769,500 Station 7 Cherry & Jensen Expansion - $210,000 $0 $332,000 $0 4,000 $810 $3,240,000 $3,240,000 $810,000 $4,050,000 $4,050,000 Station 8 Cedar & Butler Expansion - $210,000 $0 $332,000 $0 4,000 $810 $3,240,000 $3,240,000 $810,000 $4,050,000 $4,050,000 Station 9 Clinton & Fruit Expansion - $210,000 $0 $332,000 $0 3,450 $810 $2,794,500 $2,794,500 $698,625 $3,493,125 $3,493,125 Station 10 Clinton & Armstrong Replacement 1.54 $210,000 $300,000 $332,000 $511,280 10,900 $736 $8,022,400 $8,533,680 $2,133,420 $10,667,100 $10,967,100 Station 12 Marks & Acacia Replacement 1.50 $210,000 $1,400,000 $332,000 $498,000 10,900 $736 $8,022,400 $8,520,400 $2,130,100 $10,650,500 $12,050,500 Station 15 Clovis & Park Cir Dr. Expansion - $210,000 $0 $332,000 $0 3,450 $810 $2,794,500 $2,794,500 $698,625 $3,493,125 $3,493,125 Station 19 Belmont & Marks Expansion - $210,000 $0 $332,000 $0 4,000 $810 $3,240,000 $3,240,000 $810,000 $4,050,000 $4,050,000 Station 21 Belmont & Van Ness New 1.50 $210,000 $315,000 $332,000 $498,000 10,900 $736 $8,022,400 $8,520,400 $2,130,100 $10,650,500 $10,965,500 Station 22 North & Chestnut New 1.50 $210,000 $315,000 $332,000 $498,000 10,900 $736 $8,022,400 $8,520,400 $2,130,100 $10,650,500 $10,965,500 Station 23 Church & Fruit New 1.50 $210,000 $315,000 $332,000 $498,000 10,900 $736 $8,022,400 $8,520,400 $2,130,100 $10,650,500 $10,965,500 Station 24 Herndon & Brawley New 1.50 $210,000 $315,000 $332,000 $498,000 10,900 $736 $8,022,400 $8,520,400 $2,130,100 $10,650,500 $10,965,500 Station 25 McKinley & DeWolf New 1.50 $210,000 $315,000 $332,000 $498,000 10,900 $736 $8,022,400 $8,520,400 $2,130,100 $10,650,500 $10,965,500 Station 26 Calif. & Temperance New 1.50 $210,000 $315,000 $332,000 $498,000 10,900 $736 $8,022,400 $8,520,400 $2,130,100 $10,650,500 $10,965,500 Station 27 Teague & Chestnut New 1.50 $210,000 $315,000 $332,000 $498,000 10,900 $736 $8,022,400 $8,520,400 $2,130,100 $10,650,500 $10,965,500 Station 28 Champlain & Friant New 1.50 $210,000 $315,000 $332,000 $498,000 10,900 $736 $8,022,400 $8,520,400 $2,130,100 $10,650,500 $10,965,500 Station 29 Barstow & Brawley New 1.50 $210,000 $315,000 $332,000 $498,000 10,900 $736 $8,022,400 $8,520,400 $2,130,100 $10,650,500 $10,965,500 Station 30 Dakota & Brawley New 1.50 $210,000 $315,000 $332,000 $498,000 10,900 $736 $8,022,400 $8,520,400 $2,130,100 $10,650,500 $10,965,500 Station 31 Central & Cherry New 1.50 $210,000 $315,000 $332,000 $498,000 10,900 $736 $8,022,400 $8,520,400 $2,130,100 $10,650,500 $10,965,500 TOTAL $6,530,000 $13,282,152 217,100 $177,057,928 $190,340,080 $47,585,020 $237,925,100 $244,455,100 [1] Estimated fee-funded portion of training facility calculated below:

Training Facility
Grant-Funded Initial Phase 25.00 $210,000 $5,250,000 - $3,663,128 - - $12,136,872 $15,800,000 $3,950,000 $19,750,000 $25,000,000 Fee-Funded Remainder - - - - $4,636,872 - - $15,363,128 $20,000,000 $5,000,000 $25,000,000 $25,000,000 Total 25.00 $210,000 $5,250,000 $332,000 $8,300,000 - - $27,500,000 $35,800,000 $8,950,000 $44,750,000 $50,000,000 CIP_fire3
Source: Fresno Fire Department and EPS.
[1] Cost per building square foot based on costs for recently constructed public safety buildings. Expansion costs assumed to be 10% higher than new construction costs.

Planned Fire
Facilities
Site Imp. & Parking

LAND ACQUISITION CONSTRUCTION
TOTAL
VALUE
Building Subtotal
Structure
Value
Total
Structure
Value
Prepared by EPS 3/31/2022 Z:\Shared\Projects\SAC\212000\212007 Fresno Nexus Studies\Task 2 Fire and Police\Models\212007 Fire m8.xlsx 20 DRAFT
Table 10
Fresno Fire Impact Fee Program Update
Planned Fire Apparatus and Equipment (2022 $)
Item Number Source of Cost per Unit
Engines [1] 11 $889,000 $9,779,000 FFD estimate in 2021 [1] Fire Trucks [1] 6 $1,402,000 $8,412,000 FFD estimate in 2021 [1] Squads [1] 15 $160,000 $2,400,000 FFD estimate in 2021 [1] Patrol Rigs [2] 2 $345,000 $690, 000 FFD estimate in 2021 Breathing Support Super Vac [2] 1 $265,000 $265,000 2019 Fire Impac t Fee Nexus Study; escalated at 3% a year for 2 years.

Brush Rigs [2] 2 $371,000 $742,000 2019 Fire Impact Fee Nexus Study; escalated at 3% a year for 2 years.

Decon Hazmat Trailer [2] 1 $945, 000 $945,000 FFD est imate in 2021 Water Tenders [2] 2 $451,000 $902,000 2019 Fire Impact Fee Nexus Study; escalated at 3% a year for 2 years.

Super Vacs [2] 2 $557,000 $1,114,000 2019 Fire Impact Fee Nexus Study; escalated at 3% a year for 2 years.

SUVs/Trucks [2] 15 $90,000 $1, 350,000 FFD estim ate in 2021 COMM/Command Unit [2] 1 $530,000 $530,000 2019 Fire Impact Fee Nexu s Study; escalated at 3% a year for 2 years.

Water Rescue Vehicle [3] 1 $100, 000 $100,000 FFD Draft Master Plan 2020-2035 (6/13/19) : planned in 2022 Aircraft Rescue and Firefighting Vehicle [3] 1 $881,000 $881,000 FF D Draft Master Plan 2020-2035 (6/13/19): $935,000 in 2023 discounted by 3% annually to 2022 $ Universal Search and Rescue (USAR) Vehicle [3] 1 $840,000 $840,000 FFD Draft Master Plan 2020-2035 (6/13/19): $945,000 in 2025 discounted by 3% annually to 2022 $ USAR Tow Vehicle] [3] 1 $100,000 $100,000 FFD Draft Master Plan 2020-2035 (6/13/19) : planned in 2022 Personal Equipment [4] 278 $8,000 $2,224,000 2019 Fire Impact Fee Nexus Study; escalated a t 3% a year for 2 years.

TOTAL $31,274,000
CIP_fire4
Source: Fresno Fire Department; EPS.
[1] Number of vehicles derived from Current and Future Fire Stations with Daily Staffing Map (total vehicles less existing vehicles from Table 8). [2] Number from 2019 Fire Impact Fee Nexus Study.
[3] Number from Fresno Fire Department Draft Master Plan 2020-2035 (6/13/19). [4] Number based on standard of 0.81 firefighters per 1,000 residents. See Table 8 for number of current officers.

Cost
per Unit
Planned Fire Apparatus and Equipment
Total
Cost
Prepared by EPS 3/31/2022 Z:\Shared\Projects\SAC\212000\212007 Fresno Nexus Studies\Task 2 Fire and Police\Models\212007 Fire m8.xlsx 21 Report: Fire Development Impact Fee Program Nexus Study Update—2022 June 2022
22 Economic & Planning Systems, Inc. (EPS)
Cost Allocation
Introduction
The Fire Fees are estimated by allocating the FFD capital costs (detailed in the previous chapter) to the various land uses based on each land use’s relative demand for fire services. The general process outlined below is used to allocate costs:
 Emergency call activity is used to estimate the relative demand for FFD services and to allocate capital costs to residents and employees. This allocation is used to establish a cost per resident and a cost per employee.  For each residential land use, the cost per resident is converted to a cost per dwelling unit using average persons per household assumptions.  For each nonresidential land use, the cost per employee is converted to a cost per thousand building square feet using average square feet per employee assumptions.
 The costs per dwelling unit and per thousand building square feet are equivalent to the base fees by land use. In addition, the City charges an administration fee to administer the fee program.

This methodology provides an appropriate estimate of the relative impact each land use has on the public safety system. The resulting fees are summarized in Table 1 of this 2022 Nexus Study.

FFD Capital Costs Allocation
Table 11 details the allocation of FFD service calls to residents and employees and the resulting estimated FFD cost per resident and cost per employee.

Table 12 details the methodology used to convert the FFD cost per resident and cost per employee to costs per dwelling unit and thousand building square feet by land use.

As summarized in the introduction of this chapter, emergency call activity was used to estimate each land use’s relative demand for fire services. FFD capital costs were allocated to the various land uses based on this relative demand.

DRAFT
Table 11
Fresno Fire Impact Fee Program Update
Fire Improvements Cost per Resident/Employee (2022 $)
Item Formula Residential Nonresidential Total
Annual Calls for Service [1]
A 38,994 5,120 44,114
2021 Service Area Residents and Employees [2] B 586,770 219,509 806,279 Calls per Resident or Employee C = A / B 0.07 0.02 0.05 Allocation Factor [3] D = C / Residential C 1.00 0.35
2035 Residents/Employees [2] E 771,000 276,529 1,047,529 2035 Persons Served F=D*E 771,000 97,049 868,049
Percentage Distribution of Persons Served G 89% 11% 100% Total Costs [4] H=G*Total Cost $518,636,257 $65,282,773 $583,919,030 Cost per Resident/Employee H / E $673 $236
firepol
Source: City of Fresno and EPS
[1] See Table D-1.
[2] See Table 3.
[3] The allocation factor accounts for the relative impact of an employee as compared to that of a resident. [4] See Table 6 for total costs.

Prepared by EPS 3/31/2022 Z:\Shared\Projects\SAC\212000\212007 Fresno Nexus Studies\Task 2 Fire and Police\Models\212007 Fire m8.xlsx 23 DRAFT
Table 12
Fresno Fire Impact Fee Program Update
Fire Improvements Cost Allocation (2022 $)
Item
Cost per
Person
Persons
per Unit
Bldg. Sq. Ft.
per Employee
Employees per
1,000 Bldg. Sq. Ft.

Cost per Unit/
1,000 Bldg. Sq. Ft.
[1] [2] [2]
Formula A B C D= 1000 / C A*B or
A*D
Residential
Single-Family $673 3.33 - - $2,240
Multifamily $673 2.54 - - $1,709
Subtotal Residential
Nonresidential
Retail $236 - 400 2.50 $590
Office $236 - 350 2.86 $675
Industrial $236 - 700 1.43 $337
Subtotal Nonresidential
fire_alloc
Source: EPS
[1] See Table 11.
[2] See Table 5.

Prepared by EPS 3/31/2022 Z:\Shared\Projects\SAC\212000\212007 Fresno Nexus Studies\Task 2 Fire and Police\Models\212007 Fire m8.xlsx 24 Report: Fire Development Impact Fee Program Nexus Study Update—2022 June 2022
Economic & Planning Systems, Inc. (EPS) 25
The specific steps in allocating the FFD capital costs are outlined below. Please refer to Appendix D for call activity detail referenced in Step 3, refer to Table 11 for Steps 3 through 7, and refer to Table 12 for Step 8:

1. Identify the capital costs to be funded by the Fire Fee Program, as detailed in Chapter 3.

2. Identify the service population and employees for residential and nonresidential uses, respectively in the buildout horizon year of 2035, as detailed in Chapter 2.

3. Using the calls for service data provided by the FFD, determine the distribution of service calls between residential and nonresidential uses (see Table D-1 through Table D-3). Then estimate the number of calls per resident or employee.

4. Divide the number of calls per employee by the number of calls per resident (both from Step 3) to determine the resident equivalent factor (shown in Tables 11 as “Allocation Factor”) for nonresidential uses. This factor is used to estimate the relative impact of an employee as compared to a resident.

5. Estimate residential and nonresidential persons served in 2035. For residential uses, the number of persons served equals the estimated 2035 population.

For nonresidential uses, the number of persons served equals the estimated 2035 employees multiplied by the Allocation Factor from Step 4.

6. Allocate the capital costs from Step 1 to residential and nonresidential uses based on the percentage distribution of the estimated persons served from Step 5.

7. Divide the residential costs from step 6 by the estimated 2035 population from Step 2 to determine a cost per resident. Divide the nonresidential costs from Step 6 by the estimated 2035 employees from Step 2 to determine a cost per employee.

8. Multiply the cost per person from Step 7 by persons per household for each residential use and by employees per 1,000 building square feet for each nonresidential use. The result will be the base fee per residential dwelling unit and per thousand nonresidential building square feet.

Administration
In addition to the base Fire Fee for each developable land use, the City charges a fee to administer the Fire Fee Program. The administration fee charged per residential dwelling unit and thousand nonresidential building square feet is 2 percent of the base fee.

Report: Fire Development Impact Fee Program Nexus Study Update—2022 June 2022
26 Economic & Planning Systems, Inc. (EPS)
Implementation
The Fire Fees presented in this 2022 Nexus Study are based on the best cost estimates and land use information available at this time. If costs, development projections, or funding sources other than development impact fees change significantly, the fees should be adjusted accordingly.

The proposed updated Fire Fee schedule must be adopted by the City Council. The updated fees will be effective 60 days following final action on the adoption of this 2022 Nexus Study Update and any associated fee resolution(s) establishing the updated fees.

The City should conduct periodic reviews of the estimated development, costs, and associated funding sources. Based on these reviews, the City should make necessary adjustments to the fee. Each year the City should apply an appropriate inflation adjustment factor to the fee to reflect changes in construction costs. As required by AB 602, the City shall update the nexus study no later than every eight years.

Applicability of Fee Program
Once the updated Fire Fee Program takes effect, the updated Fire Fees will be collected from all new residential and nonresidential development within the boundary of the City prior to building permit issuance. The Fire Fees will be charged per dwelling unit and commercial building square foot.

Additions to Existing Development
An addition to existing development is considered new development for the purposes of this 2022 Nexus Study and will be included in the Fire Fee Program if the covered building square footage of the addition increases the existing structure size by more than 500 square feet.

Accessory Dwelling Units
In accordance with State of California (State) law, accessory dwelling units (ADUs) will be included in the Fire Fee Program and charged a fee if the ADU is 750 square feet or greater. The fees for ADUs shall be charged proportionately in relation to the square footage of the primary dwelling unit.

Report: Fire Development Impact Fee Program Nexus Study Update—2022 June 2022
Economic & Planning Systems, Inc. (EPS) 27
Fee Exemptions
The following types of development are specifically exempt from the Fire Fee Program:
 All public agencies, including federal and state agencies, public school districts, and the City, unless other arrangements or agreements are established with the City.
 Any internal or external alternation or modification to existing residential and nonresidential buildings when no change in use occurs and the square footage increase is 500 building square feet or less.
 Any replacement or reconstruction of any structure that is damaged or destroyed as a result of fire, flood, explosion, wind, earthquake, riot, or other calamity, or act of God. If the building replaced or reconstructed exceeds the documented total floor area of the damaged/destroyed building, the excess square footage is subject to the Fire Fee. If a structure has been vacant for more than one year, no exemption or credit shall apply. If a structure is replaced with an alternative land use, such as replacing a single family home with a commercial building, no exemption shall apply.
 Residential accessory structures that do not increase covered building square footage such as open decks and pools.
 ADUs that are under 750 square feet. These ADUs are currently exempted from development impact fee programs by State law. A change in the State law could result in ADUs under 750 square feet no longer being exempted.

With written approval from the FFD, any or all of the Fire Fees may be waived if the City determines that a proposed project will not impact the need for fire improvements for which the fee is being collected. Written fee waivers may be available on a case-by-case basis for certain agricultural facilities, temporary structures (including temporary mobile homes), or other facilities that are determined to have no impact on the need for fire improvements identified in the Fire Fee Program.

Fee Credits or Adjustments
The purpose of the Fire Fee Program is to provide funds to construct/acquire new fire protection improvements. Although it is not currently anticipated that developers will construct/acquire fire protection improvements included in the fee program (other than Station 18), should this occur, the developers may enter into a fee credit and reimbursement agreement with the City.

Report: Fire Development Impact Fee Program Nexus Study Update—2022 June 2022
28 Economic & Planning Systems, Inc. (EPS)
Reimbursement to Developers
In the event a developer or developers do construct/acquire any fire protection improvements included in the Fire Fee Program, fee credits and reimbursements will be provided under the following conditions.
 Developer-installed/acquired improvements shall be considered for credits and/or reimbursements. Only funds collected from the Fire Fee Program shall be used to reimburse a developer who installed eligible facility improvements or acquired eligible equipment identified in the CIP.
 The value of any developer-installed/acquired improvement for fee credit or reimbursement purposes shall be based upon the lesser of the actual costs or the cost estimates (as updated) used to establish the amount of the Fire Fees.  The use of accumulated fee revenues shall be used in the following priority order: (1) critical projects, (2) repayment of inter-fund loans, and (3) repayment of accrued reimbursement to private developers.

A project is deemed to be a “critical project” when failure to complete the project prohibits further development within the City.

Periodic Inflation Adjustment and Fee
Review
The Fire Fee schedule should be adjusted annually to account for the inflation of construction and land acquisition costs. It is recommended that the Fire Fees be adjusted on July 1 of each year beginning on July 1, 2023. The adjustment will be based on the percentage change in the 20-City Construction Cost Index (CCI) as reported in the Engineering News Record (ENR) for the 12-month period ending in May of the year of the adjustment.

In addition, the Fire Fees are subject to periodic adjustment based on changes in developable land, cost estimates, or other funding sources. The City should review the Fire Fees periodically to determine if any of the following adjustments to the fees are warranted:
 Changes to the required facilities or equipment listed in the CIPs.  Changes in the cost to update or administer the fee.
 Changes in costs because of inflation.
 Changes in assumed development.
 Changes in other funding sources.

Any proposed changes to the Fire Fees based on the periodic review must be presented to City Council before any adjustment of the fee.

Report: Fire Development Impact Fee Program Nexus Study Update—2022 June 2022
Economic & Planning Systems, Inc. (EPS) 29
Fee Administration
Consistent with the current programs, the Fire Fees will be collected from new development within the City at the time of building permit issuance; however, use of these funds may need to wait until a sufficient fund balance can be accrued.

Per Government Code Section 66006, the City is required to deposit, invest, account for, and expend the fee in a prescribed manner.

Five-Year Review
By the fifth fiscal year following the first deposit into the Fire Fee account or fund, and every 5 years thereafter, the City is required to make all of the following findings with respect to that portion of the account or fund remaining unexpended:
 Identify the purpose of the fee.
 Demonstrate a reasonable relationship between the fee and the purpose for which it is charged.
 Identify all sources and amounts of funding anticipated to complete financing for incomplete fire protection improvements.
 Designate the approximate dates that the funding referred to above is expected to be deposited in the appropriate account or fund.

The City must refund the unexpended or uncommitted revenue portion for which a need could not be demonstrated in the above findings, unless the administrative costs exceed the amount of the refund.

Report: Fire Development Impact Fee Program Nexus Study Update—2022 June 2022
30 Economic & Planning Systems, Inc. (EPS)
AB 1600 Nexus Findings
Authority
This report has been prepared to update the Fire Fees in accordance with the procedural guidelines established in AB 1600, which is codified in California Government Section 66000 et. seq. This code section sets forth the procedural requirements for establishing and collecting development impact fees. The procedures require that a “reasonable relationship or nexus must exist between a governmental exaction and the purpose of the condition.” 1 Specifically, each local
agency imposing a fee must:
 Identify the purpose of the fee.
 Identify how the fee is to be used.
 Determine how a reasonable relationship exists between the fee’s use and the type of development project on which the fee is imposed.  Determine how a reasonable relationship exists between the need for the public facility and the type of development project on which the fee is imposed.
 Demonstrate a reasonable relationship between the amount of the fee and the cost of the public facility or portion of the public facility attributable to the development on which the fee is imposed.

As documented in this report, AB 602 added a new California Government Code Section 66016.5 that establishes “standards and practices” that a local agency must follow when preparing a nexus study. This section identifies California Government Code Section 66016.5 provisions that have been addressed in this nexus study.

Summary of Nexus Findings
The development impact fees to be collected for each land use are calculated based on the proportionate share of the total facility use that each land use represents. With this approach, the following findings are made concerning the City’s Fire Fee Program.

1 Public Needs & Private Dollars; William Abbott, Marian E. Moe, and Marilee Hanson, page 109.

Report: Fire Development Impact Fee Program Nexus Study Update—2022 June 2022
Economic & Planning Systems, Inc. (EPS) 31
Purpose of Fee
New development in the City will increase the service population and, therefore, the need for new fire capital improvements to adequately serve the new residents and employees. The purpose of the Fire Fee Program updated through this 2022 Nexus Study is to fund the new fire facilities, vehicles, and equipment necessary to serve new residential and nonresidential development in the City.

Use of Fees
Fire Fee revenue will be used to construct new development’s proportionate share of fire buildings, as well as to acquire fire vehicles and equipment necessitated by new development. It also will be used to plan for and design fire facilities and fund the studies and administration needed to support the programs.

Relationship between Use of Fees and Type of Development The Fire Fees will be used to construct new fire facilities and acquire the vehicles and equipment needed to provide fire protection to the projected new service population. A reasonable relationship exists between the use of the Fire Fees and the residential and commercial development on which the fees are charged because the fees will be used to provide the fire facilities, vehicles, and equipment needed to serve the new residents and employees generated by the new development.

Relationship between Need for Facility and Type of Project New residential and nonresidential development will generate new residents and employees, resulting in the need for additional fire facilities, vehicles, and equipment to meet the new demand for fire services. A reasonable relationship exists between the need for the fire improvements and the type of new development projects because new fire facilities, vehicles, and equipment will be required to adequately serve the new development types that will result in an increased service population.

Relationship between Amount of Fees and Cost of or Portion of Facility Attributed to Development on which Fee is Imposed The costs of fire facilities, vehicles, and equipment needed to serve new development are allocated among the new residential and nonresidential development based on service call activity. Using this method, fire costs per resident and per employee are estimated. These costs are converted to costs per dwelling unit and thousand nonresidential building square feet by land use using persons per household for residential development and employees per thousand

Report: Fire Development Impact Fee Program Nexus Study Update—2022 June 2022
32 Economic & Planning Systems, Inc. (EPS)
building square feet for nonresidential development. For each land use, the base Fire Fee is equal to the allocated cost per dwelling unit or thousand building square feet. A reasonable relationship exists between the amount of the Fire Fees and the costs of the improvements attributable to new residential and nonresidential development on which the fees are imposed because the fees are derived using appropriate cost allocation factors as measures of the proportional demand for fire services generated by each development type.

AB 602 Requirements
The following text includes specific language from the newly enacted AB 602 that applies to preparation of this nexus study.

On or after January 1, 2022, a local agency that conducts and impact fee nexus study shall follow all of the following standards and practices:
 When applicable, the nexus study shall identify the existing level of service for each public facility, identify the proposed new level of service, and include an explanation of why the new level of service is appropriate.  If a nexus study supports the increase of an existing fee, the local agency shall review the assumptions of the nexus study supporting the original fee and evaluate the amount of fees collected under the original fee.  Large jurisdictions (as defined in Section 66016.5) shall adopt a capital improvement plan as part of the nexus study.
 Studies shall be updated at least every eight years, from the period beginning on January 1, 2022.

Level of Service
Levels of service can be measured in a variety of ways. This section describes how various levels of service standards and evaluations have informed preparation of this nexus study. First, the Fresno General Plan sets forth the level of service standards of 0.81 firefighters per 1,000 City residents. This level of service standard informs both the number of fire stations required as well as the amount of equipment that is required.

Existing and Proposed Level of Service
The City has documented its existing and proposed level of service by evaluating the number of fire stations per capita. Presently, the City has 0.039 fire stations per 1,000 residents. The proposed level of service, at City General Plan buildout anticipates a service level of 0.051 fire stations per 1,000 residents.

Report: Fire Development Impact Fee Program Nexus Study Update—2022 June 2022
Economic & Planning Systems, Inc. (EPS) 33
Factoring both the existing and proposed level of service, this nexus study includes a proposed Fire Fees update based on a “buildout level of service” approach to calculating the maximum justifiable fee. This method evaluates the overall fire capital facility needs, both existing plus planned development, and allocates the costs of such facilities to the total planned City service population (residents and employees) at City General Plan buildout.

Nexus Study Review
Because this nexus study is proposing an increase to an existing fee, the City is required to review the assumptions of the nexus study that was prepared to support the original fee and evaluate the amount of fees collected under the original fee.

The City last prepared an update to the City’s Fire Fees in 2019. The City complies with California Government Code Section 66006 and prepares annual reports for the Fire Fees. Through preparation of these annual reports, the City has evaluated and tracked the amount of fees collected under the original fee that was last updated in 2019. In the course of preparing those annual updates, the City has reviewed the assumptions of the 2019 nexus study prepared for the last Fire Fees update and has determined the cost estimates in that study are not sufficient to fund the City’s planned fire facilities that are required to serve new service population in the City. Therefore, based on the review of the prior nexus study and tracking and evaluation of fees collected under the original fee, the City determined this Fire Fees nexus study update was warranted.

Capital Improvement Plan
Appendix E includes the CIP that is being adopted by the City with this nexus study. This section, as well as the information in Appendices C and E, describes the approximate location, size, time of availability, and estimated cost of all facilities or improvements to be funded with the Fire Fees. Table E-1 identifies the planned size, location, and estimated cost of proposed fire station facilities.

Fire apparatus and equipment identified in Table E-2 would be acquired as needed when stations are constructed, and as new firefighters and personnel are added, for which the equipment is identified.

To derive estimated bond financing costs, the City provided estimates on the timing of future facilities. As shown on Table C-5, the City estimates every 3 years that one new facility, facility expansion, and replacement station would be constructed.

Report: Fire Development Impact Fee Program Nexus Study Update—2022 June 2022
34 Economic & Planning Systems, Inc. (EPS)
While the size, location, and approximate time of availability for fire capital facilities and equipment is indicated herein, the exact timing and location of planned improvements is contingent on myriad factors such as the amount, pace, and location of new development, availability and timing of impact fee revenues and other funding sources, and facility and design and construction schedules.

As such, the size, location, and approximate timing of fire capital facilities may vary from the amounts included herein.

Nexus Study Updates
Beginning with January 1, 2022, AB 602 requires nexus studies to be updated at least once every 8 years.

APPENDICES:

Appendix A: Population and
Employment Backup
Appendix B: Land Acquisition and
Facilities Construction Costs
Appendix C: Fire Facilities and
Apparatus Bond Financing
Appendix D: Fresno Fire Department
Service Call Activity
Appendix E: Capital Improvement Program

APPENDIX A:

Population and
Employment Backup

Table A-1 Estimated Persons per Household .......................... A-1 Table A-2 Estimated City Employment—2021 ........................ A-2

DRAFT
Table A-1
Fresno Fire Impact Fee Program Update
Estimated Persons per Household
Item Formula
Value
2019 US Census American Community Survey Data
Occupied Housing Units
Single Family (attached and detached) A 109,431
Multifamily B 55,631
Total 165,062
Population in Occupied Housing Units
Single Family (attached and detached) C 364,333
Multifamily D 141,336
Total 505,669
Single Family Persons per Household C/A 3.33
Multifamily Persons per Household D/B 2.54
pph
Source: US Census American Community Survey 2015-2019 Tables B25032 and B25033; EPS.

Prepared by EPS 3/31/2022 Z:\Shared\Projects\SAC\212000\212007 Fresno Nexus Studies\Task 2 Fire and Police\Models\212007 Fire m8.xlsx A-1
DRAFT
Table A-2
Fresno Fire Impact Fee Program Update
Estimated City Employment - 2021
Year
Employed
Residents
Cit
y
Employment Percentage
Formula AB B / A
U.S. Census Bureau (OnTheMap) Data - All Jobs
2014 178,329 209,923 117.7%
2015 184,815 210,527 113.9%
2016 194,000 225,306 116.1%
2017 199,044 232,331 116.7%
2018 202,850 236,037 116.4%
2019 204,306 236,014 115.5%
Avg. City Employ. as Pct. of Employed Resid (rounded) 116.1% California Employment Development Department Data
2021 (September) 216,800 251,705
Employment Growth (2014-2021) 41,782
Total Employment Growth (2014-2035) 108,000
from General Plan
Less Estimated Employment Growth (2014-2021) (41,782)
Remaining Employment Growth (2021-2035) 66,218
emp
Source: U.S. Census Bureau (OnTheMap); California EDD
est. as emp. resid. * 116%
Prepared by EPS 3/31/2022 Z:\Shared\Projects\SAC\212000\212007 Fresno Nexus Studies\Task 2 Fire and Police\Models\212007 Fire m8.xlsx A-2

APPENDIX B:

Land Acquisition and
Facilities Construction Costs

Table B-1 Fire and Police Land Acquisition and
Facilities Construction Cost ................................... B-1 Table B-2 Construction Cost Inflation Factors ........................ B-2

DRAFT
Table B-1
Fresno Fire Impact Fee Program Update
Fire and Police Land Acquisition and Facilities Construction Cost (2022 $) Item
Square
Feet Acres
Total
Cost
Cost
per Acre
Adj. Cost
per Acre
Total
Cost
Cost
per Acre
Bldg.

Sq. Ft.

Total
Cost
Cost per
Sq. Ft.

Bldg.

Sq. Ft.

Total
Cost
Cost per
Sq. Ft.

Adj. Cost
per Sq. Ft.

Fire Station Cost Estimates
Fire Station 6, 10, and 12 [2] 2018 3.6% 67,200 1.54 $300,000 $194,46 4 $201,561 N/A N/A 10,900 $10,000,000 $917 N/A N/A N/A N/A Fire Station 18 [3] 2021 0.0% 84,506 1.94 $400,000 $206,186 $206,186 N/A N/A 10,678 $8,500,000 $796 N/A N/A N/A N/A Site Improvement Cost Estimate
Southeast Police Substation [4] 2020 0.0% 109,513 2.51 N/A N/A N/A $ 834,232 $331,825 10,318 $6,445,245 $625 N/A N/A N/A N/A County Sheriff Substation [5] 2021 0.0% N/A N/A N/A N/A N/A N/A N/ A 22,700 $9,500,000 $419 35,520 $1,968,875 $55 N/A Storage Facility (2016 Nexus Study) 2016 14.3% N/ A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A $121 $138 Fire Unit Costs to Use $210,000 $332,000 $920
Fire Unit Costs to Use Net of 25% Soft Costs $736
Police Unit Costs to Use [6] $210,000 $332,000 $520 $140 unit cost
Source: City; EPS.
[1] See T
able B-2.
[2] Land cost for Station 10. T
otal construction cost for replacement stations 6, 10, and 12 estimated by FFD. FFD estimates that construction cost for new stations will range from $8.5 M to 12.5 M. [3] T
otal construction cost provided by FFD based on actual costs. [4] F
or Southeast Police Substation, total cost = $7,279,477. Construction cost = construction contract amount. Site improvements cost = remaining cost. [5] C
onstruction and storage facility costs estimated by City based on total bid amount of $11,468,875 for substation and storage facility. [6] Building construction cost = av
erage of cost per building square foot for Southeast Police Substation and County Sheriff Substation.

Storage Facility Construction Cost
Year
CCI
Adjust.
[1]
Site Size Land Cost Site Improvements Building Construction Cost Prepared by EPS 3/31/2022 Z:\Shared\Projects\SAC\212000\212007 Fresno Nexus Studies\Task 2 Fire and Police\Models\212007 Fire m8.xlsx B-1
DRAFT
Table B-2
Fresno Fire Impact Fee Program Update
Construction Cost Inflation Factors
Year Change Pct. Change
20-City Annual Average CCI
2015 10,031 1,435 14.3%
2016 10,339 1,127 10.9%
2017 10,737 729 6.8%
2018 11,062 404 3.6%
2019 11,281 185 1.6%
2020 11,466
cci
Source: Engineering News Record
Annual
Average CCI
Change in CCI
(from year shown to 2020)
Prepared by EPS 3/31/2022 Z:\Shared\Projects\SAC\212000\212007 Fresno Nexus Studies\Task 2 Fire and Police\Models\212007 Fire m8.xlsx B-2

APPENDIX C:

Fire Facilities and
Apparatus Bond Financing

Table C-1 Estimated Net Effective Financing Cost—
Existing Fire Facilities ........................................... C-1 Table C-2 Debt Service and Financing Cost Summary ............. C-2 Table C-3 Debt Service and Financing Cost Detail ................... C-3 Table C-4 Future Facilities and Apparatus Bond Funding .......... C-4 Table C-5 Future Facilities and Apparatus Bond
Construction Proceeds and Schedule ...................... C-5

DRAFT
Table C-1
Fresno Fire Impact Fee Program Update
Estimated Net Effective Financing Cost - Existing Fire Facilities [1] Item
Formula Facilities
Total Existing Bond Size 7,590,000.00
Land Acquisition and Construction Proceeds 7,590,000.00 Facility Cost Percent of Total Bond Size A 100.00%
Present Value of Remaining Debt Service (2023-2039) at 3.00% B $7,613,383 Less Remaining Construction and Land Acquisition Proceeds Land Acquisition and Construction Proceeds C $7,590,000 Less Const. & Land Acq. Proceeds Already Paid (100.% of principal payments made) D=A*$0.92M ($920,000) Subtotal E=C+D $6,670,000
Financing Costs B-E $943,383
Financing Costs (Rounded) B-E $940,000
Fiscal Annual Principal Interest
PAYMENT SCHEDULE Year Debt Service Payment Payment
Assumption
2018 $326,183 $0 $326,183
Estimated Inflation Factor [2] 3.00% 2019 $575,813 $210,000 $365,813 Bond Term (Years) 30 2020 $580,313 $225,000 $355,313
2021 $579,063 $235,000 $344,063
2022 $582,313 $250,000 $332,313
Subtotal $2,643,683 $920,000 $1,723,683
2023 $579,813 $260,000 $319,813
2024 $576,813 $270,000 $306,813
2025 $573,313 $280,000 $293,313
2026 $579,313 $300,000 $279,313
2027 $574,313 $310,000 $264,313
2028 $578,813 $330,000 $248,813
2029 $582,313 $350,000 $232,313
2030 $574,813 $360,000 $214,813
2031 $581,813 $385,000 $196,813
2032 $577,563 $400,000 $177,563
2033 $577,563 $420,000 $157,563
2034 $581,563 $445,000 $136,563
2035 $579,313 $465,000 $114,313
2036 $581,063 $490,000 $91,063
2037 $576,563 $510,000 $66,563
2038 $581,063 $540,000 $41,063
2039 $575,813 $555,000 $20,813
2040 $0 $0 $0
Subtotal $9,831,813 $6,670,000 $3,161,813
Total $12,475,495 $7,590,000 $4,885,495
ex bond1
Source: Fresno 2017 Lease Revenue Bonds Debt Service Schedule for Fire Projects (Infrastructure Fee) [1] Financing costs for Station 18 are excluded because the present value of the remaining loan payments is less than the remaining principal to be paid, resulting in remaining financing costs less than zero. This situation occurs because the annual loan interest rate (2.44%) is low
er than the discount rate (3%) used to estimate the present value. [2] Annual fee program inflation is recommended to be based on the annual change in ENR-CCI. Thi s analysis assumes 3.00%.

Debt Service Paid
Remaining Debt Service
Existing Facilities
Prepared by EPS 3/31/2022 Z:\Shared\Projects\SAC\212000\212007 Fresno Nexus Studies\Task 2 Fire and Police\Models\212007 Fire m8.xlsx C-1
DRAFT
Table C-2
Fresno Fire Impact Fee Program Update
Debt Service and Financing Cost Summary Planned Facilities Planned Fire Facilities and Apparatus
Item
Year Bond Financing
Source: Table C-3
Present Value of Debt Service $288,371,113
Less Construction Proceeds ($186,882,570)
Financing Costs $101,488,543
Financing Costs (Rounded) $101,500,000
2023 $0
2024 $0
2025 $1,518,541
2026 $1,518,541
2027 $1,518,541
2028 $3,037,082
2029 $3,037,082
2030 $3,037,082
2031 $4,555,624
2032 $4,555,624
2033 $6,214,831
2034 $6,214,831
2035 $9,251,740
2036 $9,251,740
2037 $13,053,273
2038 $13,053,273
2039 $14,712,481
2040 $14,712,481
2041 $14,712,481
2042 $14,712,481
2043 $14,712,481
2044 $14,712,481
2045 $14,712,481
2046 $14,712,481
2047 $14,712,481
2048 $14,712,481
2049 $14,712,481
2050 $14,712,481
2051 $14,712,481
2052 $14,712,481
2053 $14,712,481
2054 $14,712,481
2055 $13,193,939
2056 $13,193,939
2057 $13,193,939
2058 $11,675,398
2059 $11,675,398
2060 $11,675,398
2061 $10,156,857
2062 $10,156,857
2063 $8,497,650
2064 $8,497,650
2065 $5,460,741
2066 $5,460,741
2067 $1,659,207
2068 $1,659,207
2069 $0
Total $441,374,418
bond1
Source: City of Fresno, Fresno Fire Department, and EPS.

Financing Costs
Debt Service Schedule
Prepared by EPS 3/31/2022 Z:\Shared\Projects\SAC\212000\212007 Fresno Nexus Studies\Task 2 Fire and Police\Models\212007 Fire m8.xlsx C-2
DRAFTTable C-3
Fresno Fire Impact Fee Program Update
Debt Service and Financing Cost Detail (2022 $)
Planned Fire Facilities and Apparatus
Item Source Total 2025 2028 2031 2033 2035 2037 2039
Bond Interest Rate 5.25%
Bond Term (years) 30
Const. Proceeds Pct. 85%
Estimated Inflation Factor 3.00%
Construction Proceeds Table C-4 $186,882,570 $19,288,990 $19,288,990 $19,288,990 $21,075,775 $38,575,775 $48,288,275 $21,075,775 Total Bond Size $219,861,847 $22,692,929 $22,692,929 $22,692,929 $24,795,030 $45,383,265 $56,809,736 $24,795,030 Annual Debt Service $1,518,541 $1,518,541 $1,518,541 $1,659,207 $3,036,909 $3,801,533 $1,659,207 First Year Table C-4 2025 2028 2031 2033 2035 2037 2039 Last Year 2054 2057 2060 2062 2064 2066 2068
Present Value of Debt Service $288,371,113 $29,764,078 $29,764,078 $29,764,078 $32,521,196 $59,524,755 $74,511,730 $32,521,196 Less Bond Proceeds ($186,882,570) ($19,288,990) ($19,288,990) ($19,288,990) ($21,075,775) ($38,575,775) ($48,288,275) ($21,075,775) Financing Costs $101,488,543 $10,475,088 $10,475,088 $10,475,088 $11,445,421 $20,948,980 $26,223,455 $11,445,421 Year
2023 $0 $0 $0 $0 $0 $0 $0 $0
2024 $0 $0 $0 $0 $0 $0 $0 $0
2025 $1,518,541 $1,518,541 $0 $0 $0 $0 $0 $0
2026 $1,518,541 $1,518,541 $0 $0 $0 $0 $0 $0
2027 $1,518,541 $1,518,541 $0 $0 $0 $0 $0 $0
2028 $3,037,082 $1,518,541 $1,518,541 $0 $0 $0 $0 $0
2029 $3,037,082 $1,518,541 $1,518,541 $0 $0 $0 $0 $0
2030 $3,037,082 $1,518,541 $1,518,541 $0 $0 $0 $0 $0
2031 $4,555,624 $1,518,541 $1,518,541 $1,518,541 $0 $0 $0 $0 2032 $4,555,624 $1,518,541 $1,518,541 $1,518,541 $0 $0 $0 $0 2033 $6,214,831 $1,518,541 $1,518,541 $1,518,541 $1,659,207 $0 $0 $0 2034 $6,214,831 $1,518,541 $1,518,541 $1,518,541 $1,659,207 $0 $0 $0 2035 $9,251,740 $1,518,541 $1,518,541 $1,518,541 $1,659,207 $3,036,909 $0 $0 2036 $9,251,740 $1,518,541 $1,518,541 $1,518,541 $1,659,207 $3,036,909 $0 $0 2037 $13,053,273 $1,518,541 $1,518,541 $1,518,541 $1,659,207 $3,036,909 $3,801,533 $0 2038 $13,053,273 $1,518,541 $1,518,541 $1,518,541 $1,659,207 $3,036,909 $3,801,533 $0 2039 $14,712,481 $1,518,541 $1,518,541 $1,518,541 $1,659,207 $3,036,909 $3,801,533 $1,659,207 2040 $14,712,481 $1,518,541 $1,518,541 $1,518,541 $1,659,207 $3,036,909 $3,801,533 $1,659,207 2041 $14,712,481 $1,518,541 $1,518,541 $1,518,541 $1,659,207 $3,036,909 $3,801,533 $1,659,207 2042 $14,712,481 $1,518,541 $1,518,541 $1,518,541 $1,659,207 $3,036,909 $3,801,533 $1,659,207 2043 $14,712,481 $1,518,541 $1,518,541 $1,518,541 $1,659,207 $3,036,909 $3,801,533 $1,659,207 2044 $14,712,481 $1,518,541 $1,518,541 $1,518,541 $1,659,207 $3,036,909 $3,801,533 $1,659,207 2045 $14,712,481 $1,518,541 $1,518,541 $1,518,541 $1,659,207 $3,036,909 $3,801,533 $1,659,207 2046 $14,712,481 $1,518,541 $1,518,541 $1,518,541 $1,659,207 $3,036,909 $3,801,533 $1,659,207 2047 $14,712,481 $1,518,541 $1,518,541 $1,518,541 $1,659,207 $3,036,909 $3,801,533 $1,659,207 2048 $14,712,481 $1,518,541 $1,518,541 $1,518,541 $1,659,207 $3,036,909 $3,801,533 $1,659,207 2049 $14,712,481 $1,518,541 $1,518,541 $1,518,541 $1,659,207 $3,036,909 $3,801,533 $1,659,207 2050 $14,712,481 $1,518,541 $1,518,541 $1,518,541 $1,659,207 $3,036,909 $3,801,533 $1,659,207 2051 $14,712,481 $1,518,541 $1,518,541 $1,518,541 $1,659,207 $3,036,909 $3,801,533 $1,659,207 2052 $14,712,481 $1, 518,541 $1,518,541 $1,518,541 $1,659,207 $3,036,909 $3,801,533 $1,659,207 2053 $14,712,481 $1,518,541 $1,518,541 $1,518,541 $1,659,207 $3,036,909 $3,801,533 $1,659,207 2054 $14,712,481 $1,518,541 $1,518,541 $1,518,541 $1,659,207 $3,036,909 $3,801,533 $1,659,207 2055 $13,193,939 $0 $1,518,541 $1,518,541 $1,659,207 $3,036,909 $3,801,533 $1,659,207 2056 $13,193,939 $0 $1,518,541 $1,518,541 $1,659,207 $3,036,909 $3,801,533 $1,659,207 2057 $13,193,939 $0 $1,518,541 $1,518,541 $1,659,207 $3,036,909 $3,801,533 $1,659,207 2058 $11,675,398 $0 $0 $1,518,541 $1,659,207 $3,036,909 $3,801,533 $1,659,207 2059 $11,675,398 $0 $0 $1,518,541 $1,659,207 $3,036,909 $3,801,533 $1,659,207 2060 $11,675,398 $0 $0 $1,518,541 $1,659,207 $3,036,909 $3,801,533 $1,659,207 2061 $10,156,857 $0 $0 $0 $1,659,207 $3,036,909 $3,801,533 $1,659,207 2062 $10,156,857 $0 $0 $0 $1,659,207 $3,036,909 $3,801,533 $1,659,207 2063 $8,497,650 $0 $0 $0 $0 $3,036,909 $3,801,533 $1,659,207 2064 $8,497,650 $0 $0 $0 $0 $3,036,909 $3,801,533 $1,659,207 2065 $5,460,741 $0 $0 $0 $0 $0 $3,801,533 $1,659,207
2066 $5,460,741 $0 $0 $0 $0 $0 $3,801,533 $1,659,207
2067 $1,659,207 $0 $0 $0 $0 $0 $0 $1,659,207
2068 $1,659,207 $0 $0 $0 $0 $0 $0 $1,659,207
2069 $0 $0 $0 $0 $0 $0 $0 $0
TOTAL $441,374,418 $45,556,237 $45,556,237 $45,556,237 $49,776,221 $91,107,268 $114,045,999 $49,776,221 bond detail
Source: City of Fresno, Fresno Fire Department, and EPS.

Annual Debt Service
Year
Prepared by EPS 3/31/2022 Z:\Shared\Projects\SAC\212000\212007 Fresno Nexus Studies\Task 2 Fire and Police\Models\212007 Fire m8.xlsx C-3
DRAFTTable C-4
Fresno Fire Impact Fee Program Update
Future Facilities and Apparatus Bond Funding (2022 $)
Planned Facility Location
Improvement
Type
Land
Costs
Site Imp.
& Parking Building Soft
Construction
Subtotal
Total
Costs Pct. [1] Cost
excl land [2]
Percentage Bond Funded 0% 70% 70% 70% 70%
Formula A B C D E=B+C+D F=A+E G H=G*Total H F+H
New Stations (11)
Station 21 Belmont & Van Ness New $0 $348,600 $5,615,680 $1,491,070 $7,455,350 $7,455,350 7.4% $1,511,592 $8,966,942 Station 22 North & Chestnut New $0 $348,600 $5,615,680 $1,491,070 $7,455,350 $7,455,350 7.4% $1,511,592 $8,966,942 Station 23 Church & Fruit New $0 $348,600 $5,615,680 $1,491,070 $7,455,350 $7,455,350 7.4% $1,511,592 $8,966,942 Station 24 Herndon & Brawley New $0 $348,600 $5,615,680 $1,491,070 $7,455,350 $7,455,350 7.4% $1,511,592 $8,966,942 Station 25 McKinley & DeWolf New $0 $348,600 $5,615,680 $1,491,070 $7,455,350 $7,455,350 7.4% $1,511,592 $8,966,942 Station 26 Calif. & Temperance New $0 $348,600 $5,615,680 $1,491,070 $7,455,350 $7,455,350 7.4% $1,511,592 $8,966,942 Station 27 Teague & Chestnut New $0 $348,600 $5,615,680 $1,491,070 $7,455,350 $7,455,350 7.4% $1,511,592 $8,966,942 Station 28 Champlain & Friant New $0 $348,600 $5,615,680 $1,491,070 $7,455,350 $7,455,350 7.4% $1,511,592 $8,966,942 Station 29 Barstow & Brawley New $0 $348,600 $5,615,680 $1,491,070 $7,455,350 $7,455,350 7.4% $1,511,592 $8,966,942 Station 30 Dakota & Brawley New $0 $348,600 $5,615,680 $1,491,070 $7,455,350 $7,455,350 7.4% $1,511,592 $8,966,942 Station 31 Central & Cherry New $0 $348,600 $5,615,680 $1,491,070 $7,455,350 $7,455,350 7.4% $1,511,592 $8,966,942 Subtotal New $0 $3,834,600 $61,772,480 $16,401,770 $82,008,850 $82,008,850 81.8% $16,627,515 $98,636,365 Average New $0 $348,600 $5,615,680 $1,491,070 $7, 455,350 $7,455,350 $1,511,592 $8, 966,942 Expansion Stations (7)
Station 2 West & Fir Expansion $0 $0 $1,956,150 $489,038 $2,445,188 $2,445,188 2.4% $495,768 $2,940,956 Station 5 Fresno & Shields Expansion $0 $0 $1,956,150 $489,038 $2,445,188 $2,445,188 2.4% $495,768 $2,940,956 Station 7 Cherry & Jensen Expansion $0 $0 $2,268,000 $567,000 $2,835,000 $2,835,000 2.8% $574,804 $3,409,804 Station 8 Cedar & Butler E xpansion $0 $0 $2,268,000 $567,000 $2,835,000 $2,835,000 2.8% $574,804 $3,409,804 Station 9 Clinton & Fruit E xpansion $0 $0 $1,956,150 $489,038 $2,445,188 $2,445,188 2.4% $495,768 $2,940,956 Station 15 Clovis & Park Cir Dr. Expansion $0 $0 $1,956,150 $489,038 $2,445,188 $2,445,188 2.4% $495,768 $2,940,956 Station 19 Belmont & Marks Expansion $0 $0 $2,268,000 $567,000 $2,835,000 $2,835,000 2.8% $574,804 $3,409,804 Subtotal Expansion $0 $0 $14, 628,600 $3,657,150 $18, 285,750 $18,285,750 18.2% $3,707,485 $21,993,235 A
verage Expansion $0 $0 $2, 089,800 $522,450 $2,612,250 $2,612,250 $529,641 $3,141,891 Replacement Stations (3)
Station 6 Gettysburg & Rowell Replacement $0 $348,600 $4,945,920 $1,3 23,630 $6,618,150 $6,618,150 0.0% $0 $6,618,150 Station 10 Clinton & Armstrong Replacement $0 $357,896 $5,615,680 $1, 493,394 $7,466,970 $7,466,970 0.0% $0 $7,466,970 Station 12 Marks & Acacia R eplacement $0 $348,600 $5,615,680 $1,491,0 70 $7,455,350 $7,455,350 0.0% $0 $7,455,350 Subtotal Replacement $0 $1, 055,096 $16,177,280 $4, 308,094 $21,540,470 $21,540,470 0.0% $0 $21,540,470 Average Replacement $0 $351,699 $5,392,427 $1,436,031 $7,180,157 $7,1 80,157 $0 $7,180,157 Training Facility - Second Phase Undetermined Replacement $0 $3,245,810 $10,754,190 $3,500,000 $17,500,000 $17, 500,000 0.0% $0 $1 7,500,000 Shop Facility Undetermined Replacement $0 $1,162,000 $20,608,000 $5,442,500 $27,212,500 $27, 212,500 0.0% $0 $2 7,212,500 Total $0 $9,297,506 $123,940,550 $33,309,514 $166,547,570 $166,547,570 100.0% $20,335,000 $186,882,570 Total New and Expansion Stations $0 $3,834,600 $76,401,080 $20,058,920 $100,294,600 $100,294,600 100.0% $20,335,000 $120,629,600 bond
Source: City of Fresno, Fresno Fire Department, and EPS. [1] Percentage of "Total New and Expansion Stations" cost.

Apparatus CostConstruction Costs Total
Bond/Loan
Funded Cost
Prepared by EPS 3/31/2022 Z:\Shared\Projects\SAC\212000\212007 Fresno Nexus Studies\Task 2 Fire and Police\Models\212007 Fire m8.xlsx C-4
DRAFT
Table C-5
Fresno Fire Impact Fee Program Update
Future Facilities and Apparatus Bond Construction Proceeds and Schedule (2022 $) Year
Total
Cost Number
Total
Cost Number
Total
Cost Number
Total
Cost Shop
Avg. Bond-Funded Cost per Station [1] $8,966,942 $3,141,891 $7,180,157 2025 $19,288,990 1 $8, 966,942 1 $3,141, 891 1 $7,180,157 - - 2028 $19,288,990 1 $8, 966,942 1 $3, 141,891 1 $7,180,157 - - 2031 $19,288,990 1 $8, 966,942 1 $3, 141,891 1 $7,180,157 - - 2033 $21,075,775 2 $17, 933,885 1 $3,141,891 - - - - 2035 $38,575,775 2 $17, 933,885 1 $3, 141,891 - - $17,500,000 - 2037 $48,288,275 2 $17, 933,885 1 $3, 141,891 - - - $27,212,500 2039 $21,075,775 2 $17, 933,885 1 $3,141,891 - - - - Total $186,882,570 11 $98,636,365 7 $21,993,235 3 $21,540,47 0 $17,500,000 $27,212,500 sched
Source: City of Fresno, Fresno Fire Department, and EPS. [1] See Table C-4.

New Stations Expansion Stations Replacement Stations
Training
Center
Prepared by EPS 3/31/2022 Z:\Shared\Projects\SAC\212000\212007 Fresno Nexus Studies\Task 2 Fire and Police\Models\212007 Fire m8.xlsx C-5

APPENDIX D:

Fresno Fire Department
Service Call Activity

Table D-1 Distribution of Fire Call Activity (2 pages) .............. D-1 Table D-2 Detailed Fire Call Activity, 2015-2020 (2 pages) ..... D-3 Table D-3 Estimated Allocation of Uncategorized
Fire Call Activity ................................................. D-5

DRAFT

Page 1 of 2 ends

Fresno Fire Impact Fee Program Update
Distribution of Fire Call Activity
Code [1] Type of Call Resid. Nonresid. Resid. Nonresid. [2]
Fire Calls
r Residential 1,133 100.0% 0.0% 1,133 0
nr Health Care, Detention, Correction 10 0.0% 100.0% 0 10 nr Mercantile, Business 180 0.0% 100.0% 0 180
nr Industrial, Utility, Defense, Agriculture, Mining 39 0.0% 100.0% 03 9 nr Manufacturing, Processing 13 0.0% 100.0% 0 13
sh Assembly 92 90.9% 9.1% 83 8
sh Educational 26 90.9% 9.1% 24 2
sh Storage 74 90.9% 9.1% 67 7
sh Outside or Special Property 2,217 90.9% 9.1% 2,015 202 sh None 6 90.9% 9.1% 5 1
sh Undetermined 6 90.9% 9.1% 5 1
sh Property use, Other 15 90.9% 9.1% 13 1
Subtotal 3,809 3,346 463
Medical Aid/Rescue
r Residential 19,636 100.0% 0.0% 19,636 0
nr Health Care, Detention, Correction 930 0.0% 100.0% 0 930 nr Mercantile, Business 978 0.0% 100.0% 0 978
nr Industrial, Utility, Defense, Agriculture, Mining 28 0.0% 100.0% 02 8 nr Manufacturing, Processing 29 0.0% 100.0% 0 29
sh Assembly 647 90.9% 9.1% 588 59
sh Educational 288 90.9% 9.1% 261 26
sh Storage 115 90.9% 9.1% 104 10
sh Outside or Special Property 5,738 90.9% 9.1% 5,215 523 sh None 188 90.9% 9.1% 171 17
sh Undetermined 1,749 90.9% 9.1% 1,590 159
sh Property use, Other 150 90.9% 9.1% 136 14
Subtotal 30,474 27,701 2,773
Hazardous Conditions
r Residential 644 100.0% 0.0% 644 0
nr Health Care, Detention, Correction 17 0.0% 100.0% 0 17 nr Mercantile, Business 76 0.0% 100.0% 0 76
nr Industrial, Utility, Defense, Agriculture, Mining 9 0.0% 100.0% 0 9 nr Manufacturing, Processing 7 0.0% 100.0% 0 7
sh Assembly 32 90.9% 9.1% 29 3
sh Educational 17 90.9% 9.1% 15 2
sh Storage 9 90.9% 9.1% 8 1
sh Outside or Special Property 286 90.9% 9.1% 260 26
sh None 0 90.9% 9.1% 0 0
sh Undetermined 1 90.9% 9.1% 1 0
sh Property use, Other 2 90.9% 9.1% 2 0
Subtotal 1,100 960 140
Service Calls
r Residential 767 100.0% 0.0% 767 0
nr Health Care, Detention, Correction 18 0.0% 100.0% 0 18 nr Mercantile, Business 100 0.0% 100.0% 0 100
nr Industrial, Utility, Defense, Agriculture, Mining 5 0.0% 100.0% 0 5 nr Manufacturing, Processing 2 0.0% 100.0% 0 2
Percentage of Calls [3]Total Est.

Annual Calls
Estimated Annual Calls
Prepared by EPS 3/31/2022 Z:\Shared\Projects\SAC\212000\212007 Fresno Nexus Studies\Task 2 Fire and Police\Models\212007 Fire m8.xlsx D-1
DRAFT

Page 2 of 2 ends

Fresno Fire Impact Fee Program Update
Distribution of Fire Call Activity
Code [1] Type of Call Resid. Nonresid. Resid. Nonresid. [2]
Percentage of Calls [3]Total Est.

Annual Calls
Estimated Annual Calls
sh Assembly 39 90.9% 9.1% 35 4
sh Educational 17 90.9% 9.1% 16 2
sh Storage 85 90.9% 9.1% 77 8
sh Outside or Special Property 470 90.9% 9.1% 427 43
sh None 2 90.9% 9.1% 2 0
sh Undetermined 8 90.9% 9.1% 7 1
sh Property use, Other 7 90.9% 9.1% 7 1
Subtotal 1,520 1,338 182
False Alarms
r Residential 1,200 100.0% 0.0% 1,200 0
nr Health Care, Detention, Correction 309 0.0% 100.0% 0 309 nr Mercantile, Business 517 0.0% 100.0% 0 517
nr Industrial, Utility, Defense, Agriculture, Mining 31 0.0% 100.0% 03 1 nr Manufacturing, Processing 65 0.0% 100.0% 0 65
sh Assembly 191 90.9% 9.1% 174 17
sh Educational 283 90.9% 9.1% 257 26
sh Storage 140 90.9% 9.1% 128 13
sh Outside or Special Property 30 90.9% 9.1% 28 3
sh None 1 90.9% 9.1% 1 0
sh Undetermined 7 90.9% 9.1% 6 1
sh Property use, Other 13 90.9% 9.1% 12 1
Subtotal 2,787 1,805 981
Other
r Residential 1,574 100.0% 0.0% 1,574 0
nr Health Care, Detention, Correction 79 0.0% 100.0% 0 79 nr Mercantile, Business 240 0.0% 100.0% 0 240
nr Industrial, Utility, Defense, Agriculture, Mining 21 0.0% 100.0% 02 1 nr Manufacturing, Processing 13 0.0% 100.0% 0 13
sh Assembly 100 90.9% 9.1% 90 9
sh Educational 62 90.9% 9.1% 56 6
sh Storage 110 90.9% 9.1% 100 10
sh Outside or Special Property 1,658 90.9% 9.1% 1,507 151 sh None 54 90.9% 9.1% 49 5
sh Undetermined 466 90.9% 9.1% 424 42
sh Property use, Other 50 90.9% 9.1% 45 5
Subtotal 4,424 3,844 580
Grand Total 44,114 38,994 5,120
Share of Total 88.4% 11.6%
call dist
Source: Fresno Fire Department
[1] Categorization by EPS. Code as follows:
r = Directly Assigned to Residential
nr = Directly Assigned to Nonresidential
sh = Shared Assignment based on Potential Service. See Table D-3 for percentage split between residential and nonresidential. [2] 2015-2020 average. See Table D-2.
[3] See Table D-3 for pct. allocation of shared assignment calls.

Prepared by EPS 3/31/2022 Z:\Shared\Projects\SAC\212000\212007 Fresno Nexus Studies\Task 2 Fire and Police\Models\212007 Fire m8.xlsx D-2
DRAFT

Page 1 of 2 ends

Table D-2
Fresno Fire Impact Fee Program Update
Detailed Fire Call Activity, 2015-2020
Code [1] Type of Call 2015 2016 2017 2018 2019 2020 Total Average Fire Calls
r Residential 1,045 1,163 1,136 1,128 1,150 1,176 6,798 1,133 n r H e a l t h C a r e , D e t e n t i o n , C o r r e c t i o n 98 1 8598 5 71 0 nr Mercantile, Business 137 144 174 186 182 258 1,081 180 nr Industrial, Ut ility, Defense, Agriculture, Mining 34 50 38 30 28 52 232 39 nr Manufacturing, Processing 13 19 6 22 9 11 80 13
sh Assembly 71 69 83 84 91 151 549 92
sh Educational 28 32 21 30 22 24 157 26
sh Storage 68 69 85 61 76 85 444 74
sh Outside or Special Property 1,407 1,774 1,875 2,013 2,244 3,989 13,3 02 2,217 s h N o n e 1501 2 06 3 3 6
sh Undetermined 73267 1 0 3 5 6
sh Property use, Other 18 24 8 9 10 19 88 15
Subtotal 2,838 3,360 3,446 3,575 3,848 5,789 22,856 3,809 Medical Aid/Rescue
r Residential 19,603 19,725 21,262 19,892 19,349 17,982 117,813 19,636 nr Health Care, Detention, Correction 1,000 898 897 890 999 893 5,577 93 0 nr Mercantile, Business 909 956 1,002 1,089 1,035 878 5,869 978 nr Industrial, Ut ility, Defense, Agriculture, Mining 37 33 28 28 30 10 166 28 nr Manufacturing, Processing 44 29 22 22 27 30 174 29
sh Assembly 668 643 753 705 729 381 3,879 647
sh Educational 348 338 356 327 278 78 1,725 288
sh Storage 116 111 106 149 122 85 689 115
sh Outside or Special Property 5,386 6,105 6,088 5,895 5,774 5,179 34,4 27 5,738 sh None 23 16 25 463 399 204 1,130 188
sh Undetermined 1,788 1,960 1,634 2,005 1,865 1,243 10,495 1,749 sh Property use, Other 251 209 171 95 71 100 897 150
Subtotal 30,173 31,023 32,344 31,560 30,678 27,063 182,841 30,474 Hazardous Conditions
r Residential 622 596 678 656 696 617 3,865 644
nr Health Care, Detention, Correction 17 21 20 16 13 15 102 17 nr Mercantile, Business 76 62 75 84 90 69 456 76
nr Industrial, U tility, Defense, Agriculture, Mining 14 6 1 1887 5 4 9 nr Manufacturing, Processing 1 574247 3 9 7
sh Assembly 33 34 33 33 27 31 191 32
sh Educational 14 20 21 21 16 9 101 17
sh Storage 7 3 11 10 10 13 54 9
sh Outside or Special Property 281 292 302 310 297 236 1,718 286 s h N o n e 0000000 0
sh Undetermined 0031048 1
sh Property use, Other 621211 1 3 2
Subtotal 1,085 1,043 1,159 1,143 1,162 1,009 6,601 1,100 Service Calls
r Residential 739 617 690 825 932 801 4,604 767
nr Health Care, Detention, Correction 21 11 17 14 21 26 110 18 nr Mercantile, Business 93 89 101 103 98 114 598 100
nr Industrial, Ut ility, Defense, Agriculture, Mining 626626 2 8 5 nr Manufacturing, Processing 412133 1 4 2
sh Assembly 41 49 32 45 43 23 233 39
sh Educational 20 19 16 20 23 5 103 17
sh Storage 54 102 92 105 76 80 509 85
sh Outside or Special Property 340 370 464 550 554 541 2,819 470 s h N o n e 032051 1 1 2
sh Undetermined 13 8 1 1734 4 6 8
sh Property use, Other 1487851 4 3 7
Subtotal 1,345 1,279 1,440 1,684 1,765 1,605 9,118 1,520 2015-2020
Prepared by EPS 3/31/2022 Z:\Shared\Projects\SAC\212000\212007 Fresno Nexus Studies\Task 2 Fire and Police\Models\212007 Fire m8.xlsx D-3
DRAFT

Page 2 of 2 ends

Table D-2
Fresno Fire Impact Fee Program Update
Detailed Fire Call Activity, 2015-2020
Code [1] Type of Call 2015 2016 2017 2018 2019 2020 Total Average 2015-2020
False Alarms
r Residential 1,260 1,072 1,159 1,200 1,352 1,159 7,202 1,200 nr Health Care, Detention, Correction 372 336 282 315 285 262 1,852 309 nr Mercantile, Business 628 511 506 495 471 488 3,099 517 nr Industrial, Ut ility, Defense, Agriculture, Mining 29 41 29 24 28 36 187 31 nr Manufacturing, Processing 64 59 63 63 74 64 387 65
sh Assembly 226 225 153 167 214 163 1,148 191
sh Educational 342 328 300 287 255 185 1,697 283
sh Storage 165 125 146 134 132 140 842 140
sh Outside or Special Property 25 34 28 36 29 30 182 30 s h N o n e 0011114 1
sh Undetermined 102548 1 3 4 2 7
sh Property use, Other 26 21 1 3559 7 91 3
Subtotal 3,147 2,754 2,685 2,731 2,854 2,550 16,721 2,787 Other
r Residential 1,553 1,671 1,684 1,502 1,563 1,468 9,441 1,574 nr Health Care, Detention, Correction 72 76 92 72 75 87 474 79 nr Mercantile, Business 208 265 260 216 231 258 1,438 240 nr Industrial, Ut ility, Defense, Agriculture, Mining 25 33 16 22 9 22 1 27 21 nr Manufacturing, Processing 10 8 19 18 9 11 75 13
sh Assembly 81 116 101 107 106 86 597 100
sh Educational 55 79 68 78 49 40 369 62
sh Storage 172 110 121 101 90 63 657 110
sh Outside or Special Property 1,266 1,587 1,607 1,615 1,747 2,125 9,94 7 1,658 sh None 14 6 21 94 132 58 325 54
sh Undetermined 350 396 454 503 620 475 2,798 466
sh Property use, Other 59 81 57 28 35 38 298 50
Subtotal 3,865 4,428 4,500 4,356 4,666 4,731 26,546 4,424 Total
r Residential 24,822 24,844 26,609 25,203 25,042 23,203 149,723 24,954 nr Health Care, Detention, Correction 1,491 1,350 1,326 1,312 1,402 1, 291 8,172 1,362 nr Mercantile, Business 2,051 2,027 2,118 2,173 2,107 2,065 12,541 2,090 nr Industrial, U tility, Defense, Agriculture, Mining 145 165 128 118 105 133 794 132 nr Manufacturing, Processing 150 123 116 128 126 126 769 128 sh Assembly 1,120 1,136 1,155 1,141 1,210 835 6,597 1,100 sh Educational 807 816 782 763 643 341 4,152 692
sh Storage 582 520 561 560 506 466 3,195 533
sh Outside or Special Property 8,705 10,162 10,364 10,419 10,645 12,10 0 62,395 10,399 sh None 38 30 49 559 557 270 1,503 251
sh Undetermined 2,168 2,369 2,109 2,526 2,503 1,749 13,424 2,237 sh Property use, Other 374 345 257 147 127 168 1,418 236 Total 42,453 43,887 45,574 45,049 44,973 42,747 264,683 44,114 call_detail
Source: Fresno Fire Department
[1] Categorization by EPS. Code as follows:
r = Directly Assigned to Residential
nr = Directly Assigned to Nonresidential
sh = Shared Assignment based on Potential Service
Prepared by EPS 3/31/2022 Z:\Shared\Projects\SAC\212000\212007 Fresno Nexus Studies\Task 2 Fire and Police\Models\212007 Fire m8.xlsx D-4
DRAFT
Table D-3
Fresno Fire Impact Fee Program Update
Estimated Allocation of Uncategorized Fire Call Activit y
Item Formula Population Employees Total
2021 Fire Service Population A 586,770 219,509 806,279
Percentage of Total 72.8% 27.2% 100.0%
Potential Service (Hours per Week) [1] B 168 45
Equivalent Factor [2] C = B / 168 100.0% 26.8%
Equivalent Persons Served D = A x C 586,770 58,797 645,567 Assignment of Uncategorized Calls E = D / Total D 90.9% 9.1% 100.0% call_allocation
Source: City of Fresno and EPS
[1] Maximum hours at home/work.

Resid. hours = 7 days/week *24 hrs/day.

Nonres. hours= 5 days/week*9 hrs/day.
[2] Relates each employee to resident based on potential service hours.

Prepared by EPS 3/31/2022 Z:\Shared\Projects\SAC\212000\212007 Fresno Nexus Studies\Task 2 Fire and Police\Models\212007 Fire m8.xlsx D-5

APPENDIX E:

Capital Improvement Program

DRAFT
Table E-1
Fresno Fire Impact Fee Program Update
Planned Fire Facilities (2022 $)
Item Location
Improvement
Type Acres
Cost
per Acre
Total Land
Value
Cost
per Acre Value Sq. Ft.

Cost per
Sq. Ft. [1] Value
Soft
Costs
Formula A B C=A*B D E=A*D F G H=F*G I=E+H J=I*25% K=I+J C+K New, Replacement, and Expansion
Shop Facility Undetermined Replacement 5.00 $210,000 $1,050,000 $332,000 $1,660,000 40,000 $736 $29,440,000 $31,100,000 $7,775,000 $38,875,000 $39,925,000 Training Facility [1] Undetermined Replacement 25.00 $210,000 - - $4,636,872 - - $15,363,128 $20,000,000 $5,000,000 $25,000,000 $25,000,000 Station 2 West & Fir Expansion - $210,000 $0 $332,000 $0 3,450 $810 $2,794,500 $2,794,500 $698,625 $3,493,125 $3,493,125 Station 5 Fresno & Shields Expansion - $210,000 $0 $332,000 $0 3,450 $810 $2,794,500 $2,794,500 $698,625 $3,493,125 $3,493,125 Station 6 Gettysburg & Rowell Replacement 1.50 $210,000 $315,000 $332,000 $498,000 9,600 $736 $7,065,600 $7,563,600 $1,890,900 $9,454,500 $9,769,500 Station 7 Cherry & Jensen Expansion - $210,000 $0 $332,000 $0 4,000 $810 $3,240,000 $3,240,000 $810,000 $4,050,000 $4,050,000 Station 8 Cedar & Butler Expansion - $210,000 $0 $332,000 $0 4,000 $810 $3,240,000 $3,240,000 $810,000 $4,050,000 $4,050,000 Station 9 Clinton & Fruit Expansion - $210,000 $0 $332,000 $0 3,450 $810 $2,794,500 $2,794,500 $698,625 $3,493,125 $3,493,125 Station 10 Clinton & Armstrong Replacement 1.54 $210,000 $300,000 $332,000 $511,280 10,900 $736 $8,022,400 $8,533,680 $2,133,420 $10,667,100 $10,967,100 Station 12 Marks & Acacia Replacement 1.50 $210,000 $1,400,000 $332,000 $498,000 10,900 $736 $8,022,400 $8,520,400 $2,130,100 $10,650,500 $12,050,500 Station 15 Clovis & Park Cir Dr. Expansion - $210,000 $0 $332,000 $0 3,450 $810 $2,794,500 $2,794,500 $698,625 $3,493,125 $3,493,125 Station 19 Belmont & Marks Expansion - $210,000 $0 $332,000 $0 4,000 $810 $3,240,000 $3,240,000 $810,000 $4,050,000 $4,050,000 Station 21 Belmont & Van Ness New 1.50 $210,000 $315,000 $332,000 $498,000 10,900 $736 $8,022,400 $8,520,400 $2,130,100 $10,650,500 $10,965,500 Station 22 North & Chestnut New 1.50 $210,000 $315,000 $332,000 $498,000 10,900 $736 $8,022,400 $8,520,400 $2,130,100 $10,650,500 $10,965,500 Station 23 Church & Fruit New 1.50 $210,000 $315,000 $332,000 $498,000 10,900 $736 $8,022,400 $8,520,400 $2,130,100 $10,650,500 $10,965,500 Station 24 Herndon & Brawley New 1.50 $210,000 $315,000 $332,000 $498,000 10,900 $736 $8,022,400 $8,520,400 $2,130,100 $10,650,500 $10,965,500 Station 25 McKinley & DeWolf New 1.50 $210,000 $315,000 $332,000 $498,000 10,900 $736 $8,022,400 $8,520,400 $2,130,100 $10,650,500 $10,965,500 Station 26 Calif. & Temperance New 1.50 $210,000 $315,000 $332,000 $498,000 10,900 $736 $8,022,400 $8,520,400 $2,130,100 $10,650,500 $10,965,500 Station 27 Teague & Chestnut New 1.50 $210,000 $315,000 $332,000 $498,000 10,900 $736 $8,022,400 $8,520,400 $2,130,100 $10,650,500 $10,965,500 Station 28 Champlain & Friant New 1.50 $210,000 $315,000 $332,000 $498,000 10,900 $736 $8,022,400 $8,520,400 $2,130,100 $10,650,500 $10,965,500 Station 29 Barstow & Brawley New 1.50 $210,000 $315,000 $332,000 $498,000 10,900 $736 $8,022,400 $8,520,400 $2,130,100 $10,650,500 $10,965,500 Station 30 Dakota & Brawley New 1.50 $210,000 $315,000 $332,000 $498,000 10,900 $736 $8,022,400 $8,520,400 $2,130,100 $10,650,500 $10,965,500 Station 31 Central & Cherry New 1.50 $210,000 $315,000 $332,000 $498,000 10,900 $736 $8,022,400 $8,520,400 $2,130,100 $10,650,500 $10,965,500 TOTAL $6,530,000 $13,282,152 217,100 $177,057,928 $190,340,080 $47,585,020 $237,925,100 $244,455,100 [1] Estimated fee-funded portion of training facility calculated below:

Training Facility
Grant-Funded Initial Phase 25.00 $210,000 $5,250,000 - $3,663,128 - - $12,136,872 $15,800,000 $3,950,000 $19,750,000 $25,000,000 Fee-Funded Remainder - - - - $4,636,872 - - $15,363,128 $20,000,000 $5,000,000 $25,000,000 $25,000,000 Total 25.00 $210,000 $5,250,000 $332,000 $8,300,000 - - $27,500,000 $35,800,000 $8,950,000 $44,750,000 $50,000,000 CIP_fire3
Source: Fresno Fire Department and EPS.
[1] Cost per building square foot based on costs for recently constructed public safety buildings. Expansion costs assumed to be 10% higher than new construction costs.

Planned Fire
Facilities
Site Imp. & Parking

LAND ACQUISITION CONSTRUCTION
TOTAL
VALUE
Building Subtotal
Structure
Value
Total
Structure
Value
Prepared by EPS 3/31/2022 Z:\Shared\Projects\SAC\212000\212007 Fresno Nexus Studies\Task 2 Fire and Police\Models\212007 Fire m8.xlsx

DRAFT
Table E-2
Fresno Fire Impact Fee Program Update
Planned Fire Apparatus and Equipment (2022 $)
Item Number Source of Cost per Unit
Engines [1] 11 $889,000 $9,779,000 FFD estimate in 2021 [1] Fire Trucks [1] 6 $1,402,000 $8,412,000 FFD estimate in 2021 [1] Squads [1] 15 $160,000 $2,400,000 FFD estimate in 2021 [1] Patrol Rigs [2] 2 $345,000 $690, 000 FFD estimate in 2021 Breathing Support Super Vac [2] 1 $265,000 $265,000 2019 Fire Impac t Fee Nexus Study; escalated at 3% a year for 2 years.

Brush Rigs [2] 2 $371,000 $742,000 2019 Fire Impact Fee Nexus Study; escalated at 3% a year for 2 years.

Decon Hazmat Trailer [2] 1 $945, 000 $945,000 FFD est imate in 2021 Water Tenders [2] 2 $451,000 $902,000 2019 Fire Impact Fee Nexus Study; escalated at 3% a year for 2 years.

Super Vacs [2] 2 $557,000 $1,114,000 2019 Fire Impact Fee Nexus Study; escalated at 3% a year for 2 years.

SUVs/Trucks [2] 15 $90,000 $1, 350,000 FFD estim ate in 2021 COMM/Command Unit [2] 1 $530,000 $530,000 2019 Fire Impact Fee Nexu s Study; escalated at 3% a year for 2 years.

Water Rescue Vehicle [3] 1 $100, 000 $100,000 FFD Draft Master Plan 2020-2035 (6/13/19) : planned in 2022 Aircraft Rescue and Firefighting Vehicle [3] 1 $881,000 $881,000 FF D Draft Master Plan 2020-2035 (6/13/19): $935,000 in 2023 discounted by 3% annually to 2022 $ Universal Search and Rescue (USAR) Vehicle [3] 1 $840,000 $840,000 FFD Draft Master Plan 2020-2035 (6/13/19): $945,000 in 2025 discounted by 3% annually to 2022 $ USAR Tow Vehicle] [3] 1 $100,000 $100,000 FFD Draft Master Plan 2020-2035 (6/13/19) : planned in 2022 Personal Equipment [4] 278 $8,000 $2,224,000 2019 Fire Impact Fee Nexus Study; escalated a t 3% a year for 2 years.

TOTAL $31,274,000
CIP_fire4
Source: Fresno Fire Department; EPS.
[1] Number of vehicles derived from Current and Future Fire Stations with Daily Staffing Map (total vehicles less existing vehicles from Table 8). [2] Number from 2019 Fire Impact Fee Nexus Study.
[3] Number from Fresno Fire Department Draft Master Plan 2020-2035 (6/13/19). [4] Number based on standard of 0.81 firefighters per 1,000 residents. See Table 8 for number of current officers.

Cost
per Unit
Planned Fire Apparatus and Equipment
Total
Cost
Prepared by EPS 3/31/2022 Z:\Shared\Projects\SAC\212000\212007 Fresno Nexus Studies\Task 2 Fire and Police\Models\212007 Fire m8.xlsx