CITY OF FRESNO
CATEGORICAL EXEMPTIONS
Environmental Assessment for Installation of Solar Photovoltaic (PV) Canopies at Mary Ella Brown Center
THE
PROJECT DESCRIBED HEREIN IS DETERMINED TO BE CATEGORICALLY
EXEMPT FROM THE PREPARATION OF ENVIRONMENTAL DOCUMENTS
PURSUANT TO ARTICLE 19 OF THE STATE CEQA GUIDELINES.
APP
LICANT: Ann Kloose, Sustainability Manager
City of Fresno Department of Public Works
Sustainability Division
PROJECT LOCATION: 1350 E. Annadale Avenue, Fresno (APN 328-140-27T) PRO
JECT DESCRIPTION: Construction of multiple solar photovoltaic (PV) canopies and associated electrical components over the existing parking lot at the Mary Ella Brown Center. The proposed canopy photovoltaic system is intended to provide a portion of the site’s energy needs, and to generate savings in energy costs.
Thi
s project is exempt under Section s 15303/Class 3; 15304/Class 4; and 15332/Class 11 of the California Environmental Quality Act (CEQA) Guidelines as follows:
15303
/Class 3 New Construction or Conversion of Small Structures ; consists of construction and location of limited numbers of new, small facilities or structures:
(e) Accessory (appurtenant) structures – a canopy photovoltaic system over existing parking lot.
15304
/Class 4 Minor Alterations to Land; consists of minor public or private alterations in the condition of land, water, and/or vegetation which do not involve the removal of mature, scenic trees.
(f) Minor trenching and backfilling where the surface is restored 15311/C
lass 11 Accessory Structures; consists of construction or placement of minor structures accessory to (appurtenant to) existing commercial, industrial, or institutional facilities:
(b) Small parking lots – a canopy photovoltaic system installed on a parking lot as an accessory use to the existing Mary Ella Brown Center
The pr
oposed project meets the criteria noted above. There is no substantial evidence in the record that any of the exceptions to these Categorical Exemptions, set forth in CEQA Guidelines, Section 15300.2 apply to this project. Therefore, no adverse environmental impacts will occurs as a result of the proposed project.
Date: June 7, 2022
P
repared By: Rafik Albert, Vice President of Planning
EPD Solutions, Inc.
(949) 794-1182
1350 E. Annadale Avenue
CEQA Notice of Exemptions
June 7, 2022
Submitted By: ___________________________________
Ann D. Kloose, Sustainability Manager
City of Fresno
Public Works Department